Beruflich Dokumente
Kultur Dokumente
Commission Determined Tariff Commission Determined Free as per GoK order. (In
FC per HP Nil
(CDT) Tariff (CDT) case, GoK do not release the
subsidy CDT shall be
8 LT-4(a) IP Sets – 10 HP & Below
collected from the
334 Ps per KWH 334 Ps per KWH 370 Ps per KWH 370 consumers) Change in
CDT 36 Ps Increase
FC per KW Rs.50/-
16 LT-6 ( c)
Electric Vehicle Charging
DC per KVA Rs.180/-
Newly Introduced
Stations EC per KWH Tariff
485 Ps
(For both LT & HT)
Less than 67 HP Weekly Less than 67 HP Weekly
Temporary Power Supply for all Rs.190/- Rs.200 Weekly Min: Rs.10/- Increased
17 LT-7(a) Min.per.KW Min.per.KW
purposes
EC per KWH 1000 Ps EC per KWH 1030 Ps E.C: 30 Ps Increased
Hoarding & Adveristment Fixed charges per month per Fixed charges per month
Rs.60/- Rs.75 per KW Rs.15/- Increased
18 LT-7(b) :Power Supply on permanent KW per KW
connection basis
EC per KWH 1000 Ps EC per KWH 1030 Ps E.C: : 30 Ps Increased
HIGH TENSION SUPPLY
DC per KVA Rs.200/- DC per KVA Rs.200 No Increase
19 HT-1 HT Water Supply
EC per KWH 485 Ps EC per KWH 500 Ps 15 Ps Increased
Demand Charges (DC) per Demand Charges (DC)
Rs.210/- Rs.210 No Increase
HT Industrial: Applicable to KVA per KVA
Areas under Bruhat Bangalore Consumption Energy Charges Consumption Energy
20 HT-2(a)(i)
Mahanagara Palike and (EC) Charges (EC)
Municipal Corporations. 0 to 1 Lakh KWH 665 Ps 0 to 1 Lakh KWH 690 Ps 25 Ps Increased
Above 1 Lakh KWH 695 Ps Above 1 Lakh KWH 720 Ps 25 Ps Increased
Applicable to Bangalore Demand Charges (DC) per Rs.210/- Demand Charges (DC) Rs.210 No Increase
21 HT-2(a)(i) Metropolitan Railway KVA per KVA
Consumption Energy Charges Consumption Energy
Corporation Ltd. (BMRCL). 600 Ps 500 Ps 100 Ps Decrease
(EC) Charges (EC)
Demand Charges (DC) per Demand Charges (DC)
Rs.210/- Rs.210/- No Increase
22 HT-2(a)(i) Railway Traction KVA per KVA
Consumption Energy Charges Consumption Energy
620 Ps 600 Ps 20 Ps Decreased
(EC) per KWH Charges (EC) per KWH
Demand Charges (DC) per Demand Charges (DC)
Rs.210/- Rs.210/- No Increase
KVA per KVA
23 HT-2(a)(i) Effluent Treatment Plants
Consumption Energy Charges Consumption Energy
620 Ps 640 Ps 20 Ps Increase
(EC) per KWH Charges (EC) per KWH
Demand Charges (DC) per Demand Charges (DC)
Rs.200/- Rs.200 No Increase
KVA per KVA
HT Industrial: Applicable to
Consumption Energy Charges Consumption Energy
24 HT-2(a)(ii) Areas other than those covered
(EC) Charges (EC)
under HT-2(a)(i)
0 to 1 Lakh KWH 660 Ps 0 to 1 Lakh KWH 680 Ps 20 Ps Increased
Above 1 Lakh KWH 680 Ps Above 1 Lakh KWH 700 Ps 20 Ps Increased
Demand Charges (DC) per Demand Charges (DC)
Rs.230/- Rs.230 No Increase
HT Commercial Arears under KVA per KVA
Bruhat Bangalore Mahanagara Consumption Energy Charges Consumption Energy
25 HT-2(b)(i)
Palike and Municipal (EC) Charges (EC)
Corporations. 0 to 2 Lakhs KWH 845 Ps 0 to 2 Lakhs KWH 870 Ps 25 Ps Increased
Above 2 Lakhs KWH 855 Ps Above 2 Lakhs KWH 880 Ps 25 Ps Increased
HT Lift Irrigation Schemes under 225 Ps subject to Min. 250 Ps subject to Min. EC ; 25 Ps Increased
EC per KWH and Annual EC per KWH and Annual
29 HT-3 (a)(i) Government of Rs. 1240/- per HP per of Rs. 1360/- per HP per Rs.120/- increase in Annual
Minimum Minimum
Depts./Corporations. annum annum Minimum Charges
HT Res. Apartments Applicable DC per KVA Rs 120/- DC per KVA Rs.120 No Increase
33 HT-4
to all areas
EC per KWH 620 Ps EC per KWH 645 Ps 25 Ps Increased
Note: In respect of HT installation (where ever applicable) the existing demand charges levied at 75% on the
contract demand (Billing Demand) has been enhanced to 85%
Increase(+)/reduction(-) in Increase(+)/reduction(-) in
Time of day energy charges over the normal Time of day energy charges over the
tariff applicable normal tariff applicable
06.00Hrs to 10.00Hrs (+)100 paise per Unit 06.00Hrs to 10.00Hrs (+)100 paise per Unit
10.00Hrs to18.00Hrs 0 10.00Hrs to18.00Hrs 0
18.00Hrs to 22.00Hrs (+)100 paise per unit 18.00Hrs to 22.00Hrs (+)100 paise per unit
22.00Hrs to 06.00Hrs (-)100 paise per unit 22.00Hrs to 06.00Hrs (-)100 paise per unit