Existing Status Online Building Permission System (OBPS) –for AMRUT Cities and ULBs in

Andhra Pradesh

Before OBPS (Offline Submission)

 Number of procedures for issuance of Building Plan with time line


 What are the NOC required for issuance of Building Plan/Layout Plan/Industrial Plan/ MSB
 Time line for Site Inspection/ Joint Inspection/ Issuance of Occupancy and Completion
Certificate
 Checklist for apply Building Plan

When OBPS is introduced or made operational in Andhra Pradesh?

 (wide Notification,/Amendment/Circular or else related to OBPS )

Then and Now


1. Registration/Renewal of empanelled Architect/Engineers/Planers/ Individual
2. Issuance of ID and Password for Architect/Engineers/Planers/ Individual
3. Types of Building Permission (Risk Base Building/Green Buildings as per Building Bye Laws)
4. Issuance of NOC (Internal Agencies and External Agencies) integrated with Common
Application Form/Apply Manual/ Automated with GIS or any other process
5. Automated fee calculator
6. Statistics of Building Plan Approval and Rejection Status during any specified period (if
so issued, maybe 3 - 6 months of observation)
Period No of No of Avg. Avg. No of No of Avg. No of
Applications Approvals Time Cost of relaxations/ cases Time for cases
taken (in Fees (in Discretions rejected rejection in
days) Rs) given process
From To

7. NOC at Occupancy cum Completion stages


8. The status of the following Reforms and Benchmarks may also be listed/detailed-
 Risk based classification – Any Building classification for approval, inspection and
completion as per risk involved.
 CCZMs of NOC agency – Does the agency have a Colour Coded Zoning Map? Integrated
with the OPBS?
 GIS based CCZM – is it GIS based CCZM? Shared with the ULB? Uploaded on the agency
website?
 Online calculator – for prior estimation of Cost of NOC.
 Single Joint Site Inspection – Does the agency represent itself in the SJI?
 Web interface redesign \ modification – Interactive web portal design with modules
 User Manuals – for online user training and ease of applications for NOC
 Checklist of documents – for user assistance in appropriate application with list of all
documents required for NOC
 Notification and Circular updates – for updated information and reference
 Updated FAQs – Interactive/Static FAQs, update frequency
 Capacity Building Training Calendar – Capacity Building Training calendar, if any?.
 Walk through Videos of OBPS
 Social Awareness of OBPS: Facebook, Twitter, WhatsApp, Telegram etc.,
 Star Rating System for OBPS

9. Major bottle necks


a) Process Issues: if any
b) Payment issues: If any
c) IT issues: if any.
d) BBL issues: if any.
e) Integration issues: if any
f) Maximum Delay: if anywhere, Department/process and what predominant reasons.

10. Statistics of NOC issued during any specified period (if so issued, maybe 3-6 months
of observation):

Period No of No of Avg. Avg. No of No of Avg. No of


Applications Approvals Time Cost of relaxations/ cases Time for cases
taken Fees (in Discretions rejected rejection in
(in days) Rs) given process
From To

11. What is the procedure for applying for Building Plan/ Layout Plan/Industrial Plan/
Multistoried Building Plan in Andhra Pradesh Capital Region Development Authority area

12. If any other information pertaining to OBPS