Conceptual Design of Centralized Biogas Power Plant (Case Study in Bantul,


Yogyakarta, Indonesia)

Conference Paper · August 2014


DOI: 10.13140/2.1.1776.0006

CITATIONS READS
0 1,519

3 authors, including:

Rachmawan Budiarto Andang Widi Harto


Gadjah Mada University Gadjah Mada University
37 PUBLICATIONS   27 CITATIONS    36 PUBLICATIONS   3 CITATIONS   

SEE PROFILE SEE PROFILE

Some of the authors of this publication are also working on these related projects:

Increasing of Poor Household Income Through Green Business Practices Supported by Renewable Energy, MCAI – USA, Consortium Lakpesdam NU - PUSTEK UGM - PSE UGM
- CCES Indonesia, Jambi and West Sumatera View project

cdsr shera View project

All content following this page was uploaded by Rachmawan Budiarto on 09 October 2014.

The user has requested enhancement of the downloaded file.


Proceedings of the 3rd Applied Science for Technology Innovation, ASTECHNOVA 2014
International Energy Conference
Yogyakarta, Indonesia, 13-14 August 2014

Conceptual Design of Centralized Biogas Power Plant


(Case Study in Bantul, Yogyakarta, Indonesia)

Dintani Y N Na’imah, Rachmawan Budiarto


Department of Engineering Physics, Universitas Gadjah Mada
Jalan Grafika No. 2. Yogyakarta, Indonesia
dyudhitya@gmail.com; rachmawan@yahoo.com

Andang Widi Harto


Department of Engineering Physics, Universitas Gadjah Mada
Jalan Grafika No. 2. Yogyakarta, Indonesia
andang@ugm.ac.id

ABSTRACT
Since found in 1821, electricity has become one of most important needs to do daily activities. As
the increasing of population and economy activities, electricity demand will grow as well. Indonesia is a
development country which still depend its electricity supply on oil and gas sources. Since these sources
can be diminished in any time, government should more invest on build renewable energy power plant so
that the national energy dependence wouldn‟t be at stake.
This research is designed approaching to Linko Biogas Plants, Denmark. Parameters which are
used to design this plant are feedstock type, hydraulic retention time, and temperature operation of
digester. This plant utilizes gas turbine to generate electricity. To get the optimum electricity production,
gas turbine pressure ratio is varied, starts from 1.5 until 60.0.
Centralized Biogas Power Plant in Bantul will process 25,000 kg of cow manure each day. All of
feedstock will be mixed with water inside buffer tank. Then, digestion of this feedstock-water mixture
takes place inside two stages digester, both are continuous flow type which is operates in mesophilic
temperature (35oC). Total biogas yields from both digesters are 18,270 m3 per day. The raw biogas is
being purified before it enters power generation stage. In power generation stage, gas turbine uses air as
working fluid. The optimum pressure ratio of air compressor is 10.50, whereas, pressure ratio for biogas
compressor is higher by 1.1. Capacity factor of gas turbine is assumed to be 25% so that the electricity
generation of centralized biogas power plant is 2.109 GWh/year.

KEYWORDS: Conceptual Design, Centralized Biogas Power Plant, Manure

1 INTRODUCTION

Indonesia is a development country. In 2011, Indonesia population reach 237,641,000 people


(Ministry of Energy and Mineral Resources, 2011a). With the growth rate at 1.4%, this population will be
as much as 273 million in 2020 (Ministry of Energy and Mineral Resources, 2011a).
As the population grows, national electricity demands will also increases. Indonesia electricity
consumption reach 90.348 billion barrel oil equivalent (BOE) in 2010 or increased by 7.781 billion BOE.
By 2010, this rising of electricity consumption is the highest than any previous year. Figure 1.1 shows the
electricity consumption from 2005 until 2010. This electricity consumption is predicted to growth 6.6%
annually (Ministry of Energy and Mineral Resources, 2011a).
Perusahaan Listrik Negara (PLN), as the only electricity supplier in Indonesia, produces 25,670.51
MW of electricity. More than 30% of this electricity generates from steam power plant. While the other
28% electricity produce from combine cycle power plant. The rest electricity produced from hydro power
plant, diesel power plant, geothermal power plant and renewable energy power plant (Ministry of Energy
and Mineral Resources, 2011b).
As the increasing of electricity generation in Indonesia is unstoppable, the main electricity source
which is oil, coal and gas reserves slowly decline. None of oil and gas reserve resources will be last for
more than 200 years (Sekretariat Panitia Teknis Sumber Energi.). Thus, PLN cannot only depend on
these fossil resources as these resources are non-renewable ones. PLN must be looking for its
replacement, such as renewable energy resources.
Indonesia is blessed for having plenty of renewable energy resources. That Indonesia is an
agriculture country, it has 49.81 GW biomass potential energy. But until 2005, only 0.3 GW has been
used to supply the energy needs (Sekretariat Panitia Teknis Sumber Energi). Biomass energy potential
will increase as the growth of integrated farming in Indonesia.
Bantul was chosen because it has the most biogas technology potential than any area in
Yogyakarta. Bantul has 12 potential farming group which spread through 9 subdistrict (Salbuyun, 2011).
Pandan Mulyo, Bantul‟s biggest farmer group located in Srandakan, has 348 m3 biogas potential per day.
Unfortunately, this potential has not been utilized as electricity source.

2 METHODOLOGY

All vessels in this plant are designed as cylinder shape. Vessel is made with 10% oversizing
volume for safety reason. Volume for each vessel is determined using Equation 1.
(1)
Height of digester is determined first according to height of Linko Gas digester. So that, Biogas
Plant in Bantul has the same layer as Linko Gas Digester in Denmark. For another vessel, height diameter
ratio (Eq 2) is determined first. Thus the vessel sizing can be determined using Equation 3 – Equation 5.
(2)
(3)

(4)
⁄ ( ⁄ )

√ ⁄
(5)
Air, along with biogas, will be burned in combustion chamber. Air is assumed to be ideal gas, so
that
̅ (6)
Compressor and turbine are work isentropically with specific pressure ratio. Pressure ratio defined
as the comparison of fluid out from compressor/turbines with the inlet fluid to compressor/turbines,
according to the following equations:
(7)
(8)
: pressure ratio for compressor
: pressure ratio for turbine
The energy which is used by compressor is defined according to equation below:
(9)
where
: ideal work of compressor
: Specific heat of working fluid (kJ/kmol.K)
M : molecular weight of working fluid (kg/kmol)
The temperature and pressure inside the compressor and turbine is correlated according to the
following equations:

( ) (10)


( ) (11)

( ) (12)

( ) (13)

( )
T1 : temperature of inlet gas of compressor
T2‟ : the ideal temperature of gas leaving compressor to regenerator
T4 : temperature of gas leaving combustion chamber to turbine
T5‟ : the ideal temperature of gas leaving the turbine to high pressure regenerator
k : specific heat ratio of the working fluid
The difference between ideal and actual work of compressor and turbine are defined as isentropic
efficiency of compressor and isentropic efficiency of the turbine . The actual temperature of gas
leaving compressor and turbine are:
(14)
(15)
Before entering to gas turbine, the heat of working fluid is added by using heat exchanger or
furnace/combustion chamber. Combustion needs three requirement elements. It is fuel, oxygen and
trigger. The heat which is added to the working fluid is correlated to the specific heat of working fluid,
working fluid molecular weight and the temperature difference before and after combustion. It can be
calculated using this following equation:
(16)
: Ideal heat added to working fluid
: Specific heat of working fluid (kJ/kmol.K)
M : molecular weight of working fluid (kg/kmol)
T3 : temperature of gas leaving low pressure regenerator to furnace
T4 : temperature of gas leaving furnace to turbine
Due to caloric loss inside the furnace, the actual heat that has to be produce in furnace is:
(17)
: actual heat that must be added to the working fluid
: furnace efficiency
Then the exhaust gas from furnace will be expanded inside the turbine. This expansion produces
energy whose amount can be calculated using the equation below:
(18)
Brayton cycle efficiency is defined as:
(19)
: total efficiency of gas turbine (%)
: mechanic efficiency due to friction on turbine shaft (%)
: generator and conversion from mechanic to electricity efficiency (%)
: net turbine energy which is produced by expansion inside turbine (kJ/kg)

3 MECHANISM OF COLLECTING FEEDSTOCK

Bantul is located at 110o12‟34” – 110o31‟08” longitude and 7o44„04” – 8o00‟27” latitude. The total
area of Bantul is 506.86 km2. Bantul still has a lot of green areas, rice fields and gardens. Therefore,
25.56% people in Bantul work in agriculture sector (Bantul Government, 2013).
In 2011, Bantul has 59,819 livestock which is 20.37% from the total livestock in Yogyakarta
Province (Salbuyun, 2011). From the total livestock that lived in Bantul, 98% of it is population of cow.
The other livestock are dairy cow, buffalo and horse. From 2010 until 2011, this number of livestock had
increased 4.24% and this growth will increase annually.
Total livestock in Bantul potentially will produce 1,707,588.10 kg manure per day. This manure
production will yield 34,420.74 – 66,818.68 m3 of biogas per day. This biogas yield has the same value as
15,833.54 – 30,736.59 kg of Liquid Petroleum Gas (LPG), 17,898.78 – 34,745.94 liters of diesel fuel,
27,536.59 – 53,454.94 liters of gasoline, and 21,340.86 – 41,427.58 liters of kerosene (Salbuyun, 2011).
The Centralized Biogas Power Plant is designed to supply electricity to city of Bantul. To
minimizing loss at power distribution, three areas are chosen to be alternatives location of Centralized
Biogas Power Plant. Feedstock will be collected from area nearby the plant location. Table 1 is shown the
alternative locations for biogas feedstock.
Table 1 Alternative Location of Manure Collecting Mechanism
Alternatives 1 Alternatives 2 Alternatives 3
Number Number Number
Sub-district of cows Sub-district of cows Sub-district of cows
1 Panjangan*) 4574 Bantul*) 2657 Pleret*) 3440
2 Srandakan 3995 Jetis 2255 Bantul 2657
3 Pandak 3716 Imogiri 2495 Jetis 2255
4 Bambanglipuro 4739 Pundong 3295 Imogiri 2495
5 Jetis 2255 Bambanglipuro 4739 Bantul 2657
6 Bantul 2657 Pandak 3716 Kasihan 2985
7 Pundong**) 3295 Panjangan 4574 Piyungan 4347
8 Sanden**) 2913 Banguntapan 1422
9 Pandak**) 3716
TOTAL 25231 26644 25974
*) Sub-district with mark *) is the location of Centralized Biogas Power Plant
Location with mark **) is the farthest sub-district from the plant. Thus manure from this sub-
**) district will be collected to meet the feedstock requirements (25,000 cows)
For alternatives 2 and 3, Biogas Plant will be built in Bantul and Pleret.
4 DESIGN OF BIOGAS PRODUCTION PROCESS AND POWER GENERATION

After collected from all nearby places, feedstock enter buffer tank to get conditioning treatment.
Inside the buffer tank, feedstock is separated from all impurities, like stone, and mixed with water.
Centralized Biogas Power Plant in Bantul will utilize two stage digesters. Both digesters are continuous
flow digesters. Digestate from first stage digester will enter the second stage digester to get more biogas
production. The other purpose of multiple digestions is to minimize the probability of fresh manure being
washed out before producing biogas. Biogas yield from both digesters is cleaned from contamination such
as hydrogen sulphide, carbon dioxide and water vapour. Then biogas ready to process in power
generation stage.
Centralized Biogas Power Plant in Bantul will produce electricity at the same amount in every unit
time. It means that the electricity production does not depend on its hourly demand. The electricity
installation is on-grid type. If the electricity production from Biogas Power Plant doesn‟t meet the
demand, it needs supplementary supply from other sources.
Centralized Biogas Power Plant in Bantul utilizes regenerative gas turbine. This gas turbine uses
exhaust gas which is mixture of air and biogas from combustion chamber as working fluid. The air is
assumed to be gas ideal, so its specific heat stays constant at various temperatures. Besides, the air
volume in 1 atm and 308 K is 25.28 m3/kmol. All process is summarized in Figure 1 and Figure 2.

4.1 Biogas Production


Centralized Biogas Power Plant in Bantul is using multiple digesters which can increase biogas
production by 5% (Ellegard, 2013a). Feedstock of this plant is manure from cows, in specific, beef cattle
that can produce 29 kg of manure per day. Using manure properties from Table 2, total feedstock
collected is 725,000 kg/day. The first digestion produces 17,400 m3 of biogas, whereas the second
digestion produces 870 m3 of biogas. Kawentar (2010) mentioned that low heating value of biogas is
33,496 kJ/liter. Thus, total of biogas yield in centralized Biogas Plant contains 7,083.01 kJ/s of heating
value. Biogas-to-manure ratio of this plant is 8.98. It means 1 kg of manure produce 8.98 m3 of biogas.
Table 2 Manure properties
Parameter Amount Unit
Manure production 29 Kg/day
Total dry matter 12% From total manure
Volatile slurry 80% From total dry matter
Biogas yields from 1st 25% From total volatile slurry
digestion
Biogas yields from 2nd 5% From 1st digestion biogas
digestion

4.2 Conditioning Stage


Conditioning stage occurs inside buffer tank. Manure will be mix with water with manure-water
ratio is 1:1. It means 1 kg of manure needs 1 liter of water (Hanif, 2010). The other purpose of this stage
is to stabilize the input flow to digester.
Buffer tank has two inlets at top of it, one for manure inlet and another is for water inlet. Manure is
pumped into the buffer tank at 2.10 x 10-2 m3/s. Water is delivered into the buffer tank 8.39 x 10-3 m3/s.
To avoid agglutination, buffer tank also equipped with two low speed agitators. Manure is set to stay
inside the buffer tank for 30 minutes.
The height to diameter ratio of buffer tank is designed to be 1.25. In consequence, buffer tank‟s
diameter and height is 5.72 m and 7.16 m respectively.

Figure 1: Biogas Production and Purification Stage

Figure 2: Power Generation Stage


4.3 First and Second Stage Digester
Digester which is used in Centralized Biogas Power Plant in Bantul is continuous flow type.
Continuous flow digester is compatible to be used for large-scale biogas plant. That it requires less
volume than the batch type one is one of continuous flow digester advantage. Besides, the gas production
from continuous flow digester is more stable to be delivered to gas turbine system. Furthermore,
operation and maintenance cost of continuous flow digester is less than batch type digester.
Centralized Biogas Power Plant in Bantul is designed to have multiple stage digesters. The purpose
of multiple stage digesters is to degrade the feedstock again, in case that a few of fresh manure had been
washed out. The utilizing of multiple stage digesters will increase biogas production by 5% (Ellegard,
2013b).
Centralized biogas power plant in Bantul processes 265,000 ton of manure per year (725,000
kg/day). This number is close with feedstock of Linko Gas plant in Denmark, which is 260,000 ton/year
(712,328.77 kg/day). Therefore, Centralized Biogas Power Plant in Bantul adapts Linko Gas biogas plant.
Like Linko Gas, Centralized biogas power plant will have digesters whose height is 8.7 meter, with
safety margin by 10%. So, the effective volume is 90% from the actual volume.
Having huge number of feedstock, Centralized biogas plant in Bantul has 15 first stage digesters
and 10 second stage digesters. The first digester retention time is 18 days. Then the manure will be
transferred to second stage digester and stay there for 6 days. The height of second stage digester is still
the same with the height of first stage digester, which is 8.7 m. Height of first stage digester is 22.26 m,
while the diameter of second stage digester is 6.48 m.
Both digesters will have continuous low speed top mounted agitator/mixer. Agitator applies in
digester to homogenize the substrates. It prevents floating and sinking layers and encourages fast
discharge of gas from substrate.
Both first and second digesters have three agitators inside the digester. The agitator is submersible
top mounted assembly that works at different level of fluid. Agitators must work thoroughly to prevent
dead space. The agitator and its assembly can be seen in Figure 3.

Figure 3: Left: slow speed agitator; Right: Agitator assembly in digester (Source: Optimum energy
balance thanks to Amaprop submersible mixers. Accessed from http://www.ksb.com/ksb-
uk/Products_and_Services/waste_water/Biogas/630864/biogas_low-speed_amaprop_art.html, 27 July
2013)

4.4 Purification Stage


From digester, the first impurity to be removed is hydrogen sulphide (H2S). This compound has to
be removed to increase low heating value of biogas. In this plant, hydrogen sulphide is removed using
adsorbtion technique which utilizing activated carbon as adsorbent. Because activated carbon absorbs best
at 50oC, before raw biogas enters adsorption column, it is compressed until its temperature reach 50 oC
(Vinci, et al. 2013). The activated carbon is impregnated with potassium iodine (KI) or sulphuric acid
(H2SO4) to fasten the reaction inside adsorption tank. The activated carbon needs to be replaced when it is
saturated. In this process, H2S is converted to elemental sulphur (S).
After hydrogen sulphide had been removed, biogas is delivered to CO2 absorption column (see
Figure 1 and Figure 4 for more details). In this column, CO2 is washed out using water scrubbing
technique. Biogas is fed from the bottom of vessel, where it meets a counter flow of water which is fed
from the top of vessel. Since carbon dioxide is more soluble than methane, it is absorbed by water. Biogas
which exits from the absorption vessel is saturated by water. Hence, it needs to be dried to remove water
vapour.

Figure 4: Flowchart of Biogas Purification Stage


Not only carbon dioxide that is absorbed by water, but also some methane and hydrogen sulphide.
Because of that, water from absorption column is led to flash tank. Water will be heated up until it reach
dissolved methane boiling point. The dissolved methane will become vapour and then fed back to the
absorption column.
While the methane is fed back, water is sent to desorption vessel. Carbon dioxide is separated from
water by air scrubbing. As the water is being exposed to atmospheric air, the tendency to approach
equilibrium atmospheric partial pressure will transfer oxygen into the water and carbon dioxide out of
water (Vinci, et al., 2013)Error! Reference source not found.. The exiting water is then cooled down
before the water is returned to absorption vessel. The vent gas from desorption vessel consists of air,
carbon dioxide and small amount of methane. From desorption vessel, the vent gas is delivered to gas
treatment to be filtered before it is exiled to environment.
After purification, biogas only consists of methane (CH4), hydrogen (H2) and a little bit nitrogen
(N2). Then, it will be transferred to gas holder. Although biogas impurities had already been removed,
methane and hydrogen are assumed to be loss by 2%.

4.5 Power Generation


After filtering unit, biogas will be placed temporary in gas holder. The other benefit of gas holder is
to stabilize flow rate to power generation. Centralized biogas power plant in Bantul needs 5 gas holders
which each capacity is 676.67 m3. Each gas holder height is 11.04 m and the diameter is 8.83 m.
Air compressor ratio is varied from 1.5 until 60. The result is shown in Figure 5. The highest
efficiency is reached at 23.46%, when the pressure ratio is 10.50 atm. At that pressure, power that can be
generated is 1,425.42 kW.
TOTAL EFFICIENCY
25.00%
20.00%
15.00%
10.00%
5.00%
0.00%

26.00
1.50
5.00
8.50
12.00
15.50
19.00
22.50

29.50
33.00
36.50
40.00
43.50
47.00
50.50
54.00
57.50
Figure 5: Total Efficiency of Power Generation
From total power, 462 kW of it is utilized for agitator inside the digester. So the energy that can be
transfer to the grid is 963.42 kW. The temperature of flue gas which leaves the system is 556.84 K.
Capacity factor of gas turbine is assumed to be 25% (R. Kakka Dewayan, et al., 2014) so that the
electricity generation of centralized biogas power plant is 2.109 GWh/year.

5 CONCLUSION

1. Centralized Biogas Power Plant in Bantul is design to use feedstock from 25,000 cattle manure.
The net electricity from Centralized Biogas Power Plant in Bantul is 963.42 kW.
2. Process design of Centralized Biogas Power Plant in Bantul begins with digestion. For 25,000
cow head manure, it takes place in 15 first stage and 10 second stage digesters which both are
continuous flow ones. This process produces 18,270 m3 of biogas daily. This raw biogas is
filtered using carbon active and water scrubbing technology. Then, it is ready to be used in gas
turbine (Brayton Cycle). This plant utilizes regenerative Brayton Cycle.
3. There are 3 alternatives area to build Centralized Biogas Power Plant in Bantul, which are
Panjangan, Bantul and Pleret. Feedstock will be gathered from nearby farm. This plant use
12,000 liter vacuum tanker to transport the feedstock to plant area.
Centralized Biogas Power Plants can raise energy sovereignty in Indonesia. It also enhances
integrated farming in Indonesia. Biogas in general is one of solutions to waste management and energy
scarcity in Indonesia. But to build Centralized Biogas Power Plant still needs more research from all
education background, such as microbiology, chemical engineering, mechanical engineering, economic,
etc.

6 ACKNOWLEDGEMENTS

Lars Ellegard from BWSC Denmark who willing to discuss about process parameter of centralized
biogas power plant and centralized digester sizing.
REFERENCES
Aggarangsi P. and Teerasountornkul T., 2011. “Practical Design and Efficiency of Large Scale Biogas
Digesters for Swine Farms in Thailand”. Journal of Sustainable Energy and Environment Special
Isuue, 51-55.
Chae K.J., Yim S.K., Choi K.H., Park W.K. and Lim D.K., Anaerobic Digestion of Swine Manure: Sung
Hwan farm-scale Biogas Plant in Korea.
Chengel Y.A. and Boles M.A., Fifth Edition: Thermodynamics, An Engineering Approach.
CV Madani Callysta Salbuyun, 2011. Survei Potensi Bahan Bakar Alternatif Berbasis Biogas untuk IKM.
Laporan Penelitian, CV Madani Callysta Salbuyun, Yogyakarta.
Deublin D. and Steinhauser A., 2008. Biogas from Waste and Renewable Sources. Wiley-VCH,
Weinheim.
Hanif A., 2010. Studi Pemanfaatan Biogas Sebagai Pembangkit Listrik 10 KW Kelompok Tani Mekarsari
Desa Dander Bojonegoro Menuju Desa Mandiri Energi. Laporan Penelitian, Teknik Sistem Tenaga
Jurusan Teknik Elektro Institut Teknik Sepuluh November, Surabaya.
Harto A.W., Optimasi Sistem Turbin PCMSR. Laporan Penelitian.
Hjort-Gregersen K., 1999. Centralised Biogas Plants: Integrated Energy Production, Waste Treatment
and Nutrient Redistribution Facilities. Danish Institute of Agricultural and Fisheries Economics,
Esbjerg
Kawentar W.A., 2010. Analisis Perancangan Pembankit Listrik Tenaga Sampah (PLTSa) dengan Metode
Anaerobic Digestion di Tempat Pembuangan Sampah Akhir (TPA) Bantar Gebang Bekasi.
Undergraduate Thesis, Physics Engineering Department, Engineering Faculty, Gadjah Mada
University, Yogyakarta.
Kementrian Energi dan Sumber Daya Mineral, 2006. Indonesia 2005 – 2025 Buku Putih. Laporan
Penelitian, Kementrian Energi dan Sumber Daya Mineral Bidang Sumber Energi Baru dan
Terbarukan, Jakarta.
Kementrian ESDM, 2011. “Statistik Listrik”. Presentasi.
Kumar A. and Sah G.N., 2004. Thermal Engineering.Narosa Publishing House, Pangbourne.
Luostarinen S., Normak A. and Edstrom M., 2011. Knowledge Report: Overview of Biogas Technology.
Report, Baltic Forum for Innovative Technologies for Sustainable manure Management, Baltic
MANURE, Denmark.
Ministry of Energy and Mineral Resources, 2011. 2011 Handbook of Energy and Economic Statistics of
Inonesia. Jakarta: Centre for Data and Information on Energy and Mineral Resources.
Moran, Fundamental of Engineering Thermodynamics
Persson M., 2013. Evaluation of Upgrading Techniquefor Biogas. Report, Swedish Gas Center, Swedia.
Sannaa M.N., The Development of Biogas Technology in Denmark: Achievements and Obstacles. Thesis,
Master Degree, Roskilde University RUC Denmark.
Seadi T.A., 2000. Danish Centralised Biogas Plants: Plants Description. Bioenergy Department,
University Southern Denmark, Esbjerg.
Seadi T.A., Rutz D., Prassl H., Kottner M., Finsterwalder T., Volk S. and Janssen R., 2008. Biogas
Handbook. Laporan Penelitian, University of Southern Denmark, BiG>East Project, Esbjerg,
Denmark.
Sekretariat Panitia Teknis Sumber Energi. “Blueprint Pengelolaan Energi Nasional 2006 – 2025”.
Presentasi.
Wellinger A., 1999. Process Design of Agricultural Digesters. Nova Energie GmbH, Ettenhausen.
Zhang H., 2010. Sludge Treatment to Increase Biogas Production. Thesis. Land and Water Resources
Engineering, Royal Institute of Technology, Sweden.
Brayton Cycle (Gas Turbine) for Propulsion Application Analysis.
Ellegard L., 2013a. Large Scale Biogas Plants or Centralized Biogas Plants of Today, Presentation at
Nordic Biogas Conference (23-24 April 2012). Communication via email. 6 June 2013
Ellegard L., 2013b. Communication via email. 9 June 2013.
Ellegard L., 2013c. Communnication via email. 17 June 2013.
Ellegard L., 2013d. Communication via email. 20 June 2013.
Jensen, J., 2013. Communication via e-mail. 5 June 2013.
Web-1: Bantul Regency Government. Jumlah Penduduk Berdasarkan Mata Pencaharian. Accessed from
http://bantulkab.go.id/datapokok/0506_kepadatan_penduduk_mata_pencaharian.html, 6 May 2013
10:46.
Web-2: Van Haren M. and Fleming R., 2013. Electricity and Heat Production Using Biogas From the
Anaerobic Digestion of Livestocks Manure – Literature Review. Ridgetown College – University of
Guelph. Accesed from http://homepage2.nifty.com/biogas/cnt/refdoc/whrefdoc/d14prdgn.pdf, 13
April 2013 11:00:26.
Web-3: Aqua-Calc. Manure Density in 285 Measurement Units. Accesed from http://www.aqua-
calc.com/page/density-table/substance/manure, 01 August 2013.
Web-4: Air Composition. Accesssed from http://www.engineeringtoolbox.com/air-composition-
d_212.html, 05 July 2013 09:37 am.
Web-5: Bauer Slurry Tankers. Accesed from http://www.kirkirrigation.co.nz/documents/Bauer%20
Slurry%20Tanker%20Brochure.pdf, 30 June 2013
Web-6: Optimum energy balance thanks to Amaprop submersible mixers. Accessed from
http://www.ksb.com/ksb-uk/Products_and_Services/waste_water/Biogas/630864/biogas_low-
speed_amaprop_art.html, 27 July 2013.
Web-7: Biomethane Regions: Introduction to Production of Biomethane from Biogas. Accessed from
http://www.swea.co.uk/Bio-methaneRegions/downloads/Biomethane_developer_brochure_EN.pdf, 2
August 2013
Web-8: Vinci B.J., Summerfelt S.T., Piedrahita R.H., Watten B.J., and Timmons M.B. Carbon Dioxide
Stripping. Accessed from http://ag.arizona.edu/azaqua/ista/ISTA7/RecircWorkshop/Workshop%20
PP%20%20&%20Misc%20Papers%20Adobe%202006/8%20Gas%20Transfer/Degassing/CO2%20C
ontrol.pdf, 01 October 2013.
Web-9: R. Kakka Dewayana P, Dr. Ir. Hermawan, DEA, Karnoto, ST, MT. Proyeksi Kebutuhan dan
Penyediaan Energi Listrik di Jawa Tengah Menggunakan Perangkat Lunak LEAP. Accessed from
http://eprints.undip.ac.id/25245/1/ML2F004500.pdf, 14 May 2014.