Beruflich Dokumente
Kultur Dokumente
3.1 Wiring connection for HDMI cable and OBSAI cable and synchronization delay set in BTS :.........9
o Config 3A (xx3)
o Config 3C (3)
o Config 3A (2)
SRAN : SBTS18SP_FSM3_0000_000377_000109
L2100 : FL18SP_ENB_0000_000699_000000
U2100 : wbts18_1000_0316_16
2. SRAN (FSMF master) is always act as Sync Master for both CA with SRAT/SRAN
Incase SRAN – SRAN, sync master is using SRAN with 2xFSMF.
FSMF master in SRAN is use as transmission point BTS.
3. Upload and Running SCF sequence, starting from FSMF master SRAN use as sync
Master, than continue to other FSMF in SRAN or SRAT
4. Make sure the sync HDMI cable (FTSF) is already installed properly in FSMF_1,
FSMF_2 (SRAN1), also FSMF_1 other SRAN or SRAT
To verify HDMI cable sync connection, please make test using BTS site manager
Synchronization Synchronization source : 1pps/ToD from Sync Hub Master BTS
When two band LTE networks (at least) implemented in one site, it is required to
activation Carrier Aggregation between LTE band1 – LTE band2.
Load new SRAN SCF to the system module that will be used for Activation CA in SRAN
Load new SRAN SCF to the system module that will be used for Activation CA in SRAT
Here’s some rule to get awareness regarding optic cable System module to RF module that we
will use for RF sharing.
It it important also to setup which BTS as Sync Master and Sync HUB slave, because
when BTS start-up will initialization Carrier Aggregation.
Enclosed capture synchronization phase setup between Sync Master and sync HUB.
Topology sync Master and sync HUB Slave in Implementation SRAN 18SP is networks Indosat are
:
- setup sync Master is networks element SRAN FSMF
Master)
- setup sync HUB slave is SRAN or SRAT
Some exercise how to calculate delay value (ns), based on cable sync installed.
SRIO Carrier Aggregation connection for 1xFSMF (in SRAT/SRAN) + 2xFSMF (in SRAN) are :
Or SRIO Carrier Aggregation connection for 3xFSMF (3xSBTS) in respective SRAN are :
Scenario upload, run SCF and Re-Start BTS to avoid domain_Id collotion :
1st for SBTS (SRAN) that use for sync Master to get domain_Id (3) or,
domain_Id (3) & (4) if 2 FSMF ( CA cluster member ID = 1)
3rd Restart for SRAT BTS U2100 or L1800 to get domain_Id (2)
4. DETAIL TIME TABLE OF OVERALL ACTIVITY
No Impact to NE
10.00 - 10.30 Preparation and check All Parameter
No Impact to NE
10.30 - 11.00 Call NOC/RNOC to inform the activity
No Impact to NE
11.00 - 11.15 collect alarm Before
Verify installation cable SRIO and cable synchronization is No Impact to NE
11.15 – 11.50
properly connected
Coordination with OSS regarding activity of Activation Carrier No Impact to NE
11.50 – 12.00
Aggregation
BTS G900-U900-L900
12.00 - 12.10 Lock BTS SRAN or SRAT G900-U900-L900
15.00 – 16.00 Load new SRAN or SRAT parameter changes (NCR) to the Restart all BTS
system module that will be used for Activation CA in SRAN
or SRAT
16.30 – 17.00 Call NOC/RNOC to inform activity done before Closed the No Impact to NE
Network remote
5. Setup Carrier Aggregation technology SRAN - SRAT L2100 - SRAT U2100
Instruction how to setup Carrier Aggregation between SRAN - SRAT L2100 - SRAT U2100
Pre-requise site : Please make sure the installation of cable SRIO and cable sync HDMI are proplerly connected, before BTS start-up for Carrier
Aggregation. HDMI cable in SRAN is use as bakcup (no need to set sync parameter) but mandatory installed at FSMF Master-Slave.
Detail port Connection cable SRIO and cable sync only as discriberd on the tabel bellow :
After physical cabling installation is finished, than next task are re-commissioning to setup CA in SRAT BTS and SRAN BTS :
1. Setting Sync Master at SRAN (FSMF Master) from commissioning, and setting 1PPS source line delay
Set the output configuration of 1 PPS/ToD clock signal : Enable with BTS Input Reference.
True
Set FSMF slave in SRAN for the output configuration of 1 PPS/ToD clock signal : Disable.
Disable
Set the FMSF Slave in SRAN clock as sync HUB Slave and disable to pass-through to SRAN (other BTS). Click CLOCK_FDD, change
value sync Master = false (means as Slave)
False
cable length connection from Sync Master Sync HUB Slave is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT
Add new parameter for delay setting Put the value of delay sync HUB_Master in the parameter sync/clock :
Set Synchronization mode at SRAT L2100 FSMF : Phase (default, no changes) capture is not valid, use only to make clear view
Add Input synchronization at SRAT L2100 FSMF : 1pps/ToD from Sync Hub Master BTS, capture is not valid, use only to make clear view
Set the FMSF SRAT L2100 clock as sync HUB Master#2 and able to pass-through to FSMF SRAT U2100. Click CLOCK_FDD, change
value sync Master = true (default, no changes), capture is not valid, use only to make clear view
True
Set FSMF in SRAT L2100 for the output configuration of 1 PPS/ToD clock signal : EnabelWithBtsInputReference.
capture is not valid, use only to make clear view
cable length connection from Sync Master SRAN Sync Master SRAT L2100 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT = 8ns
cable length connection from Sync Master SRAN Sync Master SRAT L2100 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns, delay estimate cable
propagation = 27 ns (5.4 x5.0 mtr)
Total delay Sync Master SRAT L2100 (SHM) = 47 ns
In FSMF SRAT L2100, Add new parameter for delay setting Put the value of delay sync HUB_Master in the parameter sync/clock
for :
Set Synchronization mode at SRAT U2100 FSMF : Phase (default, no changes) capture is not valid, use only to make clear view
Add Input synchronization at SRAT U2100 FSMF : 1pps/ToD from Sync Hub Master BTS, capture is not valid, use only to make clear view
In FSMF slave SRAN BTS, changes interface link mode port_4 at FBBx on FSMF_2 SBTS become link SRIO during commissioning
task:
Physical connection must be have corsepondence with SCF creation, the location port 4 at FBBC_1 in FSMF_2 (Slave-SRAN) condition
must be match with the set parameter SCF.
Link ID : FBBC BBMOD-1/BBMOD_R-1 is location of port_4 on FBBC_1 in FSMF_2 (Slave-SRAN) must be terminated with port SRIO build in at
FSMF SRAT U2100.
In FSMF SRAT L2100, changes interface link mode port_4 at FBBx on FSMF_2 SBTS become link SRIO during commissioning task: ..
capture is not valid, use only to make clear view
Physical connection must be have corsepondence with SCF creation, the location port 4 at FBBC_1 in FSMF_2 (Slave-SRAN) condition must be
match with the set parameter SCF.
6. Activating Carrier Aggregation SRAN - SRAT L2100 - SRAT U2100
Here’s step by step process Activating Carrier Aggregation SRAN - SRAT L2100 - SRAT U2100 :
Ensure parameter displayed bellow shall have the same values in both SBTS :
Parameter MO
cqiPerSbCyck LNCEL
riEnable LNCEL
periodicCqiFeedbackType LNCEL
riPerM LNCEL
caPoolId LNCEL
cellResourceSharingMode LNCEL
actSuperCell LNCEL
sCellDeactivationTimerEnb LNBTS
actFlexScellSelect LNBTS
caClusterId LNBTS
CA parameter required to setup :
o Activate inter-eNB DL carrier aggregation = true
Note : other parameter changing for carrier aggregation will be execute using NCR
o Create MO CAGENB after carrier aggregation = true. Put value for Link SRIO = 1
MRBTS ID
o Validate parameters
o Activate parameters
o Restart BTS, Step by step re-start BTS :
1st restart SBTS (SRAN) prior to SRAT L2100 and SRAT U2100
This activity to create domain-id between 2xFSMF in SRAN BTS. Domain-id number shall be number_3 for FSMF_1 (SRAN)
and number_4 for FSMF_2 (SRAN)
Domain-id number for SRAT BTS L2100 is number_1, domain-id number for SRAT BTS U2100 is number_2,
o All three BTS boots up, all of them, starts without plan, default domain id is 1.
By default, SRIO port is not enabled. It is up to OAM to enable SRIO port and start connection establishment, at this phase, ports are
closed, there is no any domain id conflict.
Expected result is both SBTS on-air and no alarm issue, and CA cell shown in Web-EM (Inter-eNB cells)
7. Setup Carrier Aggregation technology SRAN 1 – SRAN 2
Detail port Connection cable SRIO and cable sync only as discriberd on the tabel bellow :
After physical cabling installation is finished, than next task are re-commissioning to setup CA in SBTS1 and SBTS2 :
2. Setting Sync Master at SRAN2 with have 2xFSMF (set FSMF Master) from commissioning, and setting 1PPS source line delay
Set the output configuration of 1 PPS/ToD clock signal : Enable with BTS Input Reference.
True
Set FSMF slave in SRAN for the output configuration of 1 PPS/ToD clock signal : Disable.
Disable
Set the FMSF Slave in SRAN clock as sync HUB Slave and disable to pass-through to SRAN (other BTS). Click CLOCK_FDD, change
value sync Master = false (means as Slave)
False
cable length connection from Sync Master Sync HUB Slave is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT
Add new parameter for delay setting Put the value of delay sync HUB_Master in the parameter sync/clock :
Set Synchronization mode at SRAN1 with have 1xFSMF : Phase (default, no changes)
Add Input synchronization at SRAT L2100 FSMF : 1pps/ToD from Sync Hub Master BTS
Set FSMF in SRAN1 for the output configuration of 1 PPS/ToD clock signal : Disable
Disable
cable length connection from Sync Master SRAN2 Sync slave SRAN1 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT = 8ns
cable length connection from Sync Master SRAN Sync Master SRAT L2100 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns, delay estimate cable
propagation = 27 ns (5.4 x5.0 mtr)
Total delay Sync Master SRAT L2100 (SHM) = 47 ns
In FSMF SRAN1, Add new parameter for delay setting Put the value of delay sync HUB_Master in the parameter sync/clock for :
In FSMF_slave SRAN2 BTS, changes interface link mode port_4 at FBBx on FSMF_2 SBTS become link SRIO during commissioning
task:
Physical connection must be have corsepondence with SCF creation, the location port 4 at FBBC_1 in FSMF_2 (Slave-SRAN) condition
must be match with the set parameter SCF.
Link ID : FBBC BBMOD-1/BBMOD_R-1 is location of port_4 on FBBC_1 in FSMF_2 (Slave-SRAN) must be terminated with port SRIO build in at
FSMF SRAT U2100.
8. Activating Carrier Aggregation SRAN1 – SRAN2
Note : other parameter changing for carrier aggregation will be execute using NCR
o Create MO CAGENB after carrier aggregation = true. Put value for Link SRIO = 1
MRBTS ID
o Validate parameters
o Activate parameters
o Restart BTS, Step by step re-start BTS :
1st restart SBTS (SRAN wih 2xFSMF) prior to SRAN with 1xFSMF
This activity to create domain-id between 2xFSMF in SRAN BTS. Domain-id number shall be number_3 for FSMF_1 (SRAN)
and number_4 for FSMF_2 (SRAN)
Domain-id number for SRAN 1xFSMF is number_1,
All three BTS boots up, all of them, starts without plan, default domain id is 1.
By default, SRIO port is not enabled. It is up to OAM to enable SRIO port and start connection establishment, at this phase, ports are
closed, there is no any domain id conflict.
Expected result is both SBTS on-air and no alarm issue, and CA cell shown in Web-EM (Inter-eNB cells)
9. Setup Carrier Aggregation technology SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100
Instruction how to setup Carrier Aggregation between SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100 as of reference
Pre-requise site : Please make sure the installation of cable SRIO and cable sync HDMI are proplerly connected, before BTS start-up for Carrier
Aggregation. HDMI cable in SRAN is use as bakcup (no need to set sync parameter) but mandatory installed at FSMF Master-Slave.
Detail port Connection cable SRIO and cable sync only as discriberd on the tabel bellow :
After physical cabling installation is finished, than next task are re-commissioning to setup CA in SBTS and SRAT L2100+L1800 (sharing) + U2100
3. Setting Sync Master at SRAN with have 2xFSMF (set FSMF Master) from commissioning, and setting 1PPS source line delay
True
Set FSMF slave in SRAN for the output configuration of 1 PPS/ToD clock signal : Disable.
Disable
Set the FMSF Slave in SRAN clock as sync HUB Slave and disable to pass-through to SRAN (other BTS). Click CLOCK_FDD, change
value sync Master = false (means as Slave)
False
cable length connection from Sync Master Sync HUB SRAT L2100+L1800 (sharing)
Slave is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT
Add new parameter for delay setting Put the value of delay sync HUB_Master in the parameter sync/clock :
Set Synchronization mode at SRAT L2100+L1800 (sharing) : Phase (default, no changes), capture is not valid, use only to make clear view
Add Input synchronization at SRAT L2100+L1800 (sharing): 1pps/ToD from Sync Hub Master BTS, capture is not valid, use only to make clear view
Set FSMF in SRAT L2100+L1800 (sharing) for the output configuration of 1 PPS/ToD clock signal : Disable, capture is not valid, use only to make
clear view
Disable
Set the total delay sync HUB Slave#1 at FSMF SRAT L2100+L1800 (sharing)
estimating calculation delay based on cable length for sync between SRAN 2xFSMF (Master) SRAT L2100+L1800 (sharing)
Example : cable sync installed
cable length connection from Sync Master SRAN2 Sync slave SRAT L2100+L1800 (sharing) 1 is
5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns
Delay on port SYNC_OUT = 8ns
cable length connection from Sync Master SRAN Sync Master SRAT L2100 is 5.0 mtr
Delay port FSMF_SYNC IN = 12 ns, delay port FMSF_SYNC OUT = 8 ns, delay estimate cable
propagation = 27 ns (5.4 x5.0 mtr)
Total delay Sync Master SRAT L2100 (SHM) = 47 ns
In FSMF SRAT L2100+L1800 (sharing), add new parameter for delay setting Put the value of delay sync HUB_Master in the
parameter sync/clock for : capture is not valid, use only to make clear view
Set Synchronization mode at SRAT U2100 FSMF : Phase (default, no changes) capture is not valid, use only to make clear view
Add Input synchronization at SRAT U2100 FSMF : 1pps/ToD from Sync Hub Master BTS, capture is not valid, use only to make clear view
In FSMF_slave SRAN BTS, changes interface link mode port_4 at FBBx on FSMF_2 SBTS become link SRIO during commissioning
task:
Physical connection must be have corsepondence with SCF creation, the location port 4 at FBBC_1 in FSMF_2 (Slave-SRAN) condition
must be match with the set parameter SCF.
Link ID : FBBC BBMOD-1/BBMOD_R-1 is location of port_4 on FBBC_1 in FSMF_2 (Slave-SRAN) must be terminated with port SRIO build in at
FSMF SRAT U2100.
10. Activating Carrier Aggregation SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100
Here’s step by step process Activating Carrier Aggregation SRAN - SRAT L2100 + L1800 (sharing) + SRAT U2100 :
Ensure parameter displayed bellow shall have the same values in both SBTS :
Parameter MO
cqiPerSbCyck LNCEL
riEnable LNCEL
periodicCqiFeedbackType LNCEL
riPerM LNCEL
caPoolId LNCEL
cellResourceSharingMode LNCEL
actSuperCell LNCEL
sCellDeactivationTimerEnb LNBTS
actFlexScellSelect LNBTS
caClusterId LNBTS
CA parameter required to setup :
o Activate inter-eNB DL carrier aggregation = true
Note : other parameter changing for carrier aggregation will be execute using NCR
o Create MO CAGENB after carrier aggregation = true. Put value for Link SRIO = 1
MRBTS ID
o Validate parameters
o Activate parameters
o Restart BTS, Step by step re-start BTS :
1st restart SBTS (SRAN wih 2xFSMF) prior to SRAT L2100 + L1800 (sharing) + SRAT U2100
This activity to create domain-id between 2xFSMF in SRAN BTS. Domain-id number shall be number_3 for FSMF_1 (SRAN)
and number_4 for FSMF_2 (SRAN)
Domain-id number for SRAT L2100+L1800 (sharing) 1xFSMF is number_1, and domain-id number for SRAT U2100 is
number_2
All three BTS boots up, all of them, starts without plan, default domain id is 1.
By default, SRIO port is not enabled. It is up to OAM to enable SRIO port and start connection establishment, at this phase, ports are
closed, there is no any domain id conflict.
Expected result is both SBTS on-air and no alarm issue, and CA cell shown in Web-EM (Inter-eNB cells)
11. SERVICE AND AREA IMPACT
This activity during activation Carrier Aggregation will impacted to BTS out-off services, to all
networks element :
To verify that Carrier Aggregation already active in the Network Element, we need to use
measurement CA cap UEs for 2CC or 3CC is running (active) , and monitior the data for KPI.
In case the activation carrier aggregation is failed, we need to rollback the BTS to the original
configuration. Here’s the rollback procedure :
No Impact to NE
20.00 - 20.30 Preparation and check All Parameter
No Impact to NE
20.30 - 21.00 Call NOC/RNOC to inform the activity of rollback
No Impact to NE
21.00 - 21.15 collect alarm Before