100%(1)100% fanden dieses Dokument nützlich (1 Abstimmung)
3K Ansichten3 Seiten
This document contains a list of 77 interview questions related to piping inspection, material receiving, hydrotesting procedures, preservation methods, quality control processes, and mechanical equipment alignment and inspection. The questions cover topics such as inspection points, non-conformance reports, material traceability, pressure testing, corrosion protection, sour service specifications, and alignment tolerances.
Originalbeschreibung:
Interview questions for piping QC inspector for saudi aramco
This document contains a list of 77 interview questions related to piping inspection, material receiving, hydrotesting procedures, preservation methods, quality control processes, and mechanical equipment alignment and inspection. The questions cover topics such as inspection points, non-conformance reports, material traceability, pressure testing, corrosion protection, sour service specifications, and alignment tolerances.
This document contains a list of 77 interview questions related to piping inspection, material receiving, hydrotesting procedures, preservation methods, quality control processes, and mechanical equipment alignment and inspection. The questions cover topics such as inspection points, non-conformance reports, material traceability, pressure testing, corrosion protection, sour service specifications, and alignment tolerances.
1) What is material receiving inspection, brief it
2) What is fitup inspection explain 3) Orifice flange inspection 4) Tell the and brief the hydro test procedure 5) Explain dry lay up inspection 6) what is 4 types of inspection action point found in ITP 7) what are maximum dia allowed in threaded joint in hazardous service 8) the contractor installed the block valve ( gate valve) on inlet and discharge piping of releief valve with the valve stem direction 45 degree from the top is there any violation or not 9) the contractor os performing hydrotest for stainless steel with the help the fine water provided by proponent it is acceptable to test stainless steel line with water yes /not why 10) what is Ncr 11) what is schedule q 12) how you will manage the preservation 13) how you will manage the material traceability 14) types of gaskets 15) what is responsibility of Qc material inspection procedure 16) what is MTC 17) what is IAP package 18) if you are going to weld pipe with header how to identify piping specification 19) what are document for hydro test package 20) what do u check during material inspection brief 21) differentiate B 31 codes for pressure testing 22) what is miss alignment for fit-up inspection 23) classification of fittings and gasket’s 24) what is tack length and how many tacks welded on small explain the procedure and consumable required bore and big bore. 25) Can welding Possible on two dissimilar base metals. Explain the procedure and what consumable will use 26) Explain the inspection ;points 27) What is piping and pipe line 28) Tell the AMSEB sec standard mostly does a piping engineer referred ‘ 29) Explain the post weld heat treatment 30) Responsibility of piping inspector 31) Define the hypostatic test 32) Calibration of relief valves temperature records and pressure gauges 33) What is quality 34) What is quality assurance 35) What is quality control 36) What is INCR when u will raise INCR 37) What is material receiving? Things to be check 38) Name the satip of piping and wht is the codes 39) What are the checklist of piping and refer codes 40) Can u prepare a document for dyrotest ( hydro test procedure) 41) Hydro test of package of piping 42) Preparation of hydro test of package 43) What is weld map 44) Study of drawing , types, and joints size and pipe 45) How many types of material use in pipe 46) What is ansi class 47) Material receiving inspection of pipes 48) What is LBE 49) What is manifold requirement 50) Material preservation ( pipe , valves) 51) What is SIS 52) Torqueing value of 600# and 300# rating flanges 53) Which material test required of sour and non sour services 54) Bending activities 55) How many times raise ncr and what is root Couse analysis 56) What is level of inspection explain 57) Why perform hardness impact test 58) Impact test temperature allow for temperature 59) What is hydro test package content 60) Layup type purpose 61) What is sour and non sour service 62) What is lethal and non letha service 63) Water quality analysis 64) What is punch list 65) Explain responsibility at site and previous job 66) Do u know about ethane and methane gases 67) What is hardness value, impact value and material 68) On alloy material which type of indentor used CS & ss material 69) What I s reinstatement 70) What is torqueing value of SS and CS material and what is procedure for torqueing 71) What Types of liquid and liquid category 72) What is hydro test formula 73) What you will found in MTR 74) What is method of ststment 75) Draw the hydro test set up drawing including manifold, pressure gauge, relief valves and hose connections. 76) What is ANSI rating and what is class 77) What is API and ANSI,ASTM, ASME, ISO, PQP,ITP.. Mechanical questions
1) Draw auto level check
2) Preservation activities for rotating equipment 3) What is final alignment 4) What is VPCI 5) What are the alignment tolerances 6) Three types of tray 7) What is static and rotating inspection activities