NEBOSH International General Certificate

in Occupational Health and Safety

UNIT IGC3: HEALTH AND SAFETY PRACTICAL


APPLICATION

Student Name: MOHAMMED EESA

Student Number: 00394172

Date of Submission: -2017

APPENDIX 1
GC3 – The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessment ie. the completed observation sheets
and the report to management, is my own work. I recognise that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

For completion by a course provider representative (eg internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognise that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print) MOHAMMED EESA_________________

Signature _________________________________

Date _________________________________

For completion by the course provider’s internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognise
that contravention of this statement constitutes malpractice and may result in my being subject to the penalties
set out in the NEBOSH Malpractice policy.

Name (Print) _________________________________

Signature _________________________________

Date _________________________________

NB: This declaration must be completed in full, submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.

APPENDIX 3
GC3 – THE HEALTH AND Assessor’s marking sheet
SAFETY PRACTICAL APPLICATION

Date of practical application 24-7-2017 Name of assessor

Course provider Course provider


number name
Southern Institute Services

Student number 00394172 Student name MOHAMMED EESA

NEBOSH
Maximum
Assessor’s moderated
marks
Criteria available
marks awarded marks
(if different)

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

Identification of suitable control measures and


1.2 timescales
15

2 Report - Introduction and Executive Summary

2.1 Introduction providing an ovrview of the chosen area 5

2.2 Executive summary 5

3 Report - Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of legislation


3.2 and/or standards
5

3.3 Persuasiveness / conciseness / technical content 10

4 Report - Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 improve health and safety in the chosen area
15

TOTAL MARKS 100

Outcome: PASS (60% or more) REFER (less than 60%)


Date assessed ____ / ____ / ____

Assessor’s signature ______________________

Date received by course provider ____ / ____ / ____

Date received by NEBOSH


(if applicable) _____ / _____ / _____

Assessor’s additional comments on the practical application:

ASSESSED BY (name in block letters) _________________________________________________

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY

NEBOSH Moderator’s comments:

APPENDIX 4
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name MOHAMMED EESA Student number 00394172

Place inspected: LARSEN AND TOUBRO, Chennai Date of inspection 24/7/2017

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

IMMEDIATE ACTIONS:
1.It is found that welder was inform immediately to the
using damaged insulated cable supervisor to inform the welder to One day
and it was entangled to the remove the cable which entangled to
scaffold tube, when working at
the scaffold
minus -42 elevation platform of One week
LONG TERM ACTIONS:
N1 jacket which leads to the
The hooks must be insulated and
flow of electricity through the
entire scaffold and causes free from sharp edges
suggest to the engineer to provide One week
electrical shock to the workers
who were working on the the portable appliance test labels for
scaffold and who touch the the cables
scaffold suggest to the supervisor to provide One week
the 'S' types of hooks to hang the
cables when routing the cables to
the heights

2 .Found that the welder while climbing IMMEDIATE ACTIONS:


the ladder he did not maintain the 3 In form immediately to the
point contact and he was climbing the
supervisor to inform the works to one day
ladder by catching his tools bucket
which leads to fall from ladder and maintain the 3 point contact while
causes fatality fractures and bones climbing the ladder
brackage LONG TERM ACTIONS:
suggest to the engineer to provide Three days
the pulley for lowering and hoisting
the materials

IMMEDIATE ACTIONS:
3 .Noticed that the cherry picker/man is
moving lift from -27 elevation to -10 inform immediately to the
elevation area at N2 jacket with raised supervisor to inform the operator to Immediately
cradle which leads to the boom lower the cradle while it is moving
collapse due to hydraulic failure and
from one place to another
man lift topple due to excess
movement and uneven surface area LONG TERM ACTIONS:
which leads to head injury, breakage advise to the safety supervisor to
of bones ,fall down of persons from make sure to assist the banks men 2 weeks
cradle causes ,fatality
with the man lift and he must hold
the flags to guide the operator
IMMEDIATE ACTIONS:
inform to the concern supervisor to
4. It was found that the worker who is inform to the workers to remove the
doing arrangements for the hydro knot to lanyard and give the proper 1 day
testing to flooding line of buoyancy instructions to the workers who
tank at N1 jacket approximately 5
meter height, he worn the full body works at height and conduct tool box
harness but he tied the knot to the talks and show the demo of using
lanyard which leads to the improper full body harness prior to the work
function of the full body harness and LONG TERM ACTIONS:
causes severe injuries to spinal cord
and testis suggest to the safety supervisor to
provide the practical training to the 2 weeks
workers on usage or to bring the
awareness in the workers on wearing
the full body harness

IMMEDIATE ACTIONS:
inform to the supervisor to provide
the ear plugs to the every workers
5. It was observed ,the
gouger ,who is gouging the mud who are exposing to the loud noise
or suspend the work temporarily Same day
mate of N1 jacket in mobile
shelter area is generating the until the gouging work finish
high level noise ,where the fit up LONG TERM ACTIONS:
is also working beside the suggest to the safety engineer to
gouging work which causing ear make the provision of ear plugs /ear
muffs to each and every worker as 1 month
pain and temporary reduction in
hearing sensitivity mandatory personal protective
equipment

IMMEDIATE ACTIONS:
inform immediately to the
supervisor to suspend the activity
6. It was observed that the gas until the gas cutter cover his working
cutter who was working on the platform with the fire proof blanket Immediately
18m height scaffold for cutting and suggested him to remove the
the profile cut to ''X'' bracing of oxygen cylinder from that area
launch truss at N 2 jacket the LONG TERM ACTIONS:
sparks are falling on the oxygen
suggest the engineer to provide the
cylinder pallet, which leads to
working environment free
the fire and explosion ,causes
skin burns property damage, from the hazards and store the
cylinders at one location that should Four days
fatality
not be near to the ignition sources
APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name ______________________________________ Student number __________________

Place inspected _____________________________________ Date of inspection ___ / _____ / _____

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

IMMEDIATE ACTIONS:
7. It was found that the fitter inform immediately to the
group who has done the supervisor to make sure to remove
erection work of mock up frame the scrap materials from the scaffold Same day
of boat landing on N 2 jacket
and brief the workers in the tool box
,they left the tools, metal scrap,
talks about the consequence of the
tools, and the grinder left cutting
falling objects
disc on the scaffold, which
results in the tripping hazards , LONG TERM ACTIONS:
falling of objects causes head suggest to safety engineer to provide Fifteen days
and shoulder injury or fatality the work at height training for the
workers and make the provision of
hoisting or lowering the materials

GOOD OBSERVATION
8. It was observed that the
vehicle routes and the it must be continued to avoid the
pedestrian walks ways are vehicle accidents in the yard
segregated with the hand
barricading and appointed the
policy of speed limit is 20km/hr
for vehicles in the yard

9. It was found that the welder IMMEDIATE ACTIONS:


left the electrode sticks inside inform immediately to the welding
foreman and make sure to remove Immediate
the scaffolding tube of scaffold
at positive 5 elevation platform the electrodes from the scaffold tube
(app:21 meter height) at the N1 LONG TERM ACTIONS:
jacket ,which leads to the fall of suggest to the welding engineer to
electrodes from scaffold tube provide adequate training to the One week
during dismantle of scaffold and welders and in -force them to store
it penetrates into the body the electrodes in the electrode oven
causing severe injury and
fatality
IMMEDIATE ACTIONS:
inform to the supervisor to suspend
10. It was observed that the gas
the activity until the gas cutter cover
cutter who was working on the
his working platform with fire proof Immediate
20meter height scaffold for
cutting the profile cut "X" bracing blanket and suggested him to
of launch truss at N2 jacket the remove the oxygen cylinders from
sparks are falling on the oxygen that area
cylinder pallet ,which leads to LONG TERM ACTIONS:
the fire and explosion and suggest the engineer to provide the
causes skin burns, property working environment free from the
damage or fatality hazards and store the cylinders at Four days
one location that should not be near
to the ignition sources

GOOD OBSERVATION
11. It was observed that before maintain in this way to know the
performing the hydro testing to visitors and the workers what work is
the 2inch grout line pipe of N1 going at the area
jacket ,engineer displayed the
permit at work place and
conducting tool box talk and
done the entire area with
barricading with signage and
deployed stand by person for
entry of unauthorized persons
into the testing area
IMMEDIATE ACTIONS:
should inform immediately to the
12. It was observed that the lifting supervisor to check the rigging
rigger while doing the rigging arrangement and the center of Same day
arrangement to lift the tabular gravity prior to lifting
pipe of (length=12m LONG TERM ACTIONS:
weight=4.3ton,diameter=2m)he suggest to the engineer to provide
did not check the center of adequate training to the riggers who
gravity of the tabular pipe ,which are involved in the lifting activity and One week
leads to the unbalancing of the provision of issuing the identity cards
load or the lifting gear failure to the trained rigger and issue the
and the load may fall down and helmets with stickers for the visual
cause fatality to the workers identification of the trained riggers

IMMEDIATE ACTIONS:
should inform to the supervisor
13.It was observed that at immediately to suspend the
buoyancy tank fabrication, simultaneous activities and to
welder is welding the grout line inform the welder to cover his
pipes on the scaffold (app: 7 m ) Immediate
working area to arrest the sparks
height and the gas cutter is falling down
cutting the eye lugs on the same LONG TERM ACTIONS:
scaffold under the welder suggest the engineer that when
platform (app:4 m) height gas simultaneous activities has to
cutter was exposing to the perform first prioritize the activity
welding sparks which are falling and avoid simultaneous jobs and
from height which causes skin frequent monitoring has to be done
burns by the supervisors and provide the Three days
proper instructions to the workers

IMMEDIATE ACTIONS:
inform immediately to the concern
14.Observed that while doing supervisor to cover the holes and to
the sand blasting for N1 jacket make sure the dust should not come
boat landing at mobile shelter out from the enclosed area One day
area ,the blasting area is not
LONG TERM ACTIONS:
enclosed properly .Through the
advise the engineer to allocate the
holes the blasting material flying
outside and spread entire work adequate resources
place which causes effects to
the people like nausea, ill health IMMEDIATE ACTIONS: Ten days
and respiratory diseases inform immediately to the
supervisor to provide the hand
gloves to the rigger One day
15.It was observed that the
LONG TERM ACTIONS:
riggers while pulling the chain of
the chain hoist they did not wear advice to the engineer to conduct Three days
the hand gloves which can the physical training to the riggers
cause cuts and amputation to
the hand IMMEDIATE ACTIONS:
inform immediately to the
supervisor to provide their work
16.It was observed that the place with canopies to reduce the
welder and the grinder are exposure to heat One day
working on -27 elevation of N 2 LONG TERM ACTIONS:
jacket (44 m)height are working suggest to the engineer to provide
in the high temperature which proper ventilation and emphasize
causes skin burns, dizziness ,ill the worker to cover the full body
health effects or dehydration with the coveralls Four days
IMMEDIATE ACTIONS:
inform to the supervisor to check the
17.It was observed that the individual behaviors of the workers
grinder pulling th e plug out by and brief the worker in the tool box
tugging at the flex which is talks while handling the portable One day
connected to the junction box electrical equipment and explain the
and very nearer to the junction hazards associated with the
box fit up group is working in electricity
mobile shelter area while pulling LONG TERM ACTIONS:
the plug forcedly the live cables suggest to the site safety supervisor
may come out and fly on to the to provide the training to the
near by workers which causes workers on using of portable
electrical shocks to the worker equipment and working with Ten days
electricity

IMMEDIATE ACTIONS:
inform the supervisor to clear the
area and maintain good house-
18.It was found that the walking keeping and to maintain the fire
ways points and the fire extinguisher point free from
extinguishers point was obstructions
obstructed with the tabular pipes Same day
LONG TERM ACTIONS:
and with some other scrap
suggest to the engineer to provide
materials which leads to the
tripping hazard causing twisting proper training on emergency
of arms ,causing fractures hand response and responsibilities has to
or legs be taken to their emergency Five days
equipment

IMMEDIATE ACTIONS:
inform to the concern site engineer
to maintain the minimum 20 feet or
6 meter distance between the
19.It was found that the oxygen oxygen and the acetylene cylinders
and dissolved acetylene and keep away from the heat and
Two days
cylinders are stored at the same ignition sources
place and no identification LONG TERM ACTIONS:
signage which causes to high suggest the in-charge of the site to
explosion and uncontrolled fires allocate the permanent storage area
and heavy property damage for oxygen and acetylene cylinders
and maintain minimum distance and
fence the area around the cylinder
storage and provide suitable signage
Two weeks
and make the provision of maintain
check list, fire -fighting equipment
the soap water to check for the
leakage of the cylinder
APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name ______________________________________ Student number __________________

Place inspected _____________________________________ Date of inspection ___ / _____ / _____

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

IMMEDIATE ACTIONS:
inform immediately to the lifting
20.It was found that the tyre supervisor to arrange the out rigger
mounted crane out riggers are pads underneath the out rigger and
not placed on the out rigger One day
adequate information and
wooden pads and the land
instructions has to provide prior to
surface area is not even in
work
condition , which results to the
crane topple and causes LONG TERM ACTIONS:
property damage and fatality suggest to engineer the to make One week
provision of out riggers pads should
be along with the crane

IMMEDIATE ACTIONS:
21.It was observed that the two Advice to the engineer to provide
riggers while lifting the plate the mechanical aids like fork lift to
lift and shift the plate or assist more Immediate
manually which is (app:48kg)are
not following the lifting number of workers to avoid the
principle /technique and lifting physical stress and weight on the
heavy load which causes workers
slipped disc hernia ,cuts and LONG TERM ACTIONS:
pinch points Advice the safety supervisor of the
site to provide the practical training Fifteen days
program to bring the awareness in
the workers in manual handling
IMMEDIATE ACTIONS:
Inform to the supervisor to arrange Same day
22.It was found that the arc welder the mechanical ventilation like
and the mig welder are working at exhauster fan to remove the fumes
the same location side by side at from their work place
mobile shelter area where it is LONG TERM ACTIONS:
covered with canvas both are Ventilation device has to be installed
exposing to the dangerous to extract the fumes and ventilate One week
fumes ,which causes ill health the fresh air like local exhaust
effects and Asphyxiation ventilation

GOOD OBSERVATION Continue this kind of culture and to


23.It was been observed that ,the site avoid the confusion in the worker
evacuation plan was displayed at every and to improve health and safety
place and emergency exit sinage
posted and walkways are been
among workers
segregated with barricading and fire
extinguisher equipment are up to date
and maintaining inspection records at
the site displayed the safety slogans
and work related safety precaution
signage are displayed at every corner IMMEDIATE ACTION:
of the site Inform the safety engineer of the site
to update the health and safety
statistics and display the contact One day
24.It was found that the notice board
was ineffective because they did not numbers of the first aiders with
update the health and safety statistics photograph
and did not display the first aiders LONG TERM ACTIONS:
contact numbers which leads to the
miss perception and could not be able
Advise to the safety supervisor to
monitor the notice board daily and Three days
to contact the persons in the first aid
case maintain up to date information

IMMEDIATE ACTIONS:
inform immediately to the electrical
supervisor to arrange cable ramp the One day
25.It was found that the 440 volts
electrical cable laid across in the cable hangers to route the cables
pedestrians way leads to the cable which should not be expose to the
insulation damages due to the
continues movement of workers on the
workers and with sharp edges
cable which can cause severe LONG TERM ACTIONS:
electrical burns ,electrical shocks and Suggest the engineer to provide the
ventricular fibrillation and fatality cable hanger in more number and One week
conduct the tool box talks prior to
work and engineer has to monitor
the job
IMMEDIATE ACTIONS:
Inform to the supervisor to brief the One day
workers not to eat any food at work
26.It was found that the worker was
eating at the work place which leads to place
the bacteria and the hazardous LONG TERM ACTIONS:
substance to go inside the body Suggest to the engineer to educate
through mouth which causes ,diarrhea, and conduct several health related Fifteen days
stomach pain ,and ill health effects
programs to bring the awareness in
the workers

IMMEDIATE ACTIONS:
Inform immediately to the site in- Immediate
charge to separate those workers
27.It was observed that the two and change the work place location
workers are shouting at each other LONG TERM ACTIONS:
which leads to the violence in the work Suggest to the engineer to brief the
place and causes anger, stress ,fatigue
causes accidents/incidents injuries and workers on problems that are likely
near misses property damage,fatality to occur provide the training to the
staff in dealing with the violence
situation adopt the zero tolerance Fifteen days
policy for the work place violence

IMMEDIATE ACTIONS:
Inform immediately to the concern
supervisor to inform to the workers
28.It was observed that the workers to not to over reach from the basket Immediately
who are working in the man basket for and operate the man basket slowly
tightening the “U” bolts to the grout line
pipes of N 2 jacket ,the worker are over to the work place and tie the basket
reaching from the basket by standing to the structure
on the guard rails and the full body LONG TERM ACTIONS:
harness anchored to the basket which
Suggest to the project manager to
leads to fall down of objects and
persons causing head injuries and use the basket which is fabricated
fractures ,fatality with topless with adequate guard Fourteen days
rails and provide the life line from
the crane hook to anchor the full
body harness

GOOD OBSERVATION
29.It was noticed that, all the welfare
facilities, provided good resting shelter
Continue to maintain this standard
with adequate ventilation and lighting,
washing facilities and maintaining the
daily checklist for hygienic condition
and which are nearer to the work place
which reduces stress ,provide with the
cooling water and the normal
APPENDIX 4

GC3 – THE HEALTH AND Candidate’s observation


SAFETY PRACTICAL APPLICATION sheet

Sheet number of _____

Student name ______________________________________ Student number __________________

Place inspected _____________________________________ Date of inspection ___ / _____ / _____

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

GOOD OBSERVATION
30.It was observed that the scaffolding To be continued to avoid the mixing
damaged material and good condition
of damaged scaffold materials
material are segregated and stack at
the designated area and done with the
hard barricading with signage
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00394172

Location LARSEN AND TOUBRO, Chennai Date of review /2017

Structure report under the following headings:

Introduction including overview of area inspected and activities taking place

The health and safety inspection was carried out at LARSEN AND TUBRO MODULAR
FABRICATION FACILITY, HYDRO CARBON ENGINEERING at Chennai,India.This,facility is a part
of LARSEN & TURBO headquaters situated at, manapakkam, acknowledged as an out- standing
corporate green campus it is spread over 27 acres, in an eco- friendly surroundings with an ample
greenary almost every concreate structure in the campus has won prestigious awards for excellence
in construction .the campus accommodates 1.4lakhsq.m of built up area with a significant capacity.

1. The report is on one of the major and prestigious project of L&T is FORWARD MOUNTED
BLOCK project which is fabricating the two RIG JACKETS (N1 AND N2). The estimation cost of the
project is 400 crores fabricating in 14 acre site. to meet the IGC3 practical requirement the site was
inspected on 23 JULY 2017 its been inspected in a detailed manner and visually carried out from the
main gate, fabrication site and the mobile shelter area.

2. The machinary and the work equipment which are used in the site are man lift, man basket,
welding machine, grinding machine (AG 4, AG 5, AG 6, AG 7, AG 9), tyre mounted crane, crawler
crane (250 MT and 600 MT), gas cutting equipment, flammable and explosive cylinders, forklift, over-
head cranes (EOT and ganetry cranes).the main work activity are involved in this project are erection
work, fabrication work, grinding, ,gas cutting, welding ,manual handling, lifting activity, man basket
operations, working at height, man lift operations, pressure testing activity, electrical works, blasting
and painting works.

3. Now, the man power details of the project are 1 project manager, 1 safety manager, 3 safety
engineer, 10 safety supervisor, 14 engineers, 3 site in-charge, 24 production supervisors, 3
accountants, 425 workers. with 1 assembly point and 14 fire extinguisher point, and wind direction are
placed on the top corners of the workshop, There is the free access to reach to the assembly point,
welfare facilities such as rest room, first aid room ,drinking water facilities and washing facilities are
arranged within the site.
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00394172

Location LARSEN AND TOUBRO, Chennai Date of review 2017

Executive Summary

I would like to thank to the L&T management, engineers and the supervisors who has supported me
to successfully complete my health and safety inspection .The organization follows some of the good
practices like conducting safety induction to the visitors and the new workers ,and maintaining the
visitors register ,providing mentors to the visitors and emergency contact numbers ,maintaining the
safety notice board at the site and the entrance of the gates.

When the inspection was carried out in the work place I have identified some of the good
practices and simultaneously I have observed some unsafe practices such as:

Flammable and explosive cylinders are stored at the same place without any signage and segregation
which results in the fire and explosion , environmental pollution and severe injuries.

Working on mobile elevated working platform like man lift and man basket are not following the
safety precautions which leads to fatality
The high voltage electrical cable is routed in the pedestrian way and damaged insulated cable are
entangled to the scaffold, results in the electrical shock and property damages

Welding fumes and sparks, cutting sparks ,and simultaneously work activity which leads to the
workers are exposing on the line of fire which causes severe skin burns , ill health effects,
asphyxiation.

So, the following hazards implies the breaches of C 167- safety and health in construction
convection,1988(No.167) Article (26),(27),(29)and (17).These breaches attract the enforcement
actions ,from fines and prosecution from sequent incidents like accidents and injuries.

The management has to fulfill the health and safety obligations to comply with the health and safety
standards to avoid prosecutions and the Breach of law

The unattended loose iron scrap materials ,and tools are left on the scaffold platform and lack of
knowledge on wearing full body harness ,and left the electrodes in the scaffold tubes which leads to
falling of objects and the person causing fractures and fatality.

By showing management commitments towards health and safety by giving appropriate training on
work at height, manual handling, fire and electricity, constant supervision and regular inspections and
so by possibly prevent accidents, legal and financial consequences.

Some of the good practices were also observed which encourage or improve safety culture among
the workers are like the welfare facilities are adequate and HSE policy, and the routes were
segregated for the pedestrians and the vehicles, emergency contact numbers and the first aiders
contact numbers displayed in the site notice board and provided medical center inside the
organization.
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00394172

Location LARSEN & TOUBRO, Chennai Date of review 2017

Main findings of the inspection

Observation No. 1, 17, 25: ELECRICAL HAZARDS

It was observed that the workers were using damaged insulation cables and it was entangled to the
scaffold which results in the flow of electricity through the entire scaffold and causes electrical shocks.
found that the grinder was pulling the plug out by tugging at the flex and the people are working near
the connection point which results in causing electrical shocks if the live cable is exposed to the
works, property damage and also found that the high voltage 440volts electrical cable laid down in the
walkway which results in the tripping hazard and property damage and causes severe electric shock
or fatality
The management has to restrict these activities in order to avoid the breach of law and standards

ACCORDING TO:

C167- Safety And Health In Construction Convection, 1988(No.167), Article(26).


C167- Safety And Health In Construction Convection, 1988(No.167), Article(33)

So, the management should take certain measures like using double insulated cable, periodical
inspections, and providing inspection tags, and conducting trainings and awareness programs on
electrical hazard and activities, By monitoring and providing proper instructions given by the
supervisor and information prior to work.

Observation No. 13, 6, 19: FIRE HAZARDS

It was found that the workers are performing the simultaneous operations and being exposed under
the line of fire which could result in the severe injuries and skin burns. And observed that the gas
cutting sparks are falling on the oxygen cylinder pallet which is using for the cutting which leads to the
fire and explosion and causes the fatality and property damage. And was that the flammable explosive
cylinder has no proper designated storage area which results in the fire and explosion , property
damage, burns and sometimes it leads to the emergency in the site.The management has to control
these type of potential hazards to avoid breach of law
ACCORDING TO:

C167- Safety And Health In Construction Convection, 1988 (N.167),Article(8).


C167- Safety And Health In Construction Convection, 1988 (N.167),Article(13).
C167- Safety And Health In Construction Convection, 1988 (N.167),Article(29).
C167- Safety And Health In Construction Convection, 1988 (N.167),Article(27).

The management has to concentrate on these type of high risk activities by taking the control
measures like planning the work priority and designated area should be allocated for the cylinders and
maintain the distance with fencing and signage to educate the workers.

Observation No .22 , 21, 14 ,26 : HEALTH HAZARDS

It was observed that the welders are exposing to the dangerous fumes which are emitting from their
work which leads to the asphyxiation and lung diseases. And the workers are lifting heavy load
manually and not following the lifting technique or procedure which causes musculoskeletal disorders.
And I have identified that the sand blasting material are spread the entire work place area which
causes eye irritation, asphyxiation, acute effects, and lung diseases, .observed that the workers are
taking food at the work place which causes ill-health effects, The organization has to take
precautionary measures to control the health hazards the regulations for health hazards as per breach
of legislation and standards are:
C167- safety and health in construction convection,1988(No.167), Article(28).
The maximum weight convection and recommendation, 1967.
The Factories act,1948(Act No.63 of 1948), as amended by the factories (Amendment) act,1987(act
20 of 1948) section (34), section (36)
So, the management of the organization should follow and reduse the manual handling by using
forklift or trolley ,participation of periodic visits on safe work environment and to conduct the health
awareness programs to the workers to avoid the civil prosecutions compensations in the court.

Observation No. 20, 3, 29 : MOBILE ELEVATED WORKING PLATFORM and EQUIPMENTS


(crane)

It was observed that the tyre mounted crane out riggers wooden pads which results in the unequal
balance on the out riggers causes crane topple, property damages and fatality.it was observed that
the man lift operator was moving the vehicle from one place to another by raising the cradle which
leads to cradle collide with the adjacent structure, boom collapse and people fall from cradle causing
property damage and fatality. The workers were working in the man basket were over reaching from
the basket and stood on the guard rails on the basket leads to fall from basket causing fatality. The
management has to avoid these types of unsafe activities to comply with the health and safety
legislations and standards.

ACCORDING TO:

C167- Safety And Health In Construction In Convection, 1988 (No.167), Article (15).
C167- Safety And Health in Construction in Convection, 1988 (No.167), Article (17).
C167- Safety And Health in Construction In Convection, 1988 (No.167), Article (33)

The organization has to take control measures to avoid accidents/incidents with high risk activity and
mobile elevated working platform and equipments like carrying out of suitable risk assessment, safe
system of work, and procedures to provide adequate and related training and information, instruction
and good supervision to the workers to avoid the legal prosecutions and fines in the court.

observation No. 1, 9, 15, 18 : FALLING HAZARDS

It has been observed that the worker left the electrodes in the scaffold tube which leads to the fall
down of elecrodes when dismantle the scaffold which results in penetrating the electrodes into the
body who works under the area which causes severe injuries and fatality. And observed that the
workers are not maintaining the 3 point contact while climbing the ladder which results to falling
objectives and fall from ladder causes fractures ,severe injuries and also it may lead to fatality which
depends on the height. the workers left the iron scrap materials and tools on the scaffold at the work
place because it results in tripping and falling objects and the person causes head and shoulder injury
and fatality its noticed that the workers does not have the knowledge on the full body harness like the
worker had tied the knot to the lanyard which leads to the improper functioning of the body harness
and when they cause severe injury to the spinal cord and ger injury .

ACCORDING TO:

The management should control these unsafe activites in the work side by providing proper
equipment. training to the workers at work at height. and carry out the risk assessment, and good
supervision.

C167 - Safety And Health In Construction Convection, 1988(No.167),Article (14)


C167 - Safety And Health In Construction Convection, 1988 ,Article (18)
C167 - Safety And Health In Construction Convection, 1988 Article (30)

If there is an accident/incident are occurred regarding the work at height the organisation has to face
the external agencies, enforcement Authorities and legal prosecutions in the courts which results in
direct cost like compensations to the victim, fines and the indirect cost like loss of time and production
and cost of investigation.
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00394172

Location LARSEN AND TOUBRO, Chennai Date of review 2017

Conclusions

The management of L&T are maintaining the good standards of health and safety and the
management allocating the resource to fulfil the health and safety obligations and it follows the good
process like developing the safe system of work, method of statement, carrying out the risk
assessments, and involving the workers while carrying out the risk assessment and maintaining the
permit to work system and improving the health and safety culture by implementing the safety tours,
sudden safety work place inspection by top management, safety awareness programs and safety
award functions.

The health and safety report explains the work place hazards and the consequences are associated
with the hazard and suggest the control measures to prevent the accident/incident at the work place .
increase the high standard of safety by finding and by rectifing the faults in the system and it also
avoids legal prosecution in courts, breach of law and loss occur to the organisation due to accidents
and incidents

The critical observation was found that during performing high risk activity are close materials are on
the scaffold, electrodes inside the scaffold pipe, no proper storage of flammable and explosive
cylinders, and the no proper instructions are not given to the man lift operator and the workers who
are working in the man basket, no proper routing for the high voltage electrical cable, has no clear in
the time scale and needs to train the workers especially who deals with high risk activites like working
at height, hot work and lifting activity. so, that the organisation has to concentrate more on the work at
height activites, which advices the management to concentrate on their health and safety practises,
standards and to develop the safety culture.

To overcome the above unsafe acts and condition that the organisation has to provide with adequate
training to the workers and the staff and proper information and instruction prior to work and continues
monitoring and supervision has to be provided to the workers. Through training, instruction,
information and the supervision that the organisation can avoid the rate of accident and incidents and
injuries at the work place.
APPENDIX 5

UNIT GC3 – THE HEALTH AND Candidate report template


SAFETY PRACTICAL APPLICATION

Student number 00394172

Location LARSEN & TOUBRO, Chennai Date of review 2017

Recommendations – include as a table in the following format:

Recommendation Likely resource implications Priority Target date

observation no. 1,17,25:


ELECTRICAL
HAZARDS.
Cable hangers cost INR
1.Cable hangers.
HIGH
2.cable ramps
Cable ramp cost INR
3.training to the workers
on handling of electrical
equipments and based on
electrical hazards
associated with the Training cost INR
improper routing and
damaged cables

observation no: 13,6,19:


FIRE HAZARDS

1.Segregation

2.Fencing and signage


HIGH
3.Fire proof blankets

4.Fire watcher with


appropriate fire
extinguisher

Observation no:
22,21,14,26:
HEALTH HAZARDS

1.Provide mechanical
ventilation

2.Training and manual


handling
HIGH
3.New canvas for enclose
the area

4.Provide the portable


resting shelter

Observation no: 20,3,29


EQUIPMENT and
TOOLS

1.Provide out rigger pads

2.Provide barricading HIGH

3.Provide adequate training


to the operators and riggers

4.Provide proper instruction


and information prior to work
Observation no: 2,3,7,4:
FALLING HAZARDS

1.Train the workers to


secure the tools on
height
HIGH
2.Regular clearance of
debris after work

3.Training on personal
protective Equipment