To,
Project Manager,
Shah & Sanghavi Developers, Ltd.
Surat.
Subject: Submission of Concrete Mix Design report for Grade M -25 & M-30.
Ref: Your letter Dt. 16.12.2016 & Our I.W. No. 1516-3285.
Dear Sir,
With reference to above subject, we are herewith submitting the report of Concrete
Mix Design for Grade M -25 & M-30. All the tests were carried out under certain
laboratory conditions and under expert supervision as per relevant IS/IRC/Tender
guidelines. Please contact us for any clarification.
Thanking You,
Yours Sincerely,
Client :
Shah & Sanghavi Developers, Ltd.
Surat.
Site:
SNS ATRIA
FP No. 42/2 TP-29 Near Happy Excencia,
Vesu, Surat.
Interim Report
Dt.: 27.01.2016.
F:CMD:01
INTRODUCTION:
M/s Shah & Sanghavi Developers, Ltd. Surat, entrusted the work of concrete mix design
for Grade M -25 & M-30 for above mentioned project. The report of design mix is presented
herewith based on the thorough study of the test results of all materials and stipulations of
the design mix based on the provisions of IS/IRC/Tender Guidelines.
REFERENCE STANDARDS:
F:REP:CMD:01 Page 1 of 7
5. Chemical Admixture – BASF Master Rheobuild 821 EJ.
Materials were tested as per relevant Indian Standards. Test data considered for
design are given in Table below:
RESULTS OF TEST ON AGGREGATES
Gradation (Sieve Analysis):
Test Parameter 20 mm 10 mm White Sand
I S Sieve Size % Passing
40 mm 100 - -
25 mm 100 - -
20 mm 95 - -
12.5 mm 06 100 -
10 mm 0 87 100
4.75 mm - 05 92
2.36 mm - 0 86
1.18 mm - - 57
0.6 mm - - 34
0.3 mm - - 12
0.15 mm - - 02
0.075 mm - - 0.45
Physical Properties:
Test Parameter 20 mm 10 mm White Sand
Specific Gravity 2.899 2.791 2.643
Water Absorption in % 0.83 1.53 0.27
Flakiness Index in % 13 - -
Elongation Index in % 21 - -
Impact Value in % 10 - -
Fineness Modulus - - 3.17
Fine Aggregate Zone - - I
F:REP:CMD:01 Page 2 of 7
RESULTS OF PHYSICAL TEST OF CEMENT (Binani OPC 53 G )
Requirement as
Sr.
Parameter Results per IS 12269-
No.
2013.
Consistency in % (Amount of water as %
1 28.50 -
by mass of dry cement)
Setting Time in minutes
2 Initial 130 Min. 30 min
Final 235 Max. 600 min
Compressive Strength in MPa
72 ± 1 hr 31.0 Min 27 MPa
3
168 ± 2 hrs 38.0 Min.37 MPa
672 ± 4 hrs - Min.53 MPa
4 Specific Gravity 3.15 -
DESIGN CALCULATIONS:
F:REP:CMD:01 Page 3 of 7
Typical Design Calculation of M-25
F:REP:CMD:01 Page 4 of 7
1. Volume of Concrete : 1 m³
2. Volume of Cement :
: 0.117 m³
3. Volume of Water :
: 0.1734 m³
: 0.001 m³
5. Volume of all in aggregate : [1-(0.110+0.1734+0.001)] = 0.708 m³
F:REP:CMD:01 Page 5 of 7
G. Results of Trial Mix:
Results of Trials conducted are as follows:
M-25 :
M-30 :
The mix design is based on the samples of the materials supplied to the laboratory.
Sources of materials shall not be changed and if changed, concrete shall be redesigned.
Water sample not supplied by customer. It is advisable to check the water sample for
construction purpose before using it at the site.
Allowance for surface water or absorption thereof from the aggregates to be made for
determining the quantity of water to be added to the mix. A due account of evaporation
losses shall also be made. Slump test shall be regularly made as a guide.
The field results are likely to reduce appreciably if the temperature of the concrete at the
time of placement is less than 4° C or more than 35° C.
Properly trained and experienced persons should handle the operation of mixing of
concrete, making slump tests and making cubes. It is preferable that persons handling
these operations are kept unchanged.
F:REP:CMD:01 Page 7 of 7