BUILDING PERMIT

A Building Permit is a document issued by the Building Official to an


owner/applicant to proceed with the construction, installation, addition,
alteration, renovation, conversion, repair, moving, demolition or other work
activity of a specific project/building/structure or portions thereof, upon the
approval of the accompanying principal plans, specifications and other
pertinent documents with the duly notarized application, which will be found
satisfactory and substantially conforming with the National Building Code of
the Philippines and its Implementing Rules and Regulations. (PD 1096)

Under Chapter 3, Sec. 301 of PD 1096, No person, firm or corporation,


including any agency of the government is allowed to construct, alter,
repair, convert, use, occupy, move, demolish and add any building/structure
or any portion thereof or cause the same to be done, without first obtaining
a building permit from the Building Official assigned in the place where the
subject building/structure is located or to be erected.

The permit shall expire and becomes null and void if the building or work
authorized therein is not commenced within a period of 1 year from the date
of such permit, or if the building or work so authorized is suspended or
abandoned at any time after it has been commenced, for a period of 120
days.

REQUIREMENTS FOR BUILDING PERMIT

• Barangay Clearance/Certification, Association Certificate, Consent of


owner, SPA.
• Transfer Certificate of Title, Tax Declaration, Deed of Absolute
Sale, Waiver of Rights, Contract of Lot Award, DENR Tagging
Entry Pass/Stub.
• Contract/Agreement (should include contract price) with general
contractor.
• Contract/Agreement (should include contract price) with sub-
contractors for Electrical, Mechanical, Sanitary/Plumbing,
Elevators, And all other services required by the developer.
• Fully accomplished application forms:
• Building
• Sanitary/Plumbing
• Electrical
• Mechanical
• Fencing
• 5 Sets Of Building Plans And Specification
• Location Plan, Site Development plan, Vicinity Map
• Architectural Plans
• Structural Plans
• Sanitary/Plumbing
• Electrical Plans
• Mechanical Plans/Fire Protection Plan (ifApplicable)
• 3 Sets Of
• Structural Design and Computations
• Bill of Materials/Cost Estimates
• Specification
• 3 Large envelope w/ Folder, Faster And (1)Logbook
• Others
• Fire Safety Certificate Checklist
• Location Clearance
• Air Transport Office Clearance
• DENR Environmental Compliance Certificate
• LLDA - Laguna Lake Development Certificate

Note:
1. All Application Forms, plans, specification, design and
computation, bill of materials should be sign and sealed by duly
licensed CE, ARCH, SE, PEE, Master plumber, master
Electrician.

2. In case of large-scale Development subdivision, secure


Development permit form Saguniang Bayan.

3. Photo copy of PRC ID and PTR.