Sie sind auf Seite 1von 1

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

NOTE
PILE SCHEDULE
A 1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS OTHERWISE A
COORDINATES   NOTED AND COORDINATES ARE IN MILLIMETERS UNLESS
NO. CUT OFF LEVEL
N E   OTHERWISE NOTED.
2. FINISHED GROUND LEVEL ELEVATION OF PLANT AREA SHALL
A01-1 6706675 3700000 EL.+3000   BE GL±0.00mm = EL.+4,500mm, AND THE
A01-2 6705325 3700000 EL.+3000   FINISHED BUILDING FLOOR LEVEL SHALL BE GL+300mm =  
A02-1 6695475 3700000 EL.+3000   EL.+4,800mm
3. PILE ( ∅ 450 PHC PILE)
A02-2 6694125 3700000 EL.+3000 1) CONCRETE STRENGTH
B01-1 6706675 3708000 EL.+3000 fc = 80MPa
B B01-2 6705325 3708000 EL.+3000 2) TOLERANCE B
- LOCATION : WITHIN 150MM
B02-1 6695475 3708000 EL.+3000 - MAXIMUM INCLINATION : 1/75
B02-2 6694125 3708000 EL.+3000 - LEVEL : WITHIN 50MM
3) TERMINATION CRITERIA
A B C C01-1 6706675 3716000 EL.+3000 - TERMINATION CRIERIA OF EACH PILE TYPE AND INSTALLATION
TN
PN

C01-2 6705325 3716000 EL.+3000 METHOD AREA MENTIONED AS BELOW.


16,000 - DRIVING BY HYDRAULIC HAMMER 7TONS
C02-1 6695475 3716000 EL.+3000
Driving Hammer bruce 70
8,000 8,000 C02-2 6694125 3716000 EL.+3000 Driving Reistance
(mm)
C C
1,350 B CL OF PHC PILE
PHC D450, L=30m, e0 = 3.3

675 675 LOWER MAIN PHC D450, L=40m, e0 = 2.0


REINFORCING BAR
IN FOOTING TOP OF CONCRETE
4) CAPACITY
700MM
N 6,706,000 CAPACITY (KN)

75 100 100
(TYP.)
E 3,716,000 PILE CUT OFF LENGTH(M)
A01-1 B01-1 C01-1

675
BOTTOM OF CONCRETE COMPRESSION UPLIFT LATERAL
1,350

C2 C1 C2 40* 1,200 350 100

675
D D
2,700

1,200
1 FILLED-IN REINFORCING BARS LEAN CONCRETE *NOTE : THE PENETRATION DEPTH OF PILE SHALL BE DETERMINED

1,250
675
(5EA-D14) (fck=13.8MPa) BY DRIVING TERMINATION CRITERIA DURING PILE DRIVING IN SITU
1,350

BUT NOT LIMIED TO THE SPECIFIED LENGTH.


TIE BAR INFILL CONCRETE THE PRESSING LOAD SHALL BE APPLIED 250% OF DESIGN LOAD

675
A01-2 PF2 B01-2 PF2 C01-2 PF2 D14@150 IN CASE OF USING PRESSING MACHINE FOR PILE CONSTRUCTION.
EITHER 40M OR AS PER TERMINATION CRITERIA, WHICHEVER IS
HIGHER.
STEEL PLATE PHC PILE
4. CONCRETE STRENGTH
1.5MM D450
  1) f’c=30.0MPa : ALL BUILDINGS AND THEIR FOUNDATIONS, STACKS
AND ASH SILOS (INCLUDING FOUNDATION)
E E
80 290 80 2) f'c=24.0MPa : OTHER FOUNDATION
  3) f’c=13.8MPa : PLAIN CONCRETE FOR ENCASEMENTS, THRUST
450 BLOCKS, ELECTRICAL DUCTS, LEAN CONCRETE BACKFILL,
B     AND SIMILAR WHERE, f’c=CYLINDER COMPRESSIVE STRENGTH
AT 28 DAY
PIT LINE D14@150(TYP.) D14-5EA 5. REINFORECING BAR STRENGTH
1) ROUND BARS
GRADE SR295, fy=300 MPa
2) DEFORMED BAR
11,200

GRADE SD390, fy=400MPa


F 3) MESH REINFORCEMENT F
THE 28-DAY CYLINDER STRENGTH OF INFILL CONCRETE GRADE SD490, fy=500MPa
SHALL APPLY TO SAME AS FOOTING CONCRETE.

PHC PILE HEAD TREATMENT SECTION


SCALE : 1/30
(D450-A)
REFERENCE DOCUMENTS/DRAWINGS
DOC/DWG NO. TITLE

NS2-UV01-P0ZEN-170102~9 ARCHITECTURE GENERAL STANDARD DRAWINGS


500 500 NS2-VB00-P0ZEN-170001 DESIGN MANUAL FOR CIVIL AND BUILDING STRUCTURES
G NS2-UC07-P0ZEN-110001 SITE PLAN
G
250 250 250 250 NS2-UC07-P0ZEN-110002 PLOT PLAN

NOTE NS2-VE04-P0UYQ-174219 CALCULATION


EL+ 3,500 (T.O.F)
6. CEMENT
A02-1 B02-1 C02-1 TYPE OF CEMENT WILL BE TYPE OF CEMENT WILL BE TYPE 1
PORTLAND CEMENT FOR GENERAL APPLICATIONS
C2 C1 C2 AND FOR SEAWATER APPLICATIONS PORTLAND BLAST FURNACE
250 250

250 250
CEMENT OR EQUIVALENT ALONG WITH WATERPROOFING
500

500
2 COMPOUND SHALL BE USED.
H 7. CONCRETE COVER (CAST-IN-PLACE CONCRTE) H
B CAST-IN-PLACE CONCRETE(NON PRESTRESSED) FOR APPROVAL
A02-2 PF2 B02-2 PF2 C02-2 PF2
N 6,694,800 CONDITION OF EXPOSURE FOUNDATION COLUMN
BEAM
WALL
SLAB THIS DRAWING IS THE PROPERTY OF DOOSAN HEAVY INDUSTRIES VIETNAM.
E 3,700,000 IT IS NOT TO BE COPIED OR USED IN ANY WAY DETRIMENTAL TO THE COMPANY.
CONCRETE NOT - 40 20
EXPOSED TO WATER
CONCRETE EXPOSED TO
EARTH OR WEATHER 75 40 40
(GROUND WATER (75) (75) (75)
B 18.07.2019 FOR APPROVAL C.M.CHOI S.H.PARK J.T.SEO
OR SEA WATER)
J A 15.03.2019 FOR APPROVAL C.M.CHOI S.H.PARK J.T.SEO J
CONCRETE CAST AGAINST
Date
AND PERMANENTLY 75 75 75 Rev. (DD.MM.YYYY) DESCRIPTION DRAWN CHKD. APPD.
EXPOSED TO EARTH Project

8. CHAMFERED CORNERS OF CONCRETE COLUMN & WALL


PILE,FOUNDATION,COLUMN ARRANGEMENT PLAN : ALL EXPOSED CORNERS (ANGLE OF 90‘ OR LESS) OF NGHI SON 2 BOT THERMAL POWER PLANT PROJECT
REINFORCED CONCRETE SHOULD BE CHAMFERED. (25mmX25mm)
SCALE- 1 : 60 9. FOR THE FOLLOWING ITEMS, SEE STANDARD DRAWINGS
UNLESS NOTED OTHERWISE. Owner

- MINIMUM CONCRETE COVER


- HOOK, DEVELOPMENT AND SPLICES OF REBAR
K 10. MEMBERS WITHOUT DIMENSION K
: SYMMETRICAL WITH RESPECT TO CENTER LINE Owner's Engineer

KEY PLAN
Contractor

PN
TN
Doosan Heavy Industries Vietnam

L Sub-supplier L
FOUNDATION SCHEDULE ESP

MEMBER W L H EA B.O.F IDF

PF2 2,700 1,350 600 6 EL+ 2,900 DRAWING TITLE

VEHICLE REPAIR SHOP

DN
Jac
couplings

DN

DN
COLUMN MEMBER LIST PILE, FOUNDATION AND COLUMN ARRANGEMENT
MEMBER W L EA VEHICLE REPAIR SHOP PLAN
M M
C1 500 500 2
SCALE DRAWING NUMBER SHEET NO. REV. NO.
C2 500 500 4
1/60 NS2-XB02-P0UYQ-174241 1 of 1 B

A1 (841 x 594)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

Das könnte Ihnen auch gefallen