item no. item work no.

length breath height quantity unit total quantity


earth work in
1 exavation
long wall 2 5.2 0.9 0.9
short wall 2 3.4 0.9 0.9

2
lime concrete
in foundation

long wall 2 6.2 0.9 0.3


short wall 2 3.4 0.9 0.3

3
brick work in
foundation
long wall
first footing 2 5.9 0.6 0.3
second footing 2 5.8 0.5 0.3
plinth 2 5.7 0.4 0.6
short wall
first footing 2 3.7 0.6 0.3
second footing 2 3.8 0.5 0.3
plinth 2 3.9 0.4 0.6
item no. item work no. length breath height quantity unit
1 1 39 1.1 1 42.9 m³
earth work in exavation

lome concrete in
2 1 39 1.1 0.3 12.87 m³
foundation

brick work in foundation


first footing 1 39.3 0.8 0.2 6.288
3 second footing 1 39.4 0.7 0.1 2.758
third footing 1 39.5 0.6 0.1 2.37 m³
fourth footing 1 39.6 0.5 0.1 1.98
plinth 1 39.7 0.4 0.8 12.704

DPC 1 39.7 0.4 15.88


4 deduction of doorcell in m³
2 1.2 0.4 0.96
dpc

5 brick work in 1 39.8 0.3 4.2 50.148 m³


superstructure

deduction of doors 2 1.2 0.3 2.1 1.512


deduction of windows 4 1 0.3 1.5 1.8
deduction of shelves 2 1 0.3 1.5 0.9
deduction of lintel over 2 1.5 0.3 0.15 0.135
6 doors m³
deduction of lintels over 4 1.3 0.3 0.15 0.234
windows
deduction of lintels over 2 1.3 0.3 0.15 0.117
shelves
total quantity

42.9

12.87

26.1

14.92

50.148

4.698