Prepared By : Renny Devassy Client : ADCO

TENDER NO.: 16534.01 - EPC OF 42" LP FLARE HEADER AT BAB CDS Checked By : Date : 25/10/2017

Approved By : Rev. 0
WEEKS
Duration
Sr. No. Activity Start Date Finish Date Month - 1 Month - 2 Month - 3 Month - 4 Month - 5 Month - 6 Month - 7 Month - 8 Month - 9 Month - 10 Month - 11 Month - 12 Month - 13 Month - 14 Month - 15 Month - 16 Month - 17 Month - 18 Month - 19 Month - 20 Month - 21
(Days)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88
Tender No.: 16534.01 - EPC of 42" LP Flare Header at BAB CDS 606 1/2/2018 8/31/2019
GENERAL
7 76 1/2/2018 3/19/2018
AWARD OF CONTRACT 1/2/2018
MOBILIZATION OF KEY PERSONNEL 10 1/3/2018 1/13/2018
PREPARATION & SUBMISSION OF PLANNING PACKAGE 30 1/5/2018 2/4/2018
KICK OFF MEETING 1 1/9/2018 1/10/2018
HSE PLAN 45 1/17/2018 3/3/2018
HSE PHILOSOPHY 45 1/20/2018 3/6/2018
APPROVAL OF PLANNING PACKAGE 30 2/17/2018 3/19/2018
HOME OFFICE SERVICES 295 1/3/2018 10/25/2018
DETAILED ENGINEERING 295 1/3/2018 10/25/2018
SITE VISIT, SURVEYS AND REPORTS 42 1/3/2018 2/14/2018
VERIFICATION OF DATA 15 1/3/2018 1/18/2018
RECEIVED ALL THE NECESSARY ADDITIONAL INFORMATION FROM CLIENT 10 1/9/2018 1/19/2018
SITE SURVEY 5 1/19/2018 1/24/2018
SITE SURVEY REPORT (INCLUDING APPROVAL) 20 1/25/2018 2/14/2018
GENERAL 85 1/10/2018 4/5/2018
DESIGN BASIS MEMORANDUM 30 1/10/2018 2/9/2018
DESIGN REVIEW 5 2/5/2018 2/10/2018
DESIGN REVIEW REPORT 30 2/10/2018 3/12/2018
HAZOP REVIEW 5 2/28/2018 3/5/2018
HAZOP CLOSEOUT REPORT 30 3/6/2018 4/5/2018
PROCESS 89 1/25/2018 4/24/2018
FEED ENDORSEMENT REPORT 35 1/25/2018 3/1/2018
CALCULATIONS 45 2/15/2018 4/1/2018
DRAWINGS - PROCESS FLOW DIAGRAMS 30 2/20/2018 3/22/2018
DRAWINGS - P&IDS 35 2/25/2018 4/1/2018
PHILOSOPHIES 50 3/5/2018 4/24/2018
LOSS PREVENTION 81 1/25/2018 4/16/2018
PHILOSOPHIES/PLANS - ENGINEERINGS HSE PLANS 35 1/25/2018 3/1/2018
SPECIFICATIONS DATASHEETS - SAFETY EQUIPMENTS SIGNS 40 2/1/2018 3/13/2018
MATERIALS/SERVICE REQUISTIONS - SAFETY EQUIPMENT 35 2/7/2018 3/14/2018
TECHNICAL BID EVALUATIONS - SAFETY EQUIPMENT 35 2/25/2018 4/1/2018
SAFETY EQUIPMENT DRAWINGS 40 2/15/2018 3/27/2018
FIREWATER UTILITY FLOW DIAGRAMS UFDS & PIDS 60 2/15/2018 4/16/2018
MECHANICAL / PIPING 154 2/20/2018 7/24/2018
VALVE SPECIFICATIONS 25 2/20/2018 3/17/2018
VALVE DATA SHEETS 40 2/27/2018 4/8/2018
DESIGN CALCULATIONS 40 2/23/2018 4/4/2018
PIPING DESING BASIS 30 3/5/2018 4/4/2018
PIPING MATERIAL SPECIFICATIONS 30 2/28/2018 3/30/2018
MR'S 60 3/15/2018 5/14/2018
MATERIAL HANDLING PHILOSOPHIES & STUDY/REPORT 40 3/10/2018 4/19/2018
PIPING STRESS ANALYSIS BASIS OF DESIGN 30 3/5/2018 4/4/2018
TIE-IN PROCEDURES 30 3/8/2018 4/7/2018
STRESS ANALYSIS REPORTS 40 4/1/2018 5/11/2018
TIE-IN SCHEDULE 25 3/25/2018 4/19/2018
MTO'S 25 4/15/2018 5/10/2018
PIPE SUPPORT DETAIL DRAWINGS & SCHEDULE 30 4/25/2018 5/25/2018
DRAWINGS - OVERALL PLOT PLAN, PIPING KEY PLAN 75 5/10/2018 7/24/2018
PIPING GA DRAWINGS 50 5/20/2018 7/9/2018
PIPING LAYOUTS 60 5/25/2018 7/24/2018
ISOMETRICS 60 5/25/2018 7/24/2018
INSTRUMENTATION AND CONTROL 119 2/1/2018 5/31/2018
ENGINEERING & INSTALLATION SPECIFICATION 50 2/1/2018 3/23/2018
CONTROL SYSTEM PHILOSPHY 20 2/15/2018 3/7/2018
INSTRUMENT DATA SHEETS 30 2/25/2018 3/27/2018
MATERIAL/SERVICE REQUISTIONS 30 3/1/2018 3/31/2018
TECHNICAL BID EVALUATIONS 45 3/5/2018 4/19/2018
SYSTEM ARCHITECTURE DIAGRAM 25 3/10/2018 4/4/2018
LOGIC DIAGRAM & NARRATIVES 20 3/20/2018 4/9/2018
CONTROL NARRATIVE 15 3/15/2018 3/30/2018
ALARM AND SET POINT LIST 15 3/25/2018 4/9/2018
CABLE BLOCK DIAGRAM 15 3/28/2018 4/12/2018
I/C LAYOUTS 20 4/4/2018 4/24/2018
I/O LIST 20 4/20/2018 5/10/2018
INSTRUMENT INDEX 15 4/22/2018 5/7/2018
I/C CABLE SCHEDULE 10 4/25/2018 5/5/2018
I/C JUNCTION BOX SCHEDULE 10 4/28/2018 5/8/2018
LOOP DIAGRAMS 10 5/1/2018 5/11/2018
WIRING & TERMINATION DIAGRAM 10 5/5/2018 5/15/2018
HOOK UP DETAILS 15 5/5/2018 5/20/2018
FAT & SAT PROCEDURES 30 5/1/2018 5/31/2018
ELECTRICAL 114 2/1/2018 5/26/2018
BASIS OF DESIGN 25 2/1/2018 2/26/2018
SPECIFICATIONS FOR ALL NEW EQUIPMENTS AND CABLES 15 2/15/2018 3/2/2018
ELECTRICAL DATA SHEETS FOR EQUIPMENT AND CABLES 20 2/25/2018 3/17/2018
MATERIAL REQUISTION 22 3/1/2018 3/23/2018
CABLE SIZING / EARTHING CALCULATIONS 20 3/5/2018 3/25/2018
ELECTRICAL LOAD CALCULATION 15 3/10/2018 3/25/2018
HAZARDOUS AREA CLASSIFICATION LAYOUTS 10 3/20/2018 3/30/2018

Page 1 of 4
Prepared By : Renny Devassy Client : ADCO

TENDER NO.: 16534.01 - EPC OF 42" LP FLARE HEADER AT BAB CDS Checked By : Date : 25/10/2017

Approved By : Rev. 0
WEEKS
Duration
Sr. No. Activity Start Date Finish Date Month - 1 Month - 2 Month - 3 Month - 4 Month - 5 Month - 6 Month - 7 Month - 8 Month - 9 Month - 10 Month - 11 Month - 12 Month - 13 Month - 14 Month - 15 Month - 16 Month - 17 Month - 18 Month - 19 Month - 20 Month - 21
(Days)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88
SINGLE LINE DIAGRAM 15 3/15/2018 3/30/2018
CABLE ROUTING LAYOUTS 20 3/25/2018 4/14/2018
CABLE TRENCH AND ROAD CROSSING SECTION DRAWINGS 20 3/28/2018 4/17/2018
VENDOR DRAWINGS & DOCUMENTS 25 4/4/2018 4/29/2018
EARTHING LAYOUTS 15 4/20/2018 5/5/2018
ELECTRICAL CABLE SCHEDULE 15 4/22/2018 5/7/2018
ELECTRICAL EQUIPMENT / JUNCTION BOX SCHEDULE 10 4/25/2018 5/5/2018
MTO 10 4/28/2018 5/8/2018
ELECTRICAL INTERCONNECTION DIAGRAM 10 5/1/2018 5/11/2018
ELECTRICAL SCHEMATIC WIRING DIAGRAM 10 5/5/2018 5/15/2018
POWER, LIGHTING & EARTHING STANDARD INSTALLATION DETAILS 10 5/5/2018 5/15/2018
EARTHING BARS CONNECTION DIAGRAMS 20 5/5/2018 5/25/2018
PRE-COMMISSIONING, COMMISSIONING & SAT PROCEDURES 25 5/1/2018 5/26/2018
OPERATION & MAINTENANCE MANUALS 25 5/1/2018 5/26/2018
HEALTH, SAFETY AND ENVIRONMENT 207 4/1/2018 10/25/2018
SAFETY AND FIRE FIGHTING EQUIPMENT DATA SHEETS 30 4/1/2018 5/1/2018
HAZARDOUS AREA CLASSIFICATION SCHEDULE 25 4/25/2018 5/20/2018
FIRE DETECTION & PROTECTION PHILOSOPHY 25 5/18/2018 6/12/2018
HAZID/ENVID/OHRA REPORTS & CLOSE OUT REPORT 25 6/5/2018 6/30/2018
HAZOP WORKSHOP AND REPORT & CLOSE OUT REPORT 25 6/25/2018 7/20/2018
PHSER REPORT & CLOSE OUT 25 7/22/2018 8/16/2018
SIMOPS/CONSTRUCTABILITY WORKSHOP & REPORT 25 9/30/2018 10/25/2018
CIVIL AND STRUCTURAL 164 2/20/2018 8/3/2018
TYPICAL DETAILS/STANDARD DRAWINGS 42 3/5/2018 4/16/2018
TOPOGRAPHICAL SURVEY & GEOTECHNICAL INVESTIGATION 10 2/20/2018 3/2/2018
STRUCTURAL CALCULATIONS 100 4/1/2018 7/10/2018
FOUNDATION LAYOUTS AND DETAILED DRAWINGS 100 4/25/2018 8/3/2018
CATHODIC PROTECTION 80 5/5/2018 7/24/2018
CATHODIC PROTECTION SYSTEM 45 5/5/2018 6/19/2018
CORROSION CONTROL & MITIGATION REPORT 45 5/15/2018 6/29/2018
MATERIAL SELECTION REPORT 45 5/22/2018 7/6/2018
MATERIAL SELECTION DIAGRAM 45 5/29/2018 7/13/2018
DESIGN CATHODIC PROTECTION REPORT FOR BURIED LINES 45 6/9/2018 7/24/2018
SUB CONTRACT SERVICES 29 5/11/2018 6/9/2018
TOPOGRAPHIC SURVEY / UNDERGROUND SURVEY 20 5/11/2018 5/31/2018
GEOTECHNICAL INVESTIGATION 20 5/20/2018 6/9/2018
PROCUREMENT, MANUFACTURING AND DELIVERY 240 8/5/2018 4/2/2019
BULK MATERIALS 240 8/5/2018 4/2/2019
INQUIRY 42 8/5/2018 9/16/2018
PIPES & PLATES 5 8/5/2018 8/10/2018
FLANGES & FITTINGS 5 8/7/2018 8/12/2018
STRUCTURAL MATERIALS 5 8/11/2018 8/16/2018
VALVES 5 8/13/2018 8/18/2018
CABLES & JB's 5 8/13/2018 8/18/2018
AC UPS 5 8/15/2018 8/20/2018
SHUTDOWN VALVES FOR SAFETY FUNCTIONS 5 8/18/2018 8/23/2018
F&G DETECTORS 5 8/20/2018 8/25/2018
CONTROL VALVE 5 8/22/2018 8/27/2018
PRESSURE TRANSMITTER 5 8/25/2018 8/30/2018
TEMPERATURE TRANSMITTER & THERMOWELLS 5 8/27/2018 9/1/2018
PRESSURE AND DIFFERENTIAL PRESSURE GAUGE 5 8/29/2018 9/3/2018
ORIFICE PLATE AND RESTRICTION ORIFICE 5 8/31/2018 9/5/2018
ELECTRICAL BULK MATERIALS 10 9/2/2018 9/12/2018
CIVIL BULK MATERIALS 10 9/4/2018 9/14/2018
STRUCTURAL BULK MATERIALS 10 9/6/2018 9/16/2018
RECEIVE BIDS 47 8/11/2018 9/27/2018
PIPES & PLATES 5 8/11/2018 8/16/2018
FLANGES & FITTINGS 5 8/13/2018 8/18/2018
STRUCTURAL MATERIALS 5 8/17/2018 8/22/2018
VALVES 5 8/19/2018 8/24/2018
CABLES & JB's 5 8/19/2018 8/24/2018
AC UPS 5 8/21/2018 8/26/2018
SHUTDOWN VALVES FOR SAFETY FUNCTIONS 5 8/24/2018 8/29/2018
F&G DETECTORS 5 8/26/2018 8/31/2018
CONTROL VALVE 5 8/28/2018 9/2/2018
PRESSURE TRANSMITTER 5 8/31/2018 9/5/2018
TEMPERATURE TRANSMITTER & THERMOWELLS 5 9/2/2018 9/7/2018
PRESSURE AND DIFFERENTIAL PRESSURE GAUGE 5 9/4/2018 9/9/2018
ORIFICE PLATE AND RESTRICTION ORIFICE 5 9/6/2018 9/11/2018
ELECTRICAL BULK MATERIALS 10 9/13/2018 9/23/2018
CIVIL BULK MATERIALS 10 9/15/2018 9/25/2018
STRUCTURAL BULK MATERIALS 10 9/17/2018 9/27/2018
TECHNICAL BID EVALUATION 49 8/20/2018 10/8/2018
PIPES & PLATES 8 8/20/2018 8/28/2018
FLANGES & FITTINGS 8 8/22/2018 8/30/2018
STRUCTURAL MATERIALS 8 8/26/2018 9/3/2018
VALVES 8 8/28/2018 9/5/2018
CABLES & JB's 10 8/30/2018 9/9/2018
AC UPS 10 9/1/2018 9/11/2018
SHUTDOWN VALVES FOR SAFETY FUNCTIONS 10 9/4/2018 9/14/2018
F&G DETECTORS 10 9/6/2018 9/16/2018

Page 2 of 4
Prepared By : Renny Devassy Client : ADCO

TENDER NO.: 16534.01 - EPC OF 42" LP FLARE HEADER AT BAB CDS Checked By : Date : 25/10/2017

Approved By : Rev. 0
WEEKS
Duration
Sr. No. Activity Start Date Finish Date Month - 1 Month - 2 Month - 3 Month - 4 Month - 5 Month - 6 Month - 7 Month - 8 Month - 9 Month - 10 Month - 11 Month - 12 Month - 13 Month - 14 Month - 15 Month - 16 Month - 17 Month - 18 Month - 19 Month - 20 Month - 21
(Days)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88
CONTROL VALVE 10 9/8/2018 9/18/2018
PRESSURE TRANSMITTER 10 9/11/2018 9/21/2018
TEMPERATURE TRANSMITTER & THERMOWELLS 10 9/13/2018 9/23/2018
PRESSURE AND DIFFERENTIAL PRESSURE GAUGE 10 9/15/2018 9/25/2018
ORIFICE PLATE AND RESTRICTION ORIFICE 10 9/17/2018 9/27/2018
ELECTRICAL BULK MATERIALS 10 9/24/2018 10/4/2018
CIVIL BULK MATERIALS 10 9/26/2018 10/6/2018
STRUCTURAL BULK MATERIALS 10 9/28/2018 10/8/2018
TECHNICAL BID EVALUATION - COMPANY APPROVAL 51 8/29/2018 10/19/2018
PIPES & PLATES 10 8/29/2018 9/8/2018
FLANGES & FITTINGS 10 8/31/2018 9/10/2018
STRUCTURAL MATERIALS 10 9/4/2018 9/14/2018
VALVES 10 9/6/2018 9/16/2018
CABLES & JB's 10 9/10/2018 9/20/2018
AC UPS 10 9/12/2018 9/22/2018
SHUTDOWN VALVES FOR SAFETY FUNCTIONS 10 9/15/2018 9/25/2018
F&G DETECTORS 10 9/17/2018 9/27/2018
CONTROL VALVE 10 9/19/2018 9/29/2018
PRESSURE TRANSMITTER 10 9/22/2018 10/2/2018
TEMPERATURE TRANSMITTER & THERMOWELLS 10 9/24/2018 10/4/2018
PRESSURE AND DIFFERENTIAL PRESSURE GAUGE 10 9/26/2018 10/6/2018
ORIFICE PLATE AND RESTRICTION ORIFICE 10 9/28/2018 10/8/2018
ELECTRICAL BULK MATERIALS 10 10/5/2018 10/15/2018
CIVIL BULK MATERIALS 10 10/7/2018 10/17/2018
STRUCTURAL BULK MATERIALS 10 10/9/2018 10/19/2018
PURCAHSE ORDER 56 9/9/2018 11/4/2018
PIPES & PLATES 5 9/9/2018 9/14/2018
FLANGES & FITTINGS 5 9/11/2018 9/16/2018
STRUCTURAL MATERIALS 5 9/15/2018 9/20/2018
VALVES 5 9/17/2018 9/22/2018
CABLES & JB's 10 9/21/2018 10/1/2018
AC UPS 5 9/23/2018 9/28/2018
SHUTDOWN VALVES FOR SAFETY FUNCTIONS 5 9/26/2018 10/1/2018
F&G DETECTORS 5 9/28/2018 10/3/2018
CONTROL VALVE 5 9/30/2018 10/5/2018
PRESSURE TRANSMITTER 5 10/3/2018 10/8/2018
TEMPERATURE TRANSMITTER & THERMOWELLS 5 10/5/2018 10/10/2018
PRESSURE AND DIFFERENTIAL PRESSURE GAUGE 5 10/7/2018 10/12/2018
ORIFICE PLATE AND RESTRICTION ORIFICE 5 10/9/2018 10/14/2018
ELECTRICAL BULK MATERIALS 15 10/16/2018 10/31/2018
CIVIL BULK MATERIALS 15 10/18/2018 11/2/2018
STRUCTURAL BULK MATERIALS 15 10/20/2018 11/4/2018
DELIVERY AT SITE 188 9/15/2018 3/22/2019
PIPES & PLATES 90 9/15/2018 12/14/2018
FLANGES & FITTINGS 90 9/17/2018 12/16/2018
STRUCTURAL MATERIALS 75 9/21/2018 12/5/2018
VALVES 180 9/23/2018 3/22/2019
CABLES & JB's 90 10/2/2018 12/31/2018
AC UPS 90 9/29/2018 12/28/2018
SHUTDOWN VALVES FOR SAFETY FUNCTIONS 98 10/2/2018 1/8/2019
F&G DETECTORS 90 10/5/2018 1/3/2019
CONTROL VALVE 105 10/7/2018 1/20/2019
PRESSURE TRANSMITTER 50 10/10/2018 11/29/2018
TEMPERATURE TRANSMITTER & THERMOWELLS 50 10/12/2018 12/1/2018
PRESSURE AND DIFFERENTIAL PRESSURE GAUGE 60 10/14/2018 12/13/2018
ORIFICE PLATE AND RESTRICTION ORIFICE 75 10/16/2018 12/30/2018
ELECTRICAL BULK MATERIALS 105 11/2/2018 2/15/2019
CIVIL BULK MATERIALS 120 11/4/2018 3/4/2019
STRUCTURAL BULK MATERIALS 60 11/6/2018 1/5/2019
CONSTRUCTION 492 4/5/2018 8/10/2019
GENERAL 218 4/5/2018 11/9/2018
METHOD STATEMENTS 75 4/5/2018 6/19/2018
QC PROCEDURES & PLANS 75 4/10/2018 6/24/2018
SITE MOBILIZATION 60 6/1/2018 7/31/2018
SETTING UP SITE OFFICE & RESIDENT FACILITIES 60 6/5/2018 8/4/2018
WELDER QUALIFICATION 30 10/10/2018 11/9/2018
SETTING UP SITE STORE 30 9/5/2018 10/5/2018
SHOP WORKS 150 12/1/2018 4/30/2019
PRE FABRICATION OF STRUCTURAL STEEL 150 12/1/2018 4/30/2019
PIPING FABRICATION/NDT 150 11/1/2018 3/31/2019
COATING & PAINTING OF STRUCTURAL STEEL & PIPE SPOOLS 135 12/20/2018 5/4/2019
FIELD WORKS 220 1/2/2019 8/10/2019
CIVIL WORKS 214 1/2/2019 8/4/2019
DEMOLITION WORKS 90 1/2/2019 4/2/2019
EARTHWORKS - CUTTING/BACKFILLING - DURING SITE GRADING 27 3/10/2019 4/6/2019
EARTH WORKS IN EXCAVATION 70 3/25/2019 6/3/2019
PLAIN CONCRETE WORKS 28 4/30/2019 5/28/2019
SHUTTERING ,REBAR, REINFORCED CONCRETE , DE SHUTTERING 47 5/10/2019 6/26/2019
EARTH WORKS IN BACKFLLING 18 6/5/2019 6/23/2019
COMPACTED GATCH PAVING 19 6/1/2019 6/20/2019
ENGINEERING FILL BELOW THE FOUNDATION 35 6/3/2019 7/8/2019

Page 3 of 4
Prepared By : Renny Devassy Client : ADCO

TENDER NO.: 16534.01 - EPC OF 42" LP FLARE HEADER AT BAB CDS Checked By : Date : 25/10/2017

Approved By : Rev. 0
WEEKS
Duration
Sr. No. Activity Start Date Finish Date Month - 1 Month - 2 Month - 3 Month - 4 Month - 5 Month - 6 Month - 7 Month - 8 Month - 9 Month - 10 Month - 11 Month - 12 Month - 13 Month - 14 Month - 15 Month - 16 Month - 17 Month - 18 Month - 19 Month - 20 Month - 21
(Days)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88
STRUCTURAL STEEL WORKS 50 6/15/2019 8/4/2019
GROUTING BELOW THE BASE PLATE 20 6/15/2019 7/5/2019
FIXED PROTECTIVE FENCING (CICPA / CNIA CATEGORY FENCE) 55 1/2/2019 2/26/2019
FIRE PROOFNG FOR STEEL STRUCTURE. 50 6/15/2019 8/4/2019
EARTH WORKS IN DISPOSAL OF SURPLUS SOIL 28 6/10/2019 7/8/2019
PAVING ‐ 60 THK. INTERLOCKING TILES (PASCO OR EQIVALENT) 18 6/30/2019 7/18/2019
PIPING 101 5/1/2019 8/10/2019
PIPING INSTALLATION + NDT + TOUCH-UP COATING 45 5/1/2019 6/15/2019
HYDRO TESTING, FLUSHING, DRAINING & PURGING 15 6/10/2019 6/25/2019
INSTALLATION OF VALVES 10 6/20/2019 6/30/2019
TIE-INS 8 8/2/2019 8/10/2019
ELECTRICAL, INSTRUMENTATION AND CONTROL 69 4/1/2019 6/9/2019
ELECTRICAL WORKS 60 4/1/2019 5/31/2019
INSTRUMENTATION WORKS 60 4/10/2019 6/9/2019
PRECOMMISSIONING & COMMISSIONING 19 8/12/2019 8/31/2019
PRECOMMISSIONING ACTIVITIES (INCLUDING PUNCHLIST) 8 8/12/2019 8/20/2019
READY FOR COMMISSIONING 5 8/20/2019 8/25/2019
COMMISSIONING ASSISTANCE 5 8/24/2019 8/29/2019
SUBMISSION OF AS-BUILT DOCUMENTS 10 8/21/2019 8/31/2019