PEKERJAAN ASSESMENT DAN REDESIGN JETTY PT. SIP PT.

SARANA INDUSTAMA PERKASA

DELIVERABLE LIST

9 REV: 1
REVIEW/
NO NO. DRAWING / DOCUMENT REV SUBMIT DATE APPROVAL TITLE QTY Unit Aprroved Remark Status Tanggal Type Discipline
FROM SIP

I. DRAWING

A GENERAL

Revisi Jumlah mooring & review panjang


1 DWG-KT-SIP-001 1 27/08/2019 General Layout & Jetyy Section 1 SET Drawing General
platform

General / Project
B STRUCTURE General
Management

C MECHANICAL

1 DWG-KT-ME-001 0 27/08/2019 Layout Mechanical & Electrical 1 SET Drawing Mechanical


2 DWG-KT-ME-002 0 27/08/2019 Layout Piping Jetty A 1 SET Drawing Mechanical
3 DWG-KT-ME-003 0 27/08/2019 Layout Plan Jetty B 1 SET Drawing Mechanical
4 DWG-KT-ME-004 0 27/08/2019 Detail Pipe 1 SET Drawing Mechanical

D ELECTRICAL

II. SURVEY WORK


SURVEY TOPOGRAPHY, BATHIMETRI, HIDRO -
II.1
OCEANOGRAFI
Field Report Survey Topography, Bathimetri,
1
Hidro - oceanografi
Final Report Survey Topography, Bathimetri,
2 17/06/2019
Hidro - oceanografi

II.2 SOIL INVESTIGATION

III. STRUCTURE ASSESMENT & UNDERWATER SURVEY


Lengkapi hasil laboratorium dan Field Report Assesment & Underawater
1 SRVY-STR-KT-001 1 SET With Note DOCUMENT STRUCTURE
rekomendasi teknis survey
2 SRVY-STR-KT-002 14/08/2019 - Final Report Assesment & Underwater survey 1 SET OK DOCUMENT STRUCTURE
PEKERJAAN ASSESMENT DAN REDESIGN JETTY PT. SIP PT. SARANA INDUSTAMA PERKASA

DELIVERABLE LIST

9 REV: 1
REVIEW/
NO NO. DRAWING / DOCUMENT REV SUBMIT DATE APPROVAL TITLE QTY Unit Aprroved Remark Status Tanggal Type Discipline
FROM SIP
IV. CALCULATION REPORT

V. BILL OF QUANTITY, SPESIFICATIONS & TERM OF REFERENCE


1 BOQ-CIV-KT-001 Bill Of Quantuty ( Civil work & Structure) 1 SET DOCUMENT STRUCTURE
2 BOQ-ME-KT-002 Bill Of Quantuty ( Mechanical & Electrical) 1 SET DOCUMENT M/E

Note:
Hard Copy belum dikembalikan oleh
PT. SIP

Drawing, Document Material &


Document Calculation sudah Approved

Drawing, Document Material &


Document Calculation tidak
digunakan/diganti.