Republic of the Philippines

DEPARTMENT OF LABOR AND EMPLOYMENT


Bureau of Working Conditions
Republic of the Philippines
DEPARTMENT OF LABOR AND EMPLOYMENT
Bureau of Working Conditions
 COVERAGE
 EQUIPMENTS
 TYPES OF PERMITS
 ADMINISTRATIVE REQUIREMENTS
 PROCEDURES/PROCESS
 DESIGN CALCULATIONS
 SCHEDULE OF FEES
a. Industrial enterprise engaged in any
manufacturing of goods or products processing;
b. Agricultural enterprise engaged in forestry
and logging operations, farming, etc.;
c. Oil refineries including its depots, warehouses
and bodegas;
d. Steam, gas and other electrical generating plants
including its maintenance and repair shops; and
e. Construction Sites – ONLY if the construction
project is built for industrial use
TEN (10) Chartered Cities:
a. Manila City f. Iloilo City
b. Quezon City g. Bacolod City
c. Caloocan City h. Cebu City
d. Pasay City i. Mandaue City
e. Batangas City j. Davao City
MECH’L/ELEC’L EQUIPMENT
 Internal Combustion Engine (Genset)
 Boilers
 Pressure Vessels
 Elevators (Manlift, Dumbwaiters, etc.)
 Cranes & Hoists
 Power Piping Lines
 Turbines
• Electrical wiring installation
TYPES OF PERMITS ISSUED

Permit to fabricate
Permit to install
Permit to operate
ADMINISTRATIVE REQUIREMENTS
1. Covering / Transmittal Letter;
2. Application form & drawing for each unit of
mechanical equipment, signed and sealed by a
PME/PEE, signed by the owner/manager or his/her
authorized representative, the company’s TIN;
3. Two sets of CD/USB containing the application and
plans in PDF;
4. Photocopy of PRC ID & PTR of the PME/PEE; and
5. Certificate of appearance of the PME (BWC, RD or
ARD)
ADMINISTRATIVE REQUIREMENTS

The following shall be incorporated in the


plans/drawings:
a. Location plan;
b. Room layout;
c. Installation drawings of equipment showing plan,
section/elevations.
d. Foundation design calculation;
e. Detailed foundation construction drawings; and
f. Equipment specifications.
PROCEDURES/PROCESS
Pre-fabrication and pre-installation requirements
1. Apply for Clearance of mechanical/electrical design
for fabrication or installation to the nearest RO or BWC
with authorized PME/PEE;
2. The processor (LI) will check and evaluate all
documents submitted;
3. Result of evaluation will be communicated. (Outright
at the receiving table or written communication if
application was received thru mail)
PROCEDURES/PROCESS
4. Complete application will be stamp “CLEARED” by
the PME/PEE assigned and will sent back to RO for TSI;

5. The RO will conduct the TSI and issue the


corresponding Notice of payment; and

6. RO to prepare the Permit To Operate/ Certificate of


Electrical Installation after submission of proof of
payment from the LGU.
PROCEDURES/PROCESS
Fabrication requirements (Boilers & PV)
 LI shall check material inspection (confirmation with
ASME Code or PME Code or PE Code for material
requirements) welding procedures/ dimensional &
visual examination review of design calculation.
Installation requirements
 LI will request the client to conduct the necessary and
appropriate testing whether hydrostatic test or NDT on
boiler and pressure vessel or load test on elevator,
crane, hoist or insulation resistance or megger test for
electrical installation.
DESIGN CALCULATIONS
BOILER/PRESSURE VESSEL FABRICATION
Design Pressure, P (lbs/in²)
Allowable Stress, Sa (lbs/in²)
Tensile Stress, St (lbs/in²)
Inside Diameter, D (in)
Radius, R (in)
Shell Joint Efficiency, E (%)
Head Joint Efficiency, e (%)
Corrosion Allowance, C.A (in)
Thinning Allowance, T.A. (in)
DESIGN CALCULATIONS
1. Shell Thickness, ts
PR
ts = + C.A.
Sa(E) – 0.6P

2. Head Thickness, th
PD
th = + C.A. + T.A.
2 (Sa) (e) – 0.2 (P)
DESIGN CALCULATIONS
3. Bursting Pressure, bp
2 (St) (ts)
bp =
D + ts

4. Factor of Safety, FS
Bursting Pressure
FS =
Design Pressure
DESIGN CALCULATIONS
FOUNDATION DESIGN CALCULATION
for Genset:
Engine Stroke, (m)
Engine Speed, N (rpm)
Weight, We (kgs)
No. of Cylinders
Actual Length, L (m)
Actual Width, W (m)
Actual Depth, D (m)
DESIGN CALCULATIONS
1. Minimum required weight of foundation to absorb
vibration, Wf (kgs)
Wf = We x e x sq. root of N
2. Depth of Foundation (Df)
Df = 3.2 to 4.2 times the engine stroke
3. Area of Foundation, Af (sq.m)
Af = L x W
4. Volume of Foundation, Vf (cu. m)
Vf = L x W x D
DESIGN CALCULATIONS
5. Actual Weight of Foundation, Wf’ (kgs)
Wf’ = Vf x Dc
6. Density of Concrete Mixture for 1:2:4
Dc = 2,406 kgs/m³
Note: Wf’ > Wf
7. Total Bearing Load, TBL (kgs)
TBL = We + Wf’
8. Soil Bearing Load (SBL)
SBL = TBL / Af
DESIGN CALCULATIONS
9. Allowable Soil Bearing Capacity in the locality
where the engine is to be installed
ASBP = 12,225 kgs/m²
10. Factor of Safety of the concrete foundation shall be
at least five (5)
FS = ASBP/ SBL
SCHEDULE OF FEES

Based on the Implementing Rules and


Regulations of the National Building Code of the
Philippines (PD 1096)
Republic of the Philippines
DEPARTMENT OF LABOR AND EMPLOYMENT
Bureau of Working Conditions