Sie sind auf Seite 1von 2

Doc. no.

SW -CL-37
Project: NH:37 Contract package – EW – II (AS-02/AS-18)
Rev. 0
Date
Checklist I: for Fabrication of Steel Girder Received
(Before painting and assembling at site) Ref. RFI.
No:

Location : Girder No:


Date : Item No:
Time :
Item Description CON CON SC Remarks

Y N Y N Y N
A) Surface Preparation
1 Are the surfaces cleaned with sand blasting ?
2 Is the mill scale completely removed?
3 Are all slags removed from welds?
4 Is the surface made free from dirt and oil ?
B) Prime Coat
5 Is the prime coat applied as soon as cleaning is
completed ?
6 Type and commercial name of the prime used for
priming?
7 Are the 2nd & 3rd primer coats applied after proper
drying of previous coat ?
8 Is the prime coat covered edges, corners, welds etc.
9 Is the DFT tested? If yes, what is the average
thickness?
10 Is the spray / brush painting done?
11 Are the inaccessible areas are coated by brushing
before application of painting?
C) Final paint – One coat at Fabrication Yard
12 Is the prime coats fully dried before application of
aluminum paint ?
13 Is the paint compatible with the prime coat?
14 Type and commercial name of the paint?
15 Is the field- contact surfaces and surfaces that are to
be brought in contact with cement has been left
during painting?
16 Is the paint applied by spray / brush ?
17 Is the inaccessible areas are coated by brushing
before application of painting?
18 Is the DFT tested? If yes, what is the average
thickness?
19 Is there any wrinkled, blistered coating, coating with
pin-holes, slags, lumps and other blemishes visible?
E) Environmental Safety
20 Is the painting process creating any environmental
hazards or public inconveniences?

137
Doc. no. SW -CL-37
Project: NH:37 Contract package – EW – II (AS-02/AS-18)
Rev. 0
Date
Checklist I: for Fabrication of Steel Girder Received
(Before painting and assembling at site) Ref. RFI.
No:

Is the fabricated girder approved for next stage of


Yes No
operation?

Signed for Contractor ________________________ Designation : ________________________ Date: ___________________

Signed for SC _______________________ Designation: _______________________ Date: ___________________