Beruflich Dokumente
Kultur Dokumente
Check standard
?
E2 F1 Artifact
Calibration
The concept of statistical process control is based on
comparing how measurement process is performing today
(often a single measurement) to how it has performed in
the best (a database of measurement results).
5
1 DATA =
1 SERI
ABBA
Massa
A B B A ABBA
ABBA
Konv.
AT Standar
123.00
1
O
AT Dikalibrasi
N
O
FF
10
3
2
20
Control chart is a graphical tool used to visualize data
when monitoring, evaluating and improving a
measurement process
Data 1 Upper
UWL = mean + (2 x deviation)
Data 2 Statistical Warning Limits
Data 3
Data 4
Lower LWL = mean - (2 x deviation)
Data 5 MEAN
Data 6 DEVIATION
Data 7
Data 8
Upper
UAL = mean + (3 x deviation)
8
CHECK STANDARD
Description : 3 point control chart
Balance used : XP26C / 0.001 mg
Load : 0.002 g
Unit :g
Check Standar : F1 OIML class
Serial Number : 15885
LIMIT
Date Data Correction Mean Std Dev
UWL LWL UAL LAL
4-Feb-13 0.0020017 0.0017
5-Feb-13 0.0020007 0.0007
6-Feb-13 0.0020002 0.0002
7-Feb-13 0.0020012 0.0012
8-Feb-13 0.0019987 -0.0013
0.00005 0.0010
9-Feb-13 0.0019997 -0.0003
10-Feb-13 0.0019987 -0.0013 0.0021 -0.0020 0.0031 -0.0030
11-Feb-13 0.0020007 0.0007
12-Feb-13 0.0019992 -0.0008
13-Feb-13 0.0019997 -0.0003
7-Jul-13 0.0020035 0.0035
8-Jul-13 0.0020025 0.0025 0.00157 0.0025
9-Jul-13 0.0019987 -0.0013
9
CHECK STANDARD
Description : 3 point control chart
Balance used : XP26C / 0.001 mg
Load : 0.002 g
Unit :g
Check Standar : F1 OIML class
Serial Number : 15885
Control Chart
0,004
0,003 UAL
0,002 UWL
Mass Correction (mg)
0,001
0,000
-0,001
-0,002 LWL
-0,003 LWL
-0,004
4-13 Feb 2013 Date 7-9 Juli 2013
10
− Recalibration of the standard
− Validate calculation software
− Validate check standard calculation
12
F – test
13
F – test
14
t - test
t – test is used to evaluate the means of two processes
𝑥𝑜𝑙𝑑 − 𝑥𝑛𝑒𝑤
𝑡𝑣𝑎𝑙𝑢𝑒 =
2 2
𝑠𝑜𝑙𝑑 𝑠𝑛𝑒𝑤
+
𝑛𝑜𝑙𝑑 𝑛𝑛𝑒𝑤
Our measurement system is considered to be “out of control” if we meet the
collowing conditions:
2
𝑠2 𝑠2
𝑜𝑙𝑑+ 𝑛𝑒𝑤
𝑛𝑜𝑙𝑑 𝑛𝑛𝑒𝑤
𝑡𝑣𝑎𝑙𝑢𝑒 < 𝑡𝑐𝑟𝑖𝑡𝑖𝑐𝑎𝑙 ; 𝑣 = 𝑠2
𝑜𝑙𝑑 𝑠2
𝑛𝑒𝑤
𝑛𝑜𝑙𝑑 𝑛𝑛𝑒𝑤
+
𝑛𝑜𝑙𝑑 −1 𝑛𝑛𝑒𝑤 −1
15
t - test
16
ANALYZE DATA
• Process degradation
• Process improvement
Control • Process compared to • Possible assignable
specification / tolerances causes
Chart • Shift in values of standard • Possible action steps
• Drift of values of standard
• Outliers
17
PROCESS IMPROVEMENT
We obtained service for your balance
We have a new calibration officer who has many years of previous experience
Our environmental controls were repaired or improved
We have been practicing in balance operation
18
SHIFT IN VALUES OF STANDARD
We have errors in entering data
Our standard is damage Our equation for the correction due to environmental
Our check standard is damage condition were drifted and correction changed
We are using calculation software Our standard was recalibrated and a new value was
that has not been validated assigned without starting a new control chart
19
DRIFT OF VALUES OF STANDARD
Our working standard worn from use
Our check standard getting dirty
Our standards are not stable enough for this process
20
OUTLIERS
Balance not exercised normally / properly
We do not allow adequate thermal equilibrium to the standard prior to begin calibration
We have data entry error or miscalculation
Our environmental system is out of control
Our standard was recently damaged
21
PROCESS DEGRADATION
Our balance need service
We have calibration officer in the laboratory who needs training
Our environmental controls stopped working properly
22
PROCESS COMPARED TO SPECIFICATION / TOLERANCES
Our process is not achieving the requirements needed to meet the tolerances
because our balances has degraded and can not reach its normal performance
23
Laboratorium
Panjang
Laboratorium
Laboratorium
Gaya dan
Massa
Tekanan
Laboratorium
Suhu
Laboratorium
Volume
24
a r i f. n u r j a y a @ k e m e n d a g . g o . i d
25