PRELIMINARY DESIGN
1
PRELIMINARY DESIGN MALL BANYUWANGI
dimaksudkan untuk mendapatkan tebal plat yang ideal sehingga bahaya akibat lendutan
30/45
(2)
30/60 30/60
300 – 30 = 270
(1) (3)
30/45
(4)
600 – 30 = 570
12 = 30 + 8. 12 =126 cm.
be2 = bw + 2 (h – t)
48
= 30 + 2 (60 – 12) = 126 cm
be = 126 cm
t t
2 3
be t t be
1 1 4 6 4 1
bw h h h bw h
K1 =
be t
1 1
bw h
2
PRELIMINARY DESIGN MALL BANYUWANGI
K1 = 1,77
h3 60 3
Ib = k bw = 1,77 30 = 955800 cm4.
12 12
1 1
Is = bs t3. = . 270.123. = 38880 cm4 .
12 12
Ecb.Ib
1 = jika Ecb = Ecs
Ecs.Is
Ib 955800
1 = 24,58
Is 38880
12 = 30 + 8. 12 =126 cm.
be2 = bw + 2 (h – t)
33
= 30 + 2 (45 – 12) = 96 cm
be = 96 cm
t t
2 3
be t t be
1 1 4 6 4 1
bw h h h bw h
K1 =
be t
1 1
bw h
96 12 12
2 3
12 12 96
1 1 4 6 4 1
30 45 45 45 30 45
=
96 12
1 1
30 45
K1 = 1,63
h3 45 3
Ib = k bw = 1,63.30. = 371334 cm4.
12 12
3
PRELIMINARY DESIGN MALL BANYUWANGI
1 1
Is = bs t3. = . 570.123. = 82080 cm4 .
12 12
Ecb.Ib
1 = jika Ecb = Ecs
Ecs.Is
Ib 371334
1 = 4,52
Is 82080
12 3 = 1 = 24,58
48
300
12 4 = 2 = 4,52
33
300
m = ¼ (1 + 2 + 3 + 4 )
2 = 4,52
= ¼ (24,58 + 4,52 + 24,58 + 4,52)
1 = 24,58 3 = 24,58
= 14,55
4 = 4,52
4
PRELIMINARY DESIGN MALL BANYUWANGI
fy
ln 0,8
1500
hmin 1 =
( SKSNI 3.2-12 )
1
36 5 β m 0,12 1
240
570 0,8
1500
=
1
36 5. 2,11 14,55 0,12 1
2,11
hmin 1 = 2,92 cm
fy
ln 0,8
hmin 2 = 1500 ( SKSNI 3.2-13 )
36 9
240
570 0,8
= 1500
36 9.2,11
hmin 2 = 9,951 cm
fy
ln 0,8
hmaks = 1500 ( SKSNI 3.2-14 )
36
240
570 0,8
= 1500
36
5
PRELIMINARY DESIGN MALL BANYUWANGI
Jadi tebal plat lantai t = 12 cm sudah memenuhi syarat untuk lendutan, artinya
lendutan tidak perlu dikontrol lagi jika tebal plat yang ada lebih besar atau sama