EHS- Construction
Revision No.
Management Plan Check List
Effective Date

Contract No: Consultant:

Project Title: Contractor:

Document Name: Sub Contractor:

Please Note: The check sheet is a guide. The section no.1 to 4 is a minimum requirement for the HSE Plan, hence 100%
score is mandatory. For section no. 5, if it fails to achieve 80% score is an immediate rejection of the HSE Plan. However,
any one area may deem the plan rejected if it constitutes a serious failure in HSE requirements.

When reading a question and the HSE Plan is for a continuous moving site i.e. sewerage line, please consider the question
on this basis.

GUIDE: Tick = Yes & 2 points, Cross = No & 0 points,


Not Applicable = 2 points (for computation purpose only) & highlight the field with color.
Section Max Score % Comments
1 Project Details 8 0 0
2 Document Control 10 0 0
3 Project Description
3.1 Location 6 0 0
3.2 Scope 2 0 0
3.3 Project Schedules and Milestones 8 0 0
4 Project EHS Management
4.1 EHS Policy and Management 8 0 0
4.2 Roles and Responsibilities 4 0 0
4.3 EHS Legal Requirements 16 0 0
4.4 Management of Contractors 16 0 0
4.5 EHS Risk Management Procedures 20 0 0
4.6 Training and Awareness 12 0 0
4.7 EHS Incidents 10 0 0
4.8 Consultation and Communication 30 0 0
4.9 Monitoring, Inspection and Auditing 46 0 0
4.10 EHS-CMP Review and Update 4 0 0
4.11 EHS File (Project Close out Report) 20 0 0
5 Project Specific Information
5.1 Site Security Plan and Access Control 10 0 0
5.2 Project Permit to Work Procedures 6 0 0
5.3 Traffic Management Plan 14 0 0
5.4 Material Storage Plan 4 0 0
5.5 Identification and Management of Asbestos and other
Hazardous Materials / Substances 10 0 0

5.6 Site Safety Rules 4 0 0


5.7 Emergency Management Plan (Including First Aid) 14 0 0
5.8 Manual Handling Operations 4 0 0
5.9 Working at Height/Roofs 6 0 0

Page 1 of 10
5.10 Fixed and Temporary Electrical Installations 10 0 0
5.11 Personal Protective Equipment 4 0 0
5.12 Plant and Equipment 4 0 0
5.13 Housekeeping Arrangements/Slip,Trip & fall 4 0 0
5.14 Lifting Equipment and Lifting Operations 14 0 0
5.15 Welfare and Site Accommodation 4 0 0
5.16 Scaffolds and Ladders 6 0 0
5.17 Cantilevers and Platforms 6 0 0
5.18 Formworks and Structures 6 0 0
5.19 Excavations and Trenches/Existing Services 14 0 0
5.20 Confined Spaces 8 0 0
5.21 Demolition and Decommissioning 8 0 0
5.22 Piling 8 0 0
5.23 Electrical and Gas Welding/Gas Cutting 8 0 0
5.24 Working over or Adjacent to Water 8 0 0
5.25 Portable Tools 6 0 0
5.26 Animals and Reptiles 4 0 0
5.27 Workplace Bullying and Violence 4 0 0
5.28 Impacts / Hazards from Adjacent Activities 4 0 0
5.29 Services Coordination 8 0 0
5.30 Occupational Health Arrangements 4 0 0
5.31 Environmental Arrangements 4 0 0
TOTAL
Comments
Item Section One – Project Details Yes No (Refer. to HSE Plan section)
1.1 Name/title of the project or industry mentioned?
1.2 Name and contact information of Client, Consultant, Principal contarctor, Sub
contractor and other relevant personnel mentioned?
1.3 AD EHS Center Registration Number.
1.4 Proposed list of sub-contractors is attached?
Total Max score 8, pass mark 8 0

Comments
Item Section Two – Document Control Yes No (Refer. to HSE Plan section)
2.1 Does this section contain initial issue date of the EHS plan?
2.2 A record of ongoing issue?
2.3 Documentation and data control procedure included ?
2.4 Mechanism to record the persons who have been briefed on the plan?
2.5 Does it contain distribution list?
Total Max score 10 pass mark 10 0

Item Section Three – Project Description Yes No Comments


3.1 Location (Refer. to HSE Plan section)
3.1.1 Does the plan explain general description of the location and environment at the
project site and surrounding area?
3.1.2 Maps to show the geographic location of the project area & surroundings?
3.1.3 Location of sensitive receptors and distance to sensitive receptors identified?
Total Max score 6 pass mark 6 0
3.2 Scope
3.2.1 Objectives of the project & Scope of Construction project explained?
Total Max score 2 pass mark 2 0
3.3 Project Schedules and Milestones
3.3.1 Schedule for the project, including a proposed completion date for construction?
3.3.2 Does it include main anticipated milestones?

Page 2 of 10
3.3.3 Does it identify hours when construction activities will take place outside typical
work hours?
3.3.4 Does the plan identify anticipated manpower requirements?

Total Max score 8 pass mark 8 0

Comments
Item Section Four – Project EHS Management Yes No (Refer. to HSE Plan section)
4.1 EHS Policy and Management
4.1.1 Commitment statement towards continual improvement included?
4.1.2 Does EHS Policy demonstrate how senior management will lead by example?
4.1.3 Does this section contain commitment to comply with applicable legislation?
4.1.4 Does EHS policy signed by senior management?
Total Max score 8 pass mark 8 0
4.2 Comments
Roles and Responsibilities Yes No (Refer. to HSE Plan section)
4.2.1 Project organization chart showing name & designation of project personnel and
their roles & responsibilites ?
4.2.2 Does each role identified have defined responsibilities and accountabilities with
regards to EHS?
Total Max score 4 pass mark 4 0
4.3 Comments
EHS Legal Requirements Yes No (Refer. to HSE Plan section)
General
4.3.1 Does the plan include a list of the applicable EHS regulations with which the
PRINCIPAL CONTRACTOR will comply?
4.3.2 Does the plan include Federal & Emirate Laws and International Standards and/or
Agreements?
4.3.3 Does it include listing of any applicable EHS Standards, such as ambient noise
levels, air quality or water quality?
Regulatory Authorities / Agencies
4.3.4 Does the plan contain a list of regulatory agencies and their role that have an
interest in the project?
4.3.5 Does the plan describe the mode of interaction management?
Interested Parties
4.3.6 Does the plan include list of interested parties / stakeholders?
4.3.7 Does the plan contain list of other projects / facilities nearby that the construction
activity may impact upon or residential areas?
4.3.8 Does the plan describe the nature of the interest and how this will be managed?

Total Max score 16 pass mark 16 0


Comments
4.4 Management of Contractors Yes No (Refer. to HSE Plan section)
Selection and Appointment of Contractor & Sub-contractor
4.4.1 Does the plan include detailed procedures for the selection and appointment of
contractors / sub-contractors onto the project?
4.4.2 Are sub-contractors being audited?
4.4.3 Does the procedure identify key roles and responsibilities for the selection and
appointment of contractors / sub-contractors?
4.4.4 Does the plan include review procedure with regards to contractor’s / sub-
contractor’s competency to complete the task?
4.4.5 Does the plan identify that the contractors / sub-contractors have appropriate
resources, both in terms of financial and personnel to complete the project?

Ongoing Management
4.4.6 Does the plan include procedures for the ongoing management of contractors &
sub-contractors?

Page 3 of 10
4.4.7 Does the plan describe formal reviews of performance and reporting procedures of
contractors & sub-contractors?
4.4.8 Does the plan provide clearly defined KPIs and timelines for reporting?
Total Max score 16 pass mark 16 0

Comments
4.5 EHS Risk Management Procedures Yes No (Refer. to HSE Plan section)
EHS Risk Management
4.5.1 Does the plan include specific risk management procedures for the project?
4.5.2 Does the procedure define roles and responsibilities for all key stakeholders with
regards to EHS?
4.5.3 Does the plan outline methods to identify hazards and impacts and how these shall
be assessed and subsequently managed?
4.5.4 Does the plan discuss approval mechanisms?
Project Risk Register
4.5.5 Does the plan include Method Statements, Risk Register and Aspects Register for
contractor’s & subcontrcator`s project activities?
4.5.6 Does the plan describe how the Principal Contractor (PC) will ensure review and
approval procedure of sub-contractor’s MS, RA & EIA?

Design Risk – Identification and Control


4.5.7 Does the plan include a procedure to monitor the stages of design to ensure that
EHS is considered?
Does the procedure include following (as a minimum)?
4.5.8 Risk & Control measure
4.5.9 Change management during design stage & Construction satge
4.5.10 Operational risk & control considering end users
Total Max score 20 pass mark 20 0

Comments
4.6 Training and Awareness Yes No (Refer. to HSE Plan section)
Project Specific Training and Awareness
4.6.1 Project specific training and awareness requirements?
4.6.2 Does the plan include a list of EHS awareness and training programs for
contractors and subcontractors personnel?
4.6.3 Does the plan identify the methods that shall be used to disseminate the
information required and the training frequencies?
4.6.4 Procedure for record keeping of all trainings (attendees, training date, trainer name,
and training topic?

Induction Training-
4.6.5 Programme,Procedure & record keeping
Toolbox Talks-
4.6.6 Programme,Procedure & record keeping
Total Max score 12 pass mark 12 0

Comments
4.7 EHS Incidents Yes No (Refer. to HSE Plan section)
Investigation Procedures, Investigation team, Roles & Responsibilities,
4.7.1 Does the plan include incident investigation procedure?
4.7.2 Does the procedure include organization chart and outline roles and responsibilities
of incident investigation team?
4.7.3 Does the procedure include the monitoring and review of all incidents and incident
reports from contractors, sub-contractors or other parties involved?
4.7.4 Incident Reporting -Notification, reporting procedure, timescales & responsibilities.

4.7.5 Hazard and Near Miss Reporting Procedure

Page 4 of 10
Total Max score 10 pass mark 10 0

Comments
4.8 Consultation and Communication Yes No (Refer. to HSE Plan section)
Employee / Workforce Involvement
4.8.1 Does the plan include procedure for communication with work force?

EHS Meetings-
4.8.2 List of all planned EHS meeting,frequency,attendicies & agenda.
Internal & External Communications
4.8.3 Procedure for internal & external communication management?
4.8.4 Does the procedure address internal communication at various levels and functions
of the entity?
4.8.5 Does the procedure address communication with contractors and other visitors to
the workplace?
4.8.6 Does the procedure explain about receiving, documenting and responding to
external communication?
Consultation-
4.8.7 Procedure, EHS committee/team for consultantion,Role & responsibilities of EHS
team.
4.8.8 Does the procedure define appropriate involvement of the team in hazard
identification, risk assessment and determination of controls?
4.8.9 Does the procedure ensure appropriate involvement of the team in incident
investigation?
4.8.10 Does the procedure ensure involvement in the development and review of EHS
policies and objectives?
4.8.11 Does the procedure ensure consultation in change management that affects EHS
(including Contractors)?
4.8.12 Does the procedure ensure employee representation on EHS matters?
4.8.13 Does the plan include procedure to receive and address complaints from external
parties?
Site EHS Notice Board
4.8.14 Does Consultation and Communication address setting up and maintaining safety
notice boards at appropriate, prominent locations?
4.8.15 Language & Contents-safety signs, hazards and relevant emergency contact
information (Arabic, English) and other most common languages of the work force?

Total Max score 30 pass mark 30 0

Comments
4.9 Monitoring, Inspection and Auditing Yes No (Refer. to HSE Plan section)
General
4.9.1 procedure for monitoring and auditing of EHS performance?
4.9.2 Does the procedure contain EHS checklists system?
Internal Audit and Inspection
4.9.3 Does the plan contain internal audit and inspection procedures (including
contractors)?
4.9.4 Contents-Types of audit & inspection, Roles & responsibilities and audit
frequencies.

Non Conformance and Corrective Action


4.9.5 Does the plan include procedure for Non Conformance and Corrective Action?
4.9.6 Timelines for responding to noncompliance findings.
EHS Monitoring Requirements

4.9.7 Does the plan contain information about monitoring requirements for EHS
performance?
4.9.8 Does it discuss how identified hazards and impacts will be monitored?

Page 5 of 10
4.9.9 Does it contain Key Performance Indicators (KPIs) to be measured?
4.9.10 Does it explain frequency of measurements?
4.9.11 Does it contain detection limits?
4.9.12 Does it explain regarding corrective actions?
4.9.13 Does it identify responsible person?
4.9.14 Does it explain about health surveillance?
EHS Reporting Requirements
4.9.15 Does the EHS Plan contain procedures for reporting requirements & reporting
frequency?
Does the EHS Report contain the following (as a minimum)?
4.9.16 Pre-operation compliance reports.
4.9.17 Incident reports.
4.9.18 Periodic or annual performance reports.
4.9.19 Auditing reports.
4.9.20 Non-compliance reports.
4.9.21 Corrective action reports.
4.9.22 Complaints management reports.
4.9.23 Any special reports required by government agencies.
Total Max score 46 pass mark 46 0

Comments
4.10 EHS-CMP Review and Update Yes No (Refer. to HSE Plan section)
4.10.1 Does the plan include procedure for the periodic review of the EHS Plan?
4.10.2 Does the procedure contain list of trigger points for review and update of EHS
Plan?
Total Max score 4 pass mark 4 0
4.11 EHS File (Project Close out Report)
4.11.1 Does the EHS Plan contain EHS file system for the project?
Does the EHS File contain the following (as a minimum)?
4.11.2 A brief description of the work carried out.
4.11.3 Residual hazards and how these have been dealt with.
4.11.4 Project directory listing all key parties involved.
4.11.5 Key structural principles incorporated in the design of the structure.
4.11.6 Any hazards associated with the materials used.
4.11.7 Information regarding the removal or dismantling of installed plant and equipment.
4.11.8 EHS information about equipment provided for cleaning or maintaining the
structure.
4.11.9 The nature, location and markings of significant services, including firefighting
services.
4.11.10 Information and as-built drawings of the structure, its plant and equipment.
Total Max score 20 pass mark 20 0

Comments
Item Section 5.1-Site Security Plan and Access Control Yes No (Refer. to HSE Plan section)
5.1.1 Does the plan describe the control of the boundary of the project?
5.1.2 Does the plan describe access and egress points?
5.1.3 Visitors and crowd control stated?
5.1.4 Does the plan describe security checks?
5.1.5 Does the plan describe shift work and control of night work?
Total Max score 10 pass mark 8 0

Comments
Item SECTION 5. 2- Project Permit to Work Procedures Yes No (Refer. to HSE Plan section)
5.2.1 Does the plan describe Permit to work Procedure?
5.2.2 Are roles & responsibilities clearly defined?
5.2.3 Does the procedure describe- Training & competency, the PTW documentation,
Internal permits & authorization, Communication, emergency arrangements &
record keeping?
Total Max score 6 pass mark 5 0

Page 6 of 10
Comments
Item SECTION 5.3- Traffic Management Plan Yes No (Refer. to HSE Plan section)
5.3.1 Does the plan describe the following?
General site description and details of the type of traffic on site;
Site layout drawing clearly showing traffic routes, pedestrian crossing points,
signage location and pedestrian routes;
Details of the traffic control measures at junctions and pedestrian crossing points
including arrangements for the segregation of pedestrians and vehicles;
Loading and drop off areas;Project parking & control
Vehicle maintenance and wash-down
5.3.2 Does the plan describe control measures to minimize - impact on local traffic/traffic
disturbance, pedestrian access and crossings?
5.3.3 Does the plan describe the emergency procedures to deal with vehicle incidents
and vehicle fires that may arise on site?
Total Max score 14 pass mark 11 0

Comments
Item SECTION 5.4- Material Storage Plan Yes No (Refer. to HSE Plan section)
5.4.1 Does the plan describe how material will be stored and protected?
5.4.2 Does the plan describe how to access the materials & arrangement of safe loading
& unloading the materials?
Total Max score 4 pass mark 3 0

SECTION 5.5 -Identification and Management of Asbestos and Comments


Item Yes No (Refer. to HSE Plan section)
other Hazardous Materials / Substances
5.5.1 Asbestos Containing Materials (ACMs) and other hazardous materials/substances
are identified?
5.5.2 Does the plan describe the Permit & Licensing-Asbestos removal, waste carrier?

5.5.3 Does the plan describe method of removing ACM & PPE to be used?
5.5.4 Does the plan describe Health surveillance & monitoring and Air Monitoring?
5.5.5 Are the role & responsibilities identified?
Total Max score 10 pass mark 8 0

Comments
Item SECTION 5.6 -Site Safety Rules Yes No (Refer. to HSE Plan section)
5.6.1 Does the plan describe the minimum set of site safety rules & display location?
5.6.2 Site signages stated?
Total Max score 4 pass mark 4 0

Item SECTION 5.7 - Emergency Management Plan Yes No Comments


5.7.1 Does the plan contain EMERGENCY RESPONSE procedures?
5.7.2 Does the Emergency Response Plan describe-Emergency Evacuation plan & Fire
Prevention Plan?
5.7.3 Does the Emergency evacuation plan shows-,fire extinguishers locations, assembly
point locations egress routes ,HSE notice board locations, first aid boxes location,
first aid room location, location of EM vehicle, EM telephone ?
5.7.4 Does the plan list the first aiders & list of emergency numbers ?
5.7.5 The nearest hospital identified?
5.7.6 Are the roles & responsibilities of emergency personnel identified?
5.7.7 Does the procedure describe communication & reporting?
Total Max score 14 pass mark 12 0

Item SECTION 5.8- Manual Handling Operations Yes No Comments


5.8.1 Does the plan describe manual handling procedure?

Page 7 of 10
5.8.2 Does the plan identify the training need for employees on manual handling
technique?
Total Max score 4 pass mark 4 0

Item SECTION 5.9 -Working at Height/Roofs/Falling objects Yes No Comments


5.9.1 Does the plan describe working at height procedure?
5.9.2 Does the plan identify the training need for employees on working at height?
5.9.3 Does the plan describe guard rail system and fall arrest system to prevent fall of
person & materials?
Total Max score 6 pass mark 4 0

Item SECTION 5.10- Fixed and Temporary Electrical Installations Yes No Comments
5.10.1 Does the plan describe safe system of work?
5.10.2 Does the plan describe Electrical Maintenance, Inspection & Testing Procedure?

5.10.3 Are the training and competency requirement for electrical work discussed?
5.10.4 Does the plan describe permit to work system –LOTO?
5.10.5 Does the plan describe work on or near live conductor?
Total Max score 10 pass mark 8 0

Item SECTION 5.11 -Personal Protective Equipment Yes No Comments


5.11.1 Does the plan refer to how visitor will be controlled and the minimum PPE
5.11.2 required?
Arrangement for PPE on the site for the workers described?
Total Max score 4 pass mark 4 0

Item SECTION 5.12 -Plant and Equipment Yes No Comments


5.12.1 Training & competency requirements of operator?
5.12.2 Maintenance & inspection of P&E?
Total Max score 4 pass mark 4 0

Item SECTION 5.13 -Housekeeping Arrangements/Slip,Trip & Fall Yes No Comments


5.13.1 How to manage general housekeeping described?
5.13.2 Separation of waste and appropriate storage described?
Total Max score 4 pass mark 4 0

Item SECTION 5.14- Lifting Equipment and Lifting Operations Yes No Comments
5.14.1 Does the Lifting Plan describe safe lifting procedure?
Training & competency
Roles & Responsibilities
Type & capacity of Lifting equipment & accessories to be used identified ?
3rd Party certification of lifting equipment & accessories ?
Physical inspection of lifting equipment & accessories
Permit and Record keeping
Total Max score 14 pass mark 12 0

Item SECTION 5.15 -Welfare and Site Accommodation Yes No Comments


5.15.1 The welfare provision for workers described?
Toilets, access to drinking water, showers, cleaning & transport arrangements
5.15.2 Cleaning & maintenance of welfare arrangements?
Total Max score 4 pass mark 4 0

Item SECTION 5.16 -Scaffolds and Ladders Yes No Comments


5.16.1 Does this section discuss the safe erection, use, maintenance of all scaffold and
ladders?
5.16.2 Training & competency requirements?
5.16.3 Does this section identify the design requirements?
Total Max score 6 pass mark 6 0

Page 8 of 10
Item SECTION 5.17 -Cantilevers and Platforms Yes No Comments
5.17.1 Does this section discuss the safe erection, use, maintenance of cantilevers &
platforms?
5.17.2 Training & competency requirements?
5.17.3 Does this section identify the design requirements?
Total Max score 6 pass mark 6 0

Item SECTION 5.18 -Formworks and Structures Yes No Comments


5.18.1 Does this section discuss the Documented safe systems of work?
5.18.2 Training & competency requirements?
5.18.3 inspection & maintenance of formwork discussed?
Total Max score 6 pass mark 6 0

Item SECTION 5.19 -Excavations & Trenches/Existing services Yes No Comments


5.19.1 Does the plan describe Excavation procedure?
5.19.2 Does this section describe the roles & responsibilities?
5.19.3 Training & competency requirements?
5.19.4 ground conditions, ground water, temporary safe slope, support system described?
5.19.5 Access, barrication, lighting, inspection and emergency procedure.
5.19.6 Does the plan describe the permit to work for excavation?
5.19.7 Existing Services:procedure to locate & expose existing underground services?
Necessary temporary support system and diversions stated?
Total Max score 14 pass mark 12 0

Item SECTION 5.20 -Confined Spaces Yes No Comments


5.20.1 Does the plan describe confined space work procedure?
5.20.2 Does this section describe the roles & responsibilities?
5.20.3 Training & competency requirements?
5.20.4 Permit to work for confined space and Emergency procedure described?
Total Max score 8 pass mark 6 0

Item SECTION 5.21 -Demolition and Decommissioning Yes No Comments


5.21.1 Does the plan describe the EHS demolition / decommissioning procedure?
5.21.2 Does this section describe the roles & responsibilities?
5.21.3 Training & competency requirements?
5.21.4 Does the plan describe the permit to work system?
Total Max score 8 pass mark 6 0

Item SECTION 5.22 -Piling Yes No Comments


5.22.1 Does the plan describe the piling operation procedure?
5.22.2 Does this section describe the roles & responsibilities?
5.22.3 Does this section identify the training & competency requirements?
5.22.4 Does the plan describe the permit to work system?
Total Max score 8 pass mark 6 0

Item SECTION 5.23 -Electrical and Gas Welding/Gas Cutting Yes No Comments
5.23.1 Does the plan describe the safe system of work?
5.23.2 Training & competency requirements?
5.23.3 Does the plan describe the permit to work system and fire control measures?
5.23.4 Does the plan describe the Storage & Handling of Gas Cylinders?
Total Max score 8 pass mark 8 0

Item SECTION 5.24 -Working over or Adjacent to Water Yes No Comments


5.24.1 The safe system of work described?
5.24.2 Does this section identify the training & competency requirements?
5.24.3 Does this section describe the suitable PPE, Barrier, signage, lighting, Plate form,
Gangways, and ladder ?

Page 9 of 10
5.24.4 The first aid and rescue measures described?
Total Max score 8 pass mark 6 0

Item SECTION 5.25 -Portable Tools Yes No Comments


5.25.1 How tools & equipment will be used and checked described?
5.25.2 Training & competency requirements?
5,25.3 Does this section describe Inspection, Maintenance and Testing of Tools?
Total Max score 6 pass mark 6 0

Item SECTION 5.26 -Animals and Reptiles Yes No Comments


5.26.1 Does this section identify the types of animals & reptiles found in the desert?
5.26.2 Does this section describe the first aid & emergency measures?
Total Max score 4 pass mark 4 0

Item SECTION 5.27 -Workplace Bullying and Violence Yes No Comments


5.27.1 Procedure to control work place violence ?
5.27.2 Diciplinary action against violence stated?
Total Max score 4 pass mark 4 0

Item SECTION 5.28 - Impacts / Hazards from Adjacent Activities Yes No Comments
5.28.1 Does the plan identify the Hazards from adjacent activities:-
such as partial occupation / use of the building /facility during construction, nearby
schools / playgrounds, retail malls / shops, use of hazardous materials nearby ,
surrounding land use.
5.28.2 Does the plan describe the controls measures of identified hazards?
Total Max score 4 pass mark 4 0

Item SECTION 5.29 -Services Coordination Yes No Comments


5.29.1 Does the plan describe the procedure to work on or near live services?.
5.29.2 Training & competency requirements?
5.29.3 Does this section describe the roles & responsibilities?
5.29.4 Does this section describe the first aid and rescue measures?
Total Max score 8 pass mark 6 0

Item SECTION 5.30 -Occupational Health Arrangements Yes No Comments


5.30.1 Does the plan describe how workers will be screened to ensure they are fit to work?

5.30.2 Does the plan describe how to control Occupational health hazards ? such as
Noise & vibration, Temperature & heat stress, Radiation, Biological agents & pets.
Total Max score 4 pass mark 4 0

Item SECTION 5.31 -Environmental Arrangements Yes No Comments


5.31.1 Does the plan describe how it will deal with environments issues?Noise, dust,
waste, land protection, nuisance.
5.31.2 Does the plan describe what it will do with its waste & hazardous waste?
Total Max score 4 pass mark 4 0

OVERALL COMMENTS:

Reviewed by:

Name:

Designation: Signature:

Date:

Page 10 of 10