Sie sind auf Seite 1von 2

1/6/2015

Unit 5 cold flush


Sample location time pH CON(µs/cm) T.H.N(ppm) comment
Boiler drain 15:oo 8.29 48.1 215
Boiler drain 20:00 7.88 50.7 72
Boiler drain 21:00 8.55 11.83 28
Feed(Economizer) 21:00 8.86 4.81 Nil
Boiler drain 22:00 8.32 31.70 100
Feed(Economizer) 22:00 9.01 8.28 Nil
Boiler drain 23:35 8.80 13.89 3.2
Feed(Economizer) 23:35 9.16 8.02 Nil
Boiler drain 00:35 8.86 13.69 2.4
Feed(Economizer) 00:35 9.04 7.76 Nil

2/6/2015

Sample location time pH CON(µs/cm) T.H.N(ppm) comment


Boiler drain 8:10 AM 9.19 8.33 0.344
Feed(Economizer) 8:10 AM 9.19 7.18 0.255
Boiler drain 9:30 AM 8.48 10.73 0.297
Feed(Economizer) 9:30 AM 9.04 6.42 0.247
Boiler drain 11:45 AM 8.90 20.7 14.0
Feed(Economizer) 11:45 AM 8.58 5.62 Nil
Boiler drain 2:00 PM 9.0 11.3 4.3
Feed(Economizer) 2:00 PM 8.60 5.27 Nil
Boiler drain 3:37 PM 8.99 7.30 1.3
Feed(Economizer) 3:37 PM 8.64 4.91 Nil
Boiler drain 4:40 PM 8.58 7.05 1.1
Feed(Economizer) 4:40 PM 8.82 4.48 Nil
Boiler drain 5:40 PM 8.85 6.16 0.9
Feed(Economizer) 5:40 PM 8.79 4.64 Nil
Boiler drain 6:40 PM 8.85 5.46 0.70
Feed(Economizer) 6:40 PM 8.90 4.35 Nil
Boiler drain 7:40 PM 8.81 5.29 0.70
Feed(Economizer) 7:40 PM 9.02 4.34 Nil
Boiler drain 8:40 PM 8.79 5.22 Nil
Feed(Economizer) 8:40 PM 9.09 4.30 Nil
3/6/2015

Unit 5 Boiling out

Date Time pH Conductivity(µs/cm) N2H4(ppm) Comment


3/6/2015 8:10 pm 9.63 48.80 14.250 Pressure=18
bar
9:20pm 9.80 47.3 6.750
10:30pm 10.06 62.4 7.620
12:00am 10.24 60.8 11.480
01:am 10.30 62.6 14.220
2:00am 10.37 66.2 12.690
4:30am 10.31 56.2 11.850
5:30am 10.23 51.0 10.740