Sie sind auf Seite 1von 2

SKGC/HO/2019-20/186 Dated: - 11.09.

2019

To,

The Manager
M/s RITES Ltd.,
Site In charge Varnama (Vododara)

Name of Work: - Construction of Earth Work RCC Bridge Work Track Work and Other
allied works at MMLP Varnama near Vododara Gujarat

Sub: - Decisions commanded at the site

LOA No. CON/EP/Varnama/Bridge and Track work/2019 dated 24-06-2019

Respected Sir,
With due regards, this is bring to your notice that on dated 09/09/2019
a joint meeting has been held between INDIAN RAILWAY, RITES, CONCOR and
K.R Goyal (Contractor representative) regarding hindrance in execution to work of
chain link fencing and track work at Varnama. The following points have been
discussed between the competent authorities.

1. M.S flat must have size of 40 X 4mm for holing the mesh.
2. Fencing start from starting point then move along the curve and end at toilet
block with wall face.
3. The custom bounded area is more than 4 hectares (after calculation), if we
provide the fencing through the centre of the warehouses No. 1 and 2 so
clarify the hurdle.
4. Chain link Fencing along the 50m wide CC Pavement block for 164m (approx)
length from point A to B as shown in the enclosed drawing, need to be
provided in the Soil portion.

Page 1 of 2
Enclosed: - As above

Thanking You,

Yours Sincerely,
M/s Sanjeev Kumar Goyal Contractor

(Partner)

Copy forwarded to the following for information and necessary action please.

1. The Group General Manager/Engg., Container Corporation of India Ltd, CONCOR


Bhawan, C-3, Mathura Road, New Delhi- 110076.
2. The AGM (Civil), M/s RITES Ltd, 3-A, 3rd Floor, 4D Square Mall, Visat- Gandhinagar
Highway, Motera, Ahmedabad (Gujarat)-382424

Page 2 of 2