This document provides a job hazard analysis and safety checklist for block masonry and plaster work. It lists potential hazards such as falls, cuts, back strain, and dust inhalation. Protective measures include using proper lifting techniques, restricting block stack heights, wearing PPE like safety shoes and masks, and providing adequate working platforms. A checklist is also included to ensure safety procedures are followed, such as pre-briefing workers, using required PPE, regular tool inspections, and proper housekeeping.
This document provides a job hazard analysis and safety checklist for block masonry and plaster work. It lists potential hazards such as falls, cuts, back strain, and dust inhalation. Protective measures include using proper lifting techniques, restricting block stack heights, wearing PPE like safety shoes and masks, and providing adequate working platforms. A checklist is also included to ensure safety procedures are followed, such as pre-briefing workers, using required PPE, regular tool inspections, and proper housekeeping.
This document provides a job hazard analysis and safety checklist for block masonry and plaster work. It lists potential hazards such as falls, cuts, back strain, and dust inhalation. Protective measures include using proper lifting techniques, restricting block stack heights, wearing PPE like safety shoes and masks, and providing adequate working platforms. A checklist is also included to ensure safety procedures are followed, such as pre-briefing workers, using required PPE, regular tool inspections, and proper housekeeping.
3. Authorization required : Work Permit, Height permit
4. Site Engineer :
SL.NO Sequence of the job Potential Hazards Protective measures to be taken
1. Restrict height of stack of
a) Fall of blocks causing 1. Unloading and blocks to 1.5 m. Storage of concrete injury. 2. Adopt cross tier system of blocks to site b) Cut injury due to storage. edges of blocks. 3. Wear safety shoes. 4. Block should be stacked in cross tier in the trolley. 2. Shifting & stacking of a) Back strain while 1.Blocks should be handled carefully blocks at work place. manual lifting. with gloves to avoid injury.
2.Training should be given to
workers about correct lifting method.
3.No. of blocks stacked on a
platform should not exceed load carrying capacity of the platform.
4.Training for handling method
should be imparted.
3. Preparation of a) Improper handling of 1. Adoption of proper handling method.
cement mortar cement bags.
b) Cement dust causing 1. Use gloves and dust mask
allergy/eye injury. while handling cement bags. 2. Wash eyes with clean water if cement enters in eyes. 4. Laying of concrete a) Fall of platform/fall of 1. Working platform should be block. materials adequate (at least 600mm wide) and securely tied with the scaffolding. 2. No worker should be allowed to work under the area where masonry work is in progress. 3. Loose blocks should not be left on the wall or on working platform at the end of the day. All placed blocks should be joined with cement mortar.
b) Allergy to hand due
Gloves should be used to protect to use of cement mortar. hand. Check list for Block masonry & plaster work Date: Sl. status Description remark No. Yes NO 1 Whether all the workman prie-briefed about the job & hazard. 2 Whether all the workman wearing required P.P.E's. 3 Whether all the workman are screened & fit for the job. 4 Whether regular inspection is carried out for tools & tackles. 5 Ensure Working platform should be adequate (at least 600mm wide) and securely tied with the scaffolding 6 Whether block should be stacked in cross tier in the trolley. 7 Whether ladder is provided as per safety requirement. 8 Whether proper illumination is provided. 9 Ensure that no worker should be allowed to work under the area where masonry work in progress. Special care has been taken while loading & unloading of 10 material 11 Ensure that height permit is taken for height work 12 Check whether proper platform is provided while working on height 13 Check whether proper housekeeping is done around work area 14 Check whether persons working at height are having pass. 15 Ensure height of stack of blocks not more than 1.5 m.