Max. Low.
Labours Hour Company Company
Productivity Rate productivity per
Activity Type UNIT Rate Standard Standard
(Unit/Man/Hour) day (AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Low.
Max. Company
Labours Company Standard
Productivity Rate Hour
Activity Type UNIT Rate Standard Remarks
(Unit/Man/Hour) (AED/Hour) Labour Rate Labour
Rate
(AED/Unit) (AED/Unit)
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour) (AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Plywood &
Cup Lock Paschal Doka Peri Aluma Miva
System Productivity Productivit Productivity Productivit Productivit
Activity Type Scope of Work UNIT Productivit Rate y Rate Rate y Rate y Rate
y Rate (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man
(Unit/Man/ Hour) Hour) Hour) Hour) /Hour)
Hour)
Shutter Fabricating,
Fixing, Applying of Oil
Grouns slab Shutter Shutter, Scaffolding is m² 0.35 0.50
Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Steps Shutter Shutter, Scaffolding is m² 0.35 0.50
Erected by others for
casting
Nominal Productivity Rate Table
Operations Department Shuttering Works
Plywood &
Cup Lock Paschal Doka Peri Aluma Miva
System Productivity Productivit Productivity Productivit Productivit
Activity Type Scope of Work UNIT Productivit Rate y Rate Rate y Rate y Rate
y Rate (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man
(Unit/Man/ Hour) Hour) Hour) Hour) /Hour)
Hour)
Shutter Fabricating,
Fixing, Applying of Oil
Normal Stair Case Shutter Shutter, Scaffolding is m² 0.63 0.90
Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Decorative Stair Case Shutter, Scaffolding is m² 0.35 0.50
Erected by others for
casting
Nominal Productivity Rate Table
Operations Department Shuttering Works
Plywood &
Cup Lock Paschal Doka Peri Aluma Miva
System Productivity Productivit Productivity Productivit Productivit
Activity Type Scope of Work UNIT Productivit Rate y Rate Rate y Rate y Rate
y Rate (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man
(Unit/Man/ Hour) Hour) Hour) Hour) /Hour)
Hour)
Shutter Fabricating,
Retaining Walls Shutter (Single Side) Fixing, Applying of Oil
Shutter, Scaffolding is m² 0.63 0.90
up to 3.5m Height Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Shutter, Scaffolding is
Retaining Walls Shutter (Single Erected by others for m² 0.63 0.90
Side)More Than 3.5 3m Height casting, plat forms
used to work at
heigher Level is
produced by Others
Nominal Productivity Rate Table
Operations Department Shuttering Works
Plywood &
Cup Lock Paschal Doka Peri Aluma Miva
System Productivity Productivit Productivity Productivit Productivit
Activity Type Scope of Work UNIT Productivit Rate y Rate Rate y Rate y Rate
y Rate (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man
(Unit/Man/ Hour) Hour) Hour) Hour) /Hour)
Hour)
Shutter Fabricating,
Retaining Walls Shutter (Double Side) Fixing, Applying of Oil
Shutter, Scaffolding is m² 0.63 0.90
up to 3.5m Height Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Shutter, Scaffolding is
Retaining Walls Shutter (Double)More Erected by others for m² 0.63 0.90
Than 3.5 3m Height casting, plat forms
used to work at
heigher Level is
produced by Others
Nominal Productivity Rate Table
Operations Department Shuttering Works
Plywood &
Cup Lock Paschal Doka Peri Aluma Miva
System Productivity Productivit Productivity Productivit Productivit
Activity Type Scope of Work UNIT Productivit Rate y Rate Rate y Rate y Rate
y Rate (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man/ (Unit/Man
(Unit/Man/ Hour) Hour) Hour) Hour) /Hour)
Hour)
Shutter Fabricating,
Fixing, Applying of Oil
Shutter, Scaffolding is
Columns Shutter (Less Than 40X40) up Erected by others for m² 0.63 0.90
to 3.5m Height casting, plat forms
used to work at
heigher Level is
produced by Others
Nominal Productivity Rate Table
Shutter Fabricating,
Fixing, Applying of Oil
Slab shutter More Than 3.5m Height (More Shutter, Scaffolding is
Than 0.4m Slab m² 0.16 0.23
Erected by others for
Thickness) casting
Shutter Fabricating,
Fixing, Applying of Oil
Slab Side Shutter Shutter, Scaffolding is m² 0.63 0.90
Erected by others for
casting
Shutter Fabricating,
Fixing, Applying of Oil
Shutter, Scaffolding is
Deshuttering Works m² 3.50 5.04
Erected by others for
casting
Nominal Productivity Rate Table
0.56 0.39
0.83 0.58
0.50 0.35
0.77 0.54
0.40 0.28
0.59 0.41
0.33 0.23
0.50 0.35
0.29 0.20
0.42 0.29
0.25 0.18
0.17 0.12
0.14 0.10
0.13 0.09
0.07 0.05
0.06 0.04
0.05 0.04
0.04 0.03
0.04 0.03
0.03 0.02
0.03 0.02
0.20 0.14
0.13 0.09
0.09 0.06
0.06 0.05
0.05 0.04
0.03 0.02
Nominal Productivity Rate Table
Operations Department Tiling Works
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT productivivty per day Rate Standard Standard
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Floor Tiling (Normal)
20X20 m² 0.7 5.6 10 14.29 10.00
Any Size (Areas Less Than 5 m2) m² 0.35 2.8 10 28.57 20.00
25X25 m² 0.75 6 10 13.33 9.33
30X30 m² 0.8 6.4 10 12.50 8.75
40X40 m² 0.85 6.8 10 11.76 8.24
50X50 m² 0.9 7.2 10 11.11 7.78
60X60 m² 0.95 7.6 10 10.53 7.37
Floor Tiling (45 Degree) 0
20X20 m² 0.55 4.4 10 18.18 12.73
Any Size (Areas Less Than 5 m2) m² 0.3 2.4 10 33.33 23.33
25X25 m² 0.6 4.8 10 16.67 11.67
30X30 m² 0.65 5.2 10 15.38 10.77
40X40 m² 0.7 5.6 10 14.29 10.00
50X50 m² 0.75 6 10 13.33 9.33
60X60 m² 0.8 6.4 10 12.50 8.75
Wall Tiling 0
20X20 m² 0.6 4.8 10 16.67 11.67
Any Size (Areas Less Than 10 m2) m² 0.3 2.4 10 33.33 23.33
25X40 m² 0.65 5.2 10 15.38 10.77
30X45 m² 0.7 5.6 10 14.29 10.00
20X50 m² 0.75 6 10 13.33 9.33
30X60 m² 0.8 6.4 10 12.50 8.75
Wall Tiling (45 Degree) 0
20X20 m² 0.5 4 10 20.00 14.00
Any Size (Areas Less Than 10 m2) m² 0.25 2 10 40.00 28.00
25X40 m² 0.55 4.4 10 18.18 12.73
30X45 m² 0.6 4.8 10 16.67 11.67
20X50 m² 0.65 5.2 10 15.38 10.77
30X60 m² 0.65 5.2 10 15.38 10.77
Remarks
14.28571
Trojan Holding Nominal Productivity Rate Table
Operations Department Tiling Works
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Skirting Works
20CM Lm 2 10 5.00 3.50
30CM Lm 2.5 10 4.00 2.80
40CM Lm 3 10 3.33 2.33
50CM Lm 3.5 10 2.86 2.00
60CM Lm 4 10 2.50 1.75
Max.
Labours Hour Company Low. Company
Productivity Rate
Activity Type UNIT productivity per day Rate Standard Standard Labour Rate
(Unit/Man/Hour)
(AED/Hour) Labour Rate (AED/Unit)
(AED/Unit)
Ceiling
Primar Application ( Normal Ceiling) m² 20 160 10 0.50 0.35
Grooves Preperation in the Ceiling Lm 5 40 10 2.00 1.40
Grooves Stucoo every coat Lm 5 40 10 2.00 1.40
Putty Application ( Single Coat) m² 10 80 10 1.00 0.70
Putty Application ( Two Coat) m² 5 40 10 2.00 1.40
Sanding for Second Coat Only m² 10 80 10 1.00 0.70
Painting First Coat m² 20 160 10 0.50 0.35
Touchup Beefore Final Coat m² 25 200 10 0.40 0.28
Painting Final Coat m² 16 128 10 0.63 0.44
Internal Walls 0
Primar Application m² 25 200 10 0.40 0.28
Putty Application ( Single Coat) m² 12 96 10 0.83 0.58
Putty Application ( Two Coat) m² 6 48 10 1.67 1.17
Sanding for Second Coat Only m² 12 96 10 0.83 0.58
Touch up Before Final Coat m² 30 240 10 0.33 0.23
Painting First Coat m² 25 200 10 0.40 0.28
Painting Final Coat m² 20 160 10 0.50 0.35
0
External Paint 0
Primar Application m² 40 320 10 0.25 0.18
GRC and Decorative Items (in each coat) Lm 10 80 10 1.00 0.70
Texture Coating (Spray) m² 12.5 100 10 0.80 0.56
Weather Proof Paint Application Per Coat m² 25 200 10 0.40 0.28
0
Scaffolding Works m² 4 32 10 2.50 1.75
Logistics Works m² 10 80 10 1.00 0.70
Remarks
0.4 0.32
Nominal Productivity Rate Table
Operations Department Block Works
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Solid Block 4",6", 8" (Up to 1.5m Height) m² 0.6 10 16.67 11.67
Solid Block 4",6", 8" (From 1.5m to 3m Height) m² 0.4 10 25.00 17.50
Hollow Block 4",6", 8" (Up to 1.5m Height) m² 0.7 10 14.29 10.00
Hollow Block 4",6", 8" (From 1.5m to 3m Height) m² 0.5 10 20.00 14.00
Light Weight Block with Glue m² 1 10 10.00 7.00
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Curing for Plaster Works (Per once Per Day) m² 100 10 0.10 0.07
Nominal Productivity Rate Table
Operations Department Survey Works
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Ceiling Joints Between Hollow Core Lm 10 11 1.10 0.77
Walls Joints Between Panels Lm 15 11 0.73 0.51
Cutting for MEP Works in Block Works Lm 5 11 2.20 1.54
Repairing works in Block Works Lm 10 11 1.10 0.77
Coring Works Nos 3 11 3.67 2.57
Angle Fillet in Roof and Wet Aeas Lm 10 11 1.10 0.77
Fixing of Manholes Cover (Any Size) Nos 0.2 11 55.00 38.50
Nominal Productivity Rate Table
Operations Department Electrical Works
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Fixing of Sleeves in Walls Nos 3 14 4.67 3.27
Under Ground Conduiting Pts 3 14 4.67 3.27
Conduiting in Slabs Pts 3 14 4.67 3.27
Electrical First Fix in Walls (Block Works) Pts 3 14 4.67 3.27
Electrical First Fix in Walls ( Precast) Pts 2 14 7.00 4.90
Coring works Pts 3 14 4.67 3.27
Conduiting in Slabs ( Topping Works) Pts 2 14 7.00 4.90
DB First Fix Box 0.25 14 56.00 39.20
DB First Fix ( Precast) Box 0.25 14 56.00 39.20
Conduiting works in Corridors ( up to 10 Lm to DB ) Room 1 14 14.00 9.80
Conduiting works in Corridors (more than 10 Lm to DB ) Room 0.5 14 28.00 19.60
Wiring for Lighting Circuit Pts 0.5 14 28.00 19.60
Wiring for Power Circuit Pts 0.5 14 28.00 19.60
Wiring for Data Circuit Pts 0.5 14 28.00 19.60
Wiring from Rooms to DB in corridors (up to 10 Lm to DB ) Room 0.5 14 28.00 19.60
Wiring from Rooms to DB in corridors (More Than 10 Lm to D Room 0.5 14 28.00 19.60
Fixing of Lighting Fixtures Nos 2 14 7.00 4.90
Fixing of Face Plates (switches, Sockets,..etc) Nos 3 14 4.67 3.27
Fixing of Lighting Fixtures with threaded rods Nos 1 14 14.00 9.80
Fixing of Spot Lights Nos 2 14 7.00 4.90
Fixing of Cable Trays Lm 3 14 4.67 3.27
DB Dressing and Termination (16 Circuit Breaker DB) CB 2 14 7.00 4.90
ONU Cable Termination Nos 0.25 14 56.00 39.20
Cables Pulling from external to DB and Between DB`s DB 0.15 14 93.33 65.33
Fixing of Exhaust Fans Nos 0.5 14 28.00 19.60
SMDB Cable Glanding CB 0.25 14 56.00 39.20
Nominal Productivity Rate Table
Operations Department Drainage Works
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Fixing of Sleeves and Main Inlet Nos 3 14 4.67 3.27
UnderGround Inlets ( First Fix) Pts 1 14 14.00 9.80
PPR Piping Works Hot and Cols Pts 1 14 14.00 9.80
Insulation Works For Pipes ( For Hot Water Pts 2 14 7.00 4.90
Fixing of Horizontal Piping to Main
Connection (With Suspension Pts 0.25 14 56.00 39.20
Works)
Fixing of Angle Valves Nos 3 14 4.67 3.27
Fixing of Gate Valves with Final Connection Nos 1 14 14.00 9.80
Fixing of Shower, Mixer , ...etc. Pts 1 14 14.00 9.80
Testing of Network Pts 1 14 14.00 9.80
Fixing of Electrical Water Heater Nos 0.25 14 56.00 39.20
Fixing of Solar Heating System System 0.02 14 700.00 490.00
Fixing of Water Tank with Main Connection Nos 0.1 14 140.00 98.00
Nominal Productivity Rate Table
Operations Department AC Works
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Coring in Walls for Main Connection Nos 3 14 4.67 3.27
Fixing of Indoor Units With Copper Pipes Connection Nos 0.5 14 28.00 19.60
Fixing the Copper Pipes Supply and Return Lm 4 14 3.50 2.45
Insulation works for Copper Pipes Lm 4 14 3.50 2.45
Suspension Works For Copper Pipes Lm 4 14 3.50 2.45
Installation of Out Door Unit ( up to 2Tons Unit) Nos 0.5 14 28.00 19.60
Installation of Out Door Unit ( Package up to 20 Tons) Nos 0.03 14 466.67 326.67
Pipes Tray and Protection for on Roof Copper Pipes Lm 1 14 14.00 9.80
Nominal Productivity Rate Table
External MEP Works
Operations Department
Max. Low.
Labours Hour Company Company
Productivity Rate
Activity Type UNIT Rate Standard Standard Remarks
(Unit/Man/Hour)
(AED/Hour) Labour Rate Labour Rate
(AED/Unit) (AED/Unit)
Pipes Laying Between Manholes (UPVC) Lm 3 14 4.67 3.27
Cables Laying in Ground Lm 0.25 14 56.00 39.20
Cables Pulling in Manholes Lm 0.1 14 140.00 98.00