STANDARD OPERATING PROCEDURE FOR STATOR WATER COOLING SYSTEM


OBJECTIVE: This Procedure is intended to provide guidance and instructions for carrying out
the system of Stator water during plant start up.

SCOPE: This Procedure is applicable to Stator water pump located at Turbine area
INTRODUCTION: Stator water system is used for cooling generator stator windings. It
is a closed loop circuit. It consist of makeup tank, 2 pumps , 2 coolers, pressure control valve ,
Temp control valve, Demineralizer, Filters. Water for makeup is from CTP. When system is in
service m3/hr water is recalculate through demineralizer to keep conductivity in limit.. Do not
run the pump when there is no hydrogen in generator. Water pressure is to be maintained,
slightly less than hydrogen pressure.
Technical data:

Stator Cooling water system:

Stator water cooler:

Type: AEW630-1

Tube side design pressure: 1.2Mpa

Shell side design pressure: 1.2 Mpa

Tube side design temperature: 60 deg c

Shell side design temperature: 78 deg c

Tube side test pressure: 1.5 Mpa

Shell side test pressure: 1.5 Mpa

Baffle spacing: 1452 mm

Weight: 3166 kg

Make: DFEP control equipment co ltd.

Stator cooling water pump:

DFB type single stage centrifugal pump

Type: 100-65-260,

Flow: 110 m3/hr


Prepared By: Revision No. 00
Reviewed By : AGM Operations Approved By : GM Operations
2

Head: 80m,

Speed: 2900 rpm,

Motor power: 45 Kw,

Efficiency: 72%

Sno.:100127

Make: Original Guoying Wujin pump factory

Multiple cartridge fine water filter:

Type: WFF-121-1

Nominal diameter: DN 125

Design pressure: 1 Mpa

Design temperature: 70 deg C

Make: Hangzhou Kengxing blower co ltd Zhejiang, China

Demineralizer:

Design pressure: 1.2 Mpa

Design temperature: 70 deg c

Work pressure:1.2 Mpa

Sno.: HD282-3F-29

DFEM control equipment co ltd

RESPONSIBILITY: Unit Control Engineer, Field Engineer and Desk Engineer.


SAFTEY PRECAUTIONS:
1. Ensure no permit to work is pending on regarding this system by checking with EE/MRSE.

SAFTEY PPE’s: Ear Plugs, Safety Goggles, Hand Gloves, etc.

SPECIAL TOOLS/ EQUIPMENTS: NIL


Prepared By: Revision No. 00
Reviewed By : AGM Operations Approved By : GM Operations
3

OPERATING PROCEDURE -
Sr. RESPONSIBILITY
Description
No. UCE DE FE EE
PRE- START CHECKS:
1 All permits and cross permits have been returned. √ √ √ √
2 Power supply and control power supply available. √ √
3 System interlock test are satisfied and stator water system valve √ √
position is rightly.
4 When supplementary water for stator cooling water tank is analyzed to √
be qualified, start water supplement valve to supplement water to full.
5 Closed cooling water system is working normally. √

6 Control power supply and dynamical power is sent and instrumental
meters √ √ √
and alarming devices are working.

7 Make sure that generator hydrogen system and sealing oil system are √ √ √
working normally.

8 Make sure that hydrogen pressure inside generator reaches to √ √


0.2MPa.

Sr. Responsibility
Description
No.
Filling water to stator water system UCE DE FE EE

1 Water in system should be completely discharged before filling water


to
stator water system.
√ √
1) Stator water system Water is generally filled to stator water system
through ion exchanger with flow of 25 40L /min.

2 Make sure that water circulating pipes before ion exchanger are
flushed and clean, water in pipelines is qualified. Open manual valve
√ √
before solenoid valve.

3 Prepare resin of ion exchanger and fill water into stator, start √ √ √

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
4

condensing water transfer pump.

4 Open ion exchanger inlet manual valve


√ √

5 Supplement water inlet pressure is 0.36MPa; permit maximum inlet



water temperature is 50 DegC.

6 Supplement water to water tank to normal level. Solenoid valve closes


automatically. √

7 Open the air valves on stator water tank, cooler and pipeline to
discharge air; then close it. √

Sr. Responsibility
Description
No.
Stator water cooling pump start UCE DE FE EE
1 Stator cooling water should be reported to be qualified by chemical
and √ √ √ √
cooling water tank level is normal.

2 Start stator water cooling pump and open outlet valve slowly. Check
and
make sure that vibration, sound and all bearing temperatures are √ √ √
normal.

3 Check and make that outlet pressure is normal. When water cooler,
ion
exchanger air discharging valve see water, close air discharging valve,
regulate re-circulating valve to keep generator stator inlet water
pressure be √ √ √
at about 320KPa (local indication). Regulate water supplement valve
of water
tank and regulate ion exchanger flow to be within 25 40L /min.

4 After system runs normally, put the other stator water cooling pump
into
√ √
standby.

5 Put stator water cooler cooling water into operation.


√ √

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
5

Sr. Responsibility
Description
No.
Stator cooling water pump stop UCE DE FE EE

1 Release standby stator water cooling pump from interlock.


√ √ √ √
2 Stop stator water cooling pump. √ √ √
3 If repair is needed after stator water cooling pump stops, power should
be
cut off, inlet & outlet valves of the pump should be closed. Decrease √ √
the
pressure and then discharge water.

Sr. Responsibility
Description
No.
Stator cooling water pump switching UCE DE FE EE

1 Check and make sure that standby stator cooling water pump bearing √ √ √ √
oil cup
level is normal and oil quality is good.

2 Start standby pump and check pump completely. √ √

3 Check and make sure that stator cooling water head pipe pressure is √ √
normal.

4 Stop former running stator water cooling pump. √ √

5 Put former running pump into standby. √



Sr. Responsibility
Description
No.
Supervision for stator Water system UCE DE FE EE

1 Stator water tank level and temperature. √



2 Stator water pump inlet & outlet pressure and current. √

3 Stator water pump motor and pump bearing oil level, bearing √
temperature,

vibration and sound.

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
6

4 Stator water cooler outlet filter screen inlet & outlet pressure and √

differential pressure
5 Generator stator cooling water inlet & outlet pressure difference √ √
.
6 Stator cooling water inlet flow. √ √
7 Stator cooling water conductivity is 0.5-1.5µS/cm. √

8 Ion outlet stator water conductivity is 0.1-0.4µS/cm. √

9 Ion inlet and outlet pressure. √

Operating Procedure:

Sr. Description Responsibility


No.

UCE DE FE EE
1 Gradually adjust pressure reduce valve and keep downstream √
pressure of valve 0.5 MPa after opening makeup valve of stator √
cooling water system from demineralised water system.
2 Makeup water to tank and confirm interlock loop of level switch. When √
the low level switch is in ACTION, the makeup solenoid valve (SV)
should be filled automatically.
3 Open the venting valve of generator cooler, strainers, ion exchanger. √ √
4 Start a stator cooling water pump and make normal circulating √
operation. After water flow out from the vent valve, the vent valves can √
be closed.
5 When the stator cooling water pressure of inner generator more than √
gas pressure of generator during the initial circulating process, the √
leakage of inner generator for stator cooling water system must be
supervised and checked.
6 According to temperature of stator cooling water, the cooler would be √
put in service
7 Put ion exchanger and conductivity meter in service. We can adjust √
make up valve to control the water flow through the ion exchanger. If
the outlet water conductivity of ion exchanger is lower than the defined √
value, the water flow must be decreased. The water flow disposed by
the ion exchanger is the 5~10% of the total inlet water in the winding
8 At the normal condition, one strainer should be operated and the other
one would be standby. When the pressure drop of the water through
strainer is higher than the normal pressure drop 0.021 MPa, cleaning
or instead of new strainer should be performed after

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
7

isolating of equipment
9 System check and put another pump standby position. √ √

Alarms and interlocks


Sr. Tag no.
Description
No.
STOP/ TRIP CONDITION DURING OPERATION:

1 Stator water pump out and inlet differential pressure < 0.14MPa,
standby pump starts with a time delay of 3 5s.
2 When stator water tank level is lower than 450mm, make up water
solenoid valve opens.
3 When generator stator winding inlet water conductivity is >9.5μs/cm,
reject load or stop the unit.
4 When stator water flow is <52% of rated flow, generator trips with a
time delay of 30s.

ABRIVIATIONS / NOTATIONS:-
o SOP: Standard Operating Procedure
o UCE: Unit Control Engineer
o DE: Desk Engineer
o FE: Field Engineer
o DCS: Distributed Control System
o EE: Electrical Shift Engineer

Important Note:

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
8

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
9

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
10

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
11

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations
12

Prepared By: Revision No. 00


Reviewed By : AGM Operations Approved By : GM Operations

Das könnte Ihnen auch gefallen