Sie sind auf Seite 1von 3

QF-DGN-01

TITLE: DOCUMENT/DRAWING APPROVAL/COMMENT TRANSMITAL

Project : Design, Supply, Installation, Testing & Commissioning of Aminbazar 400/230 kV


Substation on Turnkey Basis.

Contract Number : PGCB/ADB/400kV/Amin-SS, Dated: 30/09/2018


Document Submittal Ref : HYO-PGCB-AMIN-DTS-065; Date: 07/03/2019

Subject : Comments on 400/230kV Power Transformer and Fire Wall Calculation & Foundation
Drawing.

Copy to
To
Project Director Managing Director, PGCB
A-M-M 400kV TL Project
Executive Director (P & D), PGCB
Power Grid Company of Bangladesh Limited (PGCB) √
NLDC Complex, Aftabnagar, Rampura, Dhaka-1212.
Chief Engineer (P & D/Project), PGCB

HYOSUNG Corporation

Kind Attn :

Dear Sir Executive Engr. (Civil Design), PGCB



We are pleased to enclose the following documents for the purpose indicated Intec Gopa International Energy Consultant
below: √

√ Master File
In case of any modification other than those desired are carried out, the same
shall be highlighted clearly in the Drawing/Document with full justification Issued by:
thereof and resubmitted for approval.
(Engr. Md. Delowar Hossain)
Approval/Comments/Information conveyed herein neither relieves the
Superintending Engineer
contractor of his contractual obligation and his responsibilities for correctness Civil Design, P&D.
of dimensions, material of constructions, weight, quantities, design details,
assemble fits, performance particulars and conformity of the supplies with Our Ref: 27.21.0000.412.49.001.19.206
the Statutory Laws of Bangladesh as may be applicable, nor does it limit the
Employer’s right under the contract. Date: 28/03/2019

Item Description of Document Drawing Number Revision Status Enclosed


No Drawing/ Documents Number

Approved (A)
Yes
Approved with
Comment /
Please refer to Annexure -1 Correction (C)

Request for re- No


Submission (RR)

For information
(FI)

Please acknowledge receipt of documents:


Received by Date
Ref. No. 27.21.0000.412.49.001.19.206 Date: 28/03/2019

Annexure-1
SL Description Document Number Status Comments
No.
01. Design Calculation of PGCB-AMIN-C-01-FD- Accepted For Steel Grating Support
400/230kV TR 80 Layout & Detail Drawing below
Foundation and Fire Rev:00
Wall
Mentioned comments shall have
02. 400/230kV TR-1, 2 & 3 PGCB-AMIN-C-01-FD- Approved to be incorporated:
General Arrangement 81 with 1. Detail of grating using
Sheet No. 1/3, Rev:00 Comments Re-bar is not accepted.
03. 400/230kV TR-1 & 2 PGCB-AMIN-C-01-FD- Approved 2. No site welding shall be
Foundation 81 with
allowed because all steel
General Arrangement Sheet No. 2/3, Rev:00 Comments
04. 400/230kV TR-3 PGCB-AMIN-C-01-FD- Approved materials are hot dip
Foundation General 81 galvanized.
Arrangement Sheet No. 3/3, Rev:00 3. Provide additional detail
05. 400/230kV TR-1 & 2 PGCB-AMIN-C-01-FD- Approved for the connection of H-
Foundation 82 beam to double angle bar
Pile Layout & Details Sheet No. 1/4, Rev:00
(top portion).
06. 400/230kV TR-1 & 2 PGCB-AMIN-C-01-FD- Approved
Foundation 82
Pile Layout & Details Sheet No. 2/4, Rev:00

07. 400/230kV TR-3 PGCB-AMIN-C-01-FD- Approved


Foundation 82 with
Pile Layout & Details Sheet No. 3/4, Rev:00 Comments

08. 400/230kV TR-3 PGCB-AMIN-C-01-FD- Approved


Foundation 82
Pile Layout & Details Sheet No. 4/4, Rev:00
09. 400/230kV TR-1 & 2 PGCB-AMIN-C-01-FD- Approved
Foundation 83 with
Section & Details Sheet No. 1/4, Rev:00 Corrections
10. 400/230kV TR-1 & 2 PGCB-AMIN-C-01-FD- Approved
Foundation 83 with
Section & Details Sheet No. 2/4, Rev:00 Corrections
11. 400/230kV TR-3 PGCB-AMIN-C-01-FD- Approved
Foundation 83 with
Section & Details Sheet No. 3/4, Rev:00 Corrections
12. 400/230kV TR-3 PGCB-AMIN-C-01-FD- Approved
Foundation 83 with
Section & Details Sheet No. 4/4, Rev:00 Corrections
13. 400/230kV TR-1 & 2 PGCB-AMIN-C-01-FD- Not
Foundation 84 Approved
Steel Grating Supports Sheet No. 1/2, Rev:00
Layout & Detail
14. 400/230kV TR-3 PGCB-AMIN-C-01-FD- Not
Foundation 84 Approved
Steel Grating Supports Sheet No. 2/2, Rev:00
Layout & Detail
15. 400/230kV TR-1 & 2 PGCB-AMIN-C-01-FD- Not
Foundation 85 Approved
Steel Grating Layout & Sheet No. 1/2, Rev:00
Detail
16. 400/230kV TR-3 PGCB-AMIN-C-01-FD- Not
Foundation 85 Approved
Steel Grating Layout & Sheet No. 2/2, Rev:00
Detail
17. 400/230kV TR-1 & 2 PGCB-AMIN-C-01-FD- Approved
Foundation Fire Wall 86 with
and Detail Sheet No. 1/1, Rev:00 Corrections