Sie sind auf Seite 1von 4

Project:

Visual Inspection

Check list Criteria Yes No N/A Comments


Electrical installation
All components are properly and permanently
As per drawing
connected

Equipment is easily accessible for maintenance. As per drawing

All wiring is connected. There is no loose connection

Installed wire and conduit sizes match the plans. As per drawing

All electrical building penetrations are


As per drawing
permanently flashed or sealed as per plan detail.

Wiring systems are protected against wind,


As per drawing
extreme temperatures, and solar radiation.
Mechanical installation
The array is ventilated as per the plan detail.
The array frame is secured as per plan detail As per drawing
All fasteners used on aluminum structures or
module frames are stainless or as detailed in plan As per drawing
drawing.
Dissimilar metals are isolated.
All system components are protected against
As per drawing
weather damage and corrosion.
Modules have been inspected for any defects
including delamination.
Mechanical and structural systems conform to the
As per drawing
plans.

String layout matches the as-built string diagram. As per drawing

DC system
All DC components rated to operate at Voc STC x
1.25.
All DC components rated to operate at Isc STC X
1.25

Doc No : FR/EN/17/03/00 1 of 4
Date : 24 Oktober 2018
Project:
Visual Inspection

Check list Criteria Yes No N/A Comments


DC switch disconnect is properly fitted. Not Applicable
AC and DC cables are separated.

DC cables are adequately protected. Double insulation (as per datasheet)

PV string cables, PV array cables and PV DC


main cables have been selected and erected so
As per drawing
as to minimize the risk of earth faults and short-
circuits
PV rated cables As per datasheet
Systems with string over-current protective
Not Applicable
devices:
·         Rated for DC operation at
Not Applicable
the fault energies present
·         Rated for operation at Voc
STC x # of modules in string x Not Applicable
1.15
Plug and socket connectors mated together are
of the same type and from the same
manufacturer.
Where a PV system has a direct connection to
earth on the DC side (functional earth), a
Not Applicable
functional earth fault interrupter is provided to the
requirements of IEC 60364.
AC system
Utility AC disconnect can be locked in the ‘off’
position only.
Inverter protection settings comply with local
regulations.
Inverter type and power match the system design
documents.
Inverter power is appropriate for the size of the
array.
Inverter can withstand maximum voltage (Voc)
and current (Isc) of the array.
Means of isolating the inverter are provided on
the AC side.

Doc No : FR/EN/17/03/00 2 of 4
Date : 24 Oktober 2018
Project:
Visual Inspection

Check list Criteria Yes No N/A Comments


Isolation and switching devices are connected
such that PV installation is wired to the “load” Not Applicable
side and the public supply to the “source” side.
Safety
Electrical design is adapted properly.

All live parts are adequately insulated/protected. As per drawing

The system has been properly grounded at


As per drawing
necessary locations.
Surge protection devices are installed as per
As per drawing
plan.

Area of all wiring loops kept as small as possible.

Array frame equipotential bonding installed As per drawing


Lockout/tagout procedures are in place
Labeling
Labeling is present
“WARNING MULTIPLE POWER SOURCES” "Warning two power sources"
All wiring are labeled
Protective devices and switches are labeled
Junction and terminals are labeled
Munting structure are labeled
Inverter are labeled (inverter number)
Array combiner fuse type and rating is labeled in
Not Applicable
each array combiner.
System diagram is displayed on-site in an
accessible location
Emergency shutdown protocol is displayed on-
site in an accessible location.
AC and DC isolators are appropriately labeled.
Any fused disconnect has the fuse type and
Not Applicable
rating labeled.

Doc No : FR/EN/17/03/00 3 of 4
Date : 24 Oktober 2018
Project:
Visual Inspection

Check list Criteria Yes No N/A Comments


Aesthetics
Module lines are straight
Painting is satisfactorily completed.
Inverter mounting are built as planned.
Required photographs
Arrays (from the front and rear if possible, or at
from least 2 angles)
One close up of module label
Racking system and connection point detail
Labeling, include: inverter, mounting structure,
junction and terminal, wiring
Inverters (installation and name plate)
Conduit runs (all supports, roof, wall, ceiling)
Combiner boxes (installation and name plate)
Disconnects DC and AC (installation and name
plate)
Interconnection (meter and service disconnect
and metering cabinet)
Building penetrations
Noteworthy observations

Tested by: Time started :


Time finished :

Verified by:

Doc No : FR/EN/17/03/00 4 of 4
Date : 24 Oktober 2018