www.pln.co.id |
History
Starting in 1994, an ad-hoc working group “Substation Control and Protection Interfaces” of
IEC Technical Committee 57 elaborated proposals for a standardisation of communication in
substation automation systems.
The following proposals have been presented to and accepted by the National Committees:
1. Elaboration of a standard on functional architecture, communication structure and general
requirements;
2. Elaboration of a standard on communication within and between unit and substation levels;
3. Elaboration of a standard on communication within and between process and unit levels;
4. Elaboration of a companion standard for the informative interface of protection equipment.
www.pln.co.id |
www.pln.co.id |
www.pln.co.id |
www.pln.co.id |
Arsitektur dan BOQ
SAS 150 kV
SAS 150 KV
www.pln.co.id |
BOQ SAS 150 kV Hardware
7 SUBSTATION AUTOMATION HARDWARE
(refer to SAS network drawing) ( according to TPG 9 )
7.1 HMI-Operator Work Station consist of : Sets 2
- CPU
7.5 Gate Way (independence gateway for communication to control center) Set 1
7.8 Rack/Cubicle for Work Station, Gate Way, GPS, Modem, Router, Ethernet Switch, etc Lot 1
Engineering Tools and Test Equipment (Laptop) for configurating, testing software and operation maintenance Set 1
7.10
(for relay, telecommunication and SAS equipment).
7.12 Mapping, commisioning, point to point test beetwen substation and control centre Lot 1
Miscelaneous equipment and material including cables, optical cable, STP cable and cord, clamps, Lot 1
7.13 connectors, compression terminal, connection to individual items of equipment ….etc, to complete the scope
of works.
TOTAL PRICE ITEMS 7.1 - 7.13
www.pln.co.id |
BOQ SAS 150kV Software
Communication Protocol with Control Center Consist of IEC 60870 - 5 - 101, IEC 60870 - 5 - 104 and existing
8.4 proprietary protocol (if any). Set 1
8.5 SAS Software complete system for configuration and operation/maintenance and associated ICD File Set 1
www.pln.co.id |
Arsitektur dan BOQ
SAS 275/500 kV
SAS 500 KV
www.pln.co.id |
10 SUBSTATION AUTOMATION HARDWARE (According to TPG 9B)
10.1 HMI-Operator Work Station consist of : Sets 2
- CPU
- Keyboard, Video & Mouse (KVM extender)
10.2 Server consist of: Sets 2
- CPU
- Keyboard, Mouse, VDU Unit
10.3 Colour Laser Printer Set 1
10.4 GPS Time reference clock complete with Antenna Set 1
10.5 Gate Way (independence gateway for communication to control center) Set 1
10.6 Communication to control center
a. Router (manageble) Set 1*
b. Modem Sets 2*
10.10 Ethernet Switch for station level (manageable) Sets 2
10.8 Rack/Cubicle for Work Station, Gate Way, GPS, Modem, Router, Ethernet Switch, etc Lot 1
10.9 Furniture for HMI Lot 1
10.10 Engineering Tools and Test Equipment (Laptop) for configurating, testing software and operation maintenance (for relay, Set 1
telecommunication and SAS equipment).
10.11 Mapping, commisioning, point to point test beetwen substation and control centre Lot 1
10.12 Miscelaneous equipment and material including cables, optical cable, STP cable and cord, clamps, connectors, Lot 1
compression terminal, connection to individual items of equipment ….etc, to complete the scope of works.
www.pln.co.id |
11 SUBSTATION AUTOMATION SOFTWARE
11.1 Operating System Set 1
11.2 Basic SA Software and Licences for 500 kV Set 1
11.3 HMI and IED Software. Set 1
Communication Protocol with Control Center Consist of IEC 60870 - 5 - 101, IEC 60870 - 5 - 104 and existing proprietary Set 1
11.4 protocol (if any).
11.5 SAS Software complete system for configuration and operation/maintenance and associated ICD File Set 1