Sie sind auf Seite 1von 58

Method of Procedure for

MOP of Activation Carrier Aggregation


in SRAN 18SP
Nokia - 2018
Revision Record

Date Revised Version Change description Author


Table of Contents
1. EXECUTIVE SUMMARY.............................................................................................................................4
2. BACKGROUND AND OBJECTIVES..............................................................................................................7
3. SCOPE OF WORK......................................................................................................................................8

3.1 Wiring connection for HDMI cable and OBSAI cable and synchronization delay set in BTS :.........9

3.2 Rules of WCDMA – LTE optic cable for RF Sharing........................................................12


3.3 Updating Synchronization Delay Value BTS...................................................................12
3.4 Carrier Aggregation SRIO Connection (IM sync) for 3xFSMF.........................................14
4. DETAIL TIME TABLE OF OVERALL ACTIVITY............................................................................................16
5. Setup Carrier Aggregation technology SRAN - SRAT L2100 - SRAT U2100............................................17
6. Activating Carrier Aggregation SRAN - SRAT L2100 - SRAT U2100.........................................................27
7. Setup Carrier Aggregation technology SRAN 1 – SRAN 2......................................................................30
8. Activating Carrier Aggregation SRAN1 – SRAN2....................................................................................39
9. Setup Carrier Aggregation technology SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100...............42
10. Activating Carrier Aggregation SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100...........................51
11. SERVICE AND AREA IMPACT...................................................................................................................54
12. TESTING AND VERIFICATION..................................................................................................................55
13. ROLLBACK OPERATION...........................................................................................................................56
14. PERSON IN CHARGE...............................................................................................................................57
15. SUPPORTING DOCUMENTS...................................................................................................................58
1. EXECUTIVE SUMMARY

The purpose of this document is to demonstrate the step-by-step procedure of Carrier


Aggregation in SW SRAN18SP in Indosat network.

 The BTS configuration required to Carrier Aggregation_under 4G overlay project


activation are:

o Config 3A (xx3)
o Config 3C (3)
o Config 3A (2)

 Guideline and rules Carrier aggregation:

Before the implementation, please do the following :

1. Verify the software BTS :

SRAN : SBTS18SP_FSM3_0000_000377_000109
L2100 : FL18SP_ENB_0000_000699_000000
U2100 : wbts18_1000_0316_16

2. SRAN (FSMF master) is always act as Sync Master for both CA with SRAT/SRAN
Incase SRAN – SRAN, sync master is using SRAN with 2xFSMF.
FSMF master in SRAN is use as transmission point BTS.

3. Upload and Running SCF sequence, starting from FSMF master SRAN use as sync
Master, than continue to other FSMF in SRAN or SRAT

4. Make sure the sync HDMI cable (FTSF) is already installed properly in FSMF_1,
FSMF_2 (SRAN1), also FSMF_1 other SRAN or SRAT
To verify HDMI cable sync connection, please make test using BTS site manager
Synchronization  Synchronization source : 1pps/ToD from Sync Hub Master BTS

5. Make sure the SFP FOSH installed is able to transmit 6 Gbps


6. Make sure the optical cable SRIO is already installed properly in SRIO port FSMF_1,
FSMF_2 (SRAN1), also FSMF_1 other SRAN or SRAT

To verify SRIO connection, please make test ping to ip address : 192.168.253.48


7. Backup site FILE CONFIGURATION
8. Collect alarm before and after activity
2. BACKGROUND AND OBJECTIVES

When two band LTE networks (at least) implemented in one site, it is required to
activation Carrier Aggregation between LTE band1 – LTE band2.

This document is described procedure how to activation carrier aggregation.


3. SCOPE OF WORK

The scope of Activation Carrier Aggregation:

 Verify software BTS supported for Activation CA:


SRAN: SBTS18SP_FSM3_0000_000377_000109
L2100: FL18SP_ENB_0000_000699_000000
U2100: wbts18_1000_0316_16

 Load new SRAN SCF to the system module that will be used for Activation CA in SRAN
 Load new SRAN SCF to the system module that will be used for Activation CA in SRAT

NOKIA will request the NIW for this activity.


3.3 Wiring connection for HDMI cable and OBSAI cable and synchronization delay set in BTS :
1. SRAN - SRAT L2100 - SRAT U2100
2. SRAN1 (1xFSMF) – SRAN2 (2xFSMF)
3. SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100
3.4 Rules of WCDMA – LTE optic cable for RF Sharing

Here’s some rule to get awareness regarding optic cable System module to RF module that we
will use for RF sharing.

3.5 Updating Synchronization Delay Value BTS

It it important also to setup which BTS as Sync Master and Sync HUB slave, because
when BTS start-up will initialization Carrier Aggregation.

Enclosed capture synchronization phase setup between Sync Master and sync HUB.

Topology sync Master and sync HUB Slave in Implementation SRAN 18SP is networks Indosat are
:
- setup sync Master is networks element SRAN FSMF
Master)
- setup sync HUB slave is SRAN or SRAT

Another important step is to setup delay value.

Pease calculate delay synchronization based on


length of cable sync use for connection between
sync Master  sync HUB slave_1 + sync HUB
slave_2.

Please don’t forget to input delay value based on


calculation in BTS during commissioning prior
carrier aggregation is ready for activation, it will
make high accuracy synchronization.

Some exercise how to calculate delay value (ns), based on cable sync installed.

3.6 Carrier Aggregation SRIO Connection (IM sync) for 3xFSMF


Instruction how to create CA_SRIO connection between SRAT U2100 (1xFSMF) to SBTS
RAN (2xFSMF).
By default, SRIO port is not enabled. It is up to OAM to enable SRIO port and start connection
establishment.
Inter SBTS connection is done via built-in SRIO port on SBTS FSMF_1 and SBTS FSMF_2
module. CA SRIO connection is done via FBBx_port4 as SRIO port on SBTS FSMF 2 side, and built-
in SRIO port on SRAT U2100.
Instruction how to changes link mode port_4 at FBBx on SBTS 2 become link SRIO during
commissioning task:

SRIO Carrier Aggregation connection for 1xFSMF (in SRAT/SRAN) + 2xFSMF (in SRAN) are :

Or SRIO Carrier Aggregation connection for 3xFSMF (3xSBTS) in respective SRAN are :
Scenario upload, run SCF and Re-Start BTS to avoid domain_Id collotion :

1st for SBTS (SRAN) that use for sync Master to get domain_Id (3) or,
domain_Id (3) & (4) if 2 FSMF ( CA cluster member ID = 1)

2nd Restart for SRAT BTS L2100 to get domain_Id (1)

3rd Restart for SRAT BTS U2100 or L1800 to get domain_Id (2)
4. DETAIL TIME TABLE OF OVERALL ACTIVITY

Time Operation Detail Service Impact

No Impact to NE
10.00 - 10.30 Preparation and check All Parameter
No Impact to NE
10.30 - 11.00 Call NOC/RNOC to inform the activity
No Impact to NE
11.00 - 11.15 collect alarm Before
Verify installation cable SRIO and cable synchronization is No Impact to NE
11.15 – 11.50
properly connected
Coordination with OSS regarding activity of Activation Carrier No Impact to NE
11.50 – 12.00
Aggregation
BTS G900-U900-L900
12.00 - 12.10 Lock BTS SRAN or SRAT G900-U900-L900

12.10 - 12.50 BTS G900-U900-L900


Update software BTS 900 & re-commissioning

12.50 - 13.00 BTS G900-U900-L900


Unlock BTS SRAN or SRAT G900-U900-L900
BTS G1800 – L1800
13.00 - 13.10 Lock BTS SRAN or SRAT G1800 – L1800

13.10 - 13.50 BTS G1800 – L1800


Update software BTS 900 & re-commissioning

13.50 - 14.00 BTS G1800 – L1800


Unlock BTS SRAN or SRAT G1800 – L1800
BTS U2100 – L2100
14.00 - 14.10 Lock BTS SRAN or SRAT U2100 – L2100

14.10 - 14.50 BTS U2100 – L2100


Update software BTS 900 & re-commissioning

14.50 - 15.00 BTS U2100 – L2100


Unlock BTS SRAN or SRAT U2100 – L2100

15.00 – 16.00 Load new SRAN or SRAT parameter changes (NCR) to the Restart all BTS
system module that will be used for Activation CA in SRAN
or SRAT

16.00 – 16.30 No Impact to NE


Monitoring after activation Carrier Aggregation in BTS

16.30 – 17.00 Call NOC/RNOC to inform activity done before Closed the No Impact to NE
Network remote
5. Setup Carrier Aggregation technology SRAN - SRAT L2100 - SRAT U2100

Instruction how to setup Carrier Aggregation between SRAN - SRAT L2100 - SRAT U2100
Pre-requise site : Please make sure the installation of cable SRIO and cable sync HDMI are proplerly connected, before BTS start-up for Carrier
Aggregation. HDMI cable in SRAN is use as bakcup (no need to set sync parameter) but mandatory installed at FSMF Master-Slave.

Detail port Connection cable SRIO and cable sync only as discriberd on the tabel bellow :

After physical cabling installation is finished, than next task are re-commissioning to setup CA in SRAT BTS and SRAN BTS :

1. Setting Sync Master at SRAN (FSMF Master) from commissioning, and setting 1PPS source line delay

 Synchronization mode at SRAN FSMF Master : FreqSync (default, no changes)


 Add Input synchronization at SRAN FSMF Master : ToPF (default, no changes)

 Set the output configuration of 1 PPS/ToD clock signal : Enable with BTS Input Reference.

Enable with BTS Input Reference


 Set the SRAN FMSF Master clock as sync Master and able to pass-through to SRAN (other BTS). Click CLOCK_FDD, change value sync
Master = true (default, no changes)

True

 Set FSMF slave in SRAN for the output configuration of 1 PPS/ToD clock signal : Disable.

Disable
 Set the FMSF Slave in SRAN clock as sync HUB Slave and disable to pass-through to SRAN (other BTS). Click CLOCK_FDD, change
value sync Master = false (means as Slave)

False

 Set the total delay sync HUB_Master at SRAN FSMF Master


estimating calculation delay based on cable length for sync between SRAN FSMF Master  FSMF L2100 (SRAT).
Example : cable sync installed

cable length connection from Sync Master  Sync HUB Slave is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT
 Add new parameter for delay setting  Put the value of delay sync HUB_Master in the parameter sync/clock :

 Set Synchronization mode at SRAT L2100 FSMF : Phase (default, no changes) capture is not valid, use only to make clear view

 Add Input synchronization at SRAT L2100 FSMF : 1pps/ToD from Sync Hub Master BTS, capture is not valid, use only to make clear view
 Set the FMSF SRAT L2100 clock as sync HUB Master#2 and able to pass-through to FSMF SRAT U2100. Click CLOCK_FDD, change
value sync Master = true (default, no changes), capture is not valid, use only to make clear view

True

 Set FSMF in SRAT L2100 for the output configuration of 1 PPS/ToD clock signal : EnabelWithBtsInputReference.
capture is not valid, use only to make clear view

Enabel With BTS Input Reference


 Set the total delay sync HUB_Master at FSMF_SRAT L2100
estimating calculation delay based on cable length for sync between SRAN FSMF Master  FSMF L2100 (SRAT).
Example : cable sync installed

cable length connection from Sync Master SRAN  Sync Master SRAT L2100 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT = 8ns

cable length connection from Sync Master SRAN  Sync Master SRAT L2100 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns, delay estimate cable
propagation = 27 ns (5.4 x5.0 mtr)
Total delay Sync Master SRAT L2100 (SHM) = 47 ns

 In FSMF SRAT L2100, Add new parameter for delay setting  Put the value of delay sync HUB_Master in the parameter sync/clock
for :
 Set Synchronization mode at SRAT U2100 FSMF : Phase (default, no changes) capture is not valid, use only to make clear view

Add Input synchronization at SRAT U2100 FSMF : 1pps/ToD from Sync Hub Master BTS, capture is not valid, use only to make clear view
 In FSMF slave SRAN BTS, changes interface link mode port_4 at FBBx on FSMF_2 SBTS become link SRIO during commissioning
task:

Physical connection must be have corsepondence with SCF creation, the location port 4 at FBBC_1 in FSMF_2 (Slave-SRAN) condition
must be match with the set parameter SCF.
Link ID : FBBC BBMOD-1/BBMOD_R-1 is location of port_4 on FBBC_1 in FSMF_2 (Slave-SRAN) must be terminated with port SRIO build in at
FSMF SRAT U2100.
 In FSMF SRAT L2100, changes interface link mode port_4 at FBBx on FSMF_2 SBTS become link SRIO during commissioning task: ..
capture is not valid, use only to make clear view

Physical connection must be have corsepondence with SCF creation, the location port 4 at FBBC_1 in FSMF_2 (Slave-SRAN) condition must be
match with the set parameter SCF.
6. Activating Carrier Aggregation SRAN - SRAT L2100 - SRAT U2100

Here’s step by step process Activating Carrier Aggregation SRAN - SRAT L2100 - SRAT U2100 :
 Ensure parameter displayed bellow shall have the same values in both SBTS :
Parameter MO
cqiPerSbCyck LNCEL
riEnable LNCEL
periodicCqiFeedbackType LNCEL
riPerM LNCEL
caPoolId LNCEL
cellResourceSharingMode LNCEL
actSuperCell LNCEL
sCellDeactivationTimerEnb LNBTS
actFlexScellSelect LNBTS
caClusterId LNBTS
 CA parameter required to setup :
o Activate inter-eNB DL carrier aggregation = true

Note : other parameter changing for carrier aggregation will be execute using NCR
o Create MO CAGENB after carrier aggregation = true. Put value for Link SRIO = 1

o Carrier aggregation cluster ID = refer to MRBTS ID from L1800.


Only case in area Kalimantan, MRBTS ID number 79875.. due to limitation range culster ID (max = 65535), the solution is
to delete head number “7” become 9875

MRBTS ID

o Set Carier Aggregation cluster ID member (caClusterMemberId)


Setup Member ID :
- Number_1 for 1800
- Number_2 for 2100
- Number_3 for 900
In case BTS in SRAN (SRAN 900+1800) in one BTS, member ID number will use Number_1 for 1800.
Number_1 for 1800
Number_2 for 2100
Number_3 for 900

o Validate parameters
o Activate parameters
o Restart BTS, Step by step re-start BTS :
1st restart SBTS (SRAN) prior to SRAT L2100 and SRAT U2100
This activity to create domain-id between 2xFSMF in SRAN BTS. Domain-id number shall be number_3 for FSMF_1 (SRAN)
and number_4 for FSMF_2 (SRAN)
Domain-id number for SRAT BTS L2100 is number_1, domain-id number for SRAT BTS U2100 is number_2,
o All three BTS boots up, all of them, starts without plan, default domain id is 1.
 By default, SRIO port is not enabled. It is up to OAM to enable SRIO port and start connection establishment, at this phase, ports are
closed, there is no any domain id conflict.
 Expected result is both SBTS on-air and no alarm issue, and CA cell shown in Web-EM (Inter-eNB cells)
7. Setup Carrier Aggregation technology SRAN 1 – SRAN 2

Instruction how to setup Carrier Aggregation between SRAN 1 – SRAN 2 as of reference


Pre-requise site : Please make sure the installation of cable SRIO and cable sync HDMI are proplerly connected, before BTS start-up for Carrier
Aggregation. HDMI cable in SRAN is use as bakcup (no need to set sync parameter) but mandatory installed at FSMF Master-Slave.

Detail port Connection cable SRIO and cable sync only as discriberd on the tabel bellow :

After physical cabling installation is finished, than next task are re-commissioning to setup CA in SBTS1 and SBTS2 :

2. Setting Sync Master at SRAN2 with have 2xFSMF (set FSMF Master) from commissioning, and setting 1PPS source line delay

 Synchronization mode at SRAN FSMF Master : FreqSync (default, no changes)


 Add Input synchronization at SRAN FSMF Master : ToPF (default, no changes)

 Set the output configuration of 1 PPS/ToD clock signal : Enable with BTS Input Reference.

Enable with BTS Input Reference


 Set the SRAN FMSF Master clock as sync Master and able to pass-through to SRAN (other BTS). Click CLOCK_FDD, change value sync
Master = true (default, no changes)

True

 Set FSMF slave in SRAN for the output configuration of 1 PPS/ToD clock signal : Disable.

Disable
 Set the FMSF Slave in SRAN clock as sync HUB Slave and disable to pass-through to SRAN (other BTS). Click CLOCK_FDD, change
value sync Master = false (means as Slave)

False

 Set the total delay sync HUB_Master at SRAN FSMF Master


estimating calculation delay based on cable length for sync between SRAN 2xFSMF (Master)  SRAN 1xFSMF (slave)
Example : cable sync installed

cable length connection from Sync Master  Sync HUB Slave is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT
 Add new parameter for delay setting  Put the value of delay sync HUB_Master in the parameter sync/clock :

 Set Synchronization mode at SRAN1 with have 1xFSMF : Phase (default, no changes)

 Add Input synchronization at SRAT L2100 FSMF : 1pps/ToD from Sync Hub Master BTS
 Set FSMF in SRAN1 for the output configuration of 1 PPS/ToD clock signal : Disable

Disable

 Set the total delay sync HUB Slave#1 at FSMF SRAN1


estimating calculation delay based on cable length for sync between SRAN 2xFSMF (Master)  SRAN 1xFSMF (slave)
Example : cable sync installed

cable length connection from Sync Master SRAN2  Sync slave SRAN1 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT = 8ns

cable length connection from Sync Master SRAN  Sync Master SRAT L2100 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns, delay estimate cable
propagation = 27 ns (5.4 x5.0 mtr)
Total delay Sync Master SRAT L2100 (SHM) = 47 ns
 In FSMF SRAN1, Add new parameter for delay setting  Put the value of delay sync HUB_Master in the parameter sync/clock for :
 In FSMF_slave SRAN2 BTS, changes interface link mode port_4 at FBBx on FSMF_2 SBTS become link SRIO during commissioning
task:

Physical connection must be have corsepondence with SCF creation, the location port 4 at FBBC_1 in FSMF_2 (Slave-SRAN) condition
must be match with the set parameter SCF.
Link ID : FBBC BBMOD-1/BBMOD_R-1 is location of port_4 on FBBC_1 in FSMF_2 (Slave-SRAN) must be terminated with port SRIO build in at
FSMF SRAT U2100.
8. Activating Carrier Aggregation SRAN1 – SRAN2

Here’s step by step process Activating Carrier Aggregation SRAN1 – SRAN2 :


 Ensure parameter displayed bellow shall have the same values in both SBTS :
Parameter MO
cqiPerSbCyck LNCEL
riEnable LNCEL
periodicCqiFeedbackType LNCEL
riPerM LNCEL
caPoolId LNCEL
cellResourceSharingMode LNCEL
actSuperCell LNCEL
sCellDeactivationTimerEnb LNBTS
actFlexScellSelect LNBTS
caClusterId LNBTS
 CA parameter required to setup :
o Activate inter-eNB DL carrier aggregation = true

Note : other parameter changing for carrier aggregation will be execute using NCR
o Create MO CAGENB after carrier aggregation = true. Put value for Link SRIO = 1

o Carrier aggregation cluster ID = refer to MRBTS ID from L1800.


Only case in area Kalimantan, MRBTS ID number 79875.. due to limitation range culster ID (max = 65535), the solution is
to delete head number “7” become 9875

MRBTS ID

o Set Carier Aggregation cluster ID member (caClusterMemberId)


Setup Member ID :
- Number_1 for 1800
- Number_2 for 2100
- Number_3 for 900
In case BTS in SRAN (SRAN 900+1800) in one BTS, member ID number will use Number_1 for 1800.
Number_1 for 1800
Number_2 for 2100
Number_3 for 900

o Validate parameters
o Activate parameters
o Restart BTS, Step by step re-start BTS :
1st restart SBTS (SRAN wih 2xFSMF) prior to SRAN with 1xFSMF
This activity to create domain-id between 2xFSMF in SRAN BTS. Domain-id number shall be number_3 for FSMF_1 (SRAN)
and number_4 for FSMF_2 (SRAN)
Domain-id number for SRAN 1xFSMF is number_1,
All three BTS boots up, all of them, starts without plan, default domain id is 1.
 By default, SRIO port is not enabled. It is up to OAM to enable SRIO port and start connection establishment, at this phase, ports are
closed, there is no any domain id conflict.
 Expected result is both SBTS on-air and no alarm issue, and CA cell shown in Web-EM (Inter-eNB cells)
9. Setup Carrier Aggregation technology SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100

Instruction how to setup Carrier Aggregation between SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100 as of reference

Pre-requise site : Please make sure the installation of cable SRIO and cable sync HDMI are proplerly connected, before BTS start-up for Carrier
Aggregation. HDMI cable in SRAN is use as bakcup (no need to set sync parameter) but mandatory installed at FSMF Master-Slave.
Detail port Connection cable SRIO and cable sync only as discriberd on the tabel bellow :

After physical cabling installation is finished, than next task are re-commissioning to setup CA in SBTS and SRAT L2100+L1800 (sharing) + U2100

3. Setting Sync Master at SRAN with have 2xFSMF (set FSMF Master) from commissioning, and setting 1PPS source line delay

 Synchronization mode at SRAN FSMF Master : FreqSync (default, no changes)

 Add Input synchronization at SRAN FSMF Master : ToPF (default, no changes)


 Set the output configuration of 1 PPS/ToD clock signal : Enable with BTS Input Reference.

Enable with BTS Input Reference


 Set the SRAN FMSF Master clock as sync Master and able to pass-through to SRAN (other BTS). Click CLOCK_FDD, change value sync
Master = true (default, no changes)

True

 Set FSMF slave in SRAN for the output configuration of 1 PPS/ToD clock signal : Disable.

Disable
 Set the FMSF Slave in SRAN clock as sync HUB Slave and disable to pass-through to SRAN (other BTS). Click CLOCK_FDD, change
value sync Master = false (means as Slave)

False

 Set the total delay sync HUB_Master at SRAN FSMF Master


estimating calculation delay based on cable length for sync between SRAN 2xFSMF (Master)  SRAT L2100+L1800 (sharing)
Example : cable sync installed

cable length connection from Sync Master  Sync HUB SRAT L2100+L1800 (sharing)
Slave is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT
 Add new parameter for delay setting  Put the value of delay sync HUB_Master in the parameter sync/clock :

 Set Synchronization mode at SRAT L2100+L1800 (sharing) : Phase (default, no changes), capture is not valid, use only to make clear view

 Add Input synchronization at SRAT L2100+L1800 (sharing): 1pps/ToD from Sync Hub Master BTS, capture is not valid, use only to make clear view
 Set FSMF in SRAT L2100+L1800 (sharing) for the output configuration of 1 PPS/ToD clock signal : Disable, capture is not valid, use only to make
clear view

Disable

 Set the total delay sync HUB Slave#1 at FSMF SRAT L2100+L1800 (sharing)
estimating calculation delay based on cable length for sync between SRAN 2xFSMF (Master)  SRAT L2100+L1800 (sharing)
Example : cable sync installed

cable length connection from Sync Master SRAN2  Sync slave SRAT L2100+L1800 (sharing) 1 is
5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT = 8ns

cable length connection from Sync Master SRAN  Sync Master SRAT L2100 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns, delay estimate cable
propagation = 27 ns (5.4 x5.0 mtr)
Total delay Sync Master SRAT L2100 (SHM) = 47 ns
 In FSMF SRAT L2100+L1800 (sharing), add new parameter for delay setting  Put the value of delay sync HUB_Master in the
parameter sync/clock for : capture is not valid, use only to make clear view

 Set Synchronization mode at SRAT U2100 FSMF : Phase (default, no changes) capture is not valid, use only to make clear view

 Add Input synchronization at SRAT U2100 FSMF : 1pps/ToD from Sync Hub Master BTS, capture is not valid, use only to make clear view
 In FSMF_slave SRAN BTS, changes interface link mode port_4 at FBBx on FSMF_2 SBTS become link SRIO during commissioning
task:

Physical connection must be have corsepondence with SCF creation, the location port 4 at FBBC_1 in FSMF_2 (Slave-SRAN) condition
must be match with the set parameter SCF.
Link ID : FBBC BBMOD-1/BBMOD_R-1 is location of port_4 on FBBC_1 in FSMF_2 (Slave-SRAN) must be terminated with port SRIO build in at
FSMF SRAT U2100.
10. Activating Carrier Aggregation SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100

Here’s step by step process Activating Carrier Aggregation SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100 :
 Ensure parameter displayed bellow shall have the same values in both SBTS :
Parameter MO
cqiPerSbCyck LNCEL
riEnable LNCEL
periodicCqiFeedbackType LNCEL
riPerM LNCEL
caPoolId LNCEL
cellResourceSharingMode LNCEL
actSuperCell LNCEL
sCellDeactivationTimerEnb LNBTS
actFlexScellSelect LNBTS
caClusterId LNBTS
 CA parameter required to setup :
o Activate inter-eNB DL carrier aggregation = true

Note : other parameter changing for carrier aggregation will be execute using NCR
o Create MO CAGENB after carrier aggregation = true. Put value for Link SRIO = 1

o Carrier aggregation cluster ID = refer to MRBTS ID from L1800.


Only case in area Kalimantan, MRBTS ID number 79875.. due to limitation range culster ID (max = 65535), the solution is
to delete head number “7” become 9875

MRBTS ID

o Set Carier Aggregation cluster ID member (caClusterMemberId)


Setup Member ID :
- Number_1 for 1800
- Number_2 for 2100
- Number_3 for 900
In case BTS in SRAN (SRAN 900+1800) in one BTS, member ID number will use Number_1 for 1800.
Number_1 for 1800
Number_2 for 2100
Number_3 for 900

o Validate parameters
o Activate parameters
o Restart BTS, Step by step re-start BTS :
1st restart SBTS (SRAN wih 2xFSMF) prior to SRAT L2100 + L1800 (sharing) + SRAT U2100
This activity to create domain-id between 2xFSMF in SRAN BTS. Domain-id number shall be number_3 for FSMF_1 (SRAN)
and number_4 for FSMF_2 (SRAN)
Domain-id number for SRAT L2100+L1800 (sharing) 1xFSMF is number_1, and domain-id number for SRAT U2100 is
number_2
All three BTS boots up, all of them, starts without plan, default domain id is 1.
 By default, SRIO port is not enabled. It is up to OAM to enable SRIO port and start connection establishment, at this phase, ports are
closed, there is no any domain id conflict.
 Expected result is both SBTS on-air and no alarm issue, and CA cell shown in Web-EM (Inter-eNB cells)
11. SERVICE AND AREA IMPACT

This activity during activation Carrier Aggregation will impacted to BTS out-off services, to all
networks element :

 900 : G900, U900, L900

 1800 : G1800, L1800

 2100 : U2100, L2100


12. TESTING AND VERIFICATION

To verify that Carrier Aggregation already active in the Network Element, we need to use
measurement CA cap UEs for 2CC or 3CC is running (active) , and monitior the data for KPI.

Example of CA cap UEs for 3CC or 3CC is running (active)


13. ROLLBACK OPERATION

In case the activation carrier aggregation is failed, we need to rollback the BTS to the original
configuration. Here’s the rollback procedure :

Time Operation Detail Service Impact

No Impact to NE
20.00 - 20.30 Preparation and check All Parameter
No Impact to NE
20.30 - 21.00 Call NOC/RNOC to inform the activity of rollback
No Impact to NE
21.00 - 21.15 collect alarm Before

Load SRAN or SRAT parameter changes (NCR) to the BTS G900-U900-L900-


system module that will be used for removed (non-active) G1800-L1800-U2100-
CA in SRAN or SRAT L2100
21.15 – 11.50

This parameter changes will make BTS back to the original


configuration
No Impact to NE
24.00 – 01.00 check alarm BTS after fallback
Call NOC/RNOC to inform activity done before Closed the No Impact to NE
01.00 - 01.30
Network remote
14. PERSON IN CHARGE

Name Company Phone Number Roles and Responsibilities


Happy Project Manager
Nokia 081586432070
Hadiantoro
Field Manager
Erik Ariyanto Nokia 081573933935

Salman Siregar Nokia 081617468881 Field Manager

M.Setiyo Nokia 08157619993 BTS Engineer


15. SUPPORTING DOCUMENTS

No Document description Status File

SR001780_Solution Available / Yes


1. SR001780_Solution.
pdf

Sync Hub Direct Forward Available / Yes


2. Sync Hub Direct
Forward.pdf

Classical_RF_Sharing_Released_Configurations Available / Yes


3 upto GSM-WCDMA-LTE 17
Classical_RF_Sharin
g_Released_Configurations upto GSM-WCDM

BTS_Startup_scenarios_for_FSMr3 Available / Yes


4 BTS_Startup_scenari
os_for_FSMr3.pdf

Table carrier aggregation Available / Yes


5 tabel carrier
aggregation_v1.xlsx

MOP Activation Inter-eNB Carrier Aggregation Available / Yes


6 LTE1800-LTE2100 (SRAT-SRAT)
MOP Activation
Inter-eNB Carrier Aggregation LTE1800-LTE21

Das könnte Ihnen auch gefallen