Sie sind auf Seite 1von 6

Project ID and Description (FROM) Components (TO) Components GPS Planned Start and End Dates Supplied Data/Revisions

(TO) Components GPS Planned Start and End Dates Supplied Data/Revisions Made

Project ID Project Description Component Component Cost (Php) Type of Work Component Component Cost (Php) Physical Target Unit of Measure Type of Work Start X coor Start Y Coor End X coor End Y Coor Planned Start Dated Planned End Date Supplied/Revised Details (Indicate which details are revised) - Justification
"Supplied or Revised…"

Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0176 + Construction of Drainage Structure along Road


P00300018LZ 165 - K0177 + 256, K0178 + 052 - K0178 + 300 CW1 41,463,000 CW1 41,463,000 2652 Lineal meters Construction of Drainage Structure along Road 18-Jun-19 5-Jan-20 Supplied Data : GPS, Planned Start and End Dates
Construction of Drainage Structure along Road
P00300439LZ Villasis-Malasiqui-Sn Carlos Rd - K0197 + 000 - K0197 + 640 CW1 20,319,000 CW1 20,319,000 1280 Lineal meters Construction of Drainage Structure along Road 120.383684 15.920607 120.377764 15.920745 18-Jun-19 11-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Retrofitting / Strengthening of Bridge
P00300440LZ Calvo Br. (B02765LZ) along Carmen Jct - Bayambang - Manat Rd CW1 14,130,000 CW1 14,130,000 1 Number of Bridges Retrofitting / Strengthening of Bridge 120.459507 15.810173 120.458376 15.809882 25-Jun-19 22-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Reconstruction to Concrete Pavement
P00300441LZ Urdaneta Jct-Dagupan Rd - (S05992LZ ) Ch. 000 - Ch. 403 CW1 17,000,000 CW1 17,000,000 0.806 Lane Km Reconstruction to Concrete Pavement 120.353301 16.021629 120.351916 16.025218 25-Jun-19 12-Nov-19 Supplied Data : GPS, Planned Start and End Dates
P00300726LZ Gabon Br. (B00756LZ) along Calasiao Old Rd CW1 4,785,000 Retrofitting / Strengthening of Bridge CW1 4,785,000 1 Number of Bridges Retrofitting / Strengthening of Bridge 120.368133 16.016253 120.368016 16.015968 3-Jun-19 12-Aug-19 Supplied Data : GPS, Planned Start and End Dates
Turac Br. (B00858LZ) along Carmen Jct-Bayambang-Manat Rd Widening of Bridge
P00300727LZ (Phase II) CW1 2,000,000 CW1 2,000,000 62.964 Square meters Widening of Bridge 3-Jun-19 15-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Widening of Bridge
P00300728LZ Villamil Br. 2 (B04564LZ) along Sn Carlos-Calasiao Rd (Phase II) CW1 4,000,000 CW1 4,000,000 57.24 Square meters Widening of Bridge 15-Jul-19 27-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Preventive Maintenance of Road: Asphalt
P00302190LZ Urdaneta Jct-Dagupan Rd - K0191 + -266 - K0193 + 863 CW1 65,000,000 Overlay CW1 65,000,000 12.464 Lane Km Preventive Maintenance of Road: Asphalt Overlay 120.489164 15.976117 120.461005 15.983297 3-Jun-19 12-Sep-19 Supplied Data : GPS, Planned Start and End Dates

Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0187 + Preventive Maintenance of Road: Asphalt 120.436656 15.872410 120.432678 15.881499
055 - K0188 + 055, K0192 + 517 - K0192 + 920, K0192 + 935 - Overlay 120.414954 15.917006 120.413789 15.920414
P00302368LZ K0195 + 461 CW1 62,196,000 CW1 62,196,000 15.378 Lane Km Preventive Maintenance of Road: Asphalt Overlay 120.413756 15.920470 120.404186 15.941041 3-Jun-19 11-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Preventive Maintenance of Road: Asphalt
P00302369LZ Sn Carlos-Calasiao Rd - K0205 + 149 - K0207 + 657 CW1 53,011,000 Overlay CW1 53,011,000 10.164 Lane Km Preventive Maintenance of Road: Asphalt Overlay 120.344809 15.941577 120.349779 15.963447 3-Jun-19 5-Sep-19 Supplied Data : GPS, Planned Start and End Dates
P00302908LZ Sn Carlos-Calasiao Rd - K0210 + 220 - K0210 + 700 CW1 8,528,000 Reconstruction to Concrete Pavement CW1 8,528,000 0.56 Lane Km Reconstruction to Concrete Pavement 120.360850 15.984030 120.362200 15.986230 18-Jun-19 6-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Preventive Maintenance of Road: Concrete
P00302908LZ Sn Carlos-Calasiao Rd - K0210 + 220 - K0210 + 700 CW2 1,000,000 Reblocking CW2 1,000,000 0.158 Lane Km Preventive Maintenance of Road: Concrete Reblo 120.362200 15.986230 120.363030 15.987810 18-Jun-19 6-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Villasis-Malasiqui-Sn Carlos Rd - K0183 + (-100) - K0183 + 408, Reconstruction to Concrete Pavement 120.507252 15.915097 120.506786 15.914819
P00302909LZ K0183 + (-420) - K0183 + (-280) CW1 10,401,000 CW1 10,401,000 1.276 Lane Km Reconstruction to Concrete Pavement 120.504440 15.914936 120.499800 15.915100 18-Jun-19 30-Aug-19 Supplied Data : GPS, Planned Start and End Dates
Sn Carlos-Calasiao Rd - K0209 + 240 - K0209 + 807.5, K0210 + 160 Road Widening 120.356090 15.976600 120.358970 15.981030
P00303214LZ - K0210 + 220 CW1 10,068,000 CW1 10,068,000 1.255 Lane Km Road Widening 120.360580 15.983530 120.360850 15.984000 11-Jun-19 10-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Villasis-Malasiqui-Sn Carlos Rd - K0190 + 660 - K0192 + 018, K0192 Road Widening 120.439713 15.918227 120.427440 15.920505
P00303215LZ + 700 - K0192 + 729 CW1 20,825,000 CW1 20,825,000 2.549 Lane Km Road Widening 120.421220 15.919924 120.420949 15.919898 11-Jun-19 8-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Road Widening
P00303217LZ Carmen Jct-Bayambang-Manat Rd - K0204 + 579 - K0204 + 923 CW1 13,751,000 CW1 13,751,000 0.688 Lane Km Road Widening 120.365578 15.909375 120.358994 15.918226 11-Jun-19 27-Sep-19 Supplied Data : GPS, Planned Start and End Dates

Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0175 +


038.5 - K0176 + 165, K0196 + 456 - K0197 + 080, K0196 + 625 - Road Widening
P00303218LZ K0197 + 400 CW1 56,000,000 CW1 56,000,000 4.017 Lane Km Road Widening 11-Jun-19 10-Jan-20 Supplied Data : GPS, Planned Start and End Dates

Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Rd - K0178 + Road Widening 120.447890 15.771977 120.448906 15.776685


P00304264LZ 300 - K0178 + 703; K0185 + 961 - K0186 + 770 CW1 15,642,000 CW1 15,642,000 2.45 Lane Km Road Widening 120.400002 15.950556 120.401600 15.957800 11-Jun-19 22-Aug-19 Supplied Data : GPS, Planned Start and End Dates
Villasis-Malasiqui-Sn Carlos Rd - K0192 + 729 - K0193 + 397, K0194 Road Widening 120.420949 15.919898 120.414733 15.919400
P00304265LZ + (-450) - K0194 + 242 CW1 28,732,000 CW1 28,732,000 2.724 Lane Km Road Widening 120.413043 15.920046 120.406775 15.918661 11-Jun-19 11-Oct-19 Supplied Data : GPS, Planned Start and End Dates

Access Road leading to Minor Basilica of Our Lady of Manaoag Construction of Concrete Road
P00330143LZ Shrine, Sta. Barbara-Mapandan to Manaoag Road, Pangasinan CW1 25,000,000 CW1 25,000,000 2.5 Lane Km Construction of Concrete Road 120.412000 16.010200 120.422100 16.006700 18-Jun-19 28-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Construction of River Bank Protection along Agno River, Warding Construction_of_Revetment
P00322982LZ Section, Bayambang, Pangasinan CW1 40,000,000 CW1 40,000,000 640 Lineal meters Construction of Revetment 120.423640 15.764630 120.429523 15.763961 18-Jun-19 16-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Ambayat 1st Construction_of_Revetment
P00322980LZ Section, Bayambang, Pangasinan CW1 7,000,000 CW1 7,000,000 110 Lineal meters Construction of Revetment 120.409330 15.773170 120.408630 15.773620 18-Jun-19 2-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Carungay Construction_of_Revetment
P00322981LZ Section, Bayambang, Pangasinan CW1 3,000,000 CW1 3,000,000 70 Lineal meters Construction of Revetment 120.416100 15.769960 120.415520 15.770450 18-Jun-19 26-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Construction of River Bank Protection along Agno River, Zone V Construction_of_Revetment
P00322983LZ Section, Bayambang, Pangasinan CW1 11,000,000 CW1 11,000,000 160 Lineal meters Construction of Revetment 18-Jun-19 19-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Construction of River Bank Protection along Ingalera River, Ano Construction_of_Revetment
P00322984LZ Section, San Carlos City, Pangasinan CW1 32,179,000 CW1 32,179,000 550 Lineal meters Construction of Revetment 18-Jun-19 8-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River Phase I Construction_of_Revetment
P00322986LZ at Paragos, Bayambang, Pangasinan CW1 20,000,000 CW1 20,000,000 320 Lineal meters Construction of Revetment 120.463010 15.759236 120.461710 15.759246 18-Jun-19 23-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction_of_Revetment
P00322985LZ Warding, Bayambang, Pangasinan CW1 10,000,000 CW1 10,000,000 160 Lineal meters Construction of Revetment 120.429523 15.763961 120.430998 15.764008 18-Jun-19 15-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Ingalera River, Macabito Construction of Slope Protection Structure Supplied Data : GPS, Planned Start and End Dates
P00320669LZ Section, Calasiao, Pangasinan CW1 20,000,000 CW1 20,000,000 360 Lineal meters Construction of Revetment 120.396000 15.952920 120.392500 15.953000 18-Jun-19 26-Nov-19 Revised Data: Unit of Measure, Type of Work
Construction of River Bank Protection along Agno River, Caturay Construction_of_Revetment
P00321827LZ Section, Bayambang, Pangasinan CW1 20,000,000 CW1 20,000,000 290 Lineal meters Construction of Revetment 120.369650 15.780680 120.371270 15.778800 18-Jun-19 23-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Bacnono Construction_of_Revetment
P00322044LZ Section, Bayambang Pangasinan CW1 23,179,000 CW1 23,179,000 320 Lineal meters Construction of Revetment 18-Jun-19 27-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Marusay River, Brgy. Construction_of_Revetment
P00322045LZ Talibaew, Calasiao, Pangasinan CW1 30,000,000 CW1 30,000,000 400 Lineal meters Construction of Revetment 120.363920 16.008650 120.358460 16.006500 18-Jun-19 8-Dec-19 Supplied Data : GPS, Planned Start and End Dates

Construction of Protection Works along Ingalera River, Nagsaing- Construction_of_Revetment


P00322046LZ Doyong Section, Calasiao, Pangasinan CW1 30,000,000 CW1 30,000,000 640 Lineal meters Construction of Revetment 120.348304 15.977635 120.354110 15.975537 18-Jun-19 5-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Angalacan River, Brgy. Construction_of_Revetment
P00322048LZ Baloling, Mapandan, Pangasinan CW1 50,000,000 CW1 50,000,000 955 Lineal meters Construction of Revetment 120.456883 16.030410 120.446248 16.041717 18-Jun-19 29-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Angalacan River, Brgy. Sta. Construction_of_Revetment
P00322049LZ Maria, Mapandan, Pangasinan CW1 30,000,000 CW1 30,000,000 652 Lineal meters Construction of Revetment 120.465162 16.034701 120.461121 16.032158 18-Jun-19 5-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River Phase II Construction of Revetment
P00322051LZ at Brgy. Paragos, Bayambang, Pangasinan CW1 30,000,000 CW1 30,000,000 480 Lineal meters Construction of Revetment 120.461710 15.759246 120.457286 15.759763 18-Jun-19 4-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322052LZ Bongato West, Bayambang, Pangasinan CW1 30,000,000 CW1 30,000,000 459 Lineal meters Construction of Revetment 120.459709 15.827123 120.456467 15.812220 18-Jun-19 8-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322053LZ Iton, Bayambang, Pangasinan CW1 50,000,000 CW1 50,000,000 800 Lineal meters Construction of Revetment 120.463949 15.769587 120.469032 15.764256 18-Jun-19 28-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322054LZ Manambong Norte, Bayambang, Pangasinan CW1 20,000,000 CW1 20,000,000 350 Lineal meters Construction of Revetment 120.457144 15.783325 120.456665 15.789383 18-Jun-19 23-Nov-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322055LZ Manambong Sur, Bayambang, Pangasinan CW1 50,000,000 CW1 50,000,000 800 Lineal meters Construction of Revetment 120.461330 15.773160 120.463490 15.769950 18-Jun-19 28-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River Phase III Construction of Revetment
P00322056LZ at Brgy. Paragos, Bayambang, Pangasinan CW1 14,252,000 CW1 14,252,000 240 Lineal meters Construction of Revetment 120.457286 15.759763 120.455296 15.759102 18-Jun-19 31-Oct-19 supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Brgy. Guelew, Construction of Revetment
P00322057LZ San Carlos City, Pangasinan CW1 50,000,000 CW1 50,000,000 500 Lineal meters Construction of Revetment 18-Jun-19 28-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Brgy. Supo, Construction of Revetment
P00322058LZ San Carlos City, Pangasinan CW1 50,000,000 CW1 50,000,000 550 Lineal meters Construction of Revetment 120.300340 15.832760 120.297090 15.832540 18-Jun-19 28-Dec-19 supplied Data : GPS, Planned Start and End Dates
0 supplied Data : Physical Target, Unit of Measure, Type of
P00353117LZ Construction of Drainage, Barangay Quesban, Calasiao, Pangasinan CW1 2,000,000 CW1 2,000,000 36 Lineal meters Construction of Drainage Structure along Road 120.368010 16.015700 120.368160 16.015880 20-Jun-19 19-Sep-19 Work, GPS, Planned Start and End Dates,
Construction of Slope Protection, Barangay Butao, Malasiqui, 0 supplied Data : Physical Target, Unit of Measure, Type of
P00353118LZ Pangasinan CW1 4,500,000 CW1 4,500,000 150 Lineal meters Construction of Flood Mitigation Structure 120.459400 15.911100 120.459300 15.911100 20-Jun-19 31-Aug-19 Work, GPS, Planned Start and End Dates,
Construction of Slope Protection, Barangay Ican, Malasiqui, 0 supplied Data : Physical Target, Unit of Measure, Type of
P00353119LZ Pangasinan CW1 4,500,000 CW1 4,500,000 70 Lineal meters Construction of Flood Mitigation Structure 120.408890 15.949720 120.403330 15.966670 20-Jun-19 30-Sep-19 Work, GPS, Planned Start and End Dates,
Construction of Slope Protection, Barangay Talospatang, 0 supplied Data : Physical Target, Unit of Measure, Type of
P00353120LZ Malasiqui, Pangasinan CW1 5,000,000 CW1 5,000,000 100 Lineal meters Construction of Flood Mitigation Structure 120.459100 15.914700 20-Jun-19 30-Sep-19 Work, GPS, Planned Start and End Dates,
Construction of Road, Sitio Purok 4, Barangay Alinggan, 0
P00354273LZ Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.320 Lane Km Construction of Concrete Road 120.408940 15.844460 120.409290 15.837990
Construction (Completion) of Roads, Barangay Amancosiling 0
P00354260LZ Norte, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.350 Lane Km Construction of Concrete Road 120.454500 15.789900 120.455100 15.789200
Construction of Road, Barangay Amanperez, Bayambang, 0
P00354265LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.262 Lane Km Construction of Concrete Road 120.422600 15.827600 120.422200 15.828700
0
P00354266LZ Construction of Road, Barangay Cadre Site, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.340 Lane Km Construction of Concrete Road 120.454820 15.806380 120.453010 15.806100
Project ID and Description (FROM) Components (TO) Components GPS Planned Start and End Dates Supplied Data/Revisions Made

0
P00354268LZ Construction of Road, Barangay Pangdel, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.350 Lane Km Construction of Concrete Road 120.421970 15.768740 120.424000 15.767480
Construction of Road, Barangay San Gabriel 1st, Bayambang, 0
P00354270LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.320 Lane Km Construction of Concrete Road 120.461290 15.769960 120.462640 15.768530
Construction of Road, Sitio Caloocan, Barangay Zone VII, 0
P00354272LZ Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.270 Lane Km Construction of Concrete Road 120.450810 15.820560 120.449700 15.820830
0
P00354267LZ Construction of Road, Barangay Iton, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.320 Lane Km Construction of Concrete Road 120.469700 15.768300 120.468800 15.766600
Concreting of Road, Sitio Sagur, Barangay Caoayan Bogtong, 0
P00354259LZ Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.320 Lane Km Construction of Concrete Road 120.393660 15.951500 120.390530 15.952240
0
P00354258LZ Concreting of Road, Barangay Tambac, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.300 Lane Km Construction of Concrete Road 120.407060 15.935310 120.405760 15.934710
0 120.458780 15.872000 120.458190 15.873550
P00354257LZ Concreting of Road, Barangay Bakitiw, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.280 Lane Km Construction of Concrete Road 120.461856 15.873090 120.462755 15.884300
Construction of Barangay Road Dona Maria, Barangay Bued, 0
P00354261LZ Calasiao, Pangasinan CW1 2,000,000 CW1 2,000,000 0.140 Lane Km Construction of Concrete Road 120.386970 16.012275 120.388693 16.019770
Construction of Road, Barangay Pangoloan, San Carlos City, 0
P00354269LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.220 Lane Km Construction of Concrete Road 120.322200 15.925900 120.320100 15.925700
Construction of Road, Sitio Broadway, Barangay Aponit, San Carlos 0
P00354271LZ City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.280 Lane Km Construction of Concrete Road 120.286700 15.897200 120.285200 15.899400
Construction of Multi-Purpose Building (Red Cross Building), Construction_of_Multi_Purpose_Building
P00349374LZ Barangay Agdao, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction_of_Multi_Purpose_Building 120.328400 15.906600

Construction of Multi-Purpose Building (Amphitheater), DepEd Construction_of_Multi_Purpose_Building


P00349373LZ School Division Office, Roxas Blvd., San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction_of_Multi_Purpose_Building 120.344700 15.931900
Construction (Completion) of Multi-Purpose Building (Day Care Construction_of_Multi_Purpose_Building
P00349372LZ Center), Barangay Don Pedro, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction_of_Multi_Purpose_Building 120.430519 15.885935
Construction (Completion) of Multi-Purpose Building, Brgy. Construction of Multi Purpose Building
P00341379LZ Binalay, Malasiqui, Pangasinan CW1 1,000,000 CW1 1,000,000 1 Number of Buildings Construction of Multi Purpose Building 120.430275 15.905519

Construction of Bliss Pagal Multi-Purpose Building (Agricultural Construction of Multi Purpose Building
P00341380LZ Compound), Pagal, San Carlos City, Pangasinan CW1 3,200,000 CW1 3,200,000 1 Number of Buildings Construction of Multi Purpose Building 120.334400 15.944400
Construction of Multi-Purpose Building (Health Center), Brgy. Construction of Multi Purpose Building
P00341381LZ Caturay, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building 120.375310 15.788500
Construction of Multi-Purpose Building (Health Center), Brgy. Construction of Multi Purpose Building
P00341382LZ Idong, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Multi-Purpose Building (Health Center), Brgy. Construction of Multi Purpose Building
P00341383LZ Olea, Malasiqui, Pangasinan CW1 1,500,000 CW1 1,500,000 1 Number of Buildings Construction of Multi Purpose Building 120.486115 15.861602
Construction of Multi-Purpose Building (Health Center), Brgy. Construction of Multi Purpose Building
P00341384LZ Longos, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Multi-Purpose Building (Covered Court), Brgy. Construction of Multi Purpose Building
P00341385LZ Sapang, Bayambang, Pangasinan CW1 2,400,000 CW1 2,400,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Slope Protection, Brgy. Amancosiling Norte, Construction of Slope Protection Structure
P00345146LZ Bayambang, Pangasinan CW1 5,000,000 CW1 5,000,000 1465.91 Square meters Construction of Slope Protection Structure
Construction of Slope Protection, Brgy. Malimpec, Malasiqui, Construction of Slope Protection Structure
P00345147LZ Pangasinan CW1 5,000,000 CW1 5,000,000 110 Square meters Construction of Slope Protection Structure
Construction of Slope Protection, Brgy. Mestizo Norte, San Carlos Construction of Slope Protection Structure
P00345148LZ City, Pangasinan CW1 5,000,000 CW1 5,000,000 110 Square meters Construction of Slope Protection Structure
Improvement/Rehabilitation of Slope Protection, Brgy. Paragos, Construction of Slope Protection Structure
P00345149LZ Bayambang, Pangasinan CW1 5,000,000 CW1 5,000,000 110 Square meters Construction of Slope Protection Structure
Construction of Slope Protection, Brgy. San Gabriel 2nd, Construction of Slope Protection Structure
P00345150LZ Bayambang, Pangasinan CW1 7,900,000 CW1 7,900,000 2316.138 Square meters Construction of Slope Protection Structure
Concreting of Local Road, Brgy. Antipangol, San Carlos City, Construction of Concrete Road
P00346544LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346545LZ Concreting of Local Road, Brgy. Asin Weste, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Road, Brgy. Batangcaoa, Bayambang, Construction of Concrete Road
P00346546LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346547LZ Concreting of Local Road, Brgy. Canan Sur, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346548LZ Concreting of Local Road, Brgy. Carungay, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346549LZ Concreting of Local Road, Brgy. Gomez, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346550LZ Concreting of Local Road, Brgy. Mangayao, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Road, Sitio Baguiwat, Brgy. Payar, Malasiqui, Construction of Concrete Road
P00346551LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Road, Sitio Oryaw & Sitio Anaytayan, Brgy. Construction of Concrete Road
P00346552LZ Calomboyan, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346555LZ Concreting of Local Roads, Brgy. Bega, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Roads, Brgy. Capataan, San Carlos City, Construction of Concrete Road
P00346556LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346557LZ Concreting of Local Roads, Brgy. Polo, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Roads, Brgy. San Juan, San Carlos City, Construction of Concrete Road
P00346558LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346559LZ Concreting of Local Roads, Brgy. Tebag, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Flood Control, Brgy. Salinap, San Carlos City, Construction_of_Flood_Mitigation_Structure
P00353324LZ Pangasinan CW1 8,000,000 CW1 8,000,000 8000 Lineal meters Construction_of_Flood_Mitigation_Structure
Construction of Flood Control, Brgy. Warding, Bayambang, Construction_of_Flood_Mitigation_Structure
P00353325LZ Pangasinan CW1 7,000,000 CW1 7,000,000 0 Lineal meters Construction_of_Flood_Mitigation_Structure

Rehabilitation/Construction of Local Road Sitio Nalsian - Bacayao, Rehabilitation_of_Concrete_Road


P00354275LZ Brgy. Nalsian, Calasiao, Pangasinan CW1 7,000,000 CW1 7,000,000 0.583 Lane Km Rehabilitation_of_Concrete_Road
Rehabilitation of Brgy. Road, Ababa Road, Sitio Riverside, Brgy. Rehabilitation_of_Concrete_Road
P00354274LZ Dinalaoan, Calasiao, Pangasinan CW1 2,000,000 CW1 2,000,000 0.167 Lane Km Rehabilitation_of_Concrete_Road
Construction_of_Gravel_Road
P00354263LZ Construction of Local Road, Brgy. Isla, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.167 Lane Km Construction_of_Gravel_Road
Construction of Local Road, Sitio Laoac, Brgy. Tococ West, Construction_of_Gravel_Road
P00354264LZ Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.167 Lane Km Construction_of_Gravel_Road
Construction of Local Road, Brgy. Balayong, San Carlos City, Construction_of_Concrete_Road
P00354262LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.167 Lane Km Construction_of_Concrete_Road
Construction (Completion) of Pangasinan IV DEO Building, Tuliao, 0
P00348265LZ Sta. Barbara, Pangasinan 0 6,000,000 0 6,000,000 0 0 0
Construction (Completion) of Waig-Tobor Bridge and Approaches, 0
P00355786LZ Barangay Waig, Malasiqui, Pangasinan 0 20,000,000 0 20,000,000 0 0 0
Construction of Multi-Purpose Building in Brgy. Balaya, San Carlos Construction of Multi Purpose Building
P00349375LZ City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Multi-Purpose Building in Brgy. Matagdem, San Construction of Multi Purpose Building
P00349376LZ Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Multi-Purpose Building in Brgy. Bega, San Carlos Construction of Multi Purpose Building
P00349377LZ City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Project ID and Description (FROM) Components (TO) Components GPS Planned Start and End Dates Supplied Data/Revisions Made

Construction of Multi-Purpose Building in Brgy. Mabalbalino, San Construction of Multi Purpose Building
P00349378LZ Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building

Construction of Multi-purpose Building (School


Gymnasium/Covered Court), Palaming Elementary School, Brgy. Construction of Multi Purpose Building
P00349379LZ Palaming, San Carlos City, Pangasinan CW1 3,000,000 CW1 3,000,000 1 Number of Buildings Construction of Multi Purpose Building

Construction of Multi-purpose Building (School


Gymnasium/Covered Court), Doyong National High School, Brgy. Construction of Multi Purpose Building
P00349380LZ Doyong, San Carlos City, Pangasinan CW1 3,000,000 CW1 3,000,000 1 Number of Buildings Construction of Multi Purpose Building

Construction of Multi-purpose Building (School


Gymnasium/Covered Court), Brgy. Aponit, San Carlos City, Construction of Multi Purpose Building
P00349381LZ Pangasinan CW1 3,000,000 CW1 3,000,000 1 Number of Buildings Construction of Multi Purpose Building
Repair/Rehabilitation of Multipurpose Building (Covered Court), Rehabilitation / Major Repair of Multi Purpose
P00349382LZ Brgy. Ambayat 2, Bayambang, Pangasinan CW1 3,000,000 Building CW1 3,000,000 1 Number of Buildings Rehabilitation / Major Repair of Multi Purpose Building
Construction of Multi-Purpose Building , Beleng National High Construction of Multi Purpose Building
P00349383LZ School, Bayambang, Pangasinan CW1 18,303,000 CW1 18,303,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of MPB, Bolaoit Elementary School, Malasiqui, Construction of Multi Purpose Building
P00349384LZ Pangasinan CW1 12,402,000 CW1 12,402,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of MPB, Mapandan National High School, Construction of Multi Purpose Building
P00349385LZ Mapandan, Pangasinan CW1 9,636,000 CW1 9,636,000 1 Number of Buildings Construction of Multi Purpose Building
Project ID and Description (FROM) Components (TO) Components GPS Planned Start and End Dates Supplied Data/Revisions Made

Project ID Project Description Component Component Cost (Php) Type of Work Component Component Cost (Php) Physical Target Unit of Measure Type of Work Start X coor Start Y Coor End X coor End Y Coor Planned Start Dated Planned End Date Supplied/Revised Details (Indicate which details are revised) - Justification
"Supplied or Revised…"

Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0176 + Construction of Drainage Structure along Road


P00300018LZ 165 - K0177 + 256, K0178 + 052 - K0178 + 300 CW1 41,463,000 CW1 41,463,000 2652 Lineal meters Construction of Drainage Structure along Road 18-Jun-19 5-Jan-20 Supplied Data : GPS, Planned Start and End Dates
Construction of Drainage Structure along Road
P00300439LZ Villasis-Malasiqui-Sn Carlos Rd - K0197 + 000 - K0197 + 640 CW1 20,319,000 CW1 20,319,000 1280 Lineal meters Construction of Drainage Structure along Road 120.383684 15.920607 120.377764 15.920745 18-Jun-19 11-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Retrofitting / Strengthening of Bridge
P00300440LZ Calvo Br. (B02765LZ) along Carmen Jct - Bayambang - Manat Rd CW1 14,130,000 CW1 14,130,000 1 Number of Bridges Retrofitting / Strengthening of Bridge 120.459507 15.810173 120.458376 15.809882 25-Jun-19 22-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Reconstruction to Concrete Pavement
P00300441LZ Urdaneta Jct-Dagupan Rd - (S05992LZ ) Ch. 000 - Ch. 403 CW1 17,000,000 CW1 17,000,000 0.806 Lane Km Reconstruction to Concrete Pavement 120.353301 16.021629 120.351916 16.025218 25-Jun-19 12-Nov-19 Supplied Data : GPS, Planned Start and End Dates
P00300726LZ Gabon Br. (B00756LZ) along Calasiao Old Rd CW1 4,785,000 Retrofitting / Strengthening of Bridge CW1 4,785,000 1 Number of Bridges Retrofitting / Strengthening of Bridge 120.368133 16.016253 120.368016 16.015968 3-Jun-19 12-Aug-19 Supplied Data : GPS, Planned Start and End Dates
Turac Br. (B00858LZ) along Carmen Jct-Bayambang-Manat Rd Widening of Bridge
P00300727LZ (Phase II) CW1 2,000,000 CW1 2,000,000 62.964 Square meters Widening of Bridge 3-Jun-19 15-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Widening of Bridge
P00300728LZ Villamil Br. 2 (B04564LZ) along Sn Carlos-Calasiao Rd (Phase II) CW1 4,000,000 CW1 4,000,000 57.24 Square meters Widening of Bridge 15-Jul-19 27-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Preventive Maintenance of Road: Asphalt
P00302190LZ Urdaneta Jct-Dagupan Rd - K0191 + -266 - K0193 + 863 CW1 65,000,000 Overlay CW1 65,000,000 12.464 Lane Km Preventive Maintenance of Road: Asphalt Overlay 120.489164 15.976117 120.461005 15.983297 3-Jun-19 12-Sep-19 Supplied Data : GPS, Planned Start and End Dates

Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0187 + Preventive Maintenance of Road: Asphalt 120.436656 15.872410 120.432678 15.881499
055 - K0188 + 055, K0192 + 517 - K0192 + 920, K0192 + 935 - Overlay 120.414954 15.917006 120.413789 15.920414
P00302368LZ K0195 + 461 CW1 62,196,000 CW1 62,196,000 15.378 Lane Km Preventive Maintenance of Road: Asphalt Overlay 120.413756 15.920470 120.404186 15.941041 3-Jun-19 11-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Preventive Maintenance of Road: Asphalt
P00302369LZ Sn Carlos-Calasiao Rd - K0205 + 149 - K0207 + 657 CW1 53,011,000 Overlay CW1 53,011,000 10.164 Lane Km Preventive Maintenance of Road: Asphalt Overlay 120.344809 15.941577 120.349779 15.963447 3-Jun-19 5-Sep-19 Supplied Data : GPS, Planned Start and End Dates
P00302908LZ Sn Carlos-Calasiao Rd - K0210 + 220 - K0210 + 700 CW1 8,528,000 Reconstruction to Concrete Pavement CW1 8,528,000 0.56 Lane Km Reconstruction to Concrete Pavement 120.360850 15.984030 120.362200 15.986230 18-Jun-19 6-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Preventive Maintenance of Road: Concrete
P00302908LZ Sn Carlos-Calasiao Rd - K0210 + 220 - K0210 + 700 CW2 1,000,000 Reblocking CW2 1,000,000 0.158 Lane Km Preventive Maintenance of Road: Concrete Reblo 120.362200 15.986230 120.363030 15.987810 18-Jun-19 6-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Villasis-Malasiqui-Sn Carlos Rd - K0183 + (-100) - K0183 + 408, Reconstruction to Concrete Pavement 120.507252 15.915097 120.506786 15.914819
P00302909LZ K0183 + (-420) - K0183 + (-280) CW1 10,401,000 CW1 10,401,000 1.276 Lane Km Reconstruction to Concrete Pavement 120.504440 15.914936 120.499800 15.915100 18-Jun-19 30-Aug-19 Supplied Data : GPS, Planned Start and End Dates
Sn Carlos-Calasiao Rd - K0209 + 240 - K0209 + 807.5, K0210 + 160 Road Widening 120.356090 15.976600 120.358970 15.981030
P00303214LZ - K0210 + 220 CW1 10,068,000 CW1 10,068,000 1.255 Lane Km Road Widening 120.360580 15.983530 120.360850 15.984000 11-Jun-19 10-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Villasis-Malasiqui-Sn Carlos Rd - K0190 + 660 - K0192 + 018, K0192 Road Widening 120.439713 15.918227 120.427440 15.920505
P00303215LZ + 700 - K0192 + 729 CW1 20,825,000 CW1 20,825,000 2.549 Lane Km Road Widening 120.421220 15.919924 120.420949 15.919898 11-Jun-19 8-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Road Widening
P00303217LZ Carmen Jct-Bayambang-Manat Rd - K0204 + 579 - K0204 + 923 CW1 13,751,000 CW1 13,751,000 0.688 Lane Km Road Widening 120.365578 15.909375 120.358994 15.918226 11-Jun-19 27-Sep-19 Supplied Data : GPS, Planned Start and End Dates

Camiling-Wawa-Bayambang-Malasiqui-Sta Barbara Rd - K0175 +


038.5 - K0176 + 165, K0196 + 456 - K0197 + 080, K0196 + 625 - Road Widening
P00303218LZ K0197 + 400 CW1 56,000,000 CW1 56,000,000 4.017 Lane Km Road Widening 11-Jun-19 10-Jan-20 Supplied Data : GPS, Planned Start and End Dates

Camiling-Wawa-Bayambang-Malasiqui-Sta. Barbara Rd - K0178 + Road Widening 120.447890 15.771977 120.448906 15.776685


P00304264LZ 300 - K0178 + 703; K0185 + 961 - K0186 + 770 CW1 15,642,000 CW1 15,642,000 2.45 Lane Km Road Widening 120.400002 15.950556 120.401600 15.957800 11-Jun-19 22-Aug-19 Supplied Data : GPS, Planned Start and End Dates
Villasis-Malasiqui-Sn Carlos Rd - K0192 + 729 - K0193 + 397, K0194 Road Widening 120.420949 15.919898 120.414733 15.919400
P00304265LZ + (-450) - K0194 + 242 CW1 28,732,000 CW1 28,732,000 2.724 Lane Km Road Widening 120.413043 15.920046 120.406775 15.918661 11-Jun-19 11-Oct-19 Supplied Data : GPS, Planned Start and End Dates

Access Road leading to Minor Basilica of Our Lady of Manaoag Construction of Concrete Road
P00330143LZ Shrine, Sta. Barbara-Mapandan to Manaoag Road, Pangasinan CW1 25,000,000 CW1 25,000,000 2.5 Lane Km Construction of Concrete Road 120.412000 16.010200 120.422100 16.006700 18-Jun-19 28-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Construction of River Bank Protection along Agno River, Warding Construction of Revetment
P00322982LZ Section, Bayambang, Pangasinan CW1 40,000,000 CW1 40,000,000 640 Lineal meters Construction of Revetment 120.423640 15.764630 120.429523 15.763961 18-Jun-19 16-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Ambayat 1st Construction of Revetment
P00322980LZ Section, Bayambang, Pangasinan CW1 7,000,000 CW1 7,000,000 110 Lineal meters Construction of Revetment 120.409330 15.773170 120.408630 15.773620 18-Jun-19 2-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Carungay Construction of Revetment
P00322981LZ Section, Bayambang, Pangasinan CW1 3,000,000 CW1 3,000,000 70 Lineal meters Construction of Revetment 120.416100 15.769960 120.415520 15.770450 18-Jun-19 26-Sep-19 Supplied Data : GPS, Planned Start and End Dates
Construction of River Bank Protection along Agno River, Zone V Construction of Revetment
P00322983LZ Section, Bayambang, Pangasinan CW1 11,000,000 CW1 11,000,000 160 Lineal meters Construction of Revetment 18-Jun-19 19-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Construction of River Bank Protection along Ingalera River, Ano Construction of Revetment
P00322984LZ Section, San Carlos City, Pangasinan CW1 32,179,000 CW1 32,179,000 550 Lineal meters Construction of Revetment 18-Jun-19 8-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River Phase I Construction of Revetment
P00322986LZ at Paragos, Bayambang, Pangasinan CW1 20,000,000 CW1 20,000,000 320 Lineal meters Construction of Revetment 120.463010 15.759236 120.461710 15.759246 18-Jun-19 23-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322985LZ Warding, Bayambang, Pangasinan CW1 10,000,000 CW1 10,000,000 160 Lineal meters Construction of Revetment 120.429523 15.763961 120.430998 15.764008 18-Jun-19 15-Oct-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Ingalera River, Macabito Construction of Slope Protection Structure Supplied Data : GPS, Planned Start and End Dates
P00320669LZ Section, Calasiao, Pangasinan CW1 20,000,000 CW1 20,000,000 360 Lineal meters Construction of Revetment 120.396000 15.952920 120.392500 15.953000 18-Jun-19 26-Nov-19 Revised Data: Unit of Measure, Type of Work
Construction of River Bank Protection along Agno River, Caturay Construction of Revetment
P00321827LZ Section, Bayambang, Pangasinan CW1 20,000,000 CW1 20,000,000 290 Lineal meters Construction of Revetment 120.369650 15.780680 120.371270 15.778800 18-Jun-19 23-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Bacnono Construction of Revetment
P00322044LZ Section, Bayambang Pangasinan CW1 23,179,000 CW1 23,179,000 320 Lineal meters Construction of Revetment 18-Jun-19 27-Nov-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Marusay River, Brgy. Construction of Revetment
P00322045LZ Talibaew, Calasiao, Pangasinan CW1 30,000,000 CW1 30,000,000 400 Lineal meters Construction of Revetment 120.363920 16.008650 120.358460 16.006500 18-Jun-19 8-Dec-19 Supplied Data : GPS, Planned Start and End Dates

Construction of Protection Works along Ingalera River, Nagsaing- Construction of Revetment


P00322046LZ Doyong Section, Calasiao, Pangasinan CW1 30,000,000 CW1 30,000,000 640 Lineal meters Construction of Revetment 120.348304 15.977635 120.354110 15.975537 18-Jun-19 5-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Angalacan River, Brgy. Construction of Revetment
P00322048LZ Baloling, Mapandan, Pangasinan CW1 50,000,000 CW1 50,000,000 955 Lineal meters Construction of Revetment 120.456883 16.030410 120.446248 16.041717 18-Jun-19 29-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Angalacan River, Brgy. Sta. Construction of Revetment
P00322049LZ Maria, Mapandan, Pangasinan CW1 30,000,000 CW1 30,000,000 652 Lineal meters Construction of Revetment 120.465162 16.034701 120.461121 16.032158 18-Jun-19 5-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River Phase II Construction of Revetment
P00322051LZ at Brgy. Paragos, Bayambang, Pangasinan CW1 30,000,000 CW1 30,000,000 480 Lineal meters Construction of Revetment 120.461710 15.759246 120.457286 15.759763 18-Jun-19 4-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322052LZ Bongato West, Bayambang, Pangasinan CW1 30,000,000 CW1 30,000,000 459 Lineal meters Construction of Revetment 120.459709 15.827123 120.456467 15.812220 18-Jun-19 8-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322053LZ Iton, Bayambang, Pangasinan CW1 50,000,000 CW1 50,000,000 800 Lineal meters Construction of Revetment 120.463949 15.769587 120.469032 15.764256 18-Jun-19 28-Dec-19 Supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322054LZ Manambong Norte, Bayambang, Pangasinan CW1 20,000,000 CW1 20,000,000 350 Lineal meters Construction of Revetment 120.457144 15.783325 120.456665 15.789383 18-Jun-19 23-Nov-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River at Brgy. Construction of Revetment
P00322055LZ Manambong Sur, Bayambang, Pangasinan CW1 50,000,000 CW1 50,000,000 800 Lineal meters Construction of Revetment 120.461330 15.773160 120.463490 15.769950 18-Jun-19 28-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Slope Protection Works along Agno River Phase III Construction of Revetment
P00322056LZ at Brgy. Paragos, Bayambang, Pangasinan CW1 14,252,000 CW1 14,252,000 240 Lineal meters Construction of Revetment 120.457286 15.759763 120.455296 15.759102 18-Jun-19 31-Oct-19 supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Brgy. Guelew, Construction of Revetment
P00322057LZ San Carlos City, Pangasinan CW1 50,000,000 CW1 50,000,000 500 Lineal meters Construction of Revetment 18-Jun-19 28-Dec-19 supplied Data : GPS, Planned Start and End Dates
Construction of Protection Works along Agno River, Brgy. Supo, Construction of Revetment
P00322058LZ San Carlos City, Pangasinan CW1 50,000,000 CW1 50,000,000 550 Lineal meters Construction of Revetment 120.300340 15.832760 120.297090 15.832540 18-Jun-19 28-Dec-19 supplied Data : GPS, Planned Start and End Dates
0 supplied Data : Physical Target, Unit of Measure, Type of
P00353117LZ Construction of Drainage, Barangay Quesban, Calasiao, Pangasinan CW1 2,000,000 CW1 2,000,000 36 Lineal meters Construction of Drainage Structure along Road 120.368010 16.015700 120.368160 16.015880 20-Jun-19 19-Sep-19 Work, GPS, Planned Start and End Dates,
Construction of Slope Protection, Barangay Butao, Malasiqui, 0 supplied Data : Physical Target, Unit of Measure, Type of
P00353118LZ Pangasinan CW1 4,500,000 CW1 4,500,000 150 Lineal meters Construction of Flood Mitigation Structure 120.459400 15.911100 120.459300 15.911100 20-Jun-19 31-Aug-19 Work, GPS, Planned Start and End Dates,
Construction of Slope Protection, Barangay Ican, Malasiqui, 0 supplied Data : Physical Target, Unit of Measure, Type of
P00353119LZ Pangasinan CW1 4,500,000 CW1 4,500,000 70 Lineal meters Construction of Flood Mitigation Structure 120.408890 15.949720 120.403330 15.966670 20-Jun-19 30-Sep-19 Work, GPS, Planned Start and End Dates,
Construction of Slope Protection, Barangay Talospatang, 0 supplied Data : Physical Target, Unit of Measure, Type of
P00353120LZ Malasiqui, Pangasinan CW1 5,000,000 CW1 5,000,000 100 Lineal meters Construction of Flood Mitigation Structure 120.459100 15.914700 20-Jun-19 30-Sep-19 Work, GPS, Planned Start and End Dates,
Construction of Road, Sitio Purok 4, Barangay Alinggan, 0
P00354273LZ Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.320 Lane Km Construction of Concrete Road 120.408940 15.844460 120.409290 15.837990
Construction (Completion) of Roads, Barangay Amancosiling 0
P00354260LZ Norte, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.350 Lane Km Construction of Concrete Road 120.454500 15.789900 120.455100 15.789200
Construction of Road, Barangay Amanperez, Bayambang, 0
P00354265LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.262 Lane Km Construction of Concrete Road 120.422600 15.827600 120.422200 15.828700
0
P00354266LZ Construction of Road, Barangay Cadre Site, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.340 Lane Km Construction of Concrete Road 120.454820 15.806380 120.453010 15.806100
Project ID and Description (FROM) Components (TO) Components GPS Planned Start and End Dates Supplied Data/Revisions Made

0
P00354268LZ Construction of Road, Barangay Pangdel, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.350 Lane Km Construction of Concrete Road 120.421970 15.768740 120.424000 15.767480
Construction of Road, Barangay San Gabriel 1st, Bayambang, 0
P00354270LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.320 Lane Km Construction of Concrete Road 120.461290 15.769960 120.462640 15.768530
Construction of Road, Sitio Caloocan, Barangay Zone VII, 0
P00354272LZ Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.270 Lane Km Construction of Concrete Road 120.450810 15.820560 120.449700 15.820830
0
P00354267LZ Construction of Road, Barangay Iton, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.320 Lane Km Construction of Concrete Road 120.469700 15.768300 120.468800 15.766600
Concreting of Road, Sitio Sagur, Barangay Caoayan Bogtong, 0
P00354259LZ Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.320 Lane Km Construction of Concrete Road 120.393660 15.951500 120.390530 15.952240
0
P00354258LZ Concreting of Road, Barangay Tambac, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.300 Lane Km Construction of Concrete Road 120.407060 15.935310 120.405760 15.934710
0 120.458780 15.872000 120.458190 15.873550
P00354257LZ Concreting of Road, Barangay Bakitiw, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.280 Lane Km Construction of Concrete Road 120.461856 15.873090 120.462755 15.884300
Construction of Barangay Road Dona Maria, Barangay Bued, 0
P00354261LZ Calasiao, Pangasinan CW1 2,000,000 CW1 2,000,000 0.140 Lane Km Construction of Concrete Road 120.386970 16.012275 120.388693 16.019770
Construction of Road, Barangay Pangoloan, San Carlos City, 0
P00354269LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.220 Lane Km Construction of Concrete Road 120.322200 15.925900 120.320100 15.925700
Construction of Road, Sitio Broadway, Barangay Aponit, San Carlos 0
P00354271LZ City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.280 Lane Km Construction of Concrete Road 120.286700 15.897200 120.285200 15.899400
Construction of Multi-Purpose Building (Red Cross Building), Construction_of_Multi_Purpose_Building
P00349374LZ Barangay Agdao, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction_of_Multi_Purpose_Building 120.328400 15.906600

Construction of Multi-Purpose Building (Amphitheater), DepEd Construction of Multi Purpose Building


P00349373LZ School Division Office, Roxas Blvd., San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction_of_Multi_Purpose_Building 120.344700 15.931900
Construction (Completion) of Multi-Purpose Building (Day Care Construction of Multi Purpose Building
P00349372LZ Center), Barangay Don Pedro, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction_of_Multi_Purpose_Building 120.430519 15.885935
Construction (Completion) of Multi-Purpose Building, Brgy. Construction of Multi Purpose Building
P00341379LZ Binalay, Malasiqui, Pangasinan CW1 1,000,000 CW1 1,000,000 1 Number of Buildings Construction of Multi Purpose Building 120.430275 15.905519

Construction of Bliss Pagal Multi-Purpose Building (Agricultural Construction of Multi Purpose Building
P00341380LZ Compound), Pagal, San Carlos City, Pangasinan CW1 3,200,000 CW1 3,200,000 1 Number of Buildings Construction of Multi Purpose Building 120.334400 15.944400
Construction of Multi-Purpose Building (Health Center), Brgy. Construction of Multi Purpose Building
P00341381LZ Caturay, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building 120.375310 15.788500
Construction of Multi-Purpose Building (Health Center), Brgy. Construction of Multi Purpose Building
P00341382LZ Idong, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Multi-Purpose Building (Health Center), Brgy. Construction of Multi Purpose Building
P00341383LZ Olea, Malasiqui, Pangasinan CW1 1,500,000 CW1 1,500,000 1 Number of Buildings Construction of Multi Purpose Building 120.486115 15.861602
Construction of Multi-Purpose Building (Health Center), Brgy. Construction of Multi Purpose Building
P00341384LZ Longos, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Multi-Purpose Building (Covered Court), Brgy. Construction of Multi Purpose Building
P00341385LZ Sapang, Bayambang, Pangasinan CW1 2,400,000 CW1 2,400,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Slope Protection, Brgy. Amancosiling Norte, Construction of Slope Protection Structure
P00345146LZ Bayambang, Pangasinan CW1 5,000,000 CW1 5,000,000 1465.91 Square meters Construction of Slope Protection Structure
Construction of Slope Protection, Brgy. Malimpec, Malasiqui, Construction of Slope Protection Structure
P00345147LZ Pangasinan CW1 5,000,000 CW1 5,000,000 110 Square meters Construction of Slope Protection Structure
Construction of Slope Protection, Brgy. Mestizo Norte, San Carlos Construction of Slope Protection Structure
P00345148LZ City, Pangasinan CW1 5,000,000 CW1 5,000,000 110 Square meters Construction of Slope Protection Structure
Improvement/Rehabilitation of Slope Protection, Brgy. Paragos, Construction of Slope Protection Structure
P00345149LZ Bayambang, Pangasinan CW1 5,000,000 CW1 5,000,000 110 Square meters Construction of Slope Protection Structure
Construction of Slope Protection, Brgy. San Gabriel 2nd, Construction of Slope Protection Structure
P00345150LZ Bayambang, Pangasinan CW1 7,900,000 CW1 7,900,000 2316.138 Square meters Construction of Slope Protection Structure
Concreting of Local Road, Brgy. Antipangol, San Carlos City, Construction of Concrete Road
P00346544LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346545LZ Concreting of Local Road, Brgy. Asin Weste, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Road, Brgy. Batangcaoa, Bayambang, Construction of Concrete Road
P00346546LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346547LZ Concreting of Local Road, Brgy. Canan Sur, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346548LZ Concreting of Local Road, Brgy. Carungay, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346549LZ Concreting of Local Road, Brgy. Gomez, Malasiqui, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346550LZ Concreting of Local Road, Brgy. Mangayao, Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Road, Sitio Baguiwat, Brgy. Payar, Malasiqui, Construction of Concrete Road
P00346551LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Road, Sitio Oryaw & Sitio Anaytayan, Brgy. Construction of Concrete Road
P00346552LZ Calomboyan, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346555LZ Concreting of Local Roads, Brgy. Bega, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Roads, Brgy. Capataan, San Carlos City, Construction of Concrete Road
P00346556LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346557LZ Concreting of Local Roads, Brgy. Polo, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Concreting of Local Roads, Brgy. San Juan, San Carlos City, Construction of Concrete Road
P00346558LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Concrete Road
P00346559LZ Concreting of Local Roads, Brgy. Tebag, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.311 Lane Km Construction of Concrete Road
Construction of Flood Control, Brgy. Salinap, San Carlos City, Construction of Flood Mitigation Structure
P00353324LZ Pangasinan CW1 8,000,000 CW1 8,000,000 8000 Lineal meters Construction_of_Flood_Mitigation_Structure
Construction of Flood Control, Brgy. Warding, Bayambang, Construction of Flood Mitigation Structure
P00353325LZ Pangasinan CW1 7,000,000 CW1 7,000,000 0 Lineal meters Construction_of_Flood_Mitigation_Structure

Rehabilitation/Construction of Local Road Sitio Nalsian - Bacayao, Rehabilitation of Concrete Road


P00354275LZ Brgy. Nalsian, Calasiao, Pangasinan CW1 7,000,000 CW1 7,000,000 0.583 Lane Km Rehabilitation_of_Concrete_Road
Rehabilitation of Brgy. Road, Ababa Road, Sitio Riverside, Brgy. Rehabilitation of Concrete Road
P00354274LZ Dinalaoan, Calasiao, Pangasinan CW1 2,000,000 CW1 2,000,000 0.167 Lane Km Rehabilitation_of_Concrete_Road
Construction of Gravel Road
P00354263LZ Construction of Local Road, Brgy. Isla, San Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 0.167 Lane Km Construction_of_Gravel_Road
Construction of Local Road, Sitio Laoac, Brgy. Tococ West, Construction of Gravel Road
P00354264LZ Bayambang, Pangasinan CW1 2,000,000 CW1 2,000,000 0.167 Lane Km Construction_of_Gravel_Road
Construction of Local Road, Brgy. Balayong, San Carlos City, Construction of Concrete Road
P00354262LZ Pangasinan CW1 2,000,000 CW1 2,000,000 0.167 Lane Km Construction_of_Concrete_Road
Construction (Completion) of Pangasinan IV DEO Building, Tuliao, 0
P00348265LZ Sta. Barbara, Pangasinan CW1 6,000,000 0 6,000,000 0 0 0
Construction (Completion) of Waig-Tobor Bridge and Approaches, 0
P00355786LZ Barangay Waig, Malasiqui, Pangasinan CW1 20,000,000 0 20,000,000 0 0 0
Construction of Multi-Purpose Building in Brgy. Balaya, San Carlos Construction of Multi Purpose Building
P00349375LZ City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Multi-Purpose Building in Brgy. Matagdem, San Construction of Multi Purpose Building
P00349376LZ Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of Multi-Purpose Building in Brgy. Bega, San Carlos Construction of Multi Purpose Building
P00349377LZ City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building
Project ID and Description (FROM) Components (TO) Components GPS Planned Start and End Dates Supplied Data/Revisions Made

Construction of Multi-Purpose Building in Brgy. Mabalbalino, San Construction of Multi Purpose Building
P00349378LZ Carlos City, Pangasinan CW1 2,000,000 CW1 2,000,000 1 Number of Buildings Construction of Multi Purpose Building

Construction of Multi-purpose Building (School


Gymnasium/Covered Court), Palaming Elementary School, Brgy. Construction of Multi Purpose Building
P00349379LZ Palaming, San Carlos City, Pangasinan CW1 3,000,000 CW1 3,000,000 1 Number of Buildings Construction of Multi Purpose Building

Construction of Multi-purpose Building (School


Gymnasium/Covered Court), Doyong National High School, Brgy. Construction of Multi Purpose Building
P00349380LZ Doyong, San Carlos City, Pangasinan CW1 3,000,000 CW1 3,000,000 1 Number of Buildings Construction of Multi Purpose Building

Construction of Multi-purpose Building (School


Gymnasium/Covered Court), Brgy. Aponit, San Carlos City, Construction of Multi Purpose Building
P00349381LZ Pangasinan CW1 3,000,000 CW1 3,000,000 1 Number of Buildings Construction of Multi Purpose Building
Repair/Rehabilitation of Multipurpose Building (Covered Court), Rehabilitation / Major Repair of Multi Purpose
P00349382LZ Brgy. Ambayat 2, Bayambang, Pangasinan CW1 3,000,000 Building CW1 3,000,000 1 Number of Buildings Rehabilitation / Major Repair of Multi Purpose Building
Construction of Multi-Purpose Building , Beleng National High Construction of Multi Purpose Building
P00349383LZ School, Bayambang, Pangasinan CW1 18,303,000 CW1 18,303,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of MPB, Bolaoit Elementary School, Malasiqui, Construction of Multi Purpose Building
P00349384LZ Pangasinan CW1 12,402,000 CW1 12,402,000 1 Number of Buildings Construction of Multi Purpose Building
Construction of MPB, Mapandan National High School, Construction of Multi Purpose Building
P00349385LZ Mapandan, Pangasinan CW1 9,636,000 CW1 9,636,000 1 Number of Buildings Construction of Multi Purpose Building

Das könnte Ihnen auch gefallen