Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no.

SW-CL-32
Rev. 0
Date
Received
Ref. RFI.
Checklist for : PSC Girder (Before Concreting)
No:

Location: Other Information:

Date: Girder Marked:

Time:

Item Description CON CON SC Remarks


Yes No Y N
Bed Preparation for Precast
Girder
1 NGL is properly dressed
2 NGL is properly compacted
3 Granular material compacted in layers
4 PCC done
5 Adequate Primary & secondary channels
used
6 Base plate thickness is adequate
7 Base levels are same everywhere
Reinforcements
1 Rebars are placed as per the approved
drawing
2 The rebars are from approved source &
lot
3 Rebars are cleaned
4 Cover block of appropriate size is used
5 Cover blocks are of same strength
6 Lifting strands properly placed
7 Adequate lap length is used
8 Cross girder rebars are placed in proper
position
9 Mesh rebars used in bearing position
10 Mesh rebars used in end block
11 Spiral mesh rebars used in each
anchorage location
Cable Layout
1 Cable sheaths are laid as per approved
drawing
2 Couplers are sealed properly
3 Couplers of adjacent cables are
staggered
4 Vent pipes are used
5 Vent pipes of adjacent cables are
staggered
6 Approved sheathing materials used
7 Good quality adhesive sealing tape used
8 Approved End Anchorage used
9 End Anchorage placed in proper position
10 Strands are placed in the sheath before
concreting
11 Strands are sealed at both the ends

Shuttering Preparation
1 Shuttering Panel have proper dimension

130
Project: NH:37 Contract package – EW – II (AS-02/AS-18) Doc. no. SW-CL-32
Rev. 0
Date
Received
Ref. RFI.
Checklist for : PSC Girder (Before Concreting)
No:

2 End shuttering have correct dimension


Shuttering Panel symmetrically properly
placed
C.L. of C/S Girder Opening are
appropriate
5 All minor gaps are properly sealed
6 Approved shuttering oil is applied
7 Stoppers are used at C/S Girder
openings
8 Proper shuttering pockets are made for
vibration
9 Adequate supports to formwork are given
10 Shuttering is as per proposed shuttering
arrangement.
11 Tie roads used in regular spacing.
12 Tie roads are engaged with PVC pipes

Pre Concreting equipments / arrangements


1 Source of Concrete supply approved?
2 Slump Cone is available
3 Sufficient vibrator & Needle are
arranged
4 Vibrators and needle are in working
condition
5 Proper nos. cube mould are present
(Mention Nos.)
6 Sufficient T.M. are arranged (Mention
Nos.)
7 Sufficient lighting arrangement is done
8 Sufficient Shutter vibrator are used
(Mention Nos.)
9 Method of Conc. Pouring approved
10 Alternate Conc. Pouring arrangement
available.
11 Whether condition (Bright, Dull, Rainy)
12 Protecting arrangement during rain is
available.

Final Inspection P F Date.


(With comments)

Signed for contractor Designation : Date :

Signed for SC Designation : Date :