Sie sind auf Seite 1von 5

18000 18000

5000 4000 4000 5000 5000 4000 4000 5000

2000 3000 2000 2000 2000 3000

W1 W5 W5 W1 W1 W9 W6 W5 W1
4000

4000

W3

W3
W3 D5
D7 D7
1250 1250

1250 1250

W9
W9
D6

D4
D4

W9
D6

W9
5000

5000

D3
1500

1000 1500
W8

W8
18000

18000
3000

W6
D5
4000

4000

W4
D2
2000

W6
D5
5000

5000

W7
W2
W7
D1 D1
D5
D3 D3
1000

1000
W1
W3

GROUND FLOOR PLAN TYPICAL THIRD & FOURTH FLOOR PLAN

18000 18000

5000 4000 4000 5000 5000 4000 4000 5000

2000 2000 2000 3000 3000 2000

W1 W9 W6 W5 W1
4000

4000
W3

W3

W3 D5
D7
1250 1250

W9

D6
D4

W9

D6
5000

5000
D3

PERSPECTIVE
1500

W8
18000

18000
3000

W6

D5
4000

4000
D2
2000

W6
5000

5000
W2

W7

D5
D3 D3
1000

1000
W1
W3 W7

SECOND FLOOR PLAN ROOFDECK PLAN

PROJECT NAME & LOCATION: SUBMITTED BY: SUBMITTED TO: SHEET CONTENT: SET: SHEET NO.:
Republic of the Philippines
CAGAYAN STATE UNIVERSITY -PERSPECTIVE
Carig Campus, Tuguegarao City, Cagayan VRILLIANT B. PALTEP
COLLEGE OF ENGINEERING PROPOSED FOUR-STOREY COMMERCIAL BUILDING BSCE 5C
ENGR. RAIZA CAMMA
-GROUND FLOOR PLAN
-SECOND FLOOR PLAN
-TYPICAL THIRD & FOURTH FLOOR PLAN BUILDING
1
CIVIL ENGINEERING DEPARTMENT
TUGUEGARAO CITY, CAGAYAN
RICARDO D. LOZANO PROFESSOR -ROOFDECK PLAN 5
BSCE 5C
A B C D E

TOP OF BUILDING
TOP OF BUILDING

1000 1400

1000 1400
TOP OF PARAPET WALL
TOP OF PARAPET WALL

ROOFDECK FFL
ROOFDECK FFL
3000

3000
FOURTH FLOOR FINISH LINE
FOURTH FLOOR FINISH LINE
3000

3000
14700

14700
THIRD FLOOR FINISH LINE
THIRD FLOOR FINISH LINE
3000

3000
SECOND FLOOR FINISH LINE

SECOND FLOOR FINISH LINE


3000

3000
GROUND FLOOR FINISH LINE GROUND FLOOR FINISH LINE

300
300

GRADE LINE GRADE LINE

FRONT ELEVATION LEFT SIDE ELEVATION

E D C B A

PROJECT NAME & LOCATION: SUBMITTED BY: SUBMITTED TO: SHEET CONTENT: SET: SHEET NO.:
Republic of the Philippines
CAGAYAN STATE UNIVERSITY
Carig Campus, Tuguegarao City, Cagayan VRILLIANT B. PALTEP -FRONT ELEVATION

COLLEGE OF ENGINEERING PROPOSED FOUR-STOREY COMMERCIAL BUILDING BSCE 5C


ENGR. RAIZA CAMMA
-REAR ELEVATION
-LEFT SIDE ELEVATION BUILDING
2
CIVIL ENGINEERING DEPARTMENT
TUGUEGARAO CITY, CAGAYAN
RICARDO D. LOZANO PROFESSOR
-RIGHT SIDE ELEVATION
5
BSCE 5C
18000 18000

5000 4000 4000 5000 5000 4000 4000 5000


2000 2000 2000 2000 1000

FTB1 FTB1 FTB1 B-1 B-2 B-2 B-1


FTB1

2000
S13
C1 - FI C1 - FI C1 - FI C1 - FI C1 - FI

4000
4000

FTB1

SB - 4
B-2

B-2

B-2

B-2

B-2
TB1

TB1

TB1
S4 S14 S6 S4
SB - 5

2000
S13

1250 1250
FTB1 FTB1 FTB1 FTB1 CB-1 B-1 B-2 B-2 B-1
S9 S10

SB - 5
C1 - FI C1 - FI C1 - FI C1 - FI WF1 WF1 C1 - FI SB - 4
S9 S10

WF1-TB1

5000
5000

B-1

B-1

B-1

B-1

B-1
TB1

TB1

TB1
S2 S3 S4 S4

FTB1

SB - 3
WF1 WF1 SB - 4

1500
S11

WF1 SB - 1
S12

18000
18000

3000
TB1 TB1 TB1 TB1 CB-2 B-1 B-2 B-2 B-1

S7
C1 - FI C1 - FI C1 - FI C1 - FI C1 - FI

4000
4000

FTB1

B-2
B-2

B-2
B-2

B-2
S4

TB1

TB1

TB1

SB - 3
S1 S6 S6

FTB1
SB - 1

979
FTB1

STAIR WELL

CB-1

TB1 TB1 TB1 FTB1 B-1 B-2 B-2 B-1

1550
C1 - FI C1 - FI C1 - FI C1 - FI C1 - FI

FTB1

5000
5000

STAIR WELL

B-1

B-1

B-1

B-1

B-1
WF1
TB1

TB1

TB1

TB1
S3 S4 S4

3450
SB - 2

SB - 2
S5

TB1 TB1 TB1 TB1 B-1 B-2 B-2 B-1

1000
1000

CB-1
S2

CB-1

CB-1

CB-1
S1 S1
1000 SB - 3 SB - 3 SB - 3
WF1
C1 - FI C1 - FI C1 - FI C1 - FI C1 - FI

FOUNDATION PLAN SECOND FLOOR FRAMING PLAN

18000 18000

5000 4000 4000 5000 5000 4000 4000 5000

2000 2000 2000 3000

B-1 B-2 B-2 B-1 RB - 1 RB - 2 RB - 2 RB - 1


2000

S11
4000

4000

RB - 2

RB - 2

RB - 2

RB - 2

RB - 2
B-2

B-2

B-2

B-2

B-2
S6 S4 S4
S4 S12 S4 S6 S6
SB - 5
2000

S11
1250 1250

CB-1 B-1 B-2 B-2 B-1 CB-1 RB - 1 RB - 2 RB - 2 RB - 1


S7 S8
SB - 5

SB - 4
S7 S8

RB - 1
5000

5000

RB - 1

RB - 1

RB - 1

RB - 1
B-1

B-1

B-1

B-1

B-1

S2 S3 S4 S4 S2 S3 S4 S4 S3

RSB - 3
SB - 3

SB - 4
1500

S9

SB - 1
S10
18000

18000
3000

CB-2 B-1 B-2 B-2 B-1 CB-2 RB - 1 RB - 2 RB - 2 RB - 1

RSB - 3

RB - 2

RB - 2
4000

4000

RB - 2

RB - 2
B-2
B-2

B-2
SB - 3

B-2

B-2

S4 S6 S4 S4 S6 S4
S1 S6 S1 S6
2000

CB-1 CB-1

B-1 B-2 B-2 B-1 SB - 2 RB - 1


1550

RB - 4

RB - 1
5000

5000

RB - 1

RB - 1
B-1

B-1

B-1

B-1

B-1
S3 S4 S4 STAIR WELL S3 S4 S4 STAIR WELL
3450

RSB - 2
SB - 2 RSB - 2
SB - 2

S5 S5

B-1 B-2 B-2 B-1 RB - 1 RB - 2 RB - 2 RB - 1


1000

1000

S2 S2
CB-4

CB-4
CB-2

CB-3

CB-1

CB-2

CB-3
CB-1

S1 S1 S1 S1
SB - 3 RSB - 3
SB - 3 SB - 3 RSB - 3 RSB - 3

TYPICAL THIRD & FOURTH FLOOR FRAMING PLAN ROOF DECK FRAMING PLAN

PROJECT NAME & LOCATION: SUBMITTED BY: SUBMITTED TO: SHEET CONTENT: SET: SHEET NO.:
Republic of the Philippines
CAGAYAN STATE UNIVERSITY -FOUNDATION PLAN
Carig Campus, Tuguegarao City, Cagayan VRILLIANT B. PALTEP
COLLEGE OF ENGINEERING PROPOSED FOUR-STOREY COMMERCIAL BUILDING BSCE 5C
ENGR. RAIZA CAMMA
-SECOND FLOOR FRAMING PLAN
-TYPICAL THIRD & FOURTH FLOOR
FRAMING PLAN BUILDING
3
CIVIL ENGINEERING DEPARTMENT
TUGUEGARAO CITY, CAGAYAN
RICARDO D. LOZANO PROFESSOR -ROOF DECK FRAMING PLAN 5
BSCE 5C
L/4 L/2 L/4 L/4 L/2 L/4

L/5 L/5 L/5 L/5

DETAIL OF CB DETAIL OF B -1 DETAIL OF B -1 DETAIL OF B - 2

CB SCALE 1 : 50 METERS B-I SCALE 1 : 50 METERS B-2 SCALE 1 : 50 METERS

SECTION AT SUPPORT SECTION AT FREESPAN SECTION AT SUPPORT SECTION AT MIDSPAN SECTION AT ENTIRE SPAN
300 300 300 300 300

6 - 20 mm dia. RSB 4 - 20 mm dia. RSB 6 - 20 mm dia. RSB 4 - 20 mm dia. RSB 6 - 20 mm dia. RSB
500

2 - 16 mm dia. RSB
500

2 - 16 mm dia. RSB

500
2 - 16 mm dia. RSB

500
2 - 16 mm dia. RSB

500
2 - 16 mm dia. RSB
4 - 20 mm dia. RSB 6 - 20 mm dia. RSB 4 - 20 mm dia. RSB 6 - 20 mm dia. RSB 4 - 20 mm dia. RSB

STIRRUPS : STIRRUPS : STIRRUPS :


10mm dia. TIES SPACED AT 3@ 75, 5@100, REST @ 150Mmm O.C. 10mm dia. TIES SPACED AT 3@ 75, 5@100, REST @ 150Mmm O.C. 10mm dia. TIES SPACED AT 3@ 75, REST @ 100Mmm O.C.

SB - 3 SCALE 1 : 50 METERS
L/4 L/2 L/4 L/4 L/2 L/4
SECTION AT SUPPORT SECTION AT MIDSPAN
150 150

4 - 16 mm dia. RSB 2 - 16 mm dia. RSB

500
2 - 12 mm dia. RSB

500
2 - 12 mm dia. RSB
2 - 16 mm dia. RSB 4 - 16 mm dia. RSB

STIRRUPS :
10mm dia. TIES SPACED AT 3@ 75, 5@100, REST @ 150Mmm O.C.

L/5 L/5 L/5 L /5

DETAIL OF B - 2 DETAIL OF B -1 DETAIL OF CB DETAIL OF B - 4 DETAIL OF B - 3

B-2 SCALE 1 : 50 METERS B-1 SCALE 1 : 50 METERS CB SCALE 1 : 50 METERS SB - 1 SCALE 1 : 50 METERS SB - 2 SCALE 1 : 50 METERS

SECTION AT ENTIRE SPAN SECTION AT SUPPORT SECTION AT MIDSPAN SECTION AT SUPPORT SECTION AT FREESPAN SECTION AT ENTIRE SPAN SECTION AT MIDSPAN SECTION AT ENTIRE SPAN
300 300 300 300 300
210 210 210

6 - 20 mm dia. RSB 6 - 20 mm dia. RSB 4 - 20 mm dia. RSB 6 - 20 mm dia. RSB 4 - 20 mm dia. RSB
5 - 16 mm dia. RSB 2 - 16 mm dia. RSB 5 - 16 mm dia. RSB

368

368

368
500

500

500

500

500

2 - 16 mm dia. RSB 2 - 16 mm dia. RSB 2 - 16 mm dia. RSB 2 - 16 mm dia. RSB 2 - 16 mm dia. RSB 2 - 12 mm dia. RSB 2 - 12 mm dia. RSB 2 - 12 mm dia. RSB
4 - 20 mm dia. RSB 4 - 20 mm dia. RSB 6 - 20 mm dia. RSB 4 - 20 mm dia. RSB 4 - 20 mm dia. RSB 3 - 16 mm dia. RSB 5 - 16 mm dia. RSB 3 - 16 mm dia. RSB

STIRRUPS : STIRRUPS : STIRRUPS : STIRRUPS : STIRRUPS :


10mm dia. TIES SPACED AT 3@ 75, REST @ 100Mmm O.C. 10mm dia. TIES SPACED AT 3@ 75, 5@100, REST @ 150Mmm O.C. 10mm dia. TIES SPACED AT 3@ 75, 5@100, REST @ 150Mmm O.C. 10mm dia. TIES SPACED AT 3@ 75, REST @ 100Mmm O.C. 10mm dia. TIES SPACED AT 3@ 75, REST @ 100Mmm O.C.

PROJECT NAME & LOCATION: SUBMITTED BY: SUBMITTED TO: SHEET CONTENT: SET: SHEET NO.:
Republic of the Philippines
CAGAYAN STATE UNIVERSITY
Carig Campus, Tuguegarao City, Cagayan VRILLIANT B. PALTEP
COLLEGE OF ENGINEERING PROPOSED FOUR-STOREY COMMERCIAL BUILDING BSCE 5C
ENGR. RAIZA CAMMA
-DETAILS OF BEAMS
-SCHEDULE OF BEAMS BUILDING
4
CIVIL ENGINEERING DEPARTMENT
TUGUEGARAO CITY, CAGAYAN
RICARDO D. LOZANO PROFESSOR
5
BSCE 5C
2500
400
O.C. B.U 1/2 @ L /4W/ EXTRA TOP
10 - 20mm dia. MATTING BARS
SPACED AS SHOWN BOTHWAYS BARS SPACED @ 400mm.

150
BEAM BEAM

2750
10 - 20mm dia. BOTTOM BARS
SPACED AS SHOWN BOTHWAYS
2500

500

3 - 25mm dia. Vertical Bars


ROOFDECK FLR. FINISH LINE L/4 L/2 L/4
4 - 20mm dia. Vertical Bars
3 - 25mm dia. Vertical Bars L
C1 PLAN
PLAN SECTION
6 - 25mm, 4 - 20mm dia. VERTICAL BARS with 10 - 20mm dia. VERTICAL BARS with

3300
10mm dia. TIES 3@ 75, 5@100, REST @ 10mm dia. TIES 3@ 75, 5@100,

2750
150Mmm O.C.
REST @ 150Mmm O.C.
200mm O.C. B.U 1/2 @ L
/4W/ EXTRA TOP BARS
GRADE LINE SPACED @ 400mm.
THIRD FLR. FINISH LINE
1500

550
10 - 20mm dia. MATTING BARS
2000

SPACED AS SHOWN BOTHWAYS L/4

15730
TIE BEAM 10 - 20mm dia. MATTING BARS LONG DIRECTION
SPACED AS SHOWN BOTHWAYS
500

3300

2750
150mm THK. GRAVEL BEDDING

550
SECOND FLR. FINISH LINE

DETAIL OF C1-F1

SHORT DIRECTION
3630

2500

GROUND FLR.
FINISH LINE
A
550 1650 329

STREET LINE
10mm dia. RSB SPACED AT
400mm O.C.
2200

GRADE LINE
250
TIE BEAM TIE BEAM
500 1500

400
2000

3-20mm dia. HOR. BARS


2-16mm dia. HOR. BARS
3-20mm dia. HOR. BARS

PLAN
10mm dia. STIRRUPS 3@ 75,
5@100, REST @ 150Mmm O.C.

DETAILED SECTION OF

DETAIL OF TIE BEAM


FOOTING & COLUMN TYPICAL SLAB DETAIL

PROJECT NAME & LOCATION: SUBMITTED BY: SUBMITTED TO: SHEET CONTENT: SET: SHEET NO.:
Republic of the Philippines
CAGAYAN STATE UNIVERSITY -DETAILS OF C1-F1
Carig Campus, Tuguegarao City, Cagayan VRILLIANT B. PALTEP
COLLEGE OF ENGINEERING PROPOSED FOUR-STOREY COMMERCIAL BUILDING BSCE 5C
ENGR. RAIZA CAMMA
-DETAIL OF TIE BEAM
-DETAILED SECTION OF FOOTING
AND COLUMN BUILDING
5
CIVIL ENGINEERING DEPARTMENT
TUGUEGARAO CITY, CAGAYAN
RICARDO D. LOZANO PROFESSOR -TYPICAL SLAB DETAIL 5
BSCE 5C

Das könnte Ihnen auch gefallen