SI. No. Description Unit No.

Length Breadth Height

1 Earthwork in excavation of foundation for structures including pipe culverts in all types of soil complete as per drawings and Technical Specification Clause 304, 3
2903. cum.
Footing for Portal structure (Main Carriageway) 2 40.99 4.60 2.90 1093.67 1094.00
Footing for Portal structure (Service Road) 2 23.51 4.40 2.70 558.55 559.00
Retaining Wall/ Wing Wall 2 10.00 4.26 1.60 136.18 137.00

2 Cement concrete in foundation/M-15 levelling course including centering and shuttering all complete as drawing and Technical Specifications Sections 21
2200. cum.
Box Cell (Main Carriageway) 2 40.99 4.60 0.10 37.71 38.00
Box Cell (Service Carriageway) 2 23.51 4.40 0.10 20.69 21.00
Retaining Wall/ Wing Wall 2 10.00 4.26 0.10 8.51 9.00

3 Providing and laying filter medium, behind abutments, retaining wall and return wall complete as per drawing and Technical Specifications
Clause 2504. cum.
Vertical outer wall (Main Carriageway) 2 40.99 0.60 3.50 172.17 173.00
Vertical outer wall (Service Road) 2 23.51 0.60 3.50 98.73 99.00
Retaining Wall/ Wing Wall 2 10.00 0.60 3.94 47.24 48.00
4 Back filling behind abutments, wing walls/ retaining and return walls or any other area with selected granular material of approved quality complete as per drawing an
Technical Specification clause 300. cum. Main Carriageway
Filling above box top level (Cushion above box culvert of main
carriageway had already considered (on backfill of RE Wall 0.00
portion) in schedule-B of contract agreement, therefore the
quantity has not been added here. ) 0 40.79 7.92 10.46 0.00
Filling between box top level and GL 0 40.79 4.22 4.20 0.00 0.00
Filling between GL and founding level 2 40.79 4.22 2.80 964.16 965.00
Deduction due to heel 2 40.79 2.20 0.80 -143.59 -144.00
Service Road
Filling above box top level (Cushion above box culvert of main
carriageway had already considered (on backfill of RE Wall 0.00
portion) in schedule-B of contract agreement, therefore the
quantity has not been added here. ) 0 23.31 7.81 1.93 0.00
Filling between box top level and GL 0 23.31 4.11 4.00 0.00 0.00
Filling between GL and founding level 2 23.31 4.11 2.60 497.5636 498
Deduction due to heel 2 23.31 2.20 0.60 -61.53 -62.00

Retaining Wall/ Wing Wall

Filling between box top level and GL - Remaining portion not

considered in fill behind Box 0 10 3.74 3.94 0


Filling between GL and founding level - Remaining portion not
considered in fill behind Box 2 10 3.74 1.5 112.32
5 M-35 grade Reinforced cement concrete in Box Structure including
centering and shuttering but excluding reinforcement, complete as per
drawing and Technical Specifications Sections 1500 ,1700 and 2300. cum.
M-35 grade Concrete
Footing for Portal structure (Main Carriageway) 2 40.99 4.4 0.8 288.58
Footing for Portal structure (Service Road) 2 23.51 4.2 0.6 118.48
Retaining Wall/ Wing Wall (Rectangular Part) 2 10 4.06 0.3 24.33
Retaining Wall/ Wing Wall (Tapered Part) 2 10 4.06 0.24 9.75

Vertical outer wall (Main Carriageway) 2 40.99 0.70 5.50 315.64

Vertical outer wall (Service Road) 2 23.51 0.5 5.5 129.29


Vertical inner wall 0 40.99 0.7 5.5 0
Haunch (Main Carriageway) 6 40.99 Area = 0.101 24.9
Qty. Estimated Quantity (0% extra)

chnical Specification Clause 304, 309 and

echnical Specifications Sections 2100 and

tions

quality complete as per drawing and

112.32 113

288.58 289
118.48 119
24.33 25
9.75 10

315.64 316.00

129.29 130
0 0
24.9 25
SI. No. Description Unit No. Length Breadth Height

6 Haunch (Service Road) 6 23.51 Area = 0.101 14.28 15.00


Retaining Wall/ Wing Wall stem 2 10.00 0.59 4.90 58.13 59.00
Reinforced cement concrete including centering and shuttering but excluding
RCC Grade M-35 cum
Top Slab (Main Carriageway) 1 7.40 40.99 0.70 212.34 213.00
Top Slab (Service Road) 1 7.00 23.51 0.50 82.28 83.00
Parapet wall over Box 2 9.27 0.500 1.734 16.07 17.00
7 HYSD bar reinforcement for culverts, underpass, retaining walls etc. complete as per drawings and Technical Specifiations Section 1600. MT
For Box-Main Carriageway 130 @kg per cum. 37.52 52.00
For Box-Service Road 115 @kg per cum. 13.63
Retaining Wall/ Wing Wall 80 @kg per cum. 2.73 3.00

Vertical outer wall-Main Carriageway 130 @kg per cum. 41.03


Vertical outer wall-Service Road 115 @kg per cum. 14.87
Vertical inner wall-Main Carriageway 130 @kg per cum. 0.00 61.00
Haunch-Main Carriageway 130 @kg per cum. 3.24
Haunch-Service Road 115 @kg per cum. 1.64
Retaining Wall/ Wing Wall stem 80 @kg per cum. 4.65 5.00

8 Top Slab-Main Carriageway 130 @kg per cum. 27.60 38.00


Top Slab-Service Road 115 @kg per cum. 9.46
Parapet wall over Box 80 @kg per cum. 1.29 2.00
9 Provision of an Reinforced cement concrete crash barrier at the edges of the road, approaches to bridge structures and medians, constructed with M-40 grade concrete with
reinforcement conforming to IRC:21 and dowel bars 25 mm dia, 450 mm long at expansion joints filled with pre-moulded asphalt filler board, keyed to the structure on which
installed as per design given in the enclosure to MOST circular No. RW/NH - 33022/1/94-DO III dated 24 June 1994 as per dimensions in the approved drawing and at location
the Engineer, all as
specified Lm
Main Carriageway (Crash barrier of main carriageway had already considered (on RE Wall portion) in schedule-B of contract agreement,
therefore the quantity has not been added here. ) Lm 0 7.40 0 0.00
Service Road Lm 2 9.27 18.53161 19.00
Retaining Wall/ Wing Wall Lm 0 0.00 0 0.00
10 Providing weep holes in abutments, wing walls, retaining walls, return walls etc. complete as per drawing and Technical Specifications Clause
2706. Nr.
Vertical outer wall (Main Carriageway) 287 287 287.00
Vertical outer wall (Service Road) 165 165 165.00
Retaining Wall/ Wing Wall 79 79 79.00
11 Drainage spouts complete as per drawing and Technical Specifications.
Nr. 4 4 4.00

12 Providing 20 mm Filler type expansion joint with premoulded


bituminous sheet such as Shaltex board Section 260 Lm 0 40.99 0 0.00
Qty. Estimated Quantity (0% extra)

0. MT

00

d with M-40 grade concrete with HYSD


, keyed to the structure on which it is built and
approved drawing and at locations directed by

ause
SI. No. Description Unit No. Length Breadth Height

13 Providing 65mm thick wearing course comprising of 40 mm Bituminous concrete overlaid with 25 mm bitumen mastic layer as per Technical Specifications Sections 500
(Wearing course had already considered in road work of schedule-B of contract agreement, therefore
the quantity has not been added here. ) sqm 0.0 35.0 7.40 0 0.00

Painting of culvert no. and span arrangement as per Technical


Specifications Clause 803 Nr.
14 For Box 2 2 2.00

Amount of base material not used due to addition of culvert at this


15
location
Backfill Main Carriageway
cum. -1 0
Backfill Service road cum. -1 0
Culvert Opening cum. -1 7.4 64.1 4.2 -1992.2
Retaining Wall/ Wing Wall stem cum. -1 0
Qty. Estimated Quantity (0% extra)

chnical Specifications Sections 500 & 2700

0 0
0 0
-1992.2 -1993
0 0
SI.No. Description Unit Quantity Rate

5.01 Earthwork in excavation of foundation for structures including pipe culverts in


cum.
all types of soil1790.00
complete as per drawings
68.93 and Technical Specification Clause 304, 3

5.02 Cement concrete in foundation/M-15 grade levelling course on Box culvert cum.
and under approach
68.00 slab etc.including
7203.64
centering and shuttering all complete as dra

5.03 Providing and laying filter medium, behind abutments, retaining wall and return
cum.wall complete
320.00
as per drawing 2603.82
and Technical Specifications Clause 2504.

5.04 Back filling behind abutments, wing walls/ retaining and return walls or
any other area with selected granular material of approved quality
complete as per drawing and Technical Specification clause 300.

Between FRL and GL cum. 0 1455.05


Between GL and founding level cum. 1370 1455.05

5.06 M-35 grade Reinforced cement concrete in Box/Portal including cum. 1301.00 8392.17
centering and shuttering but excluding reinforcement, complete as per
drawing and Technical Specifications Sections
1500 ,1700 and 2300.

5.07 HYSD TMT Fe-500 bar reinforcement for culverts, underpass, retaining walls
MT etc. complete as
161.00
per drawings and 73620.24
Technical Specifiations Section 1600.
Amount Rate as per Amount as per PWD
PWD

1,23,385.00 62.03 1,11,034.00

111034.00

4,89,848.00 6483.28 4,40,863.00

440863.00

8,33,222.00 2343.44 7,49,901.00

749901.00

- 1309.55 -
19,93,419.00 1309.55 17,94,084.00 1794084.00

1,09,18,213.00 7552.96 98,26,401.00

9826401.00

1,18,52,859.00 66258.21 1,06,67,572.00

10667572.00

0.00 23589855.00
SI.No. Description Unit Quantity Rate

5.08 Provision of an Reinforced cement concrete crash barrier at the edges of the road,
Lm approaches 19.00
to bridge structures 4003.10
and medians, constructed with M-40 grad

5.09 Providing weep holes in abutments, wing walls, retaining walls, return wallsNr.etc. complete 531.00
as per drawing and
167.94
Technical

5.1 Painting of culvert no. and span arrangement as per Technical Nr. 2.00 45.33
Specifications Clause 803

5.11 Providing and laying Floor apron complete as per drawing and cum.
Technical Specifications Clause 2500.

5.12 Providing and fixing of Guard post complete as per drawing and Technical Specification
Nr. or as directed by Engineer.

5.13 Providing cement concrete M-15 grade in cut off wall complete as per drawing
cum.
and Technical Specifications Sections 1500 &

5.14 Coonstruction of Reinforced cement concrete M 30 grade in cum.


Approach Slab including centering and shuttering but excluding

5.15 Drainage Spouts complete as per drawings and Technical Nr 4.00 507.95
Specifications

5.16 Expansion Joint Complete as per drawings and Technical Lm 0.00 310.00
Specifications Section 2600

5.16 Providing 65mm thick wearing course comprising of 40 mm Sqm 0.00 1039.00
Bituminous concrete overlaid with 25 mm bitumen mastic layer
Amount Rate as per Amount as per PWD
PWD
76,059.00 4003.10 76,059.00

76059

89,176.00 151.14 80,255.00


80255

91.00 40.80 82.00


82

- -

- -

- -

2,032.00 1193.17 4,773.00

4773

- 310.00 -

- 1039.00 -
0
161169
SI.No. Description Unit Quantity Rate

5.17 Reinforced Cement Concrete in approach slabs including reinforcement


Cumand side shuttering complete as per drawings and

5.18 Amount of subgrade not used due to addition of culvert at this location Cum -1993.00 457.15

Total Amount =
Amount Rate as per Amount as per PWD
PWD

(9,11,100.00) 457.15 (9,11,100.00)

2,54,67,204.00 Total Amount = 2,28,39,924.00