“Sharing Information to Improve Reliability”

TMG News Bug Causes


Vibration on
The Manufacturing Game®
October 15, 2014
Engine #1
Inspired by a Manufacturing
Game Workshop the Action Team
Creating Change: of Michael Magee, Ron Sharbono,
Charles Rice, Chad Reynolds,
When No One Has Time Jared Merritt and Steve Mitcham
People that we work with are this situation better, we have took on the challenge to eliminate
trying to move their organization considered the causes of the lack excessive vibration on Engine #1.
to a more proactive mode of of time and determined three root There had been repeated
manufacturing. One of the main causes: breakdowns associated with the
topics of conversation is usually, 1. Lack of delegation skills reciprocating compressor unit.
“how to bring such a large change by management and supervision This was very frustrating for
in approach, attitude and behavior leads managers to underestimate everyone concerned. “We thought
into an organization that resists the capacity of their organization. we had excessive vibration, but the
change.” We thought a summary They assume that if I am vibration study we had done didn’t
of the problems and proposed overloaded, the organization support our theory. When we had
solutions might be interesting and cannot stand any new work. a failure, we had been replacing the
beneficial for our readers. 2. There are too many other broken part, but not getting to the
The most common issue that programs going on that require root cause,” stated Steve Mitcham.
each of these people’s time. It was decided by the team that
change leaders Additionally, it would be necessary to connect
hear from their people in the the suction bottles to reduce
organization organization are equipment failures and downtime.
is that “we sick of programs They also realized that they needed
do not have that add tasks to stabilize the equipment by
the time to and work and bracing the compressor.
work on these seldom show Within the first 30 days they
proactive real benefits. had requisitioned the fittings for
measures.” They have lost the project, and they had also
This can be especially true when faith that any of these initiatives located the piping required. A
talking about improvement will be beneficial. discussion took place with Jerry
projects including action teams 3. No obvious benefit to the Bates, the Regional Compression
being launched through The people having to take the risk of Leader. The team explained their
Manufacturing Game®. Most trying this new approach. problem and their plan to the
change leaders realize that in fact While everyone would agree Reliability and Compression guys
the people who have no time are that strong senior management buy and got help and support from
mired in the reactive mode which in is beneficial and some would say everyone. Jerry said, “Besides the
is the most time consuming and essential, the real key is to get non- cross supports we wanted to add,
expensive maintenance that you objection. If senior management the asset reliability team came in
can have. The dilemma of the agree not to kill or derail the effort, and did alignments and added
reactive mode is to find the time the momentum in the bottom of compressor supports. Everything
to break old practices and routines the organization would go a long that was done made an impact on
while you are already overworked way in convincing the decision the vibration issue.”
fighting fires. To understand makers down the road. Below are Steve Mitcham said, “We
Creating Change... cont. on page 2 Bug Causes... cont. on page 3

What’s Creating Change... 1, 2 Bug Causes Vibration on Engine #1 1, 3


Inside? Leaking Manzel Lube System... 3 Lessons From Geese 4

1
Creating Change... cont. from page 1 the action team process is critical
two general approaches to dealing to demonstrate the value of the
with these issues. approach and overcome the notion
Throughout the year, One approach is to look for that this is just another program.
The Manufacturing Game® holds opportunities to tie this initiative It is easy for individuals not closely
workshops for the general public at into an existing program. Typically involved in the work to discount
universities and/or professional most organizations have some the defects that can be identified
organizations. initiative that is closely related and eliminated by the front-line.
For more information visit to reliability improvement A vertical cut allows the people
www.mfg-game.com that could benefit from cross who have to fund and support the
functional action teams and better process to see the teams in action.
P u b l i c Wo r k s h o p organizational understanding It is important to get better at
The Manufacturing Game® will be of the issues. By linking to an selling the benefits of the approach
holding a Public Workshop at existing initiative, you can avoid by demonstrating the bottom
IMC 2014 the organization’s natural immune line results that will be attained
Hitlon Daytona Beach, Florida system to anything new. Working to the appropriate level in the
December 12, 2014 within an existing initiative does organization. Senior management
have some potential drawbacks. wants to hear about production
For more information or to register visit:
http://maintenanceconference.com You must be willing to share or gains, waste reduction and
give up much of the credit for maintenance cost while the front–
Conferences of Interest success, and if the initiative dies, line is more interested in getting to
your addition may die with it. do work the right way, reduce fire
The second approach is to fighting, increase safety, not have
push the initiative down in the to deal with the same issues day
The 29th International Maintenance Conference
organization where the work is after day and have fewer late night
IMC 2014 getting done. These are the people callouts.
Hilton Ocean Walk Village who will benefit most from this These solutions for overcoming
Daytona Beach, Florida approach but non-objection is not resistance to change are not
December 8–12, 2014
enough from these folks. You need silver bullets but they are already
For more information or to register visit:
http://maintenanceconference.com enthusiastic support. Once you get helping at several of the sites we
Visit The Manufacturing Game at that support and some results, the work with to begin the process of
Booth #318 leadership and the staff are much improvement.
more likely to be supportive. For
this approach to work, you need The
someone to be excited about the Manufacturing
approach. This person can be a Game® will be
Reliability 2.0
first or second line supervisor since holding a Public
South Point Resort, Las Vegas
the key resource you need to get Workshop at the
April 7–11, 2015
started is properly organized cross IMC Conference
For more information or to register visit:
http://maintenanceconference functional action teams. By not in Daytona Beach, Florida, Friday,
or call (888) 575-1245 trying to launch the program on a December 12, 2014 from 8am–4pm.
company or site wide basis all at The workshop is a hands on
once, you avoid the direct assault learning experience that creates a
on the organization’s immune reliability culture. Participants will
system. The bottom-up approach experience how they can increase
Reliability & Maintenance
gives you a chance to demonstrate their organization’s reliability
Conference
the value and push the initiative through defect elimination and
Austin Convention Center, cross functional work, become more
Austin,TX
down to the level that will see
direct benefit. The downside of proactive and increase business
May 19–22, 2015 performance.
For more information or to register this approach is that it is not always
visit: www.afpm.org easy to fund this sort of a bottom- This is the perfect opportunity
up process, and it can be crowded to see how you can reinforce and
Mark Your
out by other initiatives. improve your company’s reliability
Calendar! initiatives.
Combined with either of these
approaches having a vertical cut To register ask for workshop
of the organization involved in PWS6 http://imc-2014.com/register
2
Think you’re cut out for doing defect elimination? “Take the quiz!”

1. Do you have equipment that breaks down on a regular basis?


2. Are you overwhelmed with the amount of reactive work?
3. Would you prefer not to have to come to work on nights and
weekends to handle breakdowns?
4. Do you prefer to work in an environmentally friendly and safe
workplace?
5. Do you feel passionately about getting these problems solved?

If you answered ‘yes’ to one or all of these questions you could


be a defect eliminator. It’s not hard to get started. Find a problem that is small enough for you and a
cross functional team to handle. Ask a few people from different departments that have the equipment in
common to be on your team and get started!

Bug Causes... cont. from page 1 Leaking Manzel Lube was made from a bolt-on filter
could not have completed the System Filter Housing housing to a spin-on filter housing.
project without Jerry Bates, James Clyde Childress, Rob Morgan, Isolation valves were installed on
Hill, Jerry Evans, Jamie Womack, Rob Carwile and Donna Aubrey each side of the filter housing to
Willie Pierre and numerous others left The Manufacturing Game allow for ease of maintenance
from Asset Reliability. We were workshop with the idea of of the filter without opening the
challenged to not just fix it, but to eliminating the leaks in the Manzel entire system. Pressure gauges
improve it, and I believe we did. I Lube System by replacing the were added on the upstream and
really believe this will decrease our housing. Upon further research, downstream sides of the filter
unavailable hours for this unit.” it became apparent that more was to monitor the effectiveness of
Often times when we take on needed than just replacing the the filter so that conditions could
a problem, we learn that there’s housing itself. As the team was be used to determine when to
more to the issue than initially researching the issues and looking change the filter without having to
thought. This team understood at potential solutions, there was guess. The parts were ordered and
that additional help would be an opportunity for Mechanical installation completed on the #4
required and engaged the right Specialist, Rob Carwile, to attend GMW unit for under $400.
people to help them get to the a one day training session on This is the first system like this
root of the problem. Continued lubrication systems conducted by at the station and once perfected,
measurement of machine a vendor that covered the basics it will be the model for the rest of
reliability and availability will of the Manzel system. During the the engines at the station and can
confirm their success. class, Rob determined that the best be used as a prototype for other
The team noted several solution was to upgrade the system stations.
benefits to a more reliable and maintenance Sometimes a new approach
from this friendly filter system. A change makes a world of difference!
defect
elimination
project
including
lower repair
costs,
increased
availability,
reduced
downtime
and labor hours; less frustration
and better safety. Congratulations
on the great teamwork!
Old System New System

3
TMG News
_________________
The Manufacturing Game®
October 15, 2014

7702 FM 1960 East, Ste. 226


Humble, TX 77346
(281) 812-4148
(281) 812-4149 Fax
http://www.ManufacturingGame.com
email: info@ManufacturingGame.com

October
TMG News
Lessons From Geese Lesson: there is encouragement, the
FACT 1: If we have as much sense as a production is much greater. The
As each goose goose we stay in formation with power of encouragement (to stand
flaps its wings those headed where we want to go. by one’s heart or core values and
it creates an We are willing to accept their help encourage the heart and core of
“uplift” for the and give our help to others. others) is the quality of honking
birds that follow. By flying in a “V” FACT 3: we seek.
formation, the whole flock adds When the lead goose tires, it rotates FACT 5:
71% greater flying range than if back into formation and another When a goose gets sick, wounded
each bird flew alone. goose flies to the point position. or shot down, two geese drop out
Lesson: Lesson: of formation and follow it to help
People who share a common It pays to take turns doing the and protect it. They stay with it
direction and sense of community hard tasks and sharing leadership. until it dies or is able to fly again.
can get where they are going As with geese, people are Then, they launch out with another
quicker and easier because they interdependent on each other’s formation or catch up with the
are traveling on the thrust of one skills, capabilities and unique flock.
another. arrangements of gifts, talents or Lesson:
FACT 2: resources. If we have as much
When a goose falls out of FACT 4: sense as geese, we
formation, it suddenly feels the The geese flying in formation honk will stand by each
drag and resistance of flying to encourage those up front to other in difficult
alone. It quickly moves back keep up their speed. times as well as
into formation to take advantage Lesson: when we are strong.
of the lifting power of the bird We need to make sure our honking —Based on work by Milton Olson
immediately in front of it. is encouraging. In groups where
4

Das könnte Ihnen auch gefallen