Sie sind auf Seite 1von 22

 

PT. ASAHIMAS CHEMICALS 
CILEGON ‐ BANTEN 
ROOFING SHELTER 
DESIGN CALCULATION REPORT 

PROJECT   :   
PRODUCTION BUILDING 
OWNER  :         
 
LOCATION    : CILEGON ‐ INDONESIA 
DOC. NO.    :  

0  Issued For Approval  28‐08‐2019  SD  Andi Wijaya,ST   

REV  DESCRIPTION  DATE  PREPARE  CHKD  APVD 


5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

LIST OF CONTENT 

1       PURPOSE                       1 
  1.1        SCOPE                     1 
  1.2        LANGUAGE                     1 
  1.3        UNITS OF MEASUREMENT                 1 

2       INPUT DATA                      1 


  2.1        MATERIAL PROPERTIES  AND STRENGHTS                1 
  2.1.1         Structural Steel                         1 
  2.2        DESIGN CONDITION                                  2 
  2.2.1         Local Condition                   2 
  2.2.2         Design Condition                   2 

3       REFERENCE AND  STANDARDS                4 
  3.1        DESIGN                     4 
  3.2        MATERIAL CODES AND STANDARDS               4 

4       CALCULATION                      5 
  4.1        STRUCTURAL DESIGN CONCEPT               5 
  4.1.1         General                    5 
  4.1.2         Outline of PRODUCTION BUILDING             5 
  4.2        STRUCTURAL MODELING CONCEPT               6 
  4.2.1         Modeling                 9 
  4.2.2         Three‐Dimensional View               9 
  4.2.3         Frame Numbers                 10 
  4.3        METHOD OF ANALYSIS                 8 
  4.4        ANALYSIS SOFTWARE                 8 

  4.5        CONCEPT OF STEEL ORDINARY MOMENT FRAME DESIGN           8 
  4.6        ALLOWABLE DEFLECTION                 9 
  4.7        LOADS AND LOAD COMBINATION               9 
  4.7.1         Dead Loads (DL)                  9 
  4.7.2         R o o f i n g   Live Loads (L)               10 
  4.7.3         Live Loads (L)                  10 
  4.7.4         S e i s m i c  Load (W)              11 
  4.7.6         Load Combination                13 
 
  4.8        STRUCTURAL  DESIIGN                   14 
  4.8.1         General                  14 
  4.8.2         Check of Member Stress Ratio             14 
  4.8.3         Check of Displacement                 24 

BTM i
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

   
 

  4.9     STEEL CONNECTION DESIGN               41 
  4.9.1       C olu m n   con n ect ion               41 
  4.9.2       C olu m n   b a se  p la te  a n d   A n ch or  bolts           41 
  4.9.3       B ea m   con n ect ion               43 
 

  5      FOUNDATION DESIGN                 41 
  5.1       C olu m n   con n ect ion               41 
  5.2       C olu m n   b a se  p la t e  a n d   A n ch or  b olts           41 
  5.3       B ea m   con n ecti on                 43 
 
   
 
LIST OF TABLE   : 
 
Table 1  S t r e s s   r a t i o                     14 
   
Table 2 Global displacement                      24 
   
   
 
 
LIST OF FIGURE  : 
 
Figure 2‐1 The mapped MCER                   2 
Figure 2‐2 The mapped MCER acceleration on short period Ss            3 
Figure 2‐3 The mapped MCER acceleration on 1 second period S1            3 
Figure 4‐1 Project out lined                    5 
Figure 4‐2 Production building 3d View                 6 
Figure 4‐3 Floor beam plan Fl +5.500                  7 
Figure 4‐4 Floor beam plan Fl +10.000                   7 
Figure 4‐5 3d view plan Fl +10.000 ~ +12.500                8 
Figure 4‐6 Applied equipment load on structure (SDL              10 
Figure 4‐7 Applied floor life load on structure (SLL)              10 
Figure 4‐8 Respons spectra diagram                  11 
Figure 4‐9 Applied seismic load T.m                    13 
Figure 4‐10 Plot of Global displacement diagram                 24 
 
 
 
 
 

BTM
ii
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

1. PURPOSE 

1.1. SCOPE 
This  document  covers  as  Calculation  Sheet of P r o d u c t i o n  b u i l d i n g  o f  5 t h  t r a i n  e x p a n s i o n  p r o j e c t  
o f   P T .  PT. DIACHEMS RESINS INDONESIA 

1.2. LANGUAGE 
All drawings, calculations and documents shall be written in English.

1.3. UNIT OF MEASUREMENT 
Units of Measurement in the Design shall be SI system. 

2. INPUT DATA 

2.1     MATERIAL PROPERTIES  AND STRENGHTS 
2.1.1     Structural Steel 

A.  Structural Steel               :  JIS G3101 SS400, JIS G3106 SM400/SM490 or ASTM 

    A36, or equivalent 

B  Bolts   

  ‐     High Strength Bolts  :  JIS B1186 F10T or ASTM A325, or equivalent 

  ‐     Common Bolts         :  JIS B1180 or ASTM A307 or equivalent 

  ‐     Anchor Bolts            :  JIS G3101 SS400 or ASTM A325 or equivalent 

C.  Welding Electrodes        :  AWS A5.1 / D1.1 or JIS Z3211, or equivalent 

3
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

2.2        DESIGN CONDITION 
2.2.1     Local Condition 
 
  1.         Site Location 
 
  The site is located at CILEGON ‐ INDONESIA 

2.2.2     Design Condition 

1.        Design Ground Elevation 
  The Ground level at New Plant Area shall be, EL = +0.000 

  2.          Seismic Condition 
  The  Site  shall  be  assigned  as  Seismic  Design  Category  E.  The  Structure  shall  be classified as Risk Category III 
having Importance factor of Ie  = 1.25. The  Site  Class  shall  be  Class  D  (Medium  Soil)  having  Site  Coefficient  F a   =  1.216  and 

Site Coefficient Fv  = 1.761 The mapped MCER spectral response acceleration at short period shall  be  SS=0.730g  and  mapped 

MCER  spectral  response  acceleration  at    1‐second  period shall be  S1= 0.319g from  Figure 9  and Figure 10 of  SNI  1726‐
2012respectively. 

Fig 2.1 The mapped MCER

4
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 2.2 The mapped MCER acceleration on short period Ss

Fig 2.3 The mapped MCER acceleration on 1 second period S1

5
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

3. REFERENCE AND STANDARDS 

In principle, the following Codes and Standards shall be applied. 

3.1     DESIGN CODES 
1)  AISC  ‐       American Institute of Steel Construction 
2)  AWS  ‐       American Welding Society 
3)  ACI  ‐       American Concrete Institute 
4)  ASCE  ‐       American Society of Civil Engineering 
5)  IBC  ‐       International Building code 
6)  SNI  ‐       Standard National Indonesia 

3.2     MATERIAL CODES AND STANDARDS 
1)  ASTM  ‐       American Society for Testing and Materials 
2)  ANSI  ‐       American National Standards Institute 
3)  JIS  ‐       Japanese Industrial Standard 
4)  SNI  ‐      Standard National Indonesia 
 
 
 

6
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4. CALCULATION 

4.1        STRUCTURAL DESIGN CONCEPT 
4.1.1     General 
The structural of  Production  Building consist of Steel Frame for the superstructure.The Longitudinal and Transverse Frames 
are Ordinary Moment Framing (OMF) System. 

4.1.2     Outline of production building 
The  general  outline  of  p r o d u c t i o n   b u i l d i n g are shown on the next pages 

Fig 4.1 – Project out lined

7
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.2  STRUCTURAL MODELING CONCEPT 
4.2.1     Modeling (Three‐Dimensional View) 

Fig 4.2 – Production building 3d View 

4.2.2    Frame element numbers 

Fig 4.3 – Floor beam plan Fl +5.500

8
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.3        METHOD OF ANALYSIS 
The  Static  Analysis  of  Production building shall conform to the structural model in accordance with Section 4.2. All frame 
elements shall be analyzed and designed to satisfy with all the combined stresses resulting from the Load Combinations. The 
strength design of structure shall be in accordance with SNI 2847‐2013. 

4.4        ANALYSIS SOFTWARE 
MIDAS Gen 2018 Advanced v14.2.0 software is used for structural analysis. 

4.5     CONCEPT OF STEEL ORDINARY MOMENT FRAME DESIGN 
The  Designs  of  Structural  Member  are  performed  by  MIDAS‐Gen  2018  software  in  accordance  with 
provisions of SNI 1729‐2015 using ASD Method. The design forces of structural members are determined and the most 
critical load effects are used for the design of each member. In addition, the provisions of SNI 1729‐2015 shall be also 
be satisfied for OMF (Ordinary Moment Framing) systems. 

4.6     ALLOWABLE DEFLECTION 
In addition to stress check, deflection check for  Rafter, Beams and Girders produced by Dead Load, Live Load and 
Equipment Loads shall be limited as follows: 
 
a) Main beam   : 1/300 agains beam span  1/250 agains cantilever  span 
a. Support beam for general equipment : 1/300 agains beam span 
b) Support beam for equipment : 1/1000 against beam span 
c) Sub beam for floor  : 1/200 againts beam span 
d) Floor , Joist, Purlin   : 1/200 againts beam span 

4.7        LOADS AND LOAD COMBINATION 
The  structure  analysis  and  design  for  strength,  stability  and  serviceability  will  take  account  of  relevant  and 
appropriate action effects directly arising from the following loads: 

4.7.1     Dead Loads (DL1) 
Self‐weight of structure will be calculated by software. The unit weights of materials and construction are: 
Steel structure                : 7850 kg/m  

4.7.2     R o o f i n g   Dead Loads (DL2) 

1  Roofing sheet Asbes (.35mmT)  =  6.8  kg/m2 


2  Purlin CNP 150.65.20.3,2  =  7.51  kg/m' 

9
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

  Span to span = 5m,   =  37.55   
Dead Load (D)    =  51.86   
Surcharge 20%  =  10.37   
Total dead Load  (D2)  =  62.23  kg 
 
 

4.7.3     R o o f i n g   L i v e  Loads (LL) 

1  Concentrated Load   =  100  kg 


2  Rain load Qr =  (40 ‐ 0.8 x a )   =  26.4  kg/m2 
  Span to span = 5m,  Qr  =  132  kg 

4.7.4     W i n d   Loads (WL) 
Wind  load  on  structure  will  calculate  refer  to  PPPURG‐1987  (Pedoman  Perencanaan  Pembebanan  Untuk 
Rumah dan Gedung 1987) 
 

                

1  Basic Wind speed  =  40  km/h 

10
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

      11.11  m/sec 
  Wind pressure (V2/16)  =  7.716  kg/m2 
  Span to span = 5m,  W    38.58  kg 
1  1a. Front wind load  = ‐ 1.2 * W =  =  ‐46.3  kg/m2 
  1b. Rear  = ‐ 0.4 * W =  =  ‐15.43  kg/m2 
         
2  2a. Front wind load  = +.8 * W =  =  30.86  kg/m2 
  2b. Rear  = ‐ 0.0 * W =  =  0  kg/m2 
     

4.7.5     Seismic Load (Eq) 
For seismic load refer to SNI 1726 : 2012, The roofing shelter shall  be classified as Risk Category II having Importance factor of 
Ie  = 1   
The Site Class shall be Class D (Medium Soil) having Site Coefficient F a  =  1.216 and Site Coefficient Fv  = 1.761 The mapped 

MCER spectral response acceleration at short period shall  be  SS=0.730g  and  mapped  MCER  spectral  response  acceleration 

at  1‐second period shall be S1= 0.319g from Figure 9 and Figure 10 of SNI 1726‐2012respectively. 
Seismic load applied on direction as : 
 Seismic on + X direction : X = +1  and Y = ‐0.3 
 Seismic on + Y direction : Y = +100 %  and X = ‐0.3 
 Seismic on ‐ X direction : X = ‐1  and Y = ‐0,3 
 Seismic on ‐ Y direction : Y = ‐1 and X = ‐ 0.3 
 
 
 
 
 

11
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 4.8 Respons spectra diagram

12
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

Fig 4.8   Input of Seismic Load parameter 

 
Fig 4.9   Plot of seismic load X+ 
 Fig 4.10   Plot of seismic load Y+ 
Fig 4.9   Plot of seismic load X‐ 
Fig 4.10   Plot of seismic load Y‐ 

4.7.5     Loading Combination (sLCB) 
Loading combination refer to ASD 1989 standard as following : 

No:  Name  Active  Type  Description 

13
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

 sLCB1  Strength/Stress  Add  D + (L) 


2  sLCB2  Strength/Stress  Add  0.75(D + (L) + EQX) 
3  sLCB3  Strength/Stress  Add  0.75(D + (L) + EQY) 
4  sLCB4  Strength/Stress  Add  0.75(D + (L) + EQX) 
5  sLCB5  Strength/Stress  Add  0.75(D + (L) + EQY) 
6  sLCB6  Strength/Stress  Add  0.75(D + (L) ‐ EQX) 
7  sLCB7  Strength/Stress  Add  0.75(D + (L) ‐ EQY) 
8  sLCB8  Strength/Stress  Add  0.75(D + (L) ‐ EQX) 
9  sLCB9  Strength/Stress  Add  0.75(D + (L) ‐ EQY) 
10  sLCB10  Strength/Stress  Add  0.75(D + EQX) 
11  sLCB11  Strength/Stress  Add  0.75(D + EQY) 
12  sLCB12  Strength/Stress  Add  0.75(D + EQX) 
13  sLCB13  Strength/Stress  Add  0.75(D + EQY) 
14  sLCB14  Strength/Stress  Add  0.75(D ‐ EQX) 
15  sLCB15  Strength/Stress  Add  0.75(D ‐ EQY) 
16  sLCB16  Strength/Stress  Add  0.75(D ‐ EQX) 
17  sLCB17  Strength/Stress  Add  0.75(D ‐ EQY) 

4.8        STRUCTURAL DESIGN 

4.8.1     General 

After getting the stresses for each structure element induced by various loads. the most critical stress resulting from the load 
combinations shall be used for the design for each member of the structure in accordance with the relevant codes. 

4.8.2     Check of Member Stress Ratio 

Structural members stress ratio is shown on figure below to assure the structure able to bearing load combination. the steel 
stress ratio should be less than 1 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
 midas Gen ‐ Steel Code Checking[ AISC(14th)‐ASD10 ]                        Gen 2018 
========================================================================================== 
          |  MIDAS(Modeling, Integrated Design & Analysis Software)    | 
       |  midas Gen ‐ Design & checking system for windows          | 
       +============================================================+ 
       |  Steel Member Applicable Code Checking                     | 
       |  Based On  Eurocode3:05, Eurocode3, AISC(14th)‐LRFD10,     | 
       |            AISC(14th)‐ASD10, AISC(13th)‐LRFD05,            | 
       |            AISC(13th)‐ASD05, AISC‐LRFD2K, AISC‐LRFD93,     | 
       |            AISC‐ASD89, CSA‐S16‐01, BS5950‐90               | 
              |                                             (c)SINCE 1989  | 
       +============================================================+ 
       |  MIDAS Information Technology Co.,Ltd.         (MIDAS IT)  | 
       |  MIDAS IT Design Development Team                          | 
       +============================================================+ 
       |            HomePage : www.MidasUser.com                    | 

14
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

       +============================================================+ 
       |  Gen 2018                                                  | 
       +============================================================+ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
 midas Gen ‐ Steel Code Checking[ AISC(14th)‐ASD10 ]                        Gen 2018 
========================================================================================== 
    *. DEFINITION OF LOAD COMBINATIONS WITH SCALING UP FACTORS. 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
     LCB  C    Loadcase Name(Factor) + Loadcase Name(Factor) + Loadcase Name(Factor) 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
       1  1              DL1( 1.000) +           DL2( 1.000) 
       2  1              DL1( 1.000) +           DL2( 1.000) +           WL1(‐0.450) 
                +           LL1( 0.750) 
       3  1              DL1( 0.600) +           DL2( 0.600) +           WL1( 0.600) 
       4  1              DL1( 0.600) +           DL2( 0.600) +           WL1(‐0.600) 
       5  2              DL1( 1.000) +           DL2( 1.000) +           LL1( 1.000) 
       6  2              DL1( 1.000) +           DL2( 1.000) +           WL1( 0.600) 
       7  2              DL1( 1.000) +           DL2( 1.000) +           WL1(‐0.600) 
       8  2              DL1( 1.000) +           DL2( 1.000) +           WL1( 0.450) 
                +           LL1( 0.750) 
       9  2              DL1( 1.000) +           DL2( 1.000) +           WL1(‐0.450) 
                +           LL1( 0.750) 
      10  2              DL1( 0.600) +           DL2( 0.600) +           WL1( 0.600) 
      11  2              DL1( 0.600) +           DL2( 0.600) +           WL1(‐0.600) 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐------------------------------- 
 midas Gen ‐ Steel Code Checking[ AISC(14th)‐ASD10 ]                        Gen 2018 
========================================================================================== 
 *.PROJECT     :  
 *.UNIT SYSTEM : kgf, m 
===================================================================================================================== 
   [ AISC(14th)‐ASD10 ]  CODE CHECKING SUMMARY SHEET ‐‐‐ SELECTED MEMBERS IN ANALYSIS MODEL.         
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
      MEMB  SECT Section                    Len      Ly   Cb   Ky  B1y  B2y      Pr     Mry     Mrz     Vry     Vrz      Tr     Def 
 CHK   COM   SHR Material       Fy  LCB      Lb      Lz        Kz  B1z  B2z      Pc     Mcy     Mcz     Vcy     Vcz      Tc    Defa 
===================================================================================================================== 
         1     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2375.0 4895.55 0.03757 ‐0.1143 ‐2488.0 0.00000 0.00541 
  OK  0.46  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 35010.3 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
         2     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2301.7 ‐4999.8 0.00000 ‐0.1098 2487.97 0.00000 0.00541 
  OK  0.46  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 35010.3 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
         3     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐3017.0 3841.44 0.00000 ‐0.0097 1398.30 0.00000       ‐ 
  OK  0.84  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.13 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
         4     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2995.3 3736.93 0.00000 0.00968 1326.07 0.00000       ‐ 
  OK  0.82  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.13 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
         5     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2449.0 5045.27 0.00000 0.03781 ‐2561.5 0.00000 0.00557 
  OK  0.47  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 35010.3 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
         6     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2376.2 ‐5149.6 0.00000 0.03655 2561.46 0.00000 0.00557 
  OK  0.48  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 35010.3 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
         7     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐3102.5 3950.69 0.00000 0.00327 1427.58 0.00000       ‐ 
  OK  0.87  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.14 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
         8     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐3080.8 3846.18 0.00000 ‐0.0033 1355.35 0.00000       ‐ 
  OK  0.85  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.14 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
         9     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2502.8 5045.27 0.00000 0.00000 ‐2561.5 0.00000 0.00557 
  OK  0.47  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 0.00000 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        10     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2427.3 ‐5149.6 0.00000 0.00000 2561.46 0.00000 0.00557 
  OK  0.48  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 0.00000 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        11     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐3102.5 3950.69 0.00000 0.00000 1427.58 0.00000       ‐ 

15
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

  OK  0.87  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.14 1.00 21757.9 4965.93 1591.38 0.00000 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        12     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐3080.8 3846.18 0.00000 0.00000 1355.35 0.00000       ‐ 
  OK  0.85  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.14 1.00 21757.9 4965.93 1591.38 0.00000 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        13     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2449.0 5045.27 0.00000 ‐0.0378 ‐2561.5 0.00000 0.00557 
  OK  0.47  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 35010.3 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        14     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2376.2 ‐5149.6 0.00000 ‐0.0366 2561.46 0.00000 0.00557 
  OK  0.48  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 35010.3 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        15     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐3102.5 3950.69 0.00000 ‐0.0033 1427.58 0.00000       ‐ 
  OK  0.87  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.14 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        16     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐3080.8 3846.18 0.00000 0.00327 1355.35 0.00000       ‐ 
  OK  0.85  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.14 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        17     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2375.0 4895.55 ‐0.0376 0.11435 ‐2488.0 0.00000 0.00541 
  OK  0.46  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 35010.3 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        18     1 H 350x175x7/11         3.50000 3.50000 1.00 1.00 1.00 1.00 ‐2301.7 ‐4999.8 0.00000 0.10976 2487.97 0.00000 0.00541 
  OK  0.46  0.10 A36       2.5E+07    2 3.50000 3.50000      1.00 1.00 1.00 63297.0 11190.1 2637.14 35010.3 24804.3 0.00000 0.01167 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        19     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐3017.0 3841.44 0.00000 0.00968 1398.30 0.00000       ‐ 
  OK  0.84  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.13 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        20     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2995.3 3736.93 0.00000 ‐0.0097 1326.07 0.00000       ‐ 
  OK  0.82  0.07 A36       2.5E+07    2 4.95915 4.95915      1.00 1.13 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        21     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 78.8604 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        22     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 ‐0.0201 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 2079.19 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        23     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 75.8273 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        24     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 ‐19.597 43.8758 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.09  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.01 1.00 2079.19 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        25     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 ‐0.0134 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 2079.19 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        26     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 ‐18.944 43.8750 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.09  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.01 1.00 2079.19 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        27     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 ‐19.597 43.8758 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.09  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.01 1.00 2079.19 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        28     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 ‐0.0134 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 2079.19 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        29     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 ‐18.944 43.8750 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.09  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.01 1.00 2079.19 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        30     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 78.8604 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        31     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 ‐0.0201 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 2079.19 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        32     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 75.8273 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        33     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2627.5 ‐1130.2 0.00000 0.00927 ‐728.52 0.00000       ‐ 

16
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

  OK  0.29  0.04 A36       2.5E+07    2 4.95915 4.95915      1.00 1.11 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        34     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2629.8 ‐1016.7 ‐0.0021 ‐0.0093 ‐667.70 0.00000       ‐ 
  OK  0.27  0.03 A36       2.5E+07    2 4.95915 4.95915      1.00 1.11 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        35     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2703.0 ‐1163.0 0.00000 ‐0.0031 ‐732.84 0.00000       ‐ 
  OK  0.30  0.04 A36       2.5E+07    2 4.95915 4.95915      1.00 1.12 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        36     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2705.2 ‐1049.5 0.00000 0.00313 ‐672.02 0.00000       ‐ 
  OK  0.27  0.03 A36       2.5E+07    2 4.95915 4.95915      1.00 1.12 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        37     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2703.0 ‐1163.0 0.00000 0.00000 ‐732.84 0.00000       ‐ 
  OK  0.30  0.04 A36       2.5E+07    2 4.95915 4.95915      1.00 1.12 1.00 21757.9 4965.93 1591.38 0.00000 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        38     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2705.2 ‐1049.5 0.00000 0.00000 ‐672.02 0.00000       ‐ 
  OK  0.27  0.03 A36       2.5E+07    2 4.95915 4.95915      1.00 1.12 1.00 21757.9 4965.93 1591.38 0.00000 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        39     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2703.0 ‐1163.0 0.00000 0.00313 ‐732.84 0.00000       ‐ 
  OK  0.30  0.04 A36       2.5E+07    2 4.95915 4.95915      1.00 1.12 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        40     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2705.2 ‐1049.5 0.00000 ‐0.0031 ‐672.02 0.00000       ‐ 
  OK  0.27  0.03 A36       2.5E+07    2 4.95915 4.95915      1.00 1.12 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        41     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2627.5 ‐1130.2 0.00000 ‐0.0093 ‐728.52 0.00000       ‐ 
  OK  0.29  0.04 A36       2.5E+07    2 4.95915 4.95915      1.00 1.11 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        42     2 H 300x150x6.5/9        4.95915 4.95915 1.00 1.00 1.01 1.00 ‐2629.8 ‐1016.7 0.00209 0.00927 ‐667.70 0.00000       ‐ 
  OK  0.27  0.03 A36       2.5E+07    2 4.95915 4.95915      1.00 1.11 1.00 21757.9 4965.93 1591.38 24552.7 19742.2 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        43     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 0.02093 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        44     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 0.02008 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        45     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 0.01398 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        46     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 0.01255 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        47     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 0.01398 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        48     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 0.01255 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        49     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 0.02093 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        50     4 H 150x75x5/7           5.00000 5.00000 1.00 1.00 1.00 1.00 0.02008 43.8502 0.00000 0.00000 35.0801 0.00000 ‐0.0008 
 OK*  0.08  0.00 A36       2.5E+07    2 5.00000 5.00000      1.00 1.00 1.00 27053.5 533.608 315.245 0.00000 7593.15 0.00000 0.01389 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        51     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐182.05 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        52     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐158.23 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        53     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.01 1.00 ‐105.14 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.01  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.01 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        54     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐128.96 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        55     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐177.55 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 

17
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        56     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐154.52 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        57     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.01 1.00 ‐101.43 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.01  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.01 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        58     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.01 1.00 ‐124.46 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.01 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        59     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐158.23 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        60     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐182.05 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        61     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐128.96 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        62     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.01 1.00 ‐105.14 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.01  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.01 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        63     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐154.52 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        64     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.02 1.00 ‐177.55 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.02 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        65     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.01 1.00 ‐124.46 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.02  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.01 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
        66     5 L 75x9                 3.05164 3.05164 1.00 1.00 1.01 1.00 ‐101.43 0.00000 0.00000 0.00000 0.00000 0.00000       ‐ 
 OK*  0.01  0.00 A36       2.5E+07    2 3.05164 3.05164      1.00 1.01 1.00 4110.26 362.329 187.542 0.00000 0.00000 0.00000       ‐ 
‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐‐ 
 
 
 

18
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.8.3  Check of Member joint displacement 

Fig 4.10 Plot of Global displacement diagram 

Table 2. Displacement 
 
Node  Load  DX (mm)  DY (mm)  DZ (mm)  RX ([rad])  RY ([rad])  RZ ([rad]) 

1  sLCB10  ‐5.411349  ‐0.008807  ‐0.066261  0.000004  ‐0.000816  0.000003 


2  sLCB10  0  0  0  0  0  0 
3  sLCB10  5.411349  ‐0.008807  ‐0.066261  0.000004  0.000816  ‐0.000003 
4  sLCB10  0  0  0  0  0  0 
5  sLCB10  0  0.000005  ‐19.173718  0.000002  0  0 
6  sLCB10  ‐5.566059  0.002875  ‐0.068249  ‐0.000001  ‐0.000843  ‐0.000001 
7  sLCB10  0  0  0  0  0  0 
8  sLCB10  5.566059  0.002875  ‐0.068249  ‐0.000001  0.000843  0.000001 
9  sLCB10  0  0  0  0  0  0 
10  sLCB10  0  0.000002  ‐19.720531  ‐0.000001  0  0 
11  sLCB10  ‐5.566063  0  ‐0.069852  0  ‐0.000843  0 
12  sLCB10  0  0  0  0  0  0 
13  sLCB10  5.566063  0  ‐0.069852  0  0.000843  0 
14  sLCB10  0  0  0  0  0  0 
15  sLCB10  0  0  ‐19.722145  0  0  0 
16  sLCB10  ‐5.566059  ‐0.002875  ‐0.068249  0.000001  ‐0.000843  0.000001 
17  sLCB10  0  0  0  0  0  0 
18  sLCB10  5.566059  ‐0.002875  ‐0.068249  0.000001  0.000843  ‐0.000001 
19  sLCB10  0  0  0  0  0  0 
20  sLCB10  0  ‐0.000002  ‐19.720531  0.000001  0  0 

19
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

21  sLCB10  ‐5.411349  0.008807  ‐0.066261  ‐0.000004  ‐0.000816  ‐0.000003 


22  sLCB10  0  0  0  0  0  0 
23  sLCB10  5.411349  0.008807  ‐0.066261  ‐0.000004  0.000816  0.000003 
24  sLCB10  0  0  0  0  0  0 
25  sLCB10  0  ‐0.000005  ‐19.173718  ‐0.000002  0  0 
26  sLCB10  ‐1.828674  ‐0.000005  ‐12.574021  0.000003  0.003164  0.000002 
27  sLCB10  1.828674  ‐0.000005  ‐12.574021  0.000003  ‐0.003164  ‐0.000002 
28  sLCB10  ‐1.88083  ‐0.000002  ‐12.933331  ‐0.000001  0.003255  ‐0.000001 
29  sLCB10  1.88083  ‐0.000002  ‐12.933331  ‐0.000001  ‐0.003255  0.000001 
30  sLCB10  ‐1.880832  0  ‐12.934938  0  0.003255  0 
31  sLCB10  1.880832  0  ‐12.934938  0  ‐0.003255  0 
32  sLCB10  ‐1.88083  0.000002  ‐12.933331  0.000001  0.003255  0.000001 
33  sLCB10  1.88083  0.000002  ‐12.933331  0.000001  ‐0.003255  ‐0.000001 
34  sLCB10  ‐1.828674  0.000005  ‐12.574021  ‐0.000003  0.003164  ‐0.000002 
35  sLCB10  1.828674  0.000005  ‐12.574021  ‐0.000003  ‐0.003164  0.000002 
36  sLCB10  0  ‐0.001831  ‐0.034914  0  0  0 
37  sLCB10  1.162875  ‐0.001831  ‐0.034914  0  0  0 
38  sLCB10  0  0.001831  ‐0.034914  0  0  0 
39  sLCB10  1.162875  0.001831  ‐0.034914  0  0  0 

4.8.4  Story drift 
Story Drift of  upper structure must be  checked against  Seismic  Load.  Calculation method of  drift check shown on equation 
below: 
       Seismic Load at Ultimate Limit State 
Actual Drift x Cd  / I< 0.02x Height 
       Notes: 
R           = Response modification coefficient 
Cd        = Deflection amplification factor =2.5 
I             = Importance factor 
Summary of drift check calculation can be seen on table below: 

20
Pt. Mitra Andalas Teknika , Consultant
5th TRAIN EXPANSION PROJECT
PRODUCTION BUILDING STRUCTURE CALCULATION REPORT

4.9     STEEL CONNECTION DESIGN  
4..9.1      Colum  connection ( Fix connection) 
 
 

4..9.2      Beam Connection  (Pin connection)  
 
 