Beruflich Dokumente
Kultur Dokumente
CONSTRUCTION DRAWINGS
15 APRIL 2019
CONSTRUCTION
DRAWINGS
P1 P2 P3 P4 P5 P6 P7 P8 P9
HIGH POINT
HIGH POINT
PA
DR
15
16
(NV)
STAIR
E
N LIN
UP FR 6TH
FLR LVL
26
S.04
CATIO
RWO
17
20 LOW POINT
FFL+149.70
PB
EMAR
M&E - FAN
(OPEN TO SKY)
SIT D
FAD SUMMIT
TEAD
PET /
LOW POINT
FFL+149.70
RWO
SUMMIT
HIGH POINT
HIGH POINT (OPEN TO SKY. NOT TO BE ENCLOSED OR ROOFED OVER)
(NOT ACCESSIBLE EXCEPT FOR MAINTENANCE ONLY)
(NV)
RWO
PC
STAIR LOW POINT
FFL+149.70
S.03
PD
13 10 5 1
FFL+150.05
14 20 25 26
HIGH POINT
UP FR 6TH SUMMIT
1 2 FAD FLR LVL
FL.02 LOW POINT
FFL+149.70
LPD
RWO
E FIRE LIFT
EXISTING R.C. FLAT ROOF M&E-FAN
(OPEN TO SKY)
LOBBY
(MV)
DR
D
(OPEN TO SKY. NOT TO BE ENCLOSED OR ROOFED OVER) RC FLAT ROOF
(NOT ACCESSIBLE EXCEPT FOR MAINTENANCE ONLY) FL.03 OVER LIFTS
(OPEN TO SKY)
PE
VOID
LOW POINT LOW POINT LOW POINT LOW POINT
FFL+149.70 FFL+149.70 FFL+149.70 FFL+149.70
C
HIGH POINT
RC ROOF
DR
(OPEN TO SKY) PF
RC ROOF (OPEN TO SKY)
STAIR HIGH POINT
S.05
HIGH POINT 25
20
4
15
10 13
12 UP FR 6TH
FLR LVL
architects llp
CONSTRUCTION
DRAWINGS
1 2
RWO SUMMIT
RWO RWO RWO
B
M&E
(OPEN TO
LPD SKY)
A
BIPV SHELTER PLAN
SCALE 1:100
DR
1
(NV)
architects llp
CONSTRUCTION
DRAWINGS
1 2 1 2
E E
D D
C C
B B
A A
architects llp
CONSTRUCTION
DRAWINGS
1 2
SECTION A-A
SCALE 1:80
A B C D E
SECTION B-B
SCALE 1:80
architects llp
CONSTRUCTION
DRAWINGS
A B C D E
ELEVATION 1
SCALE 1:80
1 2
ELEVATION 2
SCALE 1:80
architects llp
CONSTRUCTION
DRAWINGS
E D C B A
ELEVATION 3
SCALE 1:80
2 1
ELEVATION 4
SCALE 1:80
architects llp