TABLE OF CONTENTS Jul - 2019
I INTRODUCTION 3-5
ANNEXURES
A1 Progress Curves 353-361
Page 2 of 1078
I - INTRODUCTION Jun - 2019
DESIGN CAPACITIES:
UNIT UPGRADED LICENSOR
UNITS, UTILITIES & OFFSITES NO.
CAPACITY
CAPACITY
CRUDE BLOCK(100)
21.206 MMTPA 29.005 MMTPA UOP/PCS
CRUDE DISTILLATION UNIT 101
(460,000 BPSD) (650,000 BPSD)
SAT. GAS CONC. UNIT 102 5.166 MMTPA 5.858 MMTPA UOP
SAT. LPG MEROX UNIT 103 0.553 MMTPA 0.553 MMTPA UOP
SULPHURIC ACID ALKYLATION UNIT 142 27270 BPD 32724 BPD DuPONT
SULPHURIC ACID REGENERATION
143 292.5 TPD 292.5 TPD MECS
PROCESS
HUELS SELECTIVE HYDROGENATION
144 25900 BPD 34400 BPD UOP
UNIT
MS BLOCK (150)
Reaction - 4.49 UOP
Reaction – 5.13
MMTPA
NAPHTHA HYDROTREATING UNIT 151 MMTPA
Stripper – 6.44
MMTPA
Page 3 of 1078
I - INTRODUCTION Jun - 2019
Corresponds to Corresponds to
CCR – REGEN SECTION 153 UOP
CCR CCR
PENEX PROCESS UNIT 155 1.75 MMTPA 1.75 MMTPA UOP
Page 4 of 1078
I - INTRODUCTION Jun - 2019
PROJECT DATES
2. TARGET
Schedule : Dec-2017 (Original Sch.)
Mar-2021
Revised Sch. W.e.f 31st Jul 2019
Page 5 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Based on the weightages for the various facilities of the Complex, as reconciled with
DORC, the progress for the project has been computed and the summary of the same
is as below:
A) Overall Complex :
B) Trading Facilities :
* As desired by DORC vide e-mail dated 20.08.16, Overall Proj. Sch. revised w.e.f 01.11.2016 (Rev.1)
* As desired by DORC during Apex Review on 27.02.19 at Lagos, Overall Proj. Sch. revised w.e.f. 01.03.19 (Rev.2).
* As desired by DORC during Review Meeting on 03.08.19 at Lagos, Overall Proj. Sch. revised w.e.f. July-19 (Rev.3).
Page 6 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
OVERVIEW
HAZOP and Stage-III (90%) 3D Model Review for all process units licensed by various
Page 7 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
¾ Out of total 165 tanks, 81 tank pad handed over for mechanical erection (70 nos. tank
pad to M/s Chemietech and 10 tank pads to M/s Tecon).
¾ Shell erection completed in 36 out of 82 tanks by M/s Chemitech for tankage-II.
Mechanically cleared – 21 nos. Hydro testing completed- 15 Nos. Hydrotesting in
progress- 7 Nos.
¾ Release of Balance Piping Isometrics in various units is in progress.
ENGINEERING
PR Issue
Sl. No. MR Description Vendor PR No.
Date
1. Bolting Eqpt Bea Srl 3455/5689 08.07.19
2. Deepak Fasteners
Bolting Eqpt 3455/5690 08.07.19
Limited(Doraha Unit)
3. Bolting Eqpt President Engineering Works 3455/5691 08.07.19
Page 8 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
22. Valves- Gate/Globe/Check (Cast) Nssl Pvt. Ltd. (Neco Schubert &
3412/5716 18.07.19
Salzer)
23. Valves- Gate/Globe/Check (Cast) Oswal Industries Ltd 3412/5717 18.07.19
29. Ball valves Belgaum Aqua Valves Pvt. Ltd. 3314/5723 22.07.19
31. Special Check Valve Assembly Spirare Energy Private Limited 3319/5694 19.07.19
32. Excess Flow Check Valves Chandra Engg. & Mech Pvt Ltd 3326/5695 15.07.19
35. Hose And Hose Couplings Gaytri Industrial Corporation 3279/5728 25.07.19
Page 9 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
36. Fittings (Higher Alloys) P.K.Tubes & Fittings Pvt.Ltd. 3144/5729 29.07.19
ORDERING / TENDERING
About 510 nos. recommendations against MRs and all 49 nos. recommendations against
Tenders have been forwarded to DORC, Balance MRs need to be awarded at the earliest.
TOP UP
SL TOP UP TOP UP
DESCRIPTION UOM MTO (As MR QTY. RECOM. AWARD
MTO (As MTO (As on
NO on Feb-
on Apr-19) Aug-19)
18)
A PIPING SUMMARY
Page 10 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
SL MTO
DESCRIPTION UOM MR QTY. RECOM. AWARD
NO QTY.
C ELECTRICAL (MAJOR)
HAZARDOUS AREA
5 NO 42039 42039 42039
FITTINGS
D INSTRUMENT (MAJOR)
THERMOCOUPLE KM
6 3 3 3 65.5
EXTENSION CABLE
8 CABLE DUCTS KM 71 71 71
Page 11 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
TOTAL
SL MR ORDERED BAL.ORDER DESPD. RECD.
ITEM DESCRIPTION QTY.
1 REACTORS 61 61 61 38 20
2 COLUMNS 61 61 61 22 20
6 COMPRESSORS 60 60 60 33 13
8 FANS / BLOWERS 65 65 64 1 7 1
9 BURNERS 6 6 6
FILTERS/
10
COALESCERS
212 212 211 1 42 26
11 HOPPER / SILOS 35 35 35 1 1
COMBUSTION &
13 INCINERATOR 6 6 6
CHAMBERS
Page 12 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
CONSTRUCTION
Block wise status of critical activities is as below. Detailed block wise quantitative
construction status is enclosed as Annexure.
Piling (Nos.) RCC Sub Str. RCC Super Str . Fabricated Structural Steel (MT)
BLOCK
Cumu. Cumu. Cumu.
Total Total Total Total Recd Erec.
Comp. Comp. Comp.
INFRA. (Road,
Drain, Culvt, - - 1,78,580 1,60,809 - - - - -
Pvmt ) **
CDU 7,379 7,379 27,278 25,760 6,573 5,021 11,000 8,715 6,990
RFCCU 7,478 7,462 39,285 33,262 10,785 8322 16,000 14,818 6,906
DMHC 5,125 5,125 21,318 19,858 5,857 2,498 8,500 6,735 314
MS BLOCK 7,812 7,812 32,700 28,589 7,946 5,016 14,632 11,567 2,544
PPU 5,302 5,302 17,401 14,241 17,411 1,493 7,455 3,180 300
O/A PROJECT 1,39,512 1,32,451 7,96,777 5,64,369 2,39,512 57,154 124,776 81,662 31,630
* Excludes RCC in Roads and Pavements (513737 m3), includes RCC in manholes.
Page 13 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Equipment
UG Piping (ID) AG Piping Fabrication (ID)
Erection (MT)
BLOCK Work Cumu.
Cumu. Cumu. Work Front
Total Total Front Total Comp.
Comp. Comp. Available
Available
INFRA. (Road,
Drain, Culvt, - - - - - - - -
Pvmt ) **
CDU 16,649 4,372 68,212 32,882 35,254 607,300 21,949 21,498
O/A PROJECT 47,683 19,293 693,799 168,397 168,690 5,885,865 259,634 239,916
¾ As per practice, Value Addition is given priority and engineering value additions are
under tabulation for working out the CAPEX and OPEX. Lot-1 dated 10.02.15, Lot -2
dated 16.07.15 and Lot-3 dated 07.03.16 already submitted to DORC.
Our analysis reveals total saving on CAPEX and OPEX in the range of $
219,602,203/-
¾ KOM being organised with the vendor after readiness of critical documents like;
x General arrangement drawing
x Process /equipment data sheets
x System P&IDs
x Utility summary
x Foundation loading details
x Interface points
Page 14 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
¾ Detailed logistic study covering all ODCs and module consignment approach paper
sent to DORC.
PATH FORWARD:
Review / revision of balance AFC pile layouts & foundation drawings as per actual
load test results.
Order placement & contract signing for pending recommendations.
Expediting data from vendors and review of vendor drawings.
Increase in productivity of RCC for critical units, piperack and utilities.
Page 15 of 1078
Jun - 2019
II - EXECUTIVE SUMMARY
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Days Lost Due To Æ Rain Strike Bandh Festival Any Other Total
¾ Block-wise Mechanical completion dates as per revised schedule (Rev 2) are indicated as
under:
CPP 27-Jan-2021
OFFSITES 06-Jan-2021
HGU 15-Dec-2020
CDU 31-Dec-2020
RFCC 05-Jan-2021
DMHC 21-Dec-2020
MS BLOCK 05-Jan-2021
BUTAMER 24-Dec-2020
SULPHUR 06-Feb-2021
PPU 31-Mar-2021
* As desired by DORC vide e-mail dated 20.08.16, Overall Proj. Sch. revised w.e.f 01.11.2016 (Rev.1)
* As desired by DORC during Apex Review on 27.02.19 at Lagos, Overall Proj. Sch. revised w.e.f. 01.03.19 (Rev.2).
* As desired by DORC during Review meeting on 03.08.19 at Lagos, Overall Proj. Sch. revised w.e.f. 31.07.19 (Rev.3).
Page 16 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
CDU BLOCK
PROGRESS
Page 17 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
DETAIL ENGINEERING
ORIGINAL CUMULATIVE
S. LIKELY BALANCE
DESRIPTION UOM TENDER RELEASED REMARKS
NO QTY. QTY.
QUANTITY QTY.
CRUDE BLOCK
1 PIPES M 260039
AREAS OF CONCERN
¾ Continuous follow up with the vendor for timely delivery of long lead items such as
Crude column, Desalter package, Feed gas compressor etc.
Page 18 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Sl. Tag No. Description Delvy MR No. / Vendor Actual # / Contr. Anti./Act ROS Remarks
No . FOA No. Anticipated Deliver date for
. order date* y Date receipt at
site @
Despatched
CRUDE 6152/
1 101-CC-1001 17 CPTDC 25.02.16 25.07.17 29.07.19 30.06.19 on 29.07.19 .
COLUMN 5005
PRE-FLASH 6152/
2 101-CC-1005 17 CPTDC 25.02.16 25.07.17 31.08.19 31.10.19
COLUMN 5005
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
# Actual dates based on intimation received from DORC.
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
Page 19 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Page 20 of 1078
Job No.: A545
100 10
90 9
80 8
70 7
50 5
40 4
30 3
20 2
10 1
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
Page 21 of 1078
Job No.: A545
100 10
90 9
80 8
50 5
40 4
30 3
20 2
10 1
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
14 14
DURATION IN MONTHS
Page 22 of 1078
Job No.: A545
100 24
23
22
90
21
20
80 19
18
70 MONTHLY SCH. MONTH ACT. 17
16
CUMUL. SCH. CUMUL. ACT. 15
60
14
13
CUMUL PROG (%)
50 12
11
10
40
9
8
30 7
6
20 5
4
3
10
2
1
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
Page 23 of 1078
Job No.: A545
100 24
23
22
90
21
20
80 19
18
70 MONTHLY SCH. MONTH ACT. 17
16
CUMUL. SCH. CUMUL. ACT. 15
60
14
13
CUMUL PROG (%)
50 12
11
10
40
9
8
30 7
6
20 5
4
3
10
2
1
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
14 14
DURATION IN MONTHS
Page 24 of 1078
Job No.: A545
100 10
90 9
80 8
50 5
40 4
30 3
20 2
10 1
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
Page 25 of 1078
Job No.: A545
100 16
15
90
14
80 13
12
70 MONTHLY SCH. MONTH ACT.
11
50 8
7
40
6
30 5
4
20 3
2
10
1
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
Page 26 of 1078
Job No.: A545
100 24
23
22
90
21
20
80 19
18
MONTHLY SCH.
70 17
MONTH ACT.
16
CUMUL. SCH.
15
60 CUMUL. ACT.
14
13
CUMUL PROG (%)
50 12
11
10
40
9
8
30 7
6
20 5
4
3
10
2
1
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A
DURATION IN MONTHS
Page 27 of 1078
Job No.: A545
100 20
19
90 18
17
80 16
15
70 MONTHLY SCH. MONTH ACT. 14
13
CUMUL. SCH. CUMUL. ACT.
60 12
11
CUMUL PROG (%)
50 10
9
40 8
7
30 6
5
20 4
3
10 2
1
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
DURATION IN MONTHS
Page 28 of 1078
Job No.: A545
100 10
80 8
70 7
60 6
CUMUL PROG (%)
50 5
40 4
30 3
20 2
10 1
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
Page 29 of 1078
Jul - 2019
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
CRUDE BLOCK : 100
P&IDs
1 - PROCESS (LICENSOR) 150 150 150
2 - UTILITY (EIL) 38 38 38
AFC DRAWINGS
1 GENERAL CIVIL 36 36 36
3 PIPING
PLAN - Aug : 12
- GAD`s 354 24 354 330 24
Sep:12
5 INSTRUMENTATION 12 12 12
Page 30 of 1078
JUL -2019
CDU BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 2 2 2 2 2 2 2 2 2 2 2 2 2
2 ROTATING EQUIPMENT 11 11 11 11 11 11 11 11 11 11 11 11 11
3 STATIC EQUIPMENT 11 11 11 11 11 11 11 11 11 11 11 11 11
4 HMTD 5 5 5 5 5 5 5 5 5 5 5 5 5
TOTAL 29 29 29 29 29 29 29 29 29 29 29 29 29
Page 31 of 1078
EQUIPMENT STATUS :: CRUDE BLOCK (100) Jul-19
Job No.A545
Page 2 of 12
DANGOTE REFINERY AND PETROCHEMICAL PROJECT, NIGERIA
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 2 2 2 2
2 COLUMNS 15 15 15 10 9 1 3 2
3 VESSELS 58 58 58 30 22 6 2 11 17
5 AIR COOLERS 88 88 88 12 8 68
6 COMPRESSORS 2 2 2 1 1
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 28 28 28 5 5 14 9
COALESCERS
Page 32 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: CDU
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
PREVIOUS
MONTH
FRONT
Total %
S.
(*)
WORK ITEMS DESRIPTION UOM Scope WTG.
NO
CDU (Block)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.0% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Dredging/ Filling % 100 2.00% 100 0 100 100 0 0 100
II Piling 6.92% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Piles- CDU No. 7,379 6.92% 7,379 0 7,379 7,379 0 0 7,379
III Civil 14.42% 99.1% 24.1% 75.0% 69.9% 0.6% 0.0% 70.0%
1 Mobilisation % 100 0.89% 100 0 100 100 0 100
2 RCC (Sub-Str.) m3 26,458 7.52% 25,978 303 25,676 25,199 0 25,199
2.1 CDU Heater/APH System m3 3,394 3,394 0 3,394 3,394 0 3,394
2.2 Main/ Branch Piperack m3 5,187 5,187 0 5,187 5,187 0 5,187
2.3 Heater Piperack m3 666 666 0 666 666 0 666
2.4 BPR-7 m3 190 190 154 36 36 0 36
2.5 Technological Str-1/2/3/4/5/6/7 m3 797 797 0 797 797 0 797
2.5 Technological Str-1 m3 10 10 0 10 10 0 10
2.6 Technological Str-2 m3 25 25 0 25 25 0 25
2.7 Technological Str-3 m3 22 22 0 22 22 0 22
2.8 Technological Str-4 m3 100 100 0 100 100 0 100
2.9 Technological Str-5 m3 35 35 0 35 35 0 35
2.10 Technological Str-6 m3 150 150 0 150 150 0 150
2.11 Technological Str-7 m3 455 455 0 455 455 0 455
2.12 Technological Str-8 m3 38 38 0 38 38 0 38
2.13 Compr House m3 105 105 0 105 105 0 105
2.14 Lift m3 491 491 0 491 491 0 491
2.15 101-CC-1001 (Crude Col.) m3 915 915 0 915 915 0 915
2.16 101-CC-1005 (Preflash Col.) m3 582 582 0 582 582 0 582
101-CC-1002/1003 Heavy
2.17 m3 67 67 67 0 0 0 0
Diesel stripper)
2.18 101-CC-1004 (Kero Stripper) m3 82 82 82 0 0 0 0
2.19 101-CC-1006 (Preflash Col.) m3 582 582 0 582 582 0 582
2.20 102-CC-1004 (Stripper) m3 275 275 0 275 275 0 275
2.21 102-CC-1005 (Debutaniser) m3 222 222 0 222 222 0 222
Columns Others (102-CC-1001/
2.22 m3 410 410 0 410 410 0 410
2/6;103-CC-1001/2/3)
2.23 Exchangers m3 1,373 1,373 0 1,373 1,373 0 1,373
2.24 Pumps m3 3,794 3,794 0 3,794 3,794 0 3,794
2.25 Vessels m3 2,089 2,089 0 2,089 2,089 0 2,089
104-RB-1001A/B (Reactor
2.26 m3 370 370 0 370 370 0 370
Settler)
2.27 104-VV-1002A/B (Salt Filters) m3 420 420 0 420 420 0 420
2.28 OWS/CRWS Sump-1 m3 1,300 1,300 0 1,300 1,300 0 1,300
2.29 OWS/CRWS Sump-2 m3 1,350 1,350 0 1,350 1,350 0 1,350
2.30 UG Pit m3 530 530 0 530 530 0 530
2.31 Other Misc.Sub Strs. m3 1,230 750 0 750 273 0 273
3 RCC (Super-Str.) m3 6,573 2.24% 6,573 1,423 5,149 5,001 19 19 5,021
3.1 CDU Heater m3 336 336 0 336 336 0 336
3.2 Main/ Branch Piperack m3 3,264 3,264 0 3,264 3,264 0 3,264
3.3 Heater Piperack m3 116 116 0 116 116 0 116
3.4 BPR-7 m3 130 130 56 74 74 0 74
3.5 Technological Str-1 to 8 m3 680 680 0 680 661 19 19 680
3.6 Lift m3 50 50 0 50 50 0 50
3.7 Exchangers m3 111 111 0 111 111 0 111
3.8 Vessels (Desalters) m3 368 368 0 368 368 0 368
Page 33 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: CDU
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
PREVIOUS
MONTH
FRONT
Total %
S.
(*)
WORK ITEMS DESRIPTION UOM Scope WTG.
NO
CDU (Block)
A B C D= B-C E F G=H-E H
3
3.9 AFC level Slab m 1,267 1,267 1,267 0 0 0 0
3.10 Others Super Strs. m3 250 250 100 150 21 0 21
RCC in Pavement, Drains &
4 m3 17,350 2.96% 17,350 17,011 339 339 0 339
Sleepers
5 Misc. Civil Work % 100 0.82% 100.0 0 100.0 34.0 10 0.0 34.0
IV Strl Steel 4.45% 94.7% 24.6% 70.2% 55.3% 6.9% 5.6% 60.9%
1 Structural Steel Erection MT 11,000 10,412 2,329 8,084 6,447 544 543 6,990
1.1 Strl. Steel (Rack) MT 8,406 2.34% 7,818 1,638 6,181 6,016 0 43 6,059
MPR MT 5,046 5,046 0 5,046 4,999 0 4,999
BPR-01 MT 343 343 0 343 286 8 294
BPR-02 MT 295 295 0 295 295 0 295
BPR-03&04 MT 496 496 0 497 436 35 471
BPR- 05 MT 728 728 728 0 0
BPR-06 MT 188 188 188 0 0
BPR-07, MT 372 372 372 0 0
BPR- 08 MT 0 350 350 0 0
HPR MT 378 0 0
AFC Manifold MT 561 0 0
1.2 Strl. Steel (Tech. Str.) MT 1,743 0.55% 1,744 691 1,053 318 524 500 818
TS-01 MT 7 7 7 0 0
TS-02 MT 22 22 22 0 0
TS-03 MT 27 27 27 0 0
TS-04 MT 238 238 140 98 238 51 51
TS-05 MT 52 52 0 52 52 0
TS-06 MT 108 108 1 107 108 79 79
TS-07 MT 631 631 0 631 236 126 340 576
Other MT 0 0
Lift structure MT 659 659 494 165 82 30 112
1.3 Strl. Steel- Compr. Shed MT 136 0.04% 136 0 136 113 20 0 113
1.4 Strl. Steel- Others MT 714 0.18% 714 0 714 0
Structural Steel Alignment /
2 MT 11,000 10,412 3,421 6,990 5,520 1,071 649 6,169
grouting
2.1 Strl. Steel (Rack) MT 8,366 1.00% 7,818 1,759 6,059 5,407 647 649 6,056
2.2 Strl. Steel (Tech. Str.) MT 1,795 0.24% 1,744 926 818 424 0
2.3 Strl. Steel (Sheds) MT 136 0.02% 136 23 113 113 0 113
Page 34 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: CDU
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
PREVIOUS
MONTH
FRONT
Total %
S.
(*)
WORK ITEMS DESRIPTION UOM Scope WTG.
NO
CDU (Block)
A B C D= B-C E F G=H-E H
11 STRESS RELIVING Nos 57,217 0.88% 49,049 49,049 0
12 STEAM TRACERS RM 27,165 0.33% 0 0 0 0
13 BLASTING/PRIMER PAINTING IM 1,235,500 0.80% 1,048,461 828,461 220,000 32,640 22,879 11,096 43,736
14 FINAL PAINTING IM 1,235,500 0.80% 1,048,461 1,048,461 0 0
15 CHEMICAL CLEANING IM 20,333 0.03% 0 0 0 0
GI PIPING 0.97% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
16 PPG LAYING IM 54,213 0.88% 0 0
17 PPG SYSTEM TESTING IM 54,213 0.09% 0 0
C MECHANICAL EQPT WORK 7.40% 85.5% 61.5% 24.0% 23.6% 0.3% 0.3% 23.9%
STAT. EQUIPMENT -
18 MT 15,590 3.80% 15,590 11,218 4,372 4,341 31 4,372
ERECTION
STAT. EQPT -GROUT /
19 MT 15,590 2.53% 15,590 11,218 4,372 4,242 130 99 4,341
ALIGNMENT
ROTARY. EQUIPMENT-
20 MT 134 0.10% 0 0
COMPRESSOR ERECTION
ROT. EQPT- COMPRESSOR
21 MT 134 0.07% 0 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-PUMP
22 MT 925 0.36% 0 0
ERECTION
ROT. EQPT- PUMP
23 MT 925 0.54% 0 0
GROUT/ALIGNMENT
D CIVIL/ STRUCTURAL WORK 2.44% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
3
24 RCC WORKS M 700 0.30% 0 0
25 FIRE PROOFING m2 60,610 0.69% 0 0
26 STRL STEEL-FABN MT 555 0.35% 0 0
27 STRL STEEL-ERCN MT 879 0.45% 0 0
28 GRATING-INSTALLATION MT 55 0.02% 0 0
29 HANDRAILING RM 215 0.00% 0 0
30 STR-BLASTING / PRIMER MT 555 0.04% 0 0
31 STRL FINAL PAINTING MT 10,450 0.59% 0 0
E ELECTRICAL 5.07% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
32 Nos 10 0.07% 0 0
INSTLN
33 LIGHTING TRANSFORMER Nos 3 0.00% 0 0
34 PANEL INSTALLATION Nos 298 0.22% 0 0
35 BUS DUCT ERECTION RM 144 0.01% 0 0
Instln of Ltg Pnl, PB Stns &
36 Nos 3,616 0.53% 0 0
other control gear
DC
37 SYSTEM/BATTERY/CAPACIT Nos 4 0.01% 0 0
OR BANKS ERECTION
EARTH ELECTRODES
38 Nos 10 0.00% 0 0
INSTLN.
EARTH PLATES
39 Nos 175 0.01% 0 0
INSTALLATION
EARTH STRIPS
40 RM 7,900 0.12% 0 0
INSTALLATION
CABLE TRAYS
41 RM 59,200 1.73% 0 0
INSTALLATION
42 JBs/PBS INSTALLATION Nos 5 0.00% 0 0
43 CABLE LAYING km 604 0.88% 0 0
44 FA/PA CABLE LAYING km 16 0.02% 0 0
CABLE GLANDING &
45 Nos 5,694 0.33% 0 0
TERMINATION
46 LIGHTING POLES INSTLN. Nos 690 0.08% 0 0
47 LIGHTING FIXTURES INSTLN. Nos 6,900 0.81% 0 0
48 WIRING KM 146 0.11% 0 0
Page 35 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: CDU
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
PREVIOUS
MONTH
FRONT
Total %
S.
(*)
WORK ITEMS DESRIPTION UOM Scope WTG.
NO
CDU (Block)
A B C D= B-C E F G=H-E H
49 FIRE PROOFING OF CABLES M 604 0.00% 0 0
50 FA/PA EQPT INSTALLATION Nos 129 0.05% 0 0
51 NO LOAD RUN -MV MOTORS Nos 339 0.05% 0 0
52 NO LOAD RUN -HV MOTORS Nos 54 0.04% 0 0
F INSTRUMENTATION 5.08% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
53 INST-CALIBRATION Nos 3,586 0.15% 0 0
54 INST-INSTALLATION Nos 4,120 0.20% 0 0
55 INSTALLATION OF AIR LINE RM 1,400 0.03% 0 0
IMPULSE LINE- FABN &
56 Nos 789 0.04% 0 0
HYDROTEST
IMPULSE PIPE -
57 Nos 789 0.04% 0 0
INSTALLATION
LOCAL
58 PANELS/CABINETS/ANALYSE Nos 84 0.14% 0 0
R ERECTION
59 JB INSTALLATION Nos 570 0.01% 0 0
60 DUCTS INSTALLATION RM 4,012 0.33% 0 0
61 FRP/MISC.TRAY ERECTION RM 61,116 1.49% 0 0
MAIN (Multi pair) CABLE
62 km 232 0.94% 0 0
LAYING
BRANCH (single pair) CABLE
63 km 236 0.38% 0 0
LAYING
64 GLANDING & TERMINATION Nos 32,960 1.07% 0 0
TUBING HOOK UP OF
65 Nos 334 0.03% 0 0
CONTROL VALVE
66 SS/CU TUBING RM 7,700 0.19% 0 0
67 LOOP CHECKING Nos 1,443 0.05% 0 0
G MISC WORKS % 100 1.51% 5.0 0.0 0.0 0.0
H HEATER WORK % 3.62% 100.0% 0.0% 100.0% 31.7% 3.6% 0.0% 31.7%
1 Heater Work-A 0
Convection Module / Radiant
Module / Stack / APH MT 2388 0.68% 2388 0 2388 1446 279 0 1446
Structure
Convection Module 730 730 0 730 150 279 0 150
Radiant Module 1296 1296 0 1,296 1,296 0 1,296
Stack 161 161 0 161 0
APH Structure 200 200 0 200 0
2 Heater Work-B 0
Convection Module / Radiant
Module / Stack / APH MT 2388 0.68% 2388 0 2388 1296 180 0 1296
Structure
Convection Module 730 730 0 730 180 0
Radiant Module 1296 1296 0 1,296 1,296 0 1,296
Stack 161 161 0 161 0
APH Structure 200 200 0 200 0
3 Heater Work-C 0
Convection Module / Radiant
Module / Stack / APH MT 2388 0.68% 2388 0 2388 1296 0 0 1296
Structure
Convection Module 730 730 0 730 0
Radiant Module 1296 1296 0 1,296 1,296 0 1,296
Stack 161 161 0 161 0
APH Structure 200 200 0 200 0
4 Castables / Brickwork SQM 2000 0.16% 2,000 0 2,000 0
5 Piping Field Welding ID 37680 0.85% 37,680 0 37,680 0
6 Piping Erection IM 23085 0.22% 23,085 0 23,085 0
Page 36 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: CDU
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
PREVIOUS
MONTH
FRONT
Total %
S.
(*)
WORK ITEMS DESRIPTION UOM Scope WTG.
NO
CDU (Block)
A B C D= B-C E F G=H-E H
7 Piping Insulation RM 13875 0.02% 13,875 0 13,875 0
Electrical / Instrumentation /
8 % 100 0.33% 100 0 100 0
balance Misc. Work
VI INSULATION WORKS 2.84% 2.2% 0.0% 2.2% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 588,532 1.15% 0 0
2 HOT INSULATION: PIPING IM 403,721 0.63% 0 0
COLD INSULATION:
3 SM 5,411 0.13% 0 0
EQUIPMENT
HOT INSULATION:
4 m2 47,915 0.93% 3,139 3,139 0
EQUIPMENT
VII UG PIPING WORKS 3.71% 93.9% 52.4% 41.5% 21.4% 4.3% 3.5% 24.9%
1 UG PIPING FABRICATION ID 68,212 1.24% 68212 18957 49255 32623 3100 2631 35254
2 UG PIPING ERECTION IM 238,419 2.01% 238,419 189657 48762 4714 12000 9601 14315
3 RADIOGRAPHY NOS. 403 0.01% 150 15 135 131 15 0 131
4 RCC (precast, Sub Str) M3 820 0.23% 820 0 820 561 0 0 561
5 STRL STEEL FABRICATION MT 209 0.13% 0
6 STRL STEEL ERECTION MT 179 0.06% 0
7 GRATING WORKS MT 80 0.03% 0
Overall % 33.01% 25.91% 1.0% 0.6% 26.48%
Page 37 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
RFCC BLOCK:
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
VALUE VALUE
RFCC BLOCK Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
(%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 0.0 98.0 98.0 4 0.0 98.0 98.0
Page 38 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
DETAIL ENGINEERING
¾ Updated Topup MTO (MTO-5) released on 03-Aug-2019.
¾ 90% model review scheduled for RFCC block from 19-Sep-16 to 03-Oct-16.
¾ 90% Model review completed for Power Recovery Expander-Generator Package
(PR-5089/ 5012) with M/s Elliott Ebara Turbomachinery on 20th Dec 17.
¾ Around 7478 Piles, 51930 M3 RCC & 17498 MT Steel drawings released for
construction for RFCC block.
¾ All 17500 M3 RCC in Pavement & Drains released.
¾ All 33 Nos. UG Piping GADs issued for construction.
¾ All 236 Nos. AG piping GADs issued for Construction.
¾ ISOs for all 1173 UG Piping lines issued for construction.
¾ ISOs for 11561 out of 12364 AG piping lines issued for construction.
CUMULATIVE
ORIGINAL LIKELY BALANCE
NO. DESRIPTION UOM RELEASED REMARKS
TENDER QTY. QTY.
QTY.
QUANTITY
RFCC BLOCK
1 PIPES M 263771
Page 39 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Sl. Tag No. Description Del MR No. Vendor Actual / Contr. Anti. date ROS Remar
No. vy. / FOA Anticipated Delivery for receipt ks
No. order date* Date at site @
115-MT- GENERATOR Elliott Ebara
5089/
4 1001 / NO. 18 Turbomachine 31.03.16 30.09.17 31.08.19 Disp.
5012
1002 1&2 ry Corp
LC and
114-CC- 6152/ receipt
5 C3 SPLITTER 16 CPTDC 25.02.16 25.06.17 30.09.19
1003 5005 of
advance
payment
issue
112-CC- MAIN 6152/
6 17 CPTDC 25.02.16 25.07.17 30.09.19 resolved
1001 COLUMN 5005 on end
Jun-17.
Phils Heavy
113-CC- 6153/
7 STRIPPER 18 Engineering 02.02.16 02.08.17 30.11.19
1003 5013
Pvt Ltd.
Phils Heavy Recd.
113-CC- DEBUTANIZE 6153/
8 18 Engineering 02.02.16 02.08.17 28.03.19 28.03.19
1004 R 5013
Pvt Ltd.
Phils Heavy Recd.
114-CC- C3/C4 6153/
9 18 Engineering 02.02.16 02.08.17 23.11.18 28.11.18
1001 SPLITTER 5013
Pvt Ltd.
Hyundai Recd.
111-RB- REGENERATO 20 6200/
10 Heavy 17.06.16 17.02.18 28.12.18 28.12.18
1001 R +2 5085
Industries
Hyundai Recd.
111-RB- 20 6200/
11 REACTOR Heavy 17.06.16 17.02.18 28.12.18 28.12.18
1002 +2 5085
Industries
FUEL GAS
115-LW-
STEAM 7940/
12 1001/100 18 Thermax 29.03.17 29.09.18 31.10.19
GENERATOR 5043
2
NO.1 & 2
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
# Actual dates based on intimation received from DORC.
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
Anticipat Delay (M)
Sl Schedule
Unit/ Critical WBS/ Activity ed Finish wrt Proj. Remarks/ Suggestions
No. Finish Date
Date Sch.
Page 40 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Page 41 of 1078
Job No.: A545
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F
DURATION IN MONTHS
Page 42 of 1078
Job No.: A545
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F
DURATION IN MONTHS
Page 43 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J
14 14
DURATION IN MONTHS
Page 44 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F
DURATION IN MONTHS
Page 45 of 1078
DANGOTE REFINERY AND PETROCHEMICAL PROJECT
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D
14 14
DURATION IN MONTHS
Page 46 of 1078
DANGOTE REFINERY AND PETROCHEMICAL PROJECT
100 16
90
14
80
12
MONTHLY SCH.
70
MONTH ACT.
CUMUL. SCH.
10
60 CUMUL. ACT.
CUMUL PROG (%)
50 8
40
6
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D
14 14
DURATION IN MONTHS
Page 47 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A
DURATION IN MONTHS
Page 48 of 1078
Job No.: A545
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S
DURATION IN MONTHS
Page 49 of 1078
Job No.: A545
100 12
90
MONTHLY SCH. MONTH ACT.
10
80
CUMUL. SCH. CUMUL. ACT.
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J F
DURATION IN MONTHS
Page 50 of 1078
Jul - 2019
AFC DRAWINGS STATUS Job No. : A545
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
RFCC BLOCK : 110
P&IDs
1 - PROCESS (LICENSOR) 177 177 177
2 - UTILITY (EIL) 38 38 38
AFC DRAWINGS
1 GENERAL CIVIL 37 37 37
PLAN - Aug : 3
2 STRUCTURAL 370 370 367 3
3 PIPING
5 INSTRUMENTATION 12 12 12
Page 51 of 1078
JUL -2019
RFCC BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 9 9 9 9 9 9 9 9 9 9 9 9 9
2 ROTATING EQUIPMENT 8 8 8 8 8 8 8 8 8 8 8 8 8
3 STATIC EQUIPMENT 13 13 13 13 13 13 13 13 13 13 13 13 13
4 HMTD 3 3 3 3 3 3 3 3 3 3 3 3 3
TOTAL 33 33 33 33 33 33 33 33 33 33 33 33 33
Page 52 of 1078
EQUIPMENT STATUS :: RFCC BLOCK (110) Jul-19
Job No.A545
Page 3 of 12
DANGOTE REFINERY AND PETROCHEMICAL PROJECT, NIGERIA
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 2 2 2 2 2
2 COLUMNS 16 16 16 7 7 7 1 1
3 VESSELS 62 62 62 36 25 11 1 10 15
5 AIR COOLERS 79 79 79 14 37 26 2
6 COMPRESSORS 7 7 7 7 5 2
8 FANS / BLOWERS 5 5 5 2 3
9 BURNERS
FILTERS/
10 33 33 33 17 9 8 6 5 5
COALESCERS
11 HOPPER 5 5 5 1 1 4
Page 53 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: RFCCU
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
RFCC (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.01% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Dredging/ Filling % 100 2.01% 100 0 100 100 0 0 100
II Piling 4.93% 100.0% 0.0% 100.0% 99.8% 0.2% 0.0% 99.8%
1 Piles No. 7,478 4.93% 7,478 0 7,478 7,462 16 0 7,462
III Civil& Strl 14.85% 98.6% 16.1% 83.6% 61.9% 8.5% 3.9% 65.8%
1 Mobilisation % 100 0.88% 100 0 100 90 10 5 95
2 RCC (Sub-Str.) m3 38,285 7.65% 38,059 0 38,059 31,790 3,131 839 32,629
2.1 Main/ Branch Piperack m3 3645 3645 0 3645 2,928 300 38 2,966
2.2 Compressor house & Aux Fdn. m3 2934 2934 0 2934 2,105 200 20 2,125
2.3 TS01 m3 195 195 0 195 195 0 195
2.4 TS02 m3 950 950 0 950 950 0 950
2.5 TS03 m3 72 72 0 72 72 0 72
2.6 TS04 m3 104 104 0 104 104 0 104
2.7 TS05 m3 23 23 0 23 23 0 23
2.8 RR structure m3 5110 5110 0 5110 5,110 0 5,110
2.9 Hopper Str. m3 2995 2995 0 2995 2,995 0 2,995
Aux. Air Compr. & Acc.(111-KA-
2.10 m3 496 496 0 496 496 0 496
1001)
2.11 CBD DRUM UG-01 m3 273 273 0 273 223 0 223
2.12 CBD DRUM UG-02 m3 194 194 0 194 194 0 194
AMINE SUMP DRUM (110-VV-
2.13 m3 194 194 0 194 194 0 194
1003)
LPG AMINE ABSORBER (116-
2.14 m3 112 112 0 112 112 0 112
CC-1001)
EXTRACTOR PLUS (116-CC-
2.15 m3 108 108 0 108 108 0 108
1002)
C3/C4 SPLITTER (114-CC-
2.16 m3 251 251 0 251 251 0 251
1001)
2.17 DEETHANIZER (114-CC-1002) m3 148 148 0 148 148 0 148
2.18 C3 SPLITTER (114-CC-1003) m3 765 765 0 765 765 0 765
COMPR. SUCTION DRUM
2.19 m3 213 213 0 213 213 0 213
(114-VV-1003)
HEAT PUMP COMPRESSORS
2.20 m3 340 340 0 340 340.0 0 340.0
(114-KA-1001)
PRIMARY ABSORBER (113-
2.21 m3 218 218 0 218 218.0 0 218.0
CC-1001)
3
2.22 STRIPPER (113-CC-1003) m 372 372 0 372 372.0 0 372.0
2.23 DEBUTANIZER (113-CC-1004) m3 232 232 0 232 232 0 232
DEPENTANIZER (113-CC-
2.24 m3 151 151 0 151 151.00 0 151.00
1005)
WET GAS COMPRESSOR
2.25 m3 660 660 0 660 660 0 660
(113-KA-1001 A/B)
3
2.26 Main Column (112-CC-1001) m 537 537 0 537 537 0 537
FLUE GAS STEAM 3
2.27 m 1420 1420 0 1420 1,269 151 0 1,269
GENERATOR (115-LW-1001)
2.28 TSS STRUCTURE m3 1595 1595 0 1595 1,595.0 0 1,595.0
2.29 PRT SHED m3 503 503 0 503 339 164 0 339
2.30 CRWS Sump-1 m3 1680 1680 0 1680 1,680 0 1,680
2.31 CRWS Sump-2 m3 712 712 0 712 712 0 712
2.32 Exchangers m3 823 823 0 823 502 321 0 502
2.33 Pumps m3 4044 4044 0 4044 1,546 1,400 252 1,798
Page 54 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: RFCCU
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
RFCC (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
Vessels 3
2.34 m 2490 2490 0 2490 1,665 525 0 1,665
2.35 Other Sub Str. m3 3726 3500 0 3500 2,786 70 529 3,315
3 RCC (Super-Str.) M3 10,785 2.59% 10,785 1,700 9,085 6,761 1,617 1,561 8,322
3.1 Main/ Branch Piperack m3 3002 3002 0 3002 2,095 200 144 2,239
3.2 MPR AFC SLAB m3 1700 1700 1700 0 0 0 0 0
3.3 TS01 m3 280 280 0 280 280 0 280
3.4 TS 02 m3 37 37 0 37 37 0 37
Heat Pump Compr. (114-KA-
3.5 m3 160 160 0 160 160 0 160
1001)
3.6 RR structure m3 1350 1350 0 1350 1,350 0 1,350
3.7 Hopper Str. m3 2400 2400 0 2400 983 1,417 1,417 2,400
3.8 Other Super Str. m3 1856 1856 0 1856 1,856 0 1,856
RCC in Pavement, Drains &
4 M3 17500 2.10% 17,500 16,500 1,000 216 0 216
Sleepers
5 Misc. Civil Work % 100 1.63% 90.0 0.0 100 24.0 10.0 0.0 24.0
IV Strl Steel 4.65% 96.3% 46.3% 50.0% 32.1% 6.0% 5.5% 37.6%
1 Structural Steel Erection MT 16000 0.00% 15224 6137 9087 5967 1042 939 6906
1.1 Strl. Steel (MPR) MT 6535 1.28% 6535 1,860 4,675 4,316 320 273 4,589
1.2 Strl. Steel (Branch PR-1) MT 154 0.03% 154 154 0 0
1.3 Strl. Steel (Branch PR-2) MT 75 0.01% 75 75 0 0
1.4 Strl. Steel (Branch PR-3) MT 30 0.01% 30 0 30 32 27 27
1.5 Strl. Steel (Branch PR-4) MT 59 0.01% 59 59 0 0
1.6 Strl. Steel (Branch PR-5) MT 62 0.01% 62 62 0 0
1.7 Strl. Steel (Branch PR-6) MT 18 0.00% 18 18 0 0
1.8 Strl. Steel (Branch PR-8) MT 19 0.00% 19 19 0 0
1.9 Strl. Steel (Tech. Str.) MT 830 0.19% 830 329 501 54 400 348 402
1.10 COMPRESSOR SHEDS MT 1880 0.34% 1880 0 1,880 84 84
HEAT PUMP COMRESSOR
1.11 MT 566 0.10% 566 0 566 162 230 207 369
SHEDS
1.12 PRT Shed MT 553 0.10% 553 553 0 0
1.13 Wet Gas Compressor Rack MT 208 0.04% 208 208 0 0
1.14 RR STRUCTURE MT 2352 0.53% 2352 917 1,435 1,435 60 0 1,435
1.15 TSS Struture MT 977 0.22% 977 977 0 0
1.16 HOPPER STRUCTURE MT 129 0.03% 129 129 0 0
1.17 AFC MANIFOLD MT 777 0.17% 777 777 0 0
1.18 MISC. STR. MT 776 0.17% 0 0 0 0
Structural Steel Alignment /
2 MT 16000 0.00% 16000 9976 6024 3162 800 773 3935
grouting
2.1 Strl. Steel (MPR) MT 6535 0.55% 6535 1,946 4,589 1,800 800 700 2,500
2.2 Strl. Steel (Branch PR-1) MT 154 0.01% 154 154 0
2.3 Strl. Steel (Branch PR-2) MT 75 0.01% 75 75 0
2.4 Strl. Steel (Branch PR-3) MT 30 0.00% 30 30 0
2.5 Strl. Steel (Branch PR-4) MT 59 0.00% 59 59 0
2.6 Strl. Steel (Branch PR-5) MT 62 0.01% 62 62 0
2.7 Strl. Steel (Branch PR-6) MT 18 0.00% 18 18 0
2.8 Strl. Steel (Branch PR-8) MT 19 0.00% 19 19 0
2.9 Strl. Steel (Tech. Str.) MT 830 0.08% 830 830 0
2.10 COMPRESSOR SHEDS MT 1880 0.15% 1880 1,880 0
HEAT PUMP COMRESSOR
2.11 MT 566 0.04% 566 566 0
SHEDS
2.12 PRT Shed MT 553 0.04% 553 553 0
2.13 Wet Gas Compressor Rack MT 208 0.02% 208 208 0
2.14 RR STRUCTURE MT 2352 0.23% 2352 917 1,435 1,362 73 1,435
Page 55 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: RFCCU
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
RFCC (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
2.15 TSS Struture MT 977 0.09% 977 977 0
2.16 HOPPER STRUCTURE MT 129 0.01% 129 129 0
2.17 AFC MANIFOLD MT 777 0.07% 777 777 0
2.18 MISC. STR. MT 776 0.07% 776 776 0
V Composite work 68.91% 19.7% 15.8% 3.9% 2.6% 0.2% 0.3% 2.8%
A1 MOBILISATION % 100 0.98% 100 50 50 30 5 4 34
A2 SUPPLY OF MATERIALS % 100 0.98% 80 5 75 0
B PIPING 29.84% 67.4% 63.6% 3.8% 1.5% 0.6% 0.9% 2.4%
1 A/G PPG-WELDING CS ID 593450 9.39% 428,338 373,665 54,673 23,604 5,200 9,155 32,759
2 A/G PPG-WELDING SS ID 12650 0.26% 8,200 8,200 0
3 A/G PPG-WELDING AS ID 36995 0.87% 18,876 18,876 0 2,000 0
A/G PPG-ERCN CS (OTHER
4 IM 1141025 7.53% 752,966 726,350 26,616 7,506 7,200 15,842 23,348
THAN SPOOL)
5 A/G PPG-ERCN CS (SPOOL) IM 195770 1.29% 195,770 195,770 0
6 A/G PPG-ERCN SS IM 44575 0.37% 21,473 21,473 0
7 A/G PPG-ERCN AS IM 84715 0.83% 21,694 21,694 0
8 A/G PPG-SUPPORTING IM 1466085 3.98% 991,903 991,903 0
9 A/G PPG-HYDROTESTING IM 1466085 2.93% 991,903 991,903 0
RADIOGRAPHY/ULTRASOUN
10 Nos 10401 0.15% 7,366 7,161 205 190 0 190
D TESTING
11 STRESS RELIVING Nos 52310 0.57% 37,044 37,044 0
12 STEAM TRACERS RM 35005 0.30% 0 0
13 BLASTING/PRIMER PAINTING IM 1466085 0.67% 991,903 791,903 200,000 53,811 25,000 20,871 74,682
14 FINAL PAINTING IM 1466085 0.67% 991,903 991,903 2,493 0
15 CHEMICAL CLEANING IM 39965 0.05% 0 0 0
GI PIPING 0.80% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
16 PPG LAYING IM 63723.75 0.73% 0 0
17 PPG SYSTEM TESTING IM 63723.75 0.07% 0 0
C MECHANICAL EQPT WORK 15.03% 17.8% 1.0% 16.8% 16.2% 0.0% 0.4% 16.7%
STAT. EQUIPMENT -
18 MT 20825 3.57% 9,378 529 8,849 8,547 0 302 8,849
ERECTION
STAT. EQPT -
19 MT 20825 2.38% 9,378 529 8,849 8,547 65 100 8,647
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-
20 MT 9140 5.01% 0
COMPRESSOR ERECTION
ROT. EQPT- COMPRESSOR
21 MT 9140 3.34% 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-PUMP
22 MT 1069 0.29% 0
ERECTION
ROT. EQPT- PUMP
23 MT 1069 0.44% 0
GROUT/ALIGNMENT
D CIVIL/ STRUCTURAL WORK 4.85% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
3
24 RCC WORKS M 200 0.06% 0
25 FIRE PROOFING m2 65460 0.52% 0
26 STRL STEEL-FABN MT 2570 1.13% 0
27 STRL STEEL-ERCN MT 6190 2.23% 0
28 GRATING-INSTALLATION MT 220 0.06% 0
29 HANDRAILING RM 2420 0.02% 0
30 STR-BLASTING / PRIMER MT 2570 0.12% 0
31 STRL FINAL PAINTING MT 17640 0.71% 0
Page 56 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: RFCCU
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
RFCC (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
E ELECTRICAL 4.86% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
32 Nos 16 0.07% 0
INSTLN
33 LIGHTING TRANSFORMER Nos 5 0.00% 0
34 PANEL INSTALLATION Nos 403 0.21% 0
35 BUS DUCT ERECTION RM 175 0.01% 0
Instln of Ltg Pnl, PB Stns &
36 Nos 5636 0.58%
other control gear 0
DC SYSTEM/ BATTERY/
37 CAPACITOR BANKS Nos 10 0.03%
ERECTION 0
EARTH ELECTRODES
38 Nos 10 0.00%
INSTLN. 0
EARTH PLATES
39 Nos 220 0.01%
INSTALLATION 0
EARTH STRIPS
40 RM 9970 0.10%
INSTALLATION 0
CABLE TRAYS
41 RM 65600 1.35% 0
INSTALLATION
42 JBs/PBS INSTALLATION Nos 5 0.00% 0
43 CABLE LAYING km 1148.25 1.18% 0
44 FA/PA CABLE LAYING km 18 0.02% 0
CABLE GLANDING &
45 Nos 6120 0.25%
TERMINATION 0
46 LIGHTING POLES INSTLN. Nos 850 0.07% 0
47 LIGHTING FIXTURES INSTLN. Nos 9415 0.77% 0
48 WIRING KM 184.5 0.09% 0
49 FIRE PROOFING OF CABLES M 1148.25 0.00% 0
50 FA/PA EQPT INSTALLATION Nos 74 0.02% 0
51 NO LOAD RUN -MV MOTORS Nos 529 0.05% 0
52 NO LOAD RUN -HV MOTORS Nos 60 0.03% 0
F INSTRUMENTATION 5.96% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
53 INST-CALIBRATION Nos 2987 0.09% 0
54 INST-INSTALLATION Nos 5617 0.19% 0
55 INSTALLATION OF AIR LINE RM 1600 0.03% 0
IMPULSE LINE- FABN &
56 Nos 1168 0.04%
HYDROTEST 0
IMPULSE PIPE -
57 Nos 1168 0.04%
INSTALLATION 0
LOCAL
58 PANELS/CABINETS/ANALYSE Nos 135 0.15%
R ERECTION 0
59 JB INSTALLATION Nos 836 0.01% 0
60 DUCTS INSTALLATION RM 7187 0.41% 0
61 FRP/MISC.TRAY ERECTION RM 90334 1.55% 0
MAIN (Multi pair) CABLE
62 km 609.3 1.74%
LAYING 0
BRANCH (single pair) CABLE
63 km 360.61 0.41%
LAYING 0
64 GLANDING & TERMINATION Nos 44936 1.03% 0
TUBING HOOK UP OF
65 Nos 482 0.03%
CONTROL VALVE 0
66 SS/CU TUBING RM 10830 0.19% 0
67 LOOP CHECKING Nos 2230 0.05% 0
G MISC WORKS % 100 5.62% 5.0 0.0 0.0 0.0
VI INSULATION WORKS 1.42% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Page 57 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: RFCCU
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
RFCC (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
1 COLD INSULATION: PIPING IM 792145 1.08% 0
2 HOT INSULATION: PIPING IM 302473 0.33% 0
COLD INSULATION:
3 SM 7,946 0.14% 0 0
EQUIPMENT
HOT INSULATION:
4 m2 5,025 0.07% 754 754 0
EQUIPMENT
VII UG PIPING WORKS 3.03% 97.5% 74.8% 22.6% 16.8% 2.3% 0.9% 17.6%
1 UG PIPING FABRICATION ID 80767 1.03% 80767 46052 34715 29,731 920 2030 31,761
2 UG PIPING ERECTION IM 290106 1.72% 290106 282960 7146 288 9600 64 352
3 RCC (precast, Sub Str) M3 1000 0.20% 1000 0 1,000 634 0 634
4 STRL STEEL FABRICATION MT 104 0.05% 0
5 STRL STEEL ERECTION MT 89 0.02% 0
6 GRATING WORKS MT 40 0.01% 0
Overall % 27.5% 21.30% 1.9% 1.2% 22.53%
Page 58 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
VALUE VALUE
DMHC BLOCK Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
(%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 0.0 98.0 98.0 4 0.0 98.0 98.0
Page 59 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
DETAIL ENGINEERING
¾ Updated Topup MTO (MTO-5) released on 03-Aug-2019.
¾ 90% model review done for DMHC block from 05-Sep-16 to 15-Sep-16.
¾ Around 5115 Piles, 24085 M3 RCC & 9146 MT Steel drawings released for
construction for DMHC block.
¾ All 10335 M3 RCC in Pavement & Drains released.
¾ All 18 Nos. UG Piping GADs issued for construction.
¾ All 80 Nos. piping GADs issued for construction.
¾ All 1043 Nos. ISOs for UG piping lines issued for construction.
¾ ISOs for 5770 Nos. out of 6210 Nos. AG piping lines issued for construction.
CUMULATIVE
S. ORIGINAL LIKELY BALANC
DESRIPTION UOM RELEASED REMARKS
NO TENDER QTY E QTY.
QTY.
QUANTITY
DIESEL MHC
BLOCK
1 Piles No. 5110 5115 5115 0
Vendor data
awaited : Filter,
2 RCC (Sub-Str.) M3 21355 19700 19750 38
Exchanger,
(2nos), skids
3 RCC (Super-Str.) M3 1850 4335 4335 0
Misc. Platforms,
4 Strl. Steel MT 9730 9146 584 supports etc.
RCC In
5 Pavement & M3 13150 10335 10335 0
Drains
Note: The estimated and actual quantities have been changed due to revision in piling layout. This was discussed
during the meeting with DORC on 07.12.17 in EIL, HO.
1 PIPES M 122498
Page 60 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Sl. Tag No. Description Del MR No. / Vendor Actual# / Contr. Anti. date ROS Remar
No vy. FOA No. Anticipated Delivery for receipt ks
. order date* Date at site @
121-KA- Nuovo Recd
1002 MAKEUP GAS 5041/
1 18 Pignone (GE 30.07.15 30.01.17 30.07.19 30.06.19
A/B/C COMPRESSORS 5002
Oil co.)
Nuovo Recd.
121-KA- RECYCLE GAS 5081/
2 20 Pignone (GE 30.07.15 30.03.17 28.03.19 28.03.19
1001 COMPRESSOR 5003
Oil co.)
LC issue
PRODUCT
121-CC- 6152/ resolved
3 FRACTIONATO 16 CPTDC 25.02.16 25.06.17 30.09.19 30.06.19
2003 5005 on end
R Jun-17
121-RB- Recd.
TRAIN-1 & 2 6205/ ATB RIVA
4 1001 / 20 01.09.16 01.05.18 28.12.18 28.12.18
REACTOR 5135 CALZONI SPA
1002
121-EE- Recd
1001- TRAIN-1 & 2 6230/ GODREJ &
5 18 23.03.17 23.09.18 28.03.19 28.03.19
1010, EXCHANGERS 5266 BOYCE MFG.
1016-17
121-PA- Despatc
1001 CHARGE 5123/ SHIN NIPPON hed
6 18 02.09.16 01.03.18 30.05.19 30.04.19
A/B/C PUMPS 5047 MACHINERY
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
# Actual dates based on intimation received from DORC.
Page 61 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
Page 62 of 1078
Job No.: A545
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
Page 63 of 1078
Job No.: A545
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
Page 64 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D
DURATION IN MONTHS
Page 65 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S
14 14
DURATION IN MONTHS
Page 66 of 1078
Job No.: A545
100 16
90
14
80
12
MONTHLY SCH.
70
MONTH ACT.
CUMUL. SCH.
10
60 CUMUL. ACT.
CUMUL PROG (%)
50 8
40
6
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J
14 14
DURATION IN MONTHS
Page 67 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J
14 14
DURATION IN MONTHS
Page 68 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S
14 14
DURATION IN MONTHS
Page 69 of 1078
Job No.: A545
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N
14 14
DURATION IN MONTHS
Page 70 of 1078
Job No.: A545
100 12
90
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
Page 71 of 1078
Jul - 2019
AFC DRAWINGS STATUS Job No. : A545
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
DIESEL MHC BLOCK : 120
P&IDs
1 - PROCESS (LICENSOR) 114 114 114
2 - UTILITY (EIL) 31 31 31
AFC DRAWINGS
1 GENERAL CIVIL 23 23 23
PLAN - Aug : 7
2 STRUCTURAL 207 205 200 7
3 PIPING
- GAD`s 80 80 80
PLAN - Aug : 2
4 ELECTRICAL 17 17 15 2
5 INSTRUMENTATION 12 12 12
Page 72 of 1078
JUL -2019
DMHC BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 2 2 2 2 2 2 2 2 2 2 2 2 2
2 ROTATING EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
3 STATIC EQUIPMENT 4 4 4 4 4 4 4 4 4 4 4 4 4
TOTAL 9 9 9 9 9 9 9 9 9 9 9 9 9
Page 73 of 1078
EQUIPMENT STATUS :: DIESEL MHC BLOCK (120) Jul-19
Job No.A545
Page 4 of 12
DANGOTE REFINERY AND PETROCHEMICAL PROJECT, NIGERIA
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 2 2 2 2 2
2 COLUMNS 5 5 5 2 1 1 3
3 VESSELS 35 35 35 19 14 5 4 1 1 2 8
4 HEAT EXCHANGERS 45 45 45 43 28 13 2 2
5 AIR COOLERS 92 92 92 2 90
6 COMPRESSORS 4 4 4 4 4
7 PUMPS 48 48 48 17 15 2 4 12 3 12
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 13 13 13 8 4 4 2 3
COALESCERS
Page 74 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: DMHC
PROGRESS UPTO
S. WORK ITEMS DESRIPTION UOM Total Scope %
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO DMHC WTG.
MONTH TILL
PREVIOUS
(Block)
MONTH
FRONT
DATE
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.03% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Dredging/ Filling m3 100 2.03% 100 0 100 100 0 0 100
I Piling 7.08% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Piles No. 5,125 7.08% 5,125 0 5,125 5,125 0 0 5,125
I Civil 16.66% 98.4% 20.6% 77.8% 62.9% 4.5% 1.2% 64.1%
1 Mobilisation % 100 0.84% 100 0 100 80 10 5 85
2 RCC (Sub-Str.) m3 20,818 8.72% 20,538 0 20,538 19,636 696 128 19,764
2.1 Heater fdn 121-FF-1001,2 m3 589 589 0 589 489 100 0 489
2.2 Heater fdn 121-FF-2001A/B m3 298 298 0 298 298 0 298
2.3 Piperack Fdns m3 5,416 5,416 0 5,416 5,333.5 83 82.5 5,416.0
2.4 Reactor m3 1,170 1,170 0 1,170 1,170 0 1,170
2.5 Columns m3 457 457 0 457 457 0 457
2.6 Exchangers m3 1,500 1,400 0 1,400 1,227 173 0 1,227
2.7 Pumps m3 1,528 1,528 0 1,528 1,528 0 1,528
2.8 Vessels m3 1,500 1,500 0 1,500 1,491 9 8 1,499
2.9 CRWS Sump-1 m3 860 860 0 860 860 0 860
2.10 CRWS Sump-2 m3 892 892 0 892 892 0 892
2.11 U/G Pit for (120-VV-1002/1003/1022) m3 730 730 0 730 724 6 0 724
2.12 Compressor Shed m3 3,365 3,185 0 3,185 3,049 136 9 3,058
2.13 Tech Structures m3 262 262 0 262 228 34 0 228
2.14 APH System m3 750 750 0 750 394 150 28 422
2.15 Other Sub Strs m3 1,501 1,501 0 1,501 1,496 5 0 1,496
3 RCC (Super-Str.) m3 5,857 2.94% 5,857 1,700 4,157 2,337 600 162 2,498
3.1 Heater fdn 121-FF-1001,2; 2001A/B m3 83 83 0 83 83 0 83
3.2 Main/ Branch Piperack m3 3,927 3,927 500 3,427 1,912 450 87 1,999
3.3 AFC Slab m3 1,200 1,200 1,200 0 0
3.3 Tech Str. m3 325 325 0 325 19 150 75 94
3.4 Other Super Strs m3 322 322 0 322 322 0 0 322
4 RCC in Pavement, Drains & Sleepers m3 10,335 2.60% 10,335 10,235 100 0 75 75
5 Misc. Civil Work % 100 1.56% 90.0 90 26.0 5.0 0.0 26.0
IV Strl steel 4.90% 100.0% 96.2% 3.8% 0.0% 4.2% 2.6% 2.6%
1 Structural Steel erection MT 8,500 0.00% 8,500 8,047 453 0 500 314 314
1.1 Strl. Steel (Main Pipe Rack) MT 4,425 1.82% 4,425 3,972 453 500 314 314
1.2 Strl. Steel (Branch PR-1) MT 193 0.08% 193 193 0 0
1.3 Strl. Steel (Branch PR-2) MT 32 0.01% 32 32 0 0
1.4 Strl. Steel (Branch PR-3) MT 117 0.05% 117 117 0 0
1.5 Strl. Steel (Branch PR-4) MT 67 0.03% 67 67 0 0
1.6 Strl. Steel (Branch PR-5) MT 20 0.01% 20 20 0 0
1.7 Strl. Steel (Branch PR-8) MT 10 0.00% 10 10 0 0
1.8 Strl. Steel (Heater PR) MT 268 0.11% 268 268 0 0
1.9 Strl. Steel (Compressor PR) MT 369 0.15% 369 369 0 0
1.10 Strl. Steel (Tech. Str.) MT 37 0.02% 37 37 0 0
1.11 Strl. Steel (Reactor Structure) MT 562 0.23% 562 562 0 0
1.12 Strl. Steel (NAPHTHA Structure㸦TS02㸧) MT 133 0.06% 133 133 0 0
1.13 Strl. Steel (Compressor Sheds(CS)) MT 1,441 0.55% 1,441 1,441 0 0
1.14 Strl. Steel- Manifold Str MT 308 0.12% 308 308 0 0
1.15 Strl. Steel- Others MT 518 0.20% 518 518 0 0
2 Structural Steel Alignment / grouting MT 8,500 0.00% 8,500 8,500 0 0 0 0 0
2.1 Strl. Steel (Main Pipe Rack) MT 4,425 0.78% 4,425 4,425 0 0
2.2 Strl. Steel (Branch PR-1) MT 193 0.03% 193 193 0 0
2.3 Strl. Steel (Branch PR-2) MT 32 0.01% 32 32 0 0
Page 75 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: DMHC
PROGRESS UPTO
S. WORK ITEMS DESRIPTION UOM Total Scope %
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO DMHC WTG.
MONTH TILL
PREVIOUS
(Block)
MONTH
FRONT
DATE
(*)
A B C D= B-C E F G=H-E H
Page 76 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: DMHC
PROGRESS UPTO
S. WORK ITEMS DESRIPTION UOM Total Scope %
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO DMHC WTG.
MONTH TILL
PREVIOUS
(Block)
MONTH
FRONT
DATE
(*)
A B C D= B-C E F G=H-E H
35 BUS DUCT ERECTION RM 150 0.02% 0
Instln of Ltg Pnl, PB Stns & other control
36 Nos 2,674 0.58%
gear 0
DC SYSTEM/BATTERY/CAPACITOR
37 Nos 10 0.05%
BANKS ERECTION 0
38 EARTH ELECTRODES INSTLN. Nos 10 0.00% 0
39 EARTH PLATES INSTALLATION Nos 170 0.01% 0
40 EARTH STRIPS INSTALLATION RM 7,090 0.15% 0
41 CABLE TRAYS INSTALLATION RM 60,250 2.60% 0
42 JBs/PBS INSTALLATION Nos 5 0.00% 0
43 CABLE LAYING km 554 1.19% 0
44 FA/PA CABLE LAYING km 14 0.03% 0
45 CABLE GLANDING & TERMINATION Nos 4,776 0.41% 0
46 LIGHTING POLES INSTLN. Nos 445 0.08% 0
47 LIGHTING FIXTURES INSTLN. Nos 5,280 0.91% 0
48 WIRING KM 91 0.10% 0
49 FIRE PROOFING OF CABLES M 554 0.00% 0
50 FA/PA EQPT INSTALLATION Nos 89 0.05% 0
51 NO LOAD RUN -MV MOTORS Nos 203 0.04% 0
52 NO LOAD RUN -HV MOTORS Nos 19 0.02% 0
F INSTRUMENTATION 7.24% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
53 INST-CALIBRATION Nos 2,194 0.13% 0
54 INST-INSTALLATION Nos 4,599 0.33% 0
55 INSTALLATION OF AIR LINE RM 1,000 0.04% 0
56 IMPULSE LINE- FABN & HYDROTEST Nos 525 0.04% 0
57 IMPULSE PIPE - INSTALLATION Nos 525 0.04% 0
LOCAL PANELS/CABINETS/ANALYSER
58 Nos 98 0.23%
ERECTION 0
59 JB INSTALLATION Nos 514 0.02% 0
60 DUCTS INSTALLATION RM 3,216 0.38% 0
61 FRP/MISC.TRAY ERECTION RM 65,137 2.34% 0
62 MAIN (Multi pair) CABLE LAYING km 203 1.22% 0
63 BRANCH (single pair) CABLE LAYING km 176 0.42% 0
64 GLANDING & TERMINATION Nos 36,792 1.76% 0
65 TUBING HOOK UP OF CONTROL VALVE Nos 264 0.04% 0
66 SS/CU TUBING RM 4,870 0.17% 0
67 LOOP CHECKING Nos 1,764 0.08% 0
G MISC WORKS % 100 4.66% 5.0 0.0 0.0 0.0
VI INSULATION WORKS 1.34% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 319,120 0.92% 0
2 HOT INSULATION: PIPING IM 185,529 0.43% 0
VII UG PIPING WORKS 2.87% 81.4% 57.4% 24.0% 14.0% 3.1% 0.3% 14.3%
1 UG PIPING FABRICATION ID 38,308 1.03% 38308 20,436 17,872 13506 2850 287 13793
2 UG PIPING ERECTION IM 127,121 1.58% 88179 88152 27 27 900 0 27
3 RCC (precast, Sub Str, Sup Str) M3 500 0.21% 500 500 95 0 95
4 STRL STEEL FABRICATION MT 31 0.03% 0
5 STRL STEEL ERECTION MT 27 0.01% 0
6 GRATING WORKS MT 12 0.01% 0
Overall % 28.2% 22.14% 1.21% 0.56% 22.70%
Page 77 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
RFCC VALUE VALUE
GASOLINE Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
(%) Prog. (%) Prog. (%) Prog. (%)
BLOCK Services)
DETAILED ENGINEERING
Page 78 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
¾ 90% model review completed for RFCCG block from 12-Dec-16 to 16-Dec-16.
¾ 90% model review for Compressor Centrifugal Packaged, (SPP) (PR-5601/5194)
completed on 09th Feb 18 with M/s Elliott Turbomachinery.
¾ KOM for Hot Oil Heater Tender (7402) with M/s Thermax held on 02-Feb-17.
¾ All 8 Nos. UG piping GADs released.
¾ All 66 Nos. AG piping GADs released.
¾ All 618 Nos. UG piping ISOs released.
¾ ISOs for 2360 Nos. out of 3000 Nos. AG piping lines issued for construction.
¾ 2508 Piles & 6895 M3 RCC & 4218 MT Structural Steel drawings released for
construction.
¾ All 3500 M3 RCC in Pavement & Drains released.
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESRIPTION UOM RELEASED REMARKS
NO TENDER QTY QTY.
QTY.
QUANTITY
RFCCG
BLOCK
1 Piles No. 865 2508 2508 0
RCC (Super-
3 M3 1140 885 885 0
Str.)
Misc. pipe
4 Strl. Steel MT 4320 4218 102 supports,
platforms etc.
RCC In
5 Pavement & M3 5800 3500 3500 0
Drains
Note: The estimated and actual quantities have been changed due to revision in piling layout. This was discussed
during the meeting with DORC on 07.12.17 in EIL, HO.
Topup MTO
Sl. No. Item Description Unit
(As on Jul-18)
1 PIPES M 65150
Page 79 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Sl. Tag No. Description Del MR No. / Vendor Actual# / Contr. Anti. date ROS Remark
No vy. FOA No. Anticipated Delivery for receipt s
. order date* Date at site @
ELLIOTT Disp.
133-KA- RECYCLE GAS 5601/
1 15 TURBOMAC 20.04.17 20.07.18 30.07.19 30.06.19
1001 COMPRESSOR 5194
HINERY
Supply &
HOT OIL
2 18 T-7402 THERMAX 30.08.17 28.02.19 31.08.19 31.08.19 installati
HEATER on
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
# Actual dates based on intimation received from DORC.
Page 80 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
SCHEDULE ANALYSIS
Page 81 of 1078
Job No.: A545
100 12
90
10
80
70
MONTHLY SCH. MONTH ACT. 8
60
CUMUL. SCH. CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F
DURATION IN MONTHS
Page 82 of 1078
Job No.: A545
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J F
DURATION IN MONTHS
Page 83 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S N D J-20 F
14 14
DURATION IN MONTHS
Page 84 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
Page 85 of 1078
Job No.: A545
100 20
90 18
80 16
MONTHLY SCH.
70 14
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT. 12
CUMUL PROG (%)
50 10
40 8
30 6
20 4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F
14 14
DURATION IN MONTHS
Page 86 of 1078
Job No.: A545
100 16
90
14
80
12
MONTHLY SCH.
70
MONTH ACT.
CUMUL. SCH.
10
60 CUMUL. ACT.
CUMUL PROG (%)
50 8
40
6
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20
14 14
DURATION IN MONTHS
Page 87 of 1078
Job No.: A545
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
Page 88 of 1078
Job No.: A545
100 16
90
14
80
12
70
50 8
40
6
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
Page 89 of 1078
Job No.: A545
100 12
90
MONTHLY SCH. MONTH ACT.
10
80 CUMUL. SCH. CUMUL. ACT.
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J F
DURATION IN MONTHS
Page 90 of 1078
Jul - 2019
AFC DRAWINGS STATUS Job No. : A545
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
GASOLINE BLOCK : 130
P&IDs
1 - PROCESS 57 57 57
2 - UTILITY 21 21 21
AFC DRAWINGS
1 GENERAL CIVIL 11 11 11
3 PIPING
- GAD`s 66 66 66
PLAN -
4 ELECTRICAL 16 16 14 2
Aug : 2
5 INSTRUMENTATION 12 12 12
Page 91 of 1078
JUL -2019
GASOLINE BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT
2 ROTATING EQUIPMENT 2 2 2 2 2 2 2 2 2 2 2 2 2
3 STATIC EQUIPMENT 6 6 6 6 6 6 6 6 6 6 6 6 6
4 HMTD 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL 9 9 9 9 9 9 9 9 9 9 9 9 9
Page 92 of 1078
EQUIPMENT STATUS :: RFCC DESULF. GASOLINE BLOCK (130) Jul-19
Job No.A545
Page 5 of 12
DANGOTE REFINERY AND PETROCHEMICAL PROJECT, NIGERIA
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 4 4 4 4 4
2 COLUMNS 3 3 3 3
3 VESSELS 16 16 16 1 15
4 HEAT EXCHANGERS 32 32 32 4 4 11 17
5 AIR COOLERS 26 26 26 26
6 COMPRESSORS 1 1 1 1 1
7 PUMPS 28 28 28 1 2 17 8
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 6 6 6 6
COALESCERS
Page 93 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: RGDU
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
RGDU
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.02% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling m 100 2.02% 100 0 100 100 0 0 100
II Piling 7.24% 100.0% 0.0% 100.0% 74.4% 13.0% 6.1% 80.5%
1 Piles No. 2,305 7.24% 2,305 0 2,305 1,714 300 141 1,855
III Civil 11.09% 66.8% 35.7% 31.6% 7.8% 7.0% 4.3% 12.2%
1 Mobilisation % 100 0.86% 100 0 100 36 5 0 36
2 RCC (Sub-Str.) m3 5,900 5.62% 4,233 1,969 2,317 586 685 505 1,091
2.1 Reactor m3 415 415 0 415 254 161 0 254
2.2 Columns m3 223 223 223 0 0 0
2.3 Piperack Fdns m3 1,820 1,820 1,120 700 276 150 53 329
2.4 Vessels m3 149 149 0 149 149 0
2.5 Exchangers m3 206 206 156 103 50 53 53
2.6 Pumps m3 620 620 470 150 150 92 92
2.7 Other Sub Strs m3 2,467 800 0 800 55 25 307 363
3 RCC (Super-Str.) m3 875 1.00% 310 0 310 0 0
RCC in Pavement, Drains &
4 m3 3,500 2.00%
3,500 3,500 0 0 0
Sleepers
5 Misc. Civil Work % 100 1.61% 10.0 5.0 5 5.0 0.0
IV Strl Steel 5.13% 76.6% 76.6% 0.0% 0.0% 0.0% 0.0% 0.0%
1 Structural Steel MT 3,830 2,901 2,901 0 0 0 0
1.1 Strl. Steel (Rack) MT 2,250 3.00% 2,150 2,150 0 0
1.2 Strl. Steel (Tech. Str.) MT 620 0.94% 470 470 0 0
1.3 Strl. Steel (Sheds) MT 201 0.25% 186 186 0 0
1.4 Strl. Steel- Others MT 759 0.94% 95 95 0 0
V Composite work 69.79% 22.3% 22.2% 0.2% 0.0% 0.2% 0.0% 0.0%
A1 MOBILISATION % 100 0.96% 0.000
A2 SUPPLY OF MATERIALS % 100 0.96% 0.0
B PIPING 42.33% 68.4% 68.4% 0.0% 0.0% 0.0% 0.0% 0.0%
1 A/G PPG-WELDING CS ID 202,655 15.27% 143,426 143,426 0 0
2 A/G PPG-WELDING SS ID 10,465 1.01% 8,084 8,084 0 0
3 A/G PPG-WELDING AS ID 11,750 1.32% 8,366 8,366 0 0
A/G PPG-ERCN CS (OTHER
4 IM 343,300 10.79%
THAN SPOOL) 230,028 230,028 0
5 A/G PPG-ERCN SS IM 20,905 0.84% 14,538 14,538 0
6 A/G PPG-ERCN AS IM 23,995 1.12% 14,732 14,732 0
7 A/G PPG-SUPPORTING IM 388,200 5.02% 259,298 259,298 0
8 A/G PPG-HYDROTESTING IM 388,200 3.70% 259,298 259,298 0
RADIOGRAPHY/ULTRASOUN
9 Nos 3,565 0.24%
D TESTING 2,535 2,535 0
10 STRESS RELIVING Nos 21,782 1.13% 15,486 15,486 0
11 STEAM TRACERS RM 3,260 0.13% 0 0
12 BLASTING/PRIMER PAINTING IM 388,200 0.84% 259,298 259,298 0
13 FINAL PAINTING IM 388,200 0.84% 259,298 259,298 0
14 CHEMICAL CLEANING IM 16,245 0.09% 0 0
GI PIPING 1.12% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
15 PPG LAYING IM 18,734 1.02% 0
16 PPG SYSTEM TESTING IM 18,734 0.10% 0
C MECHANICAL EQPT WORK 6.56% 3.1% 0.0% 3.1% 0.0% 3.1% 0.0% 0.0%
Page 94 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: RGDU
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
RGDU
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
STAT. EQUIPMENT -
17 MT 3,917 3.20%
ERECTION 252 0 252 252 0
STAT. EQPT -
18 MT 3,917 2.13%
GROUT/ALIGNMENT 0
ROTARY. EQUIPMENT-
19 MT 175 0.46%
COMPRESSOR ERECTION 0
ROT. EQPT- COMPRESSOR
20 MT 175 0.30%
GROUT/ALIGNMENT 0
ROTARY. EQUIPMENT-PUMP
21 MT 144 0.19%
ERECTION 0
ROT. EQPT- PUMP
22 MT 144 0.28%
GROUT/ALIGNMENT 0
D CIVIL/ STRUCTURAL WORK 3.40% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
23 RCC WORKS M3 360 0.51% 0
24 FIRE PROOFING m2 26,870 1.02% 0
25 STRL STEEL-FABN MT 180 0.38% 0
26 STRL STEEL-ERCN MT 513 0.88% 0
27 GRATING-INSTALLATION MT 30 0.04% 0
28 HANDRAILING RM 100 0.00% 0
29 STR-BLASTING / PRIMER MT 180 0.04% 0
30 STRL FINAL PAINTING MT 2,760 0.53% 0
E ELECTRICAL 4.22% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
31 Nos 9 0.20% 0
INSTLN
33 PANEL INSTALLATION Nos 214 0.52% 0
34 BUS DUCT ERECTION RM 96 0.02% 0
Instln of Ltg Pnl, PB Stns &
35 Nos 882 0.43%
other control gear 0
DC SYSTEM /BATTERY/
36 CAPACITOR BANKS Nos 2 0.02%
ERECTION 0
EARTH ELECTRODES
37 Nos 10 0.01%
INSTLN. 0
EARTH PLATES
38 Nos 50 0.01%
INSTALLATION 0
EARTH STRIPS
39 RM 2,870 0.14%
INSTALLATION 0
CABLE TRAYS
40 RM 10,000 0.98% 0
INSTALLATION
41 JBs/PBS INSTALLATION Nos 10 0.00% 0
42 CABLE LAYING km 150 0.73% 0
43 FA/PA CABLE LAYING km 6 0.03% 0
CABLE GLANDING &
44 Nos 1,233 0.24%
TERMINATION 0
45 LIGHTING POLES INSTLN. Nos 120 0.05% 0
46 LIGHTING FIXTURES INSTLN. Nos 1,722 0.67% 0
47 WIRING KM 26 0.06% 0
48 FIRE PROOFING OF CABLES M 150 0.00% 0
49 FA/PA EQPT INSTALLATION Nos 31 0.04% 0
50 NO LOAD RUN -MV MOTORS Nos 90 0.04% 0
51 NO LOAD RUN -HV MOTORS Nos 3 0.01% 0
F INSTRUMENTATION 6.70% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
52 INST-CALIBRATION Nos 1,196 0.16% 0
53 INST-INSTALLATION Nos 2,308 0.38% 0
54 INSTALLATION OF AIR LINE RM 3,300 0.27% 0
Page 95 of 1078
BLOCKWISE QUANTITATIVE CONSTRUCTION STATUS: RGDU
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
RGDU
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
IMPULSE LINE- FABN &
55 Nos 517 0.08%
HYDROTEST 0
IMPULSE PIPE -
56 Nos 517 0.08%
INSTALLATION 0
LOCAL PANELS/ CABINETS/
57 Nos 120 0.65%
ANALYSER ERECTION 0
58 JB INSTALLATION Nos 193 0.02% 0
59 DUCTS INSTALLATION RM 1,730 0.47% 0
60 FRP/MISC.TRAY ERECTION RM 14,100 1.15% 0
MAIN (Multi pair) CABLE
61 km 65 0.89%
LAYING 0
BRANCH (single pair) CABLE
62 km 70 0.38%
LAYING 0
63 GLANDING & TERMINATION Nos 18,464 2.01% 0
TUBING HOOK UP OF
64 Nos 164 0.05%
CONTROL VALVE 0
65 SS/CU TUBING RM 230 0.02% 0
66 LOOP CHECKING Nos 799 0.09% 0
G MISC WORKS % 100 3.54% 0.0 0.0 0.0
VI INSULATION WORKS 1.58% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 156,336 1.02% 0
2 HOT INSULATION: PIPING IM 107,073 0.56% 0
VII UG PIPING WORKS 3.14% 104.5% 94.8% 2.1% 0.4% 0.0% 0.7% 1.0%
RCC (precast, Sub Str, Sup
1 M3 250 0.24%
250 0 250 140 0 140
Str)
2 UG PIPING FABRICATION ID 19,612 1.20% 19,612 18,552 1060 181 0 349 530
3 UG PIPING ERECTION IM 60,451 1.71% 60,451 60,451 0 0 0
Overall % 13.3% 8.4% 1.9% 0.9% 9.4%
Page 96 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
ALKYLATION BLOCK:
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
ALKYLATION VALUE VALUE
Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
BLOCK (%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 97.5 97.5 4 97.5 97.5
Page 97 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
DETAIL ENGINEERING
¾ Updated Topup MTO (MTO-5) released on 03-Aug-2019.
¾ 90% model review completed for Alkylation block from 05-Sep-16 to 14-Sep-16.
¾ 90% 3D model review pending for SAR unit.
¾ KOM for alkylation unit capacity up-gradation with M/s. DORC held on 11-Jan-18.
¾ Around 3674 Piles, 12560 m3 RCC and 4238 MT Steel cumulatively released for
construction for Alkylation block.
¾ All 8200 M3 RCC in Pavement & Drains released.
¾ All 16 Nos. UG Piping GADs issued for construction.
¾ All 135 Nos. AG Piping GADs issued for construction.
¾ ISOs for all 580 Nos. UG piping lines issued for construction.
¾ ISOs for 5100 Nos. out of 5786 Nos. AG piping lines issued for construction.
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESCRIPTION UOM RELEASED REMARKS
NO TENDER QTY QTY.
QTY.
QUANTITY
ALKYALATION
BLOCK
1 Piles No. 1865 3674 3674 -
Neutralisation
2 RCC (Sub-Str.) M3 5455 11350 11185 165 pits, filter,
exchanger
3 RCC (Super-Str.) M3 1280 1375 1375 -
RCC In Pavement
5 M3 12600 8200 8200 -
& Drains
Note: The estimated and actual quantities have been changed due to revision in piling layout. This was discussed
during the meeting with DORC on 07.12.17 in EIL, HO.
Topup MTO
Sl. No. Item Description Unit
(As on Jul-18)
1 PIPES M 83529
Page 98 of 1078
Jul - 2019
III - DETAILED STATUS
Job No.: A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, DORC, NIGERIA
Sl. Tag No. Description Delvy. MR No. / Vendor Award Contr. Anti. date ROS
No FOA No. Date Delivery for receipt
. (Actual) Date at site @
John Zink
Decomposition Furnace 7921/
1 13 Hamworthy 06.07.17 05.08.18 30.12.19 30.09.19
Package 5203
Combustion
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
Page 99 of 1078
Job No.: A545
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
100 12
90
10
80
70
8
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F
14 14
DURATION IN MONTHS
100 20
90 18
80 16
MONTHLY SCH.
70 14
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT. 12
CUMUL PROG (%)
50 10
40 8
30 6
20 4
10 2
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O
DURATION IN MONTHS
100 12
90
10
80 MONTHLY SCH. MONTH ACT.
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
ALKYLATION / SAR BLOCK : 142/143
P&IDs
1 - PROCESS (LICENSOR) 100 100 100
2 - UTILITY (EIL) 23 23 23
AFC DRAWINGS
1 GENERAL CIVIL 19 19 19
3 PIPING
4 ELECTRICAL 12 12 12
5 INSTRUMENTATION 12 12 12
ALKYLATION BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT
2 ROTATING EQUIPMENT 6 6 6 6 6 6 6 6 6 6 6 6 6
3 STATIC EQUIPMENT
4 HMTD 2 2 2 2 2 2 2 2 2 2 2 2 2
TOTAL 8 8 8 8 8 8 8 8 8 8 8 8 8
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 16 16 16 15 1 14 1
2 COLUMNS 5 5 5 1 1 4
3 VESSELS 41 41 41 9 4 5 17 4 11
4 HEAT EXCHANGERS 48 48 48 42 7 10 25 5 1
5 AIR COOLERS 78 78 78 78
6 COMPRESSORS 1 1 1 1
7 PUMPS 79 79 79 17 17 2 12 16 32
8 FANS / BLOWERS 7 7 7 1 1 3 3
9 BURNERS
FILTERS/
10 24 24 24 1 1 10 2 5 4 2
COALESCERS
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
MONTH
ALKYKLAT
FRONT
ION
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.03% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling M 100 2.03% 100 0 100 100 0 0 100
II Piling 9.88% 100.0% 0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Piles No. 4,002 9.88% 4,002 0 4,002 4,002 0 0 4,002
III Civil 14.11% 85.2% 26.1% 59.7% 27.1% 7.1% 4.1% 31.2%
1 Mobilisation % 100 0.87% 100 0 100 56 10 0 56
2 RCC (Sub-Str.) M3 9,000 6.73% 9,000 0 9,000 4,035 941 715 4,750
2.1 MPR/BPR M3 4,348 4,348 0 4,348 3,019 300 73 3,092
2.2 Column M3 378 378 0 378 6 175 39 45
2.3 Tech Str M3 629 629 0 629 203 150 298 501
2.4 Vessel M3 561 561 0 561 119 125 105 224
2.5 Pumps M3 218 218 0 218 94 125 0 94
2.6 Exchanger M3 226 226 0 226 108 66 79 187
2.7 Comp Shed M3 210 210 0 210 121 121
2.8 Sump M3 610 610 0 610 0 0
2.9 Tanks M3 1,524 1,524 0 1,524 253 0 0 253
2.10 Others M3 296 296 0 296 234 0 0 234
3 RCC (Super-Str.) M3 1,365 1.23% 833 0 833 330 150 49 378
3.1 MPR/BPR M3 473 473 0 473 317 150 49 365
3.2 Tech Str M3 144 144 0 144 0
3.3 Vessel M3 191 191 0 191 0
3.4 AFC Slab M3 490 0
3.5 Others M3 67 25 0 25 13 0 13
RCC in Pavement, Drains & 3
7 M 8,200 3.68% 8,200 8,200 0 0
Sleepers
8 Misc. Civil Work % 100 1.61% 5.0 2.0 5.0 0.0 2.0
IV Strl Steel 3.73% 84.7% 84.7% 0.0% 0.0% 0.0% 0.0% 0.0%
1 Strl. Steel MT 3,475 3,000 3,000 0 0
1.1 Strl. Steel (Rack) MT 2,100 2.20% 2,000 2,000 0 0
1.2 Strl. Steel (Tech. Str.) MT 886 1.06% 436 436 0 0
1.3 Strl. Steel (Sheds) MT 225 0.22% 210 210 0 0
1.4 Strl. Steel (Others) MT 264 0.26% 354 354 0 0
V Composite work 66.72% 20.5% 20.4% 0.1% 0.0% 0.0% 0.0% 0.0%
A1 MOBILISATION % 100 0.96% 0.000
A2 SUPPLY OF MATERIALS % 100 0.96% 0.0
B PIPING 35.20% 73.0% 72.6% 0.5% 0.0% 0.0% 0.0% 0.0%
1 A/G PPG-WELDING CS ID 217,255 12.86% 166,624 163,882 2,742 0
2 A/G PPG-WELDING SS ID 18,705 1.41% 7,876 7,876 0
3 A/G PPG-WELDING AS ID 19,065 1.68% 7,412 7,412 0
A/G PPG-ERCN CS (OTHER
4 IM 312,120 7.70% 251,814 251,814 0
THAN SPOOL)
5 A/G PPG-ERCN CS (SPOOL) IM 36,570 0.90% 36,570 36,570 0
6 A/G PPG-ERCN SS IM 43,845 1.38% 16,567 16,567 0
7 A/G PPG-ERCN AS IM 9,110 0.33% 4,484 4,484 0
8 A/G PPG-SUPPORTING IM 401,645 4.08% 309,435 309,435 0
9 A/G PPG-HYDROTESTING IM 401,645 3.00% 309,435 309,435 0
RADIOGRAPHY/ULTRASOUN
10 Nos 7,107 0.38% 5,069 5,069 0
D TESTING
11 STRESS RELIVING Nos 552 0.02% 394 394 0
12 STEAM TRACERS RM 1,480 0.05% 0 0
BLASTING/PRIMER
13 IM 401,645 0.69% 309,435 309,435 0
PAINTING
14 FINAL PAINTING IM 401,645 0.69% 309,435 309,435 0
15 CHEMICAL CLEANING IM 7,583 0.03% 0 0
GI PIPING 1.28% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
16 PPG LAYING IM 27,214 1.16% 0
17 PPG SYSTEM TESTING IM 27,214 0.12% 0
C MECHANICAL EQPT WORK 5.78% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
MONTH
ALKYKLAT
FRONT
ION
(*)
A B C D= B-C E F G=H-E H
STAT. EQUIPMENT -
18 MT 4,680 3.00% 0
ERECTION
STAT. EQPT -
19 MT 4,680 2.00% 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-
20 MT 128 0.26% 0
COMPRESSOR ERECTION
ROT. EQPT- COMPRESSOR
21 MT 128 0.18% 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-PUMP
22 MT 133 0.14% 0
ERECTION
ROT. EQPT- PUMP
23 MT 133 0.20% 0
GROUT/ALIGNMENT
D CIVIL/ STRUCTURAL WORK 4.01% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
24 RCC WORKS M3 700 0.79% 0
25 FIRE PROOFING m2 36,330 1.09% 0
26 STRL STEEL-FABN MT 160 0.26% 0
27 STRL STEEL-ERCN MT 316 0.43% 0
28 GRATING-INSTALLATION MT 30 0.03% 0
29 HANDRAILING RM 128 0.00% 0
30 STR-BLASTING / PRIMER MT 160 0.03% 0
31 STRL FINAL PAINTING MT 9,300 1.39% 0
E ELECTRICAL 6.87% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
1 Nos 3 0.05% 0
INSTLN
2 PANEL INSTALLATION Nos 31 0.06% 0
3 BUS DUCT ERECTION RM 15 0.00% 0
Instln of Ltg Pnl, PB Stns &
4 Nos 2,009 0.77% 0
other control gear
DC
5 SYSTEM/BATTERY/CAPACIT Nos 1 0.01% 0
OR BANKS ERECTION
EARTH ELECTRODES
6 Nos 10 0.01% 0
INSTLN.
EARTH PLATES
7 Nos 90 0.01% 0
INSTALLATION
EARTH STRIPS
8 RM 4,180 0.16% 0
INSTALLATION
CABLE TRAYS
9 RM 29,300 2.25% 0
INSTALLATION
10 JBs/PBS INSTALLATION Nos 5 0.00% 0
11 CABLE LAYING km 470 1.81% 0
12 FA/PA CABLE LAYING km 10 0.04% 0
CABLE GLANDING &
13 Nos 2,075 0.32% 0
TERMINATION
14 LIGHTING POLES INSTLN. Nos 272 0.08% 0
15 LIGHTING FIXTURES INSTLN. Nos 3,340 1.03% 0
16 WIRING KM 41 0.08% 0
17 FIRE PROOFING OF CABLES M 470 0.00% 0
18 FA/PA EQPT INSTALLATION Nos 75 0.07% 0
19 NO LOAD RUN -MV MOTORS Nos 165 0.06% 0
20 NO LOAD RUN -HV MOTORS Nos 22 0.04% 0
F INSTRUMENTATION 8.65% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
21 INST-CALIBRATION Nos 1,452 0.16% 0
22 INST-INSTALLATION Nos 2,336 0.30% 0
23 INSTALLATION OF AIR LINE RM 800 0.05% 0
IMPULSE LINE- FABN &
24 Nos 552 0.07% 0
HYDROTEST
IMPULSE PIPE -
25 Nos 552 0.07% 0
INSTALLATION
LOCAL
26 PANELS/CABINETS/ANALYS Nos 155 0.66% 0
ER ERECTION
27 JB INSTALLATION Nos 552 0.04% 0
28 DUCTS INSTALLATION RM 1,580 0.34% 0
29 FRP/MISC.TRAY ERECTION RM 31,976 2.05% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
MONTH
ALKYKLAT
FRONT
ION
(*)
A B C D= B-C E F G=H-E H
MAIN (Multi pair) CABLE
30 km 177 1.89% 0
LAYING
BRANCH (single pair) CABLE
31 km 215 0.92% 0
LAYING
32 GLANDING & TERMINATION Nos 18,688 1.60% 0
TUBING HOOK UP OF
33 Nos 225 0.06% 0
CONTROL VALVE
34 SS/CU TUBING RM 5,600 0.36% 0
35 LOOP CHECKING Nos 982 0.08% 0
G MISC WORKS % 100 3.01% 0.0 0.0 0.0
VI INSULATION WORKS 0.08% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 2,775 0.01% 0
2 HOT INSULATION: PIPING IM 16,293 0.07% 0
VII UG PIPING WORKS 3.44% 58.4% 51.2% 7.1% 6.1% 2.4% 0.0% 6.1%
RCC (precast, Sub Str, Sup 3
1 M 250 0.19% 250 0 250 7 0 0 7
Str)
2 UG PIPING FABRICATION ID 26,850 1.29% 18167 13674 4493 4413 400 0 4413
3 UG PIPING ERECTION IM 88,337 1.96% 51287 49934 1353 2882 0
4 RADIOGRAPHY NOS. 184 0.01% 0
Overall % 20.9% 16.11% 1.09% 0.58% 16.68%
BUTAMER BLOCK:
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
BUTAMER VALUE VALUE
Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
BLOCK (%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 0.7 98.4 98.4 4 0.7 98.4 98.4
DETAIL ENGINEERING
¾ Updated Topup MTO (MTO-5) released on 03-Aug-2019.
¾ 90% model review completed for Butamer block from 24-Aug-16 to 31-Aug-16.
¾ Around 602 Nos Piles, 1277 M3 RCC & 439 MT Steel cumulatively released for
construction for Butamer block.
¾ All 1277 M3 RCC in Pavement & Drains released.
¾ All 3 Nos. UG Piping GADs issued for construction.
¾ All 20 Nos. AG Piping GADs issued for construction.
¾ All 89 Nos. ISOs for UG piping lines issued for construction.
¾ ISOs for 1557 Nos. out of 1580 Nos. AG piping lines issued for construction.
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESCRIPTION UOM RELEASED REMARKS
NO TENDER QUANTITY QTY.
QTY.
QUANTITY
BUTAMER
BLOCK
1 Piles No. 500 602 602 0
Note: The estimated and actual quantities have been changed due to revision in piling layout. This was discussed
during the meeting with DORC on 07.12.17 in EIL, HO.
Topup MTO
Sl. No. Item Description Unit
(As on Jul-18)
1 PIPES M 50680
Sl. Tag No. Description Del MR No. / Vendor Award Date Contr. Anti. date ROS
No vy. FOA No. (Actual) Delivery for receipt
. Date at site @
NET GAS 6155 /
2 141-CC-1002 14 VTV 04.03.16 03.07.17 30.09.19 31.07.19
SCRUBBER 5017
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
100 12
90
10
80
70
8
50 6
40
4
30
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
100 20
90 18
80 16
MONTHLY SCH.
70 14
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT. 12
CUMUL PROG (%)
50 10
40 8
30 6
20 4
10 2
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N
DURATION IN MONTHS
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20
14 14
DURATION IN MONTHS
100 20
90 18
80 16
MONTHLY SCH.
70 14
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT. 12
CUMUL PROG (%)
50 10
40 8
30 6
20 4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M
14 14
DURATION IN MONTHS
100 14
90
12
80
MONTHLY SCH. 10
70
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT.
8
CUMUL PROG (%)
50
6
40
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19
14 14
DURATION IN MONTHS
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
100 12
10
CUMUL. SCH. CUMUL. ACT.
80
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
C4 / BUTAMER BLOCK : 141/145
P&IDs
1 - PROCESS (LICENSOR) 30 30 30
2 - UTILITY (EIL) 17 17 17
AFC DRAWINGS
1 GENERAL CIVIL 7 7 7
3 PIPING
- GAD`s 20 20 20
5 INSTRUMENTATION 11 11 11
BUTAMER BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT
2 ROTATING EQUIPMENT
3 STATIC EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
4 HMTD
TOTAL 3 3 3 3 3 3 3 3 3 3 3 3 3
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 2 2 2 2 2
2 COLUMNS 2 2 2 2
3 VESSELS 15 15 15 5 5 1 9
4 HEAT EXCHANGERS 17 17 17 13 11 1 1 1 3
5 AIR COOLERS
6 COMPRESSORS
7 PUMPS 24 24 24 6 6 4 6 6 2
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 2 2 2 2 2
COALESCERS
TOTAL 62 62 62 28 26 1 1 7 7 6 14
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
C4/BUTAM
MONTH
FRONT
ER
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.03% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling M 100 2.03% 100 0 100 100 0 0 100
II Piling 5.69% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Piles No. 614 5.69% 614 0 614 614 0 0 614
III Civil 9.88% 84.7% 21.6% 63.0% 39.1% 9.0% 4.0% 43.1%
1 Mobilisation % 100 0.91% 100 0 100 54 10 0 54
2 RCC (Sub-Str.) M3 1,960 4.21% 1,960 0 1,960 1,338 209 39 1,377
3 RCC (Super-Str.) M3 289 0.97% 289 0 289 138 75 92 230
RCC in Pavement, Drains & 3
4 M 1,250 2.10% 1,250 1,250 0 0 0
Sleepers
5 Misc. Civil Work % 100 1.68% 10.0 2.0 8 2.0 6.0 0.0 2.0
IV Strl Steel 1.88% 64.8% 64.8% 0.0% 0.0% 0.0% 0.0% 0.0%
1 Strl. Steel - Erection MT 464 0.00% 426 426 0 0 0 0 0
1.1 Strl. Steel (Rack) MT 240 0.66% 240 240 0 0
1.2 Strl. Steel (Tech. Str.) MT 147 0.46% 147 147 0 0
1.3 Strl. Steel (Sheds) MT 22 0.06% 22 22 0 0
1.4 Strl. Steel (Others) MT 55 0.14% 17 17 0 0
2 Strl. Steel - Aligment / grouting MT 464 0.00% 0 0 0 0 0 0 0
2.1 Strl. Steel (Rack) MT 240 0.28% 0
2.2 Strl. Steel (Tech. Str.) MT 147 0.20% 0
2.3 Strl. Steel (Sheds) MT 22 0.02% 0
2.4 Strl. Steel (Others) MT 55 0.06% 0
V Composite work 76.77% 15.9% 15.3% 0.7% 0.5% 0.1% 0.1% 0.5%
A1 MOBILISATION % 100 1.01% 5.0 0.0 5.0 5.0 0.0 5.0
A2 SUPPLY OF MATERIALS % 100 1.01% 0.0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
C4/BUTAM
MONTH
FRONT
ER
(*)
A B C D= B-C E F G=H-E H
2 PPG SYSTEM TESTING IM 3,843 0.06% 0
C MECHANICAL EQPT WORK 8.34% 10.2% 0.0% 11.6% 7.4% 1.1% 1.5% 8.9%
STAT. EQUIPMENT -
3 MT 546 1.31% 213 0 261 213 38 48 261
ERECTION
STAT. EQPT -
4 MT 546 0.87% 213 0 213 66 5 71
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-
5 MT 5 0.04% 0
COMPRESSOR ERECTION
ROT. EQPT- COMPRESSOR
6 MT 5 0.03% 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-PUMP
7 MT 633 2.43% 0
ERECTION
ROT. EQPT- PUMP
8 MT 633 3.65% 0
GROUT/ALIGNMENT
D CIVIL/ STRUCTURAL WORK 3.53% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
9 RCC WORKS M3 150 0.63% 0
10 FIRE PROOFING m2 6,175 0.69% 0
11 STRL STEEL-FABN MT 54 0.33% 0
12 STRL STEEL-ERCN MT 162 0.82% 0
13 GRATING-INSTALLATION MT 35 0.13% 0
14 HANDRAILING RM 1,435 0.16% 0
15 STR-BLASTING / PRIMER MT 54 0.04% 0
16 STRL FINAL PAINTING MT 1,300 0.73% 0
E ELECTRICAL 14.40% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
17 Nos 10 0.65% 0
INSTLN
18 PANEL INSTALLATION Nos 217 1.57% 0
19 BUS DUCT ERECTION RM 120 0.09% 0
Instln of Ltg Pnl, PB Stns &
20 Nos 473 0.68% 0
other control gear
DC
21 SYSTEM/BATTERY/CAPACIT Nos 2 0.07% 0
OR BANKS ERECTION
EARTH ELECTRODES
22 Nos 10 0.02% 0
INSTLN.
EARTH PLATES
23 Nos 130 0.08% 0
INSTALLATION
EARTH STRIPS
24 RM 8,950 1.29% 0
INSTALLATION
CABLE TRAYS
25 RM 17,324 5.00% 0
INSTALLATION
26 JBs/PBS INSTALLATION Nos 5 0.00% 0
27 CABLE LAYING km 132 1.91% 0
28 FA/PA CABLE LAYING km 6 0.09% 0
CABLE GLANDING &
29 Nos 2,534 1.46% 0
TERMINATION
30 LIGHTING POLES INSTLN. Nos 180 0.21% 0
31 LIGHTING FIXTURES INSTLN. Nos 790 0.91% 0
32 WIRING KM 16 0.11% 0
33 FIRE PROOFING OF CABLES M 132 0.00% 0
34 FA/PA EQPT INSTALLATION Nos 36 0.13% 0
35 NO LOAD RUN -MV MOTORS Nos 60 0.09% 0
36 NO LOAD RUN -HV MOTORS Nos 6 0.04% 0
F INSTRUMENTATION 14.04% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
37 INST-CALIBRATION Nos 599 0.24% 0
38 INST-INSTALLATION Nos 1,063 0.51% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
C4/BUTAM
MONTH
FRONT
ER
(*)
A B C D= B-C E F G=H-E H
39 INSTALLATION OF AIR LINE RM 650 0.16% 0
IMPULSE LINE- FABN &
40 Nos 241 0.12% 0
HYDROTEST
IMPULSE PIPE -
41 Nos 241 0.12% 0
INSTALLATION
LOCAL
42 PANELS/CABINETS/ANALYS Nos 45 0.72% 0
ER ERECTION
43 JB INSTALLATION Nos 265 0.06% 0
44 DUCTS INSTALLATION RM 520 0.42% 0
45 FRP/MISC.TRAY ERECTION RM 17,880 4.30% 0
MAIN (Multi pair) CABLE
46 km 71 2.83% 0
LAYING
BRANCH (single pair) CABLE
47 km 38 0.61% 0
LAYING
48 GLANDING & TERMINATION Nos 8,504 2.73% 0
TUBING HOOK UP OF
49 Nos 135 0.13% 0
CONTROL VALVE
50 SS/CU TUBING RM 4,100 0.99% 0
51 LOOP CHECKING Nos 356 0.11% 0
G MISC WORKS % 100 3.25% 0.0 0.0 0.0
VI INSULATION WORKS 1.04% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 30,000 0.58% 0
2 HOT INSULATION: PIPING IM 30,000 0.46% 0
VII UG PIPING WORKS 2.71% 91.0% 61.1% 30.0% 27.2% 9.9% 1.1% 28.3%
1 UG PIPING FABRICATION ID 7,792 1.40% 7508 4294 3214 3142 1500 72 3214
2 UG PIPING ERECTION IM 12,230 1.02% 12114 10599 1515 1015 190 1205
3 RADIOGRAPHY NOS. 1,146 0.18% 0
4 RCC (precast, Sub Str) NOS. 39 0.11% 39 0 39 31.5 0 32
Overall % 15.8% 13.0% 1.3% 0.5% 13.5%
MS BLOCK:
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
VALUE VALUE
MS BLOCK Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
(%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 0.3 98.4 98.4 4 0.3 98.4 98.4
DETAIL ENGINEERING
¾ Updated Topup MTO (MTO-5) released on 03-Aug-2019.
¾ 90% model review done for NHT CCR block from 04-Oct-16 to 21-Oct-16.
¾ KOM for for Refrigeration Package (PR-4040-5402) with M/s. Dalian Eurofilm held on
30-Jan-18.
¾ Around 8375 Piles, 41771 M3 RCC & 15803 MT Steel completed for MS block.
¾ All 16500 M3 RCC in Pavement & Drains released.
¾ All 33 Nos. UG Piping GADs issued for construction.
¾ All 412 Nos. AG Piping GADs issued for construction.
¾ ISOs for all 1309 Nos. UG piping lines issued for construction.
¾ ISOs for 9306 Nos. out of 9812 Nos. AG piping lines issued for construction.
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESRIPTION UOM RELEASED REMARKS
NO TENDER QTY QTY.
QTY.
QUANTITY
NHT-CCR & PENEX BLOCK
1 PIPES M 206358
Sl. Tag No. Description Del MR No. / Vendor Actual# / Contr. Anti. date ROS Rema
No. vy. FOA No. Anticipated Delivery for receipt rks
order date* Date at site @
152-KA- Nuovo Disp.
NET GAS 5041/
1 1002 18 Pignone (GE 30.07.15 30.01.17 30.07.19 30.06.19
COMPRESSORS 5002
A/B/C Oil co.)
Nuovo Recd.
152-KA- RECYCLE GAS 5081/
2 20 Pignone (GE 30.07.15 30.03.17 28.03.19 28.03.19
1001 COMPRESSOR 5003
Oil co.)
152-RB- Izohreskiye Despa
1001 / Zovady tched
REACTOR 18
1002 / 6110/ (Cancelled)
3 NO.1, 2 & 3 23.11.16 22.05.18 30.05.19 30.04.19
1003 +2 5008 Godrej
(RADIAL FLOW)
(Re-
ordered)
151-CC- 6152/
4 STRIPPER 16 CPTDC 25.02.16 25.06.17 30.09.19 30.06.19
1001 5005
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F
DURATION IN MONTHS
100 6
90
80
70
4
60
MONTHLY SCH. MONTH ACT.
CUMUL PROG (%)
40
2
30
20
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J-21 F
DURATION IN MONTHS
100 24
22
90
20
80
18
70 MONTHLY SCH. MONTH ACT.
16
CUMUL. SCH. CUMUL. ACT.
60
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
14 14
DURATION IN MONTHS
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J
14 14
DURATION IN MONTHS
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
14 14
DURATION IN MONTHS
100 20
90 18
16
80
14
70 MONTHLY SCH. MONTH ACT.
10
CUMUL PROG (%)
50
8
40
6
30
4
20
2
10 0
0 -2
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
14 14
DURATION IN MONTHS
100 24
22
90
20
80
18
70 MONTHLY SCH. MONTH ACT.
16
CUMUL. SCH. CUMUL. ACT.
60
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
14 14
DURATION IN MONTHS
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
14 14
DURATION IN MONTHS
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
NHT & CCR BLOCK : 150
P&IDs
1 - PROCESS (LICENSOR) 120 120 120
2 - UTILITY (EIL) 34 34 34
AFC DRAWINGS
1 GENERAL CIVIL 38 38 38
3 PIPING
PLAN - Aug : 2
4 ELECTRICAL 20 20 18 2
5 INSTRUMENTATION 12 12 12
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 1 1 1 1 1 1 1 1 1 1 1 1 1
2 ROTATING EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
3 STATIC EQUIPMENT 9 9 9 9 9 9 9 9 9 9 9 9 9
TOTAL 13 13 13 13 13 13 13 13 13 13 13 13 13
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 10 10 10 10 6 3 1
2 COLUMNS 7 7 7 2 2 4 1
3 VESSELS 72 72 72 35 19 5 11 2 35
4 HEAT EXCHANGERS 96 96 96 91 53 31 7 1 3 1
6 COMPRESSORS 8 8 8 8 1 7
7 PUMPS 83 83 83 25 17 4 4 10 8 12 2 26
8 FANS / BLOWERS 6 6 6 6 6
9 BURNERS
FILTERS/
10 16 16 16 7 3 4 6 3
COALESCERS
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope MS WTG.
PREVIOUS
Block (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.02% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Dredging/ Filling m3 100 2.02% 100 0 100 100 0 0 100
II Piling 6.47% 100.0% 0.0% 100.0% 100.00% 0.0% 0.0% 100.00%
1 Piles No. 7,812 6.47% 7,812 0 7,812 7,812 0 0 7,812
III Civil 15.43% 97.7% 19.9% 77.7% 62.1% 5.1% 3.2% 65.3%
1 Mobilisation % 100 0.88% 100 0 100 80 10 5 85
2 RCC (Sub-Str.) m3 32,000 8.03% 31,750 0 31,750 28,223 1,826 1,201 29,424
2.1 Main/Br.Piperack Fdns m3 6,650 6,650 0 6,650 6,650 0 6,650
2.2 Heater Fdn 152-FF-1001 m3 2,740 2,740 0 2,740 2,740 0 2,740
2.3 UG Pit 150-VV-1022 m3 250 250 0 250 200 0 0 200
2.4 UG Pit 150-VV-1002 m3 250 250 0 250 0 0
2.5 Lift Str Fdn m3 475 475 0 475 475 0 475
2.6 TS-1 Fdn (151-RB-1001) m3 233 233 0 233 233 0 233
2.7 TS-2 Fdn m3 556 556 0 556 556 0 556
2.8 TS-3 Fdn m3 83 83 0 83 83 0 83
2.9 TS-4 Fdn m3 691 691 0 691 691 0 691
2.10 TS-5 Fdn m3 123 123 0 123 123 0 123
2.11 TS-6 Fdn m3 150 150 0 150 150 0 150
2.12 TS-7 Fdn m3 350 350 0 350 350 0 350
2.13 TS-8 Fdn m3 103 103 0 103 103 0 103
2.14 TS-9 Fdn m3 62 62 0 62 62 0 62
2.15 TS-10 Fdn m3 11 11 0 11 11 0 11
2.16 TS-11 Fdn m3 220 220 0 220 220 0 220
2.17 TS-12 Fdn m3 48 48 0 48 15 33 0 15
2.18 TS-13 Fdn m3 72 72 0 72 72 0 72
2.19 TS-15 Fdn m3 292 292 0 292 267 25 0 267
2.20 TS-14 Fdn m3 1,200 1,200 0 1,200 1,200 0 1,200
2.21 CCR Reactor Str Fdn. m3 1,000 1,000 0 1,000 1,000 0 1,000
2.22 CCR Regeneration Pkg Fdn. m3 325 325 0 325 300 25 0 300
2.23 Sump-1 m3 1,150 1,150 0 1,150 1,150 0 1,150
2.24 Sump-2 m3 1,025 1,025 0 1,025 1,025 0 1,025
2.25 Fdn- FD Fan m3 100 100 0 100 100 0 100
2.26 Fdn- Compr. 151-KA-1001A/B m3 475 475 0 475 250 475 475
2.27 Fdn- Compr. 152-KA-1001 m3 700 700 0 700 450 250 0 450
Fdn- Compr. 152-KA-
2.28 m3 1,500 1,500
0
1,500
500 500 500
1002A/B/C
3
2.29 Fdn- Compr. 155-KA-1001A/B m 700 700 0 700 700 0 700
Columns
2.30 (151-CC-1001/2;152-CC-1001; m3 2,990 2,990 2,990
155-CC-1001/2/3/4) 0 2,965 25 25 2,990
2.31 Exchangers m3 1,047 1,047 0 1,047 987 60 31 1,018
2.32 Pumps m3 893 693 0 693 400 213 130 530
2.33 Vessels m3 1,922 1,922 0 1,922 1,732 190 40 1,772
2.34 Comp Shed Fdn. m3 2,605 2,605 0 2,605 2,525 80 0 2,525
2.35 Other Sub Strs. m3 1,009 959 0 959 688 175 0 688
3 RCC (Super-Str.) m3 7,946 2.39% 7,501 2,077 5,424 4,545 546 471 5,016
3.1 Main/Br.Piperack Columns m3 3,398 3,398 0 3,398 3,255 143 143 3,398
3.2 Heater Pedestals 152-FF-1001 m3 195 195 0 195 195 0 0 195
3.3 Tech Str. m3 1,741 1,741 500 1,241 745 253 328 1,073
3.4 Lift Str Pedestals m3 20 20 0 20 20 0 20
MPR Air Cooler Floor (Grid 4-
3.5 m3 1,577 1,577
1,577
0
0 0
67)
3
3.6 Other Super Strs. m 1,015 0.00% 570 0 570 330 150 0 330
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope MS WTG.
PREVIOUS
Block (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
RCC in Pavement, Drains &
4 m3 16,500 2.48%
16,500 16,290 210 210 0 0 210
Sleepers
5 Misc. Civil Work % 100 1.64% 90.0 0.0 90 24.0 5.0 0.0 24.0
IV Strl Steel 5.19% 100.0% 82.7% 17.3% 13.6% 3.0% 3.6% 17.2%
1 Strl. Steel - Erection MT 14,632 14,632 12,070 2,562 2,011 448 533 2,544
1.1 Strl. Steel (Rack) MT 8,364 2.06% 8,364 5,802 2,562 2,011 448 533 2,544
1.2 Strl. Steel (Tech. Str.) MT 2,824 0.79% 2,824 2,824 0 0
1.3 Strl. Steel (Sheds) MT 2,103 0.48% 2,103 2,103 0 0
1.4 Strl. Steel (Lift Str.) MT 290 0.07% 290 290 0 0
1.5 Strl. Steel (CCR Reactor Str.) MT 493 0.11% 493 493 0 0
1.6 Strl. Steel (Others) MT 558 0.13% 558 558 0 0
1 Strl. Steel - Aligment / grouting MT 14,632 14,632 14,132 500 0 0 0
1.1 Strl. Steel (Rack) MT 8,364 0.88% 8,364 7,864 500 0
1.2 Strl. Steel (Tech. Str.) MT 2,824 0.34% 2,824 2,824 0 0
1.3 Strl. Steel (Sheds) MT 2,103 0.21% 2,103 2,103 0 0
1.4 Strl. Steel (Lift Str.) MT 290 0.03% 290 290 0 0
1.5 Strl. Steel (CCR Reactor Str.) MT 493 0.05% 493 493 0 0
1.6 Strl. Steel (Others) MT 558 0.05% 558 558 0 0
V Composite work 61.63% 31.4% 26.9% 2.0% 0.5% 0.4% 0.1% 0.6%
A1 MOBILISATION % 100 0.99% 100.0 0.0 100 26 5 0 26
A2 SUPPLY OF MATERIALS % 100 0.99% 0.0
B PIPING 31.49% 87.8% 85.5% 2.4% 0.5% 0.2% 0.2% 0.7%
1 A/G PPG-WELDING CS ID 501,100 9.95% 445,949 408,777 37,172 7,784 2,900 3,442 11,226
2 A/G PPG-WELDING SS ID 6,645 0.17% 4,777 4,777 0
3 A/G PPG-WELDING AS ID 17,040 0.50% 7,676 7,676 0
A/G PPG-ERCN CS (OTHER
4 IM 1,054,315 8.73%
THAN SPOOL) 971,310 971,310 0 0
5 A/G PPG-ERCN CS (SPOOL) IM 185,570 1.54% 185,570 185,570 0
6 A/G PPG-ERCN SS IM 8,815 0.09% 4,785 4,785 0
7 A/G PPG-ERCN AS IM 57,200 0.70% 14,611 14,611 0
8 A/G PPG-SUPPORTING IM 1,305,900 4.45% 1,176,276 1,176,276 0
9 A/G PPG-HYDROTESTING IM 1,305,900 3.28% 1,176,276 1,176,276 0
RADIOGRAPHY/ULTRASOUN
10 Nos 7,563 0.14%
D TESTING 6,606 6,606 45 33 0 33
11 STRESS RELIVING Nos 18,403 0.25% 16,075 16,075 0
12 STEAM TRACERS RM 13,630 0.15% 0 0
13 BLASTING/PRIMER PAINTING IM 1,305,900 0.75% 1,176,276 1,176,276 23,437 12,474 17,000 8,832 21,306
14 FINAL PAINTING IM 1,305,900 0.75% 1,176,276 1,176,276 10,000 1,893 0
15 CHEMICAL CLEANING IM 40,316 0.06% 0 0
GI PIPING 1.05% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
16 PPG LAYING IM 66,440 0.95% 0
17 PPG SYSTEM TESTING IM 66,440 0.10% 0
C MECHANICAL EQPT WORK 9.51% 100.0% 59.6% 7.1% 1.9% 3.9% 0.2% 2.0%
STAT. EQUIPMENT -
18 MT 17,684 3.80%
ERECTION 17,684 15,141 2,543 819 1,717 73 892
STAT. EQPT -
19 MT 17,684 2.54%
GROUT/ALIGNMENT 17,684 16,792 892 0
ROTARY. EQUIPMENT-
20 MT 2,362 1.63%
COMPRESSOR ERECTION 2,362 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope MS WTG.
PREVIOUS
Block (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
ROT. EQPT- COMPRESSOR
21 MT 2,362 1.08%
GROUT/ALIGNMENT 2,362 0
ROTARY. EQUIPMENT-PUMP
22 MT 536 0.18%
ERECTION 536 0
ROT. EQPT- PUMP
23 MT 536 0.28%
GROUT/ALIGNMENT 536 0
D CIVIL/ STRUCTURAL WORK 4.42% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
24 RCC WORKS M3 450 0.17% 0
25 FIRE PROOFING m2 91,970 0.92% 0
26 STRL STEEL-FABN MT 1,450 0.80% 0
27 STRL STEEL-ERCN MT 3,240 1.46% 0
28 GRATING-INSTALLATION MT 320 0.10% 0
29 HANDRAILING RM 1,270 0.01% 0
30 STR-BLASTING / PRIMER MT 1,450 0.09% 0
31 STRL FINAL PAINTING MT 17,120 0.86% 0
E ELECTRICAL 5.66% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
32 TRANSFORMER/NGR Nos 32 0.19% 0
33 LIGHTING TRANSFORMER Nos 4 0.00% 0
34 PANEL INSTALLATION Nos 353 0.23% 0
35 BUS DUCT ERECTION RM 216 0.01% 0
Instln of Ltg Pnl, PB Stns &
36 Nos 4,951 0.64%
other control gear 0
DC
37 SYSTEM/BATTERY/CAPACIT Nos 6 0.02%
OR BANKS ERECTION 0
EARTH ELECTRODES
38 Nos 15 0.00%
INSTLN. 0
EARTH PLATES
39 Nos 175 0.01%
INSTALLATION 0
EARTH STRIPS
40 RM 11,450 0.15%
INSTALLATION 0
CABLE TRAYS
41 RM 58,200 1.50% 0
INSTALLATION
42 JBs/PBS INSTALLATION Nos 5 0.00% 0
43 CABLE LAYING km 984 1.27% 0
44 FA/PA CABLE LAYING km 19 0.02% 0
CABLE GLANDING &
45 Nos 6,943 0.36%
TERMINATION 0
46 LIGHTING POLES INSTLN. Nos 870 0.09% 0
47 LIGHTING FIXTURES INSTLN. Nos 9,355 0.97% 0
48 WIRING KM 151 0.10% 0
49 FIRE PROOFING OF CABLES M 984 0.00% 0
50 FA/PA EQPT INSTALLATION Nos 105 0.03% 0
51 NO LOAD RUN -MV MOTORS Nos 334 0.04% 0
52 NO LOAD RUN -HV MOTORS Nos 36 0.02% 0
F INSTRUMENTATION 7.54% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
53 INST-CALIBRATION Nos 3,102 0.11% 0
54 INST-INSTALLATION Nos 5,876 0.25% 0
55 INSTALLATION OF AIR LINE RM 1,920 0.04% 0
IMPULSE LINE- FABN &
56 Nos 820 0.04%
HYDROTEST 0
IMPULSE PIPE -
57 Nos 820 0.04%
INSTALLATION 0
LOCAL
58 PANELS/CABINETS/ANALYSE Nos 160 0.23%
R ERECTION 0
59 JB INSTALLATION Nos 836 0.02% 0
60 DUCTS INSTALLATION RM 7,187 0.52% 0
61 FRP/MISC.TRAY ERECTION RM 90,334 1.94% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope MS WTG.
PREVIOUS
Block (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
MAIN (Multi pair) CABLE
62 km 609 2.18%
LAYING 0
BRANCH (single pair) CABLE
63 km 361 0.52%
LAYING 0
64 GLANDING & TERMINATION Nos 47,008 1.35% 0
TUBING HOOK UP OF
65 Nos 396 0.03%
CONTROL VALVE 0
66 SS/CU TUBING RM 9,600 0.21% 0
67 LOOP CHECKING Nos 2,329 0.07% 0
G MISC WORKS % 100 1.90% 5.0 0.0 0.0 0.0
H HEATER WORK 3.00% 100.0% 0.0% 100.0% 44.3% 5.9% 0.0% 44.3%
1 CCR HEATER 0
Radiant Module / Convection
Module / Stack / APH MT 5226 1.50% 5226 5226 4212 614 0 4212
Structure
Convection Module MT 1,228 1,228 1,228 1,228 0 1,228
Radiant Module MT 2,984 2,984 2,984 2,984 0 2,984
Stack MT 614 614 614 614 0
Duct / APH Structure MT 400 400 400 0
2 NHT HEATER MT 0
Radiant Module / Convection
Module / Stack / APH MT 741 0.19% 741 741 483 0
Structure 483
Convection Module MT 182 182 182 182 0 182
Radiant Module MT 301 301 301 301 0 301
Stack MT 58 58 58 58 0
Duct / APH Structure MT 200 200 200 0
3 Balance Work % 1.32% 1.32% 1.32% 0
Castables / Brickwork SQM 2000 0.14% 2,000 2,000 0
Piping Field Welding ID 37680 0.75% 37,680 37,680 0
Piping Erection IM 23085 0.19% 23,085 23,085 0
Piping Insulation RM 13875 0.02% 13,875 13,875 0
Electrical / Instrumentation /
% 100 0.22%
balance Misc. Work 100 100 0
VI INSULATION WORKS 1.70% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 728,306 1.25% 0
2 HOT INSULATION: PIPING IM 325,979 0.45% 0
VII UG PIPING WORKS 2.66% 98.4% 24.0% 16.6% 10.4% 1.4% 0.3% 10.7%
1 UG PIPING FABRICATION ID 56,209 0.90% 56209 39707 16502 14570 2300 562 15132
2 UG PIPING ERECTION IM 205,184 1.53% 205184 0
3 RADIOGRAPHY NOS. 350 0.01% 350 0
RCC (precast, Sub Str, Sup
4 M3 700 0.18% 700 0 700 165 0 165
Str)
5 STRL STEEL FABRICATION MT 47 0.03% 0
6 STRL STEEL ERECTION MT 40 0.01% 0
7 GRATING WORKS MT 18 0.01% 0
Overall % 27.1% 20.76% 1.6% 0.7% 21.48%
HYDROGEN PLANT
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
HYDROGEN VALUE VALUE
Monthly Prog. Cumul. Monthly Cumul.
PLANT (Physical) (EI
(%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 0.8 98.8 98.8 4 0.8 98.8 98.8
¾ Operating manual for HGU incorporating DORC comments shall be issued 31.07.19.
¾ HAZOP review meeting for HGU completed from 03-Oct-16 to 08-Oct-16.
¾ IFC P&ID’s issued to DORC on 06.05.19.
DETAILED ENGINEERING
¾ 90% model review completed for HGU block from 20-Feb-17 to 22-Feb-17.
¾ KOM for HGU Reformer EP supply contract held from 25.04.17 to 27.04.17 with M/s
Air Liquide.
¾ Approximately 3060 Piles, 12036 M3 RCC and 3050 Strl. Steel drawings released for
construction.
¾ All 5,000 M3 RCC in Pavement & Drains released.
¾ All 8 Nos. UG Piping GADs issued for construction.
¾ All 87 Nos. AG Piping GADs issued for construction.
¾ All 441 Nos. UG Piping ISOs issued for construction.
¾ ISOs for 2823 Nos. out of 2875 Nos. AG piping lines issued for construction.
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESRIPTION UOM RELEASED REMARKS
NO TENDER QTY QTY.
QTY.
QUANTITY
HGU BLOCK
Misc.
4 Strl. Steel MT 3250 3050 200 Platforms,
supports etc.
RCC In
5 Pavement & M3 6300 5000 5000 0
Drains
Note: The estimated and actual quantities have been changed due to revision in piling layout. This was discussed
during the meeting with DORC on 07.12.17 in EIL, HO.
1 PIPES M 86017
Sl. Tag No. Description Delvy. MR No. / Vendor Actual# / Contr. Anti. date ROS Remarks
No. FOA No. Anti. order Delivery for receipt at
date* Date site @
161-LZ-1001, REFORMER
1 162-LZ-1001 PACKAGE 17 AIR LIQUIDE 27.04.17 26.09.18 30.08.19 30.06.19
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
# Actual dates based on intimation received from DORC.
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
Anticipat Delay (M)
Sl Schedule
Unit/ Critical WBS/ Activity ed Finish wrt Proj. Remarks/ Suggestions
No. Finish Date
Date Sch.
Hydrogen Generation Unit 28.09.20 28.09.20 -
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
100 6
90
80
50
40
2
30
20
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
100 20
90 18
80 16
50 10
40 8
30 6
20 4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
14 14
DURATION IN MONTHS
100 20
90 18
80 16
MONTHLY SCH.
70 14
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT. 12
CUMUL PROG (%)
50 10
40 8
30 6
20 4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J
14 14
DURATION IN MONTHS
100 20
90 18
80 16
50 10
40 8
30 6
20 4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
100 22
90 20
18
80
MONTHLY SCH. 16
70
MONTH ACT.
CUMUL. SCH. 14
60 CUMUL. ACT.
12
CUMUL PROG (%)
50
10
40
8
30
6
20
4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F
14 14
DURATION IN MONTHS
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J
14 14
DURATION IN MONTHS
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
HYDROGEN BLOCK : 160
P&IDs
1 - PROCESS 80 80 80
2 - UTILITY 21 21 21
AFC DRAWINGS
1 GENERAL CIVIL 11 11 11
PLAN - Aug : 1
2 STRUCTURAL 137 137 136 1
3 PIPING
PLAN- Aug : 32
- ISO`s 2875 78 2875 2823 52
Sep : 30
5 INSTRUMENTATION 12 12 12
HGU BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT
2 ROTATING EQUIPMENT 5 5 5 5 5 5 5 5 5 5 5 5 5
3 STATIC EQUIPMENT 6 6 6 6 6 6 6 6 6 6 6 6 6
4 HMTD
TOTAL 11 11 11 11 11 11 11 11 11 11 11 11 11
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 10 10 10 10
2 COLUMNS
3 VESSELS 22 22 22 22
4 HEAT EXCHANGERS 35 35 35 35 35
5 AIR COOLERS 12 12 12 12
6 COMPRESSORS 9 9 9 4 4 5
7 PUMPS 25 25 25 9 9 4 12
8 FANS / BLOWERS 6 6 6 6
9 BURNERS
FILTERS/
10
COALESCERS
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
HGU
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.00% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling M 100 2.00% 100 0 100 100 0 0 100
II Piling 9.75% 100.0% 0.0% 100.0% 94.6% 12.7% 4.5% 99.1%
1 Piles No. 3,141 9.75% 3,141 0 3,141 2,972 398 142 3,114
III Civil 17.46% 79.3% 41.4% 47.7% 30.4% 9.5% 7.0% 37.4%
1 Mobilisation % 100 0.87% 100 0 100 48 10 0 48
3
2 RCC (Sub-Str.) M 12,500 11.76% 10,194 4,500 7,421 5,066 1,350 1,255 6,321
3
3 RCC (Super-Str.) M 345 0.39% 345 150 275 83 195 32 115
RCC in Pavement, Drains &
4 M3 5,000 2.82% 5,000 5,000 0 0 0
Sleepers
5 Misc. Civil Work % 100 1.61% 10.0 0.0 10 2.0 5.0 0.0 2.0
IV Strl Steel 4.30% 85.6% 85.6% 0.0% 0.0% 0.0% 0.0% 0.0%
1 Strl. Steel MT 3,300 2,795 2,795 0 0
1.1 Strl. Steel (Rack) MT 1,600 2.11% 1,600 1,600 0 0
1.2 Strl. Steel (Tech. Str.) MT 415 0.62% 408 408 0 0
1.3 Strl. Steel (Sheds) MT 735 0.90% 688 688 0 0
1.4 Strl. Steel (Others) MT 550 0.67% 99 99 0 0
V Composite work 62.40% 22.5% 22.5% 0.0% 0.0% 0.0% 0.0% 0.0%
A1 MOBILISATION % 100 0.97% 0.000
A2 SUPPLY OF MATERIALS % 100 0.97% 0.0
B PIPING 34.48% 74.8% 74.8% 0.0% 0.0% 0.0% 0.0% 0.0%
1 A/G PPG-WELDING CS ID 151,535 11.28% 118,559 118,435 124
2 A/G PPG-WELDING SS ID 17,680 1.68% 16,008 16,008 0 0
3 A/G PPG-WELDING AS ID 27,035 2.99% 20,302 20,302 0 0
A/G PPG-ERCN CS (OTHER
4 IM 229,585 7.13%
THAN SPOOL) 175,767 175,767 0
5 A/G PPG-ERCN SS IM 30,480 1.20% 13,824 13,824 0
6 A/G PPG-ERCN AS IM 26,619 1.23% 20,302 20,302 0
7 A/G PPG-SUPPORTING IM 286,684 3.66% 209,893 209,893 0
8 A/G PPG-HYDROTESTING IM 286,684 2.70% 209,893 209,893 0
RADIOGRAPHY/ULTRASOUN
9 Nos 12,373 0.83%
D TESTING 9,764 9,764 0
10 STRESS RELIVING Nos 973 0.05% 768 768 0
11 STEAM TRACERS RM 10,740 0.43% 0 0 0
12 BLASTING/PRIMER PAINTING IM 286,684 0.62% 209,893 209,893 0
13 FINAL PAINTING IM 286,684 0.62% 209,893 209,893 0
14 CHEMICAL CLEANING IM 11,738 0.06% 0 0 0
GI PIPING 0.58% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
15 PPG LAYING IM 9,740 0.52% 0
16 PPG SYSTEM TESTING IM 9,740 0.05% 0
C MECHANICAL EQPT WORK 6.48% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
STAT. EQUIPMENT -
17 MT 3,619 2.92%
ERECTION 0
STAT. EQPT -
18 MT 3,619 1.95%
GROUT/ALIGNMENT 0
ROTARY. EQUIPMENT-
19 MT 338 0.87%
COMPRESSOR ERECTION 0
ROT. EQPT- COMPRESSOR
20 MT 338 0.58%
GROUT/ALIGNMENT 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
HGU
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
ROTARY. EQUIPMENT-PUMP
21 MT 51 0.07%
ERECTION 0
ROT. EQPT- PUMP
22 MT 51 0.10%
GROUT/ALIGNMENT 0
D CIVIL/ STRUCTURAL WORK 1.88% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
3
23 RCC WORKS M 165 0.23% 0
24 FIRE PROOFING m2 8,180 0.31% 0
25 STRL STEEL-FABN MT 175 0.36% 0
26 STRL STEEL-ERCN MT 278 0.47% 0
27 GRATING-INSTALLATION MT 30 0.04% 0
28 HANDRAILING RM 110 0.00% 0
29 STR-BLASTING / PRIMER MT 175 0.04% 0
30 STRL FINAL PAINTING MT 2,260 0.43% 0
E ELECTRICAL 2.53% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
Instln of Ltg Pnl, PB Stns &
1 Nos 560 0.27%
other control gear 0
EARTH ELECTRODES
2 Nos 15 0.01%
INSTLN. 0
EARTH PLATES
3 Nos 135 0.03%
INSTALLATION 0
EARTH STRIPS
4 RM 1,710 0.08%
INSTALLATION 0
CABLE TRAYS
5 RM 8,500 0.82% 0
INSTALLATION
6 JBs/PBS INSTALLATION Nos 3 0.00% 0
7 CABLE LAYING km 116 0.56% 0
8 FA/PA CABLE LAYING km 3 0.01% 0
CABLE GLANDING &
9 Nos 1,160 0.22%
TERMINATION 0
10 LIGHTING POLES INSTLN. Nos 69 0.03% 0
11 LIGHTING FIXTURES INSTLN. Nos 915 0.35% 0
12 WIRING KM 12 0.03% 0
13 FIRE PROOFING OF CABLES M 116 0.00% 0
14 FA/PA EQPT INSTALLATION Nos 31 0.04% 0
15 NO LOAD RUN -MV MOTORS Nos 92 0.04% 0
16 NO LOAD RUN -HV MOTORS Nos 11 0.03% 0
F INSTRUMENTATION 10.34% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
17 INST-CALIBRATION Nos 2,269 0.30% 0
18 INST-INSTALLATION Nos 3,813 0.62% 0
19 INSTALLATION OF AIR LINE RM 8,350 0.67% 0
IMPULSE LINE- FABN &
20 Nos 726 0.12%
HYDROTEST 0
IMPULSE PIPE -
21 Nos 726 0.12%
INSTALLATION 0
LOCAL
22 PANELS/CABINETS/ANALYSE Nos 30 0.16%
R ERECTION 0
23 JB INSTALLATION Nos 407 0.03% 0
24 DUCTS INSTALLATION RM 1,250 0.34% 0
25 FRP/MISC.TRAY ERECTION RM 24,750 2.00% 0
MAIN (Multi pair) CABLE
26 km 151 2.03%
LAYING 0
BRANCH (single pair) CABLE
27 km 64 0.34%
LAYING 0
28 GLANDING & TERMINATION Nos 30,504 3.28% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
PREVIOUS
HGU
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
TUBING HOOK UP OF
29 Nos 325 0.10%
CONTROL VALVE 0
30 SS/CU TUBING RM 800 0.06% 0
31 LOOP CHECKING Nos 1,498 0.16% 0
G MISC WORKS % 100 4.17% 0.0 0.0 0.0
VI INSULATION WORKS 1.24% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 87,661 0.56% 0
2 HOT INSULATION: PIPING IM 52,464 0.27% 0
COLD INSULATION:
3 SM 20 0.00%
EQUIPMENT 0
HOT INSULATION: 2
4 m 6,261 0.40%
EQUIPMENT 0
VII UG PIPING WORKS 2.84% 67.4% 64.7% 2.7% 0.3% 0.0% 1.4% 1.7%
RCC (precast, Sub Str, Sup 3
1 M 200 0.19%
Str) 200 0 200 0 0 0
2 UG PIPING FABRICATION ID 15,978 0.96% 10551 9289 1262 148 0 670 818
3 UG PIPING ERECTION IM 60,389 1.69% 45859 45859 0
4 RADIOGRAPHY NOS. 114 0.01% 0
Overall % 20.35% 16.55% 2.89% 1.70% 18.25%
POLYMER BLOCK
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
POLYMER VALUE VALUE
Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
BLOCK (%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 0.0 97.3 97.3 4 0.0 97.3 97.3
DETAIL ENGINEERING
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESRIPTION UOM RELEASED REMARKS
NO TENDER QUANTITY QTY.
QTY.
QUANTITY
POLYMER
BLOCK
1 Piles No. 4000 6806 6806 0
Topup MTO
Sl. No. Item Description Unit
(As on Aug-19)
1 PIPES M 106350
Sl. Tag No. Description Delvy. MR No. / Vendor Actual# / Contr. Anti. ROS Remarks
No. FOA No. Anti. Delivery date for
order Date receipt
date* at site @
171-LZ-4001 EXTRUDER 4080/ COPERION
1 18 20.01.17 19.07.18 30.11.19 31.07.19
PACKAGE 5264 GMBH
COPERION
4110 /
2 PNEUMATIC CONVEYING PCKG. 16 IDEAL PVT. 06.07.17 05.11.18 31.09.19 31.07.19
5281
LTD.
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
# Actual dates based on intimation received from DORC.
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
Anticipa Delay
Schedule
Sl ted (M) wrt
Unit/ Critical WBS/ Activity Finish Remarks/ Suggestions
No. Finish Proj.
Date
Date Sch.
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F M A
DURATION IN MONTHS
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F M A
14 14
DURATION IN MONTHS
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A
14 14
DURATION IN MONTHS
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N
DURATION IN MONTHS
100 16
90
14
80
12
MONTHLY SCH.
70
MONTH ACT.
CUMUL. SCH.
10
60 CUMUL. ACT.
CUMUL PROG (%)
50 8
40
6
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 14
90
MONTHLY SCH. MONTH ACT.
12
10
70
60
8
CUMUL PROG (%)
50
6
40
30
4
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N
DURATION IN MONTHS
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F M A
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
POLYMER BLOCK : 170
P&IDs
1 - PROCESS 117 117 117
2 - UTILITY 13 13 13
AFC DRAWINGS
1 GENERAL CIVIL 28 28 28
PLAN - Aug : 12
2 STRUCTURAL 266 266 247 19
Sep : 7
3 ARCHITECTURE 25 25 25
4 PIPING
6 INSTRUMENTATION 12 12 12
PPU BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 20 20 20 20 20 20 20 20 20 20 20 20 18
2 ROTATING EQUIPMENT 9 9 9 9 9 9 9 9 9 9 9 9 9
3 STATIC EQUIPMENT 9 9 9 9 9 9 9 9 9 9 9 9 9
4 HMTD 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL 39 39 39 39 39 39 39 39 39 39 39 39 37
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 5 5 5 3 3 2
2 COLUMNS
3 VESSELS 40 40 40 5 1 32 2
4 HEAT EXCHANGERS 33 33 33 15 2 3 10 3
5 AIR COOLERS 1 1 1 1
6 COMPRESSORS 12 12 12 3 1 8
7 PUMPS 55 55 55 21 15 7 3 8 22
8 FANS / BLOWERS 39 39 38 1 29 9
9 BURNERS
FILTERS/
10 71 71 70 1 2 2 50 14 4
COALESCERS
11 HOPPERS / SILOS 30 30 30 2 12 16
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
MONTH TILL
PREVIOUS
PPU
MONTH
FRONT
DATE
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.03% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling M 100 2.03% 100 0 100 100 0 0 100
II Piling 9.12% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Piles No. 5,302 9.12% 5,302 0 5,302 5,302 0 0 5,302
III Civil 26.55% 80.9% 21.6% 59.4% 30.4% 4.1% 2.9% 33.3%
1 Mobilisation % 100 0.83% 100 0 100 59 10 6 65
2 RCC (Sub-Str.) M3 17,051 8.89% 16,051 0 16,051 12,978 1,200 1,143 14,121
3 RCC (Super-Str.) M3 17,411 10.89% 10,511 0 10,511 1,290 592 203 1,493
RCC in Pavement, Drains &
4 M3 18,300 5.72% 18,300 18,300 0 0 0
Sleepers
5 Misc. Civil Work % 100 0.22% 5.0 2.0 5.0 0.0 2.0
IV Strl Steel 5.72% 52.4% 38.5% 14.0% 0.7% 5.2% 4.5% 5.2%
1 Strl. Steel (Rack) MT 2,300 1.68% 2,300 1,520 780 55 410 245 300
2 Strl. Steel (Tech. Str.) MT 3,500 2.92% 320 320 0
3 Strl. Steel (Sheds) MT 1,655 1.12% 1,555 1,215 340 114 114
V Composite work 53.55% 7.0% 7.0% 0.0% 0.0% 0.0% 0.0% 0.0%
A1 MOBILISATION % 100 0.92% 0.000
A2 SUPPLY OF MATERIALS % 100 0.92% 0.0
B PIPING 19.27% 36.1% 36.1% 0.0% 0.0% 0.0% 0.0% 0.0%
1 A/G PPG-WELDING CS ID 170,048 7.01% 74,909 74,909 0 0
2 A/G PPG-WELDING SS ID 20,391 1.07% 10,710 10,710 0
3 A/G PPG-WELDING AS ID 40 0.00% 0 0 0
A/G PPG-ERCN CS (OTHER
4 IM 306,251 5.27% 90,819 90,819 0
THAN SPOOL)
5 A/G PPG-ERCN SS IM 22,112 0.48% 7,182 7,182 0
6 A/G PPG-SUPPORTING IM 328,403 2.32% 98,001 98,001 0
7 A/G PPG-HYDROTESTING IM 328,403 1.71% 98,001 98,001 0
RADIOGRAPHY/ULTRASOUN
8 Nos 8,563 0.32% 3,849 3,849 0
D TESTING
9 STRESS RELIVING Nos 101 0.00% 45 45 0
10 STEAM TRACERS RM 2,335 0.05% 0 0
11 BLASTING/PRIMER IM 328,403 0.39% 98,001 98,001 0
12 FINAL PAINTING IM 328,403 0.39% 98,001 98,001 0
13 CHEMICAL CLEANING IM 80,823 0.24% 0 0
GI PIPING 1.81% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
14 PPG LAYING IM 55,196 1.64% 0
15 PPG SYSTEM TESTING IM 55,196 0.16% 0
C MECHANICAL EQPT WORK 3.07% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
STAT. EQUIPMENT -
16 MT 2,533 1.13% 0
ERECTION
STAT. EQPT -
17 MT 2,533 0.75% 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-
18 MT 424 0.61% 0
COMPRESSOR ERECTION
ROT. EQPT- COMPRESSOR
19 MT 424 0.40% 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-PUMP
20 MT 96 0.07% 0
ERECTION
ROT. EQPT- PUMP
21 MT 96 0.10% 0
GROUT/ALIGNMENT
D CIVIL/ STRUCTURAL WORK 7.21% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
22 RCC WORKS M3 250 0.20% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
MONTH TILL
PREVIOUS
PPU
MONTH
FRONT
DATE
(*)
A B C D= B-C E F G=H-E H
2
23 FIRE PROOFING m 11,030 0.23% 0
24 STRL STEEL-FABN MT 1,035 1.19% 0
25 STRL STEEL-ERCN MT 4,110 3.86% 0
26 GRATING-INSTALLATION MT 465 0.32% 0
27 HANDRAILING RM 3,100 0.06% 0
28 STR-BLASTING / PRIMER MT 1,035 0.13% 0
29 STRL FINAL PAINTING MT 11,855 1.24% 0
E ELECTRICAL 8.44% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
30 TRANSFORMER/NGR Nos 16 0.19% 0
31 PANEL INSTALLATION Nos 420 0.56% 0
32 BUS DUCT ERECTION RM 144 0.02% 0
Instln of Ltg Pnl, PB Stns &
33 Nos 3,425 0.92% 0
other control gear
DC
34 SYSTEM/BATTERY/CAPACIT Nos 8 0.05% 0
OR BANKS ERECTION
EARTH ELECTRODES
35 Nos 10 0.00% 0
INSTLN.
EARTH PLATES
36 Nos 220 0.02% 0
INSTALLATION
EARTH STRIPS
37 RM 9,040 0.24% 0
INSTALLATION
38 CABLE TRAYS RM 37,000 1.98% 0
39 JBs/PBS INSTALLATION Nos 40 0.00% 0
40 CABLE LAYING km 747 2.00% 0
41 FA/PA CABLE LAYING km 31 0.08% 0
CABLE GLANDING &
42 Nos 5,434 0.58% 0
TERMINATION
43 LIGHTING POLES INSTLN. Nos 367 0.08% 0
44 LIGHTING FIXTURES Nos 5,767 1.24% 0
45 WIRING KM 71 0.09% 0
46 FIRE PROOFING OF CABLES M 747 0.00% 0
47 FA/PA EQPT INSTALLATION Nos 48 0.03% 0
48 NO LOAD RUN -MV MOTORS Nos 943 0.25% 0
49 NO LOAD RUN -HV MOTORS Nos 51 0.07% 0
F INSTRUMENTATION 8.65% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
50 INST-CALIBRATION Nos 2,110 0.16% 0
51 INST-INSTALLATION Nos 4,949 0.44% 0
52 INSTALLATION OF AIR LINE RM 2,650 0.12% 0
LOCAL
53 PANELS/CABINETS/ANALYS Nos 38 0.11% 0
ER ERECTION
54 JB INSTALLATION Nos 616 0.03% 0
55 DUCTS INSTALLATION RM 2,880 0.43% 0
56 FRP/MISC.TRAY ERECTION RM 55,455 2.48% 0
MAIN (Multi pair) CABLE
57 km 199 1.48% 0
LAYING
BRANCH (single pair) CABLE
58 km 171 0.51% 0
LAYING
59 GLANDING & TERMINATION Nos 39,592 2.36% 0
TUBING HOOK UP OF
60 Nos 441 0.08% 0
CONTROL VALVE
61 SS/CU TUBING RM 8,190 0.37% 0
62 LOOP CHECKING Nos 1,555 0.09% 0
G MISC WORKS % 100 3.28% 0.0 0.0 0.0
VI INSULATION WORKS 0.55% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope (Block)
MONTH TILL
PREVIOUS
PPU
MONTH
FRONT
DATE
(*)
A B C D= B-C E F G=H-E H
1 COLD INSULATION: PIPING IM 134,804 0.48% 0
2 HOT INSULATION: PIPING IM 24,494 0.07% 0
VII UG PIPING WORKS 2.48% 100.0% 95.5% 4.5% 0.6% 3.6% 1.5% 2.1%
RCC (precast, Sub Str, Sup
1 M3 350 0.18% 350 230 120 120 0 0 120
Str)
2 UG PIPING FABRICATION ID 21,766 0.73% 21,766 18,642 3,124 416 2,450 1,026 1442
3 UG PIPING ERECTION IM 101,537 1.57% 101,537 101,537 0
4 RADIOGRAPHY NOS. 92 0.00% 92 92 0
Overall % 27.89% 19.48% 1.47% 1.06% 20.55%
SULPHUR BLOCK:
PROGRESS
DETAIL ENGINEERING
¾ Updated Topup MTO (MTO-5) released on 03-Aug-2019.
¾ 90% model review completed for Sulphur block from 11-Sep-16 to 22-Sep-16.
¾ KOM for Caustic Scrubber Package (PR-6930-5405) with M/s. Enviropol Engineers
held on 04.06.18.
¾ KOM held with M/s Eco-Tech Inc. for Residual Contaminent Removal System on 15-
Nov-18.
¾ KOM for Sulphur Pelletisation and Handling System (PR-4540/5066) with M/s
Sandvik Process Systems held on 11.05.17.
¾ KOM for MCC Package (PR-7990/5069) with M/s Zeeco India held on 25.04.17.
¾ Around 4267 Piles, 13102 M3 & 3186 MT Steel drawings cumulatively released for
construction for Sulphur block.
¾ All 10,100 M3 RCC in Pavement & Drains released.
¾ All 21 Nos. UG Piping GADs issued for construction.
¾ All 130 Nos. AG Piping GADs issued for construction.
¾ ISOs for all 341 Nos. UG piping lines issued for construction.
¾ ISOs for 5082 out of 5132 AG piping lines issued for construction.
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESRIPTION UOM RELEASED REMARKS
NO TENDER QUANTITY QTY.
QTY.
QUANTITY
SULPHUR
BLOCK
1 Piles No. 2735 4267 4267 0
Vendor data
awaited: Pumps,
2 RCC (Sub-Str.) M3 14760 11800 11727 73
blowers, Skids
etc.
3 RCC (Super-Str.) M3 1515 1375 1375 0
Vendor data
awaited :
4 Strl. Steel MT 3300 3186 114 Incinerator pkg
Misc. Platforms,
supports etc.
RCC In Pavment
5 M3 14450 10100 10100 -
& Drains
Note: The estimated and actual quantities have been changed due to revision in piling layout. This was discussed
during the meeting with DORC on 07.12.17 in EIL, HO.
Topup MTO
Sl. No. Item Description Unit
(As on Jul-18)
1 PIPES M 101331
Sl. Tag No. Description Delvy. MR No. / Vendor Actual# / Contr. Anti. date ROS Remarks
No. FOA No. Anti. order Delivery for receipt
date* Date at site @
185-LZ-1001, INCINERATOR 7920/
1 12 + 3 JOHN ZINK 01.09.17 30.11.18 30.12.19 31.10.19
186-LZ-1001 PACKAGE 5200
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
# Actual dates based on intimation received from DORC.
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
100 12
11
90
10
80
9
70 MONTHLY SCH. MONTH ACT.
8
CUMUL. SCH. CUMUL. ACT.
60
7
CUMUL PROG (%)
50 6
5
40
4
30
3
20
2
10
1
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F M
DURATION IN MONTHS
100 8
90
80
6
70 MONTHLY SCH. MONTH ACT.
50 4
40
30
2
20
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F M
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M
14 14
DURATION IN MONTHS
100 12
90
10
80
8
70 MONTHLY SCH. MONTH ACT.
50
4
40
30
2
20
0
10
0 -2
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J
14 14
DURATION IN MONTHS
100 16
90
14
80 MONTHLY SCH.
MONTH ACT. 12
CUMUL. SCH.
70
CUMUL. ACT.
10
60
CUMUL PROG (%)
50 8
40
6
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A
14 14
DURATION IN MONTHS
100 12
11
90
MONTHLY SCH. MONTH ACT.
10
80 CUMUL. SCH. CUMUL. ACT.
9
70
8
60
7
CUMUL PROG (%)
50 6
5
40
4
30
3
20
2
10
1
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J-21 F M
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
SULPHUR BLOCK : 180
P&IDs
1 - PROCESS (LICENSOR) 131 131 131
2 - UTILITY (EIL) 25 25 25
AFC DRAWINGS
1 GENERAL CIVIL 24 24 24
3 ARCHITECTURE 9 9 9
4 PIPING
PLAN - Aug : 50
- ISO`s (No. of Lines) 5132 5132 5082 50
PLAN - Aug : 2
5 ELECTRICAL 22 22 20 2
6 INSTRUMENTATION 12 12 12
SULPHUR BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 4 4 4 4 4 4 4 4 4 4 4 4 3
2 ROTATING EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
3 STATIC EQUIPMENT 5 5 5 5 5 5 5 5 5 5 5 5 5
4 HMTD 3 3 3 3 3 3 3 3 3 3 3 3 3
TOTAL 15 15 15 15 15 15 15 15 15 15 15 15 14
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 8 8 8 8
2 COLUMNS 8 8 8 2 6
3 VESSELS 57 57 57 15 15 2 12 2 24 2
4 HEAT EXCHANGERS 49 49 49 35 11 12 14 2 10
5 AIR COOLERS 32 32 32 4 8 4 16
6 COMPRESSORS 6 6 6 3 3 3
7 PUMPS 70 70 70 2 2 4 12 10 34 4 4
8 FANS / BLOWERS 2 2 2 2
9 BURNERS 6 6 6 2 4
FILTERS/
10 15 15 15 9 4 2
COALESCERS
WASTE HEAT
11 4 4 4 2 2
BOILERS
COMBUSTION &
12 INCINERATOR 6 6 6 2 4
CHAMBERS
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope SRU (Block)
PREVIOUS
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.03% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling M 100 2.03% 100 0 100 100 0 0 100
II Piling 10.41% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Piles No. 3,945 10.41% 3,945 0 3,945 3,945 0 0 3,945
III Civil 18.03% 90.5% 27.3% 63.1% 46.9% 5.9% 2.9% 49.8%
1 Mobilisation % 100 0.90% 100 0 100 52 10 0 52
3
2 RCC (Sub-Str.) M 11,500 9.20% 11,108 0 11,108 8,967 739 477 9,444
2.1 Main Piperack M3 685 685 0 685 685 0 685
3
2.2 BPR-1,2&3 M 1,029 1,029 0 1,029 1,029 1,029
3
2.3 BPR-4,5,6&7, Trestle-1 M 190 190 0 190 165 25 5 170
3
2.4 SPP Rack M 320 320 0 320 320 320
3
2.5 MAB Shed M 350 350 0 350 120 182 70 190
3
2.6 Tech Str-1to7 M 782 782 0 782 755 18 23 778
3
2.7 Column & Guide Str Fdns M 385 385 0 385 320 65 65 385
3
2.8 Vessel Fdns M 635 635 0 635 635 0 635
3
2.9 OWS/CRWS Pits M 1,773 1,773 0 1,773 490 324 0 490
3
2.1 Exchanger Fdns M 178 178 0 178 178 178
3
2.11 Filter Fdns M 17 17 0 17 17 0 17
3
2.12 Pump Fdns M 450 450 0 450 440 10 0 440
3
2.13 Pump Pilecaps M 450 450 0 450 440 10 0 440
3
2.14 Incinerator Blower Shed Fdn M 152 152 0 152 100 100
3
2.15 181-TT-1001 Fdn M 860 860 0 860 860 860
3
2.16 182-TT-1001A/B Fdn M 1,880 1,880 0 1,880 1,880 1,880
3
2.17 183-TT-1001 Fdn M 75 75 0 75 75 0 75
3
2.18 183-TT-1002 Fdn M 89 89 0 89 89 0 89
3
2.19 183-TT-1003 Fdn M 70 70 0 70 70 0 70
3
2.20 185-TT-1001A/B Fdn M 150 150 0 150 100 50 50 150
3
2.21 Platform Support Fdns M 88 88 0 88 59 29 0 59
3
2.22 Other RCC -Sub-Str. M 892 500 0 500 240 26 164 404
3
3 RCC (Super-Str.) M 1,478 1.42% 1,490 0 1,490 780 331 140 920
3
3.1 Main Piperack M 403 403 0 403 403 403
3
3.2 BPR-1,2&3 M 562 562 0 562 145 275 125 270
3
3.3 TS-1-7 M 32 32 0 32 26 6 0 26
3
3.4 Cooler Floor M 188 188 0 188 0 0
3
3.5 Other RCC -Super-Str. M 293 305 0 305 206 50 15 221
RCC in Pavement, Drains & 3
4 M 10,100 4.85%
Sleepers 10,100 10,100 0 0 0
5 Misc. Civil Work % 100 1.67% 15.0 5.0 10.0 4.0 4.0 0.0 4
IV Strl Steel 2.91% 95.3% 95.3% 0.0% 0.0% 0.0% 0.0% 0.0%
6 Strl. Steel Erection MT 2,574 2,450 2,450 0 0 0
6.1 Strl. Steel (Rack) MT 1,910 2.14% 1,870 1,870 0 0
6.2 Strl. Steel (Tech. Str.) MT 325 0.42% 305 305 0 0
6.3 Strl. Steel (Sheds) MT 295 0.31% 275 275 0 0
6.4 Strl. Steel (Others) MT 44 0.05% 0 0 0 0
V Composite work 60.81% 27.0% 26.6% 0.4% 0.3% 0.0% 0.0% 0.3%
A1 MOBILISATION % 100 1.00% 10.0 0.0 10.0 8.0 5.0 0.0 8.0
A2 SUPPLY OF MATERIALS % 100 1.00% 0.0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope SRU (Block)
PREVIOUS
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
B PIPING 31.16% 87.5% 87.5% 0.0% 0.0% 0.0% 0.0% 0.0%
1 A/G PPG-WELDING CS ID 171,750 10.87% 151,720 151,720 0 0
2 A/G PPG-WELDING SS ID 18,100 1.46% 14,342 14,342 0
3 A/G PPG-WELDING AS ID 259 0.02% 259 259 0
A/G PPG-ERCN CS (OTHER
4 IM 241,280 6.37%
THAN SPOOL) 224,752 224,752 0
5 A/G PPG-ERCN CS (SPOOL) IM 60,070 1.59% 60,070 60,070 0
6 A/G PPG-ERCN SS IM 24,435 0.82% 19,179 19,179 0
7 A/G PPG-ERCN AS IM 370 0.01% 312 312 0
8 A/G PPG-SUPPORTING IM 326,155 3.54% 304,313 304,313 0
9 A/G PPG-HYDROTESTING IM 326,155 2.61% 304,313 304,313 0
RADIOGRAPHY/ULTRASOUN
10 Nos 4,292 0.25%
D TESTING 3,755 3,755 0
11 STRESS RELIVING Nos 32,690 1.42% 28,600 28,600 0
12 STEAM TRACERS RM 25,320 0.87% 0 0
13 BLASTING/PRIMER PAINTING IM 326,155 0.59% 304,313 304,313 0
14 FINAL PAINTING IM 326,155 0.59% 304,313 304,313 0
15 CHEMICAL CLEANING IM 32,136 0.15% 0 0 0
GI PIPING 0.88% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
16 PPG LAYING IM 17,554 0.80% 0
17 PPG SYSTEM TESTING IM 17,554 0.08% 0
C MECHANICAL EQPT WORK 3.73% 82.7% 71.9% 10.8% 6.9% 0.0% 1.0% 7.9%
STAT. EQUIPMENT -
18 MT 2,700 1.85% 2,700 2,328 372 268 56 324
ERECTION
STAT. EQPT -
19 MT 2,700 1.23% 2,700 2,376 324 159 0 159
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-
20 MT 49 0.11% 0
COMPRESSOR ERECTION
ROT. EQPT- COMPRESSOR
21 MT 49 0.07% 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-PUMP
22 MT 170 0.19% 0
ERECTION
ROT. EQPT- PUMP
23 MT 170 0.28% 0
GROUT/ALIGNMENT
D CIVIL/ STRUCTURAL WORK 2.50% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
3
24 RCC WORKS M 460 0.55% 0
2
25 FIRE PROOFING m 19,325 0.62% 0
26 STRL STEEL-FABN MT 90 0.16% 0
27 STRL STEEL-ERCN MT 258 0.37% 0
28 GRATING-INSTALLATION MT 30 0.03% 0
29 HANDRAILING RM 110 0.00% 0
30 STR-BLASTING / PRIMER MT 90 0.02% 0
31 STRL FINAL PAINTING MT 4,700 0.75% 0
E ELECTRICAL 9.02% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
32 Nos 4 0.07% 0
INSTLN
33 LIGHTING TRANSFORMER Nos 3 0.01% 0
34 PANEL INSTALLATION Nos 254 0.52% 0
35 BUS DUCT ERECTION RM 48 0.01% 0
Instln of Ltg Pnl, PB Stns &
36 Nos 2,322 0.96% 0
other control gear
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope SRU (Block)
PREVIOUS
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
DC
37 SYSTEM/BATTERY/CAPACIT Nos 2 0.02% 0
OR BANKS ERECTION
EARTH ELECTRODES
38 Nos 15 0.01% 0
INSTLN.
EARTH PLATES
39 Nos 155 0.03% 0
INSTALLATION
EARTH STRIPS
40 RM 7,080 0.29% 0
INSTALLATION
CABLE TRAYS
41 RM 32,500 2.67% 0
INSTALLATION
42 JBs/PBS INSTALLATION Nos 6 0.00% 0
43 CABLE LAYING km 458 1.88% 0
44 FA/PA CABLE LAYING km 15 0.06% 0
CABLE GLANDING &
45 Nos 4,555 0.75% 0
TERMINATION
46 LIGHTING POLES INSTLN. Nos 541 0.18% 0
47 LIGHTING FIXTURES INSTLN. Nos 3,700 1.22% 0
48 WIRING KM 53 0.11% 0
49 FIRE PROOFING OF CABLES M 458 0.00% 0
50 FA/PA EQPT INSTALLATION Nos 109 0.11% 0
51 NO LOAD RUN -MV MOTORS Nos 190 0.08% 0
52 NO LOAD RUN -HV MOTORS Nos 18 0.04% 0
F INSTRUMENTATION 8.08% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
53 INST-CALIBRATION Nos 1,387 0.16% 0
54 INST-INSTALLATION Nos 2,651 0.36% 0
55 INSTALLATION OF AIR LINE RM 1,200 0.08% 0
IMPULSE LINE- FABN &
56 Nos 564 0.08% 0
HYDROTEST
IMPULSE PIPE -
57 Nos 564 0.08% 0
INSTALLATION
LOCAL
58 PANELS/CABINETS/ANALYSE Nos 94 0.43% 0
R ERECTION
59 JB INSTALLATION Nos 272 0.02% 0
60 DUCTS INSTALLATION RM 1,930 0.44% 0
61 FRP/MISC.TRAY ERECTION RM 31,850 2.18% 0
MAIN (Multi pair) CABLE
62 km 125 1.42% 0
LAYING
BRANCH (single pair) CABLE
63 km 104 0.47% 0
LAYING
64 GLANDING & TERMINATION Nos 21,208 1.94% 0
TUBING HOOK UP OF
65 Nos 195 0.05% 0
CONTROL VALVE
66 SS/CU TUBING RM 4,000 0.27% 0
67 LOOP CHECKING Nos 941 0.09% 0
G MISC WORKS % 100 3.43% 0.0 0.0 0.0
VI INSULATION WORKS 1.64% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 172,870 0.95% 0
2 HOT INSULATION: PIPING IM 29,509 0.13% 0
COLD INSULATION:
3 SM 750 0.05% 0
EQUIPMENT
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope SRU (Block)
PREVIOUS
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
HOT INSULATION:
4 m2 9,373 0.51% 0
EQUIPMENT
VII UG PIPING WORKS 4.18% 98.4% 79.7% 18.7% 11.9% 2.1% 2.8% 14.7%
1 UG PIPING FABRICATION ID 22,251 1.14% 22,251 14,324 7,927 4,804 300 1,793 6597
2 UG PIPING ERECTION IM 70,457 1.67% 70,457 61,365 9,092 6,707 1,353 1,032 7,739
RCC (precast, Sub Str, Sup
3 M3 1,625 1.30% 1,625 1,425 200 116 50 0 116
Str)
4 STRL STEEL ERECTION MT 69 0.07% 0 0 0
Overall % 25.10% 21.70% 1.20% 0.67% 22.4%
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
CAPTIVE VALUE VALUE
POWER Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
(%) Prog. (%) Prog. (%) Prog. (%)
PLANT Services)
DETAIL ENGINEERING
¾ Updated Topup MTO (MTO-5) released on 03-Aug-2019.
¾ 60% model review for STG Package (PR-5442/5038) completed on 03rd Apr 18 with
M/s Hangzhou Steam Turbine Co.
¾ 60% model review for HRSG Package (PR-7830/5040) completed on 07th Mar 18
with M/s Thermax Limited.
¾ 90% model review completed for CPP block from 02-Sep-16 to 19-Sep-16.
¾ Around 10283 Piles, 44815 M3 RCC & 9484 MT Structural Steel cumulatively for
CPP block.
¾ All 12500 M3 RCC in Pavement & Drains released.
¾ All 12 Nos. UG Piping GADs issued for construction.
¾ All 154 Nos. AG Piping GADs issued for construction.
¾ All 805 Nos. ISOs for UG piping lines issued for construction.
¾ ISOs for 2757 Nos. out of 2900 Nos. AG piping lines issued for construction.
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESRIPTION UOM RELEASED REMARKS
NO TENDER QTY QTY.
QTY.
QUANTITY
CPP BLOCK
1 PIPES M 80235
Sl. Tag No. Description Del MR No. / Vendor Actual# / Contr. Anti. date ROS
No vy. FOA No. Anticipated Delivery for receipt
. order date* Date at site @
681-LZ- 7830/
1 HRSG PACKAGE 20 Thermax 24.04.17 23.12.18 30.08.19 30.06.19
1002 A~H 5040
681-LZ- UTILITY BOILER 7840/
2 20 Thermax 29.03.17 28.11.18 30.08.19 31.07.19
1003 A/B/C PACKAGE 5041
STEAM TURBINE Hangzhou
681-LZ- 5442 /
3 GENERATOR 15 steam 30.09.16 31.12.17 30.10.19 30.06.19
1004 A/B/C 5038
PACKAGE Turbine Co.
* Considering Actual / Anticipated order date as Zero Date for the vendor.
@ Considering shipment as 2 months for receipt at site.
# Actual dates based on intimation received from DORC.
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
Anticipa Delay
Schedule
Sl ted (M) wrt
Unit/ Critical WBS/ Activity Finish Remarks/ Suggestions
No. Finish Proj.
Date
Date Sch.
Captive Power Plant
02.09.20 02.09.20 -
(GTG-1 Commissioning)
Mfg & Delivery (RAS)- Centrifuge To be expedited. Impacts erection,
1. pkg (MR 4890, PO 5144) from Alfa 31.10.19 31.10.19 - piping, instrumentation & subsequent
Laval activities.
Mfg & Delivery (RAS)- Vessel 680- To be expedited. Impacts erection,
2. VV-1027 (MR 6424, PO 5352) from 31.12.19 31.12.19 - piping, instrumentation & subsequent
Fabtech activities.
No progress since last 17 months
Mfg & Delivery (RAS)- Vessels 680-
due to financial constraints. Impacts
3. VV-002,3,5,6,7,9,1010,1012 (MR 28.02.20 28.02.20 -
erection, piping, instrumentation &
6413, PO 5090) from Fabtech
subsequent activities.
Structural Steel Fabrication- Expedite fabrication for CPP on
4. Piperack/ Tech Strs (CPP) from 01.05.19 31.07.19 - priority. Impacts strl, piping erection
HXSS and CPP completion.
100 8
90
80
6
70 MONTHLY SCH. MONTH ACT.
50 4
40
30
2
20
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J
DURATION IN MONTHS
100 8
90
80
6
70 MONTHLY SCH. MONTH ACT.
50 4
40
30
2
20
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
100 16
90
14
80
12
70 MONTHLY SCH. MONTH ACT.
50 8
40
6
30
4
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A
DURATION IN MONTHS
100 16
90
14
80
12
70 MONTHLY SCH. MONTH ACT.
50 8
40
6
30
4
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S
DURATION IN MONTHS
100 20
90 18
80 16
MONTHLY SCH.
70 14
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT. 12
CUMUL PROG (%)
50 10
40 8
30 6
20 4
10 2
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M
DURATION IN MONTHS
100 24
22
90
20
80
18
MONTHLY SCH.
70
MONTH ACT.
16
CUMUL. SCH.
60 CUMUL. ACT.
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S
DURATION IN MONTHS
100 16
90
14
80
12
70 MONTHLY SCH. MONTH ACT.
50 8
40
6
30
4
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N
DURATION IN MONTHS
100 10
90
MONTHLY SCH. MONTH ACT.
70
60 6
CUMUL PROG (%)
50
40 4
30
20 2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J-21
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
CPP (POWER BLOCK): 680
P&IDs
1 - PROCESS 66 66 66
AFC DRAWINGS
1 GENERAL CIVIL 15 15 15
3 ARCHITECTURE 8 8 8
4 PIPING
6 INSTRUMENTATION 11 11 11
CPP
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 HMTD 3 3 3 3 3 3 3 3 3 3 3 3 3
2 ROTATING EQUIPMENT 4 4 4 4 4 4 4 4 4 4 4 4 4
3 PACKAGED EQUIPMENT 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL 8 8 8 8 8 8 8 8 8 8 8 8 8
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS
2 COLUMNS
3 VESSELS 12 12 12 2 1 1 8
4 HEAT EXCHANGERS 7 7 7 7 2 5
5 AIR COOLERS 1 1 1 1
6 COMPRESSORS
7 PUMPS 62 62 62 29 11 18 4 22 4 3
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 2 2 2 2
COALESCERS
TOTAL 84 84 84 36 13 18 5 4 5 22 5 11 1
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
CPP (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.09% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Dredging/ Filling m3 100 2.09% 100 0 100 100 0 0 100
II Piling 12.88% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
1 Piles No. 10,221 12.88% 10,221 0 10,221 10,221 0 0 10,221
III Civil 17.16% 97.4% 16.7% 80.7% 65.4% 6.4% 5.2% 70.6%
1 Mobilisation % 100 0.91% 100 0 100 55 10 0 55
2 RCC (Sub-Str.) m3 30,718 11.73% 30,718 0 30,718 27,218 1,860 1,582 28,800
2.1 Main/ Br. Piprack m3 2,327 2,327 0 2,327 1,381 350 97 1,478
2.2 UG CBD Pit m3 105 105 0 105 0
2.3 STG Fdns m3 1,546 1,546 0 1,546 1,546 0 1,546
2.4 STG Shed m3 2,198 2,198 0 2,198 2,168 30 0 2,168
2.5 GTG Fdns m3 2,721 2,721 0 2,721 2,721 0 2,721
2.6 GTG Shed m3 3,100 3,100 0 3,100 3,100 0 3,100
2.7 HRSG Fdns m3 8,442 8,442 0 8,442 6,938 850 633 7,571
2.8 Deaerator Str m3 380 380 0 380 380 0 380
2.9 Tank Fdn-TT-1001 m3 220 220 0 220 220 0 220
2.10 Tank Fdn-TT-1002A/B m3 702 702 0 702 702 0 702
2.11 Tank Fdn-TT-1003 m3 353 353 0 353 353 0 353
2.12 Tank Fdn-TT-1004A/B m3 430 430 0 430 430 0 430
2.13 Uitility Boiler A ,B,C & D m3 7,000 7,000 0 7,000 6,620 380 367 6,987
2.14 Other Sub Strs m3 1,194 1,194 0 1,194 659 250 485 1,144
3 RCC (Super-Str.) m3 2,570 1.18% 2,570 0 2,570 629 600 645 1,274
3.1 STG Fdns m3 1,162 1,162 0 1,162 292 350 354 646
3.2 Other Super Strs m3 1,408 1,408 0 1,408 337 250 291 628
RCC in Pavement, Drains &
4
Sleepers m3 12,500 2.86% 12,500 12,500 0 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
CPP (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
C MECHANICAL EQPT WORK 10.43% 96.8% 45.4% 8.0% 5.3% 9.3% 2.0% 7.3%
17 STATIC EQUIPMENT
17.1 ERECTION MT 20,730 0.00% 20,730 18,479 2,251 1,665 2,551 586 2,251
a) Vessels MT 902 0.39% 902 902
b) HRSG MT 9,749 2.13% 9,749 9,749 0 0
HRSG-1 MT 1,219 1,219 1,219 0
HRSG-2 MT 1,219 1,219 1,219 0
HRSG-3 MT 1,219 1,219 1,219 0
HRSG-4 MT 1,219 1,219 1,219 0
HRSG-5 MT 1,219 1,219 1,219 0
HRSG-6 MT 1,219 1,219 1,219 0
HRSG-7 MT 1,219 1,219 1,219 0
HRSG-8 MT 1,219 1,219 1,219 0
c) Utiliity Boilers MT 10,015 2.18% 10,015 7,764 2,251 1,665 2,551 586 2,251
UB-A MT 2,529 2,529 1,500 1,029 848 1,275 181 1,029
UB-B MT 2,529 2,529 1,555 974 817 1,275 157 974
UB-C MT 2,478 2,478 2,230 248 0 248 248
UB-D MT 2,478 2,478 2,478 0
d) Misc. Eqpt MT 65 0.03% 65 65
17.2 GROUT/ALIGNMENT MT 20,730 0.00% 20,665 902 2,094 1,180 2,551 497 1,677
a) Vessels MT 902 0.26% 902 902
b) HRSG MT 9,749 1.59% 9,749 0 0
HRSG-1 MT 1,219 1,219
HRSG-2 MT 1,219 1,219
HRSG-3 MT 1,219 1,219
HRSG-4 MT 1,219 1,219
HRSG-5 MT 1,219 1,219
HRSG-6 MT 1,219 1,219
HRSG-7 MT 1,219 1,219
HRSG-8 MT 1,219 1,219
c) Utiliity Boilers MT 10,015 1.64% 10,015 0 2,094 1,180 2,551 497 1,677
UB-A MT 2,529 2,529 1,009 760 1,275 137 897
UB-B MT 2,529 2,529 1,009 568 1,275 137 705
UB-C MT 2,478 2,478 77 76 76
UB-D MT 2,478 2,478 0
d) Misc. Eqpt MT 65 0.02%
18 ROTARY EQUIPMENT MT
18.1 ERECTION MT 7,481 0.00% 6,887 863 0 0 0 0 0
a) Pumps MT 594 0.31% 0
b) GTGs MT 6,024 1.64% 6,024 0 0
GTG-1 MT 753 753
GTG-2 MT 753 753
GTG-3 MT 753 753
GTG-4 MT 753 753
GTG-5 MT 753 753
GTG-6 MT 753 753
GTG-7 MT 753 753
GTG-8 MT 753 753
c) STG 1 to 4 MT 863 0.24% 863 863
18.2 GROUT/ALIGNMENT MT 7,481 0.00% 6,024 0 0 0 0 0 0
a) Pumps MT 594 0.47% 0
b) GTGs MT 6,024 6,024 0 0 0
GTG-1 MT 753 753
GTG-2 MT 753 753
GTG-3 MT 753 753
GTG-4 MT 753 753
GTG-5 MT 753 753
GTG-6 MT 753 753
GTG-7 MT 753 753
GTG-8 MT 753 753
c) STG 1 to 4 MT 863 0.33% 0
D CIVIL/ STRUCTURAL WORK 2.23% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
21 RCC WORKS M3 100 0.06% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
CPP (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
22 FIRE PROOFING m2 310 0.00% 0
23 STRL STEEL-FABN MT 830 0.70% 0
24 STRL STEEL-ERCN MT 866 0.60% 0
25 GRATING-INSTALLATION MT 83 0.04% 0
26 HANDRAILING RM 333 0.01% 0
27 STR-BLASTING / PRIMER MT 830 0.08% 0
28 STRL FINAL PAINTING MT 9,850 0.75% 0
E ELECTRICAL 15.85% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
29 Nos 32 0.28% 0
INSTLN
30 PANEL INSTALLATION Nos 693 0.68% 0
30 BUS DUCT ERECTION RM 230 0.02% 0
Instln of Ltg Pnl, PB Stns &
31 Nos 23,720 3.49%
other control gear 0
DC
31 SYSTEM/BATTERY/CAPACIT Nos 24 0.12%
OR BANKS ERECTION 0
EARTH ELECTRODES
32 Nos 545 0.17%
INSTLN. 0
EARTH PLATES
32 Nos 450 0.04%
INSTALLATION 0
EARTH STRIPS
33 RM 54,350 1.07%
INSTALLATION 0
CABLE TRAYS
33 RM 115,000 3.39% 0
INSTALLATION
34 JBs/PBS INSTALLATION Nos 5 0.00% 0
34 CABLE LAYING km 1,370 2.69% 0
35 FA/PA CABLE LAYING km 21 0.04% 0
CABLE GLANDING &
35 Nos 8,057 0.63%
TERMINATION 0
36 LIGHTING POLES INSTLN. Nos 1,151 0.18% 0
LIGHTING FIXTURES
36 Nos 15,990 2.51% 0
INSTLN
37 WIRING KM 212 0.21% 0
37 FIRE PROOFING OF CABLES M 1,370 0.00% 0
38 FA/PA EQPT INSTALLATION Nos 207 0.10% 0
38 NO LOAD RUN -MV MOTORS Nos 1,065 0.21% 0
39 NO LOAD RUN -HV MOTORS Nos 18 0.02% 0
F INSTRUMENTATION 5.87% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
40 INST-CALIBRATION Nos 1,297 0.07% 0
41 INST-INSTALLATION Nos 1,600 0.10% 0
42 INSTALLATION OF AIR LINE RM 750 0.02% 0
IMPULSE LINE- FABN &
43 Nos 460 0.03%
HYDROTEST 0
IMPULSE PIPE -
44 Nos 460 0.03%
INSTALLATION 0
LOCAL
45 PANELS/CABINETS/ANALYS Nos 188 0.41%
ER ERECTION 0
46 JB INSTALLATION Nos 322 0.01% 0
47 DUCTS INSTALLATION RM 5,100 0.56% 0
48 FRP/MISC.TRAY ERECTION RM 45,010 1.47% 0
MAIN (Multi pair) CABLE
49 km 355 1.93%
LAYING 0
BRANCH (single pair) CABLE
50 km 256 0.56%
LAYING 0
51 GLANDING & TERMINATION Nos 12,800 0.56% 0
TUBING HOOK UP OF
52 Nos 111 0.01%
CONTROL VALVE 0
53 SS/CU TUBING RM 1,840 0.06% 0
54 LOOP CHECKING Nos 920 0.04% 0
G MISC WORKS % 100 0.52% 0.0 0.0 0.0
VI INSULATION WORKS 2.23% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 140,880 0.37% 0
2 HOT INSULATION: PIPING IM 864,360 1.81% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
CPP (Block)
MONTH
FRONT
(*)
A B C D= B-C E F G=H-E H
COLD INSULATION:
3 SM 1,707 0.06%
EQUIPMENT 0
HOT INSULATION: 2
4 m 62 0.00%
EQUIPMENT 0
VII UG PIPING WORKS 2.39% 71.3% 48.9% 22.4% 13.7% 1.3% 4.5% 18.2%
RCC (precast, Sub Str, Sup 3
1 M 165 0.07%
Str) 165 0 165 140 25 0 140
2 UG PIPING FABRICATION ID 27,902 0.68% 21201 7351 13850 10496 264 352 10848
3 UG PIPING ERECTION IM 142,716 1.62% 94466 84168 10298 544.2 1314 8439.8 8984
4 RADIOGRAPHY NOS. 884 0.02% 0
Overall % 31.1% 27.3% 2.3% 1.3% 29.2%
OFFSITES:
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
VALUE VALUE
U&O Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
(%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 97.7 97.7 4 97.7 97.7
DETAIL ENGINEERING
¾ Updated Topup MTO (MTO-5) released on 03-Aug-2019.
¾ 90% model review completed for Offsite from 16-Sep-16 to 23-Sep-16.
¾ 90% model review completed for Utilities from 02-Sep-16 to 19-Sep-16.
¾ 90% model review for Compressor Centrifugal Packaged, Integrally Geared (Plant/IA)
(PR-5401/5052) completed on 05th Jan 18 with M/s Atlas Copco.
¾ KOM held with M/s onshore on 25-Sep-18 for composite works of unit II & III.
¾ KOM for RO-DM CPU / ETP / TTP / WAO (TN- 8002) with M/s. VA Tech Wabag Ltd
held on 14.09.17.
¾ Around 39,182 Piles, 190,030 M3 RCC & 38,845 MT Structural steel drawings
released for construction for U&O.
¾ All 6,45,175 M3 RCC in Pavement, Drains, Roads & Sleepers released.
¾ All 251 Nos. UG Piping GADs issued for construction.
¾ All 800 Nos. AG Piping GADs issued for construction.
¾ All 7161 Nos Isos. for UG piping lines issued for construction.
¾ ISOs for 7823 Nos. out of 10,000 Nos. AG piping lines issued for construction.
CUMULATIVE
S. ORIGINAL LIKELY BALANCE
DESRIPTION UOM RELEASED REMARKS
NO TENDER QTY. QTY.
QTY.
QTY.
OFFSITES
Stone
1 M 1800000 50000 50000 -
Columns
2 Piles No. 27370 39182 39182 -
Rest of the
RCC (Sub-
3 M3 - 164050 162930 1120 quantity is for
Str.) misc. support
RCC (Super-
4 M3 - 27100 27100 0
Str.)
Piperack
Platforms,
5 Strl. Steel MT - 39565 38845 720
Electrical & Inst
duct droppings
RCC In -
6 Pavement & M3 - 214000 214000
Sleepers
RCC In -
7 M3 - 242400 242400
Roads
RCC In -
8 Drains & M3 - 188775 188775
Culvert
Note: The estimated and actual quantities have been changed due to revision in piling layout. This was discussed
during the meeting with DORC on 07.12.17 in EIL, HO.
1 PIPES M 1122967
SCHEDULE ANALYSIS
Criticality analysis based on revised network schedule with completion of Oct’20.
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
100 8
90
80
6
70 MONTHLY SCH. MONTH ACT.
50 4
40
30
2
20
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O O O O
DURATION IN MONTHS
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
100 12
90
10
80
MONTHLY SCH. 8
70
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT.
6
CUMUL PROG (%)
50
4
40
30
2
20
0
10
0 -2
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A
14 14
DURATION IN MONTHS
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A
DURATION IN MONTHS
CUMUL. SCH. 0.0 0.0 0.0 1.8 4.3 8.5 17.2 28.3 34.0 40.7 48.3 57.9 67.4 76.8 85.5 89.5 92.3 95.5 97.8 99.2 99.3 99.7 99.9 91.7 92.5 93.0 93.8 95.3 96.9 97.7 97.9 98.3 98.5 98.8 99.5 99.9 100 100 100 100 100 100 100 100 100 100 100 100 100 100 100 99.6 99.7 99.8 99.8 99.9 99.8 99.9 100 100 100 100 100 100
CUMUL. ACT. 0.0 3.5 4.6 10.1 15.6 16.2 17.3 20.1 20.6 28.9 35.0 42.4 60.3 64.9 67.4 71.1 74.8 75.5 80.5 80.5 81.9 87.0 89.7 91.7 92.5 93.9 94.1 94.3 94.9 95.2 95.7 96.2 96.7 97.2 97.3 97.6 97.8 98.9 98.9 98.9 98.9 98.9 98.9 98.9 98.9 99.0 99.0 99.0 99.5 99.5 99.5 99.6 99.7 99.7 99.7 99.8 99.8
100 12
90
10
80
MONTHLY SCH.
70
MONTH ACT.
8
CUMUL. SCH.
60 CUMUL. ACT.
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 12
90
10
80
70
CUMUL. SCH. CUMUL. ACT. 8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
14 14
DURATION IN MONTHS
100 12
90
MONTHLY SCH. MONTH ACT.
10
80 CUMUL. SCH. CUMUL. ACT.
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
UTILITIES, OFFSITES & COMMON
P&IDs
1 - PROCESS (EIL) 38 38 38
2 - POSD (EIL) 52 52 52
AFC DRAWINGS
4 PIPING
PLAN - Aug : 6
5 ELECTRICAL 349 349 336 13 Sep: 7
PLAN - Aug : 2
6 INSTRUMENTATION 13 13 11 2
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 4 4 4 4 4 4 4 4 4 4 4 4 4
2 ROTATING EQUIPMENT 7 7 7 7 7 7 7 7 7 7 7 7 7
3 STATIC EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
4 GEN CIVIL 9 9 9 9 9 9 9 9 9 9 9 9 7
5 STRUCTURE 5 5 5 5 4 5 4 5 5 5 5 5 5
6 ELECTRICAL 29 29 29 29 29 29 29 29 28 29 28 29 28
7 INSTRUMENTATION 75 75 75 75 75 75 75 75 74 75 74 75 70
TOTAL 132 132 132 132 131 132 131 132 130 132 130 132 124
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS
2 COLUMNS
3 VESSELS 26 26 26 3 2 21
4 HEAT EXCHANGERS 3 3 3 3 3
5 AIR COOLERS
6 COMPRESSORS 9 9 9 6 6 2 1
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 2 2 2 2
COALESCERS
PROGRESS THIS
HOLDS E / P / C
Total Scope-
PLAN - JUL'19
PROGRESS
PREVIOUS
Infra (Road,
MONTH
FRONT
%
CUMU.
S. Drain,
(*)
WORK ITEMS DESRIPTION UOM WTG.
NO Culvert,
(Block)
Pavement &
C. Wall)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.21% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling m 100 2.21% 100 0 100 100 0 0 100
II Civil& Strl 97.79% 90.0% 0.0% 88.8% 45.14% 2.6% 1.5% 46.66%
2 Mobilisation % 100 0.97% 100 0 100 65 10 7 72
Excavation/Backfilling
3 m2 1,592,964 1.23% 1,592,964 0 1,592,964 886,149 0 886,149
(Boxcutting for Roads)
4 PCC m3 3,000 0.27% 0 0 0
5 RCC (Precast- Boundary Wall) m3 12,775 3.46% 12,775 0 12,775 12,775 0 0 12,775
8 RCC in Drains m3 119,938 27.07% 119,938 0 119,938 110,324 3,500 2,011 112,335
9 RCC in Box Culvert m3 26,867 6.06% 26,867 0 26,867 26,285 582 177 26,462
10 RCC in Pipeway Culvert m3 19,000 4.29% 19,000 0 19,000 11,425 4,000 2,970 14,395
11 Sub Base- Roads (150mm) m2 1,567,104 4.24% 1,567,104 0 1,567,104 987,682 50,000 28,785 1,016,467
12 Base Course- Roads (125mm) m2 1,567,104 3.18% 1,567,104 0 1,567,104 770,738 45,000 19,653 790,391
13 Base Course- Roads (100 mm) m2 1,567,104 3.18% 1,567,104 0 1,567,104 578,866 40,000 44,369 623,235
HOLDS E / P / C
PLAN - JUL'19
RELEASED (*)
THIS MONTH
PROGRESS
PROGRESS
PROGRESS
PREVIOUS
TILL DATE
NO Scope- (Block)
MONTH
FRONT
DRGS
UPTO
CUM.
Offsites
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.03% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling M 100 2.03% 100 0 100 100 0 0 100
II Piling/ Stone Column/ Dynamic Compaction 10.23% 99.8% 0.0% 99.8% 90.5% 4.0% 2.4% 92.9%
1 Piles- Offsites Piperack, Trestles No. 13995 1.84% 13995 0 13995 13995 0 13,995
2 Piles- Substations No. 5946 0.78% 5946 0 5946 5946 0 5,946
3 Piles- CR/SRRs No. 7534 0.99% 7534 0 7534 7534 0 7,534
4 Piles- PP W/H (Other Plant Bldg) No. 1796 0.24% 1796 0 1796 1796 0 1,796
5 Piles- Non Plant Bldgs No. 3,795 0.50% 3,661 0 3,661 3,318 343 13 3,331
Piles- Tankfarms, Pits, Oil
6 No. 19,055 2.26% 19,055 0 19,055 11,496 3,000 1,981 13,477
Catchers, Eqpt
7 Piles- Treated Water Reservoir No. 13477 1.77% 13477 0 13477 13477 0 13,477
8 Stone Columns No. 50660 0.64% 50660 0 50660 49937 466 723 50,660
9 Dynamic Compaction m2 383460 1.22% 383460 0 383460 383460 0 383,460
III Civil 14.67% 78.2% 0.0% 78.2% 43.8% 5.8% 2.4% 46.2%
1 Mobilisation % 100 0.78% 100 0 100 86 10 4 90
3
2 EXCAVATION/BACKFILING M 133,920 0.12% 0 0 0 0
3 RCC (Sub-Str.)-Offsites Piperack M3 27783 1.10% 27783 0 27783 27783 0 27,783
Area-02 M3 210 210 0 210 210 0 210
Area-03 M3 1382 1382 0 1382 1382 0 1,382
Area-04 M3 1605 1605 0 1605 1605 0 1,605
Area-05 M3 1162 1162 0 1162 1162 0 1,162
Area-07 M3 141 141 0 141 141 0 141
Area-08 M3 2118 2118 0 2118 2118 0 2,118
Area-09 M3 2089 2089 0 2089 2089 0 2,089
Area-10 M3 2117 2117 0 2117 2117 0 2,117
Area-11 M3 1242 1242 0 1242 1242 0 1,242
Area-13 M3 599 599 0 599 599 0 599
Area-14 M3 1220 1220 0 1220 1220 0 1,220
Area-15 M3 1390 1390 0 1390 1390 0 1,390
Area-16 M3 1340 1340 0 1340 1340 0 1,340
Area-17 M3 1075 1075 0 1075 1075 0 1,075
Area-18 M3 334 334 0 334 334 0 334
Area-19 M3 795 795 0 795 795 0 795
Area-20 M3 795 795 0 795 795 0 795
Area-21 M3 69 69 0 69 69 0 69
Area-29 M3 60 60 0 60 60 0 60
Area-30 M3 951 951 0 951 951 0 951
Area-31 M3 348 348 0 348 348 0 348
Area-32 M3 724 724 0 724 724 0 724
Area-33 M3 441 441 0 441 441 0 441
Area-34 M3 795 795 0 795 795 0 795
Area-35 M3 351 351 0 351 351 0 351
Area-39 M3 280 280 0 280 280 0 280
Area-40 M3 252 252 0 252 252 0 252
Area-41 M3 51 51 0 51 51 0 51
Drg-151 M3 517 517 0 517 517 0 517
Drg-152 M3 424 424 0 424 424 0 424
Drg-153 M3 946 946 0 946 946 0 946
Drg-154 M3 1013 1013 0 1013 1013 0 1,013
Drg-155 M3 337 337 0 337 337 0 337
HOLDS E / P / C
PLAN - JUL'19
RELEASED (*)
THIS MONTH
PROGRESS
PROGRESS
PROGRESS
PREVIOUS
TILL DATE
NO Scope- (Block)
MONTH
FRONT
DRGS
UPTO
CUM.
Offsites
A B C D= B-C E F G=H-E H
3
Drg-156 M 567 567 0 567 567 0 567
Misc. M3 43 43 0 43 43 0 43
4 RCC Sleepers M3 70,346 2.80% 70,346 0 70,346 52,143 5,500 2,477 54,620
RCC (Sub-Str.)- Tankfarms, Pits,
8 M3 101,804 4.05% 24,520 0 24,520 8,624 2,500 701 9,325
Oil Catchers, Eqpt, Flare
RCC (Sub-Str.)- Treated Water
9 M3 46,279 1.66% 46,279 0 46,279 45,344 935 256 45,600
Reservoir
RCC (Sup-Str.)- Treated Water
9 M3 18,733 0.67% 18,733 0 18,733 3,579 4,000 41 3,620
Reservoir
3
10 RCC (Sub-Str.)- Dyke Walls M 33,480 1.33% 33,480 0 33,480 1,940 3,000 3,263 5,203
RCC (Super-Str.)- Tankfarms, 3
14 M 3,205 0.15% 3,205 0 3,205 1,012 238 350 1,362
Pits, Oil Catchers, Eqpt, Flare
15 RCC (Super-Str.)- Dyke Walls M3 22,320 1.06% 22,320 0 22,320 2,000 850 850
16 Misc. Civil Work % 100 0.94% 100.0 0.0 100 37 6 0 37.0
IV Buildings 8.52% 44.1% 9.5% 34.6% 18.5% 4.5% 4.3% 22.8%
1 RCC (Sub-Str.)- Substations M3 11,419 0.45% 11,419 0 11,419 10,630 550 476 11,106
2 RCC (Sub-Str.)- CR/SRRs M3 19,582 0.78% 19,582 0 19,582 14,076 1,500 3,836 17,912
RCC (Sub-Str.)- Non Plant / Plant
3 M3 14,004 0.56% 9,077 1,254 7,823 6,167 1,200 528 6,695
Bldgs (PPU W/H)
3
4 RCC (Super-Str.)- Substations m 16,000 0.76% 16,000 0 16,000 2,714 2,500 2,152 4,866
5 RCC (Super-Str.)- CR/SRRs m3 22,296 1.06% 11,525 6,363 5,162 1,595 1,500 307 1,902
RCC (Super-Str.)- Non Plant
6 m3 22,145 1.06% 7,732 0 7,732 3,000 1,300 1,184 4,184
Bldgs
7 Screed PCC m3 6,725 0.08% 2,000 2,000 0 0
3
8 Block work m 47,255 0.26% 20,000 15,000 5,000 750 280 280
9 Plaster/ Surface finish m2 673,924 1.07% 200,000 200,000 0 0
10 Flooring- Cement m2 147,931 0.24% 0 0
11 Marble,Granite, Tile m2 87,681 0.35% 0 0
12 Doors,Widows, Shutters m2 24,949 0.10% 0 0
13 Painting m2 509,509 0.41% 0 0
14 Plumbing/ Soil Pipe m 12,965 0.03% 0 0
2
15 Underdeck Insulation m 59,450 0.09% 0 0
16 False Ceiling m2 57,464 0.37% 0 0
2
17 False Flooring m 10,894 0.13% 0 0
2
18 Sheeting/Cladding m 69,768 0.04% 50,000 50,000 0 0
19 HVAC no. 70 0.06% 0 0
20 Passenger Lift no. 3 0.00% 0 0
21 Cable Laying/ Circuit wiring km 548 0.09% 0 0
22 Earthing km 73 0.12% 0 0
23 Earth Electrode/Plate no. 1,130 0.03% 0 0
23 Misc. Finishing Work-Bldgs no. 100 0.40% 0 0
V Strl Steel 2.31% 92.2% 55.6% 36.6% 27.4% 3.8% 2.0% 29.5%
1 Strl. Steel - Erection MT 41,488 0.00% 38,248 22,311 15,937 12,730 770 898 13,628
1.1 Strl. Steel (Rack) MT 32,000 1.25% 31,660 16,223 15,437 12,629 770 898 13,527
1.2 Strl. Steel (Tech. Str.) MT 770 0.03% 670 670 0 0
Strl. Steel (Sheds)- Non Plant
1.3 MT 508 0.02% 508 508 0 0
Bldgs
1.4 Strl. Steel (Misc.)- Plant Bldgs MT 4,210 0.16% 4,210 3,710 500 101 0 0 101
1.5 Strl. Steel (Misc.)- Others MT 4,000 0.16% 1,200 1,200 0 0
2 Strl. Steel - Alignment / grouting MT 41,488 0.00% 38,248 24,721 13,527 8,269 3,500 740 9,009
2.1 Strl. Steel (Rack) MT 32,000 0.53% 31,660 18,133 13,527 8,269 3,500 740 9,009
HOLDS E / P / C
PLAN - JUL'19
RELEASED (*)
THIS MONTH
PROGRESS
PROGRESS
PROGRESS
PREVIOUS
TILL DATE
NO Scope- (Block)
MONTH
FRONT
DRGS
UPTO
CUM.
Offsites
A B C D= B-C E F G=H-E H
2.2 Strl. Steel (Tech. Str.) MT 770 0.01% 670 670 0 0
Strl. Steel (Sheds)- Non Plant
2.3 MT 508 0.01% 508 508 0 0
Bldgs
2.4 Strl. Steel (Misc.)- Plant Bldgs MT 4,210 0.07% 4,210 4,210 0 0
2.5 Strl. Steel (Misc.)- Others MT 4,000 0.07% 1,200 1,200 0 0
V Composite work 37.38% 38.4% 34.4% 4.1% 2.1% 0.6% 0.3% 2.4%
A1 MOBILISATION % 100 0.95% 100 50 50 35 5.0 0.0 35
A2 SUPPLY OF MATERIALS % 100 0.95% 20.0 0.0 20.0 5.0 0.0
B PIPING 27.66% 91.6% 83.9% 7.7% 4.0% 1.1% 0.8% 4.80%
1 A/G PPG-WELDING CS ID 2,157,298 7.06% 1,792,537 1,678,358 114,179 74,355 23,000 14,750 89,105
2 A/G PPG-WELDING SS ID 26,500 0.11% 21,033 21,033 0
3 A/G PPG-WELDING AS ID 6,495 0.03% 0 0 0
A/G PPG-ERCN CS (OTHER
4 IM 11,121,715 11.37% ######## 9,619,090 ####### 611,481 162,000 135,836 747,317
THAN SPOOL)
5 A/G PPG-ERCN SS IM 165,960 0.22% 157,299 157,299 0
6 A/G PPG-ERCN AS IM 26,860 0.04% 0 0 0
7 A/G PPG-SUPPORTING IM 11,314,535 3.85% ######## 9,808,906 ####### 442,369 162,000 27,931 470,300
8 A/G PPG-HYDROTESTING IM 11,314,535 2.57% ######## ######## 0
RADIOGRAPHY/ULTRASOUND
9 Nos 11,911 0.03% 9,862 9,639 223 159 15 64 223
TESTING
10 STRESS RELIVING Nos 1,308 0.00% 1,083 1,083 0
11 STEAM TRACERS RM 7,340 0.01% 0 0 0
12 BLASTING/PRIMER PAINTING IM 11,314,535 1.03% ######## 8,549,434 ####### 1,018,354 165,000 216,754 1,235,108
13 FINAL PAINTING IM 11,314,535 1.03% ######## ######## 350,000 0
14 CHEMICAL CLEANING IM 1,341,594 0.30% 0 0 0
GI PIPING 0.13% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
15 PPG LAYING IM 205,811 0.12% 0
16 PPG SYSTEM TESTING IM 205,811 0.01% 0
C MECHANICAL EQPT WORK 1.34% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
17 STAT. EQUIPMENT -ERECTION MT 20,424 0.70% 0
STAT. EQPT -
18 MT 20,424 0.46% 0
GROUT/ALIGNMENT
ROTARY. EQUIPMENT-PUMP
19 MT 1,311 0.07% 0
ERECTION
ROT. EQPT- PUMP
20 MT 1,311 0.11% 0
GROUT/ALIGNMENT
D CIVIL/ STRUCTURAL WORK 0.57% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
21 RCC WORKS M3 900 0.05% 0
22 FIRE PROOFING m2 360 0.00% 0
23 STRL STEEL-FABN MT 600 0.05% 0
24 STRL STEEL-ERCN MT 1,330 0.10% 0
25 GRATING-INSTALLATION MT 20 0.00% 0
26 HANDRAILING RM 1,320 0.00% 0
27 STR-BLASTING / PRIMER MT 600 0.01% 0
28 STRL FINAL PAINTING MT 45,570 0.36% 0
E ELECTRICAL 1.39% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
29 TRANSFORMER/NGR INSTLN. Nos 24 0.02% 0
30 PANEL INSTALLATION Nos 505 0.05% 0
31 BUS DUCT ERECTION RM 289 0.00% 0
Instln of Ltg Pnl, PB Stns & other
32 Nos 854 0.02% 0
control gear
HOLDS E / P / C
PLAN - JUL'19
RELEASED (*)
THIS MONTH
PROGRESS
PROGRESS
PROGRESS
PREVIOUS
TILL DATE
NO Scope- (Block)
MONTH
FRONT
DRGS
UPTO
CUM.
Offsites
A B C D= B-C E F G=H-E H
DC
33 SYSTEM/BATTERY/CAPACITOR Nos 14 0.01% 0
BANKS ERECTION
34 EARTH ELECTRODES INSTLN. Nos 675 0.02% 0
35 EARTH PLATES INSTALLATION Nos 525 0.00% 0
36 EARTH STRIPS INSTALLATION RM 118,850 0.24% 0
37 CABLE TRAYS INSTALLATION RM 93,320 0.38% 0
38 JBs/PBS INSTALLATION Nos 30 0.00% 0
39 CABLE LAYING km 2,310 0.47% 0
40 FA/PA CABLE LAYING km 72 0.01% 0
CABLE GLANDING &
41 Nos 7,381 0.06% 0
TERMINATION
42 LIGHTING POLES INSTLN. Nos 274 0.00% 0
43 LIGHTING FIXTURES INSTLN. Nos 789 0.01% 0
44 WIRING KM 2 0.00% 0
45 FIRE PROOFING OF CABLES M 2,310 0.00% 0
46 FA/PA EQPT INSTALLATION Nos 875 0.04% 0
47 NO LOAD RUN -MV MOTORS Nos 1,063 0.02% 0
48 NO LOAD RUN -HV MOTORS Nos 65 0.01% 0
F INSTRUMENTATION 2.39% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
49 INST-CALIBRATION Nos 2,816 0.02% 0
50 INST-INSTALLATION Nos 4,017 0.03% 0
51 INSTALLATION OF AIR LINE RM 3,950 0.01% 0
IMPULSE LINE- FABN &
52 Nos 1,099 0.01% 0
HYDROTEST
53 IMPULSE PIPE - INSTALLATION Nos 1,099 0.01% 0
LOCAL
54 PANELS/CABINETS/ANALYSER Nos 473 0.11% 0
ERECTION
55 JB INSTALLATION Nos 759 0.00% 0
56 DUCTS INSTALLATION RM 56,365 0.64% 0
57 FRP/MISC.TRAY ERECTION RM 224,534 0.76% 0
58 MAIN (Multi pair) CABLE LAYING km 555 0.32% 0
BRANCH (single pair) CABLE
59 km 1,342 0.30% 0
LAYING
60 GLANDING & TERMINATION Nos 32,136 0.15% 0
TUBING HOOK UP OF
61 Nos 412 0.01% 0
CONTROL VALVE
62 SS/CU TUBING RM 6,355 0.02% 0
63 LOOP CHECKING Nos 1,939 0.01% 0
G MISC WORKS % 100 1.99% 0 0 0
VI UG PIPING 1.78% 99.6% 75.2% 24.4% 19.0% 1.2% 1.7% 20.8%
1 UG PIPING FABRICATION ID 249,827 0.64% 249,827 203905 45,922 41869 2068 1879 43,748
2 UG PIPING ERECTION IM 1,080,754 0.98% 1,080,754 819,103 261,651 227780 15963 28748 256,528
3 RADIOGRAPHY NOS. 3,600 0.01% 3,600 3,600 0
4 RCC (precast, Sub Str, Sup Str) M3 3,820 0.15% 3,820 1,800 2,020 656 40 0 656
5 STRL STEEL FABRICATION MT 67 0.01% 0
6 STRL STEEL ERECTION MT 27 0.00% 0
7 GRATING WORKS MT 3 0.00% 0
VII INSULATION WORKS 0.14% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 COLD INSULATION: PIPING IM 450,244 0.12% 0
2 HOT INSULATION: PIPING IM 87,574 0.02% 0
HOLDS E / P / C
PLAN - JUL'19
RELEASED (*)
THIS MONTH
PROGRESS
PROGRESS
PROGRESS
PREVIOUS
TILL DATE
NO Scope- (Block)
MONTH
FRONT
DRGS
UPTO
CUM.
Offsites
A B C D= B-C E F G=H-E H
COLD INSULATION:
3 SM 9 0.00% 0
EQUIPMENT
V TANKAGE WORKS 0 22.94% 88.9% 21.9% 67.0% 42.7% 3.5% 2.7% 45.4%
1 TANK FABRICATION/ ROLLING MT 111,274 3.10% 111,274 0 111,274 89,468 5,272 1,697 91,165
TANKAGE WORKS - I
MT 19,609 19,609 19,609 19,387 222 222 19,609
(TECON)
TANKAGE WORKS - I (CTL) MT 17,732 17,732 17,732 5,350 2,200 1,172 6,522
TANKAGE WORKS - II (CTL) MT 64,933 64,933 64,933 63,274 1,650 110 63,384
TANKAGE WORKS - III (CTL) MT 9,000 9,000 9,000 1,457 1,200 193 1,650
2 TANK / STRL. ERCN,WELDING MT 126,352 11.55% 126,352 37,823 88,529 51,169 3,950 4,394 55,563
TANKAGE WORKS - I
MT 21,899 21,899 19,609 10,929 1,200 637 11,566
(TECON)
TANKAGE WORKS - I (CTL) MT 19,802 19,802 2,870 826 750 588 1,414
TANKAGE WORKS - II (CTL) MT 74,607 74,607 64,933 39,275 1,500 3,044 42,319
TANKAGE WORKS - III (CTL) MT 10,044 10,044 1,117 139 500 125 264
3 TANK TESTING MT 126,352 1.71% 110,903 101,978 8,925 3,200 5,725 7,385 10,585
4 STRUCTURAL/PLATE FABN MT 15,078 1.32% 15,078 0 15,078 9,205 2,050 570 9,775
TANKAGE WORKS - I
MT 2,290 2,290 2,290 711 500 0 711
(TECON)
TANKAGE WORKS - I (CTL) MT 2,070 2,070 2,070 95 750 0 95
TANKAGE WORKS - II (CTL) MT 9,674 9,674 9,674 8,379 450 170 8,549
TANKAGE WORKS - III (CTL) MT 1,044 1,044 1,044 20 350 0 20
6 TANK/STRUCTRE PAINTING MT 99,109 0.79% 99,109 24,817 74,292 11,870 3,500 1,750 13,620
NOZZLE FABRICATION/
7 NOS 3,550 0.00% 750 200 550 419 60 0 419
INSTALATION
8 RADIOGRAPHY NOS 1,990 0.01% 1,050 100 950 752 100 48 800
9 PIPING FABRICATION ID 66,311 0.21% 66,311 0 66,311 66,311 0 66,311
10 PIPING ERECTION IM 396,935 0.54% 45,000 0 45,000 34,780 3,500 28 34,808
11 PIPE SUPPORTING IM 396,935 0.22% 0
12 PIPE HYDROTESTING IM 396,935 0.16% 0
13 PIPING PAINTING IM 396,935 0.07% 0
14 GI PIPING IM 490,710 0.67% 0
16 GRAVEL FOR TANK PAD M3 183,000 0.58% 183,000 0 183,000 139,642 3,000 0 139,642
17 SAND FILLING M3 347,985 0.83% 347,985 0 347,985 347,985 0 0 347,985
18 PVC LINING m2 323,330 0.13% 323,330 0 323,330 229,535 6,500 0 229,535
ANTICRROSIVE / PREMIX
19 m2 416,275 0.33% 0
CARPET LAYER
3
20 PCC M 874 0.01% 0
21 RCC PRE CAST M3 2,985 0.12% 0
22 RCC WORKS M3 5,787 0.23% 2,500 0 2,500 1,427 300 1,727
23 BRICK/ BLOCK WORK M3 140 0.00% 0
24 EXCAVATION/BACKFILING M3 253,945 0.23% 253,945 0 253,945 0
HOLDS E / P / C
PLAN - JUL'19
RELEASED (*)
THIS MONTH
PROGRESS
PROGRESS
PROGRESS
PREVIOUS
TILL DATE
NO Scope- (Block)
MONTH
FRONT
DRGS
UPTO
CUM.
Offsites
A B C D= B-C E F G=H-E H
3
25 DISPOSAL M 292,415 0.13% 0
Overall % 46.1% 31.67% 3.0% 1.9% 33.56%
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope- WTG.
PREVIOUS
Utilities (Block)
MONTH
FRONT
(N2/ CT/
(*)
RO/ ETP)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 1.99% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling M 100 1.99% 100 0 100 100 0 0 100
II Piling 18.01% 100.0% 0.0% 100.0% 96.1% 2.8% 0.6% 96.7%
1 Piles No. 15,018 18.01% 15,018 0 15,018 14,438 418 90 14,528
1.1 Piles- CT-01 No. 404 404 404 404 0 404
1.2 Piles- CT-01 Auxillary System No. 97 97 97 97 0 97
1.3 Piles- CT-02 No. 1,114 1,114 1,114 1,114 0 1,114
1.4 Piles- CT-02 Auxillary System No. 159 159 159 159 0 159
1.5 Piles- CT-03 No. 565 565 565 565 0 565
1.6 Piles- CT-03 Auxillary System No. 131 131 131 131 0 131
1.7 Piles- CT-04 No. 391 391 391 391 0 391
1.8 Piles- CT-04 Auxillary System No. 105 105 105 105 0 105
1.9 ETP No. 3,037 3,037 3,037 3,037 0 3,037
1.20 RO/DM/CPU& CTBD No. 2,648 2,648 2,648 2,648 0 2,648
Neutralisation Pit + N2 PLANT
1.21 No. 1,289 1,289 1,289 801 326 0 801
+ CW PUMP
1.22 RW Intake & RWTP No. 5,078 5,078 5,078 4,986 92 90 5,076
III Civil& Strl 60.82% 64.5% 0.0% 64.5% 28.3% 11.4% 5.2% 33.5%
1 Mobilisation % 100 0.76% 100 0 100 52 10 0 52
2 RCC (Sub-Str.) M3 51,517 18.72% 47,017 0 47,017 34,236 6,166 2,640 36,876
2.1 RCC CT-1 incl. Sump & Basin M3 2,800 2,800 0 2,800 2,662 138 0 2662
3
2.2 RCC CT-2 incl. Sump & Basin M 3,316 3,316 0 3,316 3,043 273 58 3,101
2.3 RCC CT-3 incl. Sump & Basin M3 1,801 1,801 0 1,801 1,796 5 0 1,796
3
2.4 RCC CT-4 incl. Sump & Basin M 600 600 0 600 600 0 600
2.5 RCC N2 Plant M3 5,000 1,000 0 1,000 0
3
2.6 RCC RWTP, Intake M 25,000 25,000 0 25,000 16,665 3,500 2,282 18,947
3
2.7 RCC RO/DM/CPU& CTBD M 5,000 5,000 0 5,000 2,470 2,000 300 2,770
3
2.8 RCC ETP M 7,000 7,000 0 7,000 7,000 0 7,000
2.9 RCC (Sub-Str.) Others M3 1,000 500 0 500 250 0
3
3 RCC (Super-Str.) M 79,320 34.58% 48,964 0 48,964 10,023 10,500 5,080 15,103
3.1 RCC CT-1 M3 4,300 4,300 0 4,300 3,300 550 100 3,400
3
3.2 RCC CT-2 M 8,580 8,580 0 8,580 1,646 1,750 802 2,448
3.3 RCC CT-3 M3 5,334 5,334 0 5,334 800 1,500 700 1,500
3.4 RCC CT-4 M3 4,170 4,170 0 4,170 976 1,500 68 1,044
3.5 RCC RWTP, Intake M3 25,756 2,500 0 2,500 620 1,200 1,058 1,678
3.6 RCC RO/DM/CPU& CTBD M3 14,344 9,080 0 9,080 266 1,500 384 650
3.7 RCC ETP M3 16,636 15,000 0 15,000 2,415 2,500 1,968 4,383
3.8 RCC (Sup-Str.) Others M3 200 0 0 0
RCC in Pavement, Drains & 3
4 M 28,500 6.21%
Sleepers 0 0 0
5 Misc. Civil Work % 100 0.55% 10.0 5.0 10 4 5 0 4.0
IV Strl Steel 0.28% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 Strl. Steel Erection MT 600 0.28% 0 0 0 0 0 0 0.0
V Composite work 18.90% 0.7% 0.0% 0.7% 0.1% 0.1% 0.0% 0.1%
A1 MOBILISATION % 100 0.49% 50 0 50 4 5 0.000 4.00
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope- WTG.
PREVIOUS
Utilities (Block)
MONTH
FRONT
(N2/ CT/
(*)
RO/ ETP)
A B C D= B-C E F G=H-E H
A2 SUPPLY OF MATERIALS % 100 0.49% 0.0
B PIPING 8.01% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 A/G PPG-WELDING CS ID 117,932 1.55% 0
2 A/G PPG-WELDING SS ID 14,187 0.32% 0
3 A/G PPG-ERCN CS (SPOOL) IM 458,983 1.65% 0
4 A/G PPG-ERCN SS IM 167,807 1.28% 0
5 A/G PPG-SUPPORTING IM 626,790 1.55% 0
6 A/G PPG-HYDROTESTING IM 626,790 1.14% 0
RADIOGRAPHY/ULTRASOUN
7 Nos 123 0.00%
D TESTING 0
BLASTING/PRIMER
8 IM 626,790 0.26% 0
PAINTING
9 FINAL PAINTING IM 626,790 0.26% 0
C MECHANICAL EQPT WORK 1.93% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
STAT. EQUIPMENT -
1 MT 2,731 0.85%
ERECTION 0
STAT. EQPT -
2 MT 2,731 0.57%
GROUT/ALIGNMENT 0
ROTARY. EQUIPMENT-
3 MT 300 0.30%
COMPRESSOR ERECTION 0
ROT. EQPT- COMPRESSOR
4 MT 300 0.20%
GROUT/ALIGNMENT 0
ROTARY. EQUIPMENT-PUMP
5 MT 14 0.01%
ERECTION 0
ROT. EQPT- PUMP
6 MT 14 0.01%
GROUT/ALIGNMENT 0
D CIVIL/ STRUCTURAL WORK 0.23% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
3
1 RCC WORKS M 200 0.11% 0
2 FIRE PROOFING m2 330 0.00% 0
3 STRL STEEL-FABN MT 50 0.04% 0
4 STRL STEEL-ERCN MT 99 0.06% 0
5 GRATING-INSTALLATION MT 8 0.00% 0
6 HANDRAILING RM 33 0.00% 0
7 STR-BLASTING / PRIMER MT 50 0.00% 0
8 STRL FINAL PAINTING MT 1 0.00% 0
E ELECTRICAL 3.20% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
1 Nos 18 0.15% 0
INSTLN
2 PANEL INSTALLATION Nos 226 0.21% 0
3 BUS DUCT ERECTION RM 192 0.02% 0
Instln of Ltg Pnl, PB Stns &
4 Nos 787 0.15%
other control gear 0
DC SYSTEM/ BATTERY/
5 CAPACITOR BANKS Nos 8 0.04%
ERECTION 0
EARTH ELECTRODES
6 Nos 120 0.04%
INSTLN. 0
EARTH PLATES
7 Nos 70 0.01%
INSTALLATION 0
EARTH STRIPS
8 RM 16,420 0.31%
INSTALLATION 0
CABLE TRAYS
9 RM 10,510 0.39% 0
INSTALLATION
10 JBs/PBS INSTALLATION Nos 5 0.00% 0
11 CABLE LAYING km 485 0.91% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope- WTG.
PREVIOUS
Utilities (Block)
MONTH
FRONT
(N2/ CT/
(*)
RO/ ETP)
A B C D= B-C E F G=H-E H
12 FA/PA CABLE LAYING km 13 0.02% 0
CABLE GLANDING &
13 Nos 5,247 0.39%
TERMINATION 0
14 LIGHTING POLES INSTLN. Nos 216 0.03% 0
15 LIGHTING FIXTURES INSTLN. Nos 1,702 0.25% 0
16 WIRING KM 7 0.01% 0
17 FIRE PROOFING OF CABLES M 485 0.00% 0
18 FA/PA EQPT INSTALLATION Nos 248 0.12% 0
19 NO LOAD RUN -MV MOTORS Nos 630 0.12% 0
20 NO LOAD RUN -HV MOTORS Nos 42 0.04% 0
F INSTRUMENTATION 2.61% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
1 INST-CALIBRATION Nos 1,588 0.08% 0
2 INST-INSTALLATION Nos 2,088 0.13% 0
3 INSTALLATION OF AIR LINE RM 700 0.02% 0
IMPULSE LINE- FABN &
4 Nos 622 0.04%
HYDROTEST 0
IMPULSE PIPE -
5 Nos 622 0.04%
INSTALLATION 0
LOCAL
6 PANELS/CABINETS/ANALYSE Nos 120 0.25%
R ERECTION 0
7 JB INSTALLATION Nos 103 0.00% 0
8 DUCTS INSTALLATION RM 2,830 0.29% 0
9 FRP/MISC.TRAY ERECTION RM 9,860 0.31% 0
MAIN (Multi pair) CABLE
10 km 115 0.60%
LAYING 0
BRANCH (single pair) CABLE
11 km 33 0.07%
LAYING 0
12 GLANDING & TERMINATION Nos 16,704 0.69% 0
TUBING HOOK UP OF
13 Nos 60 0.01%
CONTROL VALVE 0
14 SS/CU TUBING RM 1,240 0.04% 0
15 LOOP CHECKING Nos 875 0.04% 0
G MISC WORKS % 100 1.94% 0.0 0.0 0.0
Overall % 59.5% 36.72% 7.4% 3.3% 40.08%
TRADING FACILITIES:
PROGRESS
WTD. PHYSICAL PROGRESS WTD. EI SERVICES
TRADING VALUE VALUE
Monthly Prog. Cumul. Monthly Cumul.
(Physical) (EI
FACILITIES (%) Prog. (%) Services) Prog. (%) Prog. (%)
Sch. Act. Sch. Act. Sch. Act. Sch. Act.
PROCESS 2 2.1 98.5 98.5 4 2.1 98.5 98.5
DETAIL ENGINEERING
¾ All 19 Nos. UG Piping GADs issued for construction.
¾ All 51 Nos. AG Piping GADs issued for construction.
¾ Around 1638 Piles, 7603 M3 RCC & 1715 MT Structural steel drawings released for
construction for trading facilities.
CUMULATIVE
S. LIKELY BALANCE
DESRIPTION UOM RELEASED REMARKS
NO QTY. QTY.
QTY.
Trading
Note: The estimated and actual quantities have been changed due to revision in piling layout. This was discussed
during the meeting with DORC on 07.12.17 in EIL, HO.
1 PIPES M 36015
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
DURATION IN MONTHS
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
DURATION IN MONTHS
100 24
22
90
20
80
18
70 MONTHLY SCH. MONTH ACT.
16
CUMUL. SCH. CUMUL. ACT.
60
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F
DURATION IN MONTHS
100 24
22
90
20
80
18
70 MONTHLY SCH. MONTH ACT.
16
CUMUL. SCH. CUMUL. ACT.
60
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F
DURATION IN MONTHS
100 24
22
90
20
80
18
70 MONTHLY SCH. MONTH ACT.
16
CUMUL. SCH. CUMUL. ACT.
60
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F
DURATION IN MONTHS
100 24
22
90
20
80
18
70 MONTHLY SCH. MONTH ACT.
16
CUMUL. SCH. CUMUL. ACT.
60
14
CUMUL PROG (%)
50 12
10
40
8
30
6
20
4
10
2
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F
DURATION IN MONTHS
100 20
80 16
70 14
60 12
CUMUL PROG (%)
50 10
40 8
30 6
20 4
10 2
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A
DURATION IN MONTHS
100 20
90 18
80 16
50 10
40 8
30 6
20 4
10 2
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O
DURATION IN MONTHS
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
TRADING FACILITIES
P&IDs
1 - POSD (EIL) 41 41 41
AFC DRAWINGS
1 GENERAL CIVIL 17 17 17
PLAN - Aug : 10
2 STRUCTURAL 55 55 32 23
Sep : 13
3 PIPELINE 13 14 14
4 PIPING
- GAD`s 51 51 51
PLAN - Aug : 2
5 ELECTRICAL 8 8 6 2
6 INSTRUMENTATION 7 7 7
TRADING FACILITIES
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 2 2 2 2 2 2 2 2 2 2 2 2 1
2 ROTATING EQUIPMENT 6 6 6 6 6 6 6 6 6 6 6 6 6
3 STATIC EQUIPMENT 1 1 1 1 1 1 1 1 1 1 1 1 1
4 ELECTRICAL 4 4 4 4 4 4 4 4 4 4 4 4 4
5 INSTRUMENTATION 10 10 10 10 10 10 10 10 10 10 10 10 8
6 PIPELINE 17 17 17 17 17 17 17 17 17 17 17 17 14
TOTAL 40 40 40 40 40 40 40 40 40 40 40 40 34
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS
2 COLUMNS
3 VESSELS 8 8 8 8
4 HEAT EXCHANGERS
5 AIR COOLERS
6 COMPRESSORS 1 1 1 1
7 PUMPS 41 41 41 35 26 9 6
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10
COALESCERS
TOTAL 50 50 50 35 26 9 8 7
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
Trading (Block)
MONTH
FRONT
Facility
(*)
A B C D= B-C E F G=H-E H
I Dredging/ Filling 2.03% 100.0% 0.0% 100.0% 100.0% 0.0% 0.0% 100.0%
3
1 Dredging/ Filling M 100 2.03% 100 0 100 100 0 0 100
II Piling/ Stone Column/ Dynamic Compaction 5.57% 100.0% 0.0% 100.0% 98.4% 0.0% 0.0% 98.4%
1 Piles No. 1,572 3.85% 1,572 0 1,572 1,536 0 0 1,536
2 Dynamic Compaction m2 29,000 1.72% 29,000 0 29,000 29,000 0 0 29,000
III Civil 16.05% 83.6% 0.0% 84.0% 30.1% 9.1% 1.1% 31.2%
1 Mobilisation % 100 0.90% 100 0 100 59 10 0 59
2 RCC (Sub-Str.) m3 16,602 12.31% 16,602 0 16,602 5,773 1,850 200 5,973
2.1 RCC- Loading Gantry Fdn m3 1,725 1,725 0 1,725 1,725 0 0 1,725
2.2 RCC- Sleepers m3 4,000 4,000 0 4,000 1,864 350 0 1,864
2.3 RCC- UG Pits m3 4,253 4,253 4,253 1,060 0 200 1,260
2.4 RCC- Pump Foundation m3 6,624 6,624 0 6,624 1,124 1,500 0 1,124
3 RCC- Pavement m3 4,000 1.78% 474 0 474 0
4 Misc. Civil Work % 100 1.06% 0 0 5 2.0 2.0 4.0
IV Strl Steel 2.39% 100.0% 0.0% 100.0% 47.1% 12.4% 0.0% 47.1%
1 Strl. Steel (Tech. Str.) MT 2,010 2.39% 2,010 0 2,010 947 250 0 947
V Composite work 67.16% 36.8% 16.1% 20.8% 7.2% 0.0% 0.0% 7.2%
A1 MOBILISATION % 100 0.90% 100 100 33.0 0 33.0
A2 SUPPLY OF MATERIALS % 100 0.90% 100 100 5.0 0 5.0
B PIPING 49.11% 95.6% 43.3% 52.3% 18.7% 0.0% 0.0% 18.7%
1 A/G PPG-WELDING CS ID 140,098 8.22% 140,098 133,022 7,076 1,392 0 1,392
1 PIPELINE-WELDING CS ID 62,610 3.67% 62,610 4,133 58,477 40,944 0 40,944
A/G PPG-ERCN CS (OTHER
2 IM 515,276 12.61% 477,950 477,950
THAN SPOOL) 0
2 PIPELINE LAYING CS IM 630,240 13.35% 630,240 0 630,240 302,400 0 302,400
3 A/G PPG-SUPPORTING IM 537,450 5.41% 477,950 0 477,950 0
4 A/G PPG-HYDROTESTING IM 537,450 3.99% 477,950 0 477,950 34,080 0 34,080
RADIOGRAPHY/ULTRASOUN
5 Nos 613 0.03% 613 613 0
D TESTING
8 BLASTING/PRIMER PAINTING IM 537,450 0.91% 477,950 402,950 75,000 34,809 0 34,809
9 FINAL PAINTING IM 537,450 0.91% 477,950 477,950 0
GI PIPING 0.08% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
10 PPG LAYING IM 1,718 0.07% 0
11 PPG SYSTEM TESTING IM 1,718 0.01% 0
C MECHANICAL EQPT WORK 3.46% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
STAT. EQUIPMENT -
12 MT 237 0.15%
ERECTION 0
STAT. EQPT -
13 MT 237 0.10%
GROUT/ALIGNMENT 0
ROTARY. EQUIPMENT-
14 MT 281 0.57%
COMPRESSOR ERECTION 0
ROT. EQPT- COMPRESSOR
15 MT 281 0.38%
GROUT/ALIGNMENT 0
ROTARY. EQUIPMENT-PUMP
16 MT 886 0.90%
ERECTION 0
ROT. EQPT- PUMP
17 MT 886 1.35%
GROUT/ALIGNMENT 0
D CIVIL/ STRUCTURAL WORK 0.17% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
3
18 RCC WORKS M 100 0.11% 0 0 0
19 STRL STEEL-FABN MT 10 0.02% 0
20 STRL STEEL-ERCN MT 10 0.01% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
Trading (Block)
MONTH
FRONT
Facility
(*)
A B C D= B-C E F G=H-E H
21 STR-BLASTING / PRIMER MT 10 0.00% 0
22 STRL FINAL PAINTING MT 160 0.02% 0
E ELECTRICAL 7.18% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
TRANSFORMER/NGR
23 Nos 4 0.07% 0
INSTLN
24 PANEL INSTALLATION Nos 273 0.52% 0
25 BUS DUCT ERECTION RM 50 0.01% 0
Instln of Ltg Pnl, PB Stns &
26 Nos 283 0.11%
other control gear 0
DC SYSTEM/ BATTERY/
27 CAPACITOR BANKS Nos 4 0.04%
ERECTION 0
EARTH ELECTRODES
28 Nos 134 0.08%
INSTLN. 0
EARTH PLATES
29 Nos 170 0.03%
INSTALLATION 0
EARTH STRIPS
30 RM 31,550 1.20%
INSTALLATION 0
CABLE TRAYS
31 RM 42,600 3.25% 0
INSTALLATION
32 JBs/PBS INSTALLATION Nos 15 0.00% 0
33 CABLE LAYING km 327 1.25% 0
CABLE GLANDING &
38 Nos 1,625 0.25%
TERMINATION 0
39 LIGHTING POLES INSTLN. Nos 50 0.02% 0
40 LIGHTING FIXTURES INSTLN. Nos 805 0.25% 0
41 WIRING KM 16 0.03% 0
42 FIRE PROOFING OF CABLES M 327 0.00% 0
43 NO LOAD RUN -MV MOTORS Nos 120 0.05% 0
44 NO LOAD RUN -HV MOTORS Nos 23 0.04% 0
F INSTRUMENTATION 5.27% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0%
45 INST-CALIBRATION Nos 372 0.04% 0
46 INST-INSTALLATION Nos 689 0.09% 0
47 INSTALLATION OF AIR LINE RM 550 0.03% 0
IMPULSE LINE- FABN &
48 Nos 200 0.03%
HYDROTEST 0
IMPULSE PIPE -
49 Nos 200 0.03%
INSTALLATION 0
LOCAL
50 PANELS/CABINETS/ANALYSE Nos 52 0.22%
R ERECTION 0
51 JB INSTALLATION Nos 63 0.00% 0
52 DUCTS INSTALLATION RM 10,750 2.28% 0
53 FRP/MISC.TRAY ERECTION RM 8,430 0.54% 0
MAIN (Multi pair) CABLE
54 km 109 1.15%
LAYING 0
BRANCH (single pair) CABLE
55 km 78 0.33%
LAYING 0
56 GLANDING & TERMINATION Nos 5,512 0.47% 0
TUBING HOOK UP OF
57 Nos 36 0.01%
CONTROL VALVE 0
58 SS/CU TUBING RM 550 0.03% 0
59 LOOP CHECKING Nos 305 0.03% 0
PROGRESS UPTO
DRGS RELEASED
CUM. PROGRESS
PROGRESS THIS
HOLDS E / P / C
PLAN - JUL'19
NO Scope WTG.
PREVIOUS
Trading (Block)
MONTH
FRONT
Facility
(*)
A B C D= B-C E F G=H-E H
G MISC WORKS % 100 0.09% 0.0 0.0 0.0
VI UG Piping 6.81% 100.0% 94.7% 5.3% 2.3% 0.0% 0.3% 2.6%
1 UG PIPING FABRICATION ID 58,326 2.37% 58,326 52,566 5,760 676 464 1,140
2 UG PIPING ERECTION IM 290,681 4.43% 290,681 282,190 8,491 8,491 0 8,491
Overall % 51.0% 23.18% 1.8% 0.2% 23.36%
COMMON/COMPLEX LEVEL
MATERIAL REQUISITIONS:
Note: Priority 1: Critical and Long Lead Items to be awarded ASAP.
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
MR For
1 8111 02.02.15 26.12.14 17.02.15 10.01.15 29.02.16
Reinforcement Bars
MR For Structural
2 8103 10.02.15 30.12.14 07.01.17 14.01.15 NA
Steel
3 Carbon Steel Plates 6300 29.10.15 27.01.15 15.04.16 11.02.15 05.02.16
MR For Structural
4 Steel (Offsite PR & 8101 26.01.15 10.02.15 10.02.15 25.02.15 08.06.16
Bridges)
Line Pipe
5 9001 23.02.15 12.02.15 09.12.16 27.02.15 04.03.16.
(Bare/Coated)
6 Plug Valves 9060 13.03.15 25.02.15 28.01.17 12.03.15 13.09.18
7 Desalter System 7710 28.07.15 16.02.15 12.08.15 03.03.15 31.03.16
Gate, Globe & Check
8 9070 26.03.15 04.03.15 10.01.17 19.03.15 I
Valves
Spiral heat
9 6161 28.09.15 13.03.15 15.01.16 28.03.15 15.12.15
exchangers
10 Desalter Vessel 7720 26.05.15 13.03.15 12.08.15 28.03.15 30.09.15
Pressure Vessels –
11 6201 13.10.15 18.03.15 14.11.16 02.04.15 06.10.15
Low Allow Steel
12 Reactor 6205 20.07.15 24.03.15 03.08.15 08.04.15 22.07.15
13 Packinox Exchanger 6105 13.08.15 25.03.15 25.11.16 09.04.15 14.12.15
14 Surge Relief valves 2180 31.03.15 30.03.15 12.12.16 14.04.15 14.12.15
MR For Structural
15 8107 16.02.15 30.03.15 03.03.15 14.04.15 06.06.16
Steel Unit Tender I
16 HV Cables 0270 15.04.15 31.03.15 30.04.15 15.04.15 13.07.18
Direct Fired Air
17 7410 05.08.15 01.04.15 20.08.15 16.04.15 16.03.16
Heater
18 ODC Columns II 6153 25.06.15 08.04.15 10.07.15 23.04.15 02.02.16
19 MV Power & Control 0275 17.04.15 09.04.15 02.05.15 24.04.15 13.07.18
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Cable
Columns (CS &
20 6154 03.08.15 10.04.15 17.08.15 25.04.15 23.06.15
CS+SS Clad)
21 ODC Columns 6152 12.06.15 10.04.15 27.06.15 25.04.15 25.02.16
22 Loading Arms (Road) 4630 30.04.15 13.04.15 04.01.17 28.04.15 28.10.15
Pump Centrifugal
23 5501 16.03.15 16.04.15 14.12.16 01.05.15 01.03.16
(SPP)
Fire Alarm & Plant
24 0280 04.05.15 21.04.15 19.05.15 06.05.15 13.07.18
Comm. Cable
25 CS Vessels 6401 30.03.15 23.04.15 13.04.15 08.05.15 01.03.16
26 HP Heat Exchanger 6230 30.09.15 25.04.15 19.11.16 10.05.15 06.10.15
27 CCR Reactor 6110 02.07.15 28.04.15 14.11.16 13.05.15 24.07.15
Fittings (Under
28 3041 30.07.15 30.04.15 23.12.16 15.05.15 23.11.16
Ground)
29 Gate Valves 3013 23.08.15 01.05.15 16.01.17 16.05.15 17.11.16
30 Fittings 9100 13.04.15 01.05.15 04.02.17 16.05.15 30.11.16
Flanges (Under
31 3031 20.08.15 07.05.15 13.01.17 22.05.15 17.11.16
Ground)
Special Control
32 2160 18.05.15 12.05.15 18.01.17 27.05.15 16.10.17
Valves
Pipes (Under
33 3002 27.07.15 12.05.15 20.12.16 27.05.15 18.11.16
Ground)
34 Flanges 9110 15.04.15 13.05.15 28.02.17 28.05.15 30.11.16
35 Mainline Ball Valve 9050 19.04.15 13.05.15 04.05.16 28.05.15 27.10.15
Butterfly Valves
36 3015 11.08.15 13.05.15 04.01.17 28.05.15 24.11.16
(Under Ground)
Mobile Fire Fighting
37 8065 17.03.16 13.05.15 01.02.17 28.05.15 10.08.18
Equipments-I
38 RFCCU Cyclones 4290 12.08.15 19.05.15 27.02.16 03.06.15 03.10.15
Electronic Type
39 Weigh Bridge (Safe 4560 15.05.15 19.05.15 24.01.17 03.06.15 I
Area)
Centrifugal
40 Compressor SPP- 5082 07.07.15 21.05.15 14.11.16 05.06.15 27.07.15
MAB
Liquid Metering
41 2157 20.03.15 22.05.15 04.12.16 06.06.15 28.10.15
System (Ultrasonic)
42 O'lets 9130 20.04.15 23.05.15 05.01.17 07.06.15 14.05.19 I
MR for Structural
43 8108 06.03.15 25.05.15 21.03.15 09.06.15 08.06.16
Steel Unit Tender II
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Heat Exchanger
44 Carbon Steel., Heat 6125 04.07.15 27.05.15 17.07.15 11.06.15 19.01.16
Exchanger Low Alloy
Programmable Logic
45 1502 15.03.16 27.05.15 21.11.16 11.06.15 27.10.15
Controllers
46 Critical Flow Nozzles 3070 11.07.15 27.05.15 02.12.16 11.06.15 12.02.18
Catalyst Addition
47 4310 20.08.15 28.05.15 21.11.16 12.06.15 09.02.16
System
48 Slide Valves 4330 26.08.15 28.05.15 05.03.16 12.06.15 27.10.15
Dual Plate Check
49 9090 14.04.15 28.05.15 29.01.17 12.06.15 I
Valves
Pressure Vessels –
50 6002 24.08.15 29.05.15 16.11.16 13.06.15 04.02.16
Monel Clad
51 Control Valves 1339 19.06.15 30.05.15 04.01.17 14.06.15 13.10.17
Centrifugal
52 5081 23.06.15 03.06.15 08.07.15 18.06.15 30.07.15
Compressor SPP
53 Isolation Valves 3012 08.07.15 03.06.15 22.07.15 18.06.15 27.10.15
Columns (CS
54 6155 17.08.15 04.06.15 31.08.15 19.06.15 04.03.16
&CS+Clad)
HFO/LFO Engine
55 Generator 5505 21.04.15 04.06.15 02.02.17 19.06.15 10.04.17
Package(s)
Air Compressor
56 Package - Rotary 5502 13.04.15 05.06.15 27.01.17 20.06.15 10.04.17
Screw
Pressure Relief
57 Valves (Thermal 1361 17.04.15 05.06.15 18.12.16 20.06.15 18.08.17
Relief)
Centrifugal Pumps-
58 Multi Stage (Prt 5123 18.08.15 06.06.15 14.11.16 21.06.15 14.12.15
Driven)
Main Column
59 Bottoms Product 4350 07.09.15 08.06.15 21.09.15 23.06.15 16.03.16
Filtration System
Flanges (Trading
60 3033 20.07.15 11.06.15 05.12.16 26.06.15 07.10.16
Facilities)
61 HV System Package 0600 27.04.15 15.06.15 11.05.15 30.6.15 24.06.16
Compressed Air and
62 Nitrogen Plant 4730 19.04.16 17.06.15 05.09.16 02.07.15 28.10.15
Package
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Heat Exchangers
63 With Helical Type 6170 05.10.15 17.06.15 20.12.15 02.07.15 04.11.15
Baffles
Claus Reactor –
64 6402 30.06.15 17.06.15 15.07.15 02.07.15 01.03.16
Pressure Vessel
65 Vessels 6403 24.08.15 17.06.15 08.12.15 02.07.15 19.01.16
Pipes (Seamless &
66 9120 17.04.15 18.06.15 12.02.17 03.07.15 22.06.17
Welded)
66KV Gas Insulated
67 0010 20.08.16 19.06.15 12.09.16 04.07.15 27.10.15
Switch Gears
Reciprocating
68 5041 12.08.15 22.06.15 02.02.16 07.07.15 30.07.15
Compressor SPP
69 Expansion Joints 3071 04.08.15 25.06.15 14.11.16 10.07.15 27.09.16
Electronic Type
70 4220 27.06.15 26.06.15 18.01.17 11.07.15 I
Weigh Bridge
Valves–Gate/Globe/
71 Check (trading 3035 22.07.15 27.06.15 17.12.16 12.07.15 01.02.17
facilities)
Centrifugal Pumps
72 Horizontal Slurry – 5084 08.09.15 27.06.15 17.11.16 12.07.15 30.10.17
SPP
73 Vessels 6404 26.08.15 27.06.15 10.12.15 12.07.15 04.01.16
Deaerator Package
74 7671 11.09.15 27.06.15 26.09.15 12.07.15 25.11.15
for CPP
Flue Gas Steam
75 7940 24.07.15 03.07.15 24.11.16 18.07.15 14.12.15
Generator Package
Centrifugal Pumps
76 5001 09.09.15 03.07.15 08.12.16 18.07.15 29.02.16
SPP-Horizontal
77 MCC Package 7990 30.07.15 08.07.15 14.11.16 23.07.15 17.02.16
Ball Valves (Trading
78 3036 24.07.15 10.07.15 19.12.16 25.07.15 18.11.16
Facilities)
Fittings (Trading
79 3045 28.07.15 11.07.15 24.12.16 26.07.15 16.11.16
facilities)
Tank Farm
80 2821 20.02.16 15.07.15 02.12.16 30.07.15 27.10.15
Management System
Clean Agent Fire
81 Extinguishing 8055 09.03.16 15.07.15 24.01.17 30.07.15 15.07.16
System
Electrostatic
82 7740 14.10.15 15.07.15 02.01.17 30.07.15 02.02.16
Coalescer
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
CCR Regeneration
83 6101 15.07.15 22.07.15 28.11.16 06.08.15 12.08.15
Package
84 Exchanger 6130 12.07.15 22.07.15 21.11.16 06.08.15 01.03.16
Gaskets (Trading
85 3051 29.07.15 22.07.15 23.12.16 06.08.15 02.02.17
Facilities)
Gas Turbine
86 5441 05.11.15 22.07.15 20.11.15 06.08.15 14.12.15
Generator Package
87 Utility Boiler Package 7840 03.09.15 22.07.15 02.01.17 06.08.15 08.12.15
Neutral Grounding
88 0140 05.09.16 23.07.15 03.02.17 07.08.15 III
Resistors – HV
Centrifugal Pumps
89 5002 15.09.15 24.07.15 02.12.16 08.08.15 29.02.16
SPP – Horizontal
90 Feed Filter 4270 29.07.15 24.07.15 21.11.16 08.08.15 21.03.18
91 Fire Alarm System 0480 24.05.16 27.07.15 13.04.17 11.08.15 09.11.17
Air Cooled Heat
92 6115 09.07.15 28.07.15 14.11.16 12.08.15 09.02.16
Exchangers
93 HRSG Package 7830 30.09.15 29.07.15 08.01.17 13.08.15 08.12.15
Power Recovery
94 Expander Generator 5089 01.09.15 14.08.15 16.12.15 19.08.15 31.03.16
Package
Strainers (Trading
95 3074 24.07.15 31.07.15 19.12.16 15.08.15 16.11.16
Facilities)
Fasteners (Trading
96 3055 21.07.15 01.08.15 16.12.16 16.08.15 30.11.16
Facilities)
Centrifugal Pumps
97 5431 30.11.15 06.08.15 18.11.16 21.08.15 28.01.16
Large Capacity
Butterfly Valves
98 3037 26.07.15 08.08.15 21.12.16 23.08.15 30.11.16
(Trading Facilities)
Closed Sample
99 3075 27.07.15 08.08.15 22.12.16 23.08.15 I
Systems
Pipes 3L PE Coated)
100 3003 17.08.15 08.08.15 16.11.16 23.08.15 07.11.16
(Under Ground)
Steam Turbine
101 5442 10.11.15 11.08.15 16.11.16 26.08.15 28.10.15
Generator
Freight cum
102 4010 12.08.15 14.08.15 14.11.16 29.08.15 18.07.16
Passenger Elevator
Dust Control Units –
103 4320 01.09.15 14.08.15 03.12.16 29.08.15 05.10.16
Filters
Pump - Centrifugal
104 5510 03.11.15 21.08.15 02.12.16 05.09.15 02.03.16
(SPP) [Horz./Vert.]
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Pipes (Trading
105 3006 18.07.15 21.08.15 13.12.16 05.09.15 24.11.16
Facilities)
Centrifugal
Compressor
106 5401 17.10.15 23.09.15 18.11.16 08.10.15 10.02.16
Packaged Int.
Geared
Pump - Centrifugal
107 5520 30.09.15 24.08.15 08.12.16 08.09.15 03.03.16
Horizontal (SPP)
MOV-Gate (Trading
108 3038 27.07.15 27.08.15 22.12.16 11.09.15 30.07.18
Facilities)
Pressure Vessel -
109 6405 29.09.15 28.08.15 14.01.16 12.09.15 25.04.16
CS/SS/Clad
110 DC UPS System 0430 27.06.16 28.08.15 16.03.17 12.09.15 09.06.17
Transformer-Power-
111 0100 28.08.16 31.08.15 12.09.16 15.09.15 17.02.16
Above 5 MVA
112 Cartridge Filters 4580 23.09.15 02.09.15 20.12.16 17.09.15 01.03.16
Reciprocating
113 5061 29.06.15 03.09.15 15.12.15 18.09.15 10.12.15
Compressor (SPP)
Centrifugal Pumps
114 5125 09.11.15 04.09.15 24.12.16 19.09.15 01.03.16
SPP- Horizontal
Heat Exchangers
115 6140 17.07.15 05.09.15 02.12.16 20.09.15 26.08.16
Hair Pin Type
Pressure Relief
116 1362 19.09.15 08.09.15 03.12.16 23.09.15 27.07.17
Valves
Pump Centrifugal
117 5443 17.11.15 11.09.15 02.12.16 26.09.15 09.03.16
Horizontal (SPP)
Plant Communication
118 0470 21.06.16 14.09.15 10.04.17 29.09.15 02.11.17
System
Heat Exchanger
119 6145 14.09.15 15.09.15 18.11.16 30.09.15 01.09.16
Carbon Steel
Pressure Vessel -
120 6150 05.10.15 16.09.15 28.11.16 01.10.15 28.04.16
Low Alloy Steel
121 Air Coolers CS 6210 08.10.15 17.09.15 06.12.16 02.10.15 10.02.16
Pressure Vessel CS
122 6157 20.09.15 17.09.15 05.10.15 02.10.15 01.03.16
& LTCS
123 Air Fin Coolers 6335 12.10.15 19.09.15 02.12.16 04.10.15 01.03.16
Pump – Centrifugal
124 5530 11.10.15 18.09.15 24.01.17 03.10.15 22.07.16
Horizontal
High Flux/ High
125 6180 16.09.15 22.09.15 05.12.16 07.10.15 III
Cond. Tube Heat
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Exchanger
Wireless Tetra
126 Communication 2470 09.10.15 24.09.15 24.02.17 09.10.15 I
System
Compressor-Rotary
127 5021 26.08.15 26.09.15 02.12.16 11.10.15 14.12.15
Screw SPP
128 Basket Filters 4360 21.09.15 29.09.15 08.01.17 14.10.15 19.09.18
Residual
129 Contaminent 4770 17.06.15 29.09.15 02.07.15 14.10.15 13.09.18
Removal System
High Mast Lighting
130 0520 13.11.15 30.09.15 28.11.16 15.10.15 02.03.16
System 30 M
Centrifugal Pumps-
131 5124 21.09.15 05.10.15 06.12.16 20.10.15 03.03.16
Multi Stage SPP
132 Flanges 3131 06.01.16 09.10.15 16.02.17 24.10.15 15.11.16
133 Vortex Clusters 6171 29.10.15 09.10.15 10.12.16 24.10.15 24.08.17
Orifice Plates &
134 1321 28.09.15 10.10.15 13.02.17 25.10.15 12.06.18
Flanges
135 Spring Supports 3191 08.01.16 10.10.15 26.12.16 25.10.15 05.12.17
Heat Exchanger
136 6160 13.10.15 13.10.15 28.12.15 28.10.15 26.08.16
Carbon Steel
137 Incinerator Package 7920 30.06.15 13.10.15 18.11.16 28.10.15 04.11.16
138 Sulfur Traps 6407 02.10.15 13.10.15. 02.12.16 28.10.15 15.11.16
Trays & Tower
139 7641 23.09.15 16.10.15 05.12.16 31.10.15 14.03.16
Internals
Centrifugal Pumps
140 5182 27.09.15 16.10.15 14.12.16 31.10.15 06.02.18
Vert. (SPP)
141 EPABX System 2472 11.10.15 16.10.15 22.02.17 31.10.15 I
142 EOT Cranes 4610 19.10.15 16.10.15 20.01.17 31.10.15 22.07.16
MOV-Butterfly
143 3039 28.07.15 16.10.15 23.12.16 31.10.15 19.06.18
Trading Facilities
Fittings – Epoxy
144 3046 12.08.15 16.10.15 09.01.17 31.10.15 01.09.16
Coated
145 Piping Spools 3188 31.12.15 16.10.15 16.12.16 31.10.15 28.10.16
146 Flanges 3132 16.03.16 17.10.15 16.01.17 01.11.15 28.09.16
147 Fittings (AS) 3142 09.01.16 17.10.15 23.01.17 01.11.15 02.03.17
148 Fittings 3140 06.12.15 17.10.15 19.01.17 01.11.15 24.11.16
Pump Centrifugal
149 5185 20.10.15 20.10.15 02.12.16 04.11.15 07.03.16
Horizontal SPP
150 Pipes (CS- 3101 19.11.15 20.10.15 02.01.17 04.11.15 07.09.16
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Seamless)
Column/ Tower
151 6156 17.09.15 21.10.15 01.10.15 06.12.15 30.11.16
Carbon Steel
Sulfur Degassing
152 Vessel with Sulfur 6412 13.10.15 21.10.15. 02.01.17 05.11.15 13.12.17
Cooler
Distributed Control
153 1500 14.12.15 21.10.15 09.12.16 05.11.15 29.11.16
System
154 Coalescer 4260 19.09.15 23.10.15 03.10.15 08.11.15 20.04.16
Air Coolers
155 6411 10.10.15 26.10.15 22.11.16 10.11.15 28.02.16
(Titanium)
Special Check
156 3128 01.01.16 27.10.15 30.01.17 11.11.15 29.08.16
Valves
Air Blowers/
157 5381 17.06.15 27.10.15 14.11.16 11.11.15 07.03.16
Compressors (MAB)
158 Pipes (CS-Welded) 3102 22.11.15 27.10.15 21.01.17 11.11.15 27.06.17
Sulphur Pelletisation
159 4540 04.07.15 28.10.15 07.12.16 12.11.15 09.02.16
and Handling System
Centrifugal Pumps
160 5383 24.09.15 29.10.15 15.12.16 13.11.15 29.08.17
Horizontal SPP
161 Vaporizers 6165 02.11.15 29.10.15 02.12.16 13.11.15 12.10.18
162 66 kV Cables 0200 04.05.16 31.10.15 18.03.17 15.11.15 26.07.18
163 Utility Vessels ODC 6158 24.09.15 31.10.15 14.11.16 15.11.15 04.03.16
164 Flanges 3130 02.12.15 03.11.15 09.12.16 18.11.15 21.09.16
165 Pressure GOctes 1101 31.08.15 03.11.15 15.01.17 18.11.15 III
166 Surge Relief Valves 2181 29.09.15 03.11.15 14.01.17 18.11.15 12.04.18
Distribution
167 0120 01.09.16 03.11.15 16.09.16 18.11.15 III
Transformers
Valves
168 3111 28.11.15 04.11.15 05.12.16 19.11.15 06.03.18
Gate/Globe/Check
169 Fittings O-Lets 3141 13.12.15 04.11.15 20.01.17 19.11.15 30.05.19 II
170 Piping Spools 3189 01.01.16 04.11.15 19.12.16 19.11.15 28.10.16
171 Pipes AS 3105 04.02.16 05.11.15 03.02.17 20.11.15 03.12.16
Air Coolers (Alloy-
172 6410 06.10.15 09.11.15 21.10.15 24.11.15 23.05.16
825)
173 Rupture Disc 1366 26.03.16 10.11.15 24.01.17 25.11.15 II
Averaging Pitot
174 2405 22.12.15 10.11.15 07.12.16 25.11.15 09.07.18
Tubes
175 Alkylation Vessels 6409 07.11.15 10.11.15 10.12.15 25.11.15 29.04.16
176 Switch Boards MV 0020 09.09.16 11.11.15 07.02.17 26.11.15 11.10.17
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Indoor
177 Mounded Bullets 6310 05.11.15 18.11.15 20.07.16 03.12.15 16.01.18
178 Field Instruments 1301 24.09.15 23.11.15 09.02.17 08.12.15 III
Valve-Dual Plate
179 3113 01.12.15 24.11.15 08.12.16 09.12.15 15.01.18
Check
Refrigeration
180 4040 16.10.15 30.11.15 16.11.16 15.12.15 26.10.17
Package
Desuperheaters &
181 2445 08.01.16 07.12.15 14.12.16 22.12.15 04.06.18
PRDS
182 Vortex Flow meters 2860 07.12.15 07.12.15 13.12.16 22.12.15 27.02.19
Reactor-Regenerator
183 6200 15.09.15 07.12.15 15.12.15 22.12.15 17.06.16
Equipment
Pipes (AS- Seamless
184 3104 27.11.15 09.12.15 26.01.17 24.12.15 10.11.16
& Welded)
Pump Centrifugal
185 5432 24.10.15 09.12.15 18.11.16 24.12.15 07.03.16
Horizontal Fire Water
Special Control
186 2356 22.04.16 10.12.15 30.03.17 25.12.15 16.05.18
Valves – Mixed
187 AC UPS System 0440 03.07.16 11.12.15 12.01.17 26.12.15 05.07.16
Steam Disengaging
188 6406 05.10.15 14.12.15 04.01.17 29.12.15 05.10.16
Drum Vessel
189 Electric Heaters 6451 17.10.15 14.12.15 18.11.16 29.12.15 05.08.16
Decomposition
190 Furnace Package 7921 26.09.15 15.12.15 02.01.17 30.12.15 08.11.16
SAR
Centrifugal
191 5181 17.09.15 15.12.15 24.11.16 30.12.15 01.03.16
Compressor SPP
192 Automatic Blinds 3190 06.01.16 16.12.15 24.12.16 31.12.15 05.08.16
Flanges – Higher
193 3133 04.12.15 18.12.15 23.01.17 02.01.16 19.08.16
Alloys
Air Compressor
194 5301 16.10.15 19.12.15 03.02.17 03.01.16 10.04.17
Rotary
Centrifugal Pumps
195 High Speed 5345 15.12.15 22.12.15 03.12.16 06.12.15 03.03.16
Integrally Geared
196 Mass Flowmeters 2065 11.01.16 23.12.15 17.12.16 07.01.16 05.03.18
197 CCTV System 2840 24.02.16 30.12.15 13.02.17 14.01.16 07.02.19
198 Pipes Higher Alloy 3106 06.02.16 30.12.15 16.02.17 15.01.16 25.11.16
Valves –
199 3112 06.02.16 30.12.15 16.02.17 14.01.16 16.03.17
Gate/Globe/Check
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
200 Valves – Ball 3114 04.12.15 30.12.15 12.12.16 14.01.16 08.01.18
Pump – centrifugal
201 5183 04.10.15 30.12.15 02.01.17 14.01.16 02.03.16
Seal less
Pump Horizontal
202 5184 05.11.15 31.12.15 10.01.17 15.01.16 28.02.16
,Vertical GPP
Nucleonic Level
203 2270 16.01.16 04.01.16 22.12.16 19.01.16 18.09.18
Instruments
204 Vessels 6413 03.12.15 05.01.16 11.07.16 20.01.16 06.10.16
205 Rotary Pumps 5008 04.11.15 05.01.16 22.01.17 20.01.16 09.05.17
Trays & Tower
206 7642 26.10.15 06.01.16 05.12.16 21.01.16 14.03.16
Internals
Self Actuated
207 Pressure Control 1342 29.12.15 08.01.16 04.01.17 23.01.16 04.04.18
Valves
Pump – Centrifugal
208 5503 26.03.15 15.01.16 10.01.17 30.01.16 07.03.16
Fire Water
Gas Detection
209 2650 27.01.16 18.01.16 02.02.17 02.02.16 II
System
210 11 kV Cables -1 0210 17.05.16 21.01.16 06.02.17 05.02.16 10.07.18
211 Fittings Higher Alloys 3144 06.01.16 22.01.16 16.01.17 06.02.16 26.07.19 I
Blower Turbo
212 5188 09.11.15 22.01.16 16.01.17 06.02.16 22.02.18
(Centrifugal)
Rotary Lobe type
213 Positive 5045 15.12.15 23.01.16 14.11.16 07.02.16 15.07.16
Displacement
Density/Specific
214 2670 25.10.15 23.01.16 19.02.17 07.02.16 04.06.18
Gravity cylinder
Tank Pressure
215 2382 30.12.15 23.01.16 05.12.16 07.02.16 11.10.18
Protect Devices
216 Valves Plug 3115 07.12.15 25.01.16 14.12.16 09.02.16 15.05.19 II
217 Valves – Butterfly 3116 10.12.15 25.01.16 17.12.16 09.02.16 27.06.17
Reciprocating Pumps
218 5004 11.11.15 08.02.16 04.01.17 23.02.16 30.06.16
Controlled Volume
Centrifugal Pumps
219 5006 30.09.15 09.02.16 07.01.17 24.02.16 22.07.16
SPP - Vertical
ASME Section - I
220 6135 16.09.15 09.02.16 14.11.16 24.02.16 08.09.16
Heat Exchanger
221 Flare System 4700 09.10.15 05.02.16 12.12.16 20.02.16 30.06.16
Ejectors
222 7970 26.12.15 11.02.16 08.01.17 16.02.16 09.01.19
Unengineered
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
MV Power and
223 0220 13.06.16 12.02.16 04.04.17 27.02.16 13.07.18
Control Cable
Catalyst Handling
224 4340 11.09.15 19.02.16 21.01.17 13.01.16 09.08.18
System
Chemical Dosing
225 5005 13.11.15 26.02.16 11.01.17 12.03.16 14.07.16
Skid
226 Magnetic Flowmeter 2055 09.01.16 19.02.16 15.12.16 05.03.16 21.02.18
227 Molten Sulfur Pumps 5382 14.09.15 05.03.16 08.12.16 30.03.16 26.12.17
Centrifugal Pumps
228 5009 07.11.15 08.03.16 25.01.17 23.03.16 22.07.16
SPP-Horizontal
Control Station-
229 0531 06.06.16 18.03.16 26.04.17 02.04.16 II
Flameproof
230 Mass Flowmeter 2880 01.01.16 14.03.16 07.01.17 29.03.16 29.01.18
231 Centrifuge Package 4890 07.01.16 19.03.16 24.12.16 03.04.16 14.07.16
232 415V Switchboards 0040 24.08.16 21.03.16 02.02.17 05.04.16 11.10.17
Flow Elements
233 1841 04.01.16 21.03.16 10.01.17 05.04.16 05.10.18
(Venturi,Flow Nozzle
Cable Trays And
Accessories
234 0820 06.03.16 21.03.16 02.01.17 05.04.16 III
(Prefabricated
Galvanized Type)
Heat Exchanger
235 6420 15.11.15 23.03.16 18.11.16 07.04.16 27.09.16
Carbon Steel
Piping Spools
236 3194 12.12.15 30.03.16 30.12.16 14.04.16 28.10.16
(Steam And BFW)
Control Valves In
237 2354 14.01.16 31.03.16 20.04.17 15.04.16 12.01.18
Strong
Ultrasonic
238 2852 28.12.15 04.04.16 03.01.17 19.04.16. 31.07.18
Flowmeters
Tank Pr. Protect
239 Devices/Flame 2384 22.03.16 07.04.16 28.02.17 22.04.16 08.10.18
Arrester
240 AAQMS 2951 12.03.16 07.04.16 18.02.17 22.04.16 12.06.18
Pilot Operated Safety
241 2564 27.02.16 12.04.16 06.02.17 27.04.16 05.10.18
Valve
Analyser (Air
242 Demand/Total 2941 07.03.16 12.04.16 14.02.17 27.04.16 31.05.18
Sulphide
Thermocouple
243 1752 12.03.16 13.04.16 27.01.17 28.04.16 03.07.18
Extension Cables
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
244 Vessels 6320 18.01.16 12.05.16 05.12.16 27.05.16 02.11.16
245 Filters 4390 15.12.15 20.05.16 02.01.17 04.06.16 25.01.18
246 Optical Fibre Cables 1555 28.12.15 23.05.16 12.01.17 07.06.16 II
247 Ejector 6910 01.01.16 28.05.16 04.03.17 12.06.16 27.04.18
Centrifugal Pump
248 5602 16.11.15 30.05.16 09.01.17 14.06.16 01.06.17
Horz (SPP)
249 Columns 6370 14.01.16 30.05.16 20.12.16 14.06.16 14.12.17
Miscellaneous
250 1940 30.03.16 24.05.16 07.03.17 08.06.16 05.06.18
Instrument Items
Spl. Level
251 Instruments-Guided 2872 28.12.15 24.05.16 03.01.17 08.06.16 23.08.18
Wave Radar
Fieldbus Signal
252 1756 01.04.16 25.05.16 09.03.17 09.06.16 29.08.18
Cables
253 Control Valves 1332 04.10.15 31.05.16 28.12.16 15.06.16 23.02.18
254 Expansion Joints 3171 26.12.15 17.03.16 14.12.16 01.04.16 05.10.16
Piping Spools High
255 3193 08.12.15 24.02.16 26.12.16 10.03.16 28.10.16
Pressure
256 Clad Piping System 3107 09.02.16 29.04.16 20.02.17 14.05.16 01.12.16
257 Valves-Higher Alloys 3129 03.01.16 11.02.16 13.01.17 16.02.16 23.10.17
GOcte Glass And
258 1262 26.01.16 03.06.16 04.01.17 18.06.16 03.08.18
Cocks
259 On-off valves (orbit) 2452 29.12.15 03.06.16 05.12.16 18.06.16 06.03.17
260 Signal cables 1750 06.01.16 06.06.16 12.12.16 21.06.16 21.09.18
261 Moisture analysers 2620 18.01.16 06.06.16 24.01.17 21.06.16 12.06.18
DIOS & Scanfining
262 6305 09.01.16 08.06.16 05.12.16 23.06.16 23.11.16
Reactors
Instrument Valves and
263 1730 05.03.16 10.06.16 09.01.17 25.06.16 28.12.17
Manifolds
264 Silencer 6120 14.07.15 13.06.16 02.01.17 28.06.16 07.12.16
265 Instrument Tubing 1710 26.12.15 13.06.16 02.01.17 28.06.16 21.09.18
266 Valves-Blow Down 3120 22.12.15 17.06.16 02.01.17 02.07.16 13.04.18
267 Pressure Relief Valve 1364 20.03.16 18.06.16 18.01.17 03.07.16 11.08.17
Polymerisation Reactor
268 6501 09.01.16 20.06.16 22.12.16 05.07.16 28.11.16
Vessel With Agitator
269 Tube Fittings 1720 30.12.15 27.06.16 05.01.17 12.07.16 22.12.17
270 Static Mixer-Alkylation 3181 04.01.16 04.07.16 27.01.17 19.07.16 15.12.17
Stack Gas Analyser
271 2680 30.12.15 05.07.16 06.02.17 20.07.16 05.06.18
System (Extractive)
Oil Mist Lubrication
272 5007 07.10.15 08.07.16 18.01.17 23.07.16 22.11.16
System
Centrifugal Pumps
273 5365 12.01.16 14.07.16 04.02.17 29.07.16 14.03.17
Vertical - SPP
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Analyser Sytem GC
274 2630 23.01.16 15.07.16 01.02.17 30.07.16 18.06.18
with Shelter
275 Static Fire Equipments-I 8150 25.02.16 21.07.16 11.01.17 05.08.16 II
276 Flanges (SS) 3232 20.06.16 27.07.16 21.03.17 11.08.16 28.11.16
Pipes (CS Seamless,
277 3201 12.06.16 28.07.16 12.04.17 12.08.16 21.09.18
AS, SS)
Tank Level Instruments
278 2785 22.12.15 28.07.16 28.12.16 12.08.16 16.04.18
(Non Contact Radar)
Analyser (Hydrogen
279 2940 03.03.16 29.07.16 10.02.17 13.08.16 07.06.18
Sulphide)
280 Strainers 3184 22.01.16 29.07.16 01.02.17 13.08.16 01.12.16
281 Air Fin Cooler (Cs & Ss) 6465 05.02.16 01.08.16 03.02.17 16.08.16 30.05.17
282 Pipes(CS-Welded) 3202 15.06.16 02.08.16 14.04.17 17.08.16 10.09.18
283 Fasteners 3255 21.07.16 02.08.16 21.04.17 17.08.16 30.11.16
Reactor-Las (1.25 Cr-
284 0.5 Mo & 2.25 Cr-1.0 6416 22.01.16 03.08.16 10.01.17 18.08.16 10.11.16
Mo)
285 Centrifugal Compressor 5161 01.11.15 03.08.16 05.01.17 18.08.16 09.11.16
286 Fittings 3240 12.07.16 03.08.16 12.04.17 18.08.16 02.05.19 I
287 Air Filters 4490 14.12.15 04.08.16 18.01.17 19.08.16 22.02.18
Compressor -
288 Reciprocating 5162 08.11.15 05.08.16 19.12.16 20.08.16 26.10.16
(Labyrinth)
Compressor Centrifugal
289 5601 02.11.15 08.08.16 28.11.16 23.08.16 28.10.16
Spp
Magnetic Level
290 1220 06.02.16 09.08.16 14.03.17 24.08.16 27.08.18
Instrument (Indicator)
291 Heat Exchanger SS 6460 15.02.16 09.08.16 15.02.17 24.08.16 29.06.17
Pipes (SS-Seamless &
292 3205 31.05.16 09.08.16 31.03.17 24.08.16 10.04.18
Weld)
293 Flanges 3230 09.07.16 09.08.16 11.01.17 24.08.16 24.11.16
294 Flanges (AS) 3231 20.06.16 09.08.16 21.03.17 24.08.16 10.10.17
295 Fittings (AS) 3242 13.07.16 09.08.16 13.04.17 24.08.16 16.08.18
Valves-Dual Plate
296 3213 21.06.16 12.08.16 21.04.17 27.08.16 15.01.18
Check
297 Valves-Butterfly 3216 30.06.16 12.08.16 29.04.17 27.08.16 02.02.18
Bagging And Palletizing
298 4120 05.10.15 19.08.16 16.01.17 03.09.16 I
Pckg.
Stack Gas Analysers
299 2600 31.12.15 19.08.16 04.01.17 03.09.16 13.06.18
(O2-Zirconia)
Pump-
300 5550 26.11.15 22.08.16 02.02.17 06.09.16 17.10.17
Centrifugal.Horizontal
Pipes (As-Seamless &
301 3204 16.06.16 22.08.16 15.04.17 06.09.16 07.05.18
Welded)
Valves-
302 3211 18.06.16 22.08.16 18.04.17 06.09.16 31.10.18
Gate/Globe/Check
303 Fittings (Ss) 3243 13.07.16 22.08.16 13.04.17 06.09.16 I
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
304 Fittings (Epoxy Coated) 3246 17.07.16 22.08.16 17.04.17 06.09.16 23.02.17
305 Gaskets 3250 18.07.16 22.08.16 18.04.17 06.09.16 II
306 Valves-Plug 3215 27.06.16 23.08.16 27.04.17 07.09.16 30.08.18
Propylene Recovery
307 4230 26.11.15 24.08.16 02.02.17 08.09.16 21.11.16
Unit
308 Air Cooler 6350 31.01.16 24.08.16 26.12.16 08.09.16 30.05.17
Heat Exch-Cs, Las, Ss ,
309 6340 03.02.16 26.08.16 02.01.17 10.09.16 02.08.17
Inlcoloy 825 & Duplex
310 Pipes (3L PE Coated) 3203 30.05.16 26.08.16 22.11.16 10.09.16 10.10.17
Valves-
311 Gate/Globe/Check 3212 19.06.16 26.08.16 19.04.17 10.09.16 19.07.17
(Cast)
312 Flanges (Higher Alloys) 3233 21.06.16 26.08.16 22.03.17 10.09.16 24.11.16
Hoses & Hose
313 3279 02.08.16 26.08.16 03.05.17 10.09.16 25.07.19 III
Couplings
314 Valves-Ball 3214 24.06.16 27.08.16 24.04.17 11.09.16 25.05.17
315 Valves-Plug 3215 27.06.16 27.08.16 27.04.17 11.09.16 II
Extruder & Pelletizer
316 4080 21.09.15 29.08.16 04.01.17 13.09.16 07.12.16
Pckg.
317 Water Quality Analysers 2605 11.01.16 29.08.16 17.01.17 13.09.16 04.06.18
Mobile Fire Fighting
318 8151 21.03.16 31.08.16 04.02.17 15.09.16 III
Equipments-II
Reciprocating
319 5361 09.11.15 02.09.16 19.12.16 17.09.16 24.10.16
Compressor SPP
Junction Boxes
(Flameproof), Lighting &
320 Distribution Board (Flp), 0530 31.05.16 06.09.16 20.03.17 21.09.16 III
Lighting Fittings &
Accessories
Electric Control System
321 0650 30.05.16 07.09.16 19.01.17 22.09.16 13.10.17
(Base+Advance)
Rim Seal Fire
322 8153 12.12.15 09.09.16 27.12.16 24.09.16 25.05.17
Protection
323 Pressure Vessels 6424 26.01.16 09.09.16 14.01.17 24.09.16 09.08.17
Reciprocating
324 5362 23.11.15 09.09.16 24.12.16 24.09.16 24.10.16
Diaphragm Compressor
325 Electric Heater 6470 09.02.16 09.09.16 27.02.17 24.09.16 08.05.17
326 Fittings (O-Lets) 3241 15.07.16 14.09.16 15.04.17 29.09.16 17.10.17
Centrifugal Pumps
327 5364 22.12.15 16.09.16 25.01.17 01.10.16 31.05.17
Horizontal - SPP
328 LV Control Cable-1 0240 11.06.16 21.09.16 04.02.17 06.10.16 13.07.18
329 Teal Trolley 4430 28.01.16 22.09.16 06.03.17 07.10.16 08.05.17
330 Fork Lift Truck 4160 06.01.16 24.09.16 21.11.17 09.10.16 III
331 PPU Cyclones 4450 02.02.16 24.09.16 01.04.17 09.10.16 20.09.17
Diesel Engine, Diesel
332 5506 20.04.15 30.09.16 06.02.17 15.10.16 12.05.17
Generator Set
333 Reciprocating 5163 22.09.15 04.10.16 24.01.17 19.10.16 08.03.17
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Compressor (Diaph)
Heat Exchanger CS &
334 6455 30.01.16 05.10.16 18.01.17 20.10.16 02.08.17
LAS
Piston Type Sample
335 Valve Strahman Or 3225 26.12.15 06.10.16 05.01.17 21.11.16 03.05.17
Equivalent
336 Thermal Sleeve (MHC) 3286 11.08.16 14.10.16 27.05.17 29.11.16 04.07.17
Vertical Single Pass
337 Texas Tower Heat 6330 26.01.16 18.10.16 14.01.17 02.11.16 17.04.17
Exchanger
338 Pellet Mass Flowmeter 4640 01.02.16 19.10.16 18.03.17 03.11.16 21.11.17
339 Purge Column 6530 18.01.16 19.10.16 14.01.17 03.11.16 19.09.17
340 Orifice Plates & Flanges 1322 22.12.15 19.10.16 17.12.16 03.11.16 26.02.19
341 Static Mixers 3180 10.01.16 20.10.16 25.01.17 04.11.16 10.07.17
342 Lighting Trafo. Dry Type 0130 05.12.16 21.10.16 18.01.17 05.11.16 01.12.17
Positive Displacement
343 5994 28.12.15 28.10.16 04.01.17 12.11.16 28.11.17
Type Blower
Reciprocating
344 Compressor, Special 5164 22.09.15 26.10.16 01.03.17 10.11.16 09.05.17
Purpose Process
345 Steam Traps 3275 24.07.16 27.10.16 24.04.17 11.11.16 12.10.18
Centrifugal Pump,
346 Special Purpose 5165 28.11.15 28.10.16 10.03.17 12.11.16 01.06.17
Process
347 Scrubber 6164 07.09.15 28.10.16 10.12.16 12.11.16 21.04.17
348 Heat Exchanger 6520 16.11.16 07.11.16 18.01.17 22.11.16 08.05.17
Centrifugal Pumps
349 5992 23.12.15 08.11.16 28.12.16 23.11.16 27.02.18
(GPP)
350 Alkyl Unloading Arm 4420 21.11.16 15.11.16 02.03.17 30.11.16 09.03.18
351 Catalyst Drum Roller 4410 10.12.16 21.11.16 11.03.17 06.12.16 11.11.17
352 Settler Filter 4550 12.12.16 25.11.16 26.04.17 10.12.16 16.11.17
Freight Cum Passenger
353 4440 08.12.16 03.12.16 05.04.17 18.12.16 27.09.17
Elevator
Air Operated
354 5166 02.12.16 03.12.16 18.03.17 18.12.16 01.11.17
Diaphragm Pump
355 MOV-Gate 3121 19.11.16 07.12.16 14.01.17 22.12.16 07.08.18
356 Earthing Material 0550 07.12.16 09.12.16 22.12.16 24.12.16 III
Centrifugal Pumps
357 5167 12.12.16 15.12.16 24.03.17 30.12.16 08.08.17
Horizontal
358 Electric Heater 6525 02.12.16 16.12.16 11.02.17 31.12.16 07.06.17
359 Cartridge Filter 4180 30.11.16 19.12.16 08.04.17 03.01.17 24.10.17
360 O'lets - II 9230 22.02.17 21.12.16 07.03.17 05.01.17 17.05.19 I
Multitube/ Double Pipe
361 6545 12.12.16 20.12.16 22.02.17 04.01.17 01.09.17
Exchangers
Line Pipe-Internal
362 9002 19.11.16 23.12.16 03.12.16 07.01.17 30.08.17
Coated
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Pneumatic Conveying
363 4110 12.11.16 27.12.16 24.02.17 11.01.17 01.03.17
Package
MV Power And Control
364 0225 07.12.16 28.12.16 21.04.17 12.01.17 14.08.18
Cables (MOU Item)
Centrifugal Pumps-
365 5991 20.12.16 29.12.16 24.01.17 13.01.17 31.05.17
Slurry Service
Silent Check Valve-
366
Muller Model 76 3226 24.12.16 29.12.16 19.01.17 13.01.17 17.05.19 II
Inline Acid sampling
367 Valve Swiss Fluid/ 3228 21.12.16 29.12.16 21.01.17 13.01.17 19.12.18
Technova/ Biar
Speical Level
Instruments – HF
368 2247 06.12.16 08.12.16 03.04.17 23.12.16 II
Energy Absorption
Probe
Variable Area
369 1022 24.11.16 13.12.16 07.02.17 28.12.16 08.07.19 II
Flowmeters (Indicators)
370 11KV Cables-2 0215 30.11.16 04.01.17 07.04.17 19.01.17 16.07.18
Safe Area Panels,
Junction Boxes,
371 0540 13.12.16 09.01.17 20.04.17 24.01.17 III
Sockets, Push Button
Control Stations
Pump-Centrifugal H/V
372 5433 19.11.16 12.01.17 04.12.16 27.01.17 17.10.17
(FW)
Centrifugal Pumps
373 5168 08.12.16 17.01.17 03.04.17 01.02.17 29.09.17
Vertical
374 Clarifier Package 4470 25.11.16 20.01.17 28.01.17 04.02.17 24.01.18
Piping Spool (Internal
375 3289 20.11.16 25.01.17 04.02.17 09.02.17 26.02.19
FBE Coated Piping)
376 Trays (Un-Engineered) 6810 04.01.17 28.01.17 21.01.16 12.02.17 06.09.17
Sight Glasses Jacoby
377 3287 28.12.16 28.01.17 16.05.17 12.02.17 14.05.19 III
Tarbox or Equivalent
Temperature GOctes
378 1400 31.12.15 31.01.17 25.01.17 15.02.17 12.10.18
(Bimetallic, Filled)
Additive Unloading &
379 4130 17.01.17 02.02.17 01.02.17 17.02.17 01.11.17
Dosing Pckg.
380 Corrosion Monitors 2690 24.12.16 08.02.17 01.03.17 23.02.17 22.08.17
381 Air Cooler 6550 14.04.17 09.02.17 28.02.17 24.02.17 20.02.18
382 Vessels With Agitator 6510 28.01.17 09.02.17 07.01.17 24.02.17 03.08.17
383 Assorted Pipes -II 9220 19.02.17 09.02.17 03.03.17 24.02.17 14.09.17
384 Electric Hoist 4690 16.01.17 22.02.17 28.03.17 09.03.17 08.05.19 I
Special Temperature
2416 26.12.17 23.02.17 25.02.17 10.03.17 02.05.18
385 Elements
386 Pressure GOctes 1102 25.12.16 27.02.17 02.02.17 14.03.17 11.10.18
Reactor Overhead
387 6505 10.12.16 01.03.17 27.03.17 16.03.17 01.09.17
Condenser
Self Actuated Pressure
1344 01.02.17 10.03.17 15.04.17 25.03.17 04.04.18
388 Control Valves
Temperature Elements
1412 27.01.17 10.03.17 23.03.17 25.03.17 13.09.18
389 Thermowells
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Dosing Package Skid
5368 20.02.17 14.03.17 06.03.17 29.03.17 05.02.18
390 Mounted
391 Pellet & Bagging Silo 6535 14.02.17 15.03.17 29.03.17 30.03.17 19.09.17
Reciprocating
392 5540 13.01.17 15.03.17 21.01.17 30.03.17 11.09.17
Compressor
393 Water Quality Analysers 2608 03.04.16 16.03.17 18.04.17 31.03.17 04.06.18
394 FGDU Vessel 6168 19.01.17 20.03.17 14.03.17 04.04.17 12.02.18
395 Flanges (AS) 3331 10.10.17 23.03.17 24.10.17 07.04.17 29.06.17
396 Plug Valves 9160 13.03.17 28.03.17 27.03.17 12.04.17 19.03.19
397 LV Control Cable-2 0245 12.03.17 30.03.17 10.04.17 14.04.17 18.07.18
Pipes (AS-Seamless &
398 3304 20.09.17 31.03.17 04.10.17 15.04.17 20.12.17
Welded)
399 Fittings (AS) 3342 17.10.17 31.03.17 31.10.17 15.04.17 16.11.18
400 Effluent Filter Package 4480 02.12.16 05.04.17 06.02.17 20.04.17 16.01.18
401 Pipes (Cs-Welded) 3302 19.09.17 05.04.17 03.10.17 18.10.17 26.10.17
Pipes (SS-Seamless &
402 3305 21.09.17 07.04.17 05.10.17 20.10.17 12.10.17
Welded)
403 Orifice Plates & Flanges 1324 27.03.17 11.04.17 11.04.17 26.04.17 13.02.19
404 Pressure Relief Valve 1368 02.02.17 11.04.17 06.04.17 21.05.17 04.05.18
405 Weigh Scale 4210 31.01.17 13.04.17 24.04.17 28.04.17 II
Portable Fire
406 8154 06.01.17 19.04.17 28.03.17 04.05.17 III
Extinguisher
407 Flanges (MS) 3333 10.10.17 20.04.17 24.10.17 08.11.17 29.06.17
408 Vortex Flowmeter 2861 12.03.16 20.04.17 27.03.17 11.04.17 20.02.19
Static Fire Equipments-
409 8152 21.01.17 20.04.17 06.04.17 05.05.17 14.01.19
II
Vaccum Cleaning
410 4460 10.12.16 26.04.17 14.04.17 11.05.17 25.06.19 I
System
411 Fittings (CS) 3340 13.10.17 27.04.17 27.10.17 11.11.17 23.03.18
HV Spray on
412 8155 28.01.17 03.05.17 13.04.17 18.05.17 17.09.18
Transformers
Ground Monitoring
413 2985 27.02.17 18.05.17 13.03.17 02.06.17 10.07.18
System
414 Fasteners 3355 23.10.17 18.05.17 06.11.17 27.06.17 27.06.17
415 Pipes (Higher Alloys) 3306 22.09.17 19.05.17 06.10.17 03.06.17 10.10.17
Caustic Scrubber
416 6930 04.01.17 24.05.17 18.03.17 08.06.17 02.11.17
Package
Pipes (CS Seamless,
417 3301 17.09.17 26.05.17 01.10.17 10.06.17 16.04.18
AS, SS)
Analyser Sytem GC
418 2632 27.01.17 06.06.17 28.04.17 21.06.17 12.07.18
with Shelter
419 Analyser systems 2942 12.02.17 07.06.17 01.04.17 22.06.17 19.06.18
Concrete Weight
420 Coating & Anode 9003 16.03.17 07.06.17 30.03.17 21.06.17 08.06.17
Installation
421 Flanges (SS) 3332 10.10.17 12.06.17 24.10.17 27.06.17 30.06.17
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
422 Sight Glasses 3385 17.11.17 12.06.17 01.12.17 27.06.17 II
423 Ejector (Eductor) 6911 06.12.16 15.06.17 12.03.17 30.06.17 26.12.17
424 Chain Pulley Blocks 4680 16.03.17 12.06.17 31.03.17 27.06.17 03.05.18
425 Flanges (CS) 3330 10.10.17 29.06.17 24.10.17 14.07.17 29.06.17
Positive Displacement
426 2870 09.10.17 06.07.17 24.10.17 21.07.17 08.10.18
Meter
427 Piston Valves 3327 09.10.17 06.07.17 23.10.17 21.07.17 03.08.18
Hoses & Hose
428 3379 05.11.17 10.07.17 19.11.17 25.07.17 II
Couplings
Junction Boxes & Cable
429 1942 03.01.17 11.07.17 18.03.17 26.07.17 05.11.18
Glands
430 Fittings (SS) 3343 17.10.17 13.07.17 31.10.17 28.07.17 05.07.19 I
431 Valves-Plug 3315 01.10.17 18.07.17 15.10.17 02.08.17 II
432 Gaskets 3350 20.10.17 20.07.17 03.11.17 04.08.17 II
433 Mass Flowmeters 2066 02.02.17 20.07.17 15.04.17 05.08.17 III
Process Stream
434 Analyser Moisture/Dew 2622 08.06.17 22.07.17 22.06.17 07.08.17 15.06.18
Pt.
435 Steam Traps 3375 27.10.17 27.07.17 10.11.17 11.08.17 18.09.18
Valves
436 Gate/Globe/Check 3311 23.09.17 28.07.17 07.10.17 12.08.17 04.06.18
(Forged)-
437 Valves-Dual Plate 3313 25.09.17 01.08.17 09.10.17 16.08.17 23.07.18
438 MOV-Ball 3318 02.10.17 09.08.17 16.10.17 24.08.17 30.08.18
439 Nucleonic LT 2272 05.03.17 14.08.17 19.03.17 29.08.17 17.09.18
440 SS/CR Manifolds 3276 29.11.16 21.08.17 17.04.17 05.09.17 III
Catalyst Drum Tilting
441 4170 09.06.17 22.08.17 24.06.17 06.09.17 26.10.18
Device
442 Valves-Butterfly 3316 03.10.17 23.08.17 17.10.17 07.09.17 17.08.18
443 Jib Cranes 4590 04.07.17 28.08.17 19.07.17 12.09.17 12.11.18
Valves-
444 Gate/Globe/Check 3320 04.10.17 28.08.17 09.10.17 12.09.17 I
(Higher Alloys)
Catalyst Drum Electric
445 4520 13.06.17 31.08.17 28.06.17 15.09.17 II
Hoist
Valves-
446 Gate/Globe/Check 3312 24.09.17 13.09.17 08.10.17 28.09.17 08.06.18
(Cast)
447 Valves-Ball 3314 28.09.17 05.10.17 12.10.17 20.10.17 II
448 MOV-Butterfly 3321 10.10.17 06.10.17 24.10.17 21.10.17 18.06.18
449 Fittings 9200 01.03.17 13.10.17 29.03.17 28.10.17 13.09.18
450 On-Off Valve 2456 20.03.17 13.10.17 04.05.17 28.10.17 19.06.18
451 Fittings (Epoxy Coated) 3346 21.12.17 31.10.17 04.01.18 15.11.17 II
452 Ram Type Valve 3328 09.10.17 16.11.17 23.10.17 01.12.17 II
453 Special Control Valves- 2357 30.03.17 20.11.17 14.04.17 05.12.17 26.02.19
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
Mixed
Machine Monitoring
454 1512 07.03.17 29.11.17 18.04.17 14.12.17 03.08.18
System
455 Strainers 3384 17.11.17 01.12.17 01.12.17 16.12.17 20.04.18
456 Tilting Disc Check Valve 3323 27.02.17 08.12.17 13.03.17 23.12.17 21.08.18
457 Fittings (O-Lets) 3341 17.10.17 19.12.17 31.10.17 03.01.18 II
458 Deadman Valves 3325 29.09.17 28.12.17 13.10.17 12.01.18 01.08.19 II
Special Check Valve
459 3319 07.10.17 28.12.17 21.10.17 12.01.18 04.07.19 II
Assembly
460 Fittings (SS) 3343 17.10.17 13.07.17 08.04.19 05.7.19 05.07.19
461 Fittings (Higher Alloys) 3344 17.10.17 10.01.18 31.10.17 25.01.18 II
462 Sample Coolers 3390 05.04.19 13.06.19 12.04.19 12.07.19 12.07.19
Special Level
463 Instruments (Tuning 2242 15.07.17 15.01.18 29.07.17 30.01.18 06.02.19
Fork)
464 Load Cells 2970 10.06.17 15.01.18 24.06.17 30.01.18 15.05.19 III
465 Piping Injection Point 3388 18.12.17 07.02.18 01.01.18 21.02.18 22.06.18
Bagging and Palletizing
466 4250 21.12.17 23.02.18 05.01.18 20.01.18 07.05.18
pkg.
Expansion Joints
467 3271 20.05.17 24.04.18 21.11.17 09.05.18 04.01.19
(Rubber)
Spring Support
468 3387 17.11.17 01.05.18 01.12.17 16.05.18 04.06.19 II
Assemblies
Pump Rotary Gear
469 5169 28.01.17 08.05.18 10.04.17 23.05.18 19.07.19 I
Type
470 Insulating Joints 9240 23.05.17 14.05.18 07.06.17 29.05.18 01.07.19 II
471 Pump Centrifugal (SPP) 5900 04.05.17 27.06.18 18.05.17 12.07.18 30.08.18
472 Pipes- CS (Seamless) 3401 06.12.17 03.07.18 20.12.17 18.07.18 23.10.18
473 Pipes- CS (Welded) 3402 08.12.17 03.07.18 22.12.17 18.07.18 14.11.18
Pipes- AS
474 3404 10.12.17 03.07.18 24.12.17 18.07.18 29.08.18
(Seamless/Welded)
Pipes- SS
475 3405 11.12.17 03.07.18 25.12.17 18.07.18 27.12.18
(Seamless/Welded)
Transformer-Power-
476
Above 5MVA 0101 17.11.17 06.08.18 01.12.17 21.08.18 I
477 MOV-Gate 3317 02.10.17 14.08.18 16.10.17 29.08.18 14.08.18
Excess Flow Check
478
Valves 3326 30.09.17 14.08.18 14.10.17 29.08.18 04.07.19 I
479 Flanges (AS) 3431 17.12.17 14.08.18 31.12.17 29.08.18 22.10.18
Limit Switch Valves
480 3491 25.12.17 14.08.18 08.01.18 29.08.18 28.09.18
(Ball Type)
Limit Switch Valves
481 3492 26.12.17 14.08.18 09.01.18 29.08.18 03.01.19
(Gate Type)
Limit Switch Valves
482 3493 26.12.17 14.08.18 09.01.18 29.08.18 05.10.18
(Butterfly Type)
483 Flanges (CS) 3430 16.12.18 05.10.18 30.12.17 20.10.18 08.04.19
484 Flanges (AS) 3436 18.12.17 12.10.18 01.01.18 27.10.18 12.11.18
Sl. MR Description MR Sch. Date Act. Sch. Agreed Order Act. Date Priority
No. No. (Recom.) Date Date Date of Order Accorded
(Recom.) (Order) (15 days from for
Act. Date of Award
Recom.)
485 Flanges (SS) 3437 18.12.17 12.10.18 01.01.18 27.10.18 12.11.18
Safe Area Ltg Fixture
486 Clamps, CG Boxes, 0541 07.12.16 05.11.18 24.05.17 20.11.18 II
Adapter
487 Pipes- CS (Seamless) 3407 13.12.17 17.12.18 27.12.17 01.01.19 18.07.19 I
Dual Plate Check
488 3413 14.12.17 17.12.18 28.12.17 01.01.19 28.01.19
Valves
489 Fittings (Epoxy Coated) 3446 18.12.17 17.12.18 01.01.18 01.01.19 17.07.19 I
490 Flanges (Higher Alloys) 3433 18.12.17 26.12.18 01.01.18 10.01.19 04.02.19
491 Pipes- AS (Smls & Wld) 3409 15.12.17 15.01.19 29.12.17 30.01.19 01.04.19
492 Pipes- SS (Smls & Wld) 3410 16.12.17 18.01.19 30.12.17 02.02.19 03.05.19 I
Pressure Vessel -CS
493 6414 16.10.15 08.01.19 01.12.15 22.01.19 14.02.19
(Up To 25 MM)
494 Air Cooler 6415 16.11.15 10.01.19 25.07.16 25.01.19 I
495 Flanges (SS) 3432 18.12.17 30.08.18 01.01.18 14.09.18 01.02.19
496 Pipes- CS (welded) 3408 14.12.17 12.02.19 28.12.17 17.02.19 I
497 Fittings (AS) 3442 19.12.17 12.02.19 02.01.18 17.02.19 05.07.19 I
Automatic DCP
498 8113 17.03.17 20.02.19 27.12.16 07.03.19 07.05.19 I
Flooding System
499 Butterfly Valves 3416 14.12.17 08.03.19 12.04.19 23.03.19 22.04.19
Valves-
500
Gate/Globe/Check 3411 17.12.17 08.03.19 12.04.19 23.03.19 10.05.19 I
501 Flanges (CS) 3435 18.12.17 08.03.19 12.04.19 23.03.19 08.07.19 I
502 Special Check Valve 3324 05.03.17 13.03.19 08.04.19 28.03.19 I
Valves-
503 3412 14.12.17 22.03.19 12.04.19 06.04.19 18.07.19 I
Gate/Globe/Check
504 Optical Pyrometer 2418 28.01.17 23.12.16 31.03.17 07.01.17 02.04.19
505 Gaskets 3450 23.12.17 05.04.19 12.04.19 20.04.19 I
506 Ball Valves 3414 14.12.17 12.04.19 12.04.19 27.04.19 05.07.19 I
507 Fittings (CS) 3440 20.12.17 12.04.19 12.04.19 27.04.19 10.07.19 I
508 Fittings (SS) 3443 21.12.17 12.04.19 12.04.19 27.04.19 I
509 Olets 3441 05.04.19 15.04.19 12.04.19 30.04.19 03.07.19 I
510 Fittingss (AS) 3442 19.12.17 12.02.19 12.04.19 05.07.19 05.07.19
511 Hose & Hose Coupling 3279 02.08.16 26.08.16 18.03.19 25.07.19 25.07.19
512 Spring supports 3191 08.01.16 10.10.15 04.03.17 05.12.17 17.07.19
513 Assorted Pipes -II 9220 19.02.17 09.02.17 03.03.17 14.09.19 17.07.19
Closed Sampling
514 3386 13.3.19 17.07.19 20.03.19 25.07.19 25.07.19
System
Balance
515 Fittings (AS) 3142 09.01.16 17.10.15 23.03.17 02.03.17 09.08.19 order
Pump Rotary Gear
516 5169 28.01.17 08.05.18 10.04.17 06.10.18 12.07.19
Type
98 Pressure Vessel -CS (26-50 mm), CS (Up Fabtech Projects & Engineers 6409 / 5109 28.03.16
to 25 mm) Ltd.
99 Pump Centrifugal Horizontal/Vertical 5501 / 5074 28.03.16
Flowserve India Controls Pvt Ltd
(SPP)
100 Pressure Vessel -CS (UP TO 25 MM), 6157 / 5093 29.03.16
Jindal Steel & Power Ltd
LTCS
101 MR for Reinforcement Bars Arcelor Mittal 8111 / 5081 30.03.16
Compressor Centrifugal (SPP),
102 Compressor Centrifugal Packaged, Atlas Copco (India) Ltd 5381 / 5110 31.03.16
Integrally Geared
103 Pressure Vessel -CS (26-50 MM), (> 100 6158 / 5116 01.04.16
Essar Heavy Engg Services
MM), (Up To 25 MM)
104 Heat Exchanger Carbon Steel, Low Alloy 6145 / 5091 01.04.16
Anup Engineering Limited
Steel, Stainless Steel
105 Trays, Random Packings and Associated 7642 / 5126 04.04.16
Sulzer India Private Limited
Internals
106 Air Fin Cooler (CS & SS) Paharpur Cooling Towers Ltd 6210 / 5068 06.04.16
107 ASME Section - I Vessels Essar Heavy Engg Services 6406 / 5120 07.04.16
108 ASME Section - I Vessels Jindal Steel & Power Ltd 6406 / 5121 08.04.16
109 Pressure Vessel -CS (26-50 MM), (Up To Fabtech Projects & Engineers 6401 / 5096 08.04.16
25 MM) Ltd.
110 Isolation Valve Remosa SPA 3012 / 5035 09.04.16
111 Pressure Vessel -CS (26-50 MM), (Up To Fabtech Projects & Engineers 6413 / 5090 13.04.16
25 MM), SS (Up To 25MM) Ltd.
228 Piping Spools (Steam & BFW) Dee Development Engineers 3194 / 5198
01.12.16
Limited
Incinerator Package (Package No. 185-LZ- John Zink International
229 7920 / 5200
1001 & 186-LZ-1001) Luxembourg Sarl 02.12.16
249 Compressor Centrifugal (SPP) Fima Maschinenbau GMBH 5161 / 5213 20.12.16
250 Silencer Grand Prix Engineering Pvt Ltd. 6120 / 5262 02.01.17
251 Pressure Vessel -Low Alloy Steel, Ss Clad Godrej & Boyce Mfg. Co. Ltd. 6201 / 5267 09.01.17
Fabtech Projects & Engineers
252 ASME Section - I Vessels 6406 / 5269 10.01.17
Ltd.
253 Heat Exchanger -High PR Godrej & Boyce Mfg. Co. Ltd. 6230 / 5266 25.01.17
254 Gaskets (Trading Facilities) IGP Engineers Pvt. Limited 3051 / 5271 02.02.17
Gate, Globe & Check Valves (Trading NSSL Pvt. Ltd. (Neco Schubert
255 3035 / 5274 11.02.17
Facilities) & Salzer)
Gate, Globe & Check Valves (Trading
256 Leader Valves Ltd 3035 / 5273 11.02.17
Facilities)
Gate, Globe & Check Valves (Trading
257 Hawa Engineers Ltd 3035 / 5272 11.02.17
Facilities)
Pump-Centrifugal Horizontal, Vertical
258 ITT Corporation India Pvt Ltd 5501 / 5117 14.02.17
(Special Purpose Process)
Pump-Centrifugal Horizontal, Vertical
259 DMW Corporation 5501 / 5112 14.02.17
(Special Purpose Process)
Pump-Centrifugal. Horizontal, Vertical
260 Flowserve India Controls Pvt Ltd 5501 / 5074 16.02.17
(Special Purpose Process)
261 Distributed Control System GE (Advance Sys-tek) 1500 / 5268 17.02.17
262 Fittings (Epoxy Coated) Arabian Pipeline Supply FZCO 3246 / 5276 23.02.17
263 Fittings (AS) Sawan Engineers Pvt Ltd 3142 / 5280 02.03.17
269 Pneumatic Conveying Package Coperion Ideal pvt. Ltd. 4110 / 5281 14.03.17
279 Pipes (Higher Alloys) Phoceenne Middle East 3106 / 5243 29.03.17
280 Heat Exchanger CS, Low Alloy Steel Precision Equipments 6130 / 5275 06.04.17
Pressure Vessel -CS (26-50 mm), Fabtech Projects & Engineers
281 6320 / 5293 11.04.17
Pressure Vessel -CS (UP TO 25 mm) Ltd.
282 Asme Section - I Vessels (Code Stamped) Patels Airtemp (India) Ltd 6406 / 5270 11.04.17
283 On-Off Valves Bliss Anand Pvt Ltd 2452 / 5290 13.04.17
Pump-Centrifugal High Speed Integrally Sundyne International S.A,
284 5365 / 5292 20.04.17
Geared France
Compressor-Rotary Screw
285 Atlas Copco (I) Ltd (Pune) 5502 / 5294 24.04.17
(Plant/Instrument Service)
Heavy Fuel Oil Engine Generator Heavy Fuel Oil Engine Generator
286 5505 / 5296 25.04.17
Packages Packages
Column/ Tower Stainless Steel ( Scrubber Zhangjiagang Furui Heavy
287 6164 / 5298 26.04.17
- SS316L / Alloy 20) Equipment Co.
Compressor-Rotary Screw
288 Atlas Copco (I) Ltd (Pune) 5301 / 5295 26.04.17
(Plant/Instrument Service)
Vertical Single Pass Texas Tower Type
289 Godrej & boyce mfg. Co. Ltd. 6330 / 5297 27.04.17
Heat Exchangers
Piston Type Sampling Valves-Strahman
290 SchuF Speciality valves India 3225 / 5299 03.05.17
Or Equivalent
291 Pump Rotary Screw Type Roto Pumps Ltd 5008 / 5303 18.05.17
298 Pipes (3L PE Coated) Man Industries (India) Ltd. 3003 / 5202 02.06.17
299 Sandvik Asia Pvt Ltd-Kanthal Division Electric Heater 6470 / 5302 06.06.17
Burckhardt Compression (India)
230 Compressor-Reciprocating (SPP) 5164 / 5304 07.06.17
Pvt.Ltd.
231 Air Fin Cooler (CS & SS) Paharpur Cooling Towers Ltd. 6465 / 5311 07.06.17
DC UPS System (Battery- Ni-Cd, Battery
232 Hitachi Hi-Rel Power Electronics 0430 / 5319 12.06.17
Charger)
233 Air Fin Cooler (CS, SS & DUPLEX SS) Paharpur Cooling Towers Ltd. 6350 / 5310 16.06.17
234 Pump-Centrifugal Horizontal (SPP) Flowserve India Controls Pvt Ltd 5165 / 5316 20.06.17
Pump-Centrifugal Horizontal, Multistage
235 Flowserve India Controls Pvt 5364 / 5312 20.06.17
(SPP)
236 Rim Seal Fire Protection Vimal Fire Controls Pvt Ltd 8153 / 5306 21.06.17
237 Pump-Centrifugal Horizontal (SPP) ITT Corporation India Pvt Ltd 5602 / 5315 21.06.17
238 Pump-Centrifugal Horizontal (SPP) Flowserve India Controls Pvt Ltd 5602 / 5314 21.06.17
239 Pump-Centrifugal Horizontal / Vertical Flowserve India Controls Pvt Ltd 5991 / 5313 22.06.17
243 Pipes- CS (Welded) Ratnamani Metals And Tubes Ltd 3102 / 5328 27.06.17
258 Thermal Sleeve (MHC) Cladtek Middle East FZC 3286 / 5339 20.07.17
Pentair Valves & Controls India
259 Butterfly Valves 3116 / 5326 25.07.17
Pvt Ltd
260 Butterfly Valves Advance Valves Pvt Ltd. 3116 / 5325 25.07.17
262 Static Mixers Sulzer India Private Limited 3180 / 5342 01.08.17
Heat Exchanger Carbon Steel, Low Alloy Titanium Equipment And Anode
263 6455 / 5348 07.08.17
Steel Mfg.Co.Ltd
264 Pump Rotary Screw Type Seepex GMBH 5167 / 5351 16.08.17
Heat Exchangers - Carbon Steel, Las, Ss Titanium Equipment and Anode
265 6340 / 5349 17.08.17
Clad, Duplex Ss And Incoloy 825 Mfg . Co. Ltd
266 Fittings (SS) Gujrat Infrapipes Pvt. Limited 3143 / 5360 18.08.17
Yingkou Liaohe Pipe Fittings Co.
267 Fittings (SS) 3143 / 5359 18.08.17
Ltd
268 Fittings (SS) EBY Fasteners 3143 / 5358 18.08.17
DEE Development Engineers
269 Fittings (SS) 3143 / 5357 18.08.17
Limited
270 Fittings (SS) CSA Fittings 3143 / 5356 18.08.17
272 Pressure Relief Valves (Thermal Releif) Bliss Anand Pvt Ltd 1361 / 5355 23.08.17
Pressure Vessel CS, SS & Vessel With Fabtech Projects & Engineers
273 6510 / 5350 24.08.17
Agitator Ltd.
274 Vortex Clusters EGS Systems Inc 6171 / 5361 25.08.17
276 Linepipe (Coated/Bare) Man Industries (India) Ltd 9002 / 5365 31.08.17
Pressure Vessel -CS (26-50 MM), (Up To Fabtech Projects & Engineers
277 6424 / 5352 05.09.17
25 MM), LTCS Ltd.
278 Butterfly Valves Advance Valves Pvt Ltd. 3116 / 5325 13.09.17
Heat Exchangers Double Pipe & Multitube Titanium Equipment and Anode
279 6545 / 5366 14.09.17
Type Mfg. Co. Ltd
280 Pressure Relief Valves Bliss Anand Pvt Ltd 1362 / 5346 15.09.17
282 Diesel Engine, Diesel Generator Set Unatrac Limited 5506/5305 20.09.17
287 Assorted Pipes-II Arabian Pipeline Supply Fzco 9220 / 5373 25.09.17
Zhangjiagang Furui Heavy
288 Column/Tower Stainless Steel 6530 / 5370 26.09.17
Equipment Co.
289 Pressure Relief Valves Pentair sanmar ltd. 1362 / 5347 27.09.17
291 Pressure Relief Valves Bliss Anand Pvt Ltd 1364 / 5354 28.09.17
Pump-Centrifugal Horizontal, Multistage
292 Sulzer Pumps India Limited 5383 / 5364 28.09.17
(SPP)
Pump-Centrifugal Horizontal, Multistage
293 Flowserve India Controls Pvt Ltd 5383 / 5362 03.10.17
(SPP)
Pellet Blender Silos & PPU Product
294 Jansens & Dieperink B.V. 6535 / 5369 09.10.17
Bagging Silos
295 Goods cum Passenger Elevator Maspero Elevatori SPA 4440 / 5374 09.10.17
296 Pipes (3L PE Coated) Arabian Pipeline Supply FZCO 3203 / 5379 10.10.17
298 Heat Exchangers With Helical Baffles Godrej & Boyce Mfg. Co. Ltd. 6175 / 5376 10.10.17
Melesi Officine Ambrogio Melesi
299 Flanges (AS) 3231 / 5382 10.10.17
& C.SRL
300 Flanges (AS) Good Luck Engineering Co. 3231 / 5381 10.10.17
302 Pipes (Higher Alloys) Gerab National Enterprise L.L.C 3306 / 5378 10.10.17
Switchboards-MV-MCC/PCC/PMCC-
303 Schneider Electric India Pvt Ltd 0040 / 5385 11.10.17
Drawout
304 Pipes (SS Seamless/Welded) Gerab National Enterprise L.L.C 3305 / 5389 12.10.17
305 Pipes (SS Seamless/Welded) Arabian Pipeline Supply FZCO 3305 / 5388 12.10.17
306 Pump Centrifugal Horizonal,Vertical (SPP) Ruhrpumpen GMBH 5530 / 5150 24.10.17
308 Valves-Gate/Globe/Check (Higher Alloys) Oswal Industries Ltd 3129 / 5397 24.10.17
309 Pump Centrifugal Horizonal.Vertical (SPP) ITT Corporation India Pvt Ltd 5530 / 5149 25.10.17
310 Pump Centrifugal Horizonal.Vertical (SPP) Flowserve India Controls Pvt Ltd 5530 / 5148 25.10.17
311 Pump Centrifugal Horizonal.Vertical (SPP) Sulzer Pumps India Limited 5520 / 5396 25.10.17
313 Pump Centrifugal Horizonal.Vertical (SPP) Flowserve India Controls Pvt Ltd 5520 / 5075 25.10.17
315 Pump Centrifugal Horizonal.Vertical (SPP) ITT Corporation India Pvt Ltd 5510 / 5098 26.10.17
316 Pipes (CS Welded) Kirtanlal International Dmcc 3302 / 5401 26.10.17
Accudyne industries india pvt.
317 Pump-Reciprocating (Diaphragm) 5168 / 5375 02.11.17
Ltd.
318 Pump, Air Operated Diaphragm Type Moniba Anand Electricals Pvt Ltd 5166 / 5404 02.11.17
Trays, Random Packings and Associated
319 Sulzer India Private Limited 6810 / 5372 02.11.17
Internals
Pump-Centrifugal Horizontal (Special
320 Ruhrpumpen Gmbh 5125 / 5399 02.11.17
Purpose Process)
Pump-Centrifugal Horizontal (Special
321 Ruhrpumpen Gmbh 5510 / 5142 03.11.17
Purpose Process)
322 Plant Communication System Zenitel 0470 / 5406 06.11.17
323 Pump Centrifugal Horizonal,Vertical (SPP) Flowserve India Controls Pvt Ltd 5510 / 5078 06.11.17
325 Heat Exchnagers Hair Pin Type Techno Process Equipments 6140 / 5384 16.11.17
326 Control Valves KSB Mil Controls Limited 1339 / 5390 17.11.17
Pump-Centrifugal.Horizontal, Multistage
327 Flowserve India Controls 5443 / 5073 17.11.17
(SPP)
328 Additives Unloading and Feeding Package Kupps & Sachs 4130 / 5403 17.11.17
329 Pump-Cent.H/V(FW) Wilo Mather And Platt Pumps 5433 / 5393 17.11.17
336 Neutral Grounding Resistors-HV Resitech Electricals Pvt Ltd 0140 / 5416 07.12.17
337 Pellet Flow Meter Coperion Ideal Pvt. Ltd. 4640 / 5410 13.12.17
Pump-Centrifugal.Horizontal (Special
338 Sulzer Pumps India Limited 5125 / 5400 14.12.17
Purpose Process)
339 Spring Supports Pipe Hangers & Supports Pvt Ltd 3191 / 5415 14.12.17
340 Spring Supports Piping Technology And Products 3191 / 5713 17.07.19
342 Sulfur Degassing vessel with sulfur cooler Jindal Steel & Power Ltd 6412 / 5417 18.12.17
344 Pipes (AS Seamless/Welded) Arabian Pipeline Supply FZCO 3304 / 5421 20.12.17
Compressor-Rotary Lobe/Vacuum Pump
345 Swam Pneumatics (P) Ltd 5994 / 5411 21.12.17
(Air Service)
346 Tube Fittings Comfit & Valves 1720 / 5422 22.12.17
347 Catalyst Drum Electric Hoists Meeka Machinery 4520 / 5413 22.12.17
348 Pressure Vessel -Cs (Up To 25 MM) Indcon Projects & Equipments 6403 / 5022 26.12.17
349 Column/ Tower Carbon Steel Zamil Process Equipment Co Ltd 6370 / 5418 27.12.17
Concrete Weight Coating & Anode
350 Man Industries (India) Ltd 9003 / 5321 28.12.17
Installation
Arai Pump Manufacturing
351 Pump-Cent.Hor., Vert.(Molten Sulphur) 5382 / 5423 28.12.17
Company Ltd
352 Instrument Valves and Manifolds Comfit & Valves Pvt. Ltd. 1730 / 5425 30.12.17
Pentair Valves & Controls India
353 Eductors 6911 / 5424 06.01.18
Pvt Ltd
354 Structural Steel Supply/Fabrication-III Diamond Group 8108 / 5427 12.01.18
355 Ball Valves Microfinish Valves Pvt Limited 3114 / 5426 12.01.18
356 Dual Plate Check Valves Advance Valves Pvt Ltd 3213 / 5429 15.01.18
357 Dual Plate Check Valves Advance Valves Pvt Ltd 3113 / 5430 15.01.18
362 Butterfly Valves Advance Valves Pvt Ltd. 3216 / 5441 02.02.18
367 Critical Flow Nozzle Duraloy Technologies, Inc 3070 / 5445 20.02.18
368 Dosing Package (Skid Mounted) Accudyne Industries India Pvt Ltd 5368 / 5442 22.02.18
369 Air Fin Cooler (CS & SS) Patels Airtemp (India) Ltd 6465 /5440 23.02.18
371 Asme Section - I Heat Exchanger Godrej & Boyce Mfg. Co. Ltd. 6135 / 5168 27.02.18
372 Air Fin Cooler (CS & SS) Enginemates Heat Transfer 6550 / 5447 27.02.18
373 Pressure Vessel-SS (Up To 25 MM) Fabtech Projects & Engineers 6168 / 5446 28.02.18
374 Valves-Gate/Globe/Check (Small Bore) Niton Valve Industries 3111 / 5458 06.03.18
376 Valves-Gate/Globe/Check (Small Bore) Associated Toolings India 3111 / 5456 06.03.18
380 Air Filters Camfil Air Filtration India 4490 / 5453 12.03.18
382 Alkyl Unloading Arm Woodfield Systems International 4420 / 5460 22.03.18
387 Centrifugal Pump (Vertical-Acid service) Chas. S. Lewis & Co 5182 / 5443 27.03.18
388 Blower-Turbo (Centrifugal) Boldrocchi India Private Limited 5188 / 5452 27.03.18
Emerson Process Management
389 Mass Flowmeters 2065 / 5455 30.03.18
India
390 Magnetic Flowmeters ABB Ltd 2055 / 5450 03.04.18
Pump Centrifugal Horizontal (General
391 Flowserve India Controls 5992 / 5451 04.04.18
Purpose)
392 Self Actuated Pressure Control Valves Nirmal Industrial Control 1342 / 5467 12.04.18
393 Self Actuated Pressure Control Valves Nirmal Industrial Control 1344 / 5466 12.04.18
395 Valves-Gate/Globe/Check (Higher Alloys) Oswal Industries Ltd 3129 / 5397 16.04.18
396 Pipes- SS (Seamless/Welded) Ratnamani Metals and Tubes 3205 / 5470 16.04.18
400 Valves-Blowdown Pentair Valves & Controls India 3120 / 5474 17.04.18
402 Control Valves GE Oil & Gas India Pvt. Ltd. 1332 / 5448 18.04.18
403 Pipes (CS Seamless) Gerab National Enterprise L.L.C 3301 / 5476 20.04.18
404 Control Valves KSB Mil Controls Limited 1332 / 5449 26.04.18
410 Ejectors (Reactor Fines Eductors) Korting Hannover AG 6910 / 5479 04.05.18
Anderson Greenwood Crosby
411 Pressure Relief Valves 1368 / 5482 04.05.18
Sanmar Limited
412 Special Control Valves-Mixed Emerson Process Management 2356 / 5487 17.05.18
413 Special Control Valves-Mixed GE Oil & Gas India Pvt. Ltd. 2356 / 5486 17.05.18
414 Bagging And Palletisation Package Statec Binder 4250 / 5484 25.05.18
Analysers -Density/Specific Gravity (Vib
415 Chemtrols Industries Pvt. Ltd. 2670 / 5490 05.06.18
cylindr)
416 Miscellaneous Inst. Items Al Kiyumi Global 1940 / 5498 06.06.18
417 Analyser(Air Demand /Total Sulphur) Chemtrols Industries Pvt. Ltd. 2941 / 5489 06.06.18
418 Valves- Gate/Globe/Check (Forged) GM Engineering Pvt. Ltd. 3311 / 5496 06.06.18.
419 Valves- Gate/Globe/Check (Forged) Douglas Chero SPA 3311 / 5495 06.06.18
420 Valves- Gate/Globe/Check (Forged) Associated Toolings India 3311 / 5494 06.06.18
421 Desuperheaters & PRDS CCI Valve Technology 2445 / 5493 07.06.18
422 Stack Gas Analyser Systems (Extractive) Chemtrols Industries Pvt. Ltd. 2680 / 5497 07.06.18
423 Water Quality Analyser Systems Chemtrols Industries 2605 / 5491 07.06.18
424 Valves- Gate/Globe/Check (Cast) Shenjiang Valve Co Ltd 3312 / 5505 08.06.18
425 Valves- Gate/Globe/Check (Cast) Oswal Industries Ltd 3312 / 5504 08.06.18
426 Valves- Gate/Globe/Check (Cast) Niton Valve Industries 3312 / 5503 08.06.18
427 Valves- Gate/Globe/Check (Cast) Leader Valves Ltd 3312 / 5502 08.06.18
431 Ambient Air Analyser Systems Chemtrols Industries 2951 / 5508 14.06.18
439 MOV Butterfly (Trading Facilities) Pentair Valves & Controls Italia 3039 / 5513 09.07.18
440 Ground Monitoring System Advanced Systek Pvt Ltd 2985 / 5518 10.07.18
442 Analyser Systems Chemtrols Industries Pvt. Ltd. 2632 / 5521 13.07.18
443 Fire Alarm & Plant Comm. Cable KEI Industries Limited 0240 / 5523 16.07.18
444 MV Power And Control Cables Ravin Cables Ltd 0220 / 5522 16.07.18
445 Fire Alarm & Plant Comm. Cable Polycab Wires Pvt Ltd 0280 / 5526 16.07.18
446 MV Power And Control Cables Polycab Wires Pvt Ltd 0275 / 5525 16.07.18
447 HV Cables (Mou Item) Polycab Wires Pvt Ltd 0270 / 5524 16.07.18
448 Fire Alarm & Plant Comm. Cable Polycab Wires Pvt Ltd 0245 / 5529 18.07.18
449 Averaging Pitot Tubes Minco (India) Pvt Ltd 2405 / 5517 18.07.18
Pressure Vessel -CS (26-50 MM),
450 Pressure Vessel -CS (UP TO 25 MM), Indcon Projects & Equipments 6413 / 5530 20.07.18
Pressure Vessel -SS (UP TO 25MM)
451 Dual Plate Check Valves Niton Valve Industries Private Ltd 3313 / 5532 23.07.18
452 Dual Plate Check Valves Leader Valves Ltd 3313 / 5531 23.07.18
454 Piping Injection Point Assemblies Cladtek Middle East 3388 / 5528 03.08.18
456 Y7GOcte Glasses and Cocks Chemtrols Industries 1262 / 5539 09.08.18
458 MV Power And Control Cables Polycab Wires Pvt Ltd 0225 / 5546 16.08.18
459 MV Power And Control Cables KEI Industries Limited 0225 / 5545 16.08.18
460 Fittings (AS) Gujarat Infrapipes pvt. Limited 3242 / 5549 16.08.18
463 Machine Monitoring Systems GE Oil & Gas India 1512 / 5537 17.08.18
468 Valves- Motor Operated Emerson Process Management 3121 / 5543 27.08.18
469 Valves- Motor Operated Flowserve India Controls 3121 / 5541 27.08.18
470 Special Check Valves Niton Valve Industries Private Ltd 3323 / 5552 29.08.18
471 Pipes (AS Seamless/Welded) Gerab National Enterprise L.L.C 3404 / 5557 29.08.18
472 Fieldbus Signal Cables Cords Cable Industries Ltd. 1756 / 5556 30.08.18
473 Plug Valves Galli & Cassina SPA 3215 / 5560 31.08.18
474 Plug Valves Chemtrols Samil (India) Pvt Ltd. 3215 / 5559 31.08.18
475 Magnetic Level Instruments(Indicator) Chemtrols Industries Pvt. Ltd. 1220 / 5554 04.09.18
476 Pipes- CS (Welded) Arabian Pipeline Supply FZCO 3202 / 5563 10.09.18
Pentair Valves & Controls India
477 Valves- Motor Operated 3121 / 5542 11.09.18
Pvt Ltd
478 Valves- Motor Operated Ampo, S.Coop (Poyam Valves) 3121 / 5540 11.09.18
480 Plug Valves Galli & Cassina SPA 9060 / 5567 17.09.18
484 Nucleonic Level Instruments Berthold Technologies GMBH 2272 / 5570 19.09.18
489 Signal Cables Polycab Wires Pvt Ltd 1750 / 5577 21.09.18
490 Instrument Tubing Ratnamani Metals and Tubes Ltd 1710 / 5576 21.09.18
China Petroleum Technology and
491 Pipes- CS (Seamless) 3201 / 5578 21.09.18
Development
492 Residual Contaminant Removal System Eco-Tech 4770 / 5564 25.09.18
Pump-Centrifugal.Horizontal (General
493 Flowserve India Controls Pvt Ltd 5900 / 5561 28.09.18
Water Service)
494 Nucleonic Level Instruments Berthold Technologies GMBH 2270 / 5573 03.10.18
SS/CR Manifolds & Compact Steam Trap
495 Forbes Marshall Pvt. 3276 / 5571 03.10.18
Assemblies
496 Limit Switch Valves (Ball Type) Belgaum Aqua Valves 3491 / 5579 03.10.18
498 Tank pr. Protect. Devices / flame arrstr Protego India Pvt Ltd 2384 / 5584 09.10.18
499 Tank pr. Protect. Devices / flame arrstr Protego India Pvt Ltd 2382 / 5587 16.10.18
Temperature Gauges (Bimetallic, Filled Goa Thermostatic Instruments
500 1400 / 5591 18.10.18
System) Pvt Ltd
501 Flanges (AS) Good luck engineering co. 3431 / 5594 22.10.18
503 Limit Switch Valves (Butterfly Type) Advance Valves Pvt Ltd. 3493 / 5581 22.10.18
504 Pressure Gauges Gauges bourdon (i) pvt. Ltd. 1102 / 5586 23.10.18
505 Pipes (CS Seamless) China Petroleum Technology 3401 / 5596 23.10.18
Pump-Centrifugal.Horizontal (General
506 Flowserve India Controls Pvt Ltd 5992 / 5451 25.10.18
Purpose)
Pump-Centrifugal.Horizontal (Special
507 Flowserve India Controls Pvt Ltd 5185 / 5592 26.10.18
Purpose Process)
508 Valves-Gate/Globe/Check (Forged) BFE SRL 3211 / 5601 31.10.18
509 Valves-Gate/Globe/Check (Forged) Associated Toolings India Pvt Ltd 3211 / 5600 31.10.18
Pump-Centrifugal.Horizontal (Special
510 ITT Corporation India Pvt Ltd 5185 / 5123 01.11.18
Purpose Process)
511 Catalyst Drum Tilting Device Morse Manufacturing co. 4170 / 5599 02.11.18
512 Flow elements(Venturi,Flow nozzles) Hydropneumatics Pvt. Ltd 1841 / 5580 12.11.18
517 Jib Cranes (Manual) Eddy Cranes Engrs (P) LTD 4590 / 5606 21.11.18
518 Steam & Air Traps Forbes Marshall pvt. Ltd 3275 / 5590 26.11.18
519 Steam & Air Traps Armstrong International 3275 / 5589 26.11.18
520 Desuperheaters & PRDS Emerson Process Management 2445 / 5609 11.12.18
524 Valves- Motor Operated Flowserve India Controls 3121 / 5541 31.12.18
526 Pipes (SS Seamless/Welded) Gerab National Enterprise L.L.C 3405 / 5611 10.01.19
527 Limit Switch Valves (Gate Type) Leader Valves Ltd 3492 / 5612 11.01.19
528 Static Fire Fighting Equipments - II HD Fireprotect pvt. Ltd. 8152 / 5615 17.01.19
529 Pilot Operated Safety Valves Bliss Anand Pvt Ltd 2564/ 5582 23.01.19
530 Dual Plate Check Valves Flovel Valves Pvt.Ltd. 3413 / 5617 01.02.19
Melesi Officine Ambrogio Melesi
531 Flanges (SS) 3432 / 5620 04.02.19
& C.SRL
Melesi Officine Ambrogio MelesI
532 Flanges (Higher Alloys) 3433 / 5621 04.02.19
& C.SRL
533 Flanges (SS) Good Luck Engineering Co. 3432 / 5619 04.02.19
537 Valves-Gate/Globe/Check (Higher Alloys) Velan Valves India Pvt Ltd 3129 / 5626 15.02.19
538 Special Level Instruments (Tuning Fork) Sapcon Instruments Pvt Ltd 2242 / 5622 16.02.19
Schneider Electric Systems India
539 Closed Circuit TV 2840 / 5623 20.02.19
Private
540 Vortex Flow Meters Emerson Process Management 2861 / 5627 20.02.19
543 Pressure Vessel -CS (UP TO 25 MM) Indcon Projects & Equipments 6414 / 5625 27.02.19
547 Pressure Relief Valves Bliss Anand Pvt Ltd 1364 / 5354 01.03.19
548 Vortex Flow Meters Emerson Process Management 2860 / 5633 01.03.19
550 Special Control Valves-Mixed Pentair Valves & Controls 2357 / 5631 12.03.19
552 Valves- Motor Operated Emerson Process Management 3121 / 5543 13.03.19
554 Piping Spool(Internal Fbe Coated Piping) Yingkou Liaohe Pipe Fittings 3289 / 5632 25.03.19
Anderson Greenwood Crosby
555 Pressure Relief Valves 1368 / 5482 26.03.19
Sanmar Limited
Emerson Process Management
556 Surge Relief Valves 2181 / 5636 27.03.19
India
557 Pipes (AS Seamless/Welded) Gerab National Enterprise 3409 / 5638 01.04.19
Evergreen Seamless Pipes &
558 Pipes (AS Seamless/Welded) 3409 / 5637 01.04.19
Tubes
559 Pipes (CS Welded) Gerab National Enterprise 3408 / 5640 04.04.19
560 Flanges (CS) Good Luck Engineering Co. 3430 / 5642 08.04.19
563 Butterfly Valves Advance Valves Pvt Ltd. 3416 / 5643 23.04.19
564 Fittings (Trading Facilities) Yingkou Liaohe Pipe Fittings 3045 / 5644 24.04.19
Gate, Globe & Check Valves (Trading
565 Oswal Industries Ltd 3035 / 5645 24.04.19
Facilities)
566 Pipes (CS Welded) Gerab National Enterprise L.L.C 3302 / 5646 24.04.19
571 Fittings (CS) Yingkou Liaohe Pipe Fittings 3140 / 5212 26.04.19
574 Pipes- CS (Welded) Ratnamani Metals And Tubes 3102 / 5328 26.04.19
577 Pipes- CS (Welded) Ratnamani Metals And Tubes 3202 / 5652 29.04.19
Evergreen Seamless Pipes &
578 Pipes- CS (Welded) 3202 / 5651 29.04.19
Tubes
579 Pressure Gauges Precision Mass Products 1102 / 5655 06.05.19
580 Sight Glass Bliss Anand Pvt Ltd 3285 / 5654 08.05.19
581 Pipes (SS Seamless/Welded) Gerab National Enterprise 3410 / 5657 08.05.19
582 Air Fin Cooler (CS & SS) Paharpur Cooling Towers 6415 / 5647 09.05.19
586 Fittings (Epoxy Coated) Yingkou Liaohe Pipe Fitting 3046 / 5663 10.05.19
592 Flanges (Trading Facilities) Good Luck Engineering 3033 / 5185 10.05.19
Valvitalia Spa-Tecnoforge
593 Flanges 3031 / 5662 10.05.19
Division
594 Flanges CD Engineering Co. 3031 / 5660 10.05.19
595 Pipes (Trading Facilities) Arabian Pipeline Supply Fzco 3006/5235 16.05.19
596 Pipes (Trading Facilities) Gerab National Enterprise L.L.C 3006 / 5236 16.05.19
598 Pipes (Trading Facilities) Evergreen Seamless Pipes & 3006 / 5676 16.05.19
Tubes Pvt. Lt
599 Pipes (Cs Seamless) Gerab National Enterprise L.L.C 3401 / 5675 16.05.19
600 Plug Valves Chemtrols Samil (India) Pvt Ltd 3115 / 5671 15.05.19
601 Plug Valves Flowserve India Controls Pvt Ltd- 3115 / 5672 15.05.19
Mmn
603 Valves- Gate/Globe/Check (Forged) Leader Valves Ltd 3411 / 5667 15.05.19
604 Flanges (Ss) Good Luck Engineering Co. 3132 / 5182 28.05.19
605 Flanges (Ss) Melesi Officine Ambrogio Melesi 3132 / 5680 28.05.19
& C.Srl
606 Flanges (Ss) Cd Engineering Co. 3132 / 5681 28.05.19
608 Flanges (Cs) Melesi Officine Ambrogio Melesi 3230 / 5234 27.05.19
& C.Srl
609 Flanges (Ss) Melesi Officine Ambrogio Melesi
& C.Srl 3232 / 5244 28.05.19
610 Flanges (Ss)
Cd Engineering Co. 3232 / 5246 28.05.19
611 Flanges (Cs)
Cd Engineering Co. 3330 / 5330 27.05.19
612 Flanges (Cs) Melesi Officine Ambrogio Melesi
& C.Srl 3330 / 5331 27.05.19
Flanges (Cs) Valvitalia Spa-Tecnoforge
613
Division 3330 / 5679 27.05.19
O'lets
614
Keonsae High Pressure Co.Ltd. 3141 / 5673 31.05.19
Spring Support Assemblies
615
Pipe Hangers & Supports Pvt Ltd 3387 / 5683 10.06.19
Control Valves Emerson Process Mangmnt
616
Chennai Pvt. Ltd 1334 / 5682 10.06.19
Silent Check Valve- Mueller Model 76
617
Mueller Steam Specialty 3226 / 5677 29.05.19
Sight Glasses- Jacoby Tarbox Or
618
Equivalent Bliss Anand Pvt Ltd 3287 / 5668 30.05.19
Electromech Material Handling
619 Electric Hoist 4690 / 5658 17.05.19
Systems (I
620 Load Cell Acme Automation Pvt Ltd, India 2970 / 5674 22.05.19
621 Eot Cranes Eddy Cranes Engrs (P) Ltd 4610 / 5151 15.05.19
622 Special Control Valves-Mixed Ge Oil & Gas India Pvt. Ltd. 2356 / 5486 13.06.19
Emerson Process Mangmnt
623 Special Control Valves-Mixed 2356 / 5487 07.06.19
Chennai Pvt. Ltd
Precision Mass Products Pvt.
624 Pressure Gauges 1102 / 5655 11.06.19
Ltd.
625 Pilot Operated Safety Valves Bliss Anand Pvt Ltd 2564 / 5582 10.06.19
Anderson Greenwood Crosby
627 Pilot Operated Safety Valves 2564 / 5583 10.06.19
Sanmar Limited
628 O'lets Eby Fasteners 9130 / 5669 30.05.19
642 Valves Chandra Engg. & Mech Pvt Ltd. 3326/5695 04.07.19
652 Variable Area Flowmeter Chemtrols Industries Pvt. Ltd. 1022/5705 8.07.19
TENDERS:
Sl. Tender Description Tender Act. Date Agreed Award Date Act. Date of
No. No. (Recom.) (15 days from Act. Date of
Award
Recom.)
Sl. Tender Description Tender Act. Date Agreed Award Date Act. Date of
No. No. (Recom.) (15 days from Act. Date of
Award
Recom.)
Piling, RCC & U/G Works :
8 8105 18.04.15 03.05.15 06.03.17
Units-I
Piling, RCC & U/G Works :
9 8106 01.05.15 16.05.15 06.03.17
Units - II
10 Treated Water Reservoir 8109 26.05.15 10.06.15 06.03.17
Buildings - IV
11 8102 27.05.15 11.06.15 01.05.18
(All Non-Plant Buildings)
Mounded Bullets
12 (LPG, C3 Bullets & C4 / 6003 03.06.15 18.06.15 12.01.18
Raffinate)
Buildings - V
13 8103 06.06.15 21.06.15 01.05.18
(All Plant Buildings)
Feasibility Study For
14 7100 12.06.15 27.06.15 12.02.16
Transport
Composite Works for Trading
15 3001 20.06.15 05.07.15 28.08.17
Facilities
Dyke Wall & Paving –
16 8014 25.06.15 10.07.15 05.03.18
Offsites
17 N2 / IA / PA Plant 4730 18.06.15 03.0715 23.09.16
18 Cooling Tower Package 8001 30.07.15 14.08.15 02.02.17
19 Material Handling Services 7101 14.08.15 29.08.15 By DORC
20 Tankage - III: (45+3 Nos.) 6004 15.09.15 30.09.15 Awarded
Design, Engg & Constr. of
21 7205 30.09.15 15.10.15 Awarded
Tankage /Moun. Bullet Fdn.
Structural Steel Erection
Works - I: CDU, RFCC,
22 8113 01.10.15 16.10.15
MHC, MS Block & Asso. 20.05.17
Interconnections
23 Balance Building Works 8116 21.10.15 05.11.16 Awarded
RO-DM, CPU & ETP
24 8002 31.10.15 15.11.15 29.08.17
Package
25 Heater Package 7401 04.11.15 19.11.15 21.09.16
26 Cathodic Protection System 8801 10.11.15 25.11.15 18.08.17
Material Handling Services -
27 7102 12.12.15 27.12.15 By DORC
II For DRPP
Raw Water Intake & Raw
28 8003 15.12.15 30.12.15 29.08.17
Water Treatment Plant
Structural Steel Erection
29 8114 15.12.15 30.12.15 20.05.17
Works – II
30 Structure Erection Crude 8117 15.12.15 30.12.15 09.01.17
Sl. Tender Description Tender Act. Date Agreed Award Date Act. Date of
No. No. (Recom.) (15 days from Act. Date of
Award
Recom.)
Area + NS Piperack and
Flare + EW Piperack
Civil & Structural Works for
31 8118 11.02.16 26.02.16 02.02.17
Mounded Bullets
Structure Erection Works :V-
32 CPP, RWTP,CA/N2, CT, RO 8119 27.02.16 13.03.16 09.01.17
DM /CPU
UG Piping & Associated
33 Works : Units - I (CDU, 8107 12.03.16 27.03.16 16.11.16
RFCCU, MS & DMHC)
UG Piping & Associated
Works : Units - II (Alkylation,
34 8108 12.03.16 27.03.16 16.11.16
Butamer, Gasoline, PPU &
Sulphur)
Third Party Inspection
35 7203 17.03.16 01.04.16 10.05.17
Services for DRPP
UG Piping & Associated
36 8110 18.03.16 02.04.16 16.11.16
Works : U&O
Structural-III: Gasoline, PPU,
37 HGU& Asso. 8115 12.05.16 27.05.16 20.05.17
Interconnections
Composite Works - I : CDU,
38 3002 10.08.16 25.08.16 30.01.18
RFCC, MHC & MS BLOCK
39 Hot Oil Heater 7402 10.08.16 25.08.16 30.08.17
Composite Works - IV :
40 3003 10.08.16 25.08.16 27.03.17
Offsite & Utilities
Composite Works - V : CPP
41 + RWTP + N2 + PA + IA + 3007 12.09.16 27.09.16 25.10.17
CWS
Central Machinery O & M
42 7204 12.09.16 27.09.16 By DORC
Services
Composite Works - II :
43 3004 22.09.16 07.10.16 29.06.18
Alkylation, Butamer & SRU
Freight Forwarding and
44 7103 04.10.16 19.10.16 By DORC
Ocean Transportation
Composite Works - III
45 3006 12.04.17 27.04.17 29.06.18
(Gasoline, HGU & PPU)
Electrical Heat Tracing
46 0010 22.12.17 06.01.18 Awarded
Works
47 FRP Vessels 6005 04.04.18 19.04.18 Awarded
48 Insulation Works 3005 03.05.18 18.05.18 12.09.18
CONSTRUCTION
BAL TO
IN PROGRESS READY REMARKS
UNIT TAKE UP
1, 2, 3, 4, 5, 6, 7,
CDU - - -
8, 9, 10
Piling- 5
190 piles 1, 2,3,4, 6, 7, 8, 9, HS-11: Stone
RFCC completed out of 10, 12 Base Piling in progress
240 5- in progress
Curing- 3, 5
Piling 85
1, 2,5, 6, 7, 8
MS BLOCK completed out of HS-4 -
480
HS-3- Stone
1,2, 4, 5, 6 Base
MHC - -
PPU
1,2 - -
-
1,2,3
ALK - - -
*Hard stand area is Including main crane area, tailing crane area and assembly area
Tankages Works:
Out of total 165 tanks, 81 tank pad handed over for mechanical erection (62 nos. tank
pad to M/s Chemitech (Tankage-II), 10 nos. tank pads to M/s Tecon (Tankage-I), 2
no. to M/s Chemitech (Tankage-I) and 7 nos. to M/s Chemitech (Tankage-III).
Tankage-II (Chemietech): Shell erection completed in 36 out of 82 tanks.
Mechanically cleared – 21 nos. Hydro-testing completed- 15 nos. Hydro-testing in
progress- 7 nos.
Tankage-IA (TECON): Erection work is in progress in 6 tanks out of 10 tanks(TF-01,
02, 03, 04, 08 & 09).
Tankage – IB (Chemietech): Fabrication is in progress for two tanks (711-TT-1101–E
/ F) & erection in progress for one tank.
Tankage-III (Chemitech): Erection commenced for 720-TT-2006.
TANKAGE-I TANKAGE-II
DESCRIPTION TANKAGE-III (CTL)
(TECON+CTL) (CTL)
Total No. of Tanks 20 87 58
Total no.s of Tanks
allocated to Tankage 16 82 58
Contractor
No. of Tanks for which 52
16 77
DC/SC/Piling Completed
Total No. of Tank Pad 7
12 62
Handed Over
Total Tank Pad in 15
9 7
Progress
Total No. of Tank Pad in 57 (by 5 (by CTL)
6 (by TECON)
which Erection started CHEMIETECH)
Vessels UG pit casting, RCC sleeper work and Pump foundation casting is in
progress.
M/s Rockseed:
Compl Comple
SS-02 Completed 1352 388 Cellar slab completed.
eted ted
M/s Royal diadem:
Compl Comple Column casting
SRR-02 Completed 988 95
eted ted commenced
M/s Onshore
Completed Pile cap work in
SRR-06 1250 967 988 -
progress
M/s Rockseed:
Compl Comple All substructure
SS-05 Completed 1300 -
eted ted completed.
M/s Rockseed:
Completed Building allocated to
SRR-03 1150 - 993 -
M/s Rockseed.
M/s Rockseed:
Completed Column Casting is in
SS-07 665 665 1620 -
progress
M/s Royal Diadem
Completed
SRR-07 1250 1065 993 - Sub-str. Completed,
backfilling in progress.
PPU M/s Sinoma:
Wareho Completed RCC work in
7200 3894 7400 1286
use progress.
M/s Arbico:
All substructure work
completed.
SS-08 Completed 350 350 1300 213
M/s Tecon:Column
casting completed.
M/s Royal Diadem:
All substructure work
completed. Column /
SRR-08 Completed 1432 1432 993 175
Wall casting is in
progress.
Drainage Works
66.5% drain length installation achieved (124.99 km out of 187.8 km).
90.3% drain concrete quantity achieved (108338 cum out of 119938 cum).
RCC Qty in M3
6538 6538 6827
Precast/Cast in Situ
Length of drain (U KM 31 31 22.36
DSCC type & V type)
4.
RCC Qty in M3
9810 9810 7385
Precast/Cast in Situ
Length of drain (U KM 46 32.88
JBN 46
5. type & V type)
RCC Qty in M3
38260 38260 37950
Precast/Cast in Situ
Length of drain (U KM 25 25 17.54
Northridge type & V type)
6.
RCC Qty in M3 18350
20639 20639
Precast/Cast in Situ
Under Length of drain (U KM 6 16 0.0
Trading type & V type)
7. Facility RCC Qty in M3
contract Precast/Cast in Situ 5174 5174 420
Culverts Works
S.No. Name of the Description UOM Scope Front Cum Remarks
Contractors Qty. Avail. Compl.
Qty.
Precasting of culverts Nos
547 547 534
Road Works
S.No. Name of the Description UOM Scope Front Cum Remarks
Contractors Qty. Avail. Compl.
Qty.
Length of road KM 120.23 120.23 38.65
(base course
JBN 225mm)
1. Sub-base quantity m2 1307097 1307097 987682
(150)
Road-base m2 1217400 1217400 770738
quantity (125)
Road-base m2 1217400 1217400 578866
quantity (100)
Laydown area work by: M/s Julius Berger & M/s Northridge:
Area to be
User Area done (SQM) Balance (SQM) Agency
developed (SQM)
JBN /
Stores 992790 791790 201000
RCF(Scrapyard)
Equipment 341160 341160 0 JBN/NR
Marine 263200 263200 0 JBN
Mammoet 78000 78000 0 JBN
XCMG 138600 138600 0 JBN
Total 1813750 1612750 201000
A) INFRASTRUCTURE
B) UNITS (BLOCK-WISE)
SN DESCRIPTION WTD. DURING THE MONTH CUMULATIVE
VALUE SCH % ACT % SCH % ACT %
B.1 CRUDE BLOCK (100) 13.0 1.1 60.4 60.4
B.2 RFCC BLOCK (110) 21.7 1.5 60.8 60.8
B.3 DIESEL MHC BLOCK (120) 10.1 1.0 59.7 59.7
B.4 RFCC GASOLINE DESULF. BLOCK (130) 4.3 2.8 44.9 44.9
B.5 ALKYLATION / SAR BLOCK (140, 142, 143) 6.5 3.0 51.8 51.8
B.6 C4 / BUTAMER BLOCK (141, 145) 6.5 2.7 59.3 59.3
B.7 NHT-CCR & PENEX BLOCK (150) 11.6 1.5 58.8 58.8
B.8 HYDROGEN PLANT (160) 10.1 1.9 56.2 56.2
B.9 POLYMER BLOCK (170) 8.7 4.2 52.8 52.8
B.10 SULFUR (SRU+ARU+SWS) BLOCK (180) 7.2 1.8 53.3 53.3
OVERALL : UNITS 100 1.9 57.3 57.3
E) TRADING FACILITIES
SN DESCRIPTION WTD. DURING THE MONTH CUMULATIVE
VALUE SCH % ACT % SCH % ACT %
1 PROCESS 2 2.1 98.5 98.5
2 ENGINEERING 10 0.1 98.0 98.0
3 ORDERING 2 100.0 100.0
4 TENDERING 2 100.0 100.0
5 MANUFACTURING & DELIVERY 54 1.2 46.9 46.9
6 CONSTRUCTION 30 0.2 23.4 23.4
OVERALL - TRADING FACILITIES 100 0.8 48.1 48.1
A) INFRASTRUCTURE
B) UNITS (BLOCK-WISE)
SN DESCRIPTION WTD. DURING THE MONTH CUMULATIVE
VALUE SCH % ACT % SCH % ACT %
B.1 CRUDE BLOCK (100) 13.0 0.4 77.7 77.7
B.2 RFCC BLOCK (110) 21.7 0.5 76.8 76.8
B.3 DIESEL MHC BLOCK (120) 10.1 0.3 77.0 77.0
B.4 RFCC GASOLINE DESULF. BLOCK (130) 4.3 0.6 72.1 72.1
B.5 ALKYLATION / SAR BLOCK (140, 142, 143) 6.5 0.5 74.6 74.6
B.6 C4 / BUTAMER BLOCK (141, 145) 6.5 0.4 74.7 74.7
B.7 NHT-CCR & PENEX BLOCK (150) 11.6 0.4 76.2 76.2
B.8 HYDROGEN PLANT (160) 10.1 0.7 75.7 75.7
B.9 POLYMER BLOCK (170) 8.7 0.8 75.0 75.0
B.10 SULFUR (SRU+ARU+SWS) BLOCK (180) 7.2 0.5 76.2 76.2
OVERALL : UNITS 100 0.5 76.1 76.1
E) TRADING FACILITIES
SN DESCRIPTION WTD. DURING THE MONTH CUMULATIVE
VALUE SCH % ACT % SCH % ACT %
1 PROCESS 4 2.1 98.5 98.5
2 ENGINEERING 50 0.1 98.0 98.0
3 ORDERING 4 100.0 100.0
4 TENDERING 6 100.0 100.0
5 MANUFACTURING & DELIVERY 6 1.2 46.9 46.9
6 CONSTRUCTION 30 0.2 23.4 23.4
OVERALL - TRADING FACILITIES 100 0.26 72.8 72.8
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
1. INFRASTRUCTURE -
-Hold in drain near Oil -Hold due to Pile foundation work in -Piling work in Progress.
1.3 Catchers. Oil Catchers 1-7. Piling agencies to be expedited for earliest Piling agencies
completion.
Drain works can be taken up after
UG Piping fabrication and -M/S onshore is being expedited to augment
completion of piping fabrication and
installation work occupying the resources for completion of UG piping and At the
1.4 installation for underground, gravity Onshore
drainage area in Offsite areas Subsequently releasing fronts for balance earliest
and pressure lines.
-Zone D &E drain works.
CDU
2
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
3 RFCCU
Delay in erection of
At the
regenerator supporting -Non availability of 300T crane -DORC to expedite the availability of 300 T DORC
earliest
structures.
Front not available for -DORC to expedite the rectification of 750T At the
3.2 - Foundation not yet ready DORC
structure erection in MPR. crane and early removal of 750T crane. earliest
Delay in foundation of Foundation bolt for expander-1 & 2 -Vendor M/s ELLIOT EBARA to be expedited
At the
3.3 expander-1 & 2 (115-PZ-1001/1002) not yet for delivery of bolts at the earliest. DORC
earliest
(115-PZ-1001/1002). received at site.
6906 MT structural steel
erected out of available
Shortage of structural 14818 MT, for balance -M/s HXSS to be expedited for delivery of HXSS/ At the
3.4
connection bolts. 8149 MT avl material, bolts. DORC earliest
3211 MT is under hold due to non
avl of bolts.
Slow progress of Piping - Non-availability of matching piping At the
3.5 -To ensure delivery of balance materials DORC
fabrication materials for complete spools. earliest
Delay in foundation of Foundation bolt for Clarifier (115- Vendor M/s ENVIRO CLEAR to be expedited
At the
3.6 Clarifier. VV-1013) not yet received at site. for delivery of bolts at the earliest. DORC
earliest
4 DMHC
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
by M/s CC-7
5 RGDU
6 SRU
7 MS BLOCK
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
55028 nos. bolts.
8 PPU
9 ALKYLATION
Non-availability of Anchor
-Delay in procurement by M/s - M/s Onshore is being expedited for early
9.1 bolt and Insert plate Onshore Immediate
Onshore availability of bolts and insert plates.
material.
-Inadequate mobilisation. M/s Onshore being expedited for
Available – 130 nos. deployment of additional manpower as per
Slow progress of Civil work
Required – 350 nos. front availability.
9.2 by M/s Onshore Onshore Immediate
-Non availability of sufficient -M/s Onshore is being expedited for
shuttering and scaffolding shifting of material from Fertilizer area to
material at site. site.
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
10
HGU
-
Inadequate manpower /machineries -
(e.g. Excavator and pile cutter, M/s Onshore is being expedited for
10.1 Slow progress of Civil work Dipper etc.) mobilisation by deployment of adequate manpower and Onshore Immediate
Onshore. machineries.
-Available manpower 240 nos.
reqd. 300 nos.
Slow progress of UG Piping Non-availability of matching piping To ensure delivery of balance piping
At the
10.2 fabrication materials for complete spools. materials. DORC
earliest
11 TRADING FACILITY
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
and instrument items.
-Delay in installation of TCP
system.
-Delay in mobilisation of side
booms (3 nos.) for lowering.
Piping works under hold Isometric /IDF required:
M/s EIL to expedite the release of Isometrics. At the
11.3 -AG piping work for Crude, Product EIL
earliest
and LVS
12 OFFSITES
a) UG Piping works
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
-Non availability of sufficient
Fabricated Steel structure/
Gratings/ Clamps for gratings/
Slow Progress of Structural Cable trays. DORC to expedite the delivery of structure
12.3 erection work (M/s Omiti + -Structure erection for some DORC Immediate
steel
M/s OIFZE) areas under hold due to missing
of few connecting members’/
Bolts / water logging.
13 Utilities
Slow Progress of Civil -Inadequate Manpower (Available- -SINOMA, JBN, DSCC and ITB are being
Works 240, Required – 450 nos.) expedited for mobilising adequate SINOMA, JBN Immediate
14.1
by SINOMA, JBN, DSCC and manpower. DSCC, and ITB
ITB
PIPING BULK MATERIAL: -Delay in clearance/ transportation -Expedite clearance from Port and
Delivery of bulk piping from Port. transportation.
15 DORC At the earliest
material -Completion/ shipping of balance -Follow up with vendors/ shipping
piping material
Orders against balance Intimation received from DORC for contract
16 Ordering recommendations (Total finalisation (with zero date). Contract finalisation - DORC ASAP
Recommendations till date -502 Nos.) for balance MRs to be expedited.
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
Frequent changes in ‘Engineering
Design Basis’ are likely to have overall
impact on engineering and
implementation. Agreed design basis /
change in tendering philosophy etc
are being opened by DORC team
which is resulting in to retendering /
re-floatation of MR / Tenders at sole After finalisation of design basis any design
Frequent changes in
17 instruction of DORC and this is further change may be avoided. - - -
‘Engineering Design Basis
impacting the delay. As a result of
change in execution philosophy, UG
Piping work has been removed from
Civil Structural Works for which
recommendations already sent to
DORC. Due to change in execution
philosophy SOR quantities for Piling &
RCC have been revised.
Mid course changes by DORC and
Changes in Execution additional activity viz HVAC offer
18 DORC -
philosophy review, maintenance buildings, GE
offers effect engineering completion.
19 Payment of EIL Invoices Delay in payment of EIL invoices DORC to clear all pending invoices. DORC ASAP
Impact
Impact Target Date
S. on Rev.
Areas of Support Constraints Action Plan on Sch. Action By w.r.t Rev
No. Sch.
(Month) Sch.
(Month)
As per MSR there is delay in shipment
due to commercial issues with
21 Delay in Shipment DORC to expedite shipping. DORC ASAP
suppliers and other non responsive
supplier’s issues to be resolved.
Note: Above table indicates Major Milestones only. Some of the Milestones whose schedules fall beyond 2
months have not been shown.
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O N D J-21 F
DURATION IN MONTHS
100 12
90
10
80
50 6
40
4
30
20
2
10
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J-21 F
DURATION IN MONTHS
100 20
90 18
80 16
MONTHLY SCH.
70 14
MONTH ACT.
CUMUL. SCH.
60 CUMUL. ACT. 12
CUMUL PROG (%)
50 10
40 8
30 6
20 4
10 2
0 0
N-14D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D
DURATION IN MONTHS
100 20
90 18
80 16
50 10
40 8
30 6
20 4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 16
90
14
80
12
70 MONTHLY SCH. MONTH ACT.
50 8
40
6
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 20
90 18
80 16
50 10
40 8
30 6
20 4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 16
90
14
80
12
70 MONTHLY SCH. MONTH ACT.
50 8
40
6
30
4
20
2
10
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 20
90 18
80 16
50 10
40 8
30 6
20 4
10 2
0 0
N- D- J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-19 F M A M J J A S O
14 14
DURATION IN MONTHS
100 12
70
8
60
CUMUL PROG (%)
50 6
40
4
30
20
2
10
0 0
N-14 D-14 J-15 F M A M J J A S O N D J-16 F M A M J J A S O N D J-17 F M A M J J A S O N D J-18 F M A M J J A S O N D J-19 F M A M J J A S O N D J-20 F M A M J J A S O N D J F
DURATION IN MONTHS
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
Month
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
(Calender)
Series1 0.0
MONTH
CRUDE BLOCK
1.0
0.0
-1.0
(-) Months (+)
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0
Month J A S O N D J F M A M J J A S O N D J F M
(Calender) 19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
INFORMATION / ACTION
RFCC BLOCK
1.0
0.0
-1.0
(-) Months (+)
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
Month 19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
(Calender)
Series1 0.0
MONTH
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
Month 19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
(Calender)
Series1 0.0
MONTH
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
ALKYLATION/SAR BLOCK
1.0
0.0
-1.0
-2.0
(-) Months (+)
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
C4/BUTAMER BLOCK
1.0
0.0
-1.0
(-) Months (+)
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
HYDROGEN BLOCK
1.0
0.0
-1.0
(-) Months (+)
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
POLYMER BLOCK
1.0
0.0
-1.0
(-) Months (+)
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
SULPHUR BLOCK
1.0
0.0
-1.0
(-) Months (+)
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
INFRASTRUCTURE
1.0
0.0
-1.0
(-) Months (+)
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
TRADING FACILITIES
1.0
0.0
-1.0
(-) Months (+)
-2.0
-3.0
-4.0
-5.0
-6.0
-7.0
-8.0
-9.0
-10.0 J A S O N D J F M A M J J A S O N D J F M
19 19 19 19 19 19 20 20 20 20 20 20 20 20 20 20 20 20 21 21 21
Series1 0.0
MONTH
NOTE : Delay is monitored based on revised overall project schedule. Revised schedule w.e.f 1st Aug 2019.
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
CRUDE BLOCK : 100
P&IDs
1 - PROCESS (LICENSOR) 150 150 150
2 - UTILITY (EIL) 38 38 38
AFC DRAWINGS
1 GENERAL CIVIL 36 36 36
3 PIPING
PLAN - Aug : 12
- GAD`s 354 24 354 330 24
Sep:12
5 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
RFCC BLOCK : 110
P&IDs
1 - PROCESS (LICENSOR) 177 177 177
2 - UTILITY (EIL) 38 38 38
AFC DRAWINGS
1 GENERAL CIVIL 37 37 37
PLAN - Aug : 3
2 STRUCTURAL 370 370 367 3
3 PIPING
5 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
DIESEL MHC BLOCK : 120
P&IDs
1 - PROCESS (LICENSOR) 114 114 114
2 - UTILITY (EIL) 31 31 31
AFC DRAWINGS
1 GENERAL CIVIL 23 23 23
PLAN - Aug : 7
2 STRUCTURAL 207 205 200 7
3 PIPING
- GAD`s 80 80 80
PLAN - Aug : 2
4 ELECTRICAL 17 17 15 2
5 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
GASOLINE BLOCK : 130
P&IDs
1 - PROCESS 57 57 57
2 - UTILITY 21 21 21
AFC DRAWINGS
1 GENERAL CIVIL 11 11 11
3 PIPING
- GAD`s 66 66 66
PLAN -
4 ELECTRICAL 16 16 14 2
Aug : 2
5 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
ALKYLATION / SAR BLOCK : 142/143
P&IDs
1 - PROCESS (LICENSOR) 100 100 100
2 - UTILITY (EIL) 23 23 23
AFC DRAWINGS
1 GENERAL CIVIL 19 19 19
3 PIPING
4 ELECTRICAL 12 12 12
5 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
C4 / BUTAMER BLOCK : 141/145
P&IDs
1 - PROCESS (LICENSOR) 30 30 30
2 - UTILITY (EIL) 17 17 17
AFC DRAWINGS
1 GENERAL CIVIL 7 7 7
3 PIPING
- GAD`s 20 20 20
5 INSTRUMENTATION 11 11 11
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
NHT & CCR BLOCK : 150
P&IDs
1 - PROCESS (LICENSOR) 120 120 120
2 - UTILITY (EIL) 34 34 34
AFC DRAWINGS
1 GENERAL CIVIL 38 38 38
3 PIPING
PLAN - Aug : 2
4 ELECTRICAL 20 20 18 2
5 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
HYDROGEN BLOCK : 160
P&IDs
1 - PROCESS 80 80 80
2 - UTILITY 21 21 21
AFC DRAWINGS
1 GENERAL CIVIL 11 11 11
PLAN - Aug : 1
2 STRUCTURAL 137 137 136 1
3 PIPING
PLAN- Aug : 32
- ISO`s 2875 78 2875 2823 52
Sep : 30
5 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
POLYMER BLOCK : 170
P&IDs
1 - PROCESS 117 117 117
2 - UTILITY 13 13 13
AFC DRAWINGS
1 GENERAL CIVIL 28 28 28
PLAN - Aug : 12
2 STRUCTURAL 266 266 247 19
Sep : 7
3 ARCHITECTURE 25 25 25
4 PIPING
6 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
SULPHUR BLOCK : 180
P&IDs
1 - PROCESS (LICENSOR) 131 131 131
2 - UTILITY (EIL) 25 25 25
AFC DRAWINGS
1 GENERAL CIVIL 24 24 24
3 ARCHITECTURE 9 9 9
4 PIPING
PLAN - Aug : 50
- ISO`s (No. of Lines) 5132 5132 5082 50
PLAN - Aug : 2
5 ELECTRICAL 22 22 20 2
6 INSTRUMENTATION 12 12 12
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
CPP (POWER BLOCK): 680
P&IDs
1 - PROCESS 66 66 66
AFC DRAWINGS
1 GENERAL CIVIL 15 15 15
3 ARCHITECTURE 8 8 8
4 PIPING
6 INSTRUMENTATION 11 11 11
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
UTILITIES, OFFSITES & COMMON
P&IDs
1 - PROCESS (EIL) 38 38 38
2 - POSD (EIL) 52 52 52
AFC DRAWINGS
4 PIPING
PLAN - Aug : 6
5 ELECTRICAL 349 349 336 13 Sep: 7
PLAN - Aug : 2
6 INSTRUMENTATION 13 13 11 2
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
OVERALL COMPLEX (EXCL. TRADING FACILITIES)
P&IDs
1 - PROCESS 1142 1142 1142
AFC DRAWINGS
4 PIPING
RELEASED IN NOS.
Sl No. DISCIPLINE TOTAL (Nos.) DURING THE MONTH CUMULATIVE BALANCE REMARKS
SCH. ACT. SCH. ACT.
TRADING FACILITIES
P&IDs
1 - POSD (EIL) 41 41 41
AFC DRAWINGS
1 GENERAL CIVIL 17 17 17
PLAN - Aug : 10
2 STRUCTURAL 55 55 32 23
Sep : 13
3 PIPELINE 13 14 14
4 PIPING
- GAD`s 51 51 51
PLAN - Aug : 2
5 ELECTRICAL 8 8 6 2
6 INSTRUMENTATION 7 7 7
OVERALL COMPLEX
TECH. / COMM. RECOMMEN. FOR
TOTAL MR ISSUE ENQUIRY BIDS RECEIVE FOI / PO
Sl No. DISCIPLINE EVALUATION AWARD
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 HMTD 18 18 18 18 18 18 18 18 18 18 18 18 18
2 PIPING 172
- MTO-I 35 35 35 34 35 34 35 34 35 34 35 35 35
- MTO-II 33 33 33 33 33 33 33 33 33 33 33 33 32
- MTO-III 41 41 41 41 41 41 41 41 41 41 41 41 34
-TOPUP MTO 42 41 40 41 39 41 40 41 37 41 35 41 28
3 PACKAGED EQUIPMENT 45 45 45 45 45 45 45 45 45 45 45 45 41
4 ROTATING EQUIPMENT 67 67 67 67 67 67 67 67 67 67 67 67 67
5 STATIC EQUIPMENT 67 67 67 67 67 67 67 67 67 67 67 67 67
6 GEN CIVIL 9 9 9 9 9 9 9 9 9 9 9 9 7
7 STRUCTURAL 5 5 5 5 4 5 4 5 5 5 5 5 5
8 ELECTRICAL 33 33 33 33 33 33 33 33 32 33 32 33 32
9 INSTRUMENTATION 85 85 85 85 85 85 85 85 84 85 84 85 78
10 PIPELINE 17 17 17 17 17 17 17 17 17 17 17 17 14
TOTAL 518 517 516 516 514 516 515 516 511 516 509 517 479
CDU BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 2 2 2 2 2 2 2 2 2 2 2 2 2
2 ROTATING EQUIPMENT 11 11 11 11 11 11 11 11 11 11 11 11 11
3 STATIC EQUIPMENT 11 11 11 11 11 11 11 11 11 11 11 11 11
4 HMTD 5 5 5 5 5 5 5 5 5 5 5 5 5
TOTAL 29 29 29 29 29 29 29 29 29 29 29 29 29
RFCC BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 9 9 9 9 9 9 9 9 9 9 9 9 9
2 ROTATING EQUIPMENT 8 8 8 8 8 8 8 8 8 8 8 8 8
3 STATIC EQUIPMENT 13 13 13 13 13 13 13 13 13 13 13 13 13
4 HMTD 3 3 3 3 3 3 3 3 3 3 3 3 3
TOTAL 33 33 33 33 33 33 33 33 33 33 33 33 33
DMHC BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 2 2 2 2 2 2 2 2 2 2 2 2 2
2 ROTATING EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
3 STATIC EQUIPMENT 4 4 4 4 4 4 4 4 4 4 4 4 4
TOTAL 9 9 9 9 9 9 9 9 9 9 9 9 9
ALKYLATION BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT
2 ROTATING EQUIPMENT 6 6 6 6 6 6 6 6 6 6 6 6 6
3 STATIC EQUIPMENT
4 HMTD 2 2 2 2 2 2 2 2 2 2 2 2 2
TOTAL 8 8 8 8 8 8 8 8 8 8 8 8 8
BUTAMER BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT
2 ROTATING EQUIPMENT
3 STATIC EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
4 HMTD
TOTAL 3 3 3 3 3 3 3 3 3 3 3 3 3
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 1 1 1 1 1 1 1 1 1 1 1 1 1
2 ROTATING EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
3 STATIC EQUIPMENT 9 9 9 9 9 9 9 9 9 9 9 9 9
TOTAL 13 13 13 13 13 13 13 13 13 13 13 13 13
SULPHUR BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 4 4 4 4 4 4 4 4 4 4 4 4 3
2 ROTATING EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
3 STATIC EQUIPMENT 5 5 5 5 5 5 5 5 5 5 5 5 5
4 HMTD 3 3 3 3 3 3 3 3 3 3 3 3 3
TOTAL 15 15 15 15 15 15 15 15 15 15 15 15 14
CPP
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 HMTD 3 3 3 3 3 3 3 3 3 3 3 3 3
2 ROTATING EQUIPMENT 4 4 4 4 4 4 4 4 4 4 4 4 4
3 PACKAGED EQUIPMENT 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL 8 8 8 8 8 8 8 8 8 8 8 8 8
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 4 4 4 4 4 4 4 4 4 4 4 4 4
2 ROTATING EQUIPMENT 7 7 7 7 7 7 7 7 7 7 7 7 7
3 STATIC EQUIPMENT 3 3 3 3 3 3 3 3 3 3 3 3 3
4 GEN CIVIL 9 9 9 9 9 9 9 9 9 9 9 9 7
5 STRUCTURE 5 5 5 5 4 5 4 5 5 5 5 5 5
6 ELECTRICAL 29 29 29 29 29 29 29 29 28 29 28 29 28
7 INSTRUMENTATION 75 75 75 75 75 75 75 75 74 75 74 75 70
TOTAL 132 132 132 132 131 132 131 132 130 132 130 132 124
TRADING FACILITIES
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 2 2 2 2 2 2 2 2 2 2 2 2 1
2 ROTATING EQUIPMENT 6 6 6 6 6 6 6 6 6 6 6 6 6
3 STATIC EQUIPMENT 1 1 1 1 1 1 1 1 1 1 1 1 1
4 ELECTRICAL 4 4 4 4 4 4 4 4 4 4 4 4 4
5 INSTRUMENTATION 10 10 10 10 10 10 10 10 10 10 10 10 8
6 PIPELINE 17 17 17 17 17 17 17 17 17 17 17 17 14
TOTAL 40 40 40 40 40 40 40 40 40 40 40 40 34
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
PIPING
- MTO-I 35 35 35 34 35 34 35 34 35 34 35 35 35
- MTO-II 33 33 33 33 33 33 33 33 33 33 33 33 32
- MTO-III 41 41 41 41 41 41 41 41 41 41 41 41 34
-TOPUP MTO 42 41 40 41 39 41 40 41 37 41 35 41 28
TOTAL 172 171 170 170 169 170 170 170 167 170 165 171 150
HGU BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT
2 ROTATING EQUIPMENT 5 5 5 5 5 5 5 5 5 5 5 5 5
3 STATIC EQUIPMENT 6 6 6 6 6 6 6 6 6 6 6 6 6
4 HMTD
TOTAL 11 11 11 11 11 11 11 11 11 11 11 11 11
PPU BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT 20 20 20 20 20 20 20 20 20 20 20 20 18
2 ROTATING EQUIPMENT 9 9 9 9 9 9 9 9 9 9 9 9 9
3 STATIC EQUIPMENT 9 9 9 9 9 9 9 9 9 9 9 9 9
4 HMTD 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL 39 39 39 39 39 39 39 39 39 39 39 39 37
GASOLINE BLOCK
MR'S SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT. SCH. ACT.
1 PACKAGED EQUIPMENT
2 ROTATING EQUIPMENT 2 2 2 2 2 2 2 2 2 2 2 2 2
3 STATIC EQUIPMENT 6 6 6 6 6 6 6 6 6 6 6 6 6
4 HMTD 1 1 1 1 1 1 1 1 1 1 1 1 1
TOTAL 9 9 9 9 9 9 9 9 9 9 9 9 9
SL ITEM DESCRIPTION TOTAL QTY. MR ORDERED BAL.ORDER DESPD. RECD. DELIVERY FORECAST AT SITE REMARKS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 61 61 61 38 20 17 1 2 20 1
2 COLUMNS 61 61 61 22 20 1 1 22 5 8 4
6 COMPRESSORS 60 60 60 33 13 20 8 5 3 11
7 PUMPS 1091 1091 1091 295 172 113 4 80 75 133 144 306 28 32 4
8 FANS / BLOWERS 65 65 64 1 7 1 6 31 3 6 15 2
9 BURNERS 6 6 6 2 4
FILTERS/
10 212 212 211 1 42 26 12 13 96 8 12 9 31 4
COALESCERS
11 HOPPER / SILOS 35 35 35 1 1 2 4 12 16
WASTE HEAT
12 4 4 4 2 2
BOILERS
COMBUSTION &
13 INCINERATOR 6 6 6 2 4
CHAMBERS
TOTAL 3201 3201 3199 2 1079 661 323 86 328 108 247 293 714 254 12 32 8 91 42
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 2 2 2 2
2 COLUMNS 15 15 15 10 9 1 3 2
3 VESSELS 58 58 58 30 22 6 2 11 17
5 AIR COOLERS 88 88 88 12 8 68
6 COMPRESSORS 2 2 2 1 1
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 28 28 28 5 5 14 9
COALESCERS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 2 2 2 2 2
2 COLUMNS 16 16 16 7 7 7 1 1
3 VESSELS 62 62 62 36 25 11 1 10 15
5 AIR COOLERS 79 79 79 14 37 26 2
6 COMPRESSORS 7 7 7 7 5 2
8 FANS / BLOWERS 5 5 5 2 3
9 BURNERS
FILTERS/
10 33 33 33 17 9 8 6 5 5
COALESCERS
11 HOPPER 5 5 5 1 1 4
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 2 2 2 2 2
2 COLUMNS 5 5 5 2 1 1 3
3 VESSELS 35 35 35 19 14 5 4 1 1 2 8
4 HEAT EXCHANGERS 45 45 45 43 28 13 2 2
5 AIR COOLERS 92 92 92 2 90
6 COMPRESSORS 4 4 4 4 4
7 PUMPS 48 48 48 17 15 2 4 12 3 12
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 13 13 13 8 4 4 2 3
COALESCERS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 4 4 4 4 4
2 COLUMNS 3 3 3 3
3 VESSELS 16 16 16 1 15
4 HEAT EXCHANGERS 32 32 32 4 4 11 17
5 AIR COOLERS 26 26 26 26
6 COMPRESSORS 1 1 1 1 1
7 PUMPS 28 28 28 1 2 17 8
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 6 6 6 6
COALESCERS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 16 16 16 15 1 14 1
2 COLUMNS 5 5 5 1 1 4
3 VESSELS 41 41 41 9 4 5 17 4 11
4 HEAT EXCHANGERS 48 48 48 42 7 10 25 5 1
5 AIR COOLERS 78 78 78 78
6 COMPRESSORS 1 1 1 1
7 PUMPS 79 79 79 17 17 2 12 16 32
8 FANS / BLOWERS 7 7 7 1 1 3 3
9 BURNERS
FILTERS/
10 24 24 24 1 1 10 2 5 4 2
COALESCERS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 10 10 10 10 6 3 1
2 COLUMNS 7 7 7 2 2 4 1
3 VESSELS 72 72 72 35 19 5 11 2 35
4 HEAT EXCHANGERS 96 96 96 91 53 31 7 1 3 1
6 COMPRESSORS 8 8 8 8 1 7
7 PUMPS 83 83 83 25 17 4 4 10 8 12 2 26
8 FANS / BLOWERS 6 6 6 6 6
9 BURNERS
FILTERS/
10 16 16 16 7 3 4 6 3
COALESCERS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 2 2 2 2 2
2 COLUMNS 2 2 2 2
3 VESSELS 15 15 15 5 5 1 9
4 HEAT EXCHANGERS 17 17 17 13 11 1 1 1 3
5 AIR COOLERS
6 COMPRESSORS
7 PUMPS 24 24 24 6 6 4 6 6 2
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 2 2 2 2 2
COALESCERS
TOTAL 62 62 62 28 26 1 1 7 7 6 14
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 10 10 10 10
2 COLUMNS
3 VESSELS 22 22 22 22
4 HEAT EXCHANGERS 35 35 35 35 35
5 AIR COOLERS 12 12 12 12
6 COMPRESSORS 9 9 9 4 4 5
7 PUMPS 25 25 25 9 9 4 12
8 FANS / BLOWERS 6 6 6 6
9 BURNERS
FILTERS/
10
COALESCERS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 5 5 5 3 3 2
2 COLUMNS
3 VESSELS 40 40 40 5 1 32 2
4 HEAT EXCHANGERS 33 33 33 15 2 3 10 3
5 AIR COOLERS 1 1 1 1
6 COMPRESSORS 12 12 12 3 1 8
7 PUMPS 55 55 55 21 15 7 3 8 22
8 FANS / BLOWERS 39 39 38 1 29 9
9 BURNERS
FILTERS/
10 71 71 70 1 2 2 50 14 4
COALESCERS
11 HOPPERS / SILOS 30 30 30 2 12 16
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS 8 8 8 8
2 COLUMNS 8 8 8 2 6
3 VESSELS 57 57 57 15 15 2 12 2 24 2
4 HEAT EXCHANGERS 49 49 49 35 11 12 14 2 10
5 AIR COOLERS 32 32 32 4 8 4 16
6 COMPRESSORS 6 6 6 3 3 3
7 PUMPS 70 70 70 2 2 4 12 10 34 4 4
8 FANS / BLOWERS 2 2 2 2
9 BURNERS 6 6 6 2 4
FILTERS/
10 15 15 15 9 4 2
COALESCERS
WASTE HEAT
11 4 4 4 2 2
BOILERS
COMBUSTION &
12 INCINERATOR 6 6 6 2 4
CHAMBERS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS
2 COLUMNS
3 VESSELS 12 12 12 2 1 1 8
4 HEAT EXCHANGERS 7 7 7 7 2 5
5 AIR COOLERS 1 1 1 1
6 COMPRESSORS
7 PUMPS 62 62 62 29 11 18 4 22 4 3
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 2 2 2 2
COALESCERS
TOTAL 84 84 84 36 13 18 5 4 5 22 5 11 1
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS
2 COLUMNS
3 VESSELS 26 26 26 3 2 21
4 HEAT EXCHANGERS 3 3 3 3 3
5 AIR COOLERS
6 COMPRESSORS 9 9 9 6 6 2 1
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10 2 2 2 2
COALESCERS
NO. (Nos.) QTY. QTY. QTY. QTY. QTY. A-19 M-19 J-19 J-19 A-19 S-19 O-19 N-19 D-19 J-20 F-20 M-20 A-20 M-20 J-20 J-20 A-20 S-20 O-20
1 REACTORS
2 COLUMNS
3 VESSELS 8 8 8 8
4 HEAT EXCHANGERS
5 AIR COOLERS
6 COMPRESSORS 1 1 1 1
7 PUMPS 41 41 41 35 26 9 6
8 FANS / BLOWERS
9 BURNERS
FILTERS/
10
COALESCERS
TOTAL 50 50 50 35 26 9 8 7
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE ISSUED INCORPORATING (SCHD (ACTUAL
DRAWING/ DOCUMENT REVAMP/ (10%) (65%) (85%) (95%) (100%) REVAMP
DRAWING/ DOCUMENT TITLE WTG PROGRESS PROGRESS
NO. EXISTING
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-140-1111 E COOLING WATER DISTRIBUTION 1.5 13-Dec-14 23-Feb-15 21-Feb-15 25-Jun-15 11-Jun-15 11-Aug-15 11-Jul-15 29-Jan-16 31-Oct-19 - - - 95% 95.0%
A545-02-41-140-1114 R CLOSED BLOW DOWN DRUM DISTRIBUTION 1.5 17-Dec-14 26-Feb-15 25-Feb-15 13-Apr-15 15-Jun-15 14-Aug-15 15-Jul-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1118 R CLOSED BLOW DOWN DRUM 1.5 4-Feb-15 28-Feb-15 15-Apr-15 13-Apr-15 3-Aug-15 17-Sep-15 2-Sep-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1128 R LP FLARE DISTRIBUTION 1.5 6-Feb-15 2-Mar-15 17-Apr-15 13-Apr-15 5-Aug-15 11-Aug-15 4-Sep-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1129 E FLARE KOD (HP & LP) 1.5 8-Feb-15 5-Mar-15 19-Apr-15 15-Apr-15 7-Aug-15 10-Sep-15 6-Sep-15 29-Jan-16 31-Oct-19 - - - 95% 95.0%
A545-02-41-140-1130 E BFW/DM WATER DISTRIBUTION 1.5 18-Dec-14 11-Mar-15 26-Feb-15 18-Jun-15 16-Jun-15 11-Aug-15 16-Jul-15 29-Jan-16 31-Oct-19 - - - 95% 95.0%
A545-02-41-140-1131 R HP STEAM DISTRIBUTION 1.5 20-Dec-14 13-Mar-15 28-Feb-15 12-Jun-15 18-Jun-15 10-Aug-15 18-Jul-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1132 E MP DISTRIBUTION 1.5 22-Dec-14 16-Mar-15 2-Mar-15 12-Jun-15 20-Jun-15 10-Aug-15 20-Jul-15 29-Jan-16 31-Oct-19 - - - 95% 95.0%
A545-02-41-140-1133 E LP DISTRIBUTION 1.5 24-Dec-14 20-Mar-15 4-Mar-15 12-Jun-15 22-Jun-15 10-Aug-15 22-Jul-15 29-Jan-16 31-Oct-19 - - - 95% 95.0%
A545-02-41-140-1137 R SUSPECT CONDENSATE RECOVERY 1.5 26-Dec-14 23-Mar-15 6-Mar-15 15-Jun-15 24-Jun-15 27-Aug-15 24-Jul-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1138 R NITROGEN DISTRIBUTION 1.5 28-Dec-14 25-Mar-15 8-Mar-15 15-Jun-15 26-Jun-15 11-Aug-15 26-Jul-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1139 R INSTRUMENT AIR AND PLANT AIR DISTRIBUTION 1.5 30-Dec-14 28-Mar-15 10-Mar-15 12-Jun-15 28-Jun-15 11-Aug-15 28-Jul-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1140 E FUEL GAS DISTRIBUTION 1.5 1-Jan-15 30-Mar-15 12-Mar-15 20-Jun-15 30-Jun-15 11-Aug-15 30-Jul-15 29-Jan-16 31-Oct-19 - - - 95% 95.0%
A545-02-41-140-1141 E SERVICE WATER DISTRIBUTION 1.5 3-Jan-15 22-May-15 14-Mar-15 12-Jun-15 2-Jul-15 10-Aug-15 1-Aug-15 29-Jan-16 31-Oct-19 - - - 95% 95.0%
A545-02-41-140-1151 R CONTROL VALVE DRAIN/ VENT DETAILS 1.5 5-Jan-15 30-Jul-15 16-Mar-15 30-Nov-15 4-Jul-15 10-Dec-15 3-Aug-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1153 R SAMPLE CONNECTION DRAIN/ VENT DETAILS 1.5 9-Jan-15 30-Jul-15 20-Mar-15 14-Dec-15 8-Jul-15 28-Dec-15 7-Aug-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1154 R PUMP SEAL PLAN DETAILS 1.5 14-Jan-15 24-Sep-15 25-Mar-15 8-Oct-15 13-Jul-15 29-Oct-15 12-Aug-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1180 E FUEL GAS K.O. DRUM 1.5 12-Feb-15 30-May-15 23-Apr-15 20-Jun-15 11-Aug-15 11-Aug-15 10-Sep-15 29-Jan-16 31-Oct-19 - - - 95% 95.0%
A545-02-41-140-1181 R STRONG ACID SEWER DISTRIBUTION 1.5 8-Jan-15 18-Jun-15 19-Mar-15 9-Jul-15 7-Jul-15 10-Aug-15 6-Aug-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-140-1183 R CHEMICAL SEWER DISTRIBUTION 1.5 10-Jan-15 18-Jun-15 21-Mar-15 9-Jul-15 9-Jul-15 10-Aug-15 8-Aug-15 29-Jan-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
Process P&IDs
A545-02-41-142-PFD R PROCESS FLOW DIAGRAM 14.7 18-Aug-14 11-Aug-14 17-Sep-14 10-Sep-14 24-Sep-14 17-Sep-14 8-Oct-14 1-Oct-14 22-Oct-14 15-Oct-14 - - 100% 100.0%
A545-02-41-142-P&ID R PIPING & INSTRUMENTATION DIAGRAM 14.7 8-Oct-14 29-Sep-14 7-Nov-14 29-Oct-14 14-Nov-14 5-Nov-14 28-Nov-14 24-Sep-15 31-Oct-19 - 28-Apr-18 28-May-18 95% 95.0%
A545-02-41-142-PDS R PROCESS DATA SHEET 14.7 27-Nov-14 17-Nov-14 27-Dec-14 17-Dec-14 3-Jan-15 24-Dec-14 17-Jan-15 29-Sep-15 28-Apr-17 25-Sep-17 10-Apr-18 30-May-18 100% 100.0%
A545-02-41-142-HZP R HAZOP 4.4 22-Feb-16 1-Feb-16 - - - - - - 23-Mar-16 12-Feb-16 30-Apr-19 - 100% 100.0%
A545-02-41-142-UTS R UTILITY SUMMARY 1.5 28-Dec-14 18-Mar-15 28-Jan-15 17-Apr-15 11-Feb-15 24-Apr-15 13-Mar-15 16-Feb-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-142-FLS R FLARE LOAD SUMMARY 1.5 19-Jan-15 28-Mar-15 19-Feb-15 28-Apr-15 5-Mar-15 5-May-15 4-Apr-15 16-Feb-16 17-May-17 30-Apr-18 16-Jun-18 30-Apr-18 100% 100.0%
A545-02-41-142-EFS R EFFLUENT SUMMARY 1.5 4-Jan-15 23-Mar-15 4-Feb-15 21-Apr-15 18-Feb-15 28-Apr-15 20-Mar-15 16-Feb-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-142-CHS R CHEMICAL SUMMARY 1.5 14-Dec-14 22-Jan-15 14-Jan-15 21-Feb-15 28-Jan-15 28-Feb-15 27-Feb-15 16-Feb-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-142-CED R CAUSE & EFFECT DIAGRAM 1.5 8-Jan-15 4-Apr-15 7-Feb-15 4-May-15 21-Feb-15 11-May-15 23-Mar-15 16-Feb-16 31-Oct-19 - 2-Jul-18 30-Jun-18 95% 95.0%
A545-02-41-142-EQL R EQUIPMENT LIST 1.5 14-Dec-14 16-Feb-15 29-Dec-14 18-Mar-15 12-Jan-15 25-Mar-15 19-Jan-15 28-Apr-15 23-Feb-15 28-Apr-15 30-Apr-19 - 100% 100.0%
A545-02-41-142-LNL R LINE LIST 1.5 9-Jan-15 16-Mar-15 9-Feb-15 15-Apr-15 23-Feb-15 22-Apr-15 25-Mar-15 29-Jan-16 29-Apr-15 29-Jan-16 30-Apr-19 - 100% 100.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE ISSUED INCORPORATING (SCHD (ACTUAL
DRAWING/ DOCUMENT REVAMP/ (10%) (65%) (85%) (95%) (100%) REVAMP
DRAWING/ DOCUMENT TITLE WTG PROGRESS PROGRESS
NO. EXISTING
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
100 97.5%
A545-142-16-47-01101 E E P&ID FOR CRWS SYSTEM 2.0 19-May-15 22-May-15 3-Jun-15 30-Jul-15 10-Jun-15 4-Aug-15 14-Jun-15 8-Aug-15 28-Jun-15 18-Aug-15 12-Aug-15 6-Oct-15 - - 100% 100.0%
A545-142-16-47-01102 E E P&ID FOR CRWS PUMPING 2.0 21-May-15 8-Sep-15 5-Jun-15 15-Sep-15 12-Jun-15 22-Sep-15 16-Jun-15 26-Sep-15 30-Jun-15 6-Oct-15 16-Nov-16 3-Jul-18 - - 100% 100.0%
A545-142-16-47-01111 E E P&ID FOR FIRE WATER SYSTEM 2.4 27-May-15 28-May-15 10-Jun-15 27-Jul-15 17-Jun-15 7-Aug-15 21-Jun-15 19-Aug-15 5-Jul-15 24-Sep-15 21-Dec-16 3-Jul-18 - - 100% 100.0%
A545-142-16-47-01112 E E P&ID FOR FIRE WATER SPRAY (6 Sheets) 9.6 5-Jun-15 30-May-15 19-Jun-15 15-Jul-15 26-Jun-15 27-Jul-15 2-Jul-15 5-Aug-15 16-Jul-15 29-Sep-15 29-Apr-19 29-Apr-19 - - 100% 100.0%
A545-142-81-41-31109 E E P&ID OF DRINKING WATER SYSTEM SAR 0.8 22-Jun-15 3-Aug-15 6-Jul-15 17-Aug-15 13-Jul-15 24-Aug-15 17-Jul-15 29-Aug-15 31-Jul-15 12-Sep-15 14-Sep-15 26-Sep-15 - - 100% 100.0%
A545-142-16-47-02000 E C AREA DIVISION LAYOUT U/G PIPING ISBL 0.7 18-May-15 13-Jul-15 5-Jun-15 27-Jul-15 12-Jun-15 3-Aug-15 19-Jun-15 10-Aug-15 4-Jul-15 24-Aug-15 2-Sep-15 31-Aug-15 - - 100% 100.0%
A545-142-16-47-02001 R C UNIT AREA-01 1.5 13-Jul-15 13-Oct-15 3-Aug-15 27-Oct-15 17-Aug-15 9-Nov-15 31-Aug-15 14-Nov-15 21-Sep-15 28-Nov-15 24-Dec-16 14-Mar-17 3-Sep-18 25-Feb-19 100% 100.0%
A545-142-16-47-02002 R C UNIT AREA-02 1.5 16-Jul-15 13-Oct-15 6-Aug-15 27-Oct-15 20-Aug-15 9-Nov-15 3-Sep-15 14-Nov-15 24-Sep-15 28-Nov-15 27-Dec-16 14-Mar-17 3-Sep-18 25-Feb-19 100% 100.0%
A545-142-16-47-02003 R C UNIT AREA-03 1.5 18-Jul-15 13-Oct-15 8-Aug-15 27-Oct-15 22-Aug-15 9-Nov-15 5-Sep-15 14-Nov-15 26-Sep-15 28-Nov-15 29-Dec-16 14-Mar-17 3-Sep-18 25-Feb-19 100% 100.0%
A545-142-16-47-02004 E C UNIT AREA-04 1.5 20-Jul-15 19-Oct-15 10-Aug-15 2-Nov-15 24-Aug-15 9-Nov-15 7-Sep-15 14-Nov-15 28-Sep-15 28-Nov-15 31-Dec-16 14-Mar-17 - - 100% 100.0%
A545-142-16-47-02005 E C UNIT AREA-05 1.5 22-Jul-15 26-Sep-15 12-Aug-15 10-Oct-15 26-Aug-15 17-Oct-15 9-Sep-15 24-Oct-15 30-Sep-15 31-Oct-15 2-Jan-17 14-Mar-17 - - 100% 100.0%
A545-142-16-47-02006 E C UNIT AREA-06 1.5 24-Jul-15 26-Sep-15 14-Aug-15 10-Oct-15 28-Aug-15 17-Oct-15 11-Sep-15 24-Oct-15 2-Oct-15 31-Oct-15 4-Jan-17 14-Mar-17 - - 100% 100.0%
A545-142-16-47-02007 E C UNIT AREA-07 1.5 26-Jul-15 14-Oct-15 17-Aug-15 28-Oct-15 31-Aug-15 9-Nov-15 14-Sep-15 14-Nov-15 5-Oct-15 28-Nov-15 7-Jan-17 15-Mar-17 - - 100% 100.0%
A545-142-16-47-02008 E C UNIT AREA-08 1.5 28-Jul-15 19-Oct-15 18-Aug-15 2-Nov-15 1-Sep-15 9-Nov-15 15-Sep-15 14-Nov-15 6-Oct-15 28-Nov-15 8-Jan-17 15-Mar-17 - - 100% 100.0%
A545-142-16-47-02009 E C UNIT AREA-09 1.5 30-Jul-15 22-Sep-15 20-Aug-15 6-Oct-15 3-Sep-15 13-Oct-15 17-Sep-15 20-Oct-15 8-Oct-15 27-Oct-15 10-Jan-17 15-Mar-17 - - 100% 100.0%
A545-142-16-47-02010 E C UNIT AREA-10 1.5 1-Aug-15 22-Sep-15 22-Aug-15 6-Oct-15 5-Sep-15 13-Oct-15 19-Sep-15 20-Oct-15 10-Oct-15 27-Oct-15 12-Jan-17 15-Mar-17 - - 100% 100.0%
A545-142-16-47-02011 E C UNIT AREA-11 1.5 3-Aug-15 22-Sep-15 24-Aug-15 6-Oct-15 7-Sep-15 13-Oct-15 21-Sep-15 20-Oct-15 12-Oct-15 27-Oct-15 14-Jan-17 15-Mar-17 - - 100% 100.0%
A545-142-16-47-02012 E C UNIT AREA-12 1.5 5-Aug-15 19-Oct-15 26-Aug-15 2-Nov-15 9-Sep-15 9-Nov-15 23-Sep-15 14-Nov-15 14-Oct-15 28-Nov-15 16-Jan-17 16-Mar-17 - - 100% 100.0%
A545-142-16-47-02013 E C UNIT AREA-13 1.5 7-Aug-15 24-Sep-15 28-Aug-15 8-Oct-15 11-Sep-15 15-Oct-15 25-Sep-15 22-Oct-15 16-Oct-15 29-Oct-15 18-Jan-17 16-Mar-17 - - 100% 100.0%
A545-142-16-47-02014 E C UNIT AREA-14 1.5 9-Aug-15 24-Sep-15 31-Aug-15 8-Oct-15 14-Sep-15 15-Oct-15 28-Sep-15 22-Oct-15 19-Oct-15 29-Oct-15 21-Jan-17 16-Mar-17 - - 100% 100.0%
A545-142-16-47-02015 E C UNIT AREA-15 1.5 11-Aug-15 26-Sep-15 1-Sep-15 10-Oct-15 15-Sep-15 17-Oct-15 29-Sep-15 24-Oct-15 20-Oct-15 31-Oct-15 22-Jan-17 16-Mar-17 - - 100% 100.0%
A545-142-16-47-02016 E C UNIT AREA-16 1.5 13-Aug-15 19-Oct-15 3-Sep-15 2-Nov-15 17-Sep-15 9-Nov-15 1-Oct-15 14-Nov-15 22-Oct-15 28-Nov-15 24-Jan-17 16-Mar-17 - - 100% 100.0%
A545-142-81-41-13301 E C GA OF CRWS SUMP 2.2 5-Sep-15 24-Sep-15 19-Sep-15 8-Oct-15 26-Sep-15 15-Oct-15 1-Oct-15 22-Oct-15 30-Nov-15 29-Oct-15 13-Feb-16 30-May-16 - - 100% 100.0%
A545-142-16-47-01116 R E LAYOUT OF FIRE EXTINGUISHER 1.1 16-Sep-15 14-Oct-15 30-Sep-15 28-Oct-15 7-Oct-15 4-Nov-15 12-Oct-15 11-Nov-15 11-Nov-15 18-Nov-15 31-Dec-16 3-Jul-18 18-May-19 25-Apr-19 100% 100.0%
A545-142-16-47-02030 R C LAYOUT OF RCC PAVEMENT 2.2 5-Sep-15 30-Oct-15 19-Sep-15 13-Nov-15 26-Sep-15 20-Nov-15 1-Oct-15 27-Nov-15 30-Nov-15 23-Dec-15 20-May-19 22-Apr-19 20-May-19 22-Apr-19 100% 100.0%
A545-142-16-47-30050 R C ISOS U/G PIPING 14.4 17-Aug-15 30-Nov-15 - - - - - - - 24-Jun-16 31-Jan-17 24-Jan-17 14-Sep-18 22-Aug-18 100% 100.0%
100 100.0%
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-16-48-00101 To
R C PILE LAYOUT 1.3 26-Mar-15 13-Mar-15 2-Apr-15 20-Mar-15 9-Apr-15 27-Mar-15 13-Apr-15 31-Mar-15 27-Apr-15 4-Aug-15 26-Jul-15 14-Aug-15 2-Jul-18 22-Aug-18 100% 100.0%
00102
A545-142-16-48-00103 To
E C PILE LAYOUT 1.9 26-Mar-15 13-Mar-15 2-Apr-15 20-Mar-15 9-Apr-15 27-Mar-15 13-Apr-15 31-Mar-15 27-Apr-15 4-Aug-15 26-Jul-15 14-Aug-15 - - 100% 100.0%
A545-142-81-41-00105
A545-142-16-48-00201 TO
R C FOUNDATION LAYOUT 3.1 4-Apr-15 24-Aug-15 11-Apr-15 31-Aug-15 18-Apr-15 7-Sep-15 22-Apr-15 14-Sep-15 6-May-15 21-Sep-15 4-Aug-15 28-Sep-15 14-Jul-18 30-Aug-18 100% 100.0%
A545-142-81-41-00205
GA & R/F DET OF FDN FOR ANALYSER
A545-142-16-48-30280 E C 7-Feb-17 22-May-17 6-Mar-19 - 13-Mar-19 - 17-Mar-19 - 31-Mar-19 - 1-May-19 - - - 100% 10.0%
SHELTER
MAIN/BRANCH PIPE RACK G.A & DET. OF FDN.&
A545-142-16-48-00301 E C 0.7 20-May-15 22-May-15 27-May-15 28-Sep-15 3-Jun-15 1-Oct-15 7-Jun-15 5-Oct-15 21-Jun-15 9-Oct-15 19-Sep-15 16-Oct-15 - - 100% 100.0%
COLS.
A545-142-81-41-10304 E C MAIN PIPE RACK R/F DET. OF BEAMS 0.7 28-May-15 23-May-15 4-Jun-15 25-Aug-15 11-Jun-15 21-Jan-16 15-Jun-15 25-Jan-16 29-Jun-15 8-Feb-16 27-Sep-15 22-Feb-16 - - 100% 100.0%
A545-142-81-41-10307 E C MAIN PIPE RACK INSERT DETAILS 0.7 6-Jun-15 26-May-15 13-Jun-15 21-Jan-16 20-Jun-15 28-Jan-16 24-Jun-15 1-Feb-16 8-Jul-15 15-Feb-16 6-Oct-15 29-Feb-16 - - 100% 100.0%
A545-142-81-41-02311 E C MAIN PIPE RACK ELEVATION ALONG GRID D 0.7 7-Jun-15 19-Dec-16 13-Jun-15 2-Jan-17 20-Jun-15 9-Jan-17 24-Jun-15 13-Jan-17 8-Jul-15 27-Jan-17 6-Oct-15 23-Feb-17 - - 100% 100.0%
A545-142-81-41-02321 &
E C MAIN PIPE RACK ELEVATION ALONG GRID E 0.7 7-Jun-15 12-Aug-15 13-Jun-15 19-Aug-15 20-Jun-15 26-Aug-15 24-Jun-15 2-Sep-15 8-Jul-15 16-Sep-15 6-Oct-15 30-Sep-15 - - 100% 100.0%
02322
A545-142-81-41-02331 &
E C MAIN PIPE RACK ELEVATION ALONG GRID F 0.7 8-Jun-15 12-Aug-15 15-Jun-15 19-Aug-15 22-Jun-15 26-Aug-15 26-Jun-15 2-Sep-15 10-Jul-15 16-Sep-15 8-Oct-15 30-Sep-15 - - 100% 100.0%
02332
A545-142-16-48-02341 E C MAIN PIPE RACK ELEVATION ALONG GRID G 0.7 10-Jun-15 23-Dec-16 17-Jun-15 30-Dec-16 24-Jun-15 6-Jan-17 28-Jun-15 13-Jan-17 12-Jul-15 27-Jan-17 10-Oct-15 23-Feb-17 - - 100% 100.0%
A545-142-16-48-00311 E C MAIN PIPE RACK PLAN AT EL.107.000 0.7 18-Jun-15 20-Jul-15 25-Jun-15 28-Aug-15 2-Jul-15 26-Aug-15 6-Jul-15 2-Sep-15 20-Jul-15 16-Sep-15 18-Oct-15 30-Sep-15 - - 100% 100.0%
A545-142-16-48-00312 E C MAIN PIPE RACK PLAN AT EL.107.000 0.7 21-Jun-15 20-Jul-15 28-Jun-15 19-Aug-15 5-Jul-15 26-Aug-15 9-Jul-15 2-Sep-15 23-Jul-15 16-Sep-15 21-Oct-15 30-Sep-15 - - 100% 100.0%
A545-142-81-41-09311 E C MAIN PIPE RACK CROSS SECTION 0.7 9-Jul-15 5-Aug-15 16-Jul-15 19-Aug-15 23-Jul-15 26-Aug-15 27-Jul-15 2-Sep-15 10-Aug-15 16-Sep-15 8-Nov-15 30-Sep-15 - - 100% 100.0%
A545-142-81-41-09321 E C MAIN PIPE RACK STAIR CASE 0.7 30-Jun-15 26-Mar-16 7-Jul-15 9-Apr-16 14-Jul-15 16-Apr-16 18-Jul-15 23-Apr-16 1-Aug-15 30-Apr-16 12-Jan-17 3-Apr-17 - - 100% 100.0%
A545-142-16-48-10316 E C MAIN PIPE RACK GA AT BATTERY LIMIT 0.7 3-Jul-15 25-Jul-15 10-Jul-15 30-Sep-15 18-Nov-16 23-Jun-18 22-Nov-16 30-Jun-18 6-Dec-16 12-Oct-18 6-Mar-19 22-Jan-19 - - 100% 100.0%
A545-142-16-48-00321 E C MAIN PIPE RACK PLAN AT EL.109.500 0.7 12-Jul-15 12-Aug-15 19-Jul-15 19-Aug-15 26-Jul-15 26-Aug-15 30-Jul-15 2-Sep-15 13-Aug-15 16-Sep-15 11-Nov-15 30-Sep-15 - - 100% 100.0%
A545-142-16-48-00322 E C MAIN PIPE RACK PLAN AT EL.109.500 0.7 15-Jul-15 12-Aug-15 22-Jul-15 19-Aug-15 29-Jul-15 26-Aug-15 2-Aug-15 2-Sep-15 16-Aug-15 16-Sep-15 14-Nov-15 30-Sep-15 - - 100% 100.0%
A545-142-81-41-00331 E C MAIN PIPE RACK PLAN AT EL.113.500 0.7 27-Jul-15 31-Aug-15 3-Aug-15 7-Sep-15 10-Aug-15 14-Sep-15 14-Aug-15 21-Sep-15 28-Aug-15 5-Oct-15 26-Nov-15 22-Jan-16 - - 100% 100.0%
A545-142-81-41-00332 E C MAIN PIPE RACK PLAN AT EL.113.500 0.7 30-Jul-15 31-Aug-15 6-Aug-15 7-Sep-15 13-Aug-15 14-Sep-15 17-Aug-15 21-Sep-15 31-Aug-15 5-Oct-15 29-Nov-15 22-Jan-16 - - 100% 100.0%
A545-142-81-41-00341 E C MAIN PIPE RACK PLAN AT EL.117.25 0.7 1-Aug-15 22-Sep-15 8-Aug-15 21-Sep-15 15-Aug-15 28-Sep-15 19-Aug-15 5-Oct-15 2-Sep-15 31-May-16 23-Feb-17 28-Sep-17 - - 100% 100.0%
A545-142-81-41-00342 E C MAIN PIPE RACK PLAN AT EL.117.25 0.7 3-Aug-15 22-Sep-15 8-Aug-15 6-Jan-17 15-Aug-15 13-Jan-17 19-Aug-15 20-Jan-17 2-Sep-15 27-Jan-17 1-Dec-15 23-Feb-17 - - 100% 100.0%
A545-142-16-48-00346 E C MAIN PIPE RACK PLAN AT EL.123.00 0.7 5-Aug-15 22-Sep-15 10-Aug-15 6-Jan-17 17-Aug-15 13-Jan-17 21-Aug-15 20-Jan-17 4-Sep-15 27-Jan-17 3-Dec-15 23-Feb-17 - - 100% 100.0%
A545-142-16-48-00347 E C MAIN PIPE RACK PLAN AT EL.123.00 0.7 7-Aug-15 22-Sep-15 12-Aug-15 6-Jan-17 19-Aug-15 13-Jan-17 23-Aug-15 20-Jan-17 6-Sep-15 27-Jan-17 5-Dec-15 23-Feb-17 - - 100% 100.0%
A545-142-16-48-08311 to
E C MAIN PIPE RACK MANIFOLD STRUCTURE 1.4 5-Aug-15 6-Feb-16 12-Aug-15 13-Feb-16 19-Aug-15 20-Feb-16 23-Aug-15 25-Feb-16 8-Apr-17 24-Mar-17 7-Jul-17 31-Mar-17 - - 100% 100.0%
08312
A545-142-81-41-00320 E C MISC. DETAILS FOR PIPE RACKS 0.2 9-Sep-15 24-Jun-17 16-Sep-15 1-Jul-17 23-Sep-15 8-Jul-17 27-Sep-15 15-Jul-17 11-Oct-15 22-Jul-17 24-Mar-19 22-Jul-17 - - 100% 100.0%
A545-142-16-48-08313 to
E C BRANCH PIPE RACK MANIFOLD STRUCTURE 2.8 9-Aug-15 6-Feb-16 16-Aug-15 13-Feb-16 23-Aug-15 20-Feb-16 27-Aug-15 25-Feb-16 12-Apr-17 24-Mar-17 11-Jul-17 31-Mar-17 - - 100% 100.0%
08317
A545-142-16-48-08314 BRANCH PIPE RACK MANIFOLD STRUCTURE 11-08-2015 =K30-7 =G30+7 =N30-7 #VALUE! 20-Feb-16 #VALUE! 25-Feb-16 #VALUE! - =S30+90 - =S30+90 - 80.0%
A545-142-16-48-08315 BRANCH PIPE RACK MANIFOLD STRUCTURE 13-08-2015 =K31-7 =G31+7 =N31-7 #VALUE! 20-Feb-16 #VALUE! 25-Feb-16 #VALUE! - =S31+90 - =S31+90 - 80.0%
A545-142-16-48-08316 BRANCH PIPE RACK MANIFOLD STRUCTURE 15-08-2015 =K32-7 =G32+7 =N32-7 #VALUE! 20-Feb-16 #VALUE! 25-Feb-16 #VALUE! - =S32+90 - =S32+90 - 80.0%
A545-142-16-48-18318 E C BRANCH PIPE RACK MANIFOLD STRUCTURE 0.7 17-Aug-15 6-Feb-16 16-Aug-15 13-Feb-16 23-Aug-15 20-Feb-16 27-Aug-15 25-Feb-16 10-Sep-15 24-Mar-17 11-Jul-17 31-Mar-17 - - 100% 100.0%
A545-142-81-41-14304 E C BRANCH PIPE RACK R/F DETAIL OF BEAM 0.7 17-Aug-15 16-Feb-16 24-Aug-15 23-Feb-16 31-Aug-15 1-Mar-16 4-Sep-15 7-Mar-16 18-Sep-15 14-Mar-16 22-Mar-17 28-Aug-18 - - 100% 100.0%
A545-142-81-41-14307 E C BRANCH PIPE RACK INSERT PLATES 0.7 19-Aug-15 16-Jan-16 26-Aug-15 23-Jan-16 2-Sep-15 30-Jan-16 7-Sep-15 5-Feb-16 21-Sep-15 12-Feb-16 25-Mar-17 30-Aug-18 - - 100% 100.0%
A545-142-16-48-00351 E C COMPRESSOR SHED FOUNDATION LAYOUT 0.7 5-Oct-15 7-Nov-15 12-Oct-15 21-Nov-15 19-Oct-15 28-Nov-15 23-Oct-15 5-Dec-15 6-Nov-15 18-Jan-16 20-Mar-19 21-Jan-19 - - 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-16-48-00358 COMPRESSOR RACK GA AND DETAILS 10-11-2015 - =G36+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-16-48-00359 COMPRESSOR RACK ELEVATION 15-11-2015 - =G37+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-16-48-00361 E C GA & DETAIL OF COMP. PLATFORM 0.7 20-Jan-17 22-May-17 27-Jan-17 30-Jun-18 3-Feb-17 12-Feb-19 7-Feb-17 19-Feb-19 21-Feb-17 26-Feb-19 13-Mar-19 26-Feb-19 - - 100% 100.0%
A545-142-16-48-00371 GA OF FDN FOR FOR 142-C-XX 20-05-2015 - =G39+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-16-48-00372 R/F DET OF FDN FOR FOR 142-C-XX 23-05-2015 - =G40+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-16-48-00373 GA OF FDN FOR FOR 142-C-XX 26-05-2015 - =G41+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-16-48-00374 R/F DET OF FDN FOR FOR 142-C-XX 29-05-2015 - =G42+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-16-48-00375 GA OF FDN FOR FOR 142-C-XX 01-06-2015 - =G43+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-16-48-00376 R/F DET OF FDN FOR FOR 142-C-XX 04-06-2015 - =G44+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-81-41-04311 E C BRANCH PIPE RACK PLAN AT EL.105.750 0.7 18-Jul-15 13-Aug-15 25-Jul-15 27-Aug-15 1-Aug-15 3-Sep-15 5-Aug-15 10-Sep-15 19-Aug-15 17-Sep-15 17-Nov-15 1-Oct-15 - - 100% 100.0%
A545-142-81-41-04312 E C BRANCH PIPE RACK PLAN AT EL.108.250 0.7 21-Jul-15 13-Aug-15 28-Jul-15 27-Aug-15 4-Aug-15 3-Sep-15 8-Aug-15 10-Sep-15 22-Aug-15 17-Sep-15 20-Nov-15 1-Oct-15 - - 100% 100.0%
A545-142-81-41-04313 E C BRANCH PIPE RACK PLAN AT EL.111.000 0.7 24-Jul-15 13-Aug-15 31-Jul-15 27-Aug-15 7-Aug-15 3-Sep-15 11-Aug-15 10-Sep-15 25-Aug-15 17-Sep-15 23-Nov-15 1-Oct-15 - - 100% 100.0%
A545-142-81-41-04314 E C BRANCH PIPE RACK PLAN AT EL.116.000 0.7 26-Jul-15 13-Aug-15 2-Aug-15 27-Aug-15 9-Aug-15 3-Sep-15 13-Aug-15 10-Sep-15 27-Aug-15 17-Sep-15 25-Nov-15 1-Oct-15 - - 100% 100.0%
A545-142-81-41-04315 E C BRANCH PIPE RACK PLAN AT EL.118.500 0.7 28-Jul-15 21-Sep-15 4-Aug-15 21-Sep-15 11-Aug-15 28-Sep-15 15-Aug-15 5-Oct-15 31-Dec-16 28-Mar-17 31-Mar-17 28-Sep-17 - - 100% 100.0%
A545-142-81-41-04316 E C BRANCH PIPE RACK PLAN AT EL.123.000 0.7 30-Jul-15 21-Sep-15 6-Aug-15 21-Sep-15 13-Aug-15 28-Sep-15 17-Aug-15 5-Oct-15 2-Jan-17 28-Mar-17 3-Apr-17 28-Sep-17 - - 100% 100.0%
A545-142-81-41-04323 E C BRANCH PIPE RACK CROSS SECTION 0.7 6-Aug-15 13-Aug-15 13-Aug-15 27-Aug-15 20-Aug-15 3-Sep-15 24-Aug-15 10-Sep-15 7-Sep-15 17-Sep-15 6-Dec-15 1-Oct-15 - - 100% 100.0%
A545-142-81-41-04324 E C BRANCH PIPE RACK STAIRCASE 0.7 8-Aug-15 26-Mar-16 15-Aug-15 9-Apr-16 22-Aug-15 16-Apr-16 26-Aug-15 23-Apr-16 9-Sep-15 30-Apr-16 21-Apr-17 31-Mar-17 - - 100% 100.0%
A545-142-81-41-01411 R C TECH STR-1 G.A. & R/F DET. OF FDN. 0.7 11-Jun-15 21-Sep-15 18-Jun-15 30-Dec-15 25-Jun-15 8-Jan-16 29-Jun-15 15-Jan-16 13-Jul-15 22-Jan-16 24-Mar-19 18-Feb-19 24-Mar-19 - 100% 100.0%
A545-142-16-48-00402 R C TECH STR-1 PLANS 0.7 14-Jun-15 22-Sep-15 21-Jun-15 18-Jan-16 28-Jun-15 25-Jan-16 2-Jul-15 29-Jan-16 16-Jul-15 12-Feb-16 27-Mar-19 12-Feb-16 27-Mar-19 - 100% 100.0%
A545-142-16-48-00403 R C TECH STR-1 ELEVATION 0.3 17-Jun-15 22-Sep-15 24-Jun-15 18-Jan-16 1-Jul-15 25-Jan-16 5-Jul-15 29-Jan-16 19-Jul-15 12-Feb-16 30-Mar-19 12-Feb-16 30-Mar-19 - 100% 100.0%
A545-142-81-41-00404 R C TECH STR-1 ELEVATION 0.3 17-Jun-15 22-Sep-15 24-Jun-15 18-Jan-16 1-Jul-15 25-Jan-16 5-Jul-15 29-Jan-16 19-Jul-15 12-Feb-16 30-Mar-19 12-Feb-16 30-Mar-19 - 100% 100.0%
A545-142-16-48-00406 TECH STR-1 PLATES & OPENINGS DETAILS 20-06-2015 - =G66+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - 30-Jul-00 -
A545-142-81-41-10407 R C TECH STR-1 STAIRCASE 0.7 23-Jun-15 30-Sep-15 30-Jun-15 15-Jan-16 7-Jul-15 29-Feb-16 11-Jul-15 7-Mar-16 25-Jul-15 14-Mar-16 5-Apr-19 14-Mar-16 5-Apr-19 - 100% 100.0%
A545-142-81-41-10408 R C TECH STR 1 STAIRCASE 0.7 26-Jun-15 30-Sep-15 3-Jul-15 15-Feb-16 10-Jul-15 29-Feb-16 14-Jul-15 7-Mar-16 28-Jul-15 14-Mar-16 8-Apr-19 14-Mar-16 8-Apr-19 - 100% 100.0%
A545-142-81-41-30411 E C TECH STR-2 GA & R/F DET. OF FDN. 0.7 2-Jul-15 25-Sep-15 9-Jul-15 20-Oct-15 16-Jul-15 27-Oct-15 20-Jul-15 3-Nov-15 3-Aug-15 10-Nov-15 1-Nov-15 18-Nov-15 - - 100% 100.0%
A545-142-81-41-10412 E C TECH STR-2 PLANS & ELEVATIONS 0.7 5-Jul-15 27-Aug-15 12-Jul-15 10-Sep-15 19-Jul-15 17-Sep-15 23-Jul-15 24-Sep-15 6-Aug-15 10-Nov-15 4-Nov-15 22-Jan-16 - - 100% 100.0%
A545-142-16-48-00416 TECH STR-2 PLATES & OPENINGS DETAILS 11-07-2015 - =G70+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - 30-Jul-00 -
A545-142-81-41-10418 E C TECH STR-2 STAIRCASE 0.7 14-Jul-15 29-Dec-15 21-Jul-15 1-Jan-16 28-Jul-15 11-Jan-16 1-Aug-15 18-Jan-16 15-Aug-15 22-Jan-16 15-Feb-17 31-Jan-17 - - 100% 100.0%
A545-142-81-41-30421 E C TECH STR-3 GA & R/F DET. OF FDN. 0.7 17-Jul-15 25-Sep-15 24-Jul-15 28-Oct-15 31-Jul-15 4-Nov-15 4-Aug-15 11-Nov-15 18-Aug-15 18-Nov-15 16-Nov-15 18-Nov-15 - - 100% 100.0%
A545-142-81-41-10422 E C TECH STR-3 PLANS & ELEVATIONS 0.7 20-Jul-15 8-Sep-15 27-Jul-15 22-Sep-15 3-Aug-15 29-Sep-15 7-Aug-15 6-Oct-15 21-Aug-15 18-Nov-15 19-Nov-15 13-Jan-16 - - 100% 100.0%
A545-142-81-41-10427 E C TECH STR-3 STAIRCASE 0.7 29-Jul-15 30-Sep-15 5-Aug-15 1-Jan-16 12-Aug-15 11-Jan-16 16-Aug-15 18-Jan-16 30-Aug-15 22-Jan-16 2-Mar-17 10-Feb-17 - - 100% 100.0%
Page 414 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 2 of 7
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA DISCIPLINE: STRUCTURAL (ALKYLATION BLOCK)
ANNEXURE-A6
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-81-41-00430 DAVITS GA & DETAILS 01-08-2015 - =G70+7 - =J70+7 - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-81-41-10431 E C TECH STR-4 GA & R/F DET. OF FDN. 0.7 4-Aug-15 16-Oct-15 11-Aug-15 30-Oct-15 18-Aug-15 6-Nov-15 22-Aug-15 13-Nov-15 5-Sep-15 20-Nov-15 4-Dec-15 22-Jan-16 - - 100% 100.0%
A545-142-81-41-10432 E C TECH STR-4 PLANS & ELEVATION 0.7 7-Aug-15 14-Sep-15 14-Aug-15 28-Sep-15 21-Aug-15 5-Oct-15 25-Aug-15 12-Oct-15 8-Sep-15 22-Jan-16 11-Mar-17 31-Mar-17 - - 100% 100.0%
A545-142-81-41-10438 E C TECH STR-4 STAIRCASE 0.7 16-Aug-15 28-Sep-15 23-Aug-15 18-Jan-16 30-Aug-15 25-Jan-16 3-Sep-15 29-Jan-16 17-Sep-15 12-Feb-16 20-Mar-17 31-Mar-17 - - 100% 100.0%
A545-142-81-41-30441 E C TECH STR-5 G.A. & R/F DET. OF FDN. 0.7 19-Aug-15 28-Sep-15 26-Aug-15 30-Oct-15 2-Sep-15 6-Nov-15 6-Sep-15 13-Nov-15 20-Sep-15 20-Nov-15 19-Dec-15 22-Jan-16 - - 100% 100.0%
A545-142-16-48-00442 E C TECH STR-5 PLAN & ELEVATION 0.7 22-Aug-15 28-Sep-15 29-Aug-15 9-Oct-15 5-Sep-15 16-Oct-15 9-Sep-15 23-Oct-15 23-Sep-15 31-Dec-15 22-Dec-15 13-Jan-16 - - 100% 100.0%
A545-142-81-41-10448 E C TECH-5 GA & DETAILS OF STAIRCASE 0.7 31-Aug-15 30-Sep-15 7-Sep-15 1-Jan-16 14-Sep-15 11-Jan-16 18-Sep-15 18-Jan-16 2-Oct-15 22-Jan-16 4-Apr-17 11-Mar-17 - - 100% 100.0%
A545-142-81-41-00451 E C TECH STR-6 G.A. & R/F DET. OF FDN. 0.7 19-Aug-15 28-Sep-15 26-Aug-15 18-Jan-16 2-Sep-15 11-Feb-16 6-Sep-15 15-Feb-16 20-Sep-15 29-Feb-16 23-Mar-17 25-Aug-17 - - 100% 100.0%
A545-142-81-41-10452 E C TECH STR-6 PLAN & ELEVATION 0.7 22-Aug-15 28-Sep-15 29-Aug-15 1-Jan-16 5-Sep-15 8-Jan-16 9-Sep-15 15-Jan-16 23-Sep-15 22-Jan-16 26-Mar-17 25-Aug-17 - - 100% 100.0%
A545-142-81-41-10458 E C TECH STR-6 STAIRCASE 0.7 28-Aug-15 28-Sep-15 4-Sep-15 14-Jan-16 11-Sep-15 21-Jan-16 15-Sep-15 28-Jan-16 29-Sep-15 4-Feb-16 1-Apr-17 25-Aug-17 - - 100% 100.0%
A545-142-81-41-30461 E C TECH STR-7 G.A. & R/F DET. OF FDN. 0.7 24-Aug-15 30-Sep-15 31-Aug-15 30-Oct-15 7-Sep-15 6-Nov-15 11-Sep-15 13-Nov-15 25-Sep-15 20-Nov-15 24-Dec-15 22-Jan-16 - - 100% 100.0%
A545-142-81-41-10462 E C TECH STR-7 PLAN & ELEVATION 0.7 26-Aug-15 16-Sep-15 2-Sep-15 30-Sep-15 9-Sep-15 7-Oct-15 13-Sep-15 14-Oct-15 27-Sep-15 5-Dec-15 26-Dec-15 22-Jan-16 - - 100% 100.0%
A545-142-81-41-10468 E C TECH STR-7 STAIR CASE 0.7 28-Aug-15 30-Sep-15 4-Sep-15 18-Jan-16 11-Sep-15 1-Mar-16 15-Sep-15 8-Mar-16 29-Sep-15 15-Mar-16 1-Apr-17 28-Feb-17 - - 100% 100.0%
A545-142-81-41-30471 E C TECH STR-8 G.A. & R/F DET. OF FDN. 0.7 30-Aug-15 30-Sep-15 6-Sep-15 30-Oct-15 13-Sep-15 6-Nov-15 17-Sep-15 13-Nov-15 1-Oct-15 20-Nov-15 30-Dec-15 22-Jan-16 - - 100% 100.0%
A545-142-81-41-10472 E C TECH STR-8 PLAN & ELEVATION 0.7 2-Sep-15 30-Sep-15 9-Sep-15 10-Oct-15 16-Sep-15 17-Oct-15 20-Sep-15 24-Oct-15 4-Oct-15 5-Dec-15 2-Jan-16 22-Jan-16 - - 100% 100.0%
A545-142-81-41-10478 E C TECH STR-8 STAIR CASE 0.7 4-Sep-15 30-Sep-15 11-Sep-15 22-Jan-16 18-Sep-15 29-Jan-16 22-Sep-15 28-Jan-16 6-Oct-15 4-Feb-16 8-Apr-17 31-Mar-17 - - 100% 100.0%
A545-142-16-48-30501 E C FDN. FOR COLUMN 142-C-1001 0.1 20-Jun-15 18-Aug-15 27-Jun-15 1-Sep-15 4-Jul-15 8-Sep-15 8-Jul-15 15-Sep-15 22-Jul-15 29-Sep-15 20-Oct-15 29-Sep-15 - - 100% 100.0%
A545-142-16-48-30502 E C FDN FOR COLUMN 142-C-1002 0.1 23-Jun-15 18-Aug-15 30-Jun-15 1-Sep-15 7-Jul-15 8-Sep-15 11-Jul-15 15-Sep-15 25-Jul-15 29-Sep-15 23-Oct-15 29-Sep-15 - - 100% 100.0%
A545-142-16-48-30503 E C FDN FOR COLUMN 142-C-1003 0.1 26-Jun-15 18-Aug-15 3-Jul-15 1-Sep-15 10-Jul-15 8-Sep-15 14-Jul-15 15-Sep-15 28-Jul-15 29-Sep-15 26-Oct-15 29-Sep-15 - - 100% 100.0%
A545-142-16-48-30504 E C FDN FOR COLUMN 142-C-1004 0.1 29-Jun-15 30-Sep-15 6-Jul-15 3-Oct-15 13-Jul-15 10-Oct-15 17-Jul-15 17-Oct-15 31-Jul-15 31-Oct-15 29-Oct-15 31-Oct-15 - - 100% 100.0%
A545-142-81-41-30510 E C FDN FOR VESSEL 140-VV-1001 0.1 8-Jul-15 30-Sep-15 15-Jul-15 17-Dec-15 22-Jul-15 24-Dec-15 26-Jul-15 31-Dec-15 9-Aug-15 14-Jan-16 9-Feb-17 11-Jan-17 - - 100% 100.0%
A545-142-81-41-30511 E C FDN FOR VESSEL 140-VV-1008 0.1 8-Jul-15 30-Sep-15 15-Jul-15 17-Dec-15 22-Jul-15 24-Dec-15 26-Jul-15 31-Dec-15 9-Aug-15 14-Jan-16 9-Feb-17 11-Jan-17 - - 100% 100.0%
A545-142-81-41-30512 E C FDN FOR VESSEL 140-VV-1016 0.1 11-Jul-15 30-Sep-15 18-Jul-15 3-Oct-15 25-Jul-15 10-Oct-15 29-Jul-15 17-Oct-15 12-Aug-15 31-Oct-15 10-Nov-15 31-Oct-15 - - 100% 100.0%
A545-142-16-48-30513 E C FDN FOR VESSEL 142-VV-1003 0.1 14-Jul-15 18-Aug-15 21-Jul-15 1-Sep-15 28-Jul-15 8-Sep-15 1-Aug-15 15-Sep-15 15-Aug-15 29-Sep-15 13-Nov-15 29-Sep-15 - - 100% 100.0%
A545-142-16-48-30515 E C FDN FOR VESSEL 142-VV-1005 0.1 23-Jul-15 30-Sep-15 30-Jul-15 21-Dec-16 6-Aug-15 28-Dec-16 10-Aug-15 4-Jan-17 10-Dec-16 11-Jan-17 10-Mar-17 29-Aug-18 - - 100% 100.0%
A545-142-16-48-30516 E C FDN FOR VESSEL 142-VV-1006 0.1 23-Jul-15 30-Sep-15 30-Jul-15 21-Dec-15 6-Aug-15 28-Dec-15 10-Aug-15 4-Jan-16 10-Dec-16 29-Dec-16 30-Mar-19 29-Dec-16 - - 100% 100.0%
A545-142-16-48-30517 E C FDN FOR VESSEL 142-VV-1007 0.1 26-Jul-15 30-Sep-15 2-Aug-15 3-Oct-15 9-Aug-15 10-Oct-15 13-Aug-15 17-Oct-15 27-Aug-15 31-Oct-15 25-Nov-15 19-Nov-15 - - 100% 100.0%
A545-142-81-41-30518 E C FDN FOR VESSEL 140-VV-1017 0.1 29-Jul-15 30-Sep-15 5-Aug-15 3-Oct-15 12-Aug-15 10-Oct-15 16-Aug-15 17-Oct-15 30-Aug-15 31-Oct-15 28-Nov-15 19-Nov-15 - - 100% 100.0%
A545-142-16-48-30519 E C FDN FOR VESSEL 142-V-1009 0.1 1-Aug-15 30-Sep-15 8-Aug-15 3-Oct-15 15-Aug-15 10-Oct-15 19-Aug-15 17-Oct-15 2-Sep-15 31-Oct-15 1-Dec-15 19-Nov-15 - - 100% 100.0%
A545-142-16-48-30520 E C FDN FOR VESSEL 142-V-1010 0.1 4-Aug-15 30-Sep-15 11-Aug-15 3-Oct-15 18-Aug-15 10-Oct-15 22-Aug-15 17-Oct-15 5-Sep-15 31-Oct-15 4-Dec-15 19-Nov-15 - - 100% 100.0%
A545-142-16-48-30521 E C FDN FOR VESSEL 142-V-1011 0.1 7-Aug-15 30-Sep-15 14-Aug-15 3-Oct-15 21-Aug-15 10-Oct-15 25-Aug-15 17-Oct-15 8-Sep-15 31-Oct-15 7-Dec-15 31-Oct-15 - - 100% 100.0%
A545-142-16-48-30523 E C FDN FOR VESSEL 142-V-1013 0.1 13-Aug-15 30-Sep-15 20-Aug-15 3-Oct-15 27-Aug-15 10-Oct-15 31-Aug-15 17-Oct-15 14-Sep-15 31-Oct-15 13-Dec-15 31-Oct-15 - - 100% 100.0%
A545-142-16-48-30524 E C FDN FOR VESSEL 142-V-1014 0.1 16-Aug-15 18-Aug-15 23-Aug-15 1-Sep-15 30-Aug-15 8-Sep-15 3-Sep-15 15-Sep-15 17-Sep-15 29-Sep-15 16-Dec-15 29-Sep-15 - - 100% 100.0%
A545-142-16-48-30526 E C FDN FOR VESSEL 142-VV-1016 0.1 22-Aug-15 30-Sep-15 29-Aug-15 3-Oct-15 5-Sep-15 10-Oct-15 9-Sep-15 17-Oct-15 23-Sep-15 31-Oct-15 22-Dec-15 31-Oct-15 - - 100% 100.0%
A545-142-16-48-30528 E C FDN FOR VESSEL 142-VV-1018 0.1 28-Aug-15 30-Sep-15 4-Sep-15 15-Oct-15 11-Sep-15 22-Oct-15 15-Sep-15 29-Oct-15 29-Sep-15 5-Nov-15 28-Dec-15 19-Nov-15 - - 100% 100.0%
A545-142-16-48-30530 E C FDN FOR VESSEL 142-VV-1020 0.1 29-Aug-15 7-Dec-16 5-Sep-15 21-Dec-16 12-Sep-15 28-Dec-16 16-Sep-15 4-Jan-17 30-Sep-15 11-Jan-17 29-Dec-15 29-Aug-18 - - 100% 100.0%
Page 415 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 3 of 7
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA DISCIPLINE: STRUCTURAL (ALKYLATION BLOCK)
ANNEXURE-A6
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-81-41-30532 E C FDN FOR VESSEL 142-VV-1022 0.1 30-Aug-15 30-Sep-15 6-Sep-15 16-Oct-15 13-Sep-15 23-Oct-15 17-Sep-15 30-Oct-15 1-Oct-15 6-Nov-15 30-Dec-15 20-Nov-15 - - 100% 100.0%
A545-142-81-41-30533 E C FDN FOR VESSEL 142-VV-1023 0.1 30-Aug-15 1-Dec-16 6-Sep-15 8-Dec-16 13-Sep-15 15-Dec-16 17-Sep-15 22-Dec-16 1-Oct-15 29-Dec-16 13-Apr-19 29-Dec-16 - - 100% 100.0%
A545-142-81-41-30533 FDN FOR VESSEL 142-VV-1023 02-09-2015 30-09-2015 =G106+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! 24-Jun-16 - - #VALUE! 100.0%
A545-142-81-41-30534 E C FDN FOR VESSEL 142-VV-1024 0.1 4-Sep-15 24-Aug-15 11-Sep-15 31-Aug-15 18-Sep-15 7-Sep-15 22-Sep-15 14-Sep-15 6-Oct-15 14-Jan-16 22-Feb-17 25-Aug-17 - - 100% 100.0%
A545-142-81-41-30535 E C FDN FOR VESSEL 142-VV-1025 0.1 7-Sep-15 30-Sep-15 14-Sep-15 19-Sep-15 21-Sep-15 26-Sep-15 25-Sep-15 3-Oct-15 9-Oct-15 17-Oct-15 7-Jan-16 31-Oct-15 - - 100% 100.0%
A545-142-16-48-30536 E FDN FOR FILTER 142-GN-1001 A/B/C/D 09-09-2015 - =G109+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-81-41-01546 E C GA & R/F DET FOR OWS/CRWS SUMP 0.2 31-Aug-15 16-Oct-15 7-Sep-15 23-Oct-15 14-Sep-15 30-Oct-15 18-Sep-15 6-Nov-15 2-Oct-15 24-Jun-16 14-Apr-19 24-Jun-16 - - 100% 100.0%
A545-142-16-48-30551 E C FDN FOR EXCHANGER 142-EE-1001 A&D 0.1 6-Sep-15 9-Sep-15 13-Sep-15 16-Sep-15 20-Sep-15 23-Sep-15 24-Sep-15 30-Sep-15 8-Oct-15 7-Oct-15 6-Jan-16 21-Oct-15 - - 100% 100.0%
A545-142-16-48-30552 E C FDN FOR EXCHANGER 142-EE-1001 B/C & E/F 0.1 9-Sep-15 9-Sep-15 16-Sep-15 16-Sep-15 23-Sep-15 23-Sep-15 27-Sep-15 30-Sep-15 11-Oct-15 7-Oct-15 9-Jan-16 21-Oct-15 - - 100% 100.0%
A545-142-16-48-30553 E C FDN FOR EXCHANGER 142-EE-1002 A-D 0.1 12-Sep-15 30-Sep-15 19-Sep-15 19-Sep-15 26-Sep-15 26-Sep-15 30-Sep-15 3-Oct-15 14-Oct-15 17-Oct-15 12-Jan-16 31-Oct-15 - - 100% 100.0%
A545-142-16-48-30554 E C FDN FOR EXCHANGER 142-EE-1004 0.1 15-Sep-15 23-Oct-15 22-Sep-15 6-Nov-15 29-Sep-15 13-Nov-15 3-Oct-15 20-Nov-15 17-Oct-15 27-Nov-15 15-Jan-16 4-Dec-15 - - 100% 100.0%
A545-142-16-48-30556 E C FDN FOR EXCHANGER 142-EE-1005 0.1 21-Sep-15 23-Oct-15 28-Sep-15 6-Nov-15 5-Oct-15 13-Nov-15 9-Oct-15 20-Nov-15 23-Oct-15 27-Nov-15 21-Jan-16 4-Dec-15 - - 100% 100.0%
A545-142-16-48-30557 E C FDN FOR EXCHANGER 142-EE-1006 0.1 24-Sep-15 30-Sep-15 17-Nov-16 22-Jul-17 4-Mar-19 19-Jun-19 8-Mar-19 26-Jun-19 22-Mar-19 3-Jul-19 22-Apr-19 10-Jul-19 - - 100% 100.0%
A545-142-16-48-30558 E C FDN FOR EXCHANGER 142-EE-1007 0.1 27-Sep-15 30-Sep-15 4-Oct-15 3-Oct-15 11-Oct-15 10-Oct-15 15-Oct-15 17-Oct-15 29-Oct-15 31-Oct-15 22-Mar-17 7-Jan-17 - - 100% 100.0%
A545-142-16-48-30559 E C FDN FOR EXCHANGER 142-EE-1008 0.1 30-Sep-15 30-Sep-15 7-Oct-15 3-Oct-15 14-Oct-15 10-Oct-15 18-Oct-15 17-Oct-15 1-Nov-15 31-Oct-15 25-Mar-17 7-Jan-17 - - 100% 100.0%
A545-142-16-48-30560 E C FDN FOR EXCHANGER 142-EE-1009A-B 0.1 3-Oct-15 11-Jan-16 5-Oct-15 25-Jan-16 12-Oct-15 1-Feb-16 16-Oct-15 8-Feb-16 30-Oct-15 15-Feb-16 23-Mar-17 7-Jan-17 - - 100% 100.0%
A545-142-16-48-30561 E C FDN FOR EXCHANGER 142-EE-1010 A-D 0.1 6-Oct-15 30-Sep-15 13-Oct-15 15-Oct-15 20-Oct-15 22-Oct-15 24-Oct-15 29-Oct-15 7-Nov-15 5-Nov-15 14-Nov-15 19-Nov-15 - - 100% 100.0%
A545-142-16-48-30562 E C FDN FOR EXCHANGER 142-EE-1012 A/B 0.1 9-Oct-15 30-Sep-15 16-Oct-15 19-Sep-15 23-Oct-15 26-Sep-15 27-Oct-15 3-Oct-15 10-Nov-15 17-Oct-15 17-Nov-15 31-Oct-15 - - 100% 100.0%
A545-142-16-48-30563 E C FDN FOR EXCHANGER 142-EE-1013 0.1 12-Oct-15 30-Sep-15 19-Oct-15 19-Sep-15 26-Oct-15 26-Sep-15 30-Oct-15 3-Oct-15 13-Nov-15 17-Oct-15 20-Nov-15 31-Oct-15 - - 100% 100.0%
A545-142-81-41-30565 E C FDN FOR EXCHANGER 140-EE-1004 0.1 15-Oct-15 30-Sep-15 22-Oct-15 17-Dec-15 29-Oct-15 24-Dec-15 2-Nov-15 31-Dec-15 16-Nov-15 14-Jan-16 4-Apr-17 25-Aug-17 - - 100% 100.0%
A545-142-81-41-30566 E C FDN FOR EXCHANGER 142-EE-1005 0.1 18-Oct-15 30-Sep-15 25-Oct-15 17-Dec-15 1-Nov-15 24-Dec-15 5-Nov-15 31-Dec-15 19-Nov-15 14-Jan-16 7-Apr-17 25-Aug-17 - - 100% 100.0%
A545-142-16-48-30564 E FDN FOR EXCHANGER 142-EE-1004 15-10-2015 30-09-2015 =G123+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - - #VALUE!
A545-142-81-41-12511 E C FDN FOR TANK 142-TT-1001 0.1 21-Oct-15 21-Oct-15 28-Oct-15 6-Nov-15 4-Nov-15 13-Nov-15 8-Nov-15 20-Nov-15 22-Nov-15 4-Dec-15 29-Nov-15 20-Nov-18 - - 100% 100.0%
A545-142-81-41-12512 E C FDN FOR TANK 142-TT-1002 0.1 24-Oct-15 21-Oct-15 31-Oct-15 6-Nov-15 7-Nov-15 13-Nov-15 11-Nov-15 20-Nov-15 25-Nov-15 4-Dec-15 2-Dec-15 20-Nov-18 - - 100% 100.0%
A545-142-81-41-12513 E C FDN FOR TANK 142-TT-1003 0.1 27-Oct-15 21-Oct-15 3-Nov-15 6-Nov-15 10-Nov-15 13-Nov-15 14-Nov-15 20-Nov-15 28-Nov-15 4-Dec-15 5-Dec-15 20-Nov-18 - - 100% 100.0%
A545-142-81-41-12514 E C FDN FOR TANK 142-TT-1004 0.1 30-Oct-15 21-Oct-15 6-Nov-15 6-Nov-15 13-Nov-15 13-Nov-15 17-Nov-15 20-Nov-15 1-Dec-15 4-Dec-15 8-Dec-15 20-Nov-18 - - 100% 100.0%
A545-142-16-48-30601 E C FDN FOR PUMPS 142-PA-1001 A/B 0.1 12-Aug-15 19-May-16 19-Aug-15 26-May-16 26-Aug-15 1-Jun-16 30-Aug-15 8-Jun-16 21-Apr-17 19-May-18 29-Mar-19 19-May-18 - - 100% 100.0%
A545-142-16-48-30602 E C FDN FOR PUMPS 142-PA-1003 A/B 0.1 15-Aug-15 19-May-16 22-Aug-15 26-May-16 29-Aug-15 1-Jun-16 2-Sep-15 8-Jun-16 25-Mar-19 3-Jul-19 25-Apr-19 10-Jul-19 - - 100% 100.0%
A545-142-16-48-30603 E C FDN FOR PUMPS 142-PA-1004 A/B 0.1 18-Aug-15 19-May-16 25-Aug-15 26-May-16 1-Sep-15 1-Jun-16 5-Sep-15 8-Jun-16 28-Mar-19 - 28-Apr-19 - - - 100% 85.0%
A545-142-16-48-30604 E C FDN FOR PUMPS 141-PA-1004A/B 0.1 21-Aug-15 14-Apr-16 28-Aug-15 21-Apr-16 4-Sep-15 28-Apr-16 8-Sep-15 5-May-16 22-Sep-15 12-May-16 12-Mar-19 14-Mar-19 - - 100% 100.0%
A545-142-16-48-30605 E C FDN FOR PUMPS 141-PA-1005A/B 0.1 24-Aug-15 14-Apr-16 31-Aug-15 21-Apr-16 7-Sep-15 28-Apr-16 11-Sep-15 5-May-16 25-Sep-15 12-May-16 15-Mar-19 14-Mar-19 - - 100% 100.0%
A545-142-16-48-30606 E C FDN FOR PUMPS 142-PA-1007 A/B 0.1 27-Aug-15 15-Apr-16 3-Sep-15 22-Apr-16 10-Sep-15 29-Apr-16 14-Sep-15 6-May-16 28-Sep-15 13-May-16 18-Mar-19 12-Jul-19 - - 100% 100.0%
A545-142-16-48-30607 E C FDN FOR PUMPS 142-PA-1008 A/B 0.1 30-Aug-15 27-May-16 6-Sep-15 3-Jun-16 13-Sep-15 10-Jun-16 17-Sep-15 17-Jun-16 9-May-17 19-May-18 16-Apr-19 19-May-18 - - 100% 100.0%
A545-142-16-48-30608 E C FDN FOR PUMPS 142-PA-1009 A/B 0.1 2-Sep-15 15-Apr-16 9-Sep-15 22-Apr-16 16-Sep-15 29-Apr-16 20-Sep-15 6-May-16 4-Oct-15 13-May-16 24-Mar-19 12-Jul-19 - - 100% 100.0%
A545-142-16-48-30609 E C FDN FOR PUMPS 142-PA-1010 A/B 0.1 5-Sep-15 15-Apr-16 12-Sep-15 22-Apr-16 19-Sep-15 29-Apr-16 23-Sep-15 6-May-16 7-Oct-15 13-May-16 27-Mar-19 13-May-16 - - 100% 100.0%
A545-142-16-48-30610 E C FDN FOR PUMPS 142-PA-1011 A/B 0.1 8-Sep-15 20-May-16 15-Sep-15 27-May-16 22-Sep-15 1-Jun-16 26-Sep-15 8-Jun-16 18-May-17 19-May-18 25-Apr-19 19-May-18 - - 100% 100.0%
A545-142-16-48-30611 E C FDN FOR PUMPS 142-PA-1012 A/B 0.1 11-Sep-15 20-May-16 18-Sep-15 27-May-16 25-Sep-15 1-Jun-16 29-Sep-15 8-Jun-16 22-May-17 19-May-18 29-Apr-19 16-Apr-19 - - 100% 100.0%
Page 416 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 4 of 7
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA DISCIPLINE: STRUCTURAL (ALKYLATION BLOCK)
ANNEXURE-A6
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-16-48-30612 E C FDN FOR PUMPS 142-PA-1013 A/B 0.1 14-Sep-15 15-Apr-16 21-Sep-15 22-Apr-16 28-Sep-15 29-Apr-16 2-Oct-15 6-May-16 5-Mar-19 3-Jul-19 5-Apr-19 10-Jul-19 - - 100% 100.0%
A545-142-16-48-30613 E C FDN FOR PUMPS 142-PA-1014 A/B 0.1 17-Sep-15 20-May-16 24-Sep-15 27-May-16 1-Oct-15 1-Jun-16 5-Oct-15 8-Jun-16 27-May-17 19-May-18 15-Mar-19 19-May-18 - - 100% 100.0%
A545-142-16-48-30614 E C FDN FOR PUMPS 142-PA-1015 A/B 0.1 20-Sep-15 14-Apr-18 26-Sep-15 28-Apr-18 3-Oct-15 5-May-18 7-Oct-15 12-May-18 29-May-17 19-May-18 17-Mar-19 19-May-18 - - 100% 100.0%
A545-142-16-48-30615 E C FDN FOR PUMPS 142-PA-1016 A/B 0.1 23-Sep-15 14-Apr-16 30-Sep-15 21-Apr-16 7-Oct-15 28-Apr-16 11-Oct-15 5-May-16 25-Oct-15 12-May-16 4-Apr-19 - - - 100% 90.0%
A545-142-16-48-30616 E C FDN FOR PUMPS 142-PA-1017 A/B 0.1 26-Sep-15 14-Apr-16 3-Oct-15 21-Apr-16 10-Oct-15 28-Apr-16 14-Oct-15 5-May-16 28-Oct-15 12-May-16 7-Apr-19 12-May-16 - - 100% 100.0%
A545-142-16-48-30617 FDN FOR PUMPS 142-PA-1018 A/B 29-09-2015 #VALUE! =H161+7 =O161-7 =K161+7 =R161-7 =N161+4 17-06-2016 =Q161+1250 - =T161+31 - - -
A545-142-16-48-30618 FDN FOR PUMPS 142-PA-1019 A/B 02-10-2015 #VALUE! =H162+7 =O162-7 =K162+7 =R162-7 =N162+4 17-06-2016 =Q162+1250 - =T162+31 - - -
A545-142-16-48-30619 E C FDN FOR PUMPS 142-PA-1020 A/B 0.1 5-Oct-15 15-Apr-16 12-Oct-15 22-Apr-16 19-Oct-15 29-Apr-16 23-Oct-15 6-May-16 6-Nov-15 13-May-16 16-Apr-19 22-Feb-19 - - 100% 100.0%
A545-142-16-48-30620 E C FDN FOR PUMPS 142-PA-1021 A/B 0.1 8-Oct-15 27-May-16 15-Oct-15 3-Jun-16 22-Oct-15 10-Jun-16 26-Oct-15 17-Jun-16 17-Jun-17 10-Oct-18 5-Apr-19 10-Oct-18 - - 100% 100.0%
A545-142-16-48-30621 E C FDN FOR PUMPS 142-PA-1022 A/B 0.1 11-Oct-15 27-May-16 18-Oct-15 3-Jun-16 25-Oct-15 10-Jun-16 29-Oct-15 17-Jun-16 20-Jun-17 19-May-18 8-Apr-19 19-May-18 - - 100% 100.0%
A545-142-16-48-30622 E C FDN FOR PUMPS 142-PA-1023 A/B 0.1 14-Oct-15 27-May-16 21-Oct-15 3-Jun-16 28-Oct-15 10-Jun-16 1-Nov-15 17-Jun-16 23-Jun-17 19-May-18 11-Apr-19 19-May-18 - - 100% 100.0%
A545-142-16-48-30623 E C FDN FOR PUMPS 142-PA-1024 A/B 0.1 17-Oct-15 15-Apr-16 24-Oct-15 22-Apr-16 31-Oct-15 29-Apr-16 4-Nov-15 6-May-16 7-Apr-19 1-Apr-19 14-Apr-19 1-Apr-19 - - 100% 100.0%
A545-142-16-48-30624 E C FDN FOR PUMPS 142-PA-1025 A/B 0.1 20-Oct-15 27-May-16 27-Oct-15 3-Jun-16 3-Nov-15 10-Jun-16 7-Nov-15 17-Jun-16 29-Jun-17 11-Oct-18 17-Apr-19 11-Oct-18 - - 100% 100.0%
A545-142-81-41-30639 E C FDN FOR PUMPS 142-PA-1026 0.1 23-Oct-15 14-Apr-18 30-Oct-15 28-Apr-18 6-Nov-15 5-May-18 10-Nov-15 12-May-18 2-Jul-17 19-May-18 20-Apr-19 19-May-18 - - 100% 100.0%
A545-142-16-48-30626 FDN FOR PUMPS 140-PA-1004 A/B 26-Oct-15 27-May-16 2-Nov-15 3-Jun-16 9-Nov-15 10-Jun-16 13-Nov-15 17-Jun-16 5-Jul-17 - 12-Jul-17 - - - 80.0%
A545-142-16-48-30627 FDN FOR PUMPS 140-PA-1009 A/B 29-10-2015 - =G161+7 - #VALUE! - #VALUE! - #VALUE! - =S161+7 - - -
A545-142-16-48-30628 FDN FOR PUMPS 143-PA-1001 A/S 1-Nov-15 20-Jun-16 15-Jun-17 #VALUE! 22-Jun-17 #VALUE! =N172+4 22-12-2017 =Q172+614 - =T172+7 - - - 65% #VALUE!
A545-142-16-48-30629 FDN FOR PUMPS 143-PA-1002 A/S 4-Nov-15 20-Jun-16 17-Jun-17 #VALUE! 24-Jun-17 #VALUE! =N173+4 22-12-2017 =Q173+614 - =T173+7 - - - 65% #VALUE!
A545-142-16-48-30630 FDN FOR PUMPS 143-PA-1003 A/S 7-Nov-15 20-Jun-16 20-Jun-17 #VALUE! 27-Jun-17 #VALUE! 1-Jul-17 22-12-2017 =Q174+614 - =T174+7 - - - 80% #VALUE!
A545-142-16-48-30631 FDN FOR PUMPS 143-PA-1004 A/S 9-Nov-15 #VALUE! 16-Nov-15 #VALUE! 23-Nov-15 #VALUE! 27-Nov-15 17-06-2016 =Q175+1214 - =T175+7 - - - 80% #VALUE!
A545-142-16-48-30632 FDN FOR PUMPS 143-PA-1006 A/S 11-Nov-15 #VALUE! 18-Nov-15 #VALUE! 25-Nov-15 #VALUE! 30-Nov-15 17-06-2016 =Q176+1214 - =T176+7 - - - 80% #VALUE!
A545-142-16-48-30633 FDN FOR PUMPS 143-PA-1007 A/B 13-Nov-15 #VALUE! 20-Nov-15 #VALUE! 27-Nov-15 #VALUE! 1-Dec-15 17-06-2016 =Q177+1214 - =T177+7 - - - 80% #VALUE!
A545-142-16-48-30634 FDN FOR PUMPS 143-PA-1008 A/B 16-Nov-15 #VALUE! 23-Nov-15 #VALUE! 30-Nov-15 #VALUE! 4-Dec-15 17-06-2016 =Q178+1214 - =T178+7 - - - 80% #VALUE!
A545-142-81-41-30635 FDN FOR PUMPS 143-PA-1009 A/B 17-Nov-15 #VALUE! 24-Nov-15 #VALUE! 1-Dec-15 #VALUE! 5-Dec-15 17-06-2016 =Q179+1214 - =T179+7 - - - 80% #VALUE!
A545-142-81-41-30636 FDN FOR PUMPS 143-PA-1010 A/B 19-Nov-15 #VALUE! 26-Nov-15 #VALUE! 3-Dec-15 #VALUE! 7-Dec-15 17-06-2016 =Q180+1214 - =T180+7 - - - 80% #VALUE!
A545-142-81-41-30637 FDN FOR PUMPS 143-PA-1011 A/B 20-Nov-15 #VALUE! 27-Nov-15 #VALUE! 4-Dec-15 #VALUE! 8-Dec-15 17-06-2016 =Q181+1214 - =T181+7 - - - 80% #VALUE!
A545-142-81-41-30638 FDN FOR PUMPS 143-PA-1012 A/B 21-Nov-15 #VALUE! 28-Nov-15 #VALUE! 5-Dec-15 #VALUE! 9-Dec-15 17-06-2016 =Q182+1214 - =T182+7 - - - 80% #VALUE!
A545-142-16-48-00701 E C PLATF. & LADDER FOR COLUMN 142-CC-1001 0.5 2-Jan-16 22-Sep-15 9-Jan-16 22-Jan-16 16-Jan-16 8-Feb-16 20-Jan-16 12-Feb-16 3-Feb-16 26-Feb-16 10-Feb-16 5-Aug-16 - - 100% 100.0%
A545-142-81-41-00704 to
E C PLATF. & LADDER FOR COLUMN 142-CC-1002 0.5 4-Jan-16 22-Sep-15 11-Jan-16 22-Jan-16 18-Jan-16 8-Feb-16 22-Jan-16 12-Feb-16 5-Feb-16 26-Feb-16 12-Feb-16 18-Jul-16 - - 100% 100.0%
10705
A545-142-16-48-00707 E C PLATF. & LADDER FOR COLUMN 142-CC-1003 0.5 6-Jan-16 22-Sep-15 13-Jan-16 22-Jan-16 20-Jan-16 11-Feb-16 24-Jan-16 15-Feb-16 7-Feb-16 29-Feb-16 14-Feb-16 30-Jun-16 - - 100% 100.0%
A545-142-16-48-00710 E C PLATF. & LADDER FOR COLUMN 142-CC-1004 0.5 8-Jan-16 22-Sep-15 15-Jan-16 22-Jan-16 22-Jan-16 29-Jan-16 26-Jan-16 5-Feb-16 9-Feb-16 12-Feb-16 16-Feb-16 30-Jul-16 - - 100% 100.0%
A545-142-81-41-30713 E C PLATF. & LADDER FOR 142-VV-1001 0.5 11-Jan-16 25-Sep-15 18-Jan-16 28-Jan-16 25-Jan-16 4-Feb-16 29-Jan-16 8-Feb-16 12-Feb-16 17-Mar-16 19-Feb-16 27-Jul-16 - - 100% 100.0%
A545-142-81-41-10714 E C PLATF. & LADDER FOR 142-VV-1003 0.5 13-Jan-16 25-Sep-15 20-Jan-16 28-Jan-16 27-Jan-16 4-Feb-16 31-Jan-16 8-Feb-16 14-Feb-16 19-Mar-16 21-Feb-16 29-Sep-16 - - 100% 100.0%
A545-142-81-41-30718 E C PLATF. & LADDER FOR 142-VV-1005 0.5 15-Jan-16 25-Sep-15 22-Jan-16 28-Jan-16 29-Jan-16 4-Feb-16 2-Feb-16 8-Feb-16 16-Feb-16 19-Mar-16 23-Feb-16 29-Jul-16 - - 100% 100.0%
A545-142-81-41-00720 E C PLATF. & LADDER FOR 142-VV-1007 0.5 20-Jan-16 30-Sep-15 27-Jan-16 27-Feb-16 3-Feb-16 5-Mar-16 7-Feb-16 12-Mar-16 21-Feb-16 19-Mar-16 28-Feb-16 22-Sep-16 - - 100% 100.0%
A545-142-81-41-30721 E C PLATF. & LADDER FOR 142-VV-1008 0.5 22-Jan-16 30-Sep-15 29-Jan-16 28-Jan-16 5-Feb-16 4-Feb-16 9-Feb-16 8-Feb-16 23-Feb-16 18-Mar-16 1-Mar-16 27-Jul-16 - - 100% 100.0%
A545-142-81-41-30722 E C PLATF. & LADDER FOR 142-VV-1009 0.5 25-Jan-16 30-Sep-15 1-Feb-16 28-Jan-16 8-Feb-16 4-Feb-16 12-Feb-16 8-Feb-16 26-Feb-16 19-Mar-16 4-Mar-16 21-Jul-16 - - 100% 100.0%
Page 417 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 5 of 7
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA DISCIPLINE: STRUCTURAL (ALKYLATION BLOCK)
ANNEXURE-A6
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-81-41-30725 E C PLATF. & LADDER FOR 142-VV-1012 0.5 30-Jan-16 30-Sep-15 6-Feb-16 31-Jan-16 13-Feb-16 7-Feb-16 17-Feb-16 11-Feb-16 2-Mar-16 18-Mar-16 9-Mar-16 20-Jul-16 - - 100% 100.0%
A545-142-81-41-00726 E C PLATF. & LADDER FOR 142-VV-1013 0.5 1-Feb-16 30-Sep-15 8-Feb-16 22-Jan-16 15-Feb-16 29-Jan-16 19-Feb-16 2-Feb-16 4-Mar-16 19-Mar-16 11-Mar-16 27-Sep-16 - - 100% 100.0%
A545-142-81-41-30727 E C PLATF. & LADDER FOR 142-VV-1014 0.5 3-Feb-16 30-Sep-15 10-Feb-16 31-Jan-16 17-Feb-16 7-Feb-16 21-Feb-16 11-Feb-16 6-Mar-16 19-Mar-16 13-Mar-16 20-Jul-16 - - 100% 100.0%
A545-142-81-41-30728 E C PLATF. & LADDER FOR 142-VV-1015 0.5 5-Feb-16 30-Sep-15 12-Feb-16 31-Jan-16 19-Feb-16 7-Feb-16 23-Feb-16 11-Feb-16 8-Mar-16 19-Mar-16 15-Mar-16 21-Jul-16 - - 100% 100.0%
A545-142-81-41-10729 E C PLATF. & LADDER FOR 142-VV-1016 0.5 8-Feb-16 30-Sep-15 15-Feb-16 27-Feb-16 22-Feb-16 5-Mar-16 26-Feb-16 12-Mar-16 11-Mar-16 19-Mar-16 18-Mar-16 28-Jul-16 - - 100% 100.0%
A545-142-81-41-10730 E C PLATF. & LADDER FOR 142-VV-1017 0.5 10-Feb-16 30-Sep-15 17-Feb-16 28-Jan-16 24-Feb-16 4-Feb-16 28-Feb-16 8-Feb-16 13-Mar-16 19-Mar-16 28-Mar-17 25-Aug-17 - - 100% 100.0%
A545-142-81-41-30732 E C PLATF. & LADDER FOR 142-VV-1019 0.5 15-Feb-16 30-Sep-15 22-Feb-16 31-Jan-16 29-Feb-16 7-Feb-16 4-Mar-16 11-Feb-16 18-Mar-16 19-Mar-16 25-Mar-16 30-Jul-16 - - 100% 100.0%
A545-142-81-41-30733 E C PLATF. & LADDER FOR 142-VV-1020 0.5 17-Feb-16 30-Sep-15 24-Feb-16 31-Jan-16 2-Mar-16 7-Feb-16 6-Mar-16 11-Feb-16 20-Mar-16 19-Mar-16 27-Mar-16 28-Jul-16 - - 100% 100.0%
A545-142-81-41-30734 E C PLATF. & LADDER FOR 142-VV-1021 0.5 19-Feb-16 30-Sep-15 26-Feb-16 31-Jan-16 4-Mar-16 7-Feb-16 8-Mar-16 11-Feb-16 22-Mar-16 19-Mar-16 29-Mar-16 30-Jul-16 - - 100% 100.0%
A545-142-81-41-10735 E C PLATF. & LADDER FOR 142-VV-1022 0.5 21-Feb-16 30-Sep-15 28-Feb-16 29-Feb-16 6-Mar-16 7-Mar-16 10-Mar-16 14-Mar-16 24-Mar-16 21-Mar-16 31-Mar-16 22-Sep-16 - - 100% 100.0%
A545-142-81-41-10737 E C PLATF. & LADDER FOR 142-VV-1024 0.5 25-Feb-16 30-Sep-15 3-Mar-16 29-Feb-16 10-Mar-16 7-Mar-16 14-Mar-16 14-Mar-16 28-Mar-16 21-Mar-16 4-Apr-16 9-Aug-16 - - 100% 100.0%
A545-142-81-41-30739 E C PLATF. & LADDER FOR 140-VV-1001 0.5 29-Feb-16 24-Feb-16 7-Mar-16 2-Mar-16 14-Mar-16 9-Mar-16 18-Mar-16 16-Mar-16 1-Apr-16 23-Mar-16 8-Apr-16 27-Jul-16 - - 100% 100.0%
A545-142-81-41-30740 E C PLATF. & LADDER FOR 140-VV-1008 0.5 2-Mar-15 30-Sep-15 9-Mar-15 7-Mar-16 16-Mar-15 14-Mar-16 20-Mar-15 21-Mar-16 3-Apr-15 28-Mar-16 10-Apr-15 28-Jul-16 - - 100% 100.0%
A545-142-81-41-10741 E C PLATF. & LADDER FOR 140-VV-1016 0.5 4-Mar-15 30-Sep-15 11-Mar-15 10-Mar-16 18-Mar-15 17-Mar-16 22-Mar-15 24-Mar-16 5-Apr-15 31-Mar-16 12-Apr-15 21-Jul-16 - - 100% 100.0%
A545-142-81-41-10742 E C PLATF. & LADDER FOR 140-VV-1017 0.5 6-Mar-15 24-Feb-16 13-Mar-15 2-Mar-16 20-Mar-15 9-Mar-16 24-Mar-15 16-Mar-16 7-Apr-15 23-Mar-16 14-Apr-15 8-Aug-16 - - 100% 100.0%
A545-142-81-41-10743 E C PLTF. & LADDER FOR VESSEL 140-VV-1010 0.4 1-Apr-16 24-Feb-16 8-Apr-16 2-Mar-16 15-Apr-16 9-Mar-16 19-Apr-16 16-Mar-16 3-May-16 23-Mar-16 1-Aug-16 30-Jul-16 - - 100% 100.0%
A545-142-16-48-30806 E C MATERIAL TAKE OFF STRL STEEL 0.9 25-Apr-15 2-May-15 24-May-17 - 31-May-17 - 5-Jun-17 - 19-Jun-17 - 18-Sep-17 31-Mar-18 - - 100% 100.0%
A545-142-16-48-30807 MATERIAL TAKE OFF RCC 4/30/2015 5/2/2015 =G200+7 - =J200+7 - =M200+4 - =P200+14 - =S200+90 - - -
A545-142-16-48-00811,
E C ELECT. SUPP. IN MPR GA & DETAILS 0.6 20-Feb-16 15-Jun-16 4-Jul-17 31-May-17 11-Jul-17 7-Jun-17 15-Jul-17 14-Jun-17 29-Jul-17 21-Jun-17 10-Apr-19 15-Jul-19 - - 100% 100.0%
00813, 00814
A545-142-16-48-00812 E C ELECT. SUPP. IN BPR GA & DETAILS 0.1 24-Feb-16 24-May-17 2-Mar-16 31-May-17 9-Mar-16 7-Jun-17 13-Mar-16 14-Jun-17 27-Mar-16 21-Jun-17 22-Apr-19 15-Jul-19 - - 100% 100.0%
A545-142-16-48-00821 E C MISC PIPE SUPPORT IN TECH STR. 0.1 7-Aug-17 21-Aug-17 14-Aug-17 28-Aug-17 21-Aug-17 4-Sep-17 4-Sep-17 11-Sep-17 11-Sep-17 18-Sep-17 15-Apr-19 15-Jul-19 - - 100% 100.0%
A545-142-81-41-30809 E C SAND FILLING & R/F DETAIL 0.1 12-Aug-17 19-Apr-18 19-Aug-17 3-May-18 26-Aug-17 10-May-18 9-Sep-17 17-May-18 16-Sep-17 24-May-18 20-Apr-19 24-May-18 - - 100% 100.0%
A545-142-81-41-00841 TO
E C OPENINGS 31-Mar-16 6-May-16 7-Apr-16 13-May-16 14-Apr-16 20-May-16 18-Apr-16 27-May-16 2-May-16 4-Jun-16 18-Apr-19 - - - 100% 85.0%
00844
A545-142-16-48-01548 to
E C GA & R/F OF NEUTRALIZATION PIT 0.1 12-Aug-17 8-May-18 19-Aug-17 22-May-18 9-Mar-19 - 16-Mar-19 - 23-Mar-19 - 23-Apr-19 - - - 100% 80.0%
01549
A545-142-16-48-00426 TECH STR-3 PLATES & OPENINGS 26-07-2015 - =G201+7 - #VALUE! - #VALUE! - #VALUE! - =S205+90 - =S205+90 -
A545-142-16-48-00436 TECH STR-4 PLATES & OPENINGS DETAILS 13-08-2015 - =G202+7 - #VALUE! - #VALUE! - #VALUE! - =S206+90 - =S206+90 -
A545-142-16-48-00445 TECH STR-5 PLATES & OPENING DETAILS 28-08-2015 - =G203+7 - #VALUE! - #VALUE! - #VALUE! - =S207+90 - =S207+90 -
A545-142-81-41-10738 PLATF. & LADDER FOR 142-VV-1025 27-02-2016 30-09-2015 =G204+7 - #VALUE! - #VALUE! - #VALUE! 21-Mar-16 =S208+7 - =S208+7 -
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-81-41-30536 to
R C GA & R/F DET. OF 142-RB-1001A/N & MOTOR 0.1 5-Feb-19 24-Aug-18 19-Feb-19 22-Mar-19 26-Feb-19 29-Mar-19 5-Mar-19 5-Apr-19 19-Mar-19 12-Apr-19 26-Mar-19 12-Apr-19 2-Apr-19 12-Apr-19 100% 100.0%
30537
A545-142-16-48-00824 R C T SUPPORTS 0.1 4-Mar-19 - 18-Mar-19 - 25-Mar-19 - 1-Apr-19 - 8-Apr-19 - 15-Apr-19 - 22-Apr-19 - 100%
A545-142-16-48-00825 R C ELECTRICAL/ INSTT. DROPPINGS 0.1 7-Mar-19 - 21-Mar-19 - 28-Mar-19 - 4-Apr-19 - 11-Apr-19 - 18-Apr-19 - 25-Apr-19 - 100%
100 #VALUE!
TOTAL TOTAL
INCORPORATE COMMENTS
DRAFTING COMPLETE CHECKING COMPLETED ISSUED FOR COMMENTS UPDATE & ISSUE FOR (SCHD (ACTUAL
DRAWING / DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG. % START (10%) & ISSUE FOR
(60%) (65%) (80%) CONSTRUCTION (100%) PROGRESS PROGRESS
CONSTRUCTION (85%)
%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
100 100.0%
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : HMTD (ALKYLATION BLOCK) ANNEXURE-A6
TOTAL TOTAL
MR/TR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW VENDOR DRAWING REVIEW
REVAMP/ PR ISSUE (After Revamp) (SCHD (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%) (After Revamp)
EXISTING PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-JA-MR-6911 EDUCTORS 1.0 9-Jul-15 11-May-16 23-Oct-16 14-Jun-17 12-Dec-16 6-Jan-18 26-Apr-17 30-Apr-19 - - - - 100% 100.0%
A545-111-CT-MR-7642 R TRAYS & TOWER INTERNALS 1.3 9-Jul-15 3-Aug-15 19-Oct-15 31-Dec-15 8-Dec-15 4-Apr-16 23-Feb-17 28-Feb-18 17-Apr-18 17-Apr-18 14-Apr-19 - 100% 100.0%
100 100.0%
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR ISSUED FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD
DRAWING/ DOCUMENT REVAMP/ COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. EXISTING (60%) (85%) (100%) INCORPORATING REVAMP PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
PIPING - ALKYLATION BLOCK
A545-142-16-43-00001 R E EQUIPMENT LAYOUT 0.6 10-Mar-15 2-Feb-15 9-May-15 20-Apr-15 8-Jun-15 22-Jun-15 29-Jun-15 6-Jul-15 29-Jul-15 5-Aug-15 5-Oct-15 29-Aug-15 28-Apr-18 19-Apr-18 100% 100.0%
A545-142-16-43-00002 E E AREA DIVISION 0.1 22-Jun-15 23-Jul-15 20-Jul-15 30-Jul-15 27-Jul-15 6-Aug-15 4-Aug-15 13-Aug-15 11-Aug-15 20-Aug-15 10-Sep-15 3-Sep-15 - - 100% 100.0%
A545-142-16-43-00011 E C PIPING GAD AREA-01 0.04 1-Dec-15 21-Sep-15 16-Dec-15 23-Oct-15 23-Dec-15 20-Nov-15 30-Dec-15 27-Nov-15 14-Jan-16 4-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00012 E C PIPING GAD AREA-01 0.04 1-Dec-15 21-Sep-15 16-Dec-15 23-Oct-15 23-Dec-15 20-Nov-15 30-Dec-15 27-Nov-15 14-Jan-16 4-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00013 E C PIPING GAD AREA-01 0.04 1-Dec-15 21-Sep-15 16-Dec-15 23-Oct-15 23-Dec-15 20-Nov-15 30-Dec-15 27-Nov-15 14-Jan-16 4-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00014 E C PIPING GAD AREA-01 0.04 1-Dec-15 21-Sep-15 16-Dec-15 23-Oct-15 23-Dec-15 20-Nov-15 30-Dec-15 27-Nov-15 14-Jan-16 4-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00015 E C PIPING GAD AREA-01 0.04 1-Dec-15 4-Dec-15 16-Dec-15 22-Jan-16 23-Dec-15 5-Feb-16 30-Dec-15 12-Feb-16 14-Jan-16 19-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00016 E C PIPING GAD AREA-01 0.04 1-Dec-15 4-Dec-15 16-Dec-15 22-Jan-16 23-Dec-15 5-Feb-16 30-Dec-15 12-Feb-16 14-Jan-16 19-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00017 E C PIPING GAD AREA-01 0.04 1-Dec-15 4-Dec-15 16-Dec-15 22-Jan-16 23-Dec-15 5-Feb-16 30-Dec-15 12-Feb-16 14-Jan-16 19-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00021 E C PIPING GAD AREA-02 0.04 1-Dec-15 21-Sep-15 16-Dec-15 20-Nov-15 23-Dec-15 27-Nov-15 30-Dec-15 4-Dec-15 14-Jan-16 11-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00022 E C PIPING GAD AREA-02 0.04 1-Dec-15 21-Sep-15 16-Dec-15 20-Nov-15 23-Dec-15 27-Nov-15 30-Dec-15 4-Dec-15 14-Jan-16 11-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00023 E C PIPING GAD AREA-02 0.04 1-Dec-15 21-Sep-15 16-Dec-15 20-Nov-15 23-Dec-15 27-Nov-15 30-Dec-15 4-Dec-15 14-Jan-16 11-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00024 E C PIPING GAD AREA-02 0.04 1-Dec-15 21-Sep-15 16-Dec-15 20-Nov-15 23-Dec-15 27-Nov-15 30-Dec-15 4-Dec-15 14-Jan-16 11-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00025 E C PIPING GAD AREA-02 0.04 1-Dec-15 4-Dec-15 16-Dec-15 29-Jan-16 23-Dec-15 5-Feb-16 30-Dec-15 12-Feb-16 14-Jan-16 19-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00026 E C PIPING GAD AREA-02 0.04 1-Dec-15 4-Dec-15 16-Dec-15 29-Jan-16 23-Dec-15 5-Feb-16 30-Dec-15 12-Feb-16 14-Jan-16 19-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00027 E C PIPING GAD AREA-02 0.04 1-Dec-15 4-Dec-15 16-Dec-15 29-Jan-16 23-Dec-15 5-Feb-16 30-Dec-15 12-Feb-16 14-Jan-16 19-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00028 E C PIPING GAD AREA-02 0.04 1-Dec-15 4-Dec-15 16-Dec-15 29-Jan-16 23-Dec-15 5-Feb-16 30-Dec-15 12-Feb-16 14-Jan-16 19-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00031 E C PIPING GAD AREA-03 0.04 1-Dec-15 21-Sep-15 16-Dec-15 20-Nov-15 23-Dec-15 27-Nov-15 30-Dec-15 4-Dec-15 14-Jan-16 11-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00032 E C PIPING GAD AREA-03 0.04 1-Dec-15 21-Sep-15 16-Dec-15 20-Nov-15 23-Dec-15 27-Nov-15 30-Dec-15 4-Dec-15 14-Jan-16 11-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00033 E C PIPING GAD AREA-03 0.04 1-Dec-15 21-Sep-15 16-Dec-15 20-Nov-15 23-Dec-15 27-Nov-15 30-Dec-15 4-Dec-15 14-Jan-16 11-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00034 E C PIPING GAD AREA-03 0.04 1-Dec-15 21-Sep-15 16-Dec-15 20-Nov-15 23-Dec-15 27-Nov-15 30-Dec-15 4-Dec-15 14-Jan-16 11-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00035 E C PIPING GAD AREA-03 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00036 E C PIPING GAD AREA-03 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00037 E C PIPING GAD AREA-03 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00038 E C PIPING GAD AREA-03 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00041 E C PIPING GAD AREA-04 0.04 1-Dec-15 21-Sep-15 16-Dec-15 27-Nov-15 23-Dec-15 4-Dec-15 30-Dec-15 11-Dec-15 14-Jan-16 18-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00042 E C PIPING GAD AREA-04 0.04 1-Dec-15 21-Sep-15 16-Dec-15 27-Nov-15 23-Dec-15 4-Dec-15 30-Dec-15 11-Dec-15 14-Jan-16 18-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00043 E C PIPING GAD AREA-04 0.04 1-Dec-15 21-Sep-15 16-Dec-15 27-Nov-15 23-Dec-15 4-Dec-15 30-Dec-15 11-Dec-15 14-Jan-16 18-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00044 E C PIPING GAD AREA-04 0.04 1-Dec-15 21-Sep-15 16-Dec-15 27-Nov-15 23-Dec-15 4-Dec-15 30-Dec-15 11-Dec-15 14-Jan-16 18-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00045 E C PIPING GAD AREA-04 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00046 E C PIPING GAD AREA-04 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00047 E C PIPING GAD AREA-04 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00051 E C PIPING GAD AREA-05 0.04 1-Dec-15 21-Sep-15 16-Dec-15 27-Nov-15 23-Dec-15 4-Dec-15 30-Dec-15 11-Dec-15 14-Jan-16 18-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00052 E C PIPING GAD AREA-05 0.04 1-Dec-15 21-Sep-15 16-Dec-15 27-Nov-15 23-Dec-15 4-Dec-15 30-Dec-15 11-Dec-15 14-Jan-16 18-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00053 E C PIPING GAD AREA-05 0.04 1-Dec-15 21-Sep-15 16-Dec-15 27-Nov-15 23-Dec-15 4-Dec-15 30-Dec-15 11-Dec-15 14-Jan-16 18-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00054 E C PIPING GAD AREA-05 0.04 1-Dec-15 26-Nov-15 16-Dec-15 27-Nov-15 23-Dec-15 4-Dec-15 30-Dec-15 11-Dec-15 14-Jan-16 18-Dec-15 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00055 E C PIPING GAD AREA-05 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00056 E C PIPING GAD AREA-05 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00057 E C PIPING GAD AREA-05 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 Page 422 of
23-Dec-15 1078
8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR ISSUED FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD
DRAWING/ DOCUMENT REVAMP/ COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. EXISTING (60%) (85%) (100%) INCORPORATING REVAMP PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-16-43-00058 E C PIPING GAD AREA-05 0.04 1-Dec-15 4-Dec-15 16-Dec-15 1-Feb-16 23-Dec-15 8-Feb-16 30-Dec-15 15-Feb-16 14-Jan-16 22-Feb-16 31-Aug-19 - - - 85% 85.0%
A545-142-16-43-00061 E C PIPING GAD AREA-06 0.04 11-Dec-15 21-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00062 E C PIPING GAD AREA-06 0.04 11-Dec-15 21-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00063 E C PIPING GAD AREA-06 0.04 11-Dec-15 26-Nov-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00064 E C PIPING GAD AREA-06 0.04 11-Dec-15 26-Nov-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00065 E C PIPING GAD AREA-06 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00066 E C PIPING GAD AREA-06 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00067 E C PIPING GAD AREA-06 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00068 E C PIPING GAD AREA-06 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00071 E C PIPING GAD AREA-07 0.04 11-Dec-15 24-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00072 E C PIPING GAD AREA-07 0.04 11-Dec-15 24-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00073 E C PIPING GAD AREA-07 0.04 11-Dec-15 26-Nov-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00074 E C PIPING GAD AREA-07 0.04 11-Dec-15 26-Nov-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00075 E C PIPING GAD AREA-07 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00076 E C PIPING GAD AREA-07 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00077 E C PIPING GAD AREA-07 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00078 E C PIPING GAD AREA-07 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00081 E C PIPING GAD AREA-08 0.04 11-Dec-15 24-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00082 E C PIPING GAD AREA-08 0.04 11-Dec-15 24-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00083 E C PIPING GAD AREA-08 0.04 11-Dec-15 26-Nov-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00084 E C PIPING GAD AREA-08 0.04 11-Dec-15 26-Nov-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00085 E C PIPING GAD AREA-08 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00086 E C PIPING GAD AREA-08 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00087 E C PIPING GAD AREA-08 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00088 E C PIPING GAD AREA-08 0.04 11-Dec-15 4-Dec-15 26-Dec-15 5-Feb-16 2-Jan-16 12-Feb-16 9-Jan-16 19-Feb-16 24-Jan-16 26-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00091 E C PIPING GAD AREA-09 0.04 11-Dec-15 24-Sep-15 26-Dec-15 23-Nov-15 2-Jan-16 30-Nov-15 9-Jan-16 7-Dec-15 24-Jan-16 14-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00092 E C PIPING GAD AREA-09 0.04 11-Dec-15 24-Sep-15 26-Dec-15 23-Nov-15 2-Jan-16 30-Nov-15 9-Jan-16 7-Dec-15 24-Jan-16 14-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00093 E C PIPING GAD AREA-09 0.04 11-Dec-15 24-Sep-15 26-Dec-15 23-Nov-15 2-Jan-16 30-Nov-15 9-Jan-16 7-Dec-15 24-Jan-16 14-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00094 E C PIPING GAD AREA-09 0.04 11-Dec-15 26-Nov-15 26-Dec-15 23-Nov-15 2-Jan-16 30-Nov-15 9-Jan-16 7-Dec-15 24-Jan-16 14-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00101 E C PIPING GAD AREA-10 0.04 11-Dec-15 29-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00102 E C PIPING GAD AREA-10 0.04 11-Dec-15 29-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00103 E C PIPING GAD AREA-10 0.04 11-Dec-15 26-Nov-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00104 E C PIPING GAD AREA-10 0.04 11-Dec-15 29-Sep-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00105 E C PIPING GAD AREA-10 0.04 11-Dec-15 26-Nov-15 26-Dec-15 27-Nov-15 2-Jan-16 4-Dec-15 9-Jan-16 11-Dec-15 24-Jan-16 18-Dec-15 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00106 E C PIPING GAD AREA-10 0.04 11-Dec-15 4-Dec-15 26-Dec-15 1-Feb-16 2-Jan-16 8-Feb-16 9-Jan-16 15-Feb-16 24-Jan-16 22-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00107 E C PIPING GAD AREA-10 0.04 11-Dec-15 4-Dec-15 26-Dec-15 1-Feb-16 2-Jan-16 8-Feb-16 9-Jan-16 15-Feb-16 24-Jan-16 22-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00108 E C PIPING GAD AREA-10 0.04 11-Dec-15 4-Dec-15 26-Dec-15 1-Feb-16 2-Jan-16 8-Feb-16 9-Jan-16 15-Feb-16 24-Jan-16 22-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00109 E C PIPING GAD AREA-10 0.04 11-Dec-15 4-Dec-15 26-Dec-15 1-Feb-16 2-Jan-16 8-Feb-16 9-Jan-16 15-Feb-16 24-Jan-16 22-Feb-16 30-Sep-19 - - - 85% 85.0%
A545-142-16-43-00111 E C PIPING GAD AREA-11 0.04 22-Dec-15 29-Sep-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR ISSUED FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD
DRAWING/ DOCUMENT REVAMP/ COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. EXISTING (60%) (85%) (100%) INCORPORATING REVAMP PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-16-43-00112 E C PIPING GAD AREA-11 0.04 22-Dec-15 29-Sep-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00113 E C PIPING GAD AREA-11 0.04 22-Dec-15 26-Nov-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00114 E C PIPING GAD AREA-11 0.04 22-Dec-15 29-Sep-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00115 E C PIPING GAD AREA-11 0.04 22-Dec-15 26-Nov-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00116 E C PIPING GAD AREA-11 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00117 E C PIPING GAD AREA-11 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00118 E C PIPING GAD AREA-11 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00119 E C PIPING GAD AREA-11 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00121 E C PIPING GAD AREA-12 0.04 22-Dec-15 29-Sep-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00122 E C PIPING GAD AREA-12 0.04 22-Dec-15 29-Sep-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00123 E C PIPING GAD AREA-12 0.04 22-Dec-15 26-Nov-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00124 E C PIPING GAD AREA-12 0.04 22-Dec-15 29-Sep-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00125 E C PIPING GAD AREA-12 0.04 22-Dec-15 26-Nov-15 6-Jan-16 27-Nov-15 13-Jan-16 4-Dec-15 20-Jan-16 11-Dec-15 4-Feb-16 18-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00126 E C PIPING GAD AREA-12 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00127 E C PIPING GAD AREA-12 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00128 E C PIPING GAD AREA-12 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00129 E C PIPING GAD AREA-12 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00131 E C PIPING GAD AREA-13 0.04 22-Dec-15 29-Sep-15 6-Jan-16 23-Oct-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00132 E C PIPING GAD AREA-13 0.04 22-Dec-15 29-Sep-15 6-Jan-16 23-Oct-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00133 E C PIPING GAD AREA-13 0.04 22-Dec-15 29-Sep-15 6-Jan-16 23-Oct-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00134 E C PIPING GAD AREA-13 0.04 22-Dec-15 26-Nov-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00135 E C PIPING GAD AREA-13 0.04 22-Dec-15 26-Nov-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00136 E C PIPING GAD AREA-13 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00137 E C PIPING GAD AREA-13 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00138 E C PIPING GAD AREA-13 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00139 E C PIPING GAD AREA-13 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00141 E C PIPING GAD AREA-14 0.04 22-Dec-15 4-Dec-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00142 E C PIPING GAD AREA-14 0.04 22-Dec-15 29-Sep-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00143 E C PIPING GAD AREA-14 0.04 22-Dec-15 26-Nov-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00144 E C PIPING GAD AREA-14 0.04 22-Dec-15 4-Dec-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00145 E C PIPING GAD AREA-14 0.04 22-Dec-15 4-Dec-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00146 E C PIPING GAD AREA-14 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00147 E C PIPING GAD AREA-14 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00148 E C PIPING GAD AREA-14 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00149 E C PIPING GAD AREA-14 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00151 E C Piping GAD Area-15 0.04 22-Dec-15 29-Sep-15 6-Jan-16 23-Oct-15 13-Jan-16 17-Dec-15 20-Jan-16 24-Dec-15 4-Feb-16 31-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00152 E C Piping GAD Area-15 0.04 22-Dec-15 29-Sep-15 6-Jan-16 23-Oct-15 13-Jan-16 17-Dec-15 20-Jan-16 24-Dec-15 4-Feb-16 31-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00153 E C Piping GAD Area-15 0.04 22-Dec-15 4-Dec-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00154 E C Piping GAD Area-15 0.04 22-Dec-15 4-Dec-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR ISSUED FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD
DRAWING/ DOCUMENT REVAMP/ COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. EXISTING (60%) (85%) (100%) INCORPORATING REVAMP PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-16-43-00155 E C Piping GAD Area-15 0.04 22-Dec-15 4-Dec-15 6-Jan-16 4-Dec-15 13-Jan-16 11-Dec-15 20-Jan-16 18-Dec-15 4-Feb-16 25-Dec-15 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00156 E C Piping GAD Area-15 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00157 E C Piping GAD Area-15 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00158 E C Piping GAD Area-15 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00159 E C Piping GAD Area-15 0.04 22-Dec-15 4-Dec-15 6-Jan-16 5-Feb-16 13-Jan-16 12-Feb-16 20-Jan-16 19-Feb-16 4-Feb-16 26-Feb-16 31-Oct-19 - - - 85% 85.0%
A545-142-16-43-00161 E C Piping GAD Area-16 0.04 2-Jan-16 29-Sep-15 17-Jan-16 23-Oct-15 24-Jan-16 11-Dec-15 31-Jan-16 18-Dec-15 15-Feb-16 25-Dec-15 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00162 E C Piping GAD Area-16 0.04 2-Jan-16 29-Sep-15 17-Jan-16 23-Oct-15 24-Jan-16 17-Dec-15 31-Jan-16 24-Dec-15 15-Feb-16 31-Dec-15 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00163 E C Piping GAD Area-16 0.04 2-Jan-16 26-Nov-15 17-Jan-16 4-Dec-15 24-Jan-16 11-Dec-15 31-Jan-16 18-Dec-15 15-Feb-16 25-Dec-15 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00164 E C Piping GAD Area-16 0.04 2-Jan-16 4-Dec-15 17-Jan-16 4-Dec-15 24-Jan-16 11-Dec-15 31-Jan-16 18-Dec-15 15-Feb-16 25-Dec-15 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00165 E C Piping GAD Area-16 0.04 2-Jan-16 4-Dec-15 17-Jan-16 4-Dec-15 24-Jan-16 11-Dec-15 31-Jan-16 18-Dec-15 15-Feb-16 25-Dec-15 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00166 E C Piping GAD Area-16 0.04 2-Jan-16 4-Dec-15 17-Jan-16 5-Feb-16 24-Jan-16 12-Feb-16 31-Jan-16 19-Feb-16 15-Feb-16 26-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00167 E C Piping GAD Area-16 0.04 2-Jan-16 4-Dec-15 17-Jan-16 5-Feb-16 24-Jan-16 12-Feb-16 31-Jan-16 19-Feb-16 15-Feb-16 26-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00168 E C Piping GAD Area-16 0.04 2-Jan-16 4-Dec-15 17-Jan-16 5-Feb-16 24-Jan-16 12-Feb-16 31-Jan-16 19-Feb-16 15-Feb-16 26-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00169 E C Piping GAD Area-16 0.04 2-Jan-16 4-Dec-15 17-Jan-16 5-Feb-16 24-Jan-16 12-Feb-16 31-Jan-16 19-Feb-16 15-Feb-16 26-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00171 E C Piping GAD Area-17 0.04 2-Jan-16 29-Sep-15 17-Jan-16 23-Oct-15 24-Jan-16 5-Feb-16 31-Jan-16 12-Feb-16 15-Feb-16 19-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00181 E C Piping GAD Area-18 0.04 2-Jan-16 29-Sep-15 17-Jan-16 23-Oct-15 24-Jan-16 5-Feb-16 31-Jan-16 12-Feb-16 15-Feb-16 19-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00191 E C Piping GAD Area-18 0.04 2-Jan-16 26-Nov-15 17-Jan-16 29-Jan-16 24-Jan-16 5-Feb-16 31-Jan-16 12-Feb-16 15-Feb-16 19-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00201 E C Piping GAD Area-20 0.04 2-Jan-16 29-Sep-15 17-Jan-16 23-Oct-15 24-Jan-16 5-Feb-16 31-Jan-16 12-Feb-16 15-Feb-16 19-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00211 E C Piping GAD Area-21 0.04 12-Jan-16 26-Nov-15 27-Jan-16 29-Jan-16 3-Feb-16 5-Feb-16 10-Feb-16 12-Feb-16 25-Feb-16 19-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-00221 E C Piping GAD Area-22 0.04 12-Jan-16 30-Sep-15 27-Jan-16 23-Oct-15 3-Feb-16 5-Feb-16 10-Feb-16 12-Feb-16 25-Feb-16 19-Feb-16 30-Nov-19 - - - 85% 85.0%
A545-142-16-43-FLEX R E FLEXIBILIT ANALYSIS 3.8 1-Mar-15 2-Jul-15 - - - - - - - - 30-Jun-19 - 30-Jun-19 - 100% 98.0%
A545-142-16-43-INTF R E INTERFACE CHECK 1.2 24-May-15 25-Jul-15 - - - - - - - - 15-Jul-19 - 15-Jul-19 - 100% 98.0%
A545-142-16-43-EMOD R E EQUIPMENT MODELLING 0.4 2-Feb-15 2-Feb-15 - - - - - - - - 31-Jul-19 - 30-Apr-18 30-Apr-18 100% 99.0%
A545-142-16-43-LMOD R E LINE MODELLING 38.5 1-Mar-15 2-Feb-15 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 99.0%
A545-142-16-43-MTO1 E P PRELIMINARY MTO 3.8 22-Jun-15 25-Jun-15 - - - - - - - - 5-Aug-15 15-Jul-15 - - 100% 100.0%
A545-142-16-43-MTO2 E P INTERMEDIATE MTO 2.6 18-Jan-16 27-Jan-16 - - - - - - - - 3-Mar-16 29-Feb-16 - - 100% 100.0%
A545-142-16-43-MTO3 E P FINAL MTO 1.3 26-Jul-16 23-Dec-16 - - - - - - - - 28-Apr-17 30-Dec-16 - - 100% 100.0%
A545-142-16-43-MTOM R P MTO DATA/ IPMCS 0.6 12-Aug-15 28-Sep-15 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 95.0%
A545-142-16-43-MTOS R P MTO FOR PIPE SUPPORTS 0.1 2-Aug-16 5-Jan-16 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 95.0%
A545-142-16-43-MTOT R P TOP-OFF MTO 0.6 28-Nov-16 2-Jan-18 - - - - - - - - 29-Sep-17 1-Feb-18 15-Sep-18 - 100% 100.0%
A545-142-16-43-NOZZ R C NOZZLE ORIENTATION 0.4 2-Jan-16 2-Jan-16 - - - - - - - - 30-Nov-16 30-Dec-17 28-Apr-18 28-Apr-18 100% 100.0%
A545-142-16-43-PCLT E PIPING CLEATS 0.3 14-Jun-15 18-Jan-16 - - - - - - - - 31-Jan-17 30-Dec-17 - - 100% 100.0%
A545-142-16-43-PMSC E PMS/VMS 0.4 20-Feb-15 18-Feb-15 6-Mar-15 - 13-Mar-15 - 20-Mar-15 - 3-Apr-15 - 13-May-15 28-Sep-17 - - 100% 100.0%
A545-142-16-43-SCAT S PIPING SPES.& CATL. 0.1 2-Mar-15 20-Jul-15 16-Mar-15 30-Nov-15 23-Mar-15 7-Dec-15 30-Mar-15 14-Dec-15 13-Apr-15 28-Dec-15 31-Jan-17 28-Sep-17 - - 100% 100.0%
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR ISSUED FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD
DRAWING/ DOCUMENT REVAMP/ COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. EXISTING (60%) (85%) (100%) INCORPORATING REVAMP PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
100 97.6%
TOTAL TOTAL
REVAMP/ MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW VENDOR DRAWING REVIEW (SCHD (ACTUAL
MR No MR DESCRIPTION WTG. % PR ISSUE (After Revamp)
EXISTING (40%) (85%) (90%) (100%) (After Revamp) PROGRESS PROGRESS
%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
CENTRIFUGAL COMPRESSOR
A545-142-KA-MR-5181 R 16.8 31-May-15 1-Aug-15 10-Sep-15 11-Dec-15 30-Oct-15 16-Mar-16 2-Jan-17 27-Jan-18 20-Apr-18 20-Apr-18 4-Jun-18 25-Aug-18 100% 100.0%
SPP
CENTRIFUGAL PUMPS SPP (ACID
A545-142-PA-MR-5182 - 11.7 11-Jun-15 3-Aug-15 20-Sep-15 14-Oct-15 13-Nov-16 27-Mar-18 11-Feb-17 25-Feb-19 - - - - 100% 100.0%
PUMPS)
A545-142-PA-MR-5183 - CENT PUMP SPP MAG DRIVE 7.0 18-Jun-15 7-Aug-15 27-Sep-15 22-Dec-15 16-Nov-15 17-Mar-16 19-Jan-17 30-Jan-18 - - - - 100% 100.0%
A545-142-PA-MR-5184 - PUMP HORZ,VERT GPP 23.3 20-Jul-15 6-Aug-15 29-Oct-15 10-Dec-15 18-Dec-15 17-Mar-16 20-Feb-17 28-May-18 - - - - 100% 100.0%
A545-142-PA-MR-5185 R PUMP CENTRIFUGAL HORZ SPP 23.3 4-Jul-15 7-Jul-15 13-Oct-15 13-Oct-15 2-Dec-15 18-Mar-16 4-Feb-17 28-Mar-18 30-May-18 1-Nov-18 4-Jul-18 27-Feb-19 100% 100.0%
A545-142-KF-MR-5188 - CENTRIFUGAL FAN 7.0 24-Jul-15 8-Aug-15 2-Nov-15 18-Jan-16 16-Dec-16 27-Mar-18 30-Apr-19 - - - - - 100% 98.0%
RECIPROCATING PUMPS
A545-101-PA-MR-5004 - 1.2 24-Jul-15 28-Aug-15 4-Nov-15 28-Jan-16 24-Dec-15 6-Oct-16 26-Feb-17 29-Jan-18 - - - - 100% 100.0%
CONTROLLED VOLUME
CENTRIFUGAL PUMPS SPP -
A545-101-PA-MR-5006 - 1.2 12-Jun-15 26-Aug-15 23-Sep-15 28-Jan-16 16-Dec-16 8-Dec-16 16-Mar-17 30-Mar-18 - - - - 100% 100.0%
VERTICAL
A545-101-LZ-MR-5007 - OIL MIST LUBRICATION SYSTEM 0.5 19-Jun-15 10-Dec-15 30-Sep-15 28-Jun-16 23-Dec-16 29-Nov-16 23-Mar-17 30-Jan-18 - - - - 100% 100.0%
100 99.9%
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW VENDOR DRAWING REVIEW TOTAL TOTAL
REVAMP/ PR ISSUE (After Revamp)
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%) (After Revamp) (SCHD (ACTUAL
EXISTING
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-VV-MR-6413 - VESSELS 31.3 31-Aug-15 7-Oct-15 26-Nov-15 30-Dec-15 25-Jan-16 13-Apr-16 10-Dec-16 28-Feb-18 - - - - 100% 100.0%
A545-101-VV-MR-6158 - UTILITY VESSELS - ODC 6.3 22-Jun-15 5-Aug-15 17-Sep-15 22-Oct-15 16-Nov-15 1-Apr-16 20-Dec-16 30-Apr-18 - - - - 100% 100.0%
A545-111-EE-MR-6160 - HEAT EXCHANGER CARBON STEEL 6.3 26-Jun-15 16-Jul-15 6-Oct-15 6-Oct-15 5-Dec-15 6-Oct-16 8-Jan-17 30-Jan-18 - - - - 100% 100.0%
A545-101-EA-MR-6210 - AIR COOLERS (CS) 12.5 6-Jul-15 25-Jun-15 1-Oct-15 10-Sep-15 30-Nov-15 18-May-16 23-Jan-17 22-Jun-18 - - - - 100% 100.0%
A545-151-EE-MR-6140 R HEAT EXCHNAGERS HAIR PIN TYPE 6.3 31-Mar-15 24-Apr-15 10-Jul-15 1-Sep-15 22-Oct-16 29-Sep-16 20-Jan-17 27-Apr-18 21-Feb-18 21-Feb-18 28-Mar-18 - 100% 100.0%
100 99.8%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-142-16-50-01010 R C CABLE LAYOUT 8.4 20-Nov-15 26-May-15 10-Dec-15 28-Aug-15 17-Dec-15 29-Sep-15 24-Dec-15 6-Oct-15 7-Jan-16 14-Oct-15 21-Jan-17 20-Feb-17 100% 100.0%
A545-142-16-50-02011 R C LIGHTING LAYOUT ALKYLATION UNIT 4.2 24-Feb-16 31-Dec-15 9-Mar-16 28-Jan-16 16-Mar-16 22-Feb-16 23-Mar-16 29-Feb-16 6-Apr-16 7-Mar-16 2-Mar-17 5-Oct-17 100% 100.0%
A545-142-16-50-02012 R C LIGHTING LAYOUT ALKYLATION UNIT 4.2 24-Feb-16 31-Dec-15 9-Mar-16 28-Jan-16 16-Mar-16 22-Feb-16 23-Mar-16 29-Feb-16 6-Apr-16 7-Mar-16 2-Mar-17 5-Oct-17 100% 100.0%
A545-142-16-50-42020 R C PANEL SCHEDULE 2.2 22-Feb-16 28-Oct-15 7-Mar-16 28-Jan-16 14-Mar-16 21-Mar-16 21-Mar-16 28-Mar-16 4-Apr-16 4-Apr-16 19-Apr-17 30-Mar-17 100% 100.0%
A545-142-16-50-03011 R C EARTHING LAYOUT ALKYLATION UNIT 2.8 4-Feb-16 25-Aug-15 18-Feb-16 9-Sep-15 25-Feb-16 16-Sep-15 3-Mar-16 23-Sep-15 17-Mar-16 30-Sep-15 6-May-16 21-Feb-17 100% 100.0%
A545-142-16-50-03012 E C EARTHING LAYOUT SAR UNIT 2.8 4-Feb-16 25-Aug-15 18-Feb-16 9-Sep-15 25-Feb-16 16-Sep-15 3-Mar-16 23-Sep-15 17-Mar-16 30-Sep-15 6-May-16 21-Feb-17 100% 100.0%
A545-142-16-50-06012 E E AREA CLASSIFICATION SAR UNIT 1.9 7-Oct-15 10-Jun-15 21-Oct-15 1-Jul-15 28-Oct-15 11-Jul-15 4-Nov-15 20-Jul-15 18-Nov-15 22-Sep-15 10-Jan-16 30-Sep-15 100% 100.0%
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE: INSTRUMENTATION (ALKYLATION BLOCK)
ANNEXURE-A6
A545-142-16-51-BM02 R C BILL OF MATERIAL 6.5 18-Mar-15 30-May-15 20-Oct-15 15-Apr-16 19-Dec-15 25-May-16 2-Jan-16 27-Jun-16 16-Feb-17 - 17-Apr-17 10-Jan-18 100% 100.0%
A545-142-16-51-CH02 R C CABLE SCHEDULE -FF 3.9 1-Jun-15 26-Oct-15 1-Jul-15 2-Apr-16 8-Jul-15 9-Apr-16 14-Jul-15 16-Apr-16 11-Aug-15 23-Apr-16 10-Oct-15 30-Apr-16 100% 100.0%
A545-142-16-51-II02 R C INSTRUMENT INDEX 12.9 13-Nov-15 18-Jul-15 3-Dec-15 29-Apr-16 10-Dec-15 6-May-16 15-Dec-15 13-May-16 25-Dec-15 13-May-16 30-Sep-19 - 85% 85.0%
A545-142-16-51-CH03 R C CABLE SCHEDULE -NFF 3.9 13-Oct-15 28-Oct-15 12-Nov-15 27-Jun-16 19-Nov-15 4-Jul-16 24-Nov-15 11-Jul-16 22-Dec-15 18-Jul-16 20-Feb-16 25-Jul-16 100% 100.0%
A545-142-16-51-00805 R C INSTRUMENT LOCATION PLAN-NFF 5.2 22-Oct-15 29-Oct-15 21-Nov-15 23-Dec-15 28-Nov-15 30-Dec-15 3-Dec-15 6-Jan-16 31-Dec-15 13-Jan-16 4-Apr-17 13-Jan-16 100% 100.0%
A545-142-16-51-00806 R C INSTRUMENT JUNCTION BOX LAYOUT-FF 2.6 13-Oct-15 22-Jul-15 12-Nov-15 2-Apr-16 19-Nov-15 9-Apr-16 24-Nov-15 16-Apr-16 22-Dec-15 23-Apr-16 20-Feb-16 30-Apr-16 100% 100.0%
A545-142-16-51-MD07 R E DCS POINT DATABASE 3.9 14-Jan-16 27-Nov-15 18-Feb-17 7-Jul-17 7-Mar-17 14-Jul-17 25-Mar-17 21-Jul-17 22-Apr-17 28-Jul-17 2-Apr-19 - 100% 96.0%
A545-142-16-51-NE10 R E NOZZLE ELEVATION FOR LEVEL INSTRUMENT 3.9 2-Jul-15 2-Mar-15 1-Aug-15 23-May-15 8-Aug-15 22-Jun-15 13-Aug-15 21-Sep-15 20-Aug-15 28-Sep-15 19-Oct-15 20-Jan-16 100% 100.0%
A545-142-16-51-00811 R C INSTRUMENT JUNCTION LAYOUT-NFF 2.6 13-Oct-15 15-Jun-16 12-Nov-15 29-Jun-16 19-Nov-15 6-Jul-16 24-Nov-15 13-Jul-16 22-Dec-15 20-Jul-16 27-Mar-17 20-Jul-16 100% 100.0%
A545-142-16-51-00812 R C AIR SUPPLY DISTRIBUTION SCHEME 3.9 19-Jan-16 29-Oct-15 18-Feb-16 22-Mar-16 25-Feb-16 29-Mar-16 1-Mar-16 5-Apr-16 29-Mar-16 12-Apr-16 28-May-16 19-Apr-16 100% 100.0%
A545-142-16-51-00813 R C INSTRUMENT LOCATION PLAN-FF 5.2 22-Oct-15 30-Oct-15 21-Nov-15 24-Dec-15 28-Nov-15 31-Dec-15 3-Dec-15 7-Jan-16 31-Dec-15 14-Jan-16 5-Apr-17 14-Jan-16 100% 100.0%
A545-142-16-51-00801 R C INSTRUMENT CABLE DUCT /TRENCH LAYOUT 3.1 21-Aug-15 3-Jul-15 25-Sep-15 17-Jul-15 2-Oct-15 24-Jul-15 7-Oct-15 29-Jul-15 4-Nov-15 7-Aug-15 4-Jan-16 14-Aug-15 100% 100.0%
A545-142-16-51-00820 LEVEL GAUGE & LIGHTING PANEL LAYOUT 28-11-2015 27-07-2015 =I22+30 =P22-7 =L22+7 =S22-7 =O22+5 =V22-7 =R22+7 =Y22-7 =U22+60 30-11-2015
A545-142-16-51-MD22 E E POWER SUPPLY SCHEME 1.3 16-May-15 2-Jul-15 15-Jun-15 14-Jul-15 2-Jul-15 28-Jul-15 17-Jul-15 15-Sep-15 31-Jul-15 22-Sep-15 31-Aug-15 29-Jan-16 100% 100.0%
A545-142-16-51-00823 R C GAS DETECTOR & CCTV LAYOUT 3.9 29-Mar-16 31-Jul-15 28-Apr-16 7-Sep-15 5-May-16 21-Sep-15 10-May-16 28-Sep-15 7-Jun-16 5-Oct-15 6-Aug-16 14-Jul-16 100% 100.0%
A545-142-16-51-SK00 E E MISCELLANENOUS SKETCHES 2.6 20-Mar-16 14-Aug-15 19-Apr-16 30-Sep-15 26-Apr-16 23-Oct-15 30-Apr-16 6-Jun-16 7-May-16 13-Jun-16 7-Jul-16 20-Jun-16 100% 100.0%
100 97.7%
TOTAL TOTAL
ISSUED
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
DRAWING/ DOCUMENT REVAMP/ INCORPORATING
DRAWING/ DOCUMENT TITLE WTG (10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
NO. EXISTING REVAMP
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-130-1111 R COOLING WATER DISTRIBUTION 1.5 17-Mar-15 7-Jan-16 26-May-15 15-Jan-16 13-Sep-15 29-Jan-16 13-Oct-15 15-Mar-16 7-May-19 - 2-Jun-18 4-Jul-18 100% 96.0%
A545-02-41-130-1114 E CLOSED BLOW DOWN DISTRIBUTION 1.5 19-Mar-15 7-Jan-16 28-May-15 15-Jan-16 15-Sep-15 29-Jan-16 15-Oct-15 15-Mar-16 31-Oct-19 - - - 95% 96.0%
A545-02-41-130-1117 E UNDER GROUND CLOSED BLOWDOWN DRUM 1.5 21-Mar-15 7-Jan-16 30-May-15 15-Jan-16 17-Sep-15 29-Jan-16 17-Oct-15 15-Mar-16 31-Oct-19 - - - 95% 96.0%
A545-02-41-130-1123 E AMINE BLOWDOWN DISTRIBUTION 1.5 27-Mar-15 7-Jan-16 4-Jun-15 15-Jan-16 22-Sep-15 29-Jan-16 22-Oct-15 15-Mar-16 31-Oct-19 - - - 95% 96.0%
A545-02-41-130-1128 R LP FLARE DISTRIBUTION 1.5 20-Mar-15 7-Jan-16 28-May-15 15-Jan-16 15-Sep-15 29-Jan-16 15-Oct-15 15-Mar-16 31-Oct-19 - 4-Jun-18 4-Jul-18 95% 96.0%
A545-02-41-130-1129 E FLARE KOD 1.5 22-Apr-15 7-Jan-16 1-Jul-15 15-Jan-16 19-Oct-15 29-Jan-16 18-Nov-15 15-Mar-16 31-Oct-19 - - - 95% 96.0%
A545-02-41-130-1132 R MP STEAM DISTRIBUTION 1.5 26-Apr-15 7-Jan-16 5-Jul-15 15-Jan-16 28-Sep-15 29-Jan-16 28-Oct-15 15-Mar-16 31-Oct-19 - 5-Jun-18 4-Jul-18 95% 96.0%
A545-02-41-130-1133 R LP STEAM DISTRIBUTION 1.5 28-Apr-15 7-Jan-16 7-Jul-15 15-Jan-16 30-Sep-15 29-Jan-16 30-Oct-15 15-Mar-16 31-Oct-19 - 7-Jun-18 4-Jul-18 95% 96.0%
A545-02-41-130-1138 E NITROGEN DISTRIBUTION 1.5 22-Apr-15 7-Jan-16 1-Jul-15 15-Jan-16 24-Sep-15 29-Jan-16 24-Oct-15 15-Mar-16 31-Oct-19 - - - 95% 96.0%
A545-02-41-130-1140 R FUEL OIL AND FUEL GAS DISTRIBUTION 1.5 27-Apr-15 7-Jan-16 6-Jul-15 15-Jan-16 19-Sep-15 29-Jan-16 19-Oct-15 15-Mar-16 31-Oct-19 - 8-Jun-18 4-Jul-18 95% 96.0%
A545-02-41-130-1141 E SERVICE WATER DISTRIBUTION 1.5 28-Apr-15 7-Jan-16 7-Jul-15 15-Jan-16 20-Sep-15 29-Jan-16 20-Oct-15 15-Mar-16 31-Oct-19 - - - 95% 96.0%
A545-02-41-130-1151 R CONTROL VALVE DRAIN/ VENT DETAILS 1.5 1-May-15 7-Jan-16 10-Jul-15 12-Feb-16 23-Sep-15 26-Feb-16 23-Oct-15 15-Mar-16 31-Oct-19 - 8-Jun-18 4-Jul-18 95% 96.0%
A545-02-41-130-1152 E LEVEL INSTRUMENTS DRAIN/ VENT DETAILS 1.5 3-May-15 7-Jan-16 12-Jul-15 22-Mar-16 25-Sep-15 5-Apr-16 25-Oct-15 15-Mar-16 31-Oct-19 - - - 95% 96.0%
A545-02-41-130-1154 R PUMP SEAL PLAN DETAILS 1.5 7-May-15 7-Jan-16 16-Jul-15 28-Jan-16 29-Sep-15 11-Feb-16 29-Oct-15 15-Mar-16 31-Oct-19 - 8-Jun-18 4-Jul-18 95% 96.0%
PROCESS DATASHEET-ISBL - - -
133-VV-1007 R FUEL GAS KO DRUM 0.6 30-Apr-15 7-Jan-16 9-Jul-15 12-Feb-16 17-Sep-15 26-Feb-16 17-Oct-15 15-Mar-16 9-Jan-17 15-Mar-16 30-Apr-18 23-Feb-18 100% 100.0%
130-VV-1008 R FLARE KNOCK OUT DRUM 0.6 2-May-15 7-Jan-16 11-Jul-15 15-Jan-16 19-Sep-15 29-Jan-16 19-Oct-15 15-Mar-16 10-Feb-17 15-Mar-16 30-Apr-18 26-Feb-18 100% 100.0%
133-VV-1009 E WASH WATER SURGE DRUM 0.6 4-May-15 7-Jan-16 13-Jul-15 12-Feb-16 21-Sep-15 26-Feb-16 21-Oct-15 15-Mar-16 13-Feb-17 15-Mar-16 - - 100% 100.0%
133-VV-1011 R HOT OIL EXPANSION DRUM 0.6 6-May-15 7-Jan-16 15-Jul-15 12-Feb-16 23-Sep-15 26-Feb-16 23-Oct-15 15-Mar-16 14-Feb-17 15-Mar-16 2-May-18 11-Jan-18 100% 100.0%
133-VV-1012 R RECYCLE GAS COMP 2ND STAG KO DRUM 0.6 6-May-15 11-Jan-16 15-Jul-15 12-Feb-16 23-Sep-15 26-Feb-16 23-Oct-15 15-Mar-16 14-Feb-17 15-Mar-16 3-May-18 27-Feb-18 100% 100.0%
130-PA-1009 A/B R FLARE KOD PUMPS 0.6 8-May-15 14-Jan-16 17-Jul-15 27-Jan-16 25-Sep-15 10-Feb-16 25-Oct-15 15-Mar-16 16-Feb-17 15-Mar-16 4-May-18 26-Feb-18 100% 100.0%
130-WH-1002 E STEAM TRAP 0.6 10-May-15 14-Jan-16 18-Jul-15 4-May-16 26-Sep-15 18-May-16 26-Oct-15 22-Jun-16 17-Feb-17 22-Jun-16 - - 100% 100.0%
130-LZ-1001 R ANTIFOAM DOSING PACKAGE 0.6 12-May-15 7-Jan-16 21-Jul-15 15-Jan-16 29-Sep-15 29-Jan-16 29-Oct-15 15-Mar-16 20-Feb-17 15-Mar-16 5-May-18 18-Apr-18 100% 100.0%
133-VV-1013 R RICH AMINE DEGASSING DRUM 0.6 14-May-15 7-Jan-16 23-Jul-15 12-Feb-16 1-Oct-15 26-Feb-16 31-Oct-15 15-Mar-16 22-Feb-17 15-Mar-16 5-May-18 20-Apr-18 100% 100.0%
133-VV-1015 R SOUR WATER DRUM 0.6 15-May-15 7-Jan-16 24-Jul-15 12-Feb-16 2-Oct-15 26-Feb-16 31-Oct-15 15-Mar-16 22-Feb-17 15-Mar-16 5-May-18 19-Apr-18 100% 100.0%
130-FA-1002 E FLAME ARRESTOR 0.6 16-May-15 14-Jan-16 25-Jul-15 3-May-16 3-Oct-15 17-May-16 2-Nov-15 24-Jun-16 24-Feb-17 24-Jun-16 - - 100% 100.0%
130-FA-1001 E FLAME ARRESTOR 0.6 18-May-15 14-Jan-16 27-Jul-15 3-May-16 5-Oct-15 17-May-16 4-Nov-15 24-Jun-16 27-Feb-17 24-Jun-16 - - 100% 100.0%
Process P&IDs - - -
A545-02-41-133-PFD R PROCESS FLOW DIAGRAM 18.5 1-Dec-14 5-Oct-15 31-Dec-14 19-Oct-15 7-Jan-15 25-Nov-15 21-Jan-15 25-Jan-16 4-Feb-15 25-Jan-16 - - 100% 100.0%
A545-02-41-133-P&ID R PIPING & INSTRUMENTATION DIAGRAM 13.8 14-Jan-15 4-Nov-15 13-Feb-15 26-Nov-15 20-Feb-15 25-Jan-16 6-Mar-15 15-Mar-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
Page 431 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 2
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
PROJECT, NIGERIA JOB NO. : A545
DISCIPLINE: PROCESS (GASOLINE BLOCK)
ANNEXURE-A6
TOTAL TOTAL
ISSUED
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
DRAWING/ DOCUMENT REVAMP/ INCORPORATING
DRAWING/ DOCUMENT TITLE WTG (10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
NO. EXISTING REVAMP
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-133-PDS R PROCESS DATA SHEET 13.8 23-Feb-15 12-Nov-15 25-Mar-15 26-Nov-15 1-Apr-15 25-Jan-16 15-Apr-15 15-Mar-16 13-Jun-16 28-Sep-17 5-May-18 28-Apr-18 100% 100.0%
A545-02-41-133-HZP R HAZOP 6.2 25-Oct-16 13-Jun-16 - - - - - - 10-Jan-17 18-Jun-16 30-Jun-18 - 100% 100.0%
A545-02-41-133-UTS R UTILITY SUMMARY 0.6 11-Mar-15 11-Jan-16 11-Apr-15 25-Jan-16 25-Apr-15 6-Jul-16 25-May-15 6-Jul-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-133-FLS R FLARE LOAD SUMMARY 0.6 8-Apr-15 11-Jan-16 9-May-15 25-Jan-16 23-May-15 25-Jan-16 22-Jun-15 12-Jul-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-133-EFS R EFFLUENT SUMMARY 0.6 18-Feb-15 11-Jan-16 21-Mar-15 25-Jan-16 4-Apr-15 25-Jan-16 4-May-15 6-Jul-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-133-CHS R CHEMICAL SUMMARY 0.6 2-Feb-15 11-Jan-16 5-Mar-15 25-Jan-16 19-Mar-15 25-Jan-16 18-Apr-15 6-Jul-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-133-CED R CAUSE & EFFECT DIAGRAM 0.6 18-Mar-15 11-Jan-16 18-Apr-15 25-Jan-16 2-May-15 6-May-16 1-Jun-15 12-Jul-16 31-Oct-19 - 2-Jul-18 6-Jul-18 95% 95.0%
A545-02-41-133-EQL R EQUIPMENT LIST 0.6 2-Mar-15 2-Nov-15 2-Apr-15 11-Jan-16 16-Apr-15 25-Jan-16 16-May-15 12-Jul-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
A545-02-41-133-LNL R LINE LIST 0.6 24-Feb-15 2-Jan-16 27-Mar-15 22-Jan-16 10-Apr-15 5-Apr-16 11-May-15 12-Jul-16 31-Oct-19 - 31-Oct-19 - 95% 95.0%
100 98.2%
INCORPORATE COMMENTS
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR ENGG. /
DRAWING/ DOCUMENT REVAMP/ ENGG. / CONSTN. CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
GENERAL CIVIL - GASOLINE BLOCK
A545-133-16-47-30050 R C ISOS U/G PIPING 5.1 15-Oct-15 20-Oct-16 - - - - - - - - 30-Apr-19 30-Apr-19 30-Apr-19 30-Apr-19 100% 100.0%
A545-133-16-47-01101 E E P&ID FOR CRWS SYSTEM 1.8 5-Sep-15 24-Nov-15 19-Sep-15 4-Jan-16 26-Sep-15 15-Jan-16 30-Sep-15 20-Jan-16 14-Oct-15 30-Mar-16 7-Dec-16 28-Jan-17 - - 100% 100.0%
A545-133-16-47-01102 E E P&ID FOR OWS SYSTEM 1.8 11-Sep-15 26-Nov-15 25-Sep-15 10-Mar-16 2-Oct-15 17-Mar-16 7-Oct-15 24-Mar-16 21-Oct-15 31-Mar-16 14-Dec-16 28-Jan-17 - - 100% 100.0%
A545-133-16-47-01103 E E P&ID FOR FIRE WATER SYSTEM 2.3 19-Sep-15 28-Mar-16 3-Oct-15 30-Apr-16 10-Oct-15 28-May-16 14-Oct-15 4-Jun-16 28-Oct-15 11-Jun-16 21-Dec-16 22-Feb-19 - - 100% 100.0%
A545-133-16-47-01105 E P&ID FOR FIRE WATER SPRAY ON VESSELS =+I14+7 29-04-2016 =I15+21 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-16-47-01106 E P&ID FOR FIRE WATER SPRAY ON AF COOLERS =+I15+7 11-04-2016 =I16+30 30-04-2016 #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-16-47-01107 E P&ID FOR FIRE WATER SPRAY ON PUMPS 31-10-2015 - =I17+30 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-81-41-31108 E E P&ID FOR DRINKING WATER SYSTEM 1.5 26-Sep-15 3-Mar-16 26-Oct-15 10-Mar-16 9-Nov-15 17-Mar-16 30-Nov-15 24-Mar-16 21-Dec-15 31-Mar-16 13-Feb-17 30-Jan-17 - - 100% 100.0%
A545-133-16-47-11109 E E P&ID FOR CRWS/OWS PUMPING 1.5 20-Sep-15 17-Mar-16 20-Oct-15 31-Mar-16 3-Nov-15 18-Jun-16 24-Nov-15 24-Jun-16 15-Dec-15 30-Jun-16 7-Feb-17 7-Jul-18 - - 100% 100.0%
A545-133-16-47-02000 E C AREA DIVISION LAYOUT U/G PIPING ISBL 1.2 5-Jul-15 25-Feb-16 4-Aug-15 10-Mar-16 18-Aug-15 17-Mar-16 8-Sep-15 24-Mar-16 29-Sep-15 31-Mar-16 22-Nov-16 7-Jul-18 - - 100% 100.0%
A545-133-16-47-02001 R C UNIT AREA-01 2.0 5-Sep-15 14-Jul-16 5-Oct-15 28-Jul-16 19-Oct-15 31-Aug-16 9-Nov-15 7-Sep-16 30-Nov-15 14-Sep-16 24-Nov-16 22-Mar-17 3-Sep-18 25-Feb-19 100% 100.0%
A545-133-16-47-02002 R C UNIT AREA-02 2.0 14-Sep-15 14-Jul-16 14-Oct-15 28-Jul-16 28-Oct-15 31-Aug-16 18-Nov-15 7-Sep-16 9-Dec-15 14-Sep-16 3-Dec-16 22-Mar-17 3-Sep-18 25-Feb-19 100% 100.0%
A545-133-16-47-02003 R C UNIT AREA-03 2.0 23-Sep-15 14-Jul-16 23-Oct-15 28-Jul-16 6-Nov-15 31-Aug-16 27-Nov-15 7-Sep-16 18-Dec-15 14-Sep-16 12-Dec-16 22-Mar-17 3-Sep-18 25-Feb-19 100% 100.0%
A545-133-16-47-02004 R C UNIT AREA-04 2.0 4-Oct-15 22-Aug-16 3-Nov-15 24-Aug-16 17-Nov-15 31-Aug-16 8-Dec-15 7-Sep-16 29-Dec-15 14-Sep-16 23-Dec-16 22-Mar-17 3-Sep-18 25-Feb-19 100% 100.0%
A545-133-16-47-02005 E C UNIT AREA-05 2.0 13-Oct-15 24-Aug-16 12-Nov-15 30-Aug-16 26-Nov-15 6-Sep-16 17-Dec-15 13-Sep-16 7-Jan-16 20-Sep-16 1-Jan-17 22-Mar-17 - - 100% 100.0%
A545-133-16-47-02006 E C UNIT AREA-06 2.0 22-Oct-15 24-Aug-16 21-Nov-15 30-Aug-16 5-Dec-15 6-Sep-16 26-Dec-15 13-Sep-16 16-Jan-16 20-Sep-16 10-Jan-17 22-Mar-17 - - 100% 100.0%
A545-133-81-41-02007 E C UNIT AREA-07 2.0 31-Oct-15 24-Aug-16 30-Nov-15 30-Aug-16 14-Dec-15 6-Sep-16 4-Jan-16 13-Sep-16 25-Jan-16 20-Sep-16 19-Jan-17 22-Mar-17 - - 100% 100.0%
A545-133-81-41-02008 E C UNIT AREA-08 2.0 9-Nov-15 24-Aug-16 9-Dec-15 30-Aug-16 23-Dec-15 6-Sep-16 13-Jan-16 13-Sep-16 3-Feb-16 20-Sep-16 28-Jan-17 22-Mar-17 - - 100% 100.0%
A545-133-81-41-02011 E E FIRE EXTINGUISHER LAYOUT 1.8 30-Sep-15 20-Jul-16 30-Oct-15 27-Jul-16 13-Nov-15 23-Jun-18 4-Dec-15 30-Jun-18 25-Dec-15 7-Jul-18 9-Dec-16 28-Feb-19 - - 100% 100.0%
A545-133-16-47-02010 E C LAYOUT OF RCC PAVEMENT 2.0 20-Dec-15 16-Jun-16 19-Jan-16 30-Jun-16 2-Feb-16 16-Aug-16 23-Feb-16 23-Aug-16 15-Mar-16 30-Aug-16 28-Feb-17 5-Mar-19 - - 100% 100.0%
A545-133-16-47-02012 E C GA CRWS/OWS SUMP 2.0 20-Dec-15 17-Mar-16 19-Jan-16 31-Mar-16 2-Feb-16 27-May-16 23-Feb-16 3-Jun-16 15-Mar-16 10-Jun-16 18-Feb-17 18-Feb-19 - - 100% 100.0%
A545-133-16-47-02032 E E STUDY/ MISC. DRAWINGS 5.2 10-Jun-15 12-Dec-15 10-Jul-15 - - - - - - - 15-Nov-16 26-May-17 - - 100% 100.0%
A545-133-16-47-90004 R E 3D MODELLING 27.6 10-Jun-15 8-Jan-16 10-Jul-15 28-Jul-16 - - - - - - 30-Apr-19 - 30-Apr-19 - 100% 100.0%
100 100.0%
TOTAL TOTAL
INCORPORATE
DRAFTING COMPLETE CHECKING COMPLETED ISSUED FOR COMMENTS UPDATE & ISSUE FOR (SCHD. (ACTUAL
MR No MR DESCRIPTION WTG. % START (10%) COMMENTS & ISSUE FOR
(60%) (65%) (80%) CONSTRUCTION (100%) PROGRESS PROGRESS
CONSTRUCTION (85%)
%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
100 100.0%
TOTAL TOTAL
MR/TR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW VENDOR DRAWING REVIEW
REVAMP/ PR ISSUE (After Revamp) (SCHD. (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%) (After Revamp)
EXISTING PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-133-CT-MR-6810 R TRAYS (UN-ENGINEERED) 64.7 5-Aug-15 10-May-16 8-Dec-16 23-Jan-17 27-Jan-17 2-Nov-17 12-May-19 30-Apr-19 17-Apr-18 17-Apr-18 12-May-19 30-Apr-19 100% 100.0%
100 100.0%
A545-101-GN-MR-4390 R FILTERS 7.2 27-Aug-15 21-Dec-15 16-Sep-15 30-Apr-16 19-Dec-16 14-Mar-18 19-Mar-17 30-Apr-19 2-Jun-18 14-Mar-18 30-Apr-19 30-Apr-19 100% 100.0%
A545-700-HH-MR-4610 EOT CRANES 6.3 02-07-2015 03-06-2015 20-May-15 9-Oct-15 9-Jul-15 27-Jul-16 21-Oct-16 30-Jan-18 - - - - 100% 100.0%
100 100.0%
A545-133-16-43-00001 R E EQUIPMENT LAYOUT 1.8 5-May-15 17-Dec-15 19-Jul-15 31-Dec-15 18-Aug-15 14-Jan-16 1-Sep-15 28-Jan-16 21-Sep-15 28-Jan-16 15-Nov-15 30-May-16 25-Apr-18 28-Apr-18 100% 100.0%
A545-133-16-43-00002 E E AREA DIVISION RFCCG 0.5 20-Jul-15 28-Dec-15 19-Aug-15 24-Feb-16 26-Aug-15 2-Mar-16 9-Sep-15 9-Mar-16 23-Sep-15 16-Mar-16 16-Dec-16 23-Aug-16 - - 100% 100.0%
A545-133-16-43-00011 E C PIPING GAD AREA-01 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00012 E C PIPING GAD AREA-01 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00013 E C PIPING GAD AREA-01 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00014 E C PIPING GAD AREA-01 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00015 E C PIPING GAD AREA-01 0.08 23-Dec-16 10-Jan-17 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00021 E C PIPING GAD AREA-02 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00022 E C PIPING GAD AREA-02 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00023 E C PIPING GAD AREA-02 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00024 E C PIPING GAD AREA-02 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00025 E C PIPING GAD AREA-02 0.08 23-Dec-16 10-Jan-17 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00031 E C PIPING GAD AREA-03 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00032 E C PIPING GAD AREA-03 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00033 E C PIPING GAD AREA-03 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00034 E C PIPING GAD AREA-03 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00035 E C PIPING GAD AREA-03 0.08 23-Dec-16 10-Jan-17 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00041 E C PIPING GAD AREA-04 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00042 E C PIPING GAD AREA-04 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00043 E C PIPING GAD AREA-04 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00044 E C PIPING GAD AREA-04 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00045 E C PIPING GAD AREA-04 0.08 23-Dec-16 10-Jan-17 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00051 E C PIPING GAD AREA-05 0.08 23-Dec-16 10-Jan-17 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00052 E C PIPING GAD AREA-05 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00053 E C PIPING GAD AREA-05 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00054 E C PIPING GAD AREA-05 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00055 E C PIPING GAD AREA-05 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00061 E C PIPING GAD AREA-06 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00062 E C PIPING GAD AREA-06 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00063 E C PIPING GAD AREA-06 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00065 E C PIPING GAD AREA-06 0.08 23-Dec-16 10-Jan-17 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - - - 85% 85.0%
A545-133-16-43-00071 R C PIPING GAD AREA-07 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00072 R C PIPING GAD AREA-07 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00073 R C PIPING GAD AREA-07 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00074 R C PIPING GAD AREA-07 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00075 R C PIPING GAD AREA-07 0.08 23-Dec-16 10-Jan-17 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00081 R C PIPING GAD AREA-08 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00082 R C PIPING GAD AREA-08 0.08 18-Nov-15 21-Sep-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00083 R C PIPING GAD AREA-08 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00084 R C PIPING GAD AREA-08 0.08 18-Nov-15 24-Oct-16 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00085 R C PIPING GAD AREA-08 0.08 23-Dec-16 10-Jan-17 6-Jan-17 10-Jan-17 13-Jan-17 17-Jan-17 20-Jan-17 24-Jan-17 4-Feb-17 31-Jan-17 2-Sep-19 - 2-Sep-19 - 85% 85.0%
A545-133-16-43-00091 E C PIPING GAD AREA-09 0.08 8-Dec-15 21-Sep-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00092 E C PIPING GAD AREA-09 0.08 8-Dec-15 21-Sep-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00093 E C PIPING GAD AREA-09 0.08 8-Dec-15 24-Oct-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00094 E C PIPING GAD AREA-09 0.08 8-Dec-15 24-Oct-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00095 E C PIPING GAD AREA-09 0.08 12-Jan-17 10-Jan-17 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00101 E C PIPING GAD AREA-10 0.08 8-Dec-15 21-Sep-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00102 E C PIPING GAD AREA-10 0.08 8-Dec-15 21-Sep-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00103 E C PIPING GAD AREA-10 0.08 8-Dec-15 24-Oct-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00104 E C PIPING GAD AREA-10 0.08 8-Dec-15 24-Oct-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00105 E C PIPING GAD AREA-10 0.08 12-Jan-17 10-Jan-17 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00111 E C PIPING GAD AREA-11 0.08 8-Dec-15 21-Sep-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00112 E C PIPING GAD AREA-11 0.08 8-Dec-15 21-Sep-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00113 E C PIPING GAD AREA-11 0.08 8-Dec-15 24-Oct-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00114 E C PIPING GAD AREA-11 0.08 8-Dec-15 24-Oct-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00115 E C PIPING GAD AREA-11 0.08 12-Jan-17 10-Jan-17 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00121 E C PIPING GAD AREA-12 0.08 8-Dec-15 21-Sep-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00122 E C PIPING GAD AREA-12 0.08 8-Dec-15 21-Sep-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00123 E C PIPING GAD AREA-12 0.08 8-Dec-15 24-Oct-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00124 E C PIPING GAD AREA-12 0.08 8-Dec-15 24-Oct-16 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00125 E C PIPING GAD AREA-12 0.08 12-Jan-17 10-Jan-17 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00131 E C PIPING GAD AREA-13 0.08 8-Dec-15 21-Sep-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00132 E C PIPING GAD AREA-13 0.08 8-Dec-15 21-Sep-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00133 E C PIPING GAD AREA-13 0.08 8-Dec-15 24-Oct-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00134 E C PIPING GAD AREA-13 0.08 8-Dec-15 24-Oct-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00135 E C PIPING GAD AREA-13 0.08 12-Jan-17 17-Jan-17 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00141 E C PIPING GAD AREA-14 0.08 8-Dec-15 21-Sep-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00142 E C PIPING GAD AREA-14 0.08 8-Dec-15 21-Sep-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00143 E C PIPING GAD AREA-14 0.08 8-Dec-15 24-Oct-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00144 E C PIPING GAD AREA-14 0.08 8-Dec-15 24-Oct-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00145 E C PIPING GAD AREA-14 0.08 12-Jan-17 10-Jan-17 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00151 R C PIPING GAD AREA-15 0.08 8-Dec-15 21-Sep-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - 31-Oct-19 - 85% 85.0%
A545-133-16-43-00152 R C PIPING GAD AREA-15 0.08 8-Dec-15 21-Sep-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - 31-Oct-19 - 85% 85.0%
A545-133-16-43-00153 R C PIPING GAD AREA-15 0.08 8-Dec-15 24-Oct-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - 31-Oct-19 - 85% 85.0%
A545-133-16-43-00154 R C PIPING GAD AREA-15 0.08 8-Dec-15 24-Oct-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - 31-Oct-19 - 85% 85.0%
A545-133-16-43-00155 R C PIPING GAD AREA-15 0.08 12-Jan-17 17-Jan-17 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - 31-Oct-19 - 85% 85.0%
A545-133-16-43-00161 E C PIPING GAD AREA-16 0.08 8-Dec-15 21-Sep-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00162 E C PIPING GAD AREA-16 0.08 8-Dec-15 21-Sep-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00163 E C PIPING GAD AREA-16 0.08 8-Dec-15 26-Oct-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00164 E C PIPING GAD AREA-16 0.08 8-Dec-15 26-Oct-16 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00165 E C PIPING GAD AREA-16 0.08 12-Jan-17 17-Jan-17 26-Jan-17 31-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00166 E C PIPING GAD AREA-16 0.08 12-Jan-17 31-Jan-17 26-Jan-17 10-Jan-17 2-Feb-17 17-Jan-17 9-Feb-17 24-Jan-17 24-Feb-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00171 E C PIPING GAD AREA-17 0.08 22-Dec-15 21-Sep-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00172 E C PIPING GAD AREA-17 0.08 22-Dec-15 21-Sep-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00173 E C PIPING GAD AREA-17 0.08 22-Dec-15 26-Oct-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00174 E C PIPING GAD AREA-17 0.08 22-Dec-15 26-Oct-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 31-Oct-19 - - - 85% 85.0%
A545-133-16-43-00175 E C PIPING GAD AREA-17 0.08 26-Jan-17 17-Jan-17 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00176 E C PIPING GAD AREA-17 0.08 26-Jan-17 31-Jan-17 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00181 E C PIPING GAD AREA-18 0.08 22-Dec-15 21-Sep-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00182 E C PIPING GAD AREA-18 0.08 22-Dec-15 21-Sep-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00183 E C PIPING GAD AREA-18 0.08 22-Dec-15 26-Oct-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00184 E C PIPING GAD AREA-18 0.08 22-Dec-15 26-Oct-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00185 E C PIPING GAD AREA-18 0.08 26-Jan-17 17-Jan-17 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00186 E C PIPING GAD AREA-18 0.08 26-Jan-17 17-Jan-17 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00191 E C PIPING GAD AREA-19 0.08 22-Dec-15 21-Sep-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00192 E C PIPING GAD AREA-19 0.08 22-Dec-15 21-Sep-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00193 E C PIPING GAD AREA-19 0.08 22-Dec-15 26-Oct-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00194 E C PIPING GAD AREA-19 0.08 22-Dec-15 26-Oct-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00195 E C PIPING GAD AREA-19 0.08 26-Jan-17 17-Jan-17 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00196 E C PIPING GAD AREA-19 0.08 26-Jan-17 17-Jan-17 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00201 E C PIPING GAD AREA-20 0.08 22-Dec-15 21-Sep-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00202 E C PIPING GAD AREA-20 0.08 22-Dec-15 21-Sep-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00203 E C PIPING GAD AREA-20 0.08 22-Dec-15 26-Oct-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00204 E C PIPING GAD AREA-20 0.08 22-Dec-15 26-Oct-16 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00205 E C PIPING GAD AREA-20 0.08 26-Jan-17 17-Jan-17 9-Feb-17 31-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00211 E C PIPING GAD AREA-21 0.08 22-Dec-15 21-Sep-16 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00212 E C PIPING GAD AREA-21 0.08 22-Dec-15 21-Sep-16 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00213 E C PIPING GAD AREA-21 0.08 22-Dec-15 26-Oct-16 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00214 E C PIPING GAD AREA-21 0.08 22-Dec-15 26-Oct-16 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00215 E C PIPING GAD AREA-21 0.08 26-Jan-17 17-Jan-17 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00221 E C PIPING GAD AREA-22 0.08 22-Dec-15 21-Sep-16 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00222 E C PIPING GAD AREA-22 0.08 22-Dec-15 21-Sep-16 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00223 E C PIPING GAD AREA-22 0.08 22-Dec-15 26-Oct-16 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00224 E C PIPING GAD AREA-22 0.08 22-Dec-15 26-Oct-16 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00225 E C PIPING GAD AREA-22 0.08 26-Jan-17 31-Jan-17 9-Feb-17 10-Jan-17 16-Feb-17 17-Jan-17 23-Feb-17 24-Jan-17 10-Mar-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00231 E C PIPING GAD AREA-23 0.08 28-Jan-16 21-Sep-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00232 E C PIPING GAD AREA-23 0.08 28-Jan-16 21-Sep-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00233 E C PIPING GAD AREA-23 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00234 E C PIPING GAD AREA-23 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00235 E C PIPING GAD AREA-23 0.08 4-Mar-17 10-Jan-17 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00241 E C PIPING GAD AREA-24 0.08 28-Jan-16 21-Sep-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00242 E C PIPING GAD AREA-24 0.08 28-Jan-16 21-Sep-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00243 E C PIPING GAD AREA-24 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00244 E C PIPING GAD AREA-24 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00245 E C PIPING GAD AREA-24 0.08 4-Mar-17 10-Jan-17 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00251 R C PIPING GAD AREA-25 0.08 28-Jan-16 21-Sep-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - 30-Nov-19 - 85% 85.0%
A545-133-16-43-00252 R C PIPING GAD AREA-25 0.08 28-Jan-16 21-Sep-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - 30-Nov-19 - 85% 85.0%
A545-133-16-43-00253 R C PIPING GAD AREA-25 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - 30-Nov-19 - 85% 85.0%
A545-133-16-43-00254 R C PIPING GAD AREA-25 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - 30-Nov-19 - 85% 85.0%
A545-133-16-43-00255 R C PIPING GAD AREA-25 0.08 4-Mar-17 10-Jan-17 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - 30-Nov-19 - 85% 85.0%
A545-133-16-43-00261 E C PIPING GAD AREA-26 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00262 E C PIPING GAD AREA-26 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00263 E C PIPING GAD AREA-26 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00264 E C PIPING GAD AREA-26 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00265 E C PIPING GAD AREA-26 0.08 4-Mar-17 10-Jan-17 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00271 E C PIPING GAD AREA-27 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00272 E C PIPING GAD AREA-27 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00273 E C PIPING GAD AREA-27 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00274 E C PIPING GAD AREA-27 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00275 E C PIPING GAD AREA-27 0.08 4-Mar-17 10-Jan-17 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00281 E C PIPING GAD AREA-28 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00282 E C PIPING GAD AREA-28 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00283 E C PIPING GAD AREA-28 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00284 E C PIPING GAD AREA-28 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00285 E C PIPING GAD AREA-28 0.08 4-Mar-17 10-Jan-17 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00291 E C PIPING GAD AREA-29 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00292 E C PIPING GAD AREA-29 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00293 E C PIPING GAD AREA-29 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00294 E C PIPING GAD AREA-29 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00295 E C PIPING GAD AREA-29 0.08 4-Mar-17 10-Jan-17 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00301 E C PIPING GAD AREA-30 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00302 E C PIPING GAD AREA-30 0.08 28-Jan-16 26-Oct-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00303 E C PIPING GAD AREA-30 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00304 E C PIPING GAD AREA-30 0.08 4-Mar-17 28-Dec-16 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00305 E C PIPING GAD AREA-30 0.08 4-Mar-17 10-Jan-17 18-Mar-17 10-Jan-17 25-Mar-17 17-Jan-17 1-Apr-17 24-Jan-17 16-Apr-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00311 E C PIPING GAD AREA-31 0.08 25-Feb-16 26-Oct-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00312 E C PIPING GAD AREA-31 0.08 25-Feb-16 26-Oct-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00313 E C PIPING GAD AREA-31 0.08 1-Apr-17 28-Dec-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00314 E C PIPING GAD AREA-31 0.08 1-Apr-17 28-Dec-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00315 E C PIPING GAD AREA-31 0.08 1-Apr-17 10-Jan-17 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00321 E C PIPING GAD AREA-32 0.08 25-Feb-16 26-Oct-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00322 E C PIPING GAD AREA-32 0.08 25-Feb-16 26-Oct-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 30-Nov-19 - - - 85% 85.0%
A545-133-16-43-00323 E C PIPING GAD AREA-32 0.08 1-Apr-17 28-Dec-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00324 E C PIPING GAD AREA-32 0.08 1-Apr-17 28-Dec-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00325 E C PIPING GAD AREA-32 0.08 1-Apr-17 10-Jan-17 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00331 E C PIPING GAD AREA-33 0.08 25-Feb-16 26-Oct-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00332 E C PIPING GAD AREA-33 0.08 25-Feb-16 26-Oct-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00333 E C PIPING GAD AREA-33 0.08 1-Apr-17 28-Dec-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00334 E C PIPING GAD AREA-33 0.08 1-Apr-17 28-Dec-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00335 E C PIPING GAD AREA-33 0.08 1-Apr-17 10-Jan-17 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00341 E C PIPING GAD AREA-34 0.08 25-Feb-16 26-Oct-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00342 E C PIPING GAD AREA-34 0.08 25-Feb-16 26-Oct-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00343 E C PIPING GAD AREA-34 0.08 1-Apr-17 28-Dec-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00344 E C PIPING GAD AREA-34 0.08 1-Apr-17 28-Dec-16 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00345 E C PIPING GAD AREA-34 0.08 1-Apr-17 10-Jan-17 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-00391 E C PIPING GAD AREA-39 0.08 1-Apr-17 31-Jan-17 15-Apr-17 10-Jan-17 22-Apr-17 17-Jan-17 29-Apr-17 24-Jan-17 14-May-17 31-Jan-17 31-Aug-19 - - - 85% 85.0%
A545-133-16-43-ECQS ENGINEERING CO-ORDINATION 9.8 15-May-15 2-Nov-15 - - - - - - - - 31-Mar-17 27-Jul-18 - - 100% 100.0%
A545-133-16-43-EQPM R EQUIPMENT MODELLING 2.4 20-Jul-15 8-Feb-16 - - - - - - - - 31-Jan-17 30-Aug-18 28-Jul-18 30-Aug-18 100% 100.0%
A545-133-16-43-FLEX R A FLEXIBILITY ANALYSIS 7.2 15-Sep-15 25-Sep-16 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 98.0%
A545-133-16-43-INTF R INTERFACE CHECK 2.7 10-Oct-15 23-Sep-16 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 98.0%
A545-133-16-43-LISO R C LINE ISOMETRICS 9.1 21-Oct-15 28-Jan-17 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 97.0%
A545-133-16-43-LMOD R LINE MODELLING 21.1 20-Aug-15 15-Jan-16 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 99.0%
A545-133-16-43-MTO1 E P PRELIMINARY MTO 2.6 3-May-15 2-Feb-16 - - - - - - - - 3-Jun-15 29-Feb-16 - - 100% 100.0%
A545-133-16-43-MTO2 E P INTERMEDIATE MTO 1.6 6-Mar-16 15-Oct-16 - - - - - - - - 15-Dec-16 30-Dec-16 - - 100% 100.0%
A545-133-16-43-MTO3 R P FINAL MTO 0.4 13-Aug-16 2-Jan-18 - - - - - - - - 27-Apr-17 1-Feb-18 15-Sep-18 - 100% 100.0%
A545-133-16-43-MTOM P MTO DATA/ IPMCS 0.4 10-May-15 25-Jan-16 - - - - - - - - 31-Dec-17 28-Jul-18 - - 100% 100.0%
A545-133-16-43-MTOS R P MTO FOR PIPE SUPPORTS 0.1 10-Mar-16 2-Dec-16 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 96.0%
A545-133-16-43-NOZZ R C NOZZLE ORIENTATION 0.3 20-Oct-15 2-Jun-16 - - - - - - - - 31-Mar-17 30-Dec-17 18-Apr-18 21-May-18 100% 100.0%
A545-133-16-43-PCLT R C PIPING CLEATS 0.3 10-Dec-15 25-Jan-17 - - - - - - - - 31-Mar-17 30-Dec-17 22-Apr-18 25-May-18 100% 100.0%
A545-133-16-43-PSTD S PIPING STUDIES 11.9 2-May-15 24-Nov-15 - - - - - - - - 30-Sep-17 27-Feb-18 - - 100% 100.0%
A545-133-16-43-PSUP R C PIPING SUPPORTS 0.9 30-Apr-15 2-Dec-16 - - - - - - - - 31-Jul-19 - 31-Jul-19 - 100% 99.0%
A545-133-16-43-SCAT PIPING SPES.& CATL. 0.4 20-Jul-15 27-Jan-16 - - - - - - - - 30-Apr-17 22-Dec-17 - - 100% 100.0%
A545-133-16-43-STTR C STEAM TRACING 0.4 20-Jan-16 2-Jan-17 - - - - - - - - 30-Jun-17 30-Jul-18 - - 100% 100.0%
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW VENDOR DRAWING REVIEW TOTAL TOTAL
REVAMP/ PR ISSUE (After Revamp)
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%) (After Revamp) (ACTUAL (ACTUAL
EXISTING
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-133-KA-MR-5601 R COMPRESSOR CENTRIFUGAL SPP 37.5 16-Jul-15 10-Feb-16 26-Oct-15 5-Aug-16 19-Mar-17 2-Dec-16 17-Jun-17 28-Jan-18 30-May-18 22-Jun-18 14-Jul-18 28-Nov-18 100% 100.0%
A545-133-PA-MR-5602 CENTRIFUGAL PUMP HORZ (SPP) 30.0 30-Jul-15 6-Jan-16 9-Nov-15 20-May-16 1-Feb-17 21-Jun-17 30-Apr-19 30-Apr-19 - 11-Jul-18 - - 100% 100.0%
RECIPROCATING PUMPS
A545-101-PA-MR-5004 10.0 24-Jul-15 28-Aug-15 4-Nov-15 28-Jan-16 24-Dec-15 6-Oct-16 23-Mar-16 30-Jan-18 - - - - 100% 100.0%
CONTROLLED VOLUME
MISCELLANEOUS (INPUT TO MR,
A545-133-16-45-MISC 22.5 1-Aug-15 30-Nov-15 - - - - 31-Dec-16 30-Jun-17 - - - - 100% 100.0%
TENDER & PACKAGES)
100 100.0%
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW VENDOR DRAWING REVIEW
MR No REVAMP/ MR DESCRIPTION WTG. % PR ISSUE (After Revamp) (SCHD (ACTUAL
(40%) (85%) (90%) (100%) (After Revamp)
EXISTING PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-131-RA-MR-6305 R DIOS & SCANFINING REACTORS 18.1 22-Sep-15 4-Feb-16 2-Jan-16 2-Jun-16 7-Nov-16 9-Dec-16 5-Feb-17 26-Feb-18 11-Apr-18 11-Apr-18 16-May-18 28-Aug-18 100% 100.0%
A545-131-CC-MR-6370 R COLUMNS 17.0 27-Sep-15 9-Feb-16 7-Jan-16 26-May-16 22-Nov-16 12-Dec-16 20-Feb-17 29-Nov-18 2-Mar-18 27-Dec-17 6-Apr-18 29-Nov-18 100% 100.0%
A545-133-VV-MR-6320 R VESSELS 35.4 4-Oct-15 24-Feb-16 14-Jan-16 9-May-16 19-Dec-16 11-Apr-17 30-Apr-19 30-Apr-19 2-Jun-18 25-Jun-18 30-Apr-19 30-Apr-19 100% 100.0%
A545-133-EA-MR-6350 AIR COOLER 4.5 14-Oct-15 12-May-16 24-Jan-16 19-Aug-16 29-Nov-16 16-Jun-17 30-Apr-19 30-Apr-19 - - - - 100% 100.0%
100 100.0%
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-133-16-48-00101 To
R C PILE LAYOUT 5.4 3-Jun-15 10-Nov-15 17-Jun-15 6-Feb-16 24-Jun-15 13-Feb-16 29-Jun-15 20-Feb-16 13-Jul-15 27-Feb-16 14-Dec-16 30-Oct-17 2-Jun-18 28-Jun-18 100% 100.0%
00104
A545-133-16-48-00201 To
R C OVERALL FDN LAYOUT 4.3 8-Jul-15 24-Nov-15 22-Jul-15 6-Feb-16 29-Jul-15 13-Feb-16 3-Aug-15 20-Feb-16 17-Aug-15 27-Feb-16 18-Jan-17 22-Mar-18 14-Jun-18 30-Jul-18 100% 100.0%
00204
A545-133-81-41-10271 R C GA & R/F DET OF FDN FOR 133-FF-1001 0.5 22-Feb-16 31-May-16 7-Mar-16 7-Jun-16 14-Mar-16 14-Jun-16 18-Mar-16 21-Jun-16 19-Aug-17 29-Aug-17 6-Apr-19 - 6-Apr-19 - 100% 90.0%
A545-133-16-48-00281 C GA & R/F DET OF FDN FOR F.D. FAN 0.5 24-Jun-17 28-Jun-17 11-Mar-19 - 18-Mar-19 - 22-Mar-19 - 5-Apr-19 15-May-19 31-Aug-19 - - - 85% 90.0%
A545-133-16-48-00282 GA & R/F DET OF FDN FOR I.D. FAN 30-06-2017 28-06-2017 #VALUE! - #VALUE! - =N14+5 - =Q14+14 - =T14+32 - - - #VALUE!
A545-133-81-41-10302 C MPR & BPRS R/F DETAIL OF FDN AND COL 0.2 23-Sep-15 2-Mar-18 7-Oct-15 9-Mar-18 14-Oct-15 16-Mar-18 19-Oct-15 23-Mar-18 2-Nov-15 30-Mar-18 22-Mar-19 30-Mar-18 - - 100% 100.0%
A545-133-81-41-10303 C MPR & BPRS R/F DETAIL OF FDN AND COL 0.2 25-Sep-15 2-Mar-18 9-Oct-15 9-Mar-18 16-Oct-15 16-Mar-18 21-Oct-15 23-Mar-18 4-Nov-15 30-Mar-18 24-Mar-19 30-Mar-18 - - 100% 100.0%
A545-133-81-41-00321 C MAIN PIPE RACK 2ND TIER PLAN 0.5 19-Oct-15 25-Feb-16 2-Nov-15 10-Mar-16 9-Nov-15 17-Mar-16 13-Nov-15 24-Mar-16 27-Nov-15 31-Mar-16 17-Mar-17 11-Mar-17 - - 100% 100.0%
A545-133-81-41-00331 C MAIN PIPE RACK 3RD TIER PLAN 0.5 2-Nov-15 25-Feb-16 16-Nov-15 10-Mar-16 23-Nov-15 17-Mar-16 27-Nov-15 24-Mar-16 11-Dec-15 31-Mar-16 31-Mar-17 11-Mar-17 - - 100% 100.0%
A545-133-81-41-00341 C MAIN PIPE RACK 4TH TIER PLAN 0.5 16-Nov-15 25-Feb-16 30-Nov-15 10-Mar-16 7-Dec-15 17-Mar-16 11-Dec-15 24-Mar-16 25-Dec-15 31-Mar-16 14-Apr-17 11-Mar-17 - - 100% 100.0%
A545-133-81-41-10320 C PIPE RACK BASE PLATE 0.1 30-Nov-15 2-Feb-18 14-Dec-15 14-Feb-18 21-Dec-15 21-Feb-18 25-Dec-15 28-Feb-18 8-Jan-16 7-Mar-18 28-Apr-17 7-Mar-18 - - 100% 100.0%
A545-133-81-41-01321 C MAIN PIPE RACK GA OF PLAN AT 125.975 0.5 12-Nov-16 28-Jan-17 26-Nov-16 11-Feb-17 3-Dec-16 18-Feb-17 7-Dec-16 25-Feb-17 21-Dec-16 4-Mar-17 7-Mar-17 11-Mar-17 - - 100% 100.0%
A545-133-81-41-01331 C MAIN PIPE RACK GA OF PLAN AT 128.35 0.5 18-Nov-16 28-Jan-17 2-Dec-16 11-Feb-17 9-Dec-16 18-Feb-17 13-Dec-16 25-Feb-17 27-Dec-16 4-Mar-17 13-Mar-17 11-Mar-17 - - 100% 100.0%
A545-133-16-48-00351 C COMPRESSOR SHED FOUNDATION DETAIL 0.5 15-Dec-15 7-Mar-16 29-Dec-15 21-Mar-16 5-Jan-16 28-Mar-16 9-Jan-16 4-Apr-16 23-Jan-16 26-May-16 22-Jun-17 25-Aug-17 - - 100% 100.0%
A545-133-16-48-00354 C COMPRESSOR SHED GABLE END DETS 0.5 5-Jan-16 7-Mar-16 19-Jan-16 21-Mar-16 26-Jan-16 28-Mar-16 30-Jan-16 4-Apr-16 13-Feb-16 26-May-16 13-Jul-17 25-Aug-17 - - 100% 100.0%
A545-133-16-48-00356 GABLE END DETAILS 12-01-2015 =K27-14 =G27+14 =N27-7 =J27+7 =Q27-7 =M27+4 04-04-2016 =P27+14 - =S27+76 - - -
A545-133-16-48-00371 E C GA OF FDN FOR 133-KA-1001A/B 0.8 11-Mar-17 29-Jun-17 23-Feb-19 1-Apr-19 2-Mar-19 8-Apr-19 6-Mar-19 15-Apr-19 20-Mar-19 22-Apr-19 21-Apr-19 22-Apr-19 - - 100% 100.0%
A545-133-16-48-01401 C BASE PLATE DETAILS FOR TECH STR 0.5 5-Nov-15 7-Oct-16 1-Apr-17 28-Apr-17 16-Mar-19 8-Mar-19 20-Mar-19 15-Mar-19 3-Apr-19 22-Mar-19 31-Aug-19 - - - 85% 90.0%
A545-133-16-48-00402 C TECH STR SADDLE SUPPORT 0.5 18-Apr-17 15-Apr-17 2-Apr-19 7-Jun-19 9-Apr-19 14-Jun-19 13-Apr-19 21-Jun-19 27-Apr-19 28-Jun-19 31-Aug-19 - - - 85% 85.0%
A545-133-81-41-10411 C TECH STR-1 R/F DET. OF FDN. 0.5 5-Dec-15 25-Aug-16 19-Dec-15 1-Sep-16 26-Dec-15 8-Sep-16 30-Dec-15 15-Sep-16 13-Jan-16 22-Sep-16 3-Apr-19 18-Jan-19 - - 100% 100.0%
A545-133-16-48-00412 C TECH STR-1 PLANS 0.5 10-Nov-15 4-Oct-16 26-Jan-17 4-Apr-17 2-Feb-17 11-Apr-17 6-Feb-17 18-Apr-17 20-Feb-17 25-Apr-17 7-Apr-19 25-Apr-17 - - 100% 100.0%
A545-133-81-41-00413 C TECH STR-1 ELEVATIONS 0.5 17-Nov-15 5-Oct-16 2-Feb-17 4-Apr-17 9-Feb-17 11-Apr-17 13-Feb-17 18-Apr-17 27-Feb-17 25-Apr-17 14-Apr-19 25-Apr-17 - - 100% 100.0%
A545-133-16-48-00418 C TECH STR-1 STAIRCASE 0.5 18-Feb-17 4-Mar-17 4-Mar-17 6-Jul-17 11-Mar-17 13-Jul-17 15-Mar-17 20-Jul-17 29-Mar-17 27-Jul-17 5-Mar-19 27-Jul-17 - - 100% 100.0%
A545-133-16-48-00419 TECH STR-1 OPENINGS & PIPE SUPPORTS 12-12-2015 - =G36+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-81-41-10421 R C TECH STR-2 R/F DET. OF FDN. 0.5 7-Dec-15 14-Mar-16 21-Dec-15 28-Mar-16 28-Dec-15 4-Apr-16 1-Jan-16 11-Apr-16 15-Jan-16 8-Sep-16 5-Apr-19 8-Sep-16 5-Apr-19 - 100% 100.0%
Page 446 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 5
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICALS PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (GASOLINE BLOCK)
ANNEXURE-A6
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-133-81-41-10422 R C TECH STR-2 PLANS & ELEVATIONS 0.5 10-Nov-15 14-Mar-16 24-Nov-15 28-Mar-16 1-Dec-15 4-Apr-16 5-Dec-15 11-Apr-16 19-Dec-15 20-Jun-16 8-Apr-17 26-May-17 18-Jul-18 27-Feb-19 100% 100.0%
A545-133-81-41-10428 C TECH STR-2 STAIRCASE 0.5 31-Dec-15 18-Aug-16 14-Jan-16 1-Sep-16 21-Jan-16 8-Sep-16 25-Jan-16 15-Sep-16 8-Feb-16 22-Sep-16 29-Apr-19 22-Sep-16 - - 100% 100.0%
A545-133-16-48-00429 TECH STR-2 OPENING & PIPE SUP. 15-12-2015 - =G40+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-81-41-00434 to
C TECH STR-3 ELEVATIONS 0.5 2-Jan-16 10-Oct-16 26-Jan-17 28-Aug-17 24-Mar-19 26-Mar-19 28-Mar-19 2-Apr-19 11-Apr-19 9-Apr-19 12-May-19 9-Apr-19 - - 100% 100.0%
00435
A545-133-16-48-00432 to
C TECH STR-3 PLANS 0.5 10-Nov-15 10-Oct-16 5-Dec-16 28-Aug-17 2-Mar-19 26-Mar-19 6-Mar-19 2-Apr-19 20-Mar-19 9-Apr-19 20-Apr-19 9-Apr-19 - - 100% 100.0%
00433
A545-133-16-48-00438 to
C TECH STR-3 STAIRCASE 0.5 6-Feb-17 4-Mar-17 20-Feb-17 28-Aug-17 19-Mar-19 8-Apr-19 23-Mar-19 15-Apr-19 6-Apr-19 22-Apr-19 7-May-19 22-Apr-19 - - 100% 100.0%
00439
A545-133-16-48-00439 TECH STR-3 OPENING & PIPE SUP. 21-12-2015 - =G44+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-16-48-00441 C TECH STR-4 GA & R/F DET. OF FDN 0.5 #VALUE! 10-Oct-16 #VALUE! 15-Apr-17 #VALUE! 5-Mar-18 #VALUE! 12-Mar-18 #VALUE! 19-Mar-18 #VALUE! 19-Jan-19 - - #VALUE! 100.0%
A545-133-16-48-00442 C TECH STR-4 PLAN 0.5 #VALUE! 27-May-16 #VALUE! 3-Jun-16 #VALUE! 10-Jun-16 #VALUE! 17-Jun-16 #VALUE! 21-Jul-17 #VALUE! 20-Feb-19 - - #VALUE! 100.0%
A545-133-16-48-00443 C TECH STR-4 ELEVATION 0.5 29-Dec-15 27-May-16 12-Jan-16 3-Jun-16 19-Jan-16 10-Jun-16 23-Jan-16 17-Jun-16 26-Feb-17 21-Jul-17 24-Mar-19 21-Jan-19 - - 100% 100.0%
A545-133-16-48-00448 C TECH STR-4 STAIRCASE 0.5 28-Jan-17 4-Mar-17 11-Feb-17 30-Jun-17 18-Feb-17 7-Jul-17 22-Feb-17 14-Jul-17 8-Mar-17 21-Jul-17 4-Mar-19 21-Jul-17 - - 100% 100.0%
A545-133-81-41-00444 C TECH STR-4 DETAILS OF MISC PLATFORMS 0.3 30-Jan-17 23-Jan-19 13-Feb-17 30-Jan-19 20-Feb-17 6-Feb-19 24-Feb-17 13-Feb-19 10-Mar-17 20-Feb-19 6-Mar-19 20-Feb-19 - - 100% 100.0%
A545-133-81-41-00445 C TECH STR-4 DETAILS OF MISC PIPE SUPP 0.3 30-Jan-17 23-Jan-19 13-Feb-17 30-Jan-19 20-Feb-17 6-Feb-19 24-Feb-17 13-Feb-19 10-Mar-17 20-Feb-19 6-Mar-19 20-Feb-19 - - 100% 100.0%
A545-133-81-41-10451 C TECH STR-5 GA & R/F DET. OF FDN 0.5 19-Jan-16 27-Jul-16 2-Feb-16 3-Aug-16 9-Feb-16 10-Aug-16 13-Feb-16 17-Aug-16 27-Feb-16 24-Aug-16 17-Jun-17 9-Mar-18 - - 100% 100.0%
A545-133-81-41-00452 C TECH STR-5 PLAN & ELEVATION 0.5 22-Jan-16 29-Apr-16 5-Feb-16 13-May-16 12-Feb-16 20-May-16 16-Feb-16 27-May-16 1-Mar-16 11-Jul-16 20-Jun-17 17-Apr-17 - - 100% 100.0%
A545-133-81-41-00458 C TECH STR-5 STAIRCASE 0.5 1-Feb-16 20-Sep-16 15-Feb-16 27-Sep-16 22-Feb-16 4-Oct-16 26-Feb-16 11-Oct-16 11-Mar-16 18-Oct-16 30-Jun-17 17-Apr-17 - - 100% 100.0%
A545-133-16-48-00459 TECH STR-5 OPENING & PIPE SUPPORTS 11-02-2016 - =G52+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-16-48-12511 C GA & R/F DET. OF FDN FOR 133-TT-1001 0.5 23-Feb-16 15-Mar-16 8-Mar-16 29-Mar-16 15-Mar-16 5-Apr-16 19-Mar-16 12-Apr-16 2-Jun-17 17-Jul-17 19-Apr-19 17-Jul-17 - - 100% 100.0%
A545-133-16-48-30501 E C FDN. FOR 133-CC-1001 0.1 12-Nov-15 18-Jan-16 26-Nov-15 1-Feb-16 3-Dec-15 8-Feb-16 7-Dec-15 15-Feb-16 21-Dec-15 29-Feb-16 6-Mar-16 20-May-16 - - 100% 100.0%
A545-133-16-48-30502 E C FDN FOR 133-CC-1002 0.1 19-Nov-15 18-Jan-16 3-Dec-15 1-Feb-16 10-Dec-15 8-Feb-16 14-Dec-15 15-Feb-16 28-Dec-15 29-Feb-16 13-Mar-16 20-May-16 - - 100% 100.0%
A545-133-81-41-30503 C FDN FOR 133-CC-1003 0.1 26-Nov-15 18-Jan-16 10-Dec-15 1-Feb-16 17-Dec-15 8-Feb-16 21-Dec-15 15-Feb-16 4-Jan-16 29-Feb-16 20-Mar-16 20-May-16 - - 100% 100.0%
A545-133-16-48-30513 C FDN FOR 133-VV-1006 0.1 22-Dec-15 22-Feb-16 5-Jan-16 29-Feb-16 12-Jan-16 7-Mar-16 16-Jan-16 14-Mar-16 30-Jan-16 21-Mar-16 20-May-17 20-Jan-17 - - 100% 100.0%
A545-133-16-48-30514 C FDN FOR 133-VV-1007 0.1 27-Dec-15 22-Feb-16 10-Jan-16 29-Feb-16 17-Jan-16 7-Mar-16 21-Jan-16 14-Mar-16 4-Feb-16 21-Mar-16 25-May-17 20-Jan-17 - - 100% 100.0%
A545-133-16-48-30515 C FDN FOR 133-VV-1009 0.1 1-Jan-16 22-Feb-16 15-Jan-16 29-Feb-16 22-Jan-16 7-Mar-16 26-Jan-16 14-Mar-16 9-Feb-16 21-Mar-16 25-Apr-16 13-May-16 - - 100% 100.0%
A545-133-16-48-30516 C FDN FOR 133-VV-1011 0.1 6-Jan-16 22-Feb-16 20-Jan-16 29-Feb-16 27-Jan-16 7-Mar-16 31-Jan-16 14-Mar-16 14-Feb-16 21-Mar-16 30-Apr-16 13-May-16 - - 100% 100.0%
A545-133-16-48-30517 C FDN FOR 133-VV-1013 0.1 11-Jan-16 22-Feb-16 25-Jan-16 29-Feb-16 1-Feb-16 7-Mar-16 5-Feb-16 14-Mar-16 19-Feb-16 21-Mar-16 5-May-16 20-May-16 - - 100% 100.0%
A545-133-16-48-30518 E C FDN FOR 133-VV-1015 0.1 16-Jan-16 22-Feb-16 30-Jan-16 29-Feb-16 6-Feb-16 7-Mar-16 10-Feb-16 14-Mar-16 24-Feb-16 21-Mar-16 10-May-16 13-May-16 - - 100% 100.0%
A545-133-16-48-30519 C GA &R/F DETAILS OF FDN FOR 130-VV-1008 0.1 21-Jan-16 12-Oct-16 4-Feb-16 19-Oct-16 11-Feb-16 26-Oct-16 15-Feb-16 2-Nov-16 29-Feb-16 9-Nov-16 19-Jun-17 12-May-17 - - 100% 100.0%
A545-133-16-48-30519 C FDN FOR 130-VV-1008 0.1 21-Jan-16 5-Oct-16 20-Jan-16 19-Oct-16 27-Jan-16 26-Oct-16 1-Feb-16 2-Nov-16 15-Feb-16 9-Nov-16 5-Jun-17 28-Sep-17 - - 100% 100.0%
A545-133-16-48-30519 FDN FOR 133-VV-1009 21-01-2016 - =G66+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-16-48-01546 C GA DET FOR OWS/CRWS SUMP 0.8 5-Jan-16 25-Oct-16 29-May-17 27-Apr-17 5-Jun-17 17-Jul-17 9-Jun-17 24-Jul-17 23-Jun-17 7-Sep-17 10-May-19 7-Sep-17 - - 100% 100.0%
A545-133-16-48-01547 C R/F DET FOR OWS/CRWS SUMP 0.8 18-Jan-16 29-Oct-16 10-Jun-17 27-Apr-17 17-Jun-17 17-Jul-17 21-Jun-17 24-Jul-17 5-Jul-17 7-Sep-17 22-May-19 7-Sep-17 - - 100% 100.0%
A545-133-16-48-30551 100%
Page 447 of 1078
C FDN FOR 133-EE-1001 A/B & C/D 0.1 28-Jan-16 10-May-16 11-Feb-16 17-May-16 18-Feb-16 24-May-16 22-Feb-16 31-May-16 7-Mar-16 9-Nov-16 26-Jun-17 30-Oct-17 - - 100.0%
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-133-16-48-30552 FDN FOR 133-EE-1001 C/D 01-02-2016 - =G70+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-16-48-30553 R C FDN FOR 133-EE-1004 0.1 3-Feb-16 6-Apr-16 17-Feb-16 20-Apr-16 24-Feb-16 27-Apr-16 28-Feb-16 4-May-16 13-Mar-16 20-May-16 2-Jul-17 12-May-17 23-Jul-18 - 100% 100.0%
A545-133-16-48-30554 E C FDN FOR 133-EE-1007 A/B 0.1 5-Feb-16 6-Apr-16 19-Feb-16 20-Apr-16 26-Feb-16 27-Apr-16 1-Mar-16 4-May-16 15-Mar-16 20-May-16 4-Jul-17 26-May-17 - - 100% 100.0%
A545-133-16-48-30555 C FDN FOR 133-EE-1009 A/B 0.1 7-Feb-16 6-Apr-16 22-Feb-16 20-Apr-16 29-Feb-16 27-Apr-16 4-Mar-16 4-May-16 18-Mar-16 20-May-16 7-Jul-17 12-May-17 - - 100% 100.0%
A545-133-16-48-30556 E C FDN FOR 133-EE-1011 A/B/C/D 0.1 9-Feb-16 6-Apr-16 23-Feb-16 20-Apr-16 1-Mar-16 27-Apr-16 5-Mar-16 4-May-16 19-Mar-16 20-May-16 8-Jul-17 26-May-17 - - 100% 100.0%
A545-133-16-48-30557 C FDN FOR 133-EE-1011 A/B/C/D 0.1 11-Feb-16 6-Apr-16 25-Feb-16 20-Apr-16 3-Mar-16 27-Apr-16 7-Mar-16 4-May-16 21-Mar-16 20-May-16 10-Jul-17 26-May-17 - - 100% 100.0%
A545-133-16-48-30558 E C FDN FOR 133-EE-1013 A/B 0.1 13-Feb-16 10-May-16 27-Feb-16 17-May-16 5-Mar-16 24-May-16 9-Mar-16 31-May-16 27-Apr-17 26-May-17 12-Jul-17 28-Aug-18 - - 100% 100.0%
A545-133-16-48-30559 C FDN FOR 133-EE-1014 0.1 15-Feb-16 6-Apr-16 29-Feb-16 20-Apr-16 7-Mar-16 27-Apr-16 11-Mar-16 4-May-16 25-Mar-16 20-May-16 14-Jul-17 12-May-17 - - 100% 100.0%
A545-133-81-41-30561 C FDN FOR 133-RB-1001A&B 0.1 17-Feb-16 9-Apr-16 2-Mar-16 23-Apr-16 9-Mar-16 30-Apr-16 13-Mar-16 7-May-16 27-Mar-16 14-May-16 16-Jul-17 8-May-17 - - 100% 100.0%
A545-133-81-41-30562 C FDN FOR 133-RB-1002 0.1 18-Feb-16 9-Apr-16 3-Mar-16 23-Apr-16 10-Mar-16 30-Apr-16 14-Mar-16 7-May-16 28-Mar-16 14-May-16 17-Jul-17 8-May-17 - - 100% 100.0%
A545-133-81-41-30563 C FDN FOR 133-RB-1003 0.1 20-Feb-16 15-Apr-16 5-Mar-16 29-Apr-16 12-Mar-16 6-May-16 16-Mar-16 13-May-16 30-Mar-16 20-May-16 19-Jul-17 8-May-17 - - 100% 100.0%
A545-133-16-48-30581 C FDN DWG FOR SKIDS 0.1 10-Jun-17 7-Apr-17 26-Mar-19 - 2-Apr-19 - 6-Apr-19 - 20-Apr-19 15-May-19 1-Aug-19 - - - 85% 91.0%
A545-133-16-48-30591 E C MISC. FDN FOR 133-GN-1001A/B 0.1 27-Jun-17 15-Apr-17 11-Jul-17 4-Feb-19 18-Jul-17 11-Feb-19 22-Jul-17 18-Feb-19 5-Aug-17 25-Feb-19 3-Apr-19 20-Mar-19 - - 100% 100.0%
A545-133-16-48-30592 C MISC. FDN FOR 133-GN-1002 A/B 0.1 2-Jul-17 15-Apr-17 28-Mar-19 12-Mar-19 4-Apr-19 19-Mar-19 8-Apr-19 26-Mar-19 22-Apr-19 2-Apr-19 24-May-19 2-Apr-19 - - 100% 100.0%
A545-133-16-48-30593 C MISC. FDN FOR 133-GN-1003 A/B 0.1 7-Jul-17 15-Apr-17 21-Jul-17 4-Feb-19 28-Jul-17 11-Feb-19 1-Aug-17 18-Feb-19 15-Aug-17 25-Feb-19 8-Mar-19 20-Mar-19 - - 100% 100.0%
A545-133-16-48-30601 R C FDN FOR PUMPS 133-PA-1001A/B 0.1 30-May-17 24-Mar-17 13-Jun-17 28-Aug-17 20-Jun-17 19-Feb-18 24-Jun-17 26-Feb-18 11-Mar-19 15-May-19 1-Aug-19 - 1-Aug-19 - 85% 90.0%
A545-133-16-48-30602 R C FDN FOR PUMPS 133-PA-1002A/B 0.1 4-Jun-17 24-Mar-17 18-Jun-17 28-Aug-17 25-Jun-17 19-Feb-18 29-Jun-17 26-Feb-18 16-Mar-19 15-May-19 1-Aug-19 - 1-Aug-19 - 85% 85.0%
A545-133-16-48-30603 R C FDN FOR PUMPS 133-PA-1003A/B 0.1 9-Jun-17 24-Mar-17 23-Jun-17 28-Aug-17 30-Jun-17 19-Feb-18 4-Jul-17 26-Feb-18 21-Mar-19 15-May-19 1-Aug-19 - 1-Aug-19 - 85% 85.0%
A545-133-16-48-30604 C FDN FOR PUMPS 133-PA-1004A/B 0.1 14-Jun-17 24-Mar-17 28-Jun-17 28-Aug-17 5-Jul-17 19-Feb-18 9-Jul-17 26-Feb-18 23-Jul-17 23-Feb-19 10-Apr-19 23-Feb-19 - - 100% 100.0%
A545-133-16-48-30605 R C FDN FOR PUMPS 133-PA-1005A/B 0.1 19-Jun-17 24-Mar-17 3-Jul-17 28-Aug-17 10-Jul-17 19-Feb-18 14-Jul-17 26-Feb-18 28-Jul-17 23-Feb-19 15-Apr-19 23-Feb-19 15-Apr-19 - 100% 100.0%
A545-133-16-48-30606 R C FDN FOR PUMPS 133-PA-1006A/B 0.1 24-Jun-17 24-Mar-17 8-Jul-17 28-Aug-17 15-Jul-17 19-Feb-18 19-Jul-17 26-Feb-18 2-Aug-17 23-Feb-19 20-Apr-19 23-Feb-19 20-Apr-19 - 100% 100.0%
A545-133-16-48-30607 C FDN FOR PUMPS 133-PA-1007A/B 0.1 29-Jun-17 24-Mar-17 13-Jul-17 28-Aug-17 20-Jul-17 19-Feb-18 24-Jul-17 26-Feb-18 7-Aug-17 23-Feb-19 25-Apr-19 23-Feb-19 - - 100% 100.0%
A545-133-16-48-30608 C FDN FOR PUMPS 133-PA-1008A/B 0.1 4-Jul-17 24-Mar-17 18-Jul-17 28-Aug-17 25-Jul-17 19-Feb-18 29-Jul-17 26-Feb-18 12-Aug-17 5-Jun-18 30-Apr-19 5-Jun-18 - - 100% 100.0%
A545-133-16-48-30609 R C FDN FOR PUMPS 133-PA-1009 A/B 0.1 9-Jul-17 24-Mar-17 23-Jul-17 30-Aug-17 30-Jul-17 19-Feb-18 3-Aug-17 26-Feb-18 17-Aug-17 5-Jun-18 29-Apr-19 5-Jun-18 29-Apr-19 - 100% 100.0%
A545-133-16-48-30610 R C FDN FOR PUMPS 133-PA-1010 A/B 0.1 14-Jul-17 24-Mar-17 28-Jul-17 30-Aug-17 4-Aug-17 19-Feb-18 8-Aug-17 26-Feb-18 22-Aug-17 23-Feb-19 24-Apr-19 23-Feb-19 24-Apr-19 - 100% 100.0%
A545-133-16-48-30611 R C FDN FOR PUMPS 133-PA-1011A/B/C 0.1 19-Jul-17 24-Mar-17 2-Aug-17 30-Aug-17 9-Aug-17 19-Feb-18 13-Aug-17 26-Feb-18 9-Apr-19 15-May-19 31-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-133-16-48-30612 C FDN FOR PUMPS 130-PA-1009A/B 0.1 24-Jul-17 24-Mar-17 7-Aug-17 30-Aug-17 14-Aug-17 19-Feb-18 18-Aug-17 26-Feb-18 9-Apr-19 - 11-May-19 - - - 80.0%
A545-133-16-48-30613 FDN FOR PUMPS 130-PA-1007A/B 29-Jul-17 24-Mar-17 12-Aug-17 30-Aug-17 19-Aug-17 19-Feb-18 23-Aug-17 26-Feb-18 =Q107+584 - =T107+32 - - - 80% 80.0%
A545-133-16-48-30614 FDN FOR PUMPS 130-PA-1008A/B 3-Aug-17 24-Mar-17 17-Aug-17 30-Aug-17 24-Aug-17 19-Feb-18 28-Aug-17 26-Feb-18 =Q108+584 - =T108+32 - - - 80% 80.0%
A545-133-16-48-30615 FDN FOR PUMPS 130-PA-1010A/B 8-Aug-17 24-Mar-17 22-Aug-17 30-Aug-17 29-Aug-17 19-Feb-18 2-Sep-17 26-Feb-18 =Q109+584 - =T109+32 - - - 80% 80.0%
A545-133-16-48-00701 TO
C PLTF. & LADDER FOR 133-CC-1001 0.6 15-Dec-16 11-Nov-16 29-Dec-16 25-Nov-16 5-Jan-17 21-Jul-17 9-Jan-17 28-Jul-17 23-Jan-17 28-Sep-17 8-Apr-17 28-Nov-17 - - 100% 100.0%
00703
A545-133-16-48-10704 to
C PLTF. & LADDER FOR 133-CC-1002 0.6 19-Jan-15 5-Nov-16 30-Dec-16 19-Nov-16 6-Jan-17 26-Nov-16 10-Jan-17 3-Dec-16 24-Jan-17 10-Dec-16 10-Apr-17 12-Oct-17 - - 100% 100.0%
10705
A545-133-16-48-10707 C PLTF. & LADDER FOR 133-CC-1003 0.6 18-Dec-16 12-Nov-16 1-Jan-17 26-Nov-16 8-Jan-17 21-Jul-17 12-Jan-17 28-Jul-17 26-Jan-17 28-Sep-17 13-Mar-19 21-Dec-18 - - 100% 100.0%
A545-133-16-48-30731 C PLTF.& LADDER FOR 133-VV-1001 0.5 21-Dec-16 12-Nov-16 4-Jan-17 26-Nov-16 11-Jan-17 1-Dec-16 15-Jan-17 3-Dec-16 29-Jan-17 7-Dec-16 16-Mar-19 7-Dec-16 - - 100% 100.0%
A545-133-16-48-30732 C PLTF. & LADDER FOR 133-VV-1002 0.5 24-Dec-16 14-Nov-16 7-Jan-17 28-Nov-16 14-Jan-17 1-Dec-16 18-Jan-17 3-Dec-16 1-Feb-17 7-Dec-16 19-Mar-19 7-Dec-16 - - 100% 100.0%
A545-133-16-48-30733 100%
Page 448 of 1078
C PLTF. & LADDER FOR 133-VV-1003 0.5 27-Dec-16 14-Nov-16 10-Jan-17 28-Nov-16 17-Jan-17 1-Dec-16 21-Jan-17 3-Dec-16 4-Feb-17 7-Dec-16 22-Mar-19 7-Dec-16 - - 100.0%
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-133-81-41-30734 C PLTF. & LADDER FOR 133-VV-1004 0.5 7-Jan-16 23-Sep-16 21-Jan-16 7-Oct-16 28-Jan-16 14-Oct-16 1-Feb-16 21-Oct-16 15-Feb-16 28-Oct-16 1-Apr-18 28-Oct-16 - - 100% 100.0%
A545-133-16-48-10735 PLTF. & LADDER FOR 133-VV-1005 =G112+3 =K114-14 =G114+14 29-11-2016 =J114+7 - =M114+4 - =P114+14 - =S114+76 - - -
A545-133-16-48-10736 C PLTF. & LADDER FOR 133-VV-1006 0.5 17-Jan-16 1-Nov-16 31-Jan-16 15-Nov-16 21-Jan-17 16-Nov-16 25-Jan-17 17-Nov-16 8-Feb-17 19-Nov-16 25-Apr-17 27-Sep-17 - - 100% 100.0%
A545-133-16-48-30738 C PLTF.& LADDER FOR 130-VV-1008 0.5 2-Jan-17 3-Nov-16 16-Jan-17 17-Nov-16 23-Jan-17 24-Nov-16 27-Jan-17 1-Dec-16 10-Feb-17 8-Dec-16 27-Apr-17 6-Oct-17 - - 100% 100.0%
A545-133-16-48-10739 C PLTF. & LADDER FOR 133-VV-1009 0.5 5-Jan-17 16-Nov-16 19-Jan-17 30-Nov-16 26-Jan-17 2-Dec-16 30-Jan-17 2-Dec-16 13-Feb-17 7-Dec-16 30-Apr-17 27-Sep-17 - - 100% 100.0%
A545-133-16-48-10741 C PLTF. & LADDER FOR 133-VV-1011 0.5 11-Feb-16 19-Oct-16 25-Feb-16 2-Nov-16 3-Mar-16 9-Nov-16 7-Mar-16 16-Nov-16 21-Mar-16 23-Nov-16 5-May-17 26-May-17 - - 100% 100.0%
A545-133-81-41-30742 C PLTF. & LADDER FOR 133-VV-1012 0.5 16-Feb-16 30-Sep-16 1-Mar-16 14-Oct-16 8-Mar-16 21-Oct-16 12-Mar-16 28-Oct-16 26-Mar-16 4-Nov-16 7-Mar-19 4-Nov-16 - - 100% 100.0%
A545-133-16-48-10743 C PLTF. & LADDER FOR 133-VV-1013 0.5 21-Jan-17 3-Nov-16 4-Feb-17 17-Nov-16 11-Feb-17 24-Nov-16 15-Feb-17 1-Dec-16 1-Mar-17 8-Dec-16 16-May-17 6-Oct-17 - - 100% 100.0%
A545-133-16-48-10745 C PLTF. & LADDER FOR 133-VV-1015 0.5 2-Feb-17 10-Nov-16 16-Feb-17 17-Nov-16 23-Feb-17 24-Nov-16 27-Feb-17 1-Dec-16 13-Mar-17 8-Dec-16 27-May-17 13-Oct-17 - - 100% 100.0%
A545-133-81-41-10744 PLTF. & LADDER FOR 130-VV-1009 26-Jan-17 3-Nov-16 9-Feb-17 17-Nov-16 16-Feb-17 24-Nov-16 20-Feb-17 1-Dec-16 6-Mar-17 8-Dec-16 20-May-17 - - - 85.0%
A545-133-16-48-30806 C MATERIAL TAKE OFF STRL STEEL 1.1 10-Nov-15 15-Nov-16 - - - - - - - - 30-Nov-17 31-Mar-18 - - 100% 100.0%
A545-133-16-48-30807 MATERIAL TAKE OFF RCC QUANTITY 20-11-2015 - =G117+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - - -
A545-133-16-48-00811 TO
MISC. PLATFORMS / SUPPORTS LAYOUT 4-Sep-17 3-Apr-17 12-Mar-19 - 19-Mar-19 - 24-Mar-19 - =Q128+14 - =T128+31 - - - 80% 10.0%
00814
A545-133-16-48-00821 TO
T SUPPORTS LAYOUT 6/1/2016 - =G122+14 - =J122+7 - =M122+5 - =P122+14 - =S122+75 - - -
0823
A545-133-16-48-00831 TO
PIPE SUPPORTS LAYOUT 6/8/2016 - =G123+14 - =J123+7 - =M123+5 - =P123+14 - =S123+75 - - -
00833
A545-133-16-48-00841 TO
OPENINGS 15-Sep-17 17-Apr-17 29-Sep-17 14-Aug-18 6-Oct-17 21-Aug-18 10-Oct-17 28-Aug-18 24-Oct-17 - 8-Jan-18 - - - 80.0%
00844
A545-133-81-41-02311/
C MAIN PIPE RACK ELEVATION GRID 1 SHT-1 0.5 20-Oct-15 18-Jan-16 3-Nov-15 1-Feb-16 10-Nov-15 8-Feb-16 14-Nov-15 15-Feb-16 28-Nov-15 29-Feb-16 18-Mar-17 11-Mar-17 - - 100% 100.0%
02312
A545-133-81-41-02321 C MAIN PIPE RACK ELEVATION GRID 2 SHT-1 0.5 26-Oct-15 18-Jan-16 9-Nov-15 1-Feb-16 16-Nov-15 8-Feb-16 20-Nov-15 15-Feb-16 4-Dec-15 29-Feb-16 24-Mar-17 11-Mar-17 - - 100% 100.0%
A545-133-81-41-02322 C MAIN PIPE RACK ELEVATION GRID 2 SHT-2 0.5 9-Nov-15 18-Jan-16 23-Nov-15 1-Feb-16 30-Nov-15 8-Feb-16 4-Dec-15 15-Feb-16 18-Dec-15 29-Feb-16 7-Apr-17 11-Mar-17 - - 100% 100.0%
A545-133-81-41-02331/
C MAIN PIPE RACK ELEVATION GRID 3 SHT-1 0.5 31-Oct-15 18-Jan-16 14-Nov-15 1-Feb-16 21-Nov-15 8-Feb-16 25-Nov-15 15-Feb-16 9-Dec-15 29-Feb-16 29-Mar-17 11-Mar-17 - - 100% 100.0%
02332
A545-133-16-48-02332 MAIN PIPE RACK ELEVATION GRID 3 SHT-2 14-11-2015 =K129-14 #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! #VALUE! =P129+14 29-02-2016 =S129+76 - - -
A545-133-81-41-04311 C BRANCH PIPE RACK 1 PLAN 0.5 22-Oct-15 26-Feb-16 5-Nov-15 4-Mar-16 12-Nov-15 11-Mar-16 16-Nov-15 18-Mar-16 30-Dec-16 30-Nov-16 16-Mar-17 2-Feb-17 - - 100% 100.0%
A545-133-16-48-04321 C BRANCH PIPE RACK 1 ELEVATION 0.5 3-Nov-15 19-Feb-16 17-Nov-15 4-Mar-16 24-Nov-15 11-Mar-16 28-Nov-15 18-Mar-16 7-Dec-16 30-Nov-16 21-Feb-17 2-Feb-17 - - 100% 100.0%
A545-133-81-41-14323 C BRANCH PIPE RACK 1 CROSS SECTION 0.5 10-Nov-15 26-Feb-16 24-Nov-15 4-Mar-16 1-Dec-15 11-Mar-16 5-Dec-15 18-Mar-16 14-Dec-16 30-Nov-16 28-Feb-17 2-Feb-17 - - 100% 100.0%
A545-133-81-41-14324 C BRANCH PIPE RACK 1 STAIRCASE 0.5 10-Nov-15 2-Dec-16 24-Nov-15 9-Dec-16 1-Dec-15 16-Dec-16 5-Dec-15 23-Dec-16 14-Dec-16 30-Dec-16 28-Feb-17 17-Apr-17 - - 100% 100.0%
A545-133-81-41-14331 C BRANCH PIPE RACK 2 PLAN DRAWING 0.5 27-Oct-15 10-Nov-15 10-Nov-15 17-Mar-16 17-Nov-15 24-Mar-16 21-Nov-15 31-Mar-16 5-Dec-15 12-Apr-16 19-Feb-16 8-Jun-16 - - 100% 100.0%
A545-133-16-48-04341 C BRANCH PIPE RACK 2 ELEVATION 0.5 3-Nov-15 10-Mar-16 17-Nov-15 17-Mar-16 24-Nov-15 24-Mar-16 28-Nov-15 31-Mar-16 12-Dec-15 12-Apr-16 26-Feb-16 8-Jun-16 - - 100% 100.0%
A545-133-81-41-34342 C BRANCH PIPE RACK 2 CROSS SECTION 0.5 16-Nov-15 10-Mar-16 30-Nov-15 17-Mar-16 7-Dec-15 24-Mar-16 11-Dec-15 31-Mar-16 25-Dec-15 12-Apr-16 10-Mar-16 8-Jun-16 - - 100% 100.0%
A545-133-81-41-14344 C BRANCH PIPE RACK 2 STAIRCASE 0.5 16-Nov-15 30-Nov-16 30-Nov-15 7-Dec-16 7-Dec-15 14-Dec-16 11-Dec-15 21-Dec-16 25-Dec-15 28-Dec-16 15-Mar-19 28-Dec-16 - - 100% 100.0%
A545-133-81-41-04351 C BRANCH PIPE RACK 3 PLANS 0.2 4-Aug-16 10-Mar-16 18-Aug-16 17-Mar-16 25-Aug-16 24-Mar-16 30-Aug-16 21-Aug-17 13-Sep-16 28-Aug-17 17-Apr-19 28-Aug-17 - - 100% 100.0%
A545-133-81-41-04352 C BRANCH PIPE RACK 3 ELEVATIONS 0.2 8-Aug-16 10-Mar-16 22-Aug-16 17-Mar-16 29-Aug-16 24-Mar-16 3-Sep-16 21-Aug-17 17-Sep-16 28-Aug-17 21-Apr-19 28-Aug-17 - - 100% 100.0%
100%
Page 449 of 1078
A545-133-16-48-08311 C MAIN PIPE RACK MANIFOLD PLAN SHT-1 0.5 24-Jun-17 24-Feb-17 8-Jul-17 12-Apr-17 15-Jul-17 17-May-17 19-Jul-17 24-May-17 2-Aug-17 31-May-17 10-Apr-19 31-May-17 - - 100.0%
INCORPORATE
UPDATE & ISSUE FOR ISSUED FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT REVAMP/ CONSTN. CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) INCORPORATING REVAMP PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-133-81-41-08312 C MAIN PIPE RACK MANIFOLD PLAN SHT-2 0.5 27-Jun-17 24-Feb-17 11-Jul-17 12-Apr-17 18-Jul-17 17-May-17 22-Jul-17 24-May-17 5-Aug-17 31-May-17 13-Apr-19 31-May-17 - - 100% 100.0%
A545-133-81-41-19321 C MAIN PIPE RACK DET. OF STAIRCASE-1 0.5 30-Nov-15 10-Aug-16 14-Dec-15 24-Aug-16 8-Mar-17 6-Jun-17 12-Mar-17 13-Jun-17 26-Mar-17 20-Jun-17 21-Apr-19 20-Jun-17 - - 100% 100.0%
A545-133-16-48-19322 C MAIN PIPE RACK DET. OF STAIRCASE-2 0.5 15-Dec-15 10-Aug-16 29-Dec-15 24-Aug-16 23-Mar-17 6-Jun-17 27-Mar-17 13-Jun-17 10-Apr-17 20-Jun-17 6-May-19 20-Jun-17 - - 100% 100.0%
A545-133-81-41-01401 C TECH STR BASE PLATE DRAWING 0.1 10-Feb-16 10-Aug-16 29-Dec-15 24-Aug-16 23-Mar-17 6-Feb-19 27-Mar-17 13-Feb-19 10-Apr-17 20-Feb-19 6-May-19 20-Feb-19 - - 100% 100.0%
100 99.1%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-133-16-50-40010 R C CABLE SCHEDULE-MV 4.0 20-Feb-16 18-Dec-15 5-Mar-16 25-Dec-15 12-Mar-16 1-Jan-16 19-Mar-16 8-Jan-16 2-Apr-16 15-Jan-16 8-Jul-17 15-Mar-17 13-Apr-19 - 100% 100.0%
A545-133-16-50-40020 R C CABLE SCHEDULE - LV 8.0 1-Mar-16 16-Jun-16 15-Mar-16 30-Jun-16 22-Mar-16 31-Aug-16 29-Mar-16 12-Sep-16 12-Apr-16 19-Sep-16 18-Jul-17 27-Jun-17 18-Apr-19 - 100% 100.0%
A545-133-16-50-40030 E C CABLE SCHEDULE - FA /PA 2.0 21-Mar-16 2-Aug-16 4-Apr-16 9-Aug-16 11-Apr-16 16-Aug-16 18-Apr-16 23-Aug-16 2-May-16 30-Aug-16 31-Aug-19 - - - 85% 85.0%
A545-133-16-50-40040 R C INTERCONNECTION -MV 1.6 25-Mar-16 20-May-16 8-Apr-16 27-May-16 15-Apr-16 3-Jun-16 22-Apr-16 10-Jun-16 6-May-16 17-Jun-16 31-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-133-16-50-40050 R C INTERCONNECTION -LV 2.4 23-May-17 17-Apr-17 6-Jun-17 28-Nov-18 16-Mar-19 - 1-Aug-19 - 15-Aug-19 - 31-Aug-19 - 31-Aug-19 - 65% 60.0%
A545-133-16-50-42020 R C PANEL SCHEDULE 0.8 27-Jan-16 2-Mar-16 10-Feb-16 9-Mar-16 17-Feb-16 16-Mar-16 24-Feb-16 23-Mar-16 9-Mar-16 30-Mar-16 22-Jul-17 11-Dec-17 15-May-19 - 100% 100.0%
100 97.5%
A545-133-16-51-SK00 E E MISCELLANENOUS SKETCHES 2.2 26-Dec-15 20-May-16 25-Jan-16 27-May-16 1-Feb-16 3-Jun-16 5-Feb-16 10-Jun-16 12-Feb-16 17-Jun-16 12-Apr-16 24-Jun-16 100% 100.0%
A545-133-16-51-00801 R C INSTRUMENT CABLE DUCT/TRENCH LAYOUT 2.6 21-Oct-15 24-Dec-15 20-Nov-15 4-Mar-16 27-Nov-15 11-Mar-16 11-Dec-15 18-Mar-16 25-Dec-15 16-Jun-16 23-Feb-16 23-Jun-16 100% 100.0%
A545-133-16-51-BM02 R BILL OF MATERIAL 5.4 12-Aug-15 1-Feb-16 - - - - - - - - 31-Aug-16 27-Jun-17 100% 100.0%
A545-133-16-51-II02 R C INSTRUMENT INDEX 7.6 24-Feb-16 19-Feb-16 15-Mar-16 21-Sep-16 22-Mar-16 28-Sep-16 13-May-17 21-Nov-16 23-May-17 28-Nov-16 15-Apr-19 10-Jul-19 100% 100.0%
A545-133-16-51-CH02 R C CABLE SCHEDULE-FF 3.3 11-Jan-16 24-Oct-16 16-Mar-17 6-Apr-17 23-Mar-17 13-Apr-17 28-Mar-17 20-Apr-17 25-Apr-17 27-Apr-17 24-Jun-17 13-Oct-17 100% 100.0%
A545-133-16-51-CH03 R C CABLE SCHEDULE-NFF 3.3 17-Jan-16 28-Oct-16 22-Mar-17 7-Apr-17 29-Mar-17 14-Apr-17 3-Apr-17 21-Apr-17 10-Apr-17 28-Apr-17 10-Jun-17 1-May-17 100% 100.0%
A545-133-16-51-00805 R C INSTRUMENT LOCATION PLAN-NFF 4.4 23-Jan-16 22-Sep-16 28-Mar-17 23-Nov-16 4-Apr-17 30-Nov-16 8-Apr-17 7-Dec-16 6-May-17 14-Dec-16 5-Jul-17 1-Jul-17 100% 100.0%
A545-133-16-51-00806 R C INSTRUMENT JUNCTION BOX LAYOUT-FF 2.2 31-Jan-16 22-Sep-16 5-Apr-17 18-Nov-16 12-Apr-17 25-Nov-16 17-Apr-17 2-Dec-16 24-Apr-17 9-Dec-16 23-Jun-17 1-Jul-17 100% 100.0%
A545-133-16-51-03306 E E SRR LAYOUT 2.2 7-Oct-15 6-Jan-16 6-Nov-15 13-Jan-16 13-Nov-15 20-Jan-16 17-Nov-15 27-Jan-16 15-Dec-15 3-Feb-16 29-Jan-16 10-Feb-16 100% 100.0%
A545-133-16-51-NE10 R E NOZZLE ELEVATION FOR LEVEL INSTRUMENT 3.3 31-Oct-15 27-Jan-16 30-Nov-15 10-Feb-16 7-Dec-15 17-Feb-16 11-Dec-15 24-Feb-16 8-Jan-16 21-May-16 8-Mar-16 16-Jan-17 100% 100.0%
A545-133-16-51-00811 R C INSTRUMENT JUNCTION BOX LAYOUT-NFF 2.2 22-Feb-16 26-Sep-16 27-Apr-17 18-Nov-16 4-May-17 25-Nov-16 8-May-17 2-Dec-16 5-Jun-17 9-Dec-16 4-Aug-17 1-Jul-17 100% 100.0%
A545-133-16-51-00812 R C AIR SUPPLY DISTRIBUTION SCHEME 3.3 16-Feb-16 23-Sep-16 17-Mar-16 5-Oct-16 24-Mar-16 12-Oct-16 28-Mar-16 19-Oct-16 4-Apr-16 26-Oct-16 3-Jun-16 26-Oct-16 100% 100.0%
A545-133-16-51-00813 R C INSTRUMENT LOACTION PLAN-FF 4.4 10-Feb-16 26-Sep-16 15-Apr-17 18-Nov-16 22-Apr-17 25-Nov-16 27-Apr-17 2-Dec-16 11-May-17 9-Dec-16 12-Jun-17 1-Jul-17 100% 100.0%
A545-133-16-51-00820 R C LEVEL GAUGE & LIGHTING PANEL LAYOUT 2.2 10-Dec-15 19-Jul-16 9-Jan-16 2-Aug-16 16-Jan-16 9-Aug-16 21-Jan-16 16-Aug-16 18-Feb-16 23-Aug-16 23-May-17 19-Jan-17 100% 100.0%
A545-133-16-51-MD22 R E POWER SUPPLY SCHEME 1.1 7-Sep-15 1-Jan-16 - - - - - - - - 5-Jan-16 29-Jan-16 100% 100.0%
A545-133-16-51-MD07 R E DCS POINT DATABASE 3.3 15-May-17 4-Mar-17 14-Jun-17 3-Jul-17 28-Jun-17 17-Jul-17 12-Jul-17 24-Jul-17 11-Sep-17 31-Oct-17 30-Sep-19 - 85% 90.0%
A545-133-16-51-00823 R C GAS DETECTOR & CCTV LAYOUT 3.3 10-Dec-15 30-Jun-16 9-Jan-16 7-Jul-16 23-Jan-16 14-Jul-16 6-Feb-16 21-Jul-16 6-Apr-16 28-Jul-16 11-Jul-17 1-Jul-17 100% 100.0%
100 99.5%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
DRAWING/ DOCUMENT (10%) (65%) (85%) (95%) (100%)
DRAWING/ DOCUMENT TITLE WTG PROGRESS PROGRESS
NO.
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-180-1111 COOLING WATER DISTRIBUTION 1.3 17-Dec-14 17-Mar-15 25-Feb-15 15-Apr-15 15-Jun-15 30-May-15 15-Jul-15 20-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1113 COOLING WATER FOR PUMP SEALS 1.3 19-Dec-14 31-Jan-15 27-Feb-15 11-Apr-15 17-Jun-15 30-Jul-15 17-Jul-15 30-Jul-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1114 CLOSED BLOW DOWN DISTRIBUTION 1.3 21-Dec-14 14-Mar-15 1-Mar-15 13-Apr-15 19-Jun-15 30-May-15 19-Jul-15 20-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1123 AMINE BLOWDOWN DISTRIBUTION 1.3 25-Dec-14 14-Mar-15 5-Mar-15 13-Apr-15 23-Jun-15 30-May-15 23-Jul-15 20-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1125 SOUR BLOWDOWN DISTRIBUTION 1.3 27-Dec-14 14-Mar-15 7-Mar-15 13-Apr-15 25-Jun-15 30-May-15 25-Jul-15 20-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1126 UNDER GROUND SOUR BLOWDOWN DRUM 1.3 29-Dec-14 2-Feb-15 9-Mar-15 3-Mar-15 27-Jun-15 30-May-15 27-Jul-15 20-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1128 ACID FLARE DISTRIBUTION 1.3 2-Feb-15 14-Mar-15 13-Apr-15 13-Apr-15 1-Aug-15 30-May-15 31-Aug-15 20-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1129 ACID FLARE KOD 1.3 4-Feb-15 14-Mar-15 15-Apr-15 13-Apr-15 3-Aug-15 30-May-15 2-Sep-15 22-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1130 BFW/DM WATER DISTRIBUTION 1.3 5-Feb-15 17-Mar-15 16-Apr-15 15-Apr-15 4-Aug-15 30-May-15 3-Sep-15 22-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1131 HP STEAM DISTRIBUTION 1.3 6-Feb-15 24-Mar-15 17-Apr-15 15-Apr-15 5-Aug-15 30-May-15 4-Sep-15 22-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1132 MP STEAM DISTRIBUTION 1.3 7-Feb-15 17-Mar-15 18-Apr-15 15-Apr-15 6-Aug-15 30-May-15 5-Sep-15 22-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1133 LP STEAM DISTRIBUTION 1.3 8-Feb-15 17-Mar-15 19-Apr-15 15-Apr-15 7-Aug-15 30-May-15 6-Sep-15 23-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1134 CONDENSATE DISTRIBUTION SYSTEM 1.3 9-Feb-15 17-Mar-15 20-Apr-15 15-Apr-15 8-Aug-15 30-May-15 7-Sep-15 23-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1135 CONDENSATE RECOVERY SYSTEM 1.3 10-Feb-15 16-Mar-15 21-Apr-15 15-Apr-15 9-Aug-15 30-May-15 8-Sep-15 23-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1136 HP LP PRDS 1.3 10-Feb-15 11-Mar-15 21-Apr-15 10-Apr-15 9-Aug-15 2-Jun-15 8-Sep-15 23-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1138 NITROGEN DISTRIBUTION 1.3 11-Feb-15 17-Mar-15 22-Apr-15 15-Apr-15 10-Aug-15 30-May-15 9-Sep-15 25-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1139 INSTRUMENT AIR AND PLANT AIR DISTRIBUTION 1.3 12-Feb-15 17-Mar-15 23-Apr-15 15-Apr-15 11-Aug-15 30-May-15 10-Sep-15 25-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1140 FUEL GAS DISTRIBUTION 1.3 13-Feb-15 28-Mar-15 24-Apr-15 25-Apr-15 12-Aug-15 30-May-15 11-Sep-15 25-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1141 SERVICE WATER DISTRIBUTION 1.3 14-Feb-15 17-Mar-15 25-Apr-15 15-Apr-15 13-Aug-15 30-May-15 12-Sep-15 25-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1151 CONTROL VALVE DRAIN/ VENT DETAILS 1.3 15-Feb-15 25-May-15 26-Apr-15 8-Jun-15 14-Aug-15 22-Jun-15 13-Sep-15 30-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1152 LEVEL INSTRUMENTS DRAIN/ VENT DETAILS 1.3 16-Feb-15 25-May-15 27-Apr-15 8-Jun-15 15-Aug-15 22-Jun-15 14-Sep-15 30-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1153 SAMPLE CONNECTION DRAIN/ VENT DETAILS 1.3 17-Feb-15 25-Sep-15 28-Apr-15 9-Dec-15 16-Aug-15 23-Dec-15 15-Sep-15 25-Jan-16 31-Oct-19 - 95% 98.0%
A545-02-41-180-1154 PUMP SEAL PLAN DETAILS 1.3 18-Feb-15 2-Jul-15 29-Apr-15 16-Jul-15 17-Aug-15 30-Jul-15 16-Sep-15 30-Jul-15 31-Oct-19 - 95% 98.0%
A545-02-41-180-1181 A/B TSP DOSING SYSTEM 1.3 19-Feb-15 16-Jul-15 30-Apr-15 30-Jul-15 18-Aug-15 30-Nov-15 17-Sep-15 25-Jan-16 31-Oct-19 - 95% 98.0%
PROCESS DATASHEET-ISBL
A545-180-02-DS-1202 CBD DRUM 0.3 5-Feb-15 10-Mar-15 16-Apr-15 24-Mar-15 15-Jul-15 4-Jun-15 14-Aug-15 4-Jun-15 3-Oct-15 4-Jun-15 100% 100.0%
A545-180-02-DS-1225 SBD DRUM 0.3 7-Feb-15 10-Mar-15 18-Apr-15 24-Mar-15 17-Jul-15 4-Jun-15 16-Aug-15 4-Jun-15 5-Oct-15 4-Jun-15 100% 100.0%
A545-180-02-DS-1203 TRAP CONDENSATE DRUM 0.3 9-Feb-15 20-Mar-15 20-Apr-15 9-May-15 19-Jul-15 8-Jun-15 18-Aug-15 8-Jun-15 7-Oct-15 8-Jun-15 100% 100.0%
A545-180-02-DS-1214 ATM CONDENSATE FLASH DRUM 0.3 11-Feb-15 16-Mar-15 22-Apr-15 30-Mar-15 21-Jul-15 8-Jun-15 20-Aug-15 8-Jun-15 9-Oct-15 8-Jun-15 100% 100.0%
A545-180-02-DS-1226 ACID FLARE KNOCK OUT DRUM 0.3 13-Feb-15 2-Mar-15 24-Apr-15 16-Mar-15 23-Jul-15 8-Jun-15 22-Aug-15 8-Jun-15 11-Oct-15 8-Jun-15 100% 100.0%
A545-180-02-DS-1210 FUEL GAS KOD-II 0.3 15-Feb-15 18-Mar-15 26-Apr-15 9-May-15 25-Jul-15 8-Jun-15 24-Aug-15 8-Jun-15 13-Oct-15 8-Jun-15 100% 100.0%
A545-180-02-DS-1213 LP CONDENSATE FLASH DRUM 0.3 17-Feb-15 16-Mar-15 28-Apr-15 30-Mar-15 27-Jul-15 8-Jun-15 26-Aug-15 8-Jun-15 15-Oct-15 8-Jun-15 100% 100.0%
A545-180-02-DS-1401 PURE VENT CONDENSER 0.3 19-Feb-15 4-Apr-15 30-Apr-15 9-May-15 29-Jul-15 8-Jun-15 28-Aug-15 8-Jun-15 17-Oct-15 8-Jun-15 100% 100.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
DRAWING/ DOCUMENT (10%) (65%) (85%) (95%) (100%)
DRAWING/ DOCUMENT TITLE WTG PROGRESS PROGRESS
NO.
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-180-02-DS-1602 CBD PUMP 0.3 21-Feb-15 4-May-15 2-May-15 18-May-15 31-Jul-15 1-Jun-15 30-Aug-15 1-Jun-15 19-Oct-15 1-Jun-15 100% 100.0%
A545-180-02-DS-1612 SBD PUMP 0.3 23-Feb-15 4-May-15 4-May-15 18-May-15 2-Aug-15 1-Jun-15 1-Sep-15 1-Jun-15 21-Oct-15 1-Jun-15 100% 100.0%
A545-180-02-DS-1603 ATM CONDENSATE PUMP 0.3 25-Feb-15 4-May-15 6-May-15 18-May-15 4-Aug-15 1-Jun-15 3-Sep-15 1-Jun-15 23-Oct-15 1-Jun-15 100% 100.0%
A545-180-02-DS-1901 HP-LP PRDS 0.3 1-Mar-15 6-May-15 10-May-15 20-May-15 8-Aug-15 3-Jun-15 7-Sep-15 3-Jun-15 27-Oct-15 3-Jun-15 100% 100.0%
A545-02-41-180-PFD PROCESS FLOW DIAGRAM 13.4 1-Sep-14 8-Sep-14 1-Oct-14 8-Oct-14 8-Oct-14 15-Oct-14 22-Oct-14 29-Oct-14 5-Nov-14 12-Nov-14 100% 100.0%
A545-02-41-180-P&ID PIPING & INSTRUMENTATION DIAGRAM 13.4 14-Oct-14 22-Oct-14 13-Nov-14 21-Nov-14 20-Nov-14 28-Nov-14 4-Dec-14 21-Sep-15 31-Oct-19 - 95% 96.0%
A545-02-41-180-PDS PROCESS DATA SHEET 13.4 23-Nov-14 3-Dec-14 23-Dec-14 2-Jan-15 30-Dec-14 9-Jan-15 13-Jan-15 24-Sep-15 15-May-17 28-Sep-17 100% 100.0%
A545-02-41-180-UTS UTILITY SUMMARY 1.3 11-Dec-14 11-Mar-15 10-Jan-15 25-Mar-15 31-Jan-15 1-Apr-15 2-Mar-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-180-FLS FLARE LOAD SUMMARY 1.3 8-Jan-15 10-Mar-15 7-Feb-15 9-Apr-15 21-Feb-15 16-Apr-15 23-Mar-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-180-EFS EFFLUENT SUMMARY 1.3 18-Nov-14 11-Mar-15 18-Dec-14 25-Mar-15 8-Jan-15 1-Apr-15 7-Feb-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-180-CHS CHEMICAL SUMMARY 1.3 2-Nov-14 17-Dec-14 2-Dec-14 31-Dec-14 16-Dec-14 7-Jan-15 15-Jan-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-180-CED CAUSE & EFFECT DIAGRAM 1.3 18-Dec-14 2-Mar-15 17-Jan-15 1-Apr-15 7-Feb-15 8-Apr-15 9-Mar-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-180-EQL EQUIPMENT LIST 1.3 2-Dec-14 3-Dec-14 16-Dec-14 17-Dec-14 23-Dec-14 24-Dec-14 6-Jan-15 31-Dec-14 10-Feb-15 7-Jan-15 100% 100.0%
A545-02-41-180-LNL LINE LIST 1.3 24-Nov-14 3-Dec-14 8-Dec-14 17-Dec-14 22-Dec-14 24-Dec-14 21-Jan-15 31-Dec-14 25-Feb-15 7-Jan-15 100% 100.0%
A545-181-16-49-10233 C MCC & CONTROL ROOM ELEVATIONS & SECTIONS 8.5 16-Apr-15 17-Aug-15 30-Apr-15 31-Aug-15 7-May-15 7-Sep-15 28-May-15 14-Sep-15 18-Jun-15 28-Sep-15 3-Aug-15 4-Mar-16 100% 100.0%
A545-181-81-41-12032 C MCC & CONTROL ROOM (DOOR WINDOW PROFILE) 8.5 20-Apr-15 22-Jan-16 4-May-15 5-Feb-16 11-May-15 12-Feb-16 1-Jun-15 19-Feb-16 22-Jun-15 4-Mar-16 7-Aug-15 4-Mar-16 100% 100.0%
A545-181-16-49-00235 C SULPHUR BAGGING BUILDING 11.3 21-Apr-15 20-Jan-15 5-May-15 10-Mar-15 12-May-15 31-Mar-15 2-Jun-15 31-Mar-15 23-Jun-15 30-Sep-15 7-Aug-15 6-Apr-16 100% 100.0%
A545-181-81-41-02025 C SULPHUR BAGGING BUILDING (TERRACE PLAN) 11.3 17-Apr-15 31-Jul-15 1-May-15 7-Aug-15 8-May-15 14-Aug-15 29-May-15 28-Aug-15 19-Jun-15 30-Sep-15 3-Aug-15 6-Apr-16 100% 100.0%
A545-181-81-41-12031 C SULPHUR BAGGING BUILDING D/W PROFILE 11.3 8-May-15 31-Jul-15 22-May-15 7-Aug-15 29-May-15 14-Aug-15 19-Jun-15 28-Aug-15 10-Jul-15 30-Sep-15 24-Aug-15 6-Apr-16 100% 100.0%
A545-181-16-49-00238 C SULPHUR PELLETISATION PLAN, ELEV & SECTIONS 11.3 19-Apr-15 20-Jan-15 4-May-15 17-Mar-15 11-May-15 24-Mar-15 1-Jun-15 31-Mar-15 22-Jun-15 29-Sep-15 6-Aug-15 10-Mar-16 100% 100.0%
100 100.0%
A545-181-16-47-01101 E P&ID FOR CRWS SYSTEM 1.2 7-Mar-15 11-Mar-15 21-Mar-15 25-Mar-15 28-Mar-15 22-Mar-15 1-Apr-15 26-Mar-15 15-Apr-15 26-Mar-15 30-May-15 31-Mar-15 100% 100.0%
A545-181-16-47-01102 E P&ID FOR OWS SYSTEM 1.2 11-May-15 11-May-15 25-May-15 25-May-15 1-Jun-15 7-Aug-15 6-Jun-15 12-Aug-15 20-Jun-15 17-Aug-15 4-Aug-15 17-Aug-15 100% 100.0%
A545-181-16-47-01103 E P&ID FOR FIRE WATER SYSTEM 1.5 16-May-15 16-May-15 30-May-15 20-May-15 6-Jun-15 29-May-15 10-Jun-15 5-Jun-15 24-Jun-15 8-Jul-15 8-Aug-15 16-Dec-15 100% 100.0%
A545-181-16-47-31104 E P&ID FOR DRINKING WATER 1.0 22-May-15 2-Jul-15 5-Jun-15 6-Jul-15 12-Jun-15 8-Jul-15 17-Jun-15 15-Jul-15 1-Jul-15 17-Jul-15 15-Aug-15 21-Sep-15 100% 100.0%
A545-181-16-47-11105 E P&ID CRWS & OWS PUMPING SYSTEM 2.5 2-Feb-15 17-Mar-15 16-Feb-15 31-Mar-15 23-Feb-15 31-Mar-15 28-Feb-15 31-Mar-15 14-Mar-15 25-May-15 31-Dec-15 16-Oct-15 100% 100.0%
A545-181-16-47-31106 E PID FOR FOAM SYSTEM 181-TT-1001 0.8 23-Apr-15 9-Sep-15 7-May-15 16-Sep-15 14-May-15 23-Sep-15 18-May-15 30-Sep-15 1-Jun-15 7-Oct-15 16-Jul-15 7-Oct-15 100% 100.0%
A545-181-16-47-31107 E PID FOR FOAM SYSTEM 182-TT-1001A 0.8 25-Apr-15 9-Sep-15 9-May-15 16-Sep-15 16-May-15 23-Sep-15 20-May-15 30-Sep-15 3-Jun-15 7-Oct-15 18-Jul-15 7-Oct-15 100% 100.0%
A545-181-16-47-31108 E PID FOR FOAM SYSTEM 182-TT-1001B 0.8 28-Apr-15 9-Sep-15 12-May-15 16-Sep-15 19-May-15 23-Sep-15 23-May-15 30-Sep-15 6-Jun-15 7-Oct-15 21-Jul-15 7-Oct-15 100% 100.0%
A545-181-16-47-02000 C AREA DIVIOSN LAYOUT U/G PIPING ISBL 0.8 8-Apr-15 20-Apr-15 29-Apr-15 4-May-15 6-May-15 11-May-15 13-May-15 16-May-15 27-May-15 19-May-15 27-Jul-15 20-Oct-15 100% 100.0%
A545-181-16-47-02001 C UNIT AREA-01 1.5 19-Jun-15 * 2-Jul-15 20-Jul-15 5-Aug-15 3-Aug-15 10-Aug-15 17-Aug-15 14-Aug-15 7-Sep-15 21-Sep-15 15-Dec-15 31-May-16 100% 100.0%
A545-181-16-47-02002 C UNIT AREA-02 1.5 21-Jun-15 * 2-Jul-15 22-Jul-15 5-Aug-15 5-Aug-15 10-Aug-15 19-Aug-15 14-Aug-15 9-Sep-15 21-Sep-15 17-Dec-15 31-May-16 100% 100.0%
A545-181-16-47-02003 C UNIT AREA-03 1.5 23-Jun-15 * 7-Jul-15 24-Jul-15 5-Aug-15 7-Aug-15 10-Aug-15 21-Aug-15 14-Aug-15 11-Sep-15 21-Sep-15 19-Dec-15 31-May-16 100% 100.0%
A545-181-16-47-02004 C UNIT AREA-04 1.5 25-Jun-15 * 7-Jul-15 26-Jul-15 5-Aug-15 9-Aug-15 10-Aug-15 23-Aug-15 14-Aug-15 13-Sep-15 21-Sep-15 21-Dec-15 10-Jun-16 100% 100.0%
A545-181-16-47-02005 C UNIT AREA-05 1.5 27-Jun-15 * 7-Jul-15 28-Jul-15 5-Aug-15 11-Aug-15 10-Aug-15 25-Aug-15 14-Aug-15 15-Sep-15 21-Sep-15 23-Dec-15 10-Jun-16 100% 100.0%
A545-181-16-47-02006 C UNIT AREA-06 1.5 29-Jun-15 * 15-Jul-15 30-Jul-15 7-Aug-15 13-Aug-15 14-Aug-15 27-Aug-15 24-Aug-15 17-Sep-15 21-Sep-15 25-Dec-15 25-Jun-16 100% 100.0%
A545-181-16-47-02007 C UNIT AREA-07 1.5 30-Jun-15 * 15-Jul-15 31-Jul-15 7-Aug-15 14-Aug-15 14-Aug-15 28-Aug-15 24-Aug-15 18-Sep-15 21-Sep-15 26-Dec-15 25-Jun-16 100% 100.0%
A545-181-16-47-02008 C UNIT AREA-08 1.5 2-Jul-15 15-Jul-15 2-Aug-15 7-Aug-15 16-Aug-15 14-Aug-15 30-Aug-15 24-Aug-15 20-Sep-15 21-Sep-15 28-Dec-15 25-Jun-16 100% 100.0%
*
A545-181-16-47-02009 C UNIT AREA-09 1.5 4-Jul-15 * 15-Jul-15 4-Aug-15 7-Aug-15 18-Aug-15 14-Aug-15 1-Sep-15 24-Aug-15 22-Sep-15 21-Sep-15 30-Dec-15 31-Aug-16 100% 100.0%
A545-181-16-47-02010 C UNIT AREA-10 1.5 6-Jul-15 22-Jul-15 6-Aug-15 7-Aug-15 20-Aug-15 14-Aug-15 3-Sep-15 24-Aug-15 24-Sep-15 21-Sep-15 1-Jan-16 31-Aug-16 100% 100.0%
A545-181-16-47-02011 C UNIT AREA-11 1.5 8-Jul-15 22-Jul-15 8-Aug-15 24-Aug-15 22-Aug-15 7-Sep-15 5-Sep-15 14-Sep-15 26-Sep-15 28-Sep-15 3-Jan-16 5-Sep-16 100% 100.0%
A545-181-16-47-02012 C UNIT AREA-12 1.5 10-Jul-15 22-Jul-15 10-Aug-15 24-Aug-15 24-Aug-15 7-Sep-15 7-Sep-15 14-Sep-15 28-Sep-15 28-Sep-15 5-Jan-16 5-Sep-16 100% 100.0%
A545-181-16-47-02013 C UNIT AREA-13 1.5 12-Jul-15 25-Jul-15 12-Aug-15 24-Aug-15 26-Aug-15 7-Sep-15 9-Sep-15 14-Sep-15 30-Sep-15 28-Sep-15 7-Jan-16 5-Sep-16 100% 100.0%
A545-181-16-47-02014 C UNIT AREA-14 1.5 14-Jul-15 25-Jul-15 14-Aug-15 24-Aug-15 28-Aug-15 7-Sep-15 11-Sep-15 14-Sep-15 2-Oct-15 28-Sep-15 9-Jan-16 9-Sep-16 100% 100.0%
A545-181-16-47-02015 C UNIT AREA-15 1.5 16-Jul-15 31-Jul-15 16-Aug-15 24-Aug-15 30-Aug-15 7-Sep-15 13-Sep-15 14-Sep-15 4-Oct-15 28-Sep-15 11-Jan-16 10-Jun-16 100% 100.0%
A545-181-81-41-02016 C UNIT AREA-16 1.5 20-Jul-15 2-Sep-15 20-Aug-15 1-Oct-15 3-Sep-15 5-Oct-15 17-Sep-15 9-Oct-15 8-Oct-15 14-Oct-15 15-Jan-16 26-Sep-16 100% 100.0%
A545-181-81-41-02017 C UNIT AREA-17 1.5 20-Jul-15 2-Sep-15 20-Aug-15 1-Oct-15 3-Sep-15 5-Oct-15 17-Sep-15 9-Oct-15 8-Oct-15 14-Oct-15 15-Jan-16 27-Sep-16 100% 100.0%
A545-181-81-41-02018 C UNIT AREA-18 1.5 20-Jul-15 2-Sep-15 20-Aug-15 1-Oct-15 3-Sep-15 5-Oct-15 17-Sep-15 9-Oct-15 8-Oct-15 13-Oct-15 15-Jan-16 1-Oct-16 100% 100.0%
A545-181-81-41-02019 C UNIT AREA-19 1.5 20-Jul-15 2-Sep-15 20-Aug-15 1-Oct-15 3-Sep-15 5-Oct-15 17-Sep-15 9-Oct-15 8-Oct-15 14-Oct-15 15-Jan-16 1-Oct-16 100% 100.0%
A545-181-81-41-02020 C UNIT AREA-20 1.5 20-Jul-15 2-Sep-15 20-Aug-15 1-Oct-15 3-Sep-15 5-Oct-15 17-Sep-15 9-Oct-15 8-Oct-15 14-Oct-15 15-Jan-16 1-Oct-16 100% 100.0%
A545-181-81-41-02021 C UNIT AREA-21 1.5 20-Jul-15 7-Nov-16 20-Aug-15 14-Nov-16 3-Sep-15 21-Nov-16 17-Sep-15 28-Nov-16 8-Oct-15 2-Dec-16 15-Jan-16 7-Dec-16 100% 100.0%
A545-181-16-47-02030 C LAYOUT OF RCC PAVEMENT SHEET 2.8 5-Sep-15 2-Nov-15 19-Sep-15 16-Nov-15 26-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 30-Nov-15 31-Dec-15 30-Apr-19 30-Apr-19 100% 100.0%
A545-181-16-47-30050 C ISOS U/G PIPING 14.1 19-Jul-15 25-Jul-15 - - - - - - - 30-Apr-16 30-Jan-17 31-Jan-17 100% 100.0%
A545-181-16-47-03301 C GA OF OWS & CRWS SUMP 1.4 30-Jun-15 30-Jun-15 14-Jul-15 15-Jul-15 21-Jul-15 24-Jul-15 26-Jul-15 28-Jul-15 9-Aug-15 22-Sep-15 8-Oct-15 12-Oct-15 100% 100.0%
A545-181-16-47-02031 C LAYOUT OF PORTABLE EXTINGUISHER 1.4 18-Jul-15 10-Sep-15 1-Aug-15 Page 456 of
24-Sep-15 1078
8-Aug-15 1-Oct-15 13-Aug-15 8-Oct-15 27-Aug-15 15-Oct-15 26-Oct-15 29-Oct-15 100% 100.0%
100 100.0%
TOTAL TOTAL
INCORPORATE
DRAFTING COMPLETE CHECKING COMPLETED ISSUED FOR COMMENTS UPDATE & ISSUE FOR (SCHD. (ACTUAL
MR No MR DESCRIPTION WTG. % START (10%) COMMENTS & ISSUE FOR
(60%) (65%) (80%) CONSTRUCTION (100%) PROGRESS PROGRESS
CONSTRUCTION (85%)
%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
100 100.0%
TOTAL TOTAL
MR/TR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW
(SCHD. (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%)
PROGRESS %) PROGRESS %)
A545-181-FI-MR-7920 INCINERATOR PACKAGE 44.4 13-Mar-15 15-Apr-15 23-Jun-15 22-Sep-15 14-Nov-16 5-Dec-16 14-Mar-17 30-Aug-18 100% 100.0%
A545-181-LZ-MR-7990 MCC PACKAGE 31.5 13-Apr-15 13-Mar-15 23-Jul-15 23-Jun-15 11-Sep-15 15-Mar-16 22-Feb-17 28-Feb-18 100% 100.0%
A545-181-LZ-MR-6930 CAUSTIC SCRUBBER PACKAGE 2.6 15-Jul-15 28-Apr-16 9-Dec-16 18-May-17 28-Jan-17 15-Dec-17 28-Apr-19 - 100% 96.0%
A545-111-CT-MR-7642 TRAYS & TOWER INTERNALS 3.0 9-Jul-15 3-Aug-15 19-Oct-15 31-Dec-15 8-Dec-15 4-Apr-16 22-Mar-17 27-Feb-18 100% 100.0%
100 99.9%
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW TOTAL (SCHD TOTAL (ACTUAL
MR No MR DESCRIPTION WTG. %
(40%) (85%) (90%) (100%) PROGRESS %) PROGRESS %)
A545-181-GN-MR-4580 CARTRIDGE FILTERS 14.5 6-Jun-15 4-Jun-15 16-Sep-15 28-Aug-15 5-Nov-15 18-Mar-16 18-Jan-17 28-Nov-17 100% 100.0%
A545-700-HH-MR-4610 EOT CRANES 21.4 2-Jul-15 3-Jun-15 12-Oct-15 9-Oct-15 1-Dec-15 27-Jul-16 24-Jan-17 30-Jan-18 100% 100.0%
100 99.9%
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD.
DRAWING/ DOCUMENT COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. (60%) (85%) (100%) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
PIPING - SULPHUR BLOCK
A545-181-16-43-00001 E EQUIPMENT LAYOUT 0.3 5-Mar-15 2-Feb-15 4-May-15 26-Feb-15 3-Jun-15 28-Mar-15 24-Jun-15 11-Apr-15 24-Jul-15 11-May-15 30-Sep-15 10-Aug-15 100% 100.0%
A545-181-16-43-00002 E AREA DIVISION 0.1 15-Jun-15 2-Apr-15 13-Jul-15 24-Apr-15 20-Jul-15 26-May-15 28-Jul-15 9-Jun-15 4-Aug-15 23-Jun-15 3-Sep-15 23-Jun-15 100% 100.0%
A545-181-16-43-00011 C PIPING GAD AREA 01 0.05 1-Dec-15 5-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 3-Dec-15 30-Dec-15 10-Dec-15 14-Jan-16 17-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00012 C PIPING GAD AREA 01 0.05 1-Dec-15 5-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 3-Dec-15 30-Dec-15 10-Dec-15 14-Jan-16 17-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00013 C PIPING GAD AREA 01 0.05 1-Dec-15 10-Aug-15 16-Dec-15 20-Oct-15 23-Dec-15 3-Dec-15 30-Dec-15 10-Dec-15 14-Jan-16 17-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00014 C PIPING GAD AREA 01 0.05 1-Dec-15 16-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 3-Dec-15 30-Dec-15 10-Dec-15 14-Jan-16 17-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00021 C PIPING GAD AREA 02 0.05 1-Dec-15 5-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 10-Oct-15 30-Dec-15 27-Nov-15 14-Jan-16 4-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00022 C PIPING GAD AREA 02 0.05 1-Dec-15 5-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 10-Oct-15 30-Dec-15 27-Nov-15 14-Jan-16 4-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00023 C PIPING GAD AREA 02 0.05 1-Dec-15 10-Aug-15 16-Dec-15 20-Oct-15 23-Dec-15 20-Nov-15 30-Dec-15 27-Nov-15 14-Jan-16 4-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00024 C PIPING GAD AREA 02 0.05 1-Dec-15 16-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 20-Nov-15 30-Dec-15 27-Nov-15 14-Jan-16 4-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00031 C PIPING GAD AREA 03 0.05 1-Dec-15 7-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 16-Oct-15 30-Dec-15 23-Oct-15 14-Jan-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00032 C PIPING GAD AREA 03 0.05 1-Dec-15 7-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 16-Oct-15 30-Dec-15 23-Oct-15 14-Jan-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00033 C PIPING GAD AREA 03 0.05 1-Dec-15 12-Aug-15 16-Dec-15 20-Oct-15 23-Dec-15 16-Oct-15 30-Dec-15 23-Oct-15 14-Jan-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00034 C PIPING GAD AREA 03 0.05 1-Dec-15 16-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 16-Oct-15 30-Dec-15 23-Oct-15 14-Jan-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00041 C PIPING GAD AREA 04 0.05 1-Dec-15 7-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 10-Oct-15 30-Dec-15 24-Dec-15 14-Jan-16 31-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00042 C PIPING GAD AREA 04 0.05 1-Dec-15 7-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 10-Oct-15 30-Dec-15 24-Dec-15 14-Jan-16 31-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00043 C PIPING GAD AREA 04 0.05 1-Dec-15 12-Aug-15 16-Dec-15 20-Oct-15 23-Dec-15 17-Dec-15 30-Dec-15 24-Dec-15 14-Jan-16 31-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00044 C PIPING GAD AREA 04 0.05 1-Dec-15 16-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 17-Dec-15 30-Dec-15 24-Dec-15 14-Jan-16 31-Dec-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00051 C PIPING GAD AREA 05 0.05 1-Dec-15 10-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 16-Oct-15 30-Dec-15 23-Oct-15 14-Jan-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00052 C PIPING GAD AREA 05 0.05 1-Dec-15 10-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 16-Oct-15 30-Dec-15 23-Oct-15 14-Jan-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00053 C PIPING GAD AREA 05 0.05 1-Dec-15 17-Aug-15 16-Dec-15 20-Oct-15 23-Dec-15 16-Oct-15 30-Dec-15 23-Oct-15 14-Jan-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00054 C PIPING GAD AREA 05 0.05 1-Dec-15 22-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 16-Oct-15 30-Dec-15 23-Oct-15 14-Jan-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00061 C PIPING GAD AREA 06 0.05 28-Dec-15 10-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00062 C PIPING GAD AREA 06 0.05 28-Dec-15 10-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00063 C PIPING GAD AREA 06 0.05 28-Dec-15 17-Aug-15 12-Jan-16 20-Oct-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00064 C PIPING GAD AREA 06 0.05 28-Dec-15 22-Sep-15 12-Jan-16 1-Oct-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00071 C PIPING GAD AREA 07 0.05 28-Dec-15 10-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00072 C PIPING GAD AREA 07 0.05 28-Dec-15 10-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00073 C PIPING GAD AREA 07 0.05 28-Dec-15 21-Aug-15 12-Jan-16 20-Oct-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00074 C PIPING GAD AREA 07 0.05 28-Dec-15 22-Sep-15 12-Jan-16 28-Jan-16 19-Jan-16 12-Feb-16 26-Jan-16 19-Feb-16 10-Feb-16 26-Feb-16 31-Aug-19 - 85% 85.0%
A545-181-16-43-00081 C PIPING GAD AREA 08 0.05 28-Dec-15 10-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00082 C PIPING GAD AREA 08 0.05 28-Dec-15 10-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 16-Oct-15 26-Jan-16 23-Oct-15 10-Feb-16 30-Oct-15 31-Aug-19 - 85% 85.0%
A545-181-16-43-00083 C PIPING GAD AREA 08 0.05 28-Dec-15 21-Aug-15 12-Jan-16 20-Oct-15 19-Jan-16 12-Nov-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
Page 461 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 5
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
JOB NO. : A545
PROJECT, NIGERIA
DISCIPLINE: PIPING (SULPHUR BLOCK)
ANNEXURE-A6
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD.
DRAWING/ DOCUMENT COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. (60%) (85%) (100%) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-43-00084 C PIPING GAD AREA 08 0.05 28-Dec-15 22-Sep-15 12-Jan-16 20-Oct-15 19-Jan-16 12-Nov-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00091 C PIPING GAD AREA 09 0.05 28-Dec-15 12-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 10-Oct-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00092 C PIPING GAD AREA 09 0.05 28-Dec-15 12-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 10-Oct-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00093 C PIPING GAD AREA 09 0.05 28-Dec-15 24-Aug-15 12-Jan-16 20-Oct-15 19-Jan-16 12-Nov-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00094 C PIPING GAD AREA 09 0.05 28-Dec-15 22-Sep-15 12-Jan-16 20-Oct-15 19-Jan-16 12-Nov-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00101 C PIPING GAD AREA 10 0.05 28-Dec-15 12-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 10-Oct-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00102 C PIPING GAD AREA 10 0.05 28-Dec-15 12-Jul-15 12-Jan-16 15-Sep-15 19-Jan-16 10-Oct-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00103 C PIPING GAD AREA 10 0.05 28-Dec-15 24-Aug-15 12-Jan-16 20-Oct-15 19-Jan-16 12-Nov-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00104 C PIPING GAD AREA 10 0.05 28-Dec-15 24-Sep-15 12-Jan-16 5-Nov-15 19-Jan-16 12-Nov-15 26-Jan-16 19-Nov-15 10-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00111 C PIPING GAD AREA 11 0.05 12-Jan-16 12-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 10-Oct-15 10-Feb-16 19-Nov-15 25-Feb-16 26-Nov-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00112 C PIPING GAD AREA 11 0.05 12-Jan-16 12-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 10-Oct-15 10-Feb-16 24-Dec-15 25-Feb-16 31-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00113 C PIPING GAD AREA 11 0.05 12-Jan-16 24-Aug-15 27-Jan-16 20-Oct-15 3-Feb-16 17-Dec-15 10-Feb-16 24-Dec-15 25-Feb-16 31-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00114 C PIPING GAD AREA 11 0.05 12-Jan-16 24-Sep-15 27-Jan-16 10-Dec-15 3-Feb-16 17-Dec-15 10-Feb-16 24-Dec-15 25-Feb-16 31-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00121 C PIPING GAD AREA 12 0.05 12-Jan-16 12-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 3-Dec-15 10-Feb-16 10-Dec-15 25-Feb-16 17-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00122 C PIPING GAD AREA 12 0.05 12-Jan-16 12-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 3-Dec-15 10-Feb-16 10-Dec-15 25-Feb-16 17-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00123 C PIPING GAD AREA 12 0.05 12-Jan-16 27-Aug-15 27-Jan-16 20-Oct-15 3-Feb-16 3-Dec-15 10-Feb-16 10-Dec-15 25-Feb-16 17-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00124 C PIPING GAD AREA 12 0.05 12-Jan-16 28-Sep-15 27-Jan-16 26-Nov-15 3-Feb-16 3-Dec-15 10-Feb-16 10-Dec-15 25-Feb-16 17-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00131 C PIPING GAD AREA 13 0.05 12-Jan-16 15-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 16-Oct-15 10-Feb-16 23-Oct-15 25-Feb-16 30-Oct-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00132 C PIPING GAD AREA 13 0.05 12-Jan-16 15-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 16-Oct-15 10-Feb-16 23-Oct-15 25-Feb-16 30-Oct-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00133 C PIPING GAD AREA 13 0.05 12-Jan-16 28-Sep-15 27-Jan-16 10-Dec-15 3-Feb-16 17-Dec-15 10-Feb-16 24-Dec-15 25-Feb-16 31-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00134 C PIPING GAD AREA 13 0.05 12-Jan-16 28-Sep-15 27-Jan-16 10-Dec-15 3-Feb-16 17-Dec-15 10-Feb-16 24-Dec-15 25-Feb-16 31-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00141 C PIPING GAD AREA 14 0.05 12-Jan-16 15-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 16-Oct-15 10-Feb-16 23-Oct-15 25-Feb-16 30-Oct-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00142 C PIPING GAD AREA 14 0.05 12-Jan-16 15-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 16-Oct-15 10-Feb-16 23-Oct-15 25-Feb-16 30-Oct-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00143 C PIPING GAD AREA 14 0.05 12-Jan-16 28-Sep-15 27-Jan-16 28-Dec-15 3-Feb-16 20-Nov-15 10-Feb-16 27-Nov-15 25-Feb-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00144 C PIPING GAD AREA 14 0.05 12-Jan-16 28-Sep-15 27-Jan-16 28-Dec-15 3-Feb-16 20-Nov-15 10-Feb-16 27-Nov-15 25-Feb-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00151 C PIPING GAD AREA 15 0.05 12-Jan-16 15-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 10-Oct-15 10-Feb-16 27-Nov-15 25-Feb-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00152 C PIPING GAD AREA 15 0.05 12-Jan-16 15-Jul-15 27-Jan-16 15-Sep-15 3-Feb-16 10-Oct-15 10-Feb-16 27-Nov-15 25-Feb-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00153 C PIPING GAD AREA 15 0.05 12-Jan-16 28-Sep-15 27-Jan-16 20-Oct-15 3-Feb-16 20-Nov-15 10-Feb-16 27-Nov-15 25-Feb-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00154 C PIPING GAD AREA 15 0.05 12-Jan-16 28-Sep-15 27-Jan-16 13-Nov-15 3-Feb-16 20-Nov-15 10-Feb-16 27-Nov-15 25-Feb-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00161 C PIPING GAD AREA 16 0.05 25-Jan-16 15-Jul-15 9-Feb-16 15-Sep-15 16-Feb-16 20-Nov-15 23-Feb-16 27-Nov-15 9-Mar-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00162 C PIPING GAD AREA 16 0.05 25-Jan-16 15-Jul-15 9-Feb-16 15-Sep-15 16-Feb-16 20-Nov-15 23-Feb-16 27-Nov-15 9-Mar-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00163 C PIPING GAD AREA 16 0.05 25-Jan-16 27-Aug-15 9-Feb-16 20-Oct-15 16-Feb-16 20-Nov-15 23-Feb-16 27-Nov-15 9-Mar-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00164 C PIPING GAD AREA 16 0.05 25-Jan-16 28-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 20-Nov-15 23-Feb-16 27-Nov-15 9-Mar-16 4-Dec-15 30-Sep-19 - 85% 85.0%
A545-181-16-43-00171 C PIPING GAD AREA 17 0.05 25-Jan-16 17-Jul-15 9-Feb-16 15-Sep-15 16-Feb-16 20-Nov-15 23-Feb-16 27-Nov-15 9-Mar-16 4-Dec-15 31-Oct-19 - 85% 85.0%
Page 462 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 2 of 5
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
JOB NO. : A545
PROJECT, NIGERIA
DISCIPLINE: PIPING (SULPHUR BLOCK)
ANNEXURE-A6
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD.
DRAWING/ DOCUMENT COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. (60%) (85%) (100%) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-43-00172 C PIPING GAD AREA 17 0.05 25-Jan-16 17-Jul-15 9-Feb-16 15-Sep-15 16-Feb-16 3-Dec-15 23-Feb-16 10-Dec-15 9-Mar-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00173 C PIPING GAD AREA 17 0.05 25-Jan-16 27-Aug-15 9-Feb-16 20-Oct-15 16-Feb-16 3-Dec-15 23-Feb-16 10-Dec-15 9-Mar-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00174 C PIPING GAD AREA 17 0.05 25-Jan-16 28-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 3-Dec-15 23-Feb-16 10-Dec-15 9-Mar-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00181 C PIPING GAD AREA 18 0.05 25-Jan-16 17-Jul-15 9-Feb-16 15-Sep-15 16-Feb-16 16-Oct-15 23-Feb-16 23-Oct-15 9-Mar-16 30-Oct-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00182 C PIPING GAD AREA 18 0.05 25-Jan-16 17-Jul-15 9-Feb-16 15-Sep-15 16-Feb-16 16-Oct-15 23-Feb-16 23-Oct-15 9-Mar-16 30-Oct-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00183 C PIPING GAD AREA 18 0.05 25-Jan-16 28-Aug-15 9-Feb-16 20-Oct-15 16-Feb-16 17-Dec-15 23-Feb-16 24-Dec-15 9-Mar-16 31-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00184 C PIPING GAD AREA 18 0.05 25-Jan-16 28-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 17-Dec-15 23-Feb-16 24-Dec-15 9-Mar-16 31-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00191 C PIPING GAD AREA 19 0.05 20-Feb-16 17-Jul-15 6-Mar-16 15-Sep-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00192 C PIPING GAD AREA 19 0.05 20-Feb-16 17-Jul-15 6-Mar-16 15-Sep-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00193 C PIPING GAD AREA 19 0.05 20-Feb-16 28-Aug-15 6-Mar-16 20-Oct-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00194 C PIPING GAD AREA 19 0.05 20-Feb-16 28-Sep-15 6-Mar-16 26-Nov-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00201 C PIPING GAD AREA 20 0.05 20-Feb-16 17-Jul-15 6-Mar-16 15-Sep-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00202 C PIPING GAD AREA 20 0.05 20-Feb-16 17-Jul-15 6-Mar-16 15-Sep-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00203 C PIPING GAD AREA 20 0.05 20-Feb-16 29-Aug-15 6-Mar-16 20-Oct-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00204 C PIPING GAD AREA 20 0.05 20-Feb-16 28-Sep-15 6-Mar-16 26-Nov-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00211 C PIPING GAD AREA 21 0.05 20-Feb-16 20-Jul-15 6-Mar-16 15-Sep-15 13-Mar-16 3-Dec-15 20-Mar-16 10-Dec-15 4-Apr-16 17-Dec-15 31-Oct-19 - 85% 85.0%
A545-181-16-43-00212 C PIPING GAD AREA 21 0.05 20-Feb-16 20-Jul-15 6-Mar-16 15-Sep-15 13-Mar-16 12-Feb-16 20-Mar-16 19-Feb-16 4-Apr-16 26-Feb-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00213 C PIPING GAD AREA 21 0.05 20-Feb-16 29-Aug-15 6-Mar-16 20-Oct-15 13-Mar-16 1-Jan-16 20-Mar-16 8-Jan-16 4-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00214 C PIPING GAD AREA 21 0.05 20-Feb-16 30-Sep-15 6-Mar-16 20-Oct-15 13-Mar-16 1-Jan-16 20-Mar-16 8-Jan-16 4-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00221 C PIPING GAD AREA 22 0.05 4-Mar-16 20-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00222 C PIPING GAD AREA 22 0.05 4-Mar-16 20-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00223 C PIPING GAD AREA 22 0.05 4-Mar-16 31-Aug-15 19-Mar-16 20-Oct-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00224 C PIPING GAD AREA 22 0.05 4-Mar-16 30-Sep-15 19-Mar-16 20-Oct-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00231 C PIPING GAD AREA 23 0.05 4-Mar-16 20-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00232 C PIPING GAD AREA 23 0.05 4-Mar-16 20-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00233 C PIPING GAD AREA 23 0.05 4-Mar-16 31-Aug-15 19-Mar-16 20-Oct-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00234 C PIPING GAD AREA 23 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00241 C PIPING GAD AREA 24 0.05 4-Mar-16 20-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00242 C PIPING GAD AREA 24 0.05 4-Mar-16 20-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00243 C PIPING GAD AREA 24 0.05 4-Mar-16 31-Aug-15 19-Mar-16 20-Oct-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00244 C PIPING GAD AREA 24 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00245 C PIPING GAD AREA 24 0.05 4-Mar-16 28-Dec-15 19-Mar-16 28-Dec-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00251 C PIPING GAD AREA 25 0.05 4-Mar-16 25-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00252 C PIPING GAD AREA 25 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
Page 463 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 3 of 5
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
JOB NO. : A545
PROJECT, NIGERIA
DISCIPLINE: PIPING (SULPHUR BLOCK)
ANNEXURE-A6
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD.
DRAWING/ DOCUMENT COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. (60%) (85%) (100%) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-43-00253 C PIPING GAD AREA 25 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00254 C PIPING GAD AREA 25 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 31-Oct-19 - 85% 85.0%
A545-181-16-43-00255 C PIPING GAD AREA 25 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 1-Jan-16 2-Apr-16 8-Jan-16 17-Apr-16 15-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00261 C PIPING GAD AREA 26 0.05 4-Mar-16 25-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00262 C PIPING GAD AREA 26 0.05 4-Mar-16 25-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00263 C PIPING GAD AREA 26 0.05 4-Mar-16 30-Sep-15 19-Mar-16 20-Oct-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00264 C PIPING GAD AREA 26 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00265 C PIPING GAD AREA 26 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00271 C PIPING GAD AREA 27 0.05 4-Mar-16 25-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00272 C PIPING GAD AREA 27 0.05 4-Mar-16 25-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00273 C PIPING GAD AREA 27 0.05 4-Mar-16 30-Sep-15 19-Mar-16 20-Oct-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00274 C PIPING GAD AREA 27 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00275 C PIPING GAD AREA 27 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00281 C PIPING GAD AREA 28 0.05 4-Mar-16 27-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00282 C PIPING GAD AREA 28 0.05 4-Mar-16 27-Jul-15 19-Mar-16 15-Sep-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00283 C PIPING GAD AREA 28 0.05 4-Mar-16 30-Sep-15 19-Mar-16 20-Oct-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00284 C PIPING GAD AREA 28 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00285 C PIPING GAD AREA 28 0.05 4-Mar-16 30-Sep-15 19-Mar-16 28-Dec-15 26-Mar-16 15-Jan-16 2-Apr-16 22-Jan-16 17-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00291 C PIPING GAD AREA 29 0.05 16-Mar-16 27-Jul-15 31-Mar-16 15-Sep-15 7-Apr-16 15-Jan-16 14-Apr-16 22-Jan-16 29-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00292 C PIPING GAD AREA 29 0.05 16-Mar-16 27-Jul-15 31-Mar-16 15-Sep-15 7-Apr-16 15-Jan-16 14-Apr-16 22-Jan-16 29-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00293 C PIPING GAD AREA 29 0.05 16-Mar-16 30-Sep-15 31-Mar-16 20-Oct-15 7-Apr-16 15-Jan-16 14-Apr-16 22-Jan-16 29-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00294 C PIPING GAD AREA 29 0.05 16-Mar-16 30-Sep-15 31-Mar-16 28-Dec-15 7-Apr-16 15-Jan-16 14-Apr-16 22-Jan-16 29-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00295 C PIPING GAD AREA 29 0.05 16-Mar-16 30-Sep-15 31-Mar-16 28-Dec-15 7-Apr-16 15-Jan-16 14-Apr-16 22-Jan-16 29-Apr-16 29-Jan-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00301 C PIPING GAD AREA 30 0.05 16-Mar-16 27-Jul-15 31-Mar-16 15-Sep-15 7-Apr-16 12-Feb-16 14-Apr-16 19-Feb-16 29-Apr-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00311 C PIPING GAD AREA 31 0.05 16-Mar-16 29-Jul-15 31-Mar-16 15-Sep-15 7-Apr-16 12-Feb-16 14-Apr-16 19-Feb-16 29-Apr-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00312 C PIPING GAD AREA 31 0.05 16-Mar-16 30-Sep-15 31-Mar-16 20-Oct-15 7-Apr-16 12-Feb-16 14-Apr-16 19-Feb-16 29-Apr-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00321 C PIPING GAD AREA 32 0.05 16-Mar-16 30-Sep-15 31-Mar-16 20-Oct-15 7-Apr-16 12-Feb-16 14-Apr-16 19-Feb-16 29-Apr-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00331 C PIPING GAD AREA 33 0.05 16-Mar-16 30-Sep-15 31-Mar-16 20-Oct-15 7-Apr-16 12-Feb-16 14-Apr-16 19-Feb-16 29-Apr-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00341 C PIPING GAD AREA 34 0.05 16-Mar-16 30-Sep-15 31-Mar-16 20-Oct-15 7-Apr-16 12-Feb-16 14-Apr-16 19-Feb-16 29-Apr-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00351 C PIPING GAD AREA 35 0.05 16-Mar-16 30-Sep-15 31-Mar-16 20-Oct-15 7-Apr-16 12-Feb-16 14-Apr-16 19-Feb-16 29-Apr-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-00361 C PIPING GAD AREA 36 0.05 16-Mar-16 30-Sep-15 31-Mar-16 20-Oct-15 7-Apr-16 12-Feb-16 14-Apr-16 19-Feb-16 29-Apr-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-181-16-43-ECQS E ENGG CORD. & SQD. CHECK 2.8 1-Jan-15 2-Feb-15 - - - - - - - - 31-Jul-19 - 100% 99.0%
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS TOTAL (SCHD.
DRAWING/ DOCUMENT COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) PROGRESS %)
NO. (60%) (85%) (100%) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-43-IJKT C JACKETED LINE ISOMETRICS 0.4 24-Jun-16 30-Jun-17 - - - - - - - - 31-Jul-19 - 100% 85.0%
A545-181-16-43-MTO1 P PRELIMINARY MTO 3.6 22-Jun-15 5-Apr-15 - - - - - - - - 5-Aug-15 15-Jul-15 100% 100.0%
A545-181-16-43-MTO2 P INTERMEDIATE MTO 1.3 18-Jan-16 27-Jan-16 - - - - - - - - 3-Mar-16 29-Feb-16 100% 100.0%
A545-181-16-43-MTO3 P FINAL MTO 1.0 24-Jun-16 23-Dec-16 - - - - - - - - 28-Apr-17 30-Dec-16 100% 100.0%
A545-181-16-43-MTOM P MTO DATA/ IPMCS MGMT. 2.0 31-Mar-15 17-Aug-15 - - - - - - - - 31-Jul-19 - 100% 96.0%
A545-181-16-43-MTOT P MTO TOP OFF 0.7 12-Oct-16 2-Jan-18 - - - - - - - - 29-Sep-17 1-Feb-18 100% 100.0%
A545-181-16-43-NOZZ C NOZZLE ORIENTATION 0.6 4-May-15 12-Mar-15 - - - - - - - - 30-Nov-16 30-Dec-17 100% 100.0%
A545-181-16-43-PCLT C PIPING CLEATS 0.5 14-May-15 18-Aug-15 - - - - - - - - 31-Dec-16 30-Dec-17 100% 100.0%
A545-181-16-43-PSUP C PIPING SUPPORT INC. SPL 2.0 4-Jul-16 21-Dec-15 - - - - - - - - 31-Jul-19 - 100% 99.0%
A545-181-16-43-SCAT E PIPING SPEC & CATL 0.5 24-Jun-15 2-Jul-15 5-Jul-15 28-Jul-15 12-Jul-15 9-Aug-15 15-Jul-15 24-Aug-15 21-Jul-15 28-Sep-15 30-Nov-16 22-Dec-17 100% 100.0%
A545-181-16-43-STTR C STEAM TRACING INCL SUPPLY 0.1 11-Jan-16 14-Jan-16 - - - - - - - - 7-Aug-17 31-Mar-17 100% 100.0%
100 98.2%
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : RED (SULPHUR BLOCK) ANNEXURE-A6
A545-181-KA-MR-5381 AIR BLOWERS/COMPRESSORS 21.3 28-Feb-15 15-Apr-15 10-Jun-15 20-Oct-15 30-Jul-15 31-Mar-16 31-Dec-16 30-Jan-18 100% 100.0%
A545-181-PA-MR-5382 MOLTEN SULFUR PUMPS 11.4 28-May-15 20-Aug-15 7-Sep-15 19-Feb-16 10-Nov-16 28-Dec-17 8-Feb-17 25-Feb-19 100% 100.0%
CENTRIFUGAL PUMPS
A545-181-PA-MR-5383 21.3 7-Jun-15 23-May-15 17-Sep-15 15-Oct-15 20-Nov-16 3-Oct-17 30-Apr-19 30-Apr-19 100% 100.0%
HORIZONTAL - SPP
CENTRIFUGAL PUMPS
A545-101-PA-MR-5009 14.2 20-Jul-15 28-Aug-15 30-Oct-15 24-Feb-16 19-Dec-15 3-Nov-16 12-Jan-17 26-Feb-18 100% 100.0%
HORIZONTAL - SPP
A545-101-PA-MR-5006 VERTICAL PUMPS (VS1/VS6) 5.7 12-Jul-15 26-Aug-15 22-Oct-15 28-Jan-16 25-Dec-16 8-Dec-16 25-Mar-17 27-Feb-18 100% 100.0%
A545-101-LZ-MR-5005 CHEMICAL DOSING SKID 8.5 27-Jul-15 24-Sep-15 6-Nov-15 18-Feb-16 26-Dec-15 18-Aug-16 30-Apr-19 - 100% 100.0%
A545-101-LZ-MR-5007 OIL MIST LUBRICATION SYSTEM 0.3 19-Jun-15 10-Dec-15 30-Sep-15 28-Jun-16 3-Dec-16 29-Nov-16 3-Mar-17 30-Jan-18 100% 100.0%
CENTRIFUGAL PUMPS
A545-161-PA-MR-5364 0.3 4-Sep-15 23-May-16 16-Dec-15 15-Sep-16 15-Dec-16 20-Jun-17 15-Mar-17 29-Jan-18 100% 100.0%
HORIZONTAL - SPP
MISCELLANEOUS (INPUT TO MR,
A545-181-16-45-MISC 11.4 31-Jul-15 20-May-15 - - - - 30-Apr-16 31-Oct-16 100% 100.0%
TENDER & PACKAGES)
100 100.0%
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING
MR No MR DESCRIPTION WTG. % (SCHD (ACTUAL
(40%) (85%) (90%) REVIEW (100%)
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
A545-181-RA-MR-6402 CLAUS REACTOR 1.5 13-Mar-15 25-Mar-15 23-Jun-15 16-Jun-15 22-Aug-15 14-Mar-16 30-Apr-19 - 100% 98.0%
A545-181-VV-MR-6407 SULPHUR TRAPS 1.5 15-Jun-15 8-Jun-15 25-Sep-15 8-Oct-15 19-Oct-16 29-Nov-16 17-Jan-17 30-Nov-17 100% 100.0%
A545-181-EA-MR-6410 AIR COOLERS (ALLOY-825) 1.1 18-Jun-15 11-Jun-15 29-Sep-15 2-Nov-15 28-Nov-15 17-Jun-16 22-Dec-16 29-Mar-18 100% 100.0%
A545-181-EA-MR-6411 AIR COOLERS (TITANIUM) 0.8 23-Jun-15 15-Jun-15 3-Oct-15 21-Oct-15 2-Dec-15 22-Mar-16 30-Apr-19 - 100% 97.0%
A545-101-CC-MR-6154 COLUMNS (CS & CS+SS CLAD) 5.6 1-May-15 21-Jan-15 11-Aug-15 10-Apr-15 10-Oct-15 4-Jul-15 13-Dec-16 27-Feb-18 100% 100.0%
A545-101-CC-MR-6155 COLUMNS (CS & CS+CLAD) 2.4 15-May-15 2-Mar-15 10-Aug-15 4-Jun-15 9-Oct-15 2-Nov-15 12-Dec-16 28-Feb-18 100% 100.0%
A545-111-VV-MR-6403 VESSELS 37.6 6-May-15 25-Mar-15 17-Aug-15 17-Jun-15 16-Oct-15 29-Oct-15 19-Dec-16 28-Dec-17 100% 100.0%
A545-111-VV-MR-6404 VESSELS 26.4 8-May-15 31-Mar-15 19-Aug-15 26-Jun-15 18-Oct-15 29-Oct-15 21-Dec-16 31-Aug-17 100% 100.0%
A545-151-EE-MR-6130 EXCHANGER 9.1 11-May-15 16-Apr-15 22-Aug-15 21-Jul-15 21-Oct-15 18-Mar-16 24-Dec-16 28-Apr-18 100% 100.0%
A545-111-EE-MR-6145 HEAT EXCHANGER CARBON STEEL 1.5 28-May-15 8-Jun-15 7-Sep-15 22-Jul-15 6-Nov-15 23-Mar-16 9-Jan-17 29-Apr-18 100% 100.0%
A545-111-EE-MR-6160 HEAT EXCHANGER CARBON STEEL 0.8 26-Jun-15 16-Jul-15 6-Oct-15 6-Oct-15 5-Dec-15 6-Oct-16 8-Jan-17 28-Feb-18 100% 100.0%
A545-101-EA-MR-6210 AIR COOLERS (CS) 1.5 6-Jul-15 25-Jun-15 1-Oct-15 10-Sep-15 30-Nov-15 18-May-16 3-Jan-17 22-May-18 100% 100.0%
A545-121-EA-MR-6335 AIR FIN COOLERS 0.8 18-Jul-15 5-Jun-15 13-Oct-15 7-Aug-15 12-Dec-15 22-Mar-16 15-Jan-17 30-Jan-18 100% 100.0%
A545-111-VV-MR-6405 BALANCE VESSEL 3.8 12-Jun-15 3-Jun-15 22-Sep-15 21-Aug-15 21-Nov-15 22-Apr-16 19-Jan-17 29-Mar-18 100% 100.0%
A545-161-VV-MR-6424 PRESSURE VESSELS 0.1 10-Oct-15 7-Apr-16 19-Jan-16 9-Sep-16 25-Oct-16 5-Sep-17 30-Apr-19 30-Apr-19 100% 100.0%
100 99.9%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-48-00101 TO
C PILE LAYOUT 2.9 25-Mar-15 13-Mar-15 1-Apr-15 20-Mar-15 8-Apr-15 27-Mar-15 12-Apr-15 31-Mar-15 26-Apr-15 18-May-15 11-Jul-15 3-Jun-15 100% 100.0%
00106
A545-181-16-48-00201 TO
C OVERALL FDN LAYOUT 2.6 12-Apr-15 22-May-15 19-Apr-15 25-Jul-15 26-Apr-15 31-Jul-15 30-Apr-15 3-Aug-15 14-May-15 10-Aug-15 29-Jul-15 17-Aug-15 100% 100.0%
00206
MCC PKG GA & R/F DET OF FDN FOR 185/186-
A545-181-16-48-00271 C 0.3 28-Nov-16 18-Jul-17 15-Mar-19 14-Feb-19 22-Mar-19 21-Feb-19 26-Mar-19 28-Feb-19 9-Apr-19 7-Mar-19 10-May-19 7-Mar-19 100% 100.0%
FD-1001/1002, 185/186-LW-1001
MCC PKG GA & R/F DET OF SUPER
A545-181-16-48-00272 C STRUCTURE FOR 185/186-FD-1001/1002, 0.3 1-Dec-16 18-Jul-17 8-Dec-16 14-Feb-19 15-Dec-16 21-Feb-19 19-Dec-16 28-Feb-19 2-Jan-17 7-Mar-19 19-Mar-19 7-Mar-19 100% 100.0%
185/186-LW-1001
A545-181-81-41-01271 GA & R/F DET OF FDN FOR 186-FD-1001 3-Dec-16 20-Jul-17 10-Dec-16 - 17-Dec-16 - 22-Dec-16 - 5-Jan-17 - 21-Mar-17 - 40.0%
A545-181-81-41-01272 GA & R/F DET OF FDN FOR 186-FD-1002 5-Dec-16 20-Jul-17 12-Dec-16 - 19-Dec-16 - 23-Dec-16 - 6-Jan-17 - 23-Mar-17 - 40.0%
A545-181-81-41-01273 GA & R/F DET OF FDN FOR 186-FD-1003/1004 7-Dec-16 22-Jul-17 14-Dec-16 - 21-Dec-16 - 25-Dec-16 - 8-Jan-17 - 25-Mar-17 - 40.0%
A545-181-81-41-01274 GA & R/F DET OF FDN FOR 186-FI-1001/1002 9-Dec-16 22-Jul-17 16-Dec-16 - 23-Dec-16 - 27-Dec-16 - 10-Jan-17 - 27-Mar-17 - 40.0%
A545-181-16-48-00301 C MAIN PIPE RACK GA & R/F DET OF FDN 0.9 8-Jul-15 22-May-15 15-Jul-15 27-Jul-15 22-Jul-15 20-Jul-15 26-Jul-15 27-Jul-15 9-Aug-15 3-Aug-15 24-Oct-15 17-Aug-15 100% 100.0%
A545-181-81-41-10304 C MAIN PIPE RACK GA & R/F OF BEAM 0.6 12-Jul-15 16-May-15 19-Jul-15 23-May-15 26-Jul-15 30-May-15 30-Jul-15 5-Jun-15 13-Aug-15 29-Feb-16 1-Mar-19 21-Dec-18 100% 100.0%
A545-181-81-41-10307 C MAIN PIPE RACK DET. OF INSERT PL 0.4 16-Jul-15 22-May-15 23-Jul-15 31-Jul-15 30-Jul-15 19-Feb-16 3-Aug-15 26-Feb-16 17-Aug-15 31-Mar-16 5-Mar-19 31-Mar-16 100% 100.0%
A545-181-81-41-10310 C BATTERY LIMIT PLATFORM 0.4 20-Jul-15 23-Sep-16 27-Jul-15 7-Oct-16 3-Aug-15 14-Oct-16 7-Aug-15 21-Oct-16 21-Aug-15 10-Nov-16 9-Dec-16 20-May-17 100% 100.0%
A545-181-81-41-10320 C PIPE RACK TYPICAL BASE PLATE DETAIL 0.1 20-Jul-15 22-Jun-18 27-Jul-15 9-Jul-18 3-Aug-15 16-Jul-18 7-Aug-15 23-Jul-18 21-Aug-15 30-Jul-18 9-Mar-19 30-Jul-18 100% 100.0%
A545-181-16-48-00311 TO
C MAIN PIPE RACK 1ST TIER PLAN 1.3 18-Jul-15 9-May-15 25-Jul-15 16-May-15 1-Aug-15 23-May-15 5-Aug-15 28-May-15 19-Aug-15 11-Sep-15 3-Nov-15 30-Sep-15 100% 100.0%
00313
A545-181-16-48-00321 TO
C MAIN PIPE RACK 2ND TIER PLAN 1.3 24-Jul-15 9-May-15 31-Jul-15 16-May-15 7-Aug-15 23-May-15 11-Aug-15 28-May-15 25-Aug-15 11-Sep-15 9-Nov-15 30-Sep-15 100% 100.0%
00323
A545-181-16-48-00331 TO
C MAIN PIPE RACK 3RD TIER PLAN 1.3 30-Jul-15 9-May-15 6-Aug-15 16-May-15 13-Aug-15 23-May-15 17-Aug-15 28-May-15 31-Aug-15 11-Sep-15 15-Nov-15 30-Sep-15 100% 100.0%
00333
A545-181-16-48-00342 C MAIN PIPE RACK COOLER LEVEL PLAN 1.3 5-Aug-15 9-May-15 12-Aug-15 16-May-15 19-Aug-15 23-May-15 23-Aug-15 28-May-15 6-Sep-15 11-Sep-15 21-Nov-15 30-Sep-15 100% 100.0%
A545-181-16-48-02331 C MAIN PIPE RACK ELEVATION GRID H1 1.3 29-Aug-15 25-Jun-15 5-Sep-15 16-Jul-15 12-Sep-15 23-Jul-15 16-Sep-15 30-Jul-15 30-Sep-15 11-Sep-15 15-Dec-15 30-Sep-15 100% 100.0%
A545-181-16-48-04304 BRANCH PIPE RACK GA & R/F OF BEAM 10-09-2015 27-06-2015 =H28+7 31-07-2015 =K28+7 =R28-7 =N28+4 =U28-7 =Q28+14 24-02-2016 =T28+76 -
A545-181-81-41-14307 C BRANCH PIPE RACK DET. OF INSERT PL 0.4 12-Sep-15 31-Jul-15 19-Sep-15 22-Feb-16 26-Sep-15 17-Mar-16 30-Sep-15 24-Mar-16 14-Oct-15 31-Mar-16 2-May-19 31-Mar-16 100% 100.0%
A545-181-16-48-04311 C BRANCH PIPE RACK 1 1ST TIER PLAN 0.4 14-Sep-15 20-Jun-15 21-Sep-15 27-Jul-15 28-Sep-15 3-Aug-15 2-Oct-15 6-Aug-15 16-Oct-15 17-Feb-16 14-Jan-17 13-Feb-17 100% 100.0%
A545-181-16-48-04312 C BRANCH PIPE RACK 1 2ND TIER PLAN 0.4 16-Sep-15 20-Jun-15 23-Sep-15 27-Jul-15 30-Sep-15 3-Aug-15 4-Oct-15 6-Aug-15 18-Oct-15 17-Feb-16 16-Jan-17 13-Feb-17 100% 100.0%
A545-181-81-41-04323 C BRANCH PIPE RACK 1 CROSS SECTION 0.4 28-Sep-15 29-Jun-15 5-Oct-15 27-Jul-15 12-Oct-15 3-Aug-15 16-Oct-15 6-Aug-15 30-Oct-15 17-Feb-16 28-Jan-17 13-Feb-17 100% 100.0%
A545-181-81-41-14324 C BRANCH PIPE RACK 1 STAIRCASE 0.4 28-Sep-15 29-Jun-15 5-Oct-15 27-Jul-15 12-Oct-15 3-Aug-15 16-Oct-15 6-Aug-15 30-Oct-15 29-Feb-16 14-Jan-16 21-Mar-16 100% 100.0%
Page 468 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 9
Jul-19
DRAWING CONTROL INDEX
JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA DISCIPLINE: STRUCTURAL (SULPHUR BLOCK)
ANNEXURE-A6
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-81-41-14325 C BPR 1 - R/F DET. OF BEAMS 0.4 29-Sep-15 29-Jun-15 6-Oct-15 27-Jul-15 13-Oct-15 3-Aug-15 17-Oct-15 6-Aug-15 31-Oct-15 29-Feb-16 20-Mar-19 22-Dec-18 100% 100.0%
A545-181-16-48-04331 C BRANCH PIPE RACK 2 1ST & 2ND TIER PLAN 0.4 2-Oct-15 20-Jun-15 9-Oct-15 17-Jul-15 16-Oct-15 24-Jul-15 20-Oct-15 29-Jul-15 3-Nov-15 14-Oct-15 18-Jan-16 28-Oct-15 100% 100.0%
A545-181-16-48-04332 C BRANCH PIPE RACK 2 3RD & 4TH TIER PLAN 0.4 4-Oct-15 20-Jun-15 11-Oct-15 17-Jul-15 18-Oct-15 24-Jul-15 22-Oct-15 29-Jul-15 5-Nov-15 14-Oct-15 20-Jan-16 28-Oct-15 100% 100.0%
A545-181-81-41-04342 C BRANCH PIPE RACK 2 CROSSSECTION 0.4 14-Oct-15 29-Jun-15 21-Oct-15 17-Jul-15 28-Oct-15 24-Jul-15 2-Nov-15 29-Jul-15 16-Nov-15 14-Oct-15 30-Jan-16 28-Oct-15 100% 100.0%
A545-181-81-41-14344 C BRANCH PIPE RACK 2 STAIRCASE 0.4 14-Oct-15 29-Jun-15 21-Oct-15 3-Feb-16 28-Oct-15 10-Feb-16 2-Nov-15 15-Feb-16 16-Nov-15 29-Feb-16 1-Feb-16 21-Mar-16 100% 100.0%
A545-181-81-41-14345 C BPR 2 - R/F DET. OF BEAMS 0.4 15-Oct-15 29-Jun-15 22-Oct-15 3-Feb-16 29-Oct-15 10-Feb-16 2-Nov-15 15-Feb-16 16-Nov-15 29-Feb-16 5-Apr-19 22-Dec-18 100% 100.0%
A545-181-16-48-05312 C BRANCH PIPE RACK 3 2ND TIER PLAN 0.4 22-Oct-15 20-Jun-15 29-Oct-15 27-Jul-15 5-Nov-15 31-Oct-15 9-Nov-15 4-Nov-15 23-Nov-15 11-Nov-15 6-Feb-16 25-Nov-15 100% 100.0%
A545-181-81-41-05323 C BRANCH PIPE RACK 3 CROSS SECTION 0.4 26-Oct-15 23-Jun-15 2-Nov-15 27-Jul-15 9-Nov-15 31-Oct-15 13-Nov-15 4-Nov-15 27-Nov-15 11-Nov-15 11-Feb-16 25-Nov-15 100% 100.0%
A545-181-81-41-15324 C BRANCH PIPE RACK 3 STAIRCASE 0.4 26-Oct-15 18-Jan-16 2-Nov-15 1-Feb-16 9-Nov-15 8-Feb-16 13-Nov-15 15-Feb-16 27-Nov-15 29-Feb-16 19-Feb-17 28-Sep-17 100% 100.0%
A545-181-81-41-15325 C BPR 3 - R/F DET. OF BEAMS 0.4 27-Oct-15 18-Jan-16 3-Nov-15 1-Feb-16 10-Nov-15 8-Feb-16 14-Nov-15 15-Feb-16 28-Nov-15 29-Feb-16 17-Apr-19 29-Feb-16 100% 100.0%
A545-181-81-41-15331 C BRANCH PIPE RACK 4 PLAN & ELEVATION 0.4 28-Oct-15 8-Jan-16 4-Nov-15 22-Jan-16 11-Nov-15 29-Jan-16 16-Nov-15 5-Feb-16 30-Nov-15 12-Feb-16 22-Feb-17 17-Feb-17 100% 100.0%
A545-181-81-41-16311 C BRANCH PIPE RACK 5 PLAN & ELEVATION 0.4 5-Nov-15 27-Jun-15 12-Nov-15 31-Jul-15 19-Nov-15 29-Jan-16 23-Nov-15 5-Feb-16 7-Dec-15 12-Feb-16 1-Mar-17 24-Apr-17 100% 100.0%
A545-181-81-41-06331 C BRANCH PIPE RACK 6 PLAN & ELEVATION 0.4 7-Nov-15 31-Dec-15 14-Nov-15 14-Jan-16 21-Nov-15 21-Jan-16 25-Nov-15 28-Jan-16 9-Dec-15 4-Feb-16 3-Mar-17 19-Apr-17 100% 100.0%
A545-181-81-41-16332 C BRANCH PIPE RACK 6 ELEVATIONS 0.4 7-Jan-17 15-Mar-17 14-Jan-17 29-Mar-17 21-Jan-17 5-Apr-17 25-Jan-17 12-Apr-17 8-Feb-17 19-Apr-17 25-Apr-19 19-Apr-17 100% 100.0%
A545-181-81-41-17311 C BRANCH PIPE RACK 7 PLAN & ELEVATION 0.4 10-Nov-15 8-Jan-16 17-Nov-15 22-Jan-16 24-Nov-15 29-Jan-16 28-Nov-15 5-Feb-16 12-Dec-15 12-Feb-16 6-Mar-17 25-Apr-17 100% 100.0%
A545-181-81-41-01302 C SPP RACK GA & R/F DET OF FDN 0.1 14-Nov-15 9-Jun-18 21-Nov-15 16-Jun-18 28-Nov-15 23-Jun-18 2-Dec-15 30-Jun-18 16-Dec-15 17-Aug-18 5-Apr-19 17-Aug-18 100% 100.0%
A545-181-81-41-01311 C SPP RACK PLAN AT EL 105 & 106(TOS) 0.1 14-Nov-15 12-Jun-17 21-Nov-15 26-Jun-17 28-Nov-15 3-Jul-17 2-Dec-15 10-Jul-17 16-Dec-15 17-Jul-17 5-Apr-19 17-Jul-17 100% 100.0%
A545-181-81-41-01321 C SPP RACK PLAN AT EL 107,109 & 110 0.1 16-Nov-15 12-Jun-17 23-Nov-15 26-Jun-17 30-Nov-15 3-Jul-17 4-Dec-15 10-Jul-17 18-Dec-15 17-Jul-17 7-Apr-19 17-Jul-17 100% 100.0%
A545-181-81-41-03311 C SPP RACK ELEVATION ALOG GRID 51 & 52 0.1 18-Nov-15 12-Jun-17 25-Nov-15 26-Jun-17 2-Dec-15 3-Jul-17 7-Dec-15 10-Jul-17 21-Dec-15 17-Jul-17 10-Apr-19 17-Jul-17 100% 100.0%
A545-181-81-41-03321 C SPP RACK ELEVATION ALOG GRID U1&Z3 0.1 20-Nov-15 12-Jun-17 27-Nov-15 26-Jun-17 4-Dec-15 3-Jul-17 8-Dec-15 10-Jul-17 22-Dec-15 17-Jul-17 11-Apr-19 17-Jul-17 100% 100.0%
A545-181-81-41-03331 C SPP RACK ELEVATION ALOG GRID V&Z4 0.1 23-Nov-15 12-Jun-17 30-Nov-15 26-Jun-17 7-Dec-15 3-Jul-17 11-Dec-15 10-Jul-17 25-Dec-15 17-Jul-17 14-Apr-19 17-Jul-17 100% 100.0%
A545-181-81-41-09313 C SPP RACK CROSS SECTIONS 0.1 26-Nov-15 12-Jun-17 3-Dec-15 26-Jun-17 10-Dec-15 3-Jul-17 14-Dec-15 10-Jul-17 28-Dec-15 17-Jul-17 17-Apr-19 17-Jul-17 100% 100.0%
A545-181-81-41-38311 C MAIN PIPE RACK MANIFOLD PLAN 0.9 13-Nov-15 31-Jul-15 20-Nov-15 16-Sep-16 27-Nov-15 23-Sep-16 1-Dec-15 30-Sep-16 15-Dec-15 7-Oct-16 9-Mar-17 20-Mar-17 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-81-41-14315 /
C MANIFOLD STRUCTURE FOR BPR-1 0.9 17-Nov-15 31-Jul-15 24-Nov-15 29-Sep-16 1-Dec-15 3-Oct-16 5-Dec-15 10-Oct-16 19-Dec-15 25-Oct-16 13-Mar-17 20-May-17 100% 100.0%
14316
A545-181-81-41-04336 /
C MANIFOLD STRUCTURE FOR BPR-2 0.9 19-Nov-15 31-Jul-15 26-Nov-15 7-Oct-16 3-Dec-15 14-Oct-16 7-Dec-15 21-Oct-16 21-Dec-15 31-Oct-16 15-Mar-17 20-May-17 100% 100.0%
14335
A545-181-16-48-09311 C MAIN PIPE RACK C/S DRAWING 0.9 21-Nov-15 31-Jul-15 28-Nov-15 14-Aug-15 5-Dec-15 21-Aug-15 9-Dec-15 25-Aug-15 23-Dec-15 30-Sep-15 8-Mar-16 30-Sep-15 100% 100.0%
A545-181-81-41-39324 C MAIN PIPE RACK LADDER 0.1 2-Jan-17 13-Feb-17 10-Jan-17 27-Feb-17 17-Jan-17 6-Mar-17 21-Jan-17 13-Mar-17 4-Feb-17 20-Mar-17 2-Mar-19 20-Mar-17 100% 100.0%
A545-181-16-48-00358 C MAIN AIR BLOWER RACK PLAN & ELEVATION 0.4 25-Dec-15 10-Oct-15 6-Dec-16 16-Aug-18 13-Dec-16 23-Aug-18 17-Dec-16 30-Aug-18 31-Dec-16 27-Feb-19 16-Mar-19 27-Feb-19 100% 100.0%
A545-181-16-48-00372 R/F DET OF FDN FOR 185-KA-1001A/B/C 8-Feb-17 21-Jul-17 15-Feb-17 - 22-Feb-17 - 26-Feb-17 - 12-Mar-17 - 27-May-17 - 40.0%
A545-181-16-48-00374 R/F DET OF FDN FOR 185-KA-1002A/B/C 16-Feb-17 24-Jul-17 23-Feb-17 - 2-Mar-17 - 6-Mar-17 - 20-Mar-17 - 4-Jun-17 - 40.0%
A545-181-81-41-01401 C TECH STR - BASE PLATE DETAILS 0.1 21-Mar-17 25-Jul-17 28-Mar-17 16-Aug-18 4-Apr-17 23-Aug-18 8-Apr-17 30-Aug-18 22-Apr-17 6-Sep-18 7-Jul-17 6-Sep-18 100% 100.0%
A545-181-16-48-00402 C TECH STR SADDLE SUPPORT 0.2 21-Mar-17 25-Jul-17 18-Mar-19 23-Feb-19 25-Mar-19 2-Mar-19 29-Mar-19 9-Mar-19 12-Apr-19 16-Mar-19 13-May-19 16-Mar-19 100% 100.0%
A545-181-81-41-30411 C TECH STR-1 R/F DET. OF FDN. 0.4 10-Jun-15 20-Jun-15 17-Jun-15 31-Jul-15 24-Jun-15 2-Nov-15 28-Jun-15 9-Nov-15 12-Jul-15 16-Nov-15 26-Sep-15 30-Nov-15 100% 100.0%
A545-181-16-48-00412 C TECH STR-1 PLANS & ELEVATIONS 0.4 12-Jun-15 30-May-15 19-Jun-15 3-Jul-15 26-Jun-15 17-Jul-15 30-Jun-15 24-Jul-15 14-Jul-15 30-Nov-15 28-Sep-15 19-Jan-16 100% 100.0%
A545-181-16-48-00418 C TECH STR-1 STAIRCASE 0.4 2-Nov-15 25-Jul-15 9-Nov-15 6-Jan-16 16-Nov-15 13-Jan-16 20-Nov-15 20-Jan-16 4-Dec-15 27-Jan-16 18-Feb-16 10-Mar-16 100% 100.0%
A545-181-16-48-00419 TECH STR-1 OPENINGS & PIPE SUPPORTS 04-11-2015 - =H76+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! -
A545-181-81-41-30421 C TECH STR-2 R/F DET. OF FDN. 0.4 24-Jun-15 20-Jun-15 1-Jul-15 31-Jul-15 8-Jul-15 2-Nov-15 12-Jul-15 9-Nov-15 26-Jul-15 16-Nov-15 10-Oct-15 30-Nov-15 100% 100.0%
A545-181-16-48-00422 C TECH STR-2 PLANS & ELEVATIONS 0.4 26-Jun-15 30-May-15 3-Jul-15 3-Jul-15 10-Jul-15 17-Jul-15 14-Jul-15 24-Jul-15 28-Jul-15 30-Nov-15 12-Oct-15 19-Jan-16 100% 100.0%
A545-181-81-41-10428 C TECH STR-2 STAIRCASE 0.4 6-Nov-15 25-Jul-15 13-Nov-15 6-Jan-16 20-Nov-15 13-Jan-16 24-Nov-15 20-Jan-16 8-Dec-15 27-Jan-16 22-Feb-16 10-Mar-16 100% 100.0%
A545-181-16-48-00429 TECH STR-2 OPENING & PIPE SUP. 08-11-2015 - =H80+7 - #VALUE! - #VALUE! - #VALUE! - =T80+76 -
A545-181-81-41-10431 C TECH STR-3 R/F DET. OF FDN. 0.4 8-Jul-15 20-Jun-15 15-Jul-15 31-Jul-15 22-Jul-15 1-Jan-16 26-Jul-15 8-Jan-16 9-Aug-15 15-Jan-16 26-Apr-19 20-Mar-19 100% 100.0%
A545-181-16-48-00432 C TECH STR-3 PLANS & ELEVATIONS 0.4 8-Nov-15 30-May-15 15-Nov-15 15-Jul-15 22-Nov-15 29-Jul-15 26-Nov-15 5-Aug-15 10-Dec-15 22-Jan-16 30-Dec-16 31-Mar-17 100% 100.0%
A545-181-81-41-10438 C TECH STR-3 STAIRCASE 0.4 10-Nov-15 25-Jul-15 17-Nov-15 18-Dec-15 24-Nov-15 25-Dec-15 28-Nov-15 1-Jan-16 12-Dec-15 8-Jan-16 26-Feb-16 22-Jan-16 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-48-00439 TECH STR-3 OPENING & PIPE SUP. 12-11-2015 - =H84+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! -
A545-181-81-41-10441 C TECH STR-4 R/F DET. OF FDN. 0.4 14-Jul-15 25-Jun-15 21-Jul-15 28-Aug-15 28-Jul-15 1-Jan-16 1-Aug-15 8-Jan-16 15-Aug-15 15-Jan-16 2-May-19 18-Mar-19 100% 100.0%
A545-181-16-48-00442 C TECH STR-4 PLANS & ELEVATIONS 0.4 16-Jul-15 27-Jun-15 23-Jul-15 15-Jul-15 30-Jul-15 29-Jul-15 3-Aug-15 5-Aug-15 17-Aug-15 23-Jan-16 4-Jan-17 31-Mar-17 100% 100.0%
A545-181-81-41-10448 C TECH STR-4 STAIRCASE 0.4 14-Nov-15 25-Jul-15 21-Nov-15 26-Dec-15 28-Nov-15 2-Jan-16 2-Dec-15 9-Jan-16 16-Dec-15 16-Jan-16 1-Mar-16 23-Jan-16 100% 100.0%
A545-181-16-48-00449 TECH STR-4 OPENING & PIPE SUP. 16-11-2015 - =H88+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! -
A545-181-81-41-31451 C TECH STR-5 GA & R/F DET. OF FDN. 0.4 17-Jul-15 26-Nov-15 24-Jul-15 10-Dec-15 31-Jul-15 17-Dec-15 4-Aug-15 24-Dec-15 18-Aug-15 31-Dec-15 2-Nov-15 21-Jan-16 100% 100.0%
A545-181-81-41-11452 C TECH STR-5 PLANS & ELEVATIONS 0.4 20-Jul-15 3-Dec-15 27-Jul-15 17-Dec-15 3-Aug-15 24-Dec-15 7-Aug-15 31-Dec-15 21-Aug-15 21-Jan-16 9-Jan-17 19-Apr-17 100% 100.0%
A545-181-16-48-11453 TECH STR-5 STAIRCASE 23-Jul-15 - 30-Jul-15 - 6-Aug-15 - 10-Aug-15 - =Q93+14 - =T93+76 -
A545-181-16-48-11454 TECH STR-5 OPENING & PIPE SUP. 27-07-2015 - =H92+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! -
A545-181-81-41-31461 C TECH STR-6 GA & R/F DET. OF FDN. 0.4 18-Jul-15 26-Nov-15 25-Jul-15 10-Dec-15 1-Aug-15 17-Dec-15 5-Aug-15 24-Dec-15 19-Aug-15 31-Dec-15 3-Nov-15 21-Jan-16 100% 100.0%
A545-181-81-41-11462 C TECH STR-6 PLANS & ELEVATIONS 0.4 22-Jul-15 25-Nov-15 29-Jul-15 9-Dec-15 5-Aug-15 16-Dec-15 9-Aug-15 23-Dec-15 23-Aug-15 31-Dec-15 7-Nov-15 21-Jan-16 100% 100.0%
A545-181-81-41-30471 C TECH STR-7 GA & R/F DET. OF FDN. 0.4 20-Jul-15 26-Nov-15 27-Jul-15 10-Dec-15 3-Aug-15 17-Dec-15 7-Aug-15 24-Dec-15 21-Aug-15 31-Dec-15 5-Nov-15 21-Jan-16 100% 100.0%
A545-181-81-41-10472 C TECH STR-7 PLANS & ELEVATIONS 0.4 24-Jul-15 3-Dec-15 31-Jul-15 17-Dec-15 7-Aug-15 24-Dec-15 11-Aug-15 31-Dec-15 25-Aug-15 20-Jan-16 12-Jan-17 19-Apr-17 100% 100.0%
A545-181-81-41-10458 C GUIDE STR FOR 181-CC-1003 STAIRCASE 0.4 9-Jul-15 25-Jul-15 16-Jul-15 9-Apr-16 23-Jul-15 16-Apr-16 27-Jul-15 23-Apr-16 10-Aug-15 30-Apr-16 25-Feb-17 20-May-17 100% 100.0%
A545-181-81-41-10468 C GUIDE STR FOR 182-CC-1003 STAIRCASE 0.4 9-Jul-15 22-Jan-16 16-Jul-15 9-Apr-16 23-Jul-15 16-Apr-16 27-Jul-15 23-Apr-16 10-Aug-15 30-Apr-16 25-Feb-17 20-May-17 100% 100.0%
A545-181-16-48-30501 C GA & R/F DET. OF FDN. FOR 181-CC-1001 0.1 6-May-15 28-Mar-15 13-May-15 4-Apr-15 20-May-15 11-Apr-15 24-May-15 16-Apr-15 7-Jun-15 10-Jun-15 22-Aug-15 24-Jun-15 100% 100.0%
A545-181-16-48-30502 C GA & R/F DET. OF FDN FOR 181-CC-1002 0.1 9-May-15 28-Mar-15 16-May-15 4-Apr-15 23-May-15 11-Apr-15 27-May-15 16-Apr-15 10-Jun-15 10-Jun-15 25-Aug-15 24-Jun-15 100% 100.0%
A545-181-16-48-30504 C FDN FOR 182-CC-1001 0.1 15-May-15 30-Mar-15 22-May-15 6-Apr-15 29-May-15 13-Apr-15 2-Jun-15 17-Apr-15 16-Jun-15 10-Jun-15 31-Aug-15 24-Jun-15 100% 100.0%
A545-181-16-48-30505 C FDN FOR 182-CC-1002 0.1 18-May-15 30-Mar-15 25-May-15 6-Apr-15 1-Jun-15 13-Apr-15 5-Jun-15 17-Apr-15 19-Jun-15 10-Jun-15 3-Sep-15 24-Jun-15 100% 100.0%
A545-181-16-48-30507 C FDN FOR 183-CC-1001 0.1 24-May-15 30-Mar-15 31-May-15 6-Apr-15 7-Jun-15 13-Apr-15 11-Jun-15 17-Apr-15 25-Jun-15 10-Jun-15 9-Sep-15 24-Jun-15 100% 100.0%
A545-181-16-48-30508 C FDN FOR 184-CC-1001 0.1 27-May-15 30-Mar-15 3-Jun-15 6-Apr-15 10-Jun-15 13-Apr-15 14-Jun-15 17-Apr-15 28-Jun-15 10-Jun-15 12-Sep-15 24-Jun-15 100% 100.0%
A545-181-16-48-30511 C FDN FOR 181-VV-1001 0.1 7-Jun-15 22-Jul-15 14-Jun-15 25-Nov-15 21-Jun-15 2-Dec-15 25-Jun-15 9-Dec-15 9-Jul-15 16-Dec-15 23-Sep-15 21-Jan-16 100% 100.0%
A545-181-16-48-30512 C FDN FOR 181-VV-1002 0.1 9-Jun-15 22-Jul-15 16-Jun-15 22-Aug-15 23-Jun-15 29-Aug-15 27-Jun-15 4-Sep-15 11-Jul-15 19-Sep-15 25-Sep-15 30-Sep-15 100% 100.0%
A545-181-16-48-30513 C FDN FOR 181-VV-1003 0.1 11-Jun-15 22-Jul-15 18-Jun-15 22-Aug-15 25-Jun-15 29-Aug-15 29-Jun-15 4-Sep-15 13-Jul-15 19-Sep-15 27-Sep-15 30-Sep-15 100% 100.0%
A545-181-16-48-30514 C FDN FOR 181-VV-1004 0.1 13-Jun-15 22-Jul-15 20-Jun-15 12-Sep-15 27-Jun-15 19-Sep-15 1-Jul-15 26-Sep-15 15-Jul-15 3-Oct-15 29-Sep-15 16-Oct-15 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-48-30518 C FDN FOR 182-VV-1001 0.1 19-Jun-15 25-Jul-15 26-Jun-15 30-Oct-15 3-Jul-15 6-Nov-15 7-Jul-15 13-Nov-15 21-Jul-15 20-Nov-15 5-Oct-15 20-Jan-16 100% 100.0%
A545-181-16-48-30519 C FDN FOR 182-VV-1002 0.1 21-Jun-15 27-Jul-15 28-Jun-15 22-Aug-15 5-Jul-15 29-Aug-15 9-Jul-15 4-Sep-15 23-Jul-15 19-Sep-15 7-Oct-15 30-Sep-15 100% 100.0%
A545-181-16-48-30520 C FDN FOR 182-VV-1003 A/B 0.1 23-Jun-15 27-Jul-15 30-Jun-15 22-Aug-15 7-Jul-15 29-Aug-15 11-Jul-15 4-Sep-15 25-Jul-15 19-Sep-15 9-Oct-15 30-Sep-15 100% 100.0%
A545-181-16-48-30521 C FDN FOR 182-VV-1004 A/B 0.1 25-Jun-15 13-May-15 2-Jul-15 20-May-15 9-Jul-15 27-May-15 13-Jul-15 3-Jun-15 27-Jul-15 10-Jun-15 11-Oct-15 24-Jun-15 100% 100.0%
A545-181-16-48-30523 C FDN FOR 183-VV-1001 0.1 29-Jun-15 29-Jul-15 6-Jul-15 25-Nov-15 13-Jul-15 2-Dec-15 17-Jul-15 9-Dec-15 31-Jul-15 16-Dec-15 15-Oct-15 19-Jan-16 100% 100.0%
A545-181-16-48-30524 C FDN FOR 183-VV-1002A/B 0.1 1-Jul-15 3-Apr-15 8-Jul-15 10-Apr-15 15-Jul-15 17-Apr-15 19-Jul-15 21-Apr-15 2-Aug-15 10-Jun-15 17-Oct-15 24-Jun-15 100% 100.0%
A545-181-16-48-30525 C FDN FOR 183-VV-1003 0.1 3-Jul-15 3-Apr-15 10-Jul-15 10-Apr-15 17-Jul-15 17-Apr-15 21-Jul-15 21-Apr-15 4-Aug-15 10-Jun-15 19-Oct-15 24-Jun-15 100% 100.0%
A545-181-16-48-30530 C FDN FOR 183-VV-1007 0.1 11-Jul-15 13-May-15 18-Jul-15 20-May-15 25-Jul-15 27-May-15 29-Jul-15 3-Jun-15 12-Aug-15 10-Jun-15 27-Oct-15 24-Jun-15 100% 100.0%
A545-181-16-48-30531 C FDN FOR 184-VV-1001 0.1 13-Jul-15 31-Jul-15 20-Jul-15 30-Oct-15 27-Jul-15 6-Nov-15 31-Jul-15 13-Nov-15 14-Aug-15 20-Nov-15 29-Oct-15 19-Jan-16 100% 100.0%
A545-181-16-48-30532 C FDN FOR 184-VV-1002 0.1 15-Jul-15 13-May-15 22-Jul-15 20-May-15 29-Jul-15 27-May-15 2-Aug-15 3-Jun-15 16-Aug-15 10-Jun-15 31-Oct-15 24-Jun-15 100% 100.0%
A545-181-16-48-31517 C FDN FOR 180-VV-1013 0.1 4-Aug-15 19-Aug-15 11-Aug-15 2-Sep-15 18-Aug-15 9-Sep-15 22-Aug-15 16-Sep-15 5-Sep-15 30-Sep-15 20-Nov-15 30-Sep-15 100% 100.0%
A545-181-16-48-31518 C FDN FOR 180-VV-1014 0.1 6-Aug-15 19-Aug-15 13-Aug-15 2-Sep-15 20-Aug-15 9-Sep-15 24-Aug-15 16-Sep-15 7-Sep-15 30-Sep-15 22-Nov-15 30-Sep-15 100% 100.0%
A545-181-16-48-31519 C FDN FOR 180-VV-1026 0.1 30-Jun-16 14-Aug-15 7-Jul-16 21-Aug-15 14-Jul-16 28-Aug-15 18-Jul-16 2-Sep-15 1-Aug-16 24-Sep-15 16-Oct-16 30-Sep-15 100% 100.0%
A545-181-81-41-01546 C GA & R/f DET. OF OWS/CRWS PIT 0.2 4-Aug-15 5-Aug-15 11-Aug-15 22-Sep-15 18-Aug-15 29-Sep-15 22-Aug-15 7-Oct-15 5-Sep-15 16-Nov-15 20-Nov-15 30-Nov-15 100% 100.0%
A545-181-16-48-00546 C GA & R/F DET FOR UG PIT FOR 180-VV-1002 0.2 8-Aug-15 5-Aug-15 15-Aug-15 22-Sep-15 22-Aug-15 29-Sep-15 26-Aug-15 7-Oct-15 9-Sep-15 5-Dec-15 24-Nov-15 19-Jan-16 100% 100.0%
A545-181-16-48-00547 C GA & R/F DET FOR UG PIT FOR 180-VV-1025 0.2 10-Aug-15 5-Aug-15 17-Aug-15 22-Sep-15 24-Aug-15 29-Sep-15 28-Aug-15 7-Oct-15 11-Sep-15 5-Dec-15 26-Nov-15 19-Jan-16 100% 100.0%
A545-181-16-48-00548 C GA & R/F DET FOR UG PIT FOR 183-VV-1006 0.2 12-Aug-15 5-Aug-15 19-Aug-15 22-Sep-15 26-Aug-15 29-Sep-15 30-Aug-15 7-Oct-15 13-Sep-15 16-Dec-15 28-Nov-15 19-Jan-16 100% 100.0%
A545-181-16-48-00549 C GA & R/F DET FOR UG PIT FOR 185-VV-1007 0.2 14-Aug-15 2-Dec-15 21-Aug-15 9-Dec-15 28-Aug-15 16-Dec-15 1-Sep-15 23-Dec-15 15-Sep-15 30-Dec-15 30-Nov-15 19-Jan-16 100% 100.0%
A545-181-16-48-00550 C GA & R/F DET FOR UG PIT FOR 186-VV-1007 0.2 16-Aug-15 2-Dec-15 23-Aug-15 9-Dec-15 30-Aug-15 16-Dec-15 3-Sep-15 23-Dec-15 17-Sep-15 30-Dec-15 2-Dec-15 19-Jan-16 100% 100.0%
A545-181-16-48-30551 C FDN FOR 181-EE-1001 A/B 0.1 2-Jun-15 20-Jul-15 9-Jun-15 20-Aug-15 16-Jun-15 27-Aug-15 20-Jun-15 31-Aug-15 4-Jul-15 24-Sep-15 18-Sep-15 29-Sep-15 100% 100.0%
A545-181-16-48-30552 C FDN FOR 181-EE-1002 0.1 4-Jun-15 20-Jul-15 11-Jun-15 20-Aug-15 18-Jun-15 27-Aug-15 22-Jun-15 31-Aug-15 6-Jul-15 24-Sep-15 20-Sep-15 29-Sep-15 100% 100.0%
A545-181-16-48-30553 C FDN FOR 181-EE-1003 0.1 6-Jun-15 20-Jul-15 13-Jun-15 22-Aug-15 20-Jun-15 29-Aug-15 24-Jun-15 2-Sep-15 8-Jul-15 24-Sep-15 22-Sep-15 29-Sep-15 100% 100.0%
A545-181-16-48-30554 C FDN FOR 181-EE-1004 0.1 8-Jun-15 20-Jul-15 15-Jun-15 22-Aug-15 22-Jun-15 29-Aug-15 26-Jun-15 2-Sep-15 10-Jul-15 24-Sep-15 24-Sep-15 29-Sep-15 100% 100.0%
A545-181-16-48-30555 C FDN FOR 181-EE-1005 0.1 10-Jun-15 22-Jul-15 17-Jun-15 22-Aug-15 24-Jun-15 29-Aug-15 28-Jun-15 2-Sep-15 12-Jul-15 24-Sep-15 26-Sep-15 29-Sep-15 100% 100.0%
A545-181-16-48-30556 C FDN FOR 182-EE-1001 A/B 0.1 12-Jun-15 22-Jul-15 19-Jun-15 24-Aug-15 26-Jun-15 31-Aug-15 30-Jun-15 4-Sep-15 14-Jul-15 24-Sep-15 28-Sep-15 29-Sep-15 100% 100.0%
A545-181-16-48-30557 C FDN FOR 182-EE-1002 0.1 14-Jun-15 22-Jul-15 21-Jun-15 22-Aug-15 28-Jun-15 29-Aug-15 2-Jul-15 2-Sep-15 16-Jul-15 24-Sep-15 30-Sep-15 29-Sep-15 100% 100.0%
A545-181-16-48-30558 C FDN FOR 182-EE-1003 A/B 0.1 16-Jun-15 22-Jul-15 23-Jun-15 22-Aug-15 30-Jun-15 29-Aug-15 4-Jul-15 2-Sep-15 18-Jul-15 24-Sep-15 2-Oct-15 29-Sep-15 100% 100.0%
A545-181-16-48-30559 C FDN FOR 182-EE-1004 A/B 0.1 18-Jun-15 22-Jul-15 25-Jun-15 30-Sep-15 2-Jul-15 19-Sep-15 6-Jul-15 26-Sep-15 20-Jul-15 3-Oct-15 4-Oct-15 16-Oct-15 100% 100.0%
A545-181-16-48-30560 C FDN FOR 182-EE-1005 A/B 0.1 20-Jun-15 25-Jul-15 27-Jun-15 22-Aug-15 4-Jul-15 29-Aug-15 8-Jul-15 2-Sep-15 22-Jul-15 24-Sep-15 6-Oct-15 29-Sep-15 100% 100.0%
A545-181-16-48-30561 C FDN FOR 183-EE-1001 A/B 0.1 22-Jun-15 15-Nov-16 29-Jun-15 22-Nov-16 6-Jul-15 29-Nov-16 10-Jul-15 6-Dec-16 15-Dec-16 13-Dec-16 20-Apr-19 13-Dec-16 100% 100.0%
A545-181-16-48-30562 C FDN FOR 184-EE-1001 A/B 0.1 24-Jun-15 15-Nov-16 1-Jul-15 22-Nov-16 8-Jul-15 29-Nov-16 12-Jul-15 6-Dec-16 17-Dec-16 13-Dec-16 22-Apr-19 13-Dec-16 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-48-30566 C FDN FOR 185-EE-1002 0.1 26-Jun-15 25-Jul-15 3-Jul-15 22-Aug-15 10-Jul-15 29-Aug-15 14-Jul-15 4-Sep-15 28-Jul-15 24-Sep-15 12-Oct-15 29-Sep-15 100% 100.0%
A545-181-16-48-30576 C FDN FOR 186-EE-1002 0.1 26-Jul-15 29-Jul-15 2-Aug-15 22-Aug-15 9-Aug-15 29-Aug-15 13-Aug-15 4-Sep-15 27-Aug-15 24-Sep-15 11-Nov-15 29-Sep-15 100% 100.0%
A545-181-81-41-31520 C FDN FOR 180-VV-1027 0.1 28-Jul-15 1-Aug-16 4-Aug-15 8-Aug-16 11-Aug-15 15-Aug-16 15-Aug-15 22-Aug-16 29-Aug-15 29-Aug-16 17-Dec-16 28-Sep-17 100% 100.0%
A545-181-16-48-30581 TO
C FDN FOR SKIDS 0.2 16-Dec-16 22-Jun-18 4-Mar-19 - 11-Mar-19 - 15-Mar-19 - 29-Mar-19 - 29-Apr-19 - 100% 40.0%
30587
A545-181-16-48-30591 C FDN FOR 183-GN-1001A/B 0.1 3-Jul-15 23-Aug-16 10-Jul-15 30-Aug-16 17-Jul-15 6-Sep-16 21-Jul-15 13-Sep-16 4-Aug-15 26-Oct-16 2-Mar-17 28-Aug-18 100% 100.0%
A545-181-16-48-30592 C FDN FOR 183-GN-1002A/B 0.1 6-Jul-15 23-Aug-16 13-Jul-15 30-Aug-16 20-Jul-15 6-Sep-16 24-Jul-15 13-Sep-16 7-Aug-15 26-Oct-16 6-Mar-17 28-Aug-18 100% 100.0%
A545-181-16-48-30593 C FDN FOR 183-GN-1003A/B 0.1 9-Jul-15 23-Aug-16 16-Jul-15 30-Aug-16 23-Jul-15 6-Sep-16 27-Jul-15 13-Sep-16 10-Aug-15 26-Oct-16 8-Mar-17 28-Aug-18 100% 100.0%
A545-181-16-48-30594 C FDN FOR 183-GN-1004A/B 0.1 12-Jul-15 23-Aug-16 19-Jul-15 30-Aug-16 26-Jul-15 6-Sep-16 30-Jul-15 13-Sep-16 13-Aug-15 26-Oct-16 11-Mar-17 28-Aug-18 100% 100.0%
A545-181-16-48-30595 C FDN FOR 183-GN-1005 0.1 15-Jul-15 23-Aug-16 22-Jul-15 30-Aug-16 29-Jul-15 6-Sep-16 2-Aug-15 13-Sep-16 16-Aug-15 26-Oct-16 14-Mar-17 28-Aug-18 100% 100.0%
A545-181-16-48-30597 C FDN FOR 184-GN-1001A/B 0.1 18-Jul-15 23-Aug-16 25-Jul-15 30-Aug-16 1-Aug-15 6-Sep-16 5-Aug-15 13-Sep-16 19-Aug-15 26-Oct-16 17-Mar-17 28-Aug-18 100% 100.0%
A545-181-16-48-30598 C FDN FOR 184-GN-1002A/B 0.1 21-Jul-15 23-Aug-16 28-Jul-15 30-Aug-16 4-Aug-15 6-Sep-16 8-Aug-15 13-Sep-16 22-Aug-15 26-Oct-16 20-Mar-17 28-Aug-18 100% 100.0%
A545-181-16-48-30601 C FDN FOR PUMPS 181-PA-1002A/B 0.0 15-Dec-15 23-Oct-15 22-Dec-15 26-May-16 29-Dec-15 4-Jun-16 2-Jan-16 11-Jun-16 6-Apr-17 23-Oct-18 2-Apr-19 23-Oct-18 100% 100.0%
A545-181-16-48-30602 C FDN FOR PUMPS 181-PA-1003A/B 0.0 17-Dec-15 23-Oct-15 24-Dec-15 26-May-16 31-Dec-15 4-Jun-16 4-Jan-16 11-Jun-16 8-Apr-17 26-Dec-18 4-Apr-19 26-Dec-18 100% 100.0%
A545-181-16-48-30603 C FDN FOR PUMPS 181-PA-1004A/B 0.0 19-Dec-15 23-Oct-15 26-Dec-15 26-May-16 2-Jan-16 4-Jun-16 6-Jan-16 11-Jun-16 10-Apr-17 23-Oct-18 6-Apr-19 23-Oct-18 100% 100.0%
A545-181-16-48-30604 C FDN FOR PUMPS 181-PA-1005A/B 0.0 21-Dec-15 23-Oct-15 28-Dec-15 26-May-16 4-Jan-16 4-Jun-16 8-Jan-16 11-Jun-16 12-Apr-17 23-Oct-18 8-Apr-19 23-Oct-18 100% 100.0%
A545-181-16-48-30605 C FDN FOR PUMPS 181-PA-1006A/B 0.0 23-Dec-15 26-Oct-15 30-Dec-15 26-May-16 6-Jan-16 4-Jun-16 10-Jan-16 11-Jun-16 14-Apr-17 23-Oct-18 10-Apr-19 23-Oct-18 100% 100.0%
A545-181-16-48-30606 C FDN FOR PUMPS 181-PA-1007A/B 0.0 25-Dec-15 26-Oct-15 1-Jan-16 27-May-16 8-Jan-16 4-Jun-16 12-Jan-16 11-Jun-16 16-Apr-17 13-Sep-18 12-Apr-19 13-Sep-18 100% 100.0%
A545-181-81-41-30607 C FDN FOR PUMPS 180-PA-1013A/B 0.0 29-Dec-15 26-Oct-15 5-Jan-16 27-May-16 12-Jan-16 4-Jun-16 16-Jan-16 11-Jun-16 20-Apr-17 17-Jul-18 16-Apr-19 17-Jul-18 100% 100.0%
A545-181-16-48-30608 C FDN FOR PUMPS 180-PA-1003 A/B 0.0 29-Dec-15 26-Oct-15 5-Jan-16 27-May-16 12-Jan-16 4-Jun-16 16-Jan-16 11-Jun-16 20-Apr-17 16-Jul-18 16-Apr-19 16-Jul-18 100% 100.0%
A545-181-16-48-30612 C FDN FOR PUMPS 182-PA-1002A/B 0.0 6-Jan-16 28-Oct-15 13-Jan-16 27-May-16 20-Jan-16 4-Jun-16 24-Jan-16 11-Jun-16 28-Apr-17 13-Sep-18 24-Apr-19 13-Sep-18 100% 100.0%
A545-181-16-48-30613 C FDN FOR PUMPS 182-PA-1003A/B 0.0 8-Jan-16 28-Oct-15 15-Jan-16 27-May-16 22-Jan-16 4-Jun-16 26-Jan-16 11-Jun-16 30-Apr-17 23-Oct-18 26-Apr-19 23-Oct-18 100% 100.0%
A545-181-16-48-30614 C FDN FOR PUMPS 182-PA-1004A/B 0.0 10-Jan-16 28-Oct-15 17-Jan-16 27-May-16 24-Jan-16 4-Jun-16 28-Jan-16 11-Jun-16 2-May-17 13-Sep-18 28-Apr-19 13-Sep-18 100% 100.0%
A545-181-16-48-30615 C FDN FOR PUMPS 182-PA-1005A/B 0.0 12-Jan-16 28-Oct-15 19-Jan-16 27-May-16 26-Jan-16 4-Jun-16 30-Jan-16 11-Jun-16 4-May-17 13-Sep-18 30-Apr-19 13-Sep-18 100% 100.0%
A545-181-16-48-30617 C FDN FOR PUMPS 182-PA-1007 A/B 0.0 14-Jan-16 28-Oct-15 21-Jan-16 27-May-16 28-Jan-16 4-Jun-16 1-Feb-16 11-Jun-16 6-May-17 20-Sep-18 2-May-19 20-Sep-18 100% 100.0%
A545-181-16-48-30616 C FDN FOR PUMPS 182-PA-1006A/B 0.0 14-Jan-16 28-Oct-15 21-Jan-16 30-May-16 28-Jan-16 2-Jul-18 1-Feb-16 9-Jul-18 6-May-17 16-Jul-18 2-May-19 16-Jul-18 100% 100.0%
A545-181-16-48-30618 C FDN FOR PUMPS 182-PA-1008A/B 0.0 18-Jan-16 29-Oct-15 25-Jan-16 30-May-16 1-Feb-16 4-Jun-16 5-Feb-16 11-Jun-16 10-May-17 5-Jun-18 6-May-19 5-Jun-18 100% 100.0%
A545-181-16-48-30619 C FDN FOR PUMPS 183-PA-1002A/B 0.0 20-Jan-16 29-Oct-15 27-Jan-16 30-May-16 3-Feb-16 4-Jun-16 7-Feb-16 11-Jun-16 12-May-17 13-Sep-18 8-May-19 13-Sep-18 100% 100.0%
A545-181-16-48-30620 C FDN FOR PUMPS 183-PA-1003A/B 0.0 22-Jan-16 29-Oct-15 29-Jan-16 30-May-16 5-Feb-16 4-Jun-16 9-Feb-16 11-Jun-16 14-May-17 13-Sep-18 10-May-19 13-Sep-18 100% 100.0%
A545-181-16-48-30621 C FDN FOR PUMPS 183-PA-1004A/B 0.0 24-Jan-16 29-Oct-15 31-Jan-16 30-May-16 7-Feb-16 4-Jun-16 11-Feb-16 11-Jun-16 16-May-17 5-Jun-18 12-May-19 5-Jun-18 100% 100.0%
A545-181-16-48-30622 C FDN FOR PUMPS 183-PA-1005 0.0 26-Jan-16 29-Oct-15 2-Feb-16 30-May-16 9-Feb-16 4-Jun-16 13-Feb-16 11-Jun-16 18-May-17 5-Jun-18 14-May-19 5-Jun-18 100% 100.0%
A545-181-16-48-30623 C FDN FOR PUMPS 183-PA-1006A/B 0.0 28-Jan-16 29-Oct-15 4-Feb-16 31-May-16 11-Feb-16 4-Jun-16 15-Feb-16 11-Jun-16 20-May-17 5-Jun-18 16-May-19 5-Jun-18 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-48-30624 C FDN FOR PUMPS 183-PA-1007 0.0 30-Jan-16 31-Oct-15 6-Feb-16 31-May-16 13-Feb-16 4-Jun-16 17-Feb-16 11-Jun-16 22-May-17 5-Jun-18 18-May-19 5-Jun-18 100% 100.0%
A545-181-16-48-30626 C FDN FOR PUMPS 184-PA-1002A/B 0.0 3-Feb-16 31-Oct-15 10-Feb-16 31-May-16 17-Feb-16 4-Jun-16 21-Feb-16 11-Jun-16 26-May-17 13-Sep-18 22-May-19 13-Sep-18 100% 100.0%
A545-181-16-48-30627 C FDN FOR PUMPS 184-PA-1003A/B 0.0 5-Feb-16 31-Oct-15 12-Feb-16 31-May-16 19-Feb-16 4-Jun-16 23-Feb-16 11-Jun-16 28-May-17 13-Sep-18 24-May-19 13-Sep-18 100% 100.0%
A545-181-16-48-30628 C FDN FOR PUMPS 184-PA-1004A/B 0.0 7-Feb-16 31-Oct-15 14-Feb-16 31-May-16 21-Feb-16 4-Jun-16 25-Feb-16 11-Jun-16 30-May-17 13-Sep-18 26-May-19 13-Sep-18 100% 100.0%
A545-181-16-48-30630 C FDN FOR PUMPS 185-PA-1005A/B 0.0 11-Feb-16 31-Oct-15 18-Feb-16 31-May-16 25-Feb-16 4-Jun-16 29-Feb-16 11-Jun-16 3-Jun-17 26-Dec-18 30-May-19 26-Dec-18 100% 100.0%
A545-181-81-41-30609 C FDN FOR PUMPS 185-PA-1006A/B 0.0 11-Feb-16 31-Oct-15 18-Feb-16 31-May-16 25-Feb-16 3-Jul-18 29-Feb-16 10-Jul-18 3-Jun-17 17-Jul-18 30-May-19 17-Jul-18 100% 100.0%
A545-181-81-41-30610 C FDN FOR PUMPS 186-PA-1006A/B 0.0 11-Feb-16 31-Oct-15 18-Feb-16 31-May-16 25-Feb-16 3-Jul-18 29-Feb-16 10-Jul-18 3-Jun-17 17-Jul-18 30-May-19 17-Jul-18 100% 100.0%
A545-181-16-48-00701 C PLTF. & LADDER FOR 181-CC-1001 0.3 3-Mar-16 10-Sep-15 10-Mar-16 17-Sep-15 17-Mar-16 24-Sep-15 21-Mar-16 1-Oct-15 4-Apr-16 9-Oct-15 19-Jun-16 25-Jun-16 100% 100.0%
A545-181-16-48-00704 C PLTF. & LADDER FOR 181-CC-1002 0.3 12-Mar-16 8-Jul-15 19-Mar-16 15-Jul-15 26-Mar-16 22-Jul-15 30-Mar-16 29-Jul-15 13-Apr-16 5-Aug-15 28-Jun-16 20-Jun-16 100% 100.0%
A545-181-16-48-00710 C PLTF. & LADDER FOR 182-CC-1001 0.3 30-Mar-16 25-Sep-15 6-Apr-16 2-Oct-15 13-Apr-16 9-Oct-15 17-Apr-16 13-Oct-15 1-May-16 20-Oct-15 16-Jul-16 24-Jun-16 100% 100.0%
A545-181-16-48-00713 TO
C PLTF. & LADDER FOR 182-CC-1002 0.3 8-Apr-16 25-Sep-15 15-Apr-16 5-Oct-15 22-Apr-16 12-Oct-15 26-Apr-16 16-Oct-15 10-May-16 23-Oct-15 25-Jul-16 23-Jun-16 100% 100.0%
00714
A545-181-16-48-00719 C PLTF. & LADDER FOR 183-CC-1001 0.3 26-Apr-16 25-Sep-15 3-May-16 5-Oct-15 10-May-16 12-Oct-15 14-May-16 16-Oct-15 28-May-16 23-Oct-15 12-Aug-16 30-May-16 100% 100.0%
A545-181-16-48-10722 TO
C PLTF. & LADDER FOR 184-CC-1001 0.3 5-May-16 25-Sep-15 12-May-16 2-Oct-15 19-May-16 9-Oct-15 23-May-16 13-Oct-15 6-Jun-16 20-Oct-15 21-Aug-16 31-May-16 100% 100.0%
10723
A545-181-81-41-30731 C PLTF.& LADDER FOR 181-VV-1001 0.3 4-Apr-16 25-Sep-15 11-Apr-16 20-Oct-15 18-Apr-16 22-Oct-15 22-Apr-16 29-Oct-15 6-May-16 5-Nov-15 21-Jul-16 29-Jun-16 100% 100.0%
A545-181-81-41-30738 C PLTF. & LADDER FOR 182-VV-1001 0.3 20-Apr-16 25-Sep-15 27-Apr-16 3-Feb-16 4-May-16 10-Feb-16 8-May-16 17-Feb-16 22-May-16 31-Mar-16 6-Aug-16 30-Jun-16 100% 100.0%
A545-181-81-41-30743 C PLTF. & LADDER FOR 183-VV-1001 0.3 28-Apr-16 28-Sep-15 5-May-16 10-Mar-16 12-May-16 17-Mar-16 16-May-16 24-Mar-16 30-May-16 31-Mar-16 14-Aug-16 30-Jun-16 100% 100.0%
A545-181-16-48-10744 C PLTF. & LADDER FOR 183-VV-1002A 0.3 30-Apr-16 28-Sep-15 7-May-16 29-Sep-15 14-May-16 6-Oct-15 18-May-16 13-Oct-15 1-Jun-16 20-Oct-15 16-Aug-16 11-May-16 100% 100.0%
A545-181-16-48-10745 C PLTF. & LADDER FOR 183-VV-1002B 0.3 2-May-16 28-Sep-15 9-May-16 29-Sep-15 16-May-16 6-Oct-15 20-May-16 13-Oct-15 3-Jun-16 20-Oct-15 18-Aug-16 11-May-16 100% 100.0%
A545-181-16-48-10746 C PLTF. & LADDER FOR 183-VV-1003 0.3 4-May-16 28-Sep-15 11-May-16 29-Sep-15 18-May-16 6-Oct-15 22-May-16 13-Oct-15 5-Jun-16 20-Oct-15 20-Aug-16 11-May-16 100% 100.0%
A545-181-16-48-10749 C PLTF.& LADDER FOR 183-VV-1007 0.3 10-May-16 30-Sep-15 17-May-16 10-Mar-16 24-May-16 17-Mar-16 28-May-16 24-Mar-16 11-Jun-16 31-Mar-16 26-Aug-16 17-Jun-16 100% 100.0%
A545-181-81-41-30750 C PLTF.& LADDER FOR 184-VV-1001 0.3 12-May-16 30-Sep-15 19-May-16 10-Mar-16 26-May-16 17-Mar-16 30-May-16 24-Mar-16 13-Jun-16 31-Mar-16 28-Aug-16 30-Jun-16 100% 100.0%
A545-181-16-48-10751 C PLTF.& LADDER FOR 184-VV-1002 0.3 14-May-16 30-Sep-15 21-May-16 29-Sep-15 28-May-16 6-Oct-15 1-Jun-16 13-Oct-15 15-Jun-16 20-Oct-15 30-Aug-16 17-Jun-16 100% 100.0%
A545-181-81-41-10770 C PLTF. & LADDER FOR 180-VV-1013 0.3 13-Jun-16 30-Sep-15 20-Jun-16 29-Jan-16 27-Jun-16 5-Feb-16 1-Jul-16 12-Feb-16 15-Jul-16 19-Mar-16 29-Sep-16 16-Jun-16 100% 100.0%
A545-181-81-41-10772 C PLTF. & LADDER FOR 180-VV-1014 0.3 15-Jun-16 30-Sep-15 22-Jun-16 29-Jan-16 29-Jun-16 5-Feb-16 3-Jul-16 12-Feb-16 17-Jul-16 19-Mar-16 1-Oct-16 16-Jun-16 100% 100.0%
A545-181-81-41-30774 C PLTF. & LADDER FOR 180-VV-1026 0.3 19-Jun-16 15-Sep-15 26-Jun-16 29-Sep-15 3-Jul-16 6-Oct-15 7-Jul-16 13-Oct-15 21-Jul-16 20-Oct-15 5-Oct-16 29-Jun-16 100% 100.0%
A545-181-16-48-30806 E MATERIAL TAKE OFF STRL STEEL 0.3 14-Apr-15 10-Apr-15 21-Apr-15 - 28-Apr-15 - 2-May-15 - 16-May-15 - 31-Jul-17 31-Mar-18 100% 100.0%
A545-181-16-48-30807 MATERIAL TAKE OFF RCC QUANTITY 4/25/2015 4/15/2015 =H197+7 - #VALUE! - #VALUE! - #VALUE! - #VALUE! -
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-48-00911 C SULPHUR BAGGING BUILDING PILE LAYOUT 0.4 8-Jun-15 14-Dec-15 15-Jun-15 28-Dec-15 22-Jun-15 8-Jan-16 26-Jun-15 15-Jan-16 10-Jul-15 22-Jan-16 24-Sep-15 22-Jan-16 100% 100.0%
A545-181-81-41-02038 C SULPHUR BAGGING BUILDING ELEVATIONS 0.1 10-Jun-15 14-Dec-15 17-Jun-15 28-Dec-15 24-Jun-15 24-Jan-19 28-Jun-15 31-Jan-19 12-Jul-15 7-Feb-19 29-Mar-19 7-Feb-19 100% 100.0%
A545-181-81-41-10931 C MCC CONTROL ROOM PILE LAYOUT 0.4 18-Jul-15 17-Dec-15 25-Jul-15 31-Dec-15 1-Aug-15 8-Jan-16 5-Aug-15 15-Jan-16 19-Aug-15 22-Jan-16 21-Mar-17 26-Feb-16 100% 100.0%
A545-181-81-41-10933 C MCC CONTROL ROOM SUPERSTRUCTURE 0.4 20-Jul-15 17-Dec-15 27-Jul-15 31-Dec-15 3-Aug-15 11-Jan-16 7-Aug-15 18-Jan-16 21-Aug-15 26-Feb-16 19-Mar-19 26-Feb-16 100% 100.0%
A545-181-81-41-12511 C FDN FOR 181-TT-1001 0.1 18-Apr-15 16-Sep-15 25-Apr-15 30-Sep-15 2-May-15 7-Oct-15 6-May-15 14-Oct-15 20-May-15 31-Dec-15 4-Aug-15 18-Jan-16 100% 100.0%
A545-181-81-41-12512 C FDN FOR 182-TT-1001A/B 0.1 21-Apr-15 3-Dec-15 28-Apr-15 10-Dec-15 5-May-15 17-Dec-15 9-May-15 24-Dec-15 23-May-15 31-Dec-15 7-Aug-15 18-Jan-16 100% 100.0%
A545-181-81-41-12513 C FDN FOR 183-TT-1001 0.1 24-Apr-15 16-Sep-15 1-May-15 30-Sep-15 8-May-15 7-Oct-15 12-May-15 14-Oct-15 26-May-15 30-Nov-15 10-Aug-15 18-Jan-16 100% 100.0%
A545-181-81-41-12514 C FDN FOR 183-TT-1002 0.1 27-Apr-15 16-Sep-15 4-May-15 30-Sep-15 11-May-15 7-Oct-15 15-May-15 14-Oct-15 29-May-15 30-Nov-15 13-Aug-15 18-Jan-16 100% 100.0%
A545-181-81-41-12515 C FDN FOR 183-TT-1003 0.1 30-Apr-15 16-Sep-15 7-May-15 30-Sep-15 14-May-15 7-Oct-15 18-May-15 14-Oct-15 1-Jun-15 30-Nov-15 15-Aug-15 18-Jan-16 100% 100.0%
A545-181-81-41-12516 C FDN FOR 185-TT-1001A/B 0.1 3-May-15 16-Sep-15 10-May-15 30-Sep-15 17-May-15 7-Oct-15 21-May-15 14-Oct-15 4-Jun-15 30-Nov-15 19-Aug-15 18-Jan-16 100% 100.0%
A545-181-16-48-30631 C FDN FOR PUMPS 187-PA-1001 A/B 0.0 3-May-17 28-Jul-17 10-May-17 28-Aug-17 17-May-17 21-Apr-18 22-May-17 28-Apr-18 15-Aug-19 - 31-Aug-19 - 80% 80.0%
A545-181-16-48-30632 C FDN FOR PUMPS 187-PA-1002 A/B 0.0 6-May-17 28-Jul-17 13-May-17 28-Aug-17 20-May-17 21-Apr-18 25-May-17 28-Apr-18 10-Mar-19 19-Mar-19 10-Apr-19 19-Mar-19 100% 100.0%
A545-181-16-48-10379 C GA OF FDN FOR BLOWERS 187-BL-1001 A/B 0.0 10-May-17 24-Jul-17 17-May-17 28-Aug-17 18-Mar-19 3-May-19 23-Mar-19 10-May-19 6-Apr-19 15-May-19 31-Aug-19 - 85% 85.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-48-31521 C FDN FOR VESSEL 187-VV-1002 0.1 17-Feb-17 25-Jul-17 24-Feb-17 28-Aug-17 16-Mar-19 5-Mar-19 21-Mar-19 12-Mar-19 4-Apr-19 19-Mar-19 5-May-19 19-Mar-19 100% 100.0%
A545-181-81-41-38345 C TRESTLE TR-1 PLAN, ELEVATION & CR SEC 0.1 25-Feb-17 26-May-17 4-Mar-17 2-Jun-17 11-Mar-17 9-Jun-17 15-Mar-17 16-Jun-17 29-Mar-17 23-Jun-17 12-Jun-17 30-Jun-17 100% 100.0%
A545-181-81-41-01482 C PLTF STR B/W S TANK PLAN & ELEVATIONS 0.1 27-Feb-17 26-May-17 6-Mar-17 2-Jun-17 13-Mar-17 9-Jun-17 17-Mar-17 16-Jun-17 31-Mar-17 23-Jun-17 14-Jun-17 30-Jun-17 100% 100.0%
A545-181-81-41-30809 C PUMP PILE CAP DET. SAND FILLING & RF DET 0.1 3-Mar-17 3-Sep-18 10-Mar-17 10-Sep-18 17-Mar-17 17-Sep-18 21-Mar-17 24-Sep-18 4-Apr-17 1-Oct-18 4-Apr-19 1-Oct-18 100% 100.0%
A545-181-16-48-MM02 E MR/TENDER & CO-ORDINATION 9.3 2-Feb-15 18-Feb-15 - - - - - - - - 16-Jun-16 31-Oct-16 100% 100.0%
100 #VALUE!
ANNEXURE-A6
A545-181-16-50-01010 C CABLE LAYOUT SULPHUR BLOCK 7.5 13-Nov-15 17-Aug-15 4-Dec-15 31-Aug-15 11-Dec-15 9-Jan-17 18-Dec-15 16-Jan-17 1-Jan-16 23-Jan-17 12-Dec-16 4-Sep-18 100% 100.0%
A545-181-16-50-40010 C CABLE SCHEDULE (MV) 3.7 11-Apr-16 6-Jul-15 25-Apr-16 31-Jul-15 2-May-16 24-Aug-15 9-May-16 31-Aug-15 23-May-16 15-Sep-15 20-Mar-17 31-Mar-17 100% 100.0%
A545-181-16-50-40020 C CABLE SCHEDULE (LV) 7.5 15-Apr-16 25-Aug-15 29-Apr-16 30-Nov-15 6-May-16 15-Jan-16 13-May-16 22-Jan-16 27-May-16 29-Jan-16 24-Mar-17 31-Mar-17 100% 100.0%
A545-181-16-50-40030 C CABLE SCHEDULE (PA/FA) 1.5 19-Apr-16 31-Aug-15 3-May-16 4-Jan-16 10-May-16 11-Jan-16 17-May-16 18-Jan-16 31-May-16 25-Jan-16 20-Jul-16 1-Apr-16 100% 100.0%
A545-181-16-50-40040 C INTERCONNECTION DIAGRAM M.V 3.7 23-Apr-16 12-May-16 7-May-16 26-May-16 14-May-16 2-Jun-16 21-May-16 9-Jun-16 4-Jun-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-181-16-50-40050 C INTERCONNECTION DIAGRAM L.V 3.7 5-Jan-17 22-May-17 6-Mar-19 16-Apr-19 13-Mar-19 23-Apr-19 20-Mar-19 30-Apr-19 15-Aug-19 - 31-Aug-19 - 80% 80.0%
A545-181-16-50-42020 C PANEL SCHEDULE 1.1 7-Apr-16 28-Oct-15 21-Apr-16 5-Feb-16 28-Apr-16 12-Feb-16 5-May-16 19-Feb-16 19-May-16 26-Feb-16 15-Apr-17 30-Dec-17 100% 100.0%
A545-181-16-50-02061 C LIGHTING LAYOUT COLUMNS 1.2 2-Feb-16 19-Sep-15 16-Feb-16 3-Oct-15 23-Feb-16 9-Oct-15 1-Mar-16 16-Oct-15 15-Mar-16 30-Oct-15 4-May-16 30-Nov-15 100% 100.0%
A545-181-16-50-02062 C LIGHTING LAYOUT COLUMNS 1.2 2-Feb-16 19-Sep-15 16-Feb-16 3-Oct-15 23-Feb-16 9-Oct-15 1-Mar-16 16-Oct-15 15-Mar-16 30-Oct-15 4-May-16 30-Nov-15 100% 100.0%
A545-181-16-50-02063 C LIGHTING LAYOUT VESSELS 1.2 2-Feb-16 19-Sep-15 16-Feb-16 3-Oct-15 23-Feb-16 9-Oct-15 1-Mar-16 16-Oct-15 15-Mar-16 30-Oct-15 4-May-16 30-Nov-15 100% 100.0%
A545-181-16-50-02100 C LIGHTING LAYOUT WARE HOUSE 2.8 28-Feb-16 19-Sep-15 14-Mar-16 3-Oct-15 21-Mar-16 9-Oct-15 28-Mar-16 16-Oct-15 11-Apr-16 30-Oct-15 31-May-16 27-Nov-15 100% 100.0%
A545-181-16-50-02011 C LIGHTING LAYOUT SULPHUR BLOCK 0.9 21-Feb-16 28-Aug-15 7-Mar-16 5-Feb-16 14-Mar-16 12-Feb-16 21-Mar-16 19-Feb-16 4-Apr-16 26-Feb-16 1-Mar-17 12-Sep-17 100% 100.0%
A545-181-16-50-02012 C LIGHTING LAYOUT SULPHUR BLOCK 0.9 21-Feb-16 28-Aug-15 7-Mar-16 5-Feb-16 14-Mar-16 12-Feb-16 21-Mar-16 19-Feb-16 4-Apr-16 26-Feb-16 1-Mar-17 12-Sep-17 100% 100.0%
A545-181-16-50-03011 C EARTHING LAYOUT SULPHUR BLOCK 1.9 29-Jan-16 10-Aug-15 12-Feb-16 31-Aug-15 19-Feb-16 7-Sep-15 26-Feb-16 14-Sep-15 11-Mar-16 21-Sep-15 4-Feb-17 7-Jul-17 100% 100.0%
A545-181-16-50-03012 C EARTHING LAYOUT SULPHUR BLOCK 1.9 29-Jan-16 10-Aug-15 12-Feb-16 31-Aug-15 19-Feb-16 7-Sep-15 26-Feb-16 14-Sep-15 11-Mar-16 21-Sep-15 4-Feb-17 7-Jul-17 100% 100.0%
FIRE ALARM & DETECTION SYSTEM
A545-181-16-50-05010 C AND PLANT COMMUNICATION SYSTEM 3.7 24-Feb-16 9-Jul-15 9-Mar-16 23-Jul-15 16-Mar-16 30-Jul-15 23-Mar-16 6-Aug-15 6-Apr-16 20-Aug-15 26-May-16 4-Sep-15 100% 100.0%
LAYOUT
FIRE ALARM LAYOUT FOR BAGGING
A545-181-16-50-05100 C 3.7 26-Feb-16 19-Oct-15 11-Mar-16 2-Nov-15 18-Mar-16 9-Nov-15 25-Mar-16 16-Nov-15 8-Apr-16 30-Nov-15 31-Aug-19 - 85% 90.0%
BUILDING
A545-181-16-50-15090 C FA / PA PELLET MCC ROOM 3.7 27-Feb-16 16-Oct-15 12-Mar-16 30-Oct-15 19-Mar-16 6-Nov-15 26-Mar-16 13-Nov-15 9-Apr-16 27-Nov-15 31-Aug-19 - 85% 90.0%
A545-181-16-50-40081 C RELAY SETTING SULPHUR BLOCK 0.1 4-Mar-19 - 3-Aug-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 10%
A545-181-16-50-CL-3601 E HAZOP SOURCE LIST 0.1 1-Dec-16 11-Jan-17 16-Dec-16 18-Jan-17 23-Dec-16 25-Jan-17 30-Dec-16 1-Feb-17 13-Jan-17 8-Feb-17 27-Jan-17 15-Feb-17 100% 100.0%
100 97.6%
TOTAL TOTAL
INCORPORATE COMMENTS UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS (SCHD. (ACTUAL
DRAWING/ DOCUMENT & ISSUE FOR ENGG. / ENGG. / CONSTRUCTION
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) PROGRESS PROGRESS
NO. CONSTRUCTION (85%) (100%)
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-181-16-51-00801 C INSTRUMENT CABLE DUCT /TRENCH LAYOUT 3.4 5-Mar-15 15-Apr-15 4-Apr-15 28-Apr-15 11-Apr-15 9-May-15 25-Apr-15 23-May-15 9-May-15 15-Jun-15 8-Jul-15 19-Jun-15 100% 100.0%
A545-181-16-51-II02 C INSTRUMENT INDEX 14.4 3-Nov-15 2-Jul-15 3-Dec-15 14-Dec-15 10-Dec-15 28-Dec-15 15-Dec-15 25-Apr-16 29-Dec-15 2-May-16 8-Apr-19 15-Jul-19 100% 100.0%
A545-181-16-51-SK00 E MISCELLANENOUS SKETCHES 2.9 24-Feb-16 17-Aug-15 25-Mar-16 28-Sep-15 1-Apr-16 16-Nov-15 5-Apr-16 23-Nov-15 12-Apr-16 30-Nov-15 11-Jun-16 9-Jun-16 100% 100.0%
A545-181-16-51-CH02 C CABLE SCHEDULE-FF 4.3 5-Feb-16 26-Oct-15 4-Mar-16 26-Apr-16 11-Mar-16 3-May-16 16-Mar-16 10-May-16 15-Apr-16 17-May-16 14-Jun-16 24-May-16 100% 100.0%
A545-181-16-51-BM02 C BILL OF MATERIAL 7.2 3-Jan-16 30-May-15 2-Feb-16 28-Sep-15 9-Feb-16 9-Jun-16 13-Feb-16 16-Jun-16 20-Feb-16 23-Jun-16 1-Feb-16 23-Jun-16 100% 100.0%
A545-181-16-51-CH03 C CABLE SCHEDULE-NFF 4.3 13-Feb-16 28-Oct-15 14-Mar-16 25-Jun-16 21-Mar-16 22-Jun-16 26-Mar-16 29-Jun-16 25-Apr-16 6-Jul-16 25-Jun-16 13-Jul-16 100% 100.0%
A545-181-16-51-00805 C INSTRUMENT LOCATION PLAN-NFF 5.7 10-Oct-15 29-Oct-15 9-Nov-15 28-Dec-15 16-Nov-15 4-Jan-16 21-Nov-15 11-Jan-16 5-Dec-15 18-Jan-16 22-Feb-17 26-Jul-17 100% 100.0%
A545-181-16-51-00806 C INSTRUMENT JUNCTION BOX LAYOUT-FF 2.9 14-Sep-15 22-Jul-15 14-Oct-15 19-Apr-16 21-Oct-15 26-Apr-16 26-Oct-15 3-May-16 9-Nov-15 10-May-16 23-Dec-15 17-May-16 100% 100.0%
A545-181-16-51-MD07 E DCS POINT DATABASE 4.3 14-Jan-16 27-Nov-15 8-Apr-17 3-Jul-17 15-Apr-17 17-Jul-17 19-Apr-17 24-Jul-17 26-Apr-17 16-Aug-17 30-Sep-19 - 85% 97.0%
A545-181-16-51-03308 E SRR LAYOUT 2.9 7-May-15 5-Jan-15 6-Jun-15 19-Jan-15 13-Jun-15 26-Jan-15 18-Jun-15 31-Jan-15 25-Jun-15 7-Feb-15 24-Aug-15 21-Feb-15 100% 100.0%
A545-181-16-51-00811 C INSTRUMENT JUNCTION BOX LAYOUT-NFF 2.9 1-Oct-15 25-Jul-15 31-Oct-15 30-Jun-16 7-Nov-15 17-Jun-16 12-Nov-15 24-Jun-16 26-Nov-15 1-Jul-16 9-Jan-16 8-Jul-16 100% 100.0%
A545-181-16-51-00812 C AIR SUPPLY DISTRIBUTION SCHEME 4.3 14-Jan-16 5-Jan-15 13-Feb-16 26-Mar-16 20-Feb-16 2-Apr-16 24-Feb-16 9-Apr-16 25-Mar-16 16-Apr-16 24-May-16 23-Apr-16 100% 100.0%
A545-181-16-51-00813 C INSTRUMENT LOCATION PLAN-FF 5.7 26-Sep-15 30-Oct-15 26-Oct-15 29-Dec-15 2-Nov-15 5-Jan-16 7-Nov-15 12-Jan-16 7-Dec-15 19-Jan-16 1-Mar-17 19-Jan-16 100% 100.0%
A545-181-16-51-00820 C LEVEL GAUGE & LIGHTING PANEL LAYOUT 2.9 24-Dec-15 27-Jul-15 23-Jan-16 20-Aug-15 30-Jan-16 27-Aug-15 3-Feb-16 3-Sep-15 10-Feb-16 10-Sep-15 11-Apr-16 14-Jan-16 100% 100.0%
A545-181-16-51-MD22 E POWER SUPPLY SCHEME 1.4 3-May-15 20-Apr-15 2-Jun-15 28-May-15 9-Jun-15 3-Jul-15 13-Jun-15 10-Jul-15 27-Jun-15 24-Jul-15 28-Jul-15 4-Aug-15 100% 100.0%
A545-181-16-51-00823 C GAS DETECTOR & CCTV LAYOUT 4.3 17-Mar-16 31-Jul-15 16-Apr-16 30-Sep-15 23-Apr-16 3-Oct-15 27-Apr-16 7-Oct-15 25-May-16 14-Oct-15 23-Jul-16 29-Jun-16 100% 100.0%
100 99.8%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-736-16-47-00001 E LAYOUT OF TRADING FACILITIES 2.3 1-Dec-14 1-Dec-14 22-Dec-14 26-Dec-14 29-Dec-14 2-Jan-15 27-Jan-15 2-Feb-15 10-Feb-15 9-Feb-15 11-May-15 9-Feb-15 100% 100.0%
A545-736-16-47-06205 C AREA 205 0.5 16-Feb-15 7-Jul-15 19-Mar-15 9-Sep-15 2-Apr-15 16-Sep-15 16-Apr-15 23-Sep-15 7-May-15 30-Sep-15 16-Jan-17 24-Feb-17 100% 100.0%
A545-736-16-47-06206 C AREA 206 0.5 17-Feb-15 7-Jul-15 20-Mar-15 9-Sep-15 3-Apr-15 16-Sep-15 17-Apr-15 23-Sep-15 8-May-15 30-Sep-15 18-Jan-17 24-Feb-17 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-736-16-47-06210 C AREA 210 0.5 18-Feb-15 10-Jul-15 21-Mar-15 8-Sep-15 4-Apr-15 15-Sep-15 18-Apr-15 22-Sep-15 9-May-15 29-Sep-15 20-Jan-17 24-Feb-17 100% 100.0%
A545-736-16-47-06211 C AREA 211 0.5 19-Feb-15 10-Jul-15 22-Mar-15 8-Sep-15 5-Apr-15 15-Sep-15 19-Apr-15 22-Sep-15 10-May-15 29-Sep-15 22-Jan-17 24-Feb-17 100% 100.0%
A545-736-16-47-06216 C AREA 216 0.5 20-Feb-15 10-Jul-15 23-Mar-15 8-Sep-15 6-Apr-15 15-Sep-15 20-Apr-15 22-Sep-15 11-May-15 29-Sep-15 24-Jan-17 28-Mar-17 100% 100.0%
A545-736-16-47-06217 C AREA 217 0.5 23-Feb-15 10-Jul-15 26-Mar-15 8-Sep-15 9-Apr-15 15-Sep-15 23-Apr-15 22-Sep-15 14-May-15 29-Sep-15 26-Jan-17 28-Mar-17 100% 100.0%
A545-736-16-47-06218 C AREA218 0.5 24-Feb-15 14-Jul-15 27-Mar-15 8-Sep-15 10-Apr-15 15-Sep-15 24-Apr-15 22-Sep-15 15-May-15 29-Sep-15 28-Jan-17 28-Mar-17 100% 100.0%
A545-736-16-47-06219 C AREA 219 0.5 25-Feb-15 14-Jul-15 28-Mar-15 8-Sep-15 11-Apr-15 15-Sep-15 25-Apr-15 22-Sep-15 16-May-15 29-Sep-15 30-Jan-17 28-Mar-17 100% 100.0%
A545-736-16-47-06222 C AREA 222 0.5 27-Feb-15 15-Jul-15 30-Mar-15 9-Sep-15 13-Apr-15 16-Sep-15 27-Apr-15 23-Sep-15 18-May-15 30-Sep-15 3-Feb-17 28-Mar-17 100% 100.0%
A545-736-16-47-06223 C AREA 223 0.5 2-Mar-15 15-Jul-15 2-Apr-15 8-Sep-15 16-Apr-15 15-Sep-15 30-Apr-15 22-Sep-15 21-May-15 29-Sep-15 5-Feb-17 28-Mar-17 100% 100.0%
A545-736-16-47-06224 C AREA 224 0.5 3-Mar-15 17-Jul-15 3-Apr-15 8-Sep-15 17-Apr-15 15-Sep-15 1-May-15 22-Sep-15 22-May-15 29-Sep-15 7-Feb-17 28-Mar-17 100% 100.0%
A545-736-16-47-06225 C AREA 225 0.5 4-Mar-15 17-Jul-15 4-Apr-15 8-Sep-15 18-Apr-15 15-Sep-15 2-May-15 22-Sep-15 23-May-15 29-Sep-15 9-Feb-17 28-Mar-17 100% 100.0%
A545-736-16-47-06229 C AREA 229 0.5 6-Mar-15 20-Jul-15 6-Apr-15 8-Sep-15 20-Apr-15 15-Sep-15 4-May-15 22-Sep-15 25-May-15 29-Sep-15 13-Feb-17 28-Mar-17 100% 100.0%
A545-736-16-47-06231 C AREA 231 0.5 10-Mar-15 20-Jul-15 10-Apr-15 9-Sep-15 24-Apr-15 16-Sep-15 8-May-15 23-Sep-15 29-May-15 30-Sep-15 17-Feb-17 28-Mar-17 100% 100.0%
A545-736-16-47-06239 C AREA 239 0.5 13-Mar-15 25-Jul-15 13-Apr-15 8-Sep-15 27-Apr-15 15-Sep-15 11-May-15 22-Sep-15 1-Jun-15 29-Sep-15 23-Feb-17 28-Mar-17 100% 100.0%
A545-736-16-47-06240 C AREA 240 0.5 16-Mar-15 25-Jul-15 16-Apr-15 8-Sep-15 30-Apr-15 15-Sep-15 14-May-15 22-Sep-15 4-Jun-15 29-Sep-15 25-Feb-17 28-Mar-17 100% 100.0%
A545-736-16-47-90000 E PDMS MODELLING 34.8 2-Jan-15 16-Feb-15 - - - - - - - - 27-Feb-17 22-Jun-18 100% 100.0%
100 100.0%
A545-736-16-48-30101 C GA & R/F DET OF FDN 736-PA-CF-101A/B 1.6 25-Jun-15 1-Apr-15 25-Jul-15 1-May-15 1-Aug-15 8-May-15 15-Aug-15 22-May-15 11-Jan-17 29-Jun-18 22-Apr-19 29-Jun-18 100% 100.0%
A545-736-16-48-30106 C GA & R/F DET OF FDN 736-ML/MR-101 1.6 2-May-15 7-Apr-15 16-May-15 7-May-15 23-May-15 14-May-15 6-Jun-15 28-May-15 18-Mar-19 - 18-Apr-19 - 100% 80.0%
A545-736-16-48-30107 C GA & R/F DET OF FDN 736-ML/MR-102 1.6 9-May-15 7-Apr-15 23-May-15 7-May-15 30-May-15 14-May-15 13-Jun-15 28-May-15 25-Mar-19 - 25-Apr-19 - 100% 80.0%
A545-736-16-48-30111 C GA & R/F DET OF FDN TROLLEY FOR 736-ML/MR-101 1.6 16-May-15 7-Apr-15 30-May-15 7-May-15 6-Jun-15 14-May-15 20-Jun-15 28-May-15 1-Apr-19 22-Jun-19 2-May-19 29-Jun-19 85% 100.0%
A545-736-16-48-30112 C GA & R/F DET OF FDN TROLLEY FOR 736-ML/MR-102 1.6 23-May-15 7-Apr-15 6-Jun-15 7-May-15 13-Jun-15 14-May-15 27-Jun-15 28-May-15 8-Apr-19 - 9-May-19 - 85% 80.0%
A545-736-16-48-30113 C GA & R/F DET OF FDN 736-SRV-1101 1.6 30-May-15 1-Apr-15 13-Jun-15 1-May-15 20-Jun-15 8-May-15 4-Jul-15 22-May-15 15-Apr-19 - 16-May-19 - 85% 80.0%
A545-736-16-48-30114 C GA & R/F DET OF FDN 736-SRV-1102 1.6 30-Apr-15 1-Apr-15 30-May-15 1-May-15 6-Jun-15 8-May-15 20-Jun-15 22-May-15 1-Apr-19 - 2-May-19 - 85% 80.0%
A545-736-16-48-30108 GA & R/F DET OF FDN OF SLEEPER 07-05-2015 - =I16+14 - =L16+7 - =O16+14 - =R16+21 - =U16+77 -
A545-736-16-48-30111 C GA & R/F DET OF FDN FOR 733-PA-CF-102A/B/C 1.6 14-May-15 1-Apr-15 28-May-15 1-May-15 4-Jun-15 8-May-15 18-Jun-15 22-May-15 11-Feb-17 29-Jun-18 23-Apr-19 29-Jun-18 100% 100.0%
A545-736-16-48-30112 C GA & R/F DET OF FDN FOR 733-PA-CF-104A/B/C 1.6 21-May-15 1-Apr-15 4-Jun-15 1-May-15 11-Jun-15 8-May-15 25-Jun-15 22-May-15 18-Feb-17 29-Jun-18 30-Apr-19 29-Jun-18 100% 100.0%
A545-736-16-48-30113 C GA & R/F DET OF FDN FOR 733-PA-CF-106A/B/C 1.6 28-May-15 1-Apr-15 11-Jun-15 1-May-15 18-Jun-15 8-May-15 2-Jul-15 22-May-15 25-Feb-17 29-Jun-18 7-May-19 29-Jun-18 85% 100.0%
A545-736-16-48-30114 GA & R/F DET OF FDN FOR 733-PA-CF-109A/B/C 4-Jun-15 1-Apr-15 18-Jun-15 1-May-15 25-Jun-15 8-May-15 9-Jul-15 22-May-15 4-Mar-17 - 20-May-17 - 100% 80.0%
A545-736-16-48-30115 GA & R/F DET OF FDN FOR 733-PA-CF-111A/B 25-Apr-15 1-Apr-15 25-May-15 1-May-15 1-Jun-15 8-May-15 15-Jun-15 22-May-15 8-Feb-17 - 10-May-17 - 100% 80.0%
A545-736-16-48-30120 C GA & R/F DET OF FDN FOR 733-M-01 1.6 2-May-15 1-Apr-15 1-Jun-15 1-May-15 8-Jun-15 8-May-15 22-Jun-15 22-May-15 3-Apr-19 - 4-May-19 - 85% 80.0%
A545-736-16-48-30121 C GA & R/F DET OF FDN FOR 733-M-02 1.6 9-May-15 1-Apr-15 8-Jun-15 1-May-15 15-Jun-15 8-May-15 29-Jun-15 22-May-15 10-Apr-19 - 11-May-19 - 85% 80.0%
A545-736-16-48-30102 C GA & R/F DET OF FDN FOR 733-M-03 1.6 16-May-15 1-Apr-15 15-Jun-15 1-May-15 22-Jun-15 8-May-15 6-Jul-15 22-May-15 17-Apr-19 8-May-19 18-May-19 14-May-19 85% 100.0%
A545-736-16-48-30103 C GA & R/F DET OF FDN FOR 733-M-04 1.6 23-May-15 1-Apr-15 22-Jun-15 1-May-15 29-Jun-15 8-May-15 13-Jul-15 22-May-15 24-Apr-19 - 25-May-19 - 85% 80.0%
A545-736-16-48-30104 C GA & R/F DET OF FDN FOR 733-M-05 1.6 30-May-15 1-Apr-15 29-Jun-15 1-May-15 6-Jul-15 8-May-15 20-Jul-15 22-May-15 1-Apr-19 28-May-19 2-May-19 4-Jun-19 85% 100.0%
A545-736-16-48-30104 C GA & R/F DET OF FDN FOR 733-VV-101 0.8 3-Jun-15 25-Jun-15 3-Jul-15 30-Sep-15 10-Jul-15 16-Aug-16 24-Jul-15 23-Aug-16 5-Apr-19 - 6-May-19 - 85% 80.0%
A545-736-16-48-30122 C GA & R/F DET OF FDN FOR 733-PA-RP-107 0.8 7-May-15 25-Jun-15 21-May-15 30-Sep-15 17-Jan-17 16-Aug-16 31-Jan-17 23-Aug-16 23-Mar-19 - 23-Apr-19 - 100% 80.0%
A545-736-16-48-30125 C GA & R/F DET OF FDN FOR SRV-1201 0.8 14-May-15 27-Jun-15 28-May-15 30-Sep-15 24-Jan-17 16-Aug-16 7-Feb-17 23-Aug-16 30-Mar-19 - 30-Apr-19 - 100% 80.0%
A545-736-16-48-30130 C GA & R/F DET OF FDN FOR 733-ML/MR-00-101 0.8 21-May-15 7-Apr-15 4-Jun-15 7-May-15 11-Jun-15 14-May-15 25-Jun-15 28-May-15 7-Mar-19 - 7-Apr-19 - 100% 80.0%
A545-736-16-48-30131 C GA & R/F DET OF FDN FOR 733-ML/MR-00-102 0.8 28-May-15 7-Apr-15 11-Jun-15 7-May-15 18-Jun-15 14-May-15 2-Jul-15 28-May-15 14-Mar-19 - 14-Apr-19 - 100% 80.0%
A545-736-16-48-30132 C GA & R/F DET OF FDN FOR 733-ML/MR-00-103 0.8 5-May-15 22-Jun-15 4-Jun-15 30-Sep-15 31-Jan-17 16-Aug-16 14-Feb-17 23-Aug-16 6-Apr-19 - 7-May-19 - 85% 80.0%
A545-736-16-48-30133 C GA & R/F DET OF FDN FOR 733-ML/MR-00-104 0.8 7-May-15 22-Jun-15 6-Jun-15 30-Sep-15 2-Feb-17 16-Aug-16 16-Feb-17 23-Aug-16 8-Apr-19 - 9-May-19 - 85% 80.0%
A545-736-16-48-30134 C GA & R/F DET OF FDN FOR 733-ML/MR-00-105 0.8 14-May-15 25-Jun-15 13-Jun-15 30-Sep-15 9-Feb-17 16-Aug-16 23-Feb-17 23-Aug-16 15-Apr-19 - 16-May-19 - 85% 80.0%
A545-736-16-48-30135 C GA & R/F DET OF FDN FOR 733-ML/MR-00-106 0.8 21-May-15 27-Jun-15 20-Jun-15 30-Sep-15 16-Feb-17 16-Aug-16 2-Mar-17 23-Aug-16 22-Apr-19 - 23-May-19 - 85% 80.0%
A545-736-16-48-30136 GA & R/F DET OF FDN FOR SLEEPER =+I41+4 31-08-2015 =I42+27 30-09-2015 =L42+7 - =O42+14 - #VALUE! - =U42+77 -
A545-736-16-48-00321 C LOADING GANTRY PILE LAYOUT 6.0 15-Jan-15 13-Jan-15 29-Jan-15 27-Jan-15 5-Feb-15 3-Feb-15 19-Feb-15 20-Jan-15 12-Mar-15 10-Feb-15 28-May-15 13-Aug-15 100% 100.0%
A545-736-16-48-30322 C GA & R/F DET OF PILE CAP 2.6 27-Jan-15 22-Jan-15 10-Feb-15 5-Feb-15 17-Feb-15 12-Feb-15 3-Mar-15 29-Jan-15 24-Mar-15 19-Feb-15 9-Jun-15 22-Apr-15 100% 100.0%
A545-736-16-48-30323 C GA & DET OF SUPER STR 6.0 6-Feb-15 28-Jan-15 20-Feb-15 11-Feb-15 27-Feb-15 4-Mar-15 13-Mar-15 16-Apr-15 3-Apr-15 1-Aug-15 19-Jun-15 14-Aug-15 100% 100.0%
A545-736-16-48-30324 C GA & DET OF ROOF 6.0 16-Feb-15 28-Jan-15 2-Mar-15 11-Feb-15 9-Mar-15 4-Mar-15 23-Mar-15 16-Apr-15 13-Apr-15 31-Jul-15 29-Jun-15 13-Aug-15 100% 100.0%
A545-736-81-41-30325 C GA & DET OF SUPER STR GANTRY-II 6.0 10-Feb-15 13-Jun-15 24-Feb-15 27-Jun-15 3-Mar-15 4-Jul-15 17-Mar-15 18-Jul-15 7-Apr-15 1-Aug-15 23-Jun-15 14-Aug-15 100% 100.0%
A545-736-81-41-30326 C GA & DET OF ROOF STR GANTRY-II 6.0 20-Feb-15 13-Jun-15 6-Mar-15 27-Jun-15 13-Mar-15 4-Jul-15 27-Mar-15 18-Jul-15 17-Apr-15 1-Aug-15 3-Jul-15 14-Aug-15 100% 100.0%
A545-736-81-41-00327 C GA & DET OF SUPER STR GANTRY-10 6.0 2-Mar-15 3-Apr-17 16-Mar-15 17-Apr-17 23-Mar-15 24-Apr-17 6-Apr-15 8-May-17 27-Apr-15 22-May-17 13-Jul-15 29-May-17 100% 100.0%
A545-736-81-41-00328 C TRUCK LOADING GANTRY 5 TO 9 MISC. DETAILS 6.0 12-Mar-15 23-May-18 26-Mar-15 6-Jun-18 2-Apr-15 13-Jun-18 16-Apr-15 27-Jun-18 7-May-15 11-Jul-18 3-Apr-19 11-Jul-18 100% 100.0%
TOTAL TOTAL
MR / TR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW
MR No MR DESCRIPTION WTG. % (SCHD. (ACTUAL
(40%) (85%) (90%) (100%)
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
PACKAGED EQUIPMENT - TRADING FACILITY
ELECTRONIC TYPE WEIGH
A545-736-LZ-MR-4560 28.57 9-Feb-15 13-Feb-15 8-May-15 19-May-15 15-Aug-19 - 31-Aug-19 - 85% 85.0%
BRIDGE (SAFE AREA)
A545-736-LL-MR-4630 LOADING ARMS (ROAD) 57.14 12-Jan-15 15-Jan-15 23-Apr-15 13-Apr-15 12-Jun-15 3-Nov-15 20-Apr-17 28-Oct-17 100% 100.0%
MISCELLANEOUS (INPUTS TO
A545-736-GN-MR-MISC 14.29 30-Jun-15 12-Feb-15 - - - - 30-Nov-15 31-Oct-16 100% 100.0%
MR, TENDER & PACKAGES)
100 95.7%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
PIPELINE ENGINEERING - TRADING FACILITY
A545-736-11-42-10012 E OFFSHORE PIPELINE ROUTING DRAWING 3.4 22-Nov-14 5-Nov-14 2-Dec-14 14-Nov-14 9-Dec-14 20-Nov-14 30-Dec-14 12-Dec-14 29-Jan-15 2-Jan-15 29-Apr-15 2-Jan-15 100% 100.0%
A545-736-11-42-10013 E ONSHORE PIPELINE ROUTING DRAWING 3.4 15-Nov-14 17-May-14 25-Nov-14 24-May-14 2-Dec-14 31-May-14 23-Dec-14 20-Jun-14 22-Jan-15 17-Sep-15 22-Apr-15 17-Sep-15 100% 100.0%
A545-736-11-42-11001 C ALIGNMENT SHEET-OFFSHORE- CRUDE OIL 1.3 28-May-15 15-Sep-15 12-Jun-15 10-Nov-15 19-Jun-15 18-Dec-15 23-Jun-15 29-Feb-16 7-Jul-15 5-Jul-16 31-Aug-19 - 85% 85.0%
A545-736-11-42-11021 C ALIGNMENT SHEET-OFFSHORE- JET/ SKO 1.3 4-Jun-15 10-Nov-15 18-Jun-15 20-Jan-16 25-Jun-15 24-Feb-16 30-Jun-15 29-Feb-16 14-Jul-15 8-Sep-16 2-Sep-19 - 85% 85.0%
A545-736-11-42-11031 C ALIGNMENT SHEET-OFFSHORE- DIESEL 1.3 11-Jun-15 30-Sep-15 25-Jun-15 8-Feb-16 2-Jul-15 16-Feb-16 6-Jul-15 29-Feb-16 20-Jul-15 13-Sep-16 4-Sep-19 - 85% 85.0%
A545-736-11-42-11041 C ALIGNMENT SHEET-OFFSHORE- GASOLINE 1.3 18-Jun-15 10-Nov-15 2-Jul-15 7-Mar-16 9-Jul-15 14-Mar-16 13-Jul-15 18-Mar-16 27-Jul-15 21-Sep-16 6-Sep-19 - 85% 85.0%
A545-736-11-42-11051 C ALIGNMENT SHEET-OFFSHORE- ETHANOL 1.3 25-Jun-15 9-Dec-15 9-Jul-15 7-Mar-16 16-Jul-15 14-Mar-16 20-Jul-15 18-Mar-16 4-Aug-19 23-Mar-17 8-Sep-19 - 80% 85.0%
A545-736-11-42-12001 C ALIGNMENT SHEET-ONSHORE- CRUDE OIL 1.3 22-Jun-15 22-Jun-15 6-Jul-15 27-Aug-15 13-Jul-15 2-Sep-15 17-Jul-15 4-Sep-15 31-Jul-15 6-Apr-16 10-Sep-19 - 85% 85.0%
A545-736-11-42-12011 C ALIGNMENT SHEET-ONSHORE- JET/SKO 1.3 29-Jun-15 22-Jun-15 13-Jul-15 30-Jul-15 20-Jul-15 25-Aug-15 25-Jul-15 1-Sep-15 8-Aug-15 8-Sep-15 12-Sep-19 - 85% 85.0%
A545-736-11-42-12021 to
12025, 12031 to 12034 & C ALIGNMENT SHEET-ONSHORE- DIESEL 1.3 6-Jul-15 22-Jun-15 20-Jul-15 30-Jul-15 27-Jul-15 29-Aug-15 31-Jul-15 2-Sep-15 14-Aug-15 9-Sep-15 14-Sep-15 12-Jan-16 100% 100.0%
12055
A545-736-11-42-12041 to
C ALIGNMENT SHEET-ONSHORE- GASOLINE 1.3 13-Jul-15 22-Jun-15 27-Jul-15 26-Aug-15 3-Aug-15 2-Sep-15 7-Aug-15 7-Sep-15 21-Aug-15 14-Sep-15 31-Aug-19 - 85% 85.0%
12045
A545-736-11-42-12051 to
C ALIGNMENT SHEET-ONSHORE- ETHANOL 1.3 20-Jul-15 22-Jun-15 3-Aug-15 22-Aug-15 10-Aug-15 29-Aug-15 14-Aug-15 3-Sep-15 28-Aug-15 10-Sep-15 2-Sep-19 - 85% 85.0%
12055
A545-736-11-42-12201 C PIPELINE CORRIDOR DRAWING 4.8 2-Jun-15 11-Feb-15 2-Jul-15 18-Feb-15 9-Jul-15 2-Mar-15 16-Jul-15 9-Mar-15 2-Aug-19 14-Mar-17 6-Sep-19 - 80% 85.0%
A545-736-11-42-12301 E EQUIPMENT LAYOUT- CRUDE OIL TERMINAL 13.4 15-Nov-14 30-Oct-15 15-Dec-14 30-Oct-14 14-Jan-15 24-Dec-14 4-Feb-15 5-Jan-15 11-Mar-15 19-Jan-15 9-Jun-15 18-Feb-15 100% 100.0%
A545-736-11-42-12302 E EQUIPMENT LAYOUT- PRODUCT TERMINAL 13.4 25-Nov-14 5-Nov-14 25-Dec-14 1-Dec-14 24-Jan-15 30-Dec-14 14-Feb-15 20-Jan-15 21-Mar-15 13-Apr-15 19-Jun-15 12-May-15 100% 100.0%
A545-736-11-42-12401 C GAD - CRUDE OIL TERMINAL 13.4 21-Mar-15 24-Mar-15 4-Apr-15 7-Apr-15 11-Apr-15 14-Apr-15 2-May-15 5-May-15 23-May-15 5-Jun-15 22-Jun-15 28-Aug-15 100% 100.0%
A545-736-11-42-12421 C GAD - PRODUCT TERMINAL 13.4 20-Apr-15 24-Apr-15 4-May-15 8-May-15 11-May-15 28-May-15 1-Jun-15 2-Jun-15 22-Jun-15 30-Jun-15 27-Mar-17 27-Feb-19 100% 100.0%
MISCELLANEOUS (INPUT TO MR, TENDER &
A545-736-11-42-MISC 20.1 2-Jan-15 15-Dec-14 - - - - - - - - 29-Mar-17 28-Mar-18 100% 100.0%
PACKAGES)
A545-736-QA-MR-9002 LINE PIPE-INTERNAL COATED 1.5 20-Jan-15 26-Jul-16 23-Nov-16 19-Dec-16 2-Jan-17 31-Aug-17 26-Feb-17 29-Mar-18 100% 100.0%
A545-736-QV-MR-9050 MAINLINE BALL VALVE 7.5 19-Nov-14 8-Dec-14 2-Mar-15 13-May-15 1-May-15 22-Mar-16 5-Apr-17 27-Feb-18 100% 100.0%
A545-736-QX-MR-9060 PLUG VALVES 7.5 24-Nov-14 8-Dec-14 6-Mar-15 24-Feb-15 2-Jul-19 17-Sep-18 31-Aug-19 - 90% 90.0%
A545-736-QY-MR-9070 CHECK & GLOBE VALVE (CAT -1) 3.8 22-Dec-14 29-Dec-14 19-Mar-15 4-Mar-15 1-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-736-QY-MR-9090 DUAL PLATE CHECK VALVES 3.8 26-Dec-14 10-Mar-15 7-Apr-15 28-May-15 1-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-736-QE-MR-9100 FITTINGS (CAT-1) 5.7 9-Jan-15 4-Mar-15 6-Apr-15 30-Apr-15 19-Feb-17 30-Nov-16 20-Apr-17 28-Oct-17 100% 100.0%
A545-736-QE-MR-9200 FITTINGS -II 0.4 9-Jan-15 28-Oct-16 12-Dec-16 12-Oct-17 10-Feb-17 20-Sep-18 10-Apr-17 30-Nov-18 100% 100.0%
A545-736-QD-MR-9110 FLANGES (CAT-1) 5.7 10-Jan-15 18-Feb-15 8-Apr-15 13-May-15 1-Feb-17 30-Nov-16 2-Apr-17 28-Oct-17 100% 100.0%
A545-736-QC-MR-9220 ASSORTED PIPES -II 0.4 14-Jan-15 18-Oct-16 7-Dec-16 9-Feb-17 5-Feb-17 25-Sep-17 6-Apr-17 28-May-18 100% 100.0%
A545-736-QE-MR-9130 O'LETS (CAT-1) 7.5 15-Jan-15 10-Mar-15 13-Apr-15 23-May-15 1-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-736-QE-MR-9230 O'LETS - II 0.4 17-Jan-15 18-Oct-16 2-Jun-19 21-Dec-16 1-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-736-QV-MR-9150 BALL VALVES 0.1 20-Jan-15 3-Dec-18 5-Mar-17 27-Dec-18 4-May-17 28-Feb-19 31-Jul-19 - 100% 90.0%
A545-736-QX-MR-9160 PLUG VALVES 0.4 23-Jan-15 24-Nov-16 2-Jun-19 27-Mar-17 1-Aug-19 22-Mar-19 31-Aug-19 - 85% 90.0%
A545-736-QG-MR-9240 INSULATING JOINTS 0.4 17-Feb-17 3-Jan-18 16-May-17 11-May-18 1-Aug-19 - 31-Aug-19 - 85% 85.0%
100 96.8%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
PIPING - UTILTIES & OFFSITES
A545-999-16-43-EDB-1001 E ENGINEERING DESIGN BASIS (PIPING) 0.6 12-Dec-14 2-Dec-14 26-Dec-14 13-Dec-14 2-Jan-15 20-Dec-14 9-Jan-15 26-Dec-14 23-Jan-15 26-Dec-14 12-Jan-17 26-Oct-17 100% 100.0%
A545-700-16-43-00002 E AREA DIVISION 0.2 28-Feb-15 2-Jan-15 28-Mar-15 1-Apr-15 4-Apr-15 20-Apr-15 12-Apr-15 2-May-15 2-May-15 2-May-15 12-Mar-19 22-Feb-19 100% 100.0%
A545-700-16-43-03621 C PIPING PLAN AREA-362 (TF) 0.0 1-Aug-15 2-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 5-Oct-18 28-Feb-18 100% 100.0%
A545-700-16-43-03631 C PIPING PLAN AREA-363 (TF) 0.0 1-Aug-15 2-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-03641 C PIPING PLAN AREA-364 (TF) 0.0 1-Aug-15 5-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-03651 C PIPING PLAN AREA-365 (TF) 0.0 1-Aug-15 5-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 3-Sep-19 - 85% 85.0%
A545-700-16-43-03661 C PIPING PLAN AREA-366 (TF) 0.0 1-Aug-15 6-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 5-Sep-19 - 85% 85.0%
A545-700-16-43-03671 C PIPING PLAN AREA-367 (TF) 0.0 1-Aug-15 7-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 5-Sep-19 - 85% 85.0%
A545-700-16-43-03681 C PIPING PLAN AREA-368 (TF) 0.0 1-Aug-15 7-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 8-Sep-19 - 85% 85.0%
A545-700-16-43-03691 C PIPING PLAN AREA-369 (TF) 0.0 1-Aug-15 9-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 10-Sep-19 - 85% 85.0%
A545-700-16-43-03701 C PIPING PLAN AREA-370 (TF) 0.0 1-Aug-15 10-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 11-Sep-19 - 85% 85.0%
A545-700-16-43-03711 C PIPING PLAN AREA-371 (TF) 0.0 1-Aug-15 12-Jul-15 16-Aug-15 7-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 28-Sep-15 28-Feb-18 100% 100.0%
A545-700-16-43-03721 C PIPING PLAN AREA-372 (TF) 0.0 1-Aug-15 15-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 28-Sep-15 28-Feb-18 100% 100.0%
A545-700-16-43-03731 C PIPING PLAN AREA-373 (TF) 0.0 1-Aug-15 15-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 28-Sep-15 28-Feb-18 100% 100.0%
A545-700-16-43-03741 C PIPING PLAN AREA-374 (TF) 0.0 1-Aug-15 17-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 28-Sep-15 28-Feb-18 100% 100.0%
A545-700-16-43-03981 C PIPING PLAN AREA-398 (TF) 0.0 1-Aug-15 17-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 28-Sep-15 28-Feb-18 100% 100.0%
A545-700-16-43-03991 C PIPING PLAN AREA-399 (TF) 0.0 1-Aug-15 19-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 13-Sep-19 - 85% 85.0%
A545-700-16-43-04001 C PIPING PLAN AREA-400 (TF) 0.0 1-Aug-15 19-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 14-Sep-19 - 85% 85.0%
A545-700-16-43-04011 C PIPING PLAN AREA-401 (TF) 0.0 1-Aug-15 20-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 16-Sep-19 - 85% 85.0%
A545-700-16-43-04021 C PIPING PLAN AREA-402 (TF) 0.0 1-Aug-15 20-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 18-Sep-19 - 85% 85.0%
A545-700-16-43-04031 C PIPING PLAN AREA-403 (TF) 0.0 1-Aug-15 22-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 21-Sep-19 - 85% 85.0%
A545-700-16-43-04041 C PIPING PLAN AREA-404 (TF) 0.0 1-Aug-15 22-Jul-15 16-Aug-15 12-Aug-15 23-Aug-15 20-Aug-15 30-Aug-15 27-Aug-15 14-Sep-15 10-Sep-15 23-Sep-19 - 85% 85.0%
A545-700-16-43-04051 C PIPING PLAN AREA-405 (TF) 0.0 9-Aug-15 22-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 25-Sep-19 - 85% 85.0%
A545-700-16-43-04061 C PIPING PLAN AREA-406 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 27-Sep-19 - 85% 85.0%
A545-700-16-43-04071 C PIPING PLAN AREA-407 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 29-Sep-19 - 85% 85.0%
A545-700-16-43-04081 C PIPING PLAN AREA-408 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 1-Oct-19 - 85% 85.0%
A545-700-16-43-04091 C PIPING PLAN AREA-409 (TF) 0.0 9-Aug-15 29-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 3-Oct-19 - 85% 85.0%
A545-700-16-43-04101 C PIPING PLAN AREA-410 (TF) 0.0 9-Aug-15 5-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 5-Oct-19 - 85% 85.0%
A545-700-16-43-04111 C PIPING PLAN AREA-411 (TF) 0.0 9-Aug-15 5-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 7-Oct-19 - 85% 85.0%
A545-700-16-43-05011 C PIPING PLAN AREA-501 (TF) 0.0 9-Aug-15 6-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 9-Oct-19 - 85% 85.0%
A545-700-16-43-05021 C PIPING PLAN AREA-502 (TF) 0.0 9-Aug-15 7-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 11-Oct-19 - 85% 85.0%
A545-700-16-43-05031 C PIPING PLAN AREA-503 (TF) 0.0 9-Aug-15 7-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05041 C PIPING PLAN AREA-504 (TF) 0.0 9-Aug-15 9-Jul-15 24-Aug-15 17-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05051 C PIPING PLAN AREA-505 (TF) 0.0 9-Aug-15 10-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
Page 486 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 2
DANGOTE REFINERY AND PETROCHEMICAL
DRAWING CONTROL INDEX APR-2019
JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE: PIPING (TRADING FACILITIES)
DRAFTING / EXTRACTION INCORPORATE COMMENTS & UPDATE & ISSUE FOR TOTAL TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS
DRAWING/ DOCUMENT COMPLETE ISSUE FOR CONSTRUCTION CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%)
NO. (60%) (85%) (100%) PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-43-05061 C PIPING PLAN AREA-506 (TF) 0.0 9-Aug-15 12-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05071 C PIPING PLAN AREA-507 (TF) 0.0 9-Aug-15 15-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05081 C PIPING PLAN AREA-508 (TF) 0.0 9-Aug-15 15-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05151 C PIPING PLAN AREA-515 (TF) 0.0 9-Aug-15 17-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05161 C PIPING PLAN AREA-516 (TF) 0.0 9-Aug-15 17-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05171 C PIPING PLAN AREA-517 (TF) 0.0 9-Aug-15 19-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05181 C PIPING PLAN AREA-518 (TF) 0.0 9-Aug-15 19-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 2-Aug-19 - 85% 85.0%
A545-700-16-43-05191 C PIPING PLAN AREA-519 (TF) 0.0 9-Aug-15 20-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05201 C PIPING PLAN AREA-520 (TF) 0.0 9-Aug-15 20-Jul-15 24-Aug-15 21-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05211 C PIPING PLAN AREA-521 (TF) 0.0 9-Aug-15 22-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05221 C PIPING PLAN AREA-522 (TF) 0.0 9-Aug-15 22-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05231 C PIPING PLAN AREA-523 (TF) 0.0 9-Aug-15 22-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 1-Aug-19 - 85% 85.0%
A545-700-16-43-05241 C PIPING PLAN AREA-524 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05251 C PIPING PLAN AREA-525 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05261 C PIPING PLAN AREA-526 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 2-Aug-19 - 85% 85.0%
A545-700-16-43-05521 C PIPING PLAN AREA-552 (TF) 0.0 9-Aug-15 22-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05531 C PIPING PLAN AREA-553 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 31-Jul-19 24-May-18 100% 100.0%
A545-700-16-43-05541 C PIPING PLAN AREA-554 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 2-Aug-19 - 85% 85.0%
A545-700-16-43-05551 C PIPING PLAN AREA-555 (TF) 0.0 9-Aug-15 25-Jul-15 24-Aug-15 28-Aug-15 31-Aug-15 20-Aug-15 7-Sep-15 27-Aug-15 22-Sep-15 10-Sep-15 4-Aug-19 - 85% 85.0%
A545-700-16-43-3DMO LINE MODELLING 28.8 1-Feb-15 20-Feb-15 - - - - - - - - 31-Mar-18 28-Mar-18 100% 100.0%
A545-700-16-43-EQMO E EQUIPMENT MODELLING 2.2 1-Mar-15 25-Feb-15 - - - - - - - - 4-Apr-18 22-Mar-18 100% 100.0%
A545-700-16-43-INTM1 P INTERMEDIATE- MTO 0.8 7-Jan-16 27-Jan-16 - - - - - - - - 8-Feb-16 29-Feb-16 100% 100.0%
A545-700-16-43-MTOF E FINAL MTO 0.5 26-Jul-16 23-Dec-16 - - - - - - - - 19-Apr-17 6-Jan-17 100% 100.0%
A545-700-16-43-NOZT E NOZZLE ORIENTATION 0.6 4-Jun-15 2-Mar-15 - - - - - - - - 19-Apr-17 15-Mar-18 100% 100.0%
A545-700-16-43-PCLT E PIPING CLEATS 0.2 18-Jun-15 28-Aug-15 - - - - - - - - 20-Apr-17 19-Mar-18 100% 100.0%
A545-700-16-43-PIPS E PIPING SUPPORTS 3.8 4-Jul-16 10-Aug-15 - - - - - - - - 20-Apr-17 21-Mar-18 100% 100.0%
A545-700-16-43-PIST S PIPING STUDIES 32.0 1-Jul-15 1-Dec-14 - - - - - - - - 20-Apr-17 31-Jul-17 100% 100.0%
A545-700-16-43-PREM P PRELIMINARY MTO 0.8 7-Jan-16 4-Jan-15 - - - - - - - - 8-Feb-16 15-Jul-15 100% 100.0%
100 99.8%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE
(SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%)
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG PROGRESS %) PROGRESS %)
%
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-04-41-714-1117 DIESEL STORAGE & TRANSFER SYSTEM 2.9 24-Jan-15 17-Nov-14 23-Feb-15 17-Dec-14 2-Mar-15 25-May-15 16-Mar-15 16-Sep-15 14-Apr-19 - 100% 99.0%
A545-04-41-714-1121 CBD & TRANSFER 2.9 27-Jan-15 9-Dec-14 26-Feb-15 6-Jan-15 5-Mar-15 25-May-15 19-Mar-15 16-Sep-15 17-Apr-19 - 100% 99.0%
A545-714-04-DS-1901 GASOLINE TANKS MIXERS 0.3 28-Mar-15 12-Dec-14 11-Apr-15 26-Dec-14 18-Apr-15 25-May-15 2-May-15 25-May-15 1-Jun-15 25-May-15 100% 100.0%
A545-714-04-DS-1902 JET FUEL TANKS MIXERS 0.3 30-Mar-15 15-Dec-14 13-Apr-15 29-Dec-14 20-Apr-15 25-May-15 4-May-15 25-May-15 3-Jun-15 25-May-15 100% 100.0%
A545-714-04-DS-1903 KEROSENE TANKS MIXERS 0.3 31-Mar-15 17-Dec-14 14-Apr-15 31-Dec-14 21-Apr-15 25-May-15 5-May-15 25-May-15 4-Jun-15 25-May-15 100% 100.0%
A545-714-04-DS-1904 DIESEL TANKS MIXERS 0.3 1-Apr-15 20-Dec-14 15-Apr-15 3-Jan-15 22-Apr-15 25-May-15 6-May-15 25-May-15 5-Jun-15 25-May-15 100% 100.0%
A545-714-04-41-DS-1712 GASOLENE STORAGE TANK 0.3 2-Apr-15 22-Dec-14 16-Apr-15 5-Jan-15 23-Apr-15 25-May-15 7-May-15 25-May-15 6-Jun-15 25-May-15 100% 100.0%
A545-714-04-41-DS-1713 JET STORAGE TANK 0.3 3-Apr-15 25-Dec-14 17-Apr-15 8-Jan-15 24-Apr-15 25-May-15 8-May-15 25-May-15 6-Jun-15 25-May-15 100% 100.0%
A545-714-04-41-DS-1714 KEROSENE STORAGE TANK 0.3 4-Apr-15 27-Dec-14 18-Apr-15 10-Jan-15 25-Apr-15 25-May-15 9-May-15 25-May-15 8-Jun-15 25-May-15 100% 100.0%
A545-714-04-41-DS-1715 DIESEL STORAGE TANK 0.3 6-Apr-15 30-Dec-14 20-Apr-15 13-Jan-15 27-Apr-15 25-May-15 11-May-15 25-May-15 10-Jun-15 25-May-15 100% 100.0%
A545-714-04-41-DS-1201 GASOLINE SUMP VESSEL 0.3 8-Apr-15 1-Jan-15 22-Apr-15 15-Jan-15 29-Apr-15 25-May-15 13-May-15 25-May-15 12-Jun-15 25-May-15 100% 100.0%
A545-714-04-41-DS-1202 JET FUEL/KERO SUMP VESSEL 0.3 9-Apr-15 3-Jan-15 23-Apr-15 17-Jan-15 30-Apr-15 25-May-15 14-May-15 25-May-15 13-Jun-15 25-May-15 100% 100.0%
A545-714-04-41-DS-1203 DIESEL SUMP VESSEL 0.3 10-Apr-15 5-Jan-15 24-Apr-15 19-Jan-15 1-May-15 25-May-15 15-May-15 25-May-15 13-Jun-15 25-May-15 100% 100.0%
A545-714-04-41-DS-1601 GASOILNE TRANSFER PUMPS 0.3 11-Apr-15 24-Mar-15 25-Apr-15 7-Apr-15 2-May-15 7-May-15 16-May-15 7-May-15 14-Jun-15 7-May-15 100% 100.0%
A545-714-04-41-DS-1602 JET FUEL TRANSFER PUMPS 0.3 13-Apr-15 24-Mar-15 27-Apr-15 7-Apr-15 4-May-15 7-May-15 18-May-15 7-May-15 16-Jun-15 7-May-15 100% 100.0%
A545-714-04-41-DS-1603 KEROSENE TRANSFER PUMPS 0.3 14-Apr-15 24-Mar-15 28-Apr-15 7-Apr-15 5-May-15 7-May-15 19-May-15 7-May-15 17-Jun-15 7-May-15 100% 100.0%
A545-714-04-41-DS-1604 DIESEL TRANSFER PUMPS 0.3 15-Apr-15 24-Mar-15 29-Apr-15 7-Apr-15 6-May-15 7-May-15 20-May-15 7-May-15 18-Jun-15 7-May-15 100% 100.0%
A545-714-04-41-DS-1606 GASOLINE SUMP VESSEL PUMP 0.3 17-Apr-15 24-Mar-15 1-May-15 7-Apr-15 8-May-15 7-May-15 22-May-15 7-May-15 20-Jun-15 7-May-15 100% 100.0%
A545-714-04-41-DS-1607 KERO/JET SUMP VESSEL PUMP 0.3 18-Apr-15 24-Mar-15 2-May-15 7-Apr-15 9-May-15 7-May-15 23-May-15 7-May-15 21-Jun-15 7-May-15 100% 100.0%
A545-714-04-41-DS-1608 DIESEL SUMP VESSEL PUMP 0.3 20-Apr-15 24-Mar-15 4-May-15 7-Apr-15 11-May-15 7-May-15 25-May-15 7-May-15 23-Jun-15 7-May-15 100% 100.0%
A545-714-04-41-DS-1609 KEROSENE REPROCESSING PUMP 0.3 21-Apr-15 23-Apr-15 5-May-15 7-May-15 12-May-15 21-May-15 26-May-15 21-May-15 24-Jun-15 21-May-15 100% 100.0%
A545-714-04-41-DS-1610 LCO FO BLENDING PUMP 0.3 22-Apr-15 23-Apr-15 6-May-15 7-May-15 13-May-15 21-May-15 27-May-15 21-May-15 25-Jun-15 21-May-15 100% 100.0%
A545-714-04-41-DS-1611 DIESEL FO BLENDING PUMP 0.3 23-Apr-15 23-Apr-15 7-May-15 7-May-15 14-May-15 21-May-15 28-May-15 21-May-15 26-Jun-15 21-May-15 100% 100.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE
(SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%)
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG PROGRESS %) PROGRESS %)
%
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-732-04-41-1113 DIESEL DAY TANKS & TRANSFER SYSTEM 2.9 18-Dec-14 5-Nov-14 17-Jan-15 5-Dec-14 24-Jan-15 25-May-15 7-Feb-15 14-Sep-15 28-Mar-19 - 100% 99.0%
A545-732-04-41-1120 GASOLINE ROAD LOADING 1.4 25-Dec-14 10-Nov-14 24-Jan-15 9-Dec-14 31-Jan-15 25-May-15 14-Feb-15 21-Sep-15 4-Apr-19 - 100% 99.0%
A545-732-04-41-1122 DIESEL ROAD LOADING 1.4 27-Dec-14 10-Nov-14 26-Jan-15 9-Dec-14 2-Feb-15 25-May-15 16-Feb-15 25-Sep-15 6-Apr-19 - 100% 99.0%
A545-04-41-732-1123 JET FUEL/ KERO ROAD LOADING 1.4 28-Dec-14 10-Nov-14 27-Jan-15 9-Dec-14 3-Feb-15 25-May-15 17-Feb-15 25-Sep-15 7-Apr-19 - 100% 99.0%
A545-04-41-732-1125 C3 ROAD LOADING 1.4 3-Jan-15 28-Jan-15 2-Feb-15 26-Feb-15 9-Feb-15 25-May-15 23-Feb-15 25-Sep-15 13-Apr-19 - 100% 99.0%
A545-04-41-732-1126 C3 ROAD UNLOADING COMPRESSOR 1.4 5-Jan-15 28-Jan-15 4-Feb-15 26-Feb-15 11-Feb-15 25-May-15 25-Feb-15 28-Sep-15 15-Apr-19 - 100% 99.0%
A545-04-41-732-1127 ETHANOL UNLOADING 1.4 7-Jan-15 2-Mar-15 6-Feb-15 28-May-15 13-Feb-15 25-May-15 27-Feb-15 28-Sep-15 17-Apr-19 - 100% 99.0%
A545-732-04-DS-1801 GASOLINE LOADING ARM 0.3 17-Apr-15 24-Jan-15 16-May-15 7-Feb-15 23-May-15 2-May-15 6-Jun-15 2-May-15 6-Jul-15 2-May-15 100% 100.0%
A545-732-04-DS-1802 DIESEL LOADING ARM 0.3 18-Apr-15 27-Jan-15 18-May-15 10-Feb-15 25-May-15 2-May-15 8-Jun-15 2-May-15 8-Jul-15 2-May-15 100% 100.0%
A545-732-04-DS-1803 FUEL/ KEROSENE LOADING ARM 0.3 19-Apr-15 29-Jan-15 19-May-15 12-Feb-15 26-May-15 2-Mar-15 9-Jun-15 2-Mar-15 9-Jul-15 2-Mar-15 100% 100.0%
A545-732-04-DS-1901 GASOLINE DAY TANKS MIXERS 0.3 22-Apr-15 31-Jan-15 22-May-15 14-Feb-15 29-May-15 25-May-15 12-Jun-15 25-May-15 11-Jul-15 25-May-15 100% 100.0%
A545-732-04-DS-1902 DIESEL DAY TANKS MIXERS 0.3 23-Apr-15 2-Feb-15 23-May-15 16-Feb-15 30-May-15 25-May-15 13-Jun-15 25-May-15 13-Jul-15 25-May-15 100% 100.0%
A545-732-04-DS-1903 JET FUEL DAY TANKS MIXERS 0.3 24-Apr-15 5-Feb-15 23-May-15 19-Feb-15 30-May-15 25-May-15 13-Jun-15 25-May-15 13-Jul-15 25-May-15 100% 100.0%
A545-732-04-DS-1904 KEROSENE DAY TANKS MIXERS 0.3 25-Apr-15 7-Feb-15 25-May-15 21-Feb-15 1-Jun-15 25-May-15 15-Jun-15 25-May-15 15-Jul-15 25-May-15 100% 100.0%
A545-732-04-41-DS-1728 GASOLINE DAY TANK 0.3 14-Apr-15 10-Feb-15 28-Apr-15 24-Feb-15 5-May-15 25-May-15 19-May-15 25-May-15 18-Jun-15 25-May-15 100% 100.0%
A545-732-04-41-DS-1729 DIESEL DAY TANK 0.3 15-Apr-15 12-Feb-15 29-Apr-15 26-Feb-15 6-May-15 25-May-15 20-May-15 25-May-15 19-Jun-15 25-May-15 100% 100.0%
A545-732-04-41-DS-1730 JET DAY TANK 0.3 16-Apr-15 14-Feb-15 30-Apr-15 28-Feb-15 7-May-15 25-May-15 21-May-15 25-May-15 20-Jun-15 25-May-15 100% 100.0%
A545-732-04-41-DS-1731 KEROSENE DAY TANK 0.3 17-Apr-15 16-Feb-15 1-May-15 2-Mar-15 8-May-15 25-May-15 22-May-15 25-May-15 20-Jun-15 25-May-15 100% 100.0%
A545-732-04-41-DS-1202 DIESEL SICK TANKER UNLOADING VESSEL 0.3 20-Apr-15 21-Feb-15 4-May-15 7-Mar-15 11-May-15 25-May-15 25-May-15 25-May-15 24-Jun-15 25-May-15 100% 100.0%
A545-732-04-41-DS-1601 GASOLINE LOADING PUMPS 0.3 22-Apr-15 19-Mar-15 6-May-15 2-Apr-15 13-May-15 16-Apr-15 27-May-15 16-Apr-15 26-Jun-15 16-Apr-15 100% 100.0%
A545-732-04-41-DS-1602 DIESEL LOADING PUMPS 0.3 23-Apr-15 19-Mar-15 7-May-15 2-Apr-15 14-May-15 16-Apr-15 28-May-15 16-Apr-15 27-Jun-15 16-Apr-15 100% 100.0%
A545-732-04-41-DS-1603 JET FUEL LOADING PUMPS 0.3 24-Apr-15 19-Mar-15 8-May-15 2-Apr-15 15-May-15 16-Apr-15 29-May-15 16-Apr-15 28-Jun-15 16-Apr-15 100% 100.0%
A545-732-04-41-DS-1604 KEROSENE LOADING PUMPS 0.3 25-Apr-15 19-Mar-15 9-May-15 2-Apr-15 16-May-15 16-Apr-15 30-May-15 16-Apr-15 29-Jun-15 16-Apr-15 100% 100.0%
A545-732-04-41-DS-1606 GASOLINE SUMP VESSEL PUMPS 0.3 27-Apr-15 19-Mar-15 11-May-15 2-Apr-15 18-May-15 16-Apr-15 1-Jun-15 16-Apr-15 1-Jul-15 16-Apr-15 100% 100.0%
A545-732-04-41-DS-1607 DIESEL SUMP VESSEL PUMPS 0.3 28-Apr-15 19-Mar-15 12-May-15 2-Apr-15 19-May-15 16-Apr-15 2-Jun-15 16-Apr-15 2-Jul-15 16-Apr-15 100% 100.0%
Page 489 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 2 of 4
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL
DRAWING CONTROL INDEX
JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE: POSD (TRADING FACILITIES)
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE
(SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%)
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG PROGRESS %) PROGRESS %)
%
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-732-04-41-DS-1608 KERO/ JET SUMP VESSEL PUMPS 0.3 29-Apr-15 19-Mar-15 13-May-15 2-Apr-15 20-May-15 16-Apr-15 3-Jun-15 16-Apr-15 3-Jul-15 16-Apr-15 100% 100.0%
A545-732-04-41-DS-1610 ETHANOL UNLOADING PUMP 0.3 30-Apr-15 27-Mar-15 14-May-15 10-Apr-15 21-May-15 22-Jun-15 4-Jun-15 22-Jun-15 4-Jul-15 22-Jun-15 100% 100.0%
A545-04-41-733-1111 LEGEND AND GENERAL NOTES 0.7 7-Jan-15 18-Dec-14 6-Feb-15 1-Jan-15 13-Feb-15 20-Apr-15 27-Feb-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-04-41-733-1113 CRUDE PIPELINE HOOK-UP TO TANKS 1.4 18-Apr-15 5-Mar-15 18-May-15 19-Mar-15 25-May-15 20-Apr-15 8-Jun-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-04-41-733-1114 CRUDE PIPELINE HOOK-UP DETAILS 1.4 22-Apr-15 10-Mar-15 22-May-15 24-Mar-15 29-May-15 20-Apr-15 12-Jun-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-04-41-733-1115 SRV SYSTEM AND SUMP TANK 1.4 26-Apr-15 16-Mar-15 26-May-15 30-Mar-15 2-Jun-15 20-Apr-15 16-Jun-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-04-41-733-1116 LEGEND AND GENERAL NOTES 2.7 18-Jan-15 12-Jan-15 17-Feb-15 26-Jan-15 24-Feb-15 20-Apr-15 10-Mar-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-04-41-733-1117 SKO BOOSTER PUMPS 1.4 18-Feb-15 17-Jan-15 20-Mar-15 31-Jan-15 27-Mar-15 20-Apr-15 10-Apr-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-04-41-733-1118 SKO MAIN LINE PUMPS 1.8 19-Feb-15 20-Jan-15 21-Mar-15 3-Feb-15 28-Mar-15 20-Apr-15 11-Apr-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0007 SKO TRANSFER LINE TO 1.4 20-Feb-15 22-Jan-15 21-Mar-15 5-Feb-15 28-Mar-15 20-Apr-15 11-Apr-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-04-41-736-1111 SKO PIG RECEIVER 1.4 21-Feb-15 24-Jan-15 23-Mar-15 7-Feb-15 30-Mar-15 20-Apr-15 13-Apr-15 20-Apr-15 31-Aug-19 - 95% 97.0%
A545-04-41-736-1112 SKO METERING SKID AND 1.8 22-Feb-15 26-Jan-15 24-Mar-15 9-Feb-15 31-Mar-15 22-Apr-15 14-Apr-15 22-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0010 SKO LOADING ARM 1.4 23-Feb-15 29-Jan-15 25-Mar-15 12-Feb-15 1-Apr-15 22-Apr-15 15-Apr-15 22-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0011 ATF BOOSTER PUMPS 1.4 24-Feb-15 31-Jan-15 26-Mar-15 14-Feb-15 2-Apr-15 22-Apr-15 16-Apr-15 22-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0012 ATF MAIN LINE PUMPS 1.8 25-Feb-15 3-Feb-15 27-Mar-15 17-Feb-15 3-Apr-15 22-Apr-15 17-Apr-15 22-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0013 ATF TRANSFER LINE TO 1.4 26-Feb-15 5-Feb-15 28-Mar-15 19-Feb-15 4-Apr-15 22-Apr-15 18-Apr-15 22-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0014 ATF PIG RECEIVER 1.4 27-Feb-15 7-Feb-15 28-Mar-15 21-Feb-15 4-Apr-15 22-Apr-15 18-Apr-15 22-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0015 ATF METERING SKID AND 1.8 28-Feb-15 9-Feb-15 30-Mar-15 23-Feb-15 6-Apr-15 27-Apr-15 20-Apr-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0016 ATF LOADING ARM 1.4 1-Mar-15 12-Feb-15 31-Mar-15 26-Feb-15 7-Apr-15 27-Apr-15 21-Apr-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0017 SLURRY OIL BOOSTER PUMPS 1.4 2-Mar-15 14-Feb-15 1-Apr-15 28-Feb-15 8-Apr-15 27-Apr-15 22-Apr-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0018 SLURRY OIL MAIN LINE PUMP 1.8 3-Mar-15 17-Feb-15 2-Apr-15 3-Mar-15 9-Apr-15 27-Apr-15 23-Apr-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0019 SLURRY OILTRANSFER LINE 1.4 4-Mar-15 19-Feb-15 3-Apr-15 5-Mar-15 10-Apr-15 27-Apr-15 24-Apr-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0020 SLURRY OIL PIG RECEIVER 1.4 5-Mar-15 21-Feb-15 4-Apr-15 7-Mar-15 11-Apr-15 27-Apr-15 25-Apr-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0021 SLURRY OIL METERING SKID 1.8 6-Mar-15 23-Feb-15 4-Apr-15 9-Mar-15 11-Apr-15 27-Apr-15 25-Apr-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0022 SLURRY OIL LOADING ARM 1.4 7-Mar-15 26-Feb-15 6-Apr-15 12-Mar-15 13-Apr-15 27-Apr-15 27-Apr-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0023 UTILITY DISTRIBUTION 1.8 13-Apr-15 28-Feb-15 13-May-15 14-Mar-15 20-May-15 27-Apr-15 3-Jun-15 27-Apr-15 31-Aug-19 - 95% 97.0%
A545-733-04-41-0024 CBD( PUMP+TANK) DIAGRAM 1.4 14-Apr-15 3-Mar-15 14-May-15 17-Mar-15 21-May-15 27-Apr-15 4-Jun-15 27-Apr-15 31-Aug-19 - 95% 97.0%
Page 490 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 3 of 4
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL
DRAWING CONTROL INDEX
JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE: POSD (TRADING FACILITIES)
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE
(SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%)
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG PROGRESS %) PROGRESS %)
%
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-733-04-41-DS-2011 PRESSURE INSTRUMENT 1.4 25-Mar-15 2-Mar-15 24-Apr-15 16-Mar-15 1-May-15 29-Apr-15 15-May-15 29-Apr-15 31-Aug-19 29-Apr-15 95% 100.0%
A545-733-04-41-DS-2111 TEMPERATURE INSTRUMENT 1.4 26-Mar-15 5-Mar-15 25-Apr-15 19-Mar-15 2-May-15 29-Apr-15 16-May-15 29-Apr-15 31-Aug-19 29-Apr-15 95% 100.0%
A545-733-04-41-DS-2211 LEVEL INSTRUMENT 1.4 27-Mar-15 10-Mar-15 27-Apr-15 24-Mar-15 4-May-15 29-Apr-15 18-May-15 29-Apr-15 31-Aug-19 29-Apr-15 95% 100.0%
A545-733-04-41-DS-2315 FLOW INSTRUMENT 1.4 28-Mar-15 16-Mar-15 28-Apr-15 30-Mar-15 5-May-15 30-Apr-15 19-May-15 30-Apr-15 31-Aug-19 30-Apr-15 95% 100.0%
100 98.5%
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING
MR No MR DESCRIPTION MHRS WTG. % (SCHD. (ACTUAL
(40%) (85%) (90%) REVIEW (100%)
PROGRESS %) PROGRESS %)
A545-736-PA-MR-5501 PUMP - CENTRIFUGAL (SPP) 1150 54.6 26-Nov-14 17-Dec-14 9-Mar-15 16-Apr-15 8-May-15 16-Feb-17 18-Mar-17 27-Feb-18 100% 100.0%
A545-736-KA-MR-5502 AIR COMPRESSOR PACKAGE 450 21.4 24-Dec-14 16-Jan-15 6-Apr-15 3-Jun-15 15-Jan-17 18-May-17 15-Apr-17 28-Jun-18 100% 100.0%
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING
MR No MR DESCRIPTION WTG. % (SCHD. (ACTUAL
(40%) (85%) (90%) REVIEW (100%)
PROGRESS %) PROGRESS %)
STATIC EQUIPMENT
A545-736-VV-MR-6401 CS VESSELS 87.0 26-Dec-14 7-Feb-15 23-Mar-15 23-Apr-15 22-May-15 9-Apr-16 16-Apr-17 28-Jan-18 100% 100.0%
MISCELLANEOUS (INPUTS TO MR,
A545-736-VV-IP-MISC 13.0 24-Jun-15 12-Feb-15 - - - - 31-Jan-16 31-Oct-16 100% 100.0%
TENDER & PACKAGES)
# ALL MISC. INPUTS RELEASED
100 100.0%
INCORPORATE COMMENTS
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR ENGG /
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-736-16-50-00119 E SINGLE LINE DIAGRAM 7.9 3-Feb-15 27-Mar-15 17-Feb-15 25-Apr-15 24-Feb-15 2-Jul-15 3-Mar-15 14-Jul-15 31-Mar-15 30-Jul-15 30-May-15 18-Aug-15 100% 100.0%
A545-736-16-50-01010 C OVERALL CABLE LAYOUT 11.8 12-Feb-15 31-Dec-14 26-Feb-15 14-Jan-15 5-Mar-15 21-Jan-15 12-Mar-15 20-Apr-15 9-Apr-15 14-Jul-15 8-Jun-15 31-Jul-15 100% 100.0%
A545-736-16-50-02010 C OVERALL LIGHTING LAYOUT 11.8 23-Apr-15 18-Dec-14 8-May-15 1-Jan-15 15-May-15 10-Apr-15 22-May-15 7-Jul-15 21-Jun-15 14-Jul-15 4-Sep-15 31-Jul-15 100% 100.0%
A545-736-16-50-03010 C OVERALL EARTHING LAYOUT 11.8 28-Mar-15 31-Dec-14 27-Apr-15 14-Jan-15 11-May-15 15-Apr-15 18-May-15 7-Jul-15 17-Jun-15 14-Jul-15 31-Aug-15 31-Jul-15 100% 100.0%
A545-736-16-50-40010 C MV CABLE SCHEDULE 7.9 27-Apr-15 23-May-15 11-May-15 4-Jul-15 18-May-15 12-Aug-15 1-Jun-15 31-Aug-15 15-Jun-15 15-Sep-15 31-Aug-19 - 85% 85.0%
A545-736-16-50-40020 C LV CABLE SCHEDULE 7.9 4-May-15 27-May-15 18-May-15 4-Jul-15 25-May-15 12-Aug-15 8-Jun-15 31-Aug-15 22-Jun-15 15-Sep-15 31-Aug-19 - 85% 85.0%
A545-736-16-50-40040 C MV INTERCONNECTION 3.1 4-May-15 20-Aug-15 8-Dec-16 23-Feb-17 15-Dec-16 20-Jul-17 29-Dec-16 27-Jul-17 8-Apr-19 - 31-Aug-19 - 85% 80.0%
A545-736-16-50-40050 C LV INTERCONNECTION 3.1 11-May-15 28-Aug-15 15-Dec-16 23-Feb-17 22-Dec-16 21-Jul-17 5-Jan-17 28-Jul-17 15-Apr-19 - 31-Aug-19 - 85% 80.0%
A545-736-16-50-40070 E RELAY COORDINATION 3.1 4-Mar-19 - 16-Mar-19 - 1-Apr-19 - 11-Apr-19 - 18-Apr-19 - 18-May-19 - 100%
A545-736-16-50-48030 P LCS SCHEDULE 3.1 19-Mar-15 6-Jul-15 2-Apr-15 25-Jul-15 18-Apr-15 14-Aug-15 28-Apr-15 30-Sep-15 28-May-15 7-Oct-15 26-Aug-15 21-Oct-15 100% 100.0%
100 92.0%
VENDOR DRAWING
MR ISSUE TBA PR ISSUE TOTAL (SCHD TOTAL (ACTUAL
REVIEW
(40%) (85%) (90%) PROGRESS %) PROGRESS %)
MR No MR DESCRIPTION WTG. % (100%)
MRs
A545-736-XT-MR-0270 HV CABLES (MOU ITEM) 6.7 10-Jan-15 13-Jan-15 8-Apr-15 31-Mar-15 18-Dec-16 16-Jul-18 16-Feb-17 25-Feb-19 100% 100.0%
A545-736-XZ-MR-0600 HV SYSTEM PACKAGE 66.7 7-Jan-15 20-Jan-15 20-Apr-15 12-Jun-15 19-Jun-15 1-Jul-16 30-Mar-17 27-Feb-18 100% 100.0%
100 100.0%
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE: INSTRUMENTATION (TRADING FACILITIES)
A545-736-16-51-IS00 C INSTALLATION STANDARDS 10.5 8-Apr-15 24-Nov-14 8-May-15 8-Dec-14 15-May-15 15-Dec-14 19-May-15 19-Dec-14 26-May-15 26-Dec-14 24-Aug-15 2-Jan-15 100% 100.0%
A545-736-16-51-II02 C INSTRUMENT INDEX 7.2 7-Jun-15 8-Aug-15 20-Oct-16 18-Mar-16 3-Nov-16 25-Mar-16 10-Nov-16 1-Apr-16 17-Nov-16 8-Apr-16 16-Apr-19 - 85% 100.0%
A545-736-16-51-BMO C BILL OF MATERIAL 9.9 8-Apr-15 20-Apr-15 - - - - - - - - 31-Dec-15 24-May-16 100% 100.0%
A545-736-16-51-CH02 C CABLE SCHEDULE 7.2 15-May-15 20-Aug-15 15-Jun-15 27-Aug-15 22-Jun-15 22-Feb-16 26-Jun-15 18-Apr-16 27-Jul-15 25-Apr-16 25-Sep-15 2-May-16 100% 100.0%
A545-736-16-51-MD06 E POWER SUPPLY SCHEME =I49+7 =M13-14 =I13+30 =P13-7 =L13+7 =S13-4 =O13+4 =V13-7 =R13+7 =Y13-14 #VALUE! 21-02-2015
INSTRUMENT LOCATION PLAN FOR CRUDE
A545-736-16-51-10851 C 9.0 27-May-15 24-Mar-15 26-Jun-15 23-Apr-15 3-Jul-15 30-Apr-15 7-Jul-15 4-May-15 6-Aug-15 18-May-15 27-Feb-17 9-Oct-15 100% 100.0%
TERMINAL
INSTRUMENT LOCATION PLAN FOR
A545-736-16-51-10852 C 9.0 3-Jun-15 28-Aug-15 3-Jul-15 5-Sep-15 10-Jul-15 8-Sep-15 14-Jul-15 12-Sep-15 13-Aug-15 15-Sep-15 20-Mar-17 18-Mar-16 100% 100.0%
PRODUCT TERMINAL
A545-736-16-51-0823 C GAS DETECTOR AND CCTV LAYOUT 9.0 16-Jun-15 3-Aug-15 16-Jul-15 29-Aug-15 23-Jul-15 23-Sep-15 27-Jul-15 30-Sep-15 3-Aug-15 30-Dec-15 20-Mar-17 10-Feb-17 100% 100.0%
A545-736-16-51-EIR01 E ELECTRICAL INTERFACE 3/2/2015 =M17-30 =I17+30 =P17-7 #VALUE! 25-May-15 #VALUE! 1-Jun-15 =R17+59 6/15/2015 =U17+60 12/31/2015
NOZZLE ELEVATION FOR LEVEL
A545-736-16-51-NE001 E 3.6 12-Mar-15 30-Dec-15 11-Apr-15 13-Jan-16 18-Apr-15 20-Jan-16 22-Apr-15 27-Jan-16 29-Apr-15 3-Feb-16 13-Jun-15 10-Feb-16 100% 100.0%
INSTRUMENT
A545-736-16-51-01160 E CONTROL ROOM LAYOUT (CR#03) 5.4 4-Jan-15 21-Jun-17 3-Feb-15 28-Sep-17 10-Feb-15 21-Nov-17 14-Feb-15 28-Nov-17 4-Jan-17 6-Dec-17 18-Feb-17 13-Dec-17 100% 100.0%
INSTRUMENT CABLE DUCT / TRENCH
A545-736-16-51-30899 C 7.2 1-Dec-14 19-Aug-15 31-Dec-14 26-Aug-15 7-Jan-15 2-Sep-15 11-Jan-15 9-Sep-15 18-Jan-15 16-Sep-15 24-Feb-15 23-Sep-15 100% 100.0%
LAYOUT
MISCELLANEOUS (INPUT TO MR, TENDER &
A545-736-16-51-MISC 21.8 20-Feb-15 10-Feb-15 - - - - - - - - 31-Aug-15 31-Oct-16 100% 100.0%
PACKAGES)
100 100.0%
A545-736-YP-MR-1101 PRESSURE GAUGES 28-May-15 15-Jul-15 24-Aug-15 2-Nov-15 16-Dec-16 - 14-Feb-17 - 100%
A545-736-YI-MR-1301 FIELD INSTRUMENTS 6-Jun-15 13-Jul-15 17-Sep-15 10-Nov-15 19-Jan-17 - 19-Apr-17 - 100%
A545-736-YF-MR-1321 ORIFICE PLATES & FLANGES 2.7 12-Jun-15 10-Jul-15 21-Sep-15 18-Apr-16 23-Jan-17 13-Jun-18 23-Apr-17 25-Feb-19 100% 100.0%
A545-736-YC-MR-1339 CONTROL VALVES 10.7 3-Mar-15 22-Jan-15 12-Jun-15 22-May-15 3-Dec-16 1-Jan-18 11-Feb-17 29-Nov-18 100% 100.0%
A545-736-YR-MR-1361 PRESSURE RELIEF VALVES 8.0 29-Dec-14 27-Feb-15 10-Apr-15 5-Jun-15 29-Jan-17 23-Aug-17 30-Mar-17 29-Mar-18 100% 100.0%
A545-736-YC-MR-2160 SPECIAL CONTROL VALVE 28-Jan-15 22-Jan-15 11-May-15 12-May-15 30-Jan-17 - 31-Mar-17 - 100% 85.0%
A545-736-YR-MR-2180 SURGE RELIEF VALVES 8.0 12-Dec-14 16-Dec-14 24-Mar-15 26-Mar-15 23-May-15 18-Dec-15 31-Aug-19 - 90% 96.0%
A545-736-YR-MR-2181 SURGE RELIEF VALVES 4.0 12-Jun-15 5-Jun-15 22-Sep-15 8-Oct-15 12-Jun-19 28-Jun-18 31-Aug-19 - 85% 90.0%
A545-736-YZ-MR-2470 TETRA SYSTEM 10.7 22-Jun-15 28-May-15 2-Oct-15 18-Sep-15 1-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-736-YZ-MR-2472 EPABX SYSTEM 10.7 24-Jun-15 12-Jun-15 4-Oct-15 9-Oct-15 1-Aug-19 - 31-Aug-19 - 85% 85.0%
COMMON DELIVERABLES
A545-000-07-41-PE-0001 PROCUREMENT PROCEDURE 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000-07-41-PE-0001 PROJECT EXECUTION METHODOLOGY 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000-07-41-PE-0001 WORK BREAKDOWN STRUCTURE 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000-07-41-PE-0001 PROJECT SCHEDULE 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000-07-41-PE-0001 PROGRESS MEASUREMENT STRUCTURE 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000--2744-5002A LEVEL - IV RESOURCE LOADED SCHEDULE 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000-07-41-PE-0001 ORAGNIATION CHART 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000-07-41-PE-0001 PROJECT QUALITY PLAN 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000-07-41-PE-0001 INSPECTION LEVELS 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-000-07-41-PE-0001 PROCUREMENT PLAN 0.2 2-Nov-14 3-Nov-14 - - - - - - 31-Dec-14 31-Dec-14 100% 100.0%
A545-02-41-700-EQL EQUIPMENT LIST 0.2 2-Dec-14 24-Dec-14 - - - - - - 31-Jan-15 28-Feb-15 100% 100.0%
A545-02-41-700-LNL LINE LIST 0.2 2-Jan-15 20-Feb-15 - - - - - - 31-Mar-15 30-Apr-15 100% 100.0%
A545-02-41-610-1111 COOLING WATER DISTRIBUTION 1.5 3-Dec-14 3-Nov-14 11-Feb-15 17-Nov-14 1-Jun-15 12-Mar-15 1-Jul-15 24-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-610-1112 PLANT AIR/ INSTRUMENT AIR DISTRIBUTION 1.5 5-Dec-14 4-Nov-14 13-Feb-15 18-Nov-14 3-Jun-15 3-Mar-15 3-Jul-15 24-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-610-1113 NITROGEN DISTRIBUTION 1.5 7-Dec-14 4-Nov-14 15-Feb-15 18-Nov-14 5-Jun-15 3-Mar-15 5-Jul-15 8-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-610-1114 DM WATER / BFW / CAUSTIC DISTRIBUTION 1.5 9-Dec-14 7-Nov-14 17-Feb-15 21-Nov-14 7-Jun-15 17-Jul-15 7-Jul-15 24-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-610-1115 LP/ MP/ HP/ VHP STEAM DISTRIBUTION 1.5 11-Dec-14 31-Oct-14 19-Feb-15 14-Nov-14 9-Jun-15 12-Mar-15 9-Jul-15 24-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-610-1116 RAW WATER/ CT-BD/ SERVICE WATER DISTRIBUTION 1.5 13-Dec-14 2-Oct-14 21-Feb-15 16-Oct-14 11-Jun-15 17-Jul-15 11-Jul-15 24-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-610-1117 FO/FG DISTRIBUTION 1.5 15-Dec-14 4-Nov-14 23-Feb-15 18-Nov-14 13-Jun-15 8-Jul-15 13-Jul-15 25-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-610-1118 HP/LP FLARE DISTRIBUTION 1.5 17-Dec-14 24-Feb-15 25-Feb-15 10-Mar-15 15-Jun-15 15-May-15 15-Jul-15 25-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-610-1119 CONDENSATE DISTRIBUTION 1.5 19-Dec-14 4-Nov-14 27-Feb-15 18-Nov-14 17-Jun-15 10-Jul-15 17-Jul-15 25-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-612-1111 COMPRESSED AIR SYSTEM 1.5 21-Dec-14 30-Dec-14 1-Mar-15 13-Jan-15 19-Jun-15 3-Mar-15 19-Jul-15 15-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-612-1112 COMPRESSED AIR SYSTEM (HP) 1.5 23-Dec-14 30-Dec-14 3-Mar-15 13-Jan-15 21-Jun-15 3-Mar-15 21-Jul-15 10-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-612-1113 COMPRESSOR TURBINE DETAILS 1.5 24-Dec-14 25-Mar-15 4-Mar-15 24-Apr-15 22-Jun-15 18-May-15 22-Jul-15 15-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-614-1111 NITROGEN SYSTEM 1.5 25-Dec-14 28-Oct-14 5-Mar-15 11-Nov-14 23-Jun-15 3-Feb-15 23-Jul-15 15-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-621-1112 REJECT DISPOSAL NETWORK 1.5 31-Dec-14 19-May-15 11-Mar-15 12-Jun-15 29-Jun-15 10-Jul-15 29-Jul-15 10-Jul-15 31-Oct-19 - 95% 96.0%
Page 498 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 5
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA
DISCIPLINE: PROCESS (UTILITIES & OFFSITES)
ANNEXURE-A6
TOTAL
TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD
(ACTUAL
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG (10%) (65%) (85%) (95%) (100%) PROGRESS
PROGRESS %)
% %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-622-1111 DM WATER STORAGE & SUPPLY 1.5 29-Dec-14 31-Oct-14 9-Mar-15 14-Nov-14 27-Jun-15 19-Mar-15 27-Jul-15 13-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-632-1111 RECIRCULATING COOLING WATER SYSTEM-II 1.5 31-Dec-14 25-Oct-14 11-Mar-15 8-Nov-14 29-Jun-15 26-Feb-15 29-Jul-15 29-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-633-1111 RECIRCULATING COOLING WATER SYSTEM 1.5 4-Jan-15 25-Oct-14 15-Mar-15 8-Nov-14 3-Jul-15 26-Feb-15 2-Aug-15 14-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-634-1111 RECIRCULATING COOLING WATER SYSTEM 1.5 8-Jan-15 25-Oct-14 19-Mar-15 8-Nov-14 7-Jul-15 26-Feb-15 6-Aug-15 19-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-641-1111 CONDENSATE POLISHING SYSTEM - P&ID 1.5 12-Jan-15 31-Oct-14 23-Mar-15 14-Nov-14 11-Jul-15 19-Mar-15 10-Aug-15 20-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-641-1112 CONDENSATE POLISHING SCHEMATIC 1.5 14-Jan-15 31-Oct-14 25-Mar-15 14-Nov-14 13-Jul-15 19-Mar-15 12-Aug-15 20-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-651-1111 FUEL GAS MIXING DRUM /C3 VAPORISER 1.5 16-Jan-15 28-Feb-15 27-Mar-15 30-Mar-15 15-Jul-15 14-Jul-15 14-Aug-15 29-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-651-1112 FUEL OIL CIRCULATION 1.5 18-Jan-15 28-Feb-15 29-Mar-15 30-Mar-15 17-Jul-15 15-Jul-15 16-Aug-15 29-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-651-1113 FUEL OIL HEATING SYSTEM 1.5 20-Jan-15 28-Feb-15 31-Mar-15 30-Mar-15 19-Jul-15 15-Jul-15 18-Aug-15 29-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-651-1114 FLARE KNOCK OUT DRUM 1.5 22-Jan-15 28-Feb-15 2-Apr-15 30-Mar-15 21-Jul-15 16-Jul-15 20-Aug-15 29-Jul-15 31-Oct-19 - 95% 96.0%
A545-02-41-651-1115 CLOSED BLOW DOWN DRUM 1.5 24-Jan-15 28-Feb-15 4-Apr-15 30-Mar-15 23-Jul-15 29-Jul-15 22-Aug-15 10-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-651-1116 STEAM BLOW DOWN FLASH DRUM 1.5 25-Jan-15 28-May-15 4-Apr-15 15-Jul-15 23-Jul-15 29-Jul-15 22-Aug-15 10-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-671-1111 TO 1115 HYDROCARBON FLARE SYSTEM 1.5 27-Jan-15 11-Feb-15 7-Apr-15 24-Mar-15 26-Jul-15 3-Jul-15 25-Aug-15 10-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-671-1117 INTERMITTENT LP FLARE KOD (NEAR PP UNIT) 1.5 28-Jan-15 11-Feb-15 8-Apr-15 24-Mar-15 27-Jul-15 22-Jul-15 26-Aug-15 10-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-671-1118 INTERMITTENT HP FLARE KOD (NEAR PP UNIT) 1.5 29-Jan-15 11-Feb-15 9-Apr-15 24-Mar-15 28-Jul-15 22-Jul-15 27-Aug-15 10-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-671-1119 SOUR FLARE SYSTEM 1.5 30-Jan-15 11-Feb-15 10-Apr-15 24-Mar-15 29-Jul-15 3-Jul-15 28-Aug-15 10-Aug-15 31-Oct-19 - 95% 96.0%
A545-02-41-682-1111 RECIRCULATING COOLING WATER SYSTEM CPP 1.5 1-Feb-15 9-Oct-14 12-Apr-15 8-Nov-14 31-Jul-15 26-Feb-15 30-Aug-15 9-Jul-15 31-Oct-19 - 95% 96.0%
A545-671-02-DS-1201 FLARE KOD 0.3 28-Feb-15 10-Mar-15 19-Apr-15 16-Mar-15 18-Jul-15 14-Jul-15 17-Aug-15 10-Aug-15 6-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1202 HC FLARE KOD II & III 0.3 2-Mar-15 12-Mar-15 21-Apr-15 16-Mar-15 20-Jul-15 2-Jul-15 19-Aug-15 10-Aug-15 8-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1203 FUEL GAS KOD 0.3 4-Mar-15 14-Mar-15 23-Apr-15 31-Mar-15 22-Jul-15 24-Jul-15 21-Aug-15 10-Aug-15 10-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1204 WATER SEAL DRUM (NORMAL 0.3 6-Mar-15 16-Mar-15 25-Apr-15 24-Mar-15 24-Jul-15 24-Jul-15 23-Aug-15 20-Aug-15 12-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1205 WATER SEAL DRUM (PEAK) 0.3 8-Mar-15 18-Mar-15 27-Apr-15 24-Mar-15 26-Jul-15 24-Jul-15 25-Aug-15 20-Aug-15 14-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1206 INTERMITTENT LP FLARE KOD 0.3 10-Mar-15 20-Mar-15 29-Apr-15 16-Mar-15 28-Jul-15 2-Jul-15 27-Aug-15 10-Aug-15 16-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1207 INTERMITTENT HP FLARE KOD 0.3 12-Mar-15 23-Mar-15 1-May-15 16-Mar-15 30-Jul-15 2-Jul-15 29-Aug-15 10-Aug-15 18-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1208 SOUR FLARE KOD 0.3 14-Mar-15 25-Mar-15 3-May-15 24-Mar-15 1-Aug-15 2-Jul-15 31-Aug-15 10-Aug-15 20-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1209 INTERMITTENT (OFFSITE STORAGE) LP FLARE KOD 0.3 15-Mar-15 27-Mar-15 4-May-15 24-Mar-15 2-Aug-15 2-Jul-15 1-Sep-15 10-Aug-15 21-Oct-15 28-Nov-15 100% 100.0%
A545-671-02-DS-1601 HC FLARE KOD BLOW DOWN PUMPS 0.3 16-Mar-15 27-Mar-15 5-May-15 9-Mar-15 3-Aug-15 23-Jul-15 2-Sep-15 22-Aug-15 22-Oct-15 4-Feb-16 100% 100.0%
A545-671-02-DS-1602 LP FLARE INTERMEDIATE KOD BLOW DOWN PUMPS 0.3 18-Mar-15 28-Mar-15 7-May-15 14-Mar-15 5-Aug-15 23-Jul-15 4-Sep-15 22-Aug-15 24-Oct-15 4-Feb-16 100% 100.0%
A545-671-02-DS-1603 HP FLARE INTERMEDIATE KOD BLOW DOWN PUMPS 0.3 20-Mar-15 30-Mar-15 9-May-15 9-Mar-15 7-Aug-15 23-Jul-15 6-Sep-15 22-Aug-15 26-Oct-15 4-Feb-16 100% 100.0%
A545-671-02-DS-1604 ACID FLARE KOD BLOWDOWN PUMPS 0.3 22-Mar-15 1-Apr-15 11-May-15 9-Mar-15 9-Aug-15 24-Jul-15 8-Sep-15 22-Aug-15 28-Oct-15 8-Feb-16 100% 100.0%
A545-671-02-DS-1801 FLARE & BLOWDOWN SYSTEM 0.3 24-Mar-15 3-Mar-15 13-May-15 17-Mar-15 11-Aug-15 4-Jul-15 10-Sep-15 14-Aug-15 30-Oct-15 8-Feb-16 100% 100.0%
A545-612-02-DS-1201 LP AIR RECEIVER 0.3 24-Feb-15 10-Sep-14 15-Apr-15 24-Sep-14 14-Jul-15 3-Mar-15 13-Aug-15 3-Mar-15 2-Oct-15 3-Mar-15 100% 100.0%
A545-612-02-DS-1202 MAIN HP AIR RECEIVER-I & II 0.3 26-Feb-15 10-Sep-14 17-Apr-15 24-Sep-14 16-Jul-15 3-Mar-15 15-Aug-15 3-Mar-15 4-Oct-15 3-Mar-15 100% 100.0%
A545-612-02-DS-1203 CPP HP INST. AIR RECEIVER 0.3 28-Feb-15 9-Jan-15 19-Apr-15 23-Jan-15 18-Jul-15 3-Mar-15 17-Aug-15 3-Mar-15 6-Oct-15 3-Mar-15 100% 100.0%
A545-612-02-DS-1501 LP AIR COMPRESSORS 0.3 2-Mar-15 10-Sep-14 21-Apr-15 24-Sep-14 20-Jul-15 9-Jan-15 19-Aug-15 9-Jan-15 8-Oct-15 9-Jan-15 100% 100.0%
A545-612-02-DS-1502 HP AIR COMPRESSORS 0.3 4-Mar-15 10-Sep-14 23-Apr-15 24-Sep-14 22-Jul-15 3-Mar-15 21-Aug-15 3-Mar-15 10-Oct-15 3-Mar-15 100% 100.0%
A545-612-02-DS-1901 INST AIR DRYERS 0.3 6-Mar-15 10-Sep-14 25-Apr-15 24-Sep-14 24-Jul-15 3-Mar-15 23-Aug-15 30-Mar-15 12-Oct-15 30-Mar-15 100% 100.0%
A545-612-02-DS-1902 LP AIR TRAP 0.3 8-Mar-15 13-Sep-14 27-Apr-15 1-Oct-15 26-Jul-15 15-Oct-15 25-Aug-15 15-Oct-15 14-Oct-15 27-Jan-16 100% 100.0%
A545-612-02-DS-1903 HP AIR TRAPS 0.3 10-Mar-15 15-Sep-14 29-Apr-15 1-Oct-15 28-Jul-15 15-Oct-15 27-Aug-15 15-Oct-15 16-Oct-15 27-Jan-16 100% 100.0%
A545-612-02-DS-1904 CPP HP AIR TRAPS 0.3 12-Mar-15 18-Sep-14 1-May-15 1-Oct-15 30-Jul-15 15-Oct-15 29-Aug-15 15-Oct-15 18-Oct-15 27-Jan-16 100% 100.0%
A545-641-02-DS-1401 FEED POLISHED EXCHANGER 0.3 14-Mar-15 4-Nov-14 3-May-15 14-Nov-14 1-Aug-15 19-Mar-15 31-Aug-15 19-Mar-15 20-Oct-15 19-Mar-15 100% 100.0%
A545-641-02-DS-1402 TRIM COOLER 0.3 17-Mar-15 4-Nov-14 6-May-15 14-Nov-14 4-Aug-15 19-Mar-15 3-Sep-15 19-Mar-15 23-Oct-15 19-Mar-15 100% 100.0%
A545-641-02-DS-1901 CONDENSATE POLISHING UNIT 0.3 20-Mar-15 4-Nov-14 9-May-15 14-Nov-14 7-Aug-15 18-Mar-15 6-Sep-15 18-Mar-15 26-Oct-15 18-Mar-15 100% 100.0%
A545-682-02-DS-1801 COOLING TOWERS 0.3 22-Feb-15 16-May-14 13-Apr-15 7-Aug-14 12-Jul-15 23-Feb-15 11-Aug-15 23-Feb-15 30-Sep-15 23-Feb-15 100% 100.0%
A545-682-02-DS-1701 H2SO4 DOSING TANK 0.3 24-Feb-15 16-May-14 15-Apr-15 8-Nov-14 14-Jul-15 25-Feb-15 13-Aug-15 25-Feb-15 2-Oct-15 25-Feb-15 100% 100.0%
A545-682-02-DS-1601 COOLING WATER CIRCULATION PUMPS 0.3 26-Feb-15 16-May-14 17-Apr-15 7-Aug-14 16-Jul-15 25-Feb-15 15-Aug-15 25-Feb-15 4-Oct-15 25-Feb-15 100% 100.0%
A545-682-02-DS-1603 H2SO4 DOSING PUMPS 0.3 2-Mar-15 7-Aug-14 21-Apr-15 12-Aug-14 20-Jul-15 25-Feb-15 19-Aug-15 25-Feb-15 8-Oct-15 25-Feb-15 100% 100.0%
A545-682-02-DS-1604 H2SO4 LOADING/TRANSFER PUMPS 0.3 4-Mar-15 7-Aug-14 23-Apr-15 12-Aug-14 22-Jul-15 25-Feb-15 21-Aug-15 25-Feb-15 10-Oct-15 25-Feb-15 100% 100.0%
A545-682-02-DS-1901 SIDE STREAM FILTER 0.3 6-Mar-15 5-Aug-14 25-Apr-15 8-Nov-14 24-Jul-15 25-Feb-15 23-Aug-15 25-Feb-15 12-Oct-15 25-Feb-15 100% 100.0%
A545-682-02-DS-1201 H2SO4 STORAGE TANK 0.3 8-Mar-15 5-Aug-14 27-Apr-15 8-Nov-14 26-Jul-15 25-Feb-15 25-Aug-15 25-Feb-15 14-Oct-15 25-Feb-15 100% 100.0%
A545-682-02-DS-1802 SILICA GEL BREATHER 0.3 18-Mar-15 12-Aug-14 7-May-15 12-Aug-14 5-Aug-15 25-Feb-15 4-Sep-15 25-Feb-15 24-Oct-15 25-Feb-15 100% 100.0%
A545-682-02-DS-1803 SILICA GEL BREATHER 0.3 20-Mar-15 7-Aug-14 9-May-15 7-Aug-14 7-Aug-15 25-Feb-15 6-Sep-15 25-Feb-15 26-Oct-15 25-Feb-15 100% 100.0%
A545-632-02-DS-1801 COOLING TOWERS 0.3 26-Feb-15 16-May-14 17-Apr-15 7-Aug-14 16-Jul-15 25-Feb-15 15-Aug-15 25-Feb-15 4-Oct-15 25-Feb-15 100% 100.0%
A545-632-02-DS-1701 H2SO4 DOSING TANK 0.3 28-Feb-15 16-May-14 19-Apr-15 8-Nov-14 18-Jul-15 25-Feb-15 17-Aug-15 25-Feb-15 6-Oct-15 25-Feb-15 100% 100.0%
A545-632-02-DS-1601 COOLING WATER CIRCULATION PUMPS 0.3 2-Mar-15 16-May-14 21-Apr-15 7-Aug-14 20-Jul-15 25-Feb-15 19-Aug-15 25-Feb-15 8-Oct-15 25-Feb-15 100% 100.0%
A545-632-02-DS-1603 H2SO4 DOSING PUMPS 0.3 4-Mar-15 12-Mar-15 23-Apr-15 12-Aug-14 22-Jul-15 25-Feb-15 21-Aug-15 25-Feb-15 10-Oct-15 25-Feb-15 100% 100.0%
A545-632-02-DS-1602 H2SO4 UNLOADING/TRANSFER PUMPS 0.3 6-Mar-15 14-Mar-15 25-Apr-15 12-Aug-14 24-Jul-15 25-Feb-15 23-Aug-15 16-Nov-15 12-Oct-15 16-Nov-15 100% 100.0%
A545-632-02-DS-1901 SIDE STREAM FILTERS 0.3 8-Mar-15 16-May-14 27-Apr-15 7-Aug-14 26-Jul-15 25-Feb-15 25-Aug-15 25-Feb-15 14-Oct-15 25-Feb-15 100% 100.0%
A545-632-02-DS-1201 H2SO4 STORAGE TANK 0.3 10-Mar-15 16-May-14 29-Apr-15 8-Nov-14 28-Jul-15 25-Feb-15 27-Aug-15 25-Feb-15 16-Oct-15 25-Feb-15 100% 100.0%
A545-632-02-DS-1802 SILICA GEL BREATHER 0.3 20-Mar-15 12-Aug-14 9-May-15 8-Nov-14 7-Aug-15 25-Feb-15 6-Sep-15 25-Feb-15 26-Oct-15 25-Feb-15 100% 100.0%
A545-632-02-DS-1803 SILICA GEL BREATHER 0.3 20-Mar-15 12-Aug-14 9-May-15 8-Nov-14 7-Aug-15 25-Feb-15 6-Sep-15 25-Feb-15 26-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1801 COOLING TOWERS 0.3 2-Mar-15 16-May-14 21-Apr-15 7-Aug-14 20-Jul-15 25-Feb-15 19-Aug-15 25-Feb-15 8-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1701 H2SO4 DOSING TANK 0.3 4-Mar-15 16-May-14 23-Apr-15 8-Nov-14 22-Jul-15 25-Feb-15 21-Aug-15 25-Feb-15 10-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1601 COOLING WATER CIRCULATION PUMPS 0.3 6-Mar-15 16-May-14 25-Apr-15 7-Aug-14 24-Jul-15 25-Feb-15 23-Aug-15 25-Feb-15 12-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1603 H2SO4 DOSING PUMPS 0.3 8-Mar-15 4-Aug-14 27-Apr-15 12-Aug-14 26-Jul-15 25-Feb-15 25-Aug-15 25-Feb-15 14-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1602 H2SO4 UNLOADING/TRANSFER PUMPS 0.3 10-Mar-15 4-Aug-14 29-Apr-15 12-Aug-14 28-Jul-15 25-Feb-15 27-Aug-15 25-Feb-15 16-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1901 SIDE STREAM FILTERS 0.3 12-Mar-15 16-May-14 1-May-15 7-Aug-14 30-Jul-15 25-Feb-15 29-Aug-15 25-Feb-15 19-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1201 H2SO4 STORAGE TANK 0.3 14-Mar-15 4-Aug-14 3-May-15 8-Nov-14 1-Aug-15 25-Feb-15 31-Aug-15 25-Feb-15 20-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1802 SILICA GEL BREATHER 0.3 24-Mar-15 1-Aug-14 13-May-15 12-Aug-14 11-Aug-15 25-Feb-15 10-Sep-15 25-Feb-15 30-Oct-15 25-Feb-15 100% 100.0%
A545-633-02-DS-1803 SILICA GEL BREATHER 0.3 26-Mar-15 1-Aug-14 15-May-15 12-Aug-14 13-Aug-15 25-Feb-15 12-Sep-15 25-Feb-15 2-Nov-15 25-Feb-15 100% 100.0%
A545-634-02-DS-1801 COOLING TOWERS 0.3 4-Mar-15 21-May-14 23-Apr-15 8-Aug-14 22-Jul-15 8-Nov-14 21-Aug-15 26-Jun-15 10-Oct-15 26-Jun-15 100% 100.0%
A545-634-02-DS-1701 H2SO4 DOSING TANK 0.3 6-Mar-15 21-May-14 25-Apr-15 8-Aug-14 24-Jul-15 25-Feb-15 23-Aug-15 25-Feb-15 12-Oct-15 25-Feb-15 100% 100.0%
A545-634-02-DS-1601 COOLING WATER CIRCULATION PUMPS 0.3 8-Mar-15 5-May-14 27-Apr-15 16-May-14 26-Jul-15 25-Feb-15 25-Aug-15 14-Jul-15 14-Oct-15 14-Jul-15 100% 100.0%
A545-634-02-DS-1603 H2SO4 DOSING PUMPS 0.3 10-Mar-15 21-May-14 29-Apr-15 12-Aug-14 28-Jul-15 25-Feb-15 27-Aug-15 25-Feb-15 16-Oct-15 25-Feb-15 100% 100.0%
A545-634-02-DS-1602 H2SO4 UNLOADING/TRANSFER PUMPS 0.3 12-Mar-15 21-May-14 1-May-15 12-Aug-14 30-Jul-15 25-Feb-15 29-Aug-15 25-Feb-15 18-Oct-15 25-Feb-15 100% 100.0%
A545-634-02-DS-1901 SIDE STREAM FILTER 0.3 14-Mar-15 21-May-14 3-May-15 12-Aug-14 1-Aug-15 25-Feb-15 31-Aug-15 26-Jun-15 20-Oct-15 26-Jun-15 100% 100.0%
A545-634-02-DS-1201 H2SO4 STORAGE TANK 0.3 16-Mar-15 21-May-14 5-May-15 12-Aug-14 3-Aug-15 25-Feb-15 2-Sep-15 25-Feb-15 22-Oct-15 25-Feb-15 100% 100.0%
A545-634-02-DS-1802 SILICA GEL BREATHER 0.3 26-Mar-15 1-Aug-14 15-May-15 12-Aug-14 13-Aug-15 25-Feb-15 12-Sep-15 25-Feb-15 1-Nov-15 25-Feb-15 100% 100.0%
A545-634-02-DS-1803 SILICA GEL BREATHER 0.3 28-Mar-15 1-Aug-14 17-May-15 12-Aug-14 15-Aug-15 25-Feb-15 14-Sep-15 25-Feb-15 3-Nov-15 25-Feb-15 100% 100.0%
PROCESS DATASHEET DM
A545-622-02-DS-1601 DM WATER TRANSFER PUMP 0.3 10-Mar-15 25-Oct-14 29-Apr-15 14-Nov-14 28-Jul-15 18-Mar-15 27-Aug-15 10-Jul-15 16-Oct-15 10-Jul-15 100% 100.0%
A545-622-02-DS-1701 DM WATER STORAGE TANK 0.3 13-Mar-15 25-Oct-14 2-May-15 14-Nov-14 31-Jul-15 18-Mar-15 30-Aug-15 12-Mar-15 19-Oct-15 12-Mar-15 100% 100.0%
A545-651-02-DS-1201 FUEL GAS KNOCK OUT DRUM 0.3 14-Mar-15 24-Jan-15 3-May-15 13-Feb-15 1-Aug-15 23-Jun-15 31-Aug-15 17-Nov-15 20-Oct-15 17-Nov-15 100% 100.0%
A545-651-02-DS-1202 FUEL OIL SURGE DRUM 0.3 16-Mar-15 1-Feb-15 5-May-15 21-Feb-15 3-Aug-15 30-Jun-15 2-Sep-15 18-Nov-15 22-Oct-15 18-Nov-15 100% 100.0%
A545-651-02-DS-1203 CONDENSATE POT 0.3 18-Mar-15 3-Feb-15 7-May-15 23-Feb-15 5-Aug-15 15-Jul-15 4-Sep-15 28-Jul-15 24-Oct-15 2-Sep-15 100% 100.0%
A545-651-02-DS-1204 FLARE KNOCK OUT DRUM 0.3 20-Mar-15 3-Feb-15 9-May-15 23-Feb-15 7-Aug-15 15-Jul-15 6-Sep-15 20-Nov-15 26-Oct-15 20-Nov-15 100% 100.0%
A545-651-02-DS-1205 CLOSED BLOW DOWN DRUM 0.3 22-Mar-15 3-Feb-15 11-May-15 23-Feb-15 9-Aug-15 28-Jul-15 8-Sep-15 20-Nov-15 28-Oct-15 20-Nov-15 100% 100.0%
A545-651-02-DS-1206 STEAM BLOWDOWN FLASH DRUM 0.3 24-Apr-15 25-Jun-15 13-Jun-15 15-Jul-15 5-Sep-15 28-Jul-15 5-Oct-15 20-Jan-16 24-Nov-15 5-Feb-16 100% 100.0%
A545-651-02-DS-1401 PROPANE VAPORISER 0.3 24-Mar-15 3-Feb-15 13-May-15 23-Feb-15 11-Aug-15 23-Jun-15 10-Sep-15 21-Jul-15 30-Oct-15 4-Sep-15 100% 100.0%
A545-651-02-DS-1402 FUEL OIL TRIM HEATER 0.3 26-Mar-15 3-Feb-15 15-May-15 23-Feb-15 13-Aug-15 30-Jun-15 12-Sep-15 21-Jul-15 1-Nov-15 8-Sep-15 100% 100.0%
A545-651-02-DS-1601 FUEL OIL CIRCULATION PUMPS 0.3 28-Mar-15 12-Mar-15 17-May-15 1-Apr-15 15-Aug-15 30-Jun-15 14-Sep-15 21-Jul-15 3-Nov-15 8-Sep-15 100% 100.0%
A545-651-02-DS-1602 CBD PUMPS 0.3 30-Mar-15 30-Jun-15 19-May-15 14-Jul-15 17-Aug-15 11-Dec-15 16-Sep-15 25-Jan-16 5-Nov-15 5-Feb-16 100% 100.0%
A545-651-02-DS-1901 FUEL OIL AFTER-FILTERS 0.3 1-Apr-15 31-Jan-15 21-May-15 21-Feb-15 19-Aug-15 23-Jun-15 18-Sep-15 5-Sep-15 7-Nov-15 24-Nov-15 100% 100.0%
A545-651-02-DS-1906 FLAME ARRESTOR 0.3 3-Apr-15 28-May-15 23-May-15 18-Jun-15 21-Aug-15 28-Jul-15 20-Sep-15 7-Sep-15 9-Nov-15 24-Nov-15 100% 100.0%
A545-651-02-DS-1905 651-VV-1001 DEMISTER 0.3 31-Mar-15 31-Jan-15 20-May-15 21-Feb-15 18-Aug-15 23-Jun-15 17-Sep-15 7-Sep-15 6-Nov-15 24-Nov-15 100% 100.0%
A545-651-02-DS-1902 LP COND. TRAP-2 (FOR 651-EE-1001A/B) 0.3 7-Apr-15 4-Feb-15 27-May-15 14-Jul-15 25-Aug-15 16-Nov-15 24-Sep-15 25-Jan-16 13-Nov-15 27-Feb-16 100% 100.0%
A545-651-02-DS-1904 LP COND. TRAP-4 (FOR 651-VV-1002) 0.3 11-Apr-15 9-Feb-15 31-May-15 14-Jul-15 29-Aug-15 16-Nov-15 28-Sep-15 25-Jan-16 17-Nov-15 27-Feb-16 100% 100.0%
A545-614-02-DS-1801 NITROGEN SYSTEM PACKAGE 0.3 12-Mar-15 28-Oct-14 1-May-15 11-Nov-14 31-Jul-15 27-Jan-15 31-Aug-15 26-Nov-15 20-Oct-15 26-Nov-15 100% 100.0%
100 97.7%
A545-730-16-49-00302 C MCR-01-MAIN CONTROL ROOM ELEVATIONS 0.4 8-Dec-15 5-Apr-14 22-Dec-15 30-Apr-14 29-Dec-15 2-Jun-14 5-Jan-16 24-Jun-14 26-Jan-16 28-Nov-14 25-May-16 6-Jun-16 100% 100.0%
A545-730-16-49-00304 C MCR-01-MAIN CONTROL ROOM D/W PROFILE 0.4 28-Dec-15 18-Nov-16 5-Jan-17 6-Jul-17 12-Jan-17 13-Jul-17 19-Jan-17 20-Jul-17 9-Feb-17 27-Jul-17 31-Aug-19 - 85% 85.0%
A545-730-16-49-00310 C CR-02-POWER BLOCK(SS-11) TERRACE PLAN 0.4 2-Jan-16 23-Dec-15 16-Jan-16 6-Jan-16 23-Jan-16 13-Jan-16 30-Jan-16 20-Jan-16 20-Feb-16 27-Jan-16 18-Jun-16 26-Feb-16 100% 100.0%
A545-730-81-41-02081 C CR-02-Power Block(SS-11) D/W Profile 0.4 27-Jan-16 15-Jan-16 11-Feb-16 29-Jan-16 18-Feb-16 5-Feb-16 25-Feb-16 12-Feb-16 17-Mar-16 19-Feb-16 15-Jul-16 26-Feb-16 100% 100.0%
A545-730-16-49-00313 C CR-03-TANK FARM PLAN,ELEV ,SECS 0.4 14-Nov-15 29-Jan-14 28-Nov-15 5-Apr-14 5-Dec-15 30-May-14 12-Dec-15 24-Jun-14 2-Jan-16 15-Nov-14 30-Apr-16 23-Feb-16 100% 100.0%
A545-730-16-49-00317 C CR-04-LOADING PLAN, ELEV & SECTION 0.4 18-Nov-15 1-Feb-14 2-Dec-15 7-Apr-14 9-Dec-15 2-Jun-14 16-Dec-15 25-Jun-14 6-Jan-16 20-Nov-14 5-May-16 24-Feb-16 100% 100.0%
A545-730-16-49-00318 C CR-04-LOADING TERRACE PLAN,ELEV,SECS 0.4 4-Jan-16 1-Feb-14 18-Jan-16 7-Apr-14 25-Jan-16 2-Jun-14 1-Feb-16 25-Jun-14 22-Feb-16 20-Nov-14 21-Jun-16 24-Feb-16 100% 100.0%
A545-730-16-49-00319 C CR-04-LOADING D/W PROFILE 0.4 11-Jan-16 13-Jan-16 25-Jan-16 27-Jan-16 1-Feb-16 3-Feb-16 8-Feb-16 10-Feb-16 29-Feb-16 17-Feb-16 28-Jun-16 24-Feb-16 100% 100.0%
A545-730-16-49-00321 C CR-05-ETP PLAN,ELEV,SECS 0.4 1-Dec-15 10-Feb-14 15-Dec-15 1-Apr-14 22-Dec-15 25-Apr-14 29-Dec-15 18-Jun-14 19-Jan-16 29-Nov-14 18-May-16 30-Nov-15 100% 100.0%
A545-730-16-49-00325 C CR-06-WATER BLOCK PLAN,ELEV,SECS 0.4 27-Nov-15 10-Feb-14 11-Dec-15 1-Apr-14 18-Dec-15 25-Apr-14 25-Dec-15 18-Jun-14 15-Jan-16 29-Nov-14 14-May-16 30-Nov-15 100% 100.0%
A545-730-16-49-00327 C CR-06-WATER BLOCK D/W PROFILE 0.4 19-Jan-16 26-Oct-15 2-Feb-16 9-Nov-15 9-Feb-16 16-Nov-15 16-Feb-16 23-Nov-15 8-Mar-16 30-Nov-15 6-Jul-16 30-Nov-15 100% 100.0%
A545-730-16-49-10337 C SRR-01-CDU GR. FL. PLAN & SECTIONS 0.3 12-Dec-15 22-Jan-14 26-Dec-15 20-Mar-14 2-Jan-16 21-Apr-14 9-Jan-16 29-May-14 30-Jan-16 10-Dec-14 30-May-16 9-Oct-15 100% 100.0%
A545-730-16-49-10338 C SRR-01-CDU FIRST FL PLAN & SECTIONS 0.3 16-Jan-16 22-Jan-14 30-Jan-16 21-Mar-14 6-Feb-16 22-Apr-14 13-Feb-16 29-May-15 5-Mar-16 13-Dec-14 4-Jul-16 9-Oct-15 100% 100.0%
A545-730-16-49-10339 C SRR-01-CDU TERRRACE PLAN & ELEVATION 0.3 19-Jan-16 22-Aug-15 2-Feb-16 5-Sep-15 9-Feb-16 12-Sep-15 16-Feb-16 18-Sep-15 8-Mar-16 25-Sep-15 6-Jul-16 9-Oct-15 100% 100.0%
A545-730-16-49-10340 C SRR-01-CDU SECTIONS & D/W PROFILES 0.3 4-Feb-16 22-Jan-14 18-Feb-16 21-Mar-14 25-Feb-16 22-Apr-14 3-Mar-16 28-May-14 24-Mar-16 25-Nov-14 22-Jul-16 9-Oct-15 100% 100.0%
A545-730-16-49-10341 C SRR-02-RFCC GR. FL. PLAN & SECTIONS 0.3 14-Dec-15 22-Jan-14 28-Dec-15 21-Mar-14 4-Jan-16 21-Apr-14 11-Jan-16 28-May-14 1-Feb-16 26-Nov-14 31-May-16 9-Oct-15 100% 100.0%
A545-730-16-49-10342 C SRR-02-RFCC FIRST FL PLAN & SECTIONS 0.3 18-Jan-16 22-Jan-14 1-Feb-16 21-Mar-14 8-Feb-16 22-Apr-14 15-Feb-16 28-May-14 7-Mar-16 27-Nov-14 5-Jul-16 9-Oct-15 100% 100.0%
A545-730-16-49-10343 C SRR-02-RFCC TERRRACE PLAN & ELEVATION 0.3 21-Jan-16 22-Jan-14 4-Feb-16 21-Mar-14 11-Feb-16 22-Apr-14 18-Feb-16 28-May-14 10-Mar-16 26-Nov-14 8-Jul-16 9-Oct-15 100% 100.0%
A545-730-16-49-10344 C SRR-02-RFCC SECTIONS & D/W PROFILES 0.3 6-Feb-16 22-Jan-14 20-Feb-16 21-Mar-14 27-Feb-16 22-Apr-14 5-Mar-16 28-May-14 26-Mar-16 26-Nov-14 24-Jul-16 9-Oct-15 100% 100.0%
A545-730-16-49-10350 C SRR-04 - DHDT FIRST FL PLAN & SECTIONS 0.3 21-Dec-15 23-Jan-14 4-Jan-16 29-Mar-14 11-Jan-16 29-Apr-14 18-Jan-16 28-May-14 8-Feb-16 27-Nov-14 7-Jun-16 29-Oct-15 100% 100.0%
A545-730-16-49-10351 C SRR-04 - DHDT TERRRACE PLAN & ELEVATION 0.3 22-Jan-16 23-Jan-14 5-Feb-16 29-Mar-14 12-Feb-16 29-Apr-14 19-Feb-16 28-May-14 11-Mar-16 26-Nov-14 9-Jul-16 29-Oct-15 100% 100.0%
A545-730-16-49-10352 C SRR-04-DHDT SECTIONS & D/W PROFILES 0.3 11-Feb-16 23-Jan-14 25-Feb-16 26-Mar-14 3-Mar-16 29-Apr-14 10-Mar-16 28-May-14 31-Mar-16 25-Nov-14 29-Jul-16 29-Oct-15 100% 100.0%
A545-730-16-49-10353 C SRR-05 -ALKYLATION GR. FL. PLAN & SECTIONS 0.3 21-Dec-15 22-Jan-14 4-Jan-16 24-Mar-14 11-Jan-16 21-Apr-14 18-Jan-16 28-May-14 8-Feb-16 25-Nov-14 7-Jun-16 9-Oct-15 100% 100.0%
A545-730-16-49-10358 R C SRR-06 -PRIME G FIRST FL PLAN & ELEVATION 0.3 25-Dec-15 10-Feb-14 8-Jan-16 31-Mar-14 15-Jan-16 30-Apr-14 22-Jan-16 29-May-14 12-Feb-16 29-Nov-14 11-Jun-16 30-Oct-15 100% 100.0%
A545-730-16-49-10360 R C SRR-06-PRIME G SECTIONS & D/W PROFILES 0.3 15-Feb-16 24-Jan-14 29-Feb-16 27-Mar-14 7-Mar-16 30-Apr-14 14-Mar-16 29-May-14 4-Apr-16 29-Nov-14 2-Aug-16 30-Oct-15 100% 100.0%
A545-730-16-49-10361 C SRR-07 -PPU GR. FL. PLAN & SECTIONS 0.3 25-Dec-15 23-Jan-14 8-Jan-16 31-Mar-14 15-Jan-16 30-Apr-14 22-Jan-16 28-May-14 12-Feb-16 28-Nov-14 11-Jun-16 9-Oct-15 100% 100.0%
A545-730-16-49-10362 C SRR-07 -PPU FIRST FL PLAN & SECTIONS 0.3 28-Dec-15 22-Jan-14 11-Jan-16 31-Mar-14 18-Jan-16 30-Apr-14 25-Jan-16 28-May-14 15-Feb-16 28-Nov-14 14-Jun-16 9-Oct-15 100% 100.0%
A545-730-16-49-10363 C SRR-07 -PPU TERRRACE PLAN & ELEVATION 0.3 29-Jan-16 23-Jan-14 12-Feb-16 1-Apr-14 19-Feb-16 1-May-14 26-Feb-16 28-May-14 18-Mar-16 29-Nov-14 16-Jul-16 9-Oct-15 100% 100.0%
A545-730-16-49-10364 C SRR-07-PPU SECTIONS & D/W PROFILES 0.3 17-Feb-16 24-Jan-14 2-Mar-16 2-Apr-14 9-Mar-16 2-May-14 16-Mar-16 28-May-14 6-Apr-16 28-Nov-14 4-Aug-16 9-Oct-15 100% 100.0%
A545-730-16-49-10372 C SRR-09 TANK FARM SECTIONS & D/W 0.3 22-Feb-16 12-Feb-14 7-Mar-16 2-Apr-14 14-Mar-16 27-Apr-14 21-Mar-16 27-May-14 11-Apr-16 10-Dec-14 9-Aug-16 30-Oct-15 100% 100.0%
A545-730-16-49-00379 R C SS-01 CDU ELEVATIONS 0.4 21-Jan-16 21-Jan-14 4-Feb-16 15-Apr-14 11-Feb-16 8-May-14 18-Feb-16 5-Jun-14 10-Mar-16 10-Dec-14 8-Jul-16 29-Jul-15 100% 100.0%
A545-730-16-49-00380 R C SS-01-CDU TERRACE PLAN & SECTIONS 0.4 27-Jan-16 20-Jan-14 10-Feb-16 14-Apr-14 17-Feb-16 7-May-14 24-Feb-16 5-Jun-14 16-Mar-16 12-Dec-14 14-Jul-16 29-Jul-15 100% 100.0%
A545-730-16-49-00388 C SS-03- NHT CCR TERRACE PLAN & SECTIONS 0.4 5-Feb-16 20-Jan-14 19-Feb-16 14-Apr-14 26-Feb-16 7-May-14 4-Mar-16 4-Jun-14 25-Mar-16 12-Dec-14 23-Jul-16 19-Aug-15 100% 100.0%
Page 504 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 2 of 7
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
PROJECT, NIGERIA JOB NO. : A545
DISCIPLINE: ARCHITECTURE (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
DRAWING/ DOCUMENT REVAMP/ CONSTRUCTION
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) ENGG / CONSTRUCTION PROGRESS PROGRESS
NO. EXISTING (100%)
% (85%) %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
SS-04 -DHDT GROUND FL PLA N & FIRST FL
A545-730-16-49-00390 C 0.4 22-Dec-15 20-Jan-14 5-Jan-16 14-Apr-14 12-Jan-16 7-May-14 19-Jan-16 5-Jun-14 9-Feb-16 15-Dec-14 8-Jun-16 21-Aug-15 100% 100.0%
PLAN
A545-730-16-49-00391 C SS-04 -DHDT ELEVATIONS 0.4 25-Jan-16 27-May-14 8-Feb-16 30-May-14 15-Feb-16 2-Jun-14 22-Feb-16 5-Jun-14 14-Mar-16 15-Dec-14 12-Jul-16 21-Aug-15 100% 100.0%
A545-730-16-49-00392 C SS-04 -DHDT TERRACE PLAN & SECTIONS 0.4 1-Feb-16 20-Jan-14 15-Feb-16 14-Apr-14 22-Feb-16 7-May-14 29-Feb-16 5-Jun-14 21-Mar-16 15-Dec-14 19-Jul-16 21-Aug-15 100% 100.0%
A545-730-16-49-00398 R C SS-06-PRIME G GR FL PLAN & SECTIONS 0.4 26-Dec-15 11-Feb-14 9-Jan-16 2-Apr-14 16-Jan-16 1-May-14 23-Jan-16 5-Jun-14 13-Feb-16 17-Dec-14 12-Jun-16 29-Jul-15 100% 100.0%
A545-730-16-49-00400 R C SST-06 -PRIME G TERRACE P LAN & SECTIONS 0.4 5-Feb-16 12-Feb-14 19-Feb-16 3-Apr-14 26-Feb-16 2-May-14 4-Mar-16 5-Jun-14 25-Mar-16 16-Dec-14 23-Jul-16 29-Jul-15 100% 100.0%
A545-730-16-49-00402 C SS-07-PPU GROUND FL & FIRST FL PLAN 0.4 28-Dec-15 20-Jan-14 11-Jan-16 14-Apr-14 18-Jan-16 7-May-14 25-Jan-16 6-Jun-14 15-Feb-16 17-Dec-14 14-Jun-16 22-Sep-15 100% 100.0%
A545-730-16-49-00403 C SS-07-PPU ELEVATIONS 0.4 1-Feb-16 21-Jan-14 15-Feb-16 15-Apr-14 22-Feb-16 8-May-14 29-Feb-16 6-Jun-14 21-Mar-16 17-Dec-14 19-Jul-16 22-Sep-15 100% 100.0%
A545-730-16-49-00404 C SS-07-PPU TERRACE PLAN & SECTIONS 0.4 8-Feb-16 20-Jan-14 22-Feb-16 14-Apr-14 29-Feb-16 7-May-14 7-Mar-16 6-Jun-14 28-Mar-16 17-Dec-14 26-Jul-16 22-Sep-15 100% 100.0%
A545-730-81-41-02012 C SS-07-PPU D/W PROFILE 0.4 10-Feb-16 28-Jul-15 24-Feb-16 11-Aug-15 2-Mar-16 18-Aug-15 9-Mar-16 25-Aug-15 30-Mar-16 8-Sep-15 28-Jul-16 22-Sep-15 100% 100.0%
A545-730-16-49-00407 C SS-08-SULPHUR BLOCK ELEVATIONS 0.4 3-Feb-16 11-Feb-14 17-Feb-16 29-Apr-14 24-Feb-16 23-May-14 2-Mar-16 5-Jun-14 23-Mar-16 16-Dec-14 21-Jul-16 24-Aug-15 100% 100.0%
A545-730-16-49-00410 C SS-09-ETP GROUND FL PLAN, ELEV & SECS 0.4 1-Jan-16 27-Jan-14 15-Jan-16 14-Apr-14 22-Jan-16 7-May-14 29-Jan-16 4-Jun-14 19-Feb-16 16-Dec-14 18-Jun-16 14-Jul-15 100% 100.0%
A545-730-16-49-00411 C SS-09-ETP FIRST FL PLAN,ELEV,SECS 0.4 5-Feb-16 3-Apr-14 19-Feb-16 15-Apr-14 26-Feb-16 5-May-14 4-Mar-16 4-Jun-14 25-Mar-16 16-Dec-14 23-Jul-16 14-Jul-15 100% 100.0%
A545-730-16-49-00412 C SS-09-ETP TERRACE PLAN , SECTIONS 0.4 12-Feb-16 4-Apr-14 26-Feb-16 16-Apr-14 4-Mar-16 6-May-14 11-Mar-16 4-Jun-14 1-Apr-16 17-Dec-14 30-Jul-16 14-Jul-15 100% 100.0%
A545-730-16-49-00413 C SS-09-ETP ( D/W PROFILE) 0.4 18-Feb-16 19-May-15 3-Mar-16 2-Jun-15 10-Mar-16 9-Jun-15 17-Mar-16 16-Jun-15 7-Apr-16 30-Jun-15 5-Aug-16 14-Jul-15 100% 100.0%
A545-730-16-49-00414 C SS-10-TTP-RO-DM GR FL PLAN, ELEV & SEC. 0.4 4-Jan-16 11-Feb-14 18-Jan-16 17-Apr-14 25-Jan-16 7-May-14 1-Feb-16 4-Jun-14 22-Feb-16 17-Dec-14 21-Jun-16 14-Jul-15 100% 100.0%
A545-730-16-49-00415 C SS-10-TTP-RO-DM FIRST FL PLAN,ELEV,SECS 0.4 8-Feb-16 3-Apr-14 22-Feb-16 18-Apr-14 29-Feb-16 8-May-14 7-Mar-16 4-Jun-14 28-Mar-16 17-Dec-14 26-Jul-16 14-Jul-15 100% 100.0%
A545-730-16-49-00416 C SS-10-TTP-RO-DM TERR.PLAN,SEC D/W PROFILE 0.4 15-Feb-16 4-Apr-14 29-Feb-16 18-Apr-14 7-Mar-16 8-May-14 14-Mar-16 4-Jun-14 4-Apr-16 17-Dec-14 2-Aug-16 14-Jul-15 100% 100.0%
A545-730-16-49-00417 C SS-10-TTP-RO-DM 0.4 21-Feb-16 19-May-15 6-Mar-16 2-Jun-15 13-Mar-16 9-Jun-15 20-Mar-16 16-Jun-15 10-Apr-16 30-Jun-15 8-Aug-16 14-Jul-15 100% 100.0%
A545-730-81-41-02014 C SS-12 D/W PROFILE 0.4 19-Feb-16 28-Jul-15 4-Mar-16 11-Aug-15 11-Mar-16 18-Aug-15 18-Mar-16 25-Aug-15 8-Apr-16 8-Sep-15 6-Aug-16 22-Sep-15 100% 100.0%
A545-730-81-41-02015 C SS-13 D/W PROFILE 0.4 21-Feb-16 4-Aug-15 6-Mar-16 11-Aug-15 13-Mar-16 18-Aug-15 20-Mar-16 25-Aug-15 10-Apr-16 8-Sep-15 8-Aug-16 22-Sep-15 100% 100.0%
A545-730-81-41-02016 C SS-14 D/W PROFILE 0.4 22-Feb-16 27-Jul-15 7-Mar-16 10-Aug-15 14-Mar-16 17-Aug-15 21-Mar-16 24-Aug-15 11-Apr-16 31-Aug-15 9-Aug-16 14-Sep-15 100% 100.0%
A545-730-16-49-00437 C SS-16 -LOADING AREA D/W PROFILE 0.4 9-Feb-16 19-May-15 23-Feb-16 2-Jun-15 1-Mar-16 9-Jun-15 8-Mar-16 16-Jun-15 29-Mar-16 30-Jun-15 27-Jul-16 14-Jul-15 100% 100.0%
A545-730-16-49-00441 C SS-17-TANK FARM AREA D/W PROFILE 0.4 5-Feb-16 19-May-15 19-Feb-16 2-Jun-15 26-Feb-16 9-Jun-15 4-Mar-16 16-Jun-15 25-Mar-16 30-Jun-15 23-Jul-16 14-Jul-15 100% 100.0%
A545-730-16-49-00445 C SS-18-ADMINISTRATIVE AREA D/W PROFILE 0.4 14-Feb-16 3-May-15 28-Feb-16 17-May-15 6-Mar-16 24-May-15 13-Mar-16 31-May-15 3-Apr-16 14-Jun-15 1-Aug-16 14-Jul-15 100% 100.0%
A545-730-81-41-12025 C SRR-01 (CDU) FALSE CEILING PLAN 0.4 27-Feb-16 14-Dec-15 12-Mar-16 28-Dec-15 19-Mar-16 4-Jan-16 26-Mar-16 11-Jan-16 16-Apr-16 18-Jan-16 14-Aug-16 25-Jan-16 100% 100.0%
A545-730-81-41-12026 C SRR-02 (RFCC) FALSE CEILING PLAN 0.4 27-Feb-16 14-Dec-15 12-Mar-16 28-Dec-15 19-Mar-16 4-Jan-16 26-Mar-16 11-Jan-16 16-Apr-16 18-Jan-16 14-Aug-16 25-Jan-16 100% 100.0%
A545-730-81-41-12027 C SRR-03 (NHT BLOCK) FALSE CEILING PLAN 0.4 1-Mar-16 10-Dec-15 15-Mar-16 24-Dec-15 22-Mar-16 31-Dec-15 29-Mar-16 7-Jan-16 19-Apr-16 14-Jan-16 17-Aug-16 21-Jan-16 100% 100.0%
A545-730-81-41-12028 C SRR-04 (MHC BLOCK) FALSE CEILING PLAN 0.4 1-Mar-16 10-Dec-15 15-Mar-16 24-Dec-15 22-Mar-16 31-Dec-15 29-Mar-16 7-Jan-16 19-Apr-16 14-Jan-16 17-Aug-16 21-Jan-16 100% 100.0%
A545-730-81-41-12029 C SRR-05 (ALKYLATION) FALSE CEILING PLAN 0.4 3-Mar-16 7-Dec-15 17-Mar-16 21-Dec-15 24-Mar-16 28-Dec-15 31-Mar-16 4-Jan-16 21-Apr-16 11-Jan-16 19-Aug-16 18-Jan-16 100% 100.0%
A545-730-81-41-12031 C SRR-07 (PPU BLOCK) FALSE CEILING PLAN 0.4 7-Mar-16 7-Dec-15 21-Mar-16 21-Dec-15 28-Mar-16 28-Dec-15 4-Apr-16 4-Jan-16 25-Apr-16 11-Jan-16 23-Aug-16 18-Jan-16 100% 100.0%
A545-730-16-49-10465 C EXTRUDER CONTROL ROOM PLAN,ELEV,SECS 0.3 14-Jan-16 1-May-14 28-Jan-16 10-May-14 4-Feb-16 30-May-14 11-Feb-16 25-Jun-14 3-Mar-16 26-Dec-14 31-Aug-19 - 85% 85.0%
A545-730-81-41-12034 C SRR-10 CRUDE STORAGE 0.3 4-Feb-16 30-Dec-15 18-Feb-16 13-Jan-16 25-Feb-16 20-Jan-16 3-Mar-16 27-Jan-16 24-Mar-16 3-Feb-16 22-Jul-16 10-Feb-16 100% 100.0%
A545-730-81-41-12035 C SRR-11 PRODUCT DESPATCH TERMINAL 0.3 6-Feb-16 7-Jan-16 20-Feb-16 21-Jan-16 27-Feb-16 28-Jan-16 5-Mar-16 4-Feb-16 26-Mar-16 11-Feb-16 24-Jul-16 18-Feb-16 100% 100.0%
A545-730-16-49-00491 C SUBSTATION-19 1ST. FL PLAN & ELEVATION 0.3 20-Jan-16 22-Oct-14 3-Feb-16 5-Nov-14 10-Feb-16 12-Nov-14 17-Feb-16 19-Nov-14 9-Mar-16 21-Mar-15 7-Jul-16 29-Jul-15 100% 100.0%
A545-730-16-49-00492 C SUBSTATION-19 TERRACE PLAN & SECTIONS 0.3 10-Feb-16 22-Oct-14 24-Feb-16 5-Nov-14 2-Mar-16 12-Nov-14 9-Mar-16 19-Nov-14 30-Mar-16 21-Mar-15 28-Jul-16 29-Jul-15 100% 100.0%
A545-740-16-49-00102 C ADMINISTRATIVE BUILDING FIRST FLOOR PLAN 0.4 25-Jan-16 13-Jan-15 8-Feb-16 27-Jan-15 15-Feb-16 3-Feb-15 22-Feb-16 10-Feb-15 14-Mar-16 10-Apr-15 12-Jul-16 12-Nov-15 100% 100.0%
A545-740-16-49-00105 C ADMINISTRATIVE BUILDING TERRACE PLAN 0.4 21-Mar-16 12-Jan-15 4-Apr-16 26-Jan-15 11-Apr-16 2-Feb-15 18-Apr-16 9-Feb-15 9-May-16 10-Apr-15 6-Sep-16 12-Nov-15 100% 100.0%
A545-740-16-49-10117 C PLANT GATE HOUSE ELEVATION 0.3 3-Feb-16 8-Oct-14 17-Feb-16 22-Oct-14 24-Feb-16 29-Oct-14 2-Mar-16 5-Nov-14 23-Mar-16 25-Mar-15 21-Jul-16 30-Oct-15 100% 100.0%
A545-740-16-49-10121 C ADMIN GATE HOUSE TERRACE PLAN,SECS 0.3 2-Feb-16 8-Oct-14 16-Feb-16 22-Oct-14 23-Feb-16 29-Oct-14 1-Mar-16 5-Nov-14 22-Mar-16 25-Mar-15 20-Jul-16 30-Sep-15 100% 100.0%
A545-740-16-49-10122 C ADMIN GATE HOUSE ELEVATIONS 0.3 6-Feb-16 8-Oct-14 20-Feb-16 22-Oct-14 27-Feb-16 29-Oct-14 5-Mar-16 5-Nov-14 26-Mar-16 25-Mar-15 24-Jul-16 30-Sep-15 100% 100.0%
A545-740-16-49-10129 C WORKERS CANTEEN ELEVATIONS & SECTIONS 0.4 9-Feb-16 10-Aug-15 23-Feb-16 17-Aug-15 1-Mar-16 24-Aug-15 8-Mar-16 31-Aug-15 29-Mar-16 7-Sep-15 27-Jul-16 21-Sep-15 100% 100.0%
A545-740-16-49-02057 C LABORATORY BUILDING D/W PROFILE 0.4 29-Feb-16 8-Sep-15 14-Mar-16 22-Sep-15 21-Mar-16 29-Sep-15 28-Mar-16 6-Oct-15 18-Apr-16 13-Oct-15 16-Aug-16 27-Oct-15 100% 100.0%
A545-740-16-49-00147 C CANTEEN G.FLOOR PLAN 0.4 25-Jan-16 11-Sep-14 8-Feb-16 25-Sep-14 15-Feb-16 2-Oct-14 22-Feb-16 9-Oct-14 14-Mar-16 10-Mar-15 12-Jul-16 30-Oct-15 100% 100.0%
A545-740-16-49-00148 C CANTEEN TERRACE PLAN 0.4 20-Feb-16 10-Sep-14 5-Mar-16 24-Sep-14 12-Mar-16 1-Oct-14 19-Mar-16 8-Oct-14 9-Apr-16 10-Mar-15 7-Aug-16 30-Oct-15 100% 100.0%
A545-740-16-49-00149 C CANTEEN ELEVATIONS & SECTIONS 0.4 25-Feb-16 22-Oct-14 10-Mar-16 5-Nov-14 17-Mar-16 12-Nov-14 24-Mar-16 19-Nov-14 14-Apr-16 18-Mar-15 12-Aug-16 30-Oct-15 100% 100.0%
A545-740-16-49-02056 C CANTEEN D/W PROFILE 0.4 2-Mar-16 18-Sep-15 16-Mar-16 25-Sep-15 23-Mar-16 2-Oct-15 30-Mar-16 9-Oct-15 20-Apr-16 16-Oct-15 18-Aug-16 30-Oct-15 100% 100.0%
A545-740-16-49-00153 C FIRE STATION TERRACE PLAN,ELEV,SECS 0.3 22-Feb-16 13-Aug-14 7-Mar-16 27-Aug-14 14-Mar-16 3-Sep-14 21-Mar-16 10-Sep-14 11-Apr-16 16-Feb-15 9-Aug-16 21-Sep-15 100% 100.0%
A545-740-16-49-00154 C FIRE STATION SECTIONS D/W SCHEDULE 0.4 4-Mar-16 27-Jul-15 18-Mar-16 10-Aug-15 25-Mar-16 17-Aug-15 1-Apr-16 24-Aug-15 22-Apr-16 7-Sep-15 20-Aug-16 21-Sep-15 100% 100.0%
A545-740-81-41-12051 C MAIN FIRE STATION D/W PROFILE 0.4 4-Mar-16 27-Jul-15 18-Mar-16 10-Aug-15 25-Mar-16 17-Aug-15 1-Apr-16 24-Aug-15 22-Apr-16 7-Sep-15 20-Aug-16 21-Sep-15 100% 100.0%
A545-740-16-49-00157 C WORKSHOP GROUND FLOOR PLAN 0.4 29-Jan-16 7-Oct-14 12-Feb-16 21-Oct-14 19-Feb-16 28-Oct-14 26-Feb-16 4-Nov-14 18-Mar-16 18-Mar-15 16-Jul-16 29-Dec-15 100% 100.0%
A545-740-16-49-00158 C WORKSHOP FIRST FLOOR PLAN 0.4 3-Feb-16 7-Oct-14 17-Feb-16 21-Oct-14 24-Feb-16 28-Oct-14 2-Mar-16 4-Nov-14 23-Mar-16 18-Mar-15 21-Jul-16 29-Dec-15 100% 100.0%
A545-740-16-49-00159 C WORKSHOP ELEVATIONS & SECTIONS 0.4 24-Feb-16 7-Oct-14 9-Mar-16 21-Oct-14 16-Mar-16 28-Oct-14 23-Mar-16 4-Nov-14 13-Apr-16 18-Mar-15 11-Aug-16 29-Dec-15 100% 100.0%
A545-740-16-49-00160 C WORKSHOP D/W PROFILE 0.4 7-Mar-16 10-Nov-15 21-Mar-16 24-Nov-15 28-Mar-16 1-Dec-15 4-Apr-16 8-Dec-15 25-Apr-16 15-Dec-15 23-Aug-16 29-Dec-15 100% 100.0%
A545-740-16-49-10165 C MAIN FAN OFFICE PLANS,ELEV,SECS 0.3 5-Feb-15 22-Oct-14 19-Feb-15 5-Nov-14 26-Feb-15 12-Nov-14 5-Mar-15 19-Nov-14 26-Mar-15 8-Jun-15 24-Jul-15 17-Sep-15 100% 100.0%
A545-740-16-49-10166 C MAIN FAN OFFICE TERRACE PLAN 0.3 26-Feb-15 22-Oct-14 12-Mar-15 5-Nov-14 19-Mar-15 12-Nov-14 26-Mar-15 19-Nov-14 16-Apr-15 8-Jun-15 14-Aug-15 17-Sep-15 100% 100.0%
A545-740-16-49-12054 C MARKETING OFFICE ELEVATION 0.3 27-Feb-16 1-Sep-14 12-Mar-16 15-Sep-14 19-Mar-16 22-Sep-14 26-Mar-16 29-Sep-14 16-Apr-16 10-Mar-15 14-Aug-16 8-Oct-15 100% 100.0%
A545-740-16-49-12055 C MARKETING OFFICE DOORS WINDOWS PROFILE 0.3 6-Mar-16 20-Aug-15 20-Mar-16 3-Sep-15 27-Mar-16 10-Sep-15 3-Apr-16 17-Sep-15 24-Apr-16 1-Oct-15 22-Aug-16 8-Oct-15 100% 100.0%
A545-740-16-49-10172 C SEALING OFFICE PLANS 0.3 9-Feb-16 13-Aug-14 23-Feb-16 27-Aug-14 1-Mar-16 3-Sep-14 8-Mar-16 10-Sep-14 29-Mar-16 6-Mar-15 27-Jul-16 4-Sep-15 100% 100.0%
A545-740-16-49-10173 SEALING OFFICE ELEVATION & SECTIONS 01-03-2016 =M216-14 =I216+14 =P216-7 #VALUE! =S216-7 #VALUE! =V216-7 #VALUE! =Y216-14 #VALUE! 04-09-2015
A545-740-16-49-10178 C SECURITY CABIN WITH GATE PLAN,ELEV,SECS 0.3 24-Nov-15 18-Aug-14 8-Dec-15 1-Sep-14 15-Dec-15 8-Sep-14 22-Dec-15 15-Sep-14 12-Jan-16 25-Feb-15 11-May-16 4-Sep-15 100% 100.0%
A545-740-16-49-10193 C SATELLITE FIRE STATION PLAN & SECS 0.3 17-Feb-16 10-Sep-14 2-Mar-16 24-Sep-14 9-Mar-16 1-Oct-14 16-Mar-16 8-Oct-14 6-Apr-16 10-Mar-15 4-Aug-16 9-Sep-15 100% 100.0%
A545-740-16-49-00197 C CATALYST WAREHOUSE PLANS & SECS 0.4 19-Feb-16 7-Oct-14 4-Mar-16 21-Oct-14 11-Mar-16 28-Oct-14 18-Mar-16 4-Nov-14 8-Apr-16 16-Mar-15 6-Aug-16 27-Nov-15 100% 100.0%
A545-740-16-49-00199 C CATALYST WAREHOUSE D/W PROFILE 0.4 21-Mar-16 9-Oct-15 4-Apr-16 23-Oct-15 11-Apr-16 30-Oct-15 18-Apr-16 6-Nov-15 9-May-16 13-Nov-15 6-Sep-16 27-Nov-15 100% 100.0%
A545-740-16-49-00205 C WAREHOUSE PLANS & SECS 0.4 23-Feb-16 7-Oct-14 8-Mar-16 21-Oct-14 15-Mar-16 28-Oct-14 22-Mar-16 4-Nov-14 12-Apr-16 17-Mar-15 10-Aug-16 7-Dec-15 100% 100.0%
A545-740-16-49-00206 C WAREHOUSE TERRACE PLAN & ELEVATIONS 0.4 15-Mar-16 7-Oct-14 29-Mar-16 21-Oct-14 5-Apr-16 28-Oct-14 12-Apr-16 4-Nov-14 3-May-16 17-Mar-15 31-Aug-16 7-Dec-15 100% 100.0%
Page 508 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 6 of 7
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
PROJECT, NIGERIA JOB NO. : A545
DISCIPLINE: ARCHITECTURE (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
DRAWING/ DOCUMENT REVAMP/ CONSTRUCTION
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) ENGG / CONSTRUCTION PROGRESS PROGRESS
NO. EXISTING (100%)
% (85%) %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-740-16-49-00207 C WAREHOUSE D/W PROFILE 0.4 25-Mar-16 19-Oct-15 8-Apr-16 2-Nov-15 15-Apr-16 9-Nov-15 22-Apr-16 16-Nov-15 13-May-16 23-Nov-15 10-Sep-16 7-Dec-15 100% 100.0%
A545-740-16-49-10211 C WEIGH BRIDGE PLAN,ELEV,SECS 0.3 25-Feb-16 18-Aug-14 10-Mar-16 1-Sep-14 17-Mar-16 8-Sep-14 24-Mar-16 15-Sep-14 14-Apr-16 26-Feb-15 12-Aug-16 21-Dec-15 100% 100.0%
A545-740-16-49-10213 C CWTP BUILDING PLAN, ELEV, SECS 0.3 27-Feb-16 11-May-15 12-Mar-16 25-May-15 19-Mar-16 1-Jun-15 26-Mar-16 8-Jun-15 16-Apr-16 22-Jun-15 14-Aug-16 18-Dec-15 100% 100.0%
A545-730-81-41-02038 C SST-01 & SST-02 (FALSE CEILING LAYOUT) 0.3 12-Jan-16 2-Feb-16 26-Jan-16 9-Feb-16 2-Feb-16 16-Feb-16 9-Feb-16 23-Feb-16 1-Mar-16 1-Mar-16 29-Jun-16 7-Mar-16 100% 100.0%
A545-730-81-41-02039 C SST-03 & SST-04 (FALSE CEILING LAYOUT) 0.3 14-Jan-16 3-Feb-16 28-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 11-Feb-16 24-Feb-16 3-Mar-16 2-Mar-16 1-Jul-16 9-Mar-16 100% 100.0%
A545-730-81-41-02040 C SST-05 & SST-06 (FALSE CEILING LAYOUT) 0.3 16-Jan-16 3-Feb-16 30-Jan-16 10-Feb-16 6-Feb-16 17-Feb-16 13-Feb-16 24-Feb-16 5-Mar-16 2-Mar-16 3-Jul-16 9-Mar-16 100% 100.0%
A545-730-81-41-02041 C SST-07 & SST-08 (FALSE CEILING LAYOUT) 0.3 18-Jan-16 3-Feb-16 1-Feb-16 10-Feb-16 8-Feb-16 17-Feb-16 15-Feb-16 24-Feb-16 7-Mar-16 2-Mar-16 5-Jul-16 9-Mar-16 100% 100.0%
A545-730-81-41-02042 C SST-09 & SST-10 (FALSE CEILING LAYOUT) 0.3 20-Jan-16 3-Feb-16 3-Feb-16 10-Feb-16 10-Feb-16 17-Feb-16 17-Feb-16 24-Feb-16 9-Mar-16 2-Mar-16 7-Jul-16 9-Mar-16 100% 100.0%
A545-730-81-41-02045 C SST-12 & SST-13 (FALSE CEILING LAYOUT) 0.3 22-Jan-16 3-Feb-16 5-Feb-16 10-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 24-Feb-16 11-Mar-16 2-Mar-16 9-Jul-16 9-Mar-16 100% 100.0%
A545-730-81-41-02046 C SST-14 & SST-15 (FALSE CEILING LAYOUT) 0.3 24-Jan-16 3-Feb-16 7-Feb-16 10-Feb-16 14-Feb-16 17-Feb-16 21-Feb-16 24-Feb-16 13-Mar-16 2-Mar-16 11-Jul-16 9-Mar-16 100% 100.0%
A545-730-81-41-02047 C SST-16 & SST-17 (FALSE CEILING LAYOUT) 0.3 26-Jan-16 3-Feb-16 9-Feb-16 10-Feb-16 16-Feb-16 17-Feb-16 23-Feb-16 24-Feb-16 15-Mar-16 2-Mar-16 13-Jul-16 9-Mar-16 100% 100.0%
A545-730-81-41-02048 C SST-18 & SST-19 (FALSE CEILING LAYOUT) 0.3 28-Jan-16 3-Feb-16 11-Feb-16 10-Feb-16 18-Feb-16 17-Feb-16 25-Feb-16 24-Feb-16 17-Mar-16 2-Mar-16 15-Jul-16 9-Mar-16 100% 100.0%
A545-740-81-41-12077 C CWTP D/W PROFILE 0.3 2-Mar-16 26-Oct-15 16-Mar-16 9-Nov-15 23-Mar-16 16-Nov-15 30-Mar-16 23-Nov-15 20-Apr-16 7-Dec-15 18-Aug-16 21-Dec-15 100% 100.0%
A545-740-16-49-00225 C D.G.SHED PLAN AND SEC 0.43 11-Jan-16 25-Dec-15 25-Jan-16 8-Jan-16 1-Feb-16 15-Jan-16 8-Feb-16 22-Jan-16 29-Feb-16 29-Jan-16 5-Mar-19 - 100%
A545-740-16-49-00226 C D.G.SHED PLAN AND SEC 24-Dec-15 11-May-15 7-Jan-16 25-May-15 14-Jan-16 1-Jun-15 21-Jan-16 8-Jun-15 11-Feb-16 22-Jun-15 10-Jun-16 - 100%
A545-730-81-41-02005 C SS-01 CDU DOOR/WINDOW PROFILE 0.4 28-Dec-15 3-Jun-15 11-Jan-16 17-Jun-15 18-Jan-16 24-Jun-15 25-Jan-16 1-Jul-15 15-Feb-16 15-Jul-15 14-Jun-16 29-Jul-15 100% 100.0%
A545-730-81-41-02009 C SS-02 (RFCC) D/W PROFILE 0.4 29-Dec-15 24-Jun-15 12-Jan-16 8-Jul-15 19-Jan-16 15-Jul-15 26-Jan-16 22-Jul-15 16-Feb-16 5-Aug-15 15-Jun-16 19-Aug-15 100% 100.0%
A545-730-81-41-02010 C SS-03- NHT CCR D/W PROFILE 0.4 30-Dec-15 24-Jun-15 13-Jan-16 8-Jul-15 20-Jan-16 15-Jul-15 27-Jan-16 22-Jul-15 17-Feb-16 5-Aug-15 16-Jun-16 19-Aug-15 100% 100.0%
A545-730-81-41-02011 C SS-04 -DHDT D/W PROFILE 0.4 4-Jan-16 26-Jun-15 18-Jan-16 10-Jul-15 25-Jan-16 17-Jul-15 1-Feb-16 24-Jul-15 22-Feb-16 7-Aug-15 21-Jun-16 21-Aug-15 100% 100.0%
A545-730-81-41-02013 C SS-08-Sulphur Block D/W PROFILE 0.4 5-Jan-16 29-Jun-15 19-Jan-16 13-Jul-15 26-Jan-16 20-Jul-15 2-Feb-16 27-Jul-15 23-Feb-16 10-Aug-15 22-Jun-16 24-Aug-15 100% 100.0%
A545-730-81-41-02006 C SS-05 ALKYLATION D/W PROFILE 0.4 6-Jan-16 3-Jun-15 20-Jan-16 17-Jun-15 27-Jan-16 24-Jun-15 3-Feb-16 1-Jul-15 24-Feb-16 15-Jul-15 23-Jun-16 29-Jul-15 100% 100.0%
A545-730-81-41-02007 C SS-06 SLECTFINING D/W PROFILE 0.4 7-Jan-16 3-Jun-15 21-Jan-16 17-Jun-15 28-Jan-16 24-Jun-15 4-Feb-16 1-Jul-15 25-Feb-16 15-Jul-15 24-Jun-16 29-Jul-15 100% 100.0%
A545-730-81-41-02008 C SS-19 PIPELINE PRODUCT D/W PROFILE 0.4 31-Dec-15 3-Jun-15 14-Jan-16 17-Jun-15 21-Jan-16 24-Jun-15 28-Jan-16 1-Jul-15 18-Feb-16 15-Jul-15 17-Jun-16 29-Jul-15 100% 100.0%
A545-740-81-41-12061 C CHEMICAL HOUSE ETP 0.4 24-Dec-15 19-Oct-15 7-Jan-16 2-Nov-15 14-Jan-16 9-Nov-15 21-Jan-16 16-Nov-15 11-Feb-16 30-Nov-15 6-Apr-19 - 100% 85.0%
A545-740-81-41-02060 C WORKSHOP D/W PROFILE 0.4 27-Dec-15 10-Nov-15 10-Jan-16 24-Nov-15 17-Jan-16 1-Dec-15 24-Jan-16 8-Dec-15 14-Feb-16 15-Dec-15 13-Jun-16 29-Dec-15 100% 100.0%
A545-740-81-41-02075 C WORKSHOP ELEVATION 0.4 27-Dec-15 10-Nov-15 10-Jan-16 24-Nov-15 17-Jan-16 1-Dec-15 24-Jan-16 8-Dec-15 14-Feb-16 15-Dec-15 13-Jun-16 29-Dec-15 100% 100.0%
A545-740-81-41-02076 C CHEMICAL HOUSE RO/DM 0.4 27-Dec-15 19-Oct-15 10-Jan-16 2-Nov-15 17-Jan-16 9-Nov-15 24-Jan-16 16-Nov-15 14-Feb-16 30-Nov-15 31-Aug-19 - 85% 85.0%
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : GENERAL CIVIL (UTILITIES & OFFSITES) ANNEXURE-A6
TOTAL TOTAL
REVAMP/
MR ISSUE T B A / EVALUATION PR ISSUE VENDOR DRAWING REVIEW (SCHD. (ACTUAL
MR No MR DESCRIPTION EXISTIN WTG. %
(40%) (85%) (90%) (100%) PROGRESS PROGRESS
G
%) %)
Sch Act Sch Act Sch Act Sch Act
GENERAL CIVIL - UTILITIES & OFFSITES
A545-724-MF-MR-8150 STATIC FIRE FIGHTING EQUIPMENTS-I E 5.0 23-Nov-15 22-Jan-16 18-Feb-16 5-Jul-16 1-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-724-MF-MR-8152 STATIC FIRE FIGHTING EQUIPMENTS-II E 10.0 11-Nov-15 29-Sep-16 22-Feb-16 5-Jul-16 29-Oct-16 17-Jan-19 17-Apr-19 - 100% 90.0%
A545-724-MF-MR-8155 HV SPRAY ON TRANSFORMERS R 10.0 16-Nov-15 30-Sep-16 2-Nov-16 29-Apr-17 22-Dec-16 18-Sep-18 30-Aug-19 - 90% 90.0%
A545-724-MF-MR-8154 PORTABLE FIRE EXTINGUISHER R 5.0 11-Dec-15 2-Sep-16 7-Nov-16 17-Apr-17 1-Aug-19 - 31-Aug-19 - 85% 85.0%
A545-724-MF-MR-8065 MOBILE FIRE FIGHTING EQUI PMENTS-I E 8.4 30-Nov-15 5-Jan-15 10-Mar-16 13-May-15 15-Nov-16 17-Aug-18 13-Feb-17 25-Feb-19 100% 100.0%
A545-724-MF-MR-8151 MOBILE FIRE FIGHTING EQUIPMENTS-II E 8.4 18-Dec-15 23-Jan-16 14-Mar-16 29-Aug-16 8-May-19 24-Jul-19 31-Aug-19 - 90% 90.0%
A545-724-MF-MR-8153 RIM SEAL FIRE PROTECTION R 25.1 1-Sep-15 17-Mar-16 27-Nov-15 5-Sep-16 22-Sep-16 21-Jun-17 21-Dec-16 26-Feb-19 100% 100.0%
A545-171-MF-MR-8113 AUTOMATIC DCP FLOODING SYSTEM E 1.7 5-Dec-16 11-Nov-16 10-Mar-17 13-Feb-19 30-Mar-19 9-May-19 31-Aug-19 - 90% 92.0%
A545-724-MR-MISC. MISCELLANEOUS / OTHERS 1.3 14-Dec-15 28-Apr-15 25-Mar-16 - 14-May-16 - 11-Sep-16 31-Oct-16 100% 100.0%
100 95.5%
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW TOTAL (SCHD TOTAL (ACTUAL
MR No MR DESCRIPTION WTG. %
(40%) (85%) (90%) (100%) PROGRESS %) PROGRESS %)
A545-700-HH-MR-4610 EOT CRANES 19.9 2-Jul-15 3-Jun-15 12-Oct-15 9-Oct-15 1-Dec-15 27-Jul-16 18-Feb-17 30-Jan-18 100% 100.0%
A545-700-HH-MR-4680 CHAIN PULLEY BLOCKS 13.5 1-Oct-16 27-Feb-17 27-Dec-16 9-Jun-17 15-Feb-17 4-May-18 16-May-17 28-Nov-18 100% 100.0%
A545-700-LS-MR-4700 FLARE SYSTEM (DE-MOUNTABLE TYPE) 15.5 22-Jun-15 11-Sep-15 2-Oct-15 3-Feb-16 21-Nov-15 14-Jul-16 13-Feb-17 28-Jun-18 100% 100.0%
A545-101-GN-MR-4390 FILTERS 0.3 27-Aug-15 21-Dec-15 7-Dec-15 3-Feb-16 26-Jan-16 14-Mar-18 30-Apr-19 30-Apr-19 100% 98.0%
A545-181-LZ-MR-4220 ELECTRONIC TYPE WEIGH BRI DGE 0.3 6-Sep-15 10-Apr-15 8-Dec-15 30-Apr-16 2-Apr-19 - 31-Aug-19 - 90% 95.0%
100 99.98%
A545-999-16-43-EDB-1001 E E ENGINEERING DESIGN BASIS (PIPING) 0.3 12-Dec-14 2-Dec-14 26-Dec-14 13-Dec-14 2-Jan-15 20-Dec-14 9-Jan-15 26-Dec-14 23-Jan-15 18-Mar-15 7-Dec-16 25-Oct-17 100% 100.0%
A545-700-16-43-00002 R E AREA DIVISION 0.1 28-Apr-15 2-Apr-15 26-May-15 14-Aug-15 3-Dec-16 7-Oct-16 11-Dec-16 14-Oct-16 18-Dec-16 21-Oct-16 17-Jan-17 28-Oct-16 100% 100.0%
A545-700-16-43-00011 E C PIPING PLAN AREA-01 0.0 1-Nov-15 10-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00021 E C PIPING PLAN AREA-02 0.0 1-Nov-15 10-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00031 E C PIPING PLAN AREA-03 0.0 1-Nov-15 10-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00041 E C PIPING PLAN AREA-04 0.0 1-Nov-15 10-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00051 E C PIPING PLAN AREA-05 0.0 1-Nov-15 10-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00061 E C PIPING PLAN AREA-06 0.0 1-Nov-15 10-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00071 E C PIPING PLAN AREA-07 0.0 1-Nov-15 10-Aug-15 16-Nov-15 20-Oct-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00081 E C PIPING PLAN AREA-08 0.0 1-Nov-15 10-Aug-15 16-Nov-15 20-Oct-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00091 R C PIPING PLAN AREA-09 0.0 1-Nov-15 10-Aug-15 16-Nov-15 20-Oct-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 28-Oct-16 28-Mar-18 100% 100.0%
A545-700-16-43-00101 E C PIPING PLAN AREA-10 0.0 1-Nov-15 10-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00111 E C PIPING PLAN AREA-11 0.0 1-Nov-15 10-Aug-15 16-Nov-15 20-Oct-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00121 E C PIPING PLAN AREA-12 0.0 1-Nov-15 10-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00131 E C PIPING PLAN AREA-13 0.0 1-Nov-15 14-Aug-15 16-Nov-15 20-Oct-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00141 R C PIPING PLAN AREA-14 0.0 1-Nov-15 14-Aug-15 16-Nov-15 20-Oct-15 23-Nov-15 25-May-16 30-Nov-15 1-Jun-16 15-Dec-15 8-Jun-16 28-Oct-16 23-Apr-18 100% 100.0%
A545-700-16-43-00151 E C PIPING PLAN AREA-15 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00161 R C PIPING PLAN AREA-16 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 30-Mar-18 100% 100.0%
A545-700-16-43-00171 R C PIPING PLAN AREA-17 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 30-May-18 100% 100.0%
A545-700-16-43-00181 E C PIPING PLAN AREA-18 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00191 R C PIPING PLAN AREA-19 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 30-Mar-18 100% 100.0%
A545-700-16-43-00201 E C PIPING PLAN AREA-20 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00211 R C PIPING PLAN AREA-21 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 23-Apr-18 100% 100.0%
A545-700-16-43-00221 R C PIPING PLAN AREA-22 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00231 E C PIPING PLAN AREA-23 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00241 E C PIPING PLAN AREA-24 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00251 E C PIPING PLAN AREA-25 0.0 1-Nov-15 14-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00261 E C PIPING PLAN AREA-26 0.0 1-Nov-15 20-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00271 R C PIPING PLAN AREA-27 0.0 1-Nov-15 20-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 28-Mar-18 100% 100.0%
A545-700-16-43-00272 R C PIPING PLAN AREA-27 0.0 1-Nov-15 20-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 21-May-18 100% 100.0%
A545-700-16-43-00281 R C PIPING PLAN AREA-28 0.0 1-Nov-15 20-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 21-May-18 100% 100.0%
A545-700-16-43-00291 R C PIPING PLAN AREA-29 0.0 1-Nov-15 20-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 23-Apr-18 100% 100.0%
A545-700-16-43-00301 R C PIPING PLAN AREA-30 0.0 1-Nov-15 20-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 28-Oct-16 23-Apr-18 100% 100.0%
A545-700-16-43-00311 R C PIPING PLAN AREA-31 0.0 1-Nov-15 20-Aug-15 16-Nov-15 3-Nov-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00321 R C PIPING PLAN AREA-32 0.0 1-Nov-15 20-Aug-15 16-Nov-15 24-Sep-15 23-Nov-15 1-Oct-15 30-Nov-15 8-Oct-15 15-Dec-15 16-Oct-15 28-Oct-16 23-Apr-18 100% 100.0%
A545-700-16-43-00331 R C PIPING PLAN AREA-33 0.0 1-Nov-15 20-Aug-15 16-Nov-15 3-Nov-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00341 R C PIPING PLAN AREA-34 0.0 1-Nov-15 20-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 21-May-18 100% 100.0%
A545-700-16-43-00342 R C PIPING PLAN AREA-34 0.0 1-Nov-15 20-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00351 E C PIPING PLAN AREA-35 0.0 1-Nov-15 20-Aug-15 16-Nov-15 18-May-16 23-Nov-15 25-May-16 30-Nov-15 1-Jun-16 15-Dec-15 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00361 E C PIPING PLAN AREA-36 0.0 1-Nov-15 25-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00362 E C PIPING PLAN AREA-36 0.0 1-Nov-15 25-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00371 E C PIPING PLAN AREA-37 0.0 1-Nov-15 25-Aug-15 16-Nov-15 18-May-16 23-Nov-15 25-May-16 30-Nov-15 1-Jun-16 15-Dec-15 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00381 R C PIPING PLAN AREA-38 0.0 1-Nov-15 25-Aug-15 16-Nov-15 3-Nov-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 28-Oct-16 23-Apr-18 100% 100.0%
A545-700-16-43-00382 R C PIPING PLAN AREA-38 0.0 1-Nov-15 2-Sep-15 16-Nov-15 17-Sep-15 23-Nov-15 24-Sep-15 30-Nov-15 1-Oct-15 15-Dec-15 16-Oct-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00391 R C PIPING PLAN AREA-39 0.0 1-Nov-15 25-Aug-15 16-Nov-15 3-Nov-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00401 R C PIPING PLAN AREA-40 0.0 1-Nov-15 25-Aug-15 16-Nov-15 3-Nov-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 28-Oct-16 30-Mar-18 100% 100.0%
A545-700-16-43-00411 R C PIPING PLAN AREA-41 0.0 1-Nov-15 30-Aug-15 16-Nov-15 3-Nov-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 15-Dec-15 24-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00421 E C PIPING PLAN AREA-42 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00431 E C PIPING PLAN AREA-43 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00441 E C PIPING PLAN AREA-44 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00451 R C PIPING PLAN AREA-45 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00452 R C PIPING PLAN AREA-45 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00453 R C PIPING PLAN AREA-45 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 30-Mar-18 100% 100.0%
A545-700-16-43-00454 R C PIPING PLAN AREA-45 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00461 E C PIPING PLAN AREA-46 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00462 E C PIPING PLAN AREA-46 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00471 R C PIPING PLAN AREA-47 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00472 R C PIPING PLAN AREA-47 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00481 R C PIPING PLAN AREA-48 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 24-Apr-18 100% 100.0%
A545-700-16-43-00491 R C PIPING PLAN AREA-49 0.0 1-Nov-15 30-Aug-15 16-Nov-15 26-Oct-15 23-Nov-15 2-Nov-15 30-Nov-15 9-Nov-15 15-Dec-15 16-Nov-15 28-Oct-16 28-Feb-18 100% 100.0%
A545-700-16-43-00501 E C PIPING PLAN AREA-50 0.0 1-Nov-15 30-Aug-15 15-Dec-16 7-Apr-17 22-Dec-16 14-Apr-17 29-Dec-16 21-Apr-17 13-Jan-17 28-Apr-17 31-Aug-19 - 85% 85.0%
A545-700-16-43-00511 E C PIPING PLAN AREA-51 0.0 22-Nov-15 30-Aug-15 5-Jan-17 7-Apr-17 12-Jan-17 14-Apr-17 19-Jan-17 21-Apr-17 3-Feb-17 28-Apr-17 31-Aug-19 - 85% 85.0%
A545-700-16-43-00521 E C PIPING PLAN AREA-52 0.0 22-Nov-15 30-Aug-15 7-Dec-15 26-Oct-15 14-Dec-15 2-Nov-15 21-Dec-15 9-Nov-15 5-Jan-16 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00531 R C PIPING PLAN AREA-53 0.0 22-Nov-15 30-Aug-15 7-Dec-15 26-Oct-15 14-Dec-15 2-Nov-15 21-Dec-15 9-Nov-15 5-Jan-16 16-Nov-15 18-Nov-16 28-Feb-18 100% 100.0%
A545-700-16-43-00541 R C PIPING PLAN AREA-54 0.0 22-Nov-15 30-Aug-15 7-Dec-15 26-Oct-15 14-Dec-15 2-Nov-15 21-Dec-15 9-Nov-15 5-Jan-16 16-Nov-15 18-Nov-16 28-Feb-18 100% 100.0%
A545-700-16-43-00551 R C PIPING PLAN AREA-55 0.0 22-Nov-15 30-Aug-15 7-Dec-15 26-Oct-15 14-Dec-15 2-Nov-15 21-Dec-15 9-Nov-15 5-Jan-16 16-Nov-15 18-Nov-16 24-Apr-18 100% 100.0%
A545-700-16-43-00552 E C PIPING PLAN AREA-55 0.0 22-Nov-15 30-Aug-15 7-Dec-15 2-Mar-17 14-Dec-15 9-Mar-17 21-Dec-15 16-Mar-17 5-Jan-16 23-Mar-17 31-Aug-19 - 85% 85.0%
A545-700-16-43-00561 E C PIPING PLAN AREA-56 0.0 22-Nov-15 30-Aug-15 7-Dec-15 26-Oct-15 14-Dec-15 2-Nov-15 21-Dec-15 9-Nov-15 5-Jan-16 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00571 E C PIPING PLAN AREA-57 0.0 22-Nov-15 30-Aug-15 7-Dec-15 26-Oct-15 14-Dec-15 2-Nov-15 21-Dec-15 9-Nov-15 5-Jan-16 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00581 E C PIPING PLAN AREA-58 0.0 22-Nov-15 30-Aug-15 7-Dec-15 26-Oct-15 14-Dec-15 2-Nov-15 21-Dec-15 9-Nov-15 5-Jan-16 16-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-00591 E C PIPING PLAN AREA-59 0.0 22-Nov-15 30-Aug-15 5-Jan-17 7-Apr-17 12-Jan-17 14-Apr-17 19-Jan-17 21-Apr-17 3-Feb-17 28-Apr-17 31-Aug-19 - 85% 85.0%
A545-700-16-43-00601 E C PIPING PLAN AREA-60 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00611 E C PIPING PLAN AREA-61 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00621 E C PIPING PLAN AREA-62 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00631 E C PIPING PLAN AREA-63 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00641 E C PIPING PLAN AREA-64 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00651 E C PIPING PLAN AREA-65 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00661 E C PIPING PLAN AREA-66 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00671 E C PIPING PLAN AREA-67 0.0 14-Dec-15 12-Jul-16 27-Jan-17 7-Apr-17 3-Feb-17 14-Apr-17 10-Feb-17 21-Apr-17 25-Feb-17 28-Apr-17 31-Aug-19 - 85% 85.0%
A545-700-16-43-00681 E C PIPING PLAN AREA-68 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00691 E C PIPING PLAN AREA-69 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00701 E C PIPING PLAN AREA-70 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00711 E C PIPING PLAN AREA-71 0.0 14-Dec-15 4-May-16 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00721 E C PIPING PLAN AREA-72 0.0 14-Dec-15 11-May-16 29-Dec-15 25-May-16 5-Jan-16 1-Jun-16 12-Jan-16 8-Jun-16 27-Jan-16 15-Jun-16 31-Aug-19 - 85% 85.0%
A545-700-16-43-00731 E C PIPING PLAN AREA-73 0.0 14-Dec-15 8-Mar-17 29-Dec-15 22-Mar-17 5-Jan-16 29-Mar-17 12-Jan-16 5-Apr-17 27-Jan-16 12-Apr-17 31-Aug-19 - 85% 85.0%
A545-700-16-43-00741 E C PIPING PLAN AREA-74 0.0 14-Dec-15 21-Feb-17 29-Dec-15 7-Mar-17 5-Jan-16 14-Mar-17 12-Jan-16 21-Mar-17 27-Jan-16 28-Mar-17 31-Aug-19 - 85% 85.0%
A545-700-16-43-01011 E C PIPING PLAN AREA-101 0.0 14-Dec-15 24-Sep-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 31-Aug-19 - 85% 85.0%
A545-700-16-43-01012 R C PIPING PLAN AREA-101 0.0 14-Dec-15 24-Sep-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 30-Mar-18 100% 100.0%
A545-700-16-43-01021 E C PIPING PLAN AREA-102 0.0 14-Dec-15 24-Sep-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01022 R C PIPING PLAN AREA-102 0.0 14-Dec-15 20-Oct-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 30-Mar-18 100% 100.0%
A545-700-16-43-01031 E C PIPING PLAN AREA-103 0.0 14-Dec-15 24-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01032 E C PIPING PLAN AREA-103 0.0 14-Dec-15 20-Oct-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01033 R C PIPING PLAN AREA-103 0.0 14-Dec-15 11-Sep-15 29-Dec-15 25-Sep-15 5-Jan-16 2-Oct-15 12-Jan-16 9-Oct-15 27-Jan-16 16-Oct-15 10-Dec-16 28-Mar-18 100% 100.0%
A545-700-16-43-01041 E C PIPING PLAN AREA-104 0.0 14-Dec-15 24-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01042 R C PIPING PLAN AREA-104 0.0 14-Dec-15 20-Oct-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 28-Mar-18 100% 100.0%
A545-700-16-43-01051 R C PIPING PLAN AREA-105 0.0 14-Dec-15 24-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 28-Mar-18 100% 100.0%
A545-700-16-43-01052 R C PIPING PLAN AREA-105 0.0 14-Dec-15 20-Oct-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 28-Mar-18 100% 100.0%
A545-700-16-43-01061 R C PIPING PLAN AREA-106 0.0 14-Dec-15 24-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 28-Mar-18 100% 100.0%
A545-700-16-43-01062 R C PIPING PLAN AREA-106 0.0 14-Dec-15 20-Oct-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 28-Mar-18 100% 100.0%
A545-700-16-43-01063 R C PIPING PLAN AREA-106 0.0 14-Dec-15 16-Feb-17 29-Dec-15 2-Mar-17 5-Jan-16 9-Mar-17 12-Jan-16 16-Mar-17 27-Jan-16 23-Mar-17 10-Dec-16 28-Mar-18 100% 100.0%
A545-700-16-43-01071 E C PIPING PLAN AREA-107 0.0 14-Dec-15 24-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01072 R C PIPING PLAN AREA-107 0.0 14-Dec-15 20-Oct-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 30-Mar-18 100% 100.0%
A545-700-16-43-01081 E C PIPING PLAN AREA-108 0.0 14-Dec-15 24-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01082 R C PIPING PLAN AREA-108 0.0 14-Dec-15 20-Oct-15 29-Dec-15 3-Nov-15 5-Jan-16 10-Nov-15 12-Jan-16 17-Nov-15 27-Jan-16 24-Nov-15 10-Dec-16 30-Mar-18 100% 100.0%
A545-700-16-43-01091 E C PIPING PLAN AREA-109 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01092 R C PIPING PLAN AREA-109 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 10-Dec-16 30-Mar-18 100% 100.0%
A545-700-16-43-01101 E C PIPING PLAN AREA-110 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01102 R C PIPING PLAN AREA-110 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 10-Dec-16 30-Mar-18 100% 100.0%
A545-700-16-43-01111 E C PIPING PLAN AREA-111 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01112 R C PIPING PLAN AREA-111 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01113 R C PIPING PLAN AREA-111 0.0 14-Dec-15 20-Feb-17 29-Dec-15 6-Mar-17 5-Jan-16 13-Mar-17 12-Jan-16 20-Mar-17 27-Jan-16 28-Mar-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01121 E C PIPING PLAN AREA-112 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01122 R C PIPING PLAN AREA-112 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 10-Dec-16 30-Mar-18 100% 100.0%
A545-700-16-43-01131 E C PIPING PLAN AREA-113 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01132 R C PIPING PLAN AREA-113 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 10-Dec-16 30-Mar-18 100% 100.0%
A545-700-16-43-01133 R C PIPING PLAN AREA-113 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01141 E C PIPING PLAN AREA-114 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01142 R C PIPING PLAN AREA-114 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01151 E C PIPING PLAN AREA-115 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01152 R C PIPING PLAN AREA-115 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01161 E C PIPING PLAN AREA-116 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01162 R C PIPING PLAN AREA-116 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01171 E C PIPING PLAN AREA-117 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01172 R C PIPING PLAN AREA-117 0.0 14-Dec-15 10-Sep-15 29-Dec-15 24-Sep-15 5-Jan-16 1-Oct-15 12-Jan-16 8-Oct-15 27-Jan-16 16-Oct-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01181 E C PIPING PLAN AREA-118 0.0 14-Dec-15 26-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01182 R C PIPING PLAN AREA-118 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01191 E C PIPING PLAN AREA-119 0.0 14-Dec-15 26-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01192 R C PIPING PLAN AREA-119 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01193 R C PIPING PLAN AREA-119 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01201 E C PIPING PLAN AREA-120 0.0 14-Dec-15 26-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01202 R C PIPING PLAN AREA-120 0.0 14-Dec-15 19-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01211 E C PIPING PLAN AREA-121 0.0 14-Dec-15 26-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01212 R C PIPING PLAN AREA-121 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01221 E C PIPING PLAN AREA-122 0.0 14-Dec-15 26-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01222 R C PIPING PLAN AREA-122 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01231 E C PIPING PLAN AREA-123 0.0 14-Dec-15 26-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01232 R C PIPING PLAN AREA-123 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01241 E C PIPING PLAN AREA-124 0.0 14-Dec-15 28-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01242 R C PIPING PLAN AREA-124 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01251 E C PIPING PLAN AREA-125 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01252 R C PIPING PLAN AREA-125 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 28-May-18 100% 100.0%
A545-700-16-43-01261 R C PIPING PLAN AREA-126 0.0 14-Dec-15 28-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01262 R C PIPING PLAN AREA-126 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01271 R C PIPING PLAN AREA-127 0.0 14-Dec-15 28-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01272 R C PIPING PLAN AREA-127 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 22-May-18 100% 100.0%
A545-700-16-43-01273 R C PIPING PLAN AREA-127 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01281 E C PIPING PLAN AREA-128 0.0 14-Dec-15 28-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01282 R C PIPING PLAN AREA-128 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01291 E C PIPING PLAN AREA-129 0.0 14-Dec-15 28-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01292 R C PIPING PLAN AREA-129 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01301 E C PIPING PLAN AREA-130 0.0 14-Dec-15 28-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01302 R C PIPING PLAN AREA-130 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 10-Dec-16 24-Apr-18 100% 100.0%
A545-700-16-43-01303 E C PIPING PLAN AREA-130 0.0 14-Dec-15 12-Oct-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01311 R C PIPING PLAN AREA-131 0.0 14-Dec-15 28-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01312 R C PIPING PLAN AREA-131 0.0 14-Dec-15 28-Sep-15 29-Dec-15 26-Oct-15 5-Jan-16 2-Nov-15 12-Jan-16 9-Nov-15 27-Jan-16 16-Nov-15 30-Sep-19 - 85% 85.0%
A545-700-16-43-01321 E C PIPING PLAN AREA-132 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01322 E C PIPING PLAN AREA-132 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01323 E C PIPING PLAN AREA-132 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01331 E C PIPING PLAN AREA-133 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 10-Dec-16 30-May-18 100% 100.0%
A545-700-16-43-01332 E C PIPING PLAN AREA-133 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 10-Dec-16 30-May-18 100% 100.0%
A545-700-16-43-01333 E C PIPING PLAN AREA-133 0.0 14-Dec-15 26-Nov-15 29-Dec-15 11-Feb-16 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 10-Dec-16 30-May-18 100% 100.0%
A545-700-16-43-01334 E C PIPING PLAN AREA-133 0.0 14-Dec-15 26-Nov-15 29-Dec-15 4-Feb-16 5-Jan-16 11-Feb-16 12-Jan-16 18-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01341 E C PIPING PLAN AREA-134 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01351 E C PIPING PLAN AREA-135 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01352 E C PIPING PLAN AREA-135 0.0 14-Dec-15 26-Nov-15 29-Dec-15 11-Feb-16 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01361 E C PIPING PLAN AREA-136 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01362 E C PIPING PLAN AREA-136 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01371 E C PIPING PLAN AREA-137 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01372 E C PIPING PLAN AREA-137 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01373 E C PIPING PLAN AREA-137 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01381 E C PIPING PLAN AREA-138 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01382 E C PIPING PLAN AREA-138 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01383 E C PIPING PLAN AREA-138 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01391 E C PIPING PLAN AREA-139 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01392 E C PIPING PLAN AREA-139 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01401 E C PIPING PLAN AREA-140 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01402 E C PIPING PLAN AREA-140 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01403 E C PIPING PLAN AREA-140 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01411 E C PIPING PLAN AREA-141 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01412 E C PIPING PLAN AREA-141 0.0 14-Dec-15 26-Nov-15 29-Dec-15 9-Feb-16 5-Jan-16 16-Feb-16 12-Jan-16 23-Feb-16 27-Jan-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01421 E C PIPING PLAN AREA-142 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01422 E C PIPING PLAN AREA-142 0.0 14-Dec-15 26-Nov-15 29-Dec-15 11-Feb-16 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01431 E C PIPING PLAN AREA-143 0.0 14-Dec-15 28-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01432 E C PIPING PLAN AREA-143 0.0 14-Dec-15 26-Nov-15 29-Dec-15 11-Feb-16 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01433 E C PIPING PLAN AREA-143 0.0 14-Dec-15 26-Nov-15 29-Dec-15 11-Feb-16 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01441 E C PIPING PLAN AREA-144 0.0 14-Dec-15 29-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01442 E C PIPING PLAN AREA-144 0.0 14-Dec-15 26-Nov-15 29-Dec-15 11-Feb-16 5-Jan-16 18-Feb-16 12-Jan-16 25-Feb-16 27-Jan-16 25-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01451 E C PIPING PLAN AREA-145 0.0 14-Dec-15 29-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 22-Feb-16 12-Jan-16 29-Feb-16 27-Jan-16 29-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01452 E C PIPING PLAN AREA-145 0.0 14-Dec-15 26-Nov-15 29-Dec-15 15-Feb-16 5-Jan-16 22-Feb-16 12-Jan-16 29-Feb-16 27-Jan-16 29-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01461 E C PIPING PLAN AREA-146 0.0 14-Dec-15 29-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 22-Feb-16 12-Jan-16 29-Feb-16 27-Jan-16 29-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01471 E C PIPING PLAN AREA-147 0.0 14-Dec-15 29-Sep-15 29-Dec-15 15-Feb-16 5-Jan-16 22-Feb-16 12-Jan-16 29-Feb-16 27-Jan-16 29-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01481 E C PIPING PLAN AREA-148 0.0 14-Dec-15 26-Nov-15 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01491 E C PIPING PLAN AREA-149 0.0 14-Dec-15 30-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01501 E C PIPING PLAN AREA-150 0.0 14-Dec-15 30-Sep-15 29-Dec-15 20-Oct-15 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01502 E C PIPING PLAN AREA-150 0.0 14-Dec-15 26-Nov-15 29-Dec-15 18-May-16 5-Jan-16 25-May-16 12-Jan-16 1-Jun-16 27-Jan-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01511 E C PIPING PLAN AREA-151 0.0 5-Jan-16 30-Sep-15 20-Jan-16 20-Oct-15 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01512 E C PIPING PLAN AREA-151 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01513 E C PIPING PLAN AREA-151 0.0 5-Jan-16 26-Nov-15 20-Jan-16 28-Feb-17 27-Jan-16 7-Mar-17 3-Feb-16 14-Mar-17 18-Feb-16 21-Mar-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01522 E C PIPING PLAN AREA-152 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01523 E C PIPING PLAN AREA-152 0.0 5-Jan-16 26-Nov-15 20-Jan-16 7-Mar-17 27-Jan-16 14-Mar-17 3-Feb-16 21-Mar-17 18-Feb-16 28-Mar-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01521 E C PIPING PLAN AREA-152 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01531 E C PIPING PLAN AREA-153 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01541 E C PIPING PLAN AREA-154 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01551 E C PIPING PLAN AREA-155 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01552 E C PIPING PLAN AREA-155 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01561 E C PIPING PLAN AREA-156 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01571 E C PIPING PLAN AREA-157 0.0 5-Jan-16 26-Nov-15 20-Jan-16 18-May-16 27-Jan-16 25-May-16 3-Feb-16 1-Jun-16 18-Feb-16 8-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01581 E C PIPING PLAN AREA-158 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 12-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01582 E C PIPING PLAN AREA-158 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 12-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01583 E C PIPING PLAN AREA-158 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 12-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01584 E C PIPING PLAN AREA-158 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 12-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01585 E C PIPING PLAN AREA-158 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 12-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01586 E C PIPING PLAN AREA-158 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 12-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01591 E C PIPING PLAN AREA-159 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01592 E C PIPING PLAN AREA-159 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01593 E C PIPING PLAN AREA-159 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 20-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01601 E C PIPING PLAN AREA-160 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01602 E C PIPING PLAN AREA-160 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01603 E C PIPING PLAN AREA-160 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01604 E C PIPING PLAN AREA-160 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 25-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01611 E C PIPING PLAN AREA-161 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 25-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01612 E C PIPING PLAN AREA-161 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 25-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01613 E C PIPING PLAN AREA-161 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 25-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01614 E C PIPING PLAN AREA-161 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 25-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01621 E C PIPING PLAN AREA-162 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01622 E C PIPING PLAN AREA-162 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 25-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01631 E C PIPING PLAN AREA-163 0.0 5-Jan-16 26-Nov-15 20-Jan-16 9-Feb-16 27-Jan-16 16-Feb-16 3-Feb-16 23-Feb-16 18-Feb-16 23-Feb-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01641 E C PIPING PLAN AREA-164 0.0 5-Jan-16 11-May-16 20-Jan-16 25-May-16 27-Jan-16 1-Jun-16 3-Feb-16 8-Jun-16 18-Feb-16 15-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01642 E C PIPING PLAN AREA-164 0.0 5-Jan-16 11-May-16 20-Jan-16 25-May-16 27-Jan-16 1-Jun-16 3-Feb-16 8-Jun-16 18-Feb-16 15-Jun-16 30-Sep-19 - 85% 85.0%
A545-700-16-43-01651 E C PIPING PLAN AREA-165 0.0 5-Jan-16 16-Feb-17 20-Jan-16 2-Mar-17 27-Jan-16 9-Mar-17 3-Feb-16 16-Mar-17 18-Feb-16 23-Mar-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01661 E C PIPING PLAN AREA-166 0.0 5-Jan-16 22-Feb-17 20-Jan-16 8-Mar-17 27-Jan-16 15-Mar-17 3-Feb-16 22-Mar-17 18-Feb-16 29-Mar-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01671 E C PIPING PLAN AREA-167 0.0 5-Jan-16 6-Mar-17 20-Jan-16 20-Mar-17 27-Jan-16 27-Mar-17 3-Feb-16 3-Apr-17 18-Feb-16 10-Apr-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01681 E C PIPING PLAN AREA-168 0.0 5-Jan-16 20-Feb-17 20-Jan-16 6-Mar-17 27-Jan-16 13-Mar-17 3-Feb-16 20-Mar-17 18-Feb-16 27-Mar-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01682 E C PIPING PLAN AREA-168 0.0 5-Jan-16 20-Feb-17 20-Jan-16 6-Mar-17 27-Jan-16 13-Mar-17 3-Feb-16 20-Mar-17 18-Feb-16 27-Mar-17 30-Sep-19 - 85% 85.0%
A545-700-16-43-01691 E C PIPING PLAN AREA-169 0.0 5-Jan-16 24-Feb-17 20-Jan-16 10-Mar-17 27-Jan-16 17-Mar-17 3-Feb-16 24-Mar-17 18-Feb-16 31-Mar-17 1-Jan-17 30-May-18 100% 100.0%
A545-700-16-43-01692 E C PIPING PLAN AREA-169 0.0 5-Jan-16 24-Feb-17 20-Jan-16 10-Mar-17 27-Jan-16 17-Mar-17 3-Feb-16 24-Mar-17 18-Feb-16 31-Mar-17 1-Jan-17 30-May-18 100% 100.0%
A545-700-16-43-02011 R C PIPING PLAN AREA-201 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 23-Nov-16 14-Apr-17 30-Nov-16 21-Apr-17 15-Dec-16 28-Apr-17 31-Oct-19 - 85% 85.0%
A545-700-16-43-02012 R C PIPING PLAN AREA-201 0.0 2-Feb-16 26-Nov-15 8-Nov-16 7-Apr-17 15-Nov-16 14-Apr-17 22-Nov-16 21-Apr-17 7-Dec-16 28-Apr-17 3-Feb-17 24-Apr-18 100% 100.0%
A545-700-16-43-02021 R C PIPING PLAN AREA-202 0.0 2-Feb-16 30-Sep-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02022 R C PIPING PLAN AREA-202 0.0 2-Feb-16 26-Nov-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02031 R C PIPING PLAN AREA-203 0.0 2-Feb-16 30-Sep-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02032 R C PIPING PLAN AREA-203 0.0 2-Feb-16 26-Nov-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02041 R C PIPING PLAN AREA-204 0.0 2-Feb-16 30-Sep-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02042 R C PIPING PLAN AREA-204 0.0 2-Feb-16 26-Nov-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 29-Jan-17 24-Apr-18 100% 100.0%
A545-700-16-43-02051 R C PIPING PLAN AREA-205 0.0 2-Feb-16 30-Sep-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02052 R C PIPING PLAN AREA-205 0.0 2-Feb-16 26-Nov-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02061 R C PIPING PLAN AREA-206 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 23-Nov-16 14-Apr-17 30-Nov-16 21-Apr-17 15-Dec-16 28-Apr-17 11-Feb-17 30-Mar-18 100% 100.0%
A545-700-16-43-02062 E C PIPING PLAN AREA-206 0.0 2-Feb-16 26-Nov-15 8-Nov-16 7-Apr-17 15-Nov-16 14-Apr-17 22-Nov-16 21-Apr-17 7-Dec-16 28-Apr-17 3-Feb-17 24-Apr-18 100% 100.0%
A545-700-16-43-02071 R C PIPING PLAN AREA-207 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 23-Nov-16 14-Apr-17 30-Nov-16 21-Apr-17 15-Dec-16 28-Apr-17 11-Feb-17 30-Mar-18 100% 100.0%
A545-700-16-43-02072 R C PIPING PLAN AREA-207 0.0 2-Feb-16 26-Nov-15 8-Nov-16 7-Apr-17 15-Nov-16 14-Apr-17 22-Nov-16 21-Apr-17 7-Dec-16 28-Apr-17 31-Oct-19 - 85% 85.0%
A545-700-16-43-02081 R C PIPING PLAN AREA-208 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 25-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02091 R C PIPING PLAN AREA-209 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 25-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02101 R C PIPING PLAN AREA-210 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 25-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02111 R C PIPING PLAN AREA-211 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 25-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02121 R C PIPING PLAN AREA-212 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 25-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02131 E C PIPING PLAN AREA-213 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 25-Feb-16 29-Jan-17 24-Apr-18 100% 100.0%
A545-700-16-43-02141 E C PIPING PLAN AREA-214 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 25-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02151 E C PIPING PLAN AREA-215 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 25-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02152 E C PIPING PLAN AREA-215 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 18-Feb-16 2-Mar-16 25-Feb-16 17-Mar-16 21-Jul-17 31-Oct-19 - 85% 85.0%
A545-700-16-43-02161 E C PIPING PLAN AREA-216 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 23-Nov-16 14-Apr-17 30-Nov-16 21-Apr-17 15-Dec-16 28-Apr-17 11-Feb-17 24-Apr-18 100% 100.0%
A545-700-16-43-02162 R C PIPING PLAN AREA-216 0.0 2-Feb-16 26-Nov-15 8-Nov-16 7-Apr-17 15-Nov-16 14-Apr-17 22-Nov-16 21-Apr-17 7-Dec-16 28-Apr-17 3-Feb-17 30-Mar-18 100% 100.0%
A545-700-16-43-02171 R C PIPING PLAN AREA-217 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 1-Jun-16 2-Mar-16 8-Jun-16 17-Mar-16 15-Jun-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02181 R C PIPING PLAN AREA-218 0.0 2-Feb-16 26-Nov-15 17-Feb-16 15-Feb-16 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02191 R C PIPING PLAN AREA-219 0.0 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02201 R C PIPING PLAN AREA-220 0.0 2-Feb-16 26-Nov-15 17-Feb-16 15-Feb-16 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02211 R C PIPING PLAN AREA-221 0.0 2-Feb-16 26-Nov-15 17-Feb-16 15-Feb-16 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02221 R C PIPING PLAN AREA-222 0.0 2-Feb-16 26-Nov-15 17-Feb-16 15-Feb-16 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02231 R C PIPING PLAN AREA-223 0.0 2-Feb-16 26-Nov-15 8-Nov-16 7-Apr-17 15-Nov-16 14-Apr-17 22-Nov-16 21-Apr-17 7-Dec-16 28-Apr-17 3-Feb-17 30-Mar-18 100% 100.0%
A545-700-16-43-02241 E C PIPING PLAN AREA-224 0.0 2-Feb-16 26-Nov-15 8-Nov-16 7-Apr-17 15-Nov-16 14-Apr-17 22-Nov-16 21-Apr-17 7-Dec-16 28-Apr-17 31-Oct-19 - 85% 85.0%
A545-700-16-43-02242 E C PIPING PLAN AREA-224 0.0 2-Feb-16 26-Nov-15 8-Nov-16 7-Apr-17 15-Nov-16 14-Apr-17 22-Nov-16 21-Apr-17 7-Dec-16 28-Apr-17 3-Feb-17 29-Mar-18 100% 100.0%
A545-700-16-43-02251 E C PIPING PLAN AREA-225 0.0 2-Feb-16 26-Nov-15 17-Feb-16 15-Feb-16 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02252 R C PIPING PLAN AREA-225 0.0 2-Feb-16 26-Nov-15 17-Feb-16 15-Feb-16 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02261 R C PIPING PLAN AREA-226 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02271 R C PIPING PLAN AREA-227 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 30-Mar-18 100% 100.0%
A545-700-16-43-02281 R C PIPING PLAN AREA-228 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02291 R C PIPING PLAN AREA-229 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02301 R C PIPING PLAN AREA-230 0.0 2-Feb-16 26-Nov-15 17-Feb-16 15-Feb-16 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 29-Jan-17 24-Apr-18 100% 100.0%
A545-700-16-43-02302 R C PIPING PLAN AREA-230 0.0 2-Feb-16 26-Nov-15 17-Feb-16 15-Feb-16 24-Feb-16 22-Feb-16 2-Mar-16 29-Feb-16 17-Mar-16 29-Feb-16 29-Jan-17 29-Mar-18 100% 100.0%
A545-700-16-43-02311 R C PIPING PLAN AREA-231 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 29-Mar-18 100% 100.0%
A545-700-16-43-02321 E C PIPING PLAN AREA-232 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 30-May-18 100% 100.0%
A545-700-16-43-02331 E C PIPING PLAN AREA-233 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 26-Apr-18 100% 100.0%
A545-700-16-43-02341 R C PIPING PLAN AREA-234 0.0 2-Feb-16 26-Nov-15 8-Nov-16 7-Apr-17 15-Nov-16 14-Apr-17 22-Nov-16 21-Apr-17 7-Dec-16 28-Apr-17 3-Feb-17 26-Apr-18 100% 100.0%
A545-700-16-43-02342 E C PIPING PLAN AREA-234 0.0 2-Feb-16 26-Nov-15 8-Nov-16 20-Mar-17 15-Nov-16 27-Mar-17 22-Nov-16 3-Apr-17 7-Dec-16 10-Apr-17 3-Feb-17 26-Apr-18 100% 100.0%
A545-700-16-43-02351 E C PIPING PLAN AREA-235 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02352 E C PIPING PLAN AREA-235 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 22-May-18 100% 100.0%
A545-700-16-43-02361 E C PIPING PLAN AREA-236 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 22-May-18 100% 100.0%
A545-700-16-43-02371 R C PIPING PLAN AREA-237 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 26-Apr-18 100% 100.0%
A545-700-16-43-02381 R C PIPING PLAN AREA-238 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 26-Apr-18 100% 100.0%
A545-700-16-43-02382 E C PIPING PLAN AREA-238 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02391 E C PIPING PLAN AREA-239 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02392 E C PIPING PLAN AREA-239 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02401 R C PIPING PLAN AREA-240 0.0 2-Feb-16 26-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 26-Apr-18 100% 100.0%
A545-700-16-43-02411 R C PIPING PLAN AREA-241 0.0 2-Feb-16 30-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 29-Mar-18 100% 100.0%
A545-700-16-43-02421 R C PIPING PLAN AREA-242 0.0 2-Feb-16 30-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 29-Jan-17 26-Apr-18 100% 100.0%
A545-700-16-43-02431 E C PIPING PLAN AREA-243 0.0 2-Feb-16 30-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02441 E C PIPING PLAN AREA-244 0.0 2-Feb-16 30-Nov-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02451 E C PIPING PLAN AREA-245 0.0 2-Feb-16 30-Nov-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02461 E C PIPING PLAN AREA-246 0.0 2-Feb-16 30-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02471 E C PIPING PLAN AREA-247 0.0 2-Feb-16 30-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02481 E C PIPING PLAN AREA-248 0.0 2-Feb-16 30-Nov-15 17-Feb-16 18-May-16 24-Feb-16 25-May-16 2-Mar-16 1-Jun-16 17-Mar-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02491 E C PIPING PLAN AREA-249 0.0 2-Feb-16 30-Nov-15 17-Feb-16 25-May-16 24-Feb-16 1-Jun-16 2-Mar-16 8-Jun-16 17-Mar-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02492 E C PIPING PLAN AREA-249 0.0 2-Feb-16 30-Nov-15 17-Feb-16 25-May-16 24-Feb-16 1-Jun-16 2-Mar-16 8-Jun-16 17-Mar-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02501 R C PIPING PLAN AREA-250 0.0 2-Feb-16 30-Nov-15 17-Feb-16 9-Feb-16 24-Feb-16 16-Feb-16 2-Mar-16 23-Feb-16 17-Mar-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02511 R C PIPING PLAN AREA-251 0.0 25-Feb-16 30-Nov-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02521 R C PIPING PLAN AREA-252 0.0 25-Feb-16 30-Nov-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02531 R C PIPING PLAN AREA-253 0.0 25-Feb-16 30-Nov-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 21-Feb-17 30-Mar-18 100% 100.0%
A545-700-16-43-02541 R C PIPING PLAN AREA-254 0.0 25-Feb-16 30-Nov-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 21-Feb-17 30-Mar-18 100% 100.0%
A545-700-16-43-02551 R C PIPING PLAN AREA-255 0.0 25-Feb-16 30-Nov-15 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 21-Feb-17 30-Mar-18 100% 100.0%
A545-700-16-43-02561 E C PIPING PLAN AREA-256 0.0 25-Feb-16 30-Nov-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02571 E C PIPING PLAN AREA-257 0.0 25-Feb-16 30-Nov-15 11-Mar-16 18-May-16 18-Mar-16 25-May-16 25-Mar-16 1-Jun-16 9-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02581 E C PIPING PLAN AREA-258 0.0 25-Feb-16 30-Nov-15 11-Mar-16 18-May-16 18-Mar-16 25-May-16 25-Mar-16 1-Jun-16 9-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02591 R C PIPING PLAN AREA-259 0.0 25-Feb-16 21-Dec-15 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 21-Feb-17 30-Mar-18 100% 100.0%
A545-700-16-43-02601 R C PIPING PLAN AREA-260 0.0 25-Feb-16 21-Dec-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 21-Feb-17 30-May-18 100% 100.0%
A545-700-16-43-02611 E C PIPING PLAN AREA-261 0.0 25-Feb-16 21-Dec-15 11-Mar-16 18-May-16 18-Mar-16 25-May-16 25-Mar-16 1-Jun-16 9-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02621 E C PIPING PLAN AREA-262 0.0 25-Feb-16 21-Dec-15 11-Mar-16 18-May-16 18-Mar-16 25-May-16 25-Mar-16 1-Jun-16 9-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02631 R C PIPING PLAN AREA-263 0.0 25-Feb-16 2-Feb-16 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02641 R C PIPING PLAN AREA-264 0.0 25-Feb-16 28-Jan-16 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 21-Feb-17 26-Apr-18 100% 100.0%
A545-700-16-43-02651 R C PIPING PLAN AREA-265 0.0 25-Feb-16 28-Jan-16 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02661 R C PIPING PLAN AREA-266 0.0 25-Feb-16 28-Jan-16 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 21-Feb-17 26-Apr-18 100% 100.0%
A545-700-16-43-02671 E C PIPING PLAN AREA-267 0.0 25-Feb-16 2-Feb-16 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02681 E C PIPING PLAN AREA-268 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 31-Oct-19 - 85% 85.0%
A545-700-16-43-02691 E C PIPING PLAN AREA-269 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 31-Oct-19 - 85% 85.0%
A545-700-16-43-02701 E C PIPING PLAN AREA-270 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 31-Oct-19 - 85% 85.0%
A545-700-16-43-02711 E C PIPING PLAN AREA-271 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 31-Oct-19 - 85% 85.0%
A545-700-16-43-02721 E C PIPING PLAN AREA-272 0.0 25-Feb-16 26-May-16 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02731 E C PIPING PLAN AREA-273 0.0 25-Feb-16 26-May-16 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02741 E C PIPING PLAN AREA-274 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 31-Oct-19 - 85% 85.0%
A545-700-16-43-02751 R C PIPING PLAN AREA-275 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 31-Oct-19 - 85% 85.0%
A545-700-16-43-02761 R C PIPING PLAN AREA-276 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 31-Oct-19 - 85% 85.0%
A545-700-16-43-02771 R C PIPING PLAN AREA-277 0.0 25-Feb-16 21-Dec-15 1-Dec-16 7-Apr-17 8-Dec-16 14-Apr-17 15-Dec-16 21-Apr-17 30-Dec-16 28-Apr-17 26-Feb-17 30-May-18 100% 100.0%
A545-700-16-43-02781 E C PIPING PLAN AREA-278 0.0 25-Feb-16 21-Dec-15 11-Mar-16 18-May-16 18-Mar-16 25-May-16 25-Mar-16 1-Jun-16 9-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02791 E C PIPING PLAN AREA-279 0.0 25-Feb-16 21-Dec-15 11-Mar-16 18-May-16 18-Mar-16 25-May-16 25-Mar-16 1-Jun-16 9-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02801 R C PIPING PLAN AREA-280 0.0 25-Feb-16 21-Dec-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 21-Feb-17 30-May-18 100% 100.0%
A545-700-16-43-02811 R C PIPING PLAN AREA-281 0.0 25-Feb-16 21-Dec-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02821 R C PIPING PLAN AREA-282 0.0 25-Feb-16 2-Feb-16 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 21-Feb-17 22-May-18 100% 100.0%
A545-700-16-43-02831 E C PIPING PLAN AREA-283 0.0 25-Feb-16 11-May-16 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02832 E C PIPING PLAN AREA-283 0.0 25-Feb-16 11-May-16 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02841 E C PIPING PLAN AREA-284 0.0 25-Feb-16 11-May-16 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02851 E C PIPING PLAN AREA-285 0.0 25-Feb-16 2-Feb-16 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02861 E C PIPING PLAN AREA-286 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 21-Feb-17 26-Apr-18 100% 100.0%
A545-700-16-43-02871 R C PIPING PLAN AREA-287 0.0 25-Feb-16 21-Dec-15 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 21-Feb-17 28-May-18 100% 100.0%
A545-700-16-43-02881 E C PIPING PLAN AREA-288 0.0 25-Feb-16 21-Dec-15 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02891 R C PIPING PLAN AREA-289 0.0 25-Feb-16 21-Dec-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 21-Feb-17 26-Apr-18 100% 100.0%
A545-700-16-43-02901 R C PIPING PLAN AREA-290 0.0 25-Feb-16 21-Dec-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02911 E C PIPING PLAN AREA-291 0.0 25-Feb-16 21-Dec-15 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02921 R C PIPING PLAN AREA-292 0.0 25-Feb-16 4-Feb-16 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 21-Feb-17 30-May-18 100% 100.0%
A545-700-16-43-02931 E C PIPING PLAN AREA-293 0.0 25-Feb-16 18-May-16 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02941 E C PIPING PLAN AREA-294 0.0 25-Feb-16 18-May-16 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02951 R C PIPING PLAN AREA-295 0.0 25-Feb-16 4-Feb-16 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 21-Feb-17 26-Apr-18 100% 100.0%
A545-700-16-43-02961 R C PIPING PLAN AREA-296 0.0 25-Feb-16 4-Feb-16 11-Mar-16 11-Feb-16 18-Mar-16 18-Feb-16 25-Mar-16 25-Feb-16 9-Apr-16 25-Feb-16 21-Feb-17 30-May-18 100% 100.0%
A545-700-16-43-02971 E C PIPING PLAN AREA-297 0.0 25-Feb-16 18-May-16 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02981 E C PIPING PLAN AREA-298 0.0 25-Feb-16 21-Dec-15 11-Mar-16 25-May-16 18-Mar-16 1-Jun-16 25-Mar-16 8-Jun-16 9-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-02991 R C PIPING PLAN AREA-299 0.0 25-Feb-16 21-Dec-15 11-Mar-16 9-Feb-16 18-Mar-16 16-Feb-16 25-Mar-16 23-Feb-16 9-Apr-16 23-Feb-16 21-Feb-17 26-Apr-18 100% 100.0%
A545-700-16-43-03001 R C PIPING PLAN AREA-300 0.0 25-Feb-16 12-Oct-15 11-Mar-16 26-Oct-15 18-Mar-16 2-Nov-15 25-Mar-16 9-Nov-15 9-Apr-16 16-Nov-15 21-Feb-17 30-May-18 100% 100.0%
A545-700-16-43-03011 R C PIPING PLAN AREA-301 0.0 16-Mar-16 12-Oct-15 31-Mar-16 26-Oct-15 7-Apr-16 2-Nov-15 14-Apr-16 9-Nov-15 29-Apr-16 16-Nov-15 13-Mar-17 26-Apr-18 100% 100.0%
A545-700-16-43-03021 E C PIPING PLAN AREA-302 0.0 16-Mar-16 12-Oct-15 31-Mar-16 26-Oct-15 7-Apr-16 2-Nov-15 14-Apr-16 9-Nov-15 29-Apr-16 16-Nov-15 31-Oct-19 - 85% 85.0%
A545-700-16-43-03031 R C PIPING PLAN AREA-303 0.0 16-Mar-16 21-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 13-Mar-17 30-Mar-18 100% 100.0%
A545-700-16-43-03041 E C PIPING PLAN AREA-304 0.0 16-Mar-16 21-Dec-15 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03051 R C PIPING PLAN AREA-305 0.0 16-Mar-16 21-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03061 R C PIPING PLAN AREA-306 0.0 16-Mar-16 2-Feb-16 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03071 E C PIPING PLAN AREA-307 0.0 16-Mar-16 18-May-16 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03081 R C PIPING PLAN AREA-308 0.0 16-Mar-16 4-Feb-16 31-Mar-16 11-Feb-16 7-Apr-16 18-Feb-16 14-Apr-16 25-Feb-16 29-Apr-16 25-Feb-16 13-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03091 R C PIPING PLAN AREA-309 0.0 16-Mar-16 4-Feb-16 31-Mar-16 11-Feb-16 7-Apr-16 18-Feb-16 14-Apr-16 25-Feb-16 29-Apr-16 25-Feb-16 13-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03092 R C PIPING PLAN AREA-309 0.0 16-Mar-16 4-Feb-16 31-Mar-16 11-Feb-16 7-Apr-16 18-Feb-16 14-Apr-16 25-Feb-16 29-Apr-16 25-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03101 R C PIPING PLAN AREA-310 0.0 16-Mar-16 18-May-16 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 13-Mar-17 30-May-18 100% 100.0%
A545-700-16-43-03111 E C PIPING PLAN AREA-311 0.0 16-Mar-16 26-May-16 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 31-Oct-19 - 85% 85.0%
A545-700-16-43-03121 E C PIPING PLAN AREA-312 0.0 16-Mar-16 26-May-16 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 31-Oct-19 - 85% 85.0%
A545-700-16-43-03131 E C PIPING PLAN AREA-313 0.0 16-Mar-16 26-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03141 E C PIPING PLAN AREA-314 0.0 16-Mar-16 8-Feb-16 31-Mar-16 15-Feb-16 7-Apr-16 22-Feb-16 14-Apr-16 29-Feb-16 29-Apr-16 29-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03151 E C PIPING PLAN AREA-315 0.0 16-Mar-16 26-May-16 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 31-Oct-19 - 85% 85.0%
A545-700-16-43-03161 E C PIPING PLAN AREA-316 0.0 16-Mar-16 18-May-16 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03171 E C PIPING PLAN AREA-317 0.0 16-Mar-16 21-Dec-15 31-Mar-16 15-Feb-16 7-Apr-16 22-Feb-16 14-Apr-16 29-Feb-16 29-Apr-16 29-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03181 E C PIPING PLAN AREA-318 0.0 16-Mar-16 21-Dec-15 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03191 E C PIPING PLAN AREA-319 0.0 16-Mar-16 21-Dec-15 31-Mar-16 15-Feb-16 7-Apr-16 22-Feb-16 14-Apr-16 29-Feb-16 29-Apr-16 29-Feb-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03201 E C PIPING PLAN AREA-320 0.0 16-Mar-16 18-May-16 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03211 E C PIPING PLAN AREA-321 0.0 16-Mar-16 18-May-16 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03221 E C PIPING PLAN AREA-322 0.0 16-Mar-16 11-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03231 E C PIPING PLAN AREA-323 0.0 16-Mar-16 26-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03241 E C PIPING PLAN AREA-324 0.0 16-Mar-16 11-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 31-Oct-19 - 85% 85.0%
A545-700-16-43-03251 E C PIPING PLAN AREA-325 0.0 16-Mar-16 11-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 13-Mar-17 26-Apr-18 100% 100.0%
A545-700-16-43-03261 R C PIPING PLAN AREA-326 0.0 16-Mar-16 11-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 13-Mar-17 30-Mar-18 100% 100.0%
A545-700-16-43-03262 R C PIPING PLAN AREA-326 0.0 16-Mar-16 11-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 13-Mar-17 30-May-18 100% 100.0%
A545-700-16-43-03271 E C PIPING PLAN AREA-327 0.0 16-Mar-16 18-May-16 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03281 R C PIPING PLAN AREA-328 0.0 16-Mar-16 26-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 13-Mar-17 30-May-18 100% 100.0%
A545-700-16-43-03282 R C PIPING PLAN AREA-328 0.0 16-Mar-16 26-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03291 R C PIPING PLAN AREA-329 0.0 16-Mar-16 26-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 13-Mar-17 30-May-18 100% 100.0%
A545-700-16-43-03292 R C PIPING PLAN AREA-329 0.0 16-Mar-16 26-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03301 E C PIPING PLAN AREA-330 0.0 16-Mar-16 18-May-16 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03311 E C PIPING PLAN AREA-331 0.0 16-Mar-16 18-May-16 31-Mar-16 25-May-16 7-Apr-16 1-Jun-16 14-Apr-16 8-Jun-16 29-Apr-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03321 R C PIPING PLAN AREA-332 0.0 16-Mar-16 21-Dec-15 31-Mar-16 11-Feb-16 7-Apr-16 18-Feb-16 14-Apr-16 25-Feb-16 29-Apr-16 25-Feb-16 13-Mar-17 26-Apr-18 100% 100.0%
A545-700-16-43-03331 R C PIPING PLAN AREA-333 0.0 16-Mar-16 21-Dec-15 31-Mar-16 11-Feb-16 7-Apr-16 18-Feb-16 14-Apr-16 25-Feb-16 29-Apr-16 25-Feb-16 13-Mar-17 26-Apr-18 100% 100.0%
A545-700-16-43-03341 R C PIPING PLAN AREA-334 0.0 16-Mar-16 21-Dec-15 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 13-Mar-17 26-Apr-18 100% 100.0%
A545-700-16-43-03351 E C PIPING PLAN AREA-335 0.0 16-Mar-16 11-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03361 E C PIPING PLAN AREA-336 0.0 16-Mar-16 11-May-16 31-Mar-16 18-May-16 7-Apr-16 25-May-16 14-Apr-16 1-Jun-16 29-Apr-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03371 E C PIPING PLAN AREA-337 0.0 16-Mar-16 2-Feb-16 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03372 E C PIPING PLAN AREA-337 0.0 16-Mar-16 2-Feb-16 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03373 E C PIPING PLAN AREA-337 0.0 16-Mar-16 2-Feb-16 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 20-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03381 E C PIPING PLAN AREA-338 0.0 16-Mar-16 28-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03382 E C PIPING PLAN AREA-338 0.0 16-Mar-16 28-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03391 E C PIPING PLAN AREA-339 0.0 16-Mar-16 28-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03392 E C PIPING PLAN AREA-339 0.0 16-Mar-16 28-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03401 E C PIPING PLAN AREA-340 0.0 16-Mar-16 28-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03402 E C PIPING PLAN AREA-340 0.0 16-Mar-16 28-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03403 E C PIPING PLAN AREA-340 0.0 16-Mar-16 28-Dec-15 31-Mar-16 9-Feb-16 7-Apr-16 16-Feb-16 14-Apr-16 23-Feb-16 29-Apr-16 25-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03411 R C PIPING PLAN AREA-341 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 18-Mar-17 26-Apr-18 100% 100.0%
A545-700-16-43-03421 E C PIPING PLAN AREA-342 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03431 E C PIPING PLAN AREA-343 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03432 E C PIPING PLAN AREA-343 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03433 E C PIPING PLAN AREA-343 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03441 E C PIPING PLAN AREA-344 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03442 E C PIPING PLAN AREA-344 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03443 E C PIPING PLAN AREA-344 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03451 E C PIPING PLAN AREA-345 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03452 E C PIPING PLAN AREA-345 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03453 E C PIPING PLAN AREA-345 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03461 E C PIPING PLAN AREA-346 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03471 E C PIPING PLAN AREA-347 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03472 E C PIPING PLAN AREA-347 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03481 E C PIPING PLAN AREA-348 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03482 E C PIPING PLAN AREA-348 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03483 E C PIPING PLAN AREA-348 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03491 E C PIPING PLAN AREA-349 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03492 E C PIPING PLAN AREA-349 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03493 E C PIPING PLAN AREA-349 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03501 E C PIPING PLAN AREA-350 0.0 16-Mar-16 28-Dec-15 21-Dec-16 7-Apr-17 28-Dec-16 14-Apr-17 4-Jan-17 21-Apr-17 19-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03511 R C PIPING PLAN AREA-351 0.0 2-Apr-16 28-Dec-15 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03521 R C PIPING PLAN AREA-352 0.0 2-Apr-16 28-Dec-15 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03531 R C PIPING PLAN AREA-353 0.0 2-Apr-16 28-Dec-15 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03541 R C PIPING PLAN AREA-354 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03551 R C PIPING PLAN AREA-355 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03561 R C PIPING PLAN AREA-356 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03571 R C PIPING PLAN AREA-357 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03581 R C PIPING PLAN AREA-358 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03582 R C PIPING PLAN AREA-358 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03591 R C PIPING PLAN AREA-359 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03592 R C PIPING PLAN AREA-359 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03601 E C PIPING PLAN AREA-360 0.0 2-Apr-16 28-Dec-15 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 26-Apr-18 100% 100.0%
A545-700-16-43-03611 R C PIPING PLAN AREA-361 0.0 2-Apr-16 11-Sep-15 17-Apr-16 25-Sep-15 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 10-Jul-19 - 100% 85.0%
A545-700-16-43-03751 E C PIPING PLAN AREA-375 0.0 2-Apr-16 30-Nov-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03752 E C PIPING PLAN AREA-375 0.0 2-Apr-16 30-Nov-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 21-Mar-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03761 E C PIPING PLAN AREA-376 0.0 2-Apr-16 30-Nov-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03771 E C PIPING PLAN AREA-377 0.0 2-Apr-16 30-Nov-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03771 E C PIPING PLAN AREA-377 0.0 2-Apr-16 30-Nov-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-03781 E C PIPING PLAN AREA-378 0.0 2-Apr-16 30-Nov-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03791 E C PIPING PLAN AREA-379 0.0 2-Apr-16 30-Nov-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03801 E C PIPING PLAN AREA-380 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03811 E C PIPING PLAN AREA-381 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03821 E C PIPING PLAN AREA-382 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03831 E C PIPING PLAN AREA-383 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03841 E C PIPING PLAN AREA-384 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03851 E C PIPING PLAN AREA-385 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03861 E C PIPING PLAN AREA-386 0.0 2-Apr-16 18-May-16 17-Apr-16 25-May-16 24-Apr-16 1-Jun-16 1-May-16 8-Jun-16 16-May-16 15-Jun-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03871 E C PIPING PLAN AREA-387 0.0 2-Apr-16 30-May-16 17-Apr-16 18-May-16 24-Apr-16 25-May-16 1-May-16 1-Jun-16 16-May-16 8-Jun-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03881 E PIPING PLAN AREA-388 0.0 2-Apr-16 30-May-16 7-Jan-17 7-Apr-17 14-Jan-17 14-Apr-17 21-Jan-17 21-Apr-17 5-Feb-17 28-Apr-17 4-Apr-17 28-Feb-18 100% 100.0%
A545-700-16-43-03891 E C PIPING PLAN AREA-389 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03901 E C PIPING PLAN AREA-390 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03911 R C PIPING PLAN AREA-391 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03921 R C PIPING PLAN AREA-392 0.0 2-Apr-16 2-Feb-16 17-Apr-16 9-Feb-16 24-Apr-16 16-Feb-16 1-May-16 23-Feb-16 16-May-16 23-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03931 R C PIPING PLAN AREA-393 0.0 2-Apr-16 30-May-16 17-Apr-16 18-May-16 24-Apr-16 25-May-16 1-May-16 1-Jun-16 16-May-16 8-Jun-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03941 E C PIPING PLAN AREA-394 0.0 2-Apr-16 28-Dec-15 7-Jan-17 7-Apr-17 14-Jan-17 14-Apr-17 21-Jan-17 21-Apr-17 5-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03951 E C PIPING PLAN AREA-395 0.0 2-Apr-16 28-Dec-15 7-Jan-17 7-Apr-17 14-Jan-17 14-Apr-17 21-Jan-17 21-Apr-17 5-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-03961 E C PIPING PLAN AREA-396 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-03971 E C PIPING PLAN AREA-397 0.0 2-Apr-16 28-Dec-15 17-Apr-16 11-Feb-16 24-Apr-16 18-Feb-16 1-May-16 25-Feb-16 16-May-16 25-Feb-16 30-Mar-17 28-Feb-18 100% 100.0%
A545-700-16-43-04121 E C PIPING PLAN AREA-412 0.0 24-Apr-16 28-Dec-15 29-Jan-17 7-Apr-17 5-Feb-17 14-Apr-17 12-Feb-17 21-Apr-17 27-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-04122 E C PIPING PLAN AREA-412 0.0 24-Apr-16 28-Dec-15 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04131 E C PIPING PLAN AREA-413 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04141 E C PIPING PLAN AREA-414 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04151 E C PIPING PLAN AREA-415 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04161 E C PIPING PLAN AREA-416 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04171 E C PIPING PLAN AREA-417 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04172 E C PIPING PLAN AREA-417 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04181 E C PIPING PLAN AREA-418 0.0 24-Apr-16 4-Feb-16 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04191 E C PIPING PLAN AREA-419 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04201 E C PIPING PLAN AREA-420 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04211 E C PIPING PLAN AREA-421 0.0 24-Apr-16 4-Feb-16 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 21-Apr-17 22-May-18 100% 100.0%
A545-700-16-43-04221 E C PIPING PLAN AREA-422 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04231 R C PIPING PLAN AREA-423 0.0 24-Apr-16 30-May-16 9-May-16 18-May-16 16-May-16 25-May-16 23-May-16 1-Jun-16 7-Jun-16 8-Jun-16 21-Apr-17 28-May-18 100% 100.0%
A545-700-16-43-04241 R C PIPING PLAN AREA-424 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04251 R C PIPING PLAN AREA-425 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 21-Apr-17 26-Apr-18 100% 100.0%
A545-700-16-43-04261 R C PIPING PLAN AREA-426 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 21-Apr-17 30-Mar-18 100% 100.0%
A545-700-16-43-04271 E C PIPING PLAN AREA-427 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04281 E C PIPING PLAN AREA-428 0.0 24-Apr-16 30-May-16 29-Jan-17 7-Apr-17 5-Feb-17 14-Apr-17 12-Feb-17 21-Apr-17 27-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-04291 E C PIPING PLAN AREA-429 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04301 E C PIPING PLAN AREA-430 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04311 E C PIPING PLAN AREA-431 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04321 E C PIPING PLAN AREA-432 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04331 E C PIPING PLAN AREA-433 0.0 24-Apr-16 30-Nov-15 9-May-16 18-May-16 16-May-16 25-May-16 23-May-16 1-Jun-16 7-Jun-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04341 E C PIPING PLAN AREA-434 0.0 24-Apr-16 30-Nov-15 9-May-16 18-May-16 16-May-16 25-May-16 23-May-16 1-Jun-16 7-Jun-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04351 E C PIPING PLAN AREA-435 0.0 24-Apr-16 30-Nov-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04361 E C PIPING PLAN AREA-436 0.0 24-Apr-16 30-Nov-15 29-Jan-17 7-Apr-17 5-Feb-17 14-Apr-17 12-Feb-17 21-Apr-17 27-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-04371 E C PIPING PLAN AREA-437 0.0 24-Apr-16 30-Nov-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04381 E C PIPING PLAN AREA-438 0.0 24-Apr-16 30-Nov-15 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04391 E C PIPING PLAN AREA-439 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04401 E C PIPING PLAN AREA-440 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04411 E C PIPING PLAN AREA-441 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04421 E C PIPING PLAN AREA-442 0.0 24-Apr-16 28-Dec-15 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04431 E C PIPING PLAN AREA-443 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04441 E C PIPING PLAN AREA-444 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04451 E C PIPING PLAN AREA-445 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04461 E C PIPING PLAN AREA-446 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04471 E C PIPING PLAN AREA-447 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04481 E C PIPING PLAN AREA-448 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04491 E C PIPING PLAN AREA-449 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04501 E C PIPING PLAN AREA-450 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04511 E C PIPING PLAN AREA-451 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04521 E C PIPING PLAN AREA-452 0.0 24-Apr-16 2-Feb-16 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04531 E C PIPING PLAN AREA-453 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04541 E C PIPING PLAN AREA-454 0.0 24-Apr-16 18-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04551 E C PIPING PLAN AREA-455 0.0 24-Apr-16 4-Feb-16 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 21-Apr-17 28-Feb-18 100% 100.0%
A545-700-16-43-04561 E C PIPING PLAN AREA-456 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 21-Apr-17 26-Apr-18 100% 100.0%
A545-700-16-43-04571 E C PIPING PLAN AREA-457 0.0 24-Apr-16 28-Dec-15 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04581 E C PIPING PLAN AREA-458 0.0 24-Apr-16 28-Dec-15 9-May-16 9-Feb-16 16-May-16 16-Feb-16 23-May-16 23-Feb-16 7-Jun-16 23-Feb-16 21-Apr-17 30-Mar-18 100% 100.0%
A545-700-16-43-04591 E C PIPING PLAN AREA-459 0.0 24-Apr-16 28-Dec-15 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04601 E C PIPING PLAN AREA-460 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04611 E C PIPING PLAN AREA-461 0.0 24-Apr-16 11-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04621 E C PIPING PLAN AREA-462 0.0 24-Apr-16 11-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04631 E C PIPING PLAN AREA-463 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04641 E C PIPING PLAN AREA-464 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04651 E C PIPING PLAN AREA-465 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04661 E C PIPING PLAN AREA-466 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04671 E C PIPING PLAN AREA-467 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 21-Apr-17 30-Mar-18 100% 100.0%
A545-700-16-43-04681 E C PIPING PLAN AREA-468 0.0 24-Apr-16 11-May-16 9-May-16 25-May-16 16-May-16 1-Jun-16 23-May-16 8-Jun-16 7-Jun-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04691 E C PIPING PLAN AREA-469 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04701 E C PIPING PLAN AREA-470 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04711 E C PIPING PLAN AREA-471 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04721 E C PIPING PLAN AREA-472 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04731 E C PIPING PLAN AREA-473 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04741 E C PIPING PLAN AREA-474 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04751 E C PIPING PLAN AREA-475 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04761 E C PIPING PLAN AREA-476 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04771 E C PIPING PLAN AREA-477 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04781 E C PIPING PLAN AREA-478 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-04791 E C PIPING PLAN AREA-479 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 6-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-04792 E C PIPING PLAN AREA-479 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 6-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-04801 E C PIPING PLAN AREA-480 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 12-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-04811 E C PIPING PLAN AREA-481 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 12-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-04821 E C PIPING PLAN AREA-482 0.0 24-Apr-16 28-Dec-15 9-May-16 11-Feb-16 16-May-16 18-Feb-16 23-May-16 25-Feb-16 7-Jun-16 12-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05091 E C PIPING PLAN AREA-509 0.0 15-Nov-15 29-Jul-15 30-Nov-15 12-Aug-15 7-Dec-15 19-Aug-15 14-Dec-15 26-Aug-15 29-Dec-15 9-Sep-15 11-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-05101 E C PIPING PLAN AREA-510 0.0 15-Nov-15 21-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 11-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-05111 E C PIPING PLAN AREA-511 0.0 15-Nov-15 21-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 11-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-05121 E C PIPING PLAN AREA-512 0.0 15-Nov-15 21-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 11-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-05131 E C PIPING PLAN AREA-513 0.0 15-Nov-15 21-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 11-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-05141 E C PIPING PLAN AREA-514 0.0 15-Nov-15 21-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05271 E C PIPING PLAN AREA-527 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05281 E C PIPING PLAN AREA-528 0.0 15-Nov-15 28-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05291 E C PIPING PLAN AREA-529 0.0 15-Nov-15 28-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05301 E C PIPING PLAN AREA-530 0.0 15-Nov-15 4-Feb-16 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05311 E C PIPING PLAN AREA-531 0.0 15-Nov-15 29-Jul-15 30-Nov-15 12-Aug-15 7-Dec-15 19-Aug-15 14-Dec-15 26-Aug-15 29-Dec-15 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-05312 E C PIPING PLAN AREA-531 0.0 15-Nov-15 1-Mar-17 30-Nov-15 15-Mar-17 7-Dec-15 22-Mar-17 14-Dec-15 29-Mar-17 29-Dec-15 12-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05321 E C PIPING PLAN AREA-532 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05331 E C PIPING PLAN AREA-533 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05341 E C PIPING PLAN AREA-534 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05351 E C PIPING PLAN AREA-535 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05361 E C PIPING PLAN AREA-536 0.0 15-Nov-15 28-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05371 E C PIPING PLAN AREA-537 0.0 15-Nov-15 28-Dec-15 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05381 E C PIPING PLAN AREA-538 0.0 15-Nov-15 11-May-16 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05391 E C PIPING PLAN AREA-539 0.0 15-Nov-15 4-Feb-16 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05401 E C PIPING PLAN AREA-540 0.0 15-Nov-15 4-Feb-16 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05411 E C PIPING PLAN AREA-541 0.0 15-Nov-15 11-May-16 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05421 E C PIPING PLAN AREA-542 0.0 15-Nov-15 4-Feb-16 30-Nov-15 11-Feb-16 7-Dec-15 18-Feb-16 14-Dec-15 25-Feb-16 29-Dec-15 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05431 E C PIPING PLAN AREA-543 0.0 15-Nov-15 30-May-16 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 11-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-05441 E C PIPING PLAN AREA-544 0.0 15-Nov-15 11-May-16 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05451 E C PIPING PLAN AREA-545 0.0 15-Nov-15 30-May-16 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05461 E C PIPING PLAN AREA-546 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05471 E C PIPING PLAN AREA-547 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05481 E C PIPING PLAN AREA-548 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05482 E C PIPING PLAN AREA-548 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05491 E C PIPING PLAN AREA-549 0.0 15-Nov-15 28-Dec-15 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05492 E C PIPING PLAN AREA-549 0.0 15-Nov-15 28-Dec-15 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05501 E C PIPING PLAN AREA-550 0.0 15-Nov-15 28-Dec-15 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 11-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-05511 E C PIPING PLAN AREA-551 0.0 15-Nov-15 28-Dec-15 30-Nov-15 18-May-16 7-Dec-15 25-May-16 14-Dec-15 1-Jun-16 29-Dec-15 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05561 E C PIPING PLAN AREA-556 0.0 15-Nov-15 28-Dec-15 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05562 E C PIPING PLAN AREA-556 0.0 15-Nov-15 28-Dec-15 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05571 E C PIPING PLAN AREA-557 0.0 15-Nov-15 28-Dec-15 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05581 E C PIPING PLAN AREA-558 0.0 15-Nov-15 28-Dec-15 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05591 E C PIPING PLAN AREA-559 0.0 15-Nov-15 28-Dec-15 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05601 E C PIPING PLAN AREA-560 0.0 15-Nov-15 28-Dec-15 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05602 E C PIPING PLAN AREA-560 0.0 15-Nov-15 28-Dec-15 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05611 E C PIPING PLAN AREA-561 0.0 15-Nov-15 30-May-16 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05612 E C PIPING PLAN AREA-561 0.0 15-Nov-15 30-May-16 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05621 E C PIPING PLAN AREA-562 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05631 E C PIPING PLAN AREA-563 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05641 E C PIPING PLAN AREA-564 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05651 E C PIPING PLAN AREA-565 0.0 15-Nov-15 30-May-16 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05652 E C PIPING PLAN AREA-565 0.0 15-Nov-15 30-May-16 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05661 E C PIPING PLAN AREA-566 0.0 15-Nov-15 30-May-16 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05662 E C PIPING PLAN AREA-566 0.0 15-Nov-15 30-May-16 29-Dec-16 13-Feb-17 5-Jan-17 20-Feb-17 12-Jan-17 27-Feb-17 27-Jan-17 6-Mar-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05671 E C PIPING PLAN AREA-567 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05681 E C PIPING PLAN AREA-568 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05691 E C PIPING PLAN AREA-569 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05701 E C PIPING PLAN AREA-570 0.0 15-Nov-15 22-May-16 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05702 E C PIPING PLAN AREA-570 0.0 15-Nov-15 22-May-16 29-Dec-16 8-Feb-17 5-Jan-17 15-Feb-17 12-Jan-17 22-Feb-17 27-Jan-17 1-Mar-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05711 E C PIPING PLAN AREA-571 0.0 15-Nov-15 22-May-16 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05712 E C PIPING PLAN AREA-571 0.0 15-Nov-15 22-May-16 29-Dec-16 21-Jan-17 5-Jan-17 28-Jan-17 12-Jan-17 4-Feb-17 27-Jan-17 11-Feb-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05721 E C PIPING PLAN AREA-572 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05731 E C PIPING PLAN AREA-573 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05741 E C PIPING PLAN AREA-574 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05742 E C PIPING PLAN AREA-574 0.0 15-Nov-15 18-May-16 30-Nov-15 25-May-16 7-Dec-15 1-Jun-16 14-Dec-15 8-Jun-16 29-Dec-15 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05743 E C PIPING PLAN AREA-574 0.0 15-Nov-15 23-May-16 30-Nov-15 30-May-16 7-Dec-15 6-Jun-16 14-Dec-15 13-Jun-16 29-Dec-15 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05751 E C PIPING PLAN AREA-575 0.0 15-Nov-15 16-May-16 30-Nov-15 30-May-16 7-Dec-15 6-Jun-16 14-Dec-15 13-Jun-16 29-Dec-15 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05761 E C PIPING PLAN AREA-576 0.0 15-Nov-15 16-May-16 30-Nov-15 30-May-16 7-Dec-15 6-Jun-16 14-Dec-15 13-Jun-16 29-Dec-15 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05762 E C PIPING PLAN AREA-576 0.0 15-Nov-15 16-May-16 30-Nov-15 30-May-16 7-Dec-15 6-Jun-16 14-Dec-15 13-Jun-16 29-Dec-15 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05771 E C PIPING PLAN AREA-577 0.0 15-Nov-15 28-Dec-15 30-Nov-15 30-May-16 7-Dec-15 6-Jun-16 14-Dec-15 13-Jun-16 29-Dec-15 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05781 E C PIPING PLAN AREA-578 0.0 15-Nov-15 28-Dec-15 30-Nov-15 30-May-16 7-Dec-15 6-Jun-16 14-Dec-15 13-Jun-16 29-Dec-15 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05782 E C PIPING PLAN AREA-578 0.0 15-Nov-15 28-Dec-15 30-Nov-15 30-May-16 7-Dec-15 6-Jun-16 14-Dec-15 13-Jun-16 29-Dec-15 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05791 E C PIPING PLAN AREA-579 0.0 15-Nov-15 28-Dec-15 29-Dec-16 7-Apr-17 5-Jan-17 14-Apr-17 12-Jan-17 21-Apr-17 27-Jan-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05792 E C PIPING PLAN AREA-579 0.0 15-Nov-15 28-Dec-15 29-Dec-16 28-Feb-17 5-Jan-17 7-Mar-17 12-Jan-17 14-Mar-17 27-Jan-17 21-Mar-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05793 E C PIPING PLAN AREA-579 0.0 15-Nov-15 28-Dec-15 29-Dec-16 28-Feb-17 5-Jan-17 7-Mar-17 12-Jan-17 14-Mar-17 27-Jan-17 21-Mar-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05794 E C PIPING PLAN AREA-579 0.0 15-Nov-15 28-Dec-15 29-Dec-16 28-Feb-17 5-Jan-17 7-Mar-17 12-Jan-17 14-Mar-17 27-Jan-17 21-Mar-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-05801 E C PIPING PLAN AREA-580 0.0 21-Nov-15 4-May-16 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05811 E C PIPING PLAN AREA-581 0.0 21-Nov-15 4-May-16 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05821 E C PIPING PLAN AREA-582 0.0 21-Nov-15 9-May-16 6-Dec-15 23-May-16 13-Dec-15 30-May-16 20-Dec-15 6-Jun-16 4-Jan-16 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05831 E C PIPING PLAN AREA-583 0.0 21-Nov-15 9-May-16 6-Dec-15 23-May-16 13-Dec-15 30-May-16 20-Dec-15 6-Jun-16 4-Jan-16 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05841 E C PIPING PLAN AREA-584 0.0 21-Nov-15 9-May-16 6-Dec-15 23-May-16 13-Dec-15 30-May-16 20-Dec-15 6-Jun-16 4-Jan-16 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-05851 E C PIPING PLAN AREA-585 0.0 21-Nov-15 1-Mar-17 6-Dec-15 15-Mar-17 13-Dec-15 22-Mar-17 20-Dec-15 29-Mar-17 4-Jan-16 12-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06011 E C PIPING PLAN AREA-601 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06012 R C PIPING PLAN AREA-601 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06013 R C PIPING PLAN AREA-601 0.0 21-Nov-15 9-Feb-17 6-Dec-15 23-Feb-17 13-Dec-15 2-Mar-17 20-Dec-15 9-Mar-17 4-Jan-16 23-Mar-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06021 E C PIPING PLAN AREA-602 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06022 R C PIPING PLAN AREA-602 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06031 E C PIPING PLAN AREA-603 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06032 R C PIPING PLAN AREA-603 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06041 R C PIPING PLAN AREA-604 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06042 R C PIPING PLAN AREA-604 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06051 E C PIPING PLAN AREA-605 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06052 R C PIPING PLAN AREA-605 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06061 E C PIPING PLAN AREA-606 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06062 E C PIPING PLAN AREA-606 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06071 E C PIPING PLAN AREA-607 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06072 R C PIPING PLAN AREA-607 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06081 E C PIPING PLAN AREA-608 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06082 R C PIPING PLAN AREA-608 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06091 E C PIPING PLAN AREA-609 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06092 R C PIPING PLAN AREA-609 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06101 E C PIPING PLAN AREA-610 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06102 R C PIPING PLAN AREA-610 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06103 R C PIPING PLAN AREA-610 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06111 E C PIPING PLAN AREA-611 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06112 R C PIPING PLAN AREA-611 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06113 R C PIPING PLAN AREA-611 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06121 E C PIPING PLAN AREA-612 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06122 E C PIPING PLAN AREA-612 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06131 E C PIPING PLAN AREA-613 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06132 R C PIPING PLAN AREA-613 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06141 E C PIPING PLAN AREA-614 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06142 R C PIPING PLAN AREA-614 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06151 E C PIPING PLAN AREA-615 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06152 E C PIPING PLAN AREA-615 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06161 E C PIPING PLAN AREA-616 0.0 21-Nov-15 4-Feb-16 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06162 E C PIPING PLAN AREA-616 0.0 21-Nov-15 4-Feb-16 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06171 E C PIPING PLAN AREA-617 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06172 E C PIPING PLAN AREA-617 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06181 E C PIPING PLAN AREA-618 0.0 21-Nov-15 4-Feb-16 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06182 E C PIPING PLAN AREA-618 0.0 21-Nov-15 4-Feb-16 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06191 E C PIPING PLAN AREA-619 0.0 21-Nov-15 4-Feb-16 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06201 E C PIPING PLAN AREA-620 0.0 21-Nov-15 28-Dec-15 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06211 E C PIPING PLAN AREA-621 0.0 21-Nov-15 28-Dec-15 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06221 E C PIPING PLAN AREA-622 0.0 21-Nov-15 28-Dec-15 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06231 E C PIPING PLAN AREA-623 0.0 21-Nov-15 28-Dec-15 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06232 E C PIPING PLAN AREA-623 0.0 21-Nov-15 4-Feb-16 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06241 E C PIPING PLAN AREA-624 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06242 E C PIPING PLAN AREA-624 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06251 E C PIPING PLAN AREA-625 0.0 21-Nov-15 18-Jul-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06252 E C PIPING PLAN AREA-625 0.0 21-Nov-15 18-Jul-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06261 E C PIPING PLAN AREA-626 0.0 21-Nov-15 11-May-16 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 17-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-06262 E C PIPING PLAN AREA-626 0.0 21-Nov-15 11-May-16 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 17-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-06271 E C PIPING PLAN AREA-627 0.0 21-Nov-15 11-May-16 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 17-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-06272 E C PIPING PLAN AREA-627 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 1-Apr-17 30-May-18 100% 100.0%
A545-700-16-43-06281 E C PIPING PLAN AREA-628 0.0 21-Nov-15 11-May-16 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06282 E C PIPING PLAN AREA-628 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06291 E C PIPING PLAN AREA-629 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06292 E C PIPING PLAN AREA-629 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06293 E C PIPING PLAN AREA-629 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06301 E C PIPING PLAN AREA-630 0.0 21-Nov-15 28-Dec-15 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06302 E C PIPING PLAN AREA-630 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06303 E C PIPING PLAN AREA-630 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06311 E C PIPING PLAN AREA-631 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06321 E C PIPING PLAN AREA-632 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06331 E C PIPING PLAN AREA-633 0.0 21-Nov-15 18-Jul-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06332 E C PIPING PLAN AREA-633 0.0 21-Nov-15 18-Jul-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06333 E C PIPING PLAN AREA-633 0.0 21-Nov-15 18-Jul-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06341 E C PIPING PLAN AREA-634 0.0 21-Nov-15 11-May-16 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06351 E C PIPING PLAN AREA-635 0.0 21-Nov-15 11-May-16 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06361 E C PIPING PLAN AREA-636 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06362 E C PIPING PLAN AREA-636 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06363 E C PIPING PLAN AREA-636 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06364 R C PIPING PLAN AREA-636 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06371 E C PIPING PLAN AREA-637 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06372 R C PIPING PLAN AREA-637 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06381 E C PIPING PLAN AREA-638 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06382 R C PIPING PLAN AREA-638 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06391 E C PIPING PLAN AREA-639 0.0 21-Nov-15 28-Dec-15 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06392 E C PIPING PLAN AREA-639 0.0 21-Nov-15 28-Dec-15 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06393 E C PIPING PLAN AREA-639 0.0 21-Nov-15 28-Dec-15 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06401 E C PIPING PLAN AREA-640 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06402 E C PIPING PLAN AREA-640 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06403 R C PIPING PLAN AREA-640 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06411 E C PIPING PLAN AREA-641 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06412 E C PIPING PLAN AREA-641 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06413 R C PIPING PLAN AREA-641 0.0 21-Nov-15 9-Feb-17 6-Dec-15 23-Feb-17 13-Dec-15 2-Mar-17 20-Dec-15 9-Mar-17 4-Jan-16 23-Mar-17 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06421 R C PIPING PLAN AREA-642 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06422 R C PIPING PLAN AREA-642 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06431 E C PIPING PLAN AREA-643 0.0 21-Nov-15 28-Dec-15 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06432 E C PIPING PLAN AREA-643 0.0 21-Nov-15 28-Dec-15 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06433 E C PIPING PLAN AREA-643 0.0 21-Nov-15 28-Dec-15 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06434 E C PIPING PLAN AREA-643 0.0 21-Nov-15 28-Dec-15 6-Dec-15 6-Mar-17 13-Dec-15 13-Mar-17 20-Dec-15 20-Mar-17 4-Jan-16 27-Mar-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06441 E C PIPING PLAN AREA-644 0.0 21-Nov-15 28-Dec-15 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06442 E C PIPING PLAN AREA-644 0.0 21-Nov-15 28-Dec-15 6-Dec-15 18-May-16 13-Dec-15 25-May-16 20-Dec-15 1-Jun-16 4-Jan-16 8-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06451 E C PIPING PLAN AREA-645 0.0 21-Nov-15 18-May-16 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06452 E C PIPING PLAN AREA-645 0.0 21-Nov-15 18-May-16 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06461 R C PIPING PLAN AREA-646 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06462 R C PIPING PLAN AREA-646 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06471 R C PIPING PLAN AREA-647 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06472 R C PIPING PLAN AREA-647 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 28-May-18 100% 100.0%
A545-700-16-43-06481 R C PIPING PLAN AREA-648 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06482 R C PIPING PLAN AREA-648 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06491 R C PIPING PLAN AREA-649 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06492 E C PIPING PLAN AREA-649 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06493 R C PIPING PLAN AREA-649 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 24-May-18 100% 100.0%
A545-700-16-43-06501 E C PIPING PLAN AREA-650 0.0 21-Nov-15 28-Dec-15 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06511 E C PIPING PLAN AREA-651 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06521 E C PIPING PLAN AREA-652 0.0 21-Nov-15 28-Dec-15 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 17-Nov-16 14-Feb-19 100% 100.0%
A545-700-16-43-06531 E C PIPING PLAN AREA-653 0.0 21-Nov-15 28-Dec-15 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06541 E C PIPING PLAN AREA-654 0.0 21-Nov-15 28-Dec-15 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06551 E C PIPING PLAN AREA-655 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06552 E C PIPING PLAN AREA-655 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06561 E C PIPING PLAN AREA-656 0.0 21-Nov-15 18-May-16 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06571 R C PIPING PLAN AREA-657 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06572 R C PIPING PLAN AREA-657 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06581 R C PIPING PLAN AREA-658 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06582 R C PIPING PLAN AREA-658 0.0 21-Nov-15 18-May-16 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 17-Nov-16 28-May-18 100% 100.0%
A545-700-16-43-06591 R C PIPING PLAN AREA-659 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 28-May-18 100% 100.0%
A545-700-16-43-06601 R C PIPING PLAN AREA-660 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06602 R C PIPING PLAN AREA-660 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 28-May-18 100% 100.0%
A545-700-16-43-06611 R C PIPING PLAN AREA-661 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06612 R C PIPING PLAN AREA-661 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 28-May-18 100% 100.0%
A545-700-16-43-06621 R C PIPING PLAN AREA-662 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 30-Nov-19 - 85% 85.0%
A545-700-16-43-06622 R C PIPING PLAN AREA-662 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06631 E C PIPING PLAN AREA-663 0.0 21-Nov-15 18-May-16 6-Dec-15 25-May-16 13-Dec-15 1-Jun-16 20-Dec-15 8-Jun-16 4-Jan-16 15-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06641 R C PIPING PLAN AREA-664 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 28-May-18 100% 100.0%
A545-700-16-43-06642 R C PIPING PLAN AREA-664 0.0 21-Nov-15 29-Jul-15 6-Dec-15 12-Aug-15 13-Dec-15 19-Aug-15 20-Dec-15 26-Aug-15 4-Jan-16 9-Sep-15 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06651 R C PIPING PLAN AREA-665 0.0 21-Nov-15 23-May-16 6-Dec-15 30-May-16 13-Dec-15 6-Jun-16 20-Dec-15 13-Jun-16 4-Jan-16 20-Jun-16 17-Nov-16 26-Apr-18 100% 100.0%
A545-700-16-43-06661 R C PIPING PLAN AREA-666 0.0 21-Nov-15 16-May-16 6-Dec-15 30-May-16 13-Dec-15 6-Jun-16 20-Dec-15 13-Jun-16 4-Jan-16 20-Jun-16 17-Nov-16 30-May-18 100% 100.0%
A545-700-16-43-06662 E C PIPING PLAN AREA-666 0.0 21-Nov-15 16-May-16 6-Dec-15 30-May-16 13-Dec-15 6-Jun-16 20-Dec-15 13-Jun-16 4-Jan-16 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06671 R C PIPING PLAN AREA-667 0.0 21-Nov-15 16-May-16 6-Dec-15 30-May-16 13-Dec-15 6-Jun-16 20-Dec-15 13-Jun-16 4-Jan-16 20-Jun-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-06672 E C PIPING PLAN AREA-667 0.0 21-Nov-15 16-May-16 6-Dec-15 30-May-16 13-Dec-15 6-Jun-16 20-Dec-15 13-Jun-16 4-Jan-16 20-Jun-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-06681 E C PIPING PLAN AREA-668 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06682 R C PIPING PLAN AREA-668 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 1-Apr-17 28-May-18 100% 100.0%
A545-700-16-43-06691 R C PIPING PLAN AREA-669 0.0 21-Nov-15 28-Dec-15 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 1-Apr-17 28-Apr-18 100% 100.0%
A545-700-16-43-06701 R C PIPING PLAN AREA-670 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 1-Apr-17 28-May-18 100% 100.0%
A545-700-16-43-06711 E C PIPING PLAN AREA-671 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06712 E C PIPING PLAN AREA-671 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06713 E C PIPING PLAN AREA-671 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06721 E C PIPING PLAN AREA-672 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06731 E C PIPING PLAN AREA-673 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 1-Apr-17 14-Feb-19 100% 100.0%
A545-700-16-43-06741 R C PIPING PLAN AREA-674 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06751 R C PIPING PLAN AREA-675 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06761 R C PIPING PLAN AREA-676 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-06771 R C PIPING PLAN AREA-677 0.0 21-Nov-15 30-May-16 4-Jan-17 7-Apr-17 11-Jan-17 14-Apr-17 18-Jan-17 21-Apr-17 2-Feb-17 28-Apr-17 30-Nov-19 - 85% 85.0%
A545-700-16-43-07011 R C PIPING PLAN AREA-701 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-07021 R C PIPING PLAN AREA-702 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-May-18 100% 100.0%
A545-700-16-43-07031 R C PIPING PLAN AREA-703 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-07041 R C PIPING PLAN AREA-704 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-07051 R C PIPING PLAN AREA-705 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-07061 R C PIPING PLAN AREA-706 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-07071 R C PIPING PLAN AREA-707 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-07081 R C PIPING PLAN AREA-708 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-07091 R C PIPING PLAN AREA-709 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 17-Nov-16 28-Apr-18 100% 100.0%
A545-700-16-43-07101 R C PIPING PLAN AREA-710 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07111 R C PIPING PLAN AREA-711 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07121 R C PIPING PLAN AREA-712 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07122 R C PIPING PLAN AREA-712 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07123 R C PIPING PLAN AREA-712 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07131 R C PIPING PLAN AREA-713 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07132 R C PIPING PLAN AREA-713 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07141 R C PIPING PLAN AREA-714 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07142 R C PIPING PLAN AREA-714 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07151 R C PIPING PLAN AREA-715 0.0 21-Nov-15 2-Feb-16 6-Dec-15 9-Feb-16 13-Dec-15 16-Feb-16 20-Dec-15 23-Feb-16 4-Jan-16 23-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07161 R C PIPING PLAN AREA-716 0.0 21-Nov-15 4-Feb-16 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-07162 R C PIPING PLAN AREA-716 0.0 21-Nov-15 4-Feb-16 6-Dec-15 11-Feb-16 13-Dec-15 18-Feb-16 20-Dec-15 25-Feb-16 4-Jan-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-700-16-43-3DMO E LINE MODELLING 23.9 1-Feb-15 20-Feb-15 - - - - - - - - 30-Jun-17 30-Jan-18 100% 100.0%
A545-700-16-43-EQMO E E EQUIPMENT MODELLING 1.0 1-Mar-15 25-Feb-15 - - - - - - - - 31-Dec-16 30-Jan-18 100% 100.0%
A545-700-16-43-FLEX E E FLEXIBILITY ANALYSIS 4.2 8-Oct-15 2-Jul-15 - - - - - - - - 14-Sep-17 30-Jan-18 100% 100.0%
A545-700-16-43-INTC E E INTERFERENCE CHECKING 1.6 22-Nov-15 25-Jul-15 - - - - - - - - 14-Sep-17 30-Jan-18 100% 100.0%
A545-700-16-43-MTOF E P FINAL MTO 0.2 26-Jul-16 23-Dec-16 - - - - - - - - 28-Apr-17 30-Dec-16 100% 100.0%
A545-700-16-43-NOZT E C NOZZLE ORIENTATION 0.3 4-Jun-15 2-Mar-15 - - - - - - - - 31-Dec-16 31-Jul-17 100% 100.0%
A545-700-16-43-PCLT E C PIPING CLEATS 0.1 18-Jun-15 18-Nov-15 - - - - - - - - 31-Dec-16 31-Jul-17 100% 100.0%
A545-700-16-43-PIST R S PIPING STUDIES 23.3 1-Jul-15 10-Feb-15 - - - - - - - - 31-Mar-17 31-May-18 100% 100.0%
A545-700-16-43-PREM E P PRELIMINARY MTO 0.4 7-Jul-15 4-Feb-15 - - - - - - - - 5-Aug-15 15-Jul-15 100% 100.0%
A545-700-16-43-00751 R C PIPING PLAN AREA-75 0.0 21-Sep-17 21-Feb-18 6-Oct-17 28-Feb-18 13-Oct-17 7-Mar-18 20-Oct-17 14-Mar-18 4-Nov-17 21-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00761 R C PIPING PLAN AREA-76 0.0 21-Sep-17 21-Feb-18 6-Oct-17 28-Feb-18 13-Oct-17 7-Mar-18 20-Oct-17 14-Mar-18 4-Nov-17 21-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00771 R C PIPING PLAN AREA-77 0.0 21-Sep-17 21-Feb-18 6-Oct-17 28-Feb-18 13-Oct-17 7-Mar-18 20-Oct-17 14-Mar-18 4-Nov-17 21-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00781 R C PIPING PLAN AREA-78 0.0 21-Sep-17 21-Feb-18 6-Oct-17 28-Feb-18 13-Oct-17 7-Mar-18 20-Oct-17 14-Mar-18 4-Nov-17 21-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00791 R C PIPING PLAN AREA-79 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00801 R C PIPING PLAN AREA-80 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00811 R C PIPING PLAN AREA-81 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00821 R C PIPING PLAN AREA-82 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00831 R C PIPING PLAN AREA-83 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00841 R C PIPING PLAN AREA-84 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00851 R C PIPING PLAN AREA-85 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00861 R C PIPING PLAN AREA-86 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-00871 R C PIPING PLAN AREA-87 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-03102 R C PIPING PLAN AREA-310 0.0 21-Sep-17 16-Feb-18 6-Oct-17 2-Mar-18 13-Oct-17 9-Mar-18 20-Oct-17 16-Mar-18 4-Nov-17 23-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-03642 R C PIPING PLAN AREA-364 0.0 21-Sep-17 16-Feb-18 6-Oct-17 2-Mar-18 13-Oct-17 9-Mar-18 20-Oct-17 16-Mar-18 4-Nov-17 23-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-04831 R C PIPING PLAN AREA-483 0.0 21-Sep-17 23-Feb-18 6-Oct-17 2-Mar-18 13-Oct-17 9-Mar-18 20-Oct-17 16-Mar-18 4-Nov-17 23-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-04841 R C PIPING PLAN AREA-484 0.0 21-Sep-17 23-Feb-18 6-Oct-17 2-Mar-18 13-Oct-17 9-Mar-18 20-Oct-17 16-Mar-18 4-Nov-17 23-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-04851 R C PIPING PLAN AREA-485 0.0 21-Sep-17 23-Feb-18 6-Oct-17 2-Mar-18 13-Oct-17 9-Mar-18 20-Oct-17 16-Mar-18 4-Nov-17 23-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-04861 R C PIPING PLAN AREA-486 0.0 21-Sep-17 23-Feb-18 6-Oct-17 2-Mar-18 13-Oct-17 9-Mar-18 20-Oct-17 16-Mar-18 4-Nov-17 23-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-04871 R C PIPING PLAN AREA-487 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-04881 R C PIPING PLAN AREA-488 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-04891 R C PIPING PLAN AREA-489 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-700-16-43-04901 R C PIPING PLAN AREA-490 0.0 21-Sep-17 30-Jan-18 6-Oct-17 13-Feb-18 13-Oct-17 20-Feb-18 20-Oct-17 27-Feb-18 4-Nov-17 6-Mar-18 30-Aug-19 - 85% 85.0%
A545-000-WL-MR-3075 CLOSED SAMPLE SYSTEMS 11-04-2015 01-05-2015 =F27+102 07-08-2015 =R27+460 - =Z27+90 -
A545-000-WD-MR-3144 FITTINGS (HIGHER ALLOYS) 0.5 21-Sep-15 8-Sep-15 1-Jan-16 14-Jan-16 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WD-MR-3240 FITTINGS 0.5 27-Mar-16 23-May-16 7-Jul-16 29-Jul-16 30-Aug-19 18-Jul-19 28-Nov-19 - 85% 85.0%
A545-000-WD-MR-3243 FITTINGS (SS) 0.5 28-Mar-16 20-May-16 8-Jul-16 12-Aug-16 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WD-MR-3244 FITTINGS (HIGHER ALLOYS) 1-Apr-16 20-05-2016 12-Jul-16 - 10-Sep-16 - 9-Dec-16 - 100%
A545-000-WF-MR-3250 GASKETS 0.5 2-Apr-16 20-May-16 13-Jul-16 17-Aug-16 30-Aug-19 25-Jul-19 28-Nov-19 - 85% 85.0%
A545-000-WK-MR-3279 HOSES & HOSE COUPLINGS 0.5 17-Apr-16 17-Jun-16 28-Jul-16 19-Aug-16 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WB-MR-3314 VALVES-BALL 0.5 3-Jul-17 22-Feb-17 23-Sep-17 4-Oct-17 30-Aug-19 22-Jul-19 28-Nov-19 - 85% 85.0%
A545-000-WB-MR-3315 VALVES-PLUG 0.5 6-Jul-17 16-Feb-17 26-Sep-17 18-Jul-17 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WB-MR-3319 VALVES-SPECIAL 0.5 12-Jul-17 26-Dec-16 2-Oct-17 26-Dec-17 30-Aug-19 19-Jul-19 28-Nov-19 - 85% 85.0%
VALVES-GATE/GLOBE/CHECK (HIGHER
A545-000-WB-MR-3320 0.2 14-Jul-17 20-Feb-17 4-Oct-17 28-Aug-17 27-May-19 - 25-Aug-19 - 90% 85.0%
ALLOYS)
A545-000-WD-MR-3341 FITTINGS (O-LETS) 0.5 22-Jul-17 13-Feb-17 12-Oct-17 21-Nov-17 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WD-MR-3343 FITTINGS (SS) 0.2 22-Jul-17 8-Feb-17 12-Oct-17 13-Jul-17 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WD-MR-3344 FITTINGS (HIGHER ALLOYS) 22-07-2017 08-02-2017 #VALUE! 9-Jan-18 #VALUE! - #VALUE! - #VALUE! 85.0%
A545-000-WE-MR-3350 GASKETS 0.5 25-Jul-17 13-Feb-17 15-Oct-17 18-Jul-17 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WK-MR-3379 HOSES & HOSE COUPLINGS 0.5 10-Aug-17 21-Apr-17 31-Oct-17 10-Jul-17 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WP-MR-3385 SIGHT GLASSES 0.2 22-Aug-17 9-Mar-17 12-Nov-17 12-Jun-17 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WI-MR-3386 CLOSED SAMPLE SYSTEMS 0.2 22-Aug-17 20-Jul-17 1-Aug-19 - 30-Aug-19 26-Jul-19 28-Nov-19 - 40% 40.0%
A545-143-WA-MR-3187 MATERIAL REQUISITION FOR GRE PIPING 14-09-2015 - =F128+102 - =R153+60 - =Z153+90 -
A545-000-WB-MR-3324 SPECIAL CHECK VALVE 0.3 8-Dec-16 27-Oct-16 28-Apr-19 6-Mar-19 30-Aug-19 - 29-Oct-19 - 85% 85.0%
A545-000-WB-MR-3325 DEADMAN VALVES 0.2 4-Jul-17 13-Feb-17 24-Sep-17 26-Dec-17 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WB-MR-3326 EXCESS FLOW CHECK VALVES 0.2 5-Jul-17 23-Feb-17 25-Sep-17 20-Jul-18 30-Aug-19 15-Jul-19 28-Nov-19 - 85% 85.0%
A545-171-WB-MR-3328 RAM TYPE VALVE 0.2 14-Jul-17 18-Aug-17 4-Oct-17 16-Nov-17 30-Aug-19 - 28-Nov-19 - 85% 85.0%
A545-000-WP-MR-3389 FINNED PIPING 0.2 6-Sep-17 17-May-17 1-Aug-19 - 30-Aug-19 - 29-Oct-19 - 40% 40.0%
A545-000-WL-MR-3390 SAMPLE COOLERS 0.1 9-Sep-17 3-May-17 15-Dec-17 - 30-Aug-19 12-Jul-19 28-Nov-19 - 85% 40.0%
A545-000-WA-MR-3403 PIPES (3L PE COATED) 0.1 16-Sep-17 3-Aug-18 7-Dec-17 30-Jan-19 30-Aug-19 - 29-Oct-19 - 85% 85.0%
A545-000-WA-MR-3407 PIPES- CS (SEAMLESS) 0.1 16-Sep-17 3-Aug-18 7-Dec-17 14-Dec-18 30-Aug-19 25-Jul-19 28-Nov-19 - 85% 85.0%
A545-000-WB-MR-3412 VALVES-GATE/GLOBE/CHECK 0.1 18-Sep-17 24-Oct-18 9-Apr-19 20-Mar-19 30-Aug-19 18-Jul-19 28-Nov-19 - 85% 85.0%
A545-000-WB-MR-3415 PLUG VALVES 0.1 18-Sep-17 25-Oct-18 1-Aug-19 - 30-Aug-19 - 28-Nov-19 - 40% 40.0%
A545-000-WD-MR-3442 FITTINGSS (SS) 0.1 23-Sep-17 5-Oct-18 14-Dec-17 7-Feb-19 30-Aug-19 8-Jul-19 28-Nov-19 - 85% 85.0%
A545-000-WD-MR-3440 FITTINGSS (CS) 0.1 24-Sep-17 5-Oct-18 15-Apr-19 11-Apr-19 30-Aug-19 10-Jul-19 29-Oct-19 - 85% 85.0%
A545-000-WD-MR-3441 FITTINGSS (AS) 0.1 25-Sep-17 8-Oct-18 15-Apr-19 12-Apr-19 30-Aug-19 8-Jul-19 29-Oct-19 - 85% 85.0%
A545-000-WD-MR-3443 FITTINGS (SS) 0.1 25-Sep-17 5-Nov-18 17-Apr-19 11-Apr-19 30-Aug-19 - 29-Oct-19 - 85% 85.0%
A545-000-WF-MR-3450 GASKETS 0.1 27-Sep-17 8-Oct-18 17-Apr-19 4-Apr-19 30-Aug-19 - 29-Oct-19 - 85% 85.0%
A545-000-WE-MR-3455 FASTENERS 0.1 27-Sep-17 8-Oct-18 16-Dec-17 21-Feb-19 30-Aug-19 8-Jul-19 29-Oct-19 - 85% 85.0%
A545-000-WD-MR-3446 FITTINGS (EPOXY COATED) 0.1 22-Sep-17 3-Aug-18 16-Dec-17 14-Dec-18 30-Aug-19 15-Jul-19 29-Oct-19 - 85% 85.0%
A545-000-WK-MR-3479 HOSE & HOSE COUPLINGS 27-Apr-19 - =F202+40 - =R202+60 - =Z202+60 - 40%
100 96.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-711-04-41-HE-0001 HAZOP- OFFSITE 1.6 21-Jul-15 17-Dec-15 - - - - - - 3-Aug-15 23-Dec-15 100% 100.0%
A545-711-04-41-PDP-0001 PROCESS DESIGN PACKAGE 1.3 14-Jan-15 22-Jan-15 13-Feb-15 24-Apr-15 27-Feb-15 27-May-15 13-Mar-15 7-Dec-15 13-Apr-15 30-Jul-18 100% 100.0%
A545-04-41-711-1111 TO 1115 CRUDE STORAGE & TRANSFER SYSTEM 4.0 4-Jan-15 13-Dec-14 3-Feb-15 13-Jan-15 10-Feb-15 19-Jun-15 24-Feb-15 28-Jun-16 31-Oct-19 - 95% 95.0%
A545-04-41-711-1119 CRUDE STORAGE & TRANSFER SYSTEM 0.2 20-May-17 20-Jun-17 19-Jun-17 11-Jul-17 26-Jun-17 18-Jul-17 10-Jul-17 6-Oct-17 31-Oct-19 - 95% 95.0%
A545-04-41-711-1120 CRUDE STORAGE & TRANSFER SYSTEM 0.2 21-May-17 20-Jun-17 20-Jun-17 11-Jul-17 27-Jun-17 18-Jul-17 11-Jul-17 6-Oct-17 31-Oct-19 - 95% 95.0%
A545-711-04-41-DS-1201 CRUDE SUMP VESSEL 0.2 24-Feb-15 9-Mar-15 10-Mar-15 23-Mar-15 17-Mar-15 20-Jul-15 31-Mar-15 7-Dec-15 30-Apr-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1701 CRUDE STORAGE TANK 0.2 25-Feb-15 24-Jan-15 11-Mar-15 14-Mar-15 18-Mar-15 20-Jul-15 1-Apr-15 7-Dec-15 1-May-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1702 CRUDE STORAGE DAY TANK 0.2 27-Feb-15 26-Jan-15 13-Mar-15 14-Mar-15 20-Mar-15 20-Jul-15 3-Apr-15 7-Dec-15 2-May-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1703 CRUDE WATER DRAIN TANK 0.2 27-Feb-15 26-Jan-15 13-Mar-15 14-Mar-15 20-Mar-15 20-Jul-15 3-Apr-15 7-Dec-15 3-May-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1733 CRUDE SURGE TANK 0.2 28-Feb-15 27-Jan-15 14-Mar-15 14-Mar-15 21-Mar-15 20-Jul-15 4-Apr-15 7-Dec-15 4-May-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1601 CRUDE BLENDING PUMPS 0.1 22-Mar-15 1-Apr-15 21-Apr-15 1-May-15 28-Apr-15 1-May-15 12-May-15 7-Dec-15 11-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1603 CRUDE FEED PUMPS 0.1 23-Mar-15 1-Apr-15 22-Apr-15 1-May-15 29-Apr-15 1-May-15 13-May-15 7-Dec-15 12-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1604 CRUDE WATER DRAIN PUMPS 0.1 24-Mar-15 1-Apr-15 22-Apr-15 1-May-15 29-Apr-15 1-May-15 13-May-15 7-Dec-15 12-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1605 CRUDE SURGE PUMPS 0.1 25-Mar-15 1-Apr-15 22-Apr-15 1-May-15 29-Apr-15 22-Jun-15 13-May-15 7-Dec-15 12-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1606 CRUDE SUMP PUMPS 0.1 27-Mar-15 1-Apr-15 24-Apr-15 22-Apr-15 1-May-15 1-May-15 15-May-15 7-Dec-15 14-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-1901 PROPELLER MIXER 0.1 24-Mar-15 17-Dec-14 23-Apr-15 31-Dec-14 30-Apr-15 15-Jul-15 14-May-15 7-Dec-15 13-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-2011 PRESSURE INSTRUMENT 0.8 25-Mar-15 4-Mar-15 24-Apr-15 26-Mar-15 1-May-15 11-Aug-15 15-May-15 7-Dec-15 14-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-2111 TEMPERATURE INSTRUMENT 0.8 26-Mar-15 5-Mar-15 25-Apr-15 27-Mar-15 2-May-15 11-Aug-15 16-May-15 7-Dec-15 15-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-2211 LEVEL INSTRUMENT 0.8 27-Mar-15 7-Mar-15 26-Apr-15 24-Mar-15 3-May-15 10-Aug-15 17-May-15 7-Dec-15 16-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-DS-2315 FLOW INSTRUMENT 0.8 28-Mar-15 8-Mar-15 27-Apr-15 26-Mar-15 4-May-15 20-Aug-15 18-May-15 7-Dec-15 17-Jun-15 30-Jul-18 100% 100.0%
A545-711-04-41-HE-1000 SIL REPORT OFFSITES 1.4 12-Dec-15 11-Mar-15 26-Dec-15 24-Oct-17 2-Jan-16 31-Oct-17 16-Jan-16 7-Nov-17 15-Feb-16 7-Nov-17 100% 100.0%
A545-711-04-41-SOI-1001 OPERATING MANUAL 2.4 4-Aug-16 12-Mar-15 18-Aug-16 31-Mar-18 25-Aug-16 14-Apr-18 8-Sep-16 28-Apr-18 16-May-19 - 95% 95.0%
A545-711-04-41-MDX-1010 F&G LAYOUT 0.8 21-May-15 14-Mar-15 4-Jun-15 18-Nov-17 15-Apr-19 - 29-Apr-19 - 29-May-19 - 95% 65.0%
A545-711-04-41-LS-1111 TO
LINE SCHEDULE 0.2 14-Apr-15 15-Mar-15 28-Apr-15 5-Jun-15 5-May-15 12-Jun-15 19-May-15 7-Dec-15 18-May-19 - 95% 95.0%
1118
Page 538 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 7
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE: POSD (OFFSITES)
ANNEXURE-A6
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-04-41-712-1115 CBD SYSTEM 0.8 6-Jan-15 30-Dec-14 5-Feb-15 28-Jan-15 12-Feb-15 15-Jul-15 26-Feb-15 28-Jun-16 6-May-19 - 95% 95.0%
A545-04-41-712-1118 LCO FEED STORAGE & TRANSFER 0.8 9-Jan-15 12-Jan-15 8-Feb-15 11-Feb-15 15-Feb-15 15-Jul-15 1-Mar-15 28-Jun-16 9-May-19 - 95% 95.0%
A545-04-41-712-1120 RFCC FEED STORAGE & TRANSFER 1.6 11-Jan-15 26-Jan-15 10-Feb-15 25-Feb-15 17-Feb-15 15-Jul-15 3-Mar-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-712-04-41-DS-1704 PROPYLENE STORAGE BULLET 0.2 2-Mar-15 12-Feb-15 16-Mar-15 14-Mar-15 23-Mar-15 2-May-15 6-Apr-15 7-Dec-15 6-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1705 SR NAPHTHA STORAGE TANK 0.2 2-Mar-15 12-Feb-15 16-Mar-15 14-Mar-15 23-Mar-15 28-Jul-15 6-Apr-15 7-Dec-15 6-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1706 UNICRACKING STORAGE TANK 0.2 2-Mar-15 12-Feb-15 16-Mar-15 14-Mar-15 23-Mar-15 28-Jul-15 6-Apr-15 7-Dec-15 6-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1707 LCO FEED STORAGE TANK 0.2 4-Mar-15 12-Feb-15 18-Mar-15 14-Mar-15 25-Mar-15 28-Jul-15 8-Apr-15 7-Dec-15 8-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1709 RFCC FEED/ AR STORAGE TANK 0.2 4-Mar-15 21-Feb-15 18-Mar-15 23-Mar-15 25-Mar-15 28-Jul-15 8-Apr-15 7-Dec-15 8-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1736 UNICRAKING NAPHTHA TANK 0.2 12-Mar-15 17-Feb-15 26-Mar-15 19-Mar-15 2-Apr-15 28-Jul-15 16-Apr-15 7-Dec-15 16-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1734 C4 STORAGE BULLETS 0.2 14-Mar-15 17-Feb-15 28-Mar-15 19-Mar-15 4-Apr-15 2-May-15 18-Apr-15 7-Dec-15 18-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1201 INTERMEDIATE SUMP VESSEL 0.2 16-Mar-15 21-Feb-15 30-Mar-15 23-Mar-15 6-Apr-15 28-Jul-15 20-Apr-15 7-Dec-15 20-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1601 PROPYLENE FEED PUMPS 0.2 18-Mar-15 7-Apr-15 1-Apr-15 7-May-15 8-Apr-15 23-Jun-15 22-Apr-15 7-Dec-15 22-May-15 30-Jul-18 100% 100.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-712-04-41-DS-1602 PROPYLENE REPROCESSING PUMPS 0.2 20-Mar-15 7-Apr-15 3-Apr-15 7-May-15 10-Apr-15 21-May-15 24-Apr-15 7-Dec-15 24-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1603 NHT FEED PUMPS 0.2 22-Mar-15 7-Apr-15 5-Apr-15 7-May-15 12-Apr-15 21-May-15 26-Apr-15 7-Dec-15 26-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1604 UNICRACKING FEED PUMPS 0.2 24-Mar-15 7-Apr-15 7-Apr-15 7-May-15 14-Apr-15 21-May-15 28-Apr-15 7-Dec-15 28-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1605 LCO FEED PUMPS 0.2 26-Mar-15 7-Apr-15 9-Apr-15 7-May-15 16-Apr-15 21-May-15 30-Apr-15 7-Dec-15 30-May-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1606 RFCC GASOLINE HDS UNIT FEED PUMPS 0.2 28-Mar-15 7-Apr-15 11-Apr-15 7-May-15 18-Apr-15 22-Jun-15 2-May-15 7-Dec-15 1-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1607 RFCC FEED PUMPS 0.2 30-Mar-15 7-Apr-15 13-Apr-15 7-May-15 20-Apr-15 21-May-15 4-May-15 7-Dec-15 3-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1608 CCR PLATFORMER FEED PUMPS 0.2 1-Apr-15 7-Apr-15 15-Apr-15 7-May-15 22-Apr-15 21-May-15 6-May-15 7-Dec-15 5-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1609 PENEX FEED PUMPS 0.2 3-Apr-15 7-Apr-15 17-Apr-15 7-May-15 24-Apr-15 21-May-15 8-May-15 7-Dec-15 7-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1610 UNICRACKING NAPHTHA PUMPS 0.2 5-Apr-15 7-Apr-15 19-Apr-15 7-May-15 26-Apr-15 21-May-15 10-May-15 7-Dec-15 9-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1611 UNSAT C4 FEED PUMPS 0.2 7-Apr-15 7-Apr-15 21-Apr-15 7-May-15 28-Apr-15 21-May-15 12-May-15 7-Dec-15 11-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1612 SAT C4 FEED PUMPS 0.2 9-Apr-15 7-Apr-15 23-Apr-15 7-May-15 30-Apr-15 21-May-15 14-May-15 7-Dec-15 13-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1614 INTERMEDIATE SUMP VESSEL PUMP (SR) 0.2 13-Apr-15 30-Apr-15 27-Apr-15 21-May-15 4-May-15 22-Jun-15 18-May-15 7-Dec-15 17-Jun-15 30-Jul-18 100% 100.0%
A545-04-41-713-1114 SECURITY SYSTEM FOR C3 BULLETS 0.6 17-Jan-15 25-Dec-14 16-Feb-15 24-Jan-15 23-Feb-15 10-Aug-15 9-Mar-15 28-Jun-16 17-May-19 - 95% 95.0%
A545-713-04-41-DS-1711 C3 STORAGE BULLETS 0.2 18-Jan-15 12-Feb-15 17-Feb-15 14-Mar-15 24-Feb-15 2-May-15 10-Mar-15 7-Dec-15 9-Apr-15 30-Jul-18 100% 100.0%
A545-713-04-41-DS-1601 C3 (PROPANE) LOADING PUMPS 0.2 18-Mar-15 7-Apr-15 17-Apr-15 7-May-15 24-Apr-15 21-May-15 8-May-15 7-Dec-15 7-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1602 C3 (PROPANE) REPROCESSING PUMPS 0.2 22-Mar-15 30-Apr-15 21-Apr-15 21-May-15 28-Apr-15 22-Jun-15 12-May-15 7-Dec-15 11-Jun-15 30-Jul-18 100% 100.0%
A545-712-04-41-DS-1603 HGU (PROPANE) FEED PUMPS 0.2 24-Mar-15 7-Apr-15 23-Apr-15 7-May-15 30-Apr-15 21-May-15 14-May-15 7-Dec-15 13-Jun-15 30-Jul-18 100% 100.0%
A545-04-41-714-1117 DIESEL STORAGE & TRANSFER SYSTEM 0.3 28-Jan-15 7-Jan-15 27-Feb-15 6-Feb-15 6-Mar-15 13-Jul-15 20-Mar-15 28-Jun-16 8-May-19 - 95% 95.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-04-41-714-1118 DIESEL STORAGE & TRANSFER SYSTEM 0.3 28-Jan-15 7-Jan-15 27-Feb-15 6-Feb-15 6-Mar-15 13-Jul-15 20-Mar-15 28-Jun-16 8-May-19 - 95% 95.0%
A545-714-04-41-1119 SLURRY STORAGE & TRANSFER SYSTEM 0.3 26-Jan-15 7-Jan-15 25-Feb-15 6-Feb-15 4-Mar-15 9-Jul-15 18-Mar-15 7-Dec-15 6-May-19 - 95% 95.0%
A545-04-41-714-1120 SLURRY STORAGE & TRANSFER SYSTEM 0.3 28-Jan-15 7-Jan-15 27-Feb-15 6-Feb-15 6-Mar-15 13-Jul-15 20-Mar-15 28-Jun-16 8-May-19 - 95% 95.0%
A545-04-41-714-1121 CBD & TRANSFER 0.3 28-Jan-15 7-Jan-15 27-Feb-15 6-Feb-15 6-Mar-15 9-Jul-15 20-Mar-15 7-Dec-15 8-May-19 - 95% 95.0%
A545-04-41-714-1122 DIESEL STORAGE & TRANSFER SYSTEM 0.3 22-May-17 24-Jul-17 21-Jun-17 23-Aug-17 28-Jun-17 30-Aug-17 12-Jul-17 6-Oct-17 23-May-19 - 95% 95.0%
A545-714-04-41-DS-1612 SLURRY FO BLENDING PUMP 0.2 24-Apr-15 17-Mar-15 8-May-15 14-Apr-15 15-May-15 21-May-15 29-May-15 7-Dec-15 28-Jun-15 30-Jul-18 100% 100.0%
A545-04-41-716-1117 SECURITY SYSTEM FOR C4 (ALK) BULLETS 0.8 3-Feb-15 24-Dec-14 5-Mar-15 23-Jan-15 12-Mar-15 10-Aug-15 26-Mar-15 28-Jun-16 14-May-19 - 95% 95.0%
A545-04-41-716-1118 ETHANOL STORAGE & TRANSFER SYSTEM 0.8 4-Feb-15 6-Jan-15 6-Mar-15 5-Feb-15 13-Mar-15 10-Aug-15 27-Mar-15 28-Jun-16 15-May-19 - 95% 95.0%
A545-04-41-716-1119 GASOLINE BLENDING SYSTEM 0.8 5-Feb-15 10-Feb-15 7-Mar-15 12-Mar-15 14-Mar-15 10-Aug-15 28-Mar-15 28-Jun-16 16-May-19 - 95% 95.0%
A545-04-41-716-1120 GASOLINE BLENDING SYSTEM 0.8 5-Feb-15 10-Feb-15 7-Mar-15 12-Mar-15 14-Mar-15 10-Aug-15 28-Mar-15 28-Jun-16 16-May-19 - 95% 95.0%
A545-04-41-716-1121 GASOLINE BLENDING SYSTEM 0.8 5-Feb-15 10-Feb-15 7-Mar-15 12-Mar-15 14-Mar-15 10-Aug-15 28-Mar-15 28-Jun-16 16-May-19 - 95% 95.0%
A545-04-41-716-1122 GASOLINE BLENDING SYSTEM 0.8 5-Feb-15 10-Feb-15 7-Mar-15 12-Mar-15 14-Mar-15 10-Aug-15 28-Mar-15 28-Jun-16 16-May-19 - 95% 95.0%
A545-04-41-716-1123 CBD & TRANSFER 0.3 9-Feb-15 10-Feb-15 11-Mar-15 12-Mar-15 18-Mar-15 28-Jul-15 1-Apr-15 28-Jun-16 20-May-19 - 95% 95.0%
A545-716-04-41-DS-1717 HYDROTREATED LIGHT NAPHTHA TANK 0.2 12-Apr-15 24-Jan-15 26-Apr-15 14-Mar-15 3-May-15 28-Jul-15 17-May-15 7-Dec-15 16-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1718 REFORMATE STORAGE TANK 0.2 13-Apr-15 26-Jan-15 27-Apr-15 14-Mar-15 4-May-15 28-Jul-15 18-May-15 7-Dec-15 17-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1719 ALKYLATE STORAGE TANK 0.2 14-Apr-15 27-Jan-15 28-Apr-15 14-Mar-15 5-May-15 28-Jul-15 19-May-15 7-Dec-15 18-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1720 LIGHT RFCC GASOLINE STORAGE TANK 0.2 15-Apr-15 29-Jan-15 29-Apr-15 14-Mar-15 6-May-15 28-Jul-15 20-May-15 7-Dec-15 19-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1721 HEAVY RFCC GASOLINE STORAGE TANK 0.2 16-Apr-15 30-Jan-15 30-Apr-15 14-Mar-15 7-May-15 28-Jul-15 21-May-15 7-Dec-15 20-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1722 C4 (ALKYLATION) STORAGE BULLET 0.2 17-Apr-15 31-Jan-15 1-May-15 14-Mar-15 8-May-15 28-Jul-15 22-May-15 7-Dec-15 21-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1723 ETHANOL STORAGE TANK 0.2 18-Apr-15 2-Feb-15 2-May-15 14-Mar-15 9-May-15 28-Jul-15 23-May-15 7-Dec-15 22-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1201 GASOLINE BLENDING SUMP VESSEL 0.2 19-Apr-15 4-Feb-15 2-May-15 23-Mar-15 9-May-15 28-Jul-15 23-May-15 7-Dec-15 22-Jun-15 30-Jul-18 100% 100.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-716-04-41-DS-1202 GASOLINE BLENDING SUMP VESSEL 0.2 20-Apr-15 5-Feb-15 4-May-15 23-Mar-15 11-May-15 28-Jul-15 25-May-15 7-Dec-15 24-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1203 ETHANOL SUMP VESSEL 0.2 21-Apr-15 7-Feb-15 5-May-15 23-Mar-15 12-May-15 28-Jul-15 26-May-15 7-Dec-15 25-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1601 ISOMERATE BLENDING PUMPS 0.2 22-Apr-15 7-Apr-15 6-May-15 7-May-15 13-May-15 21-May-15 27-May-15 7-Dec-15 26-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1602 REFORMATE BLENDING PUMPS 0.2 23-Apr-15 7-Apr-15 7-May-15 7-May-15 14-May-15 21-May-15 28-May-15 7-Dec-15 27-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1603 ALKYLATE BLENDING PUMPS 0.2 24-Apr-15 7-Apr-15 8-May-15 7-May-15 15-May-15 21-May-15 29-May-15 7-Dec-15 28-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1604 LIGHT RFCC GASOLINE BLENDING PUMPS 0.2 25-Apr-15 7-Apr-15 9-May-15 7-May-15 16-May-15 21-May-15 30-May-15 7-Dec-15 29-Jun-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1607 ETHANOL BLENDING PUMPS 0.2 29-Apr-15 7-Apr-15 13-May-15 7-May-15 20-May-15 21-May-15 3-Jun-15 7-Dec-15 3-Jul-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1608 BLENDING SUMP VESSEL PUMP 0.2 30-Apr-15 24-Apr-15 14-May-15 21-May-15 21-May-15 22-Jun-15 4-Jun-15 7-Dec-15 4-Jul-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1611 UNSAT C4 GASOLINE BLENDING PUMPS 0.2 4-May-15 7-Apr-15 18-May-15 7-May-15 25-May-15 21-May-15 8-Jun-15 7-Dec-15 8-Jul-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1612 BLENDING SUMP VESSEL PUMP-2 0.2 5-May-15 23-Apr-15 19-May-15 21-May-15 26-May-15 22-Jun-15 9-Jun-15 7-Dec-15 9-Jul-15 30-Jul-18 100% 100.0%
A545-716-04-41-DS-1613 ETHANOL SUMP VESSEL PUMP 0.2 6-May-15 23-Apr-15 20-May-15 21-May-15 27-May-15 22-Jun-15 10-Jun-15 7-Dec-15 10-Jul-15 30-Jul-18 100% 100.0%
A545-04-41-720-1112 LT SR SLOP TANK 0.8 15-Jan-15 10-Feb-15 14-Feb-15 12-Mar-15 21-Feb-15 11-Aug-15 7-Mar-15 8-Jun-16 15-May-19 - 95% 95.0%
A545-04-41-720-1113 (CRACKED+SR) HY SLOP TANK 0.8 16-Jan-15 10-Feb-15 15-Feb-15 12-Mar-15 22-Feb-15 11-Aug-15 8-Mar-15 8-Jun-16 16-May-19 - 95% 95.0%
A545-04-41-720-1114 CRACKED LT SLOP TANK 0.8 17-Jan-15 10-Feb-15 16-Feb-15 12-Mar-15 23-Feb-15 11-Aug-15 9-Mar-15 8-Jun-16 17-May-19 - 95% 95.0%
A545-04-41-720-1115 FUEL OIL BLENDING 0.8 18-Jan-15 8-Apr-15 17-Feb-15 8-May-15 24-Feb-15 11-Aug-15 10-Mar-15 8-Jun-16 18-May-19 - 95% 95.0%
A545-04-41-720-1131 OFFSITE INTERCONNECTION 0.8 19-Jan-15 22-Dec-14 18-Feb-15 21-Jan-15 25-Feb-15 15-Sep-15 11-Mar-15 2-Mar-16 19-May-19 - 95% 95.0%
A545-04-41-710-1193 GENERAL NOTES & TYPICAL DETAILS 0.8 20-Jan-15 22-Dec-14 19-Feb-15 21-Jan-15 26-Feb-15 15-Sep-15 12-Mar-15 10-May-16 20-May-19 - 95% 95.0%
A545-04-41-720-1116 FUEL OIL STORAGE 0.8 21-Jan-15 8-Apr-15 20-Feb-15 8-May-15 27-Feb-15 11-Aug-15 13-Mar-15 8-Jun-16 21-May-19 - 95% 95.0%
A545-04-41-720-1117 FUEL OIL STORAGE 0.8 22-Jan-15 8-Apr-15 21-Feb-15 8-May-15 28-Feb-15 11-Aug-15 14-Mar-15 8-Jun-16 22-May-19 - 95% 95.0%
A545-04-41-720-1118 MS DOSING SKID 0.8 23-Jan-15 8-Apr-15 23-Feb-15 8-May-15 2-Mar-15 11-Aug-15 16-Mar-15 8-Jun-16 24-May-19 - 95% 95.0%
A545-04-41-720-1119 DIESEL DOSING SKID (FUTURE) 0.8 24-Jan-15 8-Apr-15 23-Feb-15 8-May-15 2-Mar-15 11-Aug-15 16-Mar-15 8-Jun-16 24-May-19 - 95% 95.0%
A545-04-41-720-1120 DIESEL DOSING SKID 0.8 25-Jan-15 8-Apr-15 24-Feb-15 8-May-15 3-Mar-15 11-Aug-15 17-Mar-15 8-Jun-16 15-May-19 - 95% 95.0%
A545-04-41-720-1121 FLUSHING OIL TANK 0.8 26-Jan-15 14-Jul-15 25-Feb-15 28-Jul-15 4-Mar-15 11-Aug-15 18-Mar-15 8-Jun-16 16-May-19 - 95% 95.0%
A545-04-41-720-1122 PRODUCT SURGE TANK 0.8 27-Jan-15 28-Jan-15 26-Feb-15 27-Feb-15 5-Mar-15 11-Aug-15 19-Mar-15 8-Jun-16 17-May-19 - 95% 95.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-04-41-720-1123 ATF DOSING SKID 0.8 27-Jan-15 28-Jan-15 26-Feb-15 27-Feb-15 5-Mar-15 11-Aug-15 19-Mar-15 8-Jun-16 17-May-19 - 95% 95.0%
A545-04-41-720-1124 ATF DOSING SKID 0.8 27-Jan-15 28-Jan-15 26-Feb-15 27-Feb-15 5-Mar-15 11-Aug-15 19-Mar-15 8-Jun-16 17-May-19 - 95% 95.0%
A545-720-04-41-DS-1724 FLUSHING OIL TANK 0.2 28-Jan-15 30-Jan-15 11-Feb-15 14-Mar-15 18-Feb-15 28-Jul-15 4-Mar-15 7-Dec-15 3-Apr-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1725 LIGHT SR SLOP TANK 0.2 29-Jan-15 31-Jan-15 12-Feb-15 14-Mar-15 19-Feb-15 28-Jul-15 5-Mar-15 7-Dec-15 4-Apr-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1726 HY SLOP TANK (CRAKED+SR) 0.2 30-Jan-15 2-Feb-15 13-Feb-15 14-Mar-15 20-Feb-15 28-Jul-15 6-Mar-15 7-Dec-15 6-Apr-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1727 CRAKED LIGHT SLOP TANK 0.2 31-Jan-15 3-Feb-15 14-Feb-15 14-Mar-15 21-Feb-15 28-Jul-15 7-Mar-15 7-Dec-15 6-Apr-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-17XX FUEL OIL STORAGE TANK 0.2 1-Feb-15 6-Feb-15 16-Feb-15 14-Jul-15 23-Feb-15 28-Jul-15 9-Mar-15 7-Dec-15 8-Apr-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1601 FLUSHING OIL PUMPS 0.2 18-Mar-15 7-Apr-15 2-Apr-15 7-May-15 9-Apr-15 21-May-15 23-Apr-15 7-Dec-15 23-May-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1602 LIGHT SR SLOP TRANSFER PUMP 0.2 20-Mar-15 7-Apr-15 4-Apr-15 7-May-15 11-Apr-15 21-May-15 25-Apr-15 7-Dec-15 25-May-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1603 HEAVY SLOP TRANSFER PUMP 0.2 22-Mar-15 7-Apr-15 6-Apr-15 7-May-15 13-Apr-15 21-May-15 27-Apr-15 7-Dec-15 27-May-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1604 CRACKED LIGHT TRANSFER PUMP 0.2 24-Mar-15 7-Apr-15 8-Apr-15 7-May-15 15-Apr-15 21-May-15 29-Apr-15 7-Dec-15 29-May-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1605 GASOLINE SURGE PUMP 0.2 26-Mar-15 7-Apr-15 10-Apr-15 7-May-15 17-Apr-15 21-May-15 1-May-15 7-Dec-15 31-May-15 30-Jul-18 100% 100.0%
A545-720-04-41-DS-1606 IFO TRANSFER PUMP 0.2 28-Mar-15 7-Apr-15 11-Apr-15 7-May-15 18-Apr-15 21-May-15 2-May-15 7-Dec-15 1-Jun-15 30-Jul-18 100% 100.0%
A545-04-41-732-1113 DIESEL STORAGE & TRANSFER SYSTEM 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1114 DIESEL STORAGE & TRANSFER SYSTEM 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1117 SLURRY STORAGE & TRANSFER SYSTEM 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1118 CBD & TRANSFER SYSTEM 0.8 23-Dec-14 27-Jan-15 22-Jan-15 26-Feb-15 29-Jan-15 21-Jul-15 12-Feb-15 28-Jun-16 12-May-19 - 95% 95.0%
A545-04-41-732-1119 SECUTITY SYSTEM FOR C3 LOADING 0.3 24-Dec-14 27-Jan-15 23-Jan-15 26-Feb-15 30-Jan-15 21-Jul-15 13-Feb-15 28-Jun-16 13-May-19 - 95% 95.0%
A545-04-41-732-1120 GASOLINE ROAD LOADING 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1121 GASOLINE ROAD LOADING 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1122 DIESEL ROAD LOADING 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1123 JET FUEL/ KERO ROAD LOADING 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1124 SLURRY ROAD LOADING 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1125 C3 ROAD LOADING 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
(10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-04-41-732-1126 C3 ROAD UNLOADING COMPRESSOR 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-04-41-732-1127 ETHANOL UNLOADING 0.8 22-Dec-14 27-Jan-15 21-Jan-15 26-Feb-15 28-Jan-15 21-Jul-15 11-Feb-15 28-Jun-16 11-May-19 - 95% 95.0%
A545-732-04-DS-1804 SLURRY LOADING ARM 0.2 20-Apr-15 24-Feb-15 20-May-15 9-Apr-15 27-May-15 2-May-15 10-Jun-15 7-Dec-15 10-Jul-15 30-Jul-18 100% 100.0%
A545-732-04-DS-1805 C3 (PROPANE) LOADING ARM 0.2 21-Apr-15 26-Feb-15 21-May-15 9-Apr-15 28-May-15 2-May-15 11-Jun-15 7-Dec-15 11-Jul-15 30-Jul-18 100% 100.0%
A545-732-04-41-DS-1732 SLURRY DAY TANK 0.2 18-Apr-15 28-Feb-15 2-May-15 14-Mar-15 9-May-15 28-Jul-15 23-May-15 7-Dec-15 22-Jun-15 30-Jul-18 100% 100.0%
A545-732-04-41-DS-1605 SLURRY LOADING PUMPS 0.2 24-Apr-15 7-Jan-15 8-May-15 21-Jan-15 15-May-15 28-Jan-15 29-May-15 7-Dec-15 29-Jun-15 30-Jul-18 100% 100.0%
A545-732-04-41-DS-1609 SLURRY SUMP VESSEL PUMPS 0.2 24-Apr-15 7-Jan-15 8-May-15 21-Jan-15 15-May-15 28-Jan-15 29-May-15 7-Dec-15 29-Jun-15 30-Jul-18 100% 100.0%
100 96.4%
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : RED (UTILITIES & OFFSITES) ANNEXURE-A6
A545-631-PA-MR-5431 CENTRIFUGAL PUMPS LARGE CAPACITY 5.1 12-Aug-15 15-May-15 23-Nov-15 21-Jul-15 12-Jan-16 4-Feb-16 15-Feb-17 29-Jan-18 100% 100.0%
PUMP CENTRIFUGAL
A545-631-PA-MR-5432 3.9 8-Jul-15 1-Jun-15 17-Oct-15 1-Dec-15 6-Dec-15 21-Mar-16 10-Mar-17 26-Feb-18 100% 100.0%
HORIZONTAL/VERTICAL (FIRE WATER)
A545-712-PA-MR-5510 PUMP - CENTRIFUGAL (SPP) [HORZ./VERT.] 14.1 18-Jul-15 19-May-15 27-Oct-15 14-Aug-15 16-Dec-15 15-Mar-16 20-Mar-17 27-Feb-18 100% 100.0%
A545-712-PA-MR-5520 PUMP - CENTRIFUGAL HORIZONTAL (SPP) 14.1 12-Jun-15 28-May-15 23-Sep-15 17-Aug-15 12-Nov-15 15-Mar-16 14-Feb-17 22-May-18 100% 100.0%
A545-712-PA-MR-5530 PUMP - CENTRIFUGAL HORIZONTAL (SPP) 7.7 23-Jun-15 26-Jun-15 4-Oct-15 14-Sep-15 23-Nov-15 3-Oct-16 25-Feb-17 28-Jan-18 100% 100.0%
A545-101-LZ-MR-5005 CHEMICAL DOSING SKID 2.6 27-Jul-15 24-Sep-15 6-Nov-15 18-Feb-16 26-Dec-15 18-Aug-16 30-Apr-19 - 100% 100.0%
A545-101-PA-MR-5006 CENTRIFUGAL PUMPS SPP - VERTICAL 0.3 12-Jun-15 26-Aug-15 23-Sep-15 28-Jan-16 3-Nov-16 8-Dec-16 1-Feb-17 26-Feb-18 100% 100.0%
A545-101-PA-MR-5009 CENTRIFUGAL PUMPS SPP-HORIZONTAL 0.3 20-Jul-15 28-Aug-15 31-Oct-15 24-Feb-16 11-Dec-16 3-Nov-16 11-Mar-17 30-Mar-18 100% 100.0%
100 100.0%
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING
MR No MR DESCRIPTION WTG. % (SCHD (ACTUAL
(40%) (85%) (90%) REVIEW (100%)
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
A545-700-UP-MR-6300 CARBON STEEL PLATES 84.0 27-Jul-15 16-Oct-14 22-Oct-15 27-Jan-15 3-Dec-15 11-Mar-16 7-Dec-16 28-Nov-16 100% 100%
A545-700-VV-MR-6310 MOUNDED BULLETS 6.3 3-Aug-15 6-Aug-15 29-Oct-15 16-Nov-15 10-Dec-15 10-Feb-16 14-Dec-16 25-Feb-19 100% 100%
A545-700-VV-MR-6413 VESSELS 2.6 31-Aug-15 7-Oct-15 26-Nov-15 30-Dec-15 7-Jan-16 13-Apr-16 11-Jan-17 29-Mar-18 100% 100%
A545-161-VV-MR-6424 PRESSURE VESSELS 0.2 10-Oct-15 7-Apr-16 19-Jan-16 9-Sep-16 25-Oct-16 5-Sep-17 30-Apr-19 30-Apr-19 100% 100%
A545-111-EE-MR-6160 HEAT EXCHANGER CARBON STEEL 0.3 26-Jun-15 16-Jul-15 6-Oct-15 6-Oct-15 12-Jul-16 6-Oct-16 10-Oct-16 26-Feb-18 100% 100%
A545-736-VV-MR-6401 CS VESSELS 0.3 26-Dec-14 7-Feb-15 23-Mar-15 23-Apr-15 28-Dec-15 8-Apr-16 27-Mar-16 30-Jan-18 100% 100%
100 100.0%
A545-700-16-48-00005 OFFSITES SCOPE DRAWING 02-01-2015 =K9-14 =G9+14 20-12-2014 =J9+7 10-01-2015 =M9+7 05-03-2015 =P9+14 =W9-14 =S9+31 18-11-2015
A545-700-16-48-00006 E C OFFSITES LOCATION OF PIPE BRIDGES 0.1 6-Jan-15 20-Dec-14 20-Jan-15 3-Jan-15 27-Jan-15 20-Jan-15 3-Feb-15 17-Feb-15 17-Feb-15 2-Jan-16 19-Mar-15 28-Jan-16 100% 100.0%
A545-700-16-48-00011 OFFSITE AREA DIVISION LAYOUT 10-Jan-15 10-Jan-15 24-Jan-15 30-May-15 4-Dec-16 15-Sep-17 11-Dec-16 22-Sep-17 25-Dec-16 - 24-Jan-17 - 100% 80.0%
A545-700-16-48-40051 E C GENERAL NOTES FOR CONCRETE WORKS 0.1 16-Jan-15 22-Aug-14 30-Jan-15 5-Sep-14 6-Feb-15 5-Sep-14 13-Feb-15 5-Sep-14 27-Feb-15 5-Sep-14 28-Mar-15 5-Sep-14 100% 100.0%
A545-700-16-48-40061 E C MOMENT CONNECTION TYPICAL DETAILS 0.1 20-Jan-15 12-Sep-14 3-Feb-15 26-Sep-14 10-Feb-15 26-Sep-14 17-Feb-15 26-Sep-14 3-Mar-15 26-Sep-14 2-Apr-15 26-Sep-14 100% 100.0%
A545-700-16-48-40066 E C SHEAR CONNECTION BEAM TO COLUMN 0.1 21-Jan-15 12-Sep-14 4-Feb-15 26-Sep-14 11-Feb-15 26-Sep-14 18-Feb-15 26-Sep-14 4-Mar-15 26-Sep-14 3-Apr-15 26-Sep-14 100% 100.0%
A545-700-16-48-40067 E C SHEAR CONNECTION BEAM TO BEAM 0.1 22-Jan-15 12-Sep-14 5-Feb-15 26-Sep-14 12-Feb-15 26-Sep-14 19-Feb-15 26-Sep-14 5-Mar-15 26-Sep-14 4-Apr-15 26-Sep-14 100% 100.0%
A545-700-16-48-00100 E C OFFSITE PIPERACK AREA DIVISION 0.1 23-Jan-15 6-Dec-14 6-Feb-15 20-Dec-14 13-Feb-15 10-Jan-15 20-Feb-15 5-Mar-15 6-Mar-15 16-Jun-15 6-Apr-15 30-Jun-15 100% 100.0%
A545-700-16-48-00101 PILE LAYOUT AREA 01 12-01-2015 10-12-2014 =G19+30 29-12-2014 =J19+7 15-01-2015 =M19+14 20-03-2015 =P19+21 29-05-2015 =S19+77 -
A545-700-16-48-00102 E C PILE LAYOUT AREA 02 0.1 14-Jan-15 6-Dec-14 13-Feb-15 20-Dec-14 20-Feb-15 10-Jan-15 6-Mar-15 16-Mar-15 27-Mar-15 29-May-15 12-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00103 E C PILE LAYOUT AREA 03 0.1 16-Jan-15 6-Dec-14 16-Feb-15 20-Dec-14 23-Feb-15 10-Jan-15 9-Mar-15 16-Mar-15 30-Mar-15 29-May-15 15-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00104 E C PILE LAYOUT AREA 04 0.1 18-Jan-15 6-Dec-14 17-Feb-15 20-Dec-14 24-Feb-15 19-Mar-15 10-Mar-15 10-Apr-15 31-Mar-15 29-May-15 16-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00105 E C PILE LAYOUT AREA 05 0.1 20-Jan-15 6-Dec-14 19-Feb-15 20-Dec-14 26-Feb-15 19-Mar-15 12-Mar-15 10-Apr-15 2-Apr-15 29-May-15 18-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00107 E C PILE LAYOUT AREA 07 0.1 24-Jan-15 6-Dec-14 23-Feb-15 20-Dec-14 2-Mar-15 5-Jan-15 16-Mar-15 5-Mar-15 6-Apr-15 29-May-15 22-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00108 E C PILE LAYOUT AREA 08 0.1 26-Jan-15 6-Dec-14 25-Feb-15 20-Dec-14 4-Mar-15 6-Jan-15 18-Mar-15 7-Mar-15 8-Apr-15 29-May-15 24-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00109 E C PILE LAYOUT AREA 09 0.1 28-Jan-15 6-Dec-14 27-Feb-15 20-Dec-14 6-Mar-15 7-Jan-15 20-Mar-15 10-Mar-15 10-Apr-15 29-May-15 26-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00110 E C PILE LAYOUT AREA 10 0.1 30-Jan-15 6-Dec-14 2-Mar-15 20-Dec-14 9-Mar-15 10-Jan-15 23-Mar-15 12-Mar-15 13-Apr-15 29-May-15 29-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00111 E C PILE LAYOUT AREA 11 0.1 1-Feb-15 6-Dec-14 3-Mar-15 20-Dec-14 10-Mar-15 19-Mar-15 24-Mar-15 10-Apr-15 14-Apr-15 29-May-15 30-Jun-15 30-Jun-15 100% 100.0%
A545-700-16-48-00113 E C PILE LAYOUT AREA 13 0.1 5-Feb-15 6-Dec-14 7-Mar-15 20-Dec-14 14-Mar-15 19-Mar-15 28-Mar-15 10-Apr-15 18-Apr-15 29-May-15 4-Jul-15 30-Jun-15 100% 100.0%
A545-700-16-48-00114 E C PILE LAYOUT AREA 14 0.1 7-Feb-15 6-Dec-14 9-Mar-15 20-Dec-14 16-Mar-15 19-Mar-15 30-Mar-15 10-Apr-15 20-Apr-15 29-May-15 6-Jul-15 30-Jun-15 100% 100.0%
A545-700-16-48-00115 E C PILE LAYOUT AREA 15 0.1 9-Feb-15 6-Dec-14 11-Mar-15 20-Dec-14 18-Mar-15 19-Mar-15 1-Apr-15 10-Apr-15 22-Apr-15 29-May-15 8-Jul-15 30-Jun-15 100% 100.0%
A545-700-16-48-00116 E C PILE LAYOUT AREA 16 0.1 11-Feb-15 6-Dec-14 13-Mar-15 20-Dec-14 20-Mar-15 19-Mar-15 3-Apr-15 10-Apr-15 24-Apr-15 29-May-15 10-Jul-15 30-Jun-15 100% 100.0%
A545-700-16-48-00117 E C PILE LAYOUT AREA 17 0.1 13-Feb-15 6-Dec-14 16-Mar-15 20-Dec-14 23-Mar-15 19-Mar-15 6-Apr-15 10-Apr-15 27-Apr-15 29-May-15 13-Jul-15 30-Jun-15 100% 100.0%
A545-700-16-48-00118 E C PILE LAYOUT AREA 18 0.1 15-Feb-15 6-Dec-14 17-Mar-15 20-Dec-14 24-Mar-15 16-Mar-15 7-Apr-15 7-Apr-15 28-Apr-15 20-Apr-15 14-Jul-15 25-Apr-15 100% 100.0%
A545-700-16-48-00119 E C PILE LAYOUT AREA 19 0.1 17-Feb-15 6-Dec-14 19-Mar-15 20-Dec-14 26-Mar-15 16-Mar-15 9-Apr-15 7-Apr-15 30-Apr-15 20-Apr-15 16-Jul-15 25-Apr-15 100% 100.0%
A545-700-16-48-00120 E C PILE LAYOUT AREA 20 0.1 19-Feb-15 6-Dec-14 21-Mar-15 20-Dec-14 28-Mar-15 16-Mar-15 11-Apr-15 7-Apr-15 2-May-15 20-Apr-15 18-Jul-15 25-Apr-15 100% 100.0%
A545-700-16-48-00121 E C PILE LAYOUT AREA 21 0.1 21-Feb-15 11-Jan-16 23-Mar-15 25-Jan-16 30-Mar-15 8-Feb-16 13-Apr-15 15-Feb-16 4-May-15 22-Feb-16 20-Jul-15 29-Feb-16 100% 100.0%
A545-700-16-48-00129 E C PILE LAYOUT AREA 29 0.1 9-Mar-15 6-Dec-14 8-Apr-15 20-Dec-14 15-Apr-15 19-Mar-15 29-Apr-15 15-Apr-15 20-May-15 29-May-15 5-Aug-15 30-Jun-15 100% 100.0%
A545-700-16-48-00130 E C PILE LAYOUT AREA 30 0.1 11-Mar-15 6-Dec-14 10-Apr-15 20-Dec-14 17-Apr-15 19-Mar-15 1-May-15 15-Apr-15 22-May-15 29-May-15 7-Aug-15 30-Jun-15 100% 100.0%
A545-700-16-48-00131 E C PILE LAYOUT AREA 31 0.1 13-Mar-15 6-Dec-14 13-Apr-15 20-Dec-14 20-Apr-15 19-Mar-15 4-May-15 15-Apr-15 25-May-15 29-May-15 10-Aug-15 30-Jun-15 100% 100.0%
Page 547 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-00132 E C PILE LAYOUT AREA 32 0.1 15-Mar-15 6-Dec-14 14-Apr-15 20-Dec-14 21-Apr-15 19-Mar-15 5-May-15 15-Apr-15 26-May-15 29-May-15 11-Aug-15 30-Jun-15 100% 100.0%
A545-700-16-48-00133 E C PILE LAYOUT AREA 33 0.1 17-Mar-15 6-Dec-14 16-Apr-15 20-Dec-14 23-Apr-15 19-Mar-15 7-May-15 15-Apr-15 28-May-15 29-May-15 13-Aug-15 30-Jun-15 100% 100.0%
A545-700-16-48-00134 E C PILE LAYOUT AREA 34 0.1 19-Mar-15 5-Mar-15 18-Apr-15 19-Mar-15 25-Apr-15 19-Mar-15 9-May-15 15-Apr-15 30-May-15 20-Apr-15 15-Aug-15 30-Apr-15 100% 100.0%
A545-700-16-48-00135 E C PILE LAYOUT AREA 35 0.1 21-Mar-15 5-Mar-15 20-Apr-15 19-Mar-15 27-Apr-15 19-Mar-15 11-May-15 15-Apr-15 1-Jun-15 20-Apr-15 17-Aug-15 30-Apr-15 100% 100.0%
A545-700-81-41-00139 E C PILE LAYOUT AREA 39 0.1 23-Mar-15 28-Dec-15 22-Apr-15 11-Jan-16 29-Apr-15 18-Jan-16 13-May-15 25-Jan-16 3-Jun-15 26-Feb-16 13-Jan-17 13-Dec-17 100% 100.0%
A545-700-81-41-00140 E C PILE LAYOUT AREA 40 0.1 25-Mar-15 28-Dec-15 24-Apr-15 11-Jan-16 1-May-15 18-Jan-16 15-May-15 25-Jan-16 5-Jun-15 26-Feb-16 15-Jan-17 13-Dec-17 100% 100.0%
A545-700-81-41-00141 E C PILE LAYOUT AREA 41 0.1 27-Mar-15 28-Dec-15 26-Apr-15 11-Jan-16 3-May-15 18-Jan-16 17-May-15 25-Jan-16 7-Jun-15 26-Feb-16 17-Jan-17 13-Dec-17 100% 100.0%
A545-700-81-41-00151 E C PILE LAYOUT AREA 51 0.1 29-Mar-15 28-Dec-15 28-Apr-15 11-Jan-16 5-May-15 18-Jan-16 19-May-15 25-Jan-16 9-Jun-15 22-Feb-16 19-Jan-17 1-Dec-17 100% 100.0%
A545-700-81-41-00152 E C PILE LAYOUT AREA 52 0.1 29-Mar-15 28-Dec-15 28-Apr-15 11-Jan-16 5-May-15 18-Jan-16 19-May-15 25-Jan-16 9-Jun-15 22-Feb-16 19-Jan-17 12-Oct-17 100% 100.0%
A545-700-81-41-00153 E C PILE LAYOUT AREA 53 0.1 31-Mar-15 28-Dec-15 30-Apr-15 11-Jan-16 7-May-15 18-Jan-16 21-May-15 25-Jan-16 11-Jun-15 22-Feb-16 21-Jan-17 12-Oct-17 100% 100.0%
A545-700-81-41-00154 E C PILE LAYOUT AREA 54 0.1 2-Apr-15 28-Dec-15 2-May-15 11-Jan-16 9-May-15 18-Jan-16 23-May-15 25-Jan-16 13-Jun-15 22-Feb-16 23-Jan-17 12-Oct-17 100% 100.0%
A545-700-81-41-00155 E C PILE LAYOUT AREA 55 0.1 2-Apr-15 28-Dec-15 2-May-15 11-Jan-16 9-May-15 18-Jan-16 23-May-15 25-Jan-16 13-Jun-15 22-Feb-16 23-Jan-17 12-Oct-17 100% 100.0%
A545-700-81-41-00156 E C PIPERACK PILE LAYOUT MCR 0.1 8-Apr-15 27-Oct-17 8-May-15 10-Nov-17 15-May-15 17-Nov-17 29-May-15 24-Nov-17 19-Jun-15 1-Dec-17 29-Jan-17 5-Mar-18 100% 100.0%
A545-700-81-41-11579 R C PILE LAYOUT FOR TANK 716-TT-1604 A/B 0.1 2-Aug-17 24-Aug-17 1-Sep-17 7-Sep-17 8-Sep-17 14-Sep-17 22-Sep-17 21-Sep-17 13-Oct-17 28-Sep-17 26-Apr-19 28-Sep-17 100% 100.0%
A545-700-81-41-11580 R C PILE LAYOUT FOR TANK 712-TT-1208 A/B/C 0.1 4-Aug-17 24-Aug-17 3-Sep-17 7-Sep-17 10-Sep-17 14-Sep-17 24-Sep-17 21-Sep-17 15-Oct-17 28-Sep-17 28-Apr-19 28-Sep-17 100% 100.0%
A545-700-81-41-11578 R C PILE LAYOUT FOR TANK 716-TT-1601 A/B/C 0.1 4-Aug-17 24-Aug-17 3-Sep-17 7-Sep-17 10-Sep-17 14-Sep-17 24-Sep-17 21-Sep-17 15-Oct-17 28-Sep-17 28-Apr-19 28-Sep-17 100% 100.0%
A545-700-16-48-00191 E C PIPE RACK DETAIL OF PILE CAP 0.1 18-May-15 2-Feb-15 1-Jun-15 21-Aug-15 8-Jun-15 8-Sep-15 15-Jun-15 15-Sep-15 29-Jun-15 29-Sep-15 14-Sep-15 7-Oct-15 100% 100.0%
A545-700-16-48-00192 E C PIPE RACK DETAIL OF PILE CAP 0.1 20-May-15 24-Dec-15 3-Jun-15 7-Jan-16 10-Jun-15 6-Feb-16 17-Jun-15 13-Feb-16 1-Jul-15 20-Feb-16 10-Feb-17 6-Dec-17 100% 100.0%
A545-700-81-41-00201 E C PILE LAYOUT FOR OFFSITE PUMPS 0.1 23-May-15 2-Apr-18 6-Jun-15 16-Apr-18 13-Jun-15 23-Apr-18 20-Jun-15 30-Apr-18 4-Jul-15 7-May-18 19-Sep-15 4-Apr-19 100% 100.0%
A545-700-81-41-00203 E C PILE LAYOUT FOR OFFSITE PUMPS 0.1 23-May-15 4-Jun-18 6-Jun-15 18-Jun-18 13-Jun-15 25-Jun-18 20-Jun-15 2-Jul-18 4-Jul-15 9-Jul-18 19-Sep-15 17-Nov-18 100% 100.0%
A545-700-81-41-00301 E C GA & RF DETAILS OF COMPOUND WALL 0.1 23-May-15 3-Feb-15 6-Jun-15 13-Jan-16 13-Jun-15 20-Jan-16 20-Jun-15 27-Jan-16 4-Jul-15 3-Feb-16 19-Sep-15 31-Mar-16 100% 100.0%
A545-700-16-48-00302 TREATED WATER RESERVOIR DETAILS 25-May-15 3-Feb-15 15-Nov-16 - 22-Nov-16 - 29-Nov-16 - 13-Dec-16 - 28-Feb-17 - 10.0%
A545-700-16-48-00310 PIPE RACK IN AREA 01 PLAN AT 1ST TIER LVL 24-06-2015 03-02-2015 =G57+14 20-05-2015 =J57+7 =Q57-7 =M57+7 =T57-7 =P57+14 =W57-14 =S57+77 28-10-2015
A545-700-16-48-00311 PIPE RACK IN AREA 01 PLAN AT 2ND TIER LVL 26-06-2015 05-02-2015 =G58+14 20-05-2015 =J58+7 =Q58-7 =M58+7 =T58-7 =P58+14 =W58-14 =S58+77 28-10-2015
A545-700-16-48-00315 PIPE RACK IN AREA 01 ELEVATION ALONG GRID 1 01-07-2015 05-02-2015 =G59+14 20-05-2015 =J59+7 =Q59-7 =M59+7 =T59-7 =P59+14 26-10-2015 =S59+77 27-01-2016
A545-700-16-48-00316 PIPE RACK IN AREA 01 ELEVATION ALONG GRID 2 03-07-2015 05-02-2015 =G60+14 20-05-2015 =J60+7 =Q60-7 =M60+7 =T60-7 =P60+14 26-10-2015 =S60+77 27-01-2016
A545-700-16-48-00320 E C PIPE RACK IN AREA 02 PLAN AT EL. 103.000 (TOS) 0.1 4-Jul-15 7-Feb-15 18-Jul-15 24-May-15 25-Jul-15 27-Jun-15 1-Aug-15 17-Jul-15 15-Aug-15 16-Oct-15 31-Oct-15 30-Oct-15 100% 100.0%
A545-700-16-48-00321 E C PIPE RACK IN AREA 02 PLAN AT EL. 106.500 (TOS) 0.1 6-Jul-15 7-Feb-15 20-Jul-15 24-May-15 27-Jul-15 27-Jun-15 3-Aug-15 17-Jul-15 17-Aug-15 16-Oct-15 2-Nov-15 30-Oct-15 100% 100.0%
A545-700-16-48-00322 E C PIPE RACK IN AREA 02 PLAN AT EL. 110.000 (TOS) 0.1 8-Jul-15 7-Feb-15 22-Jul-15 24-May-15 29-Jul-15 27-Jun-15 5-Aug-15 17-Jul-15 19-Aug-15 30-Nov-15 4-Nov-15 8-Dec-15 100% 100.0%
A545-700-16-48-00323 E C PIPE RACK IN AREA 02 PLAN AT FLARE LVL 0.1 10-Jul-15 7-Feb-15 24-Jul-15 24-May-15 31-Jul-15 27-Jun-15 7-Aug-15 17-Jul-15 21-Aug-15 30-Nov-15 6-Nov-15 8-Dec-15 100% 100.0%
A545-700-16-48-00325 E C PIPE RACK IN AREA 02 ELEVATION ALONG GRID A 0.1 14-Jul-15 7-Feb-15 28-Jul-15 24-May-15 4-Aug-15 27-Jun-15 11-Aug-15 17-Jul-15 25-Aug-15 19-Aug-15 10-Nov-15 9-Oct-15 100% 100.0%
A545-700-16-48-00326 E C PIPE RACK IN AREA 02 ELEVATION ALONG GRID B 0.1 16-Jul-15 7-Feb-15 30-Jul-15 24-May-15 6-Aug-15 27-Jun-15 13-Aug-15 17-Jul-15 27-Aug-15 19-Aug-15 12-Nov-15 9-Oct-15 100% 100.0%
A545-700-16-48-00330 E C PIPE RACK IN AREA 03 PLAN AT EL. 103.000 (TOS) 0.1 24-Jul-15 9-Feb-15 7-Aug-15 26-May-15 14-Aug-15 27-Jun-15 21-Aug-15 17-Jul-15 4-Sep-15 16-Oct-15 20-Nov-15 30-Oct-15 100% 100.0%
Page 548 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 2 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-00331 E C PIPE RACK IN AREA 03 PLAN AT EL. 106.500 (TOS) 0.1 26-Jul-15 9-Feb-15 10-Aug-15 26-May-15 17-Aug-15 27-Jun-15 24-Aug-15 17-Jul-15 7-Sep-15 16-Oct-15 23-Nov-15 30-Oct-15 100% 100.0%
A545-700-16-48-00332 E C PIPE RACK IN AREA 03 PLAN AT EL. 110.000 (TOS) 0.1 28-Jul-15 9-Feb-15 11-Aug-15 26-May-15 18-Aug-15 27-Jun-15 25-Aug-15 17-Jul-15 8-Sep-15 30-Nov-15 24-Nov-15 8-Dec-15 100% 100.0%
A545-700-16-48-00333 E C PIPE RACK IN AREA 03 PLAN AT FLARE LVL 0.1 30-Jul-15 9-Feb-15 13-Aug-15 26-May-15 20-Aug-15 27-Jun-15 27-Aug-15 17-Jul-15 10-Sep-15 30-Nov-15 26-Nov-15 8-Dec-15 100% 100.0%
A545-700-16-48-00335 E C PIPE RACK IN AREA 03 ELEVATION ALONG GRID A 0.1 24-Jul-15 10-Feb-15 7-Aug-15 26-May-15 14-Aug-15 27-Jun-15 21-Aug-15 17-Jul-15 4-Sep-15 24-Aug-15 20-Nov-15 9-Oct-15 100% 100.0%
A545-700-16-48-00336 E C PIPE RACK IN AREA 03 ELEVATION ALONG GRID B 0.1 26-Jul-15 10-Feb-15 10-Aug-15 26-May-15 17-Aug-15 27-Jun-15 24-Aug-15 17-Jul-15 7-Sep-15 24-Aug-15 23-Nov-15 9-Oct-15 100% 100.0%
A545-700-16-48-00340 E C PIPE RACK IN AREA 04 PLAN AT EL. 103.000 (TOS) 0.1 3-Aug-15 11-Feb-15 17-Aug-15 27-May-15 24-Aug-15 27-Jun-15 31-Aug-15 17-Jul-15 14-Sep-15 16-Oct-15 30-Nov-15 30-Oct-15 100% 100.0%
A545-700-16-48-00341 E C PIPE RACK IN AREA 04 PLAN AT EL. 106.500 (TOS) 0.1 5-Aug-15 11-Feb-15 19-Aug-15 27-May-15 26-Aug-15 27-Jun-15 2-Sep-15 17-Jul-15 16-Sep-15 16-Oct-15 2-Dec-15 30-Oct-15 100% 100.0%
A545-700-16-48-00342 E C PIPE RACK IN AREA 04 PLAN AT EL. 110.000 (TOS) 0.1 7-Aug-15 11-Feb-15 21-Aug-15 27-May-15 28-Aug-15 27-Jun-15 4-Sep-15 17-Jul-15 18-Sep-15 30-Nov-15 4-Dec-15 8-Dec-15 100% 100.0%
A545-700-16-48-00343 E C PIPE RACK IN AREA 04 PLAN AT FLARE LVL 0.1 9-Aug-15 11-Feb-15 24-Aug-15 27-May-15 31-Aug-15 27-Jun-15 7-Sep-15 17-Jul-15 21-Sep-15 30-Nov-15 7-Dec-15 8-Dec-15 100% 100.0%
A545-700-16-48-00345 E C PIPE RACK IN AREA 04 ELEVATION ALONG GRID A 0.1 3-Aug-15 12-Feb-15 17-Aug-15 27-May-15 24-Aug-15 27-Jun-15 31-Aug-15 17-Jul-15 14-Sep-15 27-Aug-15 30-Nov-15 9-Oct-15 100% 100.0%
A545-700-16-48-00346 E C PIPE RACK IN AREA 04 ELEVATION ALONG GRID B 0.1 5-Aug-15 12-Feb-15 19-Aug-15 27-May-15 26-Aug-15 27-Jun-15 2-Sep-15 17-Jul-15 16-Sep-15 28-Aug-15 2-Dec-15 9-Oct-15 100% 100.0%
A545-700-16-48-00350 E C PIPE RACK IN AREA 05 PLAN AT EL. 103.000 (TOS) 0.1 13-Aug-15 12-Feb-15 27-Aug-15 30-May-15 3-Sep-15 27-Jun-15 10-Sep-15 17-Jul-15 24-Sep-15 16-Oct-15 10-Dec-15 30-Oct-15 100% 100.0%
A545-700-16-48-00351 E C PIPE RACK IN AREA 05 PLAN AT EL. 106.500 (TOS) 0.1 15-Aug-15 12-Feb-15 29-Aug-15 30-May-15 5-Sep-15 27-Jun-15 12-Sep-15 17-Jul-15 26-Sep-15 16-Oct-15 12-Dec-15 30-Oct-15 100% 100.0%
A545-700-16-48-00352 E C PIPE RACK IN AREA 05 PLAN AT EL. 110.000 (TOS) 0.1 17-Aug-15 13-Feb-15 31-Aug-15 30-May-15 7-Sep-15 27-Jun-15 14-Sep-15 17-Jul-15 28-Sep-15 30-Nov-15 14-Dec-15 8-Dec-15 100% 100.0%
A545-700-16-48-00353 E C PIPE RACK IN AREA 05 PLAN AT FLARE LVL 0.1 19-Aug-15 13-Feb-15 2-Sep-15 30-May-15 9-Sep-15 27-Jun-15 16-Sep-15 17-Jul-15 30-Sep-15 30-Nov-15 16-Dec-15 8-Dec-15 100% 100.0%
A545-700-16-48-00355 E C PIPE RACK IN AREA 05 ELEVATION ALONG GRID A 0.1 13-Aug-15 13-Feb-15 27-Aug-15 30-May-15 3-Sep-15 27-Jun-15 10-Sep-15 17-Jul-15 24-Sep-15 31-Aug-15 10-Dec-15 9-Oct-15 100% 100.0%
A545-700-16-48-00356 E C PIPE RACK IN AREA 05 ELEVATION ALONG GRID B 0.1 15-Aug-15 13-Feb-15 29-Aug-15 30-May-15 5-Sep-15 27-Jun-15 12-Sep-15 17-Jul-15 26-Sep-15 31-Aug-15 12-Dec-15 9-Oct-15 100% 100.0%
A545-700-16-48-00370 E C PIPE RACK IN AREA 07 PLAN AT EL. 103.000 (TOS) 0.1 2-Sep-15 17-Feb-15 16-Sep-15 30-May-15 23-Sep-15 2-Jul-15 30-Sep-15 25-Jul-15 14-Oct-15 14-Aug-15 30-Dec-15 18-Sep-15 100% 100.0%
A545-700-16-48-00371 E C PIPE RACK IN AREA 07 PLAN AT EL. 106.500 (TOS) 0.1 4-Sep-15 18-Feb-15 18-Sep-15 30-May-15 25-Sep-15 2-Jul-15 2-Oct-15 25-Jul-15 16-Oct-15 14-Aug-15 1-Jan-16 18-Sep-15 100% 100.0%
A545-700-16-48-00372 E C PIPE RACK IN AREA 07 PLAN AT EL. 110.000 (TOS) 0.1 6-Sep-15 18-Feb-15 21-Sep-15 30-May-15 28-Sep-15 20-Jul-15 5-Oct-15 31-Jul-15 19-Oct-15 14-Dec-15 4-Jan-16 28-Dec-15 100% 100.0%
A545-700-16-48-00373 E C PIPE RACK IN AREA 07 PLAN AT EL 112.900 (TOS) 0.1 8-Sep-15 18-Feb-15 22-Sep-15 30-May-15 29-Sep-15 23-Nov-15 6-Oct-15 30-Nov-15 20-Oct-15 8-Dec-15 23-Mar-17 31-Jan-17 100% 100.0%
A545-700-81-41-00374 E C PIPE RACK IN AREA 07 PLAN AT EL 116.400 (TOS) 0.15 10-Sep-15 18-Feb-15 24-Sep-15 30-May-15 1-Oct-15 10-Jan-17 8-Oct-15 17-Jan-17 22-Oct-15 24-Jan-17 7-Jan-16 31-Jan-17 100% 100.0%
A545-700-16-48-00376 E C PIPE RACK IN AREA 07 ELEVATION ALONG GRID E 0.1 4-Sep-15 18-Feb-15 18-Sep-15 30-May-15 25-Sep-15 16-Jul-15 2-Oct-15 23-Jul-15 16-Oct-15 6-Aug-15 1-Jan-16 2-Dec-15 100% 100.0%
A545-700-16-48-00377 E C PIPE RACK IN AREA 07 ELEVATION ALONG GRID F 0.1 6-Sep-15 19-Feb-15 21-Sep-15 30-May-15 28-Sep-15 16-Jul-15 5-Oct-15 23-Jul-15 19-Oct-15 6-Aug-15 4-Jan-16 2-Dec-15 100% 100.0%
A545-700-16-48-00380 E C PIPE RACK IN AREA 08 PLAN AT EL. 103.000 (TOS) 0.1 12-Sep-15 19-Feb-15 26-Sep-15 30-May-15 3-Oct-15 2-Jul-15 10-Oct-15 25-Jul-15 24-Oct-15 14-Aug-15 9-Jan-16 18-Sep-15 100% 100.0%
A545-700-16-48-00381 E C PIPE RACK IN AREA 08 PLAN AT EL. 106.500 (TOS) 0.1 14-Sep-15 19-Feb-15 28-Sep-15 30-May-15 5-Oct-15 2-Jul-15 12-Oct-15 25-Jul-15 26-Oct-15 14-Aug-15 11-Jan-16 18-Sep-15 100% 100.0%
A545-700-16-48-00382 E C PIPE RACK IN AREA 08 PLAN AT EL. 110.000 (TOS) 0.1 16-Sep-15 19-Feb-15 30-Sep-15 30-May-15 7-Oct-15 20-Jul-15 14-Oct-15 31-Jul-15 28-Oct-15 9-Dec-15 31-Mar-17 12-Jul-17 100% 100.0%
A545-700-16-48-00383 E C PIPE RACK IN AREA 08 PLAN AT FLARE LVL 0.1 18-Sep-15 20-Feb-15 2-Oct-15 30-May-15 9-Oct-15 23-Nov-15 16-Oct-15 30-Nov-15 30-Oct-15 9-Dec-15 2-Apr-17 18-Feb-18 100% 100.0%
A545-700-16-48-00386 E C PIPE RACK IN AREA 08 ELEVATION ALONG GRID E 0.1 14-Sep-15 20-Feb-15 28-Sep-15 30-May-15 5-Oct-15 16-Jul-15 12-Oct-15 23-Jul-15 26-Oct-15 6-Aug-15 11-Jan-16 5-Dec-15 100% 100.0%
A545-700-16-48-00387 E C PIPE RACK IN AREA 08 ELEVATION ALONG GRID F 0.1 16-Sep-15 20-Feb-15 30-Sep-15 30-May-15 7-Oct-15 16-Jul-15 14-Oct-15 23-Jul-15 28-Oct-15 6-Aug-15 13-Jan-16 5-Dec-15 100% 100.0%
A545-700-16-48-00390 E C PIPE RACK IN AREA 09 PLAN AT EL. 103.000 (TOS) 0.1 22-Sep-15 21-Feb-15 6-Oct-15 30-May-15 13-Oct-15 2-Jul-15 20-Oct-15 25-Jul-15 3-Nov-15 14-Aug-15 19-Jan-16 7-Oct-15 100% 100.0%
A545-700-16-48-00391 E C PIPE RACK IN AREA 09 PLAN AT EL. 106.500 (TOS) 0.1 24-Sep-15 21-Feb-15 8-Oct-15 30-May-15 15-Oct-15 2-Jul-15 22-Oct-15 25-Jul-15 5-Nov-15 14-Aug-15 21-Jan-16 18-Sep-15 100% 100.0%
A545-700-16-48-00392 E C PIPE RACK IN AREA 09 PLAN AT EL. 110.000 (TOS) 0.1 26-Sep-15 21-Feb-15 10-Oct-15 30-May-15 17-Oct-15 20-Jul-15 24-Oct-15 31-Jul-15 7-Nov-15 4-Sep-15 23-Jan-16 18-Sep-15 100% 100.0%
A545-700-16-48-00393 E C PIPE RACK IN AREA 09 PLAN AT FLARE LVL 0.1 28-Sep-15 21-Feb-15 12-Oct-15 30-May-15 19-Oct-15 23-Nov-15 26-Oct-15 30-Nov-15 9-Nov-15 8-Dec-15 12-Apr-17 28-Aug-18 100% 100.0%
A545-700-16-48-00396 E C PIPE RACK IN AREA 09 ELEVATION ALONG GRID E 0.1 24-Sep-15 21-Feb-15 8-Oct-15 30-May-15 15-Oct-15 11-Jul-15 22-Oct-15 18-Jul-15 5-Nov-15 1-Aug-15 21-Jan-16 6-Aug-15 100% 100.0%
A545-700-16-48-00397 E C PIPE RACK IN AREA 09 ELEVATION ALONG GRID F 0.1 26-Sep-15 23-Feb-15 10-Oct-15 30-May-15 17-Oct-15 11-Jul-15 24-Oct-15 18-Jul-15 7-Nov-15 1-Aug-15 23-Jan-16 6-Aug-15 100% 100.0%
A545-700-16-48-00911 OVERHEAD WATER TANK GA AND DETAILS 26-Feb-17 2-Mar-17 12-Mar-17 - =K117+7 - =N117+7 - =Q117+14 - =T117+77 - 60% 10.0%
A545-700-16-48-00912 OVERHEAD WATER TANK- GA & R/F DET. OF FDN. 01-06-2015 - =G111+14 - =J111+7 - =M111+7 - =P111+14 - =S111+77 -
A545-700-81-41-00920 E C SUMP-1 FOR OWS SYSTEM 0.1 4-Jan-16 6-Feb-16 18-Jan-16 13-Feb-16 25-Jan-16 20-Feb-16 1-Feb-16 27-Feb-16 15-Feb-16 5-Apr-16 19-Jul-17 26-May-17 100% 100.0%
A545-700-81-41-00921 E C SUMP-2 FOR OWS SYSTEM 0.1 7-Jan-16 4-Feb-16 21-Jan-16 11-Feb-16 28-Jan-16 18-Feb-16 4-Feb-16 25-Feb-16 18-Feb-16 30-Apr-16 14-Mar-19 12-Jul-18 100% 100.0%
A545-700-81-41-00922 E C SUMP-3 FOR OWS SYSTEM 0.1 11-Jan-16 6-Feb-16 25-Jan-16 13-Feb-16 1-Feb-16 20-Feb-16 8-Feb-16 27-Feb-16 22-Feb-16 5-Apr-16 26-Jul-17 21-Aug-18 100% 100.0%
A545-700-81-41-00923 E C SUMP-5 FOR OWS SYSTEM 0.1 15-Jan-16 26-Jan-16 29-Jan-16 2-Feb-16 5-Feb-16 9-Feb-16 12-Feb-16 16-Feb-16 26-Feb-16 30-Apr-16 30-Jul-17 15-Jun-17 100% 100.0%
A545-700-81-41-00924 E C SUMP-6 FOR OWS SYSTEM 0.1 18-Jan-16 26-Jan-16 1-Feb-16 2-Feb-16 8-Feb-16 9-Feb-16 15-Feb-16 16-Feb-16 29-Feb-16 30-Apr-16 2-Aug-17 15-Jun-17 100% 100.0%
A545-700-81-41-00925 E C SUMP-7 FOR OWS SYSTEM 0.1 22-Jan-16 26-Jan-16 5-Feb-16 2-Feb-16 12-Feb-16 9-Feb-16 19-Feb-16 16-Feb-16 4-Mar-16 25-Apr-16 29-Mar-19 12-Jul-18 100% 100.0%
A545-700-81-41-00926 E C SUMP-8 FOR OWS SYSTEM 0.1 24-Jan-16 10-Mar-16 7-Feb-16 17-Mar-16 14-Feb-16 24-Mar-16 21-Feb-16 31-Mar-16 6-Mar-16 30-Apr-16 8-Aug-17 15-Jun-17 100% 100.0%
A545-700-16-48-00930 SCHEDULE OF INSTRUMENT TRAY SUPPORTS 07-09-2015 24-05-2015 =G120+14 - #VALUE! - #VALUE! - #VALUE! - =S120+77 -
A545-700-16-48-30952 E C OFFSITES DYKE CROSS OVERS 0.1 2-Feb-16 27-May-15 16-Feb-16 2-Jun-16 23-Feb-16 9-Jun-16 1-Mar-16 16-Jun-16 15-Mar-16 30-Sep-16 9-Apr-19 30-Sep-16 100% 100.0%
A545-700-16-48-00935 E C JUMP OVER SUPPORTS 0.1 5-Apr-17 26-Nov-18 20-Mar-19 1-May-19 27-Mar-19 6-May-19 3-Apr-19 11-May-19 17-Apr-19 16-May-19 31-Aug-19 - 85% 85.0%
A545-700-16-48-00941 DETAILS OF PIPE SUPPORTS ON GRADE 8-Apr-17 5-Mar-17 23-Mar-19 - 30-Mar-19 - 6-Apr-19 - =Q131+14 - =T131+31 - 80% 10.0%
A545-700-16-48-00942 E C MISCELLANEOUS PIPE SUPPORTS 0.1 11-Apr-17 15-Mar-17 25-Apr-17 21-Nov-18 2-May-17 28-Nov-18 9-May-17 5-Dec-18 23-May-17 12-Dec-18 20-Apr-19 12-Dec-18 100% 100.0%
A545-700-16-48-00943 MISCELLANEOUS PIPE SUPPOR TS 15-02-2016 - =G126+14 - =J126+7 - =M126+7 - =P126+14 - =S126+77 -
A545-700-16-48-00950 GA OF PRECAST ETC/CTC CUL VERT 15-Apr-17 28-Mar-17 29-Apr-17 - 6-May-17 - 13-May-17 - 27-May-17 - 12-Aug-17 - 10.0%
A545-700-81-41-31012 E C DET OF STR FOR ELECT/INST CABLE DRAWINGS 0.1 18-Sep-15 25-Nov-15 2-Oct-15 9-Dec-15 9-Oct-15 16-Dec-15 16-Oct-15 23-Dec-15 30-Oct-15 30-Dec-15 9-Apr-19 30-Dec-15 100% 100.0%
A545-700-16-48-41013 E C GUIDE FOR EXTENT OF FIRE PROOFING 22-Apr-17 22-Nov-18 7-Mar-19 - 14-Mar-19 - 21-Mar-19 - =Q136+14 - =T136+31 - 10.0%
A545-700-16-48-01300 E C PIPE RACK IN AREA 10 PLAN AT EL. 103.000 (TOS) 0.1 2-Oct-15 23-Feb-15 16-Oct-15 25-May-15 23-Oct-15 2-Jul-15 30-Oct-15 25-Jul-15 13-Nov-15 23-Sep-15 29-Jan-16 9-Oct-15 100% 100.0%
A545-700-16-48-01301 E C PIPE RACK IN AREA 10 PLAN AT EL. 106.500 (TOS) 0.1 4-Oct-15 24-Feb-15 19-Oct-15 25-May-15 26-Oct-15 2-Jul-15 2-Nov-15 25-Jul-15 16-Nov-15 23-Sep-15 1-Feb-16 9-Oct-15 100% 100.0%
A545-700-16-48-01302 E C PIPE RACK IN AREA 10 PLAN AT EL. 110.000 (TOS) 0.1 6-Oct-15 24-Feb-15 20-Oct-15 25-May-15 27-Oct-15 8-Sep-15 3-Nov-15 22-Sep-15 17-Nov-15 25-Dec-15 20-Apr-17 31-Jan-17 100% 100.0%
Page 550 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 4 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-01303 E C PIPE RACK IN AREA 10 PLAN AT FLARE LVL 0.1 8-Oct-15 24-Feb-15 22-Oct-15 25-May-15 29-Oct-15 8-Sep-15 5-Nov-15 22-Sep-15 19-Nov-15 25-Dec-15 22-Apr-17 31-Jan-17 100% 100.0%
A545-700-16-48-01306 E C PIPE RACK IN AREA 10 ELEVATION ALONG GRID E 0.1 4-Oct-15 24-Feb-15 18-Oct-15 25-May-15 25-Oct-15 11-Jul-15 1-Nov-15 18-Jul-15 15-Nov-15 1-Aug-15 31-Jan-16 6-Aug-15 100% 100.0%
A545-700-16-48-01307 E C PIPE RACK IN AREA 10 ELEVATION ALONG GRID F 0.1 6-Oct-15 24-Feb-15 20-Oct-15 25-May-15 27-Oct-15 11-Jul-15 3-Nov-15 18-Jul-15 17-Nov-15 1-Aug-15 2-Feb-16 6-Aug-15 100% 100.0%
A545-700-16-48-01310 E C PIPE RACK IN AREA 11 PLAN AT EL. 103.000 (TOS) 0.1 12-Oct-15 25-Feb-15 26-Oct-15 28-May-15 2-Nov-15 2-Jul-15 9-Nov-15 25-Jul-15 23-Nov-15 24-Sep-15 8-Feb-16 9-Oct-15 100% 100.0%
A545-700-16-48-01311 E C PIPE RACK IN AREA 11 PLAN AT EL. 106.500 (TOS) 0.1 14-Oct-15 25-Feb-15 28-Oct-15 28-May-15 4-Nov-15 2-Jul-15 11-Nov-15 25-Jul-15 25-Nov-15 24-Sep-15 10-Feb-16 9-Oct-15 100% 100.0%
A545-700-16-48-01312 E C PIPE RACK IN AREA 11 PLAN AT EL. 110.000 (TOS) 0.1 16-Oct-15 4-Dec-15 30-Oct-15 18-Dec-15 6-Nov-15 25-Dec-15 13-Nov-15 1-Jan-16 27-Nov-15 8-Jan-16 30-Apr-17 31-Jan-17 100% 100.0%
A545-700-16-48-01313 E C PIPE RACK IN AREA 11 PLAN AT FLARE LVL 0.1 16-Oct-15 25-Feb-15 30-Oct-15 28-May-15 6-Nov-15 23-Nov-15 13-Nov-15 30-Nov-15 27-Nov-15 14-Dec-15 12-Feb-16 28-Dec-15 100% 100.0%
A545-700-16-48-01316 E C PIPE RACK IN AREA 11 ELEVATION ALONG GRID E 0.1 14-Oct-15 26-Feb-15 28-Oct-15 28-May-15 4-Nov-15 11-Jul-15 11-Nov-15 18-Jul-15 25-Nov-15 1-Aug-15 10-Feb-16 6-Aug-15 100% 100.0%
A545-700-16-48-01317 E C PIPE RACK IN AREA 11 ELEVATION ALONG GRID F 0.1 16-Oct-15 26-Feb-15 30-Oct-15 28-May-15 6-Nov-15 11-Jul-15 13-Nov-15 18-Jul-15 27-Nov-15 1-Aug-15 12-Feb-16 6-Aug-15 100% 100.0%
A545-700-16-48-01330 E C PIPE RACK IN AREA 13 PLAN AT EL. 103.000 (TOS) 0.1 30-Oct-15 27-Feb-15 13-Nov-15 20-Jun-15 20-Nov-15 2-Jul-15 27-Nov-15 25-Jul-15 11-Dec-15 23-Oct-15 26-Feb-16 27-Dec-15 100% 100.0%
A545-700-16-48-01331 E C PIPE RACK IN AREA 13 PLAN AT EL. 106.500 (TOS) 0.1 1-Nov-15 27-Feb-15 15-Nov-15 20-Jun-15 22-Nov-15 2-Jul-15 29-Nov-15 25-Jul-15 13-Dec-15 23-Oct-15 28-Feb-16 27-Dec-15 100% 100.0%
A545-700-16-48-01332 E C PIPE RACK IN AREA 13 PLAN AT EL. 110.000 (TOS) 0.1 3-Nov-15 27-Feb-15 17-Nov-15 20-Jul-15 24-Nov-15 31-Jul-15 1-Dec-15 30-Nov-15 15-Dec-15 28-Jan-16 1-Mar-16 4-Feb-16 100% 100.0%
A545-700-16-48-01333 E C PIPE RACK IN AREA 13 PLAN AT FLARE LVL 0.1 5-Nov-15 27-Feb-15 19-Nov-15 11-Sep-15 26-Nov-15 23-Nov-15 3-Dec-15 30-Nov-15 17-Dec-15 28-Jan-16 3-Mar-16 4-Feb-16 100% 100.0%
A545-700-81-41-01334 E C PIPE RACK IN AREA 13 PLAN AT FLARE LVL 0.1 7-Nov-15 8-Dec-15 21-Nov-15 22-Dec-15 28-Nov-15 29-Dec-15 5-Dec-15 5-Jan-16 19-Dec-15 12-Jan-16 5-Mar-16 28-Aug-18 100% 100.0%
A545-700-16-48-01340 E C PIPE RACK IN AREA 14 PLAN AT EL. 103.000 (TOS) 0.1 9-Nov-15 28-Feb-15 23-Nov-15 20-Jun-15 30-Nov-15 2-Jul-15 7-Dec-15 25-Jul-15 21-Dec-15 23-Oct-15 24-May-17 17-Mar-17 100% 100.0%
A545-700-16-48-01341 E C PIPE RACK IN AREA 14 PLAN AT EL. 106.500 (TOS) 0.1 11-Nov-15 28-Feb-15 25-Nov-15 20-Jun-15 2-Dec-15 2-Jul-15 9-Dec-15 25-Jul-15 23-Dec-15 23-Oct-15 26-May-17 17-Mar-17 100% 100.0%
A545-700-16-48-01342 E C PIPE RACK IN AREA 14 PLAN AT EL. 110.000 (TOS) 0.1 13-Nov-15 28-Feb-15 27-Nov-15 20-Jul-15 4-Dec-15 31-Jul-15 11-Dec-15 30-Nov-15 25-Dec-15 28-Jan-16 11-Mar-16 4-Feb-16 100% 100.0%
A545-700-16-48-01343 E C PIPE RACK IN AREA 14 PLAN AT FLARE LVL 0.1 15-Nov-15 28-Feb-15 29-Nov-15 4-Sep-15 6-Dec-15 11-Sep-15 13-Dec-15 30-Nov-15 27-Dec-15 28-Jan-16 13-Mar-16 4-Feb-16 100% 100.0%
A545-700-81-41-01344 E C PIPE RACK IN AREA 14 PLAN AT FLARE LVL 0.1 17-Nov-15 8-Dec-15 1-Dec-15 22-Dec-15 8-Dec-15 29-Dec-15 15-Dec-15 5-Jan-16 29-Dec-15 12-Jan-16 1-Jun-17 17-Mar-17 100% 100.0%
A545-700-16-48-01350 E C PIPE RACK IN AREA 15 PLAN AT EL. 103.000 (TOS) 0.1 19-Nov-15 2-Mar-15 3-Dec-15 20-Jun-15 10-Dec-15 2-Jul-15 17-Dec-15 25-Jul-15 31-Dec-15 23-Oct-15 3-Jun-17 6-Feb-17 100% 100.0%
A545-700-16-48-01351 E C PIPE RACK IN AREA 15 PLAN AT EL. 106.500 (TOS) 0.1 21-Nov-15 2-Mar-15 5-Dec-15 20-Jun-15 12-Dec-15 2-Jul-15 19-Dec-15 25-Jul-15 2-Jan-16 23-Oct-15 5-Jun-17 6-Feb-17 100% 100.0%
A545-700-16-48-01352 E C PIPE RACK IN AREA 15 PLAN AT EL. 110.000 (TOS) 0.1 23-Nov-15 2-Mar-15 7-Dec-15 20-Jul-15 14-Dec-15 31-Jul-15 21-Dec-15 30-Nov-15 4-Jan-16 30-Jan-17 21-Mar-16 6-Feb-17 100% 100.0%
A545-700-16-48-01353 E C PIPE RACK IN AREA 15 PLAN AT FLARE LVL 0.1 25-Nov-15 3-Mar-15 9-Dec-15 16-Nov-15 16-Dec-15 23-Nov-15 23-Dec-15 30-Nov-15 6-Jan-16 28-Jan-16 23-Mar-16 4-Feb-16 100% 100.0%
A545-700-16-48-01360 E C PIPE RACK IN AREA 16 PLAN AT EL. 103.000 (TOS) 0.1 29-Nov-15 3-Mar-15 13-Dec-15 20-Jun-15 20-Dec-15 2-Jul-15 27-Dec-15 25-Jul-15 10-Jan-16 26-Oct-15 13-Jun-17 6-Feb-17 100% 100.0%
A545-700-16-48-01361 E C PIPE RACK IN AREA 16 PLAN AT EL. 106.500 (TOS) 0.1 1-Dec-15 3-Mar-15 15-Dec-15 20-Jun-15 22-Dec-15 2-Jul-15 29-Dec-15 25-Jul-15 12-Jan-16 26-Oct-15 15-Jun-17 6-Feb-17 100% 100.0%
Page 551 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 5 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-01362 E C PIPE RACK IN AREA 16 PLAN AT EL. 110.000 (TOS) 0.1 3-Dec-15 3-Mar-15 17-Dec-15 20-Jul-15 24-Dec-15 31-Jul-15 31-Dec-15 30-Nov-15 14-Jan-16 28-Jan-16 31-Mar-16 4-Feb-16 100% 100.0%
A545-700-16-48-01363 E C PIPE RACK IN AREA 16 PLAN AT FLARE LVL 0.1 5-Dec-15 3-Mar-15 19-Dec-15 16-Nov-15 26-Dec-15 23-Nov-15 2-Jan-16 30-Nov-15 16-Jan-16 18-Feb-16 19-Jun-17 6-Feb-17 100% 100.0%
A545-700-16-48-01370 E C PIPE RACK IN AREA 17 PLAN AT EL. 103.000 (TOS) 0.1 9-Dec-15 5-Mar-15 23-Dec-15 20-Jun-15 30-Dec-15 2-Jul-15 6-Jan-16 25-Jul-15 20-Jan-16 8-Jan-16 23-Jun-17 6-Feb-17 100% 100.0%
A545-700-16-48-01371 E C PIPE RACK IN AREA 17 PLAN AT EL. 106.500 (TOS) 0.1 11-Dec-15 5-Mar-15 25-Dec-15 20-Jun-15 1-Jan-16 2-Jul-15 8-Jan-16 25-Jul-15 22-Jan-16 8-Jan-16 25-Jun-17 6-Feb-17 100% 100.0%
A545-700-16-48-01372 E C PIPE RACK IN AREA 17 PLAN AT EL. 110.000 (TOS) 0.1 13-Dec-15 5-Mar-15 27-Dec-15 20-Jul-15 3-Jan-16 31-Jul-15 10-Jan-16 30-Nov-15 24-Jan-16 28-Jan-16 10-Apr-16 4-Feb-16 100% 100.0%
A545-700-16-48-01373 E C PIPE RACK IN AREA 17 PLAN AT FLARE LVL 0.1 15-Dec-15 5-Mar-15 29-Dec-15 16-Nov-15 5-Jan-16 23-Nov-15 12-Jan-16 30-Nov-15 26-Jan-16 18-Feb-16 29-Jun-17 6-Feb-17 100% 100.0%
A545-700-16-48-01380 E C PIPE RACK IN AREA 18 PLAN AT EL. 103.000 (TOS) 0.1 19-Dec-15 7-Mar-15 2-Jan-16 20-Jun-15 9-Jan-16 2-Jul-15 16-Jan-16 25-Jul-15 30-Jan-16 28-Jan-16 3-Jul-17 26-Dec-16 100% 100.0%
A545-700-16-48-01381 E C PIPE RACK IN AREA 18 PLAN AT EL. 106.500 (TOS) 0.1 21-Dec-15 9-Mar-15 4-Jan-16 20-Jun-15 11-Jan-16 2-Jul-15 18-Jan-16 25-Jul-15 1-Feb-16 27-Jan-16 5-Jul-17 26-Dec-16 100% 100.0%
A545-700-81-41-01382 E C PIPE RACK IN AREA 18 PLAN AT FLARE LVL 0.1 21-Dec-15 14-Dec-15 4-Jan-16 28-Dec-15 11-Jan-16 4-Jan-16 18-Jan-16 11-Jan-16 1-Feb-16 12-Dec-16 18-Apr-16 26-Dec-16 100% 100.0%
A545-700-16-48-01385 E C PIPE RACK IN AREA 18 ELEVATION ALONG GRID J 0.1 21-Dec-15 9-Mar-15 4-Jan-16 12-Jun-15 11-Jan-16 19-Jun-15 18-Jan-16 26-Jun-15 1-Feb-16 10-Jul-15 18-Apr-16 25-Jan-16 100% 100.0%
A545-700-16-48-01386 E C PIPE RACK IN AREA 18 ELEVATION ALONG GRID K 0.1 23-Dec-15 9-Mar-15 6-Jan-16 12-Jun-15 13-Jan-16 19-Jun-15 20-Jan-16 26-Jun-15 3-Feb-16 10-Jul-15 20-Apr-16 25-Jan-16 100% 100.0%
A545-700-16-48-01390 E C PIPE RACK IN AREA 19 PLAN AT EL. 103.000 (TOS) 0.1 29-Dec-15 9-Mar-15 12-Jan-16 20-Jun-15 19-Jan-16 2-Jul-15 26-Jan-16 25-Jul-15 9-Feb-16 11-Jan-16 26-Apr-16 25-Jan-16 100% 100.0%
A545-700-16-48-01391 E C PIPE RACK IN AREA 19 PLAN AT EL. 106.500 (TOS) 0.1 31-Dec-15 10-Mar-15 14-Jan-16 20-Jun-15 21-Jan-16 2-Jul-15 28-Jan-16 25-Jul-15 11-Feb-16 27-Jan-16 15-Jul-17 26-Dec-16 100% 100.0%
A545-700-81-41-01392 E C PIPE RACK IN AREA 19 PLAN AT FLARE LVL. 0.1 31-Dec-15 14-Dec-15 14-Jan-16 28-Dec-15 21-Jan-16 4-Jan-16 28-Jan-16 11-Jan-16 11-Feb-16 12-Dec-16 28-Apr-16 26-Dec-16 100% 100.0%
A545-700-16-48-01395 E C PIPE RACK IN AREA 19 ELEVATION ALONG GRID J 0.1 31-Dec-15 10-Mar-15 14-Jan-16 12-Jun-15 21-Jan-16 19-Jun-15 28-Jan-16 26-Jun-15 11-Feb-16 10-Jul-15 28-Apr-16 25-Jan-16 100% 100.0%
A545-700-81-41-01583 E C PILE LAYOUT FOR TANKS 0.1 2-Jan-16 10-Mar-15 16-Jan-16 28-Dec-18 23-Jan-16 4-Jan-19 30-Jan-16 11-Jan-19 13-Feb-16 25-Jan-19 26-Mar-19 25-Jan-19 100% 100.0%
A545-700-16-48-01396 E C PIPE RACK IN AREA 19 ELEVATION ALONG GRID K 0.1 2-Jan-16 10-Mar-15 16-Jan-16 12-Jun-15 23-Jan-16 19-Jun-15 30-Jan-16 26-Jun-15 13-Feb-16 10-Jul-15 30-Apr-16 3-Oct-18 100% 100.0%
A545-700-81-41-05310 E C PIPERCAK AND IC EXTENSION GA AND DETAILS 0.0 3-Mar-16 10-Mar-15 17-Mar-16 5-Sep-18 24-Mar-16 12-Sep-18 31-Mar-16 19-Sep-18 14-Apr-16 3-Oct-18 16-Apr-19 3-Oct-18 100% 100.0%
A545-700-81-41-00831 to
E C PIPE RACK MISC.PIPE SUPPORTS 0.0 3-Mar-16 10-Mar-15 17-Mar-16 27-Aug-18 24-Mar-16 3-Sep-18 31-Mar-16 10-Sep-18 14-Apr-16 24-Sep-18 30-Jun-16 5-Nov-18 100% 100.0%
00836
FLARE TRESTLE PILE LAYOUT & TEST PILE
A545-700-16-48-01401 E C 0.1 29-Mar-15 16-Dec-15 12-Apr-15 30-Dec-15 19-Apr-15 4-Mar-16 26-Apr-15 11-Mar-16 10-May-15 18-Mar-16 11-Oct-16 13-Dec-16 100% 100.0%
LOCATION
A545-700-16-48-01402 E C FLARE STACK AREA- PILE LAYOUT. 0.1 13-Apr-15 10-Dec-15 27-Apr-15 24-Dec-15 4-May-15 31-Dec-15 11-May-15 7-Jan-16 6-Mar-19 22-Jan-19 6-Apr-19 22-Jan-19 100% 100.0%
A545-700-16-48-01403 E C FLARE STACK STRUCTURE PILE CAP LAYOUT 0.1 1-Apr-17 3-Mar-17 15-Apr-17 14-Jun-18 22-Apr-17 21-Jun-18 29-Apr-17 28-Jun-18 13-May-17 17-Jan-19 21-Mar-19 17-Jan-19 100% 100.0%
A545-700-16-48-01406 FLARE STACK SUPPORT GA & R/F DET. OF FDNS 12-Apr-17 3-Mar-17 26-Apr-17 14-Jun-18 3-May-17 21-Jun-18 10-May-17 28-Jun-18 =Q202+685 - =T202+31 - 80% 80.0%
A545-700-16-48-01408 E C FLARE TRESTLES GA & R/F DET. OF FDNS 0.1 14-Apr-15 14-Dec-15 28-Apr-15 28-Dec-15 5-May-15 2-Jan-16 12-May-15 7-Jan-16 26-May-15 18-Mar-16 16-Mar-19 18-Mar-16 100% 100.0%
A545-700-81-41-01503 E C TRESTLES SUPER STR NEAR FLARE STACK 0.0 14-Apr-15 14-Dec-15 28-Apr-15 28-Dec-15 5-May-15 2-Jan-16 12-May-15 7-Jan-16 26-May-15 26-Feb-19 16-Mar-19 26-Feb-19 100% 100.0%
A545-700-81-41-11409 E C FLARE TRESTLES GA & RF DET. OF SUPER STR 0.1 21-Apr-15 14-Dec-15 5-May-15 28-Dec-15 12-May-15 2-Jan-16 19-May-15 7-Jan-16 2-Jun-15 18-Mar-16 23-Mar-19 18-Mar-16 100% 100.0%
A545-700-16-48-01410 GA OF FLARE TRESTLE NEAR SPHERE AREA 28-Feb-17 29-Jun-18 14-Mar-19 - 21-Mar-19 - 28-Mar-19 - =Q210+14 - =T210+31 - 80% 10.0%
A545-700-81-41-01546 E C GA & RF DT OF SUMP-1 FOR SANITARY SEWAGE 0.1 21-Mar-15 25-May-15 4-Apr-15 29-Jan-16 11-Apr-15 5-Feb-16 18-Apr-15 12-Feb-16 2-May-15 22-Mar-16 12-Mar-17 17-Nov-18 100% 100.0%
A545-700-81-41-01547 E C GA & RF DT OF SUMP-2 FOR SANITARY SEWAGE 0.1 24-Mar-15 26-May-15 7-Apr-15 29-Jan-16 14-Apr-15 5-Feb-16 21-Apr-15 12-Feb-16 5-May-15 22-Mar-16 15-Mar-17 4-Dec-18 100% 100.0%
A545-700-81-41-01548 E C GA & RF DT OF SUMP-3 FOR SANITARY SEWAGE 0.1 27-Mar-15 27-May-15 10-Apr-15 29-Jan-16 17-Apr-15 5-Feb-16 24-Apr-15 12-Feb-16 8-May-15 22-Mar-16 18-Mar-17 4-Dec-18 100% 100.0%
A545-700-81-41-01549 E C GA & RF DT OF SUMP-4 FOR SANITARY SEWAGE 0.1 30-Mar-15 28-May-15 13-Apr-15 29-Jan-16 20-Apr-15 5-Feb-16 27-Apr-15 12-Feb-16 11-May-15 22-Mar-16 21-Mar-17 4-Dec-18 100% 100.0%
A545-700-81-41-01550 E C GA & RF DT OF SUMP-5 FOR SANITARY SEWAGE 0.1 2-Apr-15 29-May-15 16-Apr-15 29-Jan-16 23-Apr-15 5-Feb-16 30-Apr-15 12-Feb-16 14-May-15 22-Mar-16 24-Mar-17 4-Dec-18 100% 100.0%
A545-700-81-41-01581 E C PILE LAYOUT FOR TANKS 711-TT-1101 M/N 0.0 6-Apr-16 9-Nov-18 20-Apr-16 23-Nov-18 27-Apr-16 30-Nov-18 4-May-16 7-Dec-18 18-May-16 14-Dec-18 14-Mar-19 14-Dec-18 100% 100.0%
A545-700-81-41-01582 E C PILE LAYOUT FOR TANKS 0.0 8-Apr-16 7-Dec-18 22-Apr-16 21-Dec-18 29-Apr-16 28-Dec-18 6-May-16 4-Jan-19 20-May-16 11-Jan-19 16-Mar-19 11-Jan-19 100% 100.0%
A545-641-81-41-01028 E C DRAWING FOR GROUND IMPROVEMENT 0.0 7-May-15 22-May-15 17-Nov-16 16-Jun-18 24-Nov-16 23-Jun-18 1-Dec-16 30-Jun-18 15-Dec-16 2-Apr-18 2-Mar-17 17-Dec-18 100% 100.0%
A545-641-16-48-12511 E C GA & RF DT OF TANK 622-TT-1001 A/B 0.1 7-May-15 22-May-15 17-Nov-16 16-Jun-18 24-Nov-16 23-Jun-18 1-Dec-16 30-Jun-18 15-Dec-16 2-Apr-18 2-Mar-17 18-Oct-18 100% 100.0%
A545-641-16-48-12512 E C GA & RF DT OF TANK 622-TT-1002 A/B 0.1 13-May-15 25-May-15 23-Nov-16 16-Jun-18 30-Nov-16 23-Jun-18 7-Dec-16 30-Jun-18 21-Dec-16 17-Dec-18 20-Apr-19 17-Dec-18 100% 100.0%
A545-641-16-48-12513 E C GA & RF DT OF TANK 622-TT-1003 0.1 19-May-15 27-May-15 29-Dec-16 19-Mar-18 5-Jan-17 26-Mar-18 12-Jan-17 2-Apr-18 26-Jan-17 2-Apr-18 13-Apr-17 18-Oct-18 100% 100.0%
A545-641-16-48-12514 E C GA & RF DT OF TANK 622-TT-1004 0.1 22-May-15 28-May-15 5-Jun-15 27-Jun-16 12-Jun-15 4-Jul-16 19-Jun-15 11-Jul-16 30-Dec-16 2-Apr-18 17-Mar-17 18-Oct-18 100% 100.0%
A545-641-16-48-12515 E C GA & RF DT OF TANK 622-TT-1005 0.1 13-May-15 25-May-15 27-May-15 16-Jun-16 3-Jun-15 23-Jun-16 10-Jun-15 30-Jun-16 21-Dec-16 18-Oct-18 20-Apr-19 18-Oct-18 100% 100.0%
A545-641-16-48-12516 E C GA & RF DT OF TANK 622-TT-1006 0.1 19-May-15 27-May-15 2-Jun-15 27-Jun-16 9-Jun-15 4-Jul-16 16-Jun-15 11-Jul-16 27-Dec-16 2-Apr-18 14-Mar-17 18-Oct-18 100% 100.0%
A545-641-16-48-12517 GA & RF DT OF TANK 622-TT-1007 22-May-15 28-05-2015 5-Jun-15 =O227-7 12-Jun-15 =R227-7 19-Jun-15 30-06-2016 =Q227+1360 - =T227+31 -
A545-700-16-48-01556 E C GA & RF DT FDN FOR TANK 716-TT-1604 A/B 0.1 5-Apr-15 30-May-15 19-Apr-15 18-Feb-16 26-Apr-15 25-Feb-16 3-May-15 3-Mar-16 17-May-15 8-Apr-16 18-Jan-17 15-Jun-17 100% 100.0%
A545-700-16-48-01553 E C GA & RF DT FDN FOR TANK 711-TT-1104 0.1 11-Apr-15 17-May-15 25-Apr-15 5-Feb-16 2-May-15 12-Feb-16 9-May-15 19-Feb-16 23-May-15 5-Apr-16 24-Jan-17 15-Jun-17 100% 100.0%
A545-700-16-48-01555 E C GA & RF DT FDN FOR TANK 716-TT-1601 A/B/C 0.1 17-Apr-15 19-May-15 1-May-15 5-Feb-16 8-May-15 12-Feb-16 15-May-15 19-Feb-16 29-May-15 8-Apr-16 30-Jan-17 15-Jun-17 100% 100.0%
A545-700-81-41-01556 E C GA & RF DT FDN FOR TANK 716-TT-1604 A/B 0.1 27-Apr-15 11-Mar-16 11-May-15 18-Mar-16 18-May-15 25-Mar-16 25-May-15 1-Apr-16 8-Jun-15 8-Apr-16 9-Feb-17 22-May-18 100% 100.0%
A545-700-16-48-01562 E C GA & RF DT FDN FOR TANK 712-TT-1208 A/B/C 0.1 16-Oct-15 26-May-15 30-Oct-15 12-Feb-16 6-Nov-15 19-Feb-16 13-Nov-15 26-Feb-16 27-Nov-15 8-Apr-16 31-Jul-17 15-Jun-17 100% 100.0%
A545-641-16-48-12519 E C GA & RF DT FDN FOR TANK 721-TT-1003 A/B 0.1 22-Oct-15 2-Jun-16 5-Nov-15 16-Jun-16 12-Nov-15 23-Jun-16 19-Nov-15 30-Jun-16 22-Apr-17 2-Apr-18 8-Jul-17 18-Oct-18 100% 100.0%
A545-641-16-48-12518 E C GA & RF DT FDN FOR TANK 721-TT-1002 A/B 0.1 14-Oct-15 29-May-15 17-Mar-17 12-Mar-18 24-Mar-17 19-Mar-18 31-Mar-17 26-Mar-18 14-Apr-17 2-Apr-18 30-Jun-17 18-Oct-18 100% 100.0%
A545-700-16-48-01567 E C GA & RF DT FDN FOR TANK 720-TT-2004 A/B 0.1 20-Oct-15 30-May-15 3-Nov-15 5-Feb-16 10-Nov-15 12-Feb-16 17-Nov-15 19-Feb-16 1-Dec-15 6-May-16 4-Aug-17 15-Jun-17 100% 100.0%
A545-700-16-48-01568 E C GA & RF DT FDN FOR TANK 720-TT-2006 A/B 0.1 23-Oct-15 1-Apr-16 6-Nov-15 15-Apr-16 13-Nov-15 22-Apr-16 20-Nov-15 29-Apr-16 4-Dec-15 6-May-16 7-Aug-17 13-May-17 100% 100.0%
A545-700-16-48-10951 E C GA & R/F DETAIL OF DYKE AND FIRE WALL 0.1 23-Oct-15 30-May-15 6-Nov-15 11-Jun-15 13-Nov-15 18-Jun-15 20-Nov-15 25-Jun-15 4-Dec-15 2-Jul-15 19-Feb-16 16-Jul-15 100% 100.0%
A545-700-81-41-01845 E C GA & DETAIL OF SUPPORT FOR CABLE & DUCT 0.0 30-Oct-15 26-Oct-18 13-Nov-15 9-Nov-18 20-Nov-15 16-Nov-18 27-Nov-15 23-Nov-18 11-Dec-15 30-Nov-18 2-Mar-19 30-Nov-18 100% 100.0%
Page 553 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 7 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-31601 E C GA & RF DT OF FDN FOR 711-PA-1101 A/B/C/D 0.0 2-Jan-16 30-Jan-16 16-Jan-16 18-May-16 23-Jan-16 2-Jun-16 30-Jan-16 9-Jun-16 25-Mar-17 31-May-18 1-Apr-19 31-May-18 100% 100.0%
A545-700-16-48-31602 E C GA & RF DT OF FDN FOR 671-PA-1003 A/B/C 0.0 4-Jan-16 30-Jan-16 27-Feb-17 7-Apr-18 6-Mar-17 21-Apr-18 13-Mar-17 28-Apr-18 27-Mar-17 1-Aug-18 3-Apr-19 1-Aug-18 100% 100.0%
A545-700-16-48-31603 E C GA & RF DT OF FDN FOR 711-PA-1102 A/B/C 0.0 6-Jan-16 30-Jan-16 20-Jan-16 18-May-16 27-Jan-16 2-Jun-16 3-Feb-16 9-Jun-16 29-Mar-17 31-May-18 5-Apr-19 31-May-18 100% 100.0%
A545-700-16-48-31604 E C GA & RF DT OF FDN FOR 711-PA-1103 A/B 0.0 8-Jan-16 30-Jan-16 22-Jan-16 31-May-16 29-Jan-16 7-Jun-16 5-Feb-16 14-Jun-16 31-Mar-17 31-May-18 7-Apr-19 31-May-18 100% 100.0%
A545-700-16-48-31605 E C GA & RF DT OF FDN FOR 711-PA-1104 0.0 10-Jan-16 30-Jan-16 24-Jan-16 18-May-16 31-Jan-16 2-Jun-16 7-Feb-16 9-Jun-16 2-Apr-17 30-May-18 9-Apr-19 30-May-18 100% 100.0%
A545-700-81-41-31606 E C GA & RF DT OF FDN FOR 712-PA-1218A/B 0.0 12-Jan-16 30-Jan-16 26-Jan-16 1-Feb-19 2-Feb-16 8-Feb-19 9-Feb-16 15-Feb-19 4-Apr-17 22-Feb-19 11-Apr-19 22-Feb-19 100% 100.0%
A545-700-16-48-31607 E C GA & RF DT OF FDN FOR 712-PA-1201 A/B/C 0.0 14-Jan-16 30-Jan-16 9-Mar-17 14-Apr-18 16-Mar-17 21-Apr-18 23-Mar-17 28-Apr-18 6-Apr-17 15-Jun-18 13-Apr-19 15-Jun-18 100% 100.0%
A545-700-16-48-31608 E C GA & RF DT OF FDN FOR 712-PA-1202 A/B 0.0 16-Jan-16 2-Apr-16 30-Jan-16 16-Apr-16 6-Feb-16 23-Apr-16 13-Feb-16 30-Apr-16 27-Feb-16 6-Jun-16 9-Apr-19 6-Jun-16 100% 100.0%
A545-700-16-48-31609 E C GA & RF DT OF FDN FOR 712-PA-1203 A/B 0.0 18-Jan-16 30-Jan-16 1-Feb-16 22-Apr-16 8-Feb-16 25-Apr-16 15-Feb-16 2-May-16 29-Feb-16 6-Jun-16 27-Jun-17 22-Feb-19 100% 100.0%
A545-700-16-48-31610 E C GA & RF DT OF FDN FOR 712-PA-1204 C/D 0.0 20-Jan-16 30-Jan-16 3-Feb-16 22-Apr-16 10-Feb-16 29-Apr-16 17-Feb-16 6-May-16 2-Mar-16 6-Jun-16 13-Apr-19 6-Jun-16 100% 100.0%
A545-700-16-48-31611 E C GA & RF DT OF FDN FOR 712-PA-1205 A/B/C 0.0 22-Jan-16 30-Jan-16 5-Feb-16 22-May-16 12-Feb-16 2-Jun-16 19-Feb-16 9-Jun-16 14-Apr-17 1-Aug-18 22-Mar-19 1-Aug-18 100% 100.0%
A545-700-16-48-31612 E C GA & RF DT OF FDN FOR 712-PA-1206 A/B 0.0 24-Jan-16 30-Jan-16 7-Feb-16 22-Apr-16 14-Feb-16 25-Apr-16 21-Feb-16 2-May-16 6-Mar-16 6-Jun-16 28-Mar-19 6-Jun-16 100% 100.0%
A545-700-16-48-31613 E C GA & RF DT OF FDN FOR 712-PA-1207 C/D 0.0 26-Jan-16 30-Jan-16 9-Feb-16 22-Apr-16 16-Feb-16 25-Apr-16 23-Feb-16 2-May-16 8-Mar-16 6-Jun-16 20-Mar-19 22-Feb-19 100% 100.0%
A545-700-16-48-31614 E C GA & RF DT OF FDN FOR 712-PA-1208 A/B 0.0 28-Jan-16 30-Jan-16 11-Feb-16 22-May-16 18-Feb-16 30-May-16 25-Feb-16 6-Jun-16 20-Apr-17 22-Feb-19 28-Mar-19 22-Feb-19 100% 100.0%
A545-700-81-41-43024 E C Detail for cast in situ & Pre cast kerb stone 0.0 30-Jan-16 30-Jan-16 13-Feb-16 22-May-16 20-Feb-16 23-Nov-18 27-Feb-16 30-Nov-18 22-Apr-17 7-Dec-18 30-Mar-19 7-Dec-18 100.0%
A545-700-16-48-31616 E C GA & RF DT OF FDN FOR 712-PA-1213 0.0 1-Feb-16 30-Jan-16 27-Mar-17 3-Apr-18 3-Apr-17 17-Apr-18 10-Apr-17 24-Apr-18 24-Apr-17 22-Jun-18 1-Apr-19 22-Jun-18 100% 100.0%
A545-700-16-48-31617 E C GA & RF DT OF FDN FOR 712-PA-1210 A/B 0.0 3-Feb-16 30-Jan-16 29-Mar-17 3-Apr-18 5-Apr-17 17-Apr-18 12-Apr-17 24-Apr-18 26-Apr-17 22-Jun-18 3-Apr-19 22-Jun-18 100% 100.0%
A545-700-81-41-31675 E C GA & RF DT OF FDN FOR 716-PA-1604 A/B/C 0.0 5-Feb-16 30-Jan-16 19-Feb-16 24-May-16 26-Feb-16 30-May-16 4-Mar-16 6-Jun-16 28-Apr-17 7-May-18 5-Apr-19 7-May-18 100% 100.0%
A545-700-16-48-31619 E C GA & RF DT OF FDN FOR 716-PA-1611 0.0 7-Feb-16 30-Jan-16 2-Apr-17 3-Apr-18 9-Apr-17 17-Apr-18 16-Apr-17 24-Apr-18 30-Apr-17 7-May-18 16-Jul-17 22-Feb-19 100% 100.0%
A545-700-16-48-31620 E C GA & RF DT OF FDN FOR 711-PA-1107A/B 0.0 9-Feb-16 30-Jan-16 4-Apr-17 3-Apr-18 11-Apr-17 17-Apr-18 18-Apr-17 24-Apr-18 2-May-17 22-Feb-19 9-Apr-19 22-Feb-19 100% 100.0%
A545-700-16-48-31621 E C GA & RF DT OF FDN FOR 713-PA-1301 A/B/C 0.0 11-Feb-16 30-Jan-16 6-Apr-17 3-Apr-18 13-Apr-17 17-Apr-18 20-Apr-17 24-Apr-18 4-May-17 22-Feb-19 11-Apr-19 22-Feb-19 100% 100.0%
A545-700-81-41-31622 E C GA & RF DT OF FDN FOR 720-PA-2006 0.0 13-Feb-16 30-Jan-16 27-Feb-16 3-Jun-16 5-Mar-16 10-Jun-16 12-Mar-16 17-Jun-16 6-May-17 9-Aug-18 13-Apr-19 9-Aug-18 100% 100.0%
A545-700-81-41-31623 E C GA & RF DT OF FDN FOR 712-PA-1216A/B 0.0 15-Feb-16 30-Jan-16 10-Apr-17 3-Apr-18 17-Apr-17 17-Apr-18 24-Apr-17 24-Apr-18 8-May-17 22-Jun-18 15-Apr-19 23-Apr-19 100% 100.0%
A545-700-16-48-31624 E C GA & RF DT OF FDN FOR 714-PA-1401 A-F 0.0 17-Feb-16 17-May-16 2-Mar-16 31-May-16 9-Mar-16 7-Jun-16 16-Mar-16 14-Jun-16 10-May-17 31-May-18 17-Apr-19 31-May-18 100% 100.0%
A545-700-16-48-31625 E C GA & RF DT OF FDN FOR 714-PA-1402 A/B 0.0 19-Feb-16 17-May-16 4-Mar-16 31-May-16 11-Mar-16 7-Jun-16 18-Mar-16 14-Jun-16 12-May-17 25-Apr-18 19-Apr-19 25-Apr-18 100% 100.0%
A545-700-16-48-31626 E C GA & RF DT OF FDN FOR 714-PA-1403 A 0.0 21-Feb-16 17-May-16 6-Mar-16 31-May-16 13-Mar-16 7-Jun-16 20-Mar-16 14-Jun-16 14-May-17 20-Apr-18 21-Apr-19 20-Apr-18 100% 100.0%
A545-700-16-48-31627 E C GA & RF DT OF FDN FOR 714-PA-1404 A/B/C 0.0 23-Feb-16 17-May-16 8-Mar-16 31-May-16 15-Mar-16 7-Jun-16 22-Mar-16 14-Jun-16 16-May-17 25-Apr-18 23-Apr-19 25-Apr-18 100% 100.0%
A545-700-16-48-31628 E C GA & RF DT OF FDN FOR 714-PA-1405 A/B 0.0 25-Feb-16 17-May-16 10-Mar-16 31-May-16 17-Mar-16 7-Jun-16 24-Mar-16 14-Jun-16 18-May-17 30-May-18 25-Apr-19 30-May-18 100% 100.0%
A545-700-16-48-31629 E C GA & RF DT OF FDN FOR 733-PA-CF-105 A/B/C 0.0 27-Feb-16 29-Apr-15 12-Mar-16 13-May-15 19-Mar-16 20-May-15 26-Mar-16 27-May-15 20-May-17 17-Jul-18 27-Apr-19 17-Jul-18 100% 100.0%
A545-700-16-48-31630 E C GA & RF DT OF FDN FOR 712-PA-1214A/B 0.0 29-Feb-16 29-Apr-15 14-Mar-16 13-May-15 21-Mar-16 20-May-15 28-Mar-16 27-May-15 22-May-17 15-Jun-18 29-Apr-19 15-Jun-18 100% 100.0%
A545-700-16-48-31631 E C GA & RF DT OF FDN FOR 712-PA-1204 A/B/C 0.0 2-Mar-16 29-Apr-15 16-Mar-16 13-May-15 23-Mar-16 20-May-15 30-Mar-16 27-May-15 24-May-17 15-Jun-18 1-May-19 15-Jun-18 100% 100.0%
A545-700-16-48-31632 GA & RF DT OF FDN FOR 714-PA-1409 4-Mar-16 29-Apr-15 18-Mar-16 13-May-15 25-Mar-16 20-May-15 1-Apr-16 27-May-15 26-May-17 - 11-Aug-17 - 80.0%
A545-700-16-48-31633 E C GA & RF DT OF FDN FOR 713-PA-1303 A/B 0.0 6-Mar-16 30-Jan-16 20-Mar-16 2-Jun-16 27-Mar-16 9-Jun-16 3-Apr-16 16-Jun-16 28-May-17 22-Feb-19 5-May-19 22-Feb-19 100% 100.0%
Page 554 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 8 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-31634 E C GA & RF DT OF FDN FOR 714-PA-1404 D 0.0 8-Mar-16 30-Jan-16 22-Mar-16 2-Jun-16 29-Mar-16 9-Jun-16 5-Apr-16 16-Jun-16 30-May-17 12-Oct-18 7-May-19 12-Oct-18 100% 100.0%
A545-700-16-48-31635 E C GA & RF DT OF FDN FOR 714-PA-1405 C/D 0.0 10-Mar-16 30-Jan-16 24-Mar-16 2-Jun-16 31-Mar-16 9-Jun-16 7-Apr-16 16-Jun-16 1-Jun-17 12-Oct-18 9-May-19 12-Oct-18 100% 100.0%
A545-700-16-48-31618 E C GA & RF DT OF FDN FOR 714-PA-1412 0.0 10-Mar-16 30-Jan-16 24-Mar-16 2-Jun-16 31-Mar-16 9-Jun-16 7-Apr-16 16-Jun-16 1-Jun-17 31-May-18 9-May-19 31-May-18 100% 100.0%
A545-700-16-48-31636 E C GA & RF DT OF FDN FOR 716-PA-1601 A/B/C 0.0 12-Mar-16 30-Jan-16 26-Mar-16 23-May-16 2-Apr-16 30-May-16 9-Apr-16 6-Jun-16 3-Jun-17 29-May-18 11-May-19 29-May-18 100% 100.0%
A545-700-16-48-31637 E C GA & RF DT OF FDN FOR 716-PA-1602 A/B/C 0.0 14-Mar-16 30-Jan-16 28-Mar-16 23-May-16 4-Apr-16 30-May-16 11-Apr-16 6-Jun-16 5-Jun-17 28-May-18 13-May-19 28-May-18 100% 100.0%
A545-700-16-48-31638 E C GA & RF DT OF FDN FOR 716-PA-1603 A/B/C 0.0 16-Mar-16 30-Jan-16 30-Mar-16 23-May-16 6-Apr-16 30-May-16 13-Apr-16 6-Jun-16 7-Jun-17 25-Apr-18 15-May-19 25-Apr-18 100% 100.0%
A545-700-16-48-31639 E C GA & RF DT OF FDN FOR 716-PA-1605 A/B/C 0.0 18-Mar-16 30-Jan-16 1-Apr-16 16-May-16 8-Apr-16 23-May-16 15-Apr-16 30-May-16 29-Apr-16 6-Jun-16 1-May-19 6-Jun-16 100% 100.0%
A545-700-16-48-31640 E C GA & RF DT OF FDN FOR 716-PA-1606 A/B/C 0.0 20-Mar-16 30-Jan-16 3-Apr-16 15-Apr-16 10-Apr-16 22-Apr-16 17-Apr-16 29-Apr-16 1-May-16 6-May-16 3-May-19 1-May-19 100% 100.0%
A545-700-16-48-31641 E C GA & RF DT OF FDN FOR 716-PA-1607 A/B/C 0.0 22-Mar-16 30-Jan-16 16-May-17 3-Apr-18 23-May-17 17-Apr-18 30-May-17 24-Apr-18 15-Mar-19 1-May-19 15-Apr-19 1-May-19 100% 100.0%
A545-700-16-48-31642 E C GA & RF DT OF FDN FOR 716-PA-1611 0.0 24-Mar-16 30-Jan-16 7-Apr-16 15-Apr-16 14-Apr-16 22-Apr-16 21-Apr-16 29-Apr-16 5-May-16 6-May-16 29-Jun-17 17-Sep-18 100% 100.0%
A545-700-16-48-31643 GA & RF DT OF FDN FOR 713-PA-1301A/B/C 26-Mar-16 30-Jan-16 10-Apr-17 3-Apr-18 17-Apr-17 17-Apr-18 24-Apr-17 24-Apr-18 =Q282+694 - =T282+31 - 80% 80.0%
A545-700-16-48-31644 E C GA & RF DT OF FDN FOR 712-PA-1207 A/B/C 0.0 16-Apr-16 30-Jan-16 30-Apr-16 24-May-16 7-May-16 2-Jun-16 14-May-16 9-Jun-16 9-May-17 27-Feb-19 25-Jul-17 27-Feb-19 100% 100.0%
A545-700-16-48-31645 GA & RF DT OF FDN FOR 713-PA-1303A/B 0.0 18-Apr-16 30-Jan-16 2-May-16 2-Jun-16 9-May-16 9-Jun-16 16-May-16 16-Jun-16 5-Apr-19 - 6-May-19 - 100% 80.0%
A545-700-16-48-31646 E C GA & RF DT OF FDN FOR 712-PA-1210 C/D 0.0 20-Apr-16 30-Jan-16 5-May-17 3-Apr-18 12-May-17 17-Apr-18 19-May-17 24-Apr-18 2-Jun-17 15-Oct-18 10-Apr-19 15-Oct-18 100% 100.0%
A545-700-16-48-31647 GA & RF DT OF FDN FOR 716-PA-1608 22-Apr-16 30-Jan-16 7-May-17 3-Apr-18 14-May-17 17-Apr-18 21-May-17 24-Apr-18 4-Jun-17 - 20-Aug-17 - 80.0%
A545-700-16-48-31648 GA & RF DT OF FDN FOR 716-PA-1609 24-Apr-16 30-Jan-16 9-May-17 3-Apr-18 16-May-17 17-Apr-18 23-May-17 24-Apr-18 6-Jun-17 - 22-Aug-17 - 80.0%
A545-700-16-48-31649 E C GA & RF DT OF FDN FOR 720-PA-2001 A/B 0.0 26-Apr-16 30-Jan-16 10-May-16 22-Apr-16 17-May-16 29-Apr-16 24-May-16 6-May-16 7-Jun-16 6-Jun-16 1-Aug-17 20-Jul-18 100% 100.0%
A545-700-16-48-31650 E C GA & RF DT OF FDN FOR 720-PA-2002 A/B 0.0 28-Apr-16 30-Jan-16 12-May-16 22-Apr-16 19-May-16 29-Apr-16 26-May-16 6-May-16 9-Jun-16 6-Jun-16 3-Aug-17 20-Jul-18 100% 100.0%
A545-700-81-41-31674 E C GA & RF DT OF FDN FOR 720-PA-2007 A/B/C 0.0 30-Apr-16 2-Apr-18 14-May-16 16-Apr-18 21-May-16 23-Apr-18 28-May-16 30-Apr-18 11-Jun-16 7-May-18 5-Mar-19 7-May-18 100% 100.0%
A545-700-81-41-31679 E C GA & RF DT OF FDN FOR 714-PA-1410A/B 0.0 2-May-16 11-May-18 16-May-16 25-May-18 23-May-16 1-Jun-18 30-May-16 8-Jun-18 13-Jun-16 15-Jun-18 7-Mar-19 15-Jun-18 100% 100.0%
A545-700-81-41-31680 E C GA & RF DT OF FDN FOR 671-PA-1004A/B 0.0 2-May-16 27-Jun-18 16-May-16 11-Jul-18 23-May-16 18-Jul-18 30-May-16 25-Jul-18 13-Jun-16 1-Aug-18 7-Mar-19 1-Aug-18 100% 100.0%
A545-700-81-41-31678 E C GA & RF DT OF FDN FOR 714-PA-1411A/B/C 0.0 2-May-16 11-May-18 16-May-16 25-May-18 23-May-16 1-Jun-18 30-May-16 8-Jun-18 13-Jun-16 15-Jun-18 7-Mar-19 4-Apr-19 100% 100.0%
A545-700-81-41-31677 E C GA & RF DT OF FDN FOR 711-PA-1106A/B/C 0.0 2-May-16 11-May-18 16-May-16 25-May-18 23-May-16 1-Jun-18 30-May-16 8-Jun-18 13-Jun-16 15-Jun-18 7-Mar-19 15-Jun-18 100% 100.0%
A545-700-81-41-31681 E C GA & RF DT OF FDN FOR 712-PA-1217A/B 0.0 5-May-16 18-May-18 19-May-16 1-Jun-18 26-May-16 8-Jun-18 2-Jun-16 15-Jun-18 16-Jun-16 22-Jun-18 10-Mar-19 22-Jun-18 100% 100.0%
A545-700-16-48-31615 E C GA & RF DT OF FDN FOR 712-PA-1209 A/B 0.0 4-Jul-16 23-Jan-19 18-Jul-16 6-Feb-19 25-Jul-16 13-Feb-19 1-Aug-16 20-Feb-19 15-Aug-16 27-Feb-19 9-May-19 27-Feb-19 100% 100.0%
A545-700-16-48-01702 GA & DT OF CIRCULAR PLTF FOR 712-VV-1202 06-07-2015 19-05-2015 =G272+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! -
A545-700-16-48-01703 GA & DT OF CIRCULAR PLTF FOR 714-VV-1401 08-07-2015 20-05-2015 =G273+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! -
A545-700-81-41-31704 E C GA & DT OF CIRCULAR PLTF FOR 651-VV-1002 0.1 10-Jul-15 21-May-15 24-Jul-15 1-Mar-16 31-Jul-15 8-Mar-16 7-Aug-15 15-Mar-16 21-Aug-15 22-Mar-16 6-Nov-15 4-Aug-16 100% 100.0%
A545-700-81-41-31705 E C GA & DT OF CIRCULAR PLTF FOR 651-VV-1004 0.1 12-Jul-15 22-May-15 26-Jul-15 1-Mar-16 2-Aug-15 8-Mar-16 9-Aug-15 15-Mar-16 23-Aug-15 22-Mar-16 8-Nov-15 8-Sep-16 100% 100.0%
A545-700-81-41-01703 E C GA & DT OF CIRCULAR PLTF FOR 651-VV-1001 0.1 14-Jul-15 23-May-15 28-Jul-15 1-Mar-16 4-Aug-15 8-Mar-16 11-Aug-15 15-Mar-16 25-Aug-15 22-Mar-16 10-Nov-15 22-Sep-16 100% 100.0%
A545-700-16-48-02300 E C PIPE RACK IN AREA 20 PLAN AT EL. 103.000 (TOS) 0.1 8-Jan-16 11-Mar-15 22-Jan-16 20-Jun-15 29-Jan-16 2-Jul-15 5-Feb-16 25-Jul-15 19-Feb-16 25-Jan-16 5-Mar-17 30-Dec-16 100% 100.0%
A545-700-16-48-02301 E C PIPE RACK IN AREA 20 PLAN AT EL. 106.500 (TOS) 0.1 10-Jan-16 11-Mar-15 24-Jan-16 20-Jun-15 31-Jan-16 2-Jul-15 7-Feb-16 25-Jul-15 21-Feb-16 27-Jan-16 7-Mar-17 30-Dec-16 100% 100.0%
A545-700-81-41-02302 E C PIPE RACK IN AREA 20 PLAN AT FLARE LVL 0.1 12-Jan-16 29-Dec-15 26-Jan-16 12-Jan-16 2-Feb-16 9-Dec-16 9-Feb-16 16-Dec-16 23-Feb-16 23-Dec-16 10-May-16 30-Dec-16 100% 100.0%
Page 555 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 9 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-02305 E C PIPE RACK IN AREA 20 ELEVATION ALONG GRID J 0.1 10-Jan-16 11-Mar-15 24-Jan-16 12-Jun-15 31-Jan-16 19-Jun-15 7-Feb-16 26-Jun-15 21-Feb-16 10-Jul-15 8-May-16 25-Jan-16 100% 100.0%
A545-700-16-48-02306 E C PIPE RACK IN AREA 20 ELEVATION ALONG GRID K 0.1 12-Jan-16 11-Mar-15 26-Jan-16 12-Jun-15 2-Feb-16 19-Jun-15 9-Feb-16 26-Jun-15 23-Feb-16 10-Jul-15 10-May-16 25-Jan-16 100% 100.0%
A545-700-81-41-02310 E C PIPE RACK IN AREA 21 PLAN AT EL 103.500 0.1 14-Jan-16 14-Dec-15 28-Jan-16 28-Dec-15 4-Feb-16 4-Jan-16 11-Feb-16 11-Jan-16 25-Feb-16 25-Jan-16 11-Mar-17 30-Dec-16 100% 100.0%
A545-700-81-41-02311 E C PIPE RACK IN AREA 21 PLAN AT EL 106.000 0.1 16-Jan-16 14-Dec-15 30-Jan-16 28-Dec-15 6-Feb-16 4-Jan-16 13-Feb-16 11-Jan-16 27-Feb-16 25-Jan-16 13-Mar-17 30-Dec-16 100% 100.0%
A545-700-81-41-02312 E C PIPE RACK IN AREA 21 PLAN AT FLARE EL 0.1 18-Jan-16 14-Dec-15 1-Feb-16 28-Dec-15 8-Feb-16 4-Jan-16 15-Feb-16 11-Jan-16 29-Feb-16 25-Jan-16 16-May-16 30-Dec-16 100% 100.0%
A545-700-81-41-02315 E C PIPE RACK IN AREA 20 ELEVATION ALONG GRID K 0.1 20-Jan-16 14-Dec-15 3-Feb-16 28-Dec-15 10-Feb-16 4-Jan-16 17-Feb-16 11-Jan-16 2-Mar-16 25-Jan-16 17-Mar-17 30-Dec-16 100% 100.0%
A545-700-81-41-02316 E C PIPE RACK IN AREA 20 ELEVATION ALONG GRID K 0.1 22-Jan-16 14-Dec-15 5-Feb-16 28-Dec-15 12-Feb-16 4-Jan-16 19-Feb-16 11-Jan-16 4-Mar-16 25-Jan-16 19-Mar-17 30-Dec-16 100% 100.0%
A545-700-16-48-02390 E C PIPE RACK IN AREA 29 PLAN AT EL. 103.000 (TOS) 0.1 3-Apr-16 20-Mar-15 17-Apr-16 19-Oct-15 24-Apr-16 17-Nov-15 1-May-16 24-Nov-15 15-May-16 28-Jan-16 30-May-17 3-Mar-16 100% 100.0%
A545-700-16-48-02391 E C PIPE RACK IN AREA 29 PLAN AT EL. 106.500 (TOS) 0.1 5-Apr-16 20-Mar-15 19-Apr-16 19-Oct-15 26-Apr-16 17-Nov-15 3-May-16 24-Nov-15 17-May-16 28-Jan-16 20-Mar-19 28-Jan-16 100% 100.0%
A545-700-16-48-02392 E C PIPE RACK IN AREA 29 PLAN AT EL. 110.000 (TOS) 0.1 7-Apr-16 20-Mar-15 21-Apr-16 19-Oct-15 28-Apr-16 17-Nov-15 5-May-16 24-Nov-15 19-May-16 28-Jan-16 3-Jun-17 28-Jan-16 100% 100.0%
A545-700-16-48-02395 E C PIPE RACK IN AREA 29 ELEVATION ALONG GRID S 0.1 10-Dec-15 20-Mar-15 24-Dec-15 21-Oct-15 31-Dec-15 17-Nov-15 7-Jan-16 24-Nov-15 21-Jan-16 28-Jan-16 3-Mar-19 28-Jan-16 100% 100.0%
A545-700-16-48-02396 E C PIPE RACK IN AREA 29 ELEVATION ALONG GRID T 0.1 12-Dec-15 20-Mar-15 26-Dec-15 21-Oct-15 2-Jan-16 17-Nov-15 9-Jan-16 24-Nov-15 23-Jan-16 28-Jan-16 5-Mar-19 28-Jan-16 100% 100.0%
A545-700-16-48-03300 E C PIPE RACK IN AREA 30 PLAN AT EL. 103.000 (TOS) 0.1 13-Apr-16 20-Mar-15 27-Apr-16 21-Oct-15 4-May-16 17-Nov-15 11-May-16 24-Nov-15 25-May-16 28-Jan-16 17-Apr-19 28-Jan-16 100% 100.0%
A545-700-16-48-03301 E C PIPE RACK IN AREA 30 PLAN AT EL. 106.500 (TOS) 0.1 15-Apr-16 20-Mar-15 29-Apr-16 23-Oct-15 6-May-16 17-Nov-15 13-May-16 24-Nov-15 27-May-16 28-Jan-16 19-Apr-19 28-Jan-16 100% 100.0%
A545-700-16-48-03302 E C PIPE RACK IN AREA 30 PLAN AT EL. 110.000 (TOS) 0.1 17-Apr-16 20-Mar-15 1-May-16 23-Oct-15 8-May-16 17-Nov-15 15-May-16 24-Nov-15 29-May-16 28-Jan-16 21-Apr-19 28-Jan-16 100% 100.0%
A545-700-81-41-03303 E C PIPE RACK IN AREA 30 PLAN AT EL. 113.500 0.1 19-Apr-16 20-Mar-15 3-May-16 19-Jan-16 10-May-16 15-Apr-16 17-May-16 22-Apr-16 31-May-16 29-Apr-16 23-Apr-19 29-Apr-16 100% 100.0%
A545-700-81-41-03304 PIPE RACK IN AREA 30 PLAN AT FLARE LVL 21-04-2016 20-03-2015 =G297+14 19-01-2016 =J297+7 =Q297-7 =M297+7 22-02-2016 =P297+14 - =S297+77 -
A545-700-16-48-03305 E C PIPE RACK IN AREA 30 ELEVATION ALONG GRID S 0.1 20-Dec-15 20-Mar-15 3-Jan-16 23-Oct-15 10-Jan-16 17-Nov-15 17-Jan-16 24-Nov-15 31-Jan-16 25-Jan-16 2-Apr-19 25-Jan-16 100% 100.0%
A545-700-16-48-03306 E C PIPE RACK IN AREA 30 ELEVATION ALONG GRID T 0.1 22-Dec-15 20-Mar-15 5-Jan-16 23-Oct-15 12-Jan-16 17-Nov-15 19-Jan-16 24-Nov-15 2-Feb-16 25-Jan-16 4-Apr-19 25-Jan-16 100% 100.0%
A545-700-16-48-03310 E C PIPE RACK IN AREA 31 PLAN AT EL. 103.000 (TOS) 0.1 23-Apr-16 20-Mar-15 7-May-16 26-Oct-15 14-May-16 17-Nov-15 21-May-16 24-Nov-15 4-Jun-16 25-Jan-16 28-Mar-19 25-Jan-16 100% 100.0%
A545-700-16-48-03311 E C PIPE RACK IN AREA 31 PLAN AT EL. 106.500 (TOS) 0.1 25-Apr-16 20-Mar-15 9-May-16 26-Oct-15 16-May-16 17-Nov-15 23-May-16 24-Nov-15 6-Jun-16 25-Jan-16 30-Mar-19 25-Jan-16 100% 100.0%
A545-700-16-48-03312 E C PIPE RACK IN AREA 31 PLAN AT EL. 110.000 (TOS) 0.1 27-Apr-16 20-Mar-15 11-May-16 26-Oct-15 18-May-16 17-Nov-15 25-May-16 24-Nov-15 8-Jun-16 25-Jan-16 1-Apr-19 25-Jan-16 100% 100.0%
A545-700-81-41-03313 E C PIPE RACK IN AREA 31 PLAN AT FLARE LVL 0.1 27-Apr-16 4-Jan-16 11-May-16 18-Jan-16 18-May-16 8-Feb-16 25-May-16 15-Feb-16 8-Jun-16 22-Feb-16 1-Apr-19 22-Feb-16 100% 100.0%
A545-700-16-48-03316 E C PIPE RACK IN AREA 31 ELEVATION ALONG GRID V 0.1 1-Jan-16 20-Mar-15 15-Jan-16 26-Oct-15 22-Jan-16 17-Nov-15 29-Jan-16 24-Nov-15 12-Feb-16 25-Jan-16 15-Mar-19 25-Jan-16 100% 100.0%
A545-700-16-48-03320 E C PIPE RACK IN AREA 32 PLAN AT EL. 103.000 (TOS) 0.1 3-May-16 20-Mar-15 17-May-16 28-Oct-15 24-May-16 17-Nov-15 31-May-16 24-Nov-15 14-Jun-16 25-Jan-16 7-Apr-19 25-Jan-16 100% 100.0%
A545-700-16-48-03321 E C PIPE RACK IN AREA 32 PLAN AT EL. 106.500 (TOS) 0.1 5-May-16 20-Mar-15 19-May-16 28-Oct-15 26-May-16 17-Nov-15 2-Jun-16 24-Nov-15 16-Jun-16 25-Jan-16 9-Apr-19 25-Jan-16 100% 100.0%
A545-700-16-48-03322 E C PIPE RACK IN AREA 32 PLAN AT EL. 110.000 (TOS) 0.1 7-May-16 20-Mar-15 21-May-16 28-Oct-15 28-May-16 17-Nov-15 4-Jun-16 24-Nov-15 18-Jun-16 25-Jan-16 11-Apr-19 25-Jan-16 100% 100.0%
A545-700-81-41-03323 E C PIPE RACK IN AREA 32 PLAN AT FLARE LVL 0.1 7-May-16 20-Mar-15 21-May-16 17-Jan-16 28-May-16 8-Feb-16 4-Jun-16 15-Feb-16 18-Jun-16 22-Feb-16 3-Jul-17 25-Jan-16 100% 100.0%
A545-700-16-48-03326 E C PIPE RACK IN AREA 32 ELEVATION ALONG GRID V 0.1 11-Jan-16 21-Mar-15 25-Jan-16 28-Oct-15 1-Feb-16 17-Nov-15 8-Feb-16 24-Nov-15 22-Feb-16 25-Jan-16 25-Mar-19 25-Jan-16 100% 100.0%
A545-700-16-48-03330 E C PIPE RACK IN AREA 33 PLAN AT EL. 103.000 (TOS) 0.1 13-May-16 21-Mar-15 27-May-16 28-Oct-15 3-Jun-16 17-Nov-15 10-Jun-16 24-Nov-15 24-Jun-16 25-Jan-16 9-Jul-17 6-Feb-17 100% 100.0%
A545-700-16-48-03331 E C PIPE RACK IN AREA 33 PLAN AT EL. 106.500 (TOS) 0.1 15-May-16 21-Mar-15 29-May-16 30-Oct-15 5-Jun-16 17-Nov-15 12-Jun-16 24-Nov-15 26-Jun-16 25-Jan-16 11-Jul-17 6-Feb-17 100% 100.0%
Page 556 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 10 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-03332 E C PIPE RACK IN AREA 33 PLAN AT EL. 110.000 (TOS) 0.1 17-May-16 21-Mar-15 31-May-16 30-Oct-15 7-Jun-16 17-Nov-15 14-Jun-16 24-Nov-15 28-Jun-16 25-Jan-16 13-Jul-17 6-Feb-17 100% 100.0%
A545-700-81-41-03333 E C PIPE RACK IN AREA 33 PLAN AT FLARE LVL 0.1 19-Jan-16 3-Jan-16 2-Feb-16 17-Jan-16 9-Feb-16 8-Feb-16 16-Feb-16 15-Feb-16 1-Mar-16 22-Feb-16 16-Mar-17 6-Feb-17 100% 100.0%
A545-700-16-48-03335 E C PIPE RACK IN AREA 33 ELEVATION ALONG GRID W 0.1 19-Jan-16 21-Mar-15 2-Feb-16 30-Oct-15 9-Feb-16 17-Nov-15 16-Feb-16 24-Nov-15 1-Mar-16 25-Jan-16 16-Mar-17 6-Feb-17 100% 100.0%
A545-700-16-48-03336 E C PIPE RACK IN AREA 33 ELEVATION ALONG GRID X 0.1 21-Jan-16 21-Mar-15 4-Feb-16 30-Oct-15 11-Feb-16 17-Nov-15 18-Feb-16 24-Nov-15 3-Mar-16 25-Jan-16 18-Mar-17 6-Feb-17 100% 100.0%
A545-700-16-48-03340 E C PIPE RACK IN AREA 34 PLAN AT EL. 103.000 (TOS) 0.1 23-May-16 21-Mar-15 6-Jun-16 20-Jun-15 13-Jun-16 2-Jul-15 20-Jun-16 25-Jul-15 4-Jul-16 24-Feb-16 19-Jul-17 6-Jan-17 100% 100.0%
A545-700-16-48-03341 E C PIPE RACK IN AREA 34 PLAN AT EL. 105.000 (TOS) 0.1 25-May-16 21-Mar-15 8-Jun-16 20-Jun-15 15-Jun-16 2-Jul-15 22-Jun-16 25-Jul-15 6-Jul-16 24-Feb-16 21-Jul-17 6-Jan-17 100% 100.0%
A545-700-81-41-03342 E C PIPE RACK IN AREA 34 PLAN AT EL. 104.750 (TOS) 0.1 27-May-16 23-Mar-15 10-Jun-16 20-Jun-15 17-Jun-16 2-Jul-15 24-Jun-16 25-Jul-15 8-Jul-16 30-Dec-16 23-Sep-16 6-Jan-17 100% 100.0%
A545-700-16-48-03343 PIPE RACK IN AREA 34 PLAN AT EL. 107.000 (TOS) 29-05-2016 23-03-2015 =G321+14 20-07-2015 =J321+7 31-07-2015 =M321+7 24-11-2015 =P321+14 - =S321+77 -
A545-700-16-48-03345 E C PIPE RACK IN AREA 34 EL. Y/AA/AC/AE 0.1 29-Jan-16 23-Mar-15 12-Feb-16 12-Jun-15 19-Feb-16 19-Jun-15 26-Feb-16 26-Jun-15 11-Mar-16 10-Jul-15 27-May-16 3-Feb-16 100% 100.0%
A545-700-16-48-03346 E C PIPE RACK IN AREA 34 EL. Z/AB/AD/AF 0.1 31-Jan-16 23-Mar-15 14-Feb-16 12-Jun-15 21-Feb-16 19-Jun-15 28-Feb-16 26-Jun-15 13-Mar-16 10-Jul-15 29-May-16 3-Feb-16 100% 100.0%
A545-700-16-48-03347 E C PIPE RACK IN AREA 34 EL. 1512,1530,1547,1564 0.1 2-Feb-16 23-Mar-15 16-Feb-16 12-Jun-15 23-Feb-16 19-Jun-15 1-Mar-16 26-Jun-15 15-Mar-16 10-Jul-15 31-May-16 3-Feb-16 100% 100.0%
A545-700-16-48-03348 E C PIPE RACK IN AREA 34 EL. 1513,1531,1548,1565 0.1 4-Feb-16 23-Mar-15 18-Feb-16 12-Jun-15 25-Feb-16 19-Jun-15 3-Mar-16 26-Jun-15 17-Mar-16 10-Jul-15 2-Jun-16 3-Feb-16 100% 100.0%
A545-700-16-48-03351 E C PIPE RACK IN AREA 35 PLAN AT EL.107.000 (TOS) 0.1 4-Jun-16 23-Mar-15 18-Jun-16 20-Jun-15 25-Jun-16 2-Jul-15 2-Jul-16 25-Jul-15 16-Jul-16 24-Feb-16 31-Jul-17 31-Jan-17 100% 100.0%
A545-700-16-48-03352 PIPE RACK IN AREA 35 PLAN AT EL. 104.750 (TOS) 06-06-2016 23-03-2015 =G328+14 20-06-2015 =J328+7 02-07-2015 =M328+7 25-07-2015 =P328+14 - =S328+77 -
A545-700-81-41-03353 E C PIPE RACK IN AREA 35 PLAN AT FLARE LEVEL 0.1 8-Jun-16 23-Mar-15 22-Jun-16 20-Jul-15 29-Jun-16 31-Jul-15 6-Jul-16 24-Nov-15 20-Jul-16 24-Jan-17 5-Oct-16 31-Jan-17 100% 100.0%
A545-700-16-48-03355 E C PIPE RACK IN AREA 35 EL.ALONG GRID AG / AJ 0.1 8-Feb-16 24-Mar-15 22-Feb-16 12-Jun-15 29-Feb-16 19-Jun-15 7-Mar-16 26-Jun-15 21-Mar-16 10-Jul-15 6-Jun-16 3-Feb-16 100% 100.0%
A545-700-16-48-03356 E C PIPE RACK IN AREA 35 EL. ALONG GRID AH/AK 0.1 10-Feb-16 24-Mar-15 24-Feb-16 12-Jun-15 2-Mar-16 19-Jun-15 9-Mar-16 26-Jun-15 23-Mar-16 10-Jul-15 8-Jun-16 3-Feb-16 100% 100.0%
A545-700-16-48-03360 PIPE RACK IN AREA 36 PLAN AT EL 103.000(TOS) 04-06-2016 =K332-22 =G332+14 =N332-7 =J332+7 =Q332-7 =M332+7 =T332-14 =P332+14 10-07-2015 =S332+77 29-10-2015
A545-700-16-48-03370 PIPE RACK IN AREA 37 PLAN AT EL 103.000(TOS) 05-06-2016 =K334-22 =G334+14 =N334-7 =J334+7 =Q334-7 =M334+7 =T334-14 =P334+14 10-07-2015 =S334+77 29-10-2015
A545-700-81-41-03390 E C PIPE RACK IN AREA 39 PLAN AT EL. 103.000 (TOS) 0.1 12-Jun-16 17-Dec-15 26-Jun-16 8-Jan-16 3-Jul-16 12-Feb-16 10-Jul-16 19-Feb-16 24-Jul-16 26-Feb-16 8-Aug-17 31-Jan-17 100% 100.0%
A545-700-81-41-03391 E C PIPE RACK IN AREA 39 PLAN AT EL. 106.500 (TOS) 0.1 14-Jun-16 17-Dec-15 28-Jun-16 8-Jan-16 5-Jul-16 12-Feb-16 12-Jul-16 19-Feb-16 26-Jul-16 26-Feb-16 10-Aug-17 31-Jan-17 100% 100.0%
A545-700-81-41-03392 E C PIPE RACK IN AREA 39 PLAN AT FLARE LVL 0.1 16-Jun-16 17-Dec-15 30-Jun-16 8-Jan-16 7-Jul-16 15-Apr-16 14-Jul-16 22-Apr-16 28-Jul-16 29-Apr-16 12-Aug-17 31-Jan-17 100% 100.0%
A545-700-81-41-04300 E C PIPE RACK IN AREA 40 PLAN AT EL. 103.000 (TOS) 0.1 22-Jun-16 2-Dec-15 6-Jul-16 24-Dec-15 13-Jul-16 31-Dec-15 20-Jul-16 7-Jan-16 3-Aug-16 14-Jan-16 18-Mar-19 14-Jan-16 100% 100.0%
A545-700-81-41-04301 E C PIPE RACK IN AREA 40 PLAN AT EL. 106.500 (TOS) 0.1 24-Jun-16 2-Dec-15 8-Jul-16 24-Dec-15 15-Jul-16 31-Dec-15 22-Jul-16 7-Jan-16 5-Aug-16 14-Jan-16 20-Mar-19 14-Jan-16 100% 100.0%
A545-700-81-41-04302 E C PIPE RACK IN AREA 40 PLAN AT EL. 110.000 (TOS) 0.1 26-Jun-16 2-Dec-15 10-Jul-16 24-Dec-15 17-Jul-16 31-Dec-15 24-Jul-16 7-Jan-16 7-Aug-16 14-Jan-16 22-Mar-19 14-Jan-16 100% 100.0%
Page 557 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 11 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-81-41-04303 E C PIPE RACK IN AREA 40 PLAN AT 113.500(TOS) 0.1 28-Jun-16 2-Dec-15 12-Jul-16 24-Dec-15 19-Jul-16 31-Dec-15 26-Jul-16 7-Jan-16 9-Aug-16 14-Jan-16 24-Mar-19 14-Jan-16 100% 100.0%
A545-700-81-41-04304 PIPE RACK IN AREA 40 PLAN AT FLARE LVL 30-Jun-16 17-Dec-15 14-Jul-16 8-Jan-16 20-May-17 17-Apr-18 27-May-17 24-Apr-18 10-Jun-17 - 26-Aug-17 - 80.0%
A545-700-81-41-04305 E C PIPE RACK IN AREA 40 ELEVATION ALONG GRID S 0.1 2-Jul-16 2-Dec-15 16-Jul-16 24-Dec-15 23-Jul-16 31-Dec-15 30-Jul-16 7-Jan-16 13-Aug-16 14-Jan-16 28-Mar-19 14-Jan-16 100% 100.0%
A545-700-81-41-04306 E C PIPE RACK IN AREA 40 ELEVATION ALONG GRID T 0.1 4-Jul-16 2-Dec-15 18-Jul-16 24-Dec-15 25-Jul-16 31-Dec-15 1-Aug-16 7-Jan-16 15-Aug-16 14-Jan-16 30-Mar-19 14-Jan-16 100% 100.0%
A545-700-81-41-04310 E C PIPE RACK IN AREA 41 PLAN AT EL. 103.000 (TOS) 0.1 6-Jul-16 17-Dec-15 20-Jul-16 8-Jan-16 27-Jul-16 12-Feb-16 3-Aug-16 19-Feb-16 17-Aug-16 26-Feb-16 2-Aug-17 27-Apr-16 100% 100.0%
A545-700-81-41-04311 E C PIPE RACK IN AREA 41 PLAN AT EL. 106.500 (TOS) 0.1 8-Jul-16 17-Dec-15 22-Jul-16 8-Jan-16 29-Jul-16 12-Feb-16 5-Aug-16 19-Feb-16 19-Aug-16 26-Feb-16 4-Aug-17 27-Apr-16 100% 100.0%
A545-700-81-41-04312 E C PIPE RACK IN AREA 41 PLAN AT FLARE LVL 0.1 10-Jul-16 17-Dec-15 24-Jul-16 8-Jan-16 31-Jul-16 16-Apr-16 7-Aug-16 23-Apr-16 21-Aug-16 30-Apr-16 6-Aug-17 27-Apr-16 100% 100.0%
A545-700-81-41-06310 E C PLAN FOR BRIDGE 0.0 16-Jul-16 7-Jan-16 30-Jul-16 29-Jan-16 6-Aug-16 15-Feb-16 13-Aug-16 22-Feb-16 27-Aug-16 27-Apr-16 11-Apr-19 27-Apr-16 100% 100.0%
A545-700-81-41-06311 E C PLAN FOR BRIDGE 0.0 18-Jul-16 7-Jan-16 1-Aug-16 29-Jan-16 8-Aug-16 15-Feb-16 15-Aug-16 22-Feb-16 29-Aug-16 27-Apr-16 13-Apr-19 27-Apr-16 100% 100.0%
A545-700-81-41-06312 E C PLAN FOR BRIDGE 0.0 20-Jul-16 7-Jan-16 3-Aug-16 29-Jan-16 10-Aug-16 15-Feb-16 17-Aug-16 22-Feb-16 31-Aug-16 27-Apr-16 15-Apr-19 27-Apr-16 100% 100.0%
A545-700-81-41-06313 E C PLAN FOR BRIDGE 0.0 22-Jul-16 7-Jan-16 5-Aug-16 29-Jan-16 12-Aug-16 15-Feb-16 19-Aug-16 22-Feb-16 2-Sep-16 27-Apr-16 17-Apr-19 27-Apr-16 100% 100.0%
A545-700-81-41-06314 E C PLAN FOR BRIDGE 0.0 24-Jul-16 7-Jan-16 7-Aug-16 29-Jan-16 14-Aug-16 15-Feb-16 21-Aug-16 22-Feb-16 4-Sep-16 27-Apr-16 19-Apr-19 27-Apr-16 100% 100.0%
A545-700-81-41-06315 E C PLAN FOR BRIDGE 0.0 26-Jul-16 7-Jan-16 9-Aug-16 29-Jan-16 16-Aug-16 15-Feb-16 23-Aug-16 22-Feb-16 6-Sep-16 27-Apr-16 21-Apr-19 27-Apr-16 100% 100.0%
A545-700-81-41-06316 E C PLAN FOR BRIDGE 0.0 28-Jul-16 7-Jan-16 11-Aug-16 29-Jan-16 18-Aug-16 14-Oct-16 25-Aug-16 21-Oct-16 8-Sep-16 28-Oct-16 24-Aug-17 7-Jul-17 100% 100.0%
A545-700-81-41-06317 E C PLAN FOR BRIDGE 0.0 30-Jul-16 7-Jan-16 13-Aug-16 29-Jan-16 20-Aug-16 14-Oct-16 27-Aug-16 21-Oct-16 10-Sep-16 28-Oct-16 26-Aug-17 7-Jul-17 100% 100.0%
A545-700-81-41-06318 E C PLAN FOR BRIDGE 0.0 1-Aug-16 7-Jan-16 15-Aug-16 29-Jan-16 22-Aug-16 19-Oct-16 29-Aug-16 26-Oct-16 13-Jun-17 30-Jun-17 29-Aug-17 7-Jul-17 100% 100.0%
A545-700-81-41-06320 E C ELEVATION FOR BRIDGE 0.0 5-Aug-16 7-Jan-16 19-Aug-16 29-Jan-16 26-Aug-16 18-Feb-16 2-Sep-16 25-Feb-16 16-Sep-16 21-Apr-16 1-May-19 21-Apr-16 100% 100.0%
A545-700-81-41-06321 E C ELEVATION FOR BRIDGE 0.0 7-Aug-16 7-Jan-16 21-Aug-16 29-Jan-16 28-Aug-16 18-Feb-16 4-Sep-16 25-Feb-16 18-Sep-16 21-Apr-16 3-May-19 21-Apr-16 100% 100.0%
A545-700-81-41-06322 E C ELEVATION FOR BRIDGE 0.0 9-Aug-16 7-Jan-16 23-Aug-16 29-Jan-16 30-Aug-16 18-Feb-16 6-Sep-16 25-Feb-16 20-Sep-16 27-Apr-16 5-May-19 27-Apr-16 100% 100.0%
A545-700-81-41-06323 E C ELEVATION FOR BRIDGE 0.0 11-Aug-16 7-Jan-16 25-Aug-16 29-Jan-16 1-Sep-16 18-Feb-16 8-Sep-16 25-Feb-16 22-Sep-16 27-Apr-16 7-May-19 27-Apr-16 100% 100.0%
A545-700-81-41-06324 E C ELEVATION FOR BRIDGE 0.0 13-Aug-16 7-Jan-16 27-Aug-16 29-Jan-16 3-Sep-16 18-Feb-16 10-Sep-16 25-Feb-16 24-Sep-16 2-Jun-16 9-May-19 2-Jun-16 100% 100.0%
A545-700-81-41-06325 E C ELEVATION FOR BRIDGE 0.0 16-Aug-16 7-Jan-16 30-Aug-16 29-Jan-16 6-Sep-16 18-Feb-16 13-Sep-16 25-Feb-16 27-Sep-16 2-Jun-16 12-May-19 2-Jun-16 100% 100.0%
A545-700-81-41-06326 E C ELEVATION FOR BRIDGE 0.0 18-Aug-16 7-Jan-16 1-Sep-16 29-Jan-16 8-Sep-16 11-Oct-16 15-Sep-16 18-Oct-16 29-Sep-16 25-Oct-16 14-May-19 25-Oct-16 100% 100.0%
A545-700-81-41-06327 E C ELEVATION FOR BRIDGE 0.0 20-Aug-16 7-Jan-16 3-Sep-16 29-Jan-16 10-Sep-16 12-Oct-16 17-Sep-16 19-Oct-16 1-Oct-16 26-Oct-16 16-May-19 26-Oct-16 100% 100.0%
A545-700-81-41-06328 ELEVATION FOR BRIDGE 22-08-2016 =K372-22 =G372+14 29-01-2016 =J372+7 - =M372+7 - =P372+14 - =S372+77 -
A545-700-81-41-06329 ELEVATION FOR BRIDGE 24-08-2016 =K373-22 =G373+14 29-01-2016 =J373+7 - =M373+7 - =P373+14 - =S373+77 -
A545-700-16-48-09311 E C PIPE RACK CROSS SECTIONS 0.0 26-Aug-16 7-Jan-16 9-Sep-16 29-Jan-16 16-Sep-16 7-Apr-16 23-Sep-16 14-Apr-16 7-Oct-16 21-Apr-16 14-Jul-17 28-Mar-17 100% 100.0%
A545-700-16-48-09312 E C PIPE RACK CROSS SECTIONS 0.0 28-Aug-16 7-Jan-16 11-Sep-16 29-Jan-16 18-Sep-16 7-Apr-16 25-Sep-16 14-Apr-16 9-Oct-16 21-Apr-16 16-Jul-17 9-Mar-17 100% 100.0%
A545-700-81-41-09313 E C PIPE RACK CROSS SECTIONS 0.0 28-Aug-16 7-Jan-16 11-Sep-16 29-Jan-16 18-Sep-16 18-Nov-17 25-Sep-16 25-Nov-17 9-Oct-16 2-Dec-17 24-May-19 2-Dec-17 100% 100.0%
A545-700-81-41-09315 E C OFFSITE BRIDGE CROSS SECTIONS 0.0 29-Aug-16 7-Jan-16 12-Sep-16 29-Jan-16 19-Sep-16 7-Apr-16 26-Sep-16 14-Apr-16 10-Oct-16 21-Apr-16 25-May-19 21-Apr-16 100% 100.0%
A545-700-81-41-09316 E C OFFSITE BRIDGE CROSS SECTIONS 0.0 30-Aug-16 7-Jan-16 13-Sep-16 29-Jan-16 20-Sep-16 7-Apr-16 27-Sep-16 14-Apr-16 11-Oct-16 21-Apr-16 18-Jul-17 2-Jun-16 100% 100.0%
Page 558 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 12 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-81-41-09317 E C OFFSITE BRIDGE CROSS SECTIONS 0.0 1-Sep-16 28-Apr-16 15-Sep-16 12-May-16 22-Sep-16 19-May-16 29-Sep-16 26-May-16 13-Oct-16 2-Jun-16 8-Apr-19 2-Jun-16 100% 100.0%
A545-700-81-41-09318 &
E C OFFSITE BRIDGE IC CROSS SECTIONS 0.0 3-Sep-16 27-Oct-17 17-Sep-16 10-Nov-17 24-Sep-16 17-Nov-17 1-Oct-16 24-Nov-17 15-Oct-16 1-Dec-17 10-Apr-19 1-Dec-17 100% 100.0%
09319
A545-700-81-41-10851 E C PILE LAYOUT FOR C2 C3 BULLETS 0.0 4-Sep-16 17-Nov-16 18-Sep-16 1-Dec-16 25-Sep-16 8-Dec-16 2-Oct-16 15-Dec-16 16-Oct-16 7-Feb-17 11-Apr-19 7-Feb-17 100% 100.0%
A545-700-81-41-10861 E C PILE LAYOUT FOR 712-MB-1210 A-F & 716-MB-1606 0.0 4-Sep-16 17-Nov-16 18-Sep-16 1-Dec-16 25-Sep-16 8-Dec-16 2-Oct-16 15-Dec-16 16-Oct-16 7-Feb-17 11-Apr-19 7-Feb-17 100% 100.0%
A545-700-81-41-10871 E C PILE LAYOUT FOR 712-MB-1201 A-E 0.0 6-Sep-16 17-Nov-16 20-Sep-16 1-Dec-16 27-Sep-16 8-Dec-16 4-Oct-16 15-Dec-16 18-Oct-16 7-Feb-17 13-Apr-19 7-Feb-17 100% 100.0%
A545-730-16-48-00101 R C SUB STATION-01 PILE LAYOU T 0.1 31-Mar-15 10-Mar-15 14-Apr-15 24-Mar-15 21-Apr-15 26-Mar-15 28-Apr-15 26-Mar-15 12-May-15 26-Mar-15 28-Jul-15 7-Jul-15 100% 100.0%
A545-730-16-48-00102 R C SUB STATION-01 (CDU) GA OF PILECAPS, TB & PB 0.1 2-Apr-15 29-Jun-15 16-Apr-15 13-Jul-15 23-Apr-15 20-Jul-15 30-Apr-15 27-Jul-15 14-May-15 6-May-15 30-Jul-15 17-May-16 100% 100.0%
A545-730-16-48-00104 R C SUB STATION-01 (CDU) GA OF ROOF & ROOF BEAM 0.1 18-Sep-15 2-Jun-15 2-Oct-15 16-Jun-15 9-Oct-15 23-Jun-15 16-Oct-15 30-Jun-15 30-Oct-15 7-Jul-15 3-Dec-16 25-Sep-18 100% 100.0%
A545-730-16-48-10105 R C SUB STATION-01 (CDU) STAIRCASE 0.1 18-Sep-15 12-Sep-18 2-Oct-15 26-Sep-18 9-Oct-15 3-Oct-18 16-Oct-15 10-Oct-18 30-Oct-15 17-Oct-18 20-Mar-19 17-Oct-18 100% 100.0%
A545-730-16-48-00107 E C SUB STATION-01 (CDU) RF DETS OF ROOF BEAMS 0.1 24-Oct-15 25-May-18 7-Nov-15 8-Jun-18 14-Nov-15 15-Jun-18 21-Nov-15 22-Jun-18 5-Dec-15 25-Sep-18 25-Apr-19 25-Sep-18 100% 100.0%
A545-730-16-48-00111 E C SUB STATION-02 (RFCC) PILE LAYOUT 0.1 4-Apr-15 11-Mar-15 18-Apr-15 25-Mar-15 25-Apr-15 26-Mar-15 2-May-15 26-Mar-15 16-May-15 26-Mar-15 1-Aug-15 17-Oct-18 100% 100.0%
A545-730-16-48-00112 E C SUB STATION-02 (RFCC) GA OF PILECAP, TB & PB 0.1 6-Apr-15 22-Mar-15 20-Apr-15 3-Apr-15 27-Apr-15 10-Apr-15 4-May-15 21-Apr-15 18-May-15 6-May-15 21-Jun-16 25-Sep-18 100% 100.0%
A545-730-16-48-10115 E C STAIRCASE SS-02, 03, 04 0.1 3-Oct-15 19-Sep-18 17-Oct-15 26-Sep-18 24-Oct-15 3-Oct-18 31-Oct-15 10-Oct-18 14-Nov-15 17-Oct-18 4-Apr-19 17-Oct-18 100% 100.0%
A545-730-16-48-00118 E C SUB STATION-02 (RFCC) DETS OF COLUMNS 0.1 26-Oct-15 25-May-18 9-Nov-15 8-Jun-18 13-Dec-16 15-Jun-18 20-Dec-16 22-Jun-18 3-Jan-17 23-Aug-18 21-Mar-17 30-Aug-18 100% 100.0%
A545-730-16-48-00121 E C SUB STATION-03 (MS BLOCK) PILE LAYOUT 0.1 8-Apr-15 11-Mar-15 22-Apr-15 25-Mar-15 29-Apr-15 26-Mar-15 6-May-15 26-Mar-15 20-May-15 26-Mar-15 5-Aug-15 4-Jun-16 100% 100.0%
A545-730-16-48-10125 E C STAIRCASE SS-03 0.0 5-Oct-15 22-Jun-18 19-Oct-15 26-Sep-18 26-Oct-15 3-Oct-18 2-Nov-15 10-Oct-18 16-Nov-15 17-Oct-18 6-Apr-19 17-Oct-18 100% 100.0%
Page 559 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 13 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-81-41-10128 E C SUB STATION-03 (MS BLOCK) DETS OF COLUMNS 0.1 28-Oct-15 25-May-18 11-Nov-15 8-Jun-18 18-Nov-15 15-Jun-18 25-Nov-15 22-Jun-18 9-Dec-15 25-Jul-18 29-Apr-19 25-Jul-18 100% 100.0%
A545-730-16-48-00131 E C SS-04 (UNICRACKING) PILE LAYOUT 0.1 12-Apr-15 19-Feb-15 26-Apr-15 5-Mar-15 3-May-15 12-Mar-15 10-May-15 19-Mar-15 24-May-15 26-Mar-15 9-Aug-15 4-Jun-16 100% 100.0%
A545-730-16-48-00132 E C SUB STATION-04 (DHDT) GA & R/F OF PILE CAP 0.1 14-Apr-15 22-Mar-15 28-Apr-15 3-Apr-15 5-May-15 10-Apr-15 12-May-15 21-Apr-15 26-May-15 29-Apr-15 11-Aug-15 6-May-15 100% 100.0%
A545-730-16-48-10135 E C STAIRCASE SS-04 0.0 7-Oct-15 22-Jun-18 14-Mar-19 1-Dec-18 21-Mar-19 8-Dec-18 28-Mar-19 15-Dec-18 11-Apr-19 22-Dec-18 12-May-19 22-Dec-18 100% 100.0%
A545-730-16-48-00137 E C SS-04 (UNICRACKING) RF DETS OF ROOF BEAMS 0.1 30-Oct-15 25-May-18 13-Nov-15 8-Jun-18 20-Nov-15 15-Jun-18 27-Nov-15 22-Jun-18 11-Dec-15 25-Sep-18 2-Mar-19 25-Sep-18 100% 100.0%
A545-730-16-48-00138 E C SS-04 (UNICRACKING) R/F DETS OF COLUMNS 0.1 30-Oct-15 25-May-18 13-Nov-15 8-Jun-18 20-Nov-15 15-Jun-18 27-Nov-15 22-Jun-18 11-Dec-15 25-Jul-18 2-Mar-19 25-Jul-18 100% 100.0%
A545-730-16-48-00141 E C SUB STATION-05 (ALKYLATION) PILE LAYOUT 0.1 16-Apr-15 26-Feb-15 30-Apr-15 5-Mar-15 7-May-15 12-Mar-15 14-May-15 19-Mar-15 28-May-15 26-Mar-15 13-Aug-15 17-Oct-18 100% 100.0%
A545-730-16-48-10145 E C STAIRCASE SS-05 0.0 9-Oct-15 27-Jun-18 23-Oct-15 26-Sep-18 30-Oct-15 3-Oct-18 6-Nov-15 10-Oct-18 20-Nov-15 17-Oct-18 21-Mar-19 17-Oct-18 100% 100.0%
A545-730-16-48-00146 E C SS-05 (ALKYLATION) RF DETS OF FLOOR BEAMS 0.1 29-Sep-15 23-May-18 13-Oct-15 6-Jun-18 20-Oct-15 13-Jun-18 27-Oct-15 20-Jun-18 10-Nov-15 4-Jul-18 11-Mar-19 4-Jul-18 100% 100.0%
A545-730-16-48-00151 E C SUB STATION-06 (SELECT FINING) PILE LAYOUT 0.1 20-Apr-15 19-Feb-15 4-May-15 5-Mar-15 11-May-15 12-Mar-15 18-May-15 19-Mar-15 1-Jun-15 26-Mar-15 17-Aug-15 7-Jul-15 100% 100.0%
A545-730-16-48-10155 E C STAIRCASE SS-06 0.0 12-Oct-15 22-Jun-18 26-Oct-15 26-Sep-18 2-Nov-15 3-Oct-18 9-Nov-15 10-Oct-18 23-Nov-15 17-Oct-18 24-Mar-19 17-Oct-18 100% 100.0%
A545-730-16-48-00161 E C SUB STATION-07 (PPU) PILE LAYOUT 0.1 24-Apr-15 12-Mar-15 8-May-15 26-Mar-15 15-May-15 26-Mar-15 22-May-15 10-Apr-15 5-Jun-15 3-Oct-18 21-Aug-15 17-Oct-18 100% 100.0%
A545-730-16-48-00162 E C SUB STATION-07 (PPU) GA OF PILE CAPS, TB & PB 0.1 26-Apr-15 22-Mar-15 10-May-15 2-Apr-15 17-May-15 15-Apr-15 24-May-15 27-Apr-15 7-Jun-15 7-May-15 23-Aug-15 4-Jul-18 100% 100.0%
A545-730-16-48-00167 E C SUB STATION-07 (PPU) RF DETS OF ROOF BEAMS 0.0 17-Oct-15 5-Jun-18 31-Oct-15 12-Jun-18 7-Nov-15 19-Jun-18 14-Nov-15 26-Jun-18 28-Nov-15 25-Sep-18 29-Mar-19 25-Sep-18 100% 100.0%
A545-730-81-41-10168 E C SUB STATION-07 (PPU) DETS OF COLUMNS 0.0 17-Oct-15 5-Jun-18 31-Oct-15 12-Jun-18 7-Nov-15 19-Jun-18 14-Nov-15 26-Jun-18 28-Nov-15 31-Jul-18 29-Mar-19 31-Jul-18 100% 100.0%
A545-730-16-48-00171 E C SUB STATION-08 PILE LAYOU T 0.1 28-Apr-15 31-Dec-14 12-May-15 14-Jan-15 19-May-15 20-Jan-15 26-May-15 22-Jan-15 9-Jun-15 4-Oct-18 25-Aug-15 18-Oct-18 100% 100.0%
A545-730-81-41-10175 E C SUB STATION-08 DET. OF STAIRCASE 0.1 16-Oct-15 12-Sep-16 30-Oct-15 26-Sep-16 13-Mar-17 4-Oct-18 20-Mar-17 11-Oct-18 3-Apr-17 18-Oct-18 21-Mar-19 18-Oct-18 100% 100.0%
A545-730-16-48-00181 E C SUB STATION-09 (ETP) PILE LAYOUT 0.1 2-May-15 2-Mar-15 16-May-15 16-Mar-15 23-May-15 21-Mar-15 30-May-15 10-Apr-15 13-Jun-15 27-Mar-15 29-Aug-15 18-Oct-18 100% 100.0%
A545-730-16-48-00182 E C SUB STATION-09 (ETP) GA OF PILECAPS, TB & PB 0.1 4-May-15 22-Mar-15 18-May-15 1-Apr-15 25-May-15 10-Apr-15 1-Jun-15 16-Apr-15 15-Jun-15 6-May-15 25-Jan-17 10-Sep-18 100% 100.0%
A545-730-16-48-10185 E C STAIRCASE SS-09 0.0 19-Oct-15 12-Jun-18 2-Nov-15 26-Jun-18 9-Nov-15 4-Oct-18 16-Nov-15 11-Oct-18 30-Nov-15 18-Oct-18 21-Mar-19 18-Oct-18 100% 100.0%
A545-730-16-48-00187 E C SUB STATION-09 (ETP) RF DETS OF ROOF BEAMS 0.0 11-Nov-15 12-Jun-18 25-Nov-15 26-Jun-18 2-Dec-15 11-Sep-18 9-Dec-15 18-Sep-18 23-Dec-15 25-Sep-18 13-Apr-19 25-Sep-18 100% 100.0%
A545-730-81-41-10188 E C SS-09 (ETP) R/F DETAILS OF COLUMNS 0.0 11-Nov-15 12-Jun-18 25-Nov-15 26-Jun-18 2-Dec-15 27-Aug-18 9-Dec-15 3-Sep-18 23-Dec-15 10-Sep-18 13-Apr-19 10-Sep-18 100% 100.0%
A545-730-16-48-00191 E C SUB STATION-10(RO-DM PL.) PILE LAYOUT 0.1 6-May-15 2-Mar-15 20-May-15 16-Mar-15 27-May-15 20-Mar-15 3-Jun-15 10-Apr-15 17-Jun-15 27-Mar-15 2-Sep-15 18-Oct-18 100% 100.0%
A545-730-81-41-01302 E C SUBSTATION 11 & CR2 R/F DETS OF BEAMS 0.1 13-Nov-15 11-Aug-15 27-Nov-15 25-Aug-15 10-Apr-17 16-Feb-19 17-Apr-17 23-Feb-19 1-May-17 2-Mar-19 8-Apr-19 2-Mar-19 100% 100.0%
A545-730-81-41-01303 E C SUBSTATION 11 & CR2 GA ROOF LVL 0.1 13-Nov-15 11-Aug-15 27-Nov-15 25-Aug-15 10-Apr-17 14-Feb-19 17-Apr-17 21-Feb-19 1-May-17 28-Feb-19 8-Apr-19 28-Feb-19 100% 100.0%
A545-730-81-41-01304 E C SUBSTATION 11 & CR2 R/F DETS OF BEAMS 0.1 13-Nov-15 11-Aug-15 27-Nov-15 25-Aug-15 10-Apr-17 20-Feb-19 17-Apr-17 27-Feb-19 1-May-17 6-Mar-19 8-Apr-19 5-Feb-19 100% 100.0%
A545-730-81-41-01306 E C SUBSTATION 11 & CR2 STAIRCASES 0.1 13-Nov-15 11-Aug-15 27-Nov-15 25-Aug-15 10-Apr-17 22-Jan-19 17-Apr-17 29-Jan-19 1-May-17 5-Feb-19 8-Apr-19 5-Feb-19 100% 100.0%
A545-730-81-41-01307 E C SUBSTATION 11 & CR2 GA FIRST FLOOR 0.1 13-Nov-15 11-Aug-15 27-Nov-15 25-Aug-15 10-Apr-17 17-Oct-18 17-Apr-17 24-Oct-18 1-May-17 31-Oct-18 8-Apr-19 31-Oct-18 100% 100.0%
A545-730-81-41-01308 E C SUBSTATION 11 & CR2 R/F DETS OF BEAMS 0.1 13-Nov-15 11-Aug-15 27-Nov-15 25-Aug-15 10-Apr-17 16-Feb-19 17-Apr-17 23-Feb-19 1-May-17 2-Mar-19 8-Apr-19 20-Dec-18 100% 100.0%
A545-730-81-41-00298 E C SUBSTATION 11 & CR2 GA AT TIE BEAM LVL 0.0 16-Nov-15 11-Aug-15 30-Nov-15 25-Aug-15 13-Apr-17 6-Feb-19 20-Apr-17 13-Feb-19 4-May-17 20-Feb-19 11-Apr-19 20-Feb-19 100% 100.0%
Page 561 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 15 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-81-41-00300 E C SUBSTATION 11 & CR2 R/F DETS OF COLUMNS 0.0 16-Nov-15 11-Aug-15 30-Nov-15 25-Aug-15 13-Apr-17 6-Dec-18 20-Apr-17 13-Dec-18 4-May-17 20-Dec-18 11-Apr-19 20-Dec-18 100% 100.0%
A545-730-81-41-01310 E C SUBSTATION 11 & CR2 R/F DETS OF BEAMS 0.0 16-Nov-15 11-Aug-15 30-Nov-15 25-Aug-15 13-Apr-17 20-Feb-19 20-Apr-17 27-Feb-19 4-May-17 6-Mar-19 11-Apr-19 6-Mar-19 100% 100.0%
A545-730-16-48-10201 E C SS-12 (COOLING TOWER-02) PILE LAYOUT 0.1 10-May-15 11-Mar-15 24-May-15 25-Mar-15 31-May-15 31-Mar-15 7-Jun-15 15-Apr-15 21-Jun-15 26-Mar-15 6-Sep-15 18-Aug-15 100% 100.0%
A545-730-16-48-00203 E C SUB STATION-12 GA @ EL 104.250 & TIE BEAM 0.1 26-Sep-15 18-Jun-15 10-Oct-15 25-Jun-15 17-Oct-15 2-Jul-15 24-Oct-15 9-Jul-15 7-Nov-15 16-Jul-15 23-Jan-16 9-Jun-16 100% 100.0%
A545-730-16-48-00204 E C SUB STATION-12 GA OF ROOF & ROOF BEAMS 0.1 10-Oct-15 18-Jun-15 24-Oct-15 25-Jun-15 31-Oct-15 2-Jul-15 7-Nov-15 9-Jul-15 21-Nov-15 16-Jul-15 10-Jul-17 29-Aug-18 100% 100.0%
A545-730-16-48-10205 E C SS-12 STAIRCASE 0.1 23-Oct-15 13-Sep-18 6-Nov-15 27-Sep-18 13-Nov-15 4-Oct-18 20-Nov-15 11-Oct-18 4-Dec-15 18-Oct-18 25-Mar-19 18-Oct-18 100% 100.0%
A545-730-81-41-10208 E C SS-12 (COOLING TOWER-02) DETS OF COLUMNS 0.1 25-Oct-15 31-May-18 8-Nov-15 14-Jun-18 15-Nov-15 21-Jun-18 22-Nov-15 28-Jun-18 6-Dec-15 10-Sep-18 27-Mar-19 10-Sep-18 100% 100.0%
A545-730-16-48-10211 E C SS-13 (COOLING TOWER-03) PILE LAYOUT 0.1 14-May-15 11-Mar-15 28-May-15 25-Mar-15 4-Jun-15 31-Mar-15 11-Jun-15 15-Apr-15 25-Jun-15 26-Mar-15 10-Sep-15 18-Oct-18 100% 100.0%
A545-730-16-48-00213 E C SUB STATION-13 GA @ EL 104.250 & TIE BEAM 0.1 28-Sep-15 26-Jun-15 12-Oct-15 10-Jul-15 19-Oct-15 17-Jul-15 26-Oct-15 24-Jul-15 9-Nov-15 31-Jul-15 25-Jan-16 25-Sep-18 100% 100.0%
A545-730-16-48-00214 E C SUB STATION-13 GA OF ROOF & ROOF BEAMS 0.1 20-Oct-15 11-Jun-15 3-Nov-15 25-Jun-15 10-Nov-15 2-Jul-15 17-Nov-15 9-Jul-15 1-Dec-15 16-Jul-15 16-Feb-16 10-Sep-18 100% 100.0%
A545-730-16-48-10215 E C STAIRCASE SS-13 0.0 26-Oct-15 28-Jun-18 9-Nov-15 27-Sep-18 16-Nov-15 4-Oct-18 23-Nov-15 11-Oct-18 7-Dec-15 18-Oct-18 28-Mar-19 18-Oct-18 100% 100.0%
A545-730-81-41-10218 E C SS-13 (COOLING TOWER-03) DETS OF COLUMNS 0.0 22-Oct-15 28-Jun-18 5-Nov-15 20-Aug-18 12-Nov-15 27-Aug-18 19-Nov-15 3-Sep-18 3-Dec-15 10-Sep-18 24-Mar-19 10-Sep-18 100% 100.0%
A545-730-16-48-00221 E C SUB STATION-14 (CT-04) PILE LAYOUT 0.1 18-May-15 24-Feb-15 1-Jun-15 16-Mar-15 8-Jun-15 25-Mar-15 15-Jun-15 7-Apr-15 29-Jun-15 17-Mar-15 14-Sep-15 18-Aug-15 100% 100.0%
A545-730-81-41-00227 E C SS-14 (RWTP) RF DETS OF ROOF BEAMS 0.0 20-Nov-15 14-Jun-18 4-Dec-15 28-Jun-18 11-Dec-15 11-Sep-18 18-Dec-15 18-Sep-18 1-Jan-16 25-Sep-18 22-Apr-19 25-Sep-18 100% 100.0%
A545-730-81-41-10228 E C SS-14 (RWTP) R/F DETAILS OF COLUMNS 0.0 20-Nov-15 14-Jun-18 4-Dec-15 28-Jun-18 11-Dec-15 27-Aug-18 18-Dec-15 3-Sep-18 1-Jan-16 10-Sep-18 22-Apr-19 10-Sep-18 100% 100.0%
A545-730-81-41-06014 E C PILE LAYOUT SS-14 POWER TRANSFORMERS 0.0 20-Nov-15 14-Jun-18 4-Dec-15 28-Jun-18 11-Dec-15 16-Nov-18 18-Dec-15 23-Nov-18 1-Jan-16 30-Nov-18 22-Apr-19 30-Nov-18 100% 100.0%
A545-730-16-48-00231 E C SS-15 (CRUDE TANK FARM) PILE LAYOUT 0.1 22-May-15 11-Mar-15 5-Jun-15 25-Mar-15 12-Jun-15 31-Mar-15 19-Jun-15 10-Apr-15 3-Jul-15 26-Mar-15 18-Sep-15 18-Oct-18 100% 100.0%
A545-730-16-48-10235 E C STAIRCASE SS-15 0.0 13-Jul-15 22-Jun-18 27-Jul-15 27-Sep-18 3-Aug-15 4-Oct-18 10-Aug-15 11-Oct-18 24-Aug-15 18-Oct-18 2-Apr-19 18-Oct-18 100% 100.0%
A545-730-81-41-02046 E C SST-14 & SST-15 False Ceiling Layout 0.1 25-Jun-15 28-Jun-18 9-Jul-15 10-Oct-18 16-Jul-15 17-Oct-18 23-Jul-15 24-Oct-18 6-Aug-15 31-Oct-18 15-Mar-19 31-Oct-18 100% 100.0%
A545-730-16-48-00241 E C SUBSTATION-16 PILE LAYOUT 0.1 27-May-15 29-Dec-14 10-Jun-15 12-Jan-15 17-Jun-15 19-Jan-15 24-Jun-15 3-Mar-15 8-Jul-15 17-Mar-15 23-Sep-15 2-Jul-15 100% 100.0%
A545-730-16-48-00242 E C SUBSTATION-16 GA & R/F DET. FOR PILE CAP 0.1 29-May-15 30-Dec-14 12-Jun-15 13-Jan-15 19-Jun-15 19-Jan-15 26-Jun-15 3-Mar-15 10-Jul-15 6-May-15 26-Feb-17 28-Dec-17 100% 100.0%
A545-730-16-48-10245 E C SS-16 STAIRCASE 0.1 15-Jul-15 13-Sep-18 29-Jul-15 27-Sep-18 5-Aug-15 4-Oct-18 12-Aug-15 11-Oct-18 26-Aug-15 18-Oct-18 4-Apr-19 18-Oct-18 100% 100.0%
A545-730-16-48-00251 E C SS-17 (INT. TANK FARM) PILE LAYOUT 0.1 22-Mar-15 2-Mar-15 5-Apr-15 16-Mar-15 12-Apr-15 30-Mar-15 19-Apr-15 30-Mar-15 3-May-15 17-Mar-15 19-Jul-15 14-Jul-15 100% 100.0%
A545-730-81-41-10255 E C SS-17 STAIRCASE 0.1 15-Jul-15 13-Sep-18 29-Jul-15 27-Sep-18 5-Aug-15 4-Oct-18 12-Aug-15 11-Oct-18 26-Aug-15 18-Oct-18 4-Apr-19 18-Oct-18 100% 100.0%
A545-730-16-48-00261 E C SS-18 (ADMINIST. AREA) PILE LAYOUT 0.1 24-Mar-15 2-Mar-15 7-Apr-15 16-Mar-15 14-Apr-15 30-Mar-15 21-Apr-15 30-Mar-15 5-May-15 17-Mar-15 21-Jul-15 18-Oct-18 100% 100.0%
A545-730-81-41-10265 E C STAIRCASE SS-18 0.0 17-Jul-15 30-Jun-18 31-Jul-15 27-Sep-18 7-Aug-15 4-Oct-18 14-Aug-15 11-Oct-18 28-Aug-15 18-Oct-18 6-Apr-19 18-Oct-18 100% 100.0%
A545-730-16-48-00268 E C SS-18 (ADMINIST. AREA) DETS OF COLUMNS 0.0 15-Aug-15 30-Jun-18 29-Aug-15 20-Aug-18 5-Sep-15 27-Aug-18 12-Sep-15 3-Sep-18 26-Sep-15 10-Sep-18 5-May-19 10-Sep-18 100% 100.0%
A545-730-16-48-00271 E C SUBSTATION-19 PILE LAYOUT 0.1 28-Mar-15 30-Dec-14 11-Apr-15 13-Jan-15 18-Apr-15 5-Mar-15 25-Apr-15 12-Mar-15 9-May-15 26-Mar-15 25-Jul-15 28-Sep-16 100% 100.0%
A545-730-16-48-00272 E C SUBSTATION-19 PILE CAP & PLINTH BEAMS 0.1 30-Mar-15 10-Mar-15 13-Apr-15 21-Jan-15 20-Apr-15 25-Jan-15 27-Apr-15 31-Jan-15 11-May-15 6-May-15 28-Dec-16 4-Jul-18 100% 100.0%
A545-730-16-48-00274 E C SUBSTATION-19 ROOF SLAB 0.1 11-May-15 2-Jun-15 25-May-15 16-Jun-15 1-Jun-15 23-Jun-15 8-Jun-15 30-Jun-15 22-Jun-15 7-Jul-15 8-Feb-17 30-Aug-18 100% 100.0%
A545-730-16-48-10275 E C SUBSTATION-01, 05, 06, 19 DET. OF STAIRCASE 0.1 18-Jun-15 24-Aug-16 2-Jul-15 7-Sep-16 9-Jul-15 14-Sep-16 16-Jul-15 21-Sep-16 30-Jul-15 28-Sep-16 8-Mar-19 28-Sep-16 100% 100.0%
A545-730-16-48-00276 E C SUBSTATION-19 RF DETS OF FLOOR BEAMS 0.0 18-Jun-15 6-Jun-18 2-Jul-15 13-Jun-18 9-Jul-15 20-Jun-18 16-Jul-15 27-Jun-18 30-Jul-15 4-Jul-18 8-Mar-19 4-Jul-18 100% 100.0%
Page 563 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 17 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-48-00277 E C SUBSTATION-19 RF DETS OF ROOF BEAMS 0.0 18-Jun-15 30-Jun-18 2-Jul-15 6-Sep-18 9-Jul-15 13-Sep-18 16-Jul-15 20-Sep-18 30-Jul-15 27-Sep-18 8-Mar-19 27-Sep-18 100% 100.0%
A545-730-81-41-10278 E C SS-19 (PIPELINE PRODUCT) R/F DETAILS OF COLU 0.0 18-Jun-15 30-Jun-18 2-Jul-15 20-Aug-18 9-Jul-15 27-Aug-18 16-Jul-15 3-Sep-18 30-Jul-15 10-Sep-18 8-Mar-19 10-Sep-18 100% 100.0%
A545-730-16-48-00279 E C SUB STATION-19 RF OF PILECAPS, PL.BEAMS 0.1 18-May-17 20-Jul-17 1-Jun-17 3-Aug-17 8-Jun-17 10-Aug-17 15-Jun-17 17-Aug-17 29-Jun-17 24-Aug-17 12-Sep-17 4-Jul-18 100% 100.0%
A545-730-16-48-00276 E C SUBSTATION-19 RF DETS OF FLOOR BEAMS 0.1 20-May-17 30-May-18 3-Jun-17 13-Jun-18 10-Jun-17 20-Jun-18 17-Jun-17 27-Jun-18 1-Jul-17 4-Jul-18 10-Mar-19 4-Jul-18 100% 100.0%
A545-730-81-41-06019 E C PILE LAYOUT SS-19 POWER TRANSFORMERS 0.1 22-May-17 2-Nov-18 5-Jun-17 9-Nov-18 12-Jun-17 16-Nov-18 19-Jun-17 23-Nov-18 3-Jul-17 30-Nov-18 12-Mar-19 30-Nov-18 100% 100.0%
A545-730-16-48-00291 E C SUBSTATION 11 & CR2 PILE LAYOUT 0.1 5-Apr-15 5-Mar-15 19-Apr-15 19-Mar-15 26-Apr-15 25-Mar-15 3-May-15 31-Mar-15 17-May-15 18-May-15 3-Jan-17 27-Dec-17 100% 100.0%
A545-730-16-48-00292 E C SUBSTATION 11 & CR2 PILE CAP LAYOUT 0.1 7-Apr-15 11-Mar-15 21-Apr-15 25-Mar-15 28-Apr-15 27-Mar-15 5-May-15 31-Mar-15 19-May-15 18-May-15 5-Jan-17 30-Aug-18 100% 100.0%
A545-730-16-48-00293 E C SUBSTATION 11 & CR2 GA OF PLINTH BEAMS 0.1 9-Apr-15 22-Aug-15 26-Nov-16 24-Mar-17 3-Dec-16 9-Jul-18 10-Dec-16 16-Jul-18 24-Dec-16 23-Jul-18 31-Mar-19 23-Jul-18 100% 100.0%
A545-730-16-48-00294 E C SUBSTATION 11 & CR2 GA & R/F DET. OF FF SLAB 0.1 16-May-15 22-Aug-15 2-Jan-17 15-Oct-18 9-Jan-17 22-Oct-18 16-Jan-17 29-Oct-18 30-Jan-17 5-Nov-18 7-May-19 5-Nov-18 100% 100.0%
A545-730-16-48-00295 E C SUBSTATION 11 & CR2 GA & R/F DET OF SF 0.0 6-Jun-15 22-Aug-15 23-Jan-17 28-Dec-18 30-Jan-17 4-Jan-19 6-Feb-17 11-Jan-19 20-Feb-17 18-Jan-19 28-May-19 18-Jan-19 100% 100.0%
A545-730-81-41-01305 E C SUBSTATION 11 & CR2 STAIRCASES 0.0 6-Jun-15 22-Aug-15 23-Jan-17 14-Dec-18 30-Jan-17 21-Dec-18 6-Feb-17 28-Dec-18 20-Feb-17 4-Jan-19 28-May-19 4-Jan-19 100% 100.0%
A545-730-16-48-00296 E C SUBSTATION 11 & CR2 GA & R/F DET OF ROOF 0.1 10-Jul-15 22-Aug-15 28-Mar-19 27-Apr-19 4-Apr-19 4-May-19 11-Apr-19 11-May-19 25-Apr-19 16-May-19 31-Aug-19 - 85% 85.0%
A545-730-16-48-00297 E C SUBSTATION 11 & CR2 GA AT TIE BEAM LEVEL 0.1 23-Jul-15 22-Aug-15 11-Mar-17 5-Feb-19 18-Mar-17 12-Feb-19 25-Mar-17 19-Feb-19 8-Apr-17 26-Feb-19 26-Mar-19 26-Feb-19 100% 100.0%
A545-730-81-41-00299 E C SUBSTATION 11 & CR2 R/F PL. BEAMS & PILECAP 0.1 23-Jul-15 18-Jun-18 11-Mar-17 2-Jul-18 18-Mar-17 9-Jul-18 25-Mar-17 16-Jul-18 8-Apr-17 23-Jul-18 26-Mar-19 23-Jul-18 100% 100.0%
A545-730-16-48-00531 E C MCR-01 -MAIN CONTROL ROOM PILE LAYOUT 0.1 11-Apr-15 16-Nov-15 25-Apr-15 7-Mar-16 2-May-15 14-Mar-16 9-May-15 21-Mar-16 23-May-15 27-May-16 9-Apr-19 27-May-16 100% 100.0%
A545-730-81-41-00533 E C MCR GA OF PLINTH BEAM 0.0 13-Apr-15 16-Nov-15 27-Apr-15 8-Dec-18 4-May-15 15-Dec-18 11-May-15 22-Dec-18 25-May-15 29-Dec-18 11-Apr-19 29-Dec-18 100% 100.0%
A545-730-16-48-10311 E C CR -03 TANKFARM PILE LAYOUT 0.1 15-Apr-15 2-Mar-15 29-Apr-15 16-Mar-15 6-May-15 23-Mar-15 13-May-15 30-Mar-15 27-May-15 23-Apr-15 12-Aug-15 14-Feb-19 100% 100.0%
A545-730-16-48-00312 E C CR-03 TANK FARM GA & R/F DET. OF PILE CAP 0.1 17-Apr-15 28-Apr-15 1-May-15 12-May-15 8-May-15 19-May-15 15-May-15 26-May-15 29-May-15 5-May-16 15-Jan-17 27-Feb-19 100% 100.0%
A545-730-81-41-00515 E C CR 03 (TANK FARM) R/F DET OF COL & WALL 0.1 20-Apr-15 31-Mar-16 4-May-15 14-Apr-16 11-May-15 21-Apr-16 18-May-15 28-Apr-16 1-Jun-15 5-May-16 18-Jan-17 30-Nov-18 100% 100.0%
A545-730-81-41-00516 E C CR 03 (TANK FARM) GA & R/F DET OF ROOF SLAB 0.1 22-Apr-15 21-Apr-16 6-May-15 5-May-16 13-May-15 12-May-16 20-May-15 19-May-16 3-Jun-15 26-May-16 19-Aug-15 2-Jun-16 100% 100.0%
A545-730-81-41-00517 E C CR 03 (TANK FARM) GA & R/F DET OF ROOF BEAM 0.1 24-Apr-15 21-Apr-16 8-May-15 5-May-16 15-May-15 12-May-16 22-May-15 19-May-16 5-Jun-15 26-May-16 21-Aug-15 2-Jun-16 100% 100.0%
A545-730-81-41-12101 E C CR-03-Tank Farm False Ceiling Plan 0.1 24-Apr-15 10-Jan-19 8-May-15 24-Jan-19 15-May-15 31-Jan-19 22-May-15 7-Feb-19 5-Jun-15 14-Feb-19 22-Apr-19 14-Feb-19 100% 100.0%
A545-730-16-48-10321 E C CR-04-LOADING PILE LAYOUT 0.1 19-Apr-15 23-Feb-15 3-May-15 9-Mar-15 10-May-15 16-Mar-15 17-May-15 23-Mar-15 31-May-15 23-Apr-15 16-Aug-15 27-Feb-19 100% 100.0%
A545-730-16-48-00322 E C CR-04-LOADING GA & R/F DET. OF PILE CAP 0.1 21-Apr-15 4-May-15 5-May-15 18-May-15 12-May-15 25-May-15 19-May-15 1-Jun-15 2-Jun-15 9-May-16 19-Jan-17 14-Aug-18 100% 100.0%
A545-730-81-41-00519 E C CR-04(LOADING) GA&RF DET OF ROOF SLAB 0.1 28-Apr-15 26-Apr-16 12-May-15 10-May-16 19-May-15 17-May-16 26-May-15 24-May-16 9-Jun-15 31-May-16 26-Jan-17 14-Aug-18 100% 100.0%
A545-730-81-41-00520 E C CR-04(LOADING) GA&RF DET OF ROOF FLOOR 0.1 30-Apr-15 26-Apr-16 14-May-15 10-May-16 21-May-15 17-May-16 28-May-15 24-May-16 11-Jun-15 31-May-16 28-Jan-17 14-Aug-18 100% 100.0%
A545-730-16-48-10331 E C CR-05-ETP PILE LAYOUT 0.1 23-Apr-15 2-Mar-15 7-May-15 16-Mar-15 14-May-15 22-Mar-15 21-May-15 2-Apr-15 4-Jun-15 17-Apr-15 20-Aug-15 19-May-15 100% 100.0%
A545-730-16-48-00332 E C CR-05-ETP GA & R/F DET. OF PILE CAP 0.1 25-Apr-15 28-Apr-15 9-May-15 12-May-15 16-May-15 19-May-15 23-May-15 26-May-15 6-Jun-15 26-Apr-16 23-Jan-17 6-Jul-17 100% 100.0%
A545-730-81-41-10334 E C CR-05 GA RF DET.OF ROOF 0.1 28-Apr-15 22-Mar-16 12-May-15 5-Apr-16 19-May-15 12-Apr-16 26-May-15 19-Apr-16 9-Jun-15 26-Apr-16 26-Jan-17 5-Jul-17 100% 100.0%
A545-730-81-41-00335 E C CR-05,06 R/F DETOF ROOF FLOOR BEAM 0.1 30-Apr-15 22-Mar-16 14-May-15 5-Apr-16 21-May-15 12-Apr-16 28-May-15 19-Apr-16 11-Jun-15 26-Apr-16 28-Jan-17 5-Jul-17 100% 100.0%
A545-730-81-41-10336 E C CR-05 RF/DET OF COL. 0.1 30-Apr-15 22-Mar-16 14-May-15 5-Apr-16 21-May-15 12-Apr-16 28-May-15 19-Apr-16 11-Jun-15 26-Apr-16 28-Jan-17 5-Jul-17 100% 100.0%
A545-730-81-41-02103 E C CR-05,06 & 08 FALSE CEILING PLAN 0.1 30-Apr-15 23-Jan-19 14-May-15 6-Feb-19 21-May-15 13-Feb-19 28-May-15 20-Feb-19 11-Jun-15 27-Feb-19 28-Apr-19 27-Feb-19 100% 100.0%
A545-730-16-48-10341 E C CR-06-WATER BLOCK PILE LAYOUT 0.1 27-Apr-15 2-Mar-15 11-May-15 16-Mar-15 18-May-15 22-Mar-15 25-May-15 2-Apr-15 8-Jun-15 17-Apr-15 24-Aug-15 19-May-15 100% 100.0%
A545-730-16-48-00342 E C CR-06-WATER BLOCK GA & R/F DET. OF PILE CAP 0.1 29-Apr-15 28-Apr-15 13-May-15 12-May-15 20-May-15 19-May-15 27-May-15 26-May-15 10-Jun-15 27-Apr-16 27-Jan-17 5-Jul-17 100% 100.0%
A545-730-81-41-10375 E C CR-06 GA/RF DET. COL. 0.1 2-May-15 23-Mar-16 16-May-15 6-Apr-16 23-May-15 13-Apr-16 30-May-15 20-Apr-16 13-Jun-15 27-Apr-16 30-Jan-17 5-Jul-17 100% 100.0%
A545-730-81-41-10376 E C CR-06 GA/RF DET ROOFSLAB/BEAM 0.1 2-May-15 23-Mar-16 16-May-15 6-Apr-16 23-May-15 13-Apr-16 30-May-15 20-Apr-16 13-Jun-15 27-Apr-16 30-Jan-17 5-Jul-17 100% 100.0%
A545-730-16-48-10351 E C CR-07-N2 PLANT PILE LAYOUT 0.1 1-May-15 9-Mar-15 15-May-15 23-Mar-15 22-May-15 28-Mar-15 29-May-15 10-Apr-15 12-Jun-15 26-Apr-16 29-Jan-17 30-Aug-18 100% 100.0%
A545-730-16-48-00352 E C CR-07-N2 PLANT GA & R/F DET. OF PILE CAP 0.1 3-May-15 31-Jul-15 17-May-15 12-Oct-15 24-May-15 19-Oct-15 31-May-15 26-Oct-15 14-Jun-15 26-Feb-16 31-Jan-17 10-Jul-17 100% 100.0%
A545-730-81-41-10354 E C CR-07(N2 PLANT) GA/RF DET. OF ROOF 0.1 5-May-15 31-Jul-15 19-May-15 12-Jun-17 26-May-15 19-Jun-17 2-Jun-15 26-Jun-17 16-Jun-15 3-Jul-17 2-Feb-17 10-Jul-17 100% 100.0%
A545-730-81-41-10581 E C CR-8 RWTP PILE LAYOUT 0.1 22-Apr-15 31-Jul-15 6-May-15 14-Jun-17 13-May-15 21-Jun-17 20-May-15 28-Jun-17 3-Jun-15 5-Jul-17 20-Jan-17 7-Sep-18 100% 100.0%
A545-730-81-41-10582 E C CR-8 RWTP R/F DET.PILE CAP 0.1 22-Apr-15 31-Jul-15 6-May-15 14-Jun-17 13-May-15 21-Jun-17 20-May-15 28-Jun-17 3-Jun-15 5-Jul-17 20-Jan-17 7-Sep-18 100% 100.0%
A545-730-81-41-10584 E C CR-8 RWTP GA & R/F DET.OF ROOF SLAB 0.1 6-May-15 31-Jul-15 20-May-15 14-Jun-17 27-May-15 21-Jun-17 3-Jun-15 28-Jun-17 17-Jun-15 5-Jul-17 3-Feb-17 7-Sep-18 100% 100.0%
A545-730-81-41-00353 E C CR-07(N2 PLANT) GA/RF DET. OF COLUMNS 0.1 4-May-15 22-Feb-16 18-May-15 7-Mar-16 25-May-15 14-Mar-16 1-Jun-15 21-Mar-16 15-Jun-15 28-Mar-16 1-Feb-17 10-Jul-17 100% 100.0%
A545-730-16-48-00355 E C GA & RF DETAIL OF COLUMN 0.1 5-May-15 22-Feb-16 19-May-15 7-Mar-16 26-May-15 14-Mar-16 2-Jun-15 21-Mar-16 16-Jun-15 28-Mar-16 2-Feb-17 30-Aug-18 100% 100.0%
A545-730-81-41-06007 E C PILE LAYOUT SS-07 POWER TRANSFORMERS 0.1 7-May-15 2-Nov-18 21-May-15 9-Nov-18 28-May-15 16-Nov-18 4-Jun-15 23-Nov-18 18-Jun-15 30-Nov-18 5-May-19 30-Nov-18 100% 100.0%
A545-730-81-41-06002 E C PILE LAYOUT SS-02 POWER TRANSFORMERS 0.1 9-May-15 2-Nov-18 23-May-15 9-Nov-18 30-May-15 16-Nov-18 6-Jun-15 23-Nov-18 20-Jun-15 30-Nov-18 7-May-19 30-Nov-18 100% 100.0%
A545-730-81-41-02104 E C CR-02-Power Block(SS-11) False Ceiling Plan 0.1 11-May-15 28-Mar-19 25-May-15 4-Apr-19 1-Jun-15 11-Apr-19 8-Jun-15 18-Apr-19 22-Jun-15 25-Apr-19 9-May-19 25-Apr-19 100% 100.0%
A545-730-16-48-10381 E C EXTRUDER CONTROL ROOM PILE LAYOUT 0.1 13-May-15 2-Mar-15 27-May-15 16-Mar-15 3-Jun-15 31-Mar-15 10-Jun-15 15-Apr-15 24-Jun-15 21-May-15 9-Sep-15 8-Jun-15 100% 100.0%
A545-730-81-41-02102 E C CONTROL ROOM -04 FALSE CEILING PLAN 0.0 17-May-15 24-Jan-19 31-May-15 7-Feb-19 7-Jun-15 14-Feb-19 14-Jun-15 21-Feb-19 28-Jun-15 28-Feb-19 15-May-19 28-Feb-19 100% 100.0%
A545-730-16-48-10499 E C GA & RF DETAIL OF COLUMN AND ROOF BEAMS 0.0 17-May-15 25-Jul-16 31-May-15 8-Aug-16 7-Jun-15 15-Aug-16 14-Jun-15 22-Aug-16 28-Jun-15 29-Aug-16 14-Feb-17 9-Jan-19 100% 100.0%
A545-730-81-41-00500 E C ECR R/F DET OF ROOF SLAB BEAM 0.0 19-May-15 25-Jul-16 2-Jun-15 8-Aug-16 9-Jun-15 15-Aug-16 16-Jun-15 22-Aug-16 30-Jun-15 29-Aug-16 16-Feb-17 24-Aug-18 100% 100.0%
A545-730-81-41-00558 E C PPWH GA & R/F DETAIL OF ROOF BEAM & SLAB 0.0 19-May-15 5-Dec-18 2-Jun-15 19-Dec-18 9-Jun-15 26-Dec-18 16-Jun-15 2-Jan-19 30-Jun-15 9-Jan-19 17-May-19 9-Jan-19 100% 100.0%
A545-730-16-48-10391 E C MARINE CONTROL ROOM PILE LAYOUT 0.1 17-May-15 28-Apr-15 31-May-15 12-May-15 7-Jun-15 19-May-15 14-Jun-15 26-May-15 28-Jun-15 23-Dec-15 13-Sep-15 24-Aug-18 100% 100.0%
A545-730-81-41-00514 E C MARINE CONTROL ROOM RF DET OF ROOF 0.1 28-May-15 23-Apr-16 11-Jun-15 7-May-16 18-Jun-15 14-May-16 25-Jun-15 21-May-16 9-Jul-15 28-May-16 25-Feb-17 7-Sep-18 100% 100.0%
A545-730-81-41-00535 E C MCR GA OF LOWER ROOF BEAM 0.1 28-May-15 1-Mar-19 11-Jun-15 15-Mar-19 18-Jun-15 22-Mar-19 25-Jun-15 29-Mar-19 9-Jul-15 5-Apr-19 25-Feb-17 5-Apr-19 100% 100.0%
A545-730-81-41-00536 E C MCR R/F DETAILS OF LOWER ROOF BEAM 0.1 28-May-15 1-Mar-19 11-Jun-15 15-Mar-19 18-Jun-15 22-Mar-19 25-Jun-15 29-Mar-19 9-Jul-15 5-Apr-19 25-Feb-17 5-Apr-19 100% 100.0%
A545-730-81-41-00537 E C MCR GA OF UPPER ROOF BEAM 0.1 28-May-15 1-Mar-19 11-Jun-15 15-Mar-19 18-Jun-15 22-Mar-19 25-Jun-15 29-Mar-19 9-Jul-15 5-Apr-19 25-Feb-17 5-Apr-19 100% 100.0%
A545-730-81-41-00538 E C MCR R/F DETAIL OF UPPER ROOF BEAM 0.1 28-May-15 1-Mar-19 11-Jun-15 15-Mar-19 18-Jun-15 22-Mar-19 25-Jun-15 29-Mar-19 9-Jul-15 5-Apr-19 25-Feb-17 5-Apr-19 100% 100.0%
A545-730-81-41-00539 E C MCR GA & DETAIL OF LOWER ROOF BEAM 0.1 28-May-15 1-Mar-19 11-Jun-15 15-Mar-19 18-Jun-15 22-Mar-19 25-Jun-15 29-Mar-19 9-Jul-15 5-Apr-19 25-Feb-17 5-Apr-19 100% 100.0%
A545-730-81-41-00540 E C GA & R/F DET OF VIEWING GALLERY 0.1 28-May-15 19-Mar-19 11-Jun-15 2-Apr-19 18-Jun-15 9-Apr-19 25-Jun-15 16-Apr-19 9-Jul-15 23-Apr-19 25-Feb-17 23-Apr-19 100% 100.0%
A545-730-16-48-10401 E C SRR-01 (CDU) PILE LAYOUT 0.1 21-May-15 2-Mar-15 4-Jun-15 16-Mar-15 11-Jun-15 25-Mar-15 18-Jun-15 10-Apr-15 2-Jul-15 16-Apr-15 17-Sep-15 7-May-15 100% 100.0%
A545-730-16-48-00402 E C SRR-01 (CDU) GA & R/F DET. OF PILE CAP 0.1 23-May-15 25-Mar-15 6-Jun-15 15-Apr-15 13-Jun-15 30-Apr-15 20-Jun-15 14-May-15 4-Jul-15 17-Jul-15 20-Feb-17 10-Aug-18 100% 100.0%
A545-730-16-48-00405 E C SRR-01 (CDU) RF DET OF 1ST FLOOR BEAM 0.1 24-May-15 20-Jul-18 7-Jun-15 3-Aug-18 14-Jun-15 10-Aug-18 21-Jun-15 17-Aug-18 5-Jul-15 24-Aug-18 22-May-19 24-Aug-18 100% 100.0%
A545-730-16-48-00406 E C GA & R/F DET. OF ROOF SLAB FOR SRR-01 (CDU) 0.1 26-May-15 18-Aug-15 9-Jun-15 1-Sep-15 16-Jun-15 8-Sep-15 23-Jun-15 15-Sep-15 7-Jul-15 22-Sep-15 22-Sep-15 30-Sep-15 100% 100.0%
A545-730-16-48-00407 E C SRR-01 (CDU) R/F DET OF ROOF SLAB BEAM 0.1 26-May-15 18-Aug-15 9-Jun-15 1-Sep-15 16-Jun-15 8-Sep-15 23-Jun-15 15-Sep-15 7-Jul-15 24-Aug-18 24-May-19 24-Aug-18 100% 100.0%
A545-730-16-48-00408 E C SRR-01 (CDU) GA& RF DET OF STAIR CASE 0.1 26-May-15 18-Aug-15 9-Jun-15 1-Sep-15 16-Jun-15 8-Sep-15 23-Jun-15 15-Sep-15 7-Jul-15 7-Sep-18 24-May-19 7-Sep-18 100% 100.0%
A545-730-16-48-10411 E C SRR-02 (RFCC) PILE LAYOUT 0.1 25-May-15 2-Mar-15 8-Jun-15 16-Mar-15 15-Jun-15 25-Mar-15 22-Jun-15 10-Apr-15 6-Jul-15 16-Apr-15 21-Sep-15 27-Jul-15 100% 100.0%
A545-730-16-48-00412 E C SRR-02 (RFCC) GA & R/F DET. OF PILE CAP 0.1 27-May-15 25-Mar-15 10-Jun-15 15-Apr-15 17-Jun-15 30-Apr-15 24-Jun-15 11-May-15 8-Jul-15 17-Jul-15 24-Feb-17 25-Apr-18 100% 100.0%
A545-730-16-48-00415 E C SRR-02 (RFCC) RF DET OF 1ST FLOOR BEAM 0.1 28-May-15 27-Jul-18 11-Jun-15 10-Aug-18 18-Jun-15 17-Aug-18 25-Jun-15 24-Aug-18 9-Jul-15 31-Aug-18 26-May-19 31-Aug-18 100% 100.0%
A545-730-16-48-00417 E C SRR-02 (RFCC) R/F DET OF ROOF SLAB BEAM 0.1 30-May-15 27-Jul-18 13-Jun-15 10-Aug-18 20-Jun-15 17-Aug-18 27-Jun-15 24-Aug-18 11-Jul-15 31-Aug-18 28-May-19 31-Aug-18 100% 100.0%
A545-730-16-48-00418 E C SRR-02 (RFCC) GA& RF DET OF STAIR CASE 0.1 30-May-15 3-Aug-18 13-Jun-15 17-Aug-18 20-Jun-15 24-Aug-18 27-Jun-15 31-Aug-18 11-Jul-15 7-Sep-18 28-May-19 7-Sep-18 100% 100.0%
A545-730-16-48-10421 E C SRR-03 (NHT CCR HGU) PILE LAYOUT 0.1 29-May-15 2-Mar-15 12-Jun-15 16-Mar-15 19-Jun-15 25-Mar-15 26-Jun-15 10-Apr-15 10-Jul-15 16-Apr-15 25-Sep-15 7-Sep-18 100% 100.0%
A545-730-16-48-00424 E C GA & R/F Det. Of First Floor for SRR-03 0.1 1-Jun-15 22-Jul-15 15-Jun-15 5-Aug-15 22-Jun-15 12-Aug-15 29-Jun-15 19-Aug-15 13-Jul-15 26-Aug-15 28-Sep-15 9-Sep-15 100% 100.0%
A545-730-16-48-00426 E C GA & R/F DET. OF ROOF SLAB FOR SRR-03 0.1 3-Jun-15 12-Aug-15 17-Jun-15 26-Aug-15 24-Jun-15 2-Sep-15 1-Jul-15 9-Sep-15 15-Jul-15 16-Sep-15 30-Sep-15 30-Sep-15 100% 100.0%
Page 566 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 20 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-48-00428 E C SRR-03 (M S BLOCK) GA& RF DET OF STAIR CASE 0.1 3-Jun-15 3-Aug-18 17-Jun-15 17-Aug-18 24-Jun-15 24-Aug-18 1-Jul-15 31-Aug-18 15-Jul-15 7-Sep-18 2-Apr-19 7-Sep-18 100% 100.0%
A545-730-16-48-10431 E C SRR-04 (DHDT) PILE LAYOUT 0.1 2-Jun-15 2-Mar-15 16-Jun-15 16-Mar-15 23-Jun-15 25-Mar-15 30-Jun-15 10-Apr-15 14-Jul-15 16-Apr-15 29-Sep-15 27-Jul-15 100% 100.0%
A545-730-16-48-00432 E C SRR-04 (DHDT) GA & R/F DET. OF PILE CAP 0.1 4-Jun-15 25-Mar-15 18-Jun-15 15-Apr-15 25-Jun-15 30-Apr-15 2-Jul-15 12-May-15 16-Jul-15 20-Jul-15 4-Mar-17 27-Aug-18 100% 100.0%
A545-730-16-48-00434 E C GA & R/F Det. Of First Floor for SRR-04 (DHDT) 0.1 5-Jun-15 22-Jul-15 19-Jun-15 5-Aug-15 26-Jun-15 12-Aug-15 3-Jul-15 19-Aug-15 17-Jul-15 26-Aug-15 2-Oct-15 9-Sep-15 100% 100.0%
A545-730-16-48-10441 E C SRR-05 (ALKYLATION) PILE LAYOUT 0.1 6-Jun-15 2-Mar-15 20-Jun-15 16-Mar-15 27-Jun-15 28-Mar-15 4-Jul-15 7-Apr-15 18-Jul-15 16-Apr-15 3-Oct-15 26-Sep-18 100% 100.0%
A545-730-16-48-00442 E C SRR-05 (ALKYLATION) GA & R/F DET. OF PILE CAP 0.1 8-Jun-15 25-Mar-15 22-Jun-15 15-Apr-15 29-Jun-15 30-Apr-15 6-Jul-15 11-May-15 20-Jul-15 20-Jul-15 8-Mar-17 26-Sep-18 100% 100.0%
A545-730-16-48-10451 E C SRR-06 (PRIME G & HGU) PILE LAYOUT 0.1 10-Jun-15 2-Mar-15 24-Jun-15 16-Mar-15 1-Jul-15 25-Mar-15 8-Jul-15 10-Apr-15 22-Jul-15 16-Apr-15 7-Oct-15 7-May-15 100% 100.0%
A545-730-16-48-10461 E C SRR-07 (PPU) PILE LAYOUT 0.1 14-Jun-15 2-Mar-15 28-Jun-15 16-Mar-15 5-Jul-15 25-Mar-15 12-Jul-15 10-Apr-15 26-Jul-15 15-May-15 11-Oct-15 12-Oct-18 100% 100.0%
A545-730-16-48-00462 E C SRR-07 (PPU) GA & R/F DET. OF PILE CAP 0.1 16-Jun-15 25-Mar-15 30-Jun-15 15-Apr-15 7-Jul-15 30-Apr-15 14-Jul-15 15-May-15 28-Jul-15 20-Jul-15 16-Mar-17 4-Sep-18 100% 100.0%
A545-730-16-48-00463 E C SRR (07) (PPU) GA & REF. DET. COLUMNS 0.1 17-Jun-15 15-Jul-15 1-Jul-15 19-Aug-15 8-Jul-15 26-Aug-15 15-Jul-15 30-Sep-15 29-Jul-15 7-Oct-15 14-Oct-15 19-Oct-15 100% 100.0%
A545-730-16-48-00464 E C SRR (07) (PPU) GA & REF. OF FIRST FLOOR SLAB 0.1 19-Jun-15 15-Jul-15 3-Jul-15 19-Aug-15 10-Jul-15 26-Aug-15 17-Jul-15 13-Oct-15 31-Jul-15 20-Oct-15 16-Oct-15 12-Oct-18 100% 100.0%
A545-730-16-48-00466 E C SRR (07) (PPU) GA & REF. DETAIL OF ROOF SLAB 0.1 23-Jun-15 15-Jul-15 7-Jul-15 19-Aug-15 14-Jul-15 26-Aug-15 21-Jul-15 23-Sep-15 4-Aug-15 13-Nov-15 20-Oct-15 12-Oct-18 100% 100.0%
Page 567 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 21 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-48-00467 E C SRR (07) (PPU) GA & REF. DETAIL OF STAIRCASE 0.1 25-Jun-15 20-Oct-15 9-Jul-15 28-Jan-16 25-Feb-17 28-Sep-18 4-Mar-17 5-Oct-18 18-Mar-17 12-Oct-18 15-Mar-19 12-Oct-18 100% 100.0%
A545-730-16-48-10471 E C SRR-08 (SULPHUR BLOCK) PILE LAYOUT 0.1 18-Jun-15 2-Mar-15 2-Jul-15 16-Mar-15 9-Jul-15 25-Mar-15 16-Jul-15 10-Apr-15 30-Jul-15 15-May-15 15-Oct-15 12-Oct-18 100% 100.0%
A545-730-16-48-10481 E C SRR-09 (TANK FARM) PILE LAYOUT 0.1 22-Jun-15 2-Mar-15 6-Jul-15 16-Mar-15 13-Jul-15 25-Mar-15 20-Jul-15 10-Apr-15 3-Aug-15 16-Apr-15 19-Oct-15 17-Jul-15 100% 100.0%
A545-730-16-48-00482 E C SRR-09 (TANK FARM) GA & R/F DET FOR PILE CAP 0.1 24-Jun-15 25-Mar-15 8-Jul-15 15-Apr-15 15-Jul-15 30-Apr-15 22-Jul-15 12-May-15 5-Aug-15 17-Jul-15 24-Mar-19 17-Jul-15 100% 100.0%
A545-730-16-48-00483 E C GA & REF. DET. COLUMNS SRR (09) (TANK FARM) 0.1 25-Jun-15 15-Jul-15 9-Jul-15 19-Aug-15 16-Jul-15 26-Aug-15 23-Jul-15 24-Sep-15 6-Aug-15 8-Oct-15 22-Oct-15 20-Oct-15 100% 100.0%
A545-730-16-48-10491 E C SRR-10 CRUDE REC TERMINAL PILE LAYOUT 0.1 26-Jun-15 27-Feb-15 10-Jul-15 7-Mar-15 17-Jul-15 10-Mar-15 24-Jul-15 25-Mar-15 7-Aug-15 16-Apr-15 23-Oct-15 7-May-15 100% 100.0%
A545-730-81-41-10499 E C ECR GA & R/F DET COL RCC WALL 0.1 5-Jul-15 29-Mar-16 19-Jul-15 5-Apr-16 26-Jul-15 12-Apr-16 2-Aug-15 19-Apr-16 16-Aug-15 26-Apr-16 31-Aug-19 - 85% 85.0%
A545-730-81-41-10500 E C ECR R/F DET OF ROOF SLAB BEAM 0.1 7-Jul-15 29-Mar-16 21-Jul-15 5-Apr-16 28-Jul-15 12-Apr-16 4-Aug-15 19-Apr-16 18-Aug-15 26-Apr-16 31-Aug-19 - 85% 85.0%
A545-730-16-48-10501 E C SRR-11 PRODUCT REC TERMIN PILE LAYOUT 0.1 30-Jun-15 2-Mar-15 14-Jul-15 16-Mar-15 21-Jul-15 25-Mar-15 28-Jul-15 10-Apr-15 11-Aug-15 16-Apr-15 27-Oct-15 11-May-15 100% 100.0%
A545-730-81-41-06004 E C PILE LAYOUT SS-04 POWER TRANSFORMERS 0.1 3-Jul-15 24-Oct-15 17-Jul-15 30-Jan-16 5-Mar-17 15-Sep-17 12-Mar-17 22-Sep-17 26-Mar-17 30-Nov-18 23-Mar-19 30-Nov-18 100% 100.0%
A545-730-81-41-06006 E C PILE LAYOUT SS-06 POWER TRANSFORMERS 0.1 3-Jul-15 24-Oct-15 17-Jul-15 30-Jan-16 5-Mar-17 15-Sep-17 12-Mar-17 22-Sep-17 26-Mar-17 30-Nov-18 23-Mar-19 30-Nov-18 100% 100.0%
A545-730-81-41-00554 E C PPWH GA & R/F DETAIL OF PLINTH BEAM 0.1 3-Jul-15 24-Oct-15 17-Jul-15 30-Jan-16 5-Mar-17 15-Sep-17 12-Mar-17 22-Sep-17 26-Mar-17 1-Aug-18 23-Mar-19 1-Aug-18 100% 100.0%
A545-730-81-41-00555 E C PPWH GA & R/F DETAIL OF TIE BEAM 0.1 7-Jul-15 24-Oct-15 21-Jul-15 30-Jan-16 9-Mar-17 15-Sep-17 16-Mar-17 22-Sep-17 30-Mar-17 1-Aug-18 27-Mar-19 1-Aug-18 100% 100.0%
A545-730-81-41-00556 E C PPWH GA & R/F DETAIL OF GUTTER BEAM 0.1 7-Jul-15 24-Oct-15 21-Jul-15 30-Jan-16 9-Mar-17 14-Aug-18 16-Mar-17 21-Aug-18 30-Mar-17 28-Aug-18 27-Mar-19 28-Aug-18 100% 100.0%
A545-730-81-41-00565 E C PPWH GA & R/F DETAIL OF COLUMNS 0.1 7-Jul-15 24-Oct-15 21-Jul-15 30-Jan-16 9-Mar-17 22-Jan-19 16-Mar-17 29-Jan-19 30-Mar-17 5-Feb-19 27-Mar-19 5-Feb-19 100% 100.0%
A545-740-81-41-10130 E C WORKERS CANTEEN FALSE CEILING PLAN 0.1 4-Jul-15 23-Mar-15 18-Jul-15 6-Apr-15 25-Jul-15 15-Apr-15 1-Aug-15 9-Jul-15 15-Aug-15 9-Jan-19 3-Apr-19 9-Jan-19 100% 100.0%
A545-730-16-48-30017 E C WASTE OIL PIT RF DETAIL 0.1 3-Jan-17 7-Dec-18 17-Jan-17 14-Dec-18 6-Sep-18 21-Dec-18 13-Sep-18 28-Dec-18 27-Sep-18 4-Jan-19 13-Dec-18 11-Jan-19 100% 100.0%
A545-740-81-41-00200 E C Catalyst Warehouse FALSE CEILING PLAN 0.1 4-Jul-15 23-Mar-15 18-Jul-15 6-Apr-15 25-Jul-15 15-Apr-15 1-Aug-15 9-Jul-15 15-Aug-15 11-Jan-19 3-Apr-19 11-Jan-19 100% 100.0%
A545-740-81-41-02083 E C PLANT GATE HOUSE FALSE CEILLING PLAN 0.1 4-Jul-15 23-Mar-15 18-Jul-15 6-Apr-15 25-Jul-15 15-Apr-15 1-Aug-15 9-Jul-15 15-Aug-15 23-Jan-19 3-Apr-19 23-Jan-19 100% 100.0%
A545-740-81-41-02084 E C FIRE STATION FALSE CEILLINGPLAN 0.1 4-Jul-15 23-Mar-15 18-Jul-15 6-Apr-15 25-Jul-15 15-Apr-15 1-Aug-15 9-Jul-15 15-Aug-15 23-Jan-19 3-Apr-19 23-Jan-19 100% 100.0%
A545-740-16-48-00101 E C FIRE WATER PUMP HOUSE PILE LAYOUT 0.1 4-Jul-15 23-Mar-15 18-Jul-15 6-Apr-15 25-Jul-15 15-Apr-15 1-Aug-15 9-Jul-15 15-Aug-15 19-Nov-15 31-Oct-15 3-Dec-15 100% 100.0%
A545-740-16-48-00103 E C FW PUMP HOUSE-GA & R/F OF SLAB & TIE BEAMS 0.1 18-Aug-15 31-Jul-15 1-Sep-15 14-Aug-15 8-Sep-15 21-Aug-15 15-Sep-15 28-Aug-15 29-Sep-15 3-Oct-15 15-Dec-15 13-Mar-18 100% 100.0%
A545-740-16-48-00111 E C TREATED RW PUMP HOUSE PILE LAYOUT 0.1 6-Jan-17 24-Jul-17 11-Mar-19 1-May-19 18-Mar-19 6-May-19 25-Mar-19 11-May-19 8-Apr-19 16-May-19 31-Aug-19 - 85% 85.0%
A545-740-16-48-00112 E C TREATED RW PH-GA & R/F OF FDN&PLINTH BEAM 0.1 13-Jan-17 24-Jul-17 18-Mar-19 1-May-19 25-Mar-19 6-May-19 1-Apr-19 11-May-19 15-Apr-19 16-May-19 31-Aug-19 - 85% 85.0%
A545-740-16-48-00115 TREATED RW PUMP HOUSE MISC 28-09-2015 - =G622+14 - #VALUE! - #VALUE! - #VALUE! - =S622+77 -
A545-740-16-48-00121 E C FIRE STATION PILE LAYOUT 0.1 8-Jul-15 3-Mar-15 22-Jul-15 17-Mar-15 29-Jul-15 21-Mar-15 5-Aug-15 22-Mar-15 19-Aug-15 22-Mar-15 4-Nov-15 26-Mar-15 100% 100.0%
A545-740-16-48-00122 E C FIRE STATION GA & R/F DET OF FDN 0.1 29-Jul-15 5-Mar-15 12-Aug-15 28-Mar-15 19-Aug-15 5-Apr-15 26-Aug-15 15-Apr-15 9-Sep-15 23-Apr-15 25-Nov-15 30-Apr-15 100% 100.0%
A545-740-81-41-00123 E C FIRE STATION GA & DET OF PLINTH BEAMS 0.1 19-Aug-15 16-May-15 2-Sep-15 30-May-15 9-Sep-15 6-Jun-15 16-Sep-15 13-Jun-15 30-Sep-15 10-Jul-15 16-Dec-15 24-Jul-15 100% 100.0%
A545-740-16-48-00124 E C FIRE STATION GA& R/F DET OF COLUMNS 0.1 22-Aug-15 1-Jun-15 5-Sep-15 15-Jun-15 12-Sep-15 22-Jun-15 19-Sep-15 29-Jun-15 3-Oct-15 10-Jul-15 19-Dec-15 24-Jul-15 100% 100.0%
A545-740-16-48-00127 E C FIRE STATION GA & R/F DETAIL OF STAIRCASE 0.1 24-Oct-15 12-Jun-15 7-Nov-15 26-Jun-15 14-Nov-15 3-Jul-15 21-Nov-15 10-Jul-15 5-Dec-15 4-Sep-15 20-Feb-16 14-Sep-15 100% 100.0%
A545-740-16-48-00131 E C CANTEEN BUILDING PILE LAYOUT 0.1 2-Apr-15 27-Feb-15 16-Apr-15 13-Mar-15 23-Apr-15 17-Mar-15 30-Apr-15 24-Mar-15 14-May-15 31-Mar-15 30-Jul-15 7-Apr-15 100% 100.0%
Page 569 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 23 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-740-16-48-00133 E C CANTEEN BUILDING GA & R/F DET OF BEAMS 0.1 7-May-15 12-Jun-15 21-May-15 26-Jun-15 28-May-15 3-Jul-15 4-Jun-15 10-Jul-15 18-Jun-15 16-Sep-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00134 E C CANTEEN BUILDING GA & R/F DET OF COL 0.1 11-May-15 19-Aug-15 25-May-15 26-Aug-15 1-Jun-15 2-Sep-15 8-Jun-15 9-Sep-15 22-Jun-15 16-Sep-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00135 E C CANTEEN BUILDING GA OF ROOF BEAMS 0.1 25-May-15 3-Aug-15 8-Jun-15 17-Aug-15 15-Jun-15 24-Aug-15 22-Jun-15 31-Aug-15 6-Jul-15 14-Sep-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00136 E C CANTEEN BUILDING R/F DETAILS OF ROOF BEAMS 0.1 8-Jun-15 3-Aug-15 22-Jun-15 17-Aug-15 29-Jun-15 24-Aug-15 6-Jul-15 31-Aug-15 20-Jul-15 14-Sep-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00141 E C WAREHOUSE BUILDING PILE LAYOUT 0.1 4-Apr-15 22-Feb-15 18-Apr-15 8-Mar-15 25-Apr-15 12-Mar-15 2-May-15 19-Mar-15 16-May-15 26-Mar-15 1-Aug-15 4-Sep-15 100% 100.0%
A545-740-16-48-00142 E C WAREHOUSE GA & R/F DET OF FDN 0.1 18-Apr-15 29-Jul-15 2-May-15 12-Aug-15 9-May-15 19-Aug-15 16-May-15 26-Aug-15 30-May-15 2-Sep-15 15-Aug-15 16-Sep-15 100% 100.0%
A545-740-16-48-00143 E C WAREHOUSE GA & R/F DET OF BEAMS 0.1 25-Apr-15 29-Jul-15 9-May-15 12-Aug-15 16-May-15 19-Aug-15 23-May-15 26-Aug-15 6-Jun-15 2-Sep-15 22-Aug-15 16-Sep-15 100% 100.0%
A545-740-16-48-00144 E C WAREHOUSE GA & R/F DET OF COL 0.1 2-May-15 26-Jun-15 16-May-15 10-Jul-15 23-May-15 17-Jul-15 30-May-15 24-Jul-15 13-Jun-15 2-Sep-15 29-Aug-15 16-Sep-15 100% 100.0%
A545-740-16-48-00145 E C WAREHOUSE GA & DET OF TIE BEAMS 0.1 9-May-15 26-Jun-15 23-May-15 10-Jul-15 30-May-15 17-Jul-15 6-Jun-15 24-Jul-15 20-Jun-15 2-Sep-15 5-Sep-15 16-Sep-15 100% 100.0%
A545-740-16-48-00146 E C WAREHOUSE GA & DET OF ROOF BEAMS 0.1 23-May-15 26-Jun-15 6-Jun-15 10-Jul-15 13-Jun-15 17-Jul-15 20-Jun-15 24-Jul-15 4-Jul-15 1-Sep-15 19-Sep-15 11-Sep-15 100% 100.0%
A545-740-16-48-00147 E C WAREHOUSE GA & DET OF ROOF SLAB 0.1 6-Jun-15 26-Jun-15 20-Jun-15 10-Jul-15 27-Jun-15 17-Jul-15 4-Jul-15 24-Jul-15 18-Jul-15 1-Sep-15 3-Oct-15 11-Sep-15 100% 100.0%
A545-740-16-48-00148 E C WAREHOUSE GA & DET OF GANTRY GIRDER 0.1 20-Jun-15 26-Jun-15 4-Jul-15 10-Jul-15 11-Jul-15 17-Jul-15 18-Jul-15 24-Jul-15 1-Aug-15 1-Sep-15 17-Oct-15 11-Sep-15 100% 100.0%
A545-740-16-48-00149 E C WAREHOUSE GA & DET OF PORTAL TYPE ROOF 0.1 27-Jun-15 8-Aug-15 11-Jul-15 15-Aug-15 18-Jul-15 22-Aug-15 25-Jul-15 29-Aug-15 8-Aug-15 5-Sep-15 24-Oct-15 15-Sep-15 100.0%
A545-740-16-48-00151 E C LAB BUILDING PILE LAYOUT 0.1 6-Apr-15 2-Jul-15 20-Apr-15 16-Jul-15 27-Apr-15 23-Jul-15 4-May-15 30-Jul-15 18-May-15 7-Sep-15 3-Aug-15 17-Sep-15 100% 100.0%
A545-740-16-48-00153 E C LAB BUILDING GA& R/F DET OF COL 0.1 20-Apr-15 6-Aug-15 4-May-15 20-Aug-15 11-May-15 27-Aug-15 18-May-15 3-Sep-15 1-Jun-15 17-Sep-15 9-Mar-19 17-Sep-15 100% 100.0%
A545-740-16-48-00154 E C LAB BUILDING GA& R/F DET OF 1ST FLOOR SLAB 0.1 4-May-15 3-Aug-15 18-May-15 17-Aug-15 25-May-15 24-Aug-15 1-Jun-15 31-Aug-15 15-Jun-15 17-Sep-15 23-Mar-19 17-Sep-15 100% 100.0%
A545-740-16-48-00155 E C LAB BUILDING GA & R/F DET OF ROOF SLAB 0.1 18-May-15 3-Aug-15 1-Jun-15 17-Aug-15 8-Jun-15 24-Aug-15 15-Jun-15 31-Aug-15 29-Jun-15 17-Sep-15 6-Apr-19 17-Sep-15 100% 100.0%
A545-740-16-48-00156 E C LAB BUILDING GA& R/F DET STAIRCASE 0.1 22-Jun-15 3-Aug-15 6-Jul-15 17-Aug-15 13-Jul-15 24-Aug-15 20-Jul-15 31-Aug-15 3-Aug-15 17-Sep-15 11-May-19 17-Sep-15 100% 100.0%
A545-740-81-41-00952 E C LAB BUILDING R/F DET OF PILE CAPS 0.1 22-Jun-15 3-Aug-15 6-Jul-15 17-Aug-15 13-Jul-15 24-Aug-15 20-Jul-15 31-Aug-15 3-Aug-15 25-Feb-19 31-Aug-19 - 85% 85.0%
A545-740-81-41-02088 E C LAB BUILDING FALSE CEILING LAYOUT PLAN 0.1 22-Jun-15 3-Aug-15 6-Jul-15 17-Aug-15 13-Jul-15 24-Aug-15 20-Jul-15 31-Aug-15 3-Aug-15 26-Apr-19 21-Apr-19 26-Apr-19 100% 100.0%
A545-740-16-48-00171 E C ADMIN BUILDING PILE LAYOUT 0.1 10-Apr-15 17-Mar-15 24-Apr-15 31-Mar-15 1-May-15 15-Apr-15 8-May-15 25-Apr-15 22-May-15 8-May-15 7-Aug-15 22-May-15 100% 100.0%
A545-740-16-48-00172 /
E C ADMIN BUILDING GA& R/F DET OF FDN 0.1 17-Apr-15 12-May-15 1-May-15 26-May-15 8-May-15 2-Jun-15 15-May-15 9-Jun-15 9-Mar-19 25-Feb-19 9-Apr-19 25-Feb-19 100% 100.0%
00173
A545-740-16-48-00174 E C ADMIN BUILDING GA& R/F DET OF COL 0.1 8-May-15 19-May-15 22-May-15 2-Jun-15 29-May-15 9-Jun-15 5-Jun-15 16-Jun-15 19-Jun-15 4-Dec-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00178 E C ADMIN BUILDING G.A. & R/F. DET. OF STAIRS 0.1 7-Aug-15 19-May-15 21-Aug-15 2-Jun-15 28-Aug-15 9-Jun-15 4-Sep-15 16-Jun-15 18-Sep-15 4-Dec-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-10201 E C SATELLITE FIRE STATION PILE LAYOUT 0.1 16-Apr-15 6-Mar-15 30-Apr-15 20-Mar-15 7-May-15 31-Mar-15 14-May-15 15-Apr-15 28-May-15 30-Apr-15 13-Aug-15 29-Jun-15 100% 100.0%
A545-740-16-48-00202 E C SATELLITE FIRE STATION GA& R/F DET OF FDN 0.1 17-Aug-15 6-Mar-15 31-Aug-15 20-Mar-15 7-Sep-15 31-Mar-15 14-Sep-15 15-Apr-15 28-Sep-15 9-May-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-10203 E C SATELLITE FIRE STATION GA& R/F DET OF COL 0.1 7-May-15 1-Jun-15 21-May-15 8-Jun-15 28-May-15 15-Jun-15 4-Jun-15 22-Jun-15 18-Jun-15 29-Jun-15 31-Aug-19 - 85% 85.0%
Page 570 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 24 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-740-16-48-00204 E C SATELLITE FIRE STATION GA& R/F DET OF SLAB 0.1 11-Jun-15 1-Jun-15 25-Jun-15 8-Jun-15 2-Jul-15 15-Jun-15 9-Jul-15 22-Jun-15 23-Jul-15 29-Jun-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00221 E C CATALYST WAREHOUSE PILE LAYOUT 0.1 20-Apr-15 22-Feb-15 4-May-15 8-Mar-15 11-May-15 15-Mar-15 18-May-15 19-Mar-15 1-Jun-15 26-Mar-15 17-Aug-15 4-Sep-15 100% 100.0%
A545-740-16-48-00231 E C WORKSHOP PILE LAYOUT 0.1 22-Apr-15 13-Mar-15 6-May-15 27-Mar-15 13-May-15 5-Apr-15 20-May-15 15-Apr-15 3-Jun-15 23-Apr-15 19-Aug-15 30-Apr-15 100% 100.0%
A545-740-16-48-00232 E C WORKSHOP GA& R/F DET OF FDN 0.1 6-May-15 31-Jul-15 20-May-15 14-Aug-15 27-May-15 21-Aug-15 3-Jun-15 28-Aug-15 17-Jun-15 4-Sep-15 2-Sep-15 17-Sep-15 100% 100.0%
A545-740-16-48-00233 E C WORKSHOP GA& R/F DET OF BEAMS 0.1 13-May-15 31-Jul-15 27-May-15 14-Aug-15 3-Jun-15 21-Aug-15 10-Jun-15 28-Aug-15 24-Jun-15 4-Sep-15 9-Sep-15 17-Sep-15 100% 100.0%
A545-740-16-48-00234 E C WORKSHOP GA & DET OF PLINTH BEAM 0.1 20-May-15 31-Jul-15 3-Jun-15 14-Aug-15 10-Jun-15 21-Aug-15 17-Jun-15 28-Aug-15 1-Jul-15 2-Sep-15 16-Sep-15 9-Sep-15 100% 100.0%
A545-740-16-48-00235 E C WORKSHOP GA & DET OF TIE BEAMS 0.1 27-May-15 31-Jul-15 10-Jun-15 14-Aug-15 17-Jun-15 21-Aug-15 24-Jun-15 28-Aug-15 8-Jul-15 7-Sep-15 23-Sep-15 17-Sep-15 100% 100.0%
A545-740-16-48-00236 E C WORKSHOP GA & DET OF ROOF BEAMS 0.1 10-Jun-15 26-Jun-15 24-Jun-15 10-Jul-15 1-Jul-15 17-Jul-15 8-Jul-15 24-Jul-15 22-Jul-15 7-Sep-15 7-Oct-15 17-Sep-15 100% 100.0%
A545-740-16-48-00237 E C WORKSHOP GA & DET OF TIE ROOF SLAB 0.1 24-Jun-15 26-Jun-15 8-Jul-15 10-Jul-15 15-Jul-15 17-Jul-15 22-Jul-15 24-Jul-15 5-Aug-15 7-Sep-15 21-Oct-15 17-Sep-15 100% 100.0%
A545-740-16-48-00238 E C WORKSHOP GA & DET OF GANTRY GIRDER 0.1 8-Jul-15 27-Jul-15 22-Jul-15 10-Aug-15 29-Jul-15 17-Aug-15 5-Aug-15 24-Aug-15 19-Aug-15 7-Sep-15 4-Nov-15 17-Sep-15 100% 100.0%
A545-740-16-48-00239 E C WORKSHOP GA & DET OF PORTAL TYPE ROOF 0.1 10-Jul-15 27-Jul-15 24-Jul-15 10-Aug-15 31-Jul-15 17-Aug-15 7-Aug-15 24-Aug-15 21-Aug-15 7-Sep-15 6-Nov-15 17-Sep-15 100% 100.0%
A545-740-81-41-00240 E C WORKSHOP GA & DET OF PORTAL TYPE ROOF 0.1 22-Jul-15 27-Jul-15 5-Aug-15 20-Aug-15 12-Aug-15 27-Aug-15 19-Aug-15 3-Sep-15 2-Sep-15 17-Sep-15 18-Nov-15 23-Sep-15 100% 100.0%
A545-740-81-41-02087 E C WORKSHOP FALSE CEILING PLAN-FIRST 0.1 22-Jul-15 27-Jul-15 5-Aug-15 11-Jan-19 12-Aug-15 18-Jan-19 19-Aug-15 25-Jan-19 2-Sep-15 8-Feb-19 31-Aug-19 - 85% 85.0%
A545-740-16-48-00241 E C ADMIN GATE HOUSE PILE LAYOUT 0.1 24-Apr-15 11-Feb-15 8-May-15 25-Feb-15 15-May-15 4-Mar-15 22-May-15 11-Mar-15 5-Jun-15 18-Mar-15 21-Aug-15 1-Apr-15 100% 100.0%
A545-740-16-48-00242 E C ADMIN GATE HOUSE GA& R/F DET OF PILECAPS 0.1 11-May-15 25-Mar-15 25-May-15 1-Apr-15 1-Jun-15 5-Apr-15 8-Jun-15 9-Apr-15 22-Jun-15 16-Apr-15 7-Sep-15 30-Apr-15 100% 100.0%
A545-740-16-48-00243 E C ADMIN GATE HOUSE GA & DET OF PLINTH BEAMS 0.1 18-May-15 1-Apr-15 1-Jun-15 15-Apr-15 8-Jun-15 25-Apr-15 15-Jun-15 7-May-15 29-Jun-15 31-Aug-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00244 E C ADMIN GATE HOUSE GA& R/F DET OF COL 0.1 25-May-15 4-Apr-15 8-Jun-15 20-Apr-15 15-Jun-15 30-Apr-15 22-Jun-15 14-May-15 6-Jul-15 31-Aug-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00245 E C ADMIN GATE HOUSE GA OF ROOF SLAB & BEAM 0.1 25-Jun-15 4-Apr-15 9-Jul-15 20-Apr-15 16-Jul-15 30-Apr-15 23-Jul-15 14-May-15 6-Aug-15 31-Aug-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00246 E C ADMIN GATE HOUSE R/F DET OF ROOF BEAMS 0.1 9-Jul-15 20-Jul-15 23-Jul-15 3-Aug-15 30-Jul-15 10-Aug-15 6-Aug-15 17-Aug-15 20-Aug-15 31-Aug-15 5-Nov-15 8-Sep-15 100% 100.0%
A545-740-16-48-00251 E C PLANT GATE HOUSE PILE LAYOUT 0.1 27-Apr-15 13-Mar-15 11-May-15 27-Mar-15 18-May-15 7-Apr-15 25-May-15 13-Apr-15 8-Jun-15 20-Apr-15 24-Aug-15 30-Apr-15 100% 100.0%
A545-740-16-48-00252 E C PLANT GATE HOUSE GA & R/F DET OF FDN 0.1 11-May-15 20-Mar-15 25-May-15 4-Apr-15 1-Jun-15 10-Apr-15 8-Jun-15 22-Apr-15 22-Jun-15 28-Apr-15 7-Sep-15 8-May-15 100% 100.0%
A545-740-16-48-00253 E C PLANT GATE HOUSE GA & DET OF PLINTH BEAMS 0.1 18-May-15 1-Apr-15 1-Jun-15 20-Apr-15 8-Jun-15 30-Apr-15 15-Jun-15 7-May-15 29-Jun-15 31-Aug-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00254 E C PLANT GATE HOUSE GA& R/F DET OF COL 0.1 25-May-15 23-Apr-15 8-Jun-15 7-May-15 15-Jun-15 14-May-15 22-Jun-15 21-May-15 6-Jul-15 31-Aug-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00255 E C PLANT GATE HOUSE GA OF ROOF SLAB & BEAMS 0.1 25-Jun-15 16-Apr-15 9-Jul-15 30-Apr-15 16-Jul-15 7-May-15 23-Jul-15 14-May-15 6-Aug-15 31-Aug-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00256 E C PLANT GATE HOUSE R/F DET OF ROOF BEAMS 0.1 9-Jul-15 29-Jul-15 23-Jul-15 12-Aug-15 30-Jul-15 19-Aug-15 6-Aug-15 25-Aug-15 20-Aug-15 8-Sep-15 5-Nov-15 9-Sep-15 100% 100.0%
A545-740-81-41-10261 E C MAIN FAN OFFICE PILE LAYOUT 0.1 29-Apr-15 5-Jun-15 13-May-15 19-Jun-15 20-May-15 26-Jun-15 27-May-15 3-Jul-15 10-Jun-15 17-Jul-15 26-Aug-15 24-Jul-15 100% 100.0%
A545-740-81-41-10262 E C MAIN FAN OFFICE PILE CAPS & PLINTH BEAMS 0.1 13-May-15 5-Jun-15 27-May-15 19-Jun-15 3-Jun-15 26-Jun-15 10-Jun-15 3-Jul-15 24-Jun-15 17-Jul-15 9-Sep-15 24-Jul-15 100% 100.0%
Page 571 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 25 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-740-81-41-10263 E C MAIN FAN OFFICE ROOF SLAB, BEAMS & COLS. 0.1 20-May-15 5-Jun-15 3-Jun-15 19-Jun-15 10-Jun-15 26-Jun-15 17-Jun-15 3-Jul-15 1-Jul-15 17-Jul-15 16-Sep-15 24-Jul-15 100% 100.0%
A545-740-16-48-30271 E C SEALING OFFICE PILE LAYOUT 0.1 1-May-15 4-Feb-15 15-May-15 18-Feb-15 22-May-15 25-Feb-15 29-May-15 2-Mar-15 12-Jun-15 9-Mar-15 28-Aug-15 16-Mar-15 100% 100.0%
A545-740-16-48-30273 E C SEALING OFFICE GA & R/F DET OF ROOF SLAB 0.1 3-Jun-15 19-Mar-15 17-Jun-15 2-Apr-15 24-Jun-15 9-Apr-15 1-Jul-15 16-Apr-15 15-Jul-15 15-Jun-15 30-Sep-15 29-Jun-15 100% 100.0%
A545-740-16-48-10401 E C SEALING OFFICE DETAIL OF FOLDING PLATFORM 0.1 5-Jun-15 15-Jun-15 19-Jun-15 22-Jun-15 26-Jun-15 29-Jun-15 3-Jul-15 6-Jul-15 17-Jul-15 13-Jul-15 31-Aug-19 - 85% 85.0%
A545-740-16-48-00281 E C WORKERS CANTEEN PILE LAYOUT 0.1 14-Aug-15 16-Feb-15 28-Aug-15 23-Feb-15 4-Sep-15 2-Mar-15 11-Sep-15 9-Mar-15 25-Sep-15 16-Mar-15 11-Dec-15 26-Mar-15 100% 100.0%
A545-740-16-48-00284 E C WORKERS CANTEEN GA & R/F DET OF COLUMNS 0.1 26-Jun-15 19-Jun-15 10-Jul-15 3-Jul-15 17-Jul-15 10-Jul-15 24-Jul-15 17-Jul-15 7-Aug-15 24-Jul-15 23-Oct-15 7-Aug-15 100% 100.0%
A545-740-16-48-10291 E C MARKETING OFFICE PILE LAYOUT 0.1 7-May-15 6-Feb-15 21-May-15 20-Feb-15 28-May-15 24-Feb-15 4-Jun-15 28-Feb-15 18-Jun-15 7-Mar-15 3-Sep-15 17-Mar-15 100% 100.0%
A545-740-16-48-00292 E C MARKETING OFFICE GA & R/F DET OF FDN 0.1 21-May-15 19-Mar-15 4-Jun-15 2-Apr-15 11-Jun-15 9-Apr-15 18-Jun-15 16-Apr-15 2-Jul-15 23-Apr-15 17-Sep-15 7-May-15 100% 100.0%
A545-740-16-48-00293 E C MARKETING OFICE GA & DET OF PLINTH BEAM 0.1 28-May-15 27-May-15 11-Jun-15 10-Jun-15 18-Jun-15 17-Jun-15 25-Jun-15 24-Jun-15 9-Jul-15 1-Jul-15 24-Sep-15 15-Jul-15 100% 100.0%
A545-740-81-41-00294 E C MARKETING OFICE GA & DET OF FLOOR BEAMS 0.1 27-Jun-15 9-Jun-15 11-Jul-15 23-Jun-15 18-Jul-15 30-Jun-15 25-Jul-15 7-Jul-15 8-Aug-15 16-Jul-15 24-Oct-15 22-Jul-15 100% 100.0%
A545-740-16-48-10296 E C MARKETING OFFICE GA & R/F DET OF COLUMNS 0.1 24-Jul-15 28-May-15 7-Aug-15 11-Jun-15 14-Aug-15 18-Jun-15 21-Aug-15 25-Jun-15 4-Sep-15 2-Jul-15 20-Nov-15 16-Jul-15 100% 100.0%
A545-740-81-41-10297 E C MARKETING OFFICE GA & R/F DET OF STAIRCASE 0.1 17-Aug-15 18-Jun-15 31-Aug-15 2-Jul-15 7-Sep-15 9-Jul-15 14-Sep-15 16-Jul-15 28-Sep-15 17-Jul-15 14-Dec-15 22-Jul-15 100% 100.0%
A545-740-81-41-10298 E C MARKETING OFFICE BUILDING MISC. DETAILS 0.1 17-Aug-15 18-Jun-15 31-Aug-15 2-Jul-15 7-Sep-15 9-Jul-15 14-Sep-15 16-Jul-15 28-Sep-15 7-Aug-18 31-Aug-19 - 85% 85.0%
A545-740-16-48-30301 E C SECURITY CABIN WITH GATE PILE LAYOUT 0.1 9-May-15 12-Mar-15 23-May-15 26-Mar-15 30-May-15 4-Apr-15 6-Jun-15 25-Apr-15 20-Jun-15 6-Jun-15 5-Sep-15 20-Jun-15 100% 100.0%
A545-740-16-48-06108 E C GA & R/F DET. OF ROOF SLAB & BEAMS FWPH 0.0 23-Jun-15 16-Dec-17 7-Jul-15 30-Dec-17 14-Jul-15 6-Jan-18 21-Jul-15 13-Jan-18 4-Aug-15 13-Mar-18 31-Aug-19 - 85% 85.0%
A545-740-16-48-16105 E C R/F DET. OF FLOOR & PLINTH BEAMS FWPH 0.0 28-Jun-15 16-Dec-17 12-Jul-15 30-Dec-17 19-Jul-15 6-Jan-18 26-Jul-15 13-Jan-18 9-Aug-15 13-Mar-18 31-Aug-19 - 85% 85.0%
A545-740-16-49-00225 E C D.G.SHED Plan and Sec 0.0 28-Jun-15 28-Mar-19 12-Jul-15 11-Apr-19 19-Jul-15 18-Apr-19 26-Jul-15 25-Apr-19 9-Aug-15 2-May-19 27-Apr-19 2-May-19 100% 100.0%
A545-740-16-49-00226 E C D.G.SHED ELEVATION 0.0 28-Jun-15 28-Mar-19 12-Jul-15 11-Apr-19 19-Jul-15 18-Apr-19 26-Jul-15 25-Apr-19 9-Aug-15 2-May-19 27-Apr-19 2-May-19 100% 100.0%
A545-740-81-41-01261 E C PRODUCT ENTRY GATE HOUSE PILE LAYOUT 0.0 28-Jun-15 22-Mar-19 12-Jul-15 5-Apr-19 19-Jul-15 12-Apr-19 26-Jul-15 19-Apr-19 9-Aug-15 26-Apr-19 27-Apr-19 26-Apr-19 100% 100.0%
A545-740-16-48-10331 WEIGH BRIDGE PILE LAYOUT 15-05-2015 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - =S710+77 - #VALUE!
A545-740-16-48-10332 WEIGH BRIDGE GA & R/F DET OF FDN 29-05-2015 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - =S711+77 - #VALUE!
A545-740-16-48-10333 WEIGH BRIDGE GA & R/F DET OF COL 05-06-2015 - 20-May-15 - 27-May-15 - 3-Jun-15 - 17-Jun-15 - =S712+77 - 85%
A545-740-16-48-10334 WEIGH BRIDGE GA & R/F DET OF ROOF SLAB 26-06-2015 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - =S713+77 - #VALUE!
Page 572 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 26 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-48-01570 GA & RF DT FDN FOR TANK 732-TT-3202A/B/C/D 10-05-2015 23-May-15 =G710+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - 10.0%
A545-700-16-48-01572 GA & RF DT FDN FOR TANK 732-TT-3204A/B 16-05-2015 26-May-15 =G711+14 - #VALUE! - #VALUE! - #VALUE! - #VALUE! - 10.0%
A545-700-81-41-30303 E C GA & RF DT FDN FOR FLOOD LIGHT MAST 0.1 18-May-15 15-Mar-16 1-Jun-15 29-Mar-16 8-Jun-15 5-Apr-16 15-Jun-15 12-Apr-16 29-Jun-15 19-Apr-16 9-Apr-19 19-Apr-16 100% 100.0%
A545-700-81-41-31521 E C GA & RF DETAIL OF 651-EE-1001 A/B 0.01 14-Aug-15 17-Aug-15 28-Aug-15 25-Aug-15 4-Sep-15 1-Sep-15 11-Sep-15 8-Sep-15 25-Sep-15 22-Jan-16 28-Mar-19 22-Jan-16 100% 100.0%
A545-700-16-48-31522 E C GA & RF DETAIL OF 651-EE-1002 0.01 16-Aug-15 17-Aug-15 30-Aug-15 25-Aug-15 6-Sep-15 1-Sep-15 13-Sep-15 8-Sep-15 16-Dec-16 16-Aug-18 31-Aug-19 - 85% 85.0%
A545-700-81-41-31523 E C GA & RF DETAIL OF 651-VV-1001 0.01 18-Aug-15 17-Aug-15 1-Sep-15 25-Aug-15 8-Sep-15 1-Sep-15 15-Sep-15 8-Sep-15 29-Sep-15 22-Jan-16 2-Mar-17 26-May-17 100% 100.0%
A545-700-16-48-31524 E C GA & RF DETAIL OF 651-VV-1002 0.01 20-Aug-15 17-Aug-15 3-Sep-15 25-Aug-15 10-Sep-15 1-Sep-15 17-Sep-15 8-Sep-15 30-Mar-19 - 31-Aug-19 - 85% 80.0%
A545-700-81-41-31525 E C GA & RF DETAIL OF 651-VV-1003 0.01 22-Aug-15 17-Aug-15 5-Sep-15 25-Aug-15 12-Sep-15 1-Sep-15 19-Sep-15 8-Sep-15 3-Oct-15 22-Jan-16 6-Mar-19 22-Jan-16 100% 100.0%
A545-700-81-41-31526 E C GA & RF DETAIL OF 651-VV-1004 0.01 24-Aug-15 17-Aug-15 7-Sep-15 25-Aug-15 14-Sep-15 1-Sep-15 21-Sep-15 8-Sep-15 5-Oct-15 22-Jan-16 8-Mar-17 22-Jan-16 100% 100.0%
A545-700-81-41-31527 E C GA & RF DETAIL OF 651-VV-1006 0.01 26-Aug-15 17-Aug-15 9-Sep-15 25-Aug-15 16-Sep-15 1-Sep-15 23-Sep-15 8-Sep-15 7-Oct-15 22-Jan-16 10-Mar-19 22-Jan-16 100% 100.0%
A545-700-81-41-31528 E C GA & RF DT FDN FOR VESSEL 671-VV-1001 0.01 21-Sep-15 17-Sep-15 5-Oct-15 25-Sep-15 12-Oct-15 2-Oct-15 19-Oct-15 9-Oct-15 2-Nov-15 16-Oct-15 18-Jan-16 30-Oct-15 100% 100.0%
A545-700-81-41-31529 E C GA & RF DT FDN FOR VESSEL 671-VV-1002A&B 0.01 23-Sep-15 17-Sep-15 7-Oct-15 25-Sep-15 14-Oct-15 2-Oct-15 21-Oct-15 9-Oct-15 4-Nov-15 16-Oct-15 20-Jan-16 30-Oct-15 100% 100.0%
A545-700-81-41-31530 E C GA & RF DT FDN FOR VESSEL 671-VV-1003 0.01 25-Sep-15 17-Sep-15 9-Oct-15 25-Sep-15 16-Oct-15 2-Oct-15 23-Oct-15 9-Oct-15 6-Nov-15 16-Oct-15 22-Jan-16 30-Oct-15 100% 100.0%
A545-700-81-41-31531 E C GA & RF DT FDN FOR VESSEL 671-VV-1006 0.01 27-Sep-15 17-Sep-15 11-Oct-15 25-Sep-15 18-Oct-15 2-Oct-15 25-Oct-15 9-Oct-15 8-Nov-15 16-Oct-15 24-Jan-16 30-Oct-15 100% 100.0%
A545-700-81-41-31532 E C GA & RF DT FDN FOR VESSEL 671-VV-1007 0.01 29-Sep-15 17-Sep-15 13-Oct-15 25-Sep-15 20-Oct-15 2-Oct-15 27-Oct-15 9-Oct-15 10-Nov-15 16-Oct-15 26-Jan-16 30-Oct-15 100% 100.0%
A545-700-81-41-31533 E C GA & RF DT FDN FOR VESSEL 671-VV-1008 0.01 1-Oct-15 17-Sep-15 15-Oct-15 25-Sep-15 22-Oct-15 2-Oct-15 29-Oct-15 9-Oct-15 12-Nov-15 16-Oct-15 28-Jan-16 30-Oct-15 100% 100.0%
A545-700-81-41-31534 E C GA & RF DT FDN FOR VESSEL 671-VV-1009 0.01 3-Oct-15 17-Sep-15 17-Oct-15 25-Sep-15 24-Oct-15 2-Oct-15 31-Oct-15 9-Oct-15 14-Nov-15 16-Oct-15 30-Jan-16 30-Oct-15 100% 100.0%
A545-700-81-41-31706 E C GA & DT OF CIRCULAR PLTF FOR 671-VV-1001 0.01 28-Nov-15 23-Feb-16 12-Dec-15 2-Mar-16 19-Dec-15 9-Mar-16 26-Dec-15 16-Mar-16 9-Jan-16 23-Mar-16 26-Mar-16 8-Sep-16 100% 100.0%
A545-700-16-48-31709 E C GA & DT OF CIRCULAR PLTF FOR 671-VV-1002A 0.01 30-Nov-15 23-Feb-16 14-Dec-15 2-Mar-16 21-Dec-15 9-Mar-16 28-Dec-15 16-Mar-16 11-Jan-16 23-Mar-16 28-Mar-16 30-Sep-16 100% 100.0%
A545-700-16-48-31710 E C GA & DT OF CIRCULAR PLTF FOR 671-VV-1002B 0.01 2-Dec-15 23-Feb-16 16-Dec-15 2-Mar-16 23-Dec-15 9-Mar-16 30-Dec-15 16-Mar-16 13-Jan-16 23-Mar-16 30-Mar-16 30-Sep-16 100% 100.0%
A545-700-16-48-31711 E C GA & DT OF CIRCULAR PLTF FOR 671-VV-1006 0.01 4-Dec-15 23-Feb-16 18-Dec-15 2-Mar-16 25-Dec-15 9-Mar-16 1-Jan-16 16-Mar-16 15-Jan-16 23-Mar-16 1-Apr-16 30-Sep-16 100% 100.0%
A545-700-81-41-31712 E C GA & DT OF CIRCULAR PLTF FOR 671-VV-1007 0.01 6-Dec-15 23-Feb-16 20-Dec-15 2-Mar-16 27-Dec-15 9-Mar-16 3-Jan-16 16-Mar-16 17-Jan-16 23-Mar-16 3-Apr-16 2-Sep-16 100% 100.0%
A545-700-81-41-31713 E C GA & DT OF CIRCULAR PLTF FOR 671-VV-1008 0.01 8-Dec-15 23-Feb-16 22-Dec-15 2-Mar-16 29-Dec-15 9-Mar-16 5-Jan-16 16-Mar-16 19-Jan-16 23-Mar-16 5-Apr-16 3-Sep-16 100% 100.0%
A545-700-81-41-31714 E C GA & DT OF CIRCULAR PLTF FOR 671-VV-1009 0.01 10-Dec-15 23-Feb-16 24-Dec-15 2-Mar-16 31-Dec-15 9-Mar-16 7-Jan-16 16-Mar-16 21-Jan-16 23-Mar-16 7-Apr-16 13-Sep-16 100% 100.0%
A545-700-16-48-30305 WATCH TOWER- GA & DETAIL OF FOUNDATION 10-01-2016 =K747-14 =G747+14 =N747-7 #VALUE! =Q747-7 #VALUE! =T747-7 #VALUE! 22-04-2016 =S747+77 -
A545-700-16-48-31649 GA & RF DT OF FDN FOR 720-PA-2001 A/B 21-03-2016 =K749-7 =G749+14 =N749-7 =J749+7 =Q749-7 =M749+7 06-05-2016 =P749+14 - =S749+77 -
A545-700-16-48-31650 GA & RF DT OF FDN FOR 720-PA-2002 A/B 23-03-2016 =K750-7 =G750+14 =N750-7 =J750+7 =Q750-7 =M750+7 06-05-2016 =P750+14 - =S750+77 -
A545-700-81-41-02933 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 20-Feb-16 23-Nov-16 5-Mar-16 1-Dec-16 12-Mar-16 8-Dec-16 19-Mar-16 15-Dec-16 2-Apr-16 16-Jan-17 18-Jun-16 23-Jan-17 100% 100.0%
A545-700-81-41-02934 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 22-Feb-16 15-Nov-16 7-Mar-16 23-Nov-16 14-Mar-16 30-Nov-16 21-Mar-16 7-Dec-16 4-Apr-16 19-Jan-17 20-Jun-16 28-Jan-19 100% 100.0%
A545-700-16-48-03933 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 24-Feb-16 18-Nov-16 9-Mar-16 26-Nov-16 16-Mar-16 3-Dec-16 23-Mar-16 10-Dec-16 6-Apr-16 2-Feb-17 22-Jun-16 24-Jan-19 100% 100.0%
A545-700-81-41-03934 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 26-Feb-16 23-Nov-16 11-Mar-16 1-Dec-16 18-Mar-16 8-Dec-16 25-Mar-16 15-Dec-16 8-Apr-16 18-Jan-17 24-Jun-16 25-Jan-17 100% 100.0%
A545-700-16-48-04934 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 28-Feb-16 4-Jan-17 13-Mar-16 12-Jan-17 20-Mar-16 19-Jan-17 27-Mar-16 26-Jan-17 10-Apr-16 2-Feb-17 26-Jun-16 9-Feb-17 100% 100.0%
A545-700-16-48-05934 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 2-Mar-16 11-Jan-17 16-Mar-16 19-Jan-17 23-Mar-16 26-Jan-17 30-Mar-16 2-Feb-17 13-Apr-16 9-Feb-17 29-Jun-16 13-Feb-19 100% 100.0%
A545-700-81-41-06933 E C GA & DETAILS OF CROSSOVER PLATFORMS 0.01 3-Mar-16 21-Jan-19 17-Mar-16 29-Jan-19 24-Mar-16 5-Feb-19 31-Mar-16 12-Feb-19 14-Apr-16 19-Feb-19 9-Apr-19 19-Feb-19 100% 100.0%
A545-700-16-48-06934 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 3-Mar-16 20-Jan-17 17-Mar-16 28-Jan-17 24-Mar-16 4-Feb-17 31-Mar-16 11-Feb-17 14-Apr-16 18-Feb-17 30-Jun-16 23-Feb-19 100% 100.0%
A545-700-16-48-07933 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 5-Mar-16 2-Dec-16 19-Mar-16 10-Dec-16 26-Mar-16 17-Dec-16 2-Apr-16 24-Dec-16 16-Apr-16 8-Jun-18 2-Jul-16 15-Jun-18 100% 100.0%
A545-700-16-48-07934 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 7-Mar-16 2-Dec-16 21-Mar-16 10-Dec-16 28-Mar-16 17-Dec-16 4-Apr-16 24-Dec-16 18-Apr-16 2-Aug-18 4-Jul-16 9-Aug-18 100% 100.0%
A545-700-81-41-08934 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 9-Mar-16 20-Mar-18 23-Mar-16 28-Mar-18 30-Mar-16 4-Apr-18 6-Apr-16 11-Apr-18 20-Apr-16 18-Apr-18 6-Jul-16 25-Apr-18 100% 100.0%
A545-700-81-41-09933 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 11-Mar-16 23-Apr-18 25-Mar-16 1-May-18 1-Apr-16 8-May-18 8-Apr-16 15-May-18 22-Apr-16 22-May-18 8-Jul-16 29-May-18 100% 100.0%
A545-700-81-41-09944 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 11-Mar-16 25-Jan-19 25-Mar-16 2-Feb-19 1-Apr-16 9-Feb-19 8-Apr-16 16-Feb-19 22-Apr-16 23-Feb-19 17-Apr-19 23-Feb-19 100% 100.0%
A545-700-81-41-01933 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 11-Mar-16 6-Feb-17 25-Mar-16 14-Feb-17 1-Apr-16 21-Feb-17 8-Apr-16 28-Feb-17 22-Apr-16 7-Mar-17 8-Jul-16 7-May-18 100% 100.0%
A545-700-81-41-05933 E C G.A. & DETAILS OF CROSS-OVERS PLATFORMS 0.01 11-Mar-16 6-Feb-17 25-Mar-16 14-Feb-17 1-Apr-16 21-Feb-17 8-Apr-16 28-Feb-17 22-Apr-16 7-Mar-17 8-Jul-16 27-Feb-19 100% 100.0%
A545-700-16-48-31651 E C GA & RF DT OF FDN FOR 720-PA-2003 A/B 0.01 24-Mar-16 24-May-16 7-Apr-16 31-May-16 14-Apr-16 7-Jun-16 21-Apr-16 14-Jun-16 7-Mar-17 15-Jun-18 31-Aug-19 - 85% 85.0%
A545-700-16-48-31652 E C GA & RF DT OF FDN FOR 720-PA-2004 A/B 0.01 25-Mar-16 24-May-16 8-Apr-16 31-May-16 15-Apr-16 7-Jun-16 22-Apr-16 14-Jun-16 8-Mar-17 9-Aug-18 31-Aug-19 - 85% 85.0%
A545-700-16-48-31653 E C GA & RF DT OF FDN FOR 720-PA-2005 A/B 0.01 29-Mar-16 27-May-16 12-Apr-16 3-Jun-16 19-Apr-16 10-Jun-16 26-Apr-16 17-Jun-16 12-Mar-17 25-Apr-18 31-Aug-19 - 85% 85.0%
A545-700-16-48-31654 E C GA & RF DT OF FDN FOR 732-PA-3201 A-H 0.01 2-Apr-16 17-May-16 16-Apr-16 31-May-16 23-Apr-16 7-Jun-16 30-Apr-16 14-Jun-16 16-Mar-17 29-May-18 31-Aug-19 - 85% 85.0%
A545-700-16-48-31655 E C GA & RF DT OF FDN FOR 732-PA-3202 A-F 0.01 6-Apr-16 17-May-16 20-Apr-16 31-May-16 27-Apr-16 7-Jun-16 4-May-16 14-Jun-16 20-Mar-17 7-May-18 5-Jun-17 29-May-18 100% 100.0%
A545-700-16-48-31656 E C GA & RF DT OF FDN FOR 732-PA-3203 A/B/C 0.01 10-Apr-16 17-May-16 24-Apr-16 31-May-16 1-May-16 7-Jun-16 8-May-16 14-Jun-16 24-Mar-17 20-Apr-18 9-Jun-17 17-Sep-18 100% 100.0%
A545-700-16-48-31657 E C GA & RF DT OF FDN FOR 732-PA-3204 A/B/C 0.01 14-Apr-16 17-May-16 28-Apr-16 31-May-16 5-May-16 7-Jun-16 12-May-16 14-Jun-16 28-Mar-17 29-May-18 31-Aug-19 - 85% 85.0%
A545-700-16-48-31658 E C GA & RF DT OF FDN FOR 732-PA-3205 A/B/C 0.01 18-Apr-16 17-May-16 2-May-16 31-May-16 9-May-16 7-Jun-16 16-May-16 14-Jun-16 1-Apr-17 7-May-18 31-Aug-19 - 85% 85.0%
A545-700-16-48-31659 GA & RF DT OF FDN FOR 732-PA-3206 22-Apr-16 30-Apr-15 6-May-16 14-May-15 13-May-16 21-May-15 20-May-16 28-May-15 5-Apr-17 - 21-Jun-17 - 80.0%
A545-700-16-48-31660 GA & RF DT OF FDN FOR 732-PA-3207 24-Apr-16 30-Apr-15 8-May-16 14-May-15 15-May-16 21-May-15 22-May-16 28-May-15 7-Apr-17 - 23-Jun-17 - 80.0%
A545-700-16-48-31661 GA & RF DT OF FDN FOR 732-PA-3208 26-Apr-16 30-Apr-15 10-May-16 14-May-15 17-May-16 21-May-15 24-May-16 28-May-15 9-Apr-17 - 25-Jun-17 - 80.0%
A545-700-16-48-31662 GA & RF DT OF FDN FOR 732-PA-3209A/S 30-Apr-16 30-Apr-15 14-May-16 14-May-15 21-May-16 21-May-15 28-May-16 28-May-15 13-Apr-17 - 29-Jun-17 - 80.0%
A545-700-16-48-31663 E C GA & RF DT OF FDN FOR 671-PA-1001 A/B/C 0.01 4-May-16 30-Apr-15 18-May-16 14-May-15 25-May-16 21-May-15 1-Jun-16 28-May-15 17-Apr-17 1-Aug-18 7-Apr-19 1-Aug-18 100% 100.0%
A545-700-81-41-01584 E C DET OF FDN FOR 716-TT-1603B 0.01 2-May-16 30-Jan-19 16-May-16 6-Feb-19 23-May-16 13-Feb-19 30-May-16 20-Feb-19 15-Apr-17 27-Feb-19 5-Apr-19 27-Feb-19 100% 100.0%
A545-700-16-48-31665 E C GA & RF DT OF FDN FOR 713-PA-1302 0.01 4-May-16 25-Jan-19 18-May-16 1-Feb-19 25-May-16 8-Feb-19 1-Jun-16 15-Feb-19 =P764+14 22-Feb-19 =S764+77 22-Feb-19 80% 100.0%
A545-700-16-48-31666 E C GA & RF DT OF FDN FOR 651-PA-1001 A/B 0.01 6-May-16 5-Aug-18 20-May-16 12-Aug-18 27-May-16 19-Aug-18 3-Jun-16 26-Aug-18 19-Apr-17 2-Sep-18 5-Jul-17 17-Sep-18 100% 100.0%
A545-700-16-48-31667 E C GA & RF DT OF FDN FOR 712-PA-1215A/B 0.01 8-May-16 13-Aug-18 22-May-16 27-Aug-18 29-May-16 3-Sep-18 5-Jun-16 10-Sep-18 21-Apr-17 17-Sep-18 11-Apr-19 3-May-19 100% 100.0%
A545-700-16-48-31668 E C GA & RF DT OF FDN FOR 733-PA-CF-101A/B/C 0.01 10-May-16 27-Jun-18 24-May-16 11-Jul-18 31-May-16 18-Jul-18 7-Jun-16 25-Jul-18 23-Apr-17 1-Aug-18 13-Apr-19 1-Aug-18 100% 100.0%
A545-700-16-48-31669 E C GA & RF DT OF FDN FOR 733-PA-CF-103A/B/C 0.01 12-May-16 30-Apr-15 26-May-16 14-May-15 2-Jun-16 21-May-15 9-Jun-16 28-May-15 25-Apr-17 17-Jul-18 15-Apr-19 17-Jul-18 100% 100.0%
A545-700-16-48-31629 E C GA & RF DT OF FDN FOR 733-PA-CF-105A/B/C 0.01 14-May-16 30-Apr-15 28-May-16 14-May-15 4-Jun-16 21-May-15 11-Jun-16 28-May-15 28-Mar-19 17-Jul-18 28-Apr-19 17-Jul-18 100% 100.0%
A545-700-16-48-31671 GA & RF DT OF FDN FOR 733-PA-CF-108A/B/C 16-May-16 30-Apr-15 30-May-16 14-May-15 6-Jun-16 21-May-15 13-Jun-16 28-May-15 29-Apr-17 - 15-Jul-17 - 80.0%
A545-700-16-48-31672 GA & RF DT OF FDN FOR 733-PA-CF-110A/B 18-May-16 30-Apr-15 1-Jun-16 14-May-15 8-Jun-16 21-May-15 15-Jun-16 28-May-15 1-May-17 - 17-Jul-17 - 80.0%
A545-700-16-48-31673 E C GA & RF DT OF FDN FOR 720-PA-2006 0.01 18-May-16 30-Apr-15 1-Jun-16 14-May-15 8-Jun-16 21-May-15 15-Jun-16 28-May-15 1-May-17 11-Oct-18 21-Apr-19 11-Oct-18 100% 100.0%
A545-700-81-41-31682 E C GA & RF DT OF FDN FOR 671-PA-1002A/B 0.01 18-May-16 30-Apr-15 1-Jun-16 14-May-15 8-Jun-16 21-May-15 15-Jun-16 28-May-15 1-May-17 1-Aug-18 21-Apr-19 1-Aug-18 100% 100.0%
A545-700-16-48-01925 E C GA & RF DETAIL OF PRECAST BOX CULVERT 0.01 23-Jan-16 17-Mar-16 6-Feb-16 31-Mar-16 13-Feb-16 11-Apr-16 20-Feb-16 18-Apr-16 5-Mar-16 25-Apr-16 30-Mar-19 25-Apr-16 100% 100.0%
A545-631-81-41-00101 E C COOLING TOWER-01 PILE LAYOUT 0.01 2-Jan-16 9-Feb-16 16-Jan-16 23-Feb-16 23-Jan-16 1-Mar-16 30-Jan-16 8-Mar-16 13-Feb-16 21-May-16 29-Dec-16 14-Mar-18 100% 100.0%
A545-631-81-41-00106 E C CT-01-R/F DETS. OF BEAMS 0.01 5-Jan-16 23-Feb-16 19-Jan-16 8-Mar-16 14-Dec-16 21-Aug-18 21-Dec-16 28-Aug-18 4-Jan-17 4-Sep-18 4-Apr-19 29-Aug-17 100% 100.0%
A545-631-81-41-00107 E C CT-01-R/f Details of Pile cap and t.beams 0.01 5-Jan-16 23-Feb-16 19-Jan-16 8-Mar-16 14-Dec-16 4-Jul-18 21-Dec-16 11-Jul-18 4-Jan-17 18-Jul-18 22-Mar-17 29-Aug-17 100% 100.0%
A545-631-81-41-00108 E C CT-01: PILE LAYOUT FOR AUX. FDNS. 0.01 5-Jan-16 23-Feb-16 19-Jan-16 8-Mar-16 14-Dec-16 31-Jul-18 21-Dec-16 7-Aug-18 4-Jan-17 14-Aug-18 4-Apr-19 23-Nov-17 100% 100.0%
A545-631-81-41-00121 E C COOLING TOWER-02 PILE LAYOUT 0.01 12-Jan-16 23-Feb-16 26-Jan-16 8-Mar-16 2-Feb-16 15-Mar-16 9-Feb-16 22-Mar-16 23-Feb-16 21-May-16 8-Jan-17 18-Jul-18 100% 100.0%
A545-631-81-41-00122 E C CT-02: PILE CAP & TIE BEAM LAYOUT & DETAILS 0.01 16-Jan-16 8-Mar-16 30-Jan-16 22-Mar-16 6-Feb-16 15-Jul-16 13-Feb-16 22-Jul-16 27-Feb-16 29-Jul-16 12-Jan-17 20-Jul-18 100% 100.0%
A545-631-81-41-00126 E C CT-02-R/F DETS. OF BEAMS 0.01 20-Jan-16 8-Mar-16 3-Feb-16 22-Mar-16 10-Feb-16 31-Aug-18 17-Feb-16 7-Sep-18 2-Mar-16 14-Sep-18 31-Aug-19 - 85% 85.0%
A545-631-81-41-01127 E C CT-02: GA & R/F OF PILE CAP & TIE BEAMS 0.01 16-Jan-16 8-Mar-16 30-Jan-16 22-Mar-16 6-Feb-16 29-Jun-18 13-Feb-16 6-Jul-18 27-Feb-16 13-Jul-18 12-Jan-17 20-Jul-18 100% 100.0%
A545-631-81-41-00128 E C CT-02: PILE LAYOUT FOR AUX. FDNS. 0.01 16-Jan-16 8-Mar-16 30-Jan-16 22-Mar-16 6-Feb-16 7-Aug-18 13-Feb-16 14-Aug-18 27-Feb-16 21-Aug-18 31-Aug-19 - 85% 85.0%
A545-631-81-41-00141 E C COOLING TOWER-03 PILE LAYOUT 0.01 15-Jan-16 11-Mar-16 29-Jan-16 25-Mar-16 5-Feb-16 1-Apr-16 12-Feb-16 8-Apr-16 26-Feb-16 21-May-16 11-Jan-17 7-Aug-18 100% 100.0%
A545-631-81-41-00142 E C COOLING TOWER-03 PILE CAP LAYOUT 0.01 18-Jan-16 11-Mar-16 1-Feb-16 25-Mar-16 8-Feb-16 1-Apr-16 15-Feb-16 8-Apr-16 29-Feb-16 29-Jul-16 14-Jan-17 16-Aug-18 100% 100.0%
A545-631-81-41-10147 E C CT-03: R/F DETS. OF PILE CAPS & TIE BEAMS 0.01 16-Jan-16 8-Mar-16 30-Jan-16 22-Mar-16 6-Feb-16 24-Jul-18 13-Feb-16 31-Jul-18 27-Feb-16 7-Aug-18 31-Aug-19 - 85% 85.0%
A545-631-81-41-00148 E C CT-03: PILE LAYOUT FOR AUX. FDNS. 0.01 16-Jan-16 8-Mar-16 30-Jan-16 22-Mar-16 6-Feb-16 9-Aug-18 13-Feb-16 16-Aug-18 27-Feb-16 23-Aug-18 31-Aug-19 - 85% 85.0%
A545-631-81-41-00161 E C COOLING TOWER-04 PILE LAYOUT 0.01 17-Jan-16 11-Mar-16 31-Jan-16 25-Mar-16 7-Feb-16 1-Apr-16 14-Feb-16 8-Apr-16 28-Feb-16 21-May-16 13-Jan-17 7-Jul-18 100% 100.0%
A545-631-81-41-00162 E C CT-04: PILE CAP & TIE BEAM LAYOUT & DETAILS 0.01 19-Jan-16 11-Mar-16 2-Feb-16 25-Mar-16 9-Feb-16 1-Apr-16 16-Feb-16 8-Apr-16 1-Mar-16 29-Jul-16 15-Jan-17 19-Jul-18 100% 100.0%
A545-631-81-41-00166 E C CT-04-R/F DETS. OF BEAMS 0.01 19-Jan-16 11-Mar-16 2-Feb-16 25-Mar-16 9-Feb-16 1-Apr-16 16-Feb-16 8-Apr-16 1-Mar-16 14-Sep-18 31-Aug-19 - 85% 85.0%
A545-631-81-41-01167 E C CT-04: R/F DET. OF PILE CAP & TIE BEAMS 0.01 19-Jan-16 11-Mar-16 2-Feb-16 25-Mar-16 9-Feb-16 1-Apr-16 16-Feb-16 8-Apr-16 1-Mar-16 12-Jul-18 15-Jan-17 19-Jul-18 100% 100.0%
A545-631-81-41-00168 E C CT-04: PILE LAYOUT FOR AUX. FDNS. 0.01 19-Jan-16 11-Mar-16 2-Feb-16 25-Mar-16 9-Feb-16 1-Apr-16 16-Feb-16 8-Apr-16 1-Mar-16 24-Aug-18 31-Aug-19 - 85% 85.0%
A545-631-81-41-10181 E C PILE LAYOUT OF C.W. PUMP FDNS. IN CT-1 TO 4 0.01 19-Jan-16 8-Mar-19 2-Feb-16 22-Mar-19 9-Feb-16 29-Mar-19 16-Feb-16 5-Apr-19 1-Mar-16 12-Apr-19 26-Mar-19 12-Apr-19 100% 100.0%
A545-631-81-41-30602 E C G.A. & R/F DET. OF FDN. FOR PUMP 682-PA-1002A 0.01 13-Jan-17 24-Aug-18 8-Mar-19 22-Mar-19 15-Mar-19 29-Mar-19 22-Mar-19 5-Apr-19 5-Apr-19 12-Apr-19 6-May-19 12-Apr-19 100% 100.0%
A545-631-81-41-30603 E C G.A. & R/F DET. OF FDN. FOR PUMP 682-PA-1002B 0.01 14-Jan-17 24-Aug-18 9-Mar-19 22-Mar-19 16-Mar-19 29-Mar-19 23-Mar-19 5-Apr-19 6-Apr-19 12-Apr-19 7-May-19 12-Apr-19 100% 100.0%
A545-631-81-41-30604 E C G.A. & R/F DET. OF FDN. FOR PUMP 632-PA-1001A 0.01 15-Jan-17 24-Aug-18 10-Mar-19 22-Mar-19 17-Mar-19 29-Mar-19 24-Mar-19 5-Apr-19 7-Apr-19 12-Apr-19 8-May-19 12-Apr-19 100% 100.0%
A545-631-81-41-30605 E C G.A. & R/F DET. OF FDN. FOR PUMP 632-PA-100B-I 0.01 16-Jan-17 24-Aug-18 11-Mar-19 22-Mar-19 18-Mar-19 29-Mar-19 25-Mar-19 5-Apr-19 8-Apr-19 12-Apr-19 9-May-19 12-Apr-19 100% 100.0%
A545-631-81-41-01127 E C CT-02: GA & R/F OF PILE CAP & TIE BEAMS 0.01 21-Jan-17 24-Aug-18 4-Feb-17 29-Jun-18 11-Feb-17 6-Jul-18 18-Feb-17 13-Jul-18 4-Mar-17 20-Jul-18 18-Jan-18 9-Aug-18 100% 100.0%
A545-631-81-41-01167 E C CT-04: R/F DET. OF PILE CAP & TIE BEAMS 0.01 22-Jan-17 24-Aug-18 5-Feb-17 29-Jun-18 12-Feb-17 6-Jul-18 19-Feb-17 13-Jul-18 5-Mar-17 20-Jul-18 19-Jan-18 10-Aug-18 100% 100.0%
A545-631-16-47-05001 E C GA & Piping Details of CW Sump & PH CT-1 0.01 12-Jan-17 24-Aug-18 11-Aug-19 - 16-Aug-19 - 21-Aug-19 - 26-Aug-19 - 31-Aug-19 - 10% 10.0%
A545-631-16-47-05002 E C GA & Piping Details of CW Sump & PH CT-2 0.01 12-Jan-17 24-Aug-18 11-Aug-19 - 16-Aug-19 - 21-Aug-19 - 26-Aug-19 - 31-Aug-19 - 10% 10.0%
A545-631-16-47-05003 E C GA & Piping Details of CW Sump & PH CT-3 0.01 12-Jan-17 24-Aug-18 11-Aug-19 - 16-Aug-19 - 21-Aug-19 - 26-Aug-19 - 31-Aug-19 - 10% 10.0%
A545-631-16-47-05004 E C GA & Piping Details of CW Sump & PH CT-4 0.01 12-Jan-17 24-Aug-18 11-Aug-19 - 16-Aug-19 - 21-Aug-19 - 26-Aug-19 - 31-Aug-19 - 10% 10.0%
A545-631-16-47-05005 E C GA & Piping Details of CW Basin & Channel CT-1 0.01 12-Jan-17 24-Aug-18 26-Jan-17 15-Oct-15 2-Feb-17 22-Oct-15 9-Feb-17 29-Oct-15 23-Feb-17 5-Nov-15 9-Jan-18 27-Jan-16 100% 100.0%
A545-631-16-47-05006 E C GA & Piping Details of CW Basin & Channel CT-2 0.01 12-Jan-17 24-Aug-18 26-Jan-17 15-Oct-15 2-Feb-17 22-Oct-15 9-Feb-17 29-Oct-15 23-Feb-17 5-Nov-15 31-Aug-19 - 85% 85.0%
A545-631-16-47-05007 E C GA & Piping Details of CW Basin & Channel CT-3 0.01 12-Jan-17 24-Aug-18 26-Jan-17 15-Oct-15 2-Feb-17 22-Oct-15 9-Feb-17 29-Oct-15 23-Feb-17 5-Nov-15 31-Aug-19 - 85% 85.0%
A545-631-16-47-05008 E C GA & Piping Details of CW Basin & Channel CT-4 0.01 12-Jan-17 24-Aug-18 26-Jan-17 15-Oct-15 2-Feb-17 22-Oct-15 9-Feb-17 29-Oct-15 23-Feb-17 5-Nov-15 9-Jan-18 1-Apr-16 100% 100.0%
A545-730-16-48-00370 E C PPU WARE HOUSE PILE LAYOUT 0.01 20-Jan-16 17-Mar-16 3-Feb-16 31-Mar-16 10-Feb-16 19-Apr-16 17-Feb-16 26-Apr-16 2-Mar-16 9-Sep-16 31-Aug-19 - 85% 85.0%
A545-730-81-41-00551 E C PPU WARE HOUSE FOUNDATION LAYOUT 0.01 23-Jan-16 17-Mar-16 6-Feb-16 31-Mar-16 13-Feb-16 19-Apr-16 20-Feb-16 26-Apr-16 6-Dec-16 12-Oct-18 31-Aug-19 - 85% 85.0%
A545-730-81-41-00554 E C PPU WARE HOUSE PLINTH BEAM LAYOUT 0.01 27-Jan-16 17-Mar-16 10-Feb-16 31-Mar-16 17-Feb-16 19-Apr-16 24-Feb-16 26-Apr-16 10-Dec-16 12-Oct-18 31-Aug-19 - 85% 85.0%
A545-700-16-48-10991 E C R/F & CROSS SECTION DETAILS 0.05 27-Jan-16 7-Feb-18 10-Feb-16 21-Feb-18 17-Feb-16 28-Feb-18 24-Feb-16 7-Mar-18 9-Mar-16 14-Mar-18 5-Mar-19 14-Mar-18 100% 100.0%
A545-740-81-41-11232 E C CWTP BUILDING PILE LAYOUT 0.05 20-Jan-16 17-Mar-16 3-Feb-16 31-Mar-16 10-Feb-16 13-Jul-16 17-Feb-16 20-Jul-16 2-Mar-16 27-Jul-16 16-Jan-17 18-Jul-17 100% 100.0%
A545-700-81-41-33112 E C SCHEDULE OF FLM 0.05 20-May-17 17-Mar-16 3-Jun-17 31-Mar-16 10-Jun-17 7-Aug-17 17-Jun-17 14-Aug-17 1-Jul-17 21-Aug-17 14-Mar-19 21-Aug-17 100% 100.0%
A545-700-81-41-34026 E C FLUSHING PIT COOLING WATER 0.05 20-May-17 17-Mar-16 3-Jun-17 31-Mar-16 10-Jun-17 15-Aug-17 17-Jun-17 22-Aug-17 1-Jul-17 29-Aug-17 14-Mar-19 29-Aug-17 100% 100.0%
A545-700-81-41-34027 E C INSTRUMENTATION PIT COOLING WATER 0.05 20-May-17 17-Mar-16 3-Jun-17 31-Mar-16 10-Jun-17 15-Aug-17 17-Jun-17 22-Aug-17 1-Jul-17 29-Aug-17 14-Mar-19 29-Aug-17 100% 100.0%
A545-700-81-41-00992 E C TW/DW FDN. LAYOUT SUMP & PUMP STATION 0.05 30-May-17 11-Dec-17 13-Jun-17 25-Dec-17 20-Jun-17 1-Jan-18 27-Jun-17 8-Jan-18 11-Jul-17 15-Jan-18 27-May-18 21-Apr-18 100% 100.0%
A545-700-81-41-00410 E C PIPERACK AND BRIDGE BASE PLATE DETAIL 0.05 30-May-17 22-Jun-18 13-Jun-17 6-Feb-18 20-Jun-17 13-Feb-18 27-Jun-17 20-Feb-18 11-Jul-17 27-Feb-18 27-May-18 20-Mar-18 100% 100.0%
A545-700-81-41-39321 E C OFFSITE BRIDGE SECTION & MTO 0.05 9-Jun-17 15-May-18 23-Jun-17 29-May-18 30-Jun-17 5-Jun-18 7-Jul-17 12-Jun-18 21-Jul-17 19-Jun-18 3-Apr-19 19-Jun-18 100% 100.0%
A545-700-81-41-00841 E C Oil Catcher- GA & Details 0.05 9-Jun-17 12-Jun-18 23-Jun-17 26-Jun-18 30-Jun-17 3-Jul-18 7-Jul-17 10-Jul-18 21-Jul-17 17-Jul-18 3-Apr-19 17-Jul-18 100% 100.0%
A545-700-81-41-00842 E C Oil Catcher- Sections & R/F Dets 0.05 9-Jun-17 12-Jun-18 23-Jun-17 26-Jun-18 30-Jun-17 3-Jul-18 7-Jul-17 10-Jul-18 21-Jul-17 17-Jul-18 3-Apr-19 17-Jul-18 100% 100.0%
A545-700-81-41-33113 E C Schedule of box culverts water block area 0.05 9-Jun-17 25-Jul-18 23-Jun-17 8-Aug-18 30-Jun-17 15-Aug-18 7-Jul-17 22-Aug-18 21-Jul-17 29-Aug-18 3-Apr-19 29-Aug-18 100% 100.0%
A545-700-81-41-40009 E C DRAWING FOR GROUND IMPROVEMENT 0.05 9-Jun-17 5-Jun-18 23-Jun-17 19-Jun-18 30-Jun-17 26-Jun-18 7-Jul-17 3-Jul-18 21-Jul-17 10-Jul-18 3-Apr-19 10-Jul-18 100% 100.0%
A545-700-81-41-01586 E C DET OF FDN FOR 712-TT-1203A/B 0.05 9-Jun-17 23-Jan-19 23-Jun-17 6-Feb-19 30-Jun-17 13-Feb-19 7-Jul-17 20-Feb-19 21-Jul-17 27-Feb-19 3-Apr-19 27-Feb-19 100% 100.0%
A545-700-81-41-01585 E C DET OF FDN FOR 714-TT-1405A 0.05 9-Jun-17 23-Jan-19 23-Jun-17 6-Feb-19 30-Jun-17 13-Feb-19 7-Jul-17 20-Feb-19 21-Jul-17 27-Feb-19 3-Apr-19 27-Feb-19 100% 100.0%
A545-700-81-41-09325 E C PPU BRIDGE GA & DETAILS 0.05 9-Jun-17 24-Jan-19 23-Jun-17 7-Feb-19 30-Jun-17 14-Feb-19 7-Jul-17 21-Feb-19 21-Jul-17 28-Feb-19 3-Apr-19 28-Feb-19 100% 100.0%
A545-700-81-41-09326 E C BR-17 & BR-20 GA & DETAILS 0.05 9-Jun-17 24-Jan-19 23-Jun-17 7-Feb-19 30-Jun-17 14-Feb-19 7-Jul-17 21-Feb-19 21-Jul-17 28-Feb-19 3-Apr-19 28-Feb-19 100% 100.0%
A545-700-81-41-01588 E C DET OF FDN FOR 716-TT-1602C 0.05 9-Jun-17 23-Jan-19 23-Jun-17 6-Feb-19 30-Jun-17 13-Feb-19 7-Jul-17 20-Feb-19 21-Jul-17 27-Feb-19 3-Apr-19 27-Feb-19 100% 100.0%
A545-700-81-41-01589 E C DET OF FDN FOR 712-TT-1209A/B 0.05 9-Jun-17 23-Jan-19 23-Jun-17 6-Feb-19 30-Jun-17 13-Feb-19 7-Jul-17 20-Feb-19 21-Jul-17 27-Feb-19 3-Apr-19 27-Feb-19 100% 100.0%
A545-700-81-41-01590 E C DET OF FDN FOR 711-TT-1101 M/N 0.05 9-Jun-17 23-Jan-19 23-Jun-17 6-Feb-19 30-Jun-17 13-Feb-19 7-Jul-17 20-Feb-19 21-Jul-17 27-Feb-19 3-Apr-19 27-Feb-19 100% 100.0%
A545-700-81-41-01587 E C DET OF FDN FOR 712-TT-1206A/C/D 0.05 9-Jun-17 23-Jan-19 23-Jun-17 6-Feb-19 30-Jun-17 13-Feb-19 7-Jul-17 20-Feb-19 21-Jul-17 27-Feb-19 3-Apr-19 27-Feb-19 100% 100.0%
A545-612-81-41-30501 E C GA & RF DETAIL OF EQPT 612-VV-1001 0.01 11-Jun-17 29-Sep-18 27-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-612-81-41-30502 E C GA & RF DETAIL OF EQPT 612-VV-1002AB 0.01 13-Jun-17 29-Sep-18 29-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-614-81-41-00101 E C PILE LAYOUT 0.02 2-Jun-17 22-Aug-18 16-Jun-17 2-Jan-19 23-Jun-17 9-Jan-19 30-Jun-17 16-Jan-19 14-Jul-17 23-Jan-19 31-Aug-19 - 85% 85.0%
A545-614-81-41-00201 E C OVERALL FDN LAYOUT 0.02 9-Jun-17 24-Aug-18 23-Jun-17 4-Feb-19 30-Jun-17 11-Feb-19 7-Jul-17 18-Feb-19 21-Jul-17 25-Feb-19 31-Aug-19 - 85% 85.0%
A545-614-81-41-00301 E C GA & RF DETAIL MAIN & BRACH PIPERACK FDN 0.01 2-Sep-18 26-Dec-18 16-Sep-18 2-Jan-19 23-Sep-18 9-Jan-19 30-Sep-18 16-Jan-19 14-Oct-18 23-Jan-19 31-Aug-19 - 85% 85.0%
A545-614-81-41-30521 E C FDN. FOR 612-VV-1001 0.01 12-Jun-17 25-Aug-18 26-Jun-17 8-Sep-18 3-Jul-17 15-Sep-18 10-Jul-17 22-Sep-18 24-Jul-17 29-Sep-18 31-Aug-19 - 85% 85.0%
A545-614-81-41-30522 E C FDN. FOR 612-VV-1002A/B & 612-VV-1003 0.01 14-Jun-17 25-Aug-18 28-Jun-17 8-Sep-18 5-Jul-17 15-Sep-18 12-Jul-17 22-Sep-18 26-Jul-17 29-Sep-18 11-Jun-18 3-Oct-18 100% 100.0%
Page 577 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 31 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-614-81-41-30523 E C FDN. FOR 614-VV-1001A/B/C/D/E/F 0.01 16-Jun-17 25-Aug-18 30-Jun-17 8-Sep-18 7-Jul-17 15-Sep-18 14-Jul-17 22-Sep-18 28-Jul-17 29-Sep-18 31-Aug-19 - 85% 85.0%
A545-614-81-41-30524 E C FDN. FOR 614-LZ-1002A/B-JE1 0.01 18-Jun-17 25-Aug-18 2-Jul-17 8-Sep-18 9-Jul-17 15-Sep-18 16-Jul-17 22-Sep-18 30-Jul-17 29-Sep-18 31-Aug-19 - 85% 85.0%
A545-614-81-41-30525 E C FDN. FOR 614-VV-1002A/B 0.01 20-Jun-17 25-Aug-18 4-Jul-17 8-Sep-18 11-Jul-17 15-Sep-18 18-Jul-17 22-Sep-18 1-Aug-17 29-Sep-18 31-Aug-19 - 85% 85.0%
A545-614-81-41-30526 E C FDN. FOR 614-LZ-1003A/B 0.01 22-Jun-17 25-Aug-18 6-Jul-17 8-Sep-18 13-Jul-17 15-Sep-18 20-Jul-17 22-Sep-18 3-Aug-17 29-Sep-18 31-Aug-19 - 85% 85.0%
A545-614-81-41-30527 E C FDN. FOR 614-LZ-1004A/B 0.01 24-Jun-17 25-Aug-18 8-Jul-17 8-Sep-18 15-Jul-17 15-Sep-18 22-Jul-17 22-Sep-18 5-Aug-17 29-Sep-18 31-Aug-19 - 85% 85.0%
A545-614-81-41-30528 E C FDN. FOR 614-LZ-1005 0.01 26-Jun-17 25-Aug-18 10-Jul-17 8-Sep-18 17-Jul-17 15-Sep-18 24-Jul-17 22-Sep-18 7-Aug-17 29-Sep-18 31-Aug-19 - 85% 85.0%
A545-614-81-41-30529 E C MAIN VENT SILENCER 0.01 28-Jun-17 25-Aug-18 12-Jul-17 8-Sep-18 19-Jul-17 15-Sep-18 26-Jul-17 22-Sep-18 9-Aug-17 29-Sep-18 31-Aug-19 - 85% 85.0%
A545-614-81-41-30530 E C GA & RF DETAIL OF FDN 612-LJ-1001 A TO G 0.01 30-Jun-17 22-Sep-18 14-Jul-17 4-Feb-19 21-Jul-17 11-Feb-19 28-Jul-17 18-Feb-19 11-Aug-17 25-Feb-19 31-Aug-19 - 85% 85.0%
A545-614-81-41-30531 E C FDN. FOR Skid 202A/B 0.01 2-Jul-17 22-Sep-18 8-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-614-81-41-30532 E C FDN. FOR 614-LZ-1002A/B-MT1 0.01 4-Jul-17 22-Sep-18 18-Jul-17 4-Feb-19 25-Jul-17 11-Feb-19 1-Aug-17 18-Feb-19 15-Aug-17 25-Feb-19 31-Aug-19 - 85% 85.0%
A545-614-81-41-30533 E C GA & RF DETAIL OF FDN 614-LZ-1006 0.01 6-Jul-17 22-Sep-18 20-Jul-17 28-Dec-18 27-Jul-17 4-Jan-19 3-Aug-17 11-Jan-19 17-Aug-17 18-Jan-19 31-Aug-19 - 85% 85.0%
A545-614-81-41-30534 E C FDN. FOR 614-LZ-1002A/B-CB1 0.01 8-Jul-17 22-Sep-18 22-Jul-17 4-Feb-19 29-Jul-17 11-Feb-19 5-Aug-17 18-Feb-19 19-Aug-17 25-Feb-19 31-Aug-19 - 85% 85.0%
A545-680-81-41-30312 E C FDN FOR PUMPS 614-PA-1001A/B 0.01 10-Jul-17 28-Sep-18 24-Jul-17 4-Feb-19 31-Jul-17 11-Feb-19 7-Aug-17 18-Feb-19 21-Aug-17 25-Feb-19 31-Aug-19 - 85% 85.0%
A545-614-81-41-00313 to
E C GA & RF DETAIL OF FDN 612-KA-1001A TO D 0.02 12-Jul-17 28-Sep-18 26-Jul-17 12-Feb-19 2-Aug-17 19-Feb-19 9-Aug-17 26-Feb-19 23-Aug-17 5-Mar-19 26-Mar-19 5-Mar-19 100% 100.0%
00314
A545-614-81-41-30315 E C GA & R/F OF FDN. COMPRESSOR 612-KA-1002 A/B 0.02 14-Jul-17 28-Sep-18 20-Mar-19 15-Feb-19 27-Mar-19 22-Feb-19 3-Apr-19 1-Mar-19 17-Apr-19 8-Mar-19 18-May-19 8-Mar-19 100% 100.0%
A545-614-81-41-10316 E C GA & RF DETAIL OF FDN 614-LZ-1002A/B-LC1 0.02 16-Jul-17 28-Sep-18 30-Jul-17 4-Feb-19 6-Aug-17 11-Feb-19 13-Aug-17 18-Feb-19 27-Aug-17 25-Feb-19 31-Aug-19 - 85% 85.0%
A545-614-81-41-00317 E C GA & RF DETAIL OF FDN 612-KA-1001E /F 0.02 18-Jul-17 3-Oct-18 1-Aug-17 12-Feb-19 8-Aug-17 19-Feb-19 15-Aug-17 26-Feb-19 29-Aug-17 5-Mar-19 21-Apr-19 5-Mar-19 100% 100.0%
A545-614-81-41-00318 E C GA & RF DETAIL OF FDN 612-KA-1001E /F 0.02 20-Jul-17 3-Oct-18 3-Aug-17 12-Feb-19 10-Aug-17 19-Feb-19 17-Aug-17 26-Feb-19 31-Aug-17 5-Mar-19 23-Apr-19 5-Mar-19 100% 100.0%
A545-614-81-41-00351 E C GA & RF DETAIL OF FDN FOR COMP. SHED 0.02 20-Jul-17 3-Oct-18 26-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-999-81-41-46061 E C EXTENT OF FIREPROOFING FOR STR. STEEL 0.01 20-Jul-17 22-Jan-19 3-Aug-17 5-Feb-19 10-Aug-17 12-Feb-19 17-Aug-17 19-Feb-19 31-Aug-17 26-Feb-19 31-Aug-19 - 85% 85.0%
A545-641-81-41-01029 E C DRAWING FOR GROUND IMPROVEMENT 0.01 22-Jul-17 8-Feb-19 5-Aug-17 22-Feb-19 12-Aug-17 1-Mar-19 19-Aug-17 8-Mar-19 2-Sep-17 15-Mar-19 25-Apr-19 15-Mar-19 100% 100.0%
A545-700-81-41-10840 E C FDN. AND SUPER STR. DET FOR LOOP SUP STR 0.01 22-Jul-17 4-Feb-19 5-Aug-17 18-Feb-19 12-Aug-17 25-Feb-19 19-Aug-17 4-Mar-19 2-Sep-17 11-Mar-19 25-Apr-19 11-Mar-19 100% 100.0%
A545-700-81-41-01937 E C GA & DETAILS OFFSITE T SUPPORT 0.01 20-Jul-17 8-Feb-19 3-Aug-17 22-Feb-19 10-Aug-17 1-Mar-19 17-Aug-17 8-Mar-19 31-Aug-17 15-Mar-19 23-Apr-19 15-Mar-19 100% 100.0%
A545-700-81-41-07937 E C GA & DETAILS OFFSITE T SUPPORT 0.01 20-Jul-17 20-Feb-19 3-Aug-17 6-Mar-19 10-Aug-17 13-Mar-19 17-Aug-17 20-Mar-19 31-Aug-17 27-Mar-19 23-Apr-19 27-Mar-19 100% 100.0%
A545-700-81-41-03937 E C GA & DETAILS OFFSITE T SUPPORT 0.01 22-Jul-17 19-Feb-19 5-Aug-17 5-Mar-19 12-Aug-17 12-Mar-19 19-Aug-17 19-Mar-19 2-Sep-17 26-Mar-19 25-Apr-19 26-Mar-19 100% 100.0%
A545-700-81-41-03942 E C GA & DETAILS OFFSITE T SUPPORT 0.01 24-Jul-17 4-Mar-19 7-Aug-17 18-Mar-19 14-Aug-17 25-Mar-19 21-Aug-17 1-Apr-19 4-Sep-17 8-Apr-19 27-Apr-19 8-Apr-19 100% 100.0%
A545-700-81-41-05311 E C FLARE SUPPORTING STR GA & DETAILS 0.01 24-Jul-17 8-Feb-19 7-Aug-17 22-Feb-19 14-Aug-17 1-Mar-19 21-Aug-17 8-Mar-19 4-Sep-17 15-Mar-19 27-Apr-19 15-Mar-19 100% 100.0%
A545-700-81-41-01032 E C DRAWING FOR GROUND IMPROVEMENT 0.01 22-Jul-17 11-Mar-19 5-Aug-17 25-Mar-19 12-Aug-17 1-Apr-19 19-Aug-17 8-Apr-19 2-Sep-17 15-Apr-19 25-Apr-19 15-Apr-19 100% 100.0%
A545-700-81-41-00811 E C OFFSITE PIPE RACK PLATFORMS & JUMPOVERS 0.01 26-Jul-17 28-Feb-19 9-Aug-17 14-Mar-19 16-Aug-17 21-Mar-19 23-Aug-17 28-Mar-19 6-Sep-17 4-Apr-19 29-Apr-19 4-Apr-19 100% 100.0%
Page 578 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 32 of 33
Jul-19
DRAWING CONTROL INDEX JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA
DISCIPLINE: STRUCTURAL (UTILITIES & OFFSITES)
ANNEXURE-A6
INCORPORATE TOTAL TOTAL
UPDATE & ISSUE FOR
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD. (ACTUAL
CONSTN.
(10%) (60%) (65%) (80%) CONSTRUCTION PROGRESS PROGRESS
DRAWING/ DOCUMENT REVAMP/ (100%)
CAT DRAWING/ DOCUMENT TITLE WTG (85%) %) %)
NO. EXISTING
%
10.00 60.00 65.00 80.00 85.00 100.00
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-81-41-00812 E C OFFSITE PIPE RACK PGA OF PLATFORMS 0.01 26-Jul-17 28-Feb-19 9-Aug-17 14-Mar-19 16-Aug-17 21-Mar-19 23-Aug-17 28-Mar-19 6-Sep-17 4-Apr-19 29-Apr-19 4-Apr-19 100% 100.0%
A545-700-81-41-SK962 E C PILE LAYOUT TW/DW SUMP 0.01 26-Jul-17 14-Mar-19 9-Aug-17 28-Mar-19 16-Aug-17 4-Apr-19 23-Aug-17 11-Apr-19 6-Sep-17 18-Apr-19 29-Apr-19 18-Apr-19 100% 100.0%
A545-700-16-48-MPR E E DESIGN CALCULATIONS FOR MAIN PIPE RACK 0.04 2-Nov-15 2-Nov-15 - - - - - - - - 30-Nov-15 30-Nov-15 100% 100.0%
A545-700-81-41-ADC-0951 E E DESIGN CALCULATIONS FOR DYKE WALL 0.04 2-Nov-15 2-Nov-15 - - - - - - - - 30-Nov-15 30-Nov-15 100% 100.0%
A545-700-16-48-BUILD E E DESIGN CALCULATIONS FOR SRR - 01 BUILDING 0.04 2-Nov-15 2-Nov-15 - - - - - - - - 30-Nov-15 30-Nov-15 100% 100.0%
A545-700-16-48-SS01 E E DESIGN CALCULATIONS FOR SUB STATION - 01 0.04 2-Nov-15 2-Nov-15 - - - - - - - - 30-Nov-15 30-Nov-15 100% 100.0%
100 98.9%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-700-16-50-01011 R C OVERALL CABLE LAYOUT PLAN 0.2 3-Oct-15 2-Apr-15 24-Oct-15 31-Jul-15 31-Oct-15 7-Aug-15 7-Nov-15 12-Aug-15 21-Nov-15 6-Aug-15 5-Dec-16 27-May-17 100% 100.0%
A545-700-16-50-01012 R C OVERALL CABLE LAYOUT DETAILS-1 0.2 3-Oct-15 2-Apr-15 24-Oct-15 31-Jul-15 31-Oct-15 7-Aug-15 7-Nov-15 12-Aug-15 21-Nov-15 6-Aug-15 5-Dec-16 27-May-17 100% 100.0%
A545-700-16-50-01013 R C OVERALL CABLE LAYOUT DETAILS-2 0.2 3-Oct-15 2-Apr-15 24-Oct-15 31-Jul-15 31-Oct-15 7-Aug-15 7-Nov-15 12-Aug-15 21-Nov-15 6-Aug-15 5-Dec-16 27-May-17 100% 100.0%
A545-700-16-50-01014 R C OVERALL CABLE LAYOUT DETAILS-3 0.2 3-Oct-15 2-Apr-15 24-Oct-15 31-Jul-15 31-Oct-15 7-Aug-15 7-Nov-15 12-Aug-15 21-Nov-15 6-Aug-15 5-Dec-16 27-May-17 100% 100.0%
A545-700-16-50-01130 E C OVERALL FO CABLE LAYOUT ECS 0.3 5-Nov-16 23-Dec-16 26-Nov-16 10-Jul-17 3-Dec-16 17-Jul-17 10-Dec-16 24-Jul-17 24-Dec-16 31-Jul-17 22-Feb-17 13-Sep-17 100% 100.0%
A545-700-16-50-02010 R C OVERALL LIGHTING LAYOUT 0.3 5-Jan-16 8-Apr-15 19-Jan-16 20-Apr-15 26-Jan-16 27-Apr-15 2-Feb-16 4-May-15 16-Feb-16 18-May-15 2-Mar-17 14-Feb-17 100% 100.0%
A545-700-16-50-03010 R C OVERALL EARTHING LAYOUT 0.3 21-Nov-15 13-Jul-15 5-Dec-15 27-Jul-15 12-Dec-15 10-Aug-15 19-Dec-15 13-Aug-15 2-Jan-16 17-Aug-15 16-Jan-17 2-Jun-17 100% 100.0%
A545-740-16-50-05021 E C FA / PA LAYOUT FIRE STATION 0.3 28-Nov-15 22-Jun-15 12-Dec-15 6-Jul-15 19-Dec-15 13-Jul-15 26-Dec-15 20-Jul-15 9-Jan-16 27-Jul-15 9-Mar-16 10-Aug-15 100% 100.0%
A545-730-16-50-01010 R C CABLE LAYOUT SS 01 CDU 0.3 21-Oct-15 29-Jun-15 4-Nov-15 12-Oct-15 11-Nov-15 19-Oct-15 18-Nov-15 26-Oct-15 2-Dec-15 9-Nov-15 31-Jan-16 23-Nov-15 100% 100.0%
A545-730-16-50-01020 E C CABLE LAYOUT SS 02 RFCCU 0.3 23-Oct-15 29-Jun-15 6-Nov-15 29-Oct-15 13-Nov-15 5-Nov-15 20-Nov-15 12-Nov-15 4-Dec-15 26-Nov-15 2-Feb-16 27-Jan-16 100% 100.0%
A545-730-16-50-01030 E C CABLE LAYOUT SS 03 NHR CCR 0.3 25-Oct-15 29-Jun-15 8-Nov-15 16-Oct-15 15-Nov-15 23-Oct-15 22-Nov-15 30-Oct-15 6-Dec-15 13-Nov-15 4-Feb-16 27-Nov-15 100% 100.0%
A545-730-16-50-01040 E C CABLE LAYOUT SS 04 MHC 0.3 27-Oct-15 29-Jun-15 10-Nov-15 19-Oct-15 17-Nov-15 26-Oct-15 24-Nov-15 2-Nov-15 8-Dec-15 16-Nov-15 6-Feb-16 30-Nov-15 100% 100.0%
A545-730-16-50-01050 E C CABLE LAYOUT SS 05 ALKYLATION 0.3 29-Oct-15 28-Aug-15 12-Nov-15 30-Sep-15 19-Nov-15 7-Oct-15 26-Nov-15 14-Oct-15 10-Dec-15 28-Oct-15 5-Dec-16 22-Mar-17 100% 100.0%
A545-730-16-50-01070 E C CABLE LAYOUT SS 07 PPU 0.3 2-Nov-15 8-Dec-15 16-Nov-15 22-Dec-15 23-Nov-15 29-Dec-15 30-Nov-15 5-Jan-16 14-Dec-15 29-Dec-15 8-Dec-16 29-Apr-17 100% 100.0%
A545-730-16-50-01080 E C CABLE LAYOUT SS 08 SRU 0.3 4-Nov-15 14-Aug-15 18-Nov-15 16-Sep-15 25-Nov-15 30-Sep-15 2-Dec-15 13-Oct-15 16-Dec-15 20-Oct-15 10-Dec-16 12-Apr-17 100% 100.0%
A545-730-16-50-01090 E C CABLE LAYOUT SS 09 ETP/TTP 0.3 5-Nov-15 16-Oct-15 19-Nov-15 30-Oct-15 26-Nov-15 3-Nov-15 3-Dec-15 10-Nov-15 17-Dec-15 17-Nov-15 11-Dec-16 17-Apr-17 100% 100.0%
A545-730-16-50-01112 R C CABLE LAYOUT SS 11 CPP 0.3 7-Nov-15 16-Oct-15 21-Nov-15 30-May-16 28-Nov-15 30-Jul-16 5-Dec-15 24-Oct-16 19-Dec-15 31-Oct-16 13-Dec-16 3-Nov-16 100% 100.0%
A545-730-16-50-01113 R C CABLE LAYOUT 0.3 7-Nov-15 16-Oct-15 21-Nov-15 30-May-16 28-Nov-15 30-Jul-16 5-Dec-15 24-Oct-16 19-Dec-15 31-Oct-16 13-Dec-16 3-Nov-16 100% 100.0%
A545-730-16-50-01120 E C CABLE LAYOUT SS 12 CT-03 0.3 9-Nov-15 25-Sep-15 23-Nov-15 9-Oct-15 30-Nov-15 16-Oct-15 7-Dec-15 23-Oct-15 21-Dec-15 30-Oct-15 15-Dec-16 29-Apr-17 100% 100.0%
A545-730-16-50-01130 E C CABLE LAYOUT SS 13 CT-02 0.3 11-Nov-15 25-Sep-15 25-Nov-15 9-Oct-15 2-Dec-15 16-Oct-15 9-Dec-15 23-Oct-15 23-Dec-15 30-Oct-15 17-Dec-16 31-Mar-17 100% 100.0%
A545-730-16-50-01140 E C CABLE LAYOUT SS 14 CT-04 0.3 13-Nov-15 21-Oct-15 27-Nov-15 4-Nov-15 4-Dec-15 11-Nov-15 11-Dec-15 18-Nov-15 25-Dec-15 23-Dec-15 19-Dec-16 18-Apr-17 100% 100.0%
A545-730-16-50-01150 E C CABLE LAYOUT SS 15 TANK FARM 0.3 15-Nov-15 5-Nov-15 28-Nov-15 19-Nov-15 5-Dec-15 26-Nov-15 12-Dec-15 3-Dec-15 26-Dec-15 10-Dec-15 20-Dec-16 20-Apr-17 100% 100.0%
A545-730-16-50-01160 E C CABLE LAYOUT SS 16 LOADING AREA 0.3 17-Nov-15 25-Sep-15 1-Dec-15 9-Oct-15 8-Dec-15 16-Oct-15 15-Dec-15 23-Oct-15 29-Dec-15 30-Oct-15 23-Dec-16 20-Apr-17 100% 100.0%
A545-730-16-50-01170 E C CABLE LAYOUT SS 17 TANK FARM 0.3 19-Nov-15 25-Sep-15 3-Dec-15 9-Oct-15 10-Dec-15 16-Oct-15 17-Dec-15 23-Oct-15 31-Dec-15 30-Oct-15 25-Dec-16 21-Apr-17 100% 100.0%
A545-730-16-50-01180 E C CABLE LAYOUT SS 18 ADMINISTRATION 0.3 21-Nov-15 12-Oct-15 5-Dec-15 26-Oct-15 12-Dec-15 2-Nov-15 19-Dec-15 9-Nov-15 2-Jan-16 16-Nov-15 2-Mar-16 30-Nov-15 100% 100.0%
Page 580 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 16
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
PROJECT, NIGERIA JOB NO. : A545
DISCIPLINE: ELECTRICAL (UTILITIES & OFFSITES)
ANNEXURE-A6
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-50-02011 R C LIGHTING LAYOUT SS 01 CDU-SHEET-1 0.2 14-Jan-16 17-Dec-14 28-Jan-16 31-Dec-14 4-Feb-16 2-Apr-15 11-Feb-16 14-Apr-15 25-Feb-16 25-Jun-15 25-Apr-16 28-Jun-16 100% 100.0%
A545-730-16-50-02012 R C LIGHTING LAYOUT SS 01 CDU-SHEET-2 0.2 14-Jan-16 17-Dec-14 28-Jan-16 31-Dec-14 4-Feb-16 2-Apr-15 11-Feb-16 14-Apr-15 25-Feb-16 25-Jun-15 25-Apr-16 28-Jun-16 100% 100.0%
A545-730-16-50-02021 E C LIGHTING LAYOUT SS 02 RFCC-SHEET1 0.2 16-Jan-16 9-Jun-15 30-Jan-16 23-Jun-15 6-Feb-16 30-Jun-15 13-Feb-16 7-Jul-15 27-Feb-16 31-Jul-15 27-Apr-16 30-Jun-16 100% 100.0%
A545-730-16-50-02022 E C LIGHTING LAYOUT SS 02 RFCC-SHEET2 0.2 16-Jan-16 9-Jun-15 30-Jan-16 23-Jun-15 6-Feb-16 30-Jun-15 13-Feb-16 7-Jul-15 27-Feb-16 31-Jul-15 27-Apr-16 30-Jun-16 100% 100.0%
A545-730-16-50-02041 E C LIGHTING LAYOUT SS 04 MHC-SHEET-1 0.2 20-Jan-16 9-Jun-15 3-Feb-16 23-Jun-15 10-Feb-16 30-Jun-15 17-Feb-16 7-Jul-15 2-Mar-16 31-Jul-15 1-May-16 7-Jul-16 100% 100.0%
Page 581 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 2 of 16
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
PROJECT, NIGERIA JOB NO. : A545
DISCIPLINE: ELECTRICAL (UTILITIES & OFFSITES)
ANNEXURE-A6
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-50-02042 E C LIGHTING LAYOUT SS 04 MHC-SHEET-2 0.2 20-Jan-16 9-Jun-15 3-Feb-16 23-Jun-15 10-Feb-16 30-Jun-15 17-Feb-16 7-Jul-15 2-Mar-16 31-Jul-15 1-May-16 7-Jul-16 100% 100.0%
A545-730-16-50-02071 E C LIGHTING LAYOUT SS 07 PPU-SHEET-1 0.2 26-Jan-16 3-Jul-15 9-Feb-16 17-Jul-15 16-Feb-16 24-Jul-15 23-Feb-16 31-Jul-15 8-Mar-16 4-Sep-15 7-May-16 29-Jul-16 100% 100.0%
A545-730-16-50-02072 E C LIGHTING LAYOUT SS 07 PPU SHEET-2 0.2 26-Jan-16 3-Jul-15 9-Feb-16 17-Jul-15 16-Feb-16 24-Jul-15 23-Feb-16 31-Jul-15 8-Mar-16 4-Sep-15 7-May-16 29-Jul-16 100% 100.0%
A545-730-16-50-02081 E C LIGHTING LAYOUT SS 08 SRU-SHEET-1 0.2 28-Jan-16 1-Jul-15 11-Feb-16 15-Jul-15 18-Feb-16 22-Jul-15 25-Feb-16 29-Jul-15 10-Mar-16 31-Jul-15 9-May-16 30-Sep-16 100% 100.0%
A545-730-16-50-02082 E C LIGHTING LAYOUT SS 08 SRU-SHEET-2 0.2 28-Jan-16 1-Jul-15 11-Feb-16 15-Jul-15 18-Feb-16 22-Jul-15 25-Feb-16 29-Jul-15 10-Mar-16 31-Jul-15 9-May-16 30-Sep-16 100% 100.0%
LIGHTING LAYOUT SS 10
A545-730-16-50-02102 E C 0.2 1-Feb-16 2-Feb-15 15-Feb-16 16-Feb-15 22-Feb-16 23-Feb-15 29-Feb-16 2-Mar-15 14-Mar-16 6-Jul-15 13-May-16 28-Oct-16 100% 100.0%
DESALINATION PLANT-SHEET-2
A545-730-16-50-02111 R C LIGHTING LAYOUT SS 11 CPP-SHEET-1 0.1 3-Feb-16 10-Jul-15 17-Feb-16 24-Jul-15 24-Feb-16 31-Jul-15 2-Mar-16 7-Aug-15 16-Mar-16 28-Sep-15 15-May-16 6-Oct-15 100% 100.0%
A545-730-16-50-02112 R C LIGHTING LAYOUT SS 11 CPP-SHEET-2 0.1 3-Feb-16 10-Jul-15 17-Feb-16 24-Jul-15 24-Feb-16 31-Jul-15 2-Mar-16 7-Aug-15 16-Mar-16 28-Sep-15 15-May-16 6-Oct-15 100% 100.0%
A545-730-16-50-02113 R C LIGHTING LAYOUT SS 11 CPP-SHEET-3 0.1 3-Feb-16 10-Jul-15 17-Feb-16 24-Jul-15 24-Feb-16 31-Jul-15 2-Mar-16 7-Aug-15 16-Mar-16 28-Sep-15 15-May-16 6-Oct-15 100% 100.0%
A545-730-16-50-02114 R C LIGHTING LAYOUT SS 11 CPP-SHEET-4 0.1 3-Feb-16 10-Jul-15 17-Feb-16 24-Jul-15 24-Feb-16 31-Jul-15 2-Mar-16 7-Aug-15 16-Mar-16 28-Sep-15 15-May-16 6-Oct-15 100% 100.0%
A545-730-16-50-02141 E C LIGHTING LAYOUT SS 14 CT-04 0.2 9-Feb-16 22-Dec-14 23-Feb-16 5-Jan-15 1-Mar-16 12-Jan-15 8-Mar-16 19-Jan-15 22-Mar-16 19-Jan-15 21-May-16 31-Oct-16 100% 100.0%
A545-730-16-50-02142 E C LIGHTING LAYOUT SS 14 CT-04 0.2 9-Feb-16 22-Dec-14 23-Feb-16 5-Jan-15 1-Mar-16 12-Jan-15 8-Mar-16 19-Jan-15 22-Mar-16 19-Jan-15 21-May-16 31-Oct-16 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-50-02301 E C LIGHTING LAYOUT MCR-01-SHEET-1 0.1 21-Feb-16 17-Dec-15 6-Mar-16 16-Jun-16 13-Mar-16 23-Jun-16 20-Mar-16 30-Jun-16 3-Apr-16 14-Jul-16 29-Mar-17 31-Aug-17 100% 100.0%
A545-730-16-50-02302 E C LIGHTING LAYOUT MCR-01-SHEET-2 0.1 21-Feb-16 17-Dec-15 6-Mar-16 16-Jun-16 13-Mar-16 23-Jun-16 20-Mar-16 30-Jun-16 3-Apr-16 14-Jul-16 29-Mar-17 31-Aug-17 100% 100.0%
A545-730-16-50-02303 E C LIGHTING LAYOUT MCR-01-SHEET-3 0.1 21-Feb-16 17-Dec-15 6-Mar-16 16-Jun-16 13-Mar-16 23-Jun-16 20-Mar-16 30-Jun-16 3-Apr-16 14-Jul-16 29-Mar-17 31-Aug-17 100% 100.0%
A545-730-16-50-02321 E C LIGHTING LAYOUT CR-03 0.3 25-Feb-16 22-Jul-15 10-Mar-16 5-Aug-15 17-Mar-16 12-Aug-15 24-Mar-16 19-Aug-15 7-Apr-16 2-Sep-15 2-Apr-17 31-Dec-16 100% 100.0%
A545-730-16-50-02331 E C LIGHTING LAYOUT CR-04 0.3 27-Feb-16 12-May-15 12-Mar-16 26-May-15 19-Mar-16 2-Jun-15 26-Mar-16 9-Jun-15 9-Apr-16 23-Jun-15 4-Apr-17 30-Dec-16 100% 100.0%
A545-730-16-50-02341 E C LIGHTING LAYOUT CR-05 0.3 29-Feb-16 15-May-15 14-Mar-16 29-May-15 21-Mar-16 5-Jun-15 28-Mar-16 12-Jun-15 11-Apr-16 26-Jun-15 6-Apr-17 30-Dec-16 100% 100.0%
A545-730-16-50-02351 E C LIGHTING LAYOUT CR-06 0.3 2-Mar-16 12-May-15 16-Mar-16 26-May-15 23-Mar-16 2-Jun-15 30-Mar-16 9-Jun-15 13-Apr-16 23-Jun-15 8-Apr-17 30-Dec-16 100% 100.0%
A545-730-16-50-02480 E C LIGHTING LAYOUT CR-07 0.3 5-Mar-16 24-Jul-15 19-Mar-16 7-Aug-15 26-Mar-16 14-Aug-15 2-Apr-16 21-Aug-15 16-Apr-16 4-Sep-15 15-Jun-16 29-Sep-16 100% 100.0%
A545-730-16-50-02361 E C LIGHTING LAYOUT SRR 01 0.2 4-Mar-16 23-Feb-15 18-Mar-16 9-Mar-15 25-Mar-16 16-Mar-15 1-Apr-16 23-Mar-15 15-Apr-16 13-Apr-15 10-Apr-17 7-Dec-16 100% 100.0%
A545-730-16-50-02362 E C LIGHTING LAYOUT SRR 01 0.2 4-Mar-16 23-Feb-15 18-Mar-16 9-Mar-15 25-Mar-16 16-Mar-15 1-Apr-16 23-Mar-15 15-Apr-16 13-Apr-15 10-Apr-17 7-Dec-16 100% 100.0%
A545-730-16-50-02371 E C LIGHTING LAYOUT SRR 02 0.2 6-Mar-16 23-Feb-15 20-Mar-16 9-Mar-15 27-Mar-16 16-Mar-15 3-Apr-16 23-Mar-15 17-Apr-16 13-Apr-15 12-Apr-17 9-Dec-16 100% 100.0%
A545-730-16-50-02372 E C LIGHTING LAYOUT SRR 02 0.2 6-Mar-16 23-Feb-15 20-Mar-16 9-Mar-15 27-Mar-16 16-Mar-15 3-Apr-16 23-Mar-15 17-Apr-16 13-Apr-15 12-Apr-17 9-Dec-16 100% 100.0%
A545-730-16-50-02381 E C LIGHTING LAYOUT SRR 03 0.2 8-Mar-16 11-Mar-15 22-Mar-16 25-Mar-15 29-Mar-16 1-Apr-15 5-Apr-16 8-Apr-15 19-Apr-16 13-Apr-15 14-Apr-17 13-Dec-16 100% 100.0%
A545-730-16-50-02382 E C LIGHTING LAYOUT SRR 03 0.2 8-Mar-16 11-Mar-15 22-Mar-16 25-Mar-15 29-Mar-16 1-Apr-15 5-Apr-16 8-Apr-15 19-Apr-16 13-Apr-15 14-Apr-17 13-Dec-16 100% 100.0%
A545-730-16-50-02391 E C LIGHTING LAYOUT SRR 04 0.2 10-Mar-16 11-Mar-15 24-Mar-16 25-Mar-15 31-Mar-16 1-Apr-15 7-Apr-16 8-Apr-15 21-Apr-16 13-Apr-15 16-Apr-17 15-Dec-16 100% 100.0%
A545-730-16-50-02392 E C LIGHTING LAYOUT SRR 04 0.2 10-Mar-16 11-Mar-15 24-Mar-16 25-Mar-15 31-Mar-16 1-Apr-15 7-Apr-16 8-Apr-15 21-Apr-16 13-Apr-15 16-Apr-17 15-Dec-16 100% 100.0%
A545-730-16-50-02401 E C LIGHTING LAYOUT SRR 06 0.2 12-Mar-16 23-Feb-15 26-Mar-16 9-Mar-15 2-Apr-16 16-Mar-15 9-Apr-16 23-Mar-15 23-Apr-16 13-Apr-15 18-Apr-17 19-Dec-16 100% 100.0%
A545-730-16-50-02402 E C LIGHTING LAYOUT SRR 06 0.2 12-Mar-16 23-Feb-15 26-Mar-16 9-Mar-15 2-Apr-16 16-Mar-15 9-Apr-16 23-Mar-15 23-Apr-16 13-Apr-15 18-Apr-17 19-Dec-16 100% 100.0%
A545-730-16-50-02411 E C LIGHTING LAYOUT SRR 07 0.2 14-Mar-16 23-Feb-15 28-Mar-16 9-Mar-15 4-Apr-16 16-Mar-15 11-Apr-16 23-Mar-15 25-Apr-16 13-Apr-15 20-Apr-17 21-Dec-16 100% 100.0%
A545-730-16-50-02412 E C LIGHTING LAYOUT SRR 07 0.2 14-Mar-16 23-Feb-15 28-Mar-16 9-Mar-15 4-Apr-16 16-Mar-15 11-Apr-16 23-Mar-15 25-Apr-16 13-Apr-15 20-Apr-17 21-Dec-16 100% 100.0%
A545-730-16-50-02421 E C LIGHTING LAYOUT SRR 08 0.2 16-Mar-16 23-Feb-15 30-Mar-16 9-Mar-15 6-Apr-16 16-Mar-15 13-Apr-16 23-Mar-15 27-Apr-16 13-Apr-15 22-Apr-17 23-Dec-16 100% 100.0%
A545-730-16-50-02422 E C LIGHTING LAYOUT SRR 08 0.2 16-Mar-16 23-Feb-15 30-Mar-16 9-Mar-15 6-Apr-16 16-Mar-15 13-Apr-16 23-Mar-15 27-Apr-16 13-Apr-15 22-Apr-17 23-Dec-16 100% 100.0%
A545-730-16-50-02431 E C LIGHTING LAYOUT SRR 09 0.2 18-Mar-16 23-Feb-15 1-Apr-16 9-Mar-15 8-Apr-16 16-Mar-15 15-Apr-16 23-Mar-15 29-Apr-16 13-Apr-15 24-Apr-17 27-Dec-16 100% 100.0%
A545-730-16-50-02432 E C LIGHTING LAYOUT SRR 09 0.2 18-Mar-16 23-Feb-15 1-Apr-16 9-Mar-15 8-Apr-16 16-Mar-15 15-Apr-16 23-Mar-15 29-Apr-16 13-Apr-15 24-Apr-17 27-Dec-16 100% 100.0%
A545-730-16-50-02441 E C LIGHTING LAYOUT SRR-10 0.1 19-Mar-16 27-Jan-15 2-Apr-16 10-Feb-15 9-Apr-16 17-Feb-15 16-Apr-16 24-Feb-15 30-Apr-16 10-Mar-15 25-Apr-17 27-Dec-16 100% 100.0%
A545-730-16-50-02442 E C LIGHTING LAYOUT SRR-10 0.1 19-Mar-16 27-Jan-15 2-Apr-16 10-Feb-15 9-Apr-16 17-Feb-15 16-Apr-16 24-Feb-15 30-Apr-16 10-Mar-15 25-Apr-17 27-Dec-16 100% 100.0%
A545-730-16-50-02451 E C LIGHTING LAYOUT SRR-11 0.1 21-Mar-16 27-Jan-15 4-Apr-16 10-Feb-15 11-Apr-16 17-Feb-15 18-Apr-16 24-Feb-15 2-May-16 10-Mar-15 27-Apr-17 28-Dec-16 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-50-02452 E C LIGHTING LAYOUT SRR-11 0.1 21-Mar-16 27-Jan-15 4-Apr-16 10-Feb-15 11-Apr-16 17-Feb-15 18-Apr-16 24-Feb-15 2-May-16 10-Mar-15 27-Apr-17 28-Dec-16 100% 100.0%
A545-730-16-50-02490 E C LIGHTING LAYOUT CR 08 0.3 21-Mar-16 27-Jan-15 4-Apr-16 10-Feb-15 11-Apr-16 17-Feb-15 18-Apr-16 24-Feb-15 2-May-16 10-Mar-15 1-Jul-16 31-Oct-16 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-50-04010 R C EQUIPMENT LAYOUT SS 01 CDU 0.3 12-Jan-16 24-Sep-15 7-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-730-16-50-04020 E C EQUIPMENT LAYOUT SS 02 RFCCU 0.3 14-Jan-16 24-Sep-15 9-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-730-16-50-04030 E C EQUIPMENT LAYOUT SS 03 NHT CCR 0.3 16-Dec-16 4-Mar-17 6-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-730-16-50-04040 E C EQUIPMENT LAYOUT SS 04 MHC 0.3 19-Dec-16 10-Mar-17 2-Jan-17 17-Mar-17 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 60.0%
EQUIPMENT LAYOUT SS 05
A545-730-16-50-04050 E C 0.3 20-Dec-16 25-Jan-17 3-Jan-17 1-Feb-17 10-Jan-17 8-Feb-17 17-Jan-17 15-Feb-17 31-Jan-17 22-Feb-17 31-Aug-19 - 85% 85.0%
ALKYLATION
EQUIPMENT LAYOUT SS 06 FCC GAS.
A545-730-16-50-04060 R C 0.3 22-Dec-16 15-Mar-17 5-Jan-17 21-Mar-17 12-Jan-17 28-Mar-17 19-Jan-17 4-Apr-17 2-Feb-17 11-Apr-17 31-Aug-19 - 85% 85.0%
TR
A545-730-16-50-04070 E C EQUIPMENT LAYOUT SS 07 PPU 0.3 24-Dec-16 18-Mar-17 7-Jan-17 20-Apr-17 14-Jan-17 27-Apr-17 21-Jan-17 4-May-17 4-Feb-17 11-May-17 5-Apr-17 18-May-17 100% 100.0%
Page 585 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 6 of 16
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
PROJECT, NIGERIA JOB NO. : A545
DISCIPLINE: ELECTRICAL (UTILITIES & OFFSITES)
ANNEXURE-A6
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-50-04080 E C EQUIPMENT LAYOUT SS 08 SRU 0.3 26-Jan-16 24-Sep-15 4-Jan-17 21-Mar-17 11-Jan-17 28-Mar-17 18-Jan-17 4-Apr-17 1-Feb-17 11-Apr-17 31-Aug-19 - 85% 85.0%
A545-730-16-50-04090 E C EQUIPMENT LAYOUT SS 09 ETP/TTP 0.3 28-Dec-16 20-Mar-17 11-Jan-17 27-Mar-17 18-Jan-17 3-Apr-17 25-Jan-17 10-Apr-17 8-Feb-17 17-Apr-17 31-Aug-19 - 85% 85.0%
EQUIPMENT LAYOUT SS 10
A545-730-16-50-04100 E C 0.3 30-Dec-16 22-Mar-17 13-Jan-17 27-Mar-17 20-Jan-17 3-Apr-17 27-Jan-17 10-Apr-17 10-Feb-17 17-Apr-17 31-Aug-19 - 85% 85.0%
DESALINATION
A545-730-16-50-04110 R C EQUIPMENT LAYOUT SS 11 CPP 0.3 1-Jan-17 22-Mar-17 6-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-730-16-50-04120 E C EQUIPMENT LAYOUT SS 12 CT-03 0.3 3-Jan-17 14-Mar-17 17-Jan-17 21-Mar-17 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 60.0%
A545-730-16-50-04130 E C EQUIPMENT LAYOUT SS 13 CT-02 0.3 5-Jan-17 25-Mar-17 19-Jan-17 21-Mar-17 26-Jan-17 28-Mar-17 2-Feb-17 4-Apr-17 16-Feb-17 11-Apr-17 31-Aug-19 - 85% 85.0%
A545-730-16-50-04140 E C EQUIPMENT LAYOUT SS 14 CT-04 0.3 7-Jan-17 25-Mar-17 12-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
A545-730-16-50-04150 E C EQUIPMENT LAYOUT SS 15 TANK FARM 0.3 9-Jan-17 25-Mar-17 23-Jan-17 28-Mar-17 30-Jan-17 4-Apr-17 6-Feb-17 11-Apr-17 20-Feb-17 18-Apr-17 31-Aug-19 - 85% 85.0%
A545-730-16-50-04170 E C EQUIPMENT LAYOUT SS 17 TANK FARM 0.3 13-Jan-17 28-Mar-17 18-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
EQUIPMENT LAYOUT SS 18
A545-730-16-50-04180 E C 0.3 16-Jan-17 31-Mar-17 21-Mar-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 40.0%
ADMINISTRATION
EQUIPMENT LAYOUT SS 19 DESPATCH
A545-730-16-50-04190 E C 0.3 17-Jan-17 13-Mar-17 31-Jan-17 20-Mar-17 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 60% 60.0%
TERMINAL
A545-730-16-50-05010 R C FIRE ALARM & PA LAYOUT SS 01 0.3 10-Nov-15 7-Apr-15 24-Nov-15 21-Apr-15 1-Dec-15 28-Apr-15 8-Dec-15 5-May-15 22-Dec-15 19-May-15 24-Feb-17 30-Dec-16 100% 100.0%
A545-730-16-50-05020 E C FIRE ALARM & PA LAYOUT SS 02 0.3 12-Nov-15 11-Mar-15 26-Nov-15 25-Mar-15 3-Dec-15 1-Apr-15 10-Dec-15 8-Apr-15 24-Dec-15 22-Apr-15 26-Feb-17 30-Dec-16 100% 100.0%
A545-730-16-50-05030 E C FIRE ALARM & PA LAYOUT SS 03 0.3 14-Nov-15 11-Mar-15 28-Nov-15 25-Mar-15 5-Dec-15 1-Apr-15 12-Dec-15 8-Apr-15 26-Dec-15 22-Apr-15 28-Feb-17 30-Dec-16 100% 100.0%
A545-730-16-50-05040 E C FIRE ALARM & PA LAYOUT SS 04 0.3 16-Nov-15 11-Mar-15 30-Nov-15 25-Mar-15 7-Dec-15 1-Apr-15 14-Dec-15 8-Apr-15 28-Dec-15 22-Apr-15 2-Mar-17 30-Dec-16 100% 100.0%
A545-730-16-50-05050 E C FIRE ALARM & PA LAYOUT SS 05 0.3 18-Nov-15 7-Apr-15 2-Dec-15 21-Apr-15 9-Dec-15 28-Apr-15 16-Dec-15 5-May-15 30-Dec-15 19-May-15 4-Mar-17 30-Dec-16 100% 100.0%
A545-730-16-50-05060 E C FIRE ALARM & PA LAYOUT SS 06 0.3 20-Nov-15 7-Apr-15 4-Dec-15 21-Apr-15 11-Dec-15 28-Apr-15 18-Dec-15 5-May-15 1-Jan-16 19-May-15 6-Mar-17 30-Dec-16 100% 100.0%
A545-730-16-50-05070 E C FIRE ALARM & PA LAYOUT SS 07 0.3 22-Nov-15 8-Apr-15 6-Dec-15 22-Apr-15 13-Dec-15 29-Apr-15 20-Dec-15 6-May-15 3-Jan-16 20-May-15 8-Mar-17 30-Dec-16 100% 100.0%
A545-730-16-50-05080 E C FIRE ALARM & PA LAYOUT SS 08 SRU 0.3 24-Nov-15 9-Apr-15 8-Dec-15 23-Apr-15 15-Dec-15 30-Apr-15 22-Dec-15 7-May-15 5-Jan-16 21-May-15 10-Mar-17 14-Jan-17 100% 100.0%
A545-730-16-50-05100 E C FIRE ALARM & PA LAYOUT SS 10 0.3 28-Nov-15 8-Apr-15 12-Dec-15 22-Apr-15 19-Dec-15 29-Apr-15 26-Dec-15 6-May-15 9-Jan-16 20-May-15 14-Mar-17 20-Jan-17 100% 100.0%
A545-730-16-50-05120 E C FIRE ALARM & PA LAYOUT SS 12 CT-03 0.3 2-Dec-15 3-Apr-15 16-Dec-15 17-Apr-15 23-Dec-15 24-Apr-15 30-Dec-15 1-May-15 13-Jan-16 15-May-15 18-Mar-17 22-Jun-17 100% 100.0%
A545-730-16-50-05130 E C FIRE ALARM & PA LAYOUT SS 13 CT-02 0.3 4-Dec-15 3-Apr-15 18-Dec-15 17-Apr-15 25-Dec-15 24-Apr-15 1-Jan-16 1-May-15 15-Jan-16 15-May-15 15-Mar-16 15-Oct-15 100% 100.0%
A545-730-16-50-05140 E C FIRE ALARM & PA LAYOUT SS 14 CT-04 0.3 6-Dec-15 3-Apr-15 20-Dec-15 17-Apr-15 27-Dec-15 24-Apr-15 3-Jan-16 1-May-15 17-Jan-16 15-May-15 22-Mar-17 30-Jun-17 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-730-16-50-05190 E C FIRE ALARM & PA LAYOUT SS 19 0.3 15-Dec-15 7-Apr-15 29-Dec-15 21-Apr-15 5-Jan-16 28-Apr-15 12-Jan-16 5-May-15 26-Jan-16 19-May-15 31-Mar-17 29-Jun-17 100% 100.0%
A545-730-16-50-05301 E C FIRE ALARM & PA LAYOUT MCR-01 0.3 16-Dec-15 27-May-16 30-Dec-15 10-Jun-16 6-Jan-16 17-Jun-16 13-Jan-16 24-Jun-16 27-Jan-16 1-Jul-16 1-Apr-17 27-Sep-17 100% 100.0%
A545-730-16-50-05321 E C FIRE ALARM & PA LAYOUT CR-03 0.3 20-Dec-15 27-Jul-15 3-Jan-16 10-Aug-15 10-Jan-16 17-Aug-15 17-Jan-16 24-Aug-15 31-Jan-16 7-Sep-15 5-Apr-17 26-Jul-17 100% 100.0%
A545-730-16-50-05331 E C FIRE ALARM & PA LAYOUT CR-04 0.3 22-Dec-15 24-Mar-16 5-Jan-16 7-Apr-16 12-Jan-16 14-Apr-16 19-Jan-16 21-Apr-16 2-Feb-16 28-Apr-16 7-Apr-17 27-Jul-17 100% 100.0%
A545-730-16-50-05341 E C FIRE ALARM & PA LAYOUT CR-05 0.3 24-Dec-15 27-Jul-15 7-Jan-16 10-Aug-15 14-Jan-16 17-Aug-15 21-Jan-16 24-Aug-15 4-Feb-16 7-Sep-15 9-Apr-17 19-Jul-17 100% 100.0%
A545-730-16-50-05351 E C FIRE ALARM & PA LAYOUT CR-06 0.3 26-Dec-15 27-Jul-15 9-Jan-16 10-Aug-15 16-Jan-16 17-Aug-15 23-Jan-16 24-Aug-15 6-Feb-16 7-Sep-15 11-Apr-17 22-Jul-17 100% 100.0%
A545-730-16-50-05501 E C FIRE ALARM & PA LAYOUT CR-07 0.3 26-Dec-15 27-Jul-15 9-Jan-16 10-Aug-15 16-Jan-16 17-Aug-15 23-Jan-16 24-Aug-15 6-Feb-16 7-Sep-15 11-Apr-17 24-Jul-17 100% 100.0%
A545-730-16-50-05361 E C FIRE ALARM & PA LAYOUT SRR 01 0.3 28-Dec-15 2-May-15 11-Jan-16 14-May-15 18-Jan-16 18-May-15 25-Jan-16 22-May-15 8-Feb-16 29-May-15 13-Apr-17 5-Jul-17 100% 100.0%
A545-730-16-50-05371 E C FIRE ALARM & PA LAYOUT SRR 02 0.3 30-Dec-15 2-May-15 13-Jan-16 14-May-15 20-Jan-16 18-May-15 27-Jan-16 22-May-15 10-Feb-16 29-May-15 15-Apr-17 11-Jul-17 100% 100.0%
A545-730-16-50-05381 E C FIRE ALARM & PA LAYOUT SRR 03 0.3 1-Jan-16 2-May-15 15-Jan-16 14-May-15 22-Jan-16 18-May-15 29-Jan-16 22-May-15 12-Feb-16 29-May-15 17-Apr-17 11-Jul-17 100% 100.0%
A545-730-16-50-05391 E C FIRE ALARM & PA LAYOUT SRR 04 0.3 3-Jan-16 2-May-15 17-Jan-16 14-May-15 24-Jan-16 18-May-15 31-Jan-16 22-May-15 14-Feb-16 29-May-15 19-Apr-17 11-Jul-17 100% 100.0%
A545-730-16-50-05401 E C FIRE ALARM & PA LAYOUT SRR 05 0.3 5-Jan-16 2-May-15 19-Jan-16 14-May-15 26-Jan-16 18-May-15 2-Feb-16 22-May-15 16-Feb-16 29-May-15 21-Apr-17 11-Jul-17 100% 100.0%
A545-730-16-50-05411 E C FIRE ALARM & PA LAYOUT SRR 06 0.3 7-Jan-16 2-May-15 21-Jan-16 14-May-15 28-Jan-16 18-May-15 4-Feb-16 22-May-15 18-Feb-16 29-May-15 23-Apr-17 11-Jul-17 100% 100.0%
A545-730-16-50-05421 E C FIRE ALARM & PA LAYOUT SRR 07 0.3 9-Jan-16 2-May-15 23-Jan-16 14-May-15 30-Jan-16 18-May-15 6-Feb-16 22-May-15 20-Feb-16 29-May-15 25-Apr-17 14-Jul-17 100% 100.0%
A545-730-16-50-05431 E C FIRE ALARM & PA LAYOUT SRR 08 0.3 11-Jan-16 2-May-15 25-Jan-16 14-May-15 1-Feb-16 18-May-15 8-Feb-16 22-May-15 22-Feb-16 29-May-15 27-Apr-17 14-Jul-17 100% 100.0%
A545-730-16-50-05441 E C FIRE ALARM & PA LAYOUT SRR 09 0.3 13-Jan-16 2-May-15 27-Jan-16 14-May-15 3-Feb-16 18-May-15 10-Feb-16 22-May-15 24-Feb-16 29-May-15 29-Apr-17 15-Jul-17 100% 100.0%
A545-730-16-50-05451 E C FIRE ALARM & PA LAYOUT SRR-10 0.3 15-Jan-16 24-Apr-15 29-Jan-16 8-May-15 5-Feb-16 15-May-15 12-Feb-16 22-May-15 26-Feb-16 5-Jun-15 21-Apr-17 17-Jul-17 100% 100.0%
A545-730-16-50-05461 E C FIRE ALARM & PA LAYOUT SRR-11 0.3 17-Jan-16 24-Apr-15 31-Jan-16 8-May-15 7-Feb-16 15-May-15 14-Feb-16 22-May-15 28-Feb-16 5-Jun-15 24-Apr-17 17-Jul-17 100% 100.0%
A545-730-16-50-05471 E C FIRE ALARM & PA LAYOUT LCR-08 0.3 19-Jan-16 9-Nov-15 2-Feb-16 23-Nov-15 9-Feb-16 30-Nov-15 16-Feb-16 24-Nov-15 1-Mar-16 1-Dec-15 30-Apr-16 8-Dec-15 100% 100.0%
A545-740-16-50-01161 E C CABLE, LTG, EARTH L/O-FWPH 0.3 12-Dec-15 11-Apr-15 2-Jan-16 13-Apr-15 9-Jan-16 16-Apr-15 16-Jan-16 23-Apr-15 30-Jan-16 23-Apr-15 6-Mar-17 12-Jun-17 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-740-16-50-01411 E C CABLE, LTG, EARTH L/O CT-01-SHEET1 0.1 25-Nov-15 29-Feb-16 9-Dec-15 14-Mar-16 16-Dec-15 21-Mar-16 23-Dec-15 28-Mar-16 6-Jan-16 4-Apr-16 31-Dec-16 25-Jan-17 100% 100.0%
A545-740-16-50-01412 E C CABLE, LTG, EARTH L/O CT-01-SHEET2 0.1 27-Nov-15 1-Mar-16 11-Dec-15 15-Mar-16 18-Dec-15 22-Mar-16 25-Dec-15 29-Mar-16 8-Jan-16 5-Apr-16 2-Jan-17 25-Jan-17 100% 100.0%
A545-740-16-50-01421 E C CABLE, LTG, EARTH L/O CT-02-SHEET1 0.1 30-Nov-15 2-Mar-16 14-Dec-15 16-Mar-16 21-Dec-15 23-Mar-16 28-Dec-15 30-Mar-16 11-Jan-16 6-Apr-16 5-Jan-17 25-Jan-17 100% 100.0%
A545-740-16-50-01422 E C CABLE, LTG, EARTH L/O CT-02-SHEET2 0.1 2-Dec-15 3-Mar-16 16-Dec-15 17-Mar-16 23-Dec-15 24-Mar-16 30-Dec-15 31-Mar-16 13-Jan-16 7-Apr-16 7-Jan-17 25-Jan-17 100% 100.0%
A545-740-16-50-01431 E C CABLE, LTG, EARTH L/O CT-03--SHEET1 0.1 5-Dec-15 22-Apr-16 19-Dec-15 6-May-16 26-Dec-15 13-May-16 2-Jan-16 20-May-16 16-Jan-16 27-May-16 10-Jan-17 25-Jan-17 100% 100.0%
A545-740-16-50-01432 E C CABLE, LTG, EARTH L/O CT-03--SHEET2 0.1 8-Dec-15 6-Apr-16 22-Dec-15 20-Apr-16 29-Dec-15 27-Apr-16 5-Jan-16 4-May-16 19-Jan-16 11-May-16 13-Jan-17 25-Jan-17 100% 100.0%
A545-740-16-50-01441 E C CABLE, LTG, EARTH L/O CT-04--SHEET1 0.1 12-Dec-15 16-Apr-16 26-Dec-15 30-Apr-16 2-Jan-16 7-May-16 9-Jan-16 14-May-16 23-Jan-16 21-May-16 17-Jan-17 25-Jan-17 100% 100.0%
A545-740-16-50-01442 E C CABLE, LTG, EARTH L/O CT-04-SHEET2 0.1 14-Dec-15 28-Mar-16 28-Dec-15 11-Apr-16 4-Jan-16 18-Apr-16 11-Jan-16 25-Apr-16 25-Jan-16 2-May-16 19-Jan-17 25-Jan-17 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-740-16-50-02101 E C LIGHTING LAYOUT WORKERS CANTEEN 0.2 22-Mar-16 1-Sep-15 5-Apr-16 8-Sep-15 12-Apr-16 15-Sep-15 19-Apr-16 22-Sep-15 3-May-16 6-Oct-15 2-Jul-16 25-Jan-16 100% 100.0%
A545-740-16-50-02141 E C LTG LAYOUT-LAB BUILDING -SHEET1 0.05 21-Feb-16 23-Sep-15 6-Mar-16 30-Sep-15 13-Mar-16 2-Jul-16 20-Mar-16 9-Jul-16 3-Apr-16 23-Jul-16 2-Jun-16 30-Jul-16 100% 100.0%
A545-740-16-50-02142 E C LTG LAYOUT-LAB BUILDING -SHEET2 0.05 21-Feb-16 23-Sep-15 6-Mar-16 30-Sep-15 13-Mar-16 2-Jul-16 20-Mar-16 9-Jul-16 3-Apr-16 23-Jul-16 2-Jun-16 30-Jul-16 100% 100.0%
A545-740-16-50-02143 E C LTG LAYOUT-LAB BUILDING -SHEET3 0.05 21-Feb-16 23-Sep-15 6-Mar-16 30-Sep-15 13-Mar-16 2-Jul-16 20-Mar-16 9-Jul-16 3-Apr-16 23-Jul-16 2-Jun-16 30-Jul-16 100% 100.0%
A545-740-16-50-02144 E C LTG LAYOUT-LAB BUILDING -SHEET4 0.05 21-Feb-16 23-Sep-15 6-Mar-16 30-Sep-15 13-Mar-16 2-Jul-16 20-Mar-16 9-Jul-16 3-Apr-16 23-Jul-16 2-Jun-16 30-Jul-16 100% 100.0%
A545-740-16-50-02145 E C LTG LAYOUT-LAB BUILDING -SHEET5 0.05 21-Feb-16 23-Sep-15 6-Mar-16 30-Sep-15 13-Mar-16 2-Jul-16 20-Mar-16 9-Jul-16 3-Apr-16 23-Jul-16 2-Jun-16 30-Jul-16 100% 100.0%
A545-740-16-50-02170-
LTG LAYOUT-ADMIN BLDG 27-Feb-16 =M327-7 12-Mar-16 6/25/2016 19-Mar-16 =S327-7 26-Mar-16 =V327-14 =R327+14 22-07-2016 =U327+60 29-07-2016
02179
A545-740-16-50-02171 E C LTG LAYOUT-ADMIN BLDG--SHEET1 0.04 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-740-16-50-02172 E C LTG LAYOUT-ADMIN BLDG-SHEET2 0.0 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
A545-740-16-50-02173 E C LTG LAYOUT-ADMIN BLDG-SHEET3 0.0 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
A545-740-16-50-02174 E C LTG LAYOUT-ADMIN BLDG-SHEET4 0.0 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
A545-740-16-50-02175 E C LTG LAYOUT-ADMIN BLDG-SHEET5 0.0 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
A545-740-16-50-02176 E C LTG LAYOUT-ADMIN BLDG-SHEET6 0.0 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
A545-740-16-50-02177 E C LTG LAYOUT-ADMIN BLDG-SHEET7 0.0 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
A545-740-16-50-02178 E C LTG LAYOUT-ADMIN BLDG-SHEET8 0.0 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
A545-740-16-50-02179 E C LTG LAYOUT-ADMIN BLDG--SHEET9 0.0 27-Feb-16 18-Jun-16 12-Mar-16 25-Jun-16 19-Mar-16 1-Jul-16 26-Mar-16 8-Jul-16 9-Apr-16 22-Jul-16 8-Jun-16 29-Jul-16 100% 100.0%
A545-740-16-50-02221 E C LTG LAYOUT GATE HOUSE 0.2 2-Mar-16 24-Mar-15 16-Mar-16 7-Apr-15 23-Mar-16 14-Apr-15 30-Mar-16 21-Apr-15 13-Apr-16 15-May-15 9-Mar-17 3-Feb-17 100% 100.0%
A545-740-16-50-02281 E C LTG. LAYOUT SEALING OFFICE 0.3 18-Mar-16 12-May-15 1-Apr-16 26-May-15 8-Apr-16 2-Jun-15 15-Apr-16 9-Jun-15 29-Apr-16 23-Jun-15 25-Mar-17 31-May-17 100% 100.0%
LIGHTING, EARTHING & LIGHTNING
A545-740-16-50-02391 E C PROTECTION LAYOUT OFFICERS 0.3 24-Mar-16 28-Aug-15 7-Apr-16 11-Sep-15 14-Apr-16 18-Sep-15 21-Apr-16 25-Sep-15 5-May-16 9-Oct-15 31-Mar-17 31-Jan-17 100% 100.0%
CANTEEN
LIGHTING, EARTHING & LIGHTNING
A545-740-16-50-02381 E C PROTECTION LAYOUT MAIN FAN 0.3 21-Mar-16 18-Aug-15 4-Apr-16 1-Sep-15 11-Apr-16 8-Sep-15 18-Apr-16 15-Sep-15 2-May-16 29-Sep-15 28-Mar-17 31-May-17 100% 100.0%
OFFICE
A545-740-16-50-05031 E C FA/PA LAYOUT PLANT GATE HOUSE 0.3 13-Nov-15 17-Jul-15 27-Nov-15 31-Jul-15 4-Dec-15 7-Aug-15 11-Dec-15 14-Aug-15 25-Dec-15 28-Aug-15 19-Nov-16 25-Aug-17 100% 100.0%
A545-740-16-50-05041 E C FA/PA LAYOUT ADMIN GATE HOUSE 0.3 17-Nov-15 17-Jul-15 1-Dec-15 31-Jul-15 8-Dec-15 7-Aug-15 15-Dec-15 14-Aug-15 29-Dec-15 28-Aug-15 23-Nov-16 25-Aug-17 100% 100.0%
A545-740-16-50-12331 E C LTG & EARTHING L/O SECURITY CABIN 0.3 18-Mar-16 12-May-15 1-Apr-16 26-May-15 8-Apr-16 2-Jun-15 15-Apr-16 9-Jun-15 29-Apr-16 23-Jun-15 25-Mar-17 31-May-17 100% 100.0%
A545-740-16-50-02361 E C LTG. LAYOUT SAT FIRE STATION-2 NOS 0.5 13-Feb-16 25-Dec-14 27-Feb-16 8-Jan-15 5-Mar-16 15-Jan-15 12-Mar-16 22-Jan-15 26-Mar-16 30-Apr-15 19-Feb-17 23-Feb-17 100% 100.0%
A545-740-16-50-05141 E C FA/PA ADMIN BUILDING-SHEET1 0.2 10-Oct-15 7-May-16 24-Oct-15 21-May-16 31-Oct-15 28-May-16 7-Nov-15 4-Jun-16 21-Nov-15 18-Jun-16 15-Dec-16 31-Oct-17 100% 100.0%
A545-740-16-50-05142 E C FA/PA ADMIN BUILDING-SHEET2 0.2 10-Oct-15 7-May-16 24-Oct-15 21-May-16 31-Oct-15 28-May-16 7-Nov-15 4-Jun-16 21-Nov-15 18-Jun-16 15-Dec-16 31-Oct-17 100% 100.0%
A545-740-16-50-05051 E C FA/PA LAYOUT MARKETING OFFICE 0.3 19-Sep-15 17-Jul-15 3-Oct-15 31-Jul-15 10-Oct-15 7-Aug-15 17-Oct-15 14-Aug-15 31-Oct-15 28-Aug-15 22-Feb-17 18-Aug-17 100% 100.0%
A545-740-16-50-05090 E C FA/PA LAYOUT WAREHOUSE 0.3 2-Sep-15 12-Aug-15 16-Sep-15 26-Aug-15 23-Sep-15 2-Sep-15 30-Sep-15 9-Sep-15 14-Oct-15 23-Sep-15 5-Feb-17 9-Aug-17 100% 100.0%
Page 590 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 11 of 16
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
PROJECT, NIGERIA JOB NO. : A545
DISCIPLINE: ELECTRICAL (UTILITIES & OFFSITES)
ANNEXURE-A6
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-999-16-50-40010 R C HV CABLE SCHEDULE 0.3 20-Jan-16 17-Aug-15 3-Feb-16 31-Aug-15 10-Feb-16 3-Sep-15 17-Feb-16 10-Sep-15 2-Mar-16 17-Sep-15 6-May-19 - 100% 90.0%
A545-999-16-50-40021 R C MV CABLE SCHEDULE 0.3 24-Jan-16 2-Jul-15 6-Feb-16 31-Jul-15 13-Feb-16 3-Sep-15 20-Feb-16 10-Sep-15 5-Mar-16 17-Sep-15 31-Aug-19 - 85% 90.0%
A545-999-16-50-40031 E C LV CABLE SCHEDULE 0.7 28-Jan-16 25-Sep-15 11-Feb-16 29-Jan-16 18-Feb-16 20-Jul-16 25-Feb-16 23-Jul-16 10-Mar-16 30-Jul-16 14-May-19 - 100% 90.0%
A545-999-16-50-00151 E E SINGLE LINE DIAGRAM SS-15-SHEET1 0.3 10-Aug-15 7-May-15 24-Aug-15 21-May-15 31-Aug-15 25-May-15 7-Sep-15 28-May-15 21-Sep-15 4-Jun-15 14-Jan-17 26-Dec-16 100% 100.0%
A545-999-16-50-00161 E E SINGLE LINE DIAGRAM SS-16-SHEET1 0.3 12-Aug-15 7-May-15 26-Aug-15 21-May-15 2-Sep-15 25-May-15 9-Sep-15 28-May-15 23-Sep-15 4-Jun-15 16-Jan-17 11-Jan-17 100% 100.0%
A545-999-16-50-00171 E E SINGLE LINE DIAGRAM SS-17-SHEET1 0.2 14-Aug-15 7-May-15 28-Aug-15 21-May-15 4-Sep-15 25-May-15 11-Sep-15 28-May-15 25-Sep-15 4-Jun-15 18-Jan-17 15-Feb-17 100% 100.0%
Page 591 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 12 of 16
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
PROJECT, NIGERIA JOB NO. : A545
DISCIPLINE: ELECTRICAL (UTILITIES & OFFSITES)
ANNEXURE-A6
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-999-16-50-00172 E E SINGLE LINE DIAGRAM SS-17-SHEET2 0.2 14-Aug-15 7-May-15 28-Aug-15 21-May-15 4-Sep-15 25-May-15 11-Sep-15 28-May-15 25-Sep-15 4-Jun-15 18-Jan-17 15-Feb-17 100% 100.0%
A545-999-16-50-00180 E E SINGLE LINE DIAGRAM SS-18 0.3 17-Aug-15 2-Nov-15 31-Aug-15 16-Nov-15 7-Sep-15 23-Nov-15 14-Sep-15 30-Nov-15 28-Sep-15 5-Dec-15 21-Jan-17 19-Dec-16 100% 100.0%
A545-999-16-50-01000 R E MAIN SINGLE LINE DIAGRAM OVERALL 0.5 18-Aug-15 24-Nov-14 1-Sep-15 8-Dec-14 8-Sep-15 15-Dec-14 15-Sep-15 22-Dec-14 29-Sep-15 29-Dec-14 22-Jan-17 11-Jan-17 100% 100.0%
A545-730-16-50-02471 E C LIGHTING LAYOUT SRR 05 0.3 11-Mar-16 2-Mar-15 25-Mar-16 9-Mar-15 1-Apr-16 16-Mar-15 8-Apr-16 23-Mar-15 22-Apr-16 13-Apr-15 17-Jun-17 16-Dec-16 100% 100.0%
A545-730-16-50-02490 E C LIGHTING LAYOUT CR-08 0.3 18-Mar-16 3-Sep-15 1-Apr-16 17-Sep-15 8-Apr-16 24-Sep-15 15-Apr-16 8-Dec-15 29-Apr-16 9-Dec-15 28-Jun-16 30-Sep-16 100% 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-740-16-50-01321 E C GASOLINE DAY PUMP LOAD-SHEET1 0.1 18-Dec-15 12-Nov-15 1-Jan-16 26-Nov-15 8-Jan-16 3-Dec-15 15-Jan-16 10-Dec-15 29-Jan-16 17-Dec-15 29-Mar-16 31-Dec-15 100% 100.0%
A545-740-16-50-01322 E C GASOLINE DAY PUMP LOAD-SHEET2 0.1 18-Dec-15 12-Nov-15 1-Jan-16 26-Nov-15 8-Jan-16 3-Dec-15 15-Jan-16 10-Dec-15 29-Jan-16 17-Dec-15 29-Mar-16 31-Dec-15 100% 100.0%
A545-740-16-50-02151 E C L/E LAYOUT CATALYST WAREHOUSE 0.1 26-Oct-15 22-Aug-15 9-Nov-15 29-Aug-15 16-Nov-15 5-Sep-15 23-Nov-15 12-Sep-15 7-Dec-15 19-Sep-15 10-Feb-17 5-May-17 100% 100.0%
A545-740-16-50-05071 E C FA/PA LAYOUT LAB BUILDING-Sheet-1 0.0 30-Oct-15 28-Dec-15 13-Nov-15 4-Jan-16 20-Nov-15 11-Jan-16 27-Nov-15 18-Jan-16 11-Dec-15 25-Jan-16 14-Feb-17 28-Aug-17 100% 100.0%
A545-740-16-50-05072 E C FA/PA LAYOUT LAB BUILDING-Sheet-2 0.0 30-Oct-15 28-Dec-15 13-Nov-15 4-Jan-16 20-Nov-15 11-Jan-16 27-Nov-15 18-Jan-16 11-Dec-15 25-Jan-16 14-Feb-17 28-Aug-17 100% 100.0%
A545-740-16-50-05110 E C FA/PA LAYOUT WORKER CANTEEN 0.1 3-Nov-15 7-Sep-15 17-Nov-15 14-Sep-15 24-Nov-15 21-Sep-15 1-Dec-15 28-Sep-15 15-Dec-15 5-Oct-15 18-Feb-17 10-Aug-17 100% 100.0%
A545-740-16-50-05120 E C FA/PA LAYOUT MAIN FAN OFFICE 0.1 6-Nov-15 7-Sep-15 20-Nov-15 14-Sep-15 27-Nov-15 21-Sep-15 4-Dec-15 28-Sep-15 18-Dec-15 5-Oct-15 21-Feb-17 9-Aug-17 100% 100.0%
A545-740-16-50-05130 E C FA/PA LAYOUT OFFICER CANTEEN 0.1 10-Nov-15 17-Sep-15 24-Nov-15 24-Sep-15 1-Dec-15 1-Oct-15 8-Dec-15 8-Oct-15 22-Dec-15 15-Oct-15 25-Feb-17 28-Aug-17 100% 100.0%
A545-999-16-50-00111 R C SLD SS-11-SHEET 1 0.02 22-Sep-15 28-Apr-15 6-Oct-15 5-May-15 13-Oct-15 12-May-15 20-Oct-15 19-May-15 3-Nov-15 26-May-15 7-Jan-17 20-Dec-16 100% 100.0%
A545-999-16-50-00112 R C SLD SS-11-SHEET 2 0.02 22-Sep-15 28-Apr-15 6-Oct-15 5-May-15 13-Oct-15 12-May-15 20-Oct-15 19-May-15 3-Nov-15 26-May-15 7-Jan-17 20-Dec-16 100% 100.0%
A545-999-16-50-00113 R C SLD SS-11-SHEET 3 0.02 22-Sep-15 28-Apr-15 6-Oct-15 5-May-15 13-Oct-15 12-May-15 20-Oct-15 19-May-15 3-Nov-15 26-May-15 7-Jan-17 20-Dec-16 100% 100.0%
A545-999-16-50-00114 R C SLD SS-11-SHEET 4 0.02 22-Sep-15 28-Apr-15 6-Oct-15 5-May-15 13-Oct-15 12-May-15 20-Oct-15 19-May-15 3-Nov-15 26-May-15 7-Jan-17 20-Dec-16 100% 100.0%
A545-999-16-50-00115 R C SLD SS-11-SHEET 5 0.02 22-Sep-15 28-Apr-15 6-Oct-15 5-May-15 13-Oct-15 12-May-15 20-Oct-15 19-May-15 3-Nov-15 26-May-15 7-Jan-17 20-Dec-16 100% 100.0%
A545-000-16-50-SP-4001 LIGHTING CALCULATION 0.02 2-Nov-15 2-Nov-15 - - - - - - - - 30-Nov-15 30-Nov-15 100% 100.0%
A545-999-16-50-Cal-
E AC UPS SIZING CALCULATION 0.02 2-Nov-15 2-Nov-15 - - - - - - - - 30-Nov-15 30-Nov-15 100% 100.0%
4012
POWER TRANSFORMER SIZING
A545-999-16-50-SP-4041 R 0.02 2-Nov-15 2-Nov-15 - - - - - - - - 30-Nov-15 30-Nov-15 100% 100.0%
CALCULATIONS
ELECTRICAL EMERGENCY POWER
A545-999-16-50-SP-0008 R DESCRIPTION FOR PLANT ELECTRICAL 0.02 2-Nov-15 2-Nov-15 - - - - - - - - 30-Nov-15 30-Nov-15 100% 100.0%
SYSTEM
100.0 96.1%
TOTAL TOTAL
MR / TR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW VENDOR DRAWING REVIEW (SCHD. (ACTUAL
REVAMP/ PR ISSUE (After Revamp)
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%) (After Revamp) PROGRESS PROGRESS
EXISTING
%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-999-XC-MR-0040 R 415V SWITCHBOARDS 6.0 5-Jan-16 31-Jul-15 16-Apr-16 18-Mar-16 12-Nov-16 11-Oct-17 21-Apr-19 - 12-Mar-19 - 21-Apr-19 - 100% 95.0%
A545-999-XD-MR-0100 TRANSFORMER-POWER-ABOVE 5 3.0 9-Jan-16 11-May-15 20-Apr-16 20-Aug-15 9-Jun-16 11-Mar-16 5-Jan-17 30-Jan-17 - - - - 100% 100.0%
A545-999-XD-MR-0101 TRANSFORMER-POWER-ABOVE 5 0.3 14-Aug-17 23-Jan-18 10-Nov-17 20-Jul-18 25-Mar-19 29-Dec-18 24-Apr-19 30-Apr-19 - - - - 100% 100.0%
A545-999-XD-MR-0120 DISTRIBUTION TRANSFORMERS 3.0 13-Jan-16 16-Jul-15 24-Apr-16 16-Oct-15 13-Jun-16 14-Mar-16 9-Jan-17 30-Mar-17 - - - - 100% 100.0%
A545-999-XD-MR-0130 LIGHTING TRAFO. DRY TYPE 1.5 15-Jan-16 30-Jun-16 29-Oct-16 21-Oct-16 18-Dec-16 5-Dec-17 18-Mar-17 28-Feb-18 - - - - 100% 100.0%
A545-999-XF-MR-0140 R NGR 3.0 17-Jan-16 7-May-15 28-Apr-16 21-Jul-15 3-Jan-17 5-Dec-17 3-Apr-17 27-Jul-18 16-Mar-19 18-Jan-19 20-Apr-19 20-Apr-19 100% 100.0%
A545-999-XG-MR-0150 CAPACITORS-HIGH VOLTAGE 0.2 10-Mar-18 14-Mar-18 26-Mar-19 - 25-Apr-19 - 25-May-19 - - - - - 100% 50.0%
A545-999-XB-MR-0020 R SWITCHBOARDS: HV (INDOOR) 6.0 21-Jan-16 29-May-15 2-May-16 29-Oct-15 7-Jan-17 6-Oct-17 7-Apr-17 27-Sep-18 14-Jun-18 17-Aug-18 19-Jul-18 27-Sep-18 100% 100.0%
A545-999-XH-MR-0430 DC UPS SYSTEM 3.8 9-Mar-16 8-Jun-15 20-Jun-16 21-Aug-15 16-Jan-17 12-Jun-17 16-Apr-17 27-Feb-18 - - - - 100% 100.0%
A545-999-XI-MR-0440 AC UPS SYSTEM 4.5 15-Mar-16 15-Jul-15 26-Jun-16 7-Dec-15 15-Aug-16 5-Jul-16 11-Feb-17 30-Jan-18 - - - - 100% 100.0%
A545-999-XT-MR-0200 66 KV CABLES 1.5 30-Jan-16 3-Jul-15 27-Apr-16 29-Oct-15 2-Jan-17 30-Jul-18 2-Apr-17 25-Feb-19 - - - - 100% 100.0%
A545-999-XT-MR-0210 11KV CABLES-1 1.5 12-Feb-16 23-Sep-15 10-May-16 11-Jan-16 16-Mar-19 27-Nov-18 15-Apr-19 28-Apr-19 - - - - 100% 100.0%
A545-999-XT-MR-0215 R 11KV CABLES-2 1.5 14-Feb-16 31-Aug-16 18-Nov-16 28-Dec-16 8-Mar-19 27-Nov-18 7-Apr-19 28-Apr-19 8-Mar-19 27-Nov-18 7-Apr-19 28-Apr-19 100% 100.0%
A545-999-XT-MR-0220 R LV POWER CABLES-1 1.5 11-Mar-16 30-Nov-15 6-Jun-16 8-Feb-16 2-Jan-17 16-Jul-18 2-Apr-17 28-Sep-18 17-Jun-18 16-Jul-18 22-Jul-18 28-Sep-18 100% 100.0%
A545-999-XT-MR-0240 LV CONTROL CABLE-1 1.5 22-Feb-16 6-May-16 4-Jun-16 20-Sep-16 31-Dec-16 16-Jul-18 31-Mar-17 29-Nov-18 - - - - 100% 100.0%
A545-999-XT-MR-0245 R LV CONTROL CABLE-2 1.5 22-Nov-16 6-Oct-16 5-Mar-17 22-Mar-17 24-Apr-17 18-Jul-18 22-Aug-17 27-Feb-19 18-Jun-18 18-Jul-18 23-Jul-18 27-Feb-19 100% 100.0%
A545-999-XM-MR-0470 PLANT COMMUNICATION SYSTEM 4.5 4-Mar-16 26-May-15 14-Jun-16 7-Sep-15 10-Jan-17 6-Nov-17 10-Apr-17 28-Feb-19 - - - - 100% 100.0%
A545-999-XN-MR-0480 FIRE ALARM SYSTEM 4.5 5-Feb-16 17-Mar-15 17-May-16 22-Jul-15 13-Dec-16 29-Nov-17 22-May-19 25-Apr-19 - - - - 100% 100.0%
A545-999-XR-MR-0520 HIGH MAST LIGHTING SYSTEM 30M 1.5 10-Aug-15 29-Jun-15 6-Nov-15 23-Sep-15 26-Dec-15 8-Mar-16 20-Dec-16 30-Dec-16 - - - - 100% 100.0%
CABLE TRAYS AND ACCESSORIES
A545-999-XZ-MR-0820 R (PREFABRICATED GALVANIZED 1.5 23-Jan-16 27-Jan-16 28-Feb-16 21-Mar-16 14-Mar-19 25-Jan-19 13-Apr-19 30-Apr-19 14-Mar-19 25-Jan-19 13-Apr-19 30-Apr-19 100% 100.0%
TYPE)
A545-999-XR-MR-0530 FLP ITEMS 3.8 26-Feb-16 18-Jan-16 24-May-16 31-Aug-16 20-Mar-19 25-Jan-19 19-Apr-19 25-Jan-19 - - - - 100% 100.0%
A545-999-XR-MR-0531 R LCS FLP 3.8 4-Mar-16 13-Oct-15 30-May-16 17-Mar-16 16-Mar-19 25-Jan-19 15-Apr-19 30-Apr-19 16-Mar-19 - 15-Apr-19 - 100% 100.0%
SAFE AREA PANELS, JUNCTION
A545-999-XZ-MR-0540 R BOXES, SOCKETS, PUSH BUTTON 1.5 18-Mar-16 8-Jun-16 1-Dec-16 30-Dec-16 1-Mar-19 28-Nov-18 31-Mar-19 10-May-19 1-Mar-19 28-Nov-18 31-Mar-19 10-May-19 100% 100.0%
CONTROL STATIONS
SAFE AREA LTG FIXTURE
A545-999-XZ-MR-0541 R 1.5 22-Mar-16 8-Jun-16 5-Dec-16 5-Nov-18 5-Mar-19 28-Nov-18 4-Apr-19 30-Apr-19 5-Mar-19 28-Nov-18 4-Apr-19 30-Apr-19 100% 100.0%
CLAMPS, CG BOXES, ADAPTER
LIGHTING POLES & BUS
A545-999-XZ-MR-0542 1.5 27-Mar-16 8-Jun-16 22-Jun-16 30-Aug-16 19-Mar-19 10-Dec-18 18-Apr-19 - - - - - 100% 95.0%
TRUNKING SYSTEM
A545-999-XZ-MR-0550 R EARTHING MATERIAL 1.5 28-Mar-16 1-Sep-16 11-Dec-16 2-Nov-16 21-Mar-19 16-Jan-19 20-Apr-19 18-Apr-19 21-Mar-19 16-Jan-19 20-Apr-19 18-Apr-19 100% 100.0%
A545-999-XZ-MR-0650 ECS SYSTEM 18.1 10-Feb-16 3-Feb-16 23-May-16 29-Aug-16 19-Dec-16 17-Oct-17 19-Mar-17 27-Feb-19 - - - - 100% 100.0%
TOTAL TOTAL
MR / TR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW VENDOR DRAWING REVIEW (SCHD. (ACTUAL
REVAMP/ PR ISSUE (After Revamp)
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%) (After Revamp) PROGRESS PROGRESS
EXISTING
%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
MISCELLANEOUS (INPUT TO MR,
A545-000-XZ-IN-MISC 8.3 21-Mar-16 20-Apr-15 - - - - 31-Dec-16 31-Oct-16 - - - - 100% 100.0%
TENDER ETC.)
100 99.5%
A545-700-16-51-00001 E E MCR LAYOUT 7.4 21-May-15 15-Apr-15 20-Jun-15 30-Sep-15 27-Jun-15 23-Oct-15 11-Jul-15 29-Oct-15 25-Jul-15 15-Jan-16 23-Sep-15 29-Jan-16 100% 100.0%
A545-700-16-51-03310 E E SRR LAYOUT (SRR-10) 7.4 10-May-15 15-May-15 9-Jun-15 29-May-15 16-Jun-15 5-Jun-15 30-Jun-15 12-Jun-15 14-Jul-15 19-Jun-15 30-Sep-19 - 85% 95.0%
A545-700-16-51-03309 E E SRR LAYOUT (SRR-9) 7.4 17-May-15 15-May-15 16-Jun-15 29-May-15 23-Jun-15 5-Jun-15 7-Jul-15 12-Jun-15 21-Jul-15 19-Jun-15 30-Sep-19 - 85% 95.0%
A545-700-16-51-03311 E E SRR LAYOUT (SRR-11) 1.8 20-May-15 18-May-15 19-Jun-15 29-May-15 26-Jun-15 5-Jun-15 10-Jul-15 12-Jun-15 24-Jul-15 19-Jun-15 22-Sep-15 28-Jan-16 100% 100.0%
A545-700-16-51-00823 R C GAS DETECTOR AND CCTV LAYOUT 7.4 28-May-15 19-Nov-15 27-Jun-15 3-Dec-15 4-Jul-15 10-Dec-15 18-Jul-15 17-Dec-15 1-Aug-15 31-Dec-15 30-Sep-19 - 85% 96.0%
A545-700-16-51-NE10 R E NOZZLE ELEVATION FOR LEVEL INSTRUME 5.5 9-Jun-15 25-Feb-16 9-Jul-15 26-Mar-16 16-Jul-15 2-Apr-16 20-Jul-15 6-Apr-16 27-Jul-15 13-Apr-16 25-Sep-15 27-Apr-16 100% 100.0%
A545-700-16-51-MD22 R E POWER SUPPLY SCHEME 1.8 3-May-15 8-Apr-16 2-Jun-15 22-Apr-16 9-Jun-15 29-Apr-16 13-Jun-15 4-May-16 27-Jun-15 11-May-16 28-Jul-15 25-May-16 100% 100.0%
A545-700-16-51-II02 R C INSTRUMENT INDEX 7.4 5-Jun-15 2-Apr-16 4-Jul-15 16-Apr-16 11-Jul-15 23-Apr-16 25-Jul-15 30-Apr-16 8-Aug-15 7-May-16 15-Apr-19 15-Jul-19 100% 100.0%
A545-700-16-51-CH02 R C CABLE SCHEDULE-FF 21-Sep-17 16-Nov-18 19-Mar-19 - 23-Mar-19 - 30-Mar-19 - 13-Apr-19 - 20-Apr-19 15-Jul-19 100% 100.0%
A545-700-16-51-CH03 R C CABLE SCHEDULE-NFF 28-Sep-17 16-Nov-18 26-Mar-19 - 30-Mar-19 - 6-Apr-19 - 20-Apr-19 - 27-Apr-19 15-Jul-19 100% 100.0%
A545-700-16-51-00805 R C INSTRUMENTATION LOCATION PLAN-NFF 8-Sep-17 6-Jul-17 22-Sep-17 13-Jul-17 26-Sep-17 20-Jul-17 3-Oct-17 27-Jul-17 17-Oct-17 3-Aug-17 30-Sep-19 - 85% 85.0%
A545-700-16-51-00806 R C INSTRUMENT JUNCTION BOX LAYOUT-FF 15-Sep-17 6-Jul-17 29-Sep-17 13-Jul-17 3-Oct-17 20-Jul-17 10-Oct-17 27-Jul-17 24-Oct-17 3-Aug-17 30-Sep-19 - 85% 85.0%
A545-700-16-51-00811 R C INSTRUMENT JUNCTION BOX LAYOUT-NFF 22-Sep-17 6-Jul-17 6-Oct-17 13-Jul-17 10-Oct-17 20-Jul-17 17-Oct-17 27-Jul-17 31-Oct-17 3-Aug-17 30-Sep-19 - 85% 85.0%
A545-700-16-51-00813 R C INSTRUMENT LOCATION PLAN-FF 5-Sep-17 6-Jul-17 19-Sep-17 13-Jul-17 23-Sep-17 20-Jul-17 30-Sep-17 27-Jul-17 14-Oct-17 3-Aug-17 30-Sep-19 - 85% 85.0%
A545-700-16-51-MD07 R C DCS POINT DATA BASE 10-Oct-17 27-Apr-17 24-Oct-17 4-May-17 28-Oct-17 11-May-17 4-Nov-17 18-May-17 18-Nov-17 25-May-17 30-Sep-19 - 100% 90.0%
100 99.0%
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : INSTRUMENTATION (UTILITIES & OFFSITES) ANNEXURE-A6
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW
REVAMP/ PR ISSUE (After Revamp) VENDOR DRAWING REVIEW (SCHD (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%)
EXISTING (After Revamp) PROGRESS PROGRESS
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
INSTRUMENTATION - UTILITIES & OFFSITES
VARIABLE AREA FLOWMETERS
A545-700-YF-MR-1022 R 1.3 25-Oct-15 23-Jun-16 18-Dec-16 2-Dec-16 18-Mar-19 - 17-Apr-19 - - - - - 100% 85.0%
(INDICATORS)
A545-700-YP-MR-1102 R PRESSURE GAUGES 1.7 10-Oct-15 3-Sep-16 3-Dec-16 27-Feb-17 22-Jan-17 23-Oct-18 22-Apr-19 - 23-Mar-19 - 22-Apr-19 - 100% 95.0%
A545-700-YL-MR-1262 R GAUGE GLASS AND COCKS 1.1 5-Nov-15 2-Feb-16 19-Jan-16 3-Jun-16 4-Dec-16 9-Aug-18 3-Apr-19 30-Apr-19 4-Mar-19 9-Aug-18 3-Apr-19 30-Apr-19 100% 100.0%
A545-700-YI-MR-1302 R FIELD INSTRUMENTS (P,DP,F,L,T,) 2.4 10-Sep-15 23-Sep-16 13-Mar-19 - 12-Apr-19 - 12-May-19 - 12-Apr-19 - 12-May-19 - 100% 40.0%
A545-700-YF-MR-1322 R ORIFICE PLATES & FLANGES 2.2 1-Oct-15 4-May-16 15-Dec-15 19-Oct-16 19-Nov-16 26-Feb-19 28-Apr-19 - 29-Mar-19 26-Feb-19 28-Apr-19 - 100% 90.0%
A545-700-YF-MR-1324 ORIFICE PLATES & FLANGES 0.9 20-Feb-16 25-Jan-17 20-May-16 11-Apr-17 24-Jul-17 15-Feb-19 6-Mar-19 28-Apr-19 - - - - 100% 100.0%
A545-700-YC-MR-1332 R CONTROL VALVES 3.7 29-Jun-15 26-May-15 27-Sep-15 6-May-16 30-Nov-16 26-Apr-18 9-May-19 30-Apr-19 - - - - 100% 95.0%
A545-700-YR-MR-1362 R PRESSURE RELIEF VALVES 2.6 24-Jun-15 5-Jun-15 12-Sep-15 3-Sep-15 5-Nov-16 15-Sep-17 15-Mar-19 25-Apr-19 - - - - 100% 100.0%
A545-700-YR-MR-1364 R PRESSURE RELIEF VALVE 1.1 24-Dec-15 3-Nov-15 13-Mar-16 14-Jun-16 18-Dec-16 28-Sep-17 27-Apr-19 - 16-Jun-18 1-Mar-19 27-Apr-19 - 100% 90.0%
A545-700-YR-MR-1366 RUPTURE DISC 30-Dec-15 4-Sep-15 19-Mar-16 5-Nov-15 24-Dec-16 - 24-Mar-17 - - - - - 100% 85.0%
A545-133-YA-MR-1368 R PRESSURE RELIEF VALVE 0.4 12-Jan-16 28-Oct-16 17-Nov-16 7-Apr-17 6-Jan-17 4-May-18 6-Apr-19 - - - - - 100% 90.0%
A545-700-YE-MR-1500 E DISTRIBUTED CONTROL SYSTEM 11.1 14-Aug-15 5-Mar-15 7-Dec-15 20-Oct-15 11-Nov-16 30-Nov-16 9-Feb-17 28-Feb-19 - - - - 100% 100.0%
A545-700-YE-MR-1512 E MACHINE MONITORING SYSTEM 1.8 5-Nov-16 21-Jun-17 29-Jan-17 28-Nov-17 20-Mar-17 17-Aug-18 9-Apr-19 - - - - - 100% 90.0%
A545-700-YM-MR-1710 R INSTRUMENT TUBING 0.9 5-Oct-15 7-Jan-16 19-Dec-15 13-Jun-16 3-Nov-16 21-Sep-18 2-Apr-19 - 3-Mar-19 - 2-Apr-19 - 100% 90.0%
A545-700-YM-MR-1720 R TUBE FITTING 0.9 9-Oct-15 7-Jan-16 23-Dec-15 3-Jun-16 7-Nov-16 22-Dec-17 6-Apr-19 - 7-Mar-19 - 6-Apr-19 - 100% 95.0%
A545-700-YS-MR-1750 R SIGNAL CABLES 0.9 16-Oct-15 14-Jan-16 30-Dec-15 6-Jun-16 14-Nov-16 21-Sep-18 12-Feb-17 26-Feb-19 - - - - 100% 95.0%
THERMOCOUPLE EXTENSION
A545-700-YS-MR-1752 R 0.9 21-Dec-15 14-Jan-16 5-Mar-16 14-Mar-16 10-Dec-16 16-Jul-18 10-Mar-17 29-Nov-18 - - - - 100% 100.0%
CABLES
A545-700-YS-MR-1555 R FIBRE OPTICS CABLES 0.9 7-Oct-15 8-Jan-16 21-Dec-15 22-Mar-16 15-Mar-19 - 14-Apr-19 - - - - - 100% 85.0%
A545-700-YS-MR-1756 R FIELDBUS SIGNAL CABLES 0.7 10-Jan-16 15-Jan-16 25-Mar-16 25-May-16 8-Feb-17 30-Aug-18 9-May-17 28-Nov-18 - - - - 100% 100.0%
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : INSTRUMENTATION (UTILITIES & OFFSITES) ANNEXURE-A6
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW
REVAMP/ PR ISSUE (After Revamp) VENDOR DRAWING REVIEW (SCHD (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%)
EXISTING (After Revamp) PROGRESS PROGRESS
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
INSTRUMENTATION - UTILITIES & OFFSITES
FLOW ELEMENTS (VENTURI, FLOW
A545-700-YF-MR-1842 6-Jan-16 - =F54+75 - #VALUE! - #VALUE! - - - - -
NOZZLES)
MISCELLANEOUS INSTRUMENT
A545-700-YM-MR-1940 E 1.1 8-Jan-16 19-Jan-16 23-Mar-16 24-May-16 6-Feb-17 6-Jun-18 7-May-17 26-Nov-18 - - - - 100% 100.0%
ITEMS
A545-700-YF-MR-2055 R MAGNETIC FLOWMETER 1.5 19-Oct-15 29-Sep-15 2-Jan-16 16-Feb-16 17-Nov-16 3-Apr-18 15-Feb-17 27-Nov-19 - - - - 100% 90.0%
A545-700-YF-MR-2065 R MASS FLOWMETERS 1.5 21-Oct-15 18-Aug-15 4-Jan-16 11-Dec-15 19-Nov-16 30-Mar-18 18-May-19 30-Apr-19 - - - - 100% 100.0%
A545-133-YA-MR-2066 R MASS FLOWMETERS 0.4 3-Nov-15 18-Oct-16 27-Nov-16 19-Jul-17 27-Mar-19 - 26-Apr-19 - 27-Mar-19 - 26-Apr-19 - 100% 85.0%
A545-700-YL-MR-2270 E NUCLEONIC LEVEL INSTRUMENTS 1.5 26-Oct-15 22-Jun-15 9-Jan-16 29-Dec-15 24-Nov-16 3-Oct-18 24-Mar-19 - - - - - 100% 90.0%
A545-700-YC-MR-2356 R SPECIAL CONTROL VALVES- MIXED 1.3 31-Jan-16 4-Jul-15 15-Apr-16 3-Dec-15 1-Mar-17 17-May-18 20-Apr-19 30-Apr-19 - - - - 100% 100.0%
A545-700-YF-MR-2357 R CONTROL VALVES 0.7 7-Jan-17 31-Mar-17 23-Mar-17 3-Nov-17 28-Dec-17 27-Feb-19 22-Apr-19 - 23-Mar-19 - 22-Apr-19 - 100% 90.0%
A545-700-YF-MR-2405 R AVERAGING PITOT TUBES 1.8 1-Oct-15 27-Aug-15 15-Dec-15 6-Nov-15 9-Nov-16 18-Jul-18 7-Feb-17 30-Nov-18 - - - - 100% 100.0%
A545-700-YT-MR-2416 R SPECIAL TEMPERATURE ELEMENTS 1.5 13-Oct-15 27-May-16 6-Dec-16 21-Feb-17 25-Jan-17 3-May-18 25-Apr-17 28-Nov-18 - - - - 100% 100.0%
A545-700-YC-MR-2445 R DESUPERHEATERS & PRDS 1.7 18-Oct-15 14-Aug-15 1-Jan-16 27-Nov-15 16-Nov-16 11-Dec-18 16-Mar-19 - - - - - 100% 90.0%
A545-700-YC-MR-2452 R ON-OFF VALVES (ORBIT) 1.3 8-Oct-15 29-Oct-15 22-Dec-15 26-May-16 16-Mar-19 - 15-Apr-19 - - - - - 100% 85.0%
A545-700-YC-MR-2454 R ON-OFF VALVE 1.5 27-Dec-15 4-Jan-16 11-Mar-16 6-Sep-16 25-Jan-17 6-Oct-18 25-May-19 - - - - - 100% 90.0%
A545-133-YC-MR-2456 R ON-OFF VALVE 0.2 28-Dec-16 28-Dec-16 13-Mar-17 12-Oct-17 12-May-17 27-Aug-18 2-May-19 28-Apr-19 2-Apr-19 - 2-May-19 - 100% 100.0%
A545-700-YR-MR-2564 R PILOT OPERATED SAFETY VALVE 0.9 7-Dec-15 2-Dec-15 20-Feb-16 11-Apr-16 5-Jan-17 23-Jan-19 5-May-19 - - - - - 100% 90.0%
A545-700-YA-MR-2605 R WATER QUALITY ANALYSERS 1.5 21-Oct-15 19-Jan-16 4-Jan-16 26-Aug-16 19-Nov-16 7-Jun-18 17-Feb-17 28-Feb-19 - - - - 100% 100.0%
A545-700-YA-MR-2620 R MOISTURE ANALYSERS 1.5 28-Oct-15 18-Jan-16 11-Jan-16 31-May-16 26-Nov-16 14-Jun-18 24-Feb-17 28-Feb-19 - - - - 100% 100.0%
A545-700-YD-MR-2650 R GAS DETECTION SYSTEM 1.8 6-Nov-15 20-Aug-15 20-Jan-16 30-Dec-15 15-Mar-19 - 14-Apr-19 - - - - - 100% 85.0%
A545-700-YA-MR-2690 CORROSION MONITORS 1.3 18-Nov-15 23-Aug-16 12-Dec-16 6-Feb-17 31-Jan-17 23-Aug-17 1-May-17 27-Jul-18 - - - - 100% 100.0%
A545-700-YA-MR-2821 R TANK FARM MANAGEMENT SYSTEM 1.8 30-Nov-15 15-Jan-15 13-Feb-16 8-Jul-15 3-Apr-16 21-Nov-15 2-Jul-16 27-Feb-18 - - - - 100% 100.0%
A545-700-YE-MR-2840 R CCTV SYSTEM 1.8 4-Dec-15 11-Aug-15 17-Feb-16 17-Dec-15 2-Jan-17 20-Feb-19 3-Mar-19 - - - - - 100% 90.0%
Page 598 of 1078
Format no. 5-2744-0112-F9, Rev 0 Page 3 of 4
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : INSTRUMENTATION (UTILITIES & OFFSITES) ANNEXURE-A6
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW
REVAMP/ PR ISSUE (After Revamp) VENDOR DRAWING REVIEW (SCHD (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%)
EXISTING (After Revamp) PROGRESS PROGRESS
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
INSTRUMENTATION - UTILITIES & OFFSITES
A545-700-YF-MR-2852 R ULTRASONIC FLOWMETERS 1.8 7-Oct-15 24-Sep-15 21-Dec-15 18-Mar-16 5-Nov-16 28-Feb-19 4-Apr-19 - - - - - 100% 90.0%
A545-700-YF-MR-2860 R VORTEX FLOWMETERS 1.5 16-Sep-15 16-May-15 30-Nov-15 26-Nov-15 15-Oct-16 1-Mar-19 24-Mar-19 - - - - - 100% 90.0%
A545-133-YF-MR-2861 R VORTEX FLOWMETER 0.7 21-Dec-15 26-Jul-16 14-Jan-17 12-Apr-17 5-Mar-17 20-Feb-19 4-May-19 - 4-Apr-19 - 4-May-19 - 100% 90.0%
A545-700-YF-MR-2880 E MASS FLOWMETER (THERMAL) 1.5 11-Oct-15 9-Sep-15 25-Dec-15 11-Feb-16 9-Nov-16 30-Jan-18 9-Mar-19 - - - - - 100% 90.0%
A545-700-YA-MR-2940 E ANALYSER (HYDROGEN SULPHIDE) 1.5 12-Dec-15 29-Feb-16 25-Feb-16 26-Jul-16 10-Jan-17 12-Jun-18 11-Mar-19 - - - - - 100% 97.0%
A545-700-YA-MR-2942 R ANALYSER SYSTEMS 0.4 28-Dec-15 17-Oct-16 12-Dec-16 2-Jun-17 12-Mar-19 - 11-Apr-19 - - - - - 100% 97.0%
A545-143-YC-MR-2354 E CONTROL VALVES IN STRONG 0.9 24-Oct-15 7-Dec-15 7-Jan-16 7-Mar-16 22-Nov-16 23-Feb-18 22-Mar-19 28-Apr-19 - - - - 100% 100.0%
A545-700-YA-MR-2951 E AAQMS 1.5 21-Dec-15 21-Oct-15 5-Mar-16 31-Mar-16 19-Jan-17 14-Jun-18 20-Mar-19 - - - - - 100% 95.0%
A545-111-YL-MR-1202 E DISPLACER LEVEL INSTRUMENTS 0.4 17-Jan-16 20-May-16 1-Apr-16 21-Sep-16 15-Feb-17 7-Mar-18 16-Apr-19 - - - - - 100% 95.0%
A545-181-YT-MR-2418 E OPTICAL PYROMETER 0.7 18-Dec-15 29-Jul-16 11-Jan-17 6-Dec-16 2-Mar-19 - 1-Apr-19 - - - - - 100% 85.0%
A545-700-YM-MR-1942 R JUNCTION BOXES & CABLE GLANDS 0.2 7-Jan-16 6-Sep-16 31-Jan-17 3-Jul-17 22-Mar-17 21-Dec-18 20-Jun-17 27-Feb-19 - - - - 100% 100.0%
A545-133-YA-MR-2608 R WATER QUALITY ANALYSERS 0.2 12-Jan-16 12-Sep-16 5-Feb-17 14-Mar-17 27-Mar-17 29-Jun-18 27-Mar-19 30-Apr-19 - - - - 100% 97.0%
A545-171-YE-MR-2985 R GROUND MONITORING SYSTEM 0.2 15-Nov-16 25-Nov-16 20-Feb-17 16-May-17 11-Apr-17 10-Jul-18 11-Apr-19 - - - - - 100% 90.0%
A545-171-YL-MR-2272 E MR FOR NUCLEONIC LT 0.2 21-Nov-16 7-Feb-17 26-Feb-17 2-Aug-17 17-Apr-17 19-Sep-18 17-Apr-19 - - - - - 100% 90.0%
A545-700-YA-MR-2610 E WATER QUALITY ANALYSER 0.1 10-Dec-15 20-Sep-18 23-Feb-16 - 2-Apr-16 - 2-May-16 - - - - - 100% 40.0%
A545-171-YW-MR-2970 E LOAD CELLS 0.1 26-Feb-17 27-May-17 3-Jun-17 8-Jan-18 25-Mar-19 - 24-Apr-19 - - - - - 100% 90.0%
100 94.0%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
DRAWING/ DOCUMENT (10%) (65%) (85%) (95%) (100%)
DRAWING/ DOCUMENT TITLE WTG PROGRESS PROGRESS
NO.
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-145-1111 COOLING WATER DISTRIBUTION 1.7 6-Dec-14 10-Dec-14 14-Feb-15 9-Jan-15 4-Jun-15 29-May-15 4-Jul-15 20-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1127 FLARE DISTRIBUTION 1.7 10-Feb-15 16-Feb-15 21-Apr-15 18-Mar-15 30-Jun-15 16-Jun-15 30-Jul-15 30-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1129 LP FLARE KOD 1.7 14-Feb-15 18-Feb-15 25-Apr-15 20-Mar-15 4-Jul-15 19-Jun-15 3-Aug-15 22-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1131 HP STEAM DISTRIBUTION 1.7 10-Dec-14 10-Dec-14 18-Feb-15 9-Jan-15 8-Jun-15 26-May-15 8-Jul-15 22-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1132 MP DISTRIBUTION 1.7 12-Dec-14 10-Dec-14 20-Feb-15 9-Jan-15 10-Jun-15 26-May-15 10-Jul-15 22-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1133 LP DISTRIBUTION 1.7 14-Dec-14 10-Dec-14 22-Feb-15 9-Jan-15 12-Jun-15 26-May-15 12-Jul-15 22-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1135 SUSPECT CONDENSATE RECOVERY SYSTEM 1.7 16-Dec-14 15-Dec-14 24-Feb-15 13-Jan-15 14-Jun-15 27-May-15 14-Jul-15 23-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1138 NITROGEN DISTRIBUTION 1.7 18-Dec-14 10-Dec-14 26-Feb-15 9-Jan-15 16-Jun-15 28-May-15 16-Jul-15 23-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1139 INSTRUMENT AIR AND PLANT AIR DISTRIBUTION 1.7 20-Dec-14 6-Dec-14 28-Feb-15 5-Jan-15 18-Jun-15 30-May-15 18-Jul-15 24-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1141 SERVICE WATER DISTRIBUTION 1.7 22-Dec-14 10-Dec-14 2-Mar-15 9-Jan-15 20-Jun-15 28-May-15 20-Jul-15 25-Jun-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1151 CONTROL VALVE DRAIN/ VENT DETAILS 1.7 24-Dec-14 28-Feb-15 4-Mar-15 30-Mar-15 22-Jun-15 7-Aug-15 22-Jul-15 7-Aug-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1152A/B LEVEL INSTRUMENTS DRAIN/ VENT DETAILS 1.7 26-Dec-14 28-Feb-15 6-Mar-15 30-Mar-15 24-Jun-15 19-Oct-15 24-Jul-15 18-Nov-15 31-Oct-19 - 95% 98.0%
A545-02-41-145-1153 SAMPLE CONNECTION DRAIN/ VENT DETAILS 1.7 8-Jan-15 22-May-15 19-Mar-15 13-Nov-15 7-Jul-15 27-Nov-15 6-Aug-15 25-Jan-16 31-Oct-19 - 95% 98.0%
A545-02-41-145-1154 PUMP SEAL PLAN DETAILS 1.7 10-Jan-15 22-May-15 21-Mar-15 12-Aug-15 9-Jul-15 8-Sep-15 8-Aug-15 25-Sep-15 31-Oct-19 - 95% 98.0%
PROCESS DATASHEET-ISBL
A545-145-02-DS-1208 LP FLARE KOD 0.3 20-Jan-15 31-Jan-15 31-Mar-15 2-Mar-15 19-Jun-15 11-Jun-15 19-Jul-15 11-Jun-15 7-Sep-15 11-Jun-15 100% 100.0%
A545-145-02-DS-1216 SUSPECT LP CONDENSATE FLASH DRUM 0.3 24-Jan-15 14-Feb-15 4-Apr-15 16-Mar-15 23-Jun-15 29-May-15 23-Jul-15 29-May-15 11-Sep-15 29-May-15 100% 100.0%
A545-145-02-DS-1217 SUSPECT ATM CONDENSATE FLASH DRUM 0.3 26-Jan-15 14-Feb-15 6-Apr-15 17-Mar-15 25-Jun-15 29-May-15 25-Jul-15 29-May-15 13-Sep-15 29-May-15 100% 100.0%
A545-145-02-DS-1402 SUSPECT VENT CONDENSER 0.3 28-Jan-15 2-Mar-15 8-Apr-15 31-Mar-15 27-Jun-15 28-May-15 27-Jul-15 28-May-15 15-Sep-15 28-May-15 100% 100.0%
A545-145-02-DS-1604 SUSPECT CONDENSATE PUMP 0.3 30-Jan-15 21-Feb-15 10-Apr-15 23-Mar-15 29-Jun-15 28-May-15 29-Jul-15 28-May-15 17-Sep-15 28-May-15 100% 100.0%
Process P&IDs
A545-02-41-145-PFD PROCESS FLOW DIAGRAM 17.0 18-Aug-14 11-Aug-14 17-Sep-14 10-Sep-14 24-Sep-14 17-Sep-14 8-Oct-14 1-Oct-14 22-Oct-14 15-Oct-14 100% 100.0%
A545-02-41-145-P&ID PIPING & INSTRUMENTATION DIAGRAM 13.6 8-Oct-14 29-Sep-14 7-Nov-14 29-Oct-14 14-Nov-14 5-Nov-14 28-Nov-14 22-Sep-15 31-Oct-19 - 95% 95.0%
A545-02-41-145-PDS PROCESS DATA SHEET 13.6 27-Nov-14 17-Nov-14 27-Dec-14 17-Dec-14 3-Jan-15 24-Dec-14 17-Jan-15 28-Sep-15 15-Mar-17 22-Sep-17 100% 100.0%
A545-02-41-100-UTS UTILITY SUMMARY 1.7 28-Dec-14 17-Feb-15 28-Jan-15 19-Mar-15 11-Feb-15 26-Mar-15 13-Mar-15 16-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-FLS FLARE LOAD SUMMARY 1.7 19-Jan-15 14-Mar-15 19-Feb-15 14-Apr-15 5-Mar-15 21-Apr-15 4-Apr-15 16-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-EFS EFFLUENT SUMMARY 1.7 4-Jan-15 17-Feb-15 4-Feb-15 19-Mar-15 18-Feb-15 26-Mar-15 20-Mar-15 16-Feb-16 31-Oct-19 - 95% 95.0%
Page 600 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 2
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE: PROCESS (C4 / BUTAMER)
ANNEXURE-A6
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD. (ACTUAL
DRAWING/ DOCUMENT (10%) (65%) (85%) (95%) (100%)
DRAWING/ DOCUMENT TITLE WTG PROGRESS PROGRESS
NO.
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-100-CHS CHEMICAL SUMMARY 1.7 14-Dec-14 23-Dec-14 14-Jan-15 22-Jan-15 28-Jan-15 29-Jan-15 27-Feb-15 16-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-CED CAUSE & EFFECT DIAGRAM 1.7 8-Jan-15 4-Mar-15 7-Feb-15 3-Apr-15 21-Feb-15 10-Apr-15 23-Mar-15 16-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-EQL EQUIPMENT LIST 1.7 14-Dec-14 9-Dec-14 29-Dec-14 8-Jan-15 12-Jan-15 15-Jan-15 19-Jan-15 22-Jan-15 23-Feb-15 29-Jan-15 100% 100.0%
A545-02-41-100-LNL LINE LIST 1.7 9-Jan-15 3-Feb-15 9-Feb-15 5-Mar-15 23-Feb-15 12-Mar-15 25-Mar-15 19-Mar-15 29-Apr-15 26-Mar-15 100% 100.0%
100 98.4%
A545-141-16-47-01102 R E P&ID FOR OWS SYSTEM 2.9 19-Apr-15 15-Apr-15 3-May-15 30-Apr-15 9-May-15 29-Jul-15 13-May-15 5-Aug-15 27-May-15 19-Aug-15 11-Jul-15 26-Aug-15 100% 100.0%
A545-141-16-47-31108 R E P&ID FOR DRINKING WATER SYSTEM 2.4 21-May-15 21-May-15 4-Jun-15 3-Jul-15 11-Jun-15 14-Jul-15 15-Jun-15 17-Jul-15 29-Jun-15 20-Jul-15 13-Aug-15 20-Jul-15 100% 100.0%
A545-141-16-47-11103 E E P&ID OF CRWS AND OWS PUMPING 3.2 25-Apr-15 28-Mar-15 9-May-15 11-Apr-15 16-May-15 11-Apr-15 20-May-15 11-Apr-15 3-Jun-15 11-Jul-15 18-Jul-15 9-Oct-15 100% 100.0%
A545-141-16-47-01104 R C LAYOUT OF FIRE EXTINGUISHER 2.4 12-Jun-15 17-Sep-15 26-Jun-15 1-Oct-15 3-Jul-15 8-Oct-15 7-Jul-15 15-Oct-15 21-Jul-15 29-Oct-15 26-Apr-19 29-Apr-19 100% 100.0%
A545-141-16-47-11112 R E P&ID FOR FIRE WATER SPRAY SYSTEM 7.6 25-May-15 17-Feb-15 8-Jun-15 3-Mar-15 15-Jun-15 3-Mar-15 19-Jun-15 3-Mar-15 3-Jul-15 16-Jul-15 17-Aug-15 16-Jul-15 100% 100.0%
A545-141-81-41-13301 E C GA OF CRWS/OWS SUMP 1.9 30-Jun-15 30-Jun-15 14-Jul-15 14-Jul-15 21-Jul-15 20-Jul-15 27-Jul-15 21-Jul-15 10-Aug-15 17-Sep-15 9-Oct-15 18-Jan-16 100% 100.0%
A545-141-16-47-02000 E E AREA DIVISION LAYOUT ISBL 1.9 21-Apr-15 20-Apr-15 9-May-15 11-May-15 16-May-15 8-Jul-15 23-May-15 10-Jul-15 6-Jun-15 13-Jul-15 5-Aug-15 13-Jul-15 100% 100.0%
A545-141-16-47-02001 R C UNIT AREA-01 7.1 19-Jun-15 10-Jul-15 10-Jul-15 14-Aug-15 24-Jul-15 28-Aug-15 7-Aug-15 4-Sep-15 28-Aug-15 18-Sep-15 14-Nov-15 29-Dec-15 100% 100.0%
A545-141-16-47-02002 R C UNIT AREA-02 7.1 21-Jun-15 17-Jul-15 11-Jul-15 14-Aug-15 25-Jul-15 28-Aug-15 8-Aug-15 4-Sep-15 29-Aug-15 18-Sep-15 16-Nov-15 29-Dec-15 100% 100.0%
A545-141-16-47-02003 R C UNIT AREA-03 7.1 23-Jun-15 25-Jul-15 14-Jul-15 14-Aug-15 28-Jul-15 28-Aug-15 11-Aug-15 4-Sep-15 1-Sep-15 18-Sep-15 18-Nov-15 29-Dec-15 100% 100.0%
A545-141-16-47-02010 R C RCC PAVEMENT LAYOUT 3.2 8-Sep-15 21-Oct-15 22-Sep-15 4-Nov-15 29-Sep-15 11-Nov-15 5-Oct-15 18-Nov-15 4-Dec-15 11-Dec-15 23-Dec-16 29-Oct-18 100% 100.0%
A545-141-16-47-30050 R C ISO UG PIPING 15.2 7-Aug-15 25-Jul-15 - - - - - - - 29-Dec-15 18-Jan-17 14-Dec-16 100% 100.0%
100 100.0%
TOTAL TOTAL
INCORPORATE COMMENTS
DRAWING / DRAFTING COMPLETE CHECKING COMPLETED ISSUED FOR COMMENTS UPDATE & ISSUE FOR (SCHD. (ACTUAL
DRAWING/ DOCUMENT TITLE WTG. % START (10%) & ISSUE FOR
DOCUMENT NO. (60%) (65%) (80%) CONSTRUCTION (100%) PROGRESS PROGRESS
CONSTRUCTION (85%)
%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
HMTD - C4 / BUTAMER
100 100.0%
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : HMTD (BUTAMER BLOCK) ANNEXURE-A6
TOTAL
VENDOR DRAWING TOTAL
MR/TR ISSUE TBA PR ISSUE (SCHD
REVIEW (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) PROGRESS
(100%) PROGRESS %)
%)
A545-111-CT-MR-7642 TRAYS & TOWER INTERNALS 58.0 9-Jul-15 3-Aug-15 19-Oct-15 31-Dec-15 8-Dec-15 4-Apr-16 5-Feb-17 28-Feb-18 100% 100.0%
A545-999-JA-MR-7970 EJECTORS UNENGINEERED 5.8 7-Sep-15 31-Aug-15 19-Dec-15 8-Feb-16 23-Mar-19 13-Mar-19 7-May-19 2-Jul-19 100% 100.0%
100 100.0%
TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW TOTAL (ACTUAL
MR No MR DESCRIPTION WTG. % (SCHD
(40%) (85%) (90%) (100%) PROGRESS %)
PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
PED - C4 / BUTAMER UNIT
A545-121-JC-MR-4260 COALESCER 49.4 2-Jun-15 15-Jun-15 12-Sep-15 20-Oct-15 1-Nov-15 13-May-16 12-Jan-17 13-Feb-17 100% 100.0%
A545-141-GN-MR-4490 AIR FILTERS 3.7 27-Aug-15 12-May-16 7-Dec-15 28-Jul-16 21-Nov-16 12-Mar-18 30-Apr-19 30-Apr-19 90% 100.0%
MISCELLANEOUS (INPUT TO MR
A545-141-GN-MR-MISC 46.9 31-Jul-15 8-May-15 - - - - 28-Feb-16 31-Oct-16 100% 100.0%
TENDER & PACKAGES)
100 100.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
PIPING - C4 / BUTAMER UNIT
A545-141-16-43-00001 E EQUIPMENT LAYOUT 0.6 5-Mar-15 2-Mar-15 4-May-15 17-Apr-15 3-Jun-15 1-May-15 24-Jun-15 8-May-15 24-Jul-15 22-May-15 30-Sep-15 26-Aug-15 100% 100.0%
A545-141-16-43-00002 E AREA DIVISION 0.1 15-Jun-15 1-May-15 13-Jul-15 7-Jun-15 20-Jul-15 14-Jun-15 28-Jul-15 22-Jun-15 4-Aug-15 7-Jul-15 3-Sep-15 26-Aug-15 100% 100.0%
A545-141-16-43-00011 C PIPING GAD AREA-01 0.1 1-Dec-15 22-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00012 C PIPING GAD AREA-01 0.1 1-Dec-15 22-Sep-15 16-Dec-15 2-Oct-15 23-Dec-15 9-Oct-15 30-Dec-15 16-Oct-15 14-Jan-16 23-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00013 C PIPING GAD AREA-01 0.1 1-Dec-15 22-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00014 C PIPING GAD AREA-01 0.1 1-Dec-15 22-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00021 C PIPING GAD AREA-02 0.1 1-Dec-15 22-Sep-15 16-Dec-15 2-Oct-15 23-Dec-15 9-Oct-15 30-Dec-15 16-Oct-15 14-Jan-16 23-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00022 C PIPING GAD AREA-02 0.1 1-Dec-15 22-Sep-15 16-Dec-15 2-Oct-15 23-Dec-15 9-Oct-15 30-Dec-15 16-Oct-15 14-Jan-16 23-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00023 C PIPING GAD AREA-02 0.1 1-Dec-15 22-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00024 C PIPING GAD AREA-02 0.1 1-Dec-15 22-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00031 C PIPING GAD AREA-03 0.1 1-Dec-15 22-Sep-15 16-Dec-15 10-Nov-15 23-Dec-15 17-Nov-15 30-Dec-15 24-Nov-15 14-Jan-16 1-Dec-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00032 C PIPING GAD AREA-03 0.1 1-Dec-15 22-Sep-15 16-Dec-15 2-Oct-15 23-Dec-15 9-Oct-15 30-Dec-15 16-Oct-15 14-Jan-16 23-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00033 C PIPING GAD AREA-03 0.1 1-Dec-15 22-Sep-15 16-Dec-15 2-Oct-15 23-Dec-15 9-Oct-15 30-Dec-15 16-Oct-15 14-Jan-16 23-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00034 C PIPING GAD AREA-03 0.1 1-Dec-15 26-Nov-15 16-Dec-15 2-Oct-15 23-Dec-15 9-Oct-15 30-Dec-15 16-Oct-15 14-Jan-16 23-Oct-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00041 C PIPING GAD AREA-04 0.1 1-Dec-15 22-Sep-15 16-Dec-15 10-Nov-15 23-Dec-15 17-Nov-15 30-Dec-15 24-Nov-15 14-Jan-16 1-Dec-15 31-Oct-19 - 85% 85.0%
A545-141-16-43-00042 C PIPING GAD AREA-04 0.1 1-Dec-15 22-Sep-15 16-Dec-15 2-Oct-15 23-Dec-15 9-Oct-15 30-Dec-15 16-Oct-15 14-Jan-16 23-Oct-15 30-Nov-19 - 85% 85.0%
A545-141-16-43-00043 C PIPING GAD AREA-04 0.1 1-Dec-15 22-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 30-Nov-19 - 85% 85.0%
A545-141-16-43-00044 C PIPING GAD AREA-04 0.1 1-Dec-15 22-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 30-Nov-19 - 85% 85.0%
A545-141-16-43-00051 C PIPING GAD AREA-05 0.1 1-Dec-15 25-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 30-Nov-19 - 85% 85.0%
A545-141-16-43-00052 C PIPING GAD AREA-05 0.1 1-Dec-15 25-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 30-Nov-19 - 85% 85.0%
A545-141-16-43-00053 C PIPING GAD AREA-05 0.1 1-Dec-15 25-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 30-Nov-19 - 85% 85.0%
A545-141-16-43-00054 C PIPING GAD AREA-05 0.1 1-Dec-15 24-Sep-15 16-Dec-15 8-Oct-15 23-Dec-15 15-Oct-15 30-Dec-15 22-Oct-15 14-Jan-16 29-Oct-15 30-Nov-19 - 85% 85.0%
A545-141-16-43-MTO1 P PRELIMINARY MTO 8.2 22-Jun-15 1-Jul-15 - - - - - - - - 5-Aug-15 15-Jul-15 100% 100.0%
A545-141-16-43-MTO2 P INTERMEDIATE MTO 4.1 18-Jan-16 27-Jan-16 - - - - - - - - 3-Mar-16 29-Feb-16 100% 100.0%
A545-141-16-43-MTO3 P FINAL MTO 2.0 26-Jul-16 23-Dec-16 - - - - - - - - 28-Apr-17 30-Dec-16 100% 100.0%
A545-141-16-43-MTOM P MTO DATA/ IPMCS 1.2 12-Aug-15 28-Sep-15 - - - - - - - - 31-Jul-19 - 100% 95.0%
A545-141-16-43-MTOS P MTO FOR PIPE SUPPORTS 0.3 2-Aug-16 7-Jan-16 - - - - - - - - 31-Jul-19 - 100% 95.0%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-141-16-43-MTOT P TOP-OFF MTO 0.8 28-Nov-16 2-Jan-18 - - - - - - - - 29-Sep-17 1-Feb-18 100% 100.0%
A545-141-16-43-NOZZ C NOZZLE ORIENTATION 0.5 2-Jan-16 2-Jul-15 - - - - - - - - 30-Nov-16 30-Dec-17 100% 100.0%
A545-141-16-43-PCLT C PIPING CLEATS 0.5 14-Jun-15 14-Sep-15 - - - - - - - - 31-Dec-16 30-Dec-17 100% 100.0%
A545-141-16-43-PMSC E PMS/VMS 0.8 20-Feb-15 20-May-15 6-Mar-15 - 13-Mar-15 - 20-Mar-15 - 3-Apr-15 - 13-May-15 28-Sep-17 100% 100.0%
A545-141-16-43-SCAT C PIPING SPES.& CATL. 0.3 24-Jun-15 20-Jul-15 5-Jul-15 12-Nov-15 12-Jul-15 30-Nov-15 16-Jul-15 14-Dec-15 22-Jul-15 28-Dec-15 21-Aug-15 25-Feb-19 100% 100.0%
100 98.8%
DANGOTE REFINERY AND PETROCHEMICAL MATERIAL CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE : RED (BUTAMER BLOCK) ANNEXURE-A6
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING
MR No MR DESCRIPTION WTG. % (SCHD (ACTUAL
(40%) (85%) (90%) REVIEW (100%)
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
A545-101-LZ-MR-5007 OIL MIST LUBRICATION SYSTEM 2.8 19-Jun-15 10-Dec-15 30-Sep-15 28-Jun-16 28-Dec-16 29-Nov-16 28-Mar-17 30-Jan-18 100% 100.0%
100 100.0%
A545-141-EX-MR-6451 ELECTRIC HEATERS 1.7 30-Jun-15 9-Jul-15 10-Oct-15 2-Dec-15 9-Dec-15 26-Aug-16 23-Dec-16 31-Jan-18 100% 100.0%
A545-141-VV-MR-6409 ALKYLATION VESSELS 8.4 20-Jul-15 7-Aug-15 30-Oct-15 10-Nov-15 29-Dec-15 28-Mar-16 12-Jan-17 29-Jan-18 100% 100.0%
A545-141-EE-MR-6420 HEAT EXCHANGER CARBON STEEL 1.7 28-Jul-15 10-Dec-15 8-Nov-15 22-Mar-16 7-Jan-16 29-Sep-16 21-Jan-17 30-Nov-17 100% 100.0%
HEAT EXCHANGER CARBON
A545-151-EE-MR-6125 STEEL., HEAT EXCHANGER LOW 2.6 16-Mar-15 19-Mar-15 26-Jun-15 27-May-15 25-Aug-15 29-Oct-15 7-Dec-16 31-Aug-17 100% 100.0%
ALLOY
A545-101-CC-MR-6154 COLUMNS (CS & CS+SS CLAD) 4.2 1-May-15 21-Jan-15 11-Aug-15 10-Apr-15 10-Oct-15 4-Jul-15 3-Dec-16 28-Dec-17 100% 100.0%
A545-101-CC-MR-6155 COLUMNS (CS & CS+CLAD) 1.8 15-May-15 2-Mar-15 25-Aug-15 4-Jun-15 24-Oct-15 2-Nov-15 17-Dec-16 27-Feb-18 100% 100.0%
A545-111-VV-MR-6403 VESSELS 28.1 6-May-15 25-Mar-15 16-Aug-15 17-Jun-15 15-Oct-15 29-Oct-15 8-Dec-16 28-Feb-18 100% 100.0%
A545-111-VV-MR-6404 REACTOR 19.6 8-May-15 31-Mar-15 18-Aug-15 26-Jun-15 17-Oct-15 29-Oct-15 10-Dec-16 31-Aug-17 100% 100.0%
A545-151-EE-MR-6130 EXCHANGER 13.5 11-May-15 16-Apr-15 22-Aug-15 21-Jul-15 21-Oct-15 18-Mar-16 14-Dec-16 28-Apr-18 100% 100.0%
A545-151-EE-MR-6140 HEAT EXCHNAGERS HAIR PIN TYPE 12.3 31-Mar-15 24-Apr-15 10-Jul-15 1-Sep-15 22-Oct-16 29-Sep-16 20-Jan-17 27-Apr-18 100% 100.0%
A545-111-EE-MR-6145 HEAT EXCHANGER CARBON STEEL 1.1 28-May-15 8-Jun-15 7-Sep-15 22-Jul-15 6-Nov-15 23-Mar-16 30-Dec-16 26-Jun-17 100% 100.0%
100 99.9%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTN. (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
STRUCTURAL - C4/BUTAMER
A545-141-16-48-00101 TO
C PILE LAYOUT 2.2 26-Mar-15 26-Mar-15 9-Apr-15 9-Apr-15 16-Apr-15 16-Apr-15 20-Apr-15 20-Apr-15 4-May-15 5-Jun-15 3-Jan-17 22-Mar-18 100% 100.0%
00102
A545-141-16-48-00201 TO
C OVERALL FDN LAYOUT 1.9 31-Mar-15 25-May-15 7-Apr-15 8-Jul-15 14-Apr-15 15-Jul-15 18-Apr-15 22-Jul-15 2-May-15 29-Jul-15 31-Jan-17 28-Mar-18 100% 100.0%
00202
GA & R/F DET OF FDN FOR ANALYSER
A545-141-16-48-30280 C 0.2 10-Jan-17 22-May-17 17-Jan-17 7-Aug-18 24-Jan-17 14-Aug-18 28-Jan-17 21-Aug-18 11-Feb-17 28-Aug-18 22-Apr-19 - 100% 98.0%
SHELTER
A545-141-16-48-00301 C MAIN PIPE RACK GA & R/F DET OF FDN 1.9 11-May-15 13-Jul-15 18-May-15 15-Oct-15 25-May-15 23-Oct-15 29-May-15 30-Oct-15 12-Jun-15 6-Nov-15 20-Sep-15 20-Nov-15 100% 100.0%
A545-141-16-48-00304 C MAIN PIPE RACK R/F DET. OF SUPERSTR. 1.4 21-May-15 13-Jul-15 28-May-15 15-Oct-15 4-Jun-15 23-Oct-15 8-Jun-15 30-Oct-15 22-Jun-15 6-Nov-15 30-Sep-15 20-Nov-15 100% 100.0%
A545-141-16-48-00307 C MAIN PIPE RACK TYP. INSERT PLATE DET. 1.0 31-May-15 14-May-15 7-Jun-15 9-Nov-15 14-Jun-15 16-Nov-15 18-Jun-15 23-Nov-15 2-Jul-15 14-Mar-16 10-Oct-15 28-Mar-16 100% 100.0%
A545-141-16-48-00311 TO
C MAIN PIPE RACK 1ST TIER PLAN 1.9 5-Jun-15 14-May-15 12-Jun-15 22-Jun-15 19-Jun-15 29-Jun-15 23-Jun-15 9-Jul-15 7-Jul-15 23-Jul-15 15-Oct-15 30-Jul-15 100% 100.0%
00312
A545-141-16-48-00321 TO
C MAIN PIPE RACK 2ND TIER PLAN 1.9 15-Jun-15 19-May-15 22-Jun-15 22-Jun-15 29-Jun-15 29-Jun-15 3-Jul-15 9-Jul-15 17-Jul-15 23-Jul-15 25-Oct-15 30-Jul-15 100% 100.0%
00322
A545-141-81-41-00331 TO
C MAIN PIPE RACK 3RD TIER PLAN 1.9 25-Jun-15 19-May-15 2-Jul-15 22-Jun-15 9-Jul-15 29-Jun-15 13-Jul-15 9-Jul-15 27-Jul-15 23-Jul-15 4-Nov-15 30-Jul-15 100% 100.0%
00332
A545-141-16-48-00341 TO
C MAIN PIPE RACK 4TH TIER PLAN 1.9 5-Jul-15 20-May-15 12-Jul-15 22-Jun-15 19-Jul-15 29-Jun-15 23-Jul-15 9-Jul-15 6-Aug-15 23-Jul-15 14-Nov-15 30-Jul-15 100% 100.0%
00342
A545-141-16-48-00401 TECH STR FOUNDATION DET. 05-08-2015 22-06-2016 =G19+7 - =J19+7 - =M19+4 - =P19+14 - =S19+76 -
A545-141-16-48-00402 C SADDLE SUPPORT DETAILS 1.0 8-Aug-15 13-Feb-18 15-Feb-17 27-Feb-18 22-Feb-17 6-Mar-18 27-Feb-17 13-Mar-18 13-Mar-17 20-Mar-18 27-Apr-19 20-Mar-18 100% 100.0%
A545-141-81-41-10410 C BASE PLATE DETAILS FOR TECH STR 1.0 13-Aug-15 4-Sep-17 20-Feb-17 18-Sep-17 27-Feb-17 25-Sep-17 4-Mar-17 2-Oct-17 18-Mar-17 9-Oct-17 2-May-19 9-Oct-17 100% 100.0%
A545-141-16-48-10411 C TECH STR-1 R/F DET. OF FDN. 1.0 11-Aug-15 7-Oct-15 18-Aug-15 21-Oct-15 25-Aug-15 28-Oct-15 29-Aug-15 2-Feb-16 12-Sep-15 16-Feb-16 27-Nov-15 21-Mar-16 100% 100.0%
A545-141-16-48-00412 C TECH STR-1 PLANS 1.0 14-Aug-15 6-Jul-15 21-Aug-15 13-Jul-15 28-Aug-15 20-Jul-15 1-Sep-15 24-Jul-15 15-Sep-15 19-Aug-15 30-Nov-15 2-Sep-15 100% 100.0%
A545-141-16-48-00415 TECH STR-1 ELEVATIONS 20-08-2015 6-Jul-15 =G23+7 13-Jul-15 #VALUE! 20-Jul-15 #VALUE! 24-Jul-15 #VALUE! =W23-14 #VALUE! 02-09-2015
A545-141-16-48-00418 C TECH STR-1 STAIRCASE 1.0 26-Aug-15 27-Jul-15 2-Sep-15 21-Dec-15 9-Sep-15 28-Dec-15 13-Sep-15 22-Apr-16 27-Sep-15 26-Sep-16 12-Dec-15 3-Oct-16 100% 100.0%
A545-141-16-48-00419 TECH STR-1 OPENINGS & PIPE SUPPORTS 29-08-2015 26-01-2016 =G25+7 - =J25+7 - =M25+4 - =P25+14 - =S25+76 -
A545-141-16-48-00421 C TECH STR-2 R/F DET. OF FDN. 1.0 1-Sep-15 17-Mar-16 8-Sep-15 31-Mar-16 15-Sep-15 7-Apr-16 19-Sep-15 14-Apr-16 3-Oct-15 21-Apr-16 18-Dec-15 28-Apr-16 100% 100.0%
A545-141-16-48-00422 C TECH STR-2 PLANS 1.0 4-Sep-15 29-May-15 11-Sep-15 10-Nov-15 18-Sep-15 17-Nov-15 22-Sep-15 24-Nov-15 6-Oct-15 21-Apr-16 21-Dec-15 28-Apr-16 100% 100.0%
A545-141-16-48-00425 C TECH STR-2 ELEVATIONS 1.0 10-Sep-15 29-May-15 17-Sep-15 10-Nov-15 24-Sep-15 17-Nov-15 28-Sep-15 24-Nov-15 12-Oct-15 21-Apr-16 27-Dec-15 28-Apr-16 100% 100.0%
A545-141-16-48-00428 C TECH STR-2 STAIRCASE 1.0 16-Sep-15 3-Aug-15 23-Sep-15 11-Apr-16 30-Sep-15 18-Apr-16 4-Oct-15 25-Apr-16 18-Oct-15 26-Sep-16 2-Jan-16 3-Oct-16 100% 100.0%
A545-141-16-48-00429 TECH STR-2 OPENING & PIPE SUP. 19-09-2015 27-01-2016 =G30+7 - =J30+7 - =M30+4 - =P30+14 - =S30+76 -
A545-141-16-48-10431 C TECH STR-3 R/F DET. OF FDN 1.0 22-Sep-15 8-Oct-15 29-Sep-15 22-Oct-15 6-Oct-15 29-Oct-15 10-Oct-15 2-Feb-16 24-Oct-15 16-Feb-16 8-Jan-16 22-Mar-16 100% 100.0%
A545-141-16-48-00432 C TECH STR-3 PLANS 1.0 25-Sep-15 9-Jul-15 2-Oct-15 16-Jul-15 9-Oct-15 23-Jul-15 13-Oct-15 27-Jul-15 27-Oct-15 8-Sep-15 11-Jan-16 22-Sep-15 100% 100.0%
A545-141-16-48-00435 C TECH STR-3 ELEVATIONS 1.0 1-Oct-15 9-Jul-15 8-Oct-15 16-Jul-15 15-Oct-15 23-Jul-15 19-Oct-15 27-Jul-15 2-Nov-15 8-Sep-15 17-Jan-16 22-Sep-15 100% 100.0%
A545-141-16-48-00438 C TECH STR-3 STAIRCASE 1.0 7-Oct-15 27-Jul-15 14-Oct-15 21-Dec-15 21-Oct-15 28-Dec-15 25-Oct-15 25-Apr-16 8-Nov-15 26-Sep-16 23-Jan-16 3-Oct-16 100% 100.0%
A545-141-16-48-00439 TECH STR-3 OPENING & PIPE SUP. 10-10-2015 25-01-2016 =G35+7 - =J35+7 - =M35+4 - =P35+14 - =S35+75 -
A545-141-16-48-10441 C TECH STR-4 R/F DET. OF FDN 1.0 13-Oct-15 5-Jan-16 20-Oct-15 19-Jan-16 27-Oct-15 26-Jan-16 31-Oct-15 2-Feb-16 14-Nov-15 16-Feb-16 29-Jan-16 28-Mar-16 100% 100.0%
A545-141-16-48-00442 C TECH STR-4 PLANS 1.0 16-Oct-15 28-May-15 23-Oct-15 16-Jul-15 30-Oct-15 23-Jul-15 3-Nov-15 28-Jul-15 17-Nov-15 17-Aug-15 1-Feb-16 2-Sep-15 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTN. (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-141-16-48-00445 TECH STR-4 ELEVATIONS 22-10-2015 28-05-2015 =G38+7 16-Jul-15 #VALUE! 23-Jul-15 #VALUE! 28-Jul-15 =P38+14 =W38-14 =S38+76 02-09-2015
A545-141-16-48-00448 C TECH STR-4 STAIRCASE 1.0 28-Oct-15 28-Jul-15 4-Nov-15 21-Dec-15 11-Nov-15 28-Dec-15 15-Nov-15 30-Mar-16 29-Nov-15 26-Sep-16 13-Feb-16 3-Oct-16 100% 100.0%
A545-141-16-48-00449 TECH STR-4 OPENING & PIPE SUP. 31-10-2015 25-01-2016 =G40+7 - =J40+7 - =M40+4 - =P40+14 - =S40+76 -
A545-141-16-48-00451 C STR FOR 141-CC-1002 R/F DETAIL OF FDN. 1.0 3-Nov-15 9-Jun-16 10-Nov-15 16-Jun-16 17-Nov-15 23-Jun-16 21-Nov-15 30-Jun-16 5-Dec-15 21-Jul-16 19-Feb-16 28-Jul-16 100% 100.0%
A545-141-16-48-00452 C STR FOR 141-CC-1002 PLAN & ELEVATION 1.0 6-Nov-15 7-Sep-15 13-Nov-15 14-Sep-15 20-Nov-15 21-Sep-15 24-Nov-15 28-Sep-15 8-Dec-15 30-Dec-15 22-Feb-16 13-Jan-16 100% 100.0%
A545-141-16-48-00455 STR FOR 141-CC-1002 12-11-2015 =K43-7 18-Dec-15 14-Sep-15 25-Dec-15 21-Sep-15 29-Dec-15 28-Sep-15 =P43+14 - =S43+76 -
A545-141-16-48-00458 STR FOR 141-CC-1002 STAIRCASE 18-11-2015 24-06-2016 =G44+7 - =J44+7 - =M44+4 - =P44+14 - =S44+76 -
A545-141-16-48-00462 C STR FOR 141-RB-1001 PLAN & ELEVATION 1.0 27-Nov-15 28-Sep-15 4-Dec-15 13-Oct-15 11-Dec-15 20-Oct-15 15-Dec-15 27-Oct-15 29-Dec-15 8-Jan-16 14-Mar-16 22-Jan-16 100% 100.0%
A545-141-16-48-00465 STR FOR 141-RB-1001 03-12-2015 28-09-2015 19-Mar-15 13-Oct-15 26-Mar-15 20-Oct-15 30-Mar-15 27-Oct-15 =P48+14 - =S48+76 - 80.0%
A545-141-16-48-00468 C STR FOR 141-RB-1001 STAIRCASE 1.0 9-Dec-15 8-Jun-16 16-Dec-15 15-Jun-16 23-Dec-15 22-Jun-16 27-Dec-15 29-Jun-16 10-Jan-16 26-Sep-16 26-Mar-16 3-Oct-16 100% 100.0%
A545-141-16-48-30501 C FDN. FOR 141-CC-1001 0.2 20-Mar-15 21-Feb-15 27-Mar-15 28-Feb-15 3-Apr-15 7-Mar-15 7-Apr-15 11-Mar-15 21-Apr-15 12-Jan-16 20-Jul-15 22-Mar-16 100% 100.0%
A545-141-16-48-30502 FDN FOR 141-CC-1002 27-Mar-15 28-Mar-15 3-Apr-15 4-Apr-15 10-Apr-15 11-Apr-15 14-Apr-15 16-Apr-15 28-Apr-15 12-Jan-16 8-Dec-16 - 85.0%
A545-141-16-48-30511 C FDN FOR 141-VV-1001 0.2 3-Apr-15 10-Aug-15 10-Apr-15 7-Sep-16 17-Apr-15 14-Sep-16 21-Apr-15 21-Sep-16 5-May-15 28-Sep-16 3-Aug-15 5-Oct-16 100% 100.0%
A545-141-16-48-30512 C FDN FOR 141-VV-1002A/B 0.2 6-Apr-15 28-Mar-15 13-Apr-15 4-Apr-15 20-Apr-15 11-Apr-15 24-Apr-15 16-Apr-15 8-May-15 20-Jul-15 6-Aug-15 3-Aug-15 100% 100.0%
A545-141-16-48-30513 C FDN FOR 141-VV-1003 0.2 9-Apr-15 12-Aug-15 16-Apr-15 7-Sep-16 23-Apr-15 14-Sep-16 27-Apr-15 21-Sep-16 11-May-15 28-Sep-16 9-Aug-15 5-Oct-16 100% 100.0%
A545-141-16-48-30514 C FDN FOR 141-VV-1004 0.2 14-Apr-15 21-Feb-15 21-Apr-15 28-Feb-15 28-Apr-15 7-Mar-15 2-May-15 11-Mar-15 16-May-15 23-Jul-15 14-Aug-15 6-Aug-15 100% 100.0%
A545-141-16-48-30515 C FDN FOR 141-VV-1005 0.2 17-Apr-15 28-Jul-15 24-Apr-15 9-Oct-15 1-May-15 16-Oct-15 5-May-15 23-Oct-15 19-May-15 16-Dec-15 17-Aug-15 30-Dec-15 100% 100.0%
A545-141-16-48-30517 C FDN FOR 141-VV-1007 0.2 23-Apr-15 20-Apr-15 30-Apr-15 27-Apr-15 7-May-15 4-May-15 11-May-15 8-May-15 25-May-15 15-Oct-15 23-Aug-15 29-Oct-15 100% 100.0%
A545-141-16-48-30518 C FDN FOR 141-VV-1008 0.2 27-Apr-15 20-Apr-15 4-May-15 27-Apr-15 11-May-15 4-May-15 15-May-15 8-May-15 29-May-15 16-Dec-15 27-Aug-15 30-Dec-15 100% 100.0%
A545-141-16-48-30520 C FDN FOR 141-VV-1010 0.16 30-Apr-15 20-Apr-15 7-May-15 27-Apr-15 14-May-15 4-May-15 18-May-15 8-May-15 1-Jun-15 15-Oct-15 30-Aug-15 29-Oct-15 100.0%
A545-141-16-48-30521 C FDN FOR 141-VV-1011 0.16 4-May-15 20-Apr-15 11-May-15 27-Apr-15 18-May-15 4-May-15 22-May-15 8-May-15 5-Jun-15 15-Oct-15 3-Sep-15 29-Oct-15 100.0%
A545-141-16-48-30522 C FDN FOR 141-VV-1012 0.2 7-May-15 20-Aug-15 14-May-15 6-Nov-15 21-May-15 13-Nov-15 25-May-15 20-Nov-15 8-Jun-15 16-Dec-15 6-Sep-15 30-Dec-15 100% 100.0%
A545-141-16-48-30541 C FDN FOR 141-RB-1001A/B 0.2 18-Jun-15 28-Mar-15 25-Jun-15 4-Apr-15 2-Jul-15 11-Apr-15 6-Jul-15 16-Apr-15 20-Jul-15 16-Jul-15 18-Oct-15 30-Jul-15 100% 100.0%
A545-141-16-48-30591 MISC. FDN FOR 141-JA-1001 12-Jan-17 - 19-Jan-17 - 26-Jan-17 - 30-Jan-17 - =P64+14 - =S64+91 - 80%
A545-141-16-48-30592 MISC. FDN FOR 141-YS-1001 21-Jan-17 - 28-Jan-17 - 4-Feb-17 - 8-Feb-17 - =P65+14 - =S65+90 - 80%
A545-141-16-48-31541 C FDN FOR 144-RB-1001 0.2 24-Jun-15 28-Mar-15 1-Jul-15 4-Apr-15 8-Jul-15 11-Apr-15 12-Jul-15 16-Apr-15 26-Jul-15 30-Jul-15 24-Oct-15 8-Jan-16 100% 100.0%
A545-141-16-48-00548 GA & R/F DET FOR UG PIT 12-05-2015 27-07-2015 =G67+7 =N67-7 =J67+7 =Q67-7 =M67+4 28-12-2015 =P67+14 - =S67+90 -
A545-141-16-48-30551 C FDN FOR 141-EE-1001 0.2 10-Apr-15 22-Apr-16 17-Apr-15 6-May-16 24-Apr-15 13-May-16 28-Apr-15 20-May-16 12-May-15 28-Sep-16 10-Aug-15 5-Oct-16 100% 100.0%
Page 611 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 2 of 5
Jul-19
DRAWING CONTROL INDEX
JOB NO. : A545
DANGOTE REFINERY & PETROCHEMICAL PROJECT, NIGERIA DISCIPLINE: STRUCTURAL (C4 / BUTAMER UNIT)
ANNEXURE-A6
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTN. (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-141-16-48-30552 C FDN FOR 141-EE-1002A/B/C 0.2 13-Apr-15 22-Aug-15 20-Apr-15 14-Oct-15 27-Apr-15 21-Oct-15 1-May-15 28-Oct-15 15-May-15 25-Jan-16 13-Aug-15 27-Jul-16 100% 100.0%
A545-141-16-48-30553 C FDN FOR 141-EE-1003 0.2 16-Apr-15 25-Aug-15 23-Apr-15 14-Oct-15 30-Apr-15 21-Oct-15 4-May-15 28-Oct-15 18-May-15 16-Dec-15 16-Aug-15 30-Dec-15 100% 100.0%
A545-141-16-48-30554 C FDN FOR 141-EE-1004 0.2 20-Apr-15 24-Jul-15 27-Apr-15 14-Oct-15 4-May-15 21-Oct-15 8-May-15 28-Oct-15 22-May-15 16-Dec-15 20-Aug-15 30-Dec-15 100% 100.0%
A545-141-16-48-30555 C FDN FOR 141-EE-1005 0.2 23-Apr-15 24-Jul-15 30-Apr-15 16-Dec-15 7-May-15 23-Dec-15 11-May-15 30-Dec-15 25-May-15 25-Jan-16 23-Aug-15 28-Jul-16 100% 100.0%
A545-141-16-48-30556 C FDN FOR 141-EE-1006 0.2 27-Apr-15 24-Jul-15 4-May-15 14-Oct-15 11-May-15 21-Oct-15 15-May-15 28-Oct-15 29-May-15 17-Dec-15 27-Aug-15 31-Dec-15 100% 100.0%
A545-141-16-48-30559 C FDN FOR 141-EE-1009 0.2 5-May-15 20-Aug-15 15-Dec-16 9-Jul-18 22-Dec-16 16-Jul-18 27-Dec-16 23-Jul-18 10-Jan-17 30-Jul-18 16-Mar-19 30-Jul-18 100% 100.0%
A545-141-16-48-30560 C FDN FOR 141-EE-1010 0.2 8-May-15 12-Aug-15 17-Dec-16 7-Aug-18 24-Dec-16 14-Aug-18 28-Dec-16 21-Aug-18 11-Jan-17 28-Aug-18 17-Mar-19 28-Aug-18 100% 100.0%
A545-141-16-48-30571 C FDN FOR 141-EE-1012 0.2 14-May-15 27-Jul-15 21-May-15 15-Dec-15 28-May-15 22-Dec-15 1-Jun-15 29-Dec-15 15-Jun-15 25-Jan-16 13-Sep-15 28-Apr-16 100% 100.0%
A545-141-81-41-00580 C MISC. FOUNDATION 0.2 5-Mar-19 - 12-Mar-19 - 19-Mar-19 - 23-Mar-19 - 6-Apr-19 - 7-May-19 - 100% 45.0%
A545-141-16-48-30601 C FDN FOR PUMPS 141-PA-1001A/B 0.1 11-May-15 28-Jun-16 22-Dec-16 28-Aug-17 29-Dec-16 21-Apr-18 2-Jan-17 28-Apr-18 27-Mar-19 23-Apr-19 27-Apr-19 23-Apr-19 100% 100.0%
A545-141-16-48-30602 C FDN FOR PUMPS 141-PA-1002A/B 0.1 14-May-15 28-Jun-16 24-Dec-16 28-Aug-17 31-Dec-16 21-Apr-18 4-Jan-17 28-Apr-18 18-Jan-17 5-Oct-18 24-Mar-19 5-Oct-18 100% 100.0%
A545-141-16-48-30603 C FDN FOR PUMPS 141-PA-1003A/B 0.1 19-May-15 28-Jun-16 30-Dec-16 28-Aug-17 6-Jan-17 21-Apr-18 10-Jan-17 28-Apr-18 5-Mar-19 23-Apr-19 5-Apr-19 23-Apr-19 100% 100.0%
A545-141-16-48-30604 C FDN FOR PUMPS 141-PA-1004A/B 0.1 22-May-15 28-Jun-16 2-Jan-17 28-Aug-17 9-Jan-17 21-Apr-18 13-Jan-17 28-Apr-18 8-Mar-19 22-Mar-19 8-Apr-19 22-Mar-19 100% 100.0%
A545-141-16-48-30605 C FDN FOR PUMPS 141-PA-1005A/B 0.1 25-May-15 28-Jun-16 5-Jan-17 28-Aug-17 12-Jan-17 21-Apr-18 16-Jan-17 28-Apr-18 11-Mar-19 22-Mar-19 11-Apr-19 22-Mar-19 100% 100.0%
A545-141-16-48-30606 C FDN FOR PUMPS 141-PA-1006A/B 0.1 28-May-15 28-Jun-16 7-Jan-17 28-Aug-17 14-Jan-17 21-Apr-18 18-Jan-17 28-Apr-18 1-Feb-17 5-Oct-18 7-Apr-19 5-Oct-18 100% 100.0%
A545-141-16-48-30607 C FDN FOR PUMPS 141-PA-1007A/B 0.1 2-Jun-15 28-Jun-16 13-Jan-17 28-Aug-17 20-Jan-17 21-Apr-18 24-Jan-17 28-Apr-18 7-Feb-17 23-Aug-18 8-May-17 30-Aug-18 100% 100.0%
A545-141-16-48-30608 C FDN FOR PUMPS 145-PA-1004A/B 0.1 5-Jun-15 28-Jun-16 16-Jan-17 28-Aug-17 23-Jan-17 21-Apr-18 27-Jan-17 28-Apr-18 10-Feb-17 20-Jun-18 11-May-17 30-Aug-18 100% 100.0%
A545-141-16-48-00701 C PLTF. & LADDER FOR 141-CC-1001 1.5 7-Apr-15 7-May-15 14-Apr-15 25-Jul-15 21-Apr-15 1-Aug-15 25-Apr-15 5-Aug-15 9-May-15 12-Aug-15 7-Aug-15 26-Aug-15 100% 100.0%
A545-141-16-48-00704 PLTF. & LADDER FOR 141-CC-1002 15-Apr-15 7/24/2015 22-Apr-15 =N86-7 29-Apr-15 =Q86-4 3-May-15 =T86-7 17-May-15 =W86-14 15-Aug-15 8/26/2015
A545-141-81-41-10546 C GA OF OWS / CRWS SUMP 0.6 18-Apr-15 11-Jan-16 25-Apr-15 25-Jan-16 2-May-15 1-Feb-16 6-May-15 8-Feb-16 20-May-15 15-Feb-16 18-Aug-15 22-Mar-16 100% 100.0%
A545-141-81-41-11546 C R/F DETAIL OF OWS / CRWS SUMP 0.6 25-Apr-15 29-Aug-17 2-May-15 12-Sep-17 9-May-15 19-Sep-17 13-May-15 26-Sep-17 27-May-15 3-Oct-17 25-Aug-15 10-Oct-17 100% 100.0%
A545-141-16-48-10711 PLTF.& LADDER FOR 141-VV-1001 21-04-2015 12-08-2015 =G88+7 - =J88+7 - =M88+4 - =P88+14 - =S88+90 -
A545-141-16-48-10712 C PLTF. & LADDER FOR 145-VV-1008 0.6 25-Apr-15 28-Aug-15 2-May-15 11-Sep-15 9-May-15 18-Sep-15 13-May-15 25-Sep-15 27-May-15 16-Oct-15 25-Aug-15 30-Oct-15 100% 100.0%
A545-141-16-48-10713 PLTF. & LADDER FOR 141-VV-1003 29-04-2015 15-06-2016 =G90+7 - =J90+7 - =M90+4 - =P90+14 - =S90+90 -
A545-141-16-48-10714 C PLTF. & LADDER FOR 141-VV-1004 0.6 1-May-15 24-Jul-15 8-May-15 1-Aug-15 15-May-15 8-Aug-15 19-May-15 12-Aug-15 2-Jun-15 19-Aug-15 31-Aug-15 26-Aug-15 100% 100.0%
A545-141-16-48-10715 C PLTF. & LADDER FOR 141-VV-1005 0.6 5-May-15 17-Aug-15 12-May-15 16-Sep-15 19-May-15 23-Sep-15 23-May-15 30-Sep-15 6-Jun-15 15-Oct-15 4-Sep-15 29-Oct-15 100% 100.0%
A545-141-16-48-10716 C PLTF. & LADDER FOR 141-VV-1006 0.6 9-May-15 17-Aug-15 16-May-15 16-Sep-15 23-May-15 23-Sep-15 27-May-15 30-Sep-15 10-Jun-15 15-Oct-15 8-Sep-15 29-Oct-15 100% 100.0%
A545-141-16-48-10722 C PLTF. & LADDER FOR 145-VV-1017 0.6 26-May-15 10-Aug-15 2-Jun-15 24-Aug-15 9-Jun-15 31-Aug-15 13-Jun-15 7-Sep-15 27-Jun-15 14-Sep-15 25-Sep-15 28-Sep-15 100% 100.0%
A545-141-16-48-40801 SCHEDULE FOR FIRE WATER TRENCHES 2-Jun-15 25-Jun-16 2-Feb-17 28-Apr-17 9-Feb-17 - 13-Feb-17 - 27-Feb-17 - 29-May-17 - 60.0%
A545-141-16-48-40802 SCHEDULE FOR ELECTRICAL TRENCHES 9-Jun-15 25-Jun-16 9-Feb-17 28-Apr-17 16-Feb-17 - 20-Feb-17 - 6-Mar-17 - 5-Jun-17 - 60.0%
A545-141-16-48-30806 E MATERIAL TAKE OFF STRL STEEL 0.6 20-Mar-15 10-Jul-15 - - - - - - - - 2-Jun-17 31-Mar-18 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTN. (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-141-16-48-30807 E MATERIAL TAKE OFF RCC QUANTITY 0.6 27-Mar-15 28-Jul-15 - - - - - - - - 30-Apr-19 30-Apr-19 100% 100.0%
A545-141-16-48-00811 TO
C MISC. PLATFORMS LAYOUT 0.3 5-Mar-16 22-Apr-16 19-Jan-17 26-Apr-17 11-Mar-19 - 15-Mar-19 - 29-Mar-19 - 29-Apr-19 - 100% 60.0%
00812
A545-141-16-48-00821 TO
C T SUPPORTS LAYOUT 0.3 2-May-16 22-Apr-16 18-Mar-17 28-Apr-17 19-Mar-19 - 23-Mar-19 - 6-Apr-19 - 7-May-19 - 100% 60.0%
00822
A545-141-16-48-00831 TO
C PIPE SUPPORTS LAYOUT 0.3 11-Jun-16 25-Jun-16 27-Apr-17 29-Apr-17 29-Mar-19 - 2-Apr-19 - 16-Apr-19 - 17-May-19 - 100% 60.0%
00832
A545-141-16-48-01311 MISC. SUPPORT 28-Aug-15 28-Aug-15 10-Apr-17 - 17-Apr-17 - 21-Apr-17 - 5-May-17 - 3-Aug-17 - 10.0%
A545-141-16-48-31501 C FDN FOR 144-CC-1001 0.2 11-May-15 21-Feb-15 18-May-15 28-Feb-15 25-May-15 7-Mar-15 29-May-15 11-Mar-15 12-Jun-15 29-Oct-15 10-Sep-15 14-Mar-16 100% 100.0%
A545-141-16-48-31511 C FDN FOR 144-VV-1003 0.2 15-May-15 20-Apr-15 22-May-15 27-Apr-15 29-May-15 4-May-15 2-Jun-15 8-May-15 16-Jun-15 16-Nov-15 14-Sep-15 30-Nov-15 100% 100.0%
A545-141-16-48-31512 C FDN FOR 144-VV-1004 0.2 19-May-15 20-Apr-15 26-May-15 27-Apr-15 2-Jun-15 4-May-15 6-Jun-15 8-May-15 20-Jun-15 19-Oct-15 18-Sep-15 29-Oct-15 100% 100.0%
A545-141-16-48-31513 C FDN FOR 144-VV-1005 0.2 23-May-15 20-Apr-15 30-May-15 27-Apr-15 6-Jun-15 4-May-15 10-Jun-15 8-May-15 24-Jun-15 19-Oct-15 22-Sep-15 29-Oct-15 100% 100.0%
A545-141-16-48-31551 C FDN FOR 144-EE-1001 0.2 5-May-15 24-Jul-15 12-May-15 14-Oct-15 19-May-15 21-Oct-15 23-May-15 28-Oct-15 6-Jun-15 16-Dec-15 4-Sep-15 30-Dec-15 100% 100.0%
A545-141-16-48-31552 C FDN FOR 144-EE-1002 0.2 8-May-15 24-Jul-15 15-May-15 13-May-16 22-May-15 20-May-16 26-May-15 27-May-16 21-Dec-16 5-Dec-17 21-Mar-17 12-Dec-17 100% 100.0%
A545-141-16-48-31553 C FDN FOR 144-EE-1003 0.2 11-May-15 24-Jul-15 18-May-15 14-Jan-16 25-May-15 21-Jan-16 29-May-15 28-Jan-16 12-Jun-15 18-Mar-16 10-Sep-15 22-Jul-16 100% 100.0%
A545-141-16-48-31554 C FDN FOR 144-EE-1005 0.2 14-May-15 24-Jul-15 21-May-15 14-Oct-15 28-May-15 21-Oct-15 1-Jun-15 28-Oct-15 15-Jun-15 17-Dec-15 13-Sep-15 31-Dec-15 100% 100.0%
A545-141-16-48-31555 C FDN FOR 144-EE-1006 0.2 17-May-15 24-Jul-15 24-May-15 14-Oct-15 31-May-15 21-Oct-15 4-Jun-15 28-Oct-15 18-Jun-15 17-Dec-15 16-Sep-15 31-Dec-15 100% 100.0%
A545-141-16-48-31562 C FDN FOR 145-VV-1016 0.2 23-May-15 27-Jul-15 30-May-15 14-Oct-15 6-Jun-15 21-Oct-15 10-Jun-15 28-Oct-15 24-Jun-15 16-Nov-15 22-Sep-15 30-Nov-15 100% 100.0%
A545-141-16-48-31571 C FDN FOR 145-VV-1017 0.2 26-May-15 27-Jul-15 2-Jun-15 8-Aug-15 9-Jun-15 15-Aug-15 13-Jun-15 22-Aug-15 27-Jun-15 14-Oct-15 25-Sep-15 27-Oct-15 100% 100.0%
A545-141-16-48-31601 C FDN FOR PUMPS 144-PA-1001A/B 0.1 10-Jun-15 29-Jun-16 24-Jan-17 28-Aug-17 31-Jan-17 19-Feb-18 4-Feb-17 26-Feb-18 11-Mar-19 23-Apr-19 11-Apr-19 23-Apr-19 100% 100.0%
A545-141-16-48-31602 C FDN FOR PUMPS 144-PA-1002A/B 0.1 15-Jun-15 29-Jun-16 28-Jan-17 28-Aug-17 4-Feb-17 19-Feb-18 8-Feb-17 26-Feb-18 15-Mar-19 23-Apr-19 15-Apr-19 23-Apr-19 100% 100.0%
A545-141-16-48-31603 C FDN FOR PUMPS 144-PA-1003 0.1 20-Jun-15 29-Jun-16 3-Feb-17 28-Aug-17 10-Feb-17 19-Feb-18 14-Feb-17 26-Feb-18 28-Feb-17 5-Oct-18 9-Apr-19 5-Oct-18 100% 100.0%
A545-141-16-48-11701 C PLTF. & LADDER FOR 144-CC-1001 0.6 5-May-15 8-May-15 12-May-15 26-Jun-15 19-May-15 3-Jul-15 23-May-15 7-Jul-15 6-Jun-15 14-Jul-15 4-Sep-15 28-Jul-15 100% 100.0%
A545-141-16-48-11711 C PLTF. & LADDER FOR 144-VV-1001 0.6 8-May-15 17-Aug-15 15-May-15 14-Sep-15 22-May-15 21-Sep-15 26-May-15 28-Sep-15 9-Jun-15 17-Oct-15 7-Sep-15 29-Oct-15 100% 100.0%
A545-141-16-48-11712 C PLTF. & LADDER FOR 144-VV-1002 0.6 11-May-15 17-Aug-15 18-May-15 14-Sep-15 25-May-15 21-Sep-15 29-May-15 28-Sep-15 12-Jun-15 17-Oct-15 10-Sep-15 29-Oct-15 100% 100.0%
A545-141-16-48-02311 TO
C MAIN PIPE RACK ELEVATION GRID 1 1.0 10-Sep-15 21-May-15 17-Sep-15 22-Jun-15 24-Sep-15 29-Jun-15 28-Sep-15 9-Jul-15 12-Oct-15 23-Jul-15 10-Jan-16 30-Jul-15 100% 100.0%
02312
A545-141-16-48-02321 TO
C MAIN PIPE RACK ELEVATION GRID 2 1.0 21-Sep-15 21-May-15 28-Sep-15 22-Jun-15 5-Oct-15 29-Jun-15 9-Oct-15 9-Jul-15 23-Oct-15 23-Jul-15 21-Jan-16 30-Jul-15 100% 100.0%
02322
A545-141-16-48-30320 C BASE PLATE DETAIL FOR MAIN PIPERACK 1.0 21-Aug-17 23-Aug-17 28-Aug-17 30-Aug-17 4-Sep-17 6-Sep-17 8-Sep-17 13-Sep-17 22-Sep-17 20-Sep-17 26-Mar-19 20-Sep-17 100% 100.0%
A545-141-16-48-09311 C MAIN PIPE RACK C/S DRAWING 1.9 22-Oct-15 15-Jun-15 29-Oct-15 22-Jun-15 5-Nov-15 29-Jun-15 9-Nov-15 3-Jul-15 23-Nov-15 17-Jul-15 22-Feb-16 31-Jul-15 100% 100.0%
A545-141-16-48-09321 C MAIN PIPE RACK DET. OF STAIRCASE 1.9 28-Oct-15 22-Aug-15 4-Nov-15 28-Oct-15 11-Nov-15 19-Apr-16 16-Nov-15 26-Apr-16 30-Nov-15 26-Sep-16 29-Feb-16 3-Oct-16 100% 100.0%
A545-141-81-41-12516 C TANK FDN FOR 622-TT-1006 0.2 22-Aug-16 26-Feb-18 29-Aug-16 12-Mar-18 5-Sep-16 19-Mar-18 10-Sep-16 26-Mar-18 24-Sep-16 2-Apr-18 24-Dec-16 11-Apr-18 100% 100.0%
INCORPORATE
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR
DRAWING/ DOCUMENT CONSTN. (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-141-81-41-40805 C SCHEDULE OF ANCHOR BOLTS 0.2 25-Aug-16 16-Feb-18 1-Sep-16 2-Mar-18 8-Sep-16 9-Mar-18 13-Sep-16 16-Mar-18 27-Sep-16 23-Mar-18 6-Mar-19 23-Mar-18 100% 100.0%
A545-141-81-41-30808 C PUMP PILE CAP R/F & SAND FILLING DETAIL 0.2 27-Aug-16 16-May-18 3-Sep-16 30-May-18 10-Sep-16 6-Jun-18 15-Sep-16 13-Jun-18 29-Sep-16 20-Jun-18 8-Mar-19 20-Jun-18 100% 100.0%
100 99.3%
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
ELECRICAL - C4 / BUTAMER
A545-141-16-50-01010 R C CABLE LAYOUT BUTAMER/C4 SHU 4.27 13-Nov-15 30-May-15 4-Dec-15 27-Aug-15 11-Dec-15 3-Sep-15 18-Dec-15 10-Sep-15 1-Jan-16 17-Sep-15 16-Feb-16 31-Oct-16 100% 100.0%
A545-141-16-50-02010 R C LIGHTING LAYOUT BUTAMER/C4 SHU 4.27 17-Feb-16 25-Aug-15 2-Mar-16 31-Dec-15 9-Mar-16 29-Jan-16 16-Mar-16 19-Feb-16 30-Mar-16 26-Feb-16 24-Jan-17 31-Jul-17 100% 100.0%
A545-141-16-50-03010 R C EARTHING LAYOUT BUTAMER/C4 SHU 4.27 29-Jan-16 20-Aug-15 12-Feb-16 25-Aug-15 19-Feb-16 1-Sep-15 26-Feb-16 8-Sep-15 11-Mar-16 22-Sep-15 24-Feb-17 30-Jan-17 100% 100.0%
A545-141-16-50-03012 R C EARTHING LAYOUT BUTAMER/C4 SHU 4.27 23-Jan-16 11-Sep-15 6-Feb-16 25-Sep-15 13-Feb-16 2-Oct-15 20-Feb-16 9-Oct-15 5-Mar-16 23-Oct-15 18-Feb-17 30-Jan-17 100% 100.0%
A545-141-16-50-40010 R C CABLE SCHEDULE MV 5.69 28-Mar-16 7-Jul-15 11-Apr-16 31-Jul-15 18-Apr-16 24-Aug-15 25-Apr-16 31-Aug-15 9-May-16 15-Sep-15 20-Mar-17 20-Feb-17 100% 100.0%
A545-141-16-50-40020 R C CABLE SCHEDULE - LV 11.38 4-Apr-16 25-Aug-15 18-Apr-16 6-Oct-15 25-Apr-16 13-Oct-15 2-May-16 20-Oct-15 16-May-16 27-Oct-15 27-Mar-17 30-Mar-17 100% 100.0%
A545-141-16-50-40030 E C CABLE SCHEDULE - FA /PA 2.85 8-Apr-16 31-Aug-15 22-Apr-16 30-Nov-15 29-Apr-16 8-Jan-16 6-May-16 15-Jan-16 20-May-16 22-Jan-16 9-Jul-16 1-Apr-16 100% 100.0%
A545-141-16-50-40050 R C INTERCONNECTION -LV 3.41 15-Apr-16 15-Jun-16 9-Feb-19 - 16-Feb-19 - 23-Feb-19 - 9-Mar-19 - 9-Apr-19 - 100% 60.0%
A545-141-16-50-42020 R C PANEL SCHEDULE 1.14 13-Feb-16 28-Oct-15 27-Feb-16 29-Jan-16 5-Mar-16 12-Feb-16 12-Mar-16 19-Feb-16 26-Mar-16 26-Feb-16 20-Apr-17 30-Mar-17 100% 100.0%
LIGHTING LAYOUT COLUMN &
A545-141-16-50-12131 E C VESSELS 0.85 22-Feb-16 3-Sep-15 7-Mar-16 17-Sep-15 14-Mar-16 24-Sep-15 21-Mar-16 1-Oct-15 4-Apr-16 8-Oct-15 23-May-16 15-Oct-15 100% 100.0%
A545-141-16-50-40081 R E RELAY SETTING 0.7 1-Aug-19 - 5-Aug-19 - 10-Aug-19 - 15-Aug-19 - 20-Aug-19 - 31-Aug-19 -
100.0 97.3%
INCORPORATE TOTAL
UPDATE & ISSUE FOR TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS COMMENTS & ISSUE FOR (SCHD
DRAWING/ DOCUMENT REVAMP/ ENGG. / CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) ENGG. / CONSTRUCTION PROGRESS
NO. EXISTING (100%) PROGRESS %)
% (85%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
INSTRUMENTATION - C4/BUTAMER
A545-141-16-51-00801 E C INSTRUMENT CABLE DUCT /TRENCH LAYOUT 3.5 5-Apr-15 10-Jun-15 5-May-15 8-Jul-15 12-May-15 15-Jul-15 26-May-15 29-Jul-15 9-Jun-15 7-Aug-15 8-Aug-15 14-Aug-15 100% 100.0%
A545-141-16-51-SK00 E MISCELLANENOUS SKETCHES 10-03-2016 13-08-2015 =I10+30 28-09-2015 #VALUE! =S10-6 #VALUE! 29-10-2015 #VALUE! 30-11-2015 #VALUE! -
A545-141-16-51-BM02 R P BILL OF MATERIAL 7.3 8-Mar-15 28-May-15 5-Dec-15 15-Apr-16 3-Feb-16 25-May-16 17-Feb-16 27-Jun-16 2-Mar-16 31-Jul-17 28-Apr-17 31-Jul-17 100% 100.0%
A545-141-16-51-CH02 R C CABLE SCHEDULE-FF 4.4 4-Feb-16 26-Oct-15 5-Mar-16 2-Apr-16 12-Mar-16 9-Apr-16 16-Mar-16 16-Apr-16 13-Apr-16 23-Apr-16 13-Jun-16 30-Apr-16 100% 100.0%
A545-141-16-51-II02 R C INSTRUMENT INDEX 14.6 3-Nov-15 18-Jul-15 23-Nov-15 27-Nov-15 30-Nov-15 31-Dec-15 5-Dec-15 7-Jan-16 15-Dec-15 14-Jan-16 30-Sep-19 - 85% 90.0%
A545-141-16-51-CH03 R C CABLE SCHEDULE-NFF 4.4 11-Feb-16 28-Oct-15 12-Mar-16 5-May-16 19-Mar-16 12-May-16 24-Mar-16 19-May-16 21-Apr-16 26-May-16 20-Jun-16 2-Jun-16 100% 100.0%
A545-141-16-51-00805 R C INSTRUMENT LOCATION PLAN-NFF 5.9 1-Oct-15 29-Oct-15 31-Oct-15 23-Dec-15 7-Nov-15 30-Dec-15 12-Nov-15 6-Jan-16 10-Dec-15 13-Jan-16 3-Apr-17 3-Oct-17 100% 100.0%
A545-141-16-51-00806 R C INSTRUMENT JUNCTION BOX LAYOUT-FF 2.9 13-Oct-15 22-Jul-15 12-Nov-15 2-Apr-16 19-Nov-15 9-Apr-16 24-Nov-15 16-Apr-16 22-Dec-15 23-Apr-16 20-Feb-16 30-Apr-16 100% 100.0%
A545-141-16-51-MD07 R E DCS POINT DATABASE 4.4 14-Jan-16 26-Nov-15 29-Mar-17 7-Jul-17 5-Apr-17 14-Jul-17 10-Apr-17 21-Jul-17 17-Apr-17 28-Jul-17 30-Sep-19 - 85% 97.0%
A545-141-16-51-03305 E E SRR LAYOUT 3.1 28-May-15 5-Jan-15 27-Jun-15 19-Jan-15 4-Jul-15 26-Jan-15 9-Jul-15 31-Jan-15 16-Jul-15 7-Feb-15 14-Sep-15 21-Feb-15 100% 100.0%
A545-141-16-51-00811 R C INSTRUMENT JUNCTION BOX LAYOUT-NFF 2.9 3-Oct-15 25-Jul-15 2-Nov-15 5-May-16 9-Nov-15 12-May-16 13-Nov-15 19-May-16 11-Dec-15 26-May-16 25-Jan-16 2-Jun-16 100% 100.0%
A545-141-16-51-00812 R C AIR SUPPLY DISTRIBUTION SCHEME 4.4 9-Jan-16 29-Oct-15 8-Feb-16 19-Mar-16 15-Feb-16 26-Mar-16 19-Feb-16 2-Apr-16 18-Mar-16 9-Apr-16 17-May-16 16-Apr-16 100% 100.0%
A545-141-16-51-00813 R C INSTRUMENT LOCATION PLAN-FF 5.9 12-Oct-15 30-Oct-15 11-Nov-15 22-Dec-15 18-Nov-15 29-Dec-15 23-Nov-15 5-Jan-16 21-Dec-15 12-Jan-16 14-Apr-17 22-Sep-17 100% 100.0%
A545-141-16-51-00820 R C LEVEL GAUGE & LIGHTING PANEL LAYOUT 2.9 18-Nov-15 27-Jul-15 18-Dec-15 31-Aug-15 25-Dec-15 7-Sep-15 29-Dec-15 14-Sep-15 5-Jan-16 21-Sep-15 5-Mar-16 11-Mar-16 100% 100.0%
A545-141-16-51-MD22 POWER SUPPLY SCHEME 12-05-2015 =M24-14 =I24+30 =P24-7 =L24+7 =S24-5 =O24+5 =V24-7 =R24+14 =Y24-14 =U24+31 21-02-2015
A545-141-16-51-00823 R C GAS DETECTOR & CCTV LAYOUT 4.4 19-Mar-16 31-Jul-15 18-Apr-16 30-Sep-15 25-Apr-16 24-Sep-15 30-Apr-16 30-Sep-15 28-May-16 7-Oct-15 17-Feb-17 18-Jan-17 100% 100.0%
A545-141-16-51-EIR01 ELECTRICAL INTERFACE 01-03-2015 =M26-14 =I26+30 =P26-7 #VALUE! #VALUE! #VALUE! =V26-28 #VALUE! 15-06-2015 =U26+60 13-07-2015
100.0 98.2%
A545-02-41-100-1111 COOLING WATER DISTRIBUTION 1.1 13-Dec-14 13-Nov-14 21-Feb-15 26-Nov-14 11-Jun-15 30-May-15 11-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1113 COOLING WATER FOR PUMPS 0.5 13-Dec-14 13-Nov-14 21-Feb-15 26-Nov-14 11-Jun-15 13-Aug-15 11-Jul-15 14-Sep-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1114 CLOSED BLOW DOWN DISTRIBUTION-I 1.1 17-Dec-14 19-Jan-15 25-Feb-15 18-Feb-15 15-Jun-15 6-Jun-15 15-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1115 CLOSED BLOW DOWN DISTRIBUTION-II 1.1 19-Dec-14 19-Jan-15 27-Feb-15 18-Feb-15 17-Jun-15 6-Jun-15 17-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1117 CLOSED BLOW DOWN DRUM -2 1.1 21-Dec-14 23-Apr-15 28-Feb-15 23-May-15 18-Jun-15 30-May-15 18-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1118 CLOSED BLOW DOWN DRUM -1 1.1 21-Dec-14 23-Apr-15 28-Feb-15 23-May-15 18-Jun-15 30-May-15 18-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1127 HP FLARE DISTRIBUTION 1.1 18-Jan-15 18-Feb-15 29-Mar-15 18-Mar-15 22-Jun-15 26-Jun-15 22-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1128 LP FLARE DISTRIBUTION 1.1 20-Jan-15 21-Feb-15 31-Mar-15 18-Mar-15 24-Jun-15 26-Jun-15 24-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1129 FLARE KOD (HP & LP) 1.1 22-Jan-15 25-Feb-15 2-Apr-15 20-Mar-15 26-Jun-15 2-Jun-15 26-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1130 BFW/DM WATER DISTRIBUTION 1.1 24-Jan-15 21-Oct-14 4-Apr-15 20-Nov-14 18-Jun-15 30-May-15 18-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1132 MP STEAM DISTRIBUTION 1.1 26-Jan-15 15-Oct-14 6-Apr-15 14-Nov-14 20-Jun-15 30-May-15 20-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1133 LP STEAM DISTRIBUTION 1.1 28-Jan-15 15-Oct-14 8-Apr-15 14-Nov-14 22-Jun-15 30-May-15 22-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1134 PURE CONDENSATE RECOVERY SYSTEM 1.1 30-Jan-15 23-Feb-15 10-Apr-15 24-Mar-15 24-Jun-15 30-May-15 24-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1138 NITROGEN DISTRIBUTION 1.1 22-Jan-15 21-Oct-14 2-Apr-15 20-Nov-14 16-Jun-15 30-May-15 16-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1140 FUEL OIL AND FUEL GAS DISTRIBUTION 1.1 27-Jan-15 21-Oct-14 7-Apr-15 20-Nov-14 16-Jun-15 3-Jun-15 16-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1141 SERVICE WATER DISTRIBUTION (EQUIPMENT) 1.1 28-Jan-15 15-Oct-14 8-Apr-15 14-Nov-14 17-Jun-15 30-May-15 17-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1146 FLUSHING OIL DISTRIBUTION DETAILS 1.1 30-Jan-15 24-Feb-15 10-Apr-15 6-Jun-15 19-Jun-15 19-Jun-15 19-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1151 CONTROL VALVE DRAIN/ VENT 1.1 1-Feb-15 28-Feb-15 12-Apr-15 23-Mar-15 26-Jun-15 6-Jun-15 26-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1152 LEVEL INSTRUMENTS DRAIN/ VENT DETAILS\ 1.1 3-Feb-15 2-Mar-15 14-Apr-15 23-Mar-15 13-Jun-15 16-Jun-15 13-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1153 SAMPLE CONNECTION DRAIN/ VENT 1.1 5-Feb-15 5-Mar-15 16-Apr-15 6-Jun-15 15-Jun-15 17-Sep-15 15-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1154 PUMP SEAL PLAN DETAILS 1.1 7-Feb-15 20-Mar-15 18-Apr-15 1-Apr-15 17-Jun-15 6-Jun-15 17-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1180 FUEL GAS PREPARATION SYSTEM 1.1 9-Feb-15 21-Oct-14 20-Apr-15 20-Nov-14 19-Jun-15 15-May-15 19-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1181 TEMPERED WATER SYSTEM 1.1 11-Feb-15 16-Feb-15 22-Apr-15 17-Mar-15 22-Jun-15 30-May-15 22-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-100-1182 FUEL GAS PREPARATION SYSTEM 0.5 11-Feb-15 17-Jul-17 22-Apr-15 14-Aug-17 22-Jun-15 21-Aug-17 22-Jul-15 11-Sep-17 31-Oct-19 - 95% 98.0%
A545-02-41-100-1185 LP CONDENSATE COLLECTION SYSTEM 1.1 12-Feb-15 23-Nov-15 23-Apr-15 22-Dec-15 23-Jun-15 29-Dec-15 23-Jul-15 20-Jan-16 31-Oct-19 - 95% 98.0%
A545-02-41-101-1191 DESALTER CHEMICAL INJECTION SYSTEM 1.1 13-Feb-15 25-Mar-15 24-Apr-15 29-May-15 23-Jun-15 25-Jun-15 23-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-101-1192 FILMING AMINE CHEMICAL INJECTION 1.1 15-Feb-15 28-Mar-15 26-Apr-15 29-May-15 25-Jun-15 25-Jun-15 25-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
A545-02-41-101-1193 NEUTRALIZING AMINE CHEMICAL INJECTION 1.1 17-Feb-15 31-Mar-15 28-Apr-15 29-May-15 27-Jun-15 25-Jun-15 27-Jul-15 30-Dec-15 31-Oct-19 - 95% 98.0%
PROCESS DATASHEET-ISBL
A545-100-02-DS-1202 CBD DRUM-1 0.5 28-Jan-15 16-Feb-15 8-Apr-15 17-Mar-15 17-Jun-15 30-May-15 17-Jul-15 30-May-15 5-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1203 AMINE BLOWDOWN DRUM 0.5 29-Jan-15 16-Feb-15 9-Apr-15 17-Mar-15 18-Jun-15 30-May-15 18-Jul-15 30-May-15 6-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1206 DECOKING POT 0.5 27-Jan-15 18-Apr-15 7-Apr-15 2-May-15 16-Jun-15 3-Jun-15 16-Jul-15 3-Jun-15 4-Sep-15 3-Jun-15 100% 100.0%
A545-100-02-DS-1208 LP FLARE KOD 0.5 30-Jan-15 18-Feb-15 10-Apr-15 20-Mar-15 19-Jun-15 30-May-15 19-Jul-15 30-May-15 7-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1209 HP FLARE KOD 0.5 31-Jan-15 18-Feb-15 11-Apr-15 20-Mar-15 20-Jun-15 30-May-15 20-Jul-15 30-May-15 8-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1210 FUEL GAS KOD 0.5 1-Feb-15 23-Feb-15 12-Apr-15 21-May-15 21-Jun-15 7-Jul-15 21-Jul-15 21-Jul-15 9-Sep-15 4-Aug-15 100% 100.0%
A545-100-02-DS-1213 PURE LP CONDENSATE FLASH DRUM 0.5 2-Feb-15 9-Feb-15 13-Apr-15 10-Mar-15 22-Jun-15 30-May-15 22-Jul-15 30-May-15 10-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1214 PURE ATM CONDENSATE FLASH DRUM 0.5 3-Feb-15 9-Feb-15 14-Apr-15 10-Mar-15 23-Jun-15 30-May-15 23-Jul-15 30-May-15 11-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1217 SUSPECT ATM CONDENSATE FLASH DRUM 0.5 4-Feb-15 9-Feb-15 15-Apr-15 10-Mar-15 24-Jun-15 30-May-15 24-Jul-15 30-May-15 12-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1227 LP CONDENSATE COLLECTION DRUM 0.5 6-Feb-15 10-Mar-16 17-Apr-15 24-Mar-16 26-Jun-15 31-Mar-16 26-Jul-15 28-Apr-16 14-Sep-15 28-Apr-16 100% 100.0%
A545-100-02-DS-1222 CBD DRUM-2 0.5 7-Feb-15 3-Mar-15 18-Apr-15 17-Mar-15 27-Jun-15 30-May-15 27-Jul-15 30-May-15 15-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1223 TEMPERED WATER DRUM 0.5 8-Feb-15 3-Mar-15 19-Apr-15 17-Mar-15 28-Jun-15 30-May-15 28-Jul-15 30-May-15 16-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1401 PURE VENT CONDENSER 0.5 9-Feb-15 9-May-15 20-Apr-15 23-May-15 29-Jun-15 30-May-15 29-Jul-15 30-May-15 17-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1402 SUSPECT VENT CONDENSER 0.5 10-Feb-15 9-May-15 21-Apr-15 23-May-15 30-Jun-15 30-May-15 30-Jul-15 30-May-15 18-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1404 TEMPERED WATER AIR COOLER 0.5 11-Feb-15 16-Feb-15 22-Apr-15 17-Mar-15 1-Jul-15 30-May-15 31-Jul-15 30-May-15 19-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1410 FUEL GAS HEATER 0.5 12-Feb-15 16-Apr-15 23-Apr-15 15-May-15 2-Jul-15 29-May-15 1-Aug-15 29-May-15 20-Sep-15 29-May-15 100% 100.0%
A545-100-02-DS-1602 CBD PUMP FOR DRUM-I 0.5 13-Feb-15 26-Feb-15 24-Apr-15 23-May-15 3-Jul-15 30-May-15 2-Aug-15 30-May-15 21-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1603 PURE ATM CONDENSATE PUMP 0.5 14-Feb-15 28-Feb-15 25-Apr-15 30-May-15 4-Jul-15 22-May-15 3-Aug-15 22-May-15 22-Sep-15 22-May-15 100% 100.0%
A545-100-02-DS-1604 SUSPECT CONDENSATE PUMP 0.5 15-Feb-15 2-Mar-15 26-Apr-15 30-May-15 5-Jul-15 22-May-15 4-Aug-15 22-May-15 23-Sep-15 22-May-15 100% 100.0%
A545-100-02-DS-1606 CBD PUMPS FOR DRUM-2 0.5 17-Feb-15 9-Mar-15 28-Apr-15 23-May-15 27-Jun-15 30-May-15 27-Jul-15 30-May-15 15-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1608 ABD PUMP 0.5 17-Feb-15 9-May-15 28-Apr-15 23-May-15 27-Jun-15 30-May-15 27-Jul-15 30-May-15 15-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1609 LP FLARE KOD PUMP 0.5 18-Feb-15 12-Mar-15 29-Apr-15 16-May-15 28-Jun-15 15-Jun-15 28-Jul-15 15-Jun-15 16-Sep-15 15-Jun-15 100% 100.0%
A545-100-02-DS-1610 HP FLARE KOD PUMP 0.5 19-Feb-15 18-Mar-15 30-Apr-15 16-May-15 29-Jun-15 15-Jun-15 29-Jul-15 15-Jun-15 17-Sep-15 15-Jun-15 100% 100.0%
A545-100-02-DS-1611 TEMPERED WATER PUMP 0.5 20-Feb-15 16-Feb-15 1-May-15 17-Mar-15 30-Jun-15 30-May-15 30-Jul-15 30-May-15 18-Sep-15 30-May-15 100% 100.0%
A545-100-02-DS-1613 CONDENSATE PUMP 0.5 21-Feb-15 18-Jan-16 2-May-15 15-Feb-16 1-Jul-15 22-Feb-16 31-Jul-15 28-Mar-16 19-Sep-15 30-Apr-16 100% 100.0%
A545-100-02-DS-1810 FUEL GAS COALESCER 0.5 21-Feb-15 27-Apr-15 2-May-15 11-May-15 1-Jul-15 18-May-15 31-Jul-15 18-May-15 19-Sep-15 18-May-15 100% 100.0%
A545-100-02-DS-1910 FUEL GAS BASKET STRAINER 0.5 22-Feb-15 1-May-15 3-May-15 15-May-15 2-Jul-15 22-May-15 1-Aug-15 22-May-15 20-Sep-15 22-May-15 100% 100.0%
A545-100-02-DS-1911 FUEL GAS KOD DEMISTER 0.5 23-Feb-15 7-May-15 4-May-15 21-May-15 3-Jul-15 29-May-15 2-Aug-15 29-May-15 21-Sep-15 29-May-15 100% 100.0%
A545-100-02-DS-1901 STEAM TRAP (CBD -1 SYSTEM) 0.5 22-Feb-15 23-Mar-15 3-May-15 28-Apr-16 2-Jul-15 5-May-16 1-Aug-15 18-May-16 20-Sep-15 22-Jun-16 100% 100.0%
A545-100-02-DS-1902 STEAM TRAP (CBD -2 SYSTEM) 0.5 23-Feb-15 26-Mar-15 4-May-15 28-Apr-16 3-Jul-15 5-May-16 2-Aug-15 18-May-16 21-Sep-15 22-Jun-16 100% 100.0%
Process P&IDs
A545-02-41-100-PFD PROCESS FLOW DIAGRAM 13.8 11-Sep-14 4-Sep-14 11-Oct-14 4-Oct-14 18-Oct-14 11-Oct-14 1-Nov-14 25-Oct-14 15-Nov-14 8-Nov-14 100% 100.0%
A545-02-41-100-P&ID PIPING & INSTRUMENTATION DIAGRAM 10.3 1-Nov-14 23-Oct-14 1-Dec-14 22-Nov-14 8-Dec-14 29-Nov-14 22-Dec-14 18-Sep-15 31-Oct-19 - 95% 99.0%
A545-02-41-100-PDS PROCESS DATA SHEET 10.3 6-Dec-14 1-Dec-14 5-Jan-15 31-Dec-14 12-Jan-15 7-Jan-15 26-Jan-15 22-Sep-15 15-May-17 28-Sep-17 100% 100.0%
A545-02-41-100-UTS UTILITY SUMMARY 0.5 5-Nov-14 10-Dec-14 6-Dec-14 24-Dec-14 20-Dec-14 7-Jan-15 19-Jan-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-FLS FLARE LOAD SUMMARY 0.5 11-Jan-15 7-Mar-15 11-Feb-15 6-Apr-15 25-Feb-15 20-Apr-15 27-Mar-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-EFS EFFLUENT SUMMARY 0.5 13-Oct-14 17-Nov-14 13-Nov-14 1-Dec-14 27-Nov-14 15-Dec-14 27-Dec-14 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-CHS CHEMICAL SUMMARY 0.5 2-Nov-14 10-Dec-14 3-Dec-14 24-Dec-14 17-Dec-14 7-Jan-15 16-Jan-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-CED CAUSE & EFFECT DIAGRAM 0.5 2-Nov-14 10-Dec-14 3-Dec-14 24-Dec-14 17-Dec-14 7-Jan-15 16-Jan-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-100-EQL EQUIPMENT LIST 0.5 2-Nov-14 26-Nov-14 3-Dec-14 10-Dec-14 17-Dec-14 24-Dec-14 16-Jan-15 31-Dec-14 20-Feb-15 7-Jan-15 100% 100.0%
A545-02-41-100-LNL LINE LIST 0.5 2-Dec-14 23-Jan-15 2-Jan-15 6-Feb-15 16-Jan-15 20-Feb-15 16-Feb-15 27-Feb-15 23-Mar-15 6-Mar-15 100% 100.0%
100 99.1%
TOTAL TOTAL
INCORPORATE COMMENTS
DRAWING / DOCUMENT DRAFTING COMPLETE CHECKING COMPLETED ISSUED FOR COMMENTS UPDATE & ISSUE FOR (SCHD. (ACTUAL
DRAWING/ DOCUMENT TITLE WTG. % START (10%) & ISSUE FOR
NO. (60%) (65%) (80%) CONSTRUCTION (100%) PROGRESS PROGRESS
CONSTRUCTION (85%)
%) %)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
HMTD - CRUDE BLOCK
100 100.0%
TOTAL TOTAL
MR/TR ISSUE TBA PR ISSUE VENDOR DRAWING REVIEW
(SCHD. (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) (100%)
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
A545-101-CT-MR-7641 TRAYS & TOWER INTERNALS 28.2 5-Jun-15 25-May-15 16-Sep-15 15-Oct-15 5-Nov-15 19-Mar-16 29-Mar-17 28-Feb-18 100% 100.0%
A545-101-JX-MR-7710 DESALTER PACKAGE 21.1 10-Apr-15 25-Nov-14 21-Jul-15 13-Feb-15 9-Sep-15 20-Aug-15 31-Jan-17 26-Feb-18 100% 100.0%
A545-101-JX-MR-7720 DESALTER VESSEL 21.1 6-Feb-15 7-Jan-15 19-May-15 13-Mar-15 8-Jul-15 14-Nov-15 3-May-17 28-Jul-18 100% 100.0%
A545-101-JX-MR-7740 ELECTROSTATIC COALESCER 14.1 26-Jun-15 25-Mar-15 7-Oct-15 15-Jul-15 26-Nov-15 9-Feb-16 19-Apr-17 27-Feb-18 100% 100.0%
A545-999-JA-MR-7970 EJECTORS UNENGINEERED 2.8 30-Jun-15 31-Aug-15 11-Oct-15 8-Feb-16 14-Mar-19 13-Mar-19 28-Apr-19 2-Jul-19 100% 100.0%
100 100.0%
A545-101-16-47-30050 R C ISO U/G PIPING 14.4 19-Aug-15 25-Jul-15 - - - - - - 28-Sep-16 16-May-16 30-Jan-17 31-Jan-17 100% 100.0%
A545-101-16-47-01101 R E P&ID FOR CRWS SYSTEM 2.2 24-Mar-15 12-Mar-15 7-Apr-15 26-Mar-15 14-Apr-15 23-Mar-15 18-Apr-15 27-Mar-15 2-May-15 27-Mar-15 1-Jul-15 13-Aug-15 100% 100.0%
A545-101-16-47-01104 R E P&ID FOR OWS SYSTEM 0.7 26-May-15 26-May-15 9-Jun-15 31-Jul-15 16-Jun-15 30-Jul-15 20-Jun-15 6-Aug-15 4-Jul-15 13-Aug-15 2-Sep-15 19-Aug-15 100% 100.0%
A545-101-16-47-01106 R E LAYOUT OF EXTINGUISHER 0.7 28-May-15 16-Oct-15 11-Jun-15 30-Oct-15 18-Jun-15 6-Nov-15 22-Jun-15 13-Nov-15 6-Jul-15 20-Nov-15 8-Oct-16 30-Aug-18 100% 100.0%
A545-101-16-47-01111 R E P&ID FOR FIRE WATER SYSTEM 2.3 15-May-15 15-May-15 29-May-15 2-Jun-15 5-Jun-15 2-Jun-15 10-Jun-15 5-Jun-15 24-Jun-15 7-Jul-15 26-Oct-16 13-Feb-17 100% 100.0%
A545-101-16-47-31125 E E P&ID FOR DRINKING WATER 0.5 29-May-15 29-May-15 12-Jun-15 15-Jun-15 19-Jun-15 3-Jul-15 24-Jun-15 6-Jul-15 8-Jul-15 13-Jul-15 7-Sep-15 20-Jul-15 100% 100.0%
A545-101-16-47-02001 E C UNIT AREA-01 0.7 19-May-15 2-Jul-15 19-Jun-15 17-Sep-15 3-Jul-15 24-Sep-15 17-Jul-15 1-Oct-15 14-Aug-15 15-Oct-15 14-Nov-15 30-May-16 100% 100.0%
A545-101-16-47-02002 E C UNIT AREA-02 0.7 21-May-15 2-Jul-15 20-Jun-15 22-Aug-15 4-Jul-15 29-Aug-15 18-Jul-15 5-Sep-15 15-Aug-15 19-Sep-15 16-Nov-15 30-May-16 100% 100.0%
A545-101-16-47-02003 E C UNIT AREA-03 0.7 23-May-15 3-Jul-15 23-Jun-15 17-Sep-15 7-Jul-15 24-Sep-15 21-Jul-15 1-Oct-15 18-Aug-15 15-Oct-15 18-Nov-15 31-May-16 100% 100.0%
A545-101-16-47-02004 R C UNIT AREA-04 0.7 25-May-15 7-Jul-15 25-Jun-15 17-Sep-15 9-Jul-15 24-Sep-15 23-Jul-15 1-Oct-15 20-Aug-15 15-Oct-15 20-Nov-15 31-May-16 100% 100.0%
A545-101-16-47-02005 R C UNIT AREA-05 0.7 27-May-15 7-Jul-15 27-Jun-15 27-Aug-15 11-Jul-15 3-Sep-15 25-Jul-15 10-Sep-15 22-Aug-15 24-Sep-15 23-Nov-15 30-May-16 100% 100.0%
A545-101-16-47-02006 R C UNIT AREA-06 0.7 29-May-15 10-Jul-15 29-Jun-15 17-Sep-15 13-Jul-15 24-Sep-15 27-Jul-15 1-Oct-15 24-Aug-15 15-Oct-15 24-Nov-15 31-May-16 100% 100.0%
A545-101-16-47-02007 R C UNIT AREA-07 0.7 31-May-15 10-Jul-15 1-Jul-15 9-Sep-15 15-Jul-15 16-Sep-15 29-Jul-15 23-Sep-15 26-Aug-15 30-Sep-15 26-Nov-15 31-May-16 100% 100.0%
A545-101-16-47-02008 E C UNIT AREA-08 0.7 2-Jun-15 14-Jul-15 3-Jul-15 17-Sep-15 17-Jul-15 24-Sep-15 31-Jul-15 1-Oct-15 28-Aug-15 8-Oct-15 28-Nov-15 31-May-16 100% 100.0%
A545-101-16-47-02009 E C UNIT AREA-09 0.7 4-Jun-15 14-Jul-15 4-Jul-15 24-Sep-15 18-Jul-15 1-Oct-15 1-Aug-15 8-Oct-15 29-Aug-15 15-Oct-15 30-Nov-15 10-Sep-16 100% 100.0%
A545-101-16-47-02010 E C UNIT AREA-10 0.7 6-Jun-15 15-Jul-15 7-Jul-15 22-Aug-15 21-Jul-15 29-Aug-15 4-Aug-15 5-Sep-15 1-Sep-15 19-Sep-15 2-Dec-15 5-Sep-16 100% 100.0%
A545-101-16-47-02011 E C UNIT AREA-11 0.7 8-Jun-15 15-Jul-15 9-Jul-15 31-Aug-15 23-Jul-15 7-Sep-15 6-Aug-15 21-Sep-15 3-Sep-15 5-Oct-15 4-Dec-15 30-Aug-16 100% 100.0%
A545-101-16-47-02012 R C UNIT AREA-12 0.7 10-Jun-15 15-Jul-15 11-Jul-15 27-Aug-15 25-Jul-15 3-Sep-15 8-Aug-15 10-Sep-15 5-Sep-15 24-Sep-15 7-Dec-15 10-Sep-16 100% 100.0%
A545-101-16-47-02013 R C UNIT AREA-13 0.7 12-Jun-15 17-Jul-15 13-Jul-15 27-Aug-15 27-Jul-15 3-Sep-15 10-Aug-15 10-Sep-15 7-Sep-15 24-Sep-15 8-Dec-15 10-Sep-16 100% 100.0%
A545-101-16-47-02014 R C UNIT AREA-14 0.7 14-Jun-15 17-Jul-15 15-Jul-15 27-Aug-15 29-Jul-15 3-Sep-15 12-Aug-15 10-Sep-15 9-Sep-15 24-Sep-15 10-Dec-15 8-Sep-16 100% 100.0%
A545-101-16-47-02015 R C UNIT AREA-15 0.7 16-Jun-15 20-Jul-15 17-Jul-15 27-Aug-15 31-Jul-15 3-Sep-15 14-Aug-15 10-Sep-15 11-Sep-15 24-Sep-15 12-Dec-15 15-Sep-16 100% 100.0%
A545-101-16-47-02016 R C UNIT AREA-16 0.7 18-Jun-15 20-Jul-15 18-Jul-15 9-Sep-15 1-Aug-15 16-Sep-15 15-Aug-15 23-Sep-15 12-Sep-15 30-Sep-15 14-Dec-15 10-Jun-16 100% 100.0%
A545-101-16-47-02017 R C UNIT AREA-17 0.7 20-Jun-15 20-Jul-15 21-Jul-15 14-Aug-15 4-Aug-15 24-Aug-15 18-Aug-15 10-Sep-15 15-Sep-15 24-Sep-15 16-Dec-15 1-Sep-16 100% 100.0%
A545-101-16-47-02018 R C UNIT AREA-18 0.7 22-Jun-15 20-Jul-15 23-Jul-15 14-Aug-15 6-Aug-15 24-Aug-15 20-Aug-15 28-Aug-15 17-Sep-15 19-Sep-15 18-Dec-15 1-Sep-16 100% 100.0%
A545-101-16-47-02019 R C UNIT AREA-19 0.7 24-Jun-15 22-Jul-15 25-Jul-15 17-Sep-15 8-Aug-15 24-Sep-15 22-Aug-15 1-Oct-15 19-Sep-15 15-Oct-15 21-Dec-15 6-Sep-16 100% 100.0%
A545-101-16-47-02020 R C UNIT AREA-20 0.7 26-Jun-15 22-Jul-15 27-Jul-15 11-Sep-15 10-Aug-15 18-Sep-15 24-Aug-15 25-Sep-15 21-Sep-15 9-Oct-15 22-Dec-15 23-Sep-16 100% 100.0%
A545-101-16-47-02021 E C UNIT AREA-21 0.7 28-Jun-15 22-Jul-15 29-Jul-15 11-Sep-15 12-Aug-15 18-Sep-15 26-Aug-15 25-Sep-15 23-Sep-15 9-Oct-15 24-Dec-15 30-Sep-16 100% 100.0%
A545-101-16-47-02022 E C UNIT AREA-22 0.7 30-Jun-15 22-Jul-15 31-Jul-15 11-Sep-15 14-Aug-15 18-Sep-15 28-Aug-15 25-Sep-15 25-Sep-15 9-Oct-15 26-Dec-15 26-Sep-16 100% 100.0%
A545-101-16-47-02023 E C UNIT AREA-23 0.7 2-Jul-15 25-Jul-15 1-Aug-15 27-Aug-15 15-Aug-15 3-Sep-15 29-Aug-15 10-Sep-15 26-Sep-15 24-Sep-15 28-Dec-15 30-Sep-16 100% 100.0%
Page 622 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 2
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX
JOB NO. : A545
PROJECT, NIGERIA DISCIPLINE: GENERAL CIVIL (CRUDE BLOCK)
ANNEXURE-A6
INCORPORATE COMMENTS
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR ENGG. /
DRAWING/ DOCUMENT REVAMP/ ENGG. / CONSTN. (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. EXISTING (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-47-02024 E C UNIT AREA-24 0.7 4-Jul-15 25-Jul-15 4-Aug-15 22-Aug-15 18-Aug-15 29-Aug-15 1-Sep-15 5-Sep-15 29-Sep-15 19-Sep-15 30-Dec-15 10-Sep-16 100% 100.0%
A545-101-16-47-02025 R C UNIT AREA-25 0.7 6-Jul-15 25-Jul-15 6-Aug-15 14-Aug-15 20-Aug-15 24-Aug-15 3-Sep-15 28-Aug-15 1-Oct-15 31-Aug-15 1-Jan-16 31-Aug-16 100% 100.0%
A545-101-16-47-02026 R C UNIT AREA-26 0.7 8-Jul-15 25-Jul-15 8-Aug-15 22-Aug-15 22-Aug-15 29-Aug-15 5-Sep-15 5-Sep-15 3-Oct-15 19-Sep-15 4-Jan-16 31-Aug-16 100% 100.0%
A545-101-16-47-02027 R C UNIT AREA-27 0.7 10-Jul-15 27-Jul-15 10-Aug-15 7-Sep-15 24-Aug-15 14-Sep-15 7-Sep-15 21-Sep-15 5-Oct-15 5-Oct-15 5-Jan-16 22-Sep-16 100% 100.0%
A545-101-16-47-02028 E C UNIT AREA-28 0.7 12-Jul-15 27-Jul-15 12-Aug-15 7-Sep-15 26-Aug-15 14-Sep-15 9-Sep-15 21-Sep-15 7-Oct-15 5-Oct-15 7-Jan-16 30-Aug-16 100% 100.0%
A545-101-16-47-02029 E C UNIT AREA-29 0.7 14-Jul-15 27-Jul-15 14-Aug-15 16-Sep-15 28-Aug-15 23-Sep-15 11-Sep-15 30-Sep-15 9-Oct-15 7-Oct-15 9-Jan-16 30-Aug-16 100% 100.0%
A545-101-16-47-02030 E C UNIT AREA-30 0.7 16-Jul-15 27-Jul-15 15-Aug-15 14-Aug-15 29-Aug-15 24-Aug-15 12-Sep-15 1-Sep-15 10-Oct-15 15-Sep-15 11-Jan-16 31-Aug-16 100% 100.0%
A545-101-16-47-02031 E C UNIT AREA-31 0.7 18-Jul-15 31-Jul-15 18-Aug-15 14-Aug-15 1-Sep-15 24-Aug-15 15-Sep-15 1-Sep-15 13-Oct-15 15-Sep-15 13-Jan-16 30-Aug-16 100% 100.0%
A545-101-16-47-02032 E C UNIT AREA-32 0.7 20-Jul-15 31-Jul-15 20-Aug-15 17-Sep-15 3-Sep-15 24-Sep-15 17-Sep-15 1-Oct-15 15-Oct-15 15-Oct-15 15-Jan-16 30-Aug-16 100% 100.0%
A545-101-16-47-02040 R C LAYOUT OF RCC PAVEMENT 1.5 10-Sep-15 2-Nov-15 24-Sep-15 16-Nov-15 1-Oct-15 23-Nov-15 5-Oct-15 30-Nov-15 19-Oct-15 29-Jan-16 24-Nov-16 3-Jul-18 100% 100.0%
A545-101-81-41-13301 E C GA OF OWS/CRWS SUMP-1 0.7 4-Jun-15 16-Jul-15 18-Jun-15 30-Jul-15 25-Jun-15 7-Aug-15 29-Jun-15 13-Aug-15 13-Jul-15 17-Sep-15 11-Sep-15 31-Oct-15 100% 100.0%
A545-101-81-41-13302 E C GA OF OWS/CRWS SUMP-2 0.7 9-Jun-15 16-Jul-15 23-Jun-15 30-Jul-15 30-Jun-15 7-Aug-15 4-Jul-15 13-Aug-15 18-Jul-15 17-Sep-15 16-Sep-15 31-Oct-15 100% 100.0%
100 100.0%
A545-111-GN-MR-4360 BASKET FILTERS 24.7 4-Jun-15 18-Jun-15 14-Sep-15 28-Sep-15 17-Nov-16 20-Sep-18 15-Feb-17 26-Feb-19 100% 100.0%
A545-121-JC-MR-4260 COALESCER 15.0 2-Jun-15 15-Jun-15 12-Sep-15 20-Oct-15 1-Nov-15 13-May-16 24-Jan-17 13-Feb-17 100% 100.0%
A545-181-GN-MR-4580 CARTRIDGE FILTERS 18.7 6-Jun-15 4-Jun-15 16-Sep-15 28-Aug-15 5-Nov-15 18-Mar-16 28-Jan-17 28-Nov-17 100% 100.0%
A545-700-HH-MR-4610 EOT CRANES 27.5 2-Jul-15 3-Jun-15 12-Oct-15 9-Oct-15 1-Dec-15 27-Jul-16 3-Feb-17 30-Jan-18 100% 100.0%
A545-101-GN-MR-4390 FILTERS 1.0 27-Aug-15 21-Dec-15 8-Dec-15 30-Apr-16 22-Nov-16 14-Mar-18 30-Apr-19 30-Apr-19 100% 100.0%
100 100.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
PIPING - CRUDE BLOCK
A545-101-16-43-00001 R E EQUIPMENT LAYOUT 0.2 19-Feb-15 2-Feb-15 20-Apr-15 20-Apr-15 21-May-15 28-Apr-15 11-Jun-15 8-May-15 11-Jul-15 22-May-15 16-Sep-15 20-Aug-15 100% 100.0%
A545-101-16-43-00002 R E AREA DIVISION 0.0 24-Apr-15 2-Apr-15 22-May-15 25-May-15 29-May-15 6-Feb-15 5-Jun-15 16-Feb-15 13-Jun-15 27-Aug-15 13-Jul-15 8-Sep-15 100% 100.0%
A545-101-16-43-00011 R C PIPING GAD AREA-01 0.03 1-Dec-15 2-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 20-Oct-15 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00012 R C PIPING GAD AREA-01 0.03 1-Dec-15 2-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 20-Oct-15 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00013 R C PIPING GAD AREA-01 0.03 1-Dec-15 20-Aug-15 16-Dec-15 30-Sep-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00014 R C PIPING GAD AREA-01 0.03 1-Dec-15 24-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00021 R C PIPING GAD AREA-02 0.03 1-Dec-15 2-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 20-Oct-15 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00022 R C PIPING GAD AREA-02 0.03 1-Dec-15 2-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 20-Oct-15 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00023 R C PIPING GAD AREA-02 0.03 1-Dec-15 20-Aug-15 16-Dec-15 30-Sep-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00024 R C PIPING GAD AREA-02 0.03 1-Dec-15 24-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00025 R C PIPING GAD AREA-02 0.03 1-Dec-15 25-Sep-15 16-Dec-15 28-Dec-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00026 R C PIPING GAD AREA-02 0.03 1-Dec-15 25-Sep-15 16-Dec-15 28-Dec-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00031 R C PIPING GAD AREA-03 0.03 1-Dec-15 2-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 20-Oct-15 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00032 R C PIPING GAD AREA-03 0.03 1-Dec-15 2-Jul-15 16-Dec-15 15-Sep-15 23-Dec-15 20-Oct-15 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00033 R C PIPING GAD AREA-03 0.03 1-Dec-15 20-Aug-15 16-Dec-15 30-Sep-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00034 R C PIPING GAD AREA-03 0.03 1-Dec-15 24-Sep-15 16-Dec-15 20-Oct-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00035 R C PIPING GAD AREA-03 0.03 1-Dec-15 25-Sep-15 16-Dec-15 28-Dec-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00036 R C PIPING GAD AREA-03 0.03 1-Dec-15 25-Sep-15 16-Dec-15 28-Dec-15 23-Dec-15 4-Feb-16 30-Dec-15 11-Feb-16 14-Jan-16 18-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00151 R C PIPING GAD AREA-15 0.03 22-Dec-15 12-Jul-15 6-Jan-16 15-Sep-15 13-Jan-16 20-Oct-15 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00152 R C PIPING GAD AREA-15 0.03 22-Dec-15 12-Jul-15 6-Jan-16 15-Sep-15 13-Jan-16 20-Oct-15 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00153 R C PIPING GAD AREA-15 0.03 22-Dec-15 20-Aug-15 6-Jan-16 30-Sep-15 13-Jan-16 3-Feb-16 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00154 R C PIPING GAD AREA-15 0.03 22-Dec-15 24-Sep-15 6-Jan-16 20-Oct-15 13-Jan-16 3-Feb-16 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Aug-19 - 85% 85.0%
A545-101-16-43-00155 R C PIPING GAD AREA-15 0.03 22-Dec-15 24-Sep-15 6-Jan-16 28-Dec-15 13-Jan-16 3-Feb-16 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00161 R C PIPING GAD AREA-16 0.03 22-Dec-15 15-Jul-15 6-Jan-16 15-Sep-15 13-Jan-16 20-Oct-15 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00162 R C PIPING GAD AREA-16 0.03 22-Dec-15 15-Jul-15 6-Jan-16 15-Sep-15 13-Jan-16 20-Oct-15 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00163 R C PIPING GAD AREA-16 0.03 22-Dec-15 20-Aug-15 6-Jan-16 30-Sep-15 13-Jan-16 3-Feb-16 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00164 R C PIPING GAD AREA-16 0.03 22-Dec-15 24-Sep-15 6-Jan-16 20-Oct-15 13-Jan-16 3-Feb-16 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00165 R C PIPING GAD AREA-16 0.03 22-Dec-15 10-Oct-15 6-Jan-16 28-Dec-15 13-Jan-16 3-Feb-16 20-Jan-16 10-Feb-16 4-Feb-16 17-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00171 R C PIPING GAD AREA-17 0.03 22-Dec-15 15-Jul-15 6-Jan-16 15-Sep-15 13-Jan-16 20-Oct-15 20-Jan-16 12-Feb-16 4-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00172 R C PIPING GAD AREA-17 0.03 22-Dec-15 15-Jul-15 6-Jan-16 15-Sep-15 13-Jan-16 20-Oct-15 20-Jan-16 12-Feb-16 4-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00173 R C PIPING GAD AREA-17 0.03 22-Dec-15 20-Aug-15 6-Jan-16 30-Sep-15 13-Jan-16 5-Feb-16 20-Jan-16 12-Feb-16 4-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00174 R C PIPING GAD AREA-17 0.03 22-Dec-15 24-Sep-15 6-Jan-16 20-Oct-15 13-Jan-16 5-Feb-16 20-Jan-16 12-Feb-16 4-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00175 R C PIPING GAD AREA-17 0.03 22-Dec-15 10-Oct-15 6-Jan-16 28-Dec-15 13-Jan-16 5-Feb-16 20-Jan-16 12-Feb-16 4-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00176 R C PIPING GAD AREA-17 0.03 22-Dec-15 10-Oct-15 6-Jan-16 28-Dec-15 13-Jan-16 5-Feb-16 20-Jan-16 12-Feb-16 4-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
Page 625 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 11
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA
DISCIPLINE: PIPING (CRUDE BLOCK)
ANNEXURE-A6
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-00177 R C PIPING GAD AREA-17 0.03 22-Dec-15 10-Oct-15 6-Jan-16 28-Dec-15 13-Jan-16 5-Feb-16 20-Jan-16 12-Feb-16 4-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00221 R C Piping GAD AREA-22 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00222 R C Piping GAD AREA-22 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00223 R C Piping GAD AREA-22 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00241 R C PIPING GAD AREA-24 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00242 R C PIPING GAD AREA-24 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00243 R C PIPING GAD AREA-24 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00251 R C PIPING GAD AREA-25 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00261 R C PIPING GAD AREA-26 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00262 R C PIPING GAD AREA-26 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00263 R C PIPING GAD AREA-26 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00264 R C PIPING GAD AREA-26 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00265 R C PIPING GAD AREA-26 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 30-Sep-19 - 85% 85.0%
A545-101-16-43-00266 R C PIPING GAD AREA-26 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 12-Feb-16 17-Feb-16 19-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00271 R C PIPING GAD AREA-27 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00272 R C PIPING GAD AREA-27 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00273 R C PIPING GAD AREA-27 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00274 R C PIPING GAD AREA-27 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00275 R C PIPING GAD AREA-27 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00281 R C PIPING GAD AREA-28 0.03 4-Jan-16 17-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00282 R C PIPING GAD AREA-28 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00283 R C PIPING GAD AREA-28 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00284 R C PIPING GAD AREA-28 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00285 R C PIPING GAD AREA-28 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00286 R C PIPING GAD AREA-28 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00291 R C PIPING GAD AREA-29 0.03 4-Jan-16 18-Jul-15 19-Jan-16 15-Sep-15 26-Jan-16 20-Oct-15 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00292 R C PIPING GAD AREA-29 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00293 R C PIPING GAD AREA-29 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00294 R C PIPING GAD AREA-29 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00295 R C PIPING GAD AREA-29 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00296 R C PIPING GAD AREA-29 0.03 4-Jan-16 24-Sep-15 19-Jan-16 20-Oct-15 26-Jan-16 6-Feb-16 2-Feb-16 13-Feb-16 17-Feb-16 20-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00321 R C PIPING GAD AREA-32 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00322 R C PIPING GAD AREA-32 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00323 R C PIPING GAD AREA-32 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-00372 E C PIPING GAD AREA-37 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00373 E C PIPING GAD AREA-37 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00374 E C PIPING GAD AREA-37 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00375 E C PIPING GAD AREA-37 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00381 E C PIPING GAD AREA-38 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00382 E C PIPING GAD AREA-38 0.03 18-Jan-16 10-Oct-15 2-Feb-16 28-Dec-15 9-Feb-16 7-Feb-16 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00383 E C PIPING GAD AREA-38 0.03 18-Jan-16 10-Oct-15 2-Feb-16 28-Dec-15 9-Feb-16 7-Feb-16 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00384 E C PIPING GAD AREA-38 0.03 18-Jan-16 10-Oct-15 2-Feb-16 28-Dec-15 9-Feb-16 7-Feb-16 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00385 E C PIPING GAD AREA-38 0.03 18-Jan-16 10-Oct-15 2-Feb-16 28-Dec-15 9-Feb-16 7-Feb-16 16-Feb-16 14-Feb-16 2-Mar-16 21-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00391 R C PIPING GAD AREA-39 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00392 R C PIPING GAD AREA-39 0.03 18-Jan-16 10-Oct-15 2-Feb-16 28-Dec-15 9-Feb-16 8-Feb-16 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00393 R C PIPING GAD AREA-39 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00394 R C PIPING GAD AREA-39 0.03 18-Jan-16 10-Oct-15 2-Feb-16 28-Dec-15 9-Feb-16 8-Feb-16 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00395 R C PIPING GAD AREA-39 0.03 18-Jan-16 20-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00396 R C PIPING GAD AREA-39 0.03 18-Jan-16 10-Oct-15 2-Feb-16 28-Dec-15 9-Feb-16 8-Feb-16 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00401 R C PIPING GAD AREA-40 0.03 18-Jan-16 22-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00402 R C PIPING GAD AREA-40 0.03 18-Jan-16 22-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00403 R C PIPING GAD AREA-40 0.03 18-Jan-16 22-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00404 R C PIPING GAD AREA-40 0.03 18-Jan-16 22-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00405 R C PIPING GAD AREA-40 0.03 18-Jan-16 22-Jul-15 2-Feb-16 15-Sep-15 9-Feb-16 20-Oct-15 16-Feb-16 15-Feb-16 2-Mar-16 22-Feb-16 31-Oct-19 - 85% 85.0%
A545-101-16-43-00431 R C PIPING GAD AREA-43 0.03 2-Feb-16 22-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00432 R C PIPING GAD AREA-43 0.03 2-Feb-16 22-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00433 R C PIPING GAD AREA-43 0.03 2-Feb-16 22-Aug-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00434 R C PIPING GAD AREA-43 0.03 2-Feb-16 24-Sep-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00435 R C PIPING GAD AREA-43 0.03 2-Feb-16 10-Oct-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00441 R C PIPING GAD AREA-44 0.03 2-Feb-16 22-Jul-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00442 R C PIPING GAD AREA-44 0.03 2-Feb-16 22-Jul-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00443 R C PIPING GAD AREA-44 0.03 2-Feb-16 22-Aug-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00444 R C PIPING GAD AREA-44 0.03 2-Feb-16 24-Sep-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00445 R C PIPING GAD AREA-44 0.03 2-Feb-16 10-Oct-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00451 R C PIPING GAD AREA-45 0.03 2-Feb-16 23-Jul-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00452 R C PIPING GAD AREA-45 0.03 2-Feb-16 23-Jul-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00453 R C PIPING GAD AREA-45 0.03 2-Feb-16 23-Jul-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00454 R C PIPING GAD AREA-45 0.03 2-Feb-16 23-Aug-15 17-Feb-16 25-Sep-15 24-Feb-16 2-Oct-15 2-Mar-16 9-Oct-15 17-Mar-16 16-Oct-15 31-Oct-19 - 85% 85.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-00461 R C PIPING GAD AREA-46 0.03 2-Feb-16 24-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00462 R C PIPING GAD AREA-46 0.03 2-Feb-16 24-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00463 R C PIPING GAD AREA-46 0.03 2-Feb-16 24-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00464 R C PIPING GAD AREA-46 0.03 2-Feb-16 24-Aug-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00465 R C PIPING GAD AREA-46 0.03 2-Feb-16 10-Oct-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00471 R C PIPING GAD AREA-47 0.03 2-Feb-16 25-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00472 R C PIPING GAD AREA-47 0.03 2-Feb-16 25-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00473 R C PIPING GAD AREA-47 0.03 2-Feb-16 25-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00474 R C PIPING GAD AREA-47 0.03 2-Feb-16 25-Aug-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00475 R C PIPING GAD AREA-47 0.03 2-Feb-16 10-Oct-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00481 R C PIPING GAD AREA-48 0.03 2-Feb-16 25-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00482 R C PIPING GAD AREA-48 0.03 2-Feb-16 25-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00483 R C PIPING GAD AREA-48 0.03 2-Feb-16 25-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00484 R C PIPING GAD AREA-48 0.03 2-Feb-16 25-Aug-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00485 R C PIPING GAD AREA-48 0.03 2-Feb-16 10-Oct-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00491 R C PIPING GAD AREA-49 0.03 2-Feb-16 26-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00492 R C PIPING GAD AREA-49 0.03 2-Feb-16 26-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00493 R C PIPING GAD AREA-49 0.03 2-Feb-16 26-Jul-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00494 R C PIPING GAD AREA-49 0.03 2-Feb-16 30-Sep-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00495 R C PIPING GAD AREA-49 0.03 2-Feb-16 10-Oct-15 17-Feb-16 5-Nov-15 24-Feb-16 12-Nov-15 2-Mar-16 19-Nov-15 17-Mar-16 26-Nov-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00501 R C PIPING GAD AREA-50 0.03 2-Feb-16 27-Jul-15 17-Feb-16 15-Sep-15 24-Feb-16 20-Oct-15 2-Mar-16 21-Dec-15 17-Mar-16 28-Dec-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00502 R C PIPING GAD AREA-50 0.03 2-Feb-16 27-Jul-15 17-Feb-16 15-Sep-15 24-Feb-16 20-Oct-15 2-Mar-16 21-Dec-15 17-Mar-16 28-Dec-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00503 R C PIPING GAD AREA-50 0.03 2-Feb-16 27-Jul-15 17-Feb-16 15-Sep-15 24-Feb-16 20-Oct-15 2-Mar-16 21-Dec-15 17-Mar-16 28-Dec-15 31-Oct-19 - 85% 85.0%
A545-101-16-43-00504 R C PIPING GAD AREA-50 0.03 2-Feb-16 30-Sep-15 17-Feb-16 20-Oct-15 24-Feb-16 14-Dec-15 2-Mar-16 21-Dec-15 17-Mar-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00505 R C PIPING GAD AREA-50 0.03 2-Feb-16 10-Oct-15 17-Feb-16 7-Dec-15 24-Feb-16 14-Dec-15 2-Mar-16 21-Dec-15 17-Mar-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00511 R C PIPING GAD AREA-51 0.03 3-Mar-16 27-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00512 R C PIPING GAD AREA-51 0.03 3-Mar-16 27-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00513 R C PIPING GAD AREA-51 0.03 3-Mar-16 27-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00514 R C PIPING GAD AREA-51 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00515 R C PIPING GAD AREA-51 0.03 3-Mar-16 10-Oct-15 18-Mar-16 30-Nov-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00521 R C PIPING GAD AREA-52 0.03 3-Mar-16 27-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00522 R C PIPING GAD AREA-52 0.03 3-Mar-16 27-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00523 R C PIPING GAD AREA-52 0.03 3-Mar-16 27-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00524 R C PIPING GAD AREA-52 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-00531 R C PIPING GAD AREA-53 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00532 R C PIPING GAD AREA-53 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00533 R C PIPING GAD AREA-53 0.03 3-Mar-16 28-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00534 R C PIPING GAD AREA-53 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00535 R C PIPING GAD AREA-53 0.03 3-Mar-16 10-Oct-15 18-Mar-16 7-Dec-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00541 R C PIPING GAD AREA-54 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00542 R C PIPING GAD AREA-54 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00543 R C PIPING GAD AREA-54 0.03 3-Mar-16 28-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00544 R C PIPING GAD AREA-54 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00545 R C PIPING GAD AREA-54 0.03 3-Mar-16 10-Oct-15 18-Mar-16 7-Dec-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00551 R C PIPING GAD AREA-55 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00552 R C PIPING GAD AREA-55 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00553 R C PIPING GAD AREA-55 0.03 3-Mar-16 28-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00554 R C PIPING GAD AREA-55 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00555 R C PIPING GAD AREA-55 0.03 3-Mar-16 10-Oct-15 18-Mar-16 7-Dec-15 25-Mar-16 14-Dec-15 1-Apr-16 21-Dec-15 16-Apr-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00561 R C PIPING GAD AREA-56 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00562 R C PIPING GAD AREA-56 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00563 R C PIPING GAD AREA-56 0.03 3-Mar-16 28-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00564 R C PIPING GAD AREA-56 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00565 R C PIPING GAD AREA-56 0.03 3-Mar-16 10-Oct-15 18-Mar-16 28-Dec-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00571 R C PIPING GAD AREA-57 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00572 R C PIPING GAD AREA-57 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00573 R C PIPING GAD AREA-57 0.03 3-Mar-16 28-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00574 R C PIPING GAD AREA-57 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00575 R C PIPING GAD AREA-57 0.03 3-Mar-16 10-Oct-15 18-Mar-16 28-Dec-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00581 R C PIPING GAD AREA-58 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00582 R C PIPING GAD AREA-58 0.03 3-Mar-16 28-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00583 R C PIPING GAD AREA-58 0.03 3-Mar-16 28-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00584 R C PIPING GAD AREA-58 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00585 R C PIPING GAD AREA-58 0.03 3-Mar-16 10-Oct-15 18-Mar-16 28-Dec-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00591 R C PIPING GAD AREA-59 0.03 3-Mar-16 29-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00592 R C PIPING GAD AREA-59 0.03 3-Mar-16 29-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00593 R C PIPING GAD AREA-59 0.03 3-Mar-16 29-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00594 R C PIPING GAD AREA-59 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-00601 R C PIPING GAD AREA-60 0.03 3-Mar-16 29-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00602 R C PIPING GAD AREA-60 0.03 3-Mar-16 29-Jul-15 18-Mar-16 15-Sep-15 25-Mar-16 20-Oct-15 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00603 R C PIPING GAD AREA-60 0.03 3-Mar-16 29-Aug-15 18-Mar-16 30-Sep-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00604 R C PIPING GAD AREA-60 0.03 3-Mar-16 30-Sep-15 18-Mar-16 20-Oct-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00605 R C PIPING GAD AREA-60 0.03 3-Mar-16 10-Oct-15 18-Mar-16 28-Dec-15 25-Mar-16 14-Jan-16 1-Apr-16 21-Jan-16 16-Apr-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00611 R C PIPING GAD AREA-61 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 15-Feb-16 16-May-16 22-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00612 R C PIPING GAD AREA-61 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 15-Feb-16 16-May-16 22-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00613 R C PIPING GAD AREA-61 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 15-Feb-16 16-May-16 22-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00614 R C PIPING GAD AREA-61 0.03 2-Apr-16 30-Sep-15 17-Apr-16 20-Oct-15 24-Apr-16 8-Feb-16 1-May-16 15-Feb-16 16-May-16 22-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00615 R C PIPING GAD AREA-61 0.03 2-Apr-16 10-Oct-15 17-Apr-16 28-Dec-15 24-Apr-16 8-Feb-16 1-May-16 15-Feb-16 16-May-16 22-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00621 R C PIPING GAD AREA-62 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00622 R C PIPING GAD AREA-62 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00623 R C PIPING GAD AREA-62 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00624 R C PIPING GAD AREA-62 0.03 2-Apr-16 30-Sep-15 17-Apr-16 20-Oct-15 24-Apr-16 10-Feb-16 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00625 R C PIPING GAD AREA-62 0.03 2-Apr-16 10-Oct-15 17-Apr-16 28-Dec-15 24-Apr-16 10-Feb-16 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00631 R C PIPING GAD AREA-63 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00632 R C PIPING GAD AREA-63 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00633 R C PIPING GAD AREA-63 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00634 R C PIPING GAD AREA-63 0.03 2-Apr-16 30-Sep-15 17-Apr-16 20-Oct-15 24-Apr-16 10-Feb-16 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00635 R C PIPING GAD AREA-63 0.03 2-Apr-16 10-Oct-15 17-Apr-16 28-Dec-15 24-Apr-16 10-Feb-16 1-May-16 17-Feb-16 16-May-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00641 R C PIPING GAD AREA-64 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00642 R C PIPING GAD AREA-64 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00643 R C PIPING GAD AREA-64 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00644 R C PIPING GAD AREA-64 0.03 2-Apr-16 30-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00645 R C PIPING GAD AREA-64 0.03 2-Apr-16 8-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00651 R C PIPING GAD AREA-65 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00652 R C PIPING GAD AREA-65 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00653 R C PIPING GAD AREA-65 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00654 R C PIPING GAD AREA-65 0.03 2-Apr-16 30-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00655 R C PIPING GAD AREA-65 0.03 2-Apr-16 8-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00661 R C PIPING GAD AREA-66 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00662 R C PIPING GAD AREA-66 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00663 R C PIPING GAD AREA-66 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00664 R C PIPING GAD AREA-66 0.03 2-Apr-16 30-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-00671 R C PIPING GAD AREA-67 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00672 R C PIPING GAD AREA-67 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00673 R C PIPING GAD AREA-67 0.03 2-Apr-16 30-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00674 R C PIPING GAD AREA-67 0.03 2-Apr-16 30-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00675 R C PIPING GAD AREA-67 0.03 2-Apr-16 8-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00681 R C PIPING GAD AREA-68 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00682 R C PIPING GAD AREA-68 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00683 R C PIPING GAD AREA-68 0.03 2-Apr-16 30-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00684 R C PIPING GAD AREA-68 0.03 2-Apr-16 30-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00685 R C PIPING GAD AREA-68 0.03 2-Apr-16 8-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00691 R C PIPING GAD AREA-69 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00692 R C PIPING GAD AREA-69 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00693 R C PIPING GAD AREA-69 0.03 2-Apr-16 1-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00694 R C PIPING GAD AREA-69 0.03 2-Apr-16 1-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00695 R C PIPING GAD AREA-69 0.03 2-Apr-16 1-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 3-Oct-15 1-May-16 9-Oct-15 16-May-16 16-Oct-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00701 R C PIPING GAD AREA-70 0.03 2-Apr-16 1-Sep-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 21-Dec-15 16-May-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00702 R C PIPING GAD AREA-70 0.03 2-Apr-16 29-Jul-15 17-Apr-16 15-Sep-15 24-Apr-16 20-Oct-15 1-May-16 21-Dec-15 16-May-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00703 R C PIPING GAD AREA-70 0.03 2-Apr-16 30-Sep-15 17-Apr-16 20-Oct-15 24-Apr-16 14-Dec-15 1-May-16 21-Dec-15 16-May-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00704 R C PIPING GAD AREA-70 0.03 2-Apr-16 30-Sep-15 17-Apr-16 20-Oct-15 24-Apr-16 14-Dec-15 1-May-16 21-Dec-15 16-May-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00705 R C PIPING GAD AREA-70 0.03 2-Apr-16 10-Oct-15 17-Apr-16 7-Dec-15 24-Apr-16 14-Dec-15 1-May-16 21-Dec-15 16-May-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00711 R C PIPING GAD AREA-71 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00712 R C PIPING GAD AREA-71 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00713 R C PIPING GAD AREA-71 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00714 R C PIPING GAD AREA-71 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00715 R C PIPING GAD AREA-71 0.03 28-Apr-16 10-Oct-15 13-May-16 7-Dec-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00721 R C PIPING GAD AREA-72 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00722 R C PIPING GAD AREA-72 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00723 R C PIPING GAD AREA-72 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00724 R C PIPING GAD AREA-72 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00725 R C PIPING GAD AREA-72 0.03 28-Apr-16 10-Oct-15 13-May-16 7-Dec-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00731 R C PIPING GAD AREA-73 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00732 R C PIPING GAD AREA-73 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00733 R C PIPING GAD AREA-73 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00734 R C PIPING GAD AREA-73 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-00741 R C PIPING GAD AREA-74 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00742 R C PIPING GAD AREA-74 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00743 R C PIPING GAD AREA-74 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00744 R C PIPING GAD AREA-74 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00745 R C PIPING GAD AREA-74 0.03 28-Apr-16 10-Oct-15 13-May-16 7-Dec-15 20-May-16 14-Dec-15 27-May-16 21-Dec-15 11-Jun-16 28-Dec-15 30-Nov-19 - 85% 85.0%
A545-101-16-43-00751 R C PIPING GAD AREA-75 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00752 R C PIPING GAD AREA-75 0.03 28-Apr-16 29-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00753 R C PIPING GAD AREA-75 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00754 R C PIPING GAD AREA-75 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00755 R C PIPING GAD AREA-75 0.03 28-Apr-16 10-Oct-15 13-May-16 28-Dec-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00761 R C PIPING GAD AREA-76 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00762 R C PIPING GAD AREA-76 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00763 R C PIPING GAD AREA-76 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00764 R C PIPING GAD AREA-76 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00765 R C PIPING GAD AREA-76 0.03 28-Apr-16 10-Oct-15 13-May-16 28-Dec-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00771 R C PIPING GAD AREA-77 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00772 R C PIPING GAD AREA-77 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00773 R C PIPING GAD AREA-77 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00774 R C PIPING GAD AREA-77 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00775 R C PIPING GAD AREA-77 0.03 28-Apr-16 10-Oct-15 13-May-16 28-Dec-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00781 R C PIPING GAD AREA-78 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00782 R C PIPING GAD AREA-78 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00783 R C PIPING GAD AREA-78 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00784 R C PIPING GAD AREA-78 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00785 R C PIPING GAD AREA-78 0.03 28-Apr-16 10-Oct-15 13-May-16 28-Dec-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00791 R C PIPING GAD AREA-79 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00792 R C PIPING GAD AREA-79 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00793 R C PIPING GAD AREA-79 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00794 R C PIPING GAD AREA-79 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00795 R C PIPING GAD AREA-79 0.03 28-Apr-16 10-Oct-15 13-May-16 28-Dec-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00801 R C PIPING GAD AREA-80 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00802 R C PIPING GAD AREA-80 0.03 28-Apr-16 30-Jul-15 13-May-16 15-Sep-15 20-May-16 20-Oct-15 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00803 R C PIPING GAD AREA-80 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00804 R C PIPING GAD AREA-80 0.03 28-Apr-16 30-Sep-15 13-May-16 20-Oct-15 20-May-16 14-Jan-16 27-May-16 21-Jan-16 11-Jun-16 28-Jan-16 30-Nov-19 - 85% 85.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-00811 R C PIPING GAD AREA-81 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 21-Jan-16 3-Jul-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00812 R C PIPING GAD AREA-81 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 21-Jan-16 3-Jul-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00813 R C PIPING GAD AREA-81 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 14-Jan-16 18-Jun-16 21-Jan-16 3-Jul-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00814 R C PIPING GAD AREA-81 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 14-Jan-16 18-Jun-16 21-Jan-16 3-Jul-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00815 R C PIPING GAD AREA-81 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 14-Jan-16 18-Jun-16 21-Jan-16 3-Jul-16 28-Jan-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00821 R C PIPING GAD AREA-82 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00822 R C PIPING GAD AREA-82 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00823 R C PIPING GAD AREA-82 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00824 R C PIPING GAD AREA-82 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00825 R C PIPING GAD AREA-82 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00831 R C PIPING GAD AREA-83 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00832 R C PIPING GAD AREA-83 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00833 R C PIPING GAD AREA-83 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00834 R C PIPING GAD AREA-83 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00835 R C PIPING GAD AREA-83 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00841 R C PIPING GAD AREA-84 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00842 R C PIPING GAD AREA-84 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00843 R C PIPING GAD AREA-84 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00844 R C PIPING GAD AREA-84 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00845 R C PIPING GAD AREA-84 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00871 R C PIPING GAD AREA-87 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00872 R C PIPING GAD AREA-87 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00873 R C PIPING GAD AREA-87 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00874 R C PIPING GAD AREA-87 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00875 R C PIPING GAD AREA-87 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00876 R C PIPING GAD AREA-87 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 10-Feb-16 18-Jun-16 17-Feb-16 3-Jul-16 24-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00881 R C PIPING GAD AREA-88 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 19-Feb-16 3-Jul-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00882 R C PIPING GAD AREA-88 0.03 20-May-16 30-Jul-15 4-Jun-16 15-Sep-15 11-Jun-16 20-Oct-15 18-Jun-16 19-Feb-16 3-Jul-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00883 R C PIPING GAD AREA-88 0.03 20-May-16 30-Sep-15 4-Jun-16 20-Oct-15 11-Jun-16 12-Feb-16 18-Jun-16 19-Feb-16 3-Jul-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00884 R C PIPING GAD AREA-88 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 12-Feb-16 18-Jun-16 19-Feb-16 3-Jul-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00885 R C PIPING GAD AREA-88 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 12-Feb-16 18-Jun-16 19-Feb-16 3-Jul-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-00886 R C PIPING GAD AREA-88 0.03 20-May-16 10-Oct-15 4-Jun-16 28-Dec-15 11-Jun-16 12-Feb-16 18-Jun-16 19-Feb-16 3-Jul-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01041 E C PIPING GAD AREA-104 0.03 22-Jun-16 31-Jul-15 7-Jul-16 15-Sep-15 14-Jul-16 20-Oct-15 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01042 E C PIPING GAD AREA-104 0.03 22-Jun-16 31-Jul-15 7-Jul-16 15-Sep-15 14-Jul-16 20-Oct-15 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-01044 E C PIPING GAD AREA-104 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 12-Feb-16 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01045 E C PIPING GAD AREA-104 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 12-Feb-16 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01046 E C PIPING GAD AREA-104 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 12-Feb-16 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01051 E C PIPING GAD AREA-105 0.03 22-Jun-16 31-Jul-15 7-Jul-16 15-Sep-15 14-Jul-16 20-Oct-15 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01052 E C PIPING GAD AREA-105 0.03 22-Jun-16 31-Jul-15 7-Jul-16 15-Sep-15 14-Jul-16 20-Oct-15 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01053 E C PIPING GAD AREA-105 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 12-Feb-16 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01054 E C PIPING GAD AREA-105 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 12-Feb-16 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01055 E C PIPING GAD AREA-105 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 12-Feb-16 21-Jul-16 19-Feb-16 5-Aug-16 26-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01061 E C PIPING GAD AREA-106 0.03 22-Jun-16 31-Jul-15 7-Jul-16 15-Sep-15 14-Jul-16 20-Oct-15 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01063 E C PIPING GAD AREA-106 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 11-Feb-16 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01064 E C PIPING GAD AREA-106 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 11-Feb-16 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01065 E C PIPING GAD AREA-106 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 11-Feb-16 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01071 E C PIPING GAD AREA-107 0.03 22-Jun-16 31-Jul-15 7-Jul-16 15-Sep-15 14-Jul-16 20-Oct-15 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01072 E C PIPING GAD AREA-107 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 11-Feb-16 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01073 E C PIPING GAD AREA-107 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 11-Feb-16 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01074 E C PIPING GAD AREA-107 0.03 22-Jun-16 31-Jul-15 7-Jul-16 15-Sep-15 14-Jul-16 20-Oct-15 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01075 E C PIPING GAD AREA-107 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 11-Feb-16 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-01076 E C PIPING GAD AREA-107 0.03 22-Jun-16 10-Oct-15 7-Jul-16 28-Dec-15 14-Jul-16 11-Feb-16 21-Jul-16 18-Feb-16 5-Aug-16 25-Feb-16 30-Nov-19 - 85% 85.0%
A545-101-16-43-MTO2 E P INTERMEDIATE MTO 0.6 18-Jan-16 27-Jan-16 - - - - - - - - 3-Mar-16 29-Feb-16 100% 100.0%
A545-101-16-43-MTOM R P MTO DATA/ IPMCS 0.9 31-Mar-15 22-Jul-15 - - - - - - - - 30-Jun-19 - 100% 95.0%
A545-101-16-43-MTOS R P MTO FOR PIPE SUPPORTS 0.0 31-Jan-16 22-Dec-15 - - - - - - - - 15-Jun-19 - 100% 95.0%
A545-101-16-43-MTOT R P TOP-OFF MTO 0.1 28-Nov-16 2-Jan-18 - - - - - - - - 29-Sep-17 1-Feb-18 100% 100.0%
A545-101-16-43-NOZZ E C NOZZLE ORIENTATION 0.3 4-Apr-15 28-Jun-15 - - - - - - - - 30-Nov-15 31-Jan-17 100% 100.0%
A545-101-16-43-PCLT E C PIPING CLEATS 0.3 2-May-15 20-Jul-15 - - - - - - - - 24-Jan-17 31-Jan-17 100% 100.0%
A545-101-16-43-PMSC E E PMS/VMS 0.2 5-Dec-14 18-May-15 5-Jan-15 8-Jun-15 19-Jan-15 22-Jun-15 22-Jan-15 7-Jul-15 21-Feb-15 21-Jul-15 2-Apr-15 4-Aug-15 100% 100.0%
INCORPORATE COMMENTS
DRAFTING / EXTRACTION UPDATE & ISSUE FOR TOTAL
START CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR TOTAL (SCHD.
DRAWING/ DOCUMENT REVAMP/ COMPLETE CONSTRUCTION (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG % (10%) (65%) (80%) CONSTRUCTION PROGRESS %)
NO. EXISTING (60%) (100%) PROGRESS %)
(85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
A545-101-16-43-SCAT R C PIPING SPECS.& CATL. 0.3 24-Jun-15 22-Jun-15 5-Jul-15 24-Jul-15 12-Jul-15 7-Aug-15 15-Jul-15 14-Aug-15 21-Jul-15 28-Aug-15 30-Dec-16 26-Sep-17 100% 100.0%
A545-101-16-43-00851 R C PIPING GAD AREA-85 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00852 R C PIPING GAD AREA-85 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00853 R C PIPING GAD AREA-85 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00854 R C PIPING GAD AREA-85 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00855 R C PIPING GAD AREA-85 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00856 R C PIPING GAD AREA-85 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00861 R C PIPING GAD AREA-86 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00862 R C PIPING GAD AREA-86 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00863 R C PIPING GAD AREA-86 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00864 R C PIPING GAD AREA-86 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00865 R C PIPING GAD AREA-86 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-00866 R C PIPING GAD AREA-86 0.0 22-Sep-17 25-Jul-18 10-May-19 6-Apr-19 17-May-19 13-Apr-19 24-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01251 R C PIPING GAD AREA-125 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01252 R C PIPING GAD AREA-125 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01253 R C PIPING GAD AREA-125 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01254 R C PIPING GAD AREA-125 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01255 R C PIPING GAD AREA-125 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01256 R C PIPING GAD AREA-125 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01261 R C PIPING GAD AREA-126 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01262 R C PIPING GAD AREA-126 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01263 R C PIPING GAD AREA-126 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01264 R C PIPING GAD AREA-126 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01265 R C PIPING GAD AREA-126 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
A545-101-16-43-01266 R C PIPING GAD AREA-126 0.0 26-Sep-17 25-Jul-18 14-May-19 6-Apr-19 21-May-19 13-Apr-19 28-May-19 20-Apr-19 30-Aug-19 - 24-Sep-19 - 80% 80.0%
100 96.8%
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING
(SCHD (ACTUAL
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) REVIEW (100%)
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
A545-101-PA-MR-5001 CENTRIFUGAL PUMPS SPP-HORIZONAL 14.4 22-May-15 20-Feb-15 2-Sep-15 24-Jun-15 22-Oct-15 18-Mar-16 23-Feb-17 26-Feb-18 100% 100.0%
A545-101-LZ-MR-5005 CHEMICAL DOSING SKID 15.3 27-Jul-15 24-Sep-15 6-Nov-15 18-Feb-16 26-Dec-15 18-Aug-16 30-Apr-19 - 100% 100.0%
A545-101-PA-MR-5006 CENTRIFUGAL PUMPS SPP-VERTICAL 3.8 12-Jun-15 26-Aug-15 23-Sep-15 28-Jan-16 26-Nov-16 8-Dec-16 24-Feb-17 28-Apr-18 100% 100.0%
A545-101-LZ-MR-5007 OIL MIST 5.7 19-Jun-15 10-Dec-15 30-Sep-15 28-Jun-16 30-Nov-16 29-Nov-16 28-Feb-17 30-Jan-18 100% 100.0%
A545-101-PA-MR-5008 ROTARY PUMPS 2.9 17-Jul-15 28-Aug-15 28-Oct-15 30-Dec-15 4-Dec-16 18-May-17 4-Mar-17 28-Mar-18 100% 100.0%
A545-101-KA-MR-5021 COMPRESSOR-ROTARY SCREW SPP 14.4 8-May-15 6-Apr-15 19-Aug-15 11-Sep-15 8-Oct-15 2-Nov-15 20-Jan-17 25-Jul-18 100% 100.0%
A545-101-KA-MR-5301 AIR COMPRESSOR ROTARY 2.9 28-Jun-15 17-Jun-15 9-Oct-15 9-Dec-15 27-Dec-16 26-Apr-17 27-Mar-17 27-Jul-18 100% 100.0%
A545-101-PA-MR-5433 PUMP-CENT.H/V (FW) 0.5 8-Aug-15 5-Sep-16 10-Nov-16 11-Jan-17 30-Dec-16 17-Nov-17 30-Apr-19 30-Apr-19 100% 100.0%
MISCELLANEOUS (INPUT TO
A545-101-LZ-IN-MISC 3.8 30-Jul-15 28-May-15 - - - - 31-Mar-16 31-Oct-16 100% 100.0%
MR,TENDER & PACKAGES)
100 100.0%
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING
MR No MR DESCRIPTION WTG. % (SCHD (ACTUAL
(40%) (85%) (90%) REVIEW (100%)
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
A545-101-EX-MR-6161 SPIRAL HEAT EXCHANGERS 4.9 26-Jun-15 23-Dec-14 21-Sep-15 13-Mar-15 20-Nov-15 4-Jan-16 3-Jan-17 29-Jan-18 100% 100.0%
A545-101-CC-MR-6152 ODC COLUMNS 2.1 23-Feb-15 31-Dec-14 5-Jun-15 10-Apr-15 4-Aug-15 29-Jul-15 6-Dec-16 28-Sep-18 100% 100.0%
A545-101-CC-MR-6153 ODC COLUMNS II 1.4 9-Mar-15 8-Jan-15 18-Jun-15 8-Apr-15 17-Aug-15 3-Sep-15 19-Dec-16 18-May-18 100% 100.0%
A545-101-CC-MR-6154 COLUMNS (CS & CS+SS CLAD) 5.0 1-May-15 21-Jan-15 27-Jul-15 10-Apr-15 25-Sep-15 4-Jul-15 18-Dec-16 29-Jan-18 100% 100.0%
A545-101-CC-MR-6155 COLUMNS (CS & CS+CLAD) 2.2 15-May-15 2-Mar-15 10-Aug-15 4-Jun-15 9-Oct-15 2-Nov-15 12-Dec-16 27-Feb-18 100% 100.0%
A545-101-VV-MR-6158 UTILITY VESSELS - ODC 0.7 22-Jun-15 5-Aug-15 17-Sep-15 22-Oct-15 16-Nov-15 1-Apr-16 30-Dec-16 28-Apr-18 100% 100.0%
A545-101-JX-MR-6171 VORTEX CLUSTERS 1.7 27-Jul-15 4-Aug-15 22-Oct-15 28-Sep-15 16-Oct-16 25-Aug-17 14-Jan-17 29-Mar-18 100% 100.0%
A545-101-EA-MR-6210 AIR COOLERS (CS) 1.3 6-Jul-15 25-Jun-15 1-Oct-15 10-Sep-15 30-Nov-15 6-Apr-16 13-Jan-17 22-May-18 100% 100.0%
A545-111-VV-MR-6403 VESSELS 33.6 6-May-15 25-Mar-15 17-Aug-15 17-Jun-15 16-Oct-15 29-Oct-15 29-Nov-16 28-Dec-17 100% 100.0%
A545-151-EA-MR-6115 AIR COOLED HEAT EXCHANGERS 1.8 11-May-15 26-Mar-15 22-Aug-15 27-Jul-15 21-Oct-15 18-Mar-16 4-Dec-16 27-Feb-18 100% 100.0%
A545-151-EE-MR-6130 EXCHANGER 2.0 14-May-15 16-Apr-15 25-Aug-15 21-Jul-15 24-Oct-15 18-Mar-16 7-Dec-16 29-Apr-18 100% 100.0%
TOTAL TOTAL
MR ISSUE TBA PR ISSUE VENDOR DRAWING
MR No MR DESCRIPTION WTG. % (SCHD (ACTUAL
(40%) (85%) (90%) REVIEW (100%)
PROGRESS %) PROGRESS %)
Sch Act Sch Act Sch Act Sch Act
A545-111-EE-MR-6145 HEAT EXCHANGER CARBON STEEL 1.3 28-May-15 8-Jun-15 8-Sep-15 22-Jul-15 7-Nov-15 23-Mar-16 21-Dec-16 25-Jul-18 100% 100.0%
A545-111-EE-MR-6160 HEAT EXCHANGER CARBON STEEL 0.7 26-Jun-15 16-Jul-15 7-Oct-15 6-Oct-15 6-Dec-15 6-Oct-16 9-Jan-17 28-Feb-18 100% 100.0%
A545-121-EA-MR-6335 AIR FIN COOLERS 0.7 8-Jul-15 5-Jun-15 19-Oct-15 7-Aug-15 18-Dec-15 22-Mar-16 11-Jan-17 27-Feb-18 100% 100.0%
A545-151-JU-MR-6120 SILENCER 0.7 13-Jul-15 15-Jan-16 23-Oct-15 13-Jun-16 1-Nov-16 2-Jan-17 30-Jan-17 28-Feb-18 100% 100.0%
A545-111-VV-MR-6404 REACTOR 0.2 8-May-15 31-Mar-15 19-Aug-15 26-Jun-15 18-Oct-15 2-Nov-15 1-Dec-16 31-Aug-17 100% 100.0%
A545-161-VV-MR-6424 PRESSURE VESSELS 0.1 10-Oct-15 7-Apr-16 19-Jan-16 9-Sep-16 25-Oct-16 5-Sep-17 30-Apr-19 30-Apr-19 100% 100.0%
100 99.99%
A545-101-16-48-00101 TO
R C PILE LAYOUT (SHEET 1 TO 8) 2.8 7-Jan-15 4-Feb-15 6-Feb-15 18-Feb-15 13-Feb-15 25-Feb-15 27-Feb-15 4-Mar-15 20-Mar-15 8-Jun-15 18-Jun-15 22-Jun-15 100% 100.0%
00108
A545-101-16-48-00201 TO
R C OVERALL FDN LAYOUT (SHEET 1 TO 8) 2.5 3-Mar-15 2-Apr-15 2-Apr-15 22-May-15 9-Apr-15 29-May-15 23-Apr-15 5-Jun-15 14-May-15 19-Jun-15 12-Aug-15 14-Jan-16 100% 100.0%
00208
A545-101-16-48-00271 E C OVERALL FDN LAYOUT (SHEET 1 TO 8) 0.3 2-Jun-15 5-Aug-15 16-Jun-15 19-Aug-15 23-Jun-15 26-Aug-15 30-Jun-15 2-Sep-15 14-Jul-15 16-Sep-15 29-Sep-15 30-Sep-15 100% 100.0%
A545-101-81-41-00273 E C GA & R/F DET OF FDN FOR APH SYSTEM 0.3 10-Jan-17 28-Aug-17 24-Jan-17 7-Sep-18 31-Jan-17 14-Sep-18 7-Feb-17 21-Sep-18 21-Feb-17 28-Sep-18 9-Apr-19 28-Sep-18 100% 100.0%
A545-101-16-48-00272 E C FDN LAYOUT OF APH SYSTEM 0.3 14-Jan-17 28-Aug-17 28-Jan-17 31-Aug-18 4-Feb-17 7-Sep-18 11-Feb-17 14-Sep-18 25-Feb-17 21-Sep-18 13-Apr-19 21-Sep-18 100% 100.0%
A545-101-16-48-00301 E C MAIN PIPE RACK GA & R/F DET OF FDN 0.9 5-Jun-15 25-May-15 19-Jun-15 6-Jul-15 26-Jun-15 13-Jul-15 3-Jul-15 20-Jul-15 17-Jul-15 27-Jul-15 2-Oct-15 10-Aug-15 100% 100.0%
A545-101-16-48-10304 E C MAIN PIPE RACK R/F DETAIL OF BEAM 0.7 14-Jun-15 25-May-15 27-Jun-15 5-Jun-15 4-Jul-15 12-Jun-15 11-Jul-15 19-Jun-15 25-Jul-15 3-Jul-15 10-Oct-15 31-Aug-15 100% 100.0%
A545-101-81-41-10307 E C MAIN PIPE RACK INSERT PLATES 0.3 23-Jun-15 26-Oct-15 7-Jul-15 20-Nov-15 14-Jul-15 20-Jan-16 21-Jul-15 27-Jan-16 4-Aug-15 10-Feb-16 20-Oct-15 18-Feb-16 100% 100.0%
A545-101-16-48-00311 TO
E C MAIN PIPE RACK 1ST TIER PLAN (SHEET 1 TO 4) 1.2 26-Jun-15 2-May-15 10-Jul-15 16-May-15 17-Jul-15 23-May-15 24-Jul-15 30-May-15 7-Aug-15 16-Jun-15 23-Oct-15 30-Jun-15 100% 100.0%
00314
A545-101-16-48-00321 TO
E C MAIN PIPE RACK 2ND TIER PLAN (SHEET 1 TO 4) 1.2 8-Jul-15 2-May-15 22-Jul-15 16-May-15 29-Jul-15 23-May-15 5-Aug-15 30-May-15 19-Aug-15 16-Jun-15 4-Nov-15 30-Jun-15 100% 100.0%
00324
A545-101-16-48-00331 TO
E C MAIN PIPE RACK 3RD TIER PLAN (SHEET 1 TO 4) 1.2 20-Jul-15 2-May-15 3-Aug-15 16-May-15 10-Aug-15 23-May-15 17-Aug-15 30-May-15 31-Aug-15 16-Jun-15 16-Nov-15 30-Jun-15 100% 100.0%
00334
A545-101-16-48-00341 TO
E C MAIN PIPE RACK 4TH TIER PLAN (SHEET 1 TO 4) 1.2 1-Aug-15 2-May-15 15-Aug-15 16-May-15 22-Aug-15 23-May-15 29-Aug-15 30-May-15 12-Sep-15 16-Jun-15 28-Nov-15 30-Jun-15 100% 100.0%
00344
A545-101-81-41-30351 E C COMPRESSOR SHED FOUNDATION DETAIL 0.3 17-Aug-15 18-May-15 31-Aug-15 25-May-15 7-Sep-15 1-Jun-15 14-Sep-15 8-Jun-15 28-Sep-15 16-Nov-15 14-Dec-15 30-Nov-15 100% 100.0%
A545-101-16-48-00352 COMPRESSOR SHED GA & R/F DET OF AUX FDN 21-11-2016 28-03-2018 =H23+854 - =K23+7 - =N23+7 - =Q23+14 - =T23+32 -
A545-101-16-48-00361 COMPRESSOR HOUSE OPERATING PLATFORM 15-09-2015 25-05-2015 =H27+1284 - =K27+7 - =N27+7 - =Q27+14 - =T27+32 -
A545-101-16-48-00373 E C GA OF FDN FOR 102-KA-1002 0.4 10-Dec-16 22-Mar-18 24-Dec-16 28-Jan-19 31-Dec-16 4-Feb-19 7-Jan-17 11-Feb-19 21-Jan-17 18-Feb-19 7-Apr-17 18-Feb-19 100% 100.0%
A545-101-16-48-00374 R/F DET OF FDN FOR 102-KA-1002 17-12-2016 22-03-2018 =H29+833 - =K29+7 - =N29+7 - =Q29+14 - =T29+32 -
A545-101-81-41-00405 E C TECH STR SADDLE SUPPORT 0.3 17-Jan-17 18-Jul-17 31-Jan-17 14-Oct-15 7-Feb-17 12-Feb-19 14-Feb-17 19-Feb-19 28-Feb-17 26-Feb-19 15-May-19 26-Feb-19 100% 100.0%
A545-101-16-48-30411 E C TECH STR-1 R/F DET. OF FDN. 0.3 19-Jun-15 20-Jul-15 3-Jul-15 14-Oct-15 10-Jul-15 20-Oct-15 17-Jul-15 27-Oct-15 31-Jul-15 3-Nov-15 15-Oct-15 10-Nov-15 100% 100.0%
A545-101-16-48-10412 E C TECH STR-1 PLANS & ELEVATIONS 0.3 21-Jun-15 8-May-15 4-Jul-15 15-May-15 11-Jul-15 22-May-15 18-Jul-15 29-May-15 2-Aug-15 12-Jun-15 16-Oct-15 30-Dec-15 100% 100.0%
A545-101-81-41-10418 E C TECH STR-1 STAIRCASE 0.3 3-Jul-15 27-Jul-15 17-Jul-15 4-Jan-16 24-Jul-15 7-Jan-16 31-Jul-15 16-Jan-16 14-Aug-15 22-Jan-16 29-Oct-15 8-Feb-16 100% 100.0%
A545-101-16-48-30421 E C TECH STR-2 R/F DET. OF FDN. 0.3 7-Jul-15 20-Jul-15 21-Jul-15 28-Jul-15 28-Jul-15 1-Aug-15 4-Aug-15 6-Aug-15 18-Aug-15 10-Aug-15 2-Nov-15 20-Aug-15 100% 100.0%
A545-101-16-48-10422 E C TECH STR-2 PLANS & ELEVATIONS 0.3 9-Jul-15 8-May-15 23-Jul-15 15-May-15 30-Jul-15 22-May-15 6-Aug-15 29-May-15 20-Aug-15 12-Jun-15 4-Nov-15 28-Jul-15 100% 100.0%
A545-101-81-41-10428 E C TECH STR-2 STAIRCASE 0.3 21-Jul-15 27-Jul-15 4-Aug-15 1-Jan-16 11-Aug-15 8-Jan-16 18-Aug-15 15-Jan-16 1-Sep-15 22-Jan-16 16-Nov-15 8-Feb-16 100% 100.0%
A545-101-16-48-30431 E C TECH STR-3 R/F DET. OF FDN 0.3 25-Jul-15 20-Jul-15 8-Aug-15 20-Aug-15 15-Aug-15 27-Aug-15 22-Aug-15 3-Sep-15 5-Sep-15 10-Sep-15 20-Nov-15 17-Sep-15 100% 100.0%
A545-101-16-48-10432 E C TECH STR-3 PLANS & ELEVATIONS 0.9 27-Jul-15 1-Jun-15 10-Aug-15 8-Jun-15 17-Aug-15 15-Jun-15 24-Aug-15 22-Jun-15 7-Sep-15 9-Sep-15 22-Nov-15 16-Sep-15 100% 100.0%
A545-101-81-41-10438 E C TECH STR-3 STAIRCASE 0.3 8-Aug-15 27-Jul-15 22-Aug-15 22-Dec-15 29-Aug-15 29-Dec-15 5-Sep-15 5-Jan-16 19-Sep-15 12-Jan-16 5-Dec-15 19-Jan-16 100% 100.0%
A545-101-16-48-10441 E C TECH STR-4 R/F DET. OF FDN 0.3 12-Aug-15 31-Jul-15 26-Aug-15 6-Oct-15 2-Sep-15 20-Oct-15 9-Sep-15 27-Oct-15 23-Sep-15 3-Nov-15 9-Dec-15 10-Nov-15 100% 100.0%
A545-101-16-48-00442 E C TECH STR-4 PLANS 0.3 14-Aug-15 30-May-15 28-Aug-15 13-Jun-15 4-Sep-15 20-Jun-15 11-Sep-15 27-Jun-15 25-Sep-15 31-Dec-15 11-Dec-15 13-Jan-16 100% 100.0%
A545-101-16-48-00443 TO
E C TECH STR-4 ELEVATIONS (SHEET 1 TO 2) 0.3 20-Aug-15 30-May-15 3-Sep-15 13-Jun-15 10-Sep-15 20-Jun-15 17-Sep-15 27-Jun-15 1-Oct-15 31-Dec-15 17-Dec-15 13-Jan-16 100% 100.0%
00444
A545-101-81-41-10448 E C TECH STR-4 STAIRCASE 0.3 26-Aug-15 27-Jul-15 9-Sep-15 4-Jan-16 16-Sep-15 7-Jan-16 23-Sep-15 16-Jan-16 7-Oct-15 15-Jan-16 23-Dec-15 22-Jan-16 100% 100.0%
A545-101-16-48-30451 R C TECH STR-5 R/F DET. OF FDN 0.3 30-Aug-15 20-Jul-15 12-Sep-15 10-Sep-15 19-Sep-15 17-Sep-15 26-Sep-15 24-Sep-15 10-Oct-15 1-Oct-15 26-Dec-15 8-Oct-15 100% 100.0%
A545-101-16-48-00452 R C TECH STR-5 PLANS 0.9 1-Sep-15 30-May-15 15-Sep-15 13-Jun-15 22-Sep-15 20-Jun-15 29-Sep-15 27-Jun-15 13-Oct-15 2-Nov-15 29-Dec-15 9-Nov-15 100% 100.0%
A545-101-81-41-00453 R C TECH STR-5 ELEVATION ALONG GRIDS B1 &C1 0.9 7-Sep-15 30-May-15 21-Sep-15 13-Jun-15 28-Sep-15 20-Jun-15 5-Oct-15 27-Jun-15 19-Oct-15 2-Nov-15 4-Jan-16 9-Nov-15 100% 100.0%
A545-101-81-41-10458 R C TECH STR-5 STAIRCASE 0.3 13-Sep-15 18-Dec-15 26-Sep-15 1-Jan-16 3-Oct-15 8-Jan-16 10-Oct-15 15-Jan-16 24-Oct-15 22-Jan-16 10-Feb-17 28-Oct-17 100% 100.0%
A545-101-81-41-10461 E C TECH STR-6 R/F DET. OF FDN 0.3 17-Sep-15 25-Jul-15 1-Oct-15 26-Oct-15 8-Oct-15 6-Nov-15 15-Oct-15 13-Nov-15 29-Oct-15 20-Nov-15 14-Jan-16 4-Dec-15 100% 100.0%
A545-101-16-48-00462 E C TECH STR-6 PLANS 0.6 19-Sep-15 5-Jun-15 3-Oct-15 19-Jun-15 10-Oct-15 26-Jun-15 17-Oct-15 3-Jul-15 31-Oct-15 20-Nov-15 16-Jan-16 4-Dec-15 100% 100.0%
A545-101-81-41-00465 E C TECH STR-5 R/F DETAIL OF BEAMS 0.3 22-Sep-15 28-Dec-17 6-Oct-15 11-Jan-18 13-Oct-15 18-Jan-18 20-Oct-15 25-Jan-18 3-Nov-15 1-Feb-18 19-Jan-16 13-Feb-18 100% 100.0%
A545-101-81-41-10468 E C TECH STR-6 STAIRCASE 0.3 1-Oct-15 27-Jul-15 15-Oct-15 1-Jan-16 22-Oct-15 8-Jan-16 29-Oct-15 15-Jan-16 12-Nov-15 22-Jan-16 9-Jun-17 28-Oct-17 100% 100.0%
A545-101-81-41-11471 E C TECH STR-7 GA & R/F DET. OF FDN 0.3 21-Sep-15 28-Dec-15 5-Oct-15 20-Feb-16 12-Oct-15 21-Mar-16 19-Oct-15 28-Mar-16 2-Nov-15 26-Sep-16 30-May-17 24-Jul-18 100% 100.0%
A545-101-81-41-11472 E C TECH STR-7 PLANS 0.3 23-Sep-15 8-Mar-16 7-Oct-15 22-Mar-16 14-Oct-15 29-Mar-16 21-Oct-15 5-Apr-16 4-Nov-15 12-Apr-16 1-Jun-17 10-Apr-17 100% 100.0%
A545-101-81-41-11473 E C TECH STR-7 PLANS 0.3 23-Sep-15 8-Mar-16 7-Oct-15 22-Mar-16 14-Oct-15 29-Mar-16 21-Oct-15 5-Apr-16 4-Nov-15 12-Apr-16 1-Jun-17 10-Apr-17 100% 100.0%
A545-101-81-41-11474 E C TECH STR-7 CROS SECTIONS 0.3 25-Sep-15 8-Mar-16 9-Oct-15 22-Mar-16 16-Oct-15 29-Mar-16 23-Oct-15 5-Apr-16 6-Nov-15 12-Apr-16 3-Jun-17 10-Apr-17 100% 100.0%
A545-101-81-41-11475 E C TECH STR-7 ELEVATIONS 0.3 28-Sep-15 8-Mar-16 12-Oct-15 22-Mar-16 19-Oct-15 29-Mar-16 26-Oct-15 5-Apr-16 9-Nov-15 12-Apr-16 6-Jun-17 10-Apr-17 100% 100.0%
A545-101-81-41-01478 E C TECH STR-7 STAIRCASE 0.3 5-Oct-15 13-Apr-17 19-Oct-15 27-Apr-17 26-Oct-15 4-May-17 2-Nov-15 11-May-17 16-Nov-15 18-May-17 13-Jun-17 18-May-17 100% 100.0%
A545-101-16-48-30501 E C FDN. FOR 101-CC-1001 0.1 11-May-15 4-Feb-15 25-May-15 18-Feb-15 1-Jun-15 25-Feb-15 8-Jun-15 4-Mar-15 22-Jun-15 5-Jun-15 7-Sep-15 19-Jun-15 100% 100.0%
A545-101-16-48-30502 E C FDN FOR 101-CC-1002 0.1 16-May-15 23-Jan-15 30-May-15 6-Feb-15 6-Jun-15 13-Feb-15 13-Jun-15 20-Feb-15 27-Jun-15 5-Jun-15 12-Sep-15 19-Jun-15 100% 100.0%
A545-101-16-48-30504 E C FDN FOR 101-CC-1004 0.1 26-May-15 23-Jan-15 9-Jun-15 6-Feb-15 16-Jun-15 13-Feb-15 23-Jun-15 20-Feb-15 7-Jul-15 5-Jun-15 22-Sep-15 19-Jun-15 100% 100.0%
A545-101-16-48-30505 R C FDN FOR 101-CC-1005 0.1 31-May-15 23-Jan-15 15-Jun-15 6-Feb-15 22-Jun-15 13-Feb-15 29-Jun-15 20-Feb-15 13-Jul-15 5-Jun-15 28-Sep-15 19-Jun-15 100% 100.0%
A545-101-16-48-30506 E C FDN FOR 102-CC-1001 0.1 5-Jun-15 3-Feb-15 19-Jun-15 17-Feb-15 26-Jun-15 24-Feb-15 3-Jul-15 3-Mar-15 17-Jul-15 5-Jun-15 2-Oct-15 19-Jun-15 100% 100.0%
A545-101-16-48-30507 E C FDN FOR 102-CC-1002 0.1 10-Jun-15 3-Feb-15 24-Jun-15 17-Feb-15 1-Jul-15 24-Feb-15 8-Jul-15 3-Mar-15 22-Jul-15 5-Jun-15 7-Oct-15 19-Jun-15 100% 100.0%
A545-101-16-48-30508 E C FDN FOR 102-CC-1003, 102-VV-1005,102-VV-1006 0.1 15-Jun-15 3-Feb-15 29-Jun-15 17-Feb-15 6-Jul-15 24-Feb-15 13-Jul-15 3-Mar-15 27-Jul-15 5-Jun-15 12-Oct-15 19-Jun-15 100% 100.0%
A545-101-16-48-30509 E C FDN FOR 102-CC-1004 0.1 20-Jun-15 3-Feb-15 4-Jul-15 17-Feb-15 11-Jul-15 24-Feb-15 18-Jul-15 3-Mar-15 1-Aug-15 5-Jun-15 17-Oct-15 19-Jun-15 100% 100.0%
A545-101-16-48-30510 E C FDN FOR 102-CC-1005 0.1 25-Jun-15 3-Feb-15 9-Jul-15 17-Feb-15 16-Jul-15 24-Feb-15 23-Jul-15 3-Mar-15 6-Aug-15 19-Jun-15 22-Oct-15 13-Jan-16 100% 100.0%
A545-101-16-48-30515 E C FDN FOR 100-VV-1008 0.1 14-Apr-15 25-Jul-15 28-Apr-15 5-Aug-15 5-May-15 12-Aug-15 12-May-15 19-Aug-15 26-May-15 7-Oct-15 11-Aug-15 13-Jan-16 100% 100.0%
A545-101-16-48-30516 E C FDN FOR 100-VV-1009 0.1 19-Apr-15 29-Jul-15 2-May-15 5-Aug-15 9-May-15 12-Aug-15 16-May-15 19-Aug-15 30-May-15 7-Oct-15 15-Aug-15 7-Oct-15 100% 100.0%
A545-101-16-48-30517 E C FDN FOR 100-VV-1010 0.1 24-Apr-15 29-Jul-15 8-May-15 30-Jul-15 15-May-15 6-Aug-15 22-May-15 13-Aug-15 5-Jun-15 7-Oct-15 21-Aug-15 7-Oct-15 100% 100.0%
A545-101-16-48-30518 E C FDN FOR 100-VV-1013 0.1 29-Apr-15 31-Jul-15 13-May-15 30-Jul-15 20-May-15 6-Aug-15 27-May-15 13-Aug-15 10-Jun-15 31-Aug-15 26-Aug-15 31-Aug-15 100% 100.0%
A545-101-16-48-30519 E C FDN FOR 100-VV-1014 0.1 4-May-15 31-Jul-15 18-May-15 30-Jul-15 25-May-15 6-Aug-15 1-Jun-15 13-Aug-15 15-Jun-15 31-Aug-15 31-Aug-15 31-Aug-15 100% 100.0%
A545-101-16-48-30520 E C FDN FOR 100-VV-1017 0.1 9-May-15 31-Jul-15 23-May-15 31-Jul-15 30-May-15 7-Aug-15 6-Jun-15 14-Aug-15 20-Jun-15 31-Aug-15 5-Sep-15 31-Aug-15 100% 100.0%
A545-101-16-48-30526 R C FDN FOR 101-VV-1001A/B, 1002A/B 0.1 29-May-15 7-Sep-15 12-Jun-15 21-Sep-15 19-Jun-15 28-Sep-15 26-Jun-15 5-Oct-15 10-Jul-15 20-Nov-15 25-Sep-15 4-Dec-15 100% 100.0%
A545-101-16-48-30533 R C FDN FOR 101-VV-1006 0.1 3-Jul-15 23-Feb-15 17-Jul-15 9-Mar-15 24-Jul-15 16-Mar-15 31-Jul-15 23-Mar-15 14-Aug-15 5-Jun-15 30-Oct-15 19-Jun-15 100% 100.0%
A545-101-16-48-30534 E C GA & R/F Details of FDN for 101-VV-1021/1022/1023 0.1 13-Jul-15 13-Feb-18 27-Jul-15 27-Feb-18 3-Aug-15 6-Mar-18 10-Aug-15 13-Mar-18 24-Aug-15 20-Mar-18 9-Nov-15 28-Aug-18 100% 100.0%
A545-101-16-48-30542 E C FDN FOR 102-VV-1009 0.1 7-Aug-15 23-Feb-15 21-Aug-15 9-Mar-15 28-Aug-15 16-Mar-15 4-Sep-15 23-Mar-15 18-Sep-15 5-Jun-15 4-Dec-15 19-Jun-15 100% 100.0%
A545-101-16-48-30543 E C FDN FOR 102-VV-1010 0.1 12-Aug-15 17-Jul-15 26-Aug-15 31-Jul-15 2-Sep-15 7-Aug-15 9-Sep-15 14-Aug-15 23-Sep-15 20-Aug-15 9-Dec-15 3-Sep-15 100% 100.0%
A545-101-81-41-11301 E C STAIRCASE OF BPR-1/6 GA & R/F DET OF FDN 0.1 17-Aug-15 11-Sep-18 31-Aug-15 25-Sep-18 7-Sep-15 2-Oct-18 14-Sep-15 9-Oct-18 28-Sep-15 16-Oct-18 5-Apr-19 16-Oct-18 100% 100.0%
A545-101-16-48-30545 E C FDN FOR 102-VV-1012A/B 0.1 18-Aug-15 23-Feb-15 1-Sep-15 9-Mar-15 8-Sep-15 16-Mar-15 15-Sep-15 23-Mar-15 29-Sep-15 20-Aug-15 15-Dec-15 3-Sep-15 100% 100.0%
A545-101-81-41-30535 E C FDN FOR 102-VV-1002 0.1 18-Aug-17 16-Apr-18 1-Sep-17 30-Apr-18 8-Sep-17 7-May-18 15-Sep-17 14-May-18 29-Sep-17 21-May-18 4-Apr-19 21-May-18 100% 100.0%
A545-101-16-48-00546 E C FDN FOR U/G PIT FOR 100-VV-1002/1003 0.3 22-Aug-15 10-Sep-15 5-Sep-15 24-Sep-15 12-Sep-15 1-Oct-15 19-Sep-15 8-Oct-15 3-Oct-15 5-Dec-15 2-May-17 22-Aug-17 100% 100.0%
A545-101-16-48-00548 E C GA DETAIL FOR U/G PIT FOR 100-VV-1022 0.3 1-Sep-15 9-Sep-15 15-Sep-15 23-Sep-15 22-Sep-15 30-Sep-15 29-Sep-15 7-Oct-15 13-Oct-15 5-Dec-15 12-May-17 22-Aug-17 100% 100.0%
A545-101-16-48-30554 E C FDN FOR 101-EE-1002A/B/C/D 0.1 4-May-15 27-Apr-16 18-May-15 4-May-16 25-May-15 11-May-16 1-Jun-15 18-May-16 15-Jun-15 8-Jun-16 12-Jan-17 22-Aug-17 100% 100.0%
A545-101-16-48-30555 E C FDN FOR 101-EE-1003A/B/C/D 0.1 7-May-15 25-Mar-15 21-May-15 8-Apr-15 28-May-15 29-Aug-16 4-Jun-15 5-Sep-16 18-Jun-15 12-Sep-16 15-Jan-17 22-Aug-17 100% 100.0%
A545-101-16-48-30556 E C FDN FOR 101-EE-1004A/B/C/D 0.1 10-May-15 27-Apr-16 24-May-15 4-May-16 31-May-15 11-May-16 7-Jun-15 18-May-16 21-Jun-15 8-Jun-16 18-Jan-17 22-Aug-17 100% 100.0%
A545-101-16-48-30557 E C FDN FOR 101-EE-1005A/B/C/D 0.1 13-May-15 18-Aug-16 27-May-15 25-Aug-16 3-Jun-15 1-Sep-16 10-Jun-15 8-Sep-16 24-Jun-15 15-Sep-16 21-Jan-17 22-Aug-17 100% 100.0%
A545-101-16-48-30558 E C FDN FOR 101-EE-1006A/B 0.1 16-May-15 27-Apr-16 30-May-15 4-May-16 6-Jun-15 11-May-16 13-Jun-15 18-May-16 27-Jun-15 17-Jun-16 24-Jan-17 24-Aug-18 100% 100.0%
A545-101-16-48-30559 E C FDN FOR 101-EE-1007A/B 0.1 19-May-15 27-Apr-16 2-Jun-15 4-May-16 9-Jun-15 11-May-16 16-Jun-15 18-May-16 30-Jun-15 17-Jun-16 27-Jan-17 24-Aug-18 100% 100.0%
A545-101-16-48-30560 E C FDN FOR 101-EE-1008A/B/C/D 0.1 22-May-15 27-Apr-16 5-Jun-15 4-May-16 12-Jun-15 11-May-16 19-Jun-15 18-May-16 3-Jul-15 17-Jun-16 30-Jan-17 24-Aug-18 100% 100.0%
A545-101-16-48-30561 R C FDN FOR 101-EE-1009 A-H 0.1 25-May-15 27-Apr-16 8-Jun-15 4-May-16 15-Jun-15 11-May-16 22-Jun-15 18-May-16 6-Jul-15 8-Jun-16 2-Feb-17 24-Aug-18 100% 100.0%
A545-101-16-48-30562 R C FDN FOR 101-EE-1010A/B/C/D 0.1 28-May-15 27-Apr-16 11-Jun-15 4-May-16 18-Jun-15 11-May-16 25-Jun-15 18-May-16 9-Jul-15 8-Jun-16 5-Feb-17 24-Aug-18 100% 100.0%
A545-101-16-48-30563 R C FDN FOR 101-EE-1011A/B 0.1 31-May-15 20-May-16 14-Jun-15 27-May-16 21-Jun-15 3-Jun-16 28-Jun-15 10-Jun-16 12-Jul-15 17-Jun-16 8-Feb-17 21-Feb-18 100% 100.0%
A545-101-16-48-30564 R C FDN FOR 101-EE-1012A TO H 0.1 3-Jun-15 27-Apr-16 17-Jun-15 4-May-16 24-Jun-15 11-May-16 1-Jul-15 18-May-16 15-Jul-15 17-Jun-16 11-Feb-17 28-Aug-18 100% 100.0%
A545-101-16-48-30565 R C FDN FOR 101-EE-1013A TO H 0.1 6-Jun-15 27-Apr-16 20-Jun-15 4-May-16 27-Jun-15 11-May-16 4-Jul-15 18-May-16 18-Jul-15 13-Jun-16 14-Feb-17 28-Aug-18 100% 100.0%
A545-101-16-48-30568 E C FDN FOR 101-EE-1016 0.1 15-Jun-15 15-May-15 29-Jun-15 22-May-15 6-Jul-15 29-May-15 13-Jul-15 5-Jun-15 27-Jul-15 22-Sep-15 12-Oct-15 6-Oct-15 100% 100.0%
A545-101-16-48-30569 E C FDN FOR 101-EE-1017 0.1 18-Jun-15 15-May-15 2-Jul-15 22-May-15 9-Jul-15 29-May-15 16-Jul-15 5-Jun-15 30-Jul-15 22-Sep-15 15-Oct-15 6-Oct-15 100% 100.0%
A545-101-81-41-30570 R C FDN FOR 101-EE-1020 0.1 20-Jun-15 27-Apr-16 4-Jul-15 4-May-16 11-Jul-15 11-May-16 18-Jul-15 18-May-16 1-Aug-15 20-Jun-16 28-Feb-17 28-Aug-18 100% 100.0%
A545-101-16-48-30572 E C FDN FOR 101-EE-1023 0.1 27-Jun-15 27-Apr-16 11-Jul-15 4-May-16 18-Jul-15 11-May-16 25-Jul-15 18-May-16 8-Aug-15 20-Jun-16 7-Mar-17 29-Aug-18 100% 100.0%
A545-101-16-48-30573 E C FDN FOR 101-EE-1021 0.1 30-Jun-15 17-Jul-15 14-Jul-15 31-Jul-15 21-Jul-15 7-Aug-15 28-Jul-15 14-Aug-15 11-Aug-15 22-Sep-15 27-Oct-15 6-Oct-15 100% 100.0%
A545-101-16-48-30575 R C FDN FOR 101-EE-1022 0.1 2-Jul-15 15-May-15 16-Jul-15 22-May-15 23-Jul-15 29-May-15 30-Jul-15 5-Jun-15 13-Aug-15 22-Sep-15 29-Oct-15 6-Oct-15 100% 100.0%
A545-101-81-41-30674 E C GA & R/F DET OF FDN & 101-LZ-1011 0.1 9-Jul-15 7-Sep-18 16-Jul-15 14-Sep-18 23-Jul-15 21-Sep-18 30-Jul-15 28-Sep-18 13-Aug-15 5-Oct-18 21-May-19 5-Oct-18 100% 100.0%
A545-101-16-48-30577 E C FDN FOR 102-EE-1003 A/B 0.1 11-Jul-15 15-May-15 25-Jul-15 22-May-15 1-Aug-15 29-May-15 8-Aug-15 5-Jun-15 22-Aug-15 22-Sep-15 7-Nov-15 6-Oct-15 100% 100.0%
A545-101-16-48-30578 E C FDN FOR 102-EE-1005 0.1 15-Jul-15 1-May-15 29-Jul-15 15-May-15 5-Aug-15 22-May-15 12-Aug-15 29-May-15 26-Aug-15 22-Sep-15 11-Nov-15 6-Oct-15 100% 100.0%
A545-101-16-48-30579 E C FDN FOR 102-EE-1006A/B/C/D 0.1 18-Jul-15 17-Jul-15 1-Aug-15 31-Jul-15 8-Aug-15 7-Aug-15 15-Aug-15 14-Aug-15 29-Aug-15 21-Sep-15 14-Nov-15 5-Oct-15 100% 100.0%
A545-101-16-48-30581 TO
E C FDN DWG FOR SKIDS 0.2 28-Jan-17 18-Jul-17 23-Mar-19 - 30-Mar-19 - 6-Apr-19 - 20-Apr-19 - 22-May-19 - 100% 70.0%
30584
A545-101-16-48-30591 E C FDN FOR 101-WG-1001A/B 0.1 5-Dec-16 20-Jul-17 19-Mar-19 25-Feb-19 26-Mar-19 4-Mar-19 2-Apr-19 11-Mar-19 16-Apr-19 18-Mar-19 18-May-19 18-Mar-19 100% 100.0%
A545-101-16-48-30598 E C FDN FOR 103-GN-1001A/B 0.1 21-Jan-17 22-Jul-17 4-Feb-17 9-Oct-18 11-Feb-17 16-Oct-18 18-Feb-17 23-Oct-18 4-Mar-17 30-Oct-18 20-May-19 30-Oct-18 100% 100.0%
A545-101-16-48-30601 E C FDN FOR PUMPS 101-PA-1001A/B/C/D 0.0 19-Dec-15 27-May-16 2-Jan-16 3-Jun-16 9-Jan-16 10-Jun-16 16-Jan-16 17-Jun-16 14-Feb-17 26-Jun-18 2-May-17 12-Nov-18 100% 100.0%
A545-101-16-48-30602 E C FDN FOR PUMPS 101-PA-1002A/B/C/D 0.0 21-Dec-15 27-May-16 4-Jan-16 3-Jun-16 11-Jan-16 10-Jun-16 18-Jan-16 17-Jun-16 16-Feb-17 28-Dec-18 4-May-19 28-Dec-18 100% 100.0%
A545-101-16-48-30603 E C FDN FOR PUMPS 101-PA-1003A/B/C 0.0 23-Dec-15 27-May-16 6-Jan-16 3-Jun-16 13-Jan-16 10-Jun-16 20-Jan-16 17-Jun-16 18-Feb-17 11-May-18 6-May-17 1-Aug-18 100% 100.0%
A545-101-16-48-30604 E C FDN FOR PUMPS 101-PA-1004A/B 0.0 25-Dec-15 27-May-16 8-Jan-16 3-Jun-16 15-Jan-16 10-Jun-16 22-Jan-16 17-Jun-16 20-Feb-17 11-May-18 8-May-17 1-Aug-18 100% 100.0%
A545-101-16-48-30605 E C FDN FOR PUMPS 101-PA-1005A/B/C 0.0 27-Dec-15 27-May-16 10-Jan-16 3-Jun-16 17-Jan-16 10-Jun-16 24-Jan-16 17-Jun-16 22-Feb-17 9-Aug-18 10-Apr-19 9-Aug-18 100% 100.0%
A545-101-16-48-30606 E C FDN FOR PUMPS 101-PA-1006A/B 0.0 29-Dec-15 27-May-16 12-Jan-16 3-Jun-16 19-Jan-16 10-Jun-16 26-Jan-16 17-Jun-16 24-Feb-17 21-Sep-18 12-Apr-19 21-Sep-18 100% 100.0%
A545-101-16-48-30607 E C FDN FOR PUMPS 101-PA-1007A/B/C 0.0 31-Dec-15 27-May-16 14-Jan-16 3-Jun-16 21-Jan-16 10-Jun-16 28-Jan-16 17-Jun-16 25-Feb-17 9-Aug-18 13-Apr-19 9-Aug-18 100% 100.0%
A545-101-16-48-30608 E C FDN FOR PUMPS 101-PA-1008A/B 0.0 2-Jan-16 27-May-16 16-Jan-16 3-Jun-16 23-Jan-16 10-Jun-16 30-Jan-16 17-Jun-16 28-Feb-17 18-Sep-18 16-Apr-19 18-Sep-18 100% 100.0%
A545-101-16-48-30609 E C FDN FOR PUMPS 101-PA-1009A/B/C 0.0 4-Jan-16 27-May-16 18-Jan-16 3-Jun-16 25-Jan-16 10-Jun-16 1-Feb-16 17-Jun-16 2-Mar-17 9-Aug-18 18-Apr-19 9-Aug-18 100% 100.0%
A545-101-16-48-30610 E C FDN FOR PUMPS 101-PA-1010A/B 0.0 6-Jan-16 27-May-16 20-Jan-16 3-Jun-16 27-Jan-16 10-Jun-16 3-Feb-16 17-Jun-16 4-Mar-17 28-Dec-18 20-Apr-19 28-Dec-18 100% 100.0%
A545-101-16-48-30611 E C FDN FOR PUMPS 101-PA-1011A/B/C 0.0 8-Jan-16 27-May-16 22-Jan-16 3-Jun-16 29-Jan-16 10-Jun-16 5-Feb-16 17-Jun-16 6-Mar-17 27-Aug-18 22-Apr-19 27-Aug-18 100% 100.0%
A545-101-16-48-30612 E C FDN FOR PUMPS 101-PA-1012A/B 0.0 10-Jan-16 27-May-16 24-Jan-16 3-Jun-16 31-Jan-16 10-Jun-16 7-Feb-16 17-Jun-16 8-Mar-17 12-Oct-18 24-Apr-19 12-Oct-18 100% 100.0%
A545-101-16-48-30613 E C FDN FOR PUMPS 101-PA-1013A/B 0.0 12-Jan-16 27-May-16 26-Jan-16 3-Jun-16 2-Feb-16 10-Jun-16 9-Feb-16 17-Jun-16 10-Mar-17 25-Apr-18 26-Apr-19 25-Apr-18 100% 100.0%
A545-101-16-48-30614 E C FDN FOR PUMPS 101-PA-1014A/B 0.0 14-Jan-16 27-May-16 28-Jan-16 3-Jun-16 4-Feb-16 10-Jun-16 11-Feb-16 17-Jun-16 11-Mar-17 12-Oct-18 27-Apr-19 12-Oct-18 100% 100.0%
A545-101-16-48-30615 E C FDN FOR PUMPS 101-PA-1015A/B 0.0 16-Jan-16 27-May-16 30-Jan-16 3-Jun-16 6-Feb-16 10-Jun-16 13-Feb-16 17-Jun-16 14-Mar-17 25-Apr-18 30-Apr-19 25-Apr-18 100% 100.0%
A545-101-16-48-30616 E C FDN FOR PUMPS 101-PA-1016A/B 0.0 18-Jan-16 30-May-16 1-Feb-16 6-Jun-16 8-Feb-16 13-Jun-16 15-Feb-16 20-Jun-16 16-Mar-17 15-Nov-18 2-May-19 15-Nov-18 100% 100.0%
A545-101-16-48-30617 E C FDN FOR PUMPS 101-PA-1017A/B 0.0 20-Jan-16 30-May-16 3-Feb-16 6-Jun-16 10-Feb-16 13-Jun-16 17-Feb-16 20-Jun-16 18-Mar-17 15-Nov-18 4-May-19 15-Nov-18 100% 100.0%
A545-101-16-48-30618 E C FDN FOR PUMPS 101-PA-1018A/B 0.0 22-Jan-16 30-May-16 5-Feb-16 6-Jun-16 12-Feb-16 13-Jun-16 19-Feb-16 20-Jun-16 20-Mar-17 21-Sep-18 6-May-19 21-Sep-18 100% 100.0%
A545-101-16-48-30619 E C FDN FOR PUMPS 101-PA-1019A/B 0.0 24-Jan-16 30-May-16 7-Feb-16 6-Jun-16 14-Feb-16 13-Jun-16 21-Feb-16 20-Jun-16 22-Mar-17 26-Apr-18 8-May-19 26-Apr-18 100% 100.0%
A545-101-16-48-30620 E C FDN FOR PUMPS 101-PA-1020A/B 0.0 26-Jan-16 30-May-16 9-Feb-16 6-Jun-16 16-Feb-16 13-Jun-16 23-Feb-16 20-Jun-16 24-Mar-17 27-Aug-18 10-May-19 27-Aug-18 100% 100.0%
A545-101-16-48-30621 E C FDN FOR PUMPS 101-PA-1021A/B 0.0 28-Jan-16 30-May-16 11-Feb-16 6-Jun-16 18-Feb-16 13-Jun-16 25-Feb-16 20-Jun-16 25-Mar-17 26-Apr-18 11-May-19 26-Apr-18 100% 100.0%
A545-101-16-48-30623 E C FDN FOR PUMPS 102-PA-1002A/B 0.0 1-Feb-16 30-May-16 15-Feb-16 6-Jun-16 22-Feb-16 13-Jun-16 29-Feb-16 20-Jun-16 30-Mar-17 22-Nov-18 16-May-19 22-Nov-18 100% 100.0%
A545-101-16-48-30624 E C FDN FOR PUMPS 102-PA-1003A/B 0.0 3-Feb-16 30-May-16 17-Feb-16 6-Jun-16 24-Feb-16 13-Jun-16 2-Mar-16 20-Jun-16 1-Apr-17 18-Sep-18 18-May-19 18-Sep-18 100% 100.0%
A545-101-16-48-30625 E C FDN FOR PUMPS 102-PA-1004A/B 0.0 5-Feb-16 30-May-16 19-Feb-16 6-Jun-16 26-Feb-16 13-Jun-16 4-Mar-16 20-Jun-16 3-Apr-17 18-Sep-18 20-May-19 18-Sep-18 100% 100.0%
A545-101-16-48-30627 E C FDN FOR PUMPS 102-PA-1006A/B 0.0 9-Feb-16 30-May-16 23-Feb-16 6-Jun-16 1-Mar-16 13-Jun-16 8-Mar-16 20-Jun-16 7-Apr-17 18-Sep-18 4-May-19 18-Sep-18 100% 100.0%
A545-101-16-48-30629 E C FDN FOR PUMPS 102-PA-1008A/B 0.0 13-Feb-16 30-May-16 27-Feb-16 6-Jun-16 5-Mar-16 13-Jun-16 12-Mar-16 20-Jun-16 11-Apr-17 4-May-18 8-May-19 4-May-18 100% 100.0%
A545-101-16-48-30631 E C FDN FOR PUMPS 102-PA-1010A/B 0.0 17-Feb-16 30-May-16 2-Mar-16 6-Jun-16 9-Mar-16 13-Jun-16 16-Mar-16 20-Jun-16 15-Apr-17 12-Oct-18 12-May-19 12-Oct-18 100% 100.0%
A545-101-16-48-30632 E C FDN FOR PUMPS 102-PA-1011A/B 0.0 19-Feb-16 30-May-16 4-Mar-16 6-Jun-16 11-Mar-16 13-Jun-16 18-Mar-16 20-Jun-16 17-Apr-17 11-May-18 3-Jul-19 9-Jul-18 100% 100.0%
A545-101-16-48-30634 E C FDN FOR PUMPS 102-PA-1013A/B 0.0 23-Feb-16 30-May-16 8-Mar-16 6-Jun-16 15-Mar-16 13-Jun-16 22-Mar-16 20-Jun-16 21-Apr-17 11-May-18 18-Apr-19 11-May-18 100% 100.0%
A545-101-81-41-30635 E C FDN FOR PUMPS 103-PA-1001A/B 0.0 25-Feb-16 30-May-16 10-Mar-16 6-Jun-16 17-Mar-16 13-Jun-16 24-Mar-16 20-Jun-16 22-Apr-17 4-May-18 19-Apr-19 4-May-18 100% 100.0%
A545-101-16-48-30636 E C FDN FOR PUMPS 103-PA-1002A/B 0.0 27-Feb-16 30-May-16 12-Mar-16 6-Jun-16 19-Mar-16 13-Jun-16 26-Mar-16 20-Jun-16 25-Apr-17 4-May-18 22-Apr-19 4-May-18 100% 100.0%
A545-101-16-48-30637 E C FDN FOR PUMPS 103-PA-1003A/B 0.0 29-Feb-16 30-May-16 14-Mar-16 6-Jun-16 21-Mar-16 13-Jun-16 28-Mar-16 20-Jun-16 27-Apr-17 4-May-18 24-Apr-19 4-May-18 100% 100.0%
A545-101-16-48-30638 E C FDN FOR PUMPS 103-PA-1004 0.0 2-Mar-16 30-May-16 16-Mar-16 6-Jun-16 23-Mar-16 13-Jun-16 30-Mar-16 20-Jun-16 29-Apr-17 11-May-18 26-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30639 E C FDN FOR PUMPS 103-PA-1005A/B 0.0 4-Mar-16 30-May-16 18-Mar-16 6-Jun-16 25-Mar-16 13-Jun-16 1-Apr-16 20-Jun-16 1-May-17 11-May-18 28-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30640 E C FDN FOR PUMPS 103-PA-1006A/B 0.0 6-Mar-16 30-May-16 20-Mar-16 6-Jun-16 27-Mar-16 13-Jun-16 3-Apr-16 20-Jun-16 3-May-17 11-May-18 30-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30641 E C FDN FOR PUMPS 103-PA-1007A/B 0.0 8-Mar-16 31-May-16 22-Mar-16 7-Jun-16 29-Mar-16 14-Jun-16 5-Apr-16 21-Jun-16 5-May-17 4-May-18 2-May-19 4-May-18 100% 100.0%
A545-101-16-48-30642 E C FDN FOR PUMPS 103-PA-1008A/B 0.0 10-Mar-16 31-May-16 24-Mar-16 7-Jun-16 31-Mar-16 14-Jun-16 7-Apr-16 21-Jun-16 6-May-17 11-May-18 3-May-19 11-May-18 100% 100.0%
A545-101-81-41-30672 E C FDN FOR PUMPS 103-PA-1010A/S 0.0 14-Mar-16 31-May-16 28-Mar-16 7-Jun-16 4-Apr-16 14-Jun-16 11-Apr-16 21-Jun-16 11-May-17 5-Jun-18 8-May-19 5-Jun-18 100% 100.0%
A545-101-16-48-30645 E C FDN FOR PUMPS 103-PA-1011A/B 0.0 16-Mar-16 31-May-16 30-Mar-16 7-Jun-16 6-Apr-16 14-Jun-16 13-Apr-16 21-Jun-16 13-May-17 4-May-18 29-Jul-17 11-May-18 100% 100.0%
A545-101-16-48-30646 E C FDN FOR PUMPS 103-PA-1012A/B 0.0 18-Mar-16 31-May-16 1-Apr-16 7-Jun-16 8-Apr-16 14-Jun-16 15-Apr-16 21-Jun-16 15-May-17 11-May-18 12-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30647 E C FDN FOR PUMPS 103-PA-1013A/B 0.0 20-Mar-16 31-May-16 3-Apr-16 7-Jun-16 10-Apr-16 14-Jun-16 17-Apr-16 21-Jun-16 17-May-17 11-May-18 14-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30648 E C FDN FOR PUMPS 104-PA-1001A/B/C 0.0 22-Mar-16 31-May-16 5-Apr-16 7-Jun-16 12-Apr-16 14-Jun-16 19-Apr-16 21-Jun-16 19-May-17 11-May-18 16-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30649 E C FDN FOR PUMPS 104-PA-1002A/B 0.0 24-Mar-16 31-May-16 7-Apr-16 7-Jun-16 14-Apr-16 14-Jun-16 21-Apr-16 21-Jun-16 20-May-17 11-May-18 17-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30650 E C FDN FOR PUMPS 104-PA-1003A/B 0.0 26-Mar-16 31-May-16 9-Apr-16 7-Jun-16 16-Apr-16 14-Jun-16 23-Apr-16 21-Jun-16 23-May-17 11-May-18 20-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30651 E C FDN FOR PUMPS 104-PA-1004A/B/C/D 0.0 28-Mar-16 31-May-16 11-Apr-16 7-Jun-16 18-Apr-16 14-Jun-16 25-Apr-16 21-Jun-16 25-May-17 11-May-18 22-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30652 E C FDN FOR PUMPS 104-PA-1005A/B/C 0.0 30-Mar-16 31-May-16 13-Apr-16 7-Jun-16 20-Apr-16 14-Jun-16 27-Apr-16 21-Jun-16 27-May-17 11-May-18 24-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30653 E C FDN FOR PUMPS 104-PA-1006 0.0 1-Apr-16 31-May-16 15-Apr-16 7-Jun-16 22-Apr-16 14-Jun-16 29-Apr-16 21-Jun-16 29-May-17 11-May-18 26-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30654 E C FDN FOR PUMPS 104-PA-1007 0.0 3-Apr-16 31-May-16 17-Apr-16 7-Jun-16 24-Apr-16 14-Jun-16 1-May-16 21-Jun-16 31-May-17 11-May-18 28-Apr-19 11-May-18 100% 100.0%
A545-101-16-48-30655 E C FDN FOR PUMPS 104-PA-1008A/B/C 0.0 5-Apr-16 31-May-16 19-Apr-16 7-Jun-16 26-Apr-16 14-Jun-16 3-May-16 21-Jun-16 2-Jun-17 15-May-18 30-Apr-19 15-May-18 100% 100.0%
A545-101-81-41-01476 E C TS-07 GA & DET. FOR COLS AND TIE BEAMS 0.0 9-Apr-16 18-Sep-18 23-Apr-16 25-Sep-18 30-Apr-16 2-Oct-18 7-May-16 9-Oct-18 6-Jun-17 16-Oct-18 4-May-19 16-Oct-18 100% 100.0%
A545-101-16-48-30658 E C FDN FOR PUMPS 100-PA-1003A/B 0.0 11-Apr-16 31-May-16 25-Apr-16 7-Jun-16 2-May-16 14-Jun-16 9-May-16 21-Jun-16 8-Jun-17 9-Jun-18 6-May-19 9-Jun-18 100% 100.0%
A545-101-16-48-30659 E C FDN FOR PUMPS 100-PA-1004A/B 0.0 13-Apr-16 31-May-16 27-Apr-16 7-Jun-16 4-May-16 14-Jun-16 11-May-16 21-Jun-16 10-Jun-17 9-Jun-18 8-May-19 9-Jun-18 100% 100.0%
A545-101-81-41-01477 E C TS-07 GA & DET. BEAMS @ 110.500 M LVL 0.0 19-Apr-16 31-May-16 3-May-16 7-Jun-16 10-May-16 14-Jun-16 17-May-16 21-Jun-16 31-May-16 16-Oct-18 28-Apr-18 16-Oct-18 100% 100.0%
A545-101-16-48-30664 E C FDN FOR PUMPS 100-PA-1009A/B 0.0 23-Apr-16 31-May-16 7-May-16 7-Jun-16 14-May-16 14-Jun-16 21-May-16 21-Jun-16 20-Jun-17 12-Feb-19 18-May-19 12-Feb-19 100% 100.0%
A545-101-16-48-30665 E C FDN FOR PUMPS 100-PA-1010A/B 0.0 25-Apr-16 31-May-16 9-May-16 7-Jun-16 16-May-16 14-Jun-16 23-May-16 21-Jun-16 22-Jun-17 9-Jun-18 20-May-19 9-Jun-18 100% 100.0%
A545-101-16-48-30666 E C FDN FOR PUMPS 100-PA-1011A/B 0.0 27-Apr-16 31-May-16 11-May-16 7-Jun-16 18-May-16 14-Jun-16 25-May-16 21-Jun-16 24-Jun-17 4-May-18 22-May-19 4-May-18 100% 100.0%
A545-101-81-41-07339 E C HEATER PIPERACK ELEVATION AT GRID 60A 0.0 27-Apr-16 13-Nov-18 11-May-16 20-Nov-18 18-May-16 27-Nov-18 25-May-16 4-Dec-18 24-Jun-17 11-Dec-18 22-May-19 11-Dec-18 100.0%
A545-101-81-41-06326 E C BRANCH PIPE RACK 5 ELEVATION ON GRID 37, 38 0.0 27-Apr-16 30-Nov-18 11-May-16 7-Dec-18 18-May-16 14-Dec-18 25-May-16 21-Dec-18 24-Jun-17 28-Dec-18 22-May-19 28-Dec-18 100.0%
A545-101-81-41-04308 E C BRANCH PIPE RACK -8 & HPR INSERT PLATES 0.0 27-Apr-16 31-May-16 11-May-16 7-Jun-16 18-May-16 14-Jun-16 25-May-16 21-Jun-16 24-Jun-17 8-Nov-18 22-May-19 8-Nov-18 100% 100.0%
A545-101-81-41-31601 E C FDN FOR PUMPS 102-PA-1014A/B 0.0 29-Apr-16 31-May-16 13-May-16 7-Jun-16 20-May-16 14-Jun-16 27-May-16 21-Jun-16 26-Jun-17 4-May-18 24-Apr-19 4-May-18 100% 100.0%
A545-101-81-41-31602 E C FDN FOR PUMPS 102-PA-1015A/B 0.0 2-May-16 31-May-16 16-May-16 7-Jun-16 23-May-16 14-Jun-16 30-May-16 21-Jun-16 29-Jun-17 4-May-18 27-Apr-19 4-May-18 100% 100.0%
A545-101-81-41-31603 E C FDN FOR PUMPS 102-PA-1016A/B 0.0 4-May-16 31-May-16 18-May-16 7-Jun-16 25-May-16 14-Jun-16 1-Jun-16 21-Jun-16 1-Jul-17 18-Sep-18 29-Apr-19 18-Sep-18 100% 100.0%
A545-101-81-41-31604 E C FDN FOR PUMPS 102-PA-1018A/B 0.0 6-May-16 31-May-16 20-May-16 7-Jun-16 27-May-16 14-Jun-16 3-Jun-16 21-Jun-16 3-Jul-17 4-May-18 1-May-19 4-May-18 100% 100.0%
A545-101-81-41-31605 E C FDN FOR PUMPS 102-PA-1019A/B 0.0 9-May-16 31-May-16 23-May-16 7-Jun-16 30-May-16 14-Jun-16 6-Jun-16 21-Jun-16 6-Jul-17 4-May-18 4-May-19 4-May-18 100% 100.0%
A545-101-81-41-31606 E C FDN FOR PUMPS 102-PA-1020A/B 0.0 11-May-16 31-May-16 25-May-16 7-Jun-16 1-Jun-16 14-Jun-16 8-Jun-16 21-Jun-16 8-Jul-17 27-Aug-18 23-Sep-17 4-May-18 100% 100.0%
A545-101-81-41-31607 E C FDN FOR PUMPS 102-PA-1021A/B 0.0 13-May-16 31-May-16 27-May-16 7-Jun-16 3-Jun-16 14-Jun-16 10-Jun-16 21-Jun-16 10-Jul-17 4-May-18 8-May-19 4-May-18 100% 100.0%
A545-101-16-48-00701 TO
E C PLTF. & LADDER FOR 101-CC-1001 0.4 25-Jun-15 10-Oct-15 9-Jul-15 28-Dec-15 16-Jul-15 14-Jun-16 23-Jul-15 21-Jun-16 6-Aug-15 28-Jun-16 4-Apr-19 28-Jun-16 100% 100.0%
00703
A545-101-81-41-00770 /
E C PLTF. & LADDER FOR 101-CC-1001 0.3 25-Jun-15 10-Oct-15 9-Jul-15 28-Dec-15 16-Jul-15 14-Jun-16 23-Jul-15 21-Jun-16 6-Aug-15 28-Jun-16 4-Apr-19 28-Jun-16 100% 100.0%
00771
A545-101-81-41-00772 E C PLTF. & LADDER FOR 101-CC-1001 (SHT 6) 0.1 29-Jun-15 21-Feb-18 13-Jul-15 28-Feb-18 20-Jul-15 7-Mar-18 27-Jul-15 14-Mar-18 10-Aug-15 21-Mar-18 8-Apr-19 21-Mar-18 100% 100.0%
A545-101-81-41-00704 E C PLTF. & LADDER FOR 101-CC-1002 /1003 0.7 30-Jun-15 29-May-15 14-Jul-15 12-Jun-15 21-Jul-15 19-Jun-15 28-Jul-15 26-Jun-15 11-Aug-15 10-Jul-15 28-Jan-17 25-Aug-17 100% 100.0%
A545-101-81-41-00710 E C PLTF. & LADDER FOR 101-CC-1004 0.7 14-Jul-15 27-May-16 28-Jul-15 10-Jun-16 4-Aug-15 17-Jun-16 11-Aug-15 24-Jun-16 25-Aug-15 8-Jul-16 10-Nov-15 22-Jul-16 100% 100.0%
A545-101-16-48-00713 TO
E C PLTF. & LADDER FOR 101-CC-1005 0.7 21-Jul-15 4-Jul-15 4-Aug-15 11-Jul-15 11-Aug-15 18-Jul-15 18-Aug-15 25-Jul-15 1-Sep-15 1-Aug-15 17-Nov-15 12-Aug-15 100% 100.0%
00714
A545-101-16-48-00716 E C PLTF. & LADDER FOR 102-CC-1001 0.7 28-Jul-15 31-Jul-15 11-Aug-15 14-Aug-15 18-Aug-15 21-Aug-15 25-Aug-15 28-Aug-15 8-Sep-15 4-Sep-15 24-Nov-15 27-May-16 100% 100.0%
A545-101-16-48-00719 E C PLTF. & LADDER FOR 102-CC-1002 0.7 4-Aug-15 5-Jun-15 18-Aug-15 19-Jun-15 25-Aug-15 26-Jun-15 1-Sep-15 3-Jul-15 15-Sep-15 17-Jul-15 1-Dec-15 3-Jun-16 100% 100.0%
A545-101-16-48-00722 E C PLTF. & LADDER FOR 102-CC-1003 0.7 11-Aug-15 10-Aug-15 25-Aug-15 1-Sep-15 1-Sep-15 9-Sep-15 8-Sep-15 10-Oct-15 22-Sep-15 26-Oct-15 21-Apr-17 28-Sep-17 100% 100.0%
A545-101-16-48-00725 E C PLTF. & LADDER FOR 102-CC-1004 0.4 18-Aug-15 5-Jun-15 1-Sep-15 19-Jun-15 8-Sep-15 26-Jun-15 15-Sep-15 3-Jul-15 29-Sep-15 17-Jul-15 15-Dec-15 31-Jul-15 100% 100.0%
A545-101-81-41-00726 E C PLTF. & LADDER FOR 102-CC-1004 0.4 18-Aug-15 5-Jun-15 1-Sep-15 19-Jun-15 8-Sep-15 26-Jun-15 15-Sep-15 3-Jul-15 29-Sep-15 17-Jul-15 15-Dec-15 31-Jul-15 100% 100.0%
A545-101-16-48-00728 TO
E C PLTF. & LADDER FOR 102-CC-1005 0.7 25-Aug-15 22-Jun-15 8-Sep-15 6-Jul-15 15-Sep-15 13-Jul-15 22-Sep-15 20-Jul-15 6-Oct-15 3-Aug-15 22-Dec-15 27-May-16 100% 100.0%
00729
A545-101-81-41-30735 E C PLTF. & LADDER FOR 100-VV-1008 0.2 12-Jul-15 25-Jul-15 25-Jul-15 27-Feb-16 1-Aug-15 5-Mar-16 8-Aug-15 12-Mar-16 22-Aug-15 19-Mar-16 7-Nov-15 12-Sep-16 100% 100.0%
A545-101-81-41-30736 E C PLTF. & LADDER FOR 100-VV-1009 0.2 15-Jul-15 27-Jul-15 29-Jul-15 27-Feb-16 5-Aug-15 5-Mar-16 12-Aug-15 12-Mar-16 26-Aug-15 19-Mar-16 11-Nov-15 31-Aug-16 100% 100.0%
A545-101-16-48-10737 E C PLTF.& LADDER FOR 100-VV-1010 0.2 18-Jul-15 29-Jul-15 1-Aug-15 1-Mar-16 8-Aug-15 8-Mar-16 15-Aug-15 15-Mar-16 29-Aug-15 22-Mar-16 14-Nov-15 31-Aug-16 100% 100.0%
A545-101-16-48-10738 E C PLTF. & LADDER FOR 100-VV-1013 0.2 21-Jul-15 29-Jul-15 4-Aug-15 29-Feb-16 11-Aug-15 7-Mar-16 18-Aug-15 14-Mar-16 1-Sep-15 21-Mar-16 17-Nov-15 15-Jul-16 100% 100.0%
A545-101-16-48-10739 E C PLTF. & LADDER FOR 100-VV-1014 0.2 24-Jul-15 29-Jul-15 7-Aug-15 1-Mar-16 14-Aug-15 8-Mar-16 21-Aug-15 15-Mar-16 4-Sep-15 22-Mar-16 20-Nov-15 4-Jul-16 100% 100.0%
A545-101-16-48-10740 E C PLTF. & LADDER FOR 100-VV-1017 0.2 27-Jul-15 29-Jul-15 10-Aug-15 1-Mar-16 17-Aug-15 8-Mar-16 24-Aug-15 15-Mar-16 7-Sep-15 22-Mar-16 23-Nov-15 20-Jul-16 100% 100.0%
A545-101-81-41-30743 E C PLTF. & LADDER FOR 100-VV-1023 0.2 5-Aug-15 31-Jul-15 19-Aug-15 1-Mar-16 26-Aug-15 8-Mar-16 2-Sep-15 15-Mar-16 16-Sep-15 22-Mar-16 2-Dec-15 31-Aug-16 100% 100.0%
A545-101-81-41-30744 E C PLTF. & LADDER FOR 100-VV-1027 0.2 5-Aug-15 31-Jul-15 19-Aug-15 4-Aug-17 26-Aug-15 11-Aug-17 2-Sep-15 18-Aug-17 16-Sep-15 25-Aug-17 16-Mar-19 25-Aug-17 100% 100.0%
A545-101-16-48-10746 E PLTF. & LADDER FOR 101-VV-1001A 08-08-2015 - =H199+1320 - #VALUE! - #VALUE! - =Q199+14 - =T199+31 -
A545-101-16-48-10747 E PLTF.& LADDER FOR 101-VV-1002A 11-08-2015 - =H200+1320 - #VALUE! - #VALUE! - =Q200+14 - =T200+31 -
A545-101-16-48-10748 E PLTF. & LADDER FOR 101-VV-1001B 14-11-2016 - =H201+870 - #VALUE! - #VALUE! - =Q201+14 - =T201+31 -
A545-101-16-48-10749 E PLTF.& LADDER FOR 101-VV-1002B 17-11-2016 - =H202+870 - #VALUE! - #VALUE! - =Q202+14 - =T202+31 -
A545-101-81-41-30750 E C PLTF. & LADDER FOR 101-VV-1003 0.2 7-Aug-15 1-Oct-15 21-Aug-15 15-Oct-15 28-Aug-15 22-Oct-15 4-Sep-15 29-Oct-15 18-Sep-15 5-Nov-15 4-Dec-15 19-Jul-16 100% 100.0%
A545-101-81-41-30751 E C PLTF.& LADDER FOR 101-VV-1004 0.2 23-Aug-15 28-Dec-15 5-Sep-15 1-Jan-16 12-Sep-15 8-Jan-16 19-Sep-15 15-Jan-16 3-Oct-15 22-Jan-16 19-Dec-15 19-Jul-16 100% 100.0%
A545-101-81-41-30752 E C PLTF. & LADDER FOR 101-VV-1005 0.2 26-Aug-15 28-Dec-15 9-Sep-15 1-Jan-16 16-Sep-15 8-Jan-16 23-Sep-15 15-Jan-16 7-Oct-15 22-Jan-16 23-Dec-15 19-Jul-16 100% 100.0%
A545-101-16-48-10753 E C PLTF.& LADDER FOR 101-VV-1006 0.2 29-Aug-15 15-Sep-15 12-Sep-15 29-Sep-15 19-Sep-15 6-Oct-15 26-Sep-15 13-Oct-15 10-Oct-15 20-Oct-15 26-Dec-15 15-Sep-16 100% 100.0%
A545-101-16-48-10755 E C PLTF. & LADDER FOR 102-VV-1002 0.2 4-Sep-15 15-Sep-15 18-Sep-15 29-Sep-15 25-Sep-15 6-Oct-15 2-Oct-15 13-Oct-15 16-Oct-15 20-Oct-15 1-Jan-16 31-Aug-16 100% 100.0%
A545-101-81-41-30757 E C PLTF.& LADDER FOR 102-VV-1004 0.2 10-Sep-15 24-Dec-15 24-Sep-15 7-Jan-16 1-Oct-15 14-Jan-16 8-Oct-15 21-Jan-16 22-Oct-15 28-Jan-16 7-Jan-16 31-Aug-16 100% 100.0%
A545-101-16-48-30760 E C PLTF. & LADDER FOR 102-VV-1007 0.2 19-Sep-15 15-Sep-15 3-Oct-15 29-Sep-15 10-Oct-15 6-Oct-15 17-Oct-15 13-Oct-15 31-Oct-15 20-Oct-15 16-Jan-16 19-Jul-16 100% 100.0%
A545-101-16-48-30761 E C PLTF. & LADDER FOR 102-VV-1008 0.2 22-Sep-15 15-Sep-15 6-Oct-15 29-Sep-15 13-Oct-15 6-Oct-15 20-Oct-15 13-Oct-15 3-Nov-15 20-Oct-15 19-Jan-16 19-Jul-16 100% 100.0%
A545-101-16-48-10762 E C PLTF. & LADDER FOR 102-VV-1009 0.2 25-Sep-15 15-Sep-15 9-Oct-15 29-Sep-15 16-Oct-15 6-Oct-15 23-Oct-15 13-Oct-15 6-Nov-15 20-Oct-15 22-Jan-16 12-Jul-16 100% 100.0%
A545-101-16-48-30765 E C PLTF. & LADDER FOR 103-VV-1001 0.2 4-Oct-15 15-Sep-15 17-Oct-15 29-Sep-15 24-Oct-15 6-Oct-15 31-Oct-15 13-Oct-15 14-Nov-15 20-Oct-15 30-Jan-16 19-Jul-16 100% 100.0%
A545-101-16-48-10766 E C PLTF. & LADDER FOR 103-VV-1002 0.2 7-Oct-15 15-Sep-15 21-Oct-15 29-Sep-15 28-Oct-15 6-Oct-15 4-Nov-15 13-Oct-15 18-Nov-15 20-Oct-15 3-Feb-16 5-Sep-16 100% 100.0%
A545-101-16-48-10767 E C PLTF. & LADDER FOR 103-VV-1003 0.2 10-Oct-15 5-Sep-15 24-Oct-15 19-Sep-15 31-Oct-15 26-Sep-15 7-Nov-15 3-Oct-15 21-Nov-15 10-Oct-15 6-Feb-16 31-May-16 100% 100.0%
A545-101-16-48-30769 E C PLTF. & LADDER FOR 103-VV-1005 0.2 16-Oct-15 15-Sep-15 30-Oct-15 29-Sep-15 6-Nov-15 6-Oct-15 13-Nov-15 13-Oct-15 27-Nov-15 20-Oct-15 12-Feb-16 31-May-16 100% 100.0%
A545-101-81-41-00773 to
E C PLTF. & LADDER FOR 104-VV-1001A/B 0.2 28-Oct-15 1-Oct-15 11-Nov-15 15-Oct-15 18-Nov-15 22-Oct-15 25-Nov-15 29-Oct-15 9-Dec-15 5-Nov-15 24-Feb-16 11-Jul-16 100% 100.0%
00774
A545-101-81-41-00775 To
E C PLTF. & LADDER FOR 104-VV-1004A/B/C/D 0.2 15-Nov-15 24-Dec-15 28-Nov-15 28-Oct-15 5-Dec-15 4-Nov-15 12-Dec-15 11-Nov-15 26-Dec-15 18-Nov-15 12-Mar-16 23-Jun-16 100% 100.0%
00778
A545-101-81-41-00782 /
E C PLTF. & LADDER FOR 104-VV-1002A/B 0.2 21-Nov-15 11-Nov-15 5-Dec-15 25-Nov-15 12-Dec-15 2-Dec-15 19-Dec-15 9-Dec-15 2-Jan-16 16-Dec-15 19-Mar-16 10-Jun-16 100% 100.0%
00783
A545-101-81-41-30481 E C PLTF SUPPORTING 102-EE-1004 & 102-EE-1018 0.1 12-Jun-15 26-Nov-15 26-Jun-15 3-Dec-15 3-Jul-15 10-Dec-15 10-Jul-15 17-Dec-15 24-Jul-15 31-Dec-15 9-Oct-15 9-Mar-18 100% 100.0%
A545-101-16-48-10482 E C PLTF SUPPORTING 102-EE-1004 & 102-EE-1018 0.1 12-Jun-15 8-May-15 26-Jun-15 15-May-15 3-Jul-15 22-May-15 10-Jul-15 29-May-15 24-Jul-15 12-Jun-15 9-Oct-15 4-Dec-15 100% 100.0%
A545-101-81-41-30483 &
E C PLTF SUPPORTING 102-EE-1007 0.2 14-Jun-15 8-May-15 27-Jun-15 15-May-15 4-Jul-15 22-May-15 11-Jul-15 29-May-15 25-Jul-15 12-Jun-15 10-Oct-15 4-Dec-15 100% 100.0%
10484
A545-101-81-41-30485 E C PLTF SUPPORTING 102-EE-1008 A/B 0.1 16-Jun-15 26-Nov-15 30-Jun-15 3-Dec-15 7-Jul-15 10-Dec-15 14-Jul-15 17-Dec-15 28-Jul-15 31-Dec-15 13-Oct-15 9-Mar-18 100% 100.0%
A545-101-16-48-10486 E C PLTF SUPPORTING 102-EE-1008 A/B 0.1 16-Jun-15 8-May-15 30-Jun-15 15-May-15 7-Jul-15 22-May-15 14-Jul-15 29-May-15 28-Jul-15 12-Jun-15 13-Oct-15 4-Dec-15 100% 100.0%
A545-101-81-41-30487 E C PLTF SUPPORTING 102-EE-1010 A/B 0.1 18-Jun-15 26-Nov-15 2-Jul-15 3-Dec-15 9-Jul-15 10-Dec-15 16-Jul-15 17-Dec-15 30-Jul-15 31-Dec-15 15-Oct-15 9-Mar-18 100% 100.0%
A545-101-16-48-10488 E C PLTF SUPPORTING 102-EE-1010 A/B 0.1 18-Jun-15 8-May-15 2-Jul-15 15-May-15 9-Jul-15 22-May-15 16-Jul-15 29-May-15 30-Jul-15 12-Jun-15 15-Oct-15 4-Dec-15 100% 100.0%
A545-101-81-41-30489 E C PLTF SUPPORTING 102-EE-1013 0.1 20-Jun-15 8-May-15 4-Jul-15 15-May-15 11-Jul-15 22-May-15 18-Jul-15 29-May-15 1-Aug-15 12-Jun-15 17-Oct-15 4-Dec-15 100% 100.0%
A545-101-16-48-10490 E C PLTF SUPPORTING 102-EE-1013 0.1 20-Jun-15 8-May-15 4-Jul-15 15-May-15 11-Jul-15 22-May-15 18-Jul-15 29-May-15 1-Aug-15 12-Jun-15 17-Oct-15 4-Dec-15 100% 100.0%
A545-101-81-41-10494 E C 104-RB-101A/B STRUCTURE FOUNDATION 0.2 25-Jun-15 5-Aug-15 9-Jul-15 14-Aug-15 16-Jul-15 2-Sep-15 23-Jul-15 16-Sep-15 6-Aug-15 27-Oct-15 22-Oct-15 10-Nov-15 100% 100.0%
A545-101-81-41-00495 E C 104-RB-101A PLAN 0.2 27-Jun-15 5-Aug-15 11-Jul-15 14-Aug-15 18-Jul-15 2-Sep-15 25-Jul-15 16-Sep-15 8-Aug-15 20-Nov-15 24-Oct-15 4-Dec-15 100% 100.0%
A545-101-81-41-00496 E C 104-RB-101A ELEVATION 0.2 29-Jun-15 5-Aug-15 13-Jul-15 14-Aug-15 20-Jul-15 2-Sep-15 27-Jul-15 16-Sep-15 10-Aug-15 20-Nov-15 26-Oct-15 4-Dec-15 100% 100.0%
A545-101-81-41-00497 E C 104-RB-101B PLAN 0.2 1-Jul-15 5-Aug-15 15-Jul-15 14-Aug-15 22-Jul-15 5-Sep-15 29-Jul-15 19-Sep-15 12-Aug-15 5-Feb-16 28-Oct-15 12-Feb-16 100% 100.0%
A545-101-81-41-00498 E C 104-RB-101B ELEVATION 0.2 3-Jul-15 5-Aug-15 17-Jul-15 14-Aug-15 24-Jul-15 5-Sep-15 31-Jul-15 19-Sep-15 14-Aug-15 5-Feb-16 30-Oct-15 12-Feb-16 100% 100.0%
A545-101-16-48-30806 E E MATERIAL TAKE OFF STRL STEEL 0.2 20-Feb-15 2-May-15 6-Mar-15 - 13-Mar-15 - 20-Mar-15 - 3-Apr-15 - 8-Feb-17 31-Mar-18 100% 100.0%
A545-101-16-48-00811 TO
E MISC. PLATFORMS / T SUPPORTS LAYOUT 20-05-2017 - =H234+654 - #VALUE! - #VALUE! - =Q234+14 - =T234+32 -
00818
A545-101-81-41-30676 E C GA & R/F DET OF FDN & 101-LZ-1013 0.1 31-Aug-17 31-Aug-18 14-Sep-17 14-Sep-18 21-Sep-17 21-Sep-18 28-Sep-17 28-Sep-18 12-Oct-17 5-Oct-18 22-May-19 5-Oct-18 100% 100.0%
A545-101-81-41-30809 E C TYP. DET. FOR PILE CAP R/F & SAND FILLING 0.1 20-May-17 26-Apr-18 3-Jun-17 3-May-18 10-Jun-17 10-May-18 17-Jun-17 17-May-18 1-Jul-17 24-May-18 16-Sep-17 7-Sep-18 100% 100.0%
A545-101-81-41-00841 To
OPENINGS LAYOUT 20-08-2015 22-04-2016 =H238+14 =O238-7 =K238+7 =R238-7 =N238+7 =U238-7 =Q238+14 31-05-2016 =T238+1297 -
00848
A545-101-16-48-31501 E C FDN FOR 102-CC-1006 0.1 25-Jul-15 23-Jan-15 8-Aug-15 6-Feb-15 15-Aug-15 13-Feb-15 22-Aug-15 20-Feb-15 5-Sep-15 5-Jun-15 21-Nov-15 19-Jun-15 100% 100.0%
A545-101-16-48-31502 E C FDN FOR 103-CC-1001 0.1 28-Jul-15 23-Jan-15 11-Aug-15 6-Feb-15 18-Aug-15 13-Feb-15 25-Aug-15 20-Feb-15 8-Sep-15 5-Jun-15 24-Nov-15 19-Jun-15 100% 100.0%
A545-101-16-48-31503 E C FDN FOR 103-CC-1002 0.1 31-Jul-15 23-Jan-15 14-Aug-15 6-Feb-15 21-Aug-15 13-Feb-15 28-Aug-15 20-Feb-15 11-Sep-15 5-Jun-15 27-Nov-15 19-Jun-15 100% 100.0%
A545-101-16-48-31504 E C FDN FOR 103-CC-1003 0.1 3-Aug-15 26-Aug-15 17-Aug-15 2-Sep-15 24-Aug-15 9-Sep-15 31-Aug-15 16-Sep-15 14-Sep-15 23-Sep-15 30-Nov-15 7-Oct-15 100% 100.0%
A545-101-16-48-31512 E C FDN FOR 103-VV-1002 0.1 4-Aug-15 23-Feb-15 18-Aug-15 9-Mar-15 25-Aug-15 16-Mar-15 1-Sep-15 23-Mar-15 15-Sep-15 5-Jun-15 1-Dec-15 19-Jun-15 100% 100.0%
A545-101-16-48-31513 E C FDN FOR 103-VV-1003 0.1 7-Aug-15 26-Feb-15 21-Aug-15 12-Mar-15 28-Aug-15 19-Mar-15 4-Sep-15 26-Mar-15 18-Sep-15 20-Nov-15 4-Dec-15 4-Dec-15 100% 100.0%
A545-101-16-48-31517 E C FDN FOR 103-VV-1007 0.1 19-Aug-15 17-Jul-15 2-Sep-15 31-Jul-15 9-Sep-15 7-Aug-15 16-Sep-15 14-Aug-15 30-Sep-15 31-Aug-15 16-Dec-15 31-Aug-15 100% 100.0%
A545-101-16-48-31518 E C FDN FOR 103-VV-1008 0.1 22-Aug-15 17-Jul-15 5-Sep-15 31-Jul-15 12-Sep-15 7-Aug-15 19-Sep-15 14-Aug-15 3-Oct-15 31-Aug-15 19-Dec-15 31-Aug-15 100% 100.0%
A545-101-16-48-31519 E C FDN FOR 103-VV-1009 0.1 25-Aug-15 17-Jul-15 8-Sep-15 31-Jul-15 15-Sep-15 7-Aug-15 22-Sep-15 14-Aug-15 6-Oct-15 31-Aug-15 22-Dec-15 31-Aug-15 100% 100.0%
A545-101-16-48-31520 E C FDN FOR 104-VV-1001A/B 0.1 28-Aug-15 23-Jan-15 11-Sep-15 6-Feb-15 18-Sep-15 13-Feb-15 25-Sep-15 20-Feb-15 9-Oct-15 5-Jun-15 25-Dec-15 19-Jun-15 100% 100.0%
A545-101-16-48-31521 E C FDN FOR 104-VV-1002A/B 0.1 31-Aug-15 23-Jan-15 14-Sep-15 6-Feb-15 21-Sep-15 13-Feb-15 28-Sep-15 20-Feb-15 12-Oct-15 5-Jun-15 28-Dec-15 19-Jun-15 100% 100.0%
A545-101-16-48-31522 E C FDN FOR 104-VV-1003A/B 0.1 3-Sep-15 4-Jul-15 17-Sep-15 18-Jul-15 24-Sep-15 25-Jul-15 1-Oct-15 1-Aug-15 15-Oct-15 14-Aug-15 31-Dec-15 7-Oct-15 100% 100.0%
A545-101-16-48-31523 E C FDN FOR 104-VV-1004A/B/C/D 0.1 7-Sep-15 23-Jan-15 21-Sep-15 6-Feb-15 28-Sep-15 13-Feb-15 5-Oct-15 20-Feb-15 19-Oct-15 5-Jun-15 4-Jan-16 19-Jun-15 100% 100.0%
A545-101-81-41-31554 E C FDN FOR 101-EE-1018A/B 0.1 25-Jan-17 8-Nov-17 8-Feb-17 15-Nov-17 15-Feb-17 22-Nov-17 22-Feb-17 29-Nov-17 8-Mar-17 6-Dec-17 4-Apr-19 6-Dec-17 100% 100.0%
A545-101-81-41-31555 E C FDN FOR 101-EE-1019A/B 0.1 30-Jan-17 8-Nov-17 13-Feb-17 15-Nov-17 20-Feb-17 22-Nov-17 27-Feb-17 29-Nov-17 13-Mar-17 6-Dec-17 9-Apr-19 6-Dec-17 100% 100.0%
A545-101-81-41-31558 E C FDN FOR 102-EE-1011 0.1 25-Aug-16 2-Dec-16 8-Sep-16 9-Dec-16 15-Sep-16 16-Dec-16 22-Sep-16 23-Dec-16 6-Oct-16 30-Dec-16 22-Dec-16 30-Dec-16 100% 100.0%
A545-101-81-41-31559 E C FDN FOR 102-EE-1012 0.1 29-Aug-16 2-Dec-16 12-Sep-16 9-Dec-16 19-Sep-16 16-Dec-16 26-Sep-16 23-Dec-16 10-Oct-16 30-Dec-16 26-Mar-19 30-Dec-16 100% 100.0%
A545-101-81-41-31560 E C FDN FOR 102-EE-1014 0.1 2-Sep-16 2-Dec-16 16-Sep-16 9-Dec-16 23-Sep-16 16-Dec-16 30-Sep-16 23-Dec-16 14-Oct-16 30-Dec-16 30-Dec-16 24-Aug-18 100% 100.0%
A545-101-81-41-31561 E C FDN FOR 102-EE-1016 0.1 5-Sep-16 2-Dec-16 19-Sep-16 9-Dec-16 26-Sep-16 16-Dec-16 3-Oct-16 23-Dec-16 17-Oct-16 30-Dec-16 2-Jan-17 24-Aug-18 100% 100.0%
A545-101-16-48-31562 E C FDN FOR 102-EE-1019 0.1 12-Dec-16 28-Mar-18 26-Dec-16 5-Feb-19 2-Jan-17 12-Feb-19 9-Jan-17 19-Feb-19 23-Jan-17 26-Feb-19 10-Apr-19 26-Feb-19 100% 100.0%
A545-101-16-48-31563 E C FDN FOR 102-EE-1020 0.1 15-Sep-15 1-May-15 29-Sep-15 15-May-15 6-Oct-15 22-May-15 13-Oct-15 29-May-15 27-Oct-15 22-Sep-15 12-Jan-16 6-Oct-15 100% 100.0%
A545-101-16-48-31566 E C FDN FOR 102-EE-1023/1024 0.1 24-Sep-15 12-Mar-15 8-Oct-15 26-Mar-15 15-Oct-15 2-Apr-15 22-Oct-15 9-Apr-15 5-Nov-15 22-Sep-15 21-Jan-16 6-Oct-15 100% 100.0%
A545-101-16-48-31568 E C FDN FOR 103-EE-1001 0.1 30-Sep-15 1-May-15 14-Oct-15 15-May-15 21-Oct-15 22-May-15 28-Oct-15 29-May-15 11-Nov-15 22-Sep-15 27-Jan-16 6-Oct-15 100% 100.0%
A545-101-16-48-31569 E C FDN FOR 104-EE-1001A/B 0.1 3-Oct-15 20-Mar-15 17-Oct-15 3-Apr-15 24-Oct-15 10-Apr-15 31-Oct-15 17-Apr-15 14-Nov-15 22-Sep-15 30-Jan-16 6-Oct-15 100% 100.0%
A545-101-81-41-01704 E C PLTF. & LADDER FOR 103-CC-1001 0.7 28-Sep-15 29-May-15 12-Oct-15 12-Jun-15 19-Oct-15 19-Jun-15 26-Oct-15 26-Jun-15 9-Nov-15 10-Jul-15 25-Jan-16 18-May-16 100% 100.0%
A545-101-81-41-01707 E C PLTF. & LADDER FOR 103-CC-1002 0.7 5-Oct-15 4-Jul-15 19-Oct-15 11-Jul-15 26-Oct-15 18-Jul-15 2-Nov-15 25-Jul-15 16-Nov-15 10-Jul-15 1-Feb-16 18-May-16 100% 100.0%
A545-101-81-41-10309 E C MAIN PIPERACK GA & R/F DETAIL OF SLEEPER 0.2 2-May-16 3-May-18 16-May-16 17-May-18 23-May-16 24-May-18 30-May-16 31-May-18 13-Jun-16 7-Jun-18 7-Mar-19 7-Jun-18 100% 100.0%
A545-101-16-48-04307 E C BRANCH PIPE RACK INSERT PLATES 0.3 30-Oct-15 18-Jan-16 13-Nov-15 22-Jan-16 20-Nov-15 29-Jan-16 27-Nov-15 5-Feb-16 11-Dec-15 12-Feb-16 26-Feb-16 18-Feb-16 100% 100.0%
A545-101-81-41-04311 E C BRANCH PIPE RACK 1 GA OF PLAN 105.500 (TOC) 0.3 31-Oct-15 11-Jun-15 14-Nov-15 18-Jun-15 21-Nov-15 25-Jun-15 28-Nov-15 2-Jul-15 12-Dec-15 16-Jul-15 27-Feb-16 30-Oct-15 100% 100.0%
A545-101-81-41-04312 E C BRANCH PIPE RACK 1 GA OF PLAN 108.750 (TOC) 0.3 1-Nov-15 11-Jun-15 14-Nov-15 18-Jun-15 21-Nov-15 25-Jun-15 28-Nov-15 2-Jul-15 12-Dec-15 16-Jul-15 27-Feb-16 30-Oct-15 100% 100.0%
A545-101-81-41-04313 E C BRANCH PIPE RACK 1 GA OF PLAN 112.250 (TOS) 0.3 3-Nov-15 11-Jun-15 16-Nov-15 18-Jun-15 23-Nov-15 25-Jun-15 30-Nov-15 2-Jul-15 14-Dec-15 16-Jul-15 29-Feb-16 30-Oct-15 100% 100.0%
A545-101-81-41-04314 E C BRANCH PIPE RACK 1 GA OF PLAN 118.500 (TOS) 0.3 4-Nov-15 11-Jun-15 17-Nov-15 18-Jun-15 24-Nov-15 25-Jun-15 1-Dec-15 2-Jul-15 15-Dec-15 16-Jul-15 1-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04315 E C BRANCH PIPE RACK 1 GA OF PLAN 123.500 (TOS) 0.3 5-Nov-15 11-Jun-15 18-Nov-15 18-Jun-15 25-Nov-15 25-Jun-15 2-Dec-15 2-Jul-15 16-Dec-15 16-Jul-15 2-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04321 E C BRANCH PIPE RACK 1 ELEVATION ON GRID 8 0.3 6-Nov-15 11-Jun-15 20-Nov-15 18-Jun-15 27-Nov-15 25-Jun-15 4-Dec-15 2-Jul-15 18-Dec-15 16-Jul-15 4-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04322 E C BRANCH PIPE RACK 1 ELEVATION ON GRID 9 0.3 7-Nov-15 11-Jun-15 21-Nov-15 18-Jun-15 28-Nov-15 25-Jun-15 5-Dec-15 2-Jul-15 19-Dec-15 16-Jul-15 5-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04323 E C BRANCH PIPE RACK 1 CROSS SECTION 0.3 9-Nov-15 11-Jun-15 23-Nov-15 18-Jun-15 30-Nov-15 25-Jun-15 7-Dec-15 2-Jul-15 21-Dec-15 16-Jul-15 7-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04324 E C BRANCH PIPE RACK 1 STAIRCASE 0.3 16-Nov-15 15-Dec-15 30-Nov-15 29-Dec-15 7-Dec-15 5-Jan-16 14-Dec-15 12-Jan-16 28-Dec-15 19-Jan-16 7-Jan-17 28-Sep-17 100% 100.0%
A545-101-81-41-04701 to
E C BPR-1, MISC. SUPPORTS/ OPENINGS/PLT. DETS 0.3 16-Nov-15 5-Jun-18 30-Nov-15 19-Jun-18 7-Dec-15 26-Jun-18 14-Dec-15 3-Jul-18 28-Dec-15 10-Jul-18 17-Apr-19 10-Jul-18 100% 100.0%
04705
A545-101-81-41-04331 E C BRANCH PIPE RACK GA OF PLAN 105.500 (TOC) 0.3 4-Nov-15 11-Jun-15 18-Nov-15 18-Jun-15 25-Nov-15 25-Jun-15 2-Dec-15 2-Jul-15 16-Dec-15 16-Jul-15 2-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04332 E C BRANCH PIPE RACK 2 GA OF PLAN 108.750 (TOC) 0.3 5-Nov-15 11-Jun-15 19-Nov-15 18-Jun-15 26-Nov-15 25-Jun-15 3-Dec-15 2-Jul-15 17-Dec-15 16-Jul-15 3-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04333 E C BRANCH PIPE RACK 2 GA OF PLAN 112.500 (TOS) 0.3 6-Nov-15 11-Jun-15 20-Nov-15 18-Jun-15 27-Nov-15 25-Jun-15 4-Dec-15 2-Jul-15 18-Dec-15 16-Jul-15 4-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04334 E C BRANCH PIPE RACK 2 GA OF PLAN 118.500 (TOS) 0.3 7-Nov-15 11-Jun-15 21-Nov-15 18-Jun-15 28-Nov-15 25-Jun-15 5-Dec-15 2-Jul-15 19-Dec-15 16-Jul-15 5-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04335 E C BRANCH PIPE RACK 2 GA OF PLAN 123.500 (TOS) 0.3 9-Nov-15 11-Jun-15 23-Nov-15 18-Jun-15 30-Nov-15 25-Jun-15 7-Dec-15 2-Jul-15 21-Dec-15 16-Jul-15 7-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04341 E C BRANCH PIPE RACK 2 ELEVATION ON GRID 7 0.3 6-Nov-15 11-Jun-15 20-Nov-15 18-Jun-15 27-Nov-15 25-Jun-15 4-Dec-15 2-Jul-15 18-Dec-15 16-Jul-15 4-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04342 E C BRANCH PIPE RACK 2 ELEVATION ON GRID 8 0.3 7-Nov-15 11-Jun-15 21-Nov-15 18-Jun-15 28-Nov-15 25-Jun-15 5-Dec-15 2-Jul-15 19-Dec-15 16-Jul-15 5-Mar-16 30-Oct-15 100% 100.0%
A545-101-81-41-04343 E C BRANCH PIPE RACK 2 CROSS SECTION 0.3 7-Nov-15 11-Jun-15 21-Nov-15 18-Jun-15 28-Nov-15 25-Jun-15 5-Dec-15 2-Jul-15 19-Dec-15 16-Jul-15 5-Mar-16 30-Oct-15 100% 100.0%
A545-101-16-48-05311 E C BRANCH PIPE RACK 3 PLAN 0.3 8-Nov-15 27-May-15 21-Nov-15 10-Jun-15 28-Nov-15 17-Jun-15 5-Dec-15 24-Jun-15 19-Dec-15 24-Jun-15 4-Mar-16 4-Dec-15 100% 100.0%
A545-101-16-48-05312 E C BRANCH PIPE RACK 3 ELEVATION 0.3 9-Nov-15 27-May-15 23-Nov-15 10-Jun-15 30-Nov-15 17-Jun-15 7-Dec-15 24-Jun-15 21-Dec-15 24-Jun-15 7-Mar-16 4-Dec-15 100% 100.0%
A545-101-81-41-04721 E C BPR-3, MISC. SUPPORTS/ PLT. DETS 0.1 9-Nov-15 13-Jul-18 23-Nov-15 27-Jul-18 30-Nov-15 3-Aug-18 7-Dec-15 10-Aug-18 21-Dec-15 17-Aug-18 11-Apr-19 17-Aug-18 100% 100.0%
A545-101-16-48-05331 E C BRANCH PIPE RACK 4 1ST TIER PLAN AT 105.500 0.3 12-Nov-15 27-May-15 26-Nov-15 10-Jun-15 3-Dec-15 17-Jun-15 10-Dec-15 24-Jun-15 24-Dec-15 24-Jun-15 10-Mar-16 14-Sep-15 100% 100.0%
A545-101-16-48-05332 E C BRANCH PIPE RACK 4 2ND TIER PLAN AT 108.758 0.3 13-Nov-15 27-May-15 27-Nov-15 10-Jun-15 4-Dec-15 17-Jun-15 11-Dec-15 24-Jun-15 25-Dec-15 24-Jun-15 11-Mar-16 14-Sep-15 100% 100.0%
A545-101-16-48-05341 E C BRANCH PIPE RACK 4 ELEVATION ON GRID 20 0.3 14-Nov-15 12-May-15 28-Nov-15 26-May-15 5-Dec-15 2-Jun-15 12-Dec-15 9-Jun-15 26-Dec-15 24-Jun-15 12-Mar-16 14-Sep-15 100% 100.0%
A545-101-16-48-05342 E C BRANCH PIPE RACK 4 ELEVATION ON GRID 22 0.3 15-Nov-15 12-May-15 28-Nov-15 26-May-15 5-Dec-15 2-Jun-15 12-Dec-15 9-Jun-15 26-Dec-15 24-Jun-15 12-Mar-16 14-Sep-15 100% 100.0%
A545-101-16-48-05343 E C BRANCH PIPE RACK 4 CROSS SECTION 0.3 15-Nov-15 12-May-15 30-Nov-15 26-May-15 7-Dec-15 2-Jun-15 14-Dec-15 9-Jun-15 28-Dec-15 24-Jun-15 14-Mar-16 14-Sep-15 100% 100.0%
A545-101-81-41-05344 E C BRANCH PIPE RACK 4 STAIRCASE 0.3 20-Nov-15 24-Nov-15 5-Dec-15 1-Jan-16 12-Dec-15 8-Jan-16 19-Dec-15 15-Jan-16 2-Jan-16 22-Jan-16 13-Jan-17 28-Sep-17 100% 100.0%
A545-101-16-48-06311 R C BRANCH PIPE RACK 5 1ST TIER PLAN AT 105.5 0.3 16-Nov-15 20-Jul-15 30-Nov-15 19-Aug-15 7-Dec-15 26-Aug-15 14-Dec-15 2-Sep-15 28-Dec-15 8-Jan-16 8-Jan-17 30-Oct-17 100% 100.0%
A545-101-16-48-06312 R C BRANCH PIPE RACK 5 2ND TIER PLAN AT 108.75 0.3 17-Nov-15 25-Jul-15 1-Dec-15 19-Aug-15 8-Dec-15 26-Aug-15 15-Dec-15 2-Sep-15 29-Dec-15 8-Jan-16 9-Jan-17 30-Oct-17 100% 100.0%
A545-101-81-41-06313 R C BRANCH PIPE RACK 5 3RD TIER PLAN AT 112.250 0.3 18-Nov-15 14-Nov-15 2-Dec-15 14-Dec-15 9-Dec-15 21-Dec-15 16-Dec-15 28-Dec-15 30-Dec-15 8-Jan-16 10-Jan-17 30-Oct-17 100% 100.0%
A545-101-81-41-06314 R C BRANCH PIPE RACK 5 4TH TIER PLAN AT 115.250 0.3 19-Nov-15 14-Nov-15 3-Dec-15 14-Dec-15 10-Dec-15 21-Dec-15 17-Dec-15 28-Dec-15 31-Dec-15 8-Jan-16 11-Jan-17 30-Oct-17 100% 100.0%
A545-101-81-41-06315 R C BRANCH PIPE RACK 5 5TH TIER PLAN AT 118.500 0.3 20-Nov-15 14-Nov-15 4-Dec-15 14-Dec-15 11-Dec-15 21-Dec-15 18-Dec-15 28-Dec-15 1-Jan-16 8-Jan-16 12-Jan-17 4-Mar-17 100% 100.0%
A545-101-81-41-06316 R C BRANCH PIPE RACK 5 6TH TIER PLAN AT 122.000 0.3 21-Nov-15 14-Nov-15 5-Dec-15 14-Dec-15 12-Dec-15 21-Dec-15 19-Dec-15 28-Dec-15 2-Jan-16 8-Jan-16 19-Mar-16 30-Apr-16 100% 100.0%
A545-101-81-41-06317 R C BRANCH PIPE RACK 5 7TH TIER PLAN AT 127.850 0.3 23-Nov-15 14-Nov-15 7-Dec-15 14-Dec-15 14-Dec-15 21-Dec-15 21-Dec-15 28-Dec-15 4-Jan-16 8-Jan-16 15-Jan-17 30-Oct-17 100% 100.0%
A545-101-16-48-06321 R C BRANCH PIPE RACK 5 ELEVATION ON GRID 34 0.3 18-Nov-15 25-Jul-15 2-Dec-15 22-Aug-15 9-Dec-15 29-Aug-15 16-Dec-15 2-Sep-15 30-Dec-15 8-Jan-16 10-Jan-17 30-Oct-17 100% 100.0%
A545-101-16-48-06322 R C BRANCH PIPE RACK 5 ELEVATION ON GRID 35 0.3 18-Nov-15 27-Jul-15 2-Dec-15 22-Aug-15 9-Dec-15 29-Aug-15 16-Dec-15 2-Sep-15 30-Dec-15 8-Jan-16 10-Jan-17 30-Oct-17 100% 100.0%
A545-101-81-41-06323 R C BRANCH PIPE RACK 5 ELEVATION ON GRID 36 0.3 19-Nov-15 27-Jul-15 3-Dec-15 22-Aug-15 10-Dec-15 29-Aug-15 17-Dec-15 2-Sep-15 31-Dec-15 8-Jan-16 11-Jan-17 30-Oct-17 100% 100.0%
A545-101-81-41-06324 R C BRANCH PIPE RACK 5 CROSS SECTION 0.3 19-Nov-15 3-Dec-15 3-Dec-15 17-Dec-15 10-Dec-15 24-Dec-15 17-Dec-15 28-Dec-15 31-Dec-15 8-Jan-16 11-Jan-17 30-Oct-17 100% 100.0%
A545-101-81-41-16325 R C BRANCH PIPE RACK 5 STAIRCASE 0.3 19-Nov-15 1-Jan-16 3-Dec-15 15-Jan-16 10-Dec-15 22-Jan-16 17-Dec-15 29-Jan-16 31-Dec-15 12-Feb-16 11-Jan-17 30-Oct-17 100% 100.0%
A545-101-81-41-18312 E C MANIFOLD STRUCTURE FOR 101-EA-1004 A-J 0.2 21-Nov-15 2-Mar-16 5-Dec-15 9-Mar-16 12-Dec-15 16-Mar-16 19-Dec-15 23-Mar-16 2-Jan-16 24-Sep-16 23-Apr-19 21-Dec-18 100% 100.0%
A545-101-16-48-08313 E C MANIFOLD STRUCTURE FOR 102-EA-1004 A-L 0.2 23-Nov-15 2-Mar-16 7-Dec-15 9-Mar-16 14-Dec-15 16-Mar-16 21-Dec-15 23-Mar-16 4-Jan-16 10-Nov-16 25-Apr-19 21-Dec-18 100% 100.0%
A545-101-81-41-18314 E C MANIFOLD STRUCTURE FOR 101-EA-1003 A-J 0.2 24-Nov-15 2-Mar-16 8-Dec-15 9-Mar-16 15-Dec-15 16-Mar-16 22-Dec-15 23-Mar-16 5-Jan-16 24-Sep-16 26-Apr-19 21-Dec-18 100% 100.0%
A545-101-16-48-08316 E C MANIFOLD STRUCTURE FOR 102-EA-1001 A-H 0.2 26-Nov-15 2-Mar-16 10-Dec-15 9-Mar-16 17-Dec-15 16-Mar-16 24-Dec-15 23-Mar-16 6-Jun-17 4-May-17 14-May-19 21-Dec-18 100% 100.0%
A545-101-16-48-08317 E C MANIFOLD STRUCTURE FOR 101-EA-1001 A-P 0.2 27-Nov-15 2-Mar-16 11-Dec-15 9-Mar-16 18-Dec-15 16-Mar-16 25-Dec-15 23-Mar-16 7-Jun-17 25-Jul-17 15-May-19 21-Dec-18 100% 100.0%
A545-101-81-41-18318 E C MANIFOLD STRUCTURE FOR 101-EA-1002 A-B 0.2 28-Nov-15 2-Mar-16 12-Dec-15 9-Mar-16 19-Dec-15 16-Mar-16 26-Dec-15 23-Mar-16 9-Jan-16 24-Sep-16 21-Mar-19 21-Dec-18 100% 100.0%
A545-101-81-41-08319 E C MANIFOLD STRUCTURE FOR 101-EA-1005 A-H 0.2 30-Nov-15 2-Mar-16 14-Dec-15 9-Mar-16 21-Dec-15 16-Mar-16 28-Dec-15 23-Mar-16 11-Jan-16 10-Nov-16 2-May-19 21-Dec-18 100% 100.0%
A545-101-16-48-09311 R C MAIN PIPE RACK C/S DRAWING 0.6 24-Nov-15 2-May-15 8-Dec-15 9-May-15 15-Dec-15 16-May-15 22-Dec-15 23-May-15 5-Jan-16 2-Jun-15 22-Mar-16 16-Jun-15 100% 100.0%
A545-101-16-48-09321 E C MAIN PIPE RACK DET. OF STAIRCASE-1 0.2 26-Nov-15 27-Jul-15 10-Dec-15 4-Feb-16 17-Dec-15 11-Feb-16 24-Dec-15 18-Feb-16 7-Jan-16 25-Feb-16 18-Jan-17 28-Oct-17 100% 100.0%
A545-101-81-41-19322 E C MAIN PIPE RACK DET. OF STAIRCASE-2 0.2 27-Nov-15 26-Oct-15 11-Dec-15 2-Mar-16 18-Dec-15 9-Mar-16 25-Dec-15 16-Mar-16 8-Jan-16 23-Mar-16 19-Jan-17 28-Oct-17 100% 100.0%
A545-101-81-41-30675 E C GA & R/F DET OF FDN & 101-LZ-1012 0.1 30-Nov-15 31-Aug-18 7-Dec-15 14-Sep-18 14-Dec-15 21-Sep-18 21-Dec-15 28-Sep-18 4-Jan-16 5-Oct-18 18-May-19 5-Oct-18 100% 100.0%
A545-101-81-41-00820 E C GA & R/F DETAIL OF FDN & SUPER STRUCTURE 0.1 19-Dec-16 26-Sep-18 2-Jan-17 10-Oct-18 9-Jan-17 17-Oct-18 16-Jan-17 24-Oct-18 30-Jan-17 31-Oct-18 30-Apr-19 31-Oct-18 100% 100.0%
A545-101-81-41-31581 E C FDN FOR 100-GN-1010A/B & 100-GN-1011 A/B 0.1 26-Jan-17 28-Mar-18 21-Mar-19 1-Mar-19 28-Mar-19 8-Mar-19 4-Apr-19 15-Mar-19 18-Apr-19 22-Mar-19 20-May-19 22-Mar-19 100% 100.0%
A545-101-16-48-31449 E C FDN FOR 102-VV-1014 0.1 9-Sep-15 23-Feb-15 23-Sep-15 9-Mar-15 30-Sep-15 16-Mar-15 7-Oct-15 23-Mar-15 21-Oct-15 20-Aug-15 6-Jan-16 3-Sep-15 100% 100.0%
A545-101-16-48-31550 E C FDN FOR 102-VV-1013A/B 0.1 16-Sep-15 23-Feb-15 30-Sep-15 9-Mar-15 7-Oct-15 16-Mar-15 14-Oct-15 23-Mar-15 28-Oct-15 20-Aug-15 13-Jan-16 3-Sep-15 100% 100.0%
A545-101-16-48-06331 R C BRANCH PIPE RACK 6 1ST TIER PLAN 0.3 19-Nov-15 27-Jul-15 3-Dec-15 1-Aug-15 10-Dec-15 8-Aug-15 17-Dec-15 13-Aug-15 31-Dec-15 16-Sep-15 17-Mar-16 30-Sep-15 100% 100.0%
A545-101-16-48-06332 R C BRANCH PIPE RACK 6 2ND TIER PLAN 0.3 23-Nov-15 27-Jul-15 7-Dec-15 1-Aug-15 14-Dec-15 8-Aug-15 21-Dec-15 13-Aug-15 4-Jan-16 16-Sep-15 21-Mar-16 30-Sep-15 100% 100.0%
A545-101-81-41-06333 R C BRANCH PIPE RACK 6 GA OF PLAN 112.250 0.3 25-Nov-15 7-Aug-15 9-Dec-15 21-Aug-15 16-Dec-15 28-Aug-15 23-Dec-15 2-Sep-15 6-Jan-16 16-Sep-15 23-Mar-16 30-Sep-15 100% 100.0%
A545-101-81-41-06334 R C BRANCH PIPE RACK 6 GA OF PLAN 118.500 0.3 27-Nov-15 7-Aug-15 11-Dec-15 21-Aug-15 18-Dec-15 28-Aug-15 25-Dec-15 2-Sep-15 8-Jan-16 16-Sep-15 25-Mar-16 30-Sep-15 100% 100.0%
A545-101-81-41-06335 R C BRANCH PIPE RACK 6 GA OF PLAN 123.500 0.3 27-Nov-15 26-Feb-16 11-Dec-15 11-Mar-16 18-Dec-15 18-Mar-16 25-Dec-15 23-Mar-16 8-Jan-16 30-Apr-16 19-Jan-17 28-Sep-17 100% 100.0%
A545-101-16-48-06341 R C BRANCH PIPE RACK 6 ELEVATION ON GRID 1 0.3 21-Nov-15 27-Jul-15 5-Dec-15 1-Aug-15 12-Dec-15 8-Aug-15 19-Dec-15 13-Aug-15 2-Jan-16 16-Sep-15 19-Mar-16 30-Sep-15 100% 100.0%
A545-101-16-48-06342 R C BRANCH PIPE RACK 6 ELEVATION ON GRID 21 0.3 23-Nov-15 27-Jul-15 7-Dec-15 1-Aug-15 14-Dec-15 8-Aug-15 21-Dec-15 13-Aug-15 4-Jan-16 16-Sep-15 21-Mar-16 30-Sep-15 100% 100.0%
A545-101-81-41-06343 R C BRANCH PIPE RACK 6 CROSS SECTION 0.3 30-Nov-15 7-Aug-15 14-Dec-15 21-Aug-15 21-Dec-15 28-Aug-15 28-Dec-15 2-Sep-15 11-Jan-16 16-Sep-15 28-Mar-16 30-Sep-15 100% 100.0%
A545-101-81-41-06344 R C BRANCH PIPE RACK 6 STAIRCASE 0.3 2-Dec-15 3-Jan-16 16-Dec-15 17-Jan-16 23-Dec-15 24-Jan-16 30-Dec-15 29-Jan-16 13-Jan-16 12-Feb-16 24-Jan-17 28-Sep-17 100% 100.0%
A545-101-16-48-07311 E C BRANCH PIPE RACK 7 GA OF PLAN 105.500 (TOC) 0.3 24-Nov-15 27-Jul-15 8-Dec-15 5-Aug-15 15-Dec-15 12-Aug-15 22-Dec-15 17-Aug-15 5-Jan-16 22-Jan-16 16-Jan-17 22-Jan-16 100% 100.0%
A545-101-16-48-07312 E C BRANCH PIPE RACK 7 GA OF PLAN 108.750 (TOC) 0.3 25-Nov-15 27-Jul-15 9-Dec-15 5-Aug-15 16-Dec-15 12-Aug-15 23-Dec-15 17-Aug-15 6-Jan-16 22-Jan-16 17-Jan-17 22-Jan-16 100% 100.0%
A545-101-16-48-07313 E C BRANCH PIPE RACK 7 GA OF PLAN 112.250 (TOC) 0.3 26-Nov-15 27-Jul-15 10-Dec-15 5-Aug-15 17-Dec-15 12-Aug-15 24-Dec-15 17-Aug-15 7-Jan-16 22-Jan-16 18-Jan-17 22-Jan-16 100% 100.0%
A545-101-16-48-07314 E C BRANCH PIPE RACK 7 GA OF PLAN 118.500 (TOC) 0.3 27-Nov-15 27-Jul-15 11-Dec-15 5-Aug-15 18-Dec-15 12-Aug-15 25-Dec-15 17-Aug-15 8-Jan-16 22-Jan-16 19-Jan-17 22-Jan-16 100% 100.0%
A545-101-81-41-17318 E C BRANCH PIPE RACK 7 GA & DETAIL OF STAIRCASE 0.3 30-Nov-15 14-Apr-17 14-Dec-15 28-Apr-17 21-Dec-15 5-May-17 28-Dec-15 12-May-17 11-Jan-16 19-May-17 2-Apr-19 19-May-17 100% 100.0%
A545-101-81-41-07331 TO
R C HEATER PIPE RACK - PLANS 0.3 29-Nov-15 27-Jul-15 13-Dec-15 23-Jan-16 20-Dec-15 30-Jan-16 27-Dec-15 4-Feb-16 10-Jan-16 12-Feb-16 21-Jan-17 28-Feb-17 100% 100.0%
07334
A545-101-81-41-07337 E C HEATER PIPERACK PLAN AT 126,127.7,132.6 0.3 7-Dec-15 27-Jul-15 21-Dec-15 21-Nov-18 28-Dec-15 28-Nov-18 4-Jan-16 3-Dec-18 18-Jan-16 11-Dec-18 9-Apr-19 11-Dec-18 100% 100.0%
A545-101-81-41-05703 E C MPR-MISC SUPPORT -107.000 0.3 9-Dec-15 27-Jul-15 23-Dec-15 8-Dec-18 30-Dec-15 15-Dec-18 6-Jan-16 20-Dec-18 20-Jan-16 28-Dec-18 11-Apr-19 28-Dec-18 100% 100.0%
A545-101-81-41-07338 E C HEATER PIPERACK ELEVATION AT GRID 61A 0.3 12-Dec-15 6-Nov-18 26-Dec-15 20-Nov-18 2-Jan-16 27-Nov-18 9-Jan-16 3-Dec-18 23-Jan-16 11-Dec-18 14-Apr-19 11-Dec-18 100% 100.0%
A545-101-81-41-07335 R C HEATER PIPE RACK - ELEVATIONS 0.3 14-Dec-15 28-Jan-17 28-Dec-15 11-Feb-17 4-Jan-16 18-Feb-17 11-Jan-16 24-Feb-17 25-Jan-16 4-Mar-17 16-Apr-19 4-Mar-17 100% 100.0%
A545-101-81-41-07336 R C HEATER PIPE RACK - CROSS SECTION 0.3 16-Dec-15 28-Jan-17 30-Dec-15 11-Feb-17 6-Jan-16 18-Feb-17 13-Jan-16 24-Feb-17 27-Jan-16 4-Mar-17 18-Apr-19 4-Mar-17 100% 100.0%
A545-101-81-41-10499 E C REACTOR 104-RB-1001A - STAIRCASE 0.3 9-Dec-15 27-Jul-15 23-Dec-15 20-Jan-16 30-Dec-15 27-Jan-16 6-Jan-16 1-Feb-16 20-Jan-16 8-Feb-16 11-May-17 28-Aug-18 100% 100.0%
A545-101-81-41-11499 E C REACTOR 104-RB-1001B - STAIRCASE 0.3 11-Dec-15 27-Jul-15 25-Dec-15 20-Jan-16 1-Jan-16 27-Jan-16 8-Jan-16 1-Feb-16 22-Jan-16 8-Feb-16 13-May-17 28-Aug-18 100% 100.0%
A545-101-81-41-01411 E C GA & DET OF GUIDED STR FOR 103-CC-1003 0.3 5-Dec-15 28-Dec-15 19-Dec-15 11-Jan-16 26-Dec-15 18-Jan-16 2-Jan-16 25-Jan-16 16-Jan-16 2-Feb-16 27-Jan-17 30-Jul-18 100% 100.0%
A545-101-81-41-01546 E C GA DETAIL OF OWS/CRWS SUMP-1 0.3 10-Nov-15 3-Dec-15 24-Nov-15 17-Dec-15 1-Dec-15 24-Dec-15 8-Dec-15 31-Dec-15 22-Dec-15 22-Jan-16 10-Aug-17 30-Aug-17 100% 100.0%
A545-101-81-41-01547 E C R/F DET FOR OWS/CRWS SUMP PIT-1 0.3 10-Nov-16 26-Jul-17 24-Nov-16 9-Aug-17 1-Dec-16 16-Aug-17 8-Dec-16 23-Aug-17 22-Dec-16 30-Aug-17 11-Aug-18 28-Aug-18 100% 100.0%
A545-101-81-41-01548 E C GA DETAIL OF OWS/CRWS SUMP-2 0.3 14-Nov-15 3-Dec-15 28-Nov-15 17-Dec-15 5-Dec-15 24-Dec-15 12-Dec-15 31-Dec-15 26-Dec-15 30-Aug-17 14-Aug-17 28-Aug-18 100% 100.0%
A545-101-81-41-01549 E C R/F DET FOR OWS/CRWS SUMP PIT-2 0.3 14-Nov-16 26-Jul-17 28-Nov-16 9-Aug-17 5-Dec-16 16-Aug-17 12-Dec-16 23-Aug-17 26-Dec-16 30-Aug-17 15-Aug-18 28-Aug-18 100% 100.0%
A545-101-81-41-11412 E C GA & RF DETAIL OF LIFT FDN. 0.3 5-Oct-15 26-Mar-16 19-Oct-15 9-Apr-16 26-Oct-15 16-Apr-16 2-Nov-15 23-Apr-16 16-Nov-15 30-Apr-16 26-Nov-16 30-Aug-18 100% 100.0%
A545-101-81-41-01413 E C LIFT STRUCTURE PLANS & ELEVATIONS 0.3 8-Oct-15 26-Mar-16 22-Oct-15 9-Apr-16 29-Oct-15 16-Apr-16 5-Nov-15 23-Apr-16 19-Nov-15 30-Apr-16 30-Nov-16 10-Apr-17 100% 100.0%
A545-101-81-41-12511 E C FDN FOR 104-TT-1001 0.3 12-Aug-15 23-Oct-15 26-Aug-15 6-Nov-15 2-Sep-15 13-Nov-15 9-Sep-15 20-Nov-15 23-Sep-15 27-Nov-15 9-Dec-15 4-Dec-15 100% 100.0%
A545-101-81-41-01401 E C TYPICAL BASE PLATES FOR TECH STRUCTURES 0.1 15-May-17 5-Jul-17 29-May-17 19-Jul-17 5-Jun-17 26-Jul-17 12-Jun-17 2-Aug-17 26-Jun-17 9-Aug-17 25-Mar-19 9-Aug-17 100% 100.0%
A545-101-81-41-07321 E C BRANCH PIPERACK 8 PLANS 0.1 5-Jan-17 11-Aug-18 19-Jan-17 25-Aug-18 26-Jan-17 1-Sep-18 2-Feb-17 8-Sep-18 16-Feb-17 15-Sep-18 4-Apr-19 15-Sep-18 100% 100.0%
A545-101-81-41-07323 E C SUPER STRUCTURE FOR PR- ELEVATIONS 0.1 12-Mar-17 11-Aug-18 25-Mar-17 25-Aug-18 1-Apr-17 1-Sep-18 8-Apr-17 8-Sep-18 22-Apr-17 15-Sep-18 20-Mar-19 15-Sep-18 100% 100.0%
A545-101-81-41-05725 E C MPR-MISC SUP-SEC-115.00 SECTIONS 0.1 26-May-17 5-Dec-18 8-Jun-17 19-Dec-18 15-Jun-17 26-Dec-18 22-Jun-17 2-Jan-19 6-Jul-17 9-Jan-19 4-Apr-19 9-Jan-19 100% 100.0%
A545-101-81-41-05733 E C MPR-MISC SUPPORT -118.500 SHEET3 0.1 26-May-17 5-Dec-18 8-Jun-17 19-Dec-18 15-Jun-17 26-Dec-18 22-Jun-17 2-Jan-19 6-Jul-17 9-Jan-19 4-Apr-19 9-Jan-19 100% 100.0%
A545-101-81-41-05721 E C MPR_MISC SUPPORT-115.00 SHEET1 0.1 26-May-17 5-Dec-18 8-Jun-17 19-Dec-18 15-Jun-17 26-Dec-18 22-Jun-17 2-Jan-19 6-Jul-17 9-Jan-19 4-Apr-19 9-Jan-19 100% 100.0%
A545-101-81-41-05731 E C MPR-MISC SUPPORT -118.500 SHEET1 0.1 26-May-17 5-Dec-18 8-Jun-17 19-Dec-18 15-Jun-17 26-Dec-18 22-Jun-17 2-Jan-19 6-Jul-17 9-Jan-19 4-Apr-19 9-Jan-19 100% 100.0%
A545-101-81-41-10423 E C TECH STR-2 GA & DET OF PLATFORMS 0.1 26-May-17 11-Dec-18 8-Jun-17 25-Dec-18 15-Jun-17 1-Jan-19 22-Jun-17 8-Jan-19 6-Jul-17 15-Jan-19 4-Apr-19 15-Jan-19 100% 100.0%
A545-101-81-41-05734 E C MPR-MISC SUP-SEC -118.500 SHEET4 0.1 26-May-17 5-Dec-18 8-Jun-17 19-Dec-18 15-Jun-17 26-Dec-18 22-Jun-17 2-Jan-19 6-Jul-17 9-Jan-19 4-Apr-19 9-Jan-19 100% 100.0%
A545-101-81-41-05723 E C MPR-MISC SUPPORT-115.00 SHEET3 0.1 26-May-17 5-Dec-18 8-Jun-17 19-Dec-18 15-Jun-17 26-Dec-18 22-Jun-17 2-Jan-19 6-Jul-17 9-Jan-19 4-Apr-19 9-Jan-19 100% 100.0%
A545-101-81-41-30679 E C FDN FOR 104-LZ-1003A/B 0.1 26-May-17 11-Dec-18 8-Jun-17 25-Dec-18 15-Jun-17 1-Jan-19 22-Jun-17 8-Jan-19 6-Jul-17 15-Jan-19 4-Apr-19 15-Jan-19 100% 100.0%
A545-101-81-41-10433 E C TECH STR-3 GA & DET OF PLATFORMS 0.1 26-May-17 13-Dec-18 8-Jun-17 27-Dec-18 15-Jun-17 3-Jan-19 22-Jun-17 10-Jan-19 6-Jul-17 17-Jan-19 4-Apr-19 17-Jan-19 100% 100.0%
A545-101-81-41-05732 E C MPR-MISC SUPPORT -118.500 SHEET2 0.1 26-May-17 5-Dec-18 8-Jun-17 19-Dec-18 15-Jun-17 26-Dec-18 22-Jun-17 2-Jan-19 6-Jul-17 9-Jan-19 4-Apr-19 9-Jan-19 100% 100.0%
A545-101-81-41-05722 E C MPR_MISC SUPPORT-115.00 SHEET2 0.1 26-May-17 5-Dec-18 8-Jun-17 19-Dec-18 15-Jun-17 26-Dec-18 22-Jun-17 2-Jan-19 6-Jul-17 9-Jan-19 4-Apr-19 9-Jan-19 100% 100.0%
A545-101-81-41-02481 to
E C TECH STR-07 MISC DETAILS 0.1 2-Jun-17 28-Jan-19 15-Jun-17 4-Feb-19 22-Jun-17 11-Feb-19 29-Jun-17 18-Feb-19 13-Jul-17 25-Feb-19 11-Apr-19 25-Feb-19 100% 100.0%
02484
A545-101-81-41-05751 to
E C MPR_MISC SUP-128.000 (3 SHEETS) 0.1 2-Jun-17 1-Feb-19 15-Jun-17 8-Feb-19 22-Jun-17 15-Feb-19 29-Jun-17 22-Feb-19 13-Jul-17 1-Mar-19 11-Apr-19 1-Mar-19 100% 100.0%
05753
MANIFOLD STR.PLAN &ELEV. MPR(FOR 101-EA-
A545-101-81-41-18323 E C 0.1 26-May-17 14-Jan-19 8-Jun-17 21-Jan-19 15-Jun-17 28-Jan-19 22-Jun-17 4-Feb-19 6-Jul-17 11-Feb-19 4-Apr-19 11-Feb-19 100% 100.0%
1007A-J)
A545-101-81-41-00677 E C FDN FOR 104-LZ-1001 0.1 26-May-17 17-Jan-19 8-Jun-17 24-Jan-19 15-Jun-17 31-Jan-19 22-Jun-17 7-Feb-19 6-Jul-17 14-Feb-19 4-Apr-19 14-Feb-19 100% 100.0%
A545-101-81-41-05754 to
E C MPR_MISC SUP-128.000 (SHEET 4 & 5) 0.1 26-May-17 1-Feb-19 8-Jun-17 8-Feb-19 15-Jun-17 15-Feb-19 22-Jun-17 22-Feb-19 6-Jul-17 1-Mar-19 4-Apr-19 1-Mar-19 100% 100.0%
05755
A545-101-81-41-05741 to
E C MPR_MISC SUPPORRT-122.100 (4 SHEETS) 0.1 26-May-17 25-Jan-19 8-Jun-17 1-Feb-19 15-Jun-17 8-Feb-19 22-Jun-17 15-Feb-19 6-Jul-17 22-Feb-19 4-Apr-19 22-Feb-19 100% 100.0%
05744
A545-101-81-41-30681 E C FDN FOR 100-LZ-1012 0.1 26-May-17 29-Jan-19 8-Jun-17 5-Feb-19 15-Jun-17 12-Feb-19 22-Jun-17 19-Feb-19 6-Jul-17 26-Feb-19 4-Apr-19 26-Feb-19 100% 100.0%
A545-101-81-41-30680 E C FDN FOR 100-LZ-1010 0.1 26-May-17 29-Jan-19 8-Jun-17 5-Feb-19 15-Jun-17 12-Feb-19 22-Jun-17 19-Feb-19 6-Jul-17 26-Feb-19 4-Apr-19 26-Feb-19 100% 100.0%
A545-101-81-41-07315 E C BRANCH PIPE RACK 7 ELEVATIONS 0.1 26-May-17 2-Jan-19 8-Jun-17 9-Jan-19 15-Jun-17 16-Jan-19 22-Jun-17 23-Jan-19 6-Jul-17 30-Jan-19 21-Sep-17 7-Feb-19 100% 100.0%
A545-101-81-41-04741 E C REACTOR STR- MISC SUPPORT 0.1 2-Mar-19 15-Feb-19 9-Mar-19 22-Feb-19 16-Mar-19 1-Mar-19 23-Mar-19 8-Mar-19 6-Apr-19 15-Mar-19 7-May-19 22-Mar-19 100% 100.0%
A545-101-81-41-07324 E C BRANCH PIPERACK 8 MISC SUPPORT DETAILS 0.1 2-Mar-19 20-Feb-19 9-Mar-19 27-Feb-19 16-Mar-19 6-Mar-19 23-Mar-19 13-Mar-19 6-Apr-19 20-Mar-19 7-May-19 27-Mar-19 100% 100.0%
A545-101-16-48-00271 R C GA & R/F DET OF FDN FOR 101-FF-1001A/B 0.0 4-Sep-17 22-Jun-18 18-Sep-17 6-Jul-18 25-Sep-17 13-Jul-18 2-Oct-17 20-Jul-18 9-Oct-17 27-Jul-18 19-Apr-19 27-Jul-18 100% 100.0%
A545-101-81-41-30678 R C FDN FOR 104-LZ-1002A/B 0.1 7-Sep-17 23-Nov-18 21-Sep-17 7-Dec-18 28-Sep-17 14-Dec-18 5-Oct-17 21-Dec-18 12-Oct-17 28-Dec-18 22-Apr-19 28-Dec-18 100% 100.0%
A545-101-16-48-00282 R C GA & R/F DET OF FDN FOR F.D. FAN 0.1 8-Sep-17 24-Aug-18 22-Sep-17 7-Sep-18 29-Sep-17 14-Sep-18 6-Oct-17 21-Sep-18 13-Oct-17 28-Sep-18 23-Apr-19 28-Sep-18 100% 100.0%
A545-101-81-41-00284 R C GA & R/F DET OF FDN FOR I.D. FAN 0.1 12-Sep-17 24-Aug-18 26-Sep-17 7-Sep-18 3-Oct-17 14-Sep-18 10-Oct-17 21-Sep-18 17-Oct-17 28-Sep-18 27-Apr-19 28-Sep-18 100% 100.0%
A545-101-16-48-01280 GA & R/F DET OF FDN FOR SAPH 15-03-2019 =H429+14 =K429+7 =N429+7 =Q429+7 =T429+7
A545-101-81-41-31481 R C TECH STR-8 GA & R/F DETAIL OF FDN 0.0 22-Aug-17 25-Nov-17 5-Sep-17 2-Dec-17 12-Sep-17 9-Dec-17 19-Sep-17 13-Dec-17 26-Sep-17 20-Dec-17 6-Apr-19 20-Dec-17 100% 100.0%
A545-101-16-48-31482 R C TECH STR-8 PLANS 0.0 25-Aug-17 2-Nov-18 8-Sep-17 16-Nov-18 15-Sep-17 23-Nov-18 22-Sep-17 30-Nov-18 29-Sep-17 7-Dec-18 9-Apr-19 7-Dec-18 100% 100.0%
A545-101-81-41-01483 R C TECH STR-8 ELEVATIONS 0.0 28-Aug-17 2-Nov-18 11-Sep-17 16-Nov-18 18-Sep-17 23-Nov-18 25-Sep-17 30-Nov-18 2-Oct-17 7-Dec-18 12-Apr-19 7-Dec-18 100% 100.0%
A545-101-81-41-01484 R C TECH STR-8 ELEVATIONS 0.0 2-Sep-17 2-Nov-18 16-Sep-17 16-Nov-18 23-Sep-17 23-Nov-18 30-Sep-17 30-Nov-18 7-Oct-17 7-Dec-18 17-Apr-19 7-Dec-18 100% 100.0%
A545-101-81-41-11488 R C TECH STR-8 STAIRCASE 0.0 6-Sep-17 2-Nov-18 20-Sep-17 16-Nov-18 27-Sep-17 23-Nov-18 4-Oct-17 30-Nov-18 11-Oct-17 7-Dec-18 21-Apr-19 7-Dec-18 100% 100.0%
A545-101-81-41-30503 R C FDN FOR 101-CC-1006 0.1 14-Aug-17 19-Jun-18 28-Aug-17 3-Jul-18 4-Sep-17 10-Jul-18 11-Sep-17 17-Jul-18 18-Sep-17 24-Jul-18 29-Mar-19 24-Jul-18 100% 100.0%
A545-101-81-41-00711 &
R C PLTF. & LADDER FOR 101-CC-1006 0.0 8-Sep-17 5-Sep-17 22-Sep-17 19-Sep-17 29-Sep-17 26-Sep-17 6-Oct-17 3-Oct-17 13-Oct-17 10-Oct-17 23-Apr-19 10-Oct-17 100% 100.0%
00712
A545-101-81-41-31556 R C FDN FOR 101-EE-1024 0.0 12-Aug-17 8-Nov-17 26-Aug-17 15-Nov-17 2-Sep-17 22-Nov-17 9-Sep-17 29-Nov-17 16-Sep-17 6-Dec-17 27-Mar-19 6-Dec-17 100% 100.0%
A545-101-81-41-31557 R C FDN FOR 101-EE-1025 0.0 16-Aug-17 8-Nov-17 30-Aug-17 15-Nov-17 6-Sep-17 22-Nov-17 13-Sep-17 29-Nov-17 20-Sep-17 6-Dec-17 31-Mar-19 6-Dec-17 100% 100.0%
A545-101-16-48-31576 R C FDN FOR 101-EE-1026 0.0 18-Aug-17 31-May-18 1-Sep-17 7-Jun-18 8-Sep-17 14-Jun-18 15-Sep-17 21-Jun-18 22-Sep-17 28-Jun-18 2-Apr-19 28-Jun-18 100% 100.0%
A545-101-16-48-31580 R C FDN FOR 101-EE-1027 0.0 21-Aug-17 4-Jun-18 4-Sep-17 18-Jun-18 11-Sep-17 25-Jun-18 18-Sep-17 2-Jul-18 25-Sep-17 9-Jul-18 5-Apr-19 9-Jul-18 100% 100.0%
100 99.8%
A545-101-16-50-01010 R C CABLE LAYOUT CDU 3.4 30-Oct-15 27-May-15 13-Nov-15 15-Jun-15 20-Nov-15 22-Jun-15 27-Nov-15 29-Jun-15 11-Dec-15 30-Sep-15 4-Jan-17 28-Dec-16 100% 100.0%
A545-101-16-50-03011 R C EARTHING LAYOUT OF CDU 1.7 18-Feb-16 25-Aug-15 3-Mar-16 16-Sep-15 19-Mar-16 23-Sep-15 2-Apr-16 30-Sep-15 23-Apr-16 14-Oct-15 22-Jun-16 28-Oct-15 100% 100.0%
A545-101-16-50-03012 R C EARTHING LAYOUT OF CDU 1.7 18-Feb-16 25-Aug-15 3-Mar-16 16-Sep-15 19-Mar-16 23-Sep-15 2-Apr-16 30-Sep-15 23-Apr-16 14-Oct-15 22-Jun-16 28-Oct-15 100% 100.0%
CABLE, LTG, EARTH L/O COMPR.
A545-101-16-50-01311 E C HOUSE CDU/STG GAS CONC UNIT/ SAT 1.7 18-Feb-16 25-Aug-15 3-Mar-16 16-Sep-15 19-Mar-16 23-Sep-15 2-Apr-16 30-Sep-15 23-Apr-16 14-Oct-15 22-Jun-16 28-Oct-15 100% 100.0%
LPG
CABLE, LTG, EARTH L/O COMPR.
A545-101-16-50-01312 E C HOUSE CDU/STG GAS CONC UNIT/ SAT 1.7 22-Feb-16 2-Apr-16 7-Mar-16 16-Apr-16 14-Mar-16 23-Apr-16 28-Mar-16 30-Apr-16 18-Apr-16 7-May-16 9-Mar-19 - 100% 90.0%
LPG
FIRE ALARM DETECTION SYSTEM AND
A545-101-16-50-05010 R C 3.4 25-Feb-16 1-Jul-15 10-Mar-16 10-Jul-15 26-Mar-16 20-Jul-15 9-Apr-16 31-Jul-15 30-Apr-16 2-Sep-15 29-Jun-16 10-Sep-15 100% 100.0%
PLANT COMMINICATION LAYOUT
A545-101-16-50-06011 R E AREA CLASSIFICATION CDU 0.7 17-Sep-15 4-Mar-15 1-Oct-15 18-Mar-15 8-Oct-15 25-Mar-15 15-Oct-15 1-Apr-15 29-Oct-15 30-Apr-15 28-Dec-15 22-Sep-15 100% 100.0%
A545-101-16-50-06012 R E AREA CLASSIFICATION CDU 0.7 17-Sep-15 4-Mar-15 1-Oct-15 18-Mar-15 8-Oct-15 25-Mar-15 15-Oct-15 1-Apr-15 29-Oct-15 30-Apr-15 28-Dec-15 22-Sep-15 100% 100.0%
A545-101-16-50-40010 R C MV CABLE SCHEDULE 6.8 28-Mar-16 2-Jul-15 12-Apr-16 31-Jul-15 19-Apr-16 23-Sep-15 30-Apr-16 30-Sep-15 14-May-16 3-Oct-15 10-Mar-17 3-May-17 100% 100.0%
A545-101-16-50-40020 R C CABLE SCHEDULE - LV CDU 11.4 4-Apr-16 27-Aug-15 19-Apr-16 2-Mar-16 26-Apr-16 21-Apr-16 7-May-16 28-Apr-16 21-May-16 2-May-16 17-Mar-17 3-May-17 100% 100.0%
A545-101-16-50-40030 E C CABLE SCHEDULE - FA /PA CDU 4.6 8-Apr-16 26-Oct-15 23-Apr-16 7-Jan-16 30-Apr-16 14-Jan-16 11-May-16 21-Jan-16 25-May-16 28-Jan-16 21-Mar-17 19-Aug-17 100% 100.0%
A545-101-16-50-40040 R C INTERCONNECTION -MV CDU 1.8 11-Apr-16 27-Oct-15 25-Apr-16 27-May-16 2-May-16 3-Jun-16 9-May-16 10-Jun-16 23-May-16 17-Jun-16 31-Aug-19 - 85% 90.0%
A545-101-16-50-40050 R C INTERCONNECTION-LV CDU 3.4 15-Apr-16 28-Oct-15 29-Dec-16 28-Apr-17 14-Jan-17 15-Jul-17 28-Jan-17 22-Jul-17 15-Aug-19 - 31-Aug-19 - 80% 80.0%
A545-101-16-50-42020 R C PANEL SCHEDULE CDU 0.9 13-Feb-16 30-Oct-15 27-Feb-16 27-Jan-16 5-Mar-16 14-Apr-16 19-Mar-16 21-Apr-16 2-Apr-16 28-Apr-16 23-May-16 29-Dec-17 100% 100.0%
A545-101-16-50-40081 E C RELAY SETTING 0.7 6-Mar-19 - 3-Aug-19 - 10-Aug-19 - 17-Aug-19 - 24-Aug-19 - 31-Aug-19 - 10%
A545-101-16-50-CL-3601 R E HAZ. AREA SOURCE LIST 0.5 3-Oct-16 23-Nov-16 17-Oct-16 30-Nov-16 24-Oct-16 7-Dec-16 31-Oct-16 14-Dec-16 14-Nov-16 21-Dec-16 13-Jan-17 28-Dec-16 100% 100.0%
A545-101-16-50-03010 EARTHING LAYOUT OF CDU 18-02-2016 25-08-2015 =I20+14 =P20-7 =L20+16 =S20-7 =O20+14 =V20-14 =R20+21 =Y20-14 =U20+60 28-10-2015
CABLE, LTG, EARTH L/O COMPR.
A545-101-16-50-01310 HOUSE CDU/STG GAS CONC UNIT/ SAT 18-02-2016 25-08-2015 =I23+14 =P23-7 =L23+16 =S23-7 =O23+14 =V23-14 =R23+21 =Y23-14 =U23+60 28-10-2015
LPG
A545-101-16-50-06010 AREA CLASSIFICATION CDU 17-09-2015 =M27-14 =I27+14 =P27-7 =L27+7 =S27-7 =O27+7 01-04-2015 =R27+14 30-04-2015 =U27+60 22-09-2015
100 97.9%
A545-101-16-51-00801 R C INSTRUMENT CABLE DUCT/ TRENCH LAYOUT 3.48 19-May-15 15-Apr-15 18-Jun-15 12-May-15 25-Jun-15 19-May-15 9-Jul-15 2-Jun-15 23-Jul-15 20-Jul-15 21-Sep-15 13-Aug-15 100% 100.0%
A545-101-16-51-II02 R C INSTRUMENT INDEX 14.51 20-Oct-15 14-Jul-15 3-Nov-15 23-Nov-15 10-Nov-15 30-Nov-15 17-Nov-15 12-May-16 1-Dec-15 19-May-16 31-Mar-19 10-Jul-19 100% 100.0%
A545-101-16-51-BM02 R C BILL OF MATERIAL 7.26 8-Jan-16 28-May-15 - - - - - - - - 6-Feb-16 23-Jun-16 100% 100.0%
A545-101-16-51-CH02 R C CABLE SCHEDULE-FF 4.35 21-Jan-16 26-Oct-15 20-Feb-16 29-Mar-16 27-Feb-16 5-Apr-16 2-Mar-16 12-Apr-16 30-Mar-16 19-Apr-16 30-May-16 26-Apr-16 100% 100.0%
A545-101-16-51-CH03 R C CABLE SCHEDULE-NFF 4.35 27-Jan-16 28-Oct-15 26-Feb-16 3-May-16 4-Mar-16 10-May-16 8-Mar-16 17-May-16 5-Apr-16 24-May-16 4-Jun-16 31-May-16 100% 100.0%
A545-101-16-51-MD07 R E DCS POINT DATABASE 4.35 14-Jan-16 27-Nov-15 27-Feb-17 1-Jul-17 6-Mar-17 15-Jul-17 10-Mar-17 22-Jul-17 17-Mar-17 26-Oct-17 30-Sep-19 - 85% 96.0%
A545-101-16-51-03301 E E SRR LAYOUT 2.90 12-Mar-15 5-Jan-15 11-Apr-15 19-Jan-15 18-Apr-15 26-Jan-15 23-Apr-15 31-Jan-15 30-Apr-15 7-Feb-15 29-Jun-15 21-Feb-15 100% 100.0%
A545-101-16-51-NE10 R E NOZZLE ELEVATION FOR LEVEL INSTRUMENTS 4.35 8-Nov-15 18-Apr-15 8-Dec-15 25-Apr-15 15-Dec-15 2-May-15 19-Dec-15 6-May-15 26-Dec-15 13-May-15 24-Feb-16 28-Sep-15 100% 100.0%
A545-101-16-51-00813 R C INSTRUMENT LOCATION PLAN-FF 5.81 27-Aug-15 23-Oct-15 26-Sep-15 22-Dec-15 3-Oct-15 29-Dec-15 7-Oct-15 5-Jan-16 6-Nov-15 12-Jan-16 24-Jan-17 16-Jan-17 100% 100.0%
A545-101-16-51-00805 R C INSTRUMENT LOCATION PLAN-NFF 5.81 24-Sep-15 27-Oct-15 24-Oct-15 22-Dec-15 31-Oct-15 29-Dec-15 4-Nov-15 5-Jan-16 4-Dec-15 12-Jan-16 21-Feb-17 20-Jan-17 100% 100.0%
A545-101-16-51-00806 R C INSTRUMENT JUNCTION BOX LAYOUT-FF 2.90 17-Aug-15 20-Jul-15 16-Sep-15 29-Mar-16 23-Sep-15 5-Apr-16 28-Sep-15 12-Apr-16 28-Oct-15 19-Apr-16 12-Dec-15 26-Apr-16 100% 100.0%
A545-101-16-51-00811 R C INSTRUMENT JUNCTION BOX LAYOUT-NFF 2.90 14-Sep-15 22-Jul-15 14-Oct-15 9-May-16 21-Oct-15 16-May-16 26-Oct-15 23-May-16 25-Nov-15 30-May-16 9-Jan-16 30-May-16 100% 100.0%
A545-101-16-51-00820 R C LEVEL GAUGE & LIGHTING PANEL LAYOUT 2.90 27-Nov-15 24-Jul-15 26-Dec-15 20-Aug-15 2-Jan-16 27-Aug-15 6-Jan-16 3-Sep-15 13-Jan-16 10-Sep-15 14-Mar-16 14-Jan-16 100% 100.0%
A545-101-16-51-00823 R C GAS DETECTOR & CCTV LAYOUT 4.35 26-Dec-15 31-Jul-15 25-Jan-16 8-Sep-15 1-Feb-16 15-Sep-15 5-Feb-16 22-Sep-15 4-Mar-16 29-Sep-15 3-May-16 29-Jun-16 100% 100.0%
A545-101-16-51-00812 R C AIR SUPPLY DISTRIBUTION SCHEME 4.35 5-Jan-16 29-Oct-15 4-Feb-16 11-Mar-16 11-Feb-16 18-Mar-16 15-Feb-16 25-Mar-16 14-Mar-16 1-Apr-16 13-May-16 7-Apr-16 100% 100.0%
A545-101-16-51-SK00 R E MISCELLANEOUS SKETCHES 2.90 18-Jan-16 4-Aug-15 17-Feb-16 31-Aug-15 24-Feb-16 21-Sep-15 29-Feb-16 28-Sep-15 28-Mar-16 26-Nov-15 27-May-16 17-Jun-16 100% 100.0%
100 99.8%
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD (ACTUAL
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG (10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-680-1111 VHP STEAM SYSTEM 1.4 5-Feb-15 9-Feb-15 7-Mar-15 10-Mar-15 15-Jun-15 29-Jun-15 15-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1112 VHP STEAM TO STG 1.4 7-Feb-15 9-Feb-15 9-Mar-15 10-Mar-15 17-Jun-15 30-Jun-15 17-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1113 STG STEAM SYSTEM 1.4 9-Feb-15 9-Feb-15 11-Mar-15 10-Mar-15 19-Jun-15 29-Jun-15 19-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1114 VHP-HP PRDS SYSTEM 1.4 11-Feb-15 9-Feb-15 13-Mar-15 10-Mar-15 21-Jun-15 29-Jun-15 21-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1115 HP STEAM SYSTEM 1.4 13-Feb-15 9-Feb-15 14-Mar-15 10-Mar-15 22-Jun-15 29-Jun-15 22-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1116 VHP-MP PRDS SYSTEM 1.4 15-Feb-15 9-Feb-15 17-Mar-15 10-Mar-15 25-Jun-15 29-Jun-15 25-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1118 MP STEAM SYSTEM 1.4 17-Feb-15 9-Feb-15 19-Mar-15 10-Mar-15 27-Jun-15 29-Jun-15 27-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1119 MP-LP PRDS SYSTEM 1.4 19-Feb-15 9-Feb-15 21-Mar-15 10-Mar-15 29-Jun-15 29-Jun-15 29-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1120 LP STEAM SYSTEM 1.4 21-Feb-15 9-Feb-15 23-Mar-15 10-Mar-15 1-Jul-15 29-Jun-15 31-Jul-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1121 VHP BFW PUMP TURBINE 1.4 23-Feb-15 9-Feb-15 25-Mar-15 10-Mar-15 3-Jul-15 29-Jun-15 2-Aug-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1122 IFO PUMP TURBINE 1.4 25-Feb-15 9-Feb-15 27-Mar-15 10-Mar-15 5-Jul-15 29-Jun-15 4-Aug-15 30-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1124 CONDENSATE COLLECTION SYSTEM 1.4 1-Mar-15 9-Mar-15 31-Mar-15 8-Apr-15 9-Jul-15 6-Jul-15 8-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1125 COOLING WATER DISTRIBUTION 1.4 3-Mar-15 1-Jun-15 2-Apr-15 1-Jul-15 11-Jul-15 8-Jul-15 10-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1127 PLANT AIR/ INST AIR DISTRIBUTION 1.4 5-Mar-15 7-Mar-15 4-Apr-15 6-Apr-15 13-Jul-15 6-Jul-15 12-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1128 NITROGEN DISTRIBUTION 1.4 7-Mar-15 7-Mar-15 6-Apr-15 6-Apr-15 15-Jul-15 6-Jul-15 14-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1129 DM WATER DISTRIBUTION SYSTEM 1.4 8-Mar-15 7-Mar-15 7-Apr-15 6-Apr-15 16-Jul-15 6-Jul-15 15-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1130 SERVICE WATER DISTRIBUTION SYSTEM 1.4 9-Mar-15 9-Feb-15 8-Apr-15 10-Mar-15 17-Jul-15 6-Jul-15 16-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1131 DM WATER & CONDENSATE STORAGE SYSTEM 1.4 10-Mar-15 9-Feb-15 9-Apr-15 10-Mar-15 18-Jul-15 6-Jul-15 17-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1132 DEAERATOR FEED PUMPING SYSTEM 1.4 11-Mar-15 9-Feb-15 10-Apr-15 10-Mar-15 19-Jul-15 6-Jul-15 18-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1133 DM WATER & CONDENSATE PREHEATING 1.4 13-Mar-15 9-Feb-15 11-Apr-15 10-Mar-15 20-Jul-15 6-Jul-15 19-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1134 DEAERATOR -I 1.4 15-Mar-15 9-Feb-15 14-Apr-15 10-Mar-15 23-Jul-15 6-Jul-15 22-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1135 DEAERATOR -II 1.4 17-Mar-15 9-Feb-15 16-Apr-15 10-Mar-15 25-Jul-15 6-Jul-15 24-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1136 /37 /38 VHP BFW FEED PUMPING SYSTEM 1.4 19-Mar-15 9-Feb-15 18-Apr-15 10-Mar-15 27-Jul-15 6-Jul-15 26-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1140 /41 /42 HP BFW PUMPING SYSTEM 1.4 23-Mar-15 9-Feb-15 22-Apr-15 10-Mar-15 11-Jul-15 6-Jul-15 10-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1143 MP BFW PUMPING SYSTEM 1.4 25-Mar-15 9-Feb-15 24-Apr-15 10-Mar-15 13-Jul-15 6-Jul-15 12-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1144 /45 /46 MORPHOLINE DOSING SYSTEM 1.4 27-Mar-15 23-Feb-15 25-Apr-15 24-Mar-15 14-Jul-15 6-Jul-15 13-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1147 HYDRAZINE DOSING SYSTEM 1.4 29-Mar-15 23-Feb-15 28-Apr-15 24-Mar-15 17-Jul-15 6-Jul-15 16-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
Page 656 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 1 of 4
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA
DISCIPLINE: PROCESS (CPP)
ANNEXURE-A6
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD (ACTUAL
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG (10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
A545-02-41-680-1151 HSD STORAGE 1.4 31-Mar-15 21-Jan-15 30-Apr-15 20-Feb-15 19-Jul-15 6-Jul-15 18-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1152 LCO STORAGE 1.4 2-Apr-15 22-Jan-15 2-May-15 21-Feb-15 21-Jul-15 6-Jul-15 20-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1153 LCO FORWARDING SYSTEM TO UB-HRSG 1.4 4-Apr-15 22-Jan-15 4-May-15 21-Feb-15 23-Jul-15 6-Jul-15 22-Aug-15 14-Jul-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1154 LCO DISTRIBUTION TO UB/HRSG 1.4 6-Apr-15 22-Jan-15 6-May-15 21-Feb-15 25-Jul-15 10-Jun-15 24-Aug-15 25-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1155 IFO STORAGE 1.4 8-Apr-15 26-Jan-15 8-May-15 25-Feb-15 27-Jul-15 10-Jun-15 26-Aug-15 25-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1157 IFO TRANSFER PUMP TO UB 1.4 12-Apr-15 2-Feb-15 12-May-15 3-Mar-15 11-Jul-15 10-Jun-15 10-Aug-15 25-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1158 IFO TRIM HEATER AND FILERS FOR UB 1.4 14-Apr-15 2-Feb-15 14-May-15 3-Mar-15 13-Jul-15 10-Jun-15 12-Aug-15 25-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1159 FUEL OIL SYSTEM (IFO) 1.4 16-Apr-15 2-Feb-15 16-May-15 4-Mar-15 15-Jul-15 10-Jun-15 14-Aug-15 25-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1160 NATURAL GAS SYSTEM 1.4 18-Apr-15 7-Feb-15 18-May-15 10-Mar-15 17-Jul-15 10-Jun-15 16-Aug-15 25-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1161 /1162 NATURAL GAS SYSTEM FOR UB/HRSG 1.4 20-Apr-15 7-Feb-15 20-May-15 10-Mar-15 19-Jul-15 10-Jun-15 18-Aug-15 27-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1163 FUEL GAS SYSTEM 1.4 22-Apr-15 7-Feb-15 22-May-15 10-Mar-15 21-Jul-15 10-Jun-15 20-Aug-15 27-Jun-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1164 VAPORISED PROPANE SYSTEM 1.4 23-Apr-15 5-Feb-15 23-May-15 4-Mar-15 22-Jul-15 6-Jul-15 21-Aug-15 8-Sep-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1165 PROPANE VAPORIZER 1.4 25-Apr-15 12-Feb-15 25-May-15 27-Mar-15 24-Jul-15 6-Jul-15 23-Aug-15 8-Sep-15 31-Oct-19 - 95% 95.0%
A545-02-41-680-1166 LCO FORWARDING SYSTEM FOR GTG 1.4 26-Apr-15 24-Jan-15 26-May-15 24-Feb-15 25-Jul-15 10-Jun-15 24-Aug-15 20-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-680-1169 FUEL SYSTEM ( HSD ) 1.4 2-May-15 24-Jan-15 1-Jun-15 24-Feb-15 31-Jul-15 10-Jun-15 30-Aug-15 22-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-680-1171 FLARE DISTRIBUTION 1.4 6-May-15 8-May-15 5-Jun-15 6-Jun-15 4-Aug-15 19-Jun-15 3-Sep-15 22-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-680-1172 FLARE KOD 1.4 8-May-15 9-Mar-15 6-Jun-15 8-Apr-15 27-Jul-15 19-Jun-15 26-Aug-15 25-Jun-15 31-Oct-19 - 95% 96.0%
A545-02-41-680-1173 CBD DISTRIBUTION 1.4 10-May-15 7-May-15 9-Jun-15 6-Jun-15 30-Jul-15 16-Nov-15 29-Aug-15 24-Dec-15 31-Oct-19 - 95% 96.0%
A545-02-41-680-1174 CBD DRUM 1.4 12-May-15 9-Mar-15 11-Jun-15 8-Apr-15 31-Jul-15 6-Oct-15 30-Aug-15 24-Dec-15 31-Oct-19 - 95% 96.0%
A545-02-41-680-1178 CONTROL VALVE VENT & DRAIN 1.4 13-May-15 21-Jul-15 12-Jun-15 20-Aug-15 1-Aug-15 27-Oct-15 31-Aug-15 24-Nov-15 31-Oct-19 - 95% 96.0%
A545-02-41-680-1179 SAMPLING CONNECTION DETAILS 1.4 14-May-15 18-Jul-15 13-Jun-15 18-Aug-15 1-Aug-15 27-Oct-15 31-Aug-15 24-Nov-15 31-Oct-19 - 95% 96.0%
A545-02-41-680-1180 LEVEL INSTRUMENT DRAIN / VENT 1.4 16-May-15 12-Sep-15 15-Jun-15 14-Oct-15 3-Aug-15 6-Nov-15 2-Sep-15 28-Dec-15 31-Oct-19 - 95% 96.0%
PROCESS DATASHEET-CPP
680-VV-1001 A/B DEAERATOR-I & II 0.3 4-Mar-15 26-Feb-15 3-Apr-15 12-Mar-15 23-May-15 19-Mar-15 22-Jun-15 19-Mar-15 11-Aug-15 19-Mar-15 100% 100.0%
680-VV-1002 FG KOD 0.3 6-Mar-15 1-May-15 5-Apr-15 15-May-15 15-Jun-15 22-May-15 15-Jul-15 22-May-15 3-Sep-15 22-May-15 100% 100.0%
680-VV-1003 NG KOD-1 0.3 8-Mar-15 1-May-15 7-Apr-15 15-May-15 16-Jun-15 22-May-15 16-Jul-15 22-May-15 4-Sep-15 22-May-15 100% 100.0%
680-VV-1005 IFO HEATER CONDENSATE POT 0.3 10-Mar-15 1-May-15 9-Apr-15 15-May-15 18-Jun-15 22-May-15 18-Jul-15 22-May-15 6-Sep-15 22-May-15 100% 100.0%
680-VV-1006 NG CONDENSATE DRAIN TANK 0.3 12-Mar-15 1-May-15 11-Apr-15 15-May-15 20-Jun-15 22-May-15 20-Jul-15 22-May-15 8-Sep-15 22-May-15 100% 100.0%
680-VV-1007 NG HEATER CONDENSATE POT 0.3 14-Mar-15 1-May-15 13-Apr-15 15-May-15 22-Jun-15 22-May-15 22-Jul-15 22-May-15 10-Sep-15 22-May-15 100% 100.0%
Page 657 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 2 of 4
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA
DISCIPLINE: PROCESS (CPP)
ANNEXURE-A6
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD (ACTUAL
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG (10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
680-VV-1009 CBD 0.3 18-Mar-15 1-May-15 17-Apr-15 15-May-15 26-Jun-15 22-May-15 26-Jul-15 22-May-15 14-Sep-15 22-May-15 100% 100.0%
680-VV-1010 LP FLARE KOD 0.3 19-Mar-15 24-Mar-15 18-Apr-15 7-Apr-15 27-Jun-15 7-Sep-15 27-Jul-15 7-Sep-15 15-Sep-15 5-Oct-15 100% 100.0%
680-VV-1012 ATM CONDENSATE FLASH DRUM 0.3 24-Mar-15 1-May-15 23-Apr-15 15-May-15 12-Jun-15 22-May-15 12-Jul-15 22-May-15 31-Aug-15 22-May-15 100% 100.0%
680-VV-1013 DUMP CONDENSER FLASH DRUM 0.3 24-Mar-15 23-May-15 23-Apr-15 6-Jun-15 12-Jun-15 3-Aug-15 12-Jul-15 3-Aug-15 31-Aug-15 31-Aug-15 100% 100.0%
680-EE-1001 A/B IFO HEATER 0.3 26-Mar-15 1-May-15 25-Apr-15 15-May-15 14-Jun-15 22-May-15 14-Jul-15 22-May-15 2-Sep-15 22-May-15 100% 100.0%
680-EE-1002 NG HEATER 0.3 28-Mar-15 1-May-15 27-Apr-15 15-May-15 16-Jun-15 22-May-15 16-Jul-15 22-May-15 4-Sep-15 22-May-15 100% 100.0%
680-EE-1006 ATM VENT CONDENSER 0.3 30-Mar-15 27-May-15 29-Apr-15 10-Jun-15 18-Jun-15 3-Aug-15 18-Jul-15 3-Aug-15 6-Sep-15 31-Aug-15 100% 100.0%
680-PA-1001 A/B/C LCO FORWARDING PUMPS TO UB & HRSG 0.3 1-Apr-15 28-Apr-15 1-May-15 12-May-15 10-Jun-15 19-May-15 10-Jul-15 19-May-15 29-Aug-15 19-May-15 100% 100.0%
680-PA-1003 A/B/C/D MUH FEED PUMPS 0.3 5-Apr-15 15-Apr-15 5-May-15 29-Apr-15 14-Jun-15 6-May-15 14-Jul-15 6-May-15 2-Sep-15 6-May-15 100% 100.0%
680-PA-1004 A/B/C/D/E/F DEAERATOR FEED PUMPS 0.3 7-Apr-15 15-Apr-15 7-May-15 29-Apr-15 16-Jun-15 6-May-15 16-Jul-15 6-May-15 4-Sep-15 6-May-15 100% 100.0%
680-PA-1005 A/B/C/D/E/F VHP BFW PUMP 0.3 9-Apr-15 15-Apr-15 9-May-15 29-Apr-15 18-Jun-15 6-May-15 18-Jul-15 6-May-15 6-Sep-15 6-May-15 100% 100.0%
680-PA-1006 A/B/C/D/E HP BFW PUMP 0.3 11-Apr-15 15-Apr-15 11-May-15 29-Apr-15 20-Jun-15 6-May-15 20-Jul-15 6-May-15 8-Sep-15 6-May-15 100% 100.0%
680-PA-1007 A/B MP BFW PUMP 0.3 13-Apr-15 15-Apr-15 13-May-15 29-Apr-15 22-Jun-15 6-May-15 22-Jul-15 6-May-15 10-Sep-15 6-May-15 100% 100.0%
680-PA-1008 A/B/C/D FO TRANSFER PUMP TO UB 0.3 15-Apr-15 28-Apr-15 15-May-15 12-May-15 24-Jun-15 19-May-15 24-Jul-15 19-May-15 12-Sep-15 19-May-15 100% 100.0%
680-PA-1011 A/B LCO TO GT-1 PUMPS 0.3 21-Apr-15 28-Apr-15 21-May-15 12-May-15 30-Jun-15 19-May-15 30-Jul-15 19-May-15 18-Sep-15 19-May-15 100% 100.0%
680-PA-1019 A/B MORPHOLINE DOSING PUMPS-3 0.3 7-May-15 27-May-15 6-Jun-15 10-Jun-15 16-Jul-15 27-Aug-15 15-Aug-15 18-Nov-15 4-Oct-15 18-Nov-15 100% 100.0%
680-PA-1020A/B HSD TO GT PUMPS 0.3 9-May-15 28-Apr-15 8-Jun-15 12-May-15 18-Jul-15 19-May-15 17-Aug-15 19-May-15 6-Oct-15 19-May-15 100% 100.0%
680-PA-1022 A/B CBD PUMPS 0.3 13-May-15 22-May-15 12-Jun-15 1-Jun-15 22-Jul-15 29-Sep-15 21-Aug-15 20-Nov-15 10-Oct-15 20-Nov-15 100% 100.0%
680-PA-1023 A/B ATM CONDENSATE PUMP 0.3 15-May-15 22-May-15 14-Jun-15 22-May-15 24-Jul-15 8-Dec-15 23-Aug-15 18-Jan-16 12-Oct-15 18-Jan-16 100% 100.0%
680-TT-1001 HSD STORAGE TANK 0.3 5-Mar-15 7-May-15 4-Apr-15 21-May-15 13-Jun-15 28-May-15 13-Jul-15 28-May-15 1-Sep-15 28-May-15 100% 100.0%
680-TT-1002 A/B LCO STORAGE TANK 0.3 7-Mar-15 7-May-15 6-Apr-15 21-May-15 15-Jun-15 28-May-15 15-Jul-15 28-May-15 3-Sep-15 28-May-15 100% 100.0%
680-TT-1003 IFO STORAGE TANK 0.3 9-Mar-15 4-May-15 8-Apr-15 18-May-15 17-Jun-15 25-May-15 17-Jul-15 25-May-15 5-Sep-15 25-May-15 100% 100.0%
680-TT-1004 A/B CONDENSATE STORAGE TANK 0.3 11-Mar-15 7-May-15 10-Apr-15 21-May-15 19-Jun-15 28-May-15 19-Jul-15 28-May-15 7-Sep-15 28-May-15 100% 100.0%
680-YS-1001/1002 VHP-HP PRDS-I & II 0.3 29-Mar-15 1-May-15 28-Apr-15 15-May-15 17-Jun-15 22-May-15 17-Jul-15 22-May-15 5-Sep-15 22-May-15 100% 100.0%
680-YS-1003/1004 VHP-MP PRDS-I & II 0.3 31-Mar-15 1-May-15 30-Apr-15 15-May-15 19-Jun-15 22-May-15 19-Jul-15 22-May-15 7-Sep-15 22-May-15 100% 100.0%
680-YS-1005/1006 MP-LP PRDS-I & II 0.3 2-Apr-15 1-May-15 2-May-15 15-May-15 21-Jun-15 22-May-15 21-Jul-15 22-May-15 9-Sep-15 22-May-15 100% 100.0%
680-GN-1003 A/B IFO SUPPLY PUMP TO UB SUCTION FILTERS 0.3 8-Apr-15 1-May-15 8-May-15 15-May-15 27-Jun-15 22-May-15 27-Jul-15 22-May-15 15-Sep-15 22-May-15 100% 100.0%
680-LZ-1001 MORPHOLINE DOSING SKID-I 0.3 12-Apr-15 27-May-15 12-May-15 10-Jun-15 1-Jul-15 27-Aug-15 31-Jul-15 27-Aug-15 19-Sep-15 27-Aug-15 100% 100.0%
680-LZ-1002 MORPHOLINE DOSING SKID-II 0.3 14-Apr-15 27-May-15 14-May-15 10-Jun-15 3-Jul-15 27-Aug-15 2-Aug-15 27-Aug-15 21-Sep-15 27-Aug-15 100% 100.0%
680-LZ-1003 MORPHOLINE DOSING SKID-III 0.3 16-Apr-15 27-May-15 16-May-15 10-Jun-15 5-Jul-15 27-Aug-15 4-Aug-15 27-Aug-15 23-Sep-15 27-Aug-15 100% 100.0%
Page 658 of 1078
Format no. 5-2744-0112-F8, Rev 0 Page 3 of 4
Jul-19
DANGOTE REFINERY AND PETROCHEMICAL DRAWING CONTROL INDEX JOB NO. : A545
PROJECT, NIGERIA
DISCIPLINE: PROCESS (CPP)
ANNEXURE-A6
TOTAL TOTAL
START ISSUED FOR COMMENTS ISSUED FOR ENGINEERING ISSUED FOR HAZOP FINAL ISSUE (SCHD (ACTUAL
DRAWING/ DOCUMENT NO. DRAWING/ DOCUMENT TITLE WTG (10%) (65%) (85%) (95%) (100%) PROGRESS PROGRESS
% %) %)
Sch Act Sch Act Sch Act Sch Act Sch Act
680-LZ-1004 HYDRAZINE DOSING SKID 0.3 18-Apr-15 27-May-15 18-May-15 10-Jun-15 7-Jul-15 27-Aug-15 6-Aug-15 27-Aug-15 25-Sep-15 27-Aug-15 100% 100.0%
680-LZ-1006 LCO CENTRIFUGE 0.3 22-Apr-15 27-May-15 22-May-15 10-Jun-15 11-Jul-15 22-Sep-15 10-Aug-15 22-Sep-15 29-Sep-15 22-Sep-15 100% 100.0%
680-LZ-1010 HSD CENTRIFUGE 0.3 25-Apr-15 27-May-15 25-May-15 10-Jun-15 14-Jul-15 22-Sep-15 13-Aug-15 22-Sep-15 2-Oct-15 22-Sep-15 100% 100.0%
A545-02-41-680-UTS UTILITY SUMMARY 1.1 28-Dec-14 17-Feb-15 28-Jan-15 19-Mar-15 11-Feb-15 26-Mar-15 13-Mar-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-680-FLS FLARE LOAD SUMMARY 1.1 19-Jan-15 14-Mar-15 19-Feb-15 14-Apr-15 5-Mar-15 21-Apr-15 4-Apr-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-680-EFS EFFLUENT SUMMARY 1.1 4-Jan-15 17-Feb-15 4-Feb-15 19-Mar-15 18-Feb-15 26-Mar-15 20-Mar-15 12-Feb-16 31-Oct-19 - 95% 95.0%
A545-02-41-680-CHS CHEMICAL SUMMARY 1.1 14-Dec-14 23-Dec-14 14-Jan-15 22-Jan-15 28-Jan-15 29-Jan-15 27-Feb-15 12-Feb-16 31-Oct-19 - 95% 95.0%
100 97.0%
INCORPORATE COMMENTS
UPDATE & ISSUE FOR TOTAL TOTAL
START DRAFTING COMPLETE CHECKING COMPLETE ISSUED FOR COMMENTS & ISSUE FOR ENGG /
DRAWING/ DOCUMENT CONSTRUCTION (SCHD. (ACTUAL
CAT DRAWING/ DOCUMENT TITLE WTG (10%) (60%) (65%) (80%) CONSTRUCTION
NO. (100%) PROGRESS %) PROGRESS %)
% (85%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
ARCHITECTURE - CPP
A545-680-16-49-00531 TO
C GTG SHED PLAN ,ELEV & SEC 26.1 24-Jun-15 10-Mar-15 8-Jul-15 1-Apr-15 15-Jul-15 6-Apr-15 22-Jul-15 16-Apr-15 12-Aug-15 11-Jun-15 10-Dec-15 11-Mar-16 100% 100.0%
00533
A545-680-81-41-3001 C GTG SHED 13.0 27-Jun-15 10-Mar-15 11-Jul-15 1-Apr-15 18-Jul-15 6-Apr-15 25-Jul-15 16-Apr-15 15-Aug-15 11-Jun-15 12-Dec-15 11-Mar-16 100% 100.0%
A545-680-16-49-00533 C GTG SHED ELEVATION 13.0 29-Jun-15 10-Mar-15 13-Jul-15 1-Apr-15 20-Jul-15 6-Apr-15 27-Jul-15 16-Apr-15 17-Aug-15 11-Jun-15 14-Dec-15 11-Mar-16 100% 100.0%
A545-680-16-49-00536 C STG SHED PLAN ,ELEV & SEC 8.7 26-Jun-15 12-Mar-15 10-Jul-15 6-Apr-15 17-Jul-15 10-Apr-15 24-Jul-15 20-Apr-15 14-Aug-15 16-Jun-15 12-Dec-15 18-Mar-16 100% 100.0%
A545-680-16-49-00537 C STG SHED FIRST FLOOR PLAN 8.7 29-Jun-15 1-May-15 13-Jul-15 15-May-15 20-Jul-15 22-May-15 27-Jul-15 29-May-15 17-Aug-15 16-Jun-15 15-Dec-15 16-Mar-16 100% 100.0%
A545-680-16-49-00538 C STG SHED SECOND FLOOR PLAN 8.7 7-Jul-15 1-May-15 21-Jul-15 15-May-15 28-Jul-15 22-May-15 4-Aug-15 29-May-15 25-Aug-15 16-Jun-15 23-Dec-15 16-Mar-16 100% 100.0%
A545-680-81-41-03003 C STG SHED TERRACE PLAN 8.7 10-Jul-15 3-Feb-16 24-Jul-15 17-Feb-16 31-Jul-15 24-Feb-16 7-Aug-15 2-Mar-16 28-Aug-15 9-Mar-16 26-Dec-15 16-Mar-16 100% 100.0%
A545-680-81-41-03004 C STG SHED (Section Elevation & Door Window Profile) 8.7 10-Jul-15 3-Feb-16 24-Jul-15 17-Feb-16 31-Jul-15 24-Feb-16 7-Aug-15 2-Mar-16 28-Aug-15 9-Mar-16 26-Dec-15 16-Mar-16 100% 100.0%
E
100 100.00%
A545-680-16-47-01102 E P&ID FOR OWS SYSTEM 2.7 8-Jul-15 16-Oct-15 22-Jul-15 30-Oct-15 29-Jul-15 6-Nov-15 3-Aug-15 13-Nov-15 17-Aug-15 20-Nov-15 1-Oct-15 4-Dec-15 100% 100.0%
A545-680-16-47-01103 E P&ID FOR FIRE WATER 2.7 9-Jul-15 28-May-15 23-Jul-15 22-Jun-15 30-Jul-15 21-Jul-15 3-Aug-15 24-Jul-15 17-Aug-15 10-Sep-15 1-Oct-15 16-Sep-15 100% 100.0%
A545-680-16-47-01104 E P&ID FOR FIRE WATER SPRAY 5.4 11-Jul-15 30-May-15 25-Jul-15 26-Jun-15 1-Aug-15 15-Jul-15 5-Aug-15 24-Jul-15 19-Aug-15 31-Oct-15 16-Nov-16 18-Feb-19 100% 100.0%
A545-680-16-47-31106 E P&ID FOR DRINKING WATER 1.9 15-Jul-15 3-Jul-15 29-Jul-15 10-Jul-15 5-Aug-15 10-Jul-15 9-Aug-15 16-Jul-15 23-Aug-15 20-Jul-15 7-Oct-15 3-Aug-15 100% 100.0%
A545-680-16-47-02001 C UNIT AREA-01 3.7 22-Jul-15 15-Jul-15 12-Aug-15 12-Oct-15 19-Aug-15 19-Oct-15 26-Aug-15 26-Oct-15 9-Sep-15 31-Oct-15 19-Nov-15 30-Jun-16 100% 100.0%
A545-680-16-47-02002 C UNIT AREA-02 3.7 24-Jul-15 15-Jul-15 14-Aug-15 12-Oct-15 21-Aug-15 19-Oct-15 28-Aug-15 26-Oct-15 11-Sep-15 31-Oct-15 9-Dec-16 25-Feb-19 100% 100.0%
A545-680-16-47-02003 C UNIT AREA-03 3.7 26-Jul-15 22-Jul-15 16-Aug-15 12-Oct-15 23-Aug-15 19-Oct-15 30-Aug-15 26-Oct-15 13-Sep-15 31-Oct-15 23-Nov-15 30-May-16 100% 100.0%
A545-680-16-47-02004 C UNIT AREA-04 3.7 28-Jul-15 22-Jul-15 18-Aug-15 12-Oct-15 25-Aug-15 19-Oct-15 1-Sep-15 26-Oct-15 15-Sep-15 31-Oct-15 25-Nov-15 30-May-16 100% 100.0%
A545-680-16-47-02005 C UNIT AREA-05 3.7 30-Jul-15 22-Jul-15 20-Aug-15 12-Oct-15 27-Aug-15 19-Oct-15 3-Sep-15 26-Oct-15 17-Sep-15 31-Oct-15 15-Dec-16 29-Oct-18 100% 100.0%
A545-680-16-47-02006 C UNIT AREA-06 3.7 2-Aug-15 25-Jul-15 23-Aug-15 12-Oct-15 30-Aug-15 19-Oct-15 6-Sep-15 26-Oct-15 20-Sep-15 31-Oct-15 17-Dec-16 29-Oct-18 100% 100.0%
A545-680-16-47-02007 C UNIT AREA-07 3.7 4-Aug-15 25-Jul-15 25-Aug-15 12-Oct-15 1-Sep-15 19-Oct-15 8-Sep-15 26-Oct-15 22-Sep-15 31-Oct-15 2-Dec-15 30-May-16 100% 100.0%
A545-680-16-47-02008 C UNIT AREA-08 3.7 6-Aug-15 31-Jul-15 27-Aug-15 12-Oct-15 3-Sep-15 19-Oct-15 10-Sep-15 26-Oct-15 24-Sep-15 31-Oct-15 4-Dec-15 30-May-16 100% 100.0%
A545-680-16-47-02009 C UNIT AREA-09 3.7 8-Aug-15 31-Jul-15 29-Aug-15 12-Oct-15 5-Sep-15 19-Oct-15 12-Sep-15 26-Oct-15 26-Sep-15 31-Oct-15 23-Dec-16 25-Feb-19 100% 100.0%
A545-680-16-47-02010 C UNIT AREA-10 3.7 10-Aug-15 31-Jul-15 31-Aug-15 12-Oct-15 7-Sep-15 19-Oct-15 14-Sep-15 26-Oct-15 28-Sep-15 31-Oct-15 26-Dec-16 25-Feb-19 100% 100.0%
A545-680-16-47-02011 C UNIT AREA-11 3.7 12-Aug-15 31-Jul-15 2-Sep-15 28-Oct-15 9-Sep-15 4-Nov-15 16-Sep-15 11-Nov-15 30-Sep-15 16-Nov-15 10-Dec-15 31-May-16 100% 100.0%
A545-680-16-47-02012 C UNIT AREA-12 3.7 14-Aug-15 31-Jul-15 4-Sep-15 28-Oct-15 11-Sep-15 4-Nov-15 18-Sep-15 11-Nov-15 2-Oct-15 16-Nov-15 12-Dec-15 31-May-16 100% 100.0%
A545-680-16-47-30050 C ISOS U/G PIPING 9.1 23-Sep-15 25-Jul-15 14-Oct-15 7-Apr-16 21-Oct-15 14-Apr-16 28-Oct-15 21-Apr-16 11-Nov-15 26-Apr-16 30-Apr-19 30-Apr-19 100% 100.0%
A545-680-16-47-04032 C LAYOUT OF PORTABLE EXTINGUISHER 2.5 11-Sep-15 14-Oct-15 25-Sep-15 28-Oct-15 2-Oct-15 4-Nov-15 7-Oct-15 11-Nov-15 6-Dec-15 18-Nov-15 4-Jan-17 19-Jun-18 100% 100.0%
A545-680-16-47-02030 C LAYOUT OF RCC PAVEMENT 4.9 11-Sep-15 26-Oct-15 25-Sep-15 9-Nov-15 2-Oct-15 16-Nov-15 7-Oct-15 23-Nov-15 6-Dec-15 30-Nov-15 30-Apr-19 29-Apr-19 100% 100.0%
100 100.0%
TOTAL
INCORPORATE COMMENTS TOTAL
DRAFTING COMPLETE CHECKING COMPLETED ISSUED FOR COMMENTS UPDATE & ISSUE FOR (SCHD.
MR No MR DESCRIPTION WTG. % START (10%) & ISSUE FOR (ACTUAL
(60%) (65%) (80%) CONSTRUCTION (100%) PROGRESS
CONSTRUCTION (85%) PROGRESS %)
%)
Sch Act Sch Act Sch Act Sch Act Sch Act Sch Act
HMTD - CPP
100 100.0%
TOTAL TOTAL
VENDOR DRAWING
MR/TR ISSUE TBA PR ISSUE (SCHD. (ACTUAL
REVIEW
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) PROGRESS PROGRESS
(100%)
%) %)
HMTD - CPP
A545-680-JT-MR-7671 DEAERATOR PACKAGE FOR CPP 10.94 26-May-15 6-Apr-15 4-Sep-15 25-Jun-15 24-Oct-15 12-Oct-15 15-Feb-17 28-Sep-17 100% 100%
A545-680-LM-MR-7830 HRSG PACKAGE 35.94 13-Jun-15 11-Mar-15 23-Sep-15 27-Jul-15 12-Nov-15 30-Dec-15 5-Apr-17 30-Apr-18 100% 100%
A545-680-LM-MR-7840 UTILITY BOILER PACKAGE 39.06 18-May-15 13-Mar-15 27-Aug-15 15-Jul-15 16-Oct-15 23-Dec-15 9-Mar-17 30-Apr-18 100% 100%
100 100.0%
TOTAL TOTAL
VENDOR DRAWING
MR/TR ISSUE TBA PR ISSUE (SCHD (ACTUAL
REVIEW
MR No MR DESCRIPTION WTG. % (40%) (85%) (90%) PROGRESS PROGRESS
(100%)
%) %)
PED - CPP
A545-680-LZ-MR-4890 CENTRIFUGE PACKAGE 11.6 21-Sep-15 29-Oct-15 31-Dec-15 15-Mar-16 19-Feb-16 8-Aug-16 10-Mar-17 22-Jun-18 100% 100.0%
A545-700-HH-MR-4610 EOT CRANES 26.2 2-Jul-15 3-Jun-15 12-Oct-15 9-Oct-15 1-Dec-15 27-Jul-16 8-Feb-17 30-Jan-18 100% 100.0%
A545-101-GN-MR-4390 FILTERS 2.9 27-Aug-15 21-Dec-15 8-Dec-15 30-Apr-16 12-Nov-16 9-Mar-18 30-Apr-19 30-Apr-19 100% 100.0%
100 100.0%
A545-680-16-43-00001 E EQUIPMENT LAYOUT 1.7 4-Jan-16 2-Feb-15 1-Feb-16 30-Apr-15 8-Feb-16 9-Jun-15 23-Feb-16 23-Jun-15 24-Mar-16 2-Jul-15 23-Apr-16 21-Aug-15 100% 100.0%
A545-680-16-43-00010 E AREA DIVISION 0.8 14-Jan-16 3-Jun-15 26-Jan-16 17-Jun-15 2-Feb-16 24-Jun-15 9-Feb-16 8-Jul-15 16-Feb-16 22-Sep-15 30-Sep-19 - 85% 85.0%
A545-680-16-43-00051 C PIPING GAD AREA-05 0.05 2-Nov-15 18-Sep-15 17-Nov-15 20-Oct-15 24-Nov-15 27-Oct-15 1-Dec-15 31-Oct-15 16-Dec-15 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00052 C PIPING GAD AREA-05 0.05 2-Nov-15 10-Oct-15 17-Nov-15 28-Dec-15 24-Nov-15 24-Jan-16 1-Dec-15 31-Jan-16 16-Dec-15 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00053 C PIPING GAD AREA-05 0.05 2-Nov-15 10-Oct-15 17-Nov-15 28-Dec-15 24-Nov-15 25-Jan-16 1-Dec-15 1-Feb-16 16-Dec-15 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00061 C PIPING GAD AREA-06 0.05 2-Nov-15 18-Sep-15 17-Nov-15 20-Oct-15 24-Nov-15 27-Oct-15 1-Dec-15 31-Oct-15 16-Dec-15 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00062 C PIPING GAD AREA-06 0.05 2-Nov-15 18-Sep-15 17-Nov-15 20-Oct-15 24-Nov-15 27-Oct-15 1-Dec-15 31-Oct-15 16-Dec-15 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00063 C PIPING GAD AREA-06 0.05 2-Nov-15 18-Sep-15 17-Nov-15 20-Oct-15 24-Nov-15 27-Oct-15 1-Dec-15 31-Oct-15 16-Dec-15 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00071 C PIPING GAD AREA-07 0.05 2-Nov-15 10-Oct-15 17-Nov-15 28-Dec-15 24-Nov-15 26-Jan-16 1-Dec-15 2-Feb-16 16-Dec-15 9-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00072 C PIPING GAD AREA-07 0.05 2-Nov-15 18-Sep-15 17-Nov-15 20-Oct-15 24-Nov-15 27-Oct-15 1-Dec-15 31-Oct-15 16-Dec-15 9-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00073 C PIPING GAD AREA-07 0.05 2-Nov-15 18-Sep-15 17-Nov-15 20-Oct-15 24-Nov-15 27-Oct-15 1-Dec-15 31-Oct-15 16-Dec-15 9-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00201 C PIPING GAD AREA-20 0.05 6-Jan-16 28-Sep-15 21-Jan-16 20-Oct-15 28-Jan-16 24-Jan-16 4-Feb-16 31-Jan-16 19-Feb-16 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00202 C PIPING GAD AREA-20 0.05 6-Jan-16 10-Oct-15 21-Jan-16 28-Dec-15 28-Jan-16 24-Jan-16 4-Feb-16 31-Jan-16 19-Feb-16 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00203 C PIPING GAD AREA-20 0.05 6-Jan-16 10-Oct-15 21-Jan-16 28-Dec-15 28-Jan-16 24-Jan-16 4-Feb-16 31-Jan-16 19-Feb-16 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00251 C PIPING GAD AREA-25 0.05 6-Jan-16 10-Oct-15 21-Jan-16 28-Dec-15 28-Jan-16 25-Jan-16 4-Feb-16 1-Feb-16 19-Feb-16 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00252 C PIPING GAD AREA-25 0.05 4-Feb-16 29-Sep-15 19-Feb-16 20-Oct-15 26-Feb-16 25-Jan-16 4-Mar-16 1-Feb-16 19-Mar-16 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00261 C PIPING GAD AREA-26 0.05 4-Feb-16 10-Oct-15 19-Feb-16 28-Dec-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 30-Sep-19 - 85% 85.0%
A545-680-16-43-00262 C PIPING GAD AREA-26 0.05 4-Feb-16 29-Sep-15 19-Feb-16 20-Oct-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 31-Oct-19 - 85% 85.0%
A545-680-16-43-00263 C PIPING GAD AREA-26 0.05 4-Feb-16 29-Sep-15 19-Feb-16 20-Oct-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 31-Oct-19 - 85% 85.0%
A545-680-16-43-00271 C PIPING GAD AREA-27 0.05 4-Feb-16 10-Oct-15 19-Feb-16 28-Dec-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 31-Oct-19 - 85% 85.0%
A545-680-16-43-00272 C PIPING GAD AREA-27 0.05 4-Feb-16 29-Sep-15 19-Feb-16 20-Oct-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 31-Oct-19 - 85% 85.0%
A545-680-16-43-00273 C PIPING GAD AREA-27 0.05 4-Feb-16 29-Sep-15 19-Feb-16 20-Oct-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 31-Oct-19 - 85% 85.0%
A545-680-16-43-00281 C PIPING GAD AREA-28 0.05 4-Feb-16 10-Oct-15 19-Feb-16 28-Dec-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 31-Oct-19 - 85% 85.0%
A545-680-16-43-00282 C PIPING GAD AREA-28 0.05 4-Feb-16 29-Sep-15 19-Feb-16 20-Oct-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 31-Oct-19 - 85% 85.0%
A545-680-16-43-00283 C PIPING GAD AREA-28 0.05 4-Feb-16 29-Sep-15 19-Feb-16 20-Oct-15 26-Feb-16 24-Jan-16 4-Mar-16 31-Jan-16 19-Mar-16 8-Feb-16 31-Oct-19 - 85% 85.0%
A545-680-16-43-00291 C PIPING GAD AREA-29 0.05 4-Feb-16 10-Oct-15 19-Feb-16 28-Dec-15 26-Feb-16 24-Jan-16 4-Mar-16 31-