Hydraulic Calculations

for
Project Name: KINGS MOUNTAIN ENERGY
Location: , ,
Drawing Name: COMBUSTION TURBINE GENERATOR BEARINGS rev 1 Calculation Date: 7/14/2017

Design
Remote Area Number: Manually Flowing
Remote Area Location: NA
Occupancy Classification: NA

Density: NA
Area of Application: NA
Coverage per Sprinkler: NA
Type of sprinklers calculated: NA
No. of sprinklers calculated: 10

Type of System: NA Volume of Dry or PreAction System: N/A


In-rack Demand: N/A gpm at Node: N/A
Hose Streams: 500.0 at Node: 1 Type: Allowance at Source

Total Water Required (including Hose Streams where applicable):


From Water Supply at Node 1: 782.2 @ 121.9

Water Supply Information:

Name of Contractor:
Address: ,
Phone Number: Name of designer: Josh Layton

Authority Having Jurisdiction:

Notes:

Automatic peaking results Left: N/A Right: N/A

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 Manually Flowing 7/14/2017 1:15:16PM Page 1


Hydraulic Graph
Job Name: KINGS MOUNTAIN ENERGY 1.85
N
Remote Area Number: Manually Flowing Date: 7/14/2017

Water Supply
Summary Sheet
Node: 1

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 7/14/2017 1:15:17PM Page 2


Summary Of Outflowing Devices Job Number: 1
Report Description: Light Hazard
Actual Flow Minimum Flow K-Factor Pressure
Device (gpm) (gpm) (K) (psi)
Nozzle 301 25.8 25.0 5.6 21.3
Nozzle 302 34.2 25.0 5.6 37.2
Nozzle 303 26.1 25.0 5.6 21.7
Nozzle 304 25.0 25.0 5.6 19.9
Nozzle 305 25.4 25.0 5.6 20.6
Nozzle 306 34.2 25.0 5.6 37.2
Nozzle 307 27.0 25.0 5.6 23.2
Nozzle 308 26.0 25.0 5.6 21.6
Nozzle 309 25.2 25.0 5.6 20.3

Most Demanding Sprinkler Data

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 7/14/2017 1:15:18PM Page 3


Job Name: KINGS MOUNTAIN ENERGY
Remote Area Number: Manually Flowing Date: 7/14/2017

Supply Analysis
Static Residual Flow Available Total Demand Required Pressure
Node Name @ @
(psi) (psi) (gpm) (psi) (gpm) (psi)

1 Water Supply 149.0 133.0 2000.0 146.2 782.2 121.9

Node Analysis
Node Number Elevation (Foot) Node Type Pressure at Discharge at Notes
Node Node
(psi) (gpm)

1 -6-0½ Supply 121.9 282.2

301 18-4½ 21.3 25.8

302 18-4½ 37.2 34.2

303 10-4½ 21.7 26.1

304 19-10½ 19.9 25.0

305 23-0 20.6 25.4

306 23-0 37.2 34.2

307 10-4½ 23.2 27.0

308 19-10½ 21.6 26.0

309 18-4½ 20.3 25.2

310 18-4½ 35.6 33.4

58 -6-0½ 121.6

59 1-0 118.5

61 -6-0½ 121.7

100 10-0½ 37.4

101 20-6½ 32.6

102 10-0½ 39.0

103 10-4 37.3

106 10-0½ 66.9

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 7/14/2017 1:15:20PM Page 4


Job Name: KINGS MOUNTAIN ENERGY
Remote Area Number: Manually Flowing Date: 7/14/2017

Node Number Elevation (Foot) Node Type Pressure at Discharge at Notes


Node Node
(psi) (gpm)

107 10-4 64.1

109 10-0½ 67.6

113 10-11 86.6

123 20-6½ 32.5

150 2-9½ 117.6

154 5-0½ 113.6

163 9-10½ 93.2

164 10-11 89.3

172 24-0 23.3

175 24-0 42.6

180 19-6 21.7

181 20-6½ 26.0

186 24-0 22.4

189 24-0 41.1

191 19-6 23.4

192 20-6½ 24.5

198 24-0 22.2

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 7/14/2017 1:15:20PM Page 5


Job Name: KINGS MOUNTAIN ENERGY
Remote Area Number: Manually Flowing Date: 7/14/2017

Pipe Information
Flow added Length C Factor Notes
Elev 1 Fittings & Total(Pt)
Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device (Equivalent
(Foot) Devices
(q) Length)
Fitting
Pf Friction Elev(Pe) Fixed Pressure Losses, when
Equiv. (Foot) Loss Per Unit
Elev 2 Total Flow applicable, are added directly
Node 2 Actual ID Length Total
(Foot) (Q) (psi) to (Pf) and shown as a
(Foot) Friction(Pf)
(Foot) negative value.

0-9 100 19.9 • • • • • Route 1 • • • • •


304 19-10½ 5.6 25.0 1 (See
Notes) Nozzle,
5-0 0.2
0.275519 E(1-5), T(3-7)
180 19-6 25.0 1.049
5-8½ 1.6

(See 1-0 100 21.7


180 19-6 26.1 1
Notes) Flow (q) from Route 6
3-7 -0.4
1.034042 PO(3-7)
181 20-6½ 51.1 1.049
4-7 4.7

13-7½ 100 26.0


181 20-6½ 53.0 1½
Flow (q) from Route 5
-0.0
0.478727
123 20-6½ 104.1 1.610
13-7½ 6.5

(See 0-4½ 100 32.5


123 20-6½ 3
Notes)
14-3 0.0
0.007360 fE(3-7), T(10-8½)
101 20-6½ 59.5 3.068
14-8 0.1

(See 10-6 100 32.6


101 20-6½ 44.6 3
Notes) Flow (q) from Route 11
3-7 4.6
0.020718 LtE(3-7)
100 10-0½ 104.1 3.068
14-1 0.3

4-6 120 37.4


100 10-0½ 1½

0.341667
102 10-0½ 104.1 1.610
4-6 1.5

29-6 120 39.0


102 10-0½ 76.5 1½
Flow (q) from Route 2

0.946467
106 10-0½ 180.5 1.610
29-6 27.9

0-4 120 66.9


106 10-0½ 101.7 1½
Flow (q) from Route 8

2.163099
109 10-0½ 282.2 1.610
0-4 0.7

(See 22-4½ 120 67.6


109 10-0½ 2
Notes)
7-9½ -0.4
0.640635 fE(3-6), fE(4-3½)
113 10-11 282.2 2.067
30-2½ 19.3

(See 5-9½ 120 86.6


113 10-11 2½
Notes)
4-3½
0.269613 fE(4-3½)
164 10-11 282.2 2.469
10-1½ 2.7

(See 1-0½ 120 89.3


164 10-11 2
Notes)
4-3½ 0.5
0.640635 fE(4-3½)
163 9-10½ 282.2 2.067
5-4 3.4

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 Manually Flowing 7/14/2017 1:15:21PM Page 6


Job Name: KINGS MOUNTAIN ENERGY
Remote Area Number: Manually Flowing Date: 7/14/2017

Pipe Information
Flow added Length C Factor Notes
Elev 1 Fittings & Total(Pt)
Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device (Equivalent
(Foot) Devices
(q) Length)
Fitting
Pf Friction Elev(Pe) Fixed Pressure Losses, when
Equiv. (Foot) Loss Per Unit
Elev 2 Total Flow applicable, are added directly
Node 2 Actual ID Length Total
(Foot) (Q) (psi) to (Pf) and shown as a
(Foot) Friction(Pf)
(Foot) negative value.

(See 32-6½ 120 93.2


163 9-10½ 2½
Notes)
35-6 2.1
0.269613 5fE(4-3½), CV(14-0)
154 5-0½ 282.2 2.469
68-0½ 18.4

(See 0-0 120 113.6


154 5-0½ 4
Notes)
2-0 1.0
0.024922 DelV(-3.0), GV(2-0)
150 2-9½ 282.2 4.026
2-0 3.0

(See 17-5½ 120 117.6


150 2-9½ 8
Notes)
127-0 0.8
0.000890 fT(33-0), 2fE(13-0)
59 1-0 282.2 7.981
144-5½ 0.1

(See 7-0½ 140 118.5


59 1-0 8
Notes)
30-6½ 3.0
0.000525 E(30-6½)
58 -6-0½ 282.2 8.390
37-6½ 0.0

(See 85-4 150 121.6


58 -6-0½ 8
Notes)
49-9½
0.000697 PIV(5-1½), T(44-8)
61 -6-0½ 282.2 7.710
135-1 0.1

(See 626-0½ 150 121.7


61 -6-0½ 10
Notes)
283-4
0.000251 5E(25-9), 2PIV(5-10),
1 -6-0½ 282.2 9.510
909-4½ 0.2 2T(58-6½), 2EE(12-10½), S

121.9 Hose Allowance At Source


500.0

1 782.2
Total(Pt) Route 1

6-9 100 20.3 • • • • • Route 2 • • • • •


309 18-4½ 5.6 25.2 1 (See
Notes) Nozzle,
8-6½ -2.4
0.280417 E(1-5), T(3-7), PO(3-7)
198 24-0 25.2 1.049
15-3½ 4.3

7-9 100 22.2


198 24-0 1½

0.034813
186 24-0 25.2 1.610
7-9 0.3

7-0 100 22.4


186 24-0 25.4 1½
Flow (q) from Route 3

0.126187
172 24-0 50.6 1.610
7-0 0.9

(See 25-6 100 23.3


172 24-0 25.8 1½
Notes) Flow (q) from Route 4
4-3½ 5.9
0.270548 3LtE(1-5)
103 10-4 76.5 1.610
29-9 8.1

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 Manually Flowing 7/14/2017 1:15:21PM Page 7


Job Name: KINGS MOUNTAIN ENERGY
Remote Area Number: Manually Flowing Date: 7/14/2017

Pipe Information
Flow added Length C Factor Notes
Elev 1 Fittings & Total(Pt)
Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device (Equivalent
(Foot) Devices
(q) Length)
Fitting
Pf Friction Elev(Pe) Fixed Pressure Losses, when
Equiv. (Foot) Loss Per Unit
Elev 2 Total Flow applicable, are added directly
Node 2 Actual ID Length Total
(Foot) (Q) (psi) to (Pf) and shown as a
(Foot) Friction(Pf)
(Foot) negative value.

(See 0-0 120 37.3


103 10-4 1½
Notes)
8-0 0.1
0.193090 PO(8-0)
102 10-0½ 76.5 1.610
8-0 1.5

39.0 Total(Pt) Route 2

1-8½ 100 20.6 • • • • • Route 3 • • • • •


305 23-0 5.6 25.4 1 (See
Notes) Nozzle,
6-5 -0.4
0.283489 2E(1-5), PO(3-7)
186 24-0 25.4 1.049
8-2 2.3

22.4 Total(Pt) Route 3

6-9 100 21.3 • • • • • Route 4 • • • • •


301 18-4½ 5.6 25.8 1 (See
Notes) Nozzle,
8-6½ -2.4
0.292718 E(1-5), T(3-7), PO(3-7)
172 24-0 25.8 1.049
15-3½ 4.5

23.3 Total(Pt) Route 4

0-9 100 21.6 • • • • • Route 5 • • • • •


308 19-10½ 5.6 26.0 1 (See
Notes) Nozzle,
5-0 0.2
0.296299 E(1-5), T(3-7)
191 19-6 26.0 1.049
5-8½ 1.7

(See 1-0 100 23.4


191 19-6 27.0 1¼
Notes) Flow (q) from Route 7
4-3½ -0.4
0.290843 PO(4-3½)
192 20-6½ 53.0 1.380
5-3½ 1.5

10-6 100 24.5


192 20-6½ 1½

0.137286
181 20-6½ 53.0 1.610
10-6 1.4

26.0 Total(Pt) Route 5

10-3 100 21.7 • • • • • Route 6 • • • • •


303 10-4½ 5.6 26.1 1 (See
Notes) Nozzle,
2-10 -4.0
0.298361 2E(1-5)
180 19-6 26.1 1.049
13-1 3.9

21.7 Total(Pt) Route 6

10-3 100 23.2 • • • • • Route 7 • • • • •


307 10-4½ 5.6 27.0 1 (See
Notes) Nozzle,
2-10 -4.0
0.317371 2E(1-5)
191 19-6 27.0 1.049
13-1 4.2

23.4 Total(Pt) Route 7

7-4½ 100 35.6 • • • • • Route 8 • • • • •


310 18-4½ 5.6 33.4 1 (See
Notes) Nozzle,
8-6½ -2.4
0.470690 E(1-5), T(3-7), PO(3-7)
201 24-0 33.4 1.049
15-11 7.5

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 Manually Flowing 7/14/2017 1:15:21PM Page 8


Job Name: KINGS MOUNTAIN ENERGY
Remote Area Number: Manually Flowing Date: 7/14/2017

Pipe Information
Flow added Length C Factor Notes
Elev 1 Fittings & Total(Pt)
Node 1 K-Factor this step Nominal ID (Foot) Fitting/Device (Equivalent
(Foot) Devices
(q) Length)
Fitting
Pf Friction Elev(Pe) Fixed Pressure Losses, when
Equiv. (Foot) Loss Per Unit
Elev 2 Total Flow applicable, are added directly
Node 2 Actual ID Length Total
(Foot) (Q) (psi) to (Pf) and shown as a
(Foot) Friction(Pf)
(Foot) negative value.

7-9 100 40.6


201 24-0 1½

0.058435
189 24-0 33.4 1.610
7-9 0.5

7-0 100 41.1


189 24-0 34.2 1½
Flow (q) from Route 9

0.215103
175 24-0 67.5 1.610
7-0 1.5

(See 27-0 100 42.6


175 24-0 34.2 1½
Notes) Flow (q) from Route 10
7-1½ 5.9
0.458605 5LtE(1-5)
107 10-4 101.7 1.610
34-1½ 15.6

(See 0-0 120 64.1


107 10-4 1½
Notes)
8-0 0.1
0.327306 PO(8-0)
106 10-0½ 101.7 1.610
8-0 2.6

66.9 Total(Pt) Route 8

2-4 100 37.2 • • • • • Route 9 • • • • •


306 23-0 5.6 34.2 1 (See
Notes) Nozzle,
6-5 -0.4
0.490654 2E(1-5), PO(3-7)
189 24-0 34.2 1.049
8-9½ 4.3

41.1 Total(Pt) Route 9

7-4½ 100 37.2 • • • • • Route 10 • • • • •


302 18-4½ 5.6 34.2 1 (See
Notes) Nozzle,
8-6½ -2.4
0.490732 E(1-5), T(3-7), PO(3-7)
175 24-0 34.2 1.049
15-11 7.8

42.6 Total(Pt) Route 10

0-0 100 32.5 • • • • • Route 11 • • • • •


123 20-6½ 3 (See
Notes) T(10-8½)
24-11½ 0.0
0.004319 fE(3-7), T(10-8½)
101 20-6½ 44.6 3.068
24-11½ 0.1

32.6 Total(Pt) Route 11

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 Manually Flowing 7/14/2017 1:15:21PM Page 9


Job Name: KINGS MOUNTAIN ENERGY
Remote Area Number: Manually Flowing Date: 7/14/2017
Equivalent Pipe Lengths of Valves and Fittings (C=120 only) C Value Multiplier

Actual Inside Diameter 4.87 Value Of C 100 130 140 150


( Schedule 40 Steel Pipe Inside Diameter ) = Factor
Multiplying Factor 0.713 1.16 1.33 1.51

Fittings Legend

ALV Alarm Valve AngV Angle Valve b Bushing


BalV Ball Valve BFP Backflow Preventer BV Butterfly Valve
C Cross Flow Turn 90° cplg Coupling Cr Cross Run
CV Check Valve DelV Deluge Valve DPV Dry Pipe Valve
E 90° Elbow EE 45° Elbow Ee1 11¼° Elbow
Ee2 22½° Elbow f Flow Device fd Flex Drop
FDC Fire Department Connection fE 90° FireLock(TM) Elbow fEE 45° FireLock(TM) Elbow
flg Flange FN Floating Node fT FireLock(TM) Tee
g Gauge GloV Globe Valve GV Gate Valve
Ho Hose Hose Hose HV Hose Valve
Hyd Hydrant LtE Long Turn Elbow mecT Mechanical Tee
Noz Nozzle P1 Pump In P2 Pump Out
PIV Post Indicating Valve PO Pipe Outlet PRV Pressure Reducing Valve
PrV Pressure Relief Valve red Reducer/Adapter S Supply
sCV Swing Check Valve Spr Sprinkler St Strainer
T Tee Flow Turn 90° Tr Tee Run U Union
WirF Wirsbo WMV Water Meter Valve Z Cap

© M.E.P.CAD, Inc. AutoSPRINK® 12 v12.0.59.0 Manually Flowing 7/14/2017 1:15:21PM Page 10

Das könnte Ihnen auch gefallen