Sie sind auf Seite 1von 1

Developed by Reviewed by Revised by

BRADY BRADY
LOCKOUT TAGOUT PROCEDURE
Description: Steam Sterilizer South Equipment # VSS-1
Location:SPD- Clean Sterile Bldg:Main Revn: 0 Date: N/A Origin Date: 03/24/09
Model# 733HC Serial# TO 272685-02
DANGER
LOCKS & TAGS
4 NEEDED
Steam pressure and burn hazard. Ensure steam and heat have dissipated
before proceeding.

NEXT AUDIT DUE NEXT AUDIT DUE NEXT AUDIT DUE NEXT AUDIT DUE

MAR 2010 MAR 2011 MAR2012 MAR 2013


East Wall of Back Rm West of Unit Near Ceiling Top of Unit near Back

W-1

S-1

E-1 P-1

ALWAYS PERFORM A MACHINE STOP BEFORE LOCKING OUT DISCONNECTS


ID Source Location Method Check Device
Disconnect is located on Move E-1 disconnect to off. Attempt Lockout Hasp and
E-1 Electrical North of Pump Stand on Lock out. restart at Lock
120V East Wall. Panel.

Water Cold
Ball Valve for Inlet on West Turn W-1 valve off. Lock out. Verify Ball Valve Lockout
Water Side Near Ceiling in back pressure has
W-1
Inlet Rm. bled off.

Ball Valve for Inlet on Turn P-1 valve off. Lock out. Verify Ball Valve Lockout
P-1
Pneumatic South Side Above Unit in pressure has
120 PSI back Rm. bled off.
Glove Valve for Inlet on Turn S-1 valve off. Lock out. Verify Gate Valve Lockout
Steam South Side Above Unit in pressure has
S-1 Inlet back Rm. bled off.

CP = CONTROL PANEL E = ELECTRICAL W = WATER P = PNEUMATIC C = CHEMICAL V = VALVE G = GAS S = STEAM

OPENING A GUARD DOES NOT CONSTITUTE A LOCKOUT!


Any machine modifications must be shown in procedure. Contact facilities to update procedure.

Safety Is Your Responsibility! 800-496-4040