Sie sind auf Seite 1von 1

USER REQUIREMENT SPECIFICATION FOR SAFETY RELIEF VALVE- SS316

Description of Equipment/ Instrument: SRV - SS 316


Size 1.5" X 3"

Project: Band-4/Anticancer
Orifice 1.5" X 3" - H - 3
Designation

Project code : Date: 8/21/2019


S. NO. DESCRIPTION UOM SPECIFICATIONS
A PROCESS AND OPERATING DATA
1 Type Pop Up, Spring Loaded
2 Make VTS
3 Quantity Nos 2
4 Service Solvent Vapor
5 Outlet Pressure Kg/Cm2 ATM
6 Set Pressure Kg/Cm 2
2.2
7 Set Pressure Range Kg/Cm 2
1.8 to 3.5
8 Design Pressure Kg/Cm2 As Per Design Code/VTS
9 Temperature °C -20 °C to 120 °C
10 Design Temparature °C As Per Design Code/VTS

B MATERIAL OF CONSTRUCTION
1 Body A 351 CF 8
2 Bonnet A 351 CF 8
3 Cap A 351 CF 8
4 Spindle SS316
5 Nozzle SS316
6 Disc SS316
7 Nozzle Ring SS304
8 Adjusting Ring Pin SS304
9 Ball SS304
10 Guide SS316
11 Spring SS (SPRING STEEL)
12 Spring Washer SS304
13 Adjusting bolt SS304
14 Adjusting bolt lock nut SS304
15 Set screw Gasket PTFE
16 Cap Gasket PTFE
17 Guide Gasket PTFE
18 Cap plug Gasket PTFE
19 Flanges ANSI RF 150#
20 Bonnet Stud A193 Gr.B7
21 Bonnet Stud Nut A194 Gr.2H
22 Drain Plug SS304

C DESIGN DATA As per API 526

D TECHNICAL DATA
1 Weight VTS
2 Inlet Size NB 40
3 Outlet Size NB 80
4 Orifice Designation VTS

E DOCUMENTATION / cGMP REQUIREMENTS


1 Drawings for Approval Drawings shall be submitted for approval
2 Hydraulic / Pneumatic test report Required

3 Vacuum test report Required

Design qualification ,Installation qualification and


4 operational qualification reports in vedor scope Required
along with validation document
Supervision of Installation & Commissioning in
5 Vendor scope (Lodging & Boarding are in Vendor Required
scope for his team)
Test and guarantee certificates for all bought-out
6 Required
items
7 Operation and Maintenance Manual Required

F INSPECTION
1 TEVA/Consultant/Vendor *

G TRIAL
1 Required

NOTE :* - TEVA scope, VTS - Vendor to Specify


Comments:
Prepared By
Reviewed By Approved By
Department
Signature
Name
Date