TERM OF REFERENCES (TOR)

VARIATION TO CONTRACT FEASIBILITY STUDY OF MINE MOUTH COAL GASIFICATION


PROJECT
PT. Batubara Kalimantan Gas
1. Background

PT. Batubara Kalimantan Gas as BUMI affiliation had appointed TCC in July, 2018 to
conduct feasibility study for coal gasification to produce some chemicals. After reviewing
market and policy development, BUMI altered product into methanol and DME as final
product.

Table 1 Revised Chemical Plant Capacity

No. Chemical Product Proposed Plant Capacity (MTPA)


1 Methanol 1,000,000
2 Dimethyl Ether (DME) 500,000

2. Scope of Assignment
There is no change in scope of assignment for feasibility study, except for product
specification.

3. Technical Standard
There is no change in technical standard.

4. Manpower Qualification
There is no change in manpower qualification

5. Methodology
There is no change in methodology of feasibility study.

6. Scope of Supply
There is no change in scope of supply

7. Reporting and Schedule


Contractor could use reporting standard as agreed in technical meeting previously and
propose new time schedule with new products.

8. Closing
There is no change in closing methods

Jakarta, October 15 2018

PT. Batubara Kalimantan Gas

xxxxxxxxxx
President Director