Beruflich Dokumente
Kultur Dokumente
STEP 3
Press the momentary On/Off power switch to turn the Set Time and Date From the Home screen,
instrument on. Result: The Dranetz logo will be displayed while Press the Setup Instrument () icon, then press Set Time and
the instrument is booting. Date. Set the time zone applicable to your application using
the Time Zone drop down selection list.
STEP 4
The instrument completes the power on sequence. If the
instrument was shut down while monitoring, the instrument
will resume monitoring upon power up.
MAKING CONNECTIONS
• Connections must be made to the instrument first, then connect to the circuit to be monitored.
Choose the “Probe and Scaling” then select the model of the current probe that will use during the installation.
Choose “3phase wye” if the configuration of the system under test is Wye.
Edit the voltage and put the system voltage of the facility. Also, edit the
current and put the 120% of the Circuit Breaker AT.
Put the file name and location of the equipment under test and press
“Start Monitor”