PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE FECHA DE INICIO: 12/17/2018
UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA
VARIANTE UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
EJECUCIÓN REAL
SEGÚN EXPEDIENTE TECNICO SEGÚN ORDEN SALDO
ITEM DESCRIPCION ANTERIOR ACTUAL ACUMULADO
UND. CANTIDAD P.U. PARCIAL UND CODIGO CANTIDAD P.U. PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
BALDE PARA PRUEBA HIDROSTATICA CON INCL.ACCESORIOS HM 2.89 15.00 43.35 0.00 0.00 0.00 2.89 0.00
CAMION CISTERNA 3000 GAL. HM 5.06 171.10 865.77 0.00 0.00 0.00 5.06 0.00
CAMION CISTERNA 5000 GAL. HM 1,041.13 200.00 208,226.08 0.00 0.00 0.00 1,041.13 0.00
CAMION VOLQUETE 15 M3 HM 7,346.75 200.00 1,469,350.42 0.00 0.00 0.00 7,346.75 0.00
CARGADOR FRONTAL S/LLANTAS 260 - 300 HP HM 1,538.19 280.00 430,692.72 0.00 0.00 0.00 1,538.19 0.00
MOCHILA APLICADOR DE CURADOR HM 0.06 113.43 6.81 0.00 0.00 0.00 0.06 0.00
CAMION GRUA 15 - 20 TN HM 18.80 180.00 3,384.00 0.00 0.00 0.00 18.80 0.00
COMPACTADOR VIBRATORIO TIPO PLANCHA 7HP HM 2,320.60 15.00 34,809.01 0.00 0.00 0.00 2,320.60 0.00
COMPRESORA NEUMATICA 93 HP 335-375 PCM HM 42.00 120.00 5,040.00 0.00 0.00 0.00 42.00 0.00
EQUIPO DE CÓMPUTO INCLUYE SOFTWARE DIA 15.00 20.00 300.00 0.00 0.00 0.00 15.00 0.00
EQUIPO DE ESTACIÓN TOTAL PRECISIÓN 5" G608M Ó SIMILAR INCL.P DIA 2.16 140.00 302.40 0.00 0.00 0.00 2.16 0.00
EQUIPO DE ESTACIÓN TOTAL PRECISIÓN 5" G608M Ó SIMILAR INCL.P DIA 58.69 220.00 12,911.80 0.00 0.00 0.00 58.69 0.00
MARTILLO NEUMATICO - 25/29 KG HM 84.00 11.88 997.92 0.00 0.00 0.00 84.00 0.00
MEZCLADORA DE CONC. (TAMBOR) 7 P3, 18 HP HM 0.67 106.20 71.15 0.00 0.00 0.00 0.67 0.00
MINI CARGADOR 252B HM 6,306.39 65.00 409,915.64 0.00 0.00 0.00 6,306.39 0.00
MOTONIVELADORA DE 130-135 HP HM 2,101.32 280.00 588,369.82 0.00 0.00 0.00 2,101.32 0.00
MOTOSOLDADORA DE 250 AMP. HM 118.01 4.14 488.56 0.00 0.00 0.00 118.01 0.00
NIVEL TOPOGRÁFICO AFL320 E=0,3" CON TRÍPODE Y ACCESORIOS DIA 0.31 50.00 15.50 0.00 0.00 0.00 0.31 0.00
NIVEL TOPOGRÁFICO AFL320 E=0,3" CON TRÍPODE Y ACCESORIOS DIA 58.69 60.00 3,521.40 0.00 0.00 0.00 58.69 0.00
PLANCHA COMPACTADORA VIBRAT. 4.0 HP HM 96.72 13.28 1,284.44 0.00 0.00 0.00 96.72 0.00
RODILLO LISO VIBRAT. AUTOP. 150 HP - 10 TON HM 2,087.13 190.00 396,554.85 0.00 0.00 0.00 2,087.13 0.00
SERVICIO DE BOMBA DE CONCRETO M3 76.00 29.50 2,242.00 0.00 0.00 0.00 76.00 0.00
VIBRADOR A GASOLINA 1 3/4", 4HP HM 24.97 76.70 1,915.20 0.00 0.00 0.00 24.97 0.00
RODILLO LISO VIBR MANUAL 10.8HP 0.8-1.1 T HM 3,063.40 80.00 245,071.77 0.00 0.00 0.00 3,063.40 0.00
CAMION BARANDA HM 8.00 250.00 2,000.00 0.00 0.00 0.00 8.00 0.00
CAMION VOLQUETE 15 M3 HM OS-8363/2018 253.00 130.00 32,890.00 253.00 32,890.00 253.00 32,890.00 -253.00 0.00
CAMIONETA DIA OS-8344/2018 30.00 250.00 7,500.00 7.00 1,750.00 7.00 1,750.00 -7.00 0.00
CAMION DE 4 A 5 TN DIA OS-8352/2018 30.00 330.00 9,900.00 6.00 1,980.00 6.00 1,980.00 -6.00 0.00
TOTAL 3,818,380.62 TOTAL 36,620.00 TOTAL 0.00 TOTAL 36,620.00 TOTAL 0.00
5. CONTROL DE INSUMOS: HERRAMIENTAS
EJECUCIÓN REAL
SEGÚN EXPEDIENTE TECNICO SEGÚN ORDEN DE COMPRA SALDO
ITEM DESCRIPCION INGRESO ANTERIOR SALIDA ANTERIOR INGRESO ACTUAL SALIDA ACTUAL INGRESO ACUMULADO SALIDA ACUMULADO
UND CODIGO CANTIDAD P.U. PARCIAL UND CODIGO CANTIDAD P.U. PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL CANTIDAD PARCIAL
1 ESCUADRA DE ALBAÑIL UND 4.00 118.00 472.00 4.00 472.00 - - - - 4.00 472.00 - - 0.00 0.00
2 RASTRILLO DE METAL ASFALTERO UND 4.00 55.00 220.00 4.00 220.00 - - - - 4.00 220.00 - - 0.00 0.00
3 ESCOBILLA DE ACERO CON MANGO DE MADERA UND 70.00 3.70 259.00 70.00 259.00 - - - - 70.00 259.00 - - 0.00 0.00
4 PICO CON MANGO UND 5.00 33.70 168.50 5.00 168.50 - - - - 5.00 168.50 - - 0.00 0.00
5 CARRETILLA BUG MARCA. SHUBERT UND 10.00 160.00 1,600.00 10.00 1,600.00 - - - - 10.00 1,600.00 - - 0.00 0.00
6 RASTRILLO DE METAL UND 6.00 13.00 78.00 6.00 78.00 - - - - 6.00 78.00 - - 0.00 0.00
7 PICOS CON MANGO UND 20.00 22.00 440.00 3.00 66.00 - - - - 3.00 66.00 - - 0.00 0.00
8 PICOS PARA EXCAVACIONES UND 3.00 28.00 84.00 5.00 140.00 - - - - 5.00 140.00 - - 0.00 0.00
9 PALETA DE MANO PARA SEÑALIZACIÓN DE TRANSITO MAR UND 5.00 16.00 80.00 1.00 16.00 - - - - 1.00 16.00 - - 0.00 0.00
10 RECOGEDOR DE METAL TAMAÑO GRANDE MARCA:NORTO UND 1.00 20.00 20.00 5.00 100.00 - - - - 5.00 100.00 - - 0.00 0.00
11 PITO UND 6.00 3.50 21.00 8.00 28.00 6.00 21.00 - - 8.00 28.00 6.00 21.00 -6.00 -21.00
12 REGLA DE ALUMINIO 1 1/2" X4" MARCA CORRALES UND 8.00 155.00 1,240.00 10.00 1,550.00 - - - - 10.00 1,550.00 - - 0.00 0.00
13 ESCOBA DE PAJA UND 10.00 13.00 130.00 7.00 91.00 - - - - 7.00 91.00 - - 0.00 0.00
14 LAMPAS (USADO) UND PEC-000007 20.00 0.00 20.00 - - - - - 20.00 - - - 0.00 0.00
15 PICOS (USADO) UND PEC-000007 20.00 0.00 20.00 - - - - - 20.00 - - - 0.00 0.00
16 CARRETILLAS (USADO) UND PEC-000007 20.00 0.00 20.00 - - - - - 20.00 - - - 0.00 0.00
17 BARRETAS (USADO) UND PEC-000007 20.00 0.00 20.00 - - - - - 20.00 - - - 0.00 0.00
18 BASTON ILUMINANTE UND PEC-3043 15.00 18.00 270.00
19 CINTA AISLANTE DE 1/2"X36 yd UND PEC-3043 10.00 3.00 30.00
20 JUEGO DE PILAS RECARGABLES 1.2V TAMAÑO AAX4 UND PEC-3043 15.00 15.00 225.00
21 LINTERNA DE MANO CON LUZ LED RECARGABLE UND PEC-3043 10.00 75.00 750.00
22 LINTERNA FRONTAL UND PEC-3043 30.00 20.00 600.00
23 LUMINARIA TIPO REFLECTOR SIMETRICO UND PEC-3043 4.00 300.00 1,200.00
24 TABLERO ADOSABLE CON DOS LLAVES TERMOMAGNETICAS UND PEC-3043 3.00 50.00 150.00
25 BARRETA DE ACERO DE 1 1/2" X 1.80m UND PEC-1072 20.00 120.00 2,400.00
26 BARRETA DE ACERO HEXAGONAL 1 1/2"X1.50 m UND PEC-1072 20.00 110.00 2,200.00
27 CARRETILLA PARA CONSTRUCCION TIPÓ BUGUI UND PEC-1072 15.00 165.00 2,475.00
28 COMBA DE 20 lb UND PEC-1072 5.00 105.00 525.00
29 COMBA DE 24 lb UND PEC-1072 5.00 125.00 625.00
30 LAMPA CUCHARA PESADA UND PEC-1072 50.00 26.00 1,300.00
31 LLANTA PARA CARRETILLA TIPO BUGUI DE 38 cm CON CAMARA Y RODAMIENTO UND PEC-1072 15.00 67.00 1,005.00
32 PICO CON MANGO UND PEC-1072 30.00 38.00 1,140.00
33 AMOLADORA DE 4" 4.00 260.00 1,040.00
34 AMOLADORA DE 9" 2.00 710.00 1,420.00
35 MAQUINA CORTADORA 4.00 450.00 1,800.00
36 TROZADORA DE 14" 2.00 650.00 1,300.00
0.00
18 HERRAMIENTAS MANUALES % 38,513.78 - - 0.00 38,513.78
TOTAL 21.00 TOTAL 0.00 TOTAL 21.00 TOTAL 38,492.78
6. CONTROL DE INSUMOS: SERVICIOS
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA 12/17/2018
VARIANTE UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
PROYECTO: EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA 12/17/2018
VARIANTE UCHUMAYO ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO COLO
OBSERVACION
OL DE INSUMOS: SERVICIOS
OBSERVACION
7. CONTROL DE GASTOS INDIRECTOS
EXPEDIENTE TECNICO DE EJECUCION DE PARTIDAS EN VIAS AUXILIARES DEL TRAMO II ENTRE LAS
PROGRESIVAS 1+468 AL 2+490 DEL PIP MEJORAMIENTO DE LA CARRETERA VARIANTE UCHUMAYO
PROYECTO: ENTRE EL PUENTE SAN ISIDRO Y LA VIA DE EVITAMIENTO,DIST SACHACA, YANAHUARA Y CERRO FECHA DE INICIO: 12/17/2018
COLO
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION PRECIO
UND METRADO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
01 INFRAESTRUCTURA 1,217,892.36
01.01 AULAS 450,422.24
01.01.01 OBRAS PROVISIONALES 25,257.64
01.01.01.01 TRABAJOS PROVISIONALES 13,258.89
PROG. 87.76 1,402.40 87.76 1,402.40
01.01.01.01.01 CERCO PERIMETRICO PROVISIONAL DE MALLA ARPILLERA m 87.76 15.98 1,402.40
EJEC. 87.76 1,402.40 87.76 1,402.40
PROG. 30.00 1,780.80 30.00 1,780.80
01.01.01.01.02 OFICINA DE OBRA m2 30.00 59.36 1,780.80
EJEC. 30.00 1,780.80 30.00 1,780.80
PROG. 70.00 4,274.90 70.00 4,274.90
01.01.01.01.03 CASETA DE GUARDIANIA Y ALMACEN DE OBRA m2 70.00 61.07 4,274.90
EJEC. 70.00 4,274.90 70.00 4,274.90
PROG. 70.00 4,820.20 70.00 4,820.20
01.01.01.01.04 VESTUARIOS Y COMEDOR PARA EL PERSONAL DE OBRA m2 70.00 68.86 4,820.20
EJEC. 70.00 4,820.20 70.00 4,820.20
PROG. 1.00 980.59 1.00 980.59
01.01.01.01.05 CARTEL DE IDENTIFICACION DE LA OBRA DE 3.60X2.40M und 1.00 980.59 980.59
EJEC. 1.00 980.59 1.00 980.59
01.01.01.02 INSTALACIONES PROVISIONALES 11,998.75 -
PROG. 1.00 900.00 4.00 3,600.00 - - - 5.00 4,500.00
01.01.01.02.01 SERVICIOS HIGIEÉ NICOS PARA OBRA mes 5.00 900.00 4,500.00
EJEC. 1.00 900.00 4.00 3,600.00 0.00 0.00 0.00 5.00 4,500.00
PROG. 1.00 500.00 1.00 500.00 1.00 500.00 1.00 500.00 1.00 500.00 5.00 2,500.00
01.01.01.02.02 SUMINISTRO DE ENERGIA ELECTRICA PARA LA OBRA mes 5.00 500.00 2,500.00
EJEC. 1.00 500.00 1.00 500.00 0.00 1.00 500.00 1.00 500.00 1.00 500.00 5.00 2,500.00
PROG. 1.00 765.00 1.00 765.00 1.00 765.00 1.00 765.00 1.00 765.00 5.00 3,825.00
01.01.01.02.03 ALMACENAMIENTO DE AGUA PARA LA CONSTRUCCION mes 5.00 765.00 3,825.00
EJEC. 1.00 765.00 1.00 765.00 0.00 1.00 765.00 1.00 765.00 1.00 765.00 5.00 3,825.00
PROVISION Y REPOSICION DE AGUA PARA CONSUMO PROG. 1.00 234.75 1.00 234.75 1.00 234.75 1.00 234.75 1.00 234.75 5.00 1,173.75
01.01.01.02.04 mes 5.00 234.75 1,173.75
HUMANO EJEC. 1.00 234.75 1.00 234.75 0.00 1.00 234.75 1.00 234.75 1.00 234.75 5.00 1,173.75
01.01.02 TRABAJOS PRELIMINARES 23,555.33 -
01.01.02.01 LIMPIEZA PRELIMINAR 1,329.15 -
PROG. 2,416.63 1,329.15 2,416.63 1,329.15
01.01.02.01.01 LIMPIEZA DE TERRENO MANUAL m2 2,416.63 0.55 1,329.15
EJEC. 2,416.63 1,329.15 0.00 2,416.63 1,329.15
01.01.02.02 TRAZOS Y REPLANTEO 9,189.28 -
PROG. 1,208.00 2,391.84 1,208.63 2,393.09 - 2,416.63 4,784.93
01.01.02.02.01 TRAZO, NIVELES Y REPLANTEO PRELIMINAR m2 2,416.63 1.98 4,784.93
EJEC. 1,208.00 2,391.84 1,208.63 2,393.09 0.00 2,416.63 4,784.93
PROG. 1.00 880.87 1.00 880.87 - 1.50 1,321.31 1.50 1,321.31 5.00 4,404.36
01.01.02.02.02 TRAZO, NIVELES Y REPLANTEO PERMANENTE mes 5.00 880.87 4,404.36
EJEC. 1.00 880.87 1.00 880.87 0.00 1.50 1,321.31 1.50 1,321.31 5.00 4,404.36
01.01.02.03 TRANSPORTE DE EQUIPOS Y HERRAMIENTAS 13,036.90
MOVILIZACION Y DESMOVILIZACION DE EQUIPO LIVIANO PROG. 1.00 2,607.38 1.00 2,607.38 1.00 2,607.38 1.00 2,607.38 1.00 2,607.38 5.00 13,036.90
01.01.02.03.01 Y HERRAMIENTAS mes 5.00 2,607.38 13,036.90
EJEC. 1.00 2,607.38 1.00 2,607.38 0.00 0.00 1.00 2,607.38 0.50 1,303.69 0.25 651.85 0.10 260.74 3.85 10,038.41
01.01.03 PRUEBAS DE CONTROL DE CALIDAD 3,490.00
PROG. 0.60 2,094.00 0.30 1,047.00 0.10 349.00 - - 1.00 3,490.00
01.01.03.01 PRUEBAS DE CONTROL DE CALIDAD glb 1.00 3,490.00 3,490.00
EJEC. 0.00 0.40 1,396.00 0.00 0.20 698.00 0.10 349.00 0.05 174.50 0.10 349.00 0.85 2,966.50
01.01.04 SEGURIDAD EN EL TRABAJO Y SALUD OCUPACIONAL 44,627.98
01.01.04.01 SEGURIDAD EN EL TRABAJO 43,547.98
ELABORACIOÉ N, IMPLEMENTACIOÉ N Y ADMINISTRACIOÉ N DEL PROG. - 1.00 2,500.00 1.00 2,500.00
01.01.04.01.01 glb 1.00 2,500.00 2,500.00
PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO EJEC. 0.00 1.00 2,500.00 1.00 2,500.00
PROG. 26.00 24,665.68 10.00 9,486.80 36.00 34,152.48
01.01.04.01.02 EQUIPOS DE PROTECCIOÉ N PERSONAL 36 P und 36.00 948.68 34,152.48
EJEC. 26.00 24,665.68 10.00 9,486.80 36.00 34,152.48
PROG. 0.50 1,102.75 0.10 220.55 0.40 882.20 1.00 2,205.50
01.01.04.01.03 EQUIPOS DE PROTECCIOÉ N COLECTIVA glb 1.00 2,205.50 2,205.50
EJEC. 0.50 1,102.75 0.10 220.55 0.40 882.20 1.00 2,205.50
PROG. 0.25 297.50 0.25 297.50 0.50 595.00 1.00 1,190.00
01.01.04.01.04 SENÑ ALIZACIOÉ N TEMPORAL DE SEGURIDAD glb 1.00 1,190.00 1,190.00
EJEC. 0.25 297.50 0.25 297.50 0.50 595.00 1.00 1,190.00
PROG. 1.00 700.00 1.00 700.00 1.00 700.00 1.00 700.00 1.00 700.00 5.00 3,500.00
01.01.04.01.05 CAPACITACIOÉ N EN SEGURIDAD Y SALUD mes 5.00 700.00 3,500.00
EJEC. 1.00 700.00 1.00 700.00 0.00 1.00 700.00 1.00 700.00 1.00 700.00 5.00 3,500.00
01.01.04.02 EMERGENCIAS 1,080.00
1,080.00 PROG. - 0.40 432.00 0.10 108.00 0.15 162.00 0.15 162.00 0.15 162.00 0.05 54.00 1.00 1,080.00
01.01.04.02.01 RECURSOS PARA RESPUESTAS ANTE EMERGENCIAS glb 1.00 1,080.00
EJEC. 0.00 0.40 432.00 0.00 0.00 0.10 108.00 0.25 270.00 0.10 108.00 0.85 918.00
01.01.05 PLAN DE MONITOREO ARQUEOLOGICO 12,660.14
12,660.14 PROG. 1.00 12,660.14 1.00 12,660.14
01.01.05.01 PLAN DE MONITOREO ARQUEOLOGICO glb 1.00 12,660.14
EJEC. 0.00 - 0.00
01.01.06 ESTRUCTURAS 176,994.65
01.01.06.01 MOVIMIENTO DE TIERRAS 15,859.56
PROG. 58.31 590.68 58.31 590.68
01.01.06.01.01 CORTE DE TERRENO CON MAQUINARIA m3 58.31 10.13 590.68
EJEC. 58.31 590.68 58.31 590.68
PROG. 7.09 241.41 62.30 2,120.69 17.30 589.00 3.30 112.33 - 28.91 983.93 118.90 4,047.36
01.01.06.01.02 EXCAVACIOÉ N DE ZANJAS PARA CIMIENTOS HASTA 1.00 m m3 118.90 34.04 4,047.36
EJEC. 7.09 241.41 62.30 2,120.69 3.30 112.33 72.69 2,474.44
PROG. 24.50 385.87 6.00 94.50 - 3.61 56.86 34.11 537.23
01.01.06.01.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO m3 34.11 15.75 537.23
EJEC. 0.00 24.50 385.87 6.00 94.50 3.61 56.86 34.11 537.23
NIVELACION INTERIOR Y APISONADO SOBRE TERRENO PROG. - 227.10 656.32 - 6.14 17.74 233.24 674.06
01.01.06.01.04 PARA FALSO PISO m2 233.24 2.89 674.06
EJEC. 0.00 227.10 656.32 6.14 17.74 233.24 674.06
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO PROG. - 60.00 671.40 59.93 670.60 113.31 1,267.96 - 233.24 2,609.96
01.01.06.01.05 m2 233.24 11.19 2,609.96
E=4'' PARA PISO EJEC. 0.00 60.00 671.40 173.24 1,938.56 233.24 2,609.96
PROG. 20.28 460.04 86.21 1,956.10 34.50 782.81 22.04 500.07 23.01 522.00 186.03 4,221.02
01.01.06.01.06 ACARREO DE MATERIAL EXCEDENTE MANUAL m3 186.03 22.69 4,221.02
EJEC. 20.28 460.04 86.21 1,956.10 34.50 782.81 45.05 1,022.07 186.03 4,221.02
ELIMINACIOÉ N DE MATERIAL, CARGADOR 125 HP / PROG. 85.02 1,452.99 90.00 1,538.10 11.01 188.16 186.03 3,179.25
01.01.06.01.07 VOLQUETE 15m3, D = 5Km m3 186.03 17.09 3,179.25
EJEC. 85.02 1,452.99 90.00 1,538.10 11.01 188.16 186.03 3,179.25
01.01.06.02 OBRAS DE CONCRETO SIMPLE 22,425.38
01.01.06.02.01 CIMIENTOS 22,425.38
PROG. - 5.46 1,015.89 10.44 1,942.47 6.02 1,120.15 4.05 754.36 3.99 741.49 29.96 5,574.36
01.01.06.02.01.01 SUB CIMIENTO DE C° 1:12 + 25% P.M. 4'' m2 29.96 186.06 5,574.36
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
01.01.06.02.01.01 SUB CIMIENTO DE C° 1:12 + 25% P.M. 4'' m2 29.96 186.06 5,574.36
EJEC. 0.00 5.46 1,015.89 10.44 1,942.47 14.06 2,616.00 29.96 5,574.36
CIMIENTOS CORRIDOS - CONCRETO CICLOÉ PEO PROG. - 17.92 3,520.50 3.90 766.08 14.15 2780.4 8.96 1760.58 44.94 8,827.56
01.01.06.02.01.02 m3 44.94 196.43 8,827.56
C:H 1:10 + 30% P.G EJEC. 0.00 17.92 3,520.50 3.90 766.08 23.12 4,541.46 44.94 8,828.04
PROG. - - - 58.52 2013.23 174.72 6010.23 - 233.24 8,023.46
01.01.06.02.01.03 FALSO PISO - CONCRETO f''c=175 kg/cm2 e=4" m2 233.24 34.40 8,023.46
EJEC. 0.00 167.1 5,748.24 66.14 2,275.22 233.24 8,023.46
01.01.06.03 OBRAS DE CONCRETO ARMADO 138,709.71
01.01.06.03.01 SOBRECIMIENTOS ARMADOS 10,646.93
CONCRETO F'c=210 kg/cm2 EN PROG. - 8.27 3,367.96 8.27 3,367.96
01.01.06.03.01.01 m3 8.27 407.25 3,367.96
SOBRECIMIENTOS ARMADOS EJEC. 0.00 8.27 3,367.96 8.27 3,367.96
ENCOFRADO Y DESENCOFRADO NORMAL EN PROG. - 110.30 4,805.77 110.30 4,805.77
01.01.06.03.01.02 SOBRECIMIENTOS ARMADOS m2 110.30 43.57 4,805.77
EJEC. 0.00 110.30 4,805.77 110.30 4,805.77
ACERO CORRUGADO F'y=4200 kg/cm2 PARA PROG. - 418.74 1,917.83 44.45 203.58 76.81 351.79 540.00 2,473.20
01.01.06.03.01.03 kg 540.00 4.58 2,473.20
SOBRECIMIENTOS ARMADOS EJEC. 0.00 418.74 1,917.83 44.45 203.58 76.81 351.79 540.00 2,473.20
01.01.06.03.02 VIGAS DE CIMENTACION 13,404.71
PROG. - 7.97 2,906.34 3.56 1,298.19 11.53 4,204.53
01.01.06.03.02.01 CONCRETO F'c=210 kg/cm2 EN VIGAS DE CIMENTACIOÉ N m3 11.53 364.66 4,204.53
EJEC. 0.00 7.97 2,906.34 3.56 1,298.19 11.53 4,204.53
ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS DE PROG. - 70.46 3,069.94 21.81 950.26 92.27 4,020.20
01.01.06.03.02.02 m2 92.27 43.57 4,020.20
CIMENTACIOÉ N EJEC. 0.00 70.46 3,069.94 21.81 950.26 92.27 4,020.20
ACERO CORRUGADO F'y=4200 kg/cm2 PARA VIGAS DE PROG. - 1,131.00 5,179.98 1,131.00 5,179.98
01.01.06.03.02.03 kg 1,131.00 4.58 5,179.98
CIMENTACIOÉ N EJEC. 0.00 1,131.00 5,179.98 1,131.00 5,179.98
01.01.06.03.03 COLUMNAS 42,931.10
PROG. - 5.43 2,722.30 5.11 2,562.82 6.38 3201.95 7.61 3815.46 24.53 12,302.53
01.01.06.03.03.01 CONCRETO F'c=210 kg/cm2 EN COLUMNAS m3 24.53 501.53 12,302.53
EJEC. 0.00 5.43 2,722.30 5.11 2,562.82 13.99 7,016.40 24.53 12,301.53
PROG. - 70.68 3,789.00 80.99 4,341.87 80.01 4289.3 56.35 3021.12 288.03 15,441.29
01.01.06.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 288.03 53.61 15,441.29
EJEC. 0.00 70.68 3,789.15 80.99 4,341.87 136.36 7,310.26 288.03 15,441.29
PROG. - 845.13 3,870.70 80.87 370.38 1,339.79 6136.23 1,050.21 4809.97 3,316.00 15,187.28
01.01.06.03.03.03 ACERO CORRUGADO F'y=4200 kg/cm2 PARA COLUMNAS kg 3,316.00 4.58 15,187.28
EJEC. 0.00 845.13 3,870.70 80.87 370.38 2390 10,946.20 3,316.00 15,187.28
01.01.06.03.04 VIGAS 39,057.27
PROG. - 7.80 3,108.38 9.43 3,757.95 9.33 3,718.10 26.56 10,584.43
01.01.06.03.04.01 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 26.56 398.51 10,584.43
EJEC. 0.00 7.80 3,108.38 9.43 3,757.95 9.33 3,718.10 26.56 10,584.43
PROG. - 8.20 479.13 168.00 9,816.24 21.31 1,245.40 36.45 2,129.51 233.96 13,670.28
01.01.06.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 233.96 58.43 13,670.28
EJEC. 0.00 8.20 479.13 168.00 9,816.24 57.76 3,374.92 233.96 13,670.28
PROG. - 346.92 1,588.89 2,885.08 13,213.67 - - 3,232.00 14,802.56
01.01.06.03.04.03 ACERO CORRUGADO F'y=4200 kg/cm2 PARA VIGAS kg 3,232.00 4.58 14,802.56
EJEC. 0.00 346.92 1,588.89 2,885.08 13,213.67 3,232.00 14,802.56
01.01.06.03.05 LOSAS ALIGERADAS 5,347.24
PROG. - - 0.91 350.60 - 0.91 350.60
01.01.06.03.05.01 CONCRETO F'c=210 kg/cm2 EN LOSAS ALIGERADAS m3 0.91 385.28 350.60
EJEC. 0.00 0.91 350.60 0.91 350.60
ENCOFRADO Y DESENCOFRADO NORMAL PROG. - - 38.10 1663.45 18.74 818.18 - 56.84 2,481.63
01.01.06.03.05.02 m2 56.84 43.66 2,481.63
EN LOSAS ALIGERADAS EJEC. 0.00 38.10 1,663.45 18.74 818.19 56.84 2,481.63
ACERO CORRUGADO F'y=4200 kg/cm2 PROG. - - 44.67 204.59 106.33 486.99 151.00 691.58
01.01.06.03.05.03 kg 151.00 4.58 691.58
PARA LOSAS ALIGERADAS EJEC. 0.00 44.67 204.59 106.33 486.99 151.00 691.58
PROG. - - 288.00 1,154.88 166.72 668.55 454.72 1,823.43
01.01.06.03.05.04 LADRILLO DE ARCILLA PARA TECHO 15 x 30 x 30 cm und 454.72 4.01 1,823.43
EJEC. 0.00 288.00 1,154.88 166.72 668.55 454.72 1,823.43
01.01.06.03.06 LOSAS MACIZAS 27,065.88
PROG. - - 8.20 3,159.30 9.35 3602.37 12.71 4896.9 30.26 11,658.57
01.01.06.03.06.01 CONCRETO F'c=210 kg/cm2 EN LOSAS MACIZAS m3 30.26 385.28 11,658.57
EJEC. 0.00 8.20 3,159.30 9.35 3,602.37 12.71 4,896.91 30.26 11,658.57
ENCOFRADO Y DESENCOFRADO NORMAL PROG. - - 121.50 5304.69 80.23 3,502.84 201.73 8,807.53
01.01.06.03.06.02 m2 201.73 43.66 8,807.53
EN LOSAS MACIZAS EJEC. 0.00 121.50 5,304.69 80.23 3,502.84 201.73 8,807.53
ACERO CORRUGADO F'y=4200 kg/cm2 PROG. - - 1,281.07 5,867.30 159.93 732.48 1,441.00 6,599.78
01.01.06.03.06.03 kg 1,441.00 4.58 6,599.78
PARA LOSAS MACIZAS EJEC. 0.00 1,281.07 5,867.30 159.93 732.48 1,441.00 6,599.78
01.01.06.03.07 MESAS DE CONCRETO 256.58
PROG. - - - - 0.34 127.92 0.34 127.92
01.01.06.03.07.01 CONCRETO F'c=175 kg/cm2 MESAS PARA LAVAMANOS m3 0.34 376.23 127.92
EJEC. 0.00 0.34 127.92 0.34 127.92
ENCOFRADO Y DESENCOFRADO NORMAL PROG. - - - - 2.80 115.84 2.80 115.84
01.01.06.03.07.02 EN MESAS DE CONCRETO m2 2.80 41.37 115.84
EJEC. 0.00 2.80 115.84 2.80 115.84
ACERO CORRUGADO F'y=4200 kg/cm2 PROG. - - - - 2.80 12.82 2.80 12.82
01.01.06.03.07.03 kg 2.80 4.58 12.82
PARA MESAS DE CONCRETO EJEC. 0.00 2.80 12.82 2.80 12.82
01.01.07 ARQUITECTURA 128,445.16
01.01.07.01 MUROS Y TABIQUES 12,609.94
PROG. - 118.71 9,875.32 16.86 1,402.58 16.01 1,332.04 151.58 12,609.94
01.01.07.01.01 MURO LADRILLO K.K. DE SOGA MEZC. C:A 1:4, TIPO IV m2 151.58 83.19 12,609.94
EJEC. 0.00 118.71 9,875.48 16.86 1,402.58 16.01 1,331.87 151.58 12,609.94
01.01.07.02 REVOQUES ENLUCIDOS Y MOLDURAS 15,424.67
PROG. - - - - 67.81 1,510.81 67.81 1,510.81
01.01.07.02.01 TARRAJEO PRIMARIO Y RAYADO MEZC. C:A 1:5 m2 67.81 22.28 1,510.81
EJEC. 0.00 67.81 1,510.81 67.81 1,510.81
TARRAJEO EN INTERIORES MEZC. C:A 1:5, e=1.50 cm PROG. - - - 55.31 863.94 49.17 767.96 49.17 767.96 153.64 2,399.86
01.01.07.02.02 m2 153.64 15.62 2,399.86
(INC. COLUMNAS EMPOT.) EJEC. 0.00 55.31 863.94 93.3 1,457.35 5.03 78.57 153.64 2,399.86
TARRAJEO EN EXTERIORES MEZC. C:A 1:5, e=1.50 cm PROG. - - - - 50.30 1,147.85 50.30 1,147.84 100.60 2,295.69
01.01.07.02.03 (INC. COLUMNAS EMPOT.) m2 100.60 22.82 2,295.69
EJEC. 0.00 100.60 2,295.69 100.60 2,295.69
PROG. - - - 16.16 513.89 19.47 619.25 16.90 537.53 19.47 619.25 72.01 2,289.92
01.01.07.02.04 TARRAJEO DE COLUMNAS MEZCLA C:A 1:5, e=1.5 cm m2 72.01 31.80 2,289.92
EJEC. 0.00 16.16 513.89 28.39 902.80 0.00 27.46 873.23 72.01 2,289.92
PROG. - - 5.30 198.59 51.44 1,927.46 23.47 879.40 13.38 501.37 93.59 3,506.82
01.01.07.02.05 TARRAJEO DE VIGAS MEZCLA C:A 1:5, e=1.5 cm m2 93.59 37.47 3,506.82
EJEC. 5.30 198.59 51.44 1,927.46 32.30 1,210.28 4.55 170.49 93.59 3,506.82
VESTIDURA DE DERRAMES DE PUERTAS, VENTANAS Y PROG. - - - 18.22 224.65 133.77 1,649.38 22.13 272.87 174.12 2,146.90
01.01.07.02.06 VANOS MEZC. C:A 1:5, e=1.50 cm ANCHO=15 cm m 174.12 12.33 2,146.90
EJEC. 0.00 38.22 471.25 20.30 250.30 0.00 115.60 1,425.35 174.12 2,146.90
PROG. - - - 59.37 444.09 57.28 428.49 53.76 402.09 170.41 1,274.67
01.01.07.02.07 BRUNÑ AS DE 1/2" UNION TECHO MURO m 170.41 7.48 1,274.67
EJEC. 0.00 59.37 444.09 67.60 505.65 19.30 144.36 24.14 180.57 170.41 1,274.67
01.01.07.03 CIELORRASOS 8,467.38
PROG. - - - 81.39 3,341.06 91.31 3,748.20 33.57 1,378.12 206.27 8,467.38
01.01.07.03.01 CIELORASO MEZC. C:A 1:5, e=1.50 cm m2 206.27 41.05 8,467.38
EJEC. 0.00 81.39 3,341.06 71.29 2,926.45 53.59 2,199.87 206.27 8,467.38
01.01.07.04 PISOS Y PAVIMENTOS 20,316.94
01.01.07.04.01 PISOS DE CERAMICO 20,316.94
PROG. - - - - 128.52 3,728.39 104.74 3,038.48 233.26 6,766.87
01.01.07.04.01.01 CONTRAPISO DE 48 mm m2 233.26 29.01 6,766.87
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
01.01.07.04.01.01 CONTRAPISO DE 48 mm m2 233.26 29.01 6,766.87
EJEC. 0.00 17.63 511.45 211.05 6,122.56 228.68 6,634.01
PROG. - - - - 21.06 1,223.45 14.20 824.80 35.26 2,048.25
01.01.07.04.01.02 PISO DE CERAMICO 30 cm x 30 cm ANTIDESLIZANTE m2 35.26 58.09 2,048.25
EJEC. 0.00 17.63 1,024.13 17.63 1,024.12 35.26 2,048.25
PROG. - - - - 76.90 4,467.15 76.90 4,467.14 44.20 2,567.53 198.00 11,501.82
01.01.07.04.01.03 PISO DE CERAMICO 40 cm x 40 cm TRANSITO ALTO m2 198.00 58.09 11,501.82
EJEC. 0.00 0.00 193.43 11,236.35 193.43 11,236.35
01.01.07.05 ZÓCALOS Y CONTRAZÓCALOS 6,933.35
PROG. - - - - 32.40 2,540.80 30.61 2,401.07 63.01 4,941.87
01.01.07.05.01 ZOCALO DE CERAMICO 30 X 20 m m2 63.01 78.43 4,941.87
EJEC. 0.00 63.01 4,941.87 63.01 4,941.87
PROG. - - - - 49.76 732.04 69.40 1,020.80 119.16 1,752.84
01.01.07.05.02 CONTRAZOÉ CALO DE CERAMICO h=0.10m m 119.16 14.71 1,752.84
EJEC. 0.00 79.34 1,167.09 79.34 1,167.09
PROG. - - - - 1.59 135.62 1.21 103.02 2.80 238.64
01.01.07.05.03 REVESTIMIENTO DE CERAMICO 30 X 20 m m2 2.80 85.23 238.64
EJEC. 0.00 - 0.00
01.01.07.06 COBERTURAS 18,754.43
COBERTURA LADRILLO PASTELERO 20 cm x 20 cm x 3 cm, PROG. - - - - 145.79 8,719.70 145.79 8,719.70 291.58 17,439.40
01.01.07.06.01 m2 291.58 59.81 17,439.40
MEZC. C:A 1:5, e=1.50 cm, BASE 2.5 cm EJEC. 0.00 37.97 2,270.99 182.28 10,902.17 220.25 13,173.15
PROG. - - - - 291.58 1,315.03 291.58 1,315.03
01.01.07.06.02 IMPERMEABILIZACION DE COBERTURA m2 291.58 4.51 1,315.03
EJEC. 0.00 - 0.00
01.01.07.07 CARPINTERIA DE MADERA 13,765.41
PUERTA DE MADERA TABLERO REBAJADO DE 45 mm PROG. 13.20 4,024.81 13.20 4,024.81
01.01.07.07.01 m2 13.20 304.91 4,024.81
DE CEDRO EJEC. 0.00 - 0.00
PUERTA CONTRAPLACADA 45 mm CON TRIPLAY 6 mm PROG. - - - - - 5.76 1,143.99 5.76 1,143.99
01.01.07.07.02 m2 5.76 198.61 1,143.99
INCLUYE MARCO EJEC. 0.00 - 0.00
VENTANA DE MADERA CEDRO PROG. - - - - - 43.82 8,596.61 43.82 8,596.61
01.01.07.07.03 (SEGUÉ N DISENÑ O, INCLUYE JUNQUILLOS) m2 43.82 196.18 8,596.61
EJEC. 0.00 - 0.00
01.01.07.08 CARPINTERIA METALICA 3,283.10
PROG. - - - - - 6.31 672.46 6.31 672.46
01.01.07.08.01 REJILLA DE FIERRO NEGRO PNTADO E=1'', A=0.25m m 6.31 106.57 672.46
EJEC. 0.00 - 0.00
DIVISIONES EN ALUMINIO Y TABLERO DE MDF PROG. - - - - - 10.56 2,610.64 10.56 2,610.64
01.01.07.08.02 m 10.56 247.22 2,610.64
PARA BANÑ OS h=1.20m EJEC. 0.00 - 0.00
01.01.07.09 CERRAJERIA 1,051.46
PROG. - - - - - 8.00 153.76 8.00 153.76
01.01.07.09.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3 1/2" X 3 1/2" pza 8.00 19.22 153.76
EJEC. 0.00 - 0.00
PROG. - - - - - 12.00 242.64 12.00 242.64
01.01.07.09.02 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 12.00 20.22 242.64
EJEC. 0.00 - 0.00
CHAPA PARA EXTERIOR CON LLAVE INTERIOR Y PROG. - - - - - 4.00 495.88 4.00 495.88
01.01.07.09.03 und 4.00 123.97 495.88
EXTERIOR 2 GOLPES EJEC. 0.00 - 0.00
PROG. - - - - - 3.00 159.18 3.00 159.18
01.01.07.09.04 CERRADURA TIPO PERILLA und 3.00 53.06 159.18
EJEC. 0.00 - 0.00
01.01.07.10 VIDRIOS, CRISTALES Y SIMILARES 7,676.19
VIDRIO SEMIDOBLE PROVISION Y COLOCACION PROG. - - - - - 720.21 7,266.92 720.21 7,266.92
01.01.07.10.01 p2 720.21 10.09 7,266.92
EN VENTANAS EJEC. 0.00 - 0.00
PROG. - - - - - 2.70 409.27 2.70 409.27
01.01.07.10.02 ESPEJO CON CRISTAL LAMINADO e=6mm m2 2.70 151.58 409.27
EJEC. 0.00 - 0.00
01.01.07.11 PINTURA 16,808.42
PINTURA DE MUROS INTERIORES C/ LATEX VINIÉLICO - PROG. - - - - 463.86 5,130.29 463.86 5,130.29
01.01.07.11.01 m2 463.86 11.06 5,130.29
2 MANOS, C/ IMPRIMANTE EJEC. 0.00 - 0.00
PINTURA DE MUROS EXTERIORES C/ LATEX VINILICO - PROG. - - - - 448.04 5,627.38 448.04 5,627.38
01.01.07.11.02 m2 448.04 12.56 5,627.38
2 MANOS, C/ IMPRIMANTE EJEC. 0.00 - 0.00
PINTURA DE CIELOS RASOS C/ LAÉ TEX VINIÉ LICO - PROG. - - - - 352.15 3,475.72 352.15 3,475.72
01.01.07.11.03 2 MANOS, C/ IMPRIMANTE m2 352.15 9.87 3,475.72
EJEC. 0.00 - 0.00
PINTURA DE DERRAMES EN PUERTAS Y VENTANAS PROG. - - - - 149.50 470.93 149.50 470.93
01.01.07.11.04 m 149.50 3.15 470.93
C/ LATEX VINILIO - 2 MANOS, C/ IMPRIMANTE EJEC. 0.00 - 0.00
PROG. - - - - 24.42 473.75 24.42 473.75
01.01.07.11.05 PINTURA EN PUERTAS CON BARNIZ 2 MANOS m2 24.42 19.40 473.75
EJEC. 0.00 - 0.00
PROG. - - - - 105.32 1,630.35 105.32 1,630.35
01.01.07.11.06 PINTURA DE VENTANAS CON ESMALTE m2 105.32 15.48 1,630.35
EJEC. 0.00 - 0.00
01.01.07.12 VARIOS 3,353.87
PROG. - 295.78 911.00 295.78 911.00 394.37 1,214.66 985.93 3,036.66
01.01.07.12.01 CURADO DEL CONCRETO CON ADITIVO m2 985.93 3.08 3,036.66
EJEC. 0.00 0.00 0.00 - 0.00
PROG. - - - 30.00 40.80 203.24 276.41 233.24 317.21
01.01.07.12.02 LIMPIEZA PERMANENTE DE OBRA m2 233.24 1.36 317.21
EJEC. 0.00 30.00 40.80 55.00 74.80 75.00 102.00 20.00 27.20 180.00 244.80
01.01.08 INSTALACIONES SANITARIAS 15,325.59
01.01.08.01 APARATOS SANITARIOS Y ACCESORIOS 5,780.31
INODORO TANQUE BAJO NINÑ OS COLOR BLANCO PROG. - - - - 6.00 2,693.28 6.00 2,693.28
01.01.08.01.01 und 6.00 448.88 2,693.28
(INC/ACCESORIOS) EJEC. 0.00 - 0.00
PROG. - - - - 6.00 1,940.58 6.00 1,940.58
01.01.08.01.02 LAVATORIO OVALIN BLANCO DE 01 LLAVE und 6.00 323.43 1,940.58
EJEC. 0.00 - 0.00
PROG. - - - - 3.00 707.19 3.00 707.19
01.01.08.01.03 URINARIO TIPO BAMBI PARA NINÑ OS COLOR BLANCO pza 3.00 235.73 707.19
EJEC. 0.00 - 0.00
PROG. - - - - 6.00 439.26 6.00 439.26
01.01.08.01.04 PAPELERA DE LOSA BLANCA EMPOTRADA EJE PLASTICO und 6.00 73.21 439.26
EJEC. 0.00 - 0.00
01.01.08.02 SISTEMA DE AGUA FRIA 5,497.51
01.01.08.02.01 SALIDAS DE AGUA FRIA 702.00
SALIDA DE AGUA FRIÉ A C/TUBERIÉ A 1/2" CLASE 10 PROG. - - - 9.00 421.20 6.00 280.80 15.00 702.00
01.01.08.02.01.01 C/ROSCA pto 15.00 46.80 702.00
EJEC. 0.00 9.00 421.20 4.00 187.20 2.00 93.60 15.00 702.00
01.01.08.02.02 REDES DE DISTRIBUCION DE AGUA 715.28
PROG. - - 3.50 24.33 14.00 97.30 72.65 504.91 90.15 626.54
01.01.08.02.02.01 TUBERIÉA PVC CLASE C/ROSCA 3/4" m 90.15 6.95 626.54
EJEC. 3.50 24.33 14.00 97.30 15.00 104.25 57.65 400.66 90.15 626.54
PROG. - - 3.50 12.92 20.55 75.82 24.05 88.74
01.01.08.02.02.02 TUBERIÉA PVC CLASE C/ROSCA 1/2" m 24.05 3.69 88.74
EJEC. 3.50 12.92 23.00 75.82 26.50 88.74
01.01.08.02.03 VALVULAS DE CONTROL 551.20
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
PROG. - - - 1.00 74.40 3.00 223.20 4.00 297.60
01.01.08.02.03.01 VALVULA DE COMPUERTA DE BRONCE DE 1/2" und 4.00 74.40 297.60
EJEC. 0.00 1.00 74.40 1.00 74.40 2.00 148.80
PROG. - - - 1.00 84.20 1.00 84.20 2.00 168.40
01.01.08.02.03.02 VALVULA DE COMPUERTA DE BRONCE DE 3/4" und 2.00 84.20 168.40
EJEC. 0.00 1.00 84.20 1.00 84.20
PROG. - - - - 1.00 85.20 1.00 85.20
01.01.08.02.03.03 VAÉ LVULA CHECK DE BRONCE DE 3/4" und 1.00 85.20 85.20
EJEC. 0.00 - 0.00
01.01.08.02.04 CAJAS PARA VALVULAS 465.90
PROG. - - - - 6.00 465.9 6.00 465.90
01.01.08.02.04.01 CAJA PARA VALVULAS und 6.00 77.65 465.90
EJEC. 0.00 - 0.00
01.01.08.02.05 VARIOS 3,063.13
PROG. - - - - 1.00 700.00 1.00 700.00
01.01.08.02.05.01 TANQUE ELEVADO DE 1100 LTS (INCL. ACCESORIOS) und 1.00 700.00 700.00
EJEC. 0.00 - 0.00
CONFECCION DE PEDESTAL METALICO PARA PROG. - - - - 1.00 1,217.00 1.00 1,217.00
01.01.08.02.05.02 und 1.00 1,217.00 1,217.00
TANQUE ELEVADO T°N° Ø 2'' EJEC. 0.00 - 0.00
PROG. - - - - 1.00 50.00 1.00 50.00
01.01.08.02.05.03 LLAVE DE RIEGO CON GRIFO DE 1/2" pza 1.00 50.00 50.00
EJEC. 0.00 - 0.00
PROG. - - - - 1.00 400.00 1.00 400.00
01.01.08.02.05.04 MEDIDOR DE AGUA (INCL. ACCESORIOS) und 1.00 400.00 400.00
EJEC. 0.00 - 0.00
CAJA PREFABRICADA DE CONCRETO PROG. - - - - 1.00 115.00 1.00 115.00
01.01.08.02.05.05 und 1.00 115.00 115.00
PARA MEDIDOR DE AGUA EJEC. 0.00 - 0.00
PRUEBA HIDRAULICA INTEGRAL + DESINFECCION PROG. - - - 0.20 116.23 0.20 116.23 0.40 232.46 0.20 116.21 1.00 581.13
01.01.08.02.05.06 glb 1.00 581.13 581.13
TUBERIA ROSCADA DE 3/4'' A 1/2'' EJEC. 0.00 0.20 116.23 0.20 116.23
01.01.08.03 SISTEMA DE DRENAJE PLUVIAL 313.37
01.01.08.03.01 REDES DE RECOLECCION 313.37
PROG. - - 2.00 46.50 - 2.00 46.50
01.01.08.03.01.01 SALIDA DE BAJADA DE LLUVIA TUBO PVC 3" pto 2.00 23.25 46.50
EJEC. 2.00 46.50 2.00 46.50
PROG. - - 5.00 53.70 3.00 32.22 8.00 85.92
01.01.08.03.01.02 RED DE RECOLECCION PVC Ø 3'' S/P m 8.00 10.74 85.92
EJEC. 5.00 53.70 3.00 32.22 8.00 85.92
PROG. - - - - 2.00 77.22 2.00 77.22
01.01.08.03.01.03 SUMIDERO Ø 3 S. BRONCE pto 2.00 38.61 77.22
EJEC. 0.00 - 0.00
PROG. - - - - 5.40 103.73 5.40 103.73
01.01.08.03.01.04 CANALETA DESAGUE PLUVIAL m 5.40 19.21 103.73
EJEC. 0.00 - 0.00
01.01.08.04 SISTEMA DE DESAGUE 3,734.40
01.01.08.04.01 SALIDAS DE DESAGUE 1,134.84
PROG. - - 4.00 407.20 - 4.00 407.20
01.01.08.04.01.01 SALIDA DE DESAGUE PVC SAL 4" pto 4.00 101.80 407.20
EJEC. 4.00 407.20 4.00 407.20
PROG. - - 6.00 570.78 - 6.00 570.78
01.01.08.04.01.02 SALIDA DE DESAGUE PVC SAL 2" pto 6.00 95.13 570.78
EJEC. 6.00 570.78 6.00 570.78
PROG. - - 2.00 156.86 - 2.00 156.86
01.01.08.04.01.03 SALIDA DE VENTILACION PVC SAL 2" pto 2.00 78.43 156.86
EJEC. 2.00 156.86 2.00 156.86
01.01.08.04.02 REDES DE DESAGUE 1,304.36
PROG. - - 12.50 256.88 37.11 762.61 49.61 1,019.49
01.01.08.04.02.01 TUBERIA PVC SAL 4'' m 49.61 20.55 1,019.49
EJEC. 12.50 256.88 10.00 205.50 22.50 462.38
PROG. - - 15.80 284.87 - 15.80 284.87
01.01.08.04.02.02 TUBERIÉA PVC SAL 2" m 15.80 18.03 284.87
EJEC. 15.80 284.87 15.80 284.87
01.01.08.04.03 ADITAMENTOS VARIOS 426.68
PROG. - - - - 4.00 135.80 4.00 135.80
01.01.08.04.03.01 SUMIDEROS DE BRONCE 2" pza 4.00 33.95 135.80
EJEC. 0.00 - 0.00
PROG. - - - - 6.00 290.88 6.00 290.88
01.01.08.04.03.02 REGISTROS DE BRONCE 4" pza 6.00 48.48 290.88
EJEC. 0.00 - 0.00
01.01.08.04.04 CAMARAS DE INSPECCION 868.52
PROG. - - - - 4.00 868.52 4.00 868.52
01.01.08.04.04.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 4.00 217.13 868.52
EJEC. 0.00 - 0.00
01.01.09 INSTALACIONES ELÉCTRICAS 15,593.08
01.01.09.01 SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEÑALES DÉBILES 3,674.03
PROG. - - 11.00 734.03 5.73 382.30 2.27 151.54 19.00 1,267.87
01.01.09.01.01 SALIDA PARA ALUMBRADO EN TECHO DE PVC SAP 20 mm pto 19.00 66.73 1,267.87
EJEC. 11.00 734.03 6.00 400.38 2.00 133.46 19.00 1,267.87
PROG. - - 2.00 136.00 1.00 68.24 - 3.00 204.24
01.01.09.01.02 SALIDA PARA ALUMBRADO DE EMERGENCIA pto 3.00 68.08 204.24
EJEC. 2.00 136.16 1.00 68.08 3.00 204.24
PROG. - - - 3.00 170.94 - - 3.00 170.94
01.01.09.01.03 INTERRUPTOR UNIPOLAR SIMPLE PVC SAP 20 mm pto 3.00 56.98 170.94
EJEC. 3.00 170.94 3.00 170.94
PROG. - - - 1.00 69.36 1.08 74.59 0.92 64.13 3.00 208.08
01.01.09.01.04 INTERRUPTOR UNIPOLAR DOBLE PVC SAP 20 mm pto 3.00 69.36 208.08
EJEC. 1.00 69.36 2.00 138.72 3.00 208.08
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE PROG. - - 3.00 283.59 8.00 756.24 2.94 277.48 4.06 384.23 18.00 1,701.54
01.01.09.01.05 pto 18.00 94.53 1,701.54
C/ LINEA A TIERRA PVC SAP 20mm EN PARED EJEC. 3.00 283.59 8.00 756.24 7.00 661.71 18.00 1,701.54
PROG. - - 2.00 121.36 - - - 2.00 121.36
01.01.09.01.06 CAJA DE PASO REDONDA pto 2.00 60.68 121.36
EJEC. 2.00 121.36 0.00 2.00 121.36
01.01.09.02 CANALIZACIÓN Y/O TUBERÍAS 1,806.12
PROG. - - 35.00 194.95 90.00 501.30 40.59 226.10 75.41 420.02 241.00 1,342.37
01.01.09.02.01 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=20 mm m 241.00 5.57 1,342.37
EJEC. 35.00 194.95 90.00 501.30 63.00 350.91 35.00 194.95 18.00 100.26 241.00 1,342.37
PROG. - - 15.00 105.00 43.00 301.00 8.25 57.75 - 66.25 463.75
01.01.09.02.02 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=25 mm m 66.25 7.00 463.75
EJEC. 15.00 105.00 43.00 301.00 8.25 57.75 0.00 66.25 463.75
01.01.09.03 CONDUCTORES Y CABLES 1,477.48
PROG. - - - - - - 602.50 1,211.03 602.50 1,211.03
01.01.09.03.01 CABLE ELEÉ CTRICO NH-80 2.5 mm2 m 602.50 2.01 1,211.03
EJEC. 0.00 50.00 100.50 100.00 201.00 150.00 301.50
PROG. - - - - - - 132.56 266.45 132.56 266.45
01.01.09.03.02 CABLE ELEÉ CTRICO NH-80 4.0 mm2 m 132.56 2.01 266.45
EJEC. 0.00 70.00 140.70 0.00 70.00 140.70
01.01.09.04 TABLEROS 806.91
PROG. - - - 2.00 537.94 - - 1.00 268.97 3.00 806.91
01.01.09.04.01 TABLERO DISTRIBUCIOÉ N CAJA METAÉ LICA CON 12 POLOS pza 3.00 268.97 806.91
EJEC. 2.00 537.94 2.00 537.94
01.01.09.05 DISPOSITIVOS DE PROTECCIÓN 1,092.49
PROG. - - - - - - 6.00 241.50 6.00 241.50
01.01.09.05.01 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 15 A pza 6.00 40.25 241.50
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
01.01.09.05.01 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 15 A pza 6.00 40.25 241.50
EJEC. 0.00 - 0.00
PROG. - - - - - - 6.00 271.50 6.00 271.50
01.01.09.05.02 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 20 A pza 6.00 45.25 271.50
EJEC. 0.00 - 0.00
PROG. - - - - - - 6.00 301.50 6.00 301.50
01.01.09.05.03 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 30 A pza 6.00 50.25 301.50
EJEC. 0.00 - 0.00
PROG. - - - - - - 1.00 72.25 1.00 72.25
01.01.09.05.04 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 50 A pza 1.00 72.25 72.25
EJEC. 0.00 - 0.00
PROG. - - - - - - 2.00 205.74 2.00 205.74
01.01.09.05.05 INTERRUPTOR DIFERENCIAL 30 mA (2 x 32 A) pza 2.00 102.87 205.74
EJEC. 0.00 - 0.00
01.01.09.06 ARTEFACTOS 2,786.04
ARTEFACTO TIPO FLUORESCENTE 60 CM X 2 LAMP- 40W PROG. - - - - - - 6.60 1,102.65 5.40 901.71 12.00 2,004.36
01.01.09.06.01 und 12.00 167.03 2,004.36
INCLUYE EQUIPO Y PANTALLA EJEC. 0.00 - 0.00
PROG. - - - - - - 1.00 107.03 1.00 107.03 2.00 214.06
01.01.09.06.02 ARTEFACTO PARA ADOSAR X 1 LAMP- 20W und 2.00 107.03 214.06
EJEC. 0.00 - 0.00
PROG. - - - - - - 1.00 82.03 1.00 82.03 2.00 164.06
01.01.09.06.03 ARTEFACTO BRAQUETE ORNAMENTAL SIMPLE 125 W und 2.00 82.03 164.06
EJEC. 0.00 - 0.00
LUZ DE EMERGENCIA A BATERIA DEL TIPO SECO PROG. - - - - - - 1.51 203.50 1.49 200.06 3.00 403.56
01.01.09.06.04 RECARGABLE CON AUTONOMIA DE 2 H. Y 2 REFLECTORES pza 3.00 134.52 403.56
DIRECCIONALES DE 18W EJEC. 0.00 - 0.00
01.01.09.07 INSTALACION DE SISTEMA DE PUESTA A TIERRA 3,470.01
SISTEMA DE PUESTA A TIERRA CON FERRETERIA PROG. - - - - - - 1.10 1,273.30 0.95 1,102.34 0.95 1,094.37 3.00 3,470.01
01.01.09.07.01 und 3.00 1,156.67 3,470.01
DE ALTA CORROSION EJEC. 0.00 - 0.00
01.01.09.08 PRUEBAS ELÉCTRICAS 480.00
PROG. - - - - - 1.00 480.00 1.00 480.00
01.01.09.08.01 PRUEBAS ELECTRICAS PARA BAJA TENSION ser 1.00 480.00 480.00
EJEC. 0.00 - 0.00
01.01.10 INSTALACIONES DE COMUNICACION 4,472.67
01.01.10.01 CANALIZACIÓN Y/O TUBERÍAS 267.36
PROG. - - - - - 48.00 267.36 48.00 267.36
01.01.10.01.01 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=20 mm m 48.00 5.57 267.36
EJEC. 0.00 48 267.36 48.00 267.36
01.01.10.02 SALIDAS DE COMUNICACIONES 1,834.18
PROG. - - - - 3.00 384.36 - 3.00 384.36
01.01.10.02.01 SALIDAS PARA CAMARA DE VIDEO pto 3.00 128.12 384.36
EJEC. 0.00 3.00 384.36 3.00 384.36
PROG. - - - - 3.00 326.88 - 3.00 326.88
01.01.10.02.02 SALIDAS PARA SENSOR INFRAROJO DE PARED pto 3.00 108.96 326.88
EJEC. 0.00 3.00 326.88 3.00 326.88
PROG. - - - - 3.00 326.88 - 3.00 326.88
01.01.10.02.03 SALIDAS PARA SIRENA EXTERIOR pto 3.00 108.96 326.88
EJEC. 0.00 3.00 326.88 3.00 326.88
PROG. - - - 2.00 248.28 2.00 248.28 2.00 248.28 6.00 744.84
01.01.10.02.04 SALIDAS PARA DATA pto 6.00 124.14 744.84
EJEC. 2.00 248.28 4.00 496.56 6.00 744.84
PROG. - - - 2.00 51.22 - - 2.00 51.22
01.01.10.02.05 CAJA DE PASO 100 X 100mm pto 2.00 25.61 51.22
EJEC. 2.00 51.22 2.00 51.22
01.01.10.03 RACK DE COMUNICACIONES 2,247.87
SUMINISTRO E INSTALACION DE CAMARA DE VIDEO PROG. - - - - - - 3.00 856.83 3.00 856.83
01.01.10.03.01 und 3.00 285.61 856.83
TIPO DOMO EJEC. 0.00 - 0.00
PROG. - - - - - - 3.00 1,224.78 3.00 1,224.78
01.01.10.03.02 SUMINISTRO E INSTALACION DE SENSOR INFRAROJO und 3.00 408.26 1,224.78
EJEC. 0.00 - 0.00
PROG. - - - - - - 1.00 166.26 1.00 166.26
01.01.10.03.03 SUMINISTRO E INSTALACION DE SIRENA EXTERIOR und 1.00 166.26 166.26
EJEC. 0.00 - 0.00
01.01.10.04 TABLEROS 123.26
PROG. - - - - - - 1.00 123.26 1.00 123.26
01.01.10.04.01 TABLERO DE CONTROL DE 12''X12''X4'' PARA ADOSAR und 1.00 123.26 123.26
EJEC. 0.00 - 0.00
01.02 SUM/AULA PSICOMOTRIZ Y ADMINISTRATIVO 297,413.44
01.02.01 ESTRUCTURAS 151,886.42
01.02.01.01 MOVIMIENTO DE TIERRAS 14,211.33
PROG. 40.15 406.72 - - - - 40.15 406.72
01.02.01.01.01 CORTE DE TERRENO CON MAQUINARIA m3 40.15 10.13 406.72
EJEC. 40.15 406.72 - 0.00 40.15 406.72
PROG. 6.57 223.64 101.66 3,460.51 - - - 108.23 3,684.15
01.02.01.01.02 EXCAVACIOÉ N DE ZANJAS PARA CIMIENTOS HASTA 1.00 m m3 108.23 34.04 3,684.15
EJEC. 6.57 223.64 101.66 3,460.51 108.23 3,684.15
PROG. - 24.04 378.63 6.99 110.09 - - 31.03 488.72
01.02.01.01.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO m3 31.03 15.75 488.72
EJEC. 0.00 24.04 378.63 6.99 110.0925 31.03 488.72
PROG. - 56.00 137.76 40.00 98.4 50.95 125.35 21.54 52.98 168.49 414.49
01.02.01.01.04 NIVELACION INTERIOR APISONADO MANUAL m2 168.49 2.46 414.49
EJEC. 0.00 56.00 137.76 40.00 98.4 57.91 142.46 14.58 35.87 168.49 414.49
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO PROG. 168.49 1,885.40 - - - - 168.49 1,885.40
01.02.01.01.05 m2 168.49 11.19 1,885.40
E=4'' PARA PISO EJEC. 0.00 168.49 1,885.40 168.49 1,885.40
PROG. 42.52 964.78 141.79 3,217.21 - - - 184.31 4,181.99
01.02.01.01.06 ACARREO DE MATERIAL EXCEDENTE MANUAL m3 184.31 22.69 4,181.99
EJEC. 42.52 964.78 141.79 3,217.22 - 0.00 184.31 4,181.99
ELIMINACIOÉ N DE MATERIAL, CARGADOR 125 HP / PROG. 60.74 1,038.05 123.57 2,111.81 - - - 184.31 3,149.86
01.02.01.01.07 m3 184.31 17.09 3,149.86
VOLQUETE 15m3, D = 5Km EJEC. 60.74 1,038.05 123.57 2,111.81 184.31 3,149.86
01.02.01.02 OBRAS DE CONCRETO SIMPLE 18,173.24
PROG. - 25.75 4,791.05 - - - 25.75 4,791.05
01.02.01.02.01 SUB CIMIENTO DE C° 1:12 + 25% P.M. 4'' m2 25.75 186.06 4,791.05
EJEC. 25.75 4,791.05 25.75 4,791.05
CIMIENTOS CORRIDOS - CONCRETO CICLOÉ PEO PROG. - 38.62 7,586.13 - - - 38.62 7,586.13
01.02.01.02.02 C:H 1:10 + 30% P.G m3 38.62 196.43 7,586.13
EJEC. 38.62 7,586.13 38.62 7,586.13
PROG. - - - - 74.42 2,560.05 94.07 3,236.01 168.49 5,796.06
01.02.01.02.03 FALSO PISO - CONCRETO f''c=175 kg/cm2 e=4" m2 168.49 34.40 5,796.06
EJEC. 0.00 74.42 2,560.05 57.91 1,992.10 29.44 1,012.74 6.72 231.17 168.49 5,796.06
01.02.01.03 OBRAS DE CONCRETO ARMADO 119,501.85
01.02.01.03.01 SOBRECIMIENTOS 11,795.09
CONCRETO F'c=210 kg/cm2 EN SOBRECIMIENTOS PROG. - 10.13 4,125.44 - - - 10.13 4,125.44
01.02.01.03.01.01 ARMADOS m3 10.13 407.25 4,125.44
EJEC. 10.13 4,125.44 10.13 4,125.44
ENCOFRADO Y DESENCOFRADO NORMAL EN PROG. - 64.50 2,810.27 - - - 64.50 2,810.27
01.02.01.03.01.02 m2 64.50 43.57 2,810.27
SOBRECIMIENTOS ARMADOS EJEC. 64.50 2,810.27 64.50 2,810.27
ACERO CORRUGADO F'y=4200 kg/cm2 PARA PROG. - 1,061.00 4,859.38 - - - 1,061.00 4,859.38
01.02.01.03.01.03 kg 1,061.00 4.58 4,859.38
SOBRECIMIENTOS ARMADOS EJEC. 1,061.00 4,859.38 1,061.00 4,859.38
01.02.01.03.02 COLUMNAS 54,289.04
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
PROG. - - 29.53 14,810.18 32.51 16,304.74 - 62.04 31,114.92
01.02.01.03.02.01 CONCRETO F'c=210 kg/cm2 EN COLUMNAS m3 62.04 501.53 31,114.92
EJEC. 29.53 14,810.18 32.51 16,304.74 62.04 31,114.92
PROG. - - 174.61 9,360.84 - - 174.61 9,360.84
01.02.01.03.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 174.61 53.61 9,360.84
EJEC. 174.61 9,360.84 174.61 9,360.84
PROG. 1,946.72 8,915.98 987.00 4,520.46 82.28 376.84 - - 3,016.00 13,813.28
01.02.01.03.02.03 ACERO CORRUGADO F'y=4200 kg/cm2 PARA COLUMNAS kg 3,016.00 4.58 13,813.28
EJEC. 1,946.72 8,915.98 987.00 4,520.46 0.00 82.28 376.84 3,016.00 13,813.28
01.02.01.03.03 VIGAS 35,504.80
PROG. - - 0.75 298.88 9.42 3,753.96 11.65 4,642.64 21.82 8,695.49
01.02.01.03.03.01 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 21.82 398.51 8,695.49
EJEC. 0.75 298.88 9.42 3,753.96 11.65 4,642.64 21.82 8,695.49
PROG. - - 11.50 671.95 99.63 5,821.38 41.45 2,421.92 152.58 8,915.25
01.02.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 152.58 58.43 8,915.25
EJEC. 11.50 671.95 99.63 5,821.38 41.45 2,421.92 152.58 8,915.25
PROG. - - 100.40 459.83 1,243.56 5,695.50 2,563.04 11,738.73 3,907.00 17,894.06
01.02.01.03.03.03 ACERO CORRUGADO F'y=4200 kg/cm2 PARA VIGAS kg 3,907.00 4.58 17,894.06
EJEC. 100.40 459.83 1,243.56 5,695.50 2,563.04 11,738.72 3,907.00 17,894.06
01.02.01.03.04 LOSAS ALIGERADAS 17,912.92
PROG. - - 0.65 250.43 0.40 154.11 20.50 7,898.24 21.55 8,302.78
01.02.01.03.04.01 CONCRETO F'c=210 kg/cm2 EN LOSAS ALIGERADAS m3 21.55 385.28 8,302.78
EJEC. 0.65 250.43 0.40 154.11 20.50 7,898.24 21.55 8,302.78
ENCOFRADO Y DESENCOFRADO NORMAL EN PROG. - - 9.60 419.14 4.35 189.92 106.15 4,634.51 120.10 5,243.57
01.02.01.03.04.02 m2 120.10 43.66 5,243.57
LOSAS ALIGERADAS EJEC. 9.60 419.14 4.35 189.92 106.15 4,634.51 120.10 5,243.57
ACERO CORRUGADO F'y=4200 kg/cm2 PARA PROG. - - 10.36 47.45 16.11 73.78 85.53 391.73 112.00 512.96
01.02.01.03.04.03 kg 112.00 4.58 512.96
LOSAS ALIGERADAS EJEC. 10.36 47.45 16.11 73.78 85.53 391.73 112.00 512.96
PROG. - - 60.00 240.60 39.00 156.39 862.00 3,456.62 961.00 3,853.61
01.02.01.03.04.04 LADRILLO DE ARCILLA PARA TECHO 15 x 30 x 30 cm und 961.00 4.01 3,853.61
EJEC. 60.00 240.60 39.00 156.39 862.00 3,456.62 961.00 3,853.61
01.02.02 ARQUITECTURA 113,201.06
01.02.02.01 MUROS Y TABIQUES 16,182.12
PROG. - 27.76 2,309.36 120.28 10,006.10 46.48 3866.66 - 194.52 16,182.12
01.02.02.01.01 MURO LADRILLO K.K. DE SOGA MEZC. C:A 1:4, TIPO IV m2 194.52 83.19 16,182.12
EJEC. 27.76 2,309.36 120.28 10,006.10 46.48 3,866.67 194.52 16,182.12
01.02.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 16,934.31
PROG. - - - - - 40.39 899.89 40.39 899.89
01.02.02.02.01 TARRAJEO PRIMARIO Y RAYADO MEZC. C:A 1:5 m2 40.39 22.28 899.89
EJEC. 0.00 24.27 540.74 16.12 359.15 40.39 899.89
TARRAJEO EN INTERIORES MEZC. C:A 1:5, e=1.50 cm PROG. - - - - 39.93 623.71 149.52 2,335.50 - 189.45 2,959.21
01.02.02.02.02 m2 189.45 15.62 2,959.21
(INC. COLUMNAS EMPOT.) EJEC. 0.00 39.93 623.71 149.52 2,335.50 0.00 0.00 189.45 2,959.21
TARRAJEO EN EXTERIORES MEZC. C:A 1:5, e=1.50 cm PROG. - - - - 24.04 548.59 46.38 1,058.39 72.86 1,662.67 143.28 3,269.65
01.02.02.02.03 m2 143.28 22.82 3,269.65
(INC. COLUMNAS EMPOT.) EJEC. 0.00 24.04 548.59 119.24 2,721.06 0.00 143.28 3,269.65
PROG. - - - - 19.25 612.15 122.17 3,885.01 - 141.42 4,497.16
01.02.02.02.04 TARRAJEO DE COLUMNAS MEZCLA C:A 1:5, e=1.5 cm m2 141.42 31.80 4,497.16
EJEC. 0.00 19.25 612.15 122.17 3,885.01 141.42 4,497.16
PROG. - - - - 32.70 1,225.27 36.08 1,351.92 68.78 2,577.19
01.02.02.02.05 TARRAJEO DE VIGAS MEZCLA C:A 1:5, e=1.5 cm m2 68.78 37.47 2,577.19
EJEC. 0.00 32.70 1,225.27 36.08 1,351.92 68.78 2,577.19
VESTIDURA DE DERRAMES DE PUERTAS, VENTANAS PROG. - - - - 6.05 74.65 121.55 1,498.66 - 127.60 1,573.31
01.02.02.02.06 m 127.60 12.33 1,573.31
Y VANOS MEZC. C:A 1:5, e=1.50 cm ANCHO=15 cm EJEC. 0.00 6.05 74.65 121.55 1,498.71 127.60 1,573.36
PROG. - - - - 21.00 157.08 133.80 1,000.82 - 154.80 1,157.90
01.02.02.02.07 BRUNÑ AS DE 1/2" UNION TECHO MURO m 154.80 7.48 1,157.90
EJEC. 0.00 21.00 157.08 133.80 1,000.82 154.80 1,157.90
01.02.02.03 CIELORRASOS 8,506.79
PROG. - - - 12.50 513.13 79.53 3,264.71 115.20 4,728.95 207.23 8,506.79
01.02.02.03.01 CIELORASO MEZC. C:A 1:5, e=1.50 cm m2 207.23 41.05 8,506.79
EJEC. 12.50 513.13 79.53 3,264.71 115.20 4,728.96 207.23 8,506.79
01.02.02.04 PISOS Y PAVIMENTOS 14,583.15
01.02.02.04.01 PISOS DE CERAMICO 14,583.15
PROG. - - - - - 167.43 4,857.14 167.43 4,857.14
01.02.02.04.01.01 CONTRAPISO DE 48 mm m2 167.43 29.01 4,857.14
EJEC. 0.00 72.53 2,104.10 79.54 2,307.46 152.07 4,411.55
PROG. - - - - - 156.69 9,102.12 156.69 9,102.12
01.02.02.04.01.02 PISO DE CERAMICO 40 cm x 40 cm TRANSITO ALTO m2 156.69 58.09 9,102.12
EJEC. 0.00 49.03 2,848.15 79.54 4,620.48 128.57 7,468.63
PROG. - - - - - 10.74 623.89 10.74 623.89
01.02.02.04.01.03 PISO DE CERAMICO 30 cm x 30 cm ANTIDESLIZANTE m2 10.74 58.09 623.89
EJEC. 0.00 16.12 936.41 7.37 428.12 23.49 1,364.54
01.02.02.05 ZÓCALOS Y CONTRAZÓCALOS 5,794.33
PROG. - - - - - 53.26 4,113.27 53.26 4,113.27
01.02.02.05.01 ZOCALO DE CERAMICO 30 X 20 m m2 53.26 77.23 4,113.27
EJEC. 0.00 21.97 1,696.74 21.97 1,696.74
PROG. - - - - - 114.28 1,681.06 114.28 1,681.06
01.02.02.05.02 CONTRAZOÉ CALO DE CERAMICO 10 cm x 30cm, h=0.10m m 114.28 14.71 1,681.06
EJEC. 0.00 66.50 978.22 41.52 610.76 108.02 1,588.97
01.02.02.06 COBERTURAS 13,446.10
COBERTURA LADRILLO PASTELERO 20 cm x 20 cm x 3 cm, PROG. - - - - - 106.74 6,384.29 102.31 6,118.99 209.05 12,503.28
01.02.02.06.01 m2 209.05 59.81 12,503.28
MEZC. C:A 1:5, e=1.50 cm, BASE 2.5 cm EJEC. 0.00 39.90 2,386.42 97.41 5,826.09 137.31 8,212.51
PROG. - - - - - 209.05 942.82 209.05 942.82
01.02.02.06.02 IMPERMEABILIZACION DE COBERTURA m2 209.05 4.51 942.82
EJEC. 0.00 - 0.00
01.02.02.07 CARPINTERIA DE MADERA 16,587.89
PUERTA DE MADERA TABLERO REBAJADO DE 45 mm PROG. - - - - - - 24.54 7,556.11 24.54 7,556.11
01.02.02.07.01 m2 24.54 307.91 7,556.11
DE CEDRO EJEC. 0.00 - 0.00
PUERTA CONTRAPLACADA 45 mm CON TRIPLAY 4 mm PROG. - - - - - - 1.47 291.96 1.47 291.96
01.02.02.07.02 m2 1.47 198.61 291.96
INCLUYE MARCO EJEC. 0.00 - 0.00
PROG. - - - - - - 44.55 8,739.82 44.55 8,739.82
01.02.02.07.03 VENTANA DE MADERA (SEGUÉ N DISENÑ O) m2 44.55 196.18 8,739.82
EJEC. 0.00 - 0.00
01.02.02.08 CARPINTERIA METALICA 755.93
PROG. - - - - - - 7.48 755.93 7.48 755.93
01.02.02.08.01 REJILLA DE F°N° PINTADO e=1'' a=0.25m m 7.48 101.06 755.93
EJEC. 0.00 - 0.00
01.02.02.09 CERRAJERIA 1,697.83
PROG. - - - - - - 32.00 647.04 32.00 647.04
01.02.02.09.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 32.00 20.22 647.04
EJEC. 0.00 - 0.00
PROG. - - - - - - 4.00 76.88 4.00 76.88
01.02.02.09.02 BISAGRA ALUMINIZADA CAPUCHINA DE 3 1/2" X 3 1/2" pza 4.00 19.22 76.88
EJEC. 0.00 - 0.00
CHAPA PARA EXTERIOR CON LLAVE INTERIOR Y PROG. - - - - - - 7.00 867.79 7.00 867.79
01.02.02.09.03 und 7.00 123.97 867.79
EXTERIOR 2 GOLPES EJEC. 0.00 - 0.00
PROG. - - - - - - 2.00 106.12 2.00 106.12
01.02.02.09.04 CERRADURA TIPO PERILLA und 2.00 53.06 106.12
EJEC. 0.00 - 0.00
01.02.02.10 VIDRIOS, CRISTALES Y SIMILARES 5,013.80
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
VIDRIO SEMIDOBLE PROVISION Y COLOCACION EN PROG. - - - - - - 478.88 4831.9 478.88 4,831.90
01.02.02.10.01 p2 478.88 10.09 4,831.90
VENTANAS FIERRO EJEC. 0.00 - 0.00
PROG. - - - - - - 1.20 181.90 1.20 181.90
01.02.02.10.02 ESPEJO CON CRISTAL LAMINADO e=6mm m2 1.20 151.58 181.90
EJEC. 0.00 - 0.00
01.02.02.11 PINTURA 11,863.13
PINTURA DE MUROS INTERIORES C/ LATEX VINIÉLICO - PROG. - - - - - 371.26 4,106.14 371.26 4,106.14
01.02.02.11.01 m2 371.26 11.06 4,106.14
2 MANOS, C/ IMPRIMANTE EJEC. 0.00 - 0.00
PINTURA DE MUROS EXTERIORES C/ LATEX VINILICO - PROG. - - - - - 143.28 1,799.60 143.28 1,799.60
01.02.02.11.02 m2 143.28 12.56 1,799.60
2 MANOS, C/ IMPRIMANTE EJEC. 0.00 - 0.00
PINTURA DE CIELOS RASOS C/ LAÉ TEX VINIÉ LICO - PROG. - - - - - 361.61 3,569.09 361.61 3,569.09
01.02.02.11.03 2 MANOS, C/ IMPRIMANTE m2 361.61 9.87 3,569.09
EJEC. 0.00 - 0.00
PROG. - - - - - 52.02 1,009.19 52.02 1,009.19
01.02.02.11.04 PINTURA EN PUERTAS CON BARNIZ 2 MANOS m2 52.02 19.40 1,009.19
EJEC. 0.00 - 0.00
PROG. - - - - - 89.09 1,379.11 89.09 1,379.11
01.02.02.11.05 PINTURA DE VENTANAS CON ESMALTE m2 89.09 15.48 1,379.11
EJEC. 0.00 - 0.00
01.02.02.12 VARIOS 1,835.68
PROG. - - - - - 251.85 775.69 251.85 775.69 503.69 1,551.37
01.02.02.12.01 CURADO DEL CONCRETO CON ADITIVO m2 503.69 3.08 1,551.37
EJEC. 0.00 0.00 - 0.00
PROG. - - - - 20.00 27.20 26.02 35.39 64.27 87.40 98.76 134.32 209.05 284.31
01.02.02.12.02 LIMPIEZA PERMANENTE DE OBRA m2 209.05 1.36 284.31
EJEC. 0.00 20.00 27.20 55.00 74.80 25.00 34.00 40.00 54.40 140.00 190.40
01.02.03 INSTALACIONES SANITARIAS 12,087.57
01.02.03.01 APARATOS SANITARIOS Y ACCESORIOS 4,038.23
INODORO TANQUE BAJO SIFON JET BLANCO ADULTO PROG. - - - - - 2.00 784.56 2.00 784.56
01.02.03.01.01 (INC. ACCESORIOS) und 2.00 392.28 784.56
EJEC. - 0.00
INODORO TANQUE BAJO CON FLUXOMETRO BLANCO PROG. - - - - - 1.00 733.04 1.00 733.04
01.02.03.01.02 und 1.00 733.04 733.04
ADULTO (INC. ACCESORIOS) EJEC. - 0.00
PROG. - - - - - 3.00 1,318.29 3.00 1,318.29
01.02.03.01.03 LAVATORIO DE PARED BLANCO DE 01 LLAVE und 3.00 439.43 1,318.29
EJEC. - 0.00
LAVADERO ACERO INOXIDABLE UNA POZA INC. GRIFERIA PROG. - - - - - 1.00 494.78 1.00 494.78
01.02.03.01.04 Y ACCESORIOS u 1.00 494.78 494.78
EJEC. - 0.00
PROG. - - - - - 1.00 307.93 1.00 307.93
01.02.03.01.05 URINARIO DE LOSA COLOR BLANCO u 1.00 307.93 307.93
EJEC. - 0.00
PROG. - - - - - 3.00 219.63 3.00 219.63
01.02.03.01.06 PAPELERA DE LOSA BLANCA EMPOTRADA EJE PLASTICO u 3.00 73.21 219.63
EJEC. - 0.00
AGARRADERA DE ALUMINIO Y ACCESORIOS PARA PROG. - - - - - 1.00 180.00 1.00 180.00
01.02.03.01.07 SSHH DISCAPACITADOS und 1.00 180.00 180.00
EJEC. - 0.00
01.02.03.02 SISTEMA DE AGUA FRIA 4,127.21
01.02.03.02.01 SALIDAS DE AGUA FRIA 323.60
PROG. - - - - - 3.05 123.2 4.95 200.4 8.00 323.60
01.02.03.02.01.01 SALIDA DE AGUA FRIÉA C/TUBERIÉA 1/2" CLASE 10 C/ROSCA pto 8.00 40.45 323.60
EJEC. 8 323.60 8.00 323.60
01.02.03.02.02 REDES DE DISTRIBUCION DE AGUA 290.60
PROG. - - 5.00 21.25 - 52.74 224.15 - - 57.74 245.40
01.02.03.02.02.01 TUBERIÉA PVC CLASE C/ROSCA 3/4" m 57.74 4.25 245.40
EJEC. 5.00 21.25 15 63.75 20.00 85.00
PROG. - - 2.00 7.38 - 10.25 37.82 - - 12.25 45.20
01.02.03.02.02.02 TUBERIÉA PVC CLASE C/ROSCA 1/2" m 12.25 3.69 45.20
EJEC. 2.00 7.38 2.00 7.38
01.02.03.02.03 VALVULAS DE CONTROL 381.80
PROG. - - - - - 4.00 297.60 - 4.00 297.60
01.02.03.02.03.01 VALVULA DE COMPUERTA DE BRONCE DE 1/2" und 4.00 74.40 297.60
EJEC. - 0.00
PROG. - - - - - 1.00 84.20 - 1.00 84.20
01.02.03.02.03.02 VALVULA DE COMPUERTA DE BRONCE DE 3/4" und 1.00 84.20 84.20
EJEC. - 0.00
01.02.03.02.04 CAJAS PARA VALVULAS 68.08
PROG. - - - - - 4.00 68.08 - 4.00 68.08
01.02.03.02.04.01 CAJA PARA VALVULAS und 4.00 17.02 68.08
EJEC. 1.00 17.02 1.00 17.02
01.02.03.02.05 VARIOS 3,063.13
PROG. - - - - - 700.00 - 700.00
01.02.03.02.05.01 TANQUE ELEVADO DE 1100 LTS (INCL. ACCESORIOS) und 1.00 700.00 700.00
EJEC. - 0.00
CONFECCION DE PEDESTAL METALICO PARA PROG. - - - - - 1,217.00 - 1,217.00
01.02.03.02.05.02 und 1.00 1,217.00 1,217.00
TANQUE ELEVADO T°N° Ø 2'' EJEC. - 0.00
PROG. - - - - - 50.00 - 50.00
01.02.03.02.05.03 LLAVE DE RIEGO CON GRIFO DE 1/2" pza 1.00 50.00 50.00
EJEC. - 0.00
PROG. - - - - - 400.00 - 400.00
01.02.03.02.05.04 MEDIDOR DE AGUA (INCL. ACCESORIOS) und 1.00 400.00 400.00
EJEC. - 0.00
CAJA PREFABRICADA DE CONCRETO PARA PROG. - - - - - 115.00 - 115.00
01.02.03.02.05.05 und 1.00 115.00 115.00
MEDIDOR DE AGUA EJEC. - 0.00
PRUEBA HIDRAULICA INTEGRAL + DESINFECCION PROG. - - - - 0.20 116.23 0.20 116.23 0.20 116.23 0.40 232.46 1.00 581.13
01.02.03.02.05.06 glb 1.00 581.13 581.13
TUBERIA ROSCADA DE 3/4'' A 1/2'' EJEC. 0.20 116.23 0.20 116.23
01.02.03.03 SISTEMA DE DRENAJE PLUVIAL 1,110.24
01.02.03.03.01 REDES DE RECOLECCION 1,110.24
PROG. - - 2.00 46.50 - - 2.00 46.50
01.02.03.03.01.01 SALIDA DE BAJADA DE LLUVIA TUBO PVC 3" pto 2.00 23.25 46.50
EJEC. 2.00 46.50 0.00 2.00 46.50
PROG. - - - 1.50 16.11 4.50 48.33 6.00 64.44
01.02.03.03.01.02 RED DE RECOLECCION PVC Ø 3'' S/P m 6.00 10.74 64.44
EJEC. 1.50 16.11 4.5 48.33 6.00 64.44
PROG. - - - - - 2.00 77.22 2.00 77.22
01.02.03.03.01.03 SUMIDERO Ø 3 S. BRONCE pto 2.00 38.61 77.22
EJEC. 0.00 - 0.00
PROG. - - - - - 48.00 922.08 48.00 922.08
01.02.03.03.01.04 CANALETA DESAGUE PLUVIAL m 48.00 19.21 922.08
EJEC. 0.00 - 0.00
01.02.03.04 SISTEMA DE DESAGUE 2,811.89
01.02.03.04.01 SALIDAS DE DESAGUE 826.08
PROG. - - - 3.00 305.40 - 3.00 305.40
01.02.03.04.01.01 SALIDA DE DESAGUE PVC SAL 4" pto 3.00 101.80 305.40
EJEC. 3.00 305.40 0.00 3.00 305.40
PROG. - - 3.00 285.39 - - 3.00 285.39
01.02.03.04.01.02 SALIDA DE DESAGUE PVC SAL 2" pto 3.00 95.13 285.39
EJEC. 3.00 285.39 0.00 0.00 3.00 285.39
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
PROG. - - 3.00 235.29 - - 3.00 235.29
01.02.03.04.01.03 SALIDA DE VENTILACION PVC SAL 2" pto 3.00 78.43 235.29
EJEC. 3.00 235.29 0.00 3.00 235.29
01.02.03.04.02 REDES DE DESAGUE 870.00
PROG. - - - 7.30 150.02 18.70 384.33 4.93 101.26 30.93 635.61
01.02.03.04.02.01 TUBERIA PVC SAL 4'' m 30.93 20.55 635.61
EJEC. 7.30 150.02 23.63 485.60 30.93 635.61
PROG. - - - 2.25 40.57 6.62 119.30 4.13 74.52 13.00 234.39
01.02.03.04.02.02 TUBERIÉA PVC SAL 2" m 13.00 18.03 234.39
EJEC. 2.25 40.57 10.75 193.82 13.00 234.39
01.02.03.04.03 ADITAMENTOS VARIOS 247.29
PROG. - - - - - 3.00 145.44 3.00 145.44
01.02.03.04.03.01 REGISTROS DE BRONCE 4" pza 3.00 48.48 145.44
EJEC. 0.00 - 0.00
PROG. - - - - - 3.00 101.85 3.00 101.85
01.02.03.04.03.02 SUMIDEROS DE BRONCE 2" pza 3.00 33.95 101.85
EJEC. 0.00 - 0.00
01.02.03.04.04 CAMARAS DE INSPECCION 868.52
PROG. - - - - - - 4.00 868.52 4.00 868.52
01.02.03.04.04.01 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 4.00 217.13 868.52
EJEC. 0.00 - 0.00
01.02.04 INSTALACIONES ELÉCTRICAS 16,224.30
01.02.04.01 SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEÑALES DÉBILES 6,834.02
PROG. - - - 7.00 666.26 3.93 374.50 6.67 634.45 1.40 133.21 19.00 1,808.42
01.02.04.01.01 SALIDA PARA ALUMBRADO EN TECHO DE PVC SAP 20 mm pto 19.00 95.18 1,808.42
EJEC. 7.00 666.26 12.00 1,142.16 19.00 1,808.42
PROG. - - 4.00 386.12 3.00 289.59 - 7.00 675.71
01.02.04.01.02 SALIDA PARA ALUMBRADO DE EMERGENCIA pto 7.00 96.53 675.71
EJEC. 4.00 386.12 0.00 3.00 289.59 7.00 675.71
PROG. - - 10.00 569.8 2.00 113.96 - 12.00 683.76
01.02.04.01.03 INTERRUPTOR UNIPOLAR SIMPLE PVC SAP 20 mm pto 12.00 56.98 683.76
EJEC. 10.00 569.8 0.00 10.00 569.80
PROG. - - 2.00 138.72 - - 2.00 138.72
01.02.04.01.04 INTERRUPTOR UNIPOLAR DOBLE PVC SAP 20 mm pto 2.00 69.36 138.72
EJEC. 2.00 138.72 0.00 2.00 138.72
SALIDA PARA TOMACORRIENTE BIPOLAR DOBLE PROG. - - 24.00 3027.6 1.22 154.50 1.53 193.40 0.24 30.55 27.00 3,406.05
01.02.04.01.05 pto 27.00 126.15 3,406.05
C/ PUESTA A TIERRA EJEC. 24.00 3027.6 0.00 3.00 378.45 27.00 3,406.05
PROG. - - 2.00 121.36 - - 2.00 121.36
01.02.04.01.06 CAJA DE PASO REDONDA pto 2.00 60.68 121.36
EJEC. 2.00 121.36 0.00 2.00 121.36
01.02.04.02 CANALIZACIÓN Y/O TUBERÍAS 573.81
PROG. - - 55.00 306.35 23.70 132.01 - 78.70 438.36
01.02.04.02.01 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=20 mm m 78.70 5.57 438.36
EJEC. 55.00 306.35 23.70 132.01 78.70 438.36
PROG. - - 19.35 135.45 - - 19.35 135.45
01.02.04.02.02 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=25 mm m 19.35 7.00 135.45
EJEC. 19.35 135.45 0.00 19.35 135.45
01.02.04.03 CONDUCTORES Y CABLES 355.43
PROG. - - - - - 146.71 294.89 146.71 294.89
01.02.04.03.01 CABLE ELEÉ CTRICO NH-80 2.5 mm2 m 146.71 2.01 294.89
EJEC. 0.00 110.00 221.10 110.00 221.10
PROG. - - - - - 30.12 60.54 30.12 60.54
01.02.04.03.02 CABLE ELEÉ CTRICO NH-80 4.0 mm2 m 30.12 2.01 60.54
EJEC. 0.00 30.12 60.54 30.12 60.54
01.02.04.04 TABLEROS 1,075.88
PROG. - - 3.00 806.91 1.00 268.97 - - - 4.00 1,075.88
01.02.04.04.01 TABLERO DISTRIBUCIOÉ N CAJA METAÉ LICA CON 12 POLOS pza 4.00 268.97 1,075.88
EJEC. 3.00 806.91 1.00 268.97 4.00 1,075.88
01.02.04.05 DISPOSITIVOS DE MANIOBRA Y PROTECCION 836.61
pza PROG. - - - - - - 6.00 241.50 6.00 241.50
01.02.04.05.01 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 15 A 6.00 40.25 241.50
EJEC. 0.00 - 0.00
PROG. - - - - - - 3.00 135.75 3.00 135.75
01.02.04.05.02 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 20 A pza 3.00 45.25 135.75
EJEC. 0.00 - 0.00
PROG. - - - - - - 3.00 150.75 3.00 150.75
01.02.04.05.03 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 30 A pza 3.00 50.25 150.75
EJEC. 0.00 - 0.00
PROG. - - - - - - 3.00 308.61 3.00 308.61
01.02.04.05.04 INTERRUPTOR DIFERENCIAL 30 mA (2 x 32 A) pza 3.00 102.87 308.61
EJEC. 0.00 - 0.00
01.02.04.06 ARTEFACTOS 3,755.21
ARTEFACTO TIPO FLUORESCENTE 60 CM X 60 CM PROG. - - - - - - 13.00 2,171.39 13.00 2,171.39
01.02.04.06.01 und 13.00 167.03 2,171.39
INCLUYE EQUIPO Y PANTALLA EJEC. 0.00 - 0.00
PROG. - - - - - - 6.00 642.18 6.00 642.18
01.02.04.06.02 ARTEFACTO PARA ADOSAR X 1 LAMP- 20W und 6.00 107.03 642.18
EJEC. 0.00 - 0.00
LUZ DE EMERGENCIA A BATERIA DEL TIPO SECO PROG. - - - - - - 7.00 941.64 7.00 941.64
01.02.04.06.03 RECARGABLE CON AUTONOMIA DE 2 H. Y 2 REFLECTORES pza 7.00 134.52 941.64
DIRECCIONALES DE 18W EJEC. 0.00 - 0.00
01.02.04.07 INSTALACION DE SISTEMA DE PUESTA A TIERRA 2,313.34
SISTEMA DE PUESTA A TIERRA CON FERRETERIA PROG. - - - - - 2.00 2,313.34 2.00 2,313.34
01.02.04.07.01 DE ALTA CORROSION und 2.00 1,156.67 2,313.34
EJEC. 0.00 - 0.00
01.02.04.08 PRUEBAS ELÉCTRICAS 480.00
PROG. - - - - - - 1.00 480.00 1.00 480.00
01.02.04.08.01 PRUEBAS ELECTRICAS PARA BAJA TENSION ser 1.00 480.00 480.00
EJEC. 0.00 - 0.00
01.02.05 INSTALACIONES DE COMUNICACION 4,014.09
01.02.05.01 CANALIZACIÓN Y/O TUBERÍAS 63.05
PROG. - - 6.00 33.42 5.32 29.63 - 11.32 63.05
01.02.05.01.01 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=20 mm m 11.32 5.57 63.05
EJEC. 6.00 33.42 5.32 29.63 11.32 63.05
01.02.05.02 SALIDAS DE COMUNICACIONES 1,742.87
PROG. - - - 1.00 128.12 - 1.00 128.12
01.02.05.02.01 SALIDAS PARA CAMARA DE VIDEO pto 1.00 128.12 128.12
EJEC. 1.00 128.12 1.00 128.12
PROG. - - - - - 4.00 435.84 4.00 435.84
01.02.05.02.02 SALIDAS PARA SENSOR INFRAROJO DE PARED pto 4.00 108.96 435.84
EJEC. 0.00 4.00 435.84 4.00 435.84
PROG. - - - - - 1.00 108.96 1.00 108.96
01.02.05.02.03 SALIDAS PARA SIRENA EXTERIOR pto 1.00 108.96 108.96
EJEC. 0.00 1.00 108.96 1.00 108.96
PROG. - - - 2.00 248.28 4.11 509.61 1.89 235.23 - 8.00 993.12
01.02.05.02.04 SALIDAS PARA DATA pto 8.00 124.14 993.12
EJEC. 2.00 248.28 6.00 744.84 8.00 993.12
PROG. - - 3.00 76.83 - - 3.00 76.83
01.02.05.02.05 CAJA DE PASO 100 X 100mm pto 3.00 25.61 76.83
EJEC. 3.00 76.83 0.00 3.00 76.83
01.02.05.03 RACK DE COMUNICACIONES 2,084.91
SUMINISTRO E INSTALACION DE CAMARA DE VIDEO PROG. - - - - - 1.00 285.61 1.00 285.61
01.02.05.03.01 und 1.00 285.61 285.61
TIPO DOMO EJEC. 0.00 - 0.00
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
PROG. - - - - - 4.00 1,633.04 4.00 1,633.04
01.02.05.03.02 SUMINISTRO E INSTALACION DE SENSOR INFRAROJO und 4.00 408.26 1,633.04
EJEC. 0.00 - 0.00
PROG. - - - - - 1.00 166.26 1.00 166.26
01.02.05.03.03 SUMINISTRO E INSTALACION DE SIRENA EXTERIOR und 1.00 166.26 166.26
EJEC. 0.00 - 0.00
01.02.05.04 TABLEROS 123.26
PROG. - - - - - 1.00 123.26 1.00 123.26
01.02.05.04.01 TABLERO DE CONTROL DE 12''X12''X4'' PARA ADOSAR und 1.00 123.26 123.26
EJEC. 0.00 - 0.00
01.03 OBRAS EXTERIORES 470,056.67
01.03.01 ESTRUCTURAS 213,871.95
01.03.01.01 MOVIMIENTO DE TIERRAS 44,544.24
PROG. 160.00 1,620.80 - - 75.00 759.75 - 9.01 91.27 244.01 2,471.82
01.03.01.01.01 CORTE DE TERRENO CON MAQUINARIA m3 244.01 10.13 2,471.82
EJEC. 160.00 1,620.80 75.00 759.75 9.01 91.27 244.01 2,471.82
PROG. 18.00 612.72 12.50 425.50 28.61 973.94 33.00 1123.34 43.86 1,492.97 45.07 1,534.12 52.61 1,790.86 233.65 7,953.45
01.03.01.01.02 EXCAVACIOÉ N DE ZANJAS PARA CIMIENTOS HASTA 1.00 m m3 233.65 34.04 7,953.45
EJEC. 18.00 612.72 12.50 425.50 19.31 657.31 49.81 1,695.53
PROG. - - 18.03 284.00 19.14 301.45 18.77 295.67 24.32 382.98 2.66 41.89 82.92 1,305.99
01.03.01.01.03 RELLENO COMPACTADO CON MATERIAL PROPIO C/EQUIPO m3 82.92 15.75 1,305.99
EJEC. 0.00 32.12 505.89 16.45 259.09 48.57 764.97
PROG. - - - - - 345.31 849.47 385.25 947.72 391.96 964.23 1,122.53 2,761.42
01.03.01.01.04 NIVELACION INTERIOR APISONADO MANUAL m2 1,122.53 2.46 2,761.42
EJEC. 0.00 - 0.00
RELLENO COMPACTADO CON MATERIAL DE PRESTAMO PROG. - - 68.80 769.87 88.22 987.2 262.61 2,938.64 480.11 5,372.40 222.79 2,493.00 1,122.53 12,561.11
01.03.01.01.05 m2 1,122.53 11.19 12,561.11
E=4'' PARA PISO EJEC. 0.00 - 0.00
PROG. 107.61 2,441.67 - - - - 107.61 2,441.67
01.03.01.01.06 ACARREO DE MATERIAL EXCEDENTE MANUAL m3 107.61 22.69 2,441.67
EJEC. 107.61 2,441.67 107.61 2,441.67
PROG. - - - 234.00 3,182.40 76.36 1,038.50 74.40 1,011.90 45.67 621.05 430.43 5,853.85
01.03.01.01.07 ACARREO DE MATERIAL EXCEDENTE CON EQUIPO MENOR m3 430.43 13.60 5,853.85
EJEC. 0.00 0.00 234.00 3,182.40 24.13 328.17 258.13 3,510.57
ELIMINACIOÉ N DE MATERIAL, CARGADOR 125 HP / PROG. 231.40 3,954.63 - - 75.00 1,281.75 - 3,958.55 306.40 9,194.93
01.03.01.01.08 m3 538.03 17.09 9,194.93
VOLQUETE 15m3, D = 5Km EJEC. 231.40 3,954.63 0.00 75.00 1,281.75 60.00 1,025.40 366.40 6,261.78
01.03.01.02 OBRAS DE CONCRETO SIMPLE 71,997.59
PROG. - 12.42 2,310.87 15.30 2,845.93 15.20 2,827.45 10.67 1,984.63 9.26 1,723.46 - 9.22 1,715.14 72.06 13,407.48
01.03.01.02.01 SUB CIMIENTO DE C° 1:12 + 25% P.M. 4'' m2 72.06 186.06 13,407.48
EJEC. 12.42 2,310.87 10.10 1,879.21 22.52 4,190.07
CIMIENTOS CORRIDOS - CONCRETO CICLOÉ PEO PROG. - - 8.40 1,650.01 20.06 3,940.30 15.98 3,139.35 15.45 3,034.98 - 16.26 3,193.50 76.15 14,958.14
01.03.01.02.02 m3 76.15 196.43 14,958.14
C:H 1:10 + 30% P.G EJEC. 8.40 1,650.01 43.66 8,576.13 20.13 3,954.14 72.19 14,180.28
PROG. - - - - - - 38.02 1308 30.25 1,040.49 68.27 2,348.49
01.03.01.02.03 FALSO PISO - CONCRETO f''c=175 kg/cm2 e=4" m2 68.27 34.40 2,348.49
EJEC. 0.00 - 0.00
PROG. - 0.87 324.16 - - - - 6.53 2,433.08 7.40 2,757.24
01.03.01.02.04 CONCRETO F'c=175 kg/cm2 EN BANCAS DE CONCRETO m3 7.40 372.60 2,757.24
EJEC. 0.87 324.16 0.87 324.16
ENCOFRADO Y DESENCOFRADO NORMAL EN PROG. - - - - - - 92.80 3,839.14 92.80 3,839.14
01.03.01.02.05 BANCAS DE CONCRETO m2 92.80 41.37 3,839.14
EJEC. 0.00 - 0.00
PROG. - - - - - - 68.40 25,416.07 68.40 25,416.07
01.03.01.02.06 CONCRETO F'C=175 kg/m2, GRADERIAS m3 68.40 371.58 25,416.07
EJEC. 0.00 - 0.00
PROG. - - - - - - 76.00 3,258.12 76.00 3,258.12
01.03.01.02.07 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADERIAS m2 76.00 42.87 3,258.12
EJEC. 0.00 - 0.00
CONCRETO F'C=175 kg/m2, GRADAS EXTERIORES, PROG. - - - - - - 1.17 434.75 1.17 434.75
01.03.01.02.08 ACABADO PULIDO m3 1.17 371.58 434.75
EJEC. 0.00 - 0.00
PROG. - - - - - - 6.67 285.94 6.67 285.94
01.03.01.02.09 ENCOFRADO Y DESENCOFRADO NORMAL EN GRADAS m2 6.67 42.87 285.94
EJEC. 0.00 - 0.00
PROG. - - - - - - 59.93 3,038.45 59.93 3,038.45
01.03.01.02.10 CONCRETO F'C=175 kg/m2, PARA RAMPAS m3 59.93 50.70 3,038.45
EJEC. 0.00 - 0.00
PROG. - - - - - - 239.00 724.17 239.00 724.17
01.03.01.02.11 JUNTAS DE DILATACION CON TECKNOPORT e=1'' h=0.10m m 239.00 3.03 724.17
EJEC. 0.00 - 0.00
PROG. - - - - - - 239.00 1,529.60 239.00 1,529.60
01.03.01.02.12 JUNTAS DE DILATACIOÉ N C/ASFALTO E=1'' m 239.00 6.40 1,529.60
EJEC. 0.00 - 0.00
01.03.01.03 OBRAS DE CONCRETO ARMADO 84,491.72
01.03.01.03.01 SOBRECIMIENTOS ARMADOS 8,953.96
CONCRETO F'c=210 kg/cm2 EN SOBRECIMIENTOS PROG. - - - - - 3.08 1,256.30 1.21 490.80 4.29 1,747.10
01.03.01.03.01.01 ARMADOS m3 4.29 407.25 1,747.10
EJEC. 0.00 4.29 1,747.10 4.29 1,747.10
ENCOFRADO Y DESENCOFRADO NORMAL EN PROG. - - - - - 22.60 984.50 1.53 66.84 24.13 1,051.34
01.03.01.03.01.02 m2 24.13 43.57 1,051.34
SOBRECIMIENTOS ARMADOS EJEC. 0.00 24.13 1,051.34 24.13 1,051.34
ACERO CORRUGADO F'y=4200 kg/cm2 PARA PROG. - - - - - 1,038.93 4,758.30 305.07 1,397.22 1,344.00 6,155.52
01.03.01.03.01.03 kg 1,344.00 4.58 6,155.52
SOBRECIMIENTOS ARMADOS EJEC. 0.00 171.90 787.30 23.69 108.50 195.59 895.80
01.03.01.03.02 SARDINELES 43,834.44
PROG. - - - - - - 17.01 5,845.34 7.77 2,669.07 24.78 8,514.41
01.03.01.03.02.01 CONCRETO F'c=175 kg/cm2 EN SARDINELES m3 24.78 343.60 8,514.41
EJEC. 0.00 0.00 - 0.00
CONCRETO F'c=175 kg/cm2 EN SARDINELES PROG. - - - - - - 17.99 6,587.64 11.04 4,040.53 29.03 10,628.17
01.03.01.03.02.02 m3 29.03 366.11 10,628.17
CIMENTACION EJEC. 0.00 0.00 - 0.00
PROG. - - - - - - 292.53 12,745.34 94.54 4,119.30 387.07 16,864.64
01.03.01.03.02.03 ENCOFRADO Y DESENCOFRADO NORMAL EN SARDINELES m2 387.07 43.57 16,864.64
EJEC. 0.00 0.00 - 0.00
PROG. - - - - - - 1,306.43 5,983.45 402.57 1,843.77 1,709.00 7,827.22
01.03.01.03.02.04 ACERO CORRUGADO F'y=4200 kg/cm2 PARA SARDINELES kg 1,709.00 4.58 7,827.22
EJEC. 0.00 0.00 - 0.00
01.03.01.03.03 COLUMNAS 18,857.70
PROG. - - 0.66 329.51 0.20 100.31 1.27 634.45 1.86 934.90 3.73 1,873.12 3.17 1,589.37 10.89 5,461.66
01.03.01.03.03.01 CONCRETO F'c=210 kg/cm2 EN COLUMNAS m3 10.89 501.53 5,461.66
EJEC. 0.66 329.51 0.20 100.31 1.07 536.64 2.62 1,314.01 4.27 2,141.53 8.82 4,421.99
PROG. - - 23.00 1,233.03 2.60 139.39 15.77 845.30 25.80 1,383.30 39.82 2,134.56 38.15 2,045.38 145.14 7,780.96
01.03.01.03.03.02 ENCOFRADO Y DESENCOFRADO NORMAL EN COLUMNAS m2 145.14 53.61 7,780.96
EJEC. 23.00 1,233.03 2.60 139.39 21.42 1,148.33 47.39 2,540.58 50.73 2,719.64 145.14 7,780.96
PROG. - - 260.54 1,193.27 262.75 1,203.40 225.85 1,034.40 269.48 1,234.20 207.38 949.81 1,226.00 5,615.08
01.03.01.03.03.03 ACERO CORRUGADO F'y=4200 kg/cm2 PARA COLUMNAS kg 1,226.00 4.58 5,615.08
EJEC. 260.54 1,193.27 434.40 1,989.55 531.06 2,432.25 0.00 1,226.00 5,615.08
01.03.01.03.04 VIGAS 9,563.58
PROG. - - - 0.70 278.96 0.92 364.87 0.88 349.50 1.42 564.40 0.74 295.34 4.65 1,853.07
01.03.01.03.04.01 CONCRETO F'c=210 kg/cm2 EN VIGAS m3 4.65 398.51 1,853.07
EJEC. 0.70 278.96 2.64 1,052.07 1.31 522.05 0.00 4.65 1,853.07
PROG. - - - 13.80 806.33 12.57 734.45 11.96 698.60 12.95 756.45 9.44 551.46 60.71 3,547.29
01.03.01.03.04.02 ENCOFRADO Y DESENCOFRADO NORMAL EN VIGAS m2 60.71 58.43 3,547.29
EJEC. 13.80 806.33 18.03 1,053.49 25.64 1,498.15 3.24 189.31 60.71 3,547.29
PROG. - - - 62.00 283.96 193.12 884.50 218.22 999.45 218.88 1,002.45 216.78 992.86 909.00 4,163.22
01.03.01.03.04.03 ACERO CORRUGADO F'y=4200 kg/cm2 PARA VIGAS kg 909.00 4.58 4,163.22
EJEC. 62.00 283.96 98.35 450.44 310.64 1,422.73 378.11 1,731.74 849.10 3,888.88
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
01.03.01.03.05 LOSAS ALIGERADAS 2,223.08
PROG. - - - - - - 1.61 620.30 1.61 620.30
01.03.01.03.05.01 CONCRETO F'c=210 kg/cm2 LOSAS ALIGERADAS m3 1.61 385.28 620.30
EJEC. - 0.00
ENCOFRADO Y DESENCOFRADO NORMAL DE PROG. - - - - - - 20.14 879.31 20.14 879.31
01.03.01.03.05.02 LOSAS ALIGERADAS m2 20.14 43.66 879.31
EJEC. 10.52 459.30 10.52 459.30
PROG. - - - - - - 17.00 77.86 17.00 77.86
01.03.01.03.05.03 ACERO CORRUGADO F'y=4200 kg/cm2 LOSAS ALIGERADAS kg 17.00 4.58 77.86
EJEC. - 0.00
PROG. - - - - - - 161.00 645.61 161.00 645.61
01.03.01.03.05.04 LADRILLO DE ARCILLA PARA TECHO 15 x 30 x 30 cm und 161.00 4.01 645.61
EJEC. - 0.00
01.03.01.03.06 PEDESTAL EN AULA ABIERTA 1,058.96
PROG. - - - - - - 0.77 386.18 0.77 386.18
01.03.01.03.06.01 CONCRETO F'c=210 kg/cm2 EN PEDESTAL m3 0.77 501.53 386.18
EJEC. - 0.00
PROG. - - - - - - 7.68 411.72 7.68 411.72
01.03.01.03.06.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PEDESTAL m2 7.68 53.61 411.72
EJEC. - 0.00
PROG. - - - - - - 57.00 261.06 57.00 261.06
01.03.01.03.06.03 ACERO CORRUGADO F'y=4200 kg/cm2 PARA PEDESTAL kg 57.00 4.58 261.06
EJEC. - 0.00
01.03.01.04 ESTRUCTURAS METÁLICAS 12,838.40
PROG. - - - - - - 8.00 2,515.52 8.00 2,515.52
01.03.01.04.01 COLUMNA METAÉ LICA und 8.00 314.44 2,515.52
EJEC. - 0.00
PROG. - - - - - - 16.00 5,243.04 16.00 5,243.04
01.03.01.04.02 COLUMNA METAÉ LICA Ø 3'' TN und 16.00 327.69 5,243.04
EJEC. - 0.00
PROG. - - - - - - 24.00 1,132.32 24.00 1,132.32
01.03.01.04.03 IZAJE DE COLUMNA METAÉ LICA und 24.00 47.18 1,132.32
EJEC. - 0.00
BASE DE PLANCHA DE ACERO PARA SOPORTE DE PROG. - - - - - - 24.00 3,947.52 24.00 3,947.52
01.03.01.04.04 und 24.00 164.48 3,947.52
COLUMNAS METALICA INC/ANCLAJE EJEC. - 0.00
01.03.02 ARQUITECTURA 184,508.28
01.03.02.01 MUROS Y TABIQUES 27,543.38
PROG. - - 45.80 3,810.02 6.75 561.53 5.45 453.45 70.13 5,834.50 99.17 8,249.54 103.79 8,634.34 331.09 27,543.38
01.03.02.01.01 MURO LADRILLO K.K. DE SOGA MEZC. C:A 1:4, TIPO IV m2 331.09 83.19 27,543.38
EJEC. 0.00 45.80 3,810.02 6.75 561.53 76.44 6,359.04 140.18 11,661.57 61.92 5,151.12 331.09 27,543.29
01.03.02.02 REVOQUES ENLUCIDOS Y MOLDURAS 12,947.69
TARRAJEO EN INTERIORES MEZC. C:A 1:5, e=1.50 cm PROG. - - - - - - 42.20 659.16 42.20 659.16
01.03.02.02.01 m2 42.20 15.62 659.16
(INC. COLUMNAS EMPOT.) EJEC. - 0.00
TARRAJEO EN EXTERIORES MEZC. C:A 1:5, e=1.50 cm PROG. - - - - - - 64.30 1,467.33 64.30 1,467.33
01.03.02.02.02 m2 64.30 22.82 1,467.33
(INC. COLUMNAS EMPOT.) EJEC. 64.30 1,467.33 64.30 1,467.33
PROG. - - - - - - 14.52 461.74 14.52 461.74
01.03.02.02.03 TARRAJEO DE COLUMNAS MEZCLA C:A 1:5, e=1.5 cm m2 14.52 31.80 461.74
EJEC. - 0.00
PROG. - - - - - - 13.21 494.98 13.21 494.98
01.03.02.02.04 TARRAJEO DE VIGAS MEZCLA C:A 1:5, e=1.5 cm m2 13.21 37.47 494.98
EJEC. - 0.00
VESTIDURA DE DERRAMES DE PUERTAS, VENTANAS Y PROG. - - - - - - 17.70 218.24 17.70 218.24
01.03.02.02.05 m 17.70 12.33 218.24
VANOS MEZC. C:A 1:5, e=1.50 cm ANCHO=15 cm EJEC. 17.70 218.24 17.70 218.24
PROG. - - - - - - 25.94 194.03 25.94 194.03
01.03.02.02.06 BRUNÑ AS DE 1/2" UNION TECHO MURO m 25.94 7.48 194.03
EJEC. 25.94 194.03 25.94 194.03
PROG. - - - - - - 32.30 287.79 32.30 287.79
01.03.02.02.07 BRUNÑ AS DE 1" EN FACHADA m 32.30 8.91 287.79
EJEC. 32.20 286.90 32.20 286.90
PROG. - - - - - - 87.10 1,904.01 87.10 1,904.01
01.03.02.02.08 TARRAJEO EN GRADERIAS MEZC. C:A 1:5, e=1.50 cm m2 87.10 21.86 1,904.01
EJEC. - 0.00
PROG. - - - - - 1,904.01 - 1,904.01
01.03.02.02.09 TARRAJEO EN BANCAS MEZC. C:A 1:5, e=1.50 cm m2 87.10 21.86 1,904.01
EJEC. - 0.00
PROG. - - - - - 5,356.40 - 5,356.40
01.03.02.02.10 TARRAJEO EN SOBRECIMIENTO MEZC. C:A 1:5 m2 201.52 26.58 5,356.40
EJEC. - 0.00
01.03.02.03 CIELORRASOS 941.69
PROG. - - - - - - 22.94 941.69 22.94 941.69
01.03.02.03.01 CIELORASO MEZC. C:A 1:5, e=1.50 cm m2 22.94 41.05 941.69
EJEC. - 0.00
01.03.02.04 PISOS Y PAVIMENTOS 62,663.53
01.03.02.04.01 PISOS DE CERAMICO 5,946.31
PROG. - - - - - - 68.27 1,980.51 - 68.27 1,980.51
01.03.02.04.01.01 CONTRAPISO DE 48 mm m2 68.27 29.01 1,980.51
EJEC. - 0.00
PROG. - - - - - - 68.27 3,965.80 - 68.27 3,965.80
01.03.02.04.01.02 PISO DE CERAMICO 40 cm x 40 cm TRANSITO ALTO m2 68.27 58.09 3,965.80
EJEC. - 0.00
01.03.02.04.02 PISOS DE CONCRETO 56,717.22
PISO DE CONCRETO F'C=175 kg/m2, E=4'' PROG. - - - - - - 527.13 26,071.85 527.13 26,071.85 1,054.26 52,143.70
01.03.02.04.02.01 ACABADO CEMENTO PULIDO m2 1,054.26 49.46 52,143.70
EJEC. - 0.00
PROG. - - - - - - 30.15 1,247.10 30.15 1,247.10 60.29 2,494.20
01.03.02.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL EN PISOS m2 60.29 41.37 2,494.20
EJEC. - 0.00
PROG. - - - - - - 220.50 668.12 - 220.50 668.12
01.03.02.04.02.03 JUNTAS DE DILATACION CON TECKNOPORT e=1'' h=0.10m m 220.50 3.03 668.12
EJEC. - 0.00
PROG. - - - - - - - 220.50 1,411.20 220.50 1,411.20
01.03.02.04.02.04 JUNTAS DE DILATACIOÉ N C/ASFALTO E=1'' m 220.50 6.40 1,411.20
EJEC. - 0.00
01.03.02.05 ZÓCALOS Y CONTRAZÓCALOS 375.11
PROG. - - - - - - 25.50 375.11 25.50 375.11
01.03.02.05.01 CONTRAZOÉ CALO DE CERAMICO 10 cm x 30cm, h=0.10m m 25.50 14.71 375.11
EJEC. - 0.00
01.03.02.06 COBERTURAS 8,198.21
COBERTURA LADRILLO PASTELERO 20 cm x 20 cm x 3 cm, PROG. - - - - - - - 13.00 777.53 13.00 777.53
01.03.02.06.01 MEZC. C:A 1:5, e=1.50 cm, BASE 2.5 cm m2 13.00 59.81 777.53
EJEC. - 0.00
PROG. - - - - - - - 13.00 58.63 13.00 58.63
01.03.02.06.02 IMPERMEABILIZACION DE COBERTURA m2 13.00 4.51 58.63
EJEC. - 0.00
PROG. - - - - - - - 73.00 4,555.20 73.00 4,555.20
01.03.02.06.03 COBERTURA CON TEJA ANDINA m2 73.00 62.40 4,555.20
EJEC. - 0.00
PROG. - - - - - - - 97.46 2,806.85 97.46 2,806.85
01.03.02.06.04 MALLA RASCHEL AL 90% TRABAJADA m2 97.46 28.80 2,806.85
EJEC. - 0.00
01.03.02.07 CARPINTERIA DE MADERA 1,886.13
PUERTA DE MADERA TABLERO REBAJADO DE 45 mm PROG. - - - - - - - 4.32 1,317.21 4.32 1,317.21
01.03.02.07.01 m2 4.32 304.91 1,317.21
DE CEDRO
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
PUERTA DE MADERA TABLERO REBAJADO DE 45 mm
01.03.02.07.01 m2 4.32 304.91 1,317.21
DE CEDRO EJEC. - 0.00
PROG. - - - - - - - 2.90 568.92 2.90 568.92
01.03.02.07.02 VENTANA DE MADERA (SEGUÉ N DISENÑ O) m2 2.90 196.18 568.92
EJEC. - 0.00
01.03.02.08 CERRAJERIA 334.79
PROG. - - - - - - - 4.00 80.88 4.00 80.88
01.03.02.08.01 BISAGRA ALUMINIZADA CAPUCHINA DE 3" X 3" pza 4.00 20.22 80.88
EJEC. - 0.00
PROG. - - - - - - - 4.00 76.88 4.00 76.88
01.03.02.08.02 BISAGRA ALUMINIZADA CAPUCHINA DE 3 1/2" X 3 1/2" pza 4.00 19.22 76.88
EJEC. - 0.00
CHAPA PARA EXTERIOR CON LLAVE INTERIOR PROG. - - - - - - - 1.00 123.97 1.00 123.97
01.03.02.08.03 Y EXTERIOR 2 GOLPES und 1.00 123.97 123.97
EJEC. - 0.00
PROG. - - - - - - - 1.00 53.06 1.00 53.06
01.03.02.08.04 CERRADURA TIPO PERILLA und 1.00 53.06 53.06
EJEC. - 0.00
01.03.02.09 VIDRIOS, CRISTALES Y SIMILARES 157.30
VIDRIO SEMIDOBLE PROVISION Y COLOCACION PROG. - - - - - - - 15.59 157.30 15.59 157.30
01.03.02.09.01 p2 15.59 10.09 157.30
EN VENTANAS FIERRO EJEC. - 0.00
01.03.02.10 PINTURA 21,582.31
PINTURA DE MUROS INTERIORES C/ LATEX VINIÉLICO - PROG. - - - - - 176.42 2,109.98 176.42 2,109.98
01.03.02.10.01 m2 176.42 11.96 2,109.98
2 MANOS, C/ IMPRIMANTE EJEC. - 0.00
PINTURA DE MUROS EXTERIORES C/ LATEX VINILICO - PROG. - - - - - 729.24 9,815.57 729.24 9,815.57
01.03.02.10.02 m2 729.24 13.46 9,815.57
2 MANOS, C/ IMPRIMANTE EJEC. - 0.00
PINTURA DE CIELOS RASOS C/ LAÉ TEX VINIÉ LICO - PROG. - - - - - 103.48 1,114.48 103.48 1,114.48
01.03.02.10.03 m2 103.48 10.77 1,114.48
2 MANOS, C/ IMPRIMANTE EJEC. - 0.00
PROG. - - - - - 159.66 1,995.75 159.66 1,995.75
01.03.02.10.04 PINTURA LATEX EN GRADERIAS 2 MANOS IN/IMPRIMANTE m2 159.66 12.50 1,995.75
EJEC. - 0.00
PROG. - - - - - 87.10 1,088.75 87.10 1,088.75
01.03.02.10.05 PINTURA LATEX EN BANCAS 2 MANOS IN/IMPRIMANTE m2 87.10 12.50 1,088.75
EJEC. - 0.00
PINTURA LATEX EN SOBRECIMIENTOS 2 MANOS IN/ PROG. - - - - - 201.52 2,519.00 201.52 2,519.00
01.03.02.10.06 m2 201.52 12.50 2,519.00
IMPRIMANTE EJEC. - 0.00
PROG. - - - - - 8.00 134.16 8.00 134.16
01.03.02.10.07 PINTURA ESMALTE COLUMNA METAÉ LICA m2 8.00 16.77 134.16
EJEC. - 0.00
PROG. - - - - - 134.00 2,804.62 134.00 2,804.62
01.03.02.10.08 PINTURA ESMALTE VIGAS METAÉ LICAS m 134.00 20.93 2,804.62
EJEC. - 0.00
01.03.02.11 VARIOS 6,384.85
PROG. - - - - - 1,186.46 3654.3 681.29 2098.37 1,867.75 5,752.67
01.03.02.11.01 CURADO DEL CONCRETO CON ADITIVO m2 1,867.75 3.08 5,752.67
EJEC. - 0.00
PROG. - - - 2.00 632.18 2.00 632.18
01.03.02.11.02 MANTENIMIENTO DE ARCOS DE FUTBOL und 2.00 316.09 632.18
EJEC. - 0.00
01.03.02.12 ÁREAS VERDES 41,493.29
PREPARACION DE TERRENO C/COLOCACION DE GRASS PROG. - - - 1,072.48 15,132.69 1,072.48 15,132.69
01.03.02.12.01 m2 1,072.48 14.11 15,132.69
(h=0.20m) EJEC. - 0.00
PROG. - - - 1,072.48 24,045.00 1,072.48 24,045.00
01.03.02.12.02 SUMINSTRO Y COLOCION DE GRASS EN BLOQUE m2 1,072.48 22.42 24,045.00
EJEC. - 0.00
PREPARACION DE TERRENO C/COLOCACION DE PROG. - - - 28.00 2,315.60 28.00 2,315.60
01.03.02.12.03 m2 28.00 82.70 2,315.60
PLANTONES h=0.70m EJEC. - 0.00
01.03.03 INSTALACIONES SANITARIAS 3,873.73
01.03.03.01 SISTEMA DE AGUA FRIA 443.39
PROG. - - 40.51 281.54 40.51 281.54
01.03.03.01.01 TUBERIÉA PVC CLASE C/ROSCA 3/4" m 40.51 6.95 281.54
EJEC. - 0.00
PROG. - - 1.00 84.20 1.00 84.20
01.03.03.01.02 VALVULA DE COMPUERTA DE BRONCE DE 3/4" und 1.00 84.20 84.20
EJEC. - 0.00
PROG. - - 1.00 77.65 1.00 77.65
01.03.03.01.03 CAJA PARA VALVULAS und 1.00 77.65 77.65
EJEC. - 0.00
01.03.03.02 SISTEMA DE DRENAJE PLUVIAL 653.64
PROG. - - 60.86 653.64 60.86 653.64
01.03.03.02.01 RED DE RECOLECCION PVC Ø 3'' S/P m 60.86 10.74 653.64
EJEC. - 0.00
01.03.03.03 SISTEMA DE DESAGUE 2,776.70
PROG. - - 29.46 605.40 29.46 605.40
01.03.03.03.01 TUBERIÉA PVC SAL 4" m 29.46 20.55 605.40
EJEC. - 0.00
PROG. - - 10.00 2,171.30 10.00 2,171.30
01.03.03.03.02 CAJA DE REGISTRO DE DESAGUE 12" X 24" pza 10.00 217.13 2,171.30
EJEC. - 0.00
01.03.04 INSTALACIONES ELÉCTRICAS 37,831.41
01.03.04.01 SALIDAS PARA ALUMBRADO, TOMACORRIENTES, FUERZA Y SEÑALES DÉBILES 17,144.93
PROG. - - 3.00 285.54 3.00 285.54
01.03.04.01.01 SALIDA PARA ALUMBRADO EN TECHO DE PVC SAP 20 mm pto 3.00 95.18 285.54
EJEC. - 0.00
PROG. - - 1.00 56.98 1.00 56.98
01.03.04.01.02 INTERRUPTOR UNIPOLAR SIMPLE PVC SAP 20 mm pto 1.00 56.98 56.98
EJEC. - 0.00
PROG. - - 1.00 69.36 1.00 69.36
01.03.04.01.03 INTERRUPTOR UNIPOLAR DOBLE PVC SAP 20 mm pto 1.00 69.36 69.36
EJEC. - 0.00
TOMACORRIENTE BIPOLAR DOBLE C/ LINEA A TIERRA PROG. - - 7.00 883.05 7.00 883.05
01.03.04.01.04 pto 7.00 126.15 883.05
PVC SAP 20mm EN PARED EJEC. - 0.00
SUM. E INST. POSTE METALICO h=5.00 m PROG. - - 5.00 3,750.00 5.00 3,750.00
01.03.04.01.05 und 5.00 750.00 3,750.00
C/FAROLA ORNAMENTAL 41W EJEC. - 0.00
SUM. E INST. POSTE METALICO h=8.00 m PROG. - - 5.00 4,400.00 5.00 4,400.00
01.03.04.01.06 C/PASTORAL SIMPLE Y EQUIPO LUMIN. 150W und 5.00 880.00 4,400.00
EJEC. - 0.00
SUM. E INST. POSTE METALICO h=8.00 m PROG. - - 7.00 7,700.00 7.00 7,700.00
01.03.04.01.07 und 7.00 1,100.00 7,700.00
C/PASTORAL DOBLE Y EQUIPO LUMIN. 2X150W EJEC. - 0.00
01.03.04.02 CANALIZACIÓN Y/O TUBERÍAS 6,019.06
PROG. - - 8.83 49.18 8.83 49.18
01.03.04.02.01 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=20 mm m 8.83 5.57 49.18
EJEC. - 0.00
PROG. - - 2.36 14.35 2.36 14.35
01.03.04.02.02 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=25 mm m 2.36 6.08 14.35
EJEC. - 0.00
PROG. - - 30.32 294.10 30.32 294.10
01.03.04.02.03 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=35 mm m 30.32 9.70 294.10
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
01.03.04.02.03 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=35 mm m 30.32 9.70 294.10
EJEC. - 0.00
PROG. - - 449.32 5,661.43 449.32 5,661.43
01.03.04.02.04 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=50 mm m 449.32 12.60 5,661.43
EJEC. - 0.00
01.03.04.03 CONDUCTORES Y CABLES 10,069.75
PROG. - - 30.32 60.94 30.32 60.94
01.03.04.03.01 CABLE ELEÉ CTRICO NH-80 4.0 mm2 m 30.32 2.01 60.94
EJEC. - 0.00
PROG. - - 11.19 22.49 11.19 22.49
01.03.04.03.02 CABLE ELEÉ CTRICO NH-80 2.5 mm2 m 11.19 2.01 22.49
EJEC. - 0.00
PROG. - - 155.11 1,802.38 155.11 1,802.38
01.03.04.03.03 CABLE NYY 2-1x6mm2 m 155.11 11.62 1,802.38
EJEC. - 0.00
PROG. - - 62.90 862.99 62.90 862.99
01.03.04.03.04 CABLE NYY 2-1x10mm2 m 62.90 13.72 862.99
EJEC. - 0.00
PROG. - - 48.51 767.43 48.51 767.43
01.03.04.03.05 CABLE NYY 2-1x16mm2 m 48.51 15.82 767.43
EJEC. - 0.00
PROG. - - 90.02 3,881.66 90.02 3,881.66
01.03.04.03.06 CABLE NYY 2-1x25mm2 + 10mm2 CU m 90.02 43.12 3,881.66
EJEC. - 0.00
PROG. - - 41.91 1,279.09 41.91 1,279.09
01.03.04.03.07 CABLE NYY 2-1x10mm2 + 10mm2 CU m 41.91 30.52 1,279.09
EJEC. - 0.00
PROG. - - 80.09 1,392.77 80.09 1,392.77
01.03.04.03.08 CABLE DE COBRE PURO 10mm2 m 80.09 17.39 1,392.77
EJEC. - 0.00
01.03.04.04 TABLEROS 537.94
PROG. - - 2.00 537.94 2.00 537.94
01.03.04.04.01 TABLERO DISTRIBUCIOÉ N CAJA METAÉ LICA CON 12 POLOS pza 2.00 268.97 537.94
EJEC. - 0.00
01.03.04.05 DISPOSITIVOS DE MANIOBRA Y PROTECCION 278.87
PROG. - - 2.00 80.50 2.00 80.50
01.03.04.05.01 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 15 A pza 2.00 40.25 80.50
EJEC. - 0.00
PROG. - - 1.00 45.25 1.00 45.25
01.03.04.05.02 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 20 A pza 1.00 45.25 45.25
EJEC. - 0.00
PROG. - - 1.00 50.25 1.00 50.25
01.03.04.05.03 INTERRUPTOR TERMOMAGNEÉ TICO DE 2 X 30 A pza 1.00 50.25 50.25
EJEC. - 0.00
PROG. - - 1.00 102.87 1.00 102.87
01.03.04.05.04 INTERRUPTOR DIFERENCIAL 30 mA (2 x 32 A) pza 1.00 102.87 102.87
EJEC. - 0.00
01.03.04.06 ARTEFACTOS 321.09
PROG. - - 3.00 321.09 3.00 321.09
01.03.04.06.01 ARTEFACTO PARA ADOSAR X 1 LAMP- 20W und 3.00 107.03 321.09
EJEC. - 0.00
01.03.04.07 SISTEMA DE PUESTA A TIERRA 1,156.67
SISTEMA DE PUESTA A TIERRA CON FERRETERIA PROG. - - 1.00 1,156.67 1.00 1,156.67
01.03.04.07.01 und 1.00 1,156.67 1,156.67
DE ALTA CORROSION EJEC. - 0.00
01.03.04.08 CAMARAS DE INSPECCION 2,303.10
PROG. - - 5.00 2,303.10 5.00 2,303.10
01.03.04.08.01 BUZOÉ N DE CONCRETO DE ENERGIÉA 60 cm x 60 cm x 60 cm und 5.00 460.62 2,303.10
EJEC. - 0.00
01.03.05 INSTALACIONES DE COMUNICACION 2,084.68
01.03.05.01 CANALIZACIÓN Y/O TUBERÍAS 66.84
PROG. - - - 6.00 33.42 6.00 33.42 12.00 66.84
01.03.05.01.01 TUBERIÉA PVC SAP (ELEÉ CTRICAS) d=20 mm m 12.00 5.57 66.84
EJEC. - 0.00
01.03.05.02 SALIDAS DE COMUNICACIONES 175.36
PROG. - - - 0.50 62.07 0.50 62.07 1.00 124.14
01.03.05.02.01 SALIDAS PARA DATA pto 1.00 124.14 124.14
EJEC. - 0.00
PROG. - - - 1.00 25.61 1.00 25.61 2.00 51.22
01.03.05.02.02 CAJA DE PASO 100 X 100mm pto 2.00 25.61 51.22
EJEC. - 0.00
01.03.05.03 CAMARAS DE INSPECCION 1,842.48
PROG. - - - 2.00 921.24 2.00 921.24 4.00 1,842.48
01.03.05.03.01 BUZOÉ N DE CONCRETO DE ENERGIÉA 60 cm x 60 cm x 60 cm und 4.00 460.62 1,842.48
EJEC. - 0.00
01.03.06 VARIOS 3,286.62
PROG. - - - 2,416.63 3,286.62 2,416.63 3,286.62
01.03.06.01 LIMPIEZA FINAL DE OBRA m2 2,416.63 1.36 3,286.62
EJEC. 150.00 204.00 150.00 204.00
01.03.07 PLAN DE MANEJO AMBIENTAL 24,600.00
PROG. 0.13 3,075.00 0.13 3,075.00 0.13 3,075.00 0.13 3,075.00 0.13 3,075.00 0.13 3,075.00 0.13 3,075.00 0.13 3,075.00 1.00 24,600.00
01.03.07.01 PRESUPUESTO PARA EL PLAN DE MANEJO AMBIENTAL glb 1.00 24,600.00 24,600.00
EJEC. 0.00 0.00 0.00 - 0.00
02 EQUIPAMIENTO 207,101.13
02.01 MOBILIARIO Y MATERIAL EDUCATIVO 191,401.13
02.01.01 MOBILIARIO Y EQUIPAMIENTO 133,146.13
02.01.01.01 MOBILIARIO AULAS POR SECTORES 75,516.03
PROG. - - - - - - 3.00 1,800.00 3.00 1,800.00
02.01.01.01.01 MOBILIARIO SECTOR DE LECTURA O BIBLIOTECA und 3.00 600.00 1,800.00
EJEC. - 0.00
PROG. - - - - - - 3.00 2,250.00 3.00 2,250.00
02.01.01.01.02 MOBILIARIO SECTOR DRAMATIZACION und 3.00 750.00 2,250.00
EJEC. - 0.00
MOBILIARIO SECTOR DE CONSTRUCION Y DE JUEGOS PROG. - - - - - - 3.00 1,650.00 3.00 1,650.00
02.01.01.01.03 TRANQUILOS und 3.00 550.00 1,650.00
EJEC. - 0.00
PROG. - - - - - - 3.00 1,578.00 3.00 1,578.00
02.01.01.01.04 MOBILIARIO SECTOR COMPUTACION und 3.00 526.00 1,578.00
EJEC. - 0.00
PROG. - - - - - - 3.00 1,050.00 3.00 1,050.00
02.01.01.01.05 MOBILIARIO SECTOR MUSICA Y ARTE und 3.00 350.00 1,050.00
EJEC. - 0.00
PROG. - - - - - - 3.00 1,590.00 3.00 1,590.00
02.01.01.01.06 MOBILIARIO SECTOR EXPERIMENTOS und 3.00 530.00 1,590.00
EJEC. - 0.00
PROG. - - - - - - 3.00 2,586.00 3.00 2,586.00
02.01.01.01.07 MOBILIARIO SECTOR ASEO Y ALIMENTACION und 3.00 862.00 2,586.00
EJEC. - 0.00
PROG. - - - - - - 3.00 24,609.00 3.00 24,609.00
02.01.01.01.08 MOBILIARIO DE AULAS und 3.00 8,203.00 24,609.00
EJEC. - 0.00
PROG. - - - - - - 3.00 33,333.00 3.00 33,333.00
02.01.01.01.09 EQUIPAMIENTO DE AULAS und 3.00 11,111.00 33,333.00
EJEC. - 0.00
PROG. - - - - - - 147.00 5,070.03 147.00 5,070.03
02.01.01.01.10 INSTALACION DE MOBILIARIO und 147.00 34.49 5,070.03
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
02.01.01.01.10 INSTALACION DE MOBILIARIO und 147.00 34.49 5,070.03
EJEC. - 0.00
02.01.01.02 MODULO DE AULA PSICOMOTRIZ Y SUM 10,586.15
PROG. - - - - - - 1.00 7,423.00 1.00 7,423.00
02.01.01.02.01 MOBILIARIO DE AULA PSICOMOTRIZ Y SUM und 1.00 7,423.00 7,423.00
EJEC. - 0.00
PROG. - - - - - - 1.00 1,956.00 1.00 1,956.00
02.01.01.02.02 EQUIPAMIENTO DE AULA PSICOMOTRIZ Y SUM und 1.00 1,956.00 1,956.00
EJEC. - 0.00
PROG. - - - - - - 35.00 1,207.15 35.00 1,207.15
02.01.01.02.03 INSTALACION DE MOBILIARIO und 35.00 34.49 1,207.15
EJEC. - 0.00
02.01.01.03 MODULO DE COCINA 19,943.45
PROG. - - - - - - 1.00 7,487.00 1.00 7,487.00
02.01.01.03.01 MOBILIARIO DE COCINA und 1.00 7,487.00 7,487.00
EJEC. - 0.00
PROG. - - - - - - 1.00 12,284.00 1.00 12,284.00
02.01.01.03.02 EQUIPAMIENTO DE COCINA und 1.00 12,284.00 12,284.00
EJEC. - 0.00
PROG. - - - - - - 5.00 172.45 5.00 172.45
02.01.01.03.03 INSTALACION DE MOBILIARIO und 5.00 34.49 172.45
EJEC. - 0.00
02.01.01.04 MODULO DE DIRECCION-SECRETARIA 15,352.29
PROG. - - - - - - 1.00 5,746.00 1.00 5,746.00
02.01.01.04.01 MOBILIARIO DE DIRECCION-SECRETARIA und 1.00 5,746.00 5,746.00
EJEC. - 0.00
PROG. - - - - - - 1.00 8,882.00 1.00 8,882.00
02.01.01.04.02 EQUIPAMIENTO DE DIRECCION-SECRETARIA und 1.00 8,882.00 8,882.00
EJEC. - 0.00
PROG. - - - - - - 21.00 724.29 21.00 724.29
02.01.01.04.03 INSTALACION DE MOBILIARIO und 21.00 34.49 724.29
EJEC. - 0.00
02.01.01.05 MODULO SALA DE PROFESORES 4,045.39
PROG. - - - - - - 1.00 3,226.00 1.00 3,226.00
02.01.01.05.01 MOBILIARIO DE SALA DE PROFESORES und 1.00 3,226.00 3,226.00
EJEC. - 0.00
PROG. - - - - - - 1.00 440.00 1.00 440.00
02.01.01.05.02 EQUIPAMIENTO DE SALA DE PROFESORES und 1.00 440.00 440.00
EJEC. - 0.00
PROG. - - - - - - 11.00 379.39 11.00 379.39
02.01.01.05.03 INSTALACION DE MOBILIARIO und 11.00 34.49 379.39
EJEC. - 0.00
02.01.01.06 MODULO DE TOPICO 4,274.39
PROG. - - - - - - 1.00 3,663.00 1.00 3,663.00
02.01.01.06.01 MOBILIARIO DE TOPICO und 1.00 3,663.00 3,663.00
EJEC. - 0.00
PROG. - - - - - - 1.00 232.00 1.00 232.00
02.01.01.06.02 EQUIPAMIENTO DE SSHH und 1.00 232.00 232.00
EJEC. - 0.00
PROG. - - - - - - 11.00 379.39 11.00 379.39
02.01.01.06.03 INSTALACION DE MOBILIARIO und 11.00 34.49 379.39
EJEC. - 0.00
02.01.01.07 MODULO DE GUARDIANIA Y DEPOSITO 2,127.45
PROG. - - - - - - 1.00 1,955.00 1.00 1,955.00
02.01.01.07.01 MOBILIARIO DE GUARDIANIA Y DEPOSITO und 1.00 1,955.00 1,955.00
EJEC. - 0.00
PROG. - - - - - - 5.00 172.45 5.00 172.45
02.01.01.07.02 INSTALACION DE MOBILIARIO und 5.00 34.49 172.45
EJEC. - 0.00
02.01.01.08 MODULO DE DEPOSITO DE MATERIAL DIDACTICO 1,068.98
PROG. - - - - - - 1.00 1,000.00 1.00 1,000.00
02.01.01.08.01 MOBILIARIO DE MODULO DE DEPOSITOS und 1.00 1,000.00 1,000.00
EJEC. - 0.00
PROG. - - - - - - 2.00 68.98 2.00 68.98
02.01.01.08.02 INSTALACION DE MOBILIARIO und 2.00 34.49 68.98
EJEC. - 0.00
02.01.01.09 MODULO SSHH 232.00
PROG. - - - - - - 1.00 232.00 1.00 232.00
02.01.01.09.01 EQUIPAMIENTO DE SSHH und 1.00 232.00 232.00
EJEC. - 0.00
02.01.02 MATERIAL EDUCATIVO 58,255.00
02.01.02.01 MODULO AULAS 46,920.00
PROG. - - - - - - 3.00 7,830.00 3.00 7,830.00
02.01.02.01.01 SECTOR DE LECTURA O BIBLIOTECA und 3.00 2,610.00 7,830.00
EJEC. - 0.00
PROG. - - - - - - 3.00 1,950.00 3.00 1,950.00
02.01.02.01.02 SECTOR DE DRAMATIZACION und 3.00 650.00 1,950.00
EJEC. - 0.00
PROG. - - - - - - 3.00 22,590.00 3.00 22,590.00
02.01.02.01.03 SECTOR DE CONSTRUCCION Y JUEGOS TRANQUILOS und 3.00 7,530.00 22,590.00
EJEC. - 0.00
PROG. - - - - - - 3.00 2,880.00 3.00 2,880.00
02.01.02.01.04 SECTOR DE MUSICA Y ARTE und 3.00 960.00 2,880.00
EJEC. - 0.00
SECTOR DE EXPERIMENTOS Y ACTIVIDAD PROG. - - - - - - 3.00 10,170.00 3.00 10,170.00
02.01.02.01.05 GRAFICO PLASTICO und 3.00 3,390.00 10,170.00
EJEC. - 0.00
PROG. - - - - - - 3.00 1,500.00 3.00 1,500.00
02.01.02.01.06 SECTOR DE ASEO Y ALIMENTACION und 3.00 500.00 1,500.00
EJEC. - 0.00
02.01.02.02 MODULO DE AULA PSICOMOTRIZ 11,030.00
PROG. - - - - - - 1.00 2,120.00 1.00 2,120.00
02.01.02.02.01 MATERIAL DE PSICOMOTRIZ und 1.00 2,120.00 2,120.00
EJEC. - 0.00
PROG. - - - - - - 1.00 8,910.00 1.00 8,910.00
02.01.02.02.02 SECTOR AULA PSICOMOTRIZ und 1.00 8,910.00 8,910.00
EJEC. - 0.00
02.01.02.03 MODULO DE JUEGOS Y ACTIVIDAD AL AIRE LIBRE 305.00
PROG. - - - - - - 1.00 305.00 1.00 305.00
02.01.02.03.01 SECTOR HUERTO und 1.00 305.00 305.00
EJEC. - 0.00
02.02 JUEGOS INFANTILES 15,700.00
MODULO COLUMPIO METAL, MADERA Y F h=3.10 m PROG. - - - - - - 1.00 2,500.00 1.00 2,500.00
02.02.01 CON 3 ASIENTOS ADQUISICION Y COLOCACION INC/CIMENTACION glb 1.00 2,500.00 2,500.00
Y PINTURA EJEC. - 0.00
MODULO MINI BALANCINES FIJO C/RESORTE, ASIENTO PROG. - - - - - - 1.00 3,200.00 1.00 3,200.00
02.02.02 MADERA ADQUISICION, COLOCACION INC/CIMENTACION Y glb 1.00 3,200.00 3,200.00
PINTADO 4 UNID. EJEC. - 0.00
MODULO MULTIPLE TOBOGAN, PUENTE, TUNEL, 2 COLUMPIOS PROG. - - - - - - 1.00 5,000.00 1.00 5,000.00
02.02.03 h=1.85 m ADQUISICION Y COLOCACION INC/CIMENTACION Y glb 1.00 5,000.00 5,000.00
PINTURA EJEC. - 0.00
MODULO MULTIPLE CASITA, AUTO, LOCOMOTORA, BOTE, PROG. - - - - - - 1.00 5,000.00 1.00 5,000.00
02.02.04 glb 1.00 5,000.00 5,000.00
EN FIBRA DE VIDRIO, ADQUISICION Y COLOCACION EJEC. - 0.00
COSTO DIRECTO PROGRAMADO 1,424,993.49 92,272.46 78,739.26 115,493.71 132,701.97 120,693.53 137,851.64 93,978.53 204,271.85 448,990.30 1,424,993.49
PLAZO DE EJECUCIÓN
EXPEDIENTE TECNICO OCTUBRE NOVIEMBRE DICIEMBRE ENERO FEBRERO MARZO ABRIL MAYO JUNIO TOTAL
ITEM DESCRIPCION
UND METRADO PRECIO PARCIAL METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO METRADO VALORIZADO
UNIT.
GASTOS GENERALES 12.00% 170,999.22 11,072.70 9,448.71 13,859.25 15,924.24 14,483.22 16,542.20 11,277.42 24,512.62 53,878.84 170,999.22
GASTOS DE SUPERVISION 5.00% 71,249.67 4,613.62 3,936.96 5,774.69 6,635.10 6,034.68 6,892.58 4,698.93 10,213.59 22,449.51 71,249.67
GASTOS DE LIQUIDACION 2.00% 28,499.87 1,845.45 1,574.79 2,309.87 2,654.04 2,413.87 2,757.03 1,879.57 4,085.44 8,979.81 28,499.87
GASTOS DE GESTION ADMINISTRATIVA 3.00% 42,749.80 2,768.17 2,362.18 3,464.81 3,981.06 3,620.81 4,135.55 2,819.36 6,128.16 13,469.71 42,749.80
GASTOS DE DIFUSION 1.00% 14,249.93 922.72 787.39 1,154.94 1,327.02 1,206.94 1,378.52 939.79 2,042.72 4,489.90 14,249.93
EXPEDIENTE TECNICO 3.09% 43,992.00 2,848.61 2,430.82 3,565.49 4,096.74 3,726.02 4,255.72 2,901.28 6,306.22 13,861.10 43,992.00
TOTAL PROGRAMADO 1,796,733.99 116,343.74 99,280.11 145,622.75 167,320.16 152,179.05 173,813.23 118,494.88 257,560.60 566,119.47 1,796,733.99
PORCENTAJE PROGRAMADO 100.00% 6.48% 5.53% 8.10% 9.31% 8.47% 9.67% 6.60% 14.33% 31.51% 100.00%
COSTO DIRECTO EJECUTADO 1,424,993.49 72,557.92 76,013.26 101,315.31 92,949.17 66,703.41 124,552.59 74,650.32 76,488.59 0.00 685,230.59
GASTOS GENERALES 12.00% 170,999.22 8,706.95 9,121.59 12,157.84 11,153.90 8,004.41 14,946.31 8,958.04 9,178.63 0.00 82,227.67
GASTOS DE SUPERVISION 5.00% 71,249.67 3,627.90 3,800.66 5,065.77 4,647.46 3,335.17 6,227.63 3,732.52 3,824.43 0.00 34,261.53
GASTOS DE LIQUIDACION 2.00% 28,499.87 1,451.16 1,520.27 2,026.31 1,858.98 1,334.07 2,491.05 1,493.01 1,529.77 0.00 13,704.61
GASTOS DE GESTION ADMINISTRATIVA 3.00% 42,749.80 2,176.74 2,280.40 3,039.46 2,788.48 2,001.10 3,736.58 2,239.51 2,294.66 0.00 20,556.92
GASTOS DE DIFUSION 1.00% 14,249.93 725.58 760.13 1,013.15 929.49 667.03 1,245.53 746.50 764.89 0.00 6,852.31
EXPEDIENTE TECNICO 3.09% 43,992.00 2,239.99 2,346.66 3,127.78 2,869.50 2,059.25 3,845.15 2,304.58 2,361.33 0.00 21,154.25
TOTAL EJECUTADO 1,796,733.99 91,486.22 95,842.97 127,745.61 117,196.98 84,104.44 157,044.84 94,140.05 96,442.31 0.00 863,987.87
PORCENTAJE EJECUTADO 100.00% 5.09% 5.33% 7.11% 6.52% 4.68% 8.74% 5.24% 5.37% 0.00% 48.09%