POTENTIAL FAIL

专案名稱: 过程責任:
Project Name Process Responsibility Rodeth L Marquez
型號: 關鍵日期:
Model Key Date: 5/26/2019
核心小组(Core team):



主要功能 C
項目/工序 潛在失效模式Potential 潛在失效效應Potential
Function or SEV
嚴重度 l
item/step Failure Mode Effect(s) of Failure
Requirement a
s
s

Danger to life and and health


of employees.

Harmfulness/Toxicity of Penalties from goverment


purchased materials
Harmful to environment

Purchasing
Purchasing Too high priced of purchased Loss for the company/
materials in relation to design uncompetetive product in
assumptions terms of price

Purchased materials out of Line stoppage/ Stop


stocks Production

Human Line stoppage/ Stop


Insufficient Manpower
Resources Production

Does not comply


Wrong issuance of material customer's specification
5
coming from Warehouse and may inhibit part
performance
Cannot meet the target
Lacking quantity issuance of J.O.I.S. quantity 4
material versus J.O.I.S requirements

Does not comply


customer's
Wrong loading of material to specification,may inhibit 6
Material the hopper dryer
1 part performance,
Preparation downtime in production

Insufficient drying time of Occurrence of silver streak 5


resin on the product
Partial part and does not
comply with cosmetic
Shortshot 5
requirements and may
inhibit part performance

Does not comply with


cosmetic requirements and
Blister 5
may inhibit part
performance
Uneven surface that may
Silver Streak 5
inhibit part performance

Will add another process


which is deburring or
deflashing and also high risk
Flash or Burrs 5
2 Injection of overcut in parting line,
may inhibit part
performance
Uneven surface that may
Sink marks 5
inhibit part performance

Doest not comply with


Blackspot 5
cosmetic requirements
Cracking or the product
Delamination 5
becomes brittle

No available QC personnel in Delay shipment or


QA/QC Costumer feedback
certain process
pertaining to quality
Logistic Delay shipment Low credibility of supplier

BA1-QAW-11-01A
潛在
制程失效模式與效應分析 (PFMEA)

POTENTIAL FAILURE MODE AND EFFECTS ANALYSIS

PROCESS FMEA

主管簽核:
arquez Approved By: Mr. Jiantao Wang

RPN S*O*D
現行預防 現行偵測
潛在失效原因
Potential Cause(s) Occ 發生率
过程控制 过程控制 DET探測度
of Failure Current Process controls Current Process controls
(Prevention) (Detection)

Prohibit substances used by supplier/ V


erification of Certificate of
Inspection of ICP Test results and compliance, MSDS during IQC
Prohibit substances exceed in
MSDS
threshold process
Inclusion of Price list during Inclusion of Price list during
Selection of uncompetetive supplier
selection of new supplier selection of new supplier

Monthly inventory checking vs Physical inventorry count of


Poor inventory / wrong forecasting
purchased order from costumer materials

Pull out Manpower from non


High absentism/ High Attrition rate Monitoring of daily attendance
critical process

Wrong issuance of Job Order


Instruction Slip versus the Strict implementation of
Always check the issued
customer requirement, unable to 4 proper tagging or labelling of 2 40
material versus the requirement.
identify the material type or no the material
proper label
Ensure that the weighing scale is Provide dummy or jig to verify
Not calibrated of weighing scale, calibrated, use jack pallet or
improper handling of material 4 the accuracy of weighing 2 32
trolly for transferring material
from one area to another. scale.
from one area to another

Production leader or Line


Material Loader must be well Leader conduct proper
Confusion of the Material Loader 4 oriented based on the material training and material 2 48
type. orientation to the Material
Loader

Provide Orientation to
Wrong setting of temperature, no Have visual reference of standard Material Loader about the
knowledge of the Loader base on drying temperature of resin, required drying time each
the standard dyring temperature of 3 2 30
have daily checklist on the material and give him a copy
resin Hopper of Resin Drying Temperature
and Time Guidelines
Plastics material too low,
insufficient injection capacity, the Should provide proper
bush doesn't match with the Raise barrel temperature, lighting illuminations
nozzle resulting in material too low, injection speed, injection time (Minimum of 300 Lux).
injection time too short, injection and injection pressure must be Conduct 100% Visual
speed too low, mold temperature 3 increase, raise the back pressure Checking of the machine 2 30
uneven, poor mold venting, gate or slightly, adjust mold cooling operator . And hourly
runner too small, insufficient back piping and add vents at suitable inspection of In-process QC,
pressure, plastics melt feeding position. based on AQL Level.
uneven, not enough lubricant in
plastic material

Fill speed faster or slower in


proper segment, barrel
temperatures up or down, hot Should provide proper
runner temperatures up or lighting illuminations
down, back pressure increase or
(Minimum of 300 Lux).
Tool or material is too hot,often decrease, decompression Conduct 100% Visual
caused by lacking of cooling 3 increase of decrease, if 2 30
Checking of the machine
around the tool or faulty heater applicable, valve gate firing operator . And hourly
positions advance or delay, inspection of In-process QC,
correct mold polish if dull, clean based on AQL Level.
the mold surface if resin or
volatiles are represent, and open
the vents as needed.
Should provide proper
Moisture in the material, usually Masterbatch isn't mixing lighting illuminations
when hygroscopic resins are dried properly, or the material has run (Minimum of 300 Lux).
improperly, air trapped in out and it's starting to come Conduct 100% Visual
plasticizing barrel, improper flow 3 2 30
through as natural only. Previous Checking of the machine
of melt in mold cavity, plastic colored material "dragging" in operator . And hourly
material temperature or mold nozzle or check valve. inspection of In-process QC,
temperature too high based on AQL Level.

Always check the the type of Should provide proper


Tool damage, too much injection resin during drying process and lighting illuminations
pressure and injection speed,
see the reference of standard (Minimum of 300 Lux).
insufficient mold agent release, dyring parameter of resin, Conduct 100% Visual
overpacking, plastic material too 3 2 30
increase back pressure, reduce Checking of the machine
high, insufficient mold clamping rear stage injection machine in operator . And hourly
pressure and poor parting line or order to avoid insufficient inspection of In-process QC,
mating surface clamping force based on AQL Level.
Should provide proper
lighting illuminations
Holding time/pressure too low, Increase the set value of holding (Minimum of 300 Lux).
cooling time too short, with pressure, holding speed and Conduct 100% Visual
sprueless hot runners this can also 3 cooling time and check the 2 30
Checking of the machine
be caused by the gate temperature setting temperature of hot operator . And hourly
being set too high runner inspection of In-process QC,
based on AQL Level.

Should provide proper


Burnt marks produced during Dismantle the barrel for lighting illuminations
injecting, material overheated and cleaning. Reduce the material (Minimum of 300 Lux).
adhered to barrel wall, material temperature, decrease the Conduct 100% Visual
3 2 30
contains foreign matter such as heating time, check the material Checking of the machine
paper, overheated stagnant dead before loading to the hopper, operator . And hourly
area in barrel slightly reduce inspection of In-process QC,
based on AQL Level.
Should provide proper
Contamination of the material e.g. lighting illuminations
PP mixed with ABS, very dangerous Proper segregation of material (Minimum of 300 Lux).
if the part is being used for a safety type during disposal and clean Conduct 100% Visual
critical application as the material 3 2 30
thoroughly the crasher machine Checking of the machine
has very little strength when before using operator . And hourly
delaminated as the materials inspection of In-process QC,
cannot bond based on AQL Level.

Per area assignment of QC Matrix table of skills per


Imbalance skill level personnel individual
Regular maintenance of delivery
No available delivery truck to use Scheduling of deliveries
truck
FMEA 編號:
FMEA Number:
FP
頁碼(Page) of
編制者:
r. Jiantao Wang Prepared By:

FMEA編制日期
FMEA Date(Orig.)
FMEA修訂日期
FMEA Date(Rev.)
措施執行結果
Action Results
建議改進措施 負責人/完成日期
Action(s) Responsibility
Recommended & Target Completion 採取措施/

OCC
DET

RPN
SEV

Date Actions Taken&


Completion Date

Revision of Purchasing
management which include PCO
compliance of suppliers to Purchasing
EU regulatives for QA/QC
hazardous substances.
Provide list of approved Purchasing
suppliers

Warehouse leader
and Purchasing
incharge

1. Conduct counselling for


operators with high
abestism rate.

2. Conduct cross training


HR Personnel
for critical processes

3. Recognition on
employees with best
performance

Location Map of the Raw


Materials should always Warehouse Leader
be implemented. Ensure Material Loader 1/10/19 3 2 2 12
accuracy of tagging and Logistic Staf
labeling.
Quantity of materials
need on J.O.I.S are
properly reviewed to Warehouse Leader
avoid shortage. Ensure Material Loader 1/10/19 3 2 2 12
the accuracy of the Logistic Staf
weighing scale as well
the calibration status.

Shall update the Material


description of product
running attached on the Warehouse Leader
hopper. And always Material Loader 1/10/19 3 2 2 12
visible and seen by the Logistic Staf
loader during loading of
materials.

Posting of Resin Drying


Temperature Guidelines
in the visible location of
working area. Regular Warehouse Leader
orientation on the Material Loader 1/10/19 3 2 2 12
materials requirements Logistic Staf
and specification should
be conducted to Material
Loader.
Machine Operators
should be properly
oriented on Short Shot
defects of the items. Shall Injection
conduct orientation to Technician, In-
the assigned operator process QC, Team 1/10/19 3 2 2 12
before the mass Leader and
production to understand Operators
the criticality, locations
and disposition needed
once found the defect.

Machine Operators
should be properly Injection
oriented on Blister Technician, In-
defects of the items. Shall process QC, Team 1/10/19 3 2 2 12
conduct orientation to Leader and
the assigned operator Operators
before the mass
production.
Machine Operators
should be properly
oriented on Silver Streak
defects of the items. Shall Injection
conduct orientation to Technician, In-
the assigned operator process QC, Team 1/10/19 3 2 2 12
before the mass Leader and
production to understand Operators
the criticality, locations
and disposition needed
once found the defect.

Machine Operators
should be properly
oriented on Flush or
Burrs defects of the Injection
items. Shall conduct Technician, In-
orientation to the process QC, Team 1/10/19 3 2 2 12
assigned operator before Leader and
the mass production to Operators
understand the criticality,
locations and correction
needed once found the
defect.
Machine Operators
should be properly
oriented on Sink Marks
defects of the items. Shall Injection
conduct orientation to Technician, In-
the assigned operator process QC, Team 1/10/19 3 2 2 12
before the mass Leader and
production to understand Operators
the criticality, locations
and disposition needed
once found the defect.

Machine Operators
should be properly
oriented on Black Spot
defects of the items. Shall Injection
conduct orientation to Technician, In-
the assigned operator process QC, Team 1/10/19 3 2 2 12
before the mass Leader and
production to understand Operators
the criticality, locations
and disposition needed
once found the defect.
Machine Operators
should be properly
oriented on
Delaminations defects of
Injection
the items. Shall conduct Technician, In-
orientation to the process QC, Team 1/10/19 3 2 2 12
assigned operator before Leader and
the mass production to Operators
understand the criticality,
locations and disposition
needed once found the
defect.

All QC personnel reach


atleast 90% of skill level
Find back up delivery truck
in case assigned truck is
not available