Beruflich Dokumente
Kultur Dokumente
Enclosed please find the Petition for Determination of Revenue Requirement and
Consumer End Tariff for FY 2013-14. The Authority is requested in order to recover the revenue
requirement in time the proposed tariff be allowed so that the same may be applicable from Jul 01, 2013
subject to an order for refund for the protection of consumers during the pendency of this petition in terms
of Sub-Rule 7 of Rule 4 of NEPRA (Tariff Standards and Procedures) Rules, 1998.
Regards,
Muhamm d Saleem
Chief Ex utive Officer
LESCO
AFFIDAVIT
I, Muhammad Saleem, Chief Executive Lahore Electric Supply Company Limited, (Distribution
License # 03/DL/2002 dated April 01,2002) being duly authorized representative/attomey of
Lahore Electric Supply Company Limited, hereby solemnly affirm and declare that the contents
of the accompanying petition/application # 3957
/FD/LESCO/CPC/Tariff 2013-14 dated July 04,
2013, including all supporting documents are true and correct to the best of my knowledge and
belief and that nothing has been concealed. I also affirm that all further documentation and
information to be provided by me in connection with the accompanying petition shall be true to
the best of my knowledge and belief.
DEPONENT
vluhttm4a Siddlque
Advuz.,:tf: high Coun
votary Punic Latina.
ClE3L UNITED BANK ISSUING BRANCH: CHEQUE No. 6212063
IMP-P CASHIER'S CHEQUE
I 1.174-0OFEN2 ROAD LAHORE
Date 1.5—.11.11..-201.3
NOT OVER RS.***749760** CC NO..621.2063
emm
f Pak Rupees SEVEN HUNDRED FORTY—NINE THOUSAND SEVEN HU /SIXTY C)
No:12120n)(. '
Beneficiary:NE.PRA .AmARAn Date:35-.1111 - 2013
Remitter: LESCO TMPRESf A C 1174oWmolew (11.74
Off
(Lc
e St
C'ontd...P/2
National Electric Power Regulatory Authority
Registrar Office
***
Urgent
No. NEPRA/TRF- 100/P94/
July 19, 2013
Subject: Petition filed by Lahore Electric Supply Company Ltd. (LESCO) for
Determination of Consumer-end Tariff Pertaining to the FY 2013-14.
Enclosed please find herewith a copy of subject tariff petition filed by Lahore Electric
Supply Company Ltd. vide letter No. 3957
/FD/LESCO/CPC/Tariff 2013-14 dated 04.07.2013
(received on 18.07.2013).
2. Attention is drawn to the Minutes of Authority Regulatory Meeting (RM 13-280) held on
16.05.2013 whereby the Authority, interalia, decided as below:
"In . future the lacking requisite information is to be communicated by the Tariff and
Legal Divisions clearly mentioning that the required information/documents fall under
the list of documents/information required under Rule 3(2 )- (8) of NEPRA (Tariff
Standards and Procedure) Rules, 1998."
3. Rule 3(3)(a) of NEPRA (Tariff Standards and Procedure) Rules, 1998 states that
Lk
no petition shall be returned after the expiry of [fifteen] 15 days of filing thereof with the
Registrar:"
4. The documents/information of the tariff petition, prima facie, have been checked to
confirm the compliance 'with the provisions of Rule 3(2) & (8) of NEPRA (Tariff Standards and
Procedure) Rules, 1998 an accordingly prepared Checklist/Summary is placed at (F/A).
End: As above
CC :
1. Vice Chairman / Member (Tariff)
2. Member (M&E & Licensing)
3. Member (CA)
Lahore Electric Supply Company Limited
BEFORE
TARIFF PETITION
ON BEHALF OF
FOR NEPRA'S APPROVAL OF CONSUMER YEAR END TARIFF FOR FISCAL YEAR 2013-
2014 FOR LAHORE ELECTRIC SUPPLY COMPANY LIMITED
DATED: 04 July, 2013
Lahore Electric Supply Company Limited (LESCO) is an ex-WAPDA DISCO owned by the
Government of Pakistan. As a result of structural reforms introduced by the Government in
the Power Sector, LESCO was incorporated as a Public Limited Company having
Registration No. L-09415 of 1997-98 (old) and 0038810 (new) and Certificate of
Incorporation No. JRL-6278 dated February 18, 1998 under Companies Ordinance 1984.
Accordingly, LESCO has been granted a Distribution License bearing No. 03/DL/2002 by
the National Electric Power Regulatory Authority (NEPRA) on April 01, 2002. LESCO is
providing a public utility service of distribution and supply of electricity within the
territories as defined in its License.
The Authority vide its determination dated Jan 10, 2012 has extended the target date (30-06-
2012) for installation of TOU meters for the consumers having load 5kW & above. Keeping
in view the performance of petitioner in FY 2011-12, Authority has further extended the
date for installation of TOU meters up-to 31-03- 2013.
It is enlightened to the Authority regarding the installation of TOU meters, LESCO has floated
following tenders for TOU meters which is still in process.:-
Tender # Qty.
1205 25000
1257 4000
1286 4000
1297 4000
However, it is ensured that as soon as the material is received all the meters, would be
installed.
Upon direction of Authority, the matter has been taken up with Power Planner International
(Pvt.). But due to large network, it is not possible for the company to get study completed
within given timeline. So the report will be submitted to the authority on completion of
study.
The activity in process and soon auditor report will be submitted to the authority.
The Authority in its determination pertaining to the FY 2011-12, directed LESCO to create
a separate fund before 30th June 2012, which is allowed by IAS -19. And again authority in
its determination pertaining to FY 2012-13, directed LESCO to complete the creation of
independent Post-Retirement benefit funds at the earliest and further allowed only expenses
to the tune of actual payment made instead of provisions for Post-Retirement benefits.
Draft Trust Deed and Pension Rules have been approved by the Board and soon the same
will be filed before the FBR for Registration.
It is ensured to the authority that LESCO would be establish its separate Post Retirement
fund till the end of July-2013 and the petitioner is of the view that after creation of Post
Retirement fund, the authority may be allowed post retirement expenses in this petition as
prior year adjustment against the reduction made by the Authority in the 0 & M Expenses
claimed for FY 2012-13.
2.5 To get the reported figure of additional recruitments verified by its Auditor and if it plans
to carryout replacement hiring , a certificate from the Auditor certifying that the
recruitment is done as replacement hiring with no additional / incremental cost impact.
As per the direction of respected authority the case has been forwarded to M/S KPMG and
soon said certificate will be provided to the authority.
2.6 WAPDA and Others (including Petitioner) to come up clearly on the settlement modality of
accumulated costs in this regard till 30th June 2012 and a way forward for the future payments of
these retired employees not later than 30th June, 2013.
LESCO vide its tariff petition dated June 16, 2011 for the FY '2011-12 took up the matter of
Post-Retirement benefits of WAPDA employees prior to its incorporation with NEPRA and
sought its decision on the same on merit. In response, NEPRA in its determination dated Jan
10, 2012, decided to hold separate meeting on the subject whereby the arguments of LESCO
and WAPDA could be heard in light of available evidences but in this regard no meeting
held. Again NEPRA in its Tariff Determination for FY 2013-14 dated 28-02-2013 directed
to resolve the matter by DISCOs and WAPDA itself.
The matter is under consideration and taken up with WAPDA in line with direction of
Authority.
Note: Working Capital is worked out based on 2 month average of Power Purchase Price and
O&M Expenses of last 3 years (FY 2011, 12 & 13).
2.8 Compliance to point regarding comments on draft PSA, Concrete recovery plan, Comments on TOU
meters & Changing terms and conditions of Lifeline consumers has been conveyed to the authority
vide letter # 3789-90/LESCO/FD/Tari ff dated April 25 2013.
3.1 That NEPRA, Under the Regulation of Generation, Transmission and Distribution of
Electric Power Act, 1997 (hereinafter NEPRA Act), is responsible for regulating the
electricity sector in Pakistan which includes determining the revenue requirement, tariffs
and other terms and conditions for the supply of electricity by the generation, transmission
and distribution companies and to recommend the same to the Federal Government for
notification. For this purpose NEPRA has laid down certain guidelines and procedures
under the NEPRA Tariff Standards and Procedures Rules, 1998.
3.2 That LESCO, being a bona fide power distribution licensee, requires adequate revenue in
order to perform its obligatory duties prescribed by NEPRA under the NEPRA Act, NEPRA
Performance Standards (Distribution) Rules 2005, NEPRA Consumer Eligibility Criteria,
2003, Distribution License of LESCO and other obligations as determined by NEPRA from
time to time. The main sources of funding available to the petitioner for its revenue
requirements are;
3.3 That in order to fulfill and perform its obligatory duties as mentioned above and to ensure
financial viability of LESCO by timely recovery of its prudently incurred costs and
reasonable return, in order to upkeep and maintain its existing distribution services/network
and to support the future investments for expansion of distribution services/network, this
petition is being filed for FY 2013-14 through its Chief Executive Officer Mr. Muhammad
Saleem, who has been duly authorized to sign and file this petition by the Board of Directors
of LESCO vide its resolution passed in the Board meeting held on 28-06-2013 An extract of
this resolution is attached as Annex-I.
4.1 The Distribution Margin determined by the Authority in its decision dated 28-02-2013 for
determination of consumer end tariff for FY 2012-13, still to be notified by the Government
of Pakistan "GoP", was not sufficient to meet with LESCO's proposed revenue
requirements for FY 2012-13 on account of increase in the asset base, the inflationary trend,
replacement hiring cost, repair and maintenance etc.
The Authority in its determination dated 28-02-2013 again disallowed O&M expenses by
Rs. 5,074 million. Major expense disallowed was Provision against Post Retirement
benefits.
The petitioner is of the view that after creation of Post Retirement fund, the reduction made
by the Authority in the 0 & M Expenses claimed for FY 2012-13 will be allowed in the FY
2013-14 as prior period adjustment.
The aforementioned position necessitates revision in tariff for FY 2012-13. This petition is,
therefore, being filed in accordance with the NEPRA Tariff Standards and Procedure Rules
1998 Part 11 Section-3 and with the intent that tariff for FY 2013-14 be determined. notified
and made effective from the very first day of the FY 2013-14 in terms of Sub-Rule 7 of Rule
4 of Tariff (Standards and Procedure) Rules, 1998.
The aim of this petition is to obtain approval for the timely implementation of cost reflective
tariffs to yield LESCO's required revenues for FY 2013-14 and its recovery from consumer.
The implementation of cost reflective tariffs will benefit consumers and LESCO, as it will;
The power purchase cost determined for FY 2012-13 has been taken for FY 2013-14. The
power purchase cost, projected for FY 2012-13, has been worked out on the basis of actual
data up to March, 2013 and estimated power purchase cost for next three months at the rate
determined by NEPRA for the respective month vide its determination dated Feb 28, 2013.
With this methodology, average power purchase rate comes to Rs.10.42/kWh (un-adjusted)
for FY 2012-13. The quantitative data along with assumptions used to reach the estimated
power purchase cost in comparison with last years' actual / provisional numbers is as under:
Table-1
2009-10 12010-11 12011-12 2012-13 2013-14
Description
Actual Prov./Est. Projected
Sales (GWh) 13,881 14,741 14,467 14,262 14,476
Growth (%) 5.42 6.19 -1.86 -1.42 1.50
Purchases (GWh) 16,100 16,986 16,727 16,207 16,450
T & D Losses (%) 13.78 13.22 13.51 12.00 12.00
Power Purchase Cost (Mtn Rs.) 113,478 125,219 167,897 168,816 175,516
Power Purchase Cost (Rs./kWh)(Un-Adj.) 7.05 7.37 10.04 10.42 10.67
Power Purchase Cost (Rs./kWh) (Adjusted) 8.18 8.49 11.61 11.84 12.12
The distribution margin covers LESCO's O&M costs, depreciation, other income and return
on regulatory asset base. In the tariff petition for FY 2013-14, distribution margin has been
worked out on the basis of audited figures of FY 2009-10, 2010-11, 2011-12 and provisional
figures for FY 2012-13. The detail of distribution margin is as follows:
i. 0 & M Expenses:
It includes salary, house acquisition, employees' retirement benefits, repair & maintenance
and other operating costs related to LESCO's electricity distribution and supply business.
The detail of which is as under:-
a. Salary:
Salary, including employee benefits, is the major component of 0 & M expenses. Since the
petitioner was incorporated as a company in compliance with the power sector reform
policy of the Government of Pakistan (GOP), and the WAPDA employees working in the
Lahore Area Electricity Board gradually became employees of the petitioner in terms of the
Manpower Transition Plan, therefore LESCO had to maintain the GOP pay scales and the
terms of employment for the employees which were prevalent in WAPDA. LESCO for the
purpose of this petition has assumed increase in basic pay @15% of running basic pay,
along with the effect of annual increments which is 5% from December, 2013 onwards. On
these assumptions the working of salary & employee benefits comes out to be Rs.7,796
million. A comparative view of previous years is shown in the table below:-
Table-2
2009-10 I 2010-11 I 2011-12 2012-13 2013-14
Description
Actual Prov. Estimated
Basic Pay & Adhoc Relief 1,786 1,738 2,862 2,945 3,031
Employee Benefits 1,922 3,111 2,865 4,296 4,323
Ad-Hoc Relief 2013 - - - - 442
Total 3,707 4,848 5,726 7,241 7,796
% Change 13 31 18 26 8
annual financial impact of these advertised jobs would be Rs.542 million approximately
(Annex-2)
__ — kmulion its.)
Description 2009-10 I 2010-11 I 2011-12 2012-13 2013-14
Actual Provisional Projected
House Acquisition 498 520 606 758 796
% Change 5% 4% 17% 25% 5%
i. Pension: - The increase in this head has been assumed @10% and applied on the
provisional figures of FY 2012-13. The Authority is requested to actualize the increase
under this head after notification of increase in Pension from the Govt. of Pakistan.
ii. Medical: - LESCO has assumed increase in Medical Expenses for FY 2013-14 @10%
which is based on past trend.
iii. Utility Allowance: - It is assumed that this head will increase @ 10%. The reason of this
assumption is based on the proposed increase in tariff during FY 2013-14.
iv. Leave Encashment: - The increase in this head is assumed in line with the increase in
salaries i.e. Pension 10%.
By applying the above assumptions on the provisional figures of FY 2012-13 the head of
employee retirement benefits for FY 2013-14 comes out to be Rs.5,791 million. The year
wise comparison of employee retirement benefits is as under: -
- ---- - kmiiiion Ks.)
Description 2009-10 2010-11 2011-12 2012-13 2013-14
Pension 2,440 2,317 2,919 3,211 3,532
Medical 291 380 650 715 786
Utility Expense 518 565 962 1,059 1,165
Leave Encashment 92 101 255 280 308
Total 3,341 3,364 4,786 5,265 5,791
% Change 7% 1% 42% 10% 10%
Except for the Vehicle Running, NEPRA fee and electricity bill collection expenses,
directors' fees all other operating expenses have been worked out based on the average of
the annual increase in the last three audited years.
ii. Depreciation:
The depreciation for FY 2013-14 is calculated on the basis of: (i) the value of existing
assets; plus (ii) addition in assets during FY 2012-13. The assets will be depreciated on a
straight-line method as per utility practice i.e. land @ 0%, buildings & civil works @ 2%,
plant and machinery @ 3.5%, office equipment @ 10%, mobile plant & equipment @ 10%
and other assets @ 10%. Based upon these assumptions, the figures for depreciation works
out to be Rs 2,604 million.
In line with the best financial management practices, LESCO has built financing cost of this
working capital requirement into its rate base. Further, from some of the previous
determinations made by the Authority, it is evident that NEPRA has been approving
working capital requirement financing cost to different companies. The calculation of Rate
Base is given as under: -
Where:
Rate Base = Regulatory Asset Base + Average Two Months Cost as Working Capital
Requirement
Regulatory Asset Base = Net Fixed Assets in Operations + Additions during the year
-Deferred Credits (assets not financed by LESCO)
And
LESCO intends to execute its development / investment plan for FY 2013-14 in the areas of
development of power (DOP), energy loss-reduction (ELR), secondary transmission and
grid (STG) and others, the amounts whereof are Rs.650 million (own resources), Rs.850
million (own resources), Rs.6,859 million and Rs.716 million respectively. The summary
whereof is as under:
As the replacement of TOU meters will continue in next year also, therefore, approval of
Rs.150 million is sought from the Authority over & above the investment plan given in
table-8 above.
v. Other Income:
This includes markup on bank deposits, late payment surcharge, amortization of deferred
credits and income from other sources, the detail whereof has been shown in the table
below. Due to declining KIBOR rates during the FY 2011-12 and 2012-13, there is sharp
decline in Profit on Bank Deposits. Similarly, due to rising prices of material the income
from Non-Utility Operations is also declining sharply. Therefore, in these heads no increase
in assumed in these two heads. For Late Payment Surcharge and Meter & Service Rental,
LESCO has assumed 10% increase for the FY 2013-14 on the provisional figures for FY
2012-13. Therefore, Other Income estimated on the assumptions discussed above is
mentioned hereunder:
-.- (million Ms.)
Description 2009-10 I 2010-11 2011-12 2012-13 2013-14
Actual Provisional Projected
Amortization of Deferred
Credits 626 658 752 881 960
Late Payment Surcharge 1,311 1,433 1,786 1,965 2,161
Profit on bank deposit 1,150 1,385 938 938 938
Scrap Sales 13 - - - -
Non-utility operations 375 274 384 384 384
Service fee for collection of TV
Fee 117 129 132 136 141
Meter & Service Rent 148 164 166 183 201
Reversal of Prov. For Bad
Debts 150 - _ _ .
Miscellaneous 22 112 49 49 49
Total 3,913 4,155 4,208 4,536 4,834
The sum total of O&M cost, Depreciation, RORB and Other Income results in LESCO's
distribution margin. Dividing this sum total by the total units to be sold (estimated 14,476
GWh) yields the average distribution margin per kWh. Accordingly, the distribution margin
for year 2013-14 comes at Rs. 21,880 Million or Rs.1.51/kWh. The summary of total
distribution margin required is as under:
Table-10 , ....... .....s.,,
Description 2012-13 2013-14
Estimated Projected
0 & M Expenses 15,935 17,867
Depreciation 2,223 2,604
RORB 5,195 6,243
Other Income -4,536 -4,834
Total D. M. 18,817 21,880
LESCO in its tariff petition for FY 2012-13 informed the Authority that for the purpose of
that petition, LESCO assumed T & D Losses @ 12% on the plea that the same shall be
adjusted according to decision of Authority on the report on Transmission Losses from third
party Consultant.
Accordingly, in line with directions of the Authority and above mentioned exercise, LESCO
for this petition also, has assumed the T & D Losses @ 12% on the clear understanding that
the same shall be adjusted according to the determination of the Authority after considering
the report on T&D losses to lIKV and below line. The report on distribution losses will be
submitted to the Authority as Additional Information to this petition after getting approval of
TORs from the Authority.
It is apprised that the Authority in its determination for FY 2012-13 dated 29-02-2013
determined average tariff of Rs.14.003/kWh for the FY 2012-13 which is still not notified by
the Govt. of Pakistan, the tariff lastly notified i.e. Rs.11.0475/kWh through SRO 487 dated
May 09, 2012 is still effective.
On the other hand, the monthly fuel price adjustment and quarterly adjustments for capacity
charges and transmission charges have also not been determined and notified therefore these
costs also stand unrecovered during FY 2012-13. Due to above facts the unrecovered cost for
the FY 2012-13 stands Rs.47,764 million (Annex-5).
The unrecovered cost is evaluated as
under: -
Table- Mln. Rs.
Description
2012-13
As regards Prior Year Adjustment, the Authority is requested to review the same in light of
expected notifications of annual, quarterly and monthly adjustments.
Table-14
Description
Min. Rs. Rs./kWh
Distribution Margin
21,880 1.51
Power Purchase Cost
175,516 12.12
Prior Period Adjustment
47,764 3.30
Total 245,159 16.94
11.
In compliance of clauses (d) & (e) of Sub-Rule 2 of Rule 3 of NEPRA (Tariff Standards &
Procedures) Rules, 1998 the comparative tables of existing and proposed charges, costs etc
and tariff design on the basis of categories of consumers likely to be affected by such
modification is attached as Annex-6.
12.
According to clause (f) of Sub-Rule 2 of Rule 3 of NEPRA (Tariff Standards & Procedures)
Rules, 1998 the summary giving brief particulars of data, facts and evidence in support of the
petition is annexed as under and forms an integral part hereof:-
13.
That in view of the grounds and facts mentioned above, it is respectfully prayed that while
admitting and allowing this petition, the tariff of LESCO for the FY 2013-14 may very
graciously be determined as estimated hereinabove by allowing the following reliefs:-
a.
Proposed tariff be allowed and made applicable immediately upon admission of this
petition subject to an order for refund for the protection of consumers during the
pendency of this petition in terms of Sub-Rule 7 of Rule 4 of NEPRA (Tariff
Standards and Procedure) Rules, 1998;
b. Distribution Margin amounting to Rs.21,880 million be determined and allowed;
c. Investment plan of Rs. 12,570 million including consumer contribution of Rs.3,495
million be approved;
d.
Prior year adjustment of Rs.47,764 million for FY 2012-13 including Annual,
Quarterly & Monthly adjustments and impact of delayed notification, be determined
and allowed.
e.
T & D losses target be considered @ 12% provisionally for FY 2013-14 subject to
its final fixation after considering the study by independent expert under the
directions of the Authority given through its determination dated 28-02-2013;
f. Redefining the baseline for determination of target of T&D losses by taking a
realistic approach in view of the study to be submitted by LESCO;
g. Fixing of the target of T&D losses according to the re-defined baseline;
h. Allow the new hiring cost of Rs.542 million over & above the Salaries, Wages &
Benefits requested above.
i. Allow the cost for creation of new Circles, Divisions, Sub-divisions and Customer
Services as mentioned above.
j. Allow financing cost for FY 2013-14 on the loan obtained by Power Sector for
meeting the obligations towards the generation companies and oil companies.
k. To resolve the issue of Post-Retirement Benefits pertaining to employees retired
before June 30, 1998
1.
Financial viability of the petitioner for the reliable supply of electricity to its 3.7
million consumers be ensured;
m. Allow Rs. 150 million for TOU meters for FY 2013-14 over & above the investment
plan as explained in Table-8 above.
n. Any other relief.
PETITIO , 7
The Lahor ectric Supply Company Ltd.
Through:
Muhammad Saleem
Chief Executive Officer LESCO
Dated: 04-June-2013
a) To sign individually or jointly the necessary documents for filing of tariff petition for
FY 2013-14.
b) To file subsequent review petition after the determination on the said application of
FY 2013-14, if any.
d) To appear before the Authority as needed, and do all acts necessary for completion
and processing of the applications.
is hereby accorded."
ez
Mian Muhammad Afzaly_/3
Company Secretary
LESCO
RECRUITMENT 2009-10 IN LESCO
Financial
S# Post BPS NOs. Implication
2012-13
1 Junior Engineer 17 37 28,416,888
2 Security inspector 15 7 3,247,692
3 C/ Assistant 14 94 40,899,024
4 A/ Assistant 14 21 9,137,016
5 Cashier 14 12 5,221,152
6 LS-I 13 1 388,128
7 DEO 12 12 4,408,128
8 Data Coder 12 11 4,040,784
9 LS-II 11 39 13,626,288
10 UDC 9 3 864,396
11 Security Sergeant 8 60 16,606,080
12 Meter Reader 7 90 23,902,560
13 LDC 7 12 3,187,008
14 Lorry Driver 7 55 14,607,120
15 Security Guard 6 529 124,078,008
16 ASSA 5 78 17,427,384
17 Bill Distributor 3 113 22,944,876
18 ALM 3 1014 205,894,728
19 Lorry Cleaner 3 6 1,218,312
20 Naib Qasid 1 8 1,384,704
Grand Total 2,202 541,500,276
Iv
Jul-11 11 11 Se •-11 Oct-11 Nov-11 Dec-11 an-12 Feb-12 Mar 12 A r-12 Ma -12 Jun-12 Total
Units Purchased NMI] 1,726 1,786 1,566 1,519 1,219 1,183 1,139 1,145 1,157
Standard Losses pdkWhI 1,307 1,469 1,511 16,727
207 214 188 182 146 142 137
Units Sold 137 139 157 176 181 2,007
[MkWhJ 1.519 L572 1 37g 1 '117 1 n701 1 nwl 1 ....,,, . --
Atual PPP 1,293 1,330 14,720
Energy 6.4271 6.6618 5.6744 6.9541 6.3226 7.2693 9.2812 7.1862 9.6394 9.6932
Capactiy 8.0608 6.9567
1.7050 1.7537 2.4566 2.1876 3.0261 3.0386 3.3172 3.0837 2.9741 2.2493 1.8799 2.1996
UOS 0.2098 0.1895 0.2518 0.2447 0.2795 0.3003 0.2670 0.2467 0.2397 0.2066 0.1924 0.1964
Actual Power Purchase Price
Energy 11,091 11,899 8,888 10,564 7,704 8,598 10,567 8,227 11,152 12,672
Capacity 11,843 10,513 123,720
2,942 3,132 3,848 3,323 3,687 3,594 3,777
UOS 3,530 3,441 2,941 2,762 3,324 40,302
362 338 394 372 341 355 304 282 277 270 283 297 3,876
14.395 15 170 11 Ill 1.1 ,10 II 7nn
1Z
''' r.' "
.......
883 14,887 14,134 167,897
Notified Refrence Price
Energy 7,874 6,449 5,842 6,470 5,736 7,470 8,342 7,241 10,910 10,127 10,060 11,033
Capacity 2,217 97,554
2,270 2,348 2,362 2,361 2,415 2,715 2,748
UOS 2,642 2,549 2,612 2,318 29,557
338.00 363.00 326.00 318.00 295.00 291.00 329.00 342.00 290.00 288.00 275.00 256.00 3,711
10.429 9 nR9 a S IA a 1 cn o ,nn .. ...,.., .- --.
,964 12,947 13,607 130,822
Qtr Adjustment
Energy 3,217 5,450 3,046 ' 4,094 1,968 1,128 2,225 986 242 2,545 1,783 (520)
Capacity 725 26,166
862 1,500 961 1,326 1,179 1,062 782
UOS 799 392 150 1,006 10,745
24 (25) 68 54 46 64 (25)
Total (60) (13) (18) 8 41 165
3.966 6/RR ctAlc o Inn ,.1.4n n ....... .....-,.. . ---
1,940 527 37,075
Less FPA 3,077 3,755 1,772 2,141 884 658 1,429 443 1,377 1,682 1,462 237 18,918
Qtr Adj 889 2,533 2,842 2,968 2,456 1,714 1,833 1,265 (349) 1,237 478 291 18,157
6,264 7,137 2,749 2,007
Lahore Electric Supply Company
FPA Calculation
FY 2011-12
Particulars Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jan-12 Feb-12 Mar-12 Apr-12 May-12 Jun-12 Total
Actual Units Purchased 1,726 1,786 1,566 1,519 1,219 1,183 1,139 1,145 1,157 1,307 1,469 1,511 16,727
Standard Units sold (at 12% loss) 1,519 1,572 1,378 1,337 1,072 1,041 1,002 1,007 1,018 1,150 1,293 1,330 14,720
Stand Life Line Units 12 26 9 13 17 20 28 28 26 21 18 16 235
Units>50<=350 - 308 310 317 300 260 210 228 223 281 307 299 3,042
Units Applicable for FPA 1,506 1,238 1,060 1,007 756 761 764 752 769 848 968 1,014 14,485
FPA Rate Rs/Kwh 2.043 3.033 1.673 2.127 1.170 0.865 1.872 0.589 1.792 1.983 1.510
_ 0.233
moun 3 1 2 884 658 1 429 443 1 377 1 682 1 462 237 18 918
STANDARD PETITION FORMATS FOR DISTRIBUTION COMPANIES
INDEX
Revenue
Sales Revenue [Min Rs] 210,417 140,367 197,395
Subsidy [Mln Rs] 26,296
Fuel Price Adjustment [Mln Rs]
Total Sales Revenue [Mln Rs] 210,417 166,663 197,395
Rental & Service Income [min Rs] 183 201
Amortization of Def Credits [Mln Rs] 4,594 881 960
Other Income [Mln Rs] 3,472 3,673
Total Revenue [Mln Rs] 215,011 171,199 202,230
Operating Cost
Power Purchase Cost [Mln Rs] 182,198 168,816 175,516
O&M Expenses [Mln Rs] 10,386 15,935 17,867
Depreciation [Mln Rs] 2,015 2,223 2,604
Amortization [Mln Rs]
Provision for Bad Debt [Mln Rs]
Total Operating Cost [Min Rs] 194,599 186,974 195,987
)2,
NEPRA PETITON —BIFURCATION/ CREATION OF 17 SUBDIVISIONS, GSO AND CITY
OPERATION CIRCLE.
The break- up of expenditure of the proposed creation of offices is given below as desire.
Niaz Nagar
Rural Area 675.01 9.31
8 617.50
Bhadar Pura 690.20 11.77
Overall Average
Line Losses in
Sr. No. S/Div Name Line Losses in Difference in %age
%age In S/Divn
%age in LESCO
1 Bedian Rd 19.4 13.1 6.3
A.I.Town
4 Canal Road 17.02 13.1 3.92
Niaz Baig
5 Chung 17.9 13.1 6.8
Niaz Nagar
Rural Area 23.6 10.5
8 13.1
Bhadar Pura 15.7 2.6
Most of the rural sub divisions comprises of large number of domestic connections, tubewell
connections as well as B-1, B-2 connections scattered in wide area in zigzag manner having remote
end for variety of consumers. Proper maintenance service, continuity of power supply, prompt
redressal of consumer complaints and recovery of arrear / revenue collection is not possible with the
existing staff.
D /71-Y-ej'
,l'agicea)Pcore
APPROVED BY BOB
2006
,3=VITUelltentl,4241CRIAM., .n.r.
SCALE OF OFFICE FURNITURE FOR LESCO STAFF
• —0
Worked by: SAAD/Ir Sit RFA RAZ Page No. 2
Commercial Assistant
SCALE OF OFFICE FURNITURE FOR LESCO STAFF
0
Worked by: SAADATSAMIRAZ Page No. 3
Commercial Assisiam
SCALE OF OFFICF, FURNITURE FOR OFFECERES OF LESCO
Note: CEO, Ex.Dir. of the company will be entitled for the furniture items as per their
actual requirements.
Chief Wpm:
Sr Junior
Article of furniture Assistant Clerk Steno Circle Asr,tt.
No Officer
D'man D' nun
1 Office Chair (Sketch-9) I I 1 1
....__... ._.. 1 1
2 Drafting Table _
- I
(Sketch-11)
3 File Rack 1 1 1 1 1 i
4 Office Table (Sketch-18) 1 1 1 1 I
5 Confidential Box (Steel) 1 - - - - -
6 Dak Trays - - - - - -
7 Bench for Naib Qasids
' As Required
(Sketch-14)
8 Desert Cooler One per Room
9 Visitors Chair for officials -) -
2 - - -
(Sketch-13)
e Page No. 5
Worked by: SAADATSARNIMZ
Commercial Assistant
ABSTRACT
CAPITAL WORKS REVISED BUDGET FOR THE YEAR 2013-14
IN RESPECT OF P.D.GSC LESCO LAHORE
Rs in Million
Source of Crop Civil Works Consultan
Sr.# Description financing Material Compensation / Labour Overhead Others Total
Cy
Land Electrical Civil Division
ON GOING WORKS
1 ON GOING GRID STATIONS LESCO 587.500 50.000 2.300 60.200 127.000 141.000 73.700 5.600 1,047.300
NEW WORKS
NEW TRANSMISSION LINES LESCO 63.000 9.000 1.150 7.500 8.000 3.000 10.000 0.500 102.150
4
SUB TOTAL - A (1+2+3+4) 2,119.000 231.200 5.400 171.000 475.500 178.000 200.500 6.100 3,386.700
GRAND TOTAL (LESCO+A.D.B+W.BANK) 5,152.500 245.500 7.590 228.010 581300 316.900 297.860 29.250 6,858.9
ESTIMATED BUDGET DURING FY-2013-14
F
Rs in Million
15 132KV G/S DHA Phase V E 2x 'Aar LESCO 20.00 0.050 1.00 1.00 0.70 22.750
16 132KV G/S Chunain E 2x 1JBays LESCO 16.00 0.050 1.00 6.00 1.50 24.550
17 132kV Sharaqpur Road SKP E 2x1/Bay LESCO 1.000 0.000 0.500 1.000 0.500 3.000
ESTIMATED BUDGET DURING FY-2013-14
FOR 6th STG Under Own Resources, W
18 132kV Sarfraz Nagar E 2x 132kV L/Bay LESCO 8.000 0.050 1.000 0.500 1.000 10.550
19 132kV Attabad E 2x 132kV LIElays ( Emco & Rustam ) LESCO 20.000 0.050 0.600 2.000 1.500 24.150
20 132kV Rustam E 2xUBays for attabad LESCO 8.000 0.050 1.000 0.500 0.500 10.050
21 132kV Nankana E 20.../Bays LESCO 15.000 0.050 1.500 1.000 1.500 19.050
22 132kV Bucheyki E 2xUBays ( Minima & Thatha Ismael) LESCO 20.000 0.050 1.500 2.000 0.000 1.500 25.050
23 132kV Shahkot E 1xL/Bay for Sangla Hill LESCO 4.000 0.050 0.500 0.500 2.000 7.050
132kV Ellahbad (1 L/B each for kasur, 7xUBays (I UB each for kasw, Ichuddian,
24 khuddian, Pattoki, Chunnian, 'Hindi E Pattoki, Chimnian, Mardi Ahmadabad & 2 UB LESCO 30.000 0.050 2.000 1.000 2.500 35.550
Ahmadabad & 2 L/B for Hujra) for Hujra)
25 132kV IChuddian E 2x1/Bays (IL/Bay for Kasur & Ellahabad LESCO 15.000 0.050 1.000 0.500 1.000 17.550
26 132kV Kasur E I xUBay for Ellahabad LESCO 10.000 0.050 0.500 0.500 0.500 11.550
2xUBay ( IL/Bay for Okara City-1 &
27 132kV Pattoki E Ellahabad)
LESCO 6.000 0.050 1.000 1.000 1.000 9.050
29 132kV Okara City 1 E 1 UBay for Panoki LESCO 1.000 0.050 1.000 0.800 1.500 4.350
30 132kV Sharaqpur E 2 L/Bays LESCO 0.500 0.000 1.000 0.500 1.000 3.000
31 132kV Sangla Hill C lx2 T/BAY, IX2 UBAY LESCO 5.000 0.050 2.000 2.000 2.000 11.050
32 132kV Emco C 1x2 T/BAY, I X2 UBAY LESCO 10.000 0.050 3.000 1.000 2.000 16.050
33 132KV G/S TOWN SHIP E Switch Room Ext. And I IKV Trench - LESCO 0.000 0.050 0.200 2.000 0.500 2.750
34 66KV G/S MalikPur E Switch Room Ext And I IKV Trench LESCO 0.000 0.000 0.000 0.000 0.000 0.000
Upgradation of 132KV Bus Bar With Twin
35 132KV G/S Bhoggiwal E Conductor
LESCO 0.000 0.000 0.000 0.000 0.000 0.000
E C
Upgradation of 132KV Bus Bar With Twin
36 132KV G/S la LESCO 3.000 0.050 0.500 0.000 1.000 4.550
E Upgradation of I 32KV Bus Bar With Twin
LESCO 3.000 0.050 0.500 0.500 1.000
37 132KV G/S Chung
''' Conductor 5.050
Upgradation of 132KV Bus Bar With Twin
38 132KV G/S Ghazi New E Conductor
LESCO 5.000 0.050 0.100 0.500 2.000 7.650
Upgradance of 132KV Bus Bar With Twin
39 132KV G/S Said Pur E Conductor
LESCO 5.000 0.050 0.100 1.000 2.000 8.150
Upgradation of 132KV Bus Bar With Twin
40 132KV G/S BbaiPhent E Conductor
LESCO 5.000 0.050 0.100 1.000 3.000 9.150
E C
Upg:;adation of 132KV Bus Bar With Twin
41 132KV G/S Garden Town
uctor
LESCO 0.000 0.000 0.000 0.000 0.000 0.000
42 132KV G/S HIS C 2x 132/1 I kV, 26 MVA , rUBays LESCO 5.000 0.050 0.100 0.500 0.500 6.150
ESTIMATED BUDGET DURING FY-2013-14
•• - •
................... ....v. v. v a •sa araa an AFIL au. a-sznau LOG • 11.1./P111C/11 ILIbilllik
43 I32KV G/S Green View E axuBay,, LESCO 8.000 0.050 1.000 5.000 0.500 14.550
44 132KV G/S Deepalpur E 2xL/Bay LESCO 16.000 0.050 0.500 0.500 0.500 17.550
45 132KV G/S Haven Lakha E 2xL/Bay LESCO 16.000 0.050 0.500 1.000 0.500 18.050
46 132KV G/S Lallyani E lx132KV,26MVA T/BAY (3rd) LESCO 1.000 0.050 0.500 0.200 1.500 3.250
47 Site Store for Electrical panne!, security
132KV G/S Johar Town-2 E LESCO 0.000 1.000 1.000 15.000
Romm/Watch Towr 0.500 17.500
48 132KV G/S LEFO E 1X132KV 20/26MVA T/F LESCO 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
49 132KV G/S Shamkay E LESCO 20.000 0.050 1.000 2.000 0.500 23.550
50 132KV G/S Recitals E 3rd T/Bay, LESCO 0.000 0.000 0.000 0.000 0.000
Consultancy Charges for Capacity
51 Building of Short Circuit, Reactive Power, LESCO
Stability, SCADA studies 5.600 5.600
Misceileneous/ Emergency
Breakdowns/Boundary Walla for different Grid
Stations/any unforeseen expenditures-UP
52
GRADATION OF BUS BAILS of Existing Grid 20.000 8.000 15.000 50.000 .5.000 98.000
Stations AND AMR/MODAMSREST HOUSE
IN CLUB Premises
Sub- TOTAL (A) 587.500 50.00 2300 60.200 127.000 141.000 73.700 5.60 1047300
ESTIMATED BUDGET DURING FY-2013-14
FOR 6th STG Under Own Resources, World Bank and Asian Development Bank
(B) GRID STATIONS WORKS (NEW Works)
Rs in Million
1 132KV G/S Okara Cantt (T-2) E lx 132/11 kV, 26 MVA 7RF/ Bay LESCO 30.00 0.050 1.00 5.00 5.00 2.00 43.050
2 Cable Bays for 220kV Shalamar-Shalamar-11
2 132kV Shalamar II E LESCO 20.000 0.050 2.000 5.000 2.000 1.000
(132kV Underground Cable) 30.050
3 132kV Skp Industrial A a 132/1IkV, 26 MVA TRF/ Bey LESCO 10.00 0.050 2.00 1.00 1.00 14.050
4 132KV G/S Shandra Scarp A 2x 132/I IkV, 26 MVA TRF/ Bay LESCO 10.00 0.050 1.00 2.00 1.00 14.050
132KV G/S Kasur (1 L/Bay for ICaaur
5 E Ix UBay LESCO 10.00 0.050 1.00 2.00 1.00
New) 14.050
132KV G/S Raiwind (In & Out Chak-65-T
6
Pack-Kasur cct)
E 2x UBays LESCO 10.00 0.050 2.00 0.50 1.00 13.550
132KV G/S Hhogiwial (for making In &
Out)
E 2s UBays LESCO 5.00 0.050 1.50 0.50 1.00 8.050
8 132KV G/S Raissimd New E 1X26/26mva LESCO 20.00 0.050 2.00 0.50 1.00 23.550
9 132KV G/S DarrogeWala N 2x UBaya LESCO 0.000 - - - 0.000
10 132KV G/S Kot Ftadha Kishan A LESCO - 0.000 1.00 1.00 2.000
II 132KV G/S LDA AVENUE N LESCO - 1.00 3.00 1.00 5.000
12 132KV G/S Lallyani N 2x L/Bays LESCO - - - - 0.000
Sob- TOTAL (5) 115.00 - 0.40 14.50 16.50 10.00 11.00 - 167.40
(C) WORLD BANK WORKS (APL-I) Year - I
Rs in Million
WORLD BANK 1 COUNTER PART FUNDING
Sr." Particular of Work Type SCOPE OF WORK Source of
Material/ Civil Works
financing Others/
duties/taxes/store Land Labour (10%) Overhead (10%) Consultancy Total
handling charges interest (6%)
Electrical Civil Division
132kV G/S Inayst Pura/State Life Housing 2x132/1 I KV, 26MVA T/Bay+2L/B+
1
Society
N 1 PT/Bay
do 10.00 0.000 2.00 5.00 20.00 5.00 0.83 32.83
132kV Mominpura G.T Road (Turn 2x132/11KV, 40MVA ,T/Bay+2L/B+
2
Key)
N 1 PT/Bay do 100.00 0.050 2.00 20.00 7.00 1.34 3039
2x132/11KV, 40MVA ,T/Bay+2UB+
3 132 kV GIS Saggian (Turn Key) N 1 PT/Bay do 150.00 0.050 3.84 0.20 3.84 1.34 9.27
Sub- TOTAL (C) 260.00 0.10 7.84 5.00 40.20 15.84 3.51 72.49
ESTIMATED BUDGET DURING FY-2013-14
FOR 6th STG Under Own Resources, World Bank and Asian Development Bank
(D) WORLD BANK WORKS (APL-I) Year -
Rsa in Million
WORLD BANK COUNTER PART FUNDING
Sri/ Particular of Work "."-- SCOPE OF WORK Source of
financing Material/ Civil Works
duties/taxes/store Land Labour (10%) Overhead (10%) Others/
Consultancy Total
handling charges interest (6%)
Electrical Civil Division
1 132KV AIS G/S Askari - X (Tom Key) 2x132/11KV.40 MVA,T/B+2LB+1PT/Bay World Bank 350.000 0.020 1.16 15.00 20.00 2.000 2.26 40.44
_J.
2 132KV GIS G/S Punjab University (Turn
Key) 2x132/1 I KV,40 MVA,T/B+2LB+ I PT/Bay do 350.000 0.020 1.16 2.000 2.26 5.44
3 132kV Attabad 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 0.500 0.48 1.53
4 132kV Ayesha 2 x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 0.500 0.48 2.03
5 132kV Batapur 2 x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 0.500 0.48 203
6 132kV Bbildd A 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 0.500 0.48 1.53
7 132kV Bhogiwal A la 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03
8 132kV Chock -65 A 2x 132/11 kV ,40 MVA TRF do 45.000 0.050 1.00 1.000 0.48 2.53
9 132kV Defence A ix 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03
10 132kV Depalpur A 2 x 132/11 kV , 40 MVA TRF do 45.000 . 0.050 1.00 1.000 0.48 2.53
11 132kV Mango Mandi A 1 x 132/11 kV ,40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03
12 132kV Model Town A I x 132/11 kV ,40 MVA TRF do .45.000 0.050 0.50 1.000 0.48 2.03
13 132kV Okara City-2 A I x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03
14 132kV Rustam A 3 x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 1.500 0.48 3.03
15 132kV &humor A 2 x 132/11 kV , 40 MVA TRF do 45.000 0.050 1.00 1.000 0.48 2.53
16 132kV Shadman A 1 x 132/11 kV ,40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03
17 1321tv Shamkay A 1 x 132/11 kV ,40 MVA TRF do 45.000 0.050 0.50 _ 1.500 0.48 2.53
18 132 kV Shalamar A I x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 0.500 0.48 1.53
19 132kV Shabmar-2 A 1 x 132/11 kV , 40 MVA TRF do 45.000 0.050 0.50 1.320 0.48 235
20 132kV Sunny View A i x 132/11 kV ,40 MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03
21 132kV Wapda Town A I x 132/11 kV AO MVA TRF do 45.000 0.050 0.50 1.000 0.48 2.03
22 132KV G/S Johar Town - 11 N 2x132/1 I KV,26MVA,TB+2LB+ I -FT-BAY do 0.000 0.000 1.00 1.00 1.00 1.000 2.00 6.00
Sub- TOTAL (D) 1555.000 - 0.99 15.82 16.00 21.00 22.82 15.64 92.27
ESTIMATED BUDGET DURING FY-2013-14
FOR 6th STG Under Own Resources, World Bank and Asian Development Bank
(E) ADB (Tranche I) Works
Rs in Million
ADB FINANCIN COUNTER PART FUNDING
Sra Particular of Work Type SCOPE OF WORK Source of
financing Material/ Civil Works
duties/taaes/store Land Labour (10%) Overhead (10%) Others/
handling charges interest (6%) Consultancy Total
Electrical Civil Division
Capacitor Installation (Ghazi New, Depalpur) ADB 17.500 0.050 2.00 1.00 1.00
Sub- TOTAL (E) 4.05
17.500 0.00 0.05 2.00 1.00 0.00 1.00 0.00 4.05
ADB Tranche II Works
Rs in Million
SrJl
ADB FINANCIN COUNTER PART FUNDING
Particular of Work Type SCOPE OF WORK
Source of
financing Material/ Civil Works
duties/tasea/store Land Labour (10%) Overhead (10%) Others/
handling charges interest (6%) Considtancy Total
Electrical Civil Division
2 x 132/11 kV, 26MVA T/B+2L/B+
132 DHA Robber (Turn Key) N ADB 100.000 - 0.050
2PT/Bay 2.00 10.00 1.800 13.85
2 2 x 132/11 kV, 26MVA T/B+2UB+
132kV Jubilee Town (Turn Key) N ADB 100.000 - 0.050
2FT/Bay 2.00 20.00 2.000 24.05
3 2 x 132/11 kV, 26MVA T/B+2L/B+
132kV Central Park (Turn Key) N ADB 100.000 - 0.050
2PT/Bay 2.00 20.00 2.000 24.05
4 2 x 132/11 kV, 26MVA T/B+2L/B+
132kV Press Club (Turn Key) N ADB 100.000 - 0.050 2.00
2PT/Bav 0.10 2.000 4.15
5 132 kV Doula Chochak (Turn Key) 2 x 132/11 kV, 26MVA T/B+21/13+
N ADB 100.000 - 0.050
2PT/Bay 1.80 20.00 1.700 23.55
6 132 kV Ai Town (T-3) A I x 132/11 kV 40 MVA PTRF ADB 100.000 0.050 1.00 0.10 1.1300 2.15
7 132kV Garden Town (1-3) A 1 x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 1.000 2.15
8 132 kV WAPDA Town T-1 A 1 x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 1.000 2.15
9 132kV Badami Bagh T-2 A I x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 0.500 1.65
10 132kV Bhatti Gate T-2 A I x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 0.500 1.65
12 132 kV SaidPur (T-3) A 1 x 132/11 kV 40 MVA PTRF ADS 50.000 0.050 1.00 0.10 1.500 2.65
13 132 kV FatehGarh (T-3) A I x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 1.000 2.15
ESTIMATED BUDGET DURING FY-2013-14
V VI% men a i ur unuer s_rwn Resources, worm Bank and Asian Development Bank
14 132 kV OKLP (T-3) A t x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 1.000 2.15
15 132 kV Rahman Park (T-3) A 1 x 132/11 kV 40 MVA PTRF ADB 50.000 0.050 1.00 0.10 1.000 2.15
17 132 kV Mango Mandi A I x 132/11 kV 40 MVA FIRE ADB 50.000 0.050 1.00 0.10 1.000 2.15
18 132KV G/S Sukh Chain N limier Ground Way ADB 50.000 0.000 0.200 2.00 1.000 3.20
19 LARP's EMMP and capacity Building Programm of Tranche-II
0.000 13.000 13.00
Sub- TOTAL (F)
1100.000 - 0.75 20.00 - 73.10 33.00 - 126.85
(G) New & Faadinfs 771 ineze fn. Now add C`4.#inn.
Rs in Million
Sub- TOTAL (G) 63.00 9.00 1.15 7.50 8.00 3.00 10.00 0.50 102.15
//41 Res-rnndost-triritin And Maus lAIrtrire- ear 1-............:--.;...... : :.....- ...._.444__, ___ .4.____ ___ ...,..... ....,
Rs in Million
Rs In Million
ADB FTNANCIN COUNTER PART FUNDING
Sri/ Particular of Work Type SCOPE OF WORK Source of
rmancing Material/ Civil Works
dunes/taxes/store Crop Compensation Others/
Labour (10%) Overhead (10 Ai) Consultancy
/ Land interest (6%) Total
handling charges
Electrical Civil Division
132KV F/F DHA Rahber Japan Power-
Wapda Town In & Out at DHA Rahber D/C 0.2 LESCO 6.00 1.00
(Turn Key) 2.00 1.00 4.00
132kV F/F Jubilee Town In & Out Wapda
2 Town - Multan Rd Sukh Chayn (Turn D/C 1.67 LESCO
Key)
1.00 3.00 0.50 4.50
132kV F/F Central Park In & Out
3 D/C 13.82
Raiwind - 1Casur (Turn Key) LESCO 3.00 2.00 2.00 2.00 6.00
132kV F/F for Press Club In & out
4 D/C 0.15
Fatehgarh - Shalamar (Turn Key) LESCO 6.00 2.00 1.00 1.00 4.00
132kV F/F Donis Chouchak W.R.R -
5 D/C 20.1
Doula Chouchak (Turn Key) LESCO 5.00 5.00 2.00 2.00 9.00
Sub- TOTAL (I) 35.94 20.00 10.00 8.00 3.00 6.50 27.50
(J) Transmission Lines planned under World bank Financing
Rs in Million
WORLD BANK COUNTER PART FUNDING
SrJI Particular of Work Type SCOPE OF WORK Source of
financing Material/ Civil Works
Crop Compensation Others/
duties/taxes/store Labour (10%) Overhead (10%)
/ Land Consultancy Total
handling charges interest (6%)
Electrical Civil Division
ESTIMATED BUDGET DURING FY-2013-14
`NW 7 1 • Ir. •
...,.....sx vial ...3 .a. kir IL/ tiller WWII resources, work! Bank and Asian Development Bank
I 132KV T/L F/F Johar Town 11 (In & Out
from wapda Town - Bund Road) D/C 4.5 World Bank 30 1.00 0.050 1.00 30.00 5.000 1.50 38.55
2 132KV T/L F/F Inayat Pura/State Life _
Housing Society D/C 5 do 30 1.00 0.050 0.05 25.00 5.000 0.50 31.60
3 132KV T/L F/F Mominpura G.T Road D/C I do 10 0.050 0.50 8.00 5.000 0.50 14.05
4 132KV T/L F/F Saggiao D/C 0.464 do 5 1.00 0.050 0.60 6.00 4.00 1.500 1.50 14.65
132kV F/F Punjab University ( In & Out from
5 D/C
G/TOWN 41/TOWN) 0.5 do 5 1.00 0.050 0.60 7.00 0.60 1.500 - 10.75
6 I32KV F/F ASKARI X(IN &OUT FROM
DEFENCE-AIRPORT) D/C 0.2 do 1 0.30 0.050 0.60 4.80 0.200 5.95
Sub- TOTAL (J) 11.664 81 4.30 0.30 3.35 80.80 4.60 18.20 4.00 - - 115.55
Prior Year Adjustment For FY 2012-13
Revenue
Sales Revenue Min Rs] 14,524 13,863 12,754 41,141 10,664 9,895 8,616 29,175 9,203 7,983 9,094 26,280 15,785 14,324 12,617 42,726 139,321
Subsidy /Min Rs] 2,796 2,731 2,605 8,131 2,403 2,085 1,903 6,391 1,760 1,734 1,770 5,264 2,034 2,260 2,216 6,510 26,296
Fuel Price Adjustment Ran Rs] 1,046 - - 1,046 - - - - - - - - - - - - 1,046
Total Sales Revenue pain Rs] 18,366 16,594 15,358 50,318 13,067 11,980 10,519 35,566 10,962 9,717 10,865 31,543 17,819 16,584 14,833 49,235 166,663
Rental 8 Service Income [Min Rs] 15 15 15 46 15 15 15 46 15 15 15 46 15 15 15 46 183
Amortization of Def Credits pain Rs] 73 73 73 220 73 73 73 220 73 73 73 220 73 73 73 220 881
Other Income Min Rs] 289 289 289 868 289 289 289 868 289 289 289 868 289 289 289 868 3,472
Total Revenue pAln Rs] 18,744 18,972 15,736 51,452 13,445 12,358 10,897 36,700 11,340 10,095 11,243 32,677 18,197 16,962 15,211 50,369 171,199
Operating Cost
Power Purchase Cost Min Rs] 16,677 14,770 13,629 45,076 13,874 12,386 13,739 39,999 14,879 11,103 13,199 39,180 16,271 15,034 13,255 44,561 168,816
08M Expenses pain Rs] 1,313 1,313 1,338 3,963 1,313 1,313 1,350 3,975 1,325 1,325 1,350 3,999 1,325 1,325 1,350 3,999 15,935
Depreciation - [Min Rs] 185 185 185 556 185 185 185 556 185 185 185 556 185 185 185 556 2,223
Amortization (Min Rs] - - - - - - - - - - -
Provision for Bad Debt ]Mtn Rs] - _ - - - - -
-
Total Operating Cost [Min Rs] 18,175 16,268 15,152 49,594 15,372 13,884 15,274 44,530 16,388 12,613 14,734 43,735 17,781 16,544 14,790 49,115 186,974
EBIT [Lan Rs] 570 704 585 1,858 (1,927) (1,526) (4,376) (7,830) (5,048) (2,518) (3,491) (11,058) 416 418 421 1,254 (15,775)
Financial Charges pAln Rs] 66 66 66 199 66 66 66 199 66 66 66 199 66 66 66 199 797
EBT jam Rs] 503 637 518 1,659 (1,994) (1,593) (4,443) (8,029) (5,115) (2,585) (3,557) (11,257) 349 352 354 1,055 (16,573)
Tax RAM Rs] - -
- -
EAT pAln Rs] 503 637 518 1,659 (1,994) (1,593) (4,443) (8,029) (5,115) (2,585) (3,557) (11,257) 349 352 354 1,055 (16,573)
VVPPF [Mat Rs] - - -
Profit for the period RAM Rs] 503 637 518 1,659 (1,994) (1,593) (4,443) (8,029) (5,115) (2,585) (3,557) (11,257) 349 352 354 1,055 (16,573)
Lahore Electric Supply Company Limited
Profit & Loss Statement (Projected*) FY 2013-14
,- --.
--e'nrh-rift•"-- MOntti2 ' Month 3 71et„-.QW.----liiti41
* . Month 6 Month 6 .i2 ii _ iiif
. ._,.-±.'.WOiiiii 7T
,.,..iO;... i • IOOttlf"m
.,.. .... ..;oi iif -4aiit ..•i
„. .•t•."
l -•ai arra total '.
. .,
ant- 1 i
. tt, --i. --.- --v ' - i"iel
ztott. 4. Total'
Power Balances
Units Received (MkWhj 1,850 1,762 1,597 5,209 1,465 1,216 1,182 3,864 1,096 1,016 1,151 3,263 1,302 1,414 1,399 4,115 16,450
Units Lost fMkWh] 291 279 209 780 168 87 119 374 99 44 147 290 182 170 179 531 1,974
Units Lost f%age] 15.74% 15.84% 13.10% 14.96% 11.45% 7.18% 10.04% 9.68% 9.08% 4.33% 12.74% 8.89% 14.00% 12.00% 12.80% 12.90% 12.00%
Units Sold [MkVVh1 1,559 1,483 1,388 4,429 1,297 1,129 1,064 3,490 996 972 1,005 2,973 1,120 1,244 1,220 3,584 14,476
Revenue
Sales Revenue (me Rs] 24,558 23,180 20,491 68,228 21,205 17,749 18,903 57,856 19,854 16,221 19,871 55,946 22,016 21,221 19,892 63,129 245,159
Subsidy ]Min Rs] - - - - - - - - - - -
- - -
Fuel Price Adjustment Mn Rs] - - - - - - - - - - - - - -
- - -
Total Sales Revenue fMln Rs] 24,558 23,180 20,491 68,228 21,205 17,749 18,903 57,856 19,854 16,221 19,871 55,946 22,016 21,221 19,892 63,129 245,159
Rental & Setvice Income (Min Rs] 17 17 17 50 17 17 17 50 17 17 17 50 17 17 17 50 201
Amortization of Def Credits [Mln Rs] 80 80 80 240 80 80 80 240 80 80 80 240 80 80 80 240 960
Other Income ItAn Rs] 306 306 306 918 306 306 306 918 306 306 308 918 306 306 306 918 3,673
Total Revenue [Mln Rs] 24,961 23,583 20,893 69,437 21,607 18,151 19,306 59,065 20,257 16,624 20,274 57,155 22,419 21,624 20,294 64,337 249,993
Operating Cost
Power Purchase COSt fMln Rs] 17,569 16,485 14,103 48,157 15,156 12,293 13,634 41,083 14,843 11,292 14,794 40,928 16,550 15,307 13,490 45,348 175,516
O&M Expenses [Mln Rs] 1,456 1,426 1,451 4,332 1,428 1,426 1,463 4,315 1,438 1,438 1,463 4,339 1,438 1,438 2,005 4,881 17,867
Depreciation [Min Rs] 217 217 217 651 217 217 217 651 217 217 217 651 217 217 217 651 2,604
Amortization [Mln Rs] - - - - - - - - - - - - - - - -
Provision for Bad Debt Min Rs] - - - - - - -
Total Operating Cost awn Rs] 19,242 18,128 15,771 53,141 16,799 13,935 15,315 46,049 16,498 12,947 16,474 45,918 18,206 16,962 15,713 50,880 195,988
EBIT imin As] ' 5,719 5,455 5,122 16,296 4,808 4,216 3,992 13,016 3,759 3,678 3,800 11,237 4,214 4,662 4,582 13,458 - 54,006
Financial Charges [Min Rs] - 104 104 104 311 104 104 104 _ 311 104 104 104 311 '104 104 104 311 1,244
EBT [Min Rs] 5,615 5,351 5,019 15,985 4,705 4,112 3,888 12,705 3,656 3,574 3,697 10,926 4,110 4,558 4,478 13,147 52,762
Tax [Min Rs] - - - - - - - - -
EAT fMln Rs] 5,615 5,351 5,019 15,985 4,705 4,112 3,888 12,705 3,656 3,574 3,697 10,926 4,110 4,558 4,478 13,147 52,762
WPPF Win Rs] -
Profit for the period [M1n Rs] 5,615 5,351 5,019 15,985 4,705 4,112 3,888 12,705 3,656 3,574 3,697 10,926 4,110 4,558 4,478 13,147 52,762
Lahore Electric Supply Company Limited
Balance Sheet fin million Ruoees1
Current Liability
Current Maturity on Long Term Loans 277 486 756 650
Subsidy Received in Advance from GoP -
Provision for Taxation 103 103 103 103
Payable to NTDC 25,134 64,397 90,647 56,769
Creditors, Accrued and Other Liabilities 7,250 9,206 13,875 14,426
Total Current Liability 32,763 74,192 105,381 71,948
Average Monthly Demand Index (MDI) [MW] 3,125 3,461 3,301 3,472
Units Purchased [GWh] 16,986 16,727 16,207 16,450
Transmission Losses (132 kV) [GWh] 170 167 162 164
Distribution Losses [GWh] 2,075 2,092 1,783 1,809
Units Sold to Customers [GWh] 14,741 14,467 14,262 14,476
Average Tariff Required [Rs/unit] 9.218 12.534 13.156 16.936
Average Tariff Existing [Rs/unit] 9.197 10.541 11.686 16.936
Tariff Difference [Rs/unit] 0.021 1.993 1.470 0.000
Revenue from Sales 114,723 132,830 140,367 245,159
Collection from Required [%] 96.1% 93.4% 99.0% 99.0%
Power Balances
Units Received [MkWh] 1,850 1,762 1,597 1,465 1,216 1,182 1,096 1,016 1,151 1,302 1,414 1,399 16,450
Units Sold [MkWh] 1,559 1,483 .1,388 1,297 1,129 1,064 996 972 1,005 1,120 1,244 1,220 14,476
Units Lost [MkWh] 291 279 209 168 87 119 99 44 147 182 170 179 1,974
Units Lost [%age] 15.74% 15.84% 13.10% 11.45% 7.18% 10.04% 9.08% 4.33% 12.74% 14.00% 12.00% 12.80% 12.00%
Distribution Losses [%age] 13.57% 13.67% 10.93% 9.28% 5.01% 7.87% 6.91% 2.16% 10.57% 11.83% 9.83% 10.63% 9.83%
Transmission Losses [%age] 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17% 2.17%
?i/
Lahore Electric Supply Company Limited
Average Rate per Unit Purchased and Sold
- Weighted Average Cost per Unit Sold to Customers
Provisional Projected
10.02 Estimated Average Rate
(Table 11 - 11.18) [Rs/kW/Month] 85.91
10.03 Estimated Maximum Demand Indicator (MDI) 85.91
(Table 11 - 11.17) [MW] 3,301
10.04 Number of Months (Fiscal Year)
3,472
[ p) 12 12
10.05 Estimated Use of System Charges = (10.02 x 10.03 x 10.04)
[,000,000 Rs] 3,402.59 3,579.13
While submitting Quarterly Petitions , this form should be submitted with actual amounts of previous quarters
and projected figures of next quarter.
Variable
Demand Fixed Use of Fixed Use of Use of
Energy Variable Use of Sum Use of
System Rate System Charges System System Charges System Charges
11.02 Month Year [kW] Rate
iRsAVVI [ Rs] 6
[kWh] IRs/kWhl
11.03 1 2 3 [ Rs] [ Rs]
4 5.3x 4 7
11.04 Jul 3,518,145 8-657 9
85.910 302,071,984 1,850,345,000 - -
11.05 Aug 3,637,686 302,071,984
85.910 312,513,493 1,762,040,000
11.06 Sep 3,604,016 312,513,493
85.910 309,620,921 1,696,696,000
11.07 Oct 3,732,072 309,620,921
85.910 320,622,347 1,466,162,600
11.08 Nov 3,684,601 320,622,347
85.910 306,228,267 1,215,878,660
11.09 Dec 3,362,151 306,226,267
85.910 288,842,366 1,182,476,000
11.10 Jan 3,439,245 288,842,366
85.910 295,465,579 1,096,976,700
11.11 Feb 2,786,232 295,485
85.910 237,561,085 1,015,749,159
11.12 Mar 3,097,166 237,561,579
,085
85.910 266,076,831 1,151,324,650
11.13 Apr 3,479,396 266,076,831
85.910 298,914,940 1,301,857,210
11.14 May 3,640,917 298,914,940
85.910 312,791,152 1,413,896,270
11.15 Jun 3,822,928 312,791,152
85.910 328,427,711 1,399,042,496
11.18 41,881,445 328,427,71
85.910 3,579,134,478 16,450,332,640
11.17 Avg per month [MW] 3,471,787 3,579,1341
,487
Avg per month [MWh] 1,370,861,063
11.18 Caoaclty and Energy
8:WMERIEEE 0
30
5;
F,
ore Electric Suoolv Comoanv Limited
Tahla/Graph 13 - Load Growth Evaluation and Setting up Load Amigo
IA I.. 10 MW111
12 DISCO Evaluation of Load Growth by using 12 month moving average
month. 1000000
Load moving
nth 111W1 wereg•
11,03
0:03 11100000
0-03
-03
v-03
0-03
n-04 1010000
5-04
r-04
r-04
7-04
n-04 1200000
1-04 2,643 0
5-04 2.6212 220
544 2,7215 439
-04 2.372 067 1000000
-04 2,024 904
-04 2,134 1.033
0-05 2,067 1.211
4505 2,097 1,385
ar-05 2,245 1,550
nr-05 2,550 1.747
00-05 2,630 1,050
in-05 2,762 2,170
u1-05 2,770 2,410
4-05 2.631 2,421 000000
65-05
01-05
5v-05
2.940
2,412
2,142
2.439
2.450
2.454
t11111 111 1 1gi t 11 111 t it 111 1 111!
■■
Intelly annmpt. •-•.- 17 Me. osevie. Awe. at MT., 0IIIM,41.0
ec-05 2,340 2,404
rn-08 2,267 2,491
05-06 2,282 2,497
ar-06 2.349 2,513
or-00 2,769 2.521
ev-06 3,087 2,540
In-06 3,062 2,578
u1-013 2.675 2,603
o-06 2,977 2.011
N5-06 2.531 2,023
.ct-06 2.761 2.619
ov-06 2,470 2.650
ec-06 2.558 2,678
en-07 2,554 2,606
eb-07 2,451 2,719
'ar-07 2,654 2,733
or-07 2,960 2,756
ay-07 3,097 2.774
un-07 3,083 2.775
101.7 3,106 2.775
19-07 3,236 2.795
eo-07 2,919 2,821
1ct-07 2,665 2,828
ov-07 2,630 2,820
ec-07 2,594 2,825
an-08 2,376 2,829
05-08 2,328 2.813
ler-08 3.440 2.803
150-08 2,883 2,808
00-08 2.929 2,862
un-08 2 864 2 848
ul-08 3,158 2,829
539-08 2,878 2.834
00-08 3,073 2.799
151-08 2,651 2,812
ov-08 2,653 2.809
on-08 2,658 2,619
an-09 2,233 2,824
eb-09 2,604 2,812
00,-09 2,812 2,8351 2,829 Load Average for last 12 months
100-09 2,766 2,766 33,951 Average Load for next Focal Year
ley-09 2,855 2,758
un-09 2.944 2,755
Jul-09 3,175 2.781
05-09 3,485 2.763
sto-09 3,472 2,813
lot-09 3,259 2,847
lov-09 2.724 2,897
oc-09 2.611 2.003
lan-10 2,934 2,916
'eb-10 2,967 2.974
ter-10 2,609 3,005
k0r-10 3,070 3,004
lay-10 3,430 3,028
lun-10 3,504 3,073 2,915 Load Average for last 12 months
Jul-10 3,376 3,120 34.966 Average Load for next Focal Year
09-10 3.020 3,137
le5-10 3,057 3.146
Dct-10 2.1790 3,114
1ov-10 2,963 3.091
)0c-10 2,980 3,111
on-11 2,870 3,125
'05-11 3,048 3,120
Alp-11 3.041 3,127
Nor-11 3.240 3,103
lay-11 3.285 3.177
lun-11 3,021 3,165 3,133 Load Average for last 12 months
Jul-11 3,615 3.125 37,597 Average Load for next Fiscal Year
0o-11 3.380 3.145
105-.11 3.038 3.125
7c1-11 3.712 3.198
Iov-11 3.401 3.258
)ec-11 3,547 3.295
lan-12 3.538 3.342
ieb-12 3,267 3,398
Aar-12 3.228 3,418
Apr-12 3.145 3,433
Aey-12 3.251 3,425
Jun-12 3,455 3,425 3,299 Load Average for 10st 12 months
Jul-12 3,343 3,401 39,585 Average Load for next Fiscal Year
bug-12 3,459 3.439
505-12 3,426 3,445
Oct-12 3,546 3,403
gov-12 3.389 3,399
30c-12 3,196 3,388
Jan-13 3,270 3,355
05.13 2.629 3,336
401,13 2.044 3,281
Apr-13 3,308 3,259
Aay-13 3,481 3,271
Jun-13 3.634 3,288
. FROM •13
Cost
Accumulated De areciation
As at July 01, Addition/ As at June 30, Book Value as on
As at July 01, Charge during the As at June 30,
deletions Adjustments June 30,
No. Description ear
year
A. Land
1 Freehold
824,949,274 - ,
824949274
, - - - -
2 Leasehold 624,949,274
24,547,824 - 24,547,824 -
Total - 24,547,824
849,497,098 - 849,497,098 • • - -
B. Buildings 849,497,098
1 Residential Buildings
253,578,138 32,744,047 286,322,183 48,238,371 5,739,617 - 53,975,988
2 Non-Residential Buildings 232,346,195
1,621,137,731 209,334,333 1,830,472,064 308,377,535 36,893,662 - 345,071,197
3 GSO Residential Buildings 1,485,400,868
12,534,074 1,618,500 14,152,574 2,384,288 283,703 - 2,887,971
4 Non-GSO Residential Buildings 11,484,604
807,749,589 104,303,119 912,052,708 153,652,476 18,283,018 - 171 935 494
Total 740,117,214
2,894,999,530 348,000,000 3,042,999,530 512,850,850 81,000,000 - 573 850 850
C. Sub Transmission 2,469,348,880
1 11 KV Poles
3,727,713,573 478,852,412 4,204,585,985 1,054,861,367 149,493,902 _ 1,204,355,270
2 11KV Line 3,000,210,715
5,839,410,808 524,884,898 6,164,275,502 1,839,808,155 224,971,498 - 2,084,779,653 4,099,495,849
3 Distribution Transformer
11,497,373,321 2,371,893,387 13,869,266,688 3,380,459,417 474,145,907 - 3,854605,324
Total 10,014,681,364
20,884,497,500 3,373,810,875 24,238,108,175 8,275,128,940 848,611,307 - 7,123,740 248 17 114 387 928
F. LV Distribution Equipments
1 LV Poles
1,605,720,373 138,127,167 1,643,847,529 525,888,287 59,573,721 - 585,442,009 1,058,405,521
2 440 LV Distribution Line
63,879,291 24,727,185 78,606,455 1,488,444 2,327,899 - 3,814,142
3 220 LV Distribution Line 74,792,313
2,977,188,801 280,070,531 3,257,237,332 1,110,842,291 117,899,170 - 1,228,541,461 2,028,895,871
4 KWh Meters & Service Cable
5,078,419,215 888,883,592 5,967,282,807 1,320,388,389 210,713,876 - 1,531,100,265 4,436,182,542
5 Misc. Equipment
2,828,532,005 328,759,033 2,957,291,038 1,068,589,433 106,069,223 - 1,174,838,656 1,782,652 382
Total
12,243,717,884 1,860,547,479 13,904,265182 4,027,152,844 498,383,890 - 4,523538,534 9,380,728,828
G. Vehicles
1 Computer Equipment
203,384,442 28,416,932 229,781,374 61,381,934 100,579,929 - 181,941,863 67,839,511
2 Furniture
49,139,908 840,359 49,980,267 38,742,188 1,877,055 - 38,619,243 11,361,024
3 Workshop Equipment
- • - - . - -
4 Laboratory Equipment
- - - _
- - -
5 Misc. Equipment
22,024,543 13,182,142 35,188,685 • 10,084,932 1,397,542 - 11,482,474 23,704,211
Total
55,028,327,528 7,738,850,708 82,785,278,234 18,345,881,527 2,208,783,142 - 18,554,844,789 44,210,833,485
J. O&M Equipments
339,143,257 23132,668 382,275,925 238,205,981 18,828,442 254,834,423 107,441,502
Grand Total 55,387,470,785 7,780,083,374 83,127,554,159 18,584,067,808 2,225,411,584 - 18,809,479,192 44,318,074,987
White submitting Quarterly Petitions , this form should be submitted with actual figures of previous quarters
and projected figures of next quarter. The Asset Register should be substantiated with notes to the accounts, If required.
Lahore Electric Supply Company Limited Actual Provisional Projected
Aging of Accounts Receivables as on 30th June • FY 2010-11 FY 2011-12 FY 2012-13 FY 2013-14
Outstanding for current year Rs In Million 17,028.00 17,401.00 16,645.00 16,000.00
Outstanding for more than 1 year Rs In Million
3,809.00 8,044.00 11,018.00 10,500.00
Outstanding for more than 2 years Its In Million
Outstanding for more than 3 years Rs In Million
Outstanding for more than 4 years Rs In Million 1,192.00 2,680.00 4,159.00 4,000.00
Outstanding for more than 5 years Rs In Million
Total Receivables as on June 30, Rs In Million 22,029.00 28,125.00 31,822.00 30,500.00
Lahore Electric Supply Company Limited
Projected Energy Sales by Tariffs
FY 1013-14
1 I 0 1.50% 1 2.00% 1
Cl(b) Supply at 400 Volts - exceeding 5kW LV 38 31 6 1.50% 32 2.00% 32
Time of Use (TOW-Peak LV 2 2 0 1.50% 2 2.00% 2
Time of Use (TOU)-Olf Peak
DISTRIBUTION
LV 1I 9 2 1.50% 9 2.00% 10
C2 Supply at I I kV HV 240 240 - 1.50% 244 2 001
/1 245
Time of Use ("TOW-Peak HV 17 17 - 1.50% 17 100% 17
Tote of Use (rou)-Off Peak HV 74 74 - 1.50% 75 200% 75
C3 Supply above I I kV STG 47 47 - 1.50% 48 2.00% 48
Time of Use (YOU)-Peak STG - - - 1.50% - 2.00% -
Time of Use (TOU)-OH Peak STG - - - ' 1.50% - 100% -
Total Slagle Point Supply 430 421 9 427 429
DI Scarp LV 140 117 23 1.50% 119 2.00% 119
02 Amicultual Tube-wells LV 102 85 17 1.50% 86 2.00% 87
7TJL1
7
Time of Use (TOU) - Peak LV 152 127 25 1.50% 129 2.00% 129
Time of Use (T01.) -Off Peak LV 821 684 137 1.50% 694 2.00% 698
Total Agriculture 1,215 1,013 203 1,028 1,033
E-1(t) Residential Supply LV 0 0 0 1.50°/ 0 2.00% 0
(-10t)Commercial Supply LV 25 25 - 1.50% 26 2.00% 26
SU.
TA
EMI
1.50% 0 2.00% 0
Total Temporary 26 26 0 26 26
Public Lighting - G LV
U, 124 103 21 1.50% 105 2.000/ 105
Residential Colonies-H HV 4 4 - 1.50% 5 2.00% 5
Railway Traction - I HV
0 0 0 - 1.50% 0 2.00% 0
Co-Generation Tariff
- - - - -
Total 16,207 14,262 1,944 14,476 14,547
Lahore Electric Supply Company Limited
Operating Cost
2012-13
• .1,•.■ 2013-14
Determined Provisional Projected
A Power Purchase Cost
Energy Charge [Min Rs] 138,822 130,336 132,291
Capacity Charge [Mln Rs] 39,616 35,076 39,646
Transmission Charge [min Rs] 3,760 3,403 3,579
Adjustment * [Mln Rs]
Total Power Purchase Cost [Min Rs] 182,199 168,815 175,516
)1,
Lahore Electric Supply Company Limited
Financial Charges
4011:1 2012.13,
Actual Provisional Projected
A Gross Fixed Assets in Operation - Opening Bal [Mln Rs] 55,387 55,387 62,816
B Addition in Fixed Assets [Mln Rs] 6,944 7,428 10,920
C Gross Fixed Assets in Operation - Closing Bal [Mln Rs] 62,331 62,816 73,735
D Less: Accumulated Depreciation [Mln Rs] 18,619 18,827 21,431
E Net Fixed Assets in Operation [Mln Rs] 43,712 43,988 52,304
F Add: Capital Work In Progress - Closing Bal [Mln Rs] 4,450 3,511 5,161
G Investment in Fixed Assets [Mln Rs] 48,161 47,499 57,465
H Less: Deferred Credits [Mln Rs] 28,465 28,255 30,789
I Regulatory Assets Base [Mln Rs] 19,697 19,245 26,676
J Average Regulatory Assets Base [Mln Rs] 17,905 17,679 22,960
Working Capital Requirement [Mln Rs] 27,212 30,989
201243 291314
Determined Provisional Projected
A Investment Plan
DOP [Mln Rs] 4,145
ELR [Mln Rs] 850
STG [Mln Rs] 7,853 7,399 6,859
TOU Meters / Smart Metering [Mln Rs]
B Financing Arrangement
Local [Mln Rs]
Note: it is apprised to the authority that data regarding Form 21(B) is still in process and it is
ensured that LESCO will file the said form later on , upon completion of information as soon
as possible.
Lahore Electric Supply Company Limited
Interest on Development Loans
Rs. Million
Sr. No. Loans Interest Rate % FY 2013-14
1st Qrt 2nd Qrt 3rd Qrt 4rth Qrt Total
This form should be submitted for each loan appearing on the DISCO's Balance Sheet
Lahore Electric Supply Company Limited
FORM -23
Dew!comsat Loans
—..........,
Or. Nn Fkst On of FY 2013-14
Leas Interml Rale RamenIng Yams Secant Ort of FY 2013-1!
Third Ort of FY 2013-14 Fame Ort et FY 2013-14
oar am June blia Olstemement Repayment Otstemannnt Rams/tont OleMersarmnt Repayment CJba Ota01 Disbursement Repayment
ACM
1 Lean No 24314Mk 17.0016 MI 35,274 - 30 35,144 35.144 35,144 35,144 130 35,014 33,014 33,014
Omni pan'
ra:
nk'No 75115-PMC 1700% 0.1 034 310 35 900 0% 3l5 1.263 1263 81 1563 1563 1,563
3 ADO
Loon Ma 2727k 10.110% 20
-Pa 235 ]00 M70 070 350 1.220 1,220 300 1,120
165 34713 30,713 37.277 37277 000 771 37,717 37,797 300 - 34097
—. .
f
orm should e submitted for each loan appearing on the DISCO's Balance Sheet
LAHORE ELECTRIC SUPPLY COMPNAY LIMITED
BONDS
Interest FY --
Particulars Opening 1 Closing Interest
Rate Redemption
Balance i Balance Charges
DOMESTIC CONSUMERS (UNITS IN MILLIONS) FY 2013
Sr. Consumers Units Variable Charges
Slabs (May - 12 to Apr - 13 ) Avarage Rate
No (30-04-2013) (May - 12 to Apr - 13 PS / KWH
(Rs. In Million)
1 0 50 1,159,130 260.72 672.29 2.58
2 1 100 738,674 506.97 2,897.48 5.72
3 101 200 744,990 1,357.04 8,750.50 6.45
4 201 300 183,455 1,070.28 7,581.37 7.08
5 301 400 50,347 617.99 4,889.22 7.91
6 401 500 19,895 386.06 3,415.83 8.85
7 501 600 9,174 256.14 2,413.44 9.42
8 601 700 5,059 183.05 1,792.15 9.79
9 701 800 2,809 133.52 1,359.35 10.18
10 801 900 1,867 103.75 1,099.45 10.60
11 901----1000 1,317 79.38 863.86 10.88
12 1000---1100 945 64.21 711.82 11.09
13 Above 1100 4,256 519.14 6,109.18 11.77
Total 2,921,918 5,538.25 42,555.94
1
Lahore Electric Supply Company Limited
Provision for Tax
Rs. Million
Sr. No. Provision for Tax allowed
2nd Qrt 3rd Qrt 4rth Qrt Total
t‘ott. PRONcie •
r
Lahore Electric Supply Company Limited
Armes-6 (1/2)
Existing & Proposed Tariff Statement
FY 201J-14
189
- -
For peak load respreaseat exordia' S kW - -
0
Railway Traction - 1 - 0 0.00% - 15.00 - 17.89 - 2.89
Co-tieneratton Tariff - - • - -
- • -
Total 2,846,074 14,476 100.00%
Note: The NEPRA Determilied Rates vide a. decision Ord 28.02-2013 have been taken for this exercise. The said detenninatiol is stal to be wined by flop.
Lahore Electric Supply Company Limited
Existing & Proposed Tariff Statement Annex-6 (2/2)
FY 21713-14
8,871 - 1.229
- _
CO) Supply a 400 Volts - according 5kW 7,785 32 0.22% 37 463 37 555 - 92
Time of Use (TOID-Peak
936 2 0.01% 4 36 4 42 - 6
Time of Use (10l1).011Pak
' 2.169 9 0.07%
DISTRIBUTION
10 119 10 146 - 27
C2 Supply at 11 kV
43,683 244 1,68% 199 3,482 199 4,187 - 705
Time of Ilse (T01.1)-Peak 3.568 . 17 0.12% 16 307 16 357 - 49
Tirtie of Use (TOU)-Off Peak 19,719 75 0.52% 90 922 90 1,139 - 217
C3 Supply above I I kV 8,008 4R 0,33% 35 680 35 8118 - 139
Time of Use (TOU)-Peak
- - 0.00% - - - - - -
Time of Use (ro)-orr Peak - - 0.00% - - - - -
Total Single Point Supply 85,946 427 2.95% 392 6,017 392 7,255 - 1,237
FTUBEWELL- TARIFF D
1)1 Scarp
100 119 0.82% - 1,720 - 2,063
.
- 343
AGRICULTURE
D2 Agricultual Tube-wells
27,605 86 0.60% 66 1,2(17 66 1,456 - 250
13-1(h) SCARP and agricultural more than 20 KW - - - - - -
.
Time of Use (TOU) - Peak 78,208 129 0.89% 188 2,317 188 2,690 -
.
373
Time °Il1a rf0t0 43f1Peak 249,971 694 4.80% 600 8,469 600 10,478 - 2,010
Total A8riceihn• 355,884 1,028 7,10% 854 13,713 854 16,688 - 2,975
P-1(i) Residential Supply
- 0 0.00% - 6 - 7 - 1
Y TA
4.50
AGRICULTURE
5.00
Tiine o(Use (TOU) -Off Peek 249,971 694 4.8% 20.00 12.20 200,00 8.00
.
- 4 20
Total A/Mullion 355,884 1,028 7.1%
E•1(t) Residential Supply - 0 • 0.0% 18.00 - 15.50 - 2.50
.RIF1
'OR)
PPL'
5,664
-
69 OAR%
.
- 1.248 - 970 - 278
Time of Use (TOU).Off Peak
23,177 319 2.20% - 3,989 • 2,623 1,366
16 307 16
'Time of Uwe (TOU).Off Peak 215 - 92
19,719 75 0.52%
_ .
90 922 90 5111
CY Supply show 11 kV - 341
8.008 48 0.33% 35 680 35 484 - 196
.
Time of Um iTOID-Peak
- - 0.00: . . . -
Time of Um ('7015)(07' Peak -
• - 0. 00% - . . - . .
Thal Slagle Point Supply 85,946 427 3.0% 392 6,017
TUBEWELL- TARIFF D
-
TARIFF
5 - 1
Supply
- 26 0.18% - 462 • 385 .
Industrial Supply 77
104 0 0.00% - 3 • 3 - 1
- • 0.00% . -
-
Totol Temporcry 104 26 0.2%
Public Lighting - G
- 105 0,72• - 1,568 - 1,435 -
E Residential Colonies-II 133
S Railway Treetion -1
-
•
0
5 003%
0.00% -
- 68
4
- 59 - 9
• 3 .
Co-Generation Tariff 1
•
- - - .
-
Tote! 2,846,074 14,476 100.00% 11,180 192,343 11,153 124,549 27 67,793
Lahore Electric Supply Company Limited
Proposed Revenue & Subsidy Statement
FY 2013-14
- - 0.00%
CI(b) Supply at 400 Volts - ermeding 5kW 7,785 32 0.22% 4 40000 .17.39 400.00 1035 - 7.04
Time ail. 01211)-Peak 936 2 0.01% own) 20.119 400.00 13(11 - 7.88
Tune of Use iTOU)-Off Peetk 2,169 9 0.07% 400.00 15.39 400.00 8.01 - 738
DISTRIBUTION
D1 Agneultual Tao-wells 27,605 86 0.60% 200.00 1689 12000 6.77 80.00 10.12
0-1(b) SCARP and ngricultural um than 20 KW - - - - . - - -
Tune of Um (T01) - Peak 78,208 129 1380% 200.00 2089 200.00 13.00 - 7.89
Time of Use (TOU) 42i2Peak 249,971 694 4.80% 200.00 15.09 200.00 8.00 - 7.09
Total Agrimeihre 355,884 1,028 7.1%
TEMPORARY
I 2
(MkWh)
3 4
(Mk Re.)
7
Var. Carnes
(Ma 14a)
S
Fixed Clown.
Rix/ (Min R.)
9
ch.
V.r.
(MI.Rat
10
im,:r )
ch
(Mtn
II 12
Ilp to 50 Units 7 256 1.77% - 1,024 - 512 - 512
For peak load requirement op to 5 kW • -
0l-I00 Unita per month - 1,804 12.87% - 26.062 - 10,790 - 15,272
101-300 Unita per mtmth - 2,055 14.19% - 34,712 - 16,663
•-I - 18,049
301 - 700 Unit. per month - 802 5.54% - 15,964 - 9,894 - 6,070
Above700 Unita per mob - 313 2.16% - 6,542 4,718 - 1,824
9 For peak lad requirement caftan it kW - - 0 00% - - - •
i Time of Use (1121R-Peak 5,664 69 0.48% - 1,448 - 970 479
Time of Use (11)1)-017 Peak 23,177 319 2.20% 4,913 - 2,623 - 2,290
- - - •
Time of Use (TOU) - Pak 78,208 129 0.89% 188 2,690 188 1,673 - 1,016
TEMPORARY'
Time of Use (T011) 4)fr Pak 249,971 694 4.80% 600 10,478 600 5,553 - 4,925
Total Agrialare 355,884 1,028 7.1% 854 16,688 827 8,996 27 7,691
ii- Ili) Residential Supply - 0 0.00% - 7 - 5 -
SUPPLY
2
TARIFF
23
Railway Traction - I - 0
0 0.00% - - - 3 - (3)
Co-Generation Tana' - - 0.00% - - - - - -
Total 2,846,074 14,476 100.00% 11,180 233,974 11,153 124,942 27 109,032
Lahore Electric Supply Company Limited
Existing & Proposed Tariff Statement Annex-6 (1/2)
F1' 2013-14
17.89
-
-
2.89
/89
Railway Tnalion - I - 0 0.00%
0 - 15.00 - 17.89 - 2 89
Co-inetinHom Tasiff - - - - - - - -
Taal 2,846,074 14,476 100.00%
•-• • - - mon . here hat. mkt.. IN this minis. The ad determination ir eli0 to be notified by GDP,
Lahore Electric Supply Company Limited
Existing & Proposed Tariff Statement Annex-6 (2/2)
FY 2013-14
Regular
53,750 138 095% 258 2,2 )7 258 2,606 - 399
O Tune of Use (TOM- Peak
63,355 101 0,70% 304 1,8 16 304 2,119 - 294
Tune of Ilse iTOU)-017Petik
198,780 458 3.16% 954 5,7 16 954 7,052 - 1,326
Total Commercial 315,1192 1,122 7.75% 1,516 17,4 10 1,516 20,648 3,248
RI
37 90 062% 1,3 /5 - 1.566 -
131 - Tone of Use al Rh-Peek
261
52,583 56 0.39% 1,0 6 - 1,179 - 163
01 - Time of Um (T01)-017 Peak
188,754 284 1.96% 3.5 16 - 4,367 -
112
82I
126,814 349 2.41% 609 4.8 5 609 5,895 -
02 - Time of Use (T011)-Peak
1,010
151.337 164 1.13% 726 2,9 3 726 3,428 -
112 - Time of Ilse (T0U)1)If Park
475
407,716 931 6.43% 1,957
O 11.4 8 1,957 14.142 - 2,694
113 - Time of Ilse (URN-Peak
129.304 284 1.96% 590 5,1 8 590 5,930 -
ELI - Trim, of Ilse (1131.5-(31T Peek
822
847,714 3.222 22.26% 3,866 39,30 5 3,866 48,632 - 9,327
114 -Tune of Ihe (TOU)-Peak
19,254 84 0.54% 83 1,5 $ 83 1,758 - 244
114 'Time of Ilse (T0111-011. Peak
135.887 622 4.30% 587 7,52 4 587 9,324 - 1,800
Tend Industrial 2,059,401 6,085 42.04% 8,418 78, 4 8,418 96,221 - 17,617
CI).) Supply al 400 Voht -up to 5 kW
77 0.00% 1 - 10 - 2
C1(h) Supply at 400 Volt, - exceeding 5kW
7,745 32
E 022% 37 46 1 37 555 - 92
Tune of Use (U)U)-Pak
936 2 0.01% 4 3
Time of Use (T011)-Off Peak
4 42 - 6
Z 2.169 9 0.07% 10
6. 0 11 1 10 146 - 27
C2 Supply at I I kV
E 43,683 244 L 68% 199 3,48 ! 199 4,187 - 705
Time of Use (U)U)-Pak
3,568 17
:4. Time of The (TOIL1)-05 Peak
0.12% 16 30 16 357 - 49
19,719 75 0.52% 90 92 90 1,139 - 217
2 C3 Supply shove I I kV
8,008 48 0.33% 35 68 1
Tune of Use (TOU)-Peak
35 818 - 139
0.00% . - . -
Time of Ilse (11/1/)1M Peak
rn 0.00% . . .
Total Single Point Supply 85,946 427 2.95% 392 6,01 392 7,255 - 1,237
O DI Scarp
100 119 0 82% 1,720 - 2,063 - 343
1.32 Agricultual Tube-wells
27,605 86 0.60% 66 1,207 66 1,456 - 250
0-159 SCARP and agricultural more than 20 KW
' .
Total Tempontry 104 26 0.18% 471 - 547 -
Public Lighting - 0 76
Cfv Residential Colonies-El
105 0.72% 1,568 - 1,871 303
5 0.93% 68 - 81 -
0 Railway Traction - I
Co.Oenention Tara
0 0.00% 4 5 -
13
I
Total
. . .
2,846,074 14,476 100, 00% 11,180 192,813 11,180 233,979 - 41,166
Lahore Electric Supply Company Limited Annex-7
Revenue Requirement
- 2012-13 2012-13 „ 2013-14
Determined Provisional Projected