Productivity Improvement in a refrigerator

plant through Lean Manufacturing

1.1 1.2 1.3 1.4


Initiation Planning Execution Closure

1.2.1 1.3.3 1.3.6 1.4.1


Brainstorming 1.3.1 1.3.2 1.3.4 1.3.5 Update and
Study of current Implementation
the list of Literature Review Data Recording Critical Examination Documentation compile report
1.1.1 1.1.2 1.1.3 assembly line
Kick Off Meeting Industrial Visit Project Charter activities

1.3.3.1 1.3.5.1 1.4.2


1.2.2 1.3.2.1 1.3.4.1
1.1.2.1 1.1.3.1 1.3.1.1 Developing Collection of 1.3.6.1 Verify all the work
1.1.1.1 Development of Time and Line Balancing
Assigning of Development Process Study precedence Data for the Lean tools and overview
Assigning of WBS Motion Study
Project Co- Of Project report
Industry ordinator Charter 1.3.4.2
1.3.3.2 Current layout
1.2.3 1.3.1.1.1 study
1.1.1.2 Development of 1.3.5.2
Development of Case
1.1.2.2 1.1.3.2 current flow Compilation Of 1.4.3
Literature Gantt Chart Studies
Defining scope Submission process report FYDP report
Review and 1.3.4.3
of Project and Approval Submission
Intial Report Takt time
Submission 1.3.1.1.2 calculation
1.2.4 Reading 1.3.5.3
Defining roles and books Submission of
responsibilities 1.3.4.4 Initial Literature
Identify Review 1.4.4
bottlenecks FYDP Presentation
1.3.1.1.3 and wastages
E-books

1.3.4.5
Proposal of
optimized plan 1.4.5
1.3.1.2 Revised FYDP
Lean report submission
Methodology
1.3.4.5.1
Improved flow
Doc Version: 1.0 process chart
Date:
1.3.4.5.2 Signature
Prepared By: Team Members Improved
Line
Advisor 1: Dr M Fahad Internal Advisor 1: ____________
balancing
Advisor 2: Naima Javed
Internal Advisor 2: ____________
1.3.4.5.3
Signature: Improved
Layout External Advisor: _____________

Das könnte Ihnen auch gefallen