Sie sind auf Seite 1von 8

DANIELI PROJECT, INDUSTRIELLE,

BETEILIGUNG Co.,
BLOCK 4B AREA E, THANH THUAN EXPORT
PROCESSING ZONE, DIST. 7 HCMC. VN.

REQUEST FOR INSPECTION SUMMARY


Date 6/21/2012 Ref. No.
To Archetype Group VN. Attention Engr. Jose Curaming /Construction Manager
From Beton6 Corporation Name Nguyễn Ngọc Trang/ Chief QC

Dear Sir/Madam,
We would like to request you to witness/inspect the following works:
Designated Staffs
No. Description of Work Time
BETON 6 ARCHETYPE
1 Inspection for PC pile 0.35x0.35x10m at P10 yard 10:00 AM on Nguyễn Văn Thơm
(20 seg: 14N1, 6B2) 22/Jun/12

2 Inspection for PC pile 0.35x0.35x10m at 8BC yard 2:00 PM on Nguyễn Văn Thơm
22/Jun/12
(20seg: 20B1)

Requested By: Received By:

Name/Sign Nguyễn Ngọc Trang Name/Sign

Position Chief QC Position

Date/Time 6/21/2012 Date/Time

Comments:

22.06 1/8 Rev._


Note:

This request must be submitted 24 hours before the inspection time for in-site and 3 days in advance for off-site inspection

22.06 2/8 Rev._


DANIELI PROJECT, INDUSTRIELLE,
BETEILIGUNG Co.,
BLOCK 4B AREA E, THANH THUAN EXPORT
PROCESSING ZONE, DIST. 7 HCMC. VN.

REQUEST FOR INSPECTION SUMMARY


Date 6/22/2012 Ref. No.
To Archetype Group VN. Attention Engr. Jose Curaming /Construction Manager
From Beton6 Corporation Name Nguyễn Ngọc Trang/ Chief QC

Dear Sir/Madam,
We would like to request you to witness/inspect the following works:
Designated Staffs
No. Description of Work Time
BETON 6 ARCHETYPE
Inspection for PC pile 0.35x0.35x10m at 23-Jun-12
+ 1P5P5
yard (16(16
yard segs: 8N1,
segs: 4B2,
8N1, 4B1)
4B2, 4B1)

10:00 AM
2 P6 yard (16 segs: 8N1, 4B2, 4B1)

3 8C yard (6 segs: 6N1)


Nguyễn Văn Thơm

4 6BC yard (20 segs: 20B2)


12:30 PM

5 10BC yard (20 segs: 20B1)

Requested By: Received By:

Name/Sign Nguyễn Ngọc Trang Name/Sign

Position Chief QC Position

Date/Time 6/22/2012 Date/Time

Comments:

Note:

23.06 3/8 Rev._


This request must be submitted 24 hours before the inspection time for in-site and 3 days in advance for off-site inspection

23.06 4/8 Rev._


DANIELI PROJECT, INDUSTRIELLE,
BETEILIGUNG Co.,
BLOCK 4B AREA E, THANH THUAN EXPORT
PROCESSING ZONE, DIST. 7 HCMC. VN.

REQUEST FOR INSPECTION SUMMARY


Date 6/24/2012 Ref. No.
To Archetype Group VN. Attention Engr. Jose Curaming /Construction Manager
From Beton6 Corporation Name Nguyễn Ngọc Trang/ Chief QC

Dear Sir/Madam,
We would like to request you to witness/inspect the following works:
Designated Staffs
No. Description of Work Time
BETON 6 ARCHETYPE
Inspection for PC pile 0.35x0.35x10m at 25-Jun-12
+ 1P5P9
yard (16(18
yard segs: 8N1,
segs: 4B2,
9N1, 4B1)
9B1)

10:00 AM
2 P10 yard (20 segs: 14N1, 6B2)

3 8BC yard (20 segs: 20B1) Cancelled, Nguyễn Văn Thơm


shifted to
26/June
4 10BC yard (20 segs: 14B2, 6B1)
12:30 PM

Requested By: Received By:

Name/Sign Nguyễn Ngọc Trang Name/Sign

Position Chief QC Position

Date/Time 6/24/2012 Date/Time

Comments:

Note:

This request must be submitted 24 hours before the inspection time for in-site and 3 days in advance for off-site inspection

25.06 5/8 Rev._


This request must be submitted 24 hours before the inspection time for in-site and 3 days in advance for off-site inspection

25.06 6/8 Rev._


DANIELI PROJECT, INDUSTRIELLE, BETEILIGUNG Co.,
BLOCK 4B AREA E, THANH THUAN EXPORT PROCESSING ZONE, DIST. 7 HCMC.
VN.

REQUEST FOR INSPECTION


Date 2/22/2017 Ref. No.
Hitachi, Ltd., Ho Chi Minh City Urban
To Attention Engr. Jose Curaming /Construction Manager
Railway Line 1 Project Office
From Beton6 Corporation Name Nguyễn Ngọc Trang/ QC Manager

Dear Sir/Madam,
We would like to request you to witness/inspect the following works:
Designated Staffs
No. Description of Work Time
BETON 6 ARCHETYPE
Inspection for PC pile 0.35x0.35x10m at 26-Jun-12
+ 1P5P5
yard (16(16
yard segs: 8N1,
segs: 4B2,
8N1, 4B1)
4B2, 4B1 )

10:00 AM
2 P6 yard (16 segs: 4N1, 8B2, 4B1 )

3 6BC yard (9 segs: 1N1, 8B1 )


Nguyễn Văn Thơm

4 8BC yard (20 segs: 20B1 )


12:30 PM

5 10BC yard (20 segs: 14B2, 6B1 )

Requested By: Received By:

Name/Sign Nguyễn Ngọc Trang Name/Sign

Position QC Manager Position

Date/Time 2/22/2017 Date/Time

Comments:

Note:

26.06 7/8 Rev._


This request must be submitted 24 hours prior to the inspection time

26.06 8/8 Rev._