SPESIFIKASI TEKNIS

PEKERJAAN STRUKTUR, ARSITEKTUR & ME


FrontOne Inn Central One Cengkareng - Bp. Jaya

I STRUKTUR
1 Pondasi : Tiang pancang uk. 30x30 cm, tulangan : 4D16, K 50
2 Beton struktur : Readymix K225
3 Besi : ex CKS/SJ
4 Bekisting : multipleks 9 mm + kaso meranti
5 Waterproofing : ex Sika/setara
6 Penutup atap bangunan : #REF!

II ARSITEKTUR
1 Dinding : Batu bata jumbo Cikarang
2 Plafond
Ruang utama : Gypsumboard 12 mm ex Jayaboard + rangka hollow
Toilet : GRC 4 mm + rangka hollow zinchromat
R. Cinema, Band, Recording : Accoustic tile ex Jayaboard + rangka maintee cross
List plafond : Aluminium U/shadow line
Cat plafond : ex Mowilex / setara

3 Finishing lantai
Ruang utama : Marmer Traventine ex Turki
Ruang Service : Keramik 30x30 cm ex Roman/setara
Carport & Koridor : Keramik 40x40 cm ex Roman/setara
Teras : Decking kayu ulin
Toilet Service : Keramik 20x20 cm ex Roman/setara
Toilet Utama : Homogenous tile 60x60 cm ex Niro Granite/setara
Plint
- Area service : Keramik 10x30 cm ex Roman/setara
- Carport & Koridor : Keramik 10x40 cm ex Roman/setara
- Area utama : Homogenous tile 10x60 cm ex Niro Granite/setara

4 Pintu & Jendela


Kusen pintu : Aluminium Powdercoating ex Alexindo/setara
Kayu Kamper Samarinda fin. Duko
Daun pintu : Kayu Kamper Samarinda fin. Duko
Daun Jendela Aluminium Powdercoating ex Alexindo/setara
Jendela : Aluminium Powdercoating ex Alexindo/setara
Engsel, handle & kunci : ex Solid/setara

5 Sanitair
Close duduk : Err:509
Wastafel : Err:509
Top Table wastafel : Err:509
Cermin wastafel : Err:509
Jet washer : Err:509
Hand shower : Err:509
Soap holder : Err:509
Floor drain : Err:509
Shower screen : Err:509

6 Railing tangga : besi hollow finish duko + handrailiing pipa besi fin.
Railing Balkon : Railing kaca tempered 12 mm
6 Finishing dinding

Halaman : 1/238
Cat dinding luar : ex Dulux ICI Weathershield
Cat dinding dalam : ex Dulux ICI Pentalite
Dinding toilet service : Keramik 20x20 cm ex Roman/setara
Dinding toilet utama : Homogenous tile 30x60 cm ex Niro Granite/setara

III MEKANIKAL & ELEKTRIKAL


A Instalasi Air Kotor
1 Instalasi pipa air kotor : pipa PVC Ø4" type D ex Wavin
2 Instalasi pipa air bekas buangan : pipa PVC Ø4" type D ex Wavin
3 Instalasi pipa air hujan : pipa PVC Ø3" type D ex Wavin
4 Instalasi pipa air panas : ex Wavin Tigris Green/ATP Toro/setara
4 Septictank & rembesan : pasangan bata diplester/aci + tutup beton
5 Roof drain Ø3" : Cast iron

B Instalasi Air Bersih


1 Instalasi pipa air bersih : pipa PVC type AW ex Wavin
2 Water torn : kap. 1000 lt, fibre glass ex Pinguin / setara
3 Pompa jetpump & distribusi : ex Grundfos
4 Waterheater : Solar WH ex. HANDAL 300L

C Instalasi Listrik
1 Instalasi titik lampu bangunan : kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsa
2 Instalasi titik stop kontak : kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsa
3 Instalasi titik saklar hotel : kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsa
4 Instalasi ceiling fan : kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsa
5 Box zekering + MCB : ex Hager + MCB ex MG asli
6 Armatur lampu : ex Centralite/setara + lampu ex Osram/setara
7 Saklar & stop kontak : ex Panasonic standard
8 Exhaust fan type ceiling : ex Panasonic

D Instalasi TV
1 Instalasi TV : kabel RJ6C5 ex Yurri
2 Outlet antena TV : ex Panasonic standard

E Instalasi Telepon
1 Instalasi titik telepon : 4Cx0,6 mm2 ex Supreme
2 Outlet telpon : ex Panasonic standard

F Instalasi AC
1 Instalasi power AC : kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsa
2 Supply & Install Unit AC : Err:509
3 Pipa refrigerant : pipa armaflex + isolator
4 Kabel dari Indoor ke outdoor : kabel NYM 3x2,5 mm2 ex Supreme
5 Pipa drain AC : Pipa PVC dia.1/2 " ex Wavin AW

G Genset : Err:509
H Elevator : Err:509

Halaman : 2/238
Tiang pancang uk. 30x30 cm, tulangan : 4D16, K 500

Gypsumboard 12 mm ex Jayaboard + rangka hollow zinchromate


GRC 4 mm + rangka hollow zinchromat
Accoustic tile ex Jayaboard + rangka maintee crosstee

Homogenous tile 60x60 cm ex Niro Granite/setara

Homogenous tile 10x60 cm ex Niro Granite/setara

Aluminium Powdercoating ex Alexindo/setara

Aluminium Powdercoating ex Alexindo/setara


Aluminium Powdercoating ex Alexindo/setara

besi hollow finish duko + handrailiing pipa besi fin. Cat

Halaman : 3/238
Homogenous tile 30x60 cm ex Niro Granite/setara

pasangan bata diplester/aci + tutup beton

kap. 1000 lt, fibre glass ex Pinguin / setara

kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsal


kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsal
kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsal
kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsal

ex Centralite/setara + lampu ex Osram/setara

kabel NYM 3x2,5mm2 Supreme + conduit ex Clipsal

Halaman : 4/238
REKAPITULASI - 3 LANTAI (28 KAMAR)
PEKERJAAN STRUKTUR, ARSITEKTUR & ME
FrontOne Inn Central One Cengkareng - Bp. Jay

TOTAL GRAND TOTAL


NO URAIAN PEKERJAAN
( Rp ) ( Rp )
I PEKERJAAN PERSIAPAN 30,888,000
II PEKERJAAN STRUKTUR 52,563,056
A Pekerjaan Strukur Lift Without lift
B Pekerjaan Bongkaran 45,101,056
C Pekerjaan Area pit stop + Rumah mesin Without lift
D Pekerjaan Kereta Lift dan Mesin lift Without lift
E Pekerjaan Struktur Tangga Eksisting
F Pekerjaan Waterproofing 7,462,000
III PEKERJAAN ARSITEKTUR 1,237,432,093
A Pekerjaan Dinding 227,810,879
B Pekerjaan Plafond 117,277,274
C Pekerjaan Finishing Lantai 383,472,319
D Pekerjaan Kusen, Pintu 259,471,000
E Pekerjaan Sanitair 139,197,800
F Pekerjaan Finishing Dinding 110,202,821
IV PEKERJAAN MEKANIKAL dan ELEKTRIKAL 1,044,533,665
A Pekerjaan Instalasi Plumbing 379,680,465
B Pekerjaan Instalasi Listrik 332,256,200
C Pekerjaan Instalasi Penangkal Petir Eksisting
D Pekerjaan Instalasi AC 228,170,600
E Pekerjaan Smoke Detector 83,938,400
F Pekerjaan Instalasi CCTV 20,488,000
V PEKERJAAN INTERIOR 783,840,000
A Interior Kamar Tidur 699,120,000
B Interior Lobby 84,720,000
VI KERJA TAMBAH 87,117,505
A Penambahan 2 Kamar Tidur dan Musolah 87,117,505
TOTAL 3,236,374,319
JASA KONTRAKTOR 10% 323,637,432
GRAND TOTAL 3,560,011,751
DIBULATKAN 3,560,000,000

Catatan : Jakarta, 25 Oktober 2016


Yang tidak termasuk di dalam penawaran :
- Biaya pengursan IMB dan koordinasi pelanggaran
- Penyambungan listrik, internet dan telefon
- Pembesaran daya listrik
- Layanan TV berlangganan yang dibutuhkan Arrifan Kartawidjaja, ST, MM
- Pengadaan genset Dir. Proyek
- Pengadaan struktur lift dan kereta lift Adikon Arsi Prasda

Halaman 5 / 238
RENCANA ANGGARAN BIAYA
PEKERJAAN STRUKTUR
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA
JML HARGA
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT SAT
(Rp)
(Rp)
I PEKERJAAN PERSIAPAN
1 Air kerja (selama proyek berjalan) PAM 10.00 bln 676,000 6,760,000
2 Listrik kerja PLN 10.00 bln 468,000 4,680,000
3 Proteksi Jaring proyek 1.00 ls 3,120,000 3,120,000
4 Keamanan lingkungan proyek lingkungan setempat + koordinasi aparat s 1.00 ls 5,200,000 5,200,000
5 Pembersihan proyek buing, sampah dll 1.00 ls 15,600,000 15,600,000
6 Transportasi & Mobilisasi 1.00 ls 26,000,000 26,000,000
7 Material & alat bantu kerja scafolding, gerobak, trolly, dll 1.00 ls 15,600,000 15,600,000

II PEKERJAAN BONGKARAN
1 Bongkaran tangga utama - unit 3,120,000 0
2 Bongkaran dinding antar ruko tebal dinding = 15 cm - m2 31,200 0
3 Bongkaran plat lantai Persiapan tangga utama, void lift dan linen - m2 46,800 0
4 Bongkaran plafond eksisting 667.70 m2 12,480 8,332,896
5 Bongkaran KM eksisting 6.00 unit 2,080,000 12,480,000
6 Bongkaran instalasi listrik 2.00 ruko 1,560,000 3,120,000
7 Bongkaran pintu dan jendela 6.00 unit 520,000 3,120,000
8 Bongkaran keramik eksisting 667.70 m2 20,800 13,888,160
9 Pembersihan puing 1.00 ls 4,160,000 4,160,000

III PEKERJAAN STRUKTUR


A Pekerjaan Strukur Lift
1 Kolom WF-200 - kg 23,920 0
2 Balok Lantai WF-200 - kg 23,920 0
3 Dudukan mesin WF-150 - kg 23,920 0
4 Balok Anak UNP 100 - kg 18,300 0
5 Jamb Pintu UNP 80 - kg 18,300 0
6 Cover hoistway grc fin cat - m2 223,600 0
7 Rumah lift Batu bata fin. Plester + aci - m2 221,520 0
8 Plate sepatu kolom - set 780,000 0
9 Ancore D16 x 20 - set 364,000 0
10 Zincromate - kg 78,000 0
11 Kawat Las - kg 46,800 0

Pekerjaan Struktur Halaman : 6/238


RENCANA ANGGARAN BIAYA
PEKERJAAN STRUKTUR
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA
JML HARGA
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT SAT
(Rp)
(Rp)
B Pekerjaan Galian & Urugan
1 Galian tanah pondasi
- Galian pondasi Pile Cap galian manual - m3 260,000 -

2 Pasir urug pasir urug darat tebal 10 cm


- di bawah Pile Cap - m3 390,000 -

3 Lantai kerja tebal 5 cm adukan 1 : 3 : 5


- di bawah Pile Cap - m3 707,200 -

4 Urugan tanah kembali bekas galian Urugan manual


- Pile Cap - m3 46,800 -

C Pekerjaan Area pit stop + Rumah mesin


1 Dinding bata - m2 139,880 0
2 Kolom praktis - bh 1,508,000 0
3 Sloof beton praktis - m' 1,820,000 0
4 Pengecoran pit stop kedalaman 80 cm - Ls 18,720,000 0

D Pekerjaan Kereta Lift dan Mesin lift Supplied by Owner


1 Electric Passenger Lift + ekspedisi type QS 630kg ex. Schindler
stainless steel auto door - unit - -
incld. ARD (Automatic Rescue Device)

2 Biaya pemasangan dan instalasi - ls - -

E Pekerjaan Struktur
1 Struktur kolom lt 4 besi d16, Mutu Beton K 225 - m3 2,912,000 -
inc bekisting
2 Struktur ring balok lt 4 besi d16, Mutu Beton K 225 - m3 2,912,000 -
inc bekisting
3 Struktur plat dak lantai 5 besi d8, Mutu Beton K 225 - m3 2,912,000 -
inc bekisting
4 Meja beton wastafel toilet umum besi d8, Mutu Beton K 175 - m3 2,912,000 -

Pekerjaan Struktur Halaman : 7/238


RENCANA ANGGARAN BIAYA
PEKERJAAN STRUKTUR
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA
JML HARGA
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT SAT
(Rp)
(Rp)
inc bekisting
top table batu granit ex nero black - m1 1,144,000 -
cermin silver inc plywood backcover - m1 1,040,000 -
5 Beton Tangga Utama dari Lt. 1 ke lantai 3
- Beton beton readymix K225 - m3 1,002,600 -
- Bekisting multipleks 9 mm + kaso meranti - m2 176,800 -
- Tulangan ex CKS / SJ - kg 10,200 -

IV PEKERJAAN WATERPROOFING
1 Waterproofing lantai Toilet type coating ex Brushbond flexi 102.50 m2 72,800 7,462,000
Lantai 1 - 3
- Kamar mandi umum 6.72
- Kamar mandi kamar hotel 95.78
Dak beton talang
- Dak beton talang -
- Dak atap -

2 Screed pelindung waterproofing tebal 3 cm - m2 36,400 -

V Pekerjaan Atap
1 Rangka atap konstruksi baja ringan - m2 208,000 -
2 Roof mesh + Alumunium voil single side - m2 46,800 -
3 Penutup atap Genteng beton ex Cisangkan - m2 187,200 -
4 Nok genteng Genteng beton ex Cisangkan - m' 171,600 -
5 Lisplank GRC - m' 109,200 -

Pekerjaan Struktur Halaman : 8/238


TOTAL GRAND TOTAL
(Rp) (Rp)
76,960,000 76,960,000

45,101,056 45,101,056

-
0

Pekerjaan Struktur Halaman : 9/238


TOTAL GRAND TOTAL
(Rp) (Rp)
-

Pekerjaan Struktur Halaman : 10/238


TOTAL GRAND TOTAL
(Rp) (Rp)

7,462,000
7,462,000

Pekerjaan Struktur Halaman : 11/238


RENCANA ANGGARAN BIAYA
PEKERJAAN ARSITEKTUR
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
III PEKERJAAN ARSITEKTUR 1,386,712,300
A Pekerjaan Dinding 298,991,297
1 Dinding partisi 10 cm Rangka Hollow + Insulasi glasswool 799.24 m2 202,020 161,462,465
- Lantai 1 204.60
- Lantai 2-3 594.64

2 Pasangan bata ringan 7,5 cm 726.31 m2 120,120 87,244,357


- Lantai 1 150.07
- Lantai 2-3 576.24

3 Plesteran + acian Semen pasir 726.31 m2 69,233 50,284,475


- Lantai 1 - 3 726.31

B Pekerjaan Plafond 117,277,274


1 Plafond gypsum gypsumboard 9 mm ex Jayaboard 587.43 m2 109,200 64,147,356
Lantai 1
- Area umum (Lobby, Server, BOF, Dll) 112.47
- Kamar tidur + Kamar mandi 63.38

Lantai 2
- Kamar tidur + Kamar mandi 171.99
- Area umum : Koridor , Balkon 33.80

Lantai 3
- Kamar tidur + Kamar mandi 171.99
- Area umum : Koridor , Balkon 33.80

2 Drop Plafond in-direct light cove gypsumboard 9 mm ex Jayaboard 65.00 m' 109,200 7,098,000
- Lounge dan Kamar Tidur 65.00

3 List plafond gypsum List plafond 10 cm 921.68 m' 21,800 20,092,624

Lantai 1
- Lobby, Restoran dan area servis, dlll 115.68
- Kamar tidur + Kamar mandi 101.60

Lantai 2
- Kamar tidur + Kamar mandi 307.20
-Area Umum : Koridor+Balkon 45.00

Lantai 3
- Kamar tidur + Kamar mandi 307.20
-Area Umum : Koridor+Balkon 45.00

4 Cat plafond ex Vinylex / Catylac 587.43 m2 26,200 15,390,666


- Plafond gypsum 587.43

5 Cat list plafond ex Vinylex / Catylac 967.76 m' 10,900 10,548,628

C Pekerjaan Finishing Lantai 445,515,979


Lantai 1 : Area Umum, Koridor & Tangga Utama

Pekerjaan Arsitektur Halaman : 12/238


RENCANA ANGGARAN BIAYA
PEKERJAAN ARSITEKTUR
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
1 Area Umum
- Area umum (Lobby, Server, BOF, Dll) Granite tile 60x60cm ex. China 108.97 m2 283,900 30,936,583
- Tangga utama Granite tile 60x60cm ex. China 11.55 m2 283,900 3,279,045

2 Lavatory+KM
- Dinding toilet Roman 40x40cm ex. Milan / setara 188.40 m2 240,200 45,253,680
- Lantai toilet Roman 40x40cm ex. Milan / setara 22.24 m2 234,800 5,221,952

3 Kamar tidur
- Kamar tidur Acian halus 47.86 m2 108,900 5,211,954
- Kamar tidur Roman 40x40cm ex. Milan / setara 47.86 m2 223,600 10,701,496

Lantai 2 : Kamar Tidur, Kamar Mandi, FOF, Back Office Finance, Dll
1 Kamar tidur
- Kamar tidur Acian halus 128.19 m2 108,900 13,959,891
- Kamar tidur Vinyl ex. Gamachi atau setara 3mm 128.19 m2 223,600 28,663,284

2 Kamar Mandi
- Dinding kamar mandi Roman 40x40cm ex. Milan / setara 422.40 m2 240,200 101,460,480
- Lantai kamar mandi Roman 40x40cm ex. Milan / setara 85.60 m2 234,800 20,098,880

3 Area umum
- Koridor + Tangga utama Granite tile 60x60cm ex. China 45.35 m2 234,800 10,648,180

Lantai 3 : Kamar tidur, Kamar Mandi & Area Umum


1 Kamar tidur
- Kamar tidur Acian halus 128.19 m2 103,700 13,293,303
- Kamar tidur Vinyl ex. Gamachi atau setara 3mm 128.19 m2 212,900 27,291,651

2 Kamar Mandi
- Dinding kamar mandi Roman 40x40cm ex. Milan / setara 422.40 m2 240,200 101,460,480
- Lantai kamar mandi Roman 40x40cm ex. Milan / setara 85.60 m2 234,800 20,098,880

3 Area umum
- Koridor+Tangga Utama Granite tile 60x60cm ex. China 33.80 m2 234,800 7,936,240

D Pekerjaan Kusen, Pintu 259,471,000

1 PK : Pintu kaca, swing 2 daun uk. 80x220x2 1.00 unit 13,562,600 13,562,600
Lokasi : Lobby
- Daun pintu kaca frameless Kaca tempered 12 mm
- Ironmongery
- Engsel pivot ex Deckson/setara
- Handle ex Deckson/setara
- Flush bolt ex Deckson/setara

2 PK : Pintu kayu, swing 2 daun uk. 80x220x2 - unit 7,338,200 -


Lokasi : R.Meeting
- Daun pintu kayu Kaca tempered 12 mm
- Ironmongery

Pekerjaan Arsitektur Halaman : 13/238


RENCANA ANGGARAN BIAYA
PEKERJAAN ARSITEKTUR
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
- Handle ex Deckson/setara
- Flush bolt ex Deckson/setara
- Electronic RFID card keylock ex. China

3 P1 : Pintu kamar, swing 1 daun uk. 90x220 cm 28.00 unit 4,695,600 131,476,800
Lokasi : Kamar tidur
- Kusen + Daun pintu + Architrave plywood fin. HPL ; honeycomb model
- Ironmongery
- Engsel ex Solid/setara
- Handle ex Solid/setara
- Electronic RFID card keylock ex. China
- Flush bolt ex Solid/setara

4 P2 : Pintu kaca geser, swing 1 daun uk. 80x220 cm 29.00 unit 1,248,000 36,192,000
Lokasi : Kamar mandi

5 P4 : Pintu swing 1 daun uk. 90x220 cm 8.00 unit 3,942,100 31,536,800


Lokasi Lt 1, Lt 2, Lt 3: Receptionist,
Linen & Service
- Kusen + Daun pintu + Architrave engineering wood ; honeycomb model
- Ironmongery
- Engsel ex Solid/setara
- Handle ex Solid/setara
- Lockcase ex Solid/setara
- Flush bolt ex Solid/setara

6 J1 : Jendela Jungkit Kusen alumunium ex. Alexindo 12.00 unit 3,891,900 46,702,800
Lokasi : Kamar Tidur Lt. 2, Lt. 3 Kaca polos t = 6mm
Aksesoris ex. Anderson

7 J2 : Jendela Kaca mati Kaca polos t = 12mm tempered - m2 1,010,100 -


Lokasi : Lounge + Resto

E Pekerjaan Sanitair 139,197,800


Kamar Mandi Lt. 1
1 Closet duduk ex. American Standar atau setara 6.00 bh 1,959,600 11,757,600
2 Wastafel ex. American Standar atau setara 6.00 bh 928,200 5,569,200
3 Jestwasher ex. American Standar atau setara 6.00 bh 398,600 2,391,600
4 Floordrain ex. SAN-ei 6.00 bh 322,100 1,932,600
5 Urinoir ex. American Standar atau setara - bh 2,052,900 -
6 Shower ex. American Standar atau setara 4.00 bh 1,105,100 4,420,400
Kamar Mandi Lt. 2+3
1 Closet duduk ex. American Standar atau setara 24.00 bh 1,959,600 47,030,400
2 Shower ex. American Standar atau setara 24.00 bh 1,105,100 26,522,400
3 Wastafel ex. American Standar atau setara 24.00 bh 928,200 22,276,800
4 Jestwasher ex. American Standar atau setara 24.00 bh 398,600 9,566,400
5 Floordrain ex. SAN-ei 24.00 bh 322,100 7,730,400

G Pekerjaan Railing tangga dan balkon Eksisting

1 Railing tangga utama Besi hollow fin. Cat duco - m' 709,800 -

Pekerjaan Arsitektur Halaman : 14/238


RENCANA ANGGARAN BIAYA
PEKERJAAN ARSITEKTUR
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)

G Pekerjaan Finishing Dinding 126,258,950

1 Pengecatan dinding dalam 1,525.55 26,200 39,969,410


- Resepsionis, BOF, R. Server, dll 354.67
- Lantai 2-3 : Kamar Tidur, Koridor 1,170.88

2 Pengecatan dinding luar (samping??) 144.00 37,100 5,342,400


- Dinding fasad depan 144.00

3 Waterproofing dinding tetangga 425.40 49,100 20,887,140


- Dinding samping tetangga 425.40

4 Alat bantu : Scaffolding + catwalk dll Logo utama ; dimensi +/- 70cm x 1.00 Ls 27,300,000 27,300,000
5 Logo tampak depan 600cm 1.00 unit 32,760,000 32,760,000
Galvanis duco + Acrylic + LED

Pekerjaan Arsitektur Halaman : 15/238


RENCANA ANGGARAN BIAYA
PEKERJAAN MEKANIKAL & ELEKTRIKAL
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
IV PEKERJAAN MEKANIKAL & ELEKTRIKAL ###
A Pekerjaan Instalasi Plumbing 417,855,679
Instalasi Air Kotor
1 Instalasi pipa air kotor pipa PVC Ø4" type AW ex Wavin 124.78 m' 87,400 10,905,772
- Lantai 1 19.95
- Lantai 2-3 104.83
- Fitting instalasi 1.00 ls 3,815,300 3,815,300

2 Instalasi pipa air bekas buangan pipa PVC Ø3" type AW ex Wavin 148.35 m' 59,800 8,871,330
- Lantai 1 25.95
- Lantai 2-3 122.40
- Fitting instalasi 1.00 ls 3,105,700 3,105,700
- Instalasi V-trap 36.00 bh 180,200 6,487,200
-
3 Instalasi pipa air hujan pipa PVC Ø3" type AW ex Wavin - m' 59,800 -
4 Fitting instl. Pipa air hujan ex. Wavin - ls - -
5 Instalasi pipa pembuangan utama - air kotor pipa PVC Ø6" type AW ex Wavin 48.96 m' 168,200 8,235,072
6 Septictank kap : 9 m3 Septictank konvensional + resapan 1.00 unit 38,875,200 38,875,200
7 Bak biotech Dinding bata + kamprot + plat penutup cor beton - unit - -
8 Bak kontrol 40x40x40cm pasangan bata diplester/aci + tutup beton 7.00 unit 300,300 2,102,100
9 Bak kontrol 60x40x40cm (for Biotech) pasangan bata diplester/aci + tutup beton - unit - -
10 Roof drain Ø3" cash iron 12.00 bh 142,000 1,704,000

Instalasi Penghawaan
1 Pipa dia. 4" ex. Wavin D 77.25 m' 65,500 5,059,875
2 Grill udara 28.00 bh 136,500 3,822,000
3 Fitting + Penggantung 1.00 Ls 1,518,400 1,518,400

Instalasi Air Bersih


1 Instalasi pipa PVC Ø1 1/4" pipa PVC type AW ex Wavin 158.64 m 37,100 5,885,544
- Suppy dari toren + Loop Utama 158.64
- Fitting instalasi 1.00 ls 2,061,500 2,061,500

2 Instalasi pipa PVC Ø 3/4" pipa PVC type AW ex Wavin 301.80 m 31,700 9,567,060
- Lantai 1 - Lantai 3 ( loop KM) 301.80
- Fitting instalasi 1.00 ls 3,345,100 3,345,100

3 Instalasi pipa PVC Ø 1/2" pipa PVC type AW ex Wavin 422.40 m 29,500 12,460,800
- Lantai 1 - Lantai 3 ( loop KM) 422.40
- Fitting instalasi 1.00 ls 4,358,900 4,358,900

Instalasi Air Panas


4 Instalasi pipa PPR Ø1 1/2" ex Westpex / Rifeng 142.78 m 47,000 6,710,472
- Suppy dari toren + Loop Utama 142.78
- Fitting instalasi 1.00 ls 3,016,900 3,016,900

5 Instalasi pipa PPR Ø 3/4" ex Westpex / Rifeng 271.62 m 31,700 8,610,354


- Suppy dari toren + Loop Utama 271.62

Pekerjaan ME Halaman : 16/238


RENCANA ANGGARAN BIAYA
PEKERJAAN MEKANIKAL & ELEKTRIKAL
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
- Fitting instalasi 1.00 ls 3,870,700 3,870,700

6 Instalasi pipa PPR Ø 1/2" ex Westpex / Rifeng 112.00 m 28,400 3,180,800


- Suppy dari toren + Loop Utama 112.00
- Fitting instalasi 1.00 ls 1,431,000 1,431,000

Aksesoris
7 Alat bantu (klem, pengantung dll ) 1.00 ls 4,738,800 4,738,800
8 Header toren atas PVC dia. 4" (3+4) 3.00 unit 3,549,000 10,647,000
9 Ball valve Ø11/4" ex Kitz 7.00 bh 256,600 1,796,200
10 Ball valve Ø3/4" ex Kitz 30.00 bh 163,800 4,914,000
11 Ball valve Ø1/2" ex Kitz 88.00 bh 163,800 14,414,400
12 Water torn kapasitas 2000 ltr + Eksisting fibreglass ex Excel / setara 3.00 unit 4,914,000 14,742,000
kabel NYM 2x2,5mm2 ex Supreme + radar electric 3.00 ttk 709,800 2,129,400
Instalasi kabel + unit radar pelampung dari pompa ke torn
13 float switch
14 Booster Pump / Distribution pump ex. Shimizu / DAP / setara ; 250 - 400 w 3.00 unit 2,566,200 7,698,600
15 Waterheater Solar WH ex. HANDAL 300L 4.00 unit 26,754,000 107,016,000
16 Dudukan Solar WH Rangka besi siku 4.00 unit 1,638,000 6,552,000
17 Testing Commisioning utk Instalasi air kotor Test Gelontor 1.00 ls 1,638,000 1,638,000
18 Testing Commisioning utk Instalasi air bersih Test Pump pressure 1.00 ls 2,184,000 2,184,000
19 Sumur bor dalam kedalaman >=50m 1.00 unit 19,437,600 19,437,600
Pompa submersible ex. Grundfos type 3A-6, 0,37kw 1.00 unit 7,098,000 7,098,000
Panel kontrol + Kabel elektroda 1.00 set 4,914,000 4,914,000
Jasa pasang dan instalasi 1.00 Ls 1,638,000 1,638,000
Pengeboran pilot hole Casing pipa Wavin AW dia. 8" 60.00 m' 327,600 19,656,000
Pipa pompa ex. Wavin AW dia. 1 1/4" 52.00 m' 26,000 1,352,000
Kabel NYYHY 3 x 2.5mm ex. Jembo atau setara 2.00 Roll 1,924,000 3,848,000
Material support Pipa Jambang dia. 5" Rucika AW 80.00 m' 182,000 14,560,000
Pipa naik dia. 2" Rucika AW 32.00 m' 46,800 1,497,600
Klem pipa 1.00 Ls 1,144,000 1,144,000
Gravel pack / Kerikil 15.00 krg 33,800 507,000
Pasir semen 1.00 m3 572,000 572,000
Persiapan & Mob Demob alat 1.00 Ls 2,080,000 2,080,000
Pumping test & pembersihan sumur 1.00 Ls 2,080,000 2,080,000

B Pekerjaan Instalasi Listrik 351,702,600

Instalasi kabel Panel + Panel


1 Instalasi Kabel Feeder PLN - Panel MDP Kabel NYY 4x120mm 10.00 m 709,800 7,098,000
2 Instalasi Kabel Feeder Genset - Panel MDP Kabel NYY 4x120mm 17.00 m 709,800 12,066,600
3 Instalasi Kabel Feeder panel MDP - Panel SDP Lantai 1 Kabel NYY 4x16mm 2.00 m 169,300 338,600
4 Instalasi Kabel Feeder panel MDP - Panel SDP Lantai 2 Kabel NYY 4x50mm 21.00 m 169,300 3,555,300
5 Instalasi Kabel Feeder panel MDP - Panel SDP Lantai 3 Kabel NYY 4x35mm 25.00 m 475,000 11,875,000
6 Instalasi Kabel Feeder panel MDP - Panel Lift Kabel NYY 4x6mm - m 92,800 -
7 Grounding - Panel MDP BC 35 mm 1.00 Ls 2,457,000 2,457,000
8 Instalasi tarikan grounding panel MDP - panel SDP BC 25 mm 65.00 m 43,700 2,840,500
9 Panel lantai dasar Metal panel uk. 70x80cm 1.00 unit 6,770,400 6,770,400
10 Panel lantai 2 - 3 ex. Metal panel uk. 30x40cm + MCB ex. Schneider 2.00 unit 3,822,000 7,644,000

Pekerjaan ME Halaman : 17/238


RENCANA ANGGARAN BIAYA
PEKERJAAN MEKANIKAL & ELEKTRIKAL
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
11 Panel lift ex. Metal panel uk. 20x30cm - unit 2,730,000 -
12 Panel telepon 1.00 unit 1,365,000 1,365,000
13 Sistem MATV analog up to 24 channel (fix modulator + rak + aksesoris) 1.00 unit 49,140,000 49,140,000
14 Genset + ohm saklar + panel (by Owner) ex. Lovol 45kva 1.00 unit - by Owner
15 Dudukan genset + teralis genset 1.00 unit - by Owner

Lantai 1
Area umum
1 Instalasi titik lampu kabel NYM ; Eterna piping 17.00 ttk 202,000 3,434,000
2 Instalasi titik stop kontak dinding kabel NYM ; Eterna piping 8.00 ttk 218,400 1,747,200
3 Instalasi titik power PABX kabel NYM ; Eterna piping 1.00 ttk 273,000 273,000
4 Instalasi titik power exhaust fan kabel NYM ; Eterna piping 1.00 ttk 142,000 142,000
5 Instalasi titik power AC kabel NYM ; Eterna piping 4.00 ttk 218,400 873,600
6 Instalasi Speaker 3.00 ttk 327,600 982,800
7 Instalasi titik wifi router CAT-6 ex. Belden 4.00 ttk 273,000 1,092,000
8 Instalasi titik telepon 4Cx0,6 mm2 ex Eterna 4.00 ttk 207,500 830,000
9 Outlet Telefon ex. Panasonic Standar 4.00 bh 60,100 240,400
10 Outlet saklar tunggal ex. Panasonic Standar 3.00 bh 43,700 131,100
11 Outlet saklar seri ex. Panasonic Standar 6.00 bh 45,900 275,400
12 Outlet Stop kontak ex. Panasonic Standar 8.00 bh 49,100 392,800
13 Lampu luar bangunan Lampu sorot LED 50w ex. China 3.00 bh 163,800 491,400
14 Lampu ex. China 12 watt 17.00 bh 87,400 1,485,800
15 PABX unit ex. Panasonic 40 channel NS300 + 1 Digital telp 1.00 set 30,030,000 30,030,000

Area Kamar
1 Instalasi titik lampu kabel NYM ; Eterna piping 16.00 ttk 202,000 3,232,000
2 Instalasi titik stop kontak kabel NYM ; Eterna piping 20.00 ttk 218,400 4,368,000
3 Instalasi titik power AC kabel NYM ; Eterna piping 4.00 ttk 218,400 873,600
4 Instalasi titik power exhaust fan kabel NYM ; Eterna piping 6.00 ttk 218,400 1,310,400
5 Instalasi saklar hotel kabel NYM ; Eterna piping 4.00 ttk 218,400 873,600
6 Instalasi TV kabel RJ6C5 ex Yurri 4.00 ttk 327,600 1,310,400
7 Instalasi titik telepon 4Cx0,6 mm2 ex Eterna 4.00 ttk 327,600 1,310,400
8 Outlet saklar seri ex. Panasonic Standar 4.00 bh 43,700 174,800
9 Outlet saklar tunggal ex. Panasonic Standar 8.00 bh 43,700 349,600
10 Outlet Stop kontak ex. Panasonic Standar 20.00 bh 49,100 982,000
11 Outlet Telefon ex. Panasonic Standar 4.00 bh 60,100 240,400
12 Outlet TV ex. Panasonic Standar 4.00 bh 60,100 240,400
13 Lampu kamar ex. China 12 watt 16.00 bh 212,900 3,406,400
14 Pesawat telp ex. Sahitel atau setara 4.00 bh 125,600 502,400
15 Kabel feeder box panel kamar kabel NYM 3x2,5mm2 Eterna 4.00 titik 546,000 2,184,000
16 Panel kamar (MCB + Kontaktor ex. Schneider) 4.00 unit 1,638,000 6,552,000

Lantai 2-3

Area umum+ Kamar


1 Instalasi titik power Solar water heater kabel NYM ; Eterna piping 2.00 ttk 491,400 982,800
2 Instalasi Speaker 8.00 ttk 327,600 2,620,800
3 Instalasi titik wifi router Cat 5E 8.00 ttk 327,600 2,620,800

Pekerjaan ME Halaman : 18/238


RENCANA ANGGARAN BIAYA
PEKERJAAN MEKANIKAL & ELEKTRIKAL
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
4 Outlet Data ex. Panasonic Standar 8.00 bh 92,800 742,400
5 Lampu koridor + area umum ex. China 12 watt 16.00 bh 87,400 1,398,400
6 Speaker ex. TOA atau setara 8.00 bh 158,300 1,266,400
7 Instalasi titik lampu kabel NYM ; Eterna piping 104.00 ttk 202,000 21,008,000
8 Instalasi titik stop kontak kabel NYM ; Eterna piping 120.00 ttk 218,400 26,208,000
9 Instalasi titik power AC kabel NYM ; Eterna piping 24.00 ttk 218,400 5,241,600
10 Instalasi titik power exhaust fan kabel NYM ; Eterna piping 24.00 ttk 218,400 5,241,600
11 Instalasi saklar hotel kabel NYM ; Eterna piping 24.00 ttk 218,400 5,241,600
12 Instalasi TV kabel RJ6C5 ex Yurri 24.00 ttk 327,600 7,862,400
13 Instalasi titik telepon 4Cx0,6 mm2 ex Eterna 24.00 ttk 327,600 7,862,400
14 Outlet saklar seri ex. Panasonic Standar 27.00 bh 43,700 1,179,900
15 Outlet saklar tunggal ex. Panasonic Standar 48.00 bh 43,700 2,097,600
16 Outlet Stop kontak ex. Panasonic Standar 120.00 bh 49,100 5,892,000
17 Outlet Telefon ex. Panasonic Standar 24.00 bh 60,100 1,442,400
18 Outlet TV ex. Panasonic Standar 24.00 bh 60,100 1,442,400
19 Lampu kamar ex. China 12 watt 96.00 bh 212,900 20,438,400
20 Pesawat telp ex. Sahitel atau setara 24.00 bh 125,600 3,014,400
21 Kabel feeder box panel kamar kabel NYM 3x2,5mm2 Eterna 24.00 titik 546,000 13,104,000
22 Panel kamar (MCB + Kontaktor ex. Schneider) 24.00 unit 1,638,000 39,312,000

C Pekerjaan Instalasi Penangkal Petir eksisting -


1 Kawat BC 50 mm2 48.00 m' - -
2 Klem penyangga plat besi galvanis ( jarak @ 35 cm ) 70.00 bh - -
3 Air terminal tembaga 1" / splitzer conventional 2.00 unit - -
4 Tes klem box PVC 20x20 cm 2.00 unit - -
5 Pipa besi galvanis medium 1" ( kebutuhan 2 btg ) 2.00 btg - -
6 Bor pentanahan 12 m 25.00 m' - -
7 Klem bak kontrol 1.00 unit - -
8 Upah Instalasi 1.00 ls - -

D Pekerjaan Instalasi AC 239,893,000

Lantai 1-3
1 AC Wall Mounted ( 1 PK ) Kamar Tidur Jasa pasang 28.00 unit 251,200 7,033,600
Pipa Refrigrant isolasi Thermaflex ex. Artic atau setara 420.00 m' 120,100 50,442,000
Pipa drain PVC "Wavin" AW 3/4" w/ isolasi "Superlon" tebal 3/8" 221.00 m' 25,100 5,547,100
Kabel kontrol ex. 4 Besar : Supreme 3x2.5mm 420.00 m' 22,900 9,618,000

2 AC Wall Mounted ( 2 PK ) Lobby Jasa pasang 2.00 unit 251,200 502,400


Pipa Refrigrant isolasi Thermaflex ex. Artic atau setara 30.00 m' 109,200 3,276,000
Pipa drain PVC "Wavin" AW 3/4" w/ isolasi "Superlon" tebal 3/8" 14.00 m' 25,100 351,400
Kabel kontrol ex. 4 Besar : Supreme 3x2.5mm 30.00 m' 22,900 687,000

3 AC Wall Mounted ( 1 PK ) FOF,server Jasa pasang 2.00 unit 251,200 502,400


Pipa Refrigrant isolasi Thermaflex ex. Artic atau setara 30.00 m' 109,200 3,276,000
Pipa drain PVC "Wavin" AW 3/4" w/ isolasi "Superlon" tebal 3/8" 13.00 m' 25,100 326,300
Kabel kontrol ex. 4 Besar : Supreme 3x2.5mm 30.00 m' 22,900 687,000

Pekerjaan ME Halaman : 19/238


RENCANA ANGGARAN BIAYA
PEKERJAAN MEKANIKAL & ELEKTRIKAL
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
4 Exhaust Fan 50 cfm di toilet Exhaust fan ex. Panasonic / KDK 36.00 unit 376,700 13,561,200

5 Vaccum & Isi Freon 32.00 unit 109,200 3,494,400


6 Fitting pipa,Accessories & Material bantu 1.00 Ls 6,540,200 6,540,200
7 Gantungan pipa 100.00 bh 13,700 1,370,000
8 Aksesoris 1.00 Ls 3,822,000 3,822,000
9 Bracket outdoor 32.00 bh 273,000 8,736,000
10 Unit AC (Freon R-32) 1 PK ex. Sharp atau setara 30.00 unit 3,603,600 108,108,000
11 Unit AC (Freon R-32) 2 PK ex.Sharp atau setara 2.00 unit 6,006,000 12,012,000

E. Pekerjaan Smoke Detector 93,950,200

1 Instalasi smoke detector 20.00 titik 737,100 14,742,000


2 MCFA Semi Addresible, 1 loop, 60 Addres 1.00 set 40,076,400 40,076,400
3 Announciator 1.00 unit 8,353,800 8,353,800
4 MDF-FA 1.00 unit 1,949,200 1,949,200
5 System 1.00 set 24,570,000 24,570,000
6 Bell + Alarm 6.00 unit 709,800 4,258,800
F. Pekerjaan Instalasi CCTV 9,071,400

1 Instalasi kabel data kabel RG 59 12.00 titik 382,200 4,586,400


2 CCTV analog ex. HIKvision + DVR analog cctv 1.00 Ls 1,365,000 1,365,000
3 Jasa instalasi CCTV 1.00 Ls 3,120,000 3,120,000

Pekerjaan ME Halaman : 20/238


RENCANA ANGGARAN BIAYA
PEKERJAAN INTERIOR
FrontOne Inn Central One Cengkareng - Bp. Jaya

HARGA SAT
JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT
(Rp) (Rp) (Rp)
(Rp)
V PEKERJAAN INTERIOR 699,120,000
A Interior Kamar Tidur

1 Kamar tidur Single 8.00 set


Wardrobe set plywood ex bbcc finsihing hpl ex taco 8.00 set 3,000,000 24,000,000
Headboard set plywood ex bbcc finsihing hpl ex taco 8.00 set 4,800,000 38,400,000
Tv panel plywood ex bbcc finsihing hpl ex taco 8.00 set 1,200,000 9,600,000
Desk shelve plywood ex bbcc finsihing hpl ex taco 8.00 set 600,000 4,800,000
Bed twin bed ex Zees 8.00 set 4,560,000 36,480,000
Poeff plywood fin oscar sintetik leather 8.00 set 780,000 6,240,000
Mirror 1 body ex asahimas 8.00 set 960,000 7,680,000
Nightstand plywood ex bbcc finsihing hpl ex taco 8.00 set 480,000 3,840,000
Digital wall printing custom printing 8.00 set 2,880,000 23,040,000
TV ex. Phillip + bracket 8.00 set 3,000,000 24,000,000
Rak Handuk stainless 8.00 set 360,000 2,880,000
Rak sabun stainless 8.00 set 348,000 2,784,000
Rak tissue stainless 8.00 set 144,000 1,152,000
Legenda darurat 8.00 set 108,000 864,000
Linen + Pillow sprei, sarung bantal, duvet cover 8.00 set 360,000 2,880,000
Cermin wastafel 8.00 set 720,000 5,760,000
Shower Curtain 8.00 set 240,000 1,920,000

3 Kamar tidur Double 20.00 set


Wardrobe set plywood ex bbcc finsihing hpl ex taco 20.00 set 3,000,000 60,000,000
Headboard set plywood ex bbcc finsihing hpl ex taco 20.00 set 4,800,000 96,000,000
Tv panel plywood ex bbcc finsihing hpl ex taco 20.00 set 1,200,000 24,000,000
Desk shelve plywood ex bbcc finsihing hpl ex taco 20.00 set 600,000 12,000,000
Bed double ex. Zees 20.00 set 5,040,000 100,800,000
Poeff plywood fin oscar sintetik leather 20.00 set 780,000 15,600,000
Mirror 1 body ex asahimas 20.00 set 960,000 19,200,000
Nightstand plywood ex bbcc finsihing hpl ex taco 20.00 set 480,000 9,600,000
Digital wall printing custom printing 20.00 set 2,880,000 57,600,000
TV ex. Phillip + bracket 20.00 set 3,000,000 60,000,000
Rak Handuk stainless 20.00 set 360,000 7,200,000
Rak sabun stainless 20.00 set 348,000 6,960,000
Rak tissue stainless 20.00 set 144,000 2,880,000
Legenda darurat 20.00 set 108,000 2,160,000
Linen sprei, sarung bantal, duvet cover 20.00 set 480,000 9,600,000
Cermin wastafel 20.00 set 720,000 14,400,000
Shower Curtain 20.00 set 240,000 4,800,000

B Interior Lobby 84,720,000


1 Meja lobby 1.00 bh 11,400,000 11,400,000
2 Logo Lobby 1.00 bh 9,600,000 9,600,000
3 Back panel 10.00 m2 1,200,000 12,000,000
4 TV Lobby 32" 1.00 bh 3,000,000 3,000,000
5 Photoshot wall printing 1.00 bh 3,840,000 3,840,000
6 Sofa 2 seater 2.00 bh 5,400,000 10,800,000
7 Sofa 1 seater 1.00 bh 2,400,000 2,400,000
8 Kursi Makan 6.00 bh 960,000 5,760,000
9 Backoffice set 3.00 set 3,600,000 10,800,000
10 Meja Makan Persegi 3.00 bh 960,000 2,880,000
11 Meja Bar 6.60 m2 900,000 5,940,000
12 Barstool 7.00 bh 900,000 6,300,000

cek arit 134,400,000 783,840,000 699,120,000

Pekerjaan Interior Halaman : 21/238


RENCANA ANGGARAN BIAYA
PEKERJAAN INTERIOR
FrontOne Inn Central One Cengkareng - Bp. Jaya

No URAIAN PEKERJAAN SPESIFIKASI QTY SAT BOBOT MARET APRIL MEI

V PEKERJAAN INTERIOR
A Interior Kamar Tidur

1 Kamar tidur Single 8.00 set


Wardrobe set plywood ex bbcc finsihing hpl ex taco 8.00 set 0.03062 0.00383 0.00383 0.00383 0.00383 0.00383 0.00383 0.00383 0.00383
Headboard set plywood ex bbcc finsihing hpl ex taco 8.00 set 0.04899 0.00612 0.00612 0.00612 0.00612 0.00612 0.00612 0.00612 0.00612
Tv panel plywood ex bbcc finsihing hpl ex taco 8.00 set 0.01225 0.00153 0.00153 0.00153 0.00153 0.00153 0.00153 0.00153 0.00153
Desk shelve plywood ex bbcc finsihing hpl ex taco 8.00 set 0.00612 0.00077 0.00077 0.00077 0.00077 0.00077 0.00077 0.00077 0.00077
Bed twin bed ex Zees 8.00 set 0.04654 0.00776 0.00776 0.00776 0.00776 0.00776 0.00776
Poeff plywood fin oscar sintetik leather 8.00 set 0.00796 0.00133 0.00133 0.00133 0.00133 0.00133 0.00133
Mirror 1 body ex asahimas 8.00 set 0.00980 0.00490 0.00490
Nightstand plywood ex bbcc finsihing hpl ex taco 8.00 set 0.00490 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061
Digital wall printing custom printing 8.00 set 0.02939 0.00980 0.00980 0.00980
TV ex. Phillip + bracket 8.00 set 0.03062 0.00510 0.00510 0.00510 0.00510 0.00510 0.00510
Rak Handuk stainless 8.00 set 0.00367 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061
Rak sabun stainless 8.00 set 0.00355 0.00059 0.00059 0.00059 0.00059 0.00059 0.00059
Rak tissue stainless 8.00 set 0.00147 0.00024 0.00024 0.00024 0.00024 0.00024 0.00024
Legenda darurat 8.00 set 0.00110 0.00018 0.00018 0.00018 0.00018 0.00018 0.00018
Linen + Pillow sprei, sarung bantal, duvet cover 8.00 set 0.00367 0.00184 0.00184
Cermin wastafel 8.00 set 0.00735 0.00367 0.00367
Shower Curtain 8.00 set 0.00245 0.00041 0.00041 0.00041 0.00041 0.00041 0.00041
0.00000
3 Kamar tidur Double 20.00 set 0.00000
Wardrobe set plywood ex bbcc finsihing hpl ex taco 20.00 set 0.07655 0.00957 0.00957 0.00957 0.00957 0.00957 0.00957 0.00957 0.00957
Headboard set plywood ex bbcc finsihing hpl ex taco 20.00 set 0.12247 0.01531 0.01531 0.01531 0.01531 0.01531 0.01531 0.01531 0.01531
Tv panel plywood ex bbcc finsihing hpl ex taco 20.00 set 0.03062 0.00383 0.00383 0.00383 0.00383 0.00383 0.00383 0.00383 0.00383
Desk shelve plywood ex bbcc finsihing hpl ex taco 20.00 set 0.01531 0.00191 0.00191 0.00191 0.00191 0.00191 0.00191 0.00191 0.00191
Bed double ex. Zees 20.00 set 0.12860 0.06430 0.06430
Poeff plywood fin oscar sintetik leather 20.00 set 0.01990 0.00249 0.00249 0.00249 0.00249 0.00249 0.00249 0.00249 0.00249
Mirror 1 body ex asahimas 20.00 set 0.02449 0.01225 0.01225
Nightstand plywood ex bbcc finsihing hpl ex taco 20.00 set 0.01225 0.00153 0.00153 0.00153 0.00153 0.00153 0.00153 0.00153 0.00153
Digital wall printing custom printing 20.00 set 0.07348 0.03674 0.03674
TV ex. Phillip + bracket 20.00 set 0.07655 0.03827 0.03827
Rak Handuk stainless 20.00 set 0.00919 0.00459 0.00459
Rak sabun stainless 20.00 set 0.00888 0.00444 0.00444
Rak tissue stainless 20.00 set 0.00367 0.00184 0.00184
Legenda darurat 20.00 set 0.00276 0.00138 0.00138
Linen sprei, sarung bantal, duvet cover 20.00 set 0.01225 0.00612 0.00612
Cermin wastafel 20.00 set 0.01837 0.00919 0.00919
Shower Curtain 20.00 set 0.00612 0.00306 0.00306
0.00000
B Interior Lobby 0.00000
1 Meja lobby 1.00 bh 0.01454
2 Logo Lobby 1.00 bh 0.01225 0.00408 0.00408 0.00408
3 Back panel 10.00 m2 0.01531 0.00191 0.00191 0.00191 0.00191 0.00191 0.00191 0.00191 0.00191
4 TV Lobby 32" 1.00 bh 0.00383
5 Photoshot wall printing 1.00 bh 0.00490 0.00163 0.00163 0.00163
6 Sofa 2 seater 2.00 bh 0.01378 0.00230 0.00230 0.00230 0.00230 0.00230 0.00230
7 Sofa 1 seater 1.00 bh 0.00306 0.00051 0.00051 0.00051 0.00051 0.00051 0.00051
8 Kursi Makan 6.00 bh 0.00735 0.00122 0.00122 0.00122 0.00122 0.00122 0.00122
9 Backoffice set 3.00 set 0.01378 0.00230 0.00230 0.00230 0.00230 0.00230 0.00230
10 Meja Makan Persegi 3.00 bh 0.00367 0.00122 0.00122 0.00122
11 Meja Bar 6.60 m2 0.00758 0.00253 0.00253 0.00253
12 Barstool 7.00 bh 0.00804 0.00134 0.00134 0.00134 0.00134 0.00134 0.00134

cek arit 1.0 0.04941059 0.04941059 0.07330578 0.07330578 0.07330578 0.09256991 0.28516024 0.28516024
0.04941059 0.09882119 0.17212696 0.24543274 0.31873852 0.41130843 0.69646867 1.0

Pekerjaan Interior Halaman : 22/238


RENCANA ANGGARAN BIAYA
PEKERJAAN INTERIOR
FrontOne Inn Central One Cengkareng - Bp. Jaya
BAST 5/ 1/ 2018

No URAIAN PEKERJAAN SPESIFIKASI BOBOT MARET APRIL MEI

V PEKERJAAN INTERIOR
A Interior Kamar Tidur

1 Kamar tidur Single


Wardrobe set plywood ex bbcc finsihing hpl ex taco 0.03062 0.00437 0.00437 0.00437 0.00437 0.00437 0.00437 0.00437
Headboard set plywood ex bbcc finsihing hpl ex taco 0.04899 0.00612 0.00700 0.00700 0.00700 0.00700 0.00700 0.00700
Tv panel plywood ex bbcc finsihing hpl ex taco 0.01225 0.00153 0.00175 0.00175 0.00175 0.00175 0.00175 0.00175
Desk shelve plywood ex bbcc finsihing hpl ex taco 0.00612 0.00077 0.00087 0.00087 0.00087 0.00087 0.00087 0.00087
Bed twin bed ex Zees 0.04654 0.00776 0.00776 0.00776 0.00776 0.00776 0.00776
Poeff plywood fin oscar sintetik leather 0.00796 0.00133 0.00133 0.00133 0.00133 0.00133 0.00133
Mirror 1 body ex asahimas 0.00980 0.00245 0.00245 0.00245 0.00245
Nightstand plywood ex bbcc finsihing hpl ex taco 0.00490 0.00061 0.00070 0.00070 0.00070 0.00070 0.00070 0.00070
Digital wall printing custom printing 0.02939 0.00735 0.00735 0.00735 0.00735
TV ex. Phillip + bracket 0.03062 0.00765 0.00765 0.00765 0.00765
Rak Handuk stainless 0.00367 0.00092 0.00092 0.00092 0.00092
Rak sabun stainless 0.00355 0.00089 0.00089 0.00089 0.00089
Rak tissue stainless 0.00147 0.00037 0.00037 0.00037 0.00037
Legenda darurat 0.00110 0.00028 0.00028 0.00028 0.00028
Linen + Pillow sprei, sarung bantal, duvet cover 0.00367 0.00092 0.00092 0.00092 0.00092
Cermin wastafel 0.00735 0.00184 0.00184 0.00184 0.00184
Shower Curtain 0.00245 0.00061 0.00061 0.00061 0.00061

3 Kamar tidur Double 0.00000


Wardrobe set plywood ex bbcc finsihing hpl ex taco 0.07655 0.00957 0.01094 0.01094 0.01094 0.01094 0.01094 0.01094
Headboard set plywood ex bbcc finsihing hpl ex taco 0.12247 0.01531 0.01750 0.01750 0.01750 0.01750 0.01750 0.01750
Tv panel plywood ex bbcc finsihing hpl ex taco 0.03062 0.00383 0.00437 0.00437 0.00437 0.00437 0.00437 0.00437
Desk shelve plywood ex bbcc finsihing hpl ex taco 0.01531 0.00191 0.00219 0.00219 0.00219 0.00219 0.00219 0.00219
Bed double ex. Zees 0.12860 0.02143 0.02143 0.02143 0.02143 0.02143 0.02143
Poeff plywood fin oscar sintetik leather 0.01990 0.00332 0.00332 0.00332 0.00332 0.00332 0.00332
Mirror 1 body ex asahimas 0.02449 0.00612 0.00612 0.00612 0.00612
Nightstand plywood ex bbcc finsihing hpl ex taco 0.01225 0.00306 0.00306 0.00306 0.00306
Digital wall printing custom printing 0.07348 0.01225 0.01225 0.01225 0.01225 0.01225 0.01225
TV ex. Phillip + bracket 0.07655 0.01914 0.01914 0.01914 0.01914
Rak Handuk stainless 0.00919 0.00230 0.00230 0.00230 0.00230
Rak sabun stainless 0.00888 0.00222 0.00222 0.00222 0.00222
Rak tissue stainless 0.00367 0.00092 0.00092 0.00092 0.00092
Legenda darurat 0.00276 0.00069 0.00069 0.00069 0.00069
Linen sprei, sarung bantal, duvet cover 0.01225 0.00306 0.00306 0.00306 0.00306
Cermin wastafel 0.01837 0.00459 0.00459 0.00459 0.00459
Shower Curtain 0.00612 0.00153 0.00153 0.00153 0.00153

B Interior Lobby
1 Meja lobby 0.01454 0.00182 0.00208 0.00208 0.00208 0.00208 0.00208 0.00208
2 Logo Lobby 0.01225 0.00204 0.00204 0.00204 0.00204 0.00204 0.00204
3 Back panel 0.01531 0.00191 0.00219 0.00219 0.00219 0.00219 0.00219 0.00219
4 TV Lobby 32" 0.00383 0.00096 0.00096 0.00096 0.00096
5 Photoshot wall printing 0.00490 0.00082 0.00082 0.00082 0.00082 0.00082 0.00082
6 Sofa 2 seater 0.01378 0.00230 0.00230 0.00230 0.00230 0.00230 0.00230
7 Sofa 1 seater 0.00306 0.00051 0.00051 0.00051 0.00051 0.00051 0.00051
8 Kursi Makan 0.00735 0.00122 0.00122 0.00122 0.00122 0.00122 0.00122
9 Backoffice set 0.01378 0.00230 0.00230 0.00230 0.00230 0.00230 0.00230
10 Meja Makan Persegi 0.00367 0.00061 0.00061 0.00061 0.00061 0.00061 0.00061
11 Meja Bar 0.00758 0.00126 0.00126 0.00126 0.00126 0.00126 0.00126
12 Barstool 0.00804 0.00134 0.00134 0.00134 0.00134 0.00134 0.00134

1.0 0.04775665 0.05395416 0.11243548 0.11243548 0.18029372 0.18029372 0.18029372 0.12633956


0.04775665 0.10171081 0.21414629 0.32658177 0.50687549 0.68716921 0.86746293 1.0

Pekerjaan Interior Halaman : 23/238


PT. ADIKON ARSI PRASADA
PROJECT: FOI Cengkareng
CLIENT: Pak Jaya
BORONGAN MANDOR KAYU Pak Eko
NO ITEM DESCRIPTION QTY UNIT PRICE TOTAL PRICE
PEKERJAAN INTERIOR
I KAMAR TIDUR SINGLE 14,520,000
WARDROBE SET PLYWOOD EX BBC FINISHING HPL EX TACO 8 SET 365,000 2,920,000
HEADBOARD SET PLYWOOD EX BBC FINISHING HPL EX TACO 8 SET 180,000 1,440,000
TV PANEL PLYWOOD EX BBC FINISHING HPL EX TACO 8 SET 180,000 1,440,000
DESK SHELVE PLYWOOD EX BBC FINISHING HPL EX TACO 8 SET 365,000 2,920,000
MIRROR 1 BODY 8 SET 180,000 1,440,000
NIGHTSTAND PLYWOOD EX BBC FINISHING HPL EX TACO 8 SET 365,000 2,920,000
CERMIN WASTAFEL 8 SET 180,000 1,440,000

II KAMAR TIDUR DOUBLE 36,300,000


WARDROBE SET PLYWOOD EX BBC FINISHING HPL EX TACO 20 SET 365,000 7,300,000
HEADBOARD SET PLYWOOD EX BBC FINISHING HPL EX TACO 20 SET 180,000 3,600,000
TV PANEL PLYWOOD EX BBC FINISHING HPL EX TACO 20 SET 180,000 3,600,000
DESK SHELVE PLYWOOD EX BBC FINISHING HPL EX TACO 20 SET 365,000 7,300,000
MIRROR 1 BODY 20 SET 180,000 3,600,000
NIGHTSTAND PLYWOOD EX BBC FINISHING HPL EX TACO 20 SET 365,000 7,300,000
CERMIN WASTAFEL 20 SET 180,000 3,600,000

III INTERIOR LOBBY 5,085,000


MEJA LOBBY 1 SET 365000 365,000
BACK PANEL 10 SET 180000 1,800,000
MEJA MAKAN PERSEGI 3 SET 365,000 1,095,000
MEJA BAR 6 SET 365,000 2,190,000

TOTAL 55,905,000
TOTAL PEMBULATAN 55,905,000

Penganggaran
Workshop
Instalasi 40%
Retensi 10%

Pengambilan
Workshop I
Workshop II
Instalasi 40%
Retensi 10%

Total
Sisa

Dibuat Disetujui

( ) ( )
DATA LUAS BANGUNAN
PEKERJAAN STRUKTUR, ARSITEKTUR & ME
HOTEL SURABAYA - Bpk. Yanuar

BANGUNAN
LUAS
UKURAN RUANG (m) LUAS
No. NAMA RUANG TOTAL KOEF
Pjg Lbr ( m2 ) ( m2 )
A LANTAI 1 152.73

1 Lobby 4.25 4.05 17.21 1.00


2 Receptionist 2.00 1.45 2.90 1.00
3 R. Server 2.25 1.45 3.26 1.00
4 BOF 4.25 2.75 11.69 1.00
5 Kamar Tidur 1 3.30 2.86 9.44 1.00
6 Kamar Tidur 2 3.30 2.86 9.44 1.00
7 Kamar Tidur 3 3.30 2.86 9.44 1.00
8 Kamar Tidur 4 3.30 2.86 9.44 1.00
9 Kamar Tidur 5 3.30 2.86 9.44 1.00
10 Kamar Tidur 6 3.00 2.75 8.25 1.00
11 Kamar Tidur 7 3.00 2.75 8.25 1.00
12 Kamar Tidur 8 3.00 2.75 8.25 1.00
13 Service 2.22 1.75 3.88 1.00
14 Toilet 2.00 1.10 2.20 1.00
15 Tangga 4.25 2.30 9.78 0.50
16 Lift 2.50 2.50 6.25 0.00
17 Void 1.00 0.50 0.50 0.00
18 Koridor 14.30 1.95 4.88 1.00
19 Koridor 4.25 1.30 5.53 1.00
20 Koridor 1.25 3.80 4.88 1.00
21 Koridor 8.25 0.95 7.84 1.00

B LANTAI 2 212.94

1 Kamar Tidur 1 3.00 2.70 8.10 1.00


2 Kamar Tidur 2 3.00 2.70 8.10 1.00
3 Kamar Tidur 3 3.00 2.70 8.10 1.00
4 Kamar Tidur 4 3.00 2.70 8.10 1.00
5 Kamar Tidur 5 3.80 2.70 10.26 1.00
6 Kamar Tidur 6 3.00 2.70 8.10 1.00
7 Kamar Tidur 7 3.00 2.70 8.10 1.00
8 Kamar Tidur 8 3.80 2.70 10.26 1.00
9 Kamar Tidur 9 3.00 2.70 8.10 1.00
10 Kamar Tidur 10 3.00 2.70 8.10 1.00
11 Kamar Tidur 11 3.80 2.70 10.26 1.00
12 Kamar Tidur 12 3.00 2.70 8.10 1.00
13 Kamar Tidur 13 3.00 2.70 8.10 1.00
14 Kamar Tidur 14 3.00 2.70 8.10 1.00
15 Kamar Tidur 15 3.00 2.70 8.10 1.00
16 Kamar Tidur 16 3.80 2.70 10.26 1.00
17 Service 2.22 1.75 3.88 1.00
18 Tangga 4.25 2.30 9.78 0.50
19 Lift 2.50 2.50 6.25 0.00
20 Void 1.00 0.50 0.50 0.00
21 Koridor 15.80 2.65 41.87 1.00
22 Koridor 6.00 1.15 6.90 1.00
23 Koridor 4.25 1.30 5.53 1.00

C LANTAI 3 212.94

Halaman : 25/238
LUAS
UKURAN RUANG (m) LUAS
No. NAMA RUANG TOTAL KOEF
Pjg Lbr ( m2 ) ( m2 )

1 Kamar Tidur 1 3.00 2.70 8.10 1.00


2 Kamar Tidur 2 3.00 2.70 8.10 1.00
3 Kamar Tidur 3 3.00 2.70 8.10 1.00
4 Kamar Tidur 4 3.00 2.70 8.10 1.00
5 Kamar Tidur 5 3.80 2.70 10.26 1.00
6 Kamar Tidur 6 3.00 2.70 8.10 1.00
7 Kamar Tidur 7 3.00 2.70 8.10 1.00
8 Kamar Tidur 8 3.80 2.70 10.26 1.00
9 Kamar Tidur 9 3.00 2.70 8.10 1.00
10 Kamar Tidur 10 3.00 2.70 8.10 1.00
11 Kamar Tidur 11 3.80 2.70 10.26 1.00
12 Kamar Tidur 12 3.00 2.70 8.10 1.00
13 Kamar Tidur 13 3.00 2.70 8.10 1.00
14 Kamar Tidur 14 3.00 2.70 8.10 1.00
15 Kamar Tidur 15 3.00 2.70 8.10 1.00
16 Kamar Tidur 16 3.80 2.70 10.26 1.00
17 Service 2.22 1.75 3.88 1.00
18 Tangga 4.25 2.30 9.78 0.50
19 Lift 2.50 2.50 6.25 0.00
20 Void 1.00 0.50 0.50 0.00
21 Koridor 15.80 2.65 41.87 1.00
22 Koridor 6.00 1.15 6.90 1.00
23 Koridor 4.25 1.30 5.53 1.00

TOTAL 578.61
DIBULATKAN 579.00

Halaman : 26/238
LUASxKOE LUAS
F TOTAL
( m2 ) ( m2 )
141.09

17.21
2.90
3.26
11.69
9.44
9.44
9.44
9.44
9.44
8.25
8.25
8.25
3.88
2.20
4.89
0.00
0.00
4.88
5.53
4.88
7.84

201.30

8.10
8.10
8.10
8.10
10.26
8.10
8.10
10.26
8.10
8.10
10.26
8.10
8.10
8.10
8.10
10.26
3.88
4.89
0.00
0.00
41.87
6.90
5.53

201.30

Halaman : 27/238
LUASxKOE LUAS
F TOTAL
( m2 ) ( m2 )

8.10
8.10
8.10
8.10
10.26
8.10
8.10
10.26
8.10
8.10
10.26
8.10
8.10
8.10
8.10
10.26
3.88
4.89
0.00
0.00
41.87
6.90
5.53

543.70
544.00

Halaman : 28/238
ANALISA HARGA SATUAN
PEKERJAAN STRUKTUR, ARSITEKTUR & ME
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
( Rp. )
I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan / m2
Upah : 1.0000 m2 3,500 3,500
Total 3,500
Dibulatkan 3,500
2 Pembuatan pagar seng sementara proyek finish cat tinggi 180 cm + Pondasi / m'
Bahan :
Dolken 5/7 1.2500 bt 7,500 9,375
seng gelombang besar 1.2778 lbr 39,000 49,833
paku seng 0.0600 kg 10,000 600
residu / meni 0.4000 lt 2,000 800
PC ( @ 50 kg ) 0.3500 zak 70,000 24,500
cat minyak 1.8000 m2 15,000 27,000
Sub Total 112,108

Upah : 1.0000 m' 25,000 25,000


Sub Total 25,000
Total 137,108
Dibulatkan 137,000
3 Pasangan Bouwplank / m'
Bahan :
kaso 4/6 kayu borneo 0.0060 m3 900,000 5,400
papan borneo 0.0060 m3 875,000 5,250
paku 0.0400 kg 10,000 400
Sub Total 11,050

Upah : 1.0000 m' 5,000 5,000


Sub Total 5,000
Total 16,050
Dibulatkan 16,000
4 Pembuatan kantor pelaksana & direksi ( sederhana ) / m2
Bahan :
multipleks 4 mm 1.1000 lbr 50,000 55,000
kaso / reng borneo 0.1100 m3 800,000 88,000
balok 8/12 borneo 0.0100 m3 900,000 9,000
paku 0.5000 kg 10,000 5,000
PC ( @ 50 kg ) 0.5000 zak 70,000 35,000
pasir beton 0.1000 m3 300,000 30,000
koral 0.0500 m3 225,000 11,250
asbes gelombang besar 0.5000 lbr 39,000 19,500
Sub Total 252,750

Upah : 1.0000 m2 50,000 50,000


Sub Total 50,000
Total 302,750
Dibulatkan 302,000
III PEKERJAAN STRUKTUR

Halaman : 29/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
A PEKERJAAN PONDASI ( Rp. )
5 Galian tanah biasa / m3
Upah : 1.0000 m3 45,000 45,000
Total 45,000
Dibulatkan 45,000
6 Pemadatan tanah dasar (dengan stemper) / m2
Alat :
sewa stemper 0.0250 hari 200,000 5,000

Upah : 1.0000 m2 4,500 4,500


Total 9,500
Dibulatkan 9,500
7 Urugan pasir dengan pasir urug padat tebal 10 cm/m3
Bahan :
pasir urug 1.2000 m3 300,000 360,000
Sub Total 360,000

Upah : 1.0000 m3 15,000 15,000


Sub Total 15,000
Total 375,000
Dibulatkan 375,000
8 Lt. Kerja / Rabat Beton ad. 1 : 3 : 5, tebal 5 cm, tanpa tulangan / m 2
Bahan :
PC ( @ 50 kg ) 0.1484 zak 70,000 10,385
pasir beton 0.0206 m3 300,000 6,188
Split ( batu pecah ) 1/2, 2/3 0.0349 m3 300,000 10,463
Sub Total 27,035
Upah : 1.0000 m2 7,500 7,500
Sub Total 7,500
Total 34,535
Lantai kerja /m3 Dibulatkan 34,000
Lantai kerja /m2 Dibulatkan 680,000
9 Pasangan batu kali campuran 1:5/ m3
Bahan :
batu belah 1.2000 m3 275,000 330,000
PC ( @ 50 kg ) 2.7000 zak 70,000 189,000
pasir pasang 0.5440 m3 285,000 155,040
Sub Total 674,040
Upah : 1.0000 m3 50,000 50,000
Sub Total 50,000
Total 724,040
Dibulatkan 724,000
10 Urugan tanah kembali tanah bekas galian /m3
Upah : 1.0000 m3 15,000 15,000
Total 15,000
Dibulatkan 15,000
11 Pasangan Rollag 1:5 / m'

Halaman : 30/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Bahan : ( Rp. )
batu bata Cikarang 22.0000 bh 500 11,000
PC ( @ 50 kg ) 0.1750 zak 70,000 12,250
pasir pasang 0.0350 m3 285,000 9,975
Sub Total 33,225
Upah : 1.0000 m' 15,000 15,000
Sub Total 15,000
Total 48,225
Dibulatkan 48,000
12 Urugan Tanah Merah untuk peniggian peil / m3
Upah + Bahan :
urugan tanah merah 1.1000 m3 100,000 110,000
Total 110,000
Dibulatkan 110,000
13 Anti Rayap Kayu ( Wood Treatment ) ex Biflex 100 EC / USA / m 2
Upah + Bahan :
anti rayap kayu 1.0000 m2 7,000 7,000
Total 7,000
Dibulatkan 7,000
14 Anti Rayap Tanah (Soil Treatment) ex Biflex 100 EC/USA / m2
Upah + Bahan :
anti rayap tanah 1.0000 m2 9,000 9,000
Total 9,000
Dibulatkan 9,000
15 Rabat Beton adukan 1 : 3 : 5, tebal 7 cm + tul. Ø8-30, 1 lapis/m 2
Bahan :
PC ( @ 50 kg ) 0.2585 zak 70,000 18,095
pasir beton 0.0429 m3 300,000 12,867
koral beton ( split ) 0.0716 m3 225,000 16,112
Besi beton 3.0000 kg 7,500 22,500
Kawat Besi beton 0.0750 kg 12,000 900
Sub Total 70,474
Upah :
Lantai kerja 1.0000 m2 7,500 7,500
Besi beton 3.0000 kg 1,500 4,500
Sub Total 12,000
Total 82,474
Dibulatkan 82,000
16 Rabat Beton adukan 1:3:5, tebal 7 cm tanpa tul. Ø8-30, 1 lapis / m 3
Bahan :
PC ( @ 50 kg ) 0.2585 zak 70,000 18,095
pasir beton 0.0429 m3 300,000 12,867
koral beton ( split ) 0.0716 m3 225,000 16,112
Sub Total 47,074
Upah :
Lantai kerja 1.0000 m2 7,500 7,500
Sub Total 7,500
Total 54,574
Rabat beton tebal 7 cm / m2 Dibulatkan 55,000
Rabat beton tebal 7 cm / m3 Dibulatkan 786,000

Halaman : 31/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
B PEKERJAAN STRUKTUR BETON ( Rp. )
17 Beton Site Mix adukan 1 :3:5 ( setara dengan K175 ) / m3
Bahan : Bahan :
Split 1/2, 2/3 0.9200 m3 300,000 276,000
PC ( @ 50 kg ) 4.6000 zak 70,000 322,000
pasir beton 0.5570 m3 300,000 167,100
Sub Total 765,100
Upah : 1.0000 m3 75,000 75,000
Alat : Sub Total 75,000
sewa vibrator 0.0500 hari 350,000 17,500
operator 0.0500 hari 75,000 3,750
Sub Total 21,250
Total 861,350
Dibulatkan 861,000
18 Beton Site Mix adukan 1 :2:3 ( setara dengan K225 )/m 3
Bahan :
Split 1/2, 2/3 0.8200 m3 300,000 246,000
PC ( @ 50 kg ) 6.5000 zak 70,000 455,000
pasir beton 0.5400 m3 300,000 162,000
Sub Total 863,000
Upah : 1.0000 m3 75,000 75,000
Sub Total 75,000
Alat :
sewa vibrator 0.0500 hari 350,000 17,500
operator 0.0500 hari 75,000 3,750
Sub Total 21,250
Total 959,250
Dibulatkan 959,000
19 Beton Readymix K175/ m 3

Bahan :
beton ready mix K175 1.0300 m3 780,000 803,400
Sub Total 803,400
Upah : 1.0000 m3 75,000 75,000
Sub Total 75,000
Alat :
concrete pump 0.0333 hr 2,500,000 83,333
operator concrete pump 0.0333 hr 350,000 11,667
vibrator 0.0500 hr 350,000 17,500
operator vibrator 0.0500 hr 75,000 3,750
Sub Total 116,250
Total 994,650
Dibulatkan 995,000
20 Beton Readymix K225 / m3
Bahan :
beton ready mix K225 1.0300 m3 750,000 772,500
Sub Total 772,500
Upah : 1.0000 m3 75,000 75,000
Sub Total 75,000

Halaman : 32/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Alat : ( Rp. )
concrete pump 0.0333 hr 2,500,000 83,333
operator concrete pump 0.0333 hr 350,000 11,667
vibrator 0.0500 hr 350,000 17,500
operator vibrator 0.0500 hr 75,000 3,750
Sub Total 116,250
Total 963,750
Dibulatkan 964,000
21 Beton Readymix K250/ m3
Bahan :
beton ready mix K250 1.0300 m3 830,000 854,900
Sub Total 854,900
Upah : 1.0000 m3 75,000 75,000
Sub Total 75,000
Alat :
concrete pump 0.0333 hr 2,500,000 83,333
operator concrete pump 0.0333 hr 350,000 11,667
vibrator 0.0500 hr 350,000 17,500
operator vibrator 0.0500 hr 75,000 3,750
Sub Total 116,250
Total 1,046,150
Dibulatkan 1,046,000
22 Beton Readymix K300/m3
Bahan :
beton ready mix K300 1.0300 m3 860,000 885,800
Sub Total 885,800
Upah : 1.0000 m3 75,000 75,000
Sub Total 75,000
Alat :
concrete pump 0.0333 hr 2,500,000 83,333
operator concrete pump 0.0333 hr 350,000 11,667
vibrator 0.0500 hr 350,000 17,500
operator vibrator 0.0500 hr 75,000 3,750
Sub Total 116,250
Total 1,077,050
Dibulatkan 1,077,000
23 Pembesian / kg
Bahan :
besi beton 1.1000 kg 7,500 8,250
kawat beton 0.0150 kg 12,000 180
Sub Total 8,430
Upah :
upah tukang besi 1.0500 kg 1,500 1,575
Sub Total 1,575
Total 10,005
Dibulatkan 10,000
24 Bekisting Pondasi Plat Beton Jalur / Setempat / m3
Bahan :

Halaman : 33/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
multipleks 9 mm uk. 4"x8" rijek (pakai 2x) 1.3500 lbr ( Rp.
125,000) 168,750
kaso 5/6 meranti ( pakai 2x ) 0.0200 m3 2,150,000 43,000
paku 5,7,10 cm 1.5000 kg 12,000 18,000
Sub Total 229,750
Upah :
upah bekisting 4.5000 m2 75,000 337,500
Sub Total 567,250
Total 797,000
upah Pondasi Plat Beton Jalur / Setempat / mDibulatkan 797,000
upah Pondasi Plat Beton Jalur / Setempat / mDibulatkan 177,000
25 Bekisting Sloof / m2
Bahan :
papan meranti ( pakai 1,5x ) 0.1200 m3 2,850,000 342,000
kaso meranti ( pakai 2x) 0.0400 m3 2,150,000 86,000
paku 5,7,10 cm 1.5000 kg 12,000 18,000
Sub Total 446,000
Upah :
upah bekisting sloof 15/20 13.3333 m2 55,000 733,333
Sub Total 733,333
Total 1,179,333
upah bekisting sloof 15/20 / m 3
Dibulatkan 1,179,000
upah bekisting sloof 15/20 / m2 Dibulatkan 88,000
26 Bekisting Kolom & Ring Balok Praktis/ m 2

Bahan :
papan meranti (pakai 2x) 0.1200 m3 2,850,000 342,000
kaso meranti (pakai 2x) 0.0400 m3 2,150,000 86,000
paku 5,7,10 cm 1.5000 kg 12,000 18,000
Sub Total 446,000
Upah :
upah bekisting kolom praktis 13/13 15.3846 m2 55,000 846,154
Sub Total 846,154
Total 1,292,154
upah bekisting kolom praktis 13/13 /m3 Dibulatkan 1,292,000
upah bekisting kolom praktis 13/13 /m 2
Dibulatkan 84,000
27 Bekisting Kolom Struktur ( 13/20 & 13/30 )/ m2
Bahan :
multipleks 9 mm 4'x8' Rijek 6.0800 lbr 125,000 760,000
kaso meranti 0.2800 m3 2,150,000 602,000
balok meranti 0.2200 m3 2,300,000 506,000
paku 5,7,10 cm 3.6000 kg 12,000 43,200
Sub Total 1,911,200
Upah :
upah bekisting kolom struktur 15/20 23.3333 m2 75,000 1,750,000
Sub Total 1,750,000
Total 3,661,200
upah bekisting kolom struktur 15/20 /m3 Dibulatkan 3,661,000
upah bekisting kolom struktur 15/20 /m 2 Dibulatkan 157,000
28 Bekisting Balok Struktur ( 15/20, 15/30, 15/40 )/ m 2

Halaman : 34/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Bahan : ( Rp. )
multipleks 9 mm 4'x8' Rijek 2.4000 lbr 125,000 300,000
kaso meranti (pakai 2x) 0.1400 m3 2,150,000 301,000
balok meranti (pakai 2x) 0.0700 m3 2,300,000 161,000
paku 5,7,10 cm 1.8000 kg 12,000 21,600
scafolding 1.0000 ls 50,000 50,000
Sub Total 833,600
Upah :
upah bekisting balok struktur 15/30 16.6667 m2 75,000 1,250,000
Sub Total 1,250,000
Total 2,083,600
upah bekisting balok struktur 15/30 /m3 Dibulatkan 2,084,000
upah bekisting balok struktur 15/30 /m2 Dibulatkan 125,000
29 Bekisting Plat beton/m2
Bahan :
multipleks 9 mm 4'x8' Rijek 1.6700 lbr 125,000 208,750
kaso meranti (pakai 2x) 0.1400 m3 2,150,000 301,000
balok 5/10 meranti ( pakai 1,5x ) 0.0700 m3 2,300,000 161,000
dolken 4/6 8.0000 btg 6,500 52,000
paku 5,7,10 cm 1.8000 kg 12,000 21,600
scafolding 1.0000 ls 50,000 50,000
Sub Total 794,350
Upah :
upah bekisting plat beton t.12 mm 8.3333 m2 75,000 625,000
Sub Total 625,000
Total 1,419,350
upah bekisting plat beton t.12 /m3 Dibulatkan 1,419,000
upah bekisting plat beton t.12 /m2 Dibulatkan 170,000

30 Bekisting Tangga Beton/ m2


Bahan :
multipleks 9 mm 4'x8' Rijek 2.6100 m3 125,000 326,250
kaso meranti (pakai 2x) 0.1400 m3 2,150,000 301,000
balok 5/10 meranti ( pakai 1,5x ) 0.1100 m3 2,300,000 253,000
paku 5,7,10 cm 4.8000 kg 12,000 57,600
Sub Total 937,850
Upah :
upah bekisting 12.0000 m2 100,000 1,200,000
Sub Total 1,200,000
Total 2,137,850
upah bekisting plat beton t.12 /m3 Dibulatkan 2,137,800
upah bekisting plat beton t.12 /m2 Dibulatkan 178,000
31 Beton Pondasi Plat Beton Jalur / Setempat Beton Site Mix adukan 1 :2:3 ( 110 kg/m3 )/ m 3
Beton site mix adukan 1:2:3 1.0000 m3 959,000 959,000
Tulangan 110.0000 kg 10,000 1,100,000
Bekisting 1.0000 m3 797,000 797,000
Total 2,856,000
32 Sloof Beton 15/20 Site Mix adukan 1:3:5 ( 4f10 +f6-100, 125 kg/m3 )/ m3

Halaman : 35/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Beton site mix adukan 1:3:5 1.0000 m3 ( Rp.
861,000) 861,000
Tulangan 125.0000 kg 10,000 1,250,000
Bekisting 1.0000 m3 1,179,000 1,179,000
Total 3,290,000
33 Kolom Praktis Beton 13/13 Site Mix adukan 1:3:5 ( 4f10 + f8-150, 145 kg/m3 )/ m3
Beton site mix adukan 1:3:5 1.0000 m3 861,000 861,000
Tulangan 180.0000 kg 10,000 1,800,000
Bekisting 1.0000 m3 1,292,000 1,292,000
Total 3,953,000
34 Kolom Beton Struktur 13/20 Site Mix adukan 1:2:3 ( 4f 13 + f6-150, 195 kg/m3 )/ m3
Beton site mix adukan 1:2:3 1.0000 m3 959,000 959,000
Tulangan 195.0000 kg 10,000 1,950,000
Bekisting 1.0000 m3 3,661,000 3,661,000
Total 6,570,000
35 Kolom Beton Struktur 15/30 Site Mix adukan 1:2: 3 ( 6f 13 + f8-150, 190 kg/m3 )/ m3
Beton site mix adukan 1:2:3 1.0000 m3 959,000 959,000
Tulangan 190.0000 kg 10,000 1,900,000
Bekisting 1.0000 m3 3,661,000 3,661,000
Total 6,520,000
36 Kolom Beton Struktur 15/30 ReadyMix K225 ( 6f 13 + f8-150, 190 kg/m3 )/ m3
Beton readymix K225 1.0000 m3 964,000 964,000
Tulangan 190.0000 kg 10,000 1,900,000
Bekisting 1.0000 m3 3,661,000 3,661,000
Total 6,525,000
37 Balok Beton Struktur 15/30 Site Mix adukan 1:2:3 ( 4f 13 + f8-150, 145 kg/m3 )/ m3
Beton site mix adukan 1:2:3 1.0000 m3 959,000 959,000
Tulangan 145.0000 kg 10,000 1,450,000
Bekisting 1.0000 m3 2,084,000 2,084,000
Total 4,493,000
38 Balok Beton Struktur 15/30 Ready Mix K225 ( 4f 13 + f8-150, 145 kg/m3 )/ m3
Beton readymix K225 1.0000 m3 964,000 964,000
Tulangan 145.0000 kg 10,000 1,450,000
Bekisting 1.0000 m3 2,084,000 2,084,000
Total 4,498,000
39 Balok Beton Struktur 15/25 Site Mix adukan 1:2:3 ( 4f 13 + f8-150, 161 kg/m3 )/ m3
Beton site mix adukan 1:2:3 1.0000 m3 959,000 959,000
Tulangan 161.0000 kg 10,000 1,610,000
Bekisting 1.0000 m3 2,084,000 2,084,000
Total 4,653,000
40 Balok Beton Struktur 15/25 Ready Mix K225 ( 4f 13 + f8-150, 161 kg/m3 )/ m3
Beton readymix K225 1.0000 m3 964,000 964,000
Tulangan 161.0000 kg 10,000 1,610,000
Bekisting 1.0000 m3 2,084,000 2,084,000
Total 4,658,000
41 RingBalk Beton Struktur 15/20 Site Mix adukan 1:3:5 ( 4f 12 + f8-200, 192 kg/m3 )/ m3
Beton site mix adukan 1:3:5 1.0000 m3 861,000 861,000
Tulangan 185.0000 kg 10,000 1,850,000
Bekisting 1.0000 m3 1,292,000 1,292,000

Halaman : 36/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Total ( Rp. ) 4,003,000
42 Plat Beton t. 12 cm Site Mix adukan 1:2:3 ( f8-150 +f8-150, 92 kg/m3 )/ m3
Beton site mix adukan 1:2:3 1.0000 m3 959,000 959,000
Tulangan 92.0000 kg 10,000 920,000
Bekisting 1.0000 m3 1,419,000 1,419,000
Total 3,298,000
43 Plat Beton t. 12 cm ReadyMix K225 ( f8-150 +f8-150, 92 kg/m3 )/ m3
Beton Readymix K225 1.0000 m3 964,000 964,000
Tulangan 92.0000 kg 10,000 920,000
Bekisting 1.0000 m3 1,419,000 1,419,000
Total 3,303,000
44 Dak Beton t. 10 cm Site Mix adukan 1:2:3 ( f8-200 +f8-200, 83 kg/m3 )/ m3
Beton site mix adukan 1:2:3 1.0000 m3 959,000 959,000
Tulangan 83.0000 kg 10,000 830,000
Bekisting 1.0000 m3 1,419,000 1,419,000
Total 3,208,000
45 Dak Beton t. 10 cm Ready Mix K225 ( f8-200 +f8-200, 83 kg/m3 )/ m3
Beton Readymix K225 1.0000 m3 964,000 964,000
Tulangan 83.0000 kg 10,000 830,000
Bekisting 1.0000 m3 1,419,000 1,419,000
Total 3,213,000
46 Tangga Beton Site Mix adukan 1:2:3 ( 125 kg/m3 )/ m3
Beton site mix adukan 1:2:3 1.0000 m3 959,000 959,000
Tulangan 125.0000 kg 10,000 1,250,000
Bekisting 1.0000 m3 2,137,800 2,137,800
Total 4,346,800
47 Tangga Beton Ready Mix K225 ( 125 kg/m3 )/ m3
Beton ready mix adukan K225 1.0000 m3 964,000 964,000
Tulangan 125.0000 kg 10,000 1,250,000
Bekisting 1.0000 m3 2,137,800 2,137,800
Total 4,351,800
48 Pasang wiremesh M6/ m2
Bahan :
Wiremesh M6 1.1000 m2 37,500 41,250
material bantu 1.0000 m2 2,000 2,000
Sub Total 43,250
Upah : 1.0000 m2 15,000 15,000
Sub Total 15,000
Total 58,250
Dibulatkan 58,000

D PEKERJAAN WATERPROOFING
1 Waterproofing type Coating/ m2
Bahan + upah :
waterproofing coating 1.1000 m2 45,000 49,500
Total 49,500
Dibulatkan 50,000
2 Waterproofing type Membrane/ m2

Halaman : 37/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Bahan + upah : ( Rp. )
waterproofing membrane 1.1000 m2 85,000 93,500
Total 93,500
Dibulatkan 94,000

E PASANGAN BATU BATA


1 Pasangan batu bata 1/2 bata biasa campuran 1:5 ( uk. 180x90x40 )/ m 2
Bahan :
batu bata Cikarang 70.0000 bh 700 49,000
PC ( @ 50 kg ) 0.2150 zak 70,000 15,050
pasir pasang 0.0430 m3 285,000 12,255
Sub Total 76,305
Upah : 1.0000 m2 20,000 20,000
Sub Total 20,000
Total 96,305
Dibulatkan 96,000
2 Pasangan batu bata 1/2 bata trasraam campuran 1:3 ( uk. 180x90x40 )/ m 2
Bahan :
batu bata Cikarang 70.0000 bh 700 49,000
PC ( @ 50 kg ) 0.3450 zak 70,000 24,150
pasir pasang 0.0400 m3 285,000 11,400
Sub Total 84,550
Upah : 1.0000 m2 20,000 20,000
Sub Total 20,000
Total 104,550
Dibulatkan 105,000
3 Pasangan batu celcon tebal 10 cm spesie khusus / m2
Bahan :
Bata celcon 0.1050 m3 1,000,000 105,000
Mortar khusus ( @ 40 kg ) MU-380 3.1500 kg 3,500 11,025
Sub Total 116,025
Upah : 1.0000 m2 15,000 15,000
Sub Total 15,000

Total 131,025
Dibulatkan 131,000
4 Pasangan batu celcon tebal 7,5 cm spesie khusus / m2
Bahan :
Bata celcon 0.0760 m3 1,000,000 76,000
Mortar khusus ( @ 40 kg ) MU-380 2.4000 kg 3,500 8,400
Sub Total 84,400
Upah : 1.0000 m2 15,000 15,000
Sub Total 15,000
Total 99,400
Dibulatkan 99,000

5 Pasangan batu alam Andesit alur 20x40 / m2


Bahan : Bahan :
batu alam andesit 1.1500 m2 300,000 345,000
PC ( @ 50 kg ) 0.3500 zak 70,000 24,500

Halaman : 38/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
pasir pasang 0.0500 m3 ( Rp.
285,000) 14,250
Sub Total 383,750
Upah : 1.0000 m2 150,000 150,000
Sub Total 150,000
Total 533,750
Dibulatkan 534,000

F PLESTERAN & ACIAN


1 Plesteran tebal 20 mm campuran 1:5/ m2
Bahan : Bahan :
PC ( @ 50 kg ) 0.1733 zak 70,000 12,133
pasir pasang 0.0300 m3 285,000 8,550
Sub Total 20,683
Upah : 1.0000 m2 15,000 15,000
Sub Total 15,000
Total 35,683
Dibulatkan 36,000
2 Plesteran tebal 20 mm campuran 1:3/ m2
Bahan :
PC ( @ 50 kg ) 0.2700 zak 70,000 18,900
pasir pasang 0.0270 m3 285,000 7,695
Sub Total 26,595
Upah : 1.0000 m2 15,000 15,000
Sub Total 15,000
Total 41,595
Dibulatkan 42,000
3 Acian/ m2
Bahan :
PC ( @ 50 kg ) 0.1120 zak 70,000 7,840
Sub Total 7,840
Upah : 1.0000 m2 15,000 15,000
Sub Total 15,000
Total 22,840
Dibulatkan 23,000
4 Acian Drymix/ Skimcoat /m2
Bahan :
Drymix aci 5.000 kg 2,000 10,000
alat bantu 1.000 m2 2,500 2,500
Sub Total 12,500
Upah :
Upah kerja 1.000 m2 15,000 15,000
Sub Total 15,000
Total 1 27,500
Jasa kontraktor 10% 2,750
Total 2 30,250
Dibulatkan 30,000
4 Plesteran tebal 20 mm campuran 1:5 + Aci 1.0000 m2 59,000 59,000
5 Plesteran tebal 20 mm campuran 1:3 + Aci 1.0000 m2 65,000 65,000
6 Plesteran + Acian Skimcoat/ m2 1.0000 m2 66,000 66,000

G PEKERJAAN ATAP

Halaman : 39/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
( Rp. )
1 Atap genteng Keramik berglazur ex M-Class/ m2
Bahan :
genteng 15.0000 bh 10,000 150,000
Sub Total 150,000
Upah : 1.0000 m2 30,000 30,000
Sub Total 30,000
Total 180,000
Dibulatkan 180,000
2 Atap genteng beton ex Cisangkan / m2
Bahan :
genteng 11.0000 bh 13,500 148,500
Sub Total 148,500
Upah : 1.0000 m2 30,000 30,000
Sub Total 30,000
Total 178,500
Dibulatkan 180,000
3 Atap genteng keramik ex Jatiwangi / m2
Bahan :
genteng 15.0000 bh 7,500 112,500
Sub Total 112,500
Upah : 1.0000 m2 30,000 30,000
Sub Total 30,000
Total 142,500
Dibulatkan 145,000
4 Genteng Nok + Karpusan dengan Genteng Cisangkan/m'
Bahan :
genteng nok 3.9000 bh 40,000 156,000
PC ( @ 50 kg ) 0.3500 zak 70,000 24,500
pasir pasang 0.0325 kg 285,000 9,263
papan ruiter 2/20 borneo super 0.0044 m3 2,050,000 9,020
waterproofing 1.1000 m' 15,000 16,500
Sub Total 215,283
Upah : 1.0000 m' 45,000 45,000
Sub Total 45,000
Total 260,283
Dibulatkan 260,000
5 Genteng Nok + Karpusan dengan Genteng Jatiwangi/ m'
Bahan :
genteng nok 4.0000 bh 15,000 60,000
PC ( @ 50 kg ) 0.3500 zak 70,000 24,500
pasir pasang 0.0325 kg 285,000 9,263
papan ruiter 2/20 borneo super 0.0044 m3 2,050,000 9,020
waterproofing 1.1000 m' 15,000 16,500
Sub Total 119,283
Upah : 1.0000 m' 45,000 45,000
Sub Total 45,000
Total 164,283
Dibulatkan 165,000
6 Pemasangan Lisplank/ m'
Bahan :
lisplank GRC 1.1000 m' 50,000 55,000
paku 0.1000 kg 12,000 1,200

Halaman : 40/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Sub Total ( Rp. ) 56,200
Upah : 1.0000 m' 45,000 45,000
Sub Total 45,000
Total 101,200
Dibulatkan 105,000

III PEKERJAAN ARSITEKTUR


A PEKERJAAN FINISHING LANTAI
1 Pasangan Lantai Homogenous tile 60x60 cm (Toilet)/ m2
Bahan :
Homogenous tile 60x60cm 0.9722 m2 420,000 408,333
PC ( @ 50 kg ) 0.3000 Zak 70,000 21,000
pasir pasang 0.0400 m3 285,000 11,400
semen grouting 0.2500 kg 12,000 3,000
Sub Total 443,733
Upah : 1.0000 m2 50,000 50,000
Sub Total 50,000
Total 493,733
Dibulatkan 495,000
2 Pasangan Lantai Homogenous tile 60x60 cm (Ruangan)/ m2
Bahan :
Homogenous tile 60x60cm 0.9722 m2 450,000 437,500
PC ( @ 50 kg ) 0.3000 Zak 70,000 21,000
pasir pasang 0.0400 m3 285,000 11,400
semen grouting 0.2500 kg 12,000 3,000
Sub Total 472,900
Upah : 1.0000 m2 50,000 50,000
Sub Total 50,000
Total 522,900
Dibulatkan 525,000
2 Pasangan Lantai Keramik motif kayu ex Roman / m2
Bahan :
lantai keramik motif kayu 1.0500 dus 225,000 236,250
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen warna 0.2500 kg 12,000 3,000
Sub Total 272,975
Upah : 1.0000 m2 50,000 50,000
Sub Total 50,000
Total 322,975
Dibulatkan 325,000
3 Pasangan Lantai Keramik 30x30 cm ex Roman / m2
Bahan :
ubin Keramik 30x30 cm 1.0606 dus 70,000 74,242
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen warna 0.2500 kg 12,000 3,000
Sub Total 110,967
Upah : 1.0000 m2 50,000 50,000
Sub Total 50,000
Total 160,967
Dibulatkan 165,000

Halaman : 41/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
4 Pasangan Lantai Keramik 50x50 cm ex Roman / m2 ( Rp. )
Bahan :
ubin Keramik 50x50 cm 1.0500 dus 210,000 220,500
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen warna 0.2500 kg 12,000 3,000
Sub Total 257,225
Upah : 1.0000 m2 50,000 50,000
Sub Total 50,000
Total 307,225
Dibulatkan 310,000
5 Pasangan Lantai Keramik 40x40 cm ex Roman / m2
Bahan :
ubin Keramik 40x40 cm 1.0500 dus 160,000 168,000
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen warna 0.2500 kg 12,000 3,000
Sub Total 204,725
Upah : 1.0000 m2 50,000 50,000
Sub Total 50,000
Total 254,725
Dibulatkan 255,000
6 Pasangan Plint Homogenous tile ex. Niro Granito uk. 10x60 cm / m'
Bahan :
Homogenous tile 60x60cm 0.2000 m2 300,000 60,000
PC ( @ 50 kg ) 0.0600 zak 70,000 4,200
pasir pasang 0.0080 m3 285,000 2,280
semen grouting 0.0750 kg 12,000 900
Sub Total 67,380
Upah : 1.0000 m' 15,000 15,000
Sub Total 15,000
Total 82,380
Dibulatkan 85,000
7 Pasangan Plint Keramik 10x40 cm ex Roman Cuting manual/ m'
Bahan :
keramik 40x40 cm 0.3000 m2 85,000 25,500
PC ( @ 50 kg ) 0.0600 zak 70,000 4,200
pasir pasang 0.0080 m3 285,000 2,280
semen grouting 0.0750 kg 12,000 900
Sub Total 32,880
Upah : 1.0000 m' 15,000 15,000
Sub Total 15,000
Total 47,880
Dibulatkan 50,000
8 Pasangan Plint Keramik 10x30 cm ex Roman Cuting manual/ m'
Bahan :
keramik 30x30 cm 0.3000 m2 70,000 21,000
PC ( @ 50 kg ) 0.0600 zak 70,000 4,200
pasir pasang 0.0080 m3 285,000 2,280
semen grouting 0.0750 kg 12,000 900
Sub Total 28,380
Upah : 1.0000 m' 15,000 15,000

Halaman : 42/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Sub Total ( Rp. ) 15,000
Total 43,380
Dibulatkan 45,000
9 Pasangan Lantai Keramik 20x20 cm ex Roman /m2
Bahan :
ubin Keramik 20x20 cm 1.0500 dus 65,000 68,250
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen grouting 0.2500 kg 12,000 3,000
Sub Total 104,975
Upah : 1.0000 m2 45,000 45,000
Sub Total 45,000
Total 149,975
Dibulatkan 150,000
10 Pasangan Lantai Keramik 33,3x33,3 cm ex Roman / m2
Bahan : Bahan :
ubin Keramik 1.0521 dus 85,000 89,429
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
grouting 0.2500 kg 12,000 3,000
Sub Total 126,154
Upah : 1.0000 m2 35,000 35,000
Sub Total 35,000
Total 161,154
Dibulatkan 165,000
11 Pasangan Lantai Keramik Mozaic 5x5 cm / m2
Bahan : Bahan :
Keramik Mozaic 1.1000 m2 250,000 275,000
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
grouting 0.2500 kg 12,000 3,000
Sub Total 311,725
Upah : 1.0000 m2 45,000 45,000
Sub Total 45,000
Total 356,725
Dibulatkan 360,000
12 Pasangan Plint Keramik 10x33 cm ex Roman Cuting manual/ m'
Bahan :
keramik 30x30 cm 0.3000 m2 85,000 25,500
PC ( @ 50 kg ) 0.0600 zak 70,000 4,200
pasir pasang 0.0080 m3 285,000 2,280
semen grouting 0.0750 kg 12,000 900
Sub Total 32,880
Upah : 1.0000 m' 15,000 15,000
Sub Total 15,000
Total 47,880
Dibulatkan 50,000
13 Lantai Marmer Traventine, uk. slab/ m2
Bahan :
Marmer traventine 1.1000 m2 1,275,000 1,402,500
Sub Total 1,402,500
Upah :

Halaman : 43/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
upah pasang + material bantu 1.0000 m2 ( Rp.
500,000) 500,000
- upah pasang
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
- Kristalisasi
Sub Total 500,000
Total 1,902,500
Dibulatkan 1,905,000
14 Lantai Marmer lokal, uk. slab/ m2
Bahan :
Marmer lokal 1.1000 m2 450,000 495,000
Sub Total 495,000
Upah :
upah pasang + material bantu 1.0000 m2 500,000 500,000
- upah pasang
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
- Kristalisasi
Sub Total 500,000
Total 995,000
Dibulatkan 995,000
1 Plint Type 1 - Granit Nero absoluto, tinggi 10 cm/m'
Bahan :
granit Nero Absoluto tinggi 10 cm 0.1050 m2 750,000 78,750
PC ( @ 50 kg ) 0.0228 zak 70,000 1,596
pasir pasang 0.0030 m3 285,000 855
semen grouting 0.0250 kg 12,000 300
Sub Total 81,501
Upah :
potong, pasang 1.0000 m' 50,000 50,000
Sub Total 50,000
Total 131,501
Dibulatkan 135,000

B PEKERJAAN FINISHING DINDNG


1 Pasangan Dinding Batu Andesit / m2
Bahan :
batu andesit 1.1000 m2 300,000 330,000
Sub Total 330,000
Upah : 1.0000 m2 150,000 150,000
upah pasang + material bantu
- upah pasang
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 150,000
Total 480,000
Dibulatkan 480,000
2 Pasangan Dinding Batu templek / m2
Bahan :

Halaman : 44/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
batu templek 1.2000 m2 ( Rp.
275,000) 330,000
Sub Total 330,000
Upah : 1.0000 m2 150,000 150,000
upah pasang + material bantu
- upah pasang
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 150,000
Total 480,000
Dibulatkan 480,000
2 Batu paras putih hammer susun sirih / m2
Bahan :
Batu paras putih hammer susun sirih 1.1000 m2 350,000 385,000
Sub Total 385,000
Upah : 1.0000 m2 150,000 150,000
upah pasang + material bantu
- upah pasang
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 150,000
Total 535,000
Dibulatkan 535,000
3 Batu paras putih stone siar bata pattern / m2
Bahan :
Batu paras putih hammer susun sirih 1.1000 m2 350,000 385,000
Sub Total 385,000
Upah : 1.0000 m2 150,000 150,000
upah pasang + material bantu
- upah pasang
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 150,000
Total 535,000
Dibulatkan 535,000
4 Dinding Andesit Honed uk. 60x60x2 cm / m2
Bahan :
Andesit honed 1.1000 m2 350,000 385,000
Sub Total 385,000
Upah :
upah pasang + material bantu 1.0000 m2 150,000 150,000
- upah pasang
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 150,000
Total 535,000
Dibulatkan 535,000
5 Batu paras putih motif grid / m2
Bahan :

Halaman : 45/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Batu paras putih motif grid 1.1000 m2 ( Rp.
300,000) 330,000
Sub Total 330,000
Upah :
upah pasang + material bantu 1.0000 m2 150,000 150,000
- upah pasang
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 150,000
Total 480,000
Dibulatkan 480,000
6 Dinding keramik ex Roman 20x20 cm/ m2
Bahan :
ubin Keramik 20x20 cm 1.0500 dus 65,000 68,250
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen grouting 0.2500 kg 12,000 3,000
Sub Total 104,975
Upah : 1.0000 m2 45,000 45,000
Sub Total 45,000
Total 149,975
Dibulatkan 150,000
7 Dinding keramik ex Roman 20x60 cm/ m2
Bahan :
ubin Keramik 20x60 cm 1.0500 dus 150,000 157,500
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen grouting 0.2500 kg 12,000 3,000
Sub Total 194,225
Upah : 1.0000 m2 45,000 45,000
Sub Total 45,000
Total 239,225
Dibulatkan 240,000
8 Dinding keramik Motif kayu/ m2
Bahan :
Dinding Keramik motif kayu 1.0500 dus 200,000 210,000
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen grouting 0.2500 kg 12,000 3,000
Sub Total 246,725
Upah : 1.0000 m2 50,000 50,000
Sub Total 50,000
Total 296,725
Dibulatkan 300,000
9 Dinding homogenous tile ex Niro ganito uk. 30x60 / m2
Bahan :
homogenous tile ex Niro granito uk. 30x60 1.0500 dus 275,000 288,750
PC ( @ 50 kg ) 0.2660 zak 70,000 18,620
pasir pasang 0.0530 m3 285,000 15,105
semen grouting 0.2500 kg 12,000 3,000
Sub Total 325,475
Upah : 1.0000 m2 45,000 45,000

Halaman : 46/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Sub Total ( Rp. ) 45,000
Total 370,475
Dibulatkan 375,000
10 Dinding marmer Import /m2
Bahan :
Dinding marmer Emperador dark maron 1.1000 m2 1,400,000 1,540,000
Sub Total 1,540,000
Upah :
upah pasang + material bantu 1.0000 m2 500,000 500,000
- upah pasang + kawat angkur galvanis
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 500,000
Total 2,040,000
Dibulatkan 2,040,000
11 Dinding marmer Traventine ( cream ) /m2
Bahan :
Dinding marmer Traventine ( ceam ) 1.1000 m2 1,120,000 1,232,000
Sub Total 1,232,000
Upah :
upah pasang + material bantu 1.0000 m2 500,000 500,000
- upah pasang + kawat angkur galvanis
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 500,000
Total 1,732,000
Dibulatkan 1,735,000
12 Dinding marmer Ujung Pandang/m2
Bahan :
marmer ujung pandang 1.1000 m2 450,000 495,000
Sub Total 495,000
Upah :
upah pasang + material bantu 1.0000 m2 500,000 500,000
- upah pasang + kawat angkur galvanis
- coating permukaan atas
- Epoxi / pasir silika perekat
- Semen + pasir
Sub Total 500,000
Total 995,000
Dibulatkan 995,000

IV PEKERJAAN INSTALASI LISTRIK


1 Instalasi Penangkal Petir / titik
Bahan :
kawat BC 50 mm2 45.0000 m' 30,000 1,350,000
Klem penyangga plat besi galvanis ( jarak @ 130.0000 bh 5,000 650,000
Air terminal tembaga 1" / splitzer convention 1.0000 unit 350,000 350,000
Tes klem box PVC 20x20 cm 1.0000 unit 250,000 250,000
Pipa besi galvanis medium 1" ( kebutuhan 2 b 2.0000 btg 250,000 500,000
Bor pentanahan 12 m 12.0000 m' 75,000 900,000

Halaman : 47/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
klem bak kontrol 1.0000 unit ( Rp.
150,000) 150,000
Sub Total 4,150,000
Upah : 1.0000 titik 200,000 200,000
Sub Total 200,000
Total 4,350,000
Dibulatkan 4,350,000
E SANITARY Discon 25%
1 Closet duduk ex Toto CW 660NJ/SW660J /unit
Bahan :
Closet duduk ex Toto CW 660J/SW 660J 1.000 unit 1,845,000 1,845,000
material bantu 1.000 ls 15,000 15,000
Sub Total 1,860,000
Upah :
Upah pasang 1.000 unit 250,000 250,000
Sub Total 250,000
Total 2,110,000
Dibulatkan 2,110,000
2 Closet duduk ex Toto CW708NJ/TV150NSV6J /unit
Bahan :
Closet duduk ex Toto CW894J 1.0000 unit 4,305,000 4,305,000
Sub Total 4,305,000
Upah :
upah pasang + material bantu 1.0000 unit 250,000 250,000
Sub Total 250,000
Total 4,555,000
Dibulatkan 4,555,000
3 Closet duduk ex Toto CW 823J /unit
Bahan :
Closet duduk ex Toto CW 823J 1.0000 unit 5,422,500 5,422,500
Sub Total 5,422,500
Upah :
upah pasang + material bantu 1.0000 unit 250,000 250,000
Sub Total 250,000
Total 5,672,500
Dibulatkan 5,675,000
4 Closet jongkok ex Toto CE9/TV150NW12 /unit
Bahan :
Closet jongkok ex Toto CE9/TV150NW12 1.0000 unit 2,377,500 2,377,500
Sub Total 2,377,500
Upah :
upah pasang + material bantu 1.0000 unit 150,000 150,000
Sub Total 150,000
Total 2,527,500
Dibulatkan 2,530,000
5 Closet jongkok ex Toto CE6 /unit
Bahan :
Closet jongkok ex Toto CE6 1.0000 unit 344,250 344,250
Sub Total 344,250
Upah :
upah pasang + material bantu 1.0000 unit 200,000 200,000
Sub Total 200,000
Total 544,250
Dibulatkan 545,000

Halaman : 48/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
6 Wastafel ex Toto type L237V3 / unit ( Rp. )
Bahan :
Wastafel ex Toto type L237V3 1.0000 unit 1,687,500 1,687,500
Sub Total 1,687,500
Upah :
upah pasang + material bantu 1.0000 unit 225,000 225,000
Sub Total 225,000
Total 1,912,500
Dibulatkan 1,915,000
7 Wastafel ex Toto type LW315/LW315FJ / unit
Bahan :
Wastafel ex Toto type LW315/LW315FJ 1.0000 unit 2,438,250 2,438,250
Sub Total 2,438,250
Upah :
upah pasang + material bantu 1.0000 unit 225,000 225,000
Sub Total 225,000
Total 2,663,250
Dibulatkan 2,665,000
8 Wastafel ex Toto type LW526J/ unit
Bahan :
Wastafel ex Toto type LW526J 1.0000 unit 2,166,750 2,166,750
Sub Total 2,166,750
Upah :
upah pasang + material bantu 1.0000 unit 225,000 225,000
Sub Total 225,000
Total 2,391,750
Dibulatkan 2,395,000
9 Wastafel ex Toto type L529V1/ unit
Bahan :
Wastafel ex Toto type L529V1 1.0000 unit 1,034,250 1,034,250
Sub Total 1,034,250
Upah :
upah pasang + material bantu 1.0000 unit 225,000 225,000
Sub Total 225,000
Total 1,259,250
Dibulatkan 1,260,000
10 Wastafel ex Toto type LW523J/ unit
Bahan :
Wastafel ex Toto type LW523J 1.0000 unit 2,344,500 2,344,500
Sub Total 2,344,500
Upah :
upah pasang + material bantu 1.0000 unit 225,000 225,000
Sub Total 225,000
Total 2,569,500
Dibulatkan 2,570,000
11 Mirror ex Toto TS119AS5 / unit
Bahan :
Mirror TS119AS5 1.0000 unit 401,250 401,250
Sub Total 401,250
Upah :
upah pasang + material bantu 1.0000 unit 35,000 35,000
Sub Total 35,000
Total 436,250

Halaman : 49/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Dibulatkan ( Rp. ) 440,000
12 Mirror TX716AW / unit
Bahan :
Mirror TX716AW 1.0000 unit 640,500 640,500
Sub Total 640,500
Upah :
upah pasang + material bantu 1.0000 unit 35,000 35,000
Sub Total 35,000
Total 675,500
Dibulatkan 680,000
13 Jet Washer ex Toto type TX403SMCRB /unit
Bahan :
Jet Washer ex Toto type TX403SMCRB 1.0000 unit 369,750 369,750
Sub Total 369,750
Upah :
upah pasang + material bantu 1.0000 unit 25,000 25,000
Sub Total 25,000
Total 394,750
Dibulatkan 395,000
14 Jet Washer ex Toto type TX403SB /unit
Bahan :
Jet Washer ex Toto type TX403SB 1.0000 unit 297,750 297,750
Sub Total 297,750
Upah :
upah pasang + material bantu 1.0000 unit 25,000 25,000
Sub Total 25,000
Total 322,750
Dibulatkan 325,000
15 Jet Washer ex Toto type THX20NB /unit
Bahan :
Jet Washer ex Toto type THX20NB 1.0000 unit 171,000 171,000
Sub Total 171,000
Upah :
upah pasang + material bantu 1.0000 unit 25,000 25,000
Sub Total 25,000
Total 196,000
Dibulatkan 200,000
16 Eco Washer Toto TCW09S /unit
Bahan :
Eco Washer Toto TCW09S 1.0000 unit 1,642,500 1,642,500
Sub Total 1,642,500
Upah :
upah pasang + material bantu 1.0000 unit 35,000 35,000
Sub Total 35,000
Total 1,677,500
Dibulatkan 1,680,000
17 Papper Holder ex Toto type S20 /unit
Bahan :
Papper Holder ex Toto type S20 1.0000 unit 210,000 210,000
Sub Total 210,000
Upah :
upah pasang + material bantu 1.0000 unit 25,000 25,000
Sub Total 25,000

Halaman : 50/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Total ( Rp. ) 235,000
Dibulatkan 235,000
18 Papper Holder ex Toto type TX703AC /unit
Bahan :
Papper Holder ex Toto type TX703AC 1.0000 unit 389,250 389,250
Sub Total 389,250
Upah :
upah pasang + material bantu 1.0000 unit 25,000 25,000
Sub Total 25,000
Total 414,250
Dibulatkan 415,000
19 Kran Wastafel ex Toto TX109LD /bh
Bahan :
Kran Wastafel ex Toto TX109LD 1.0000 unit 450,000 450,000
Sub Total 450,000
Upah :
upah pasang + material bantu 1.0000 unit 15,000 15,000
Sub Total 15,000
Total 465,000
Dibulatkan 465,000
20 Kran Dinding ex Toto T23B13 /bh
Bahan :
Kran Dinding ex Toto T23B13 1.0000 unit 176,250 176,250
Sub Total 176,250
Upah :
upah pasang + material bantu 1.0000 unit 15,000 15,000
Sub Total 15,000
Total 191,250
Dibulatkan 195,000
21 Kran Taman ex Toto T26-13 /bh
Bahan :
Kran taman ex Toto T26-13 1.0000 unit 250,500 250,500
Sub Total 250,500
Upah :
upah pasang + material bantu 1.0000 unit 15,000 15,000
Sub Total 15,000
Total 265,500
Dibulatkan 270,000
22 Kran Wastafel ex Toto TX116LOBR /bh
Bahan :
Kran Wastafel ex Toto TX116LOBR 1.0000 unit 1,627,500 1,627,500
Sub Total 1,627,500
Upah :
upah pasang + material bantu 1.0000 unit 15,000 15,000
Sub Total 15,000
Total 1,642,500
Dibulatkan 1,640,000
23 Soap Holder ex Toto type S161 /bh
Bahan :
Soap Holder ex Toto type S161 1.0000 unit 258,750 258,750
Sub Total 258,750
Upah :
upah pasang + material bantu 1.0000 unit 25,000 25,000

Halaman : 51/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Sub Total ( Rp. ) 25,000
Total 283,750
Dibulatkan 280,000
24 Soap Holder ex Toto type S156 /bh
Bahan :
Soap Holder ex Toto type S156 1.0000 unit 67,500 67,500
Sub Total 67,500
Upah :
upah pasang + material bantu 1.0000 unit 25,000 25,000
Sub Total 25,000
Total 92,500
Dibulatkan 95,000
25 Hand dryer ex Blossom /unit
Bahan :
Hand dryer ex Blossom 1.0000 unit 2,500,000 2,500,000
Sub Total 2,500,000
Upah :
upah pasang + material bantu 1.0000 unit 150,000 150,000
Sub Total 150,000
Total 2,650,000
Dibulatkan 2,650,000
26 Hand dryer ex HD3100R /unit
Bahan :
Hand dryer ex HD3100R 1.0000 unit 3,427,500 3,427,500
Sub Total 3,427,500
Upah :
upah pasang + material bantu 1.0000 unit 150,000 150,000
Sub Total 150,000
Total 3,577,500
Dibulatkan 3,580,000
27 Robe Hook ex Toto TX4W/unit
Bahan :
Robe Hook ex Toto TX4W 1.0000 unit 1,117,500 1,117,500
Sub Total 1,117,500
Upah :
upah pasang + material bantu 1.0000 unit 25,000 25,000
Sub Total 25,000
Total 1,142,500
Dibulatkan 1,145,000
28 Robe Hook ex Toto TX704AEZV1 /unit
Bahan :
Robe Hook ex Toto TX704AEZV1 1.0000 unit 40,500 40,500
Sub Total 40,500
Upah :
upah pasang + material bantu 1.0000 unit 10,000 10,000
Sub Total 10,000
Total 50,500
Dibulatkan 55,000
29 Robe Hook ex Toto TX704ACW /unit
Bahan :
Robe Hook ex Toto TX704ACW 1.0000 unit 218,250 218,250
Sub Total 218,250
Upah :

Halaman : 52/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
upah pasang + material bantu 1.0000 unit (10,000
Rp. ) 10,000
Sub Total 10,000
Total 228,250
Dibulatkan 230,000
30 Floor drain ex Toto type TX1AV1 /unit
Bahan :
Floor drain ex Toto type TX1AV1 1.0000 unit 243,750 243,750
Sub Total 243,750
Upah :
upah pasang + material bantu 1.0000 unit 35,000 35,000
Sub Total 35,000
Total 278,750
Dibulatkan 280,000
31 Floor drain ex Toto type TX1BV1N /unit
Bahan :
Floor drain ex Toto type TX1BV1N 1.0000 unit 303,000 303,000
Sub Total 303,000
Upah :
upah pasang + material bantu 1.0000 unit 35,000 35,000
Sub Total 35,000
Total 338,000
Dibulatkan 340,000
32 Urinoir ex Toto type U57M /unit
Bahan :
Urinoir ex Toto type U57M /unit 1.0000 unit 1,822,500 1,822,500
Sub Total 1,822,500
Upah :
upah pasang + material bantu 1.0000 unit 250,000 250,000
Sub Total 250,000
Total 2,072,500
Dibulatkan 2,073,000
33 Kran zink ex Toto type TX603KM /bh
Bahan :
Kran zink ex Toto type TX603KM 1.0000 unit 360,000 360,000
Sub Total 360,000
Upah :
upah pasang + material bantu 1.0000 unit 15,000 15,000
Sub Total 15,000
Total 375,000
Dibulatkan 375,000
34 Kran zink ex Toto type T30AR13V7N /bh
Bahan :
Kran zink ex Toto type T30AR13V7N 1.0000 unit 291,000 291,000
Sub Total 291,000
Upah :
upah pasang + material bantu 1.0000 unit 15,000 15,000
Sub Total 15,000
Total 306,000
Dibulatkan 306,000
35 Hand Shower set ex Toto type TX432SJ
Bahan :
Hand Shower set ex Toto type TX432SJ 1.0000 unit 1,627,500 1,627,500
Sub Total 1,627,500

Halaman : 53/238
Harga Sat
Jumlah Harga
No. Uraian Koefisien Sat
( Rp. )
Upah : ( Rp. )
upah pasang + material bantu 1.0000 unit 125,000 125,000
Sub Total 125,000
Total 1,752,500
Dibulatkan 1,753,000
36 Hand Shower set ex Toto type TX472 SESM
Bahan :
Shower set ex Toto type TX472 SESM 1.0000 unit 646,500 646,500
Sub Total 646,500
Upah :
upah pasang + material bantu 1.0000 unit 125,000 125,000
Sub Total 125,000
Total 771,500
Dibulatkan 770,000
37 Bathtub ex Toto type FB1700-75
Bahan :
Bathtub ex Toto type FB1700-75 1.0000 unit 3,307,500 3,307,500
Dudukan bathtub - pas. Bata 1.0000 unit 350,000 350,000
Sub Total 3,657,500
Upah :
upah pasang + material bantu 1.0000 unit 400,000 400,000
Sub Total 400,000
Total 4,057,500
Dibulatkan 4,060,000
38 Kran bathtub ex Toto type TX432 SDN
Bahan :
Kran bathtub ex Toto type TX432 SDN 1.0000 unit 1,005,000 1,005,000
Sub Total 1,005,000
Upah :
upah pasang + material bantu 1.0000 unit 125,000 125,000
Sub Total 125,000
Total 1,130,000
Dibulatkan 1,130,000
Softscape
Bahan :
Mobilisasi tenaga kerja 1.00 m2 5,000 5,000
Pembersihan lahan 1.10 m2 27,500 30,250
Top soil lembang/tanah subur, tebal 20 cm 0.22 m3 375,000 82,500
Pasir agak halus t. 5 cm 0.06 m3 450,000 24,750
Pupuk kandang/kompos 0.22 zak 37,500 8,418
Anti rayap/semut, area luar 1.10 m2 32,500 35,750
rumput gajah mini 1.10 m2 37,500 41,250
Versicell 2050, 500x500x20 mm 1.10 m2 155,000 170,500
geotextile 1.10 m2 15,000 16,500
Sub Total 414,918
Upah :
pasang
1.00 m2 Include 0
Sub Total 0
Total 2 414,918
Rounded 415,000

Halaman : 54/238
DAFTAR HARGA SATUAN BAHAN
Harga Sat
No. Uraian SAT
( Rp. )
I PEKERJAAN PERSIAPAN
1 balok 8/12 borneo 900,000 m3
2 cat minyak 15,000 lt
3 dolken 5/7 7,500 btg
4 kaso / reng borneo 800,000 m3
5 kaso 4/6 kayu borneo 850,000 m3
6 multipleks 4 mm 50,000 lbr
7 paku 10,000 kg
8 paku seng 10,000 kg
9 papan borneo 875,000 m3
10 residu / meni 2,000 lt
11 seng gelombang besar 39,000 lbr

II PEKERJAAN STRUKTUR & MATERIAL DASAR


1 anti rayap kayu ex Biflex 100 EC / USA 7,000 m2
2 anti rayap tanah (Soil Treatment) ex Biflex 100 EC/USA / m2 9,000 m2
3 balok 5/10 meranti 2,300,000 m3
4 batu bata Cikarang 500 bh
5 batu belah 275,000 m3
6 Besi beton 7,500 kg
7 beton ready mix K175 780,000 m3
8 beton ready mix K225 750,000 m3
9 beton ready mix K250 830,000 m3
10 beton ready mix K300 860,000 m3
11 dolken 4/6 6,500 m3
12 kaso 5/6 meranti 2,150,000 m3
13 kawat Besi beton 12,000 kg
14 koral beton ( split ) 225,000 m3
15 multipleks 9 mm 4'x8' Rijek 125,000 lbr
16 paku 5,7,10 cm 12,000 kg
17 papan meranti 2,850,000 m3
18 pasir beton 300,000 m3
19 pasir pasang 285,000 m3
20 pasir urug 300,000 m3
21 PC ( @ 50 kg ) ex Holcim 70,000 zak
22 Split ( batu pecah ) 1/2, 2/3 300,000 m3
23 urugan tanah merah 100,000 m3
24 Wiremesh M6 37,500 m2
25 Wiremesh M7 51,000 m2
26 Wiremesh M8 66,000 m2

D PEKERJAAN WATERPROOFING
1 waterproofing coating 45,000 m2
2 waterproofing membrane 85,000 m2

E PASANGAN BATU BATA


1 batu bata Cikarang 700 bh
2 Bata celcon 1,000,000 m3
Harga Sat
No. Uraian SAT
3 Mortar khusus ( @ 40 kg ) MU-380 ( 3,500
Rp. ) kg

G PEKERJAAN ATAP
1 genteng keramik berglazur M-Class 10,000 bh
2 genteng beton Cisangkan 12,000 bh
3 genteng keramik Jatiwangi 7,500 bh
4 genteng nok Cisangkan 40,000 bh
5 papan ruiter 2/20 borneo super 2,050,000 m3
6 waterproofing nok genteng 15,000 m'
7 genteng nok Jatiwangi 15,000 bh
8 lisplank GRC 50,000 m'

III PEKERJAAN ARSITEKTUR


A PEKERJAAN FINISHING LANTAI
1 Homogenous tile 60x60cm ex Niro Granite 300,000 m2
2 Lantai Keramik 20x20 cm ex Roman 65,000 dus
3 lantai Keramik 30x30 cm ex Roman 70,000 dus
4 Lantai Keramik 33,3x33,3 ex Roman 85,000 dus
5 Lantai Keramik 40x40 ex Roman 85,000 dus
6 Lantai Keramik Mozaic 5x5 ex Ceramic Mass 250,000 m2
7 Lantai Keramik motif kayu ex Roman 200,000 m2
8 Marmer traventine 1,275,000 m2
9 Marmer lokal 450,000 m2
10 Granit nero assoluto 750,000 m2
11 semen grouting 12,000 kg

B PEKERJAAN FINISHING DINDING


1 Dinding andesit susun sirih 300,000 m2
2 Batu paras putih hammer susun sirih 350,000 m2
3 Batu paras putih stone siar bata pattern 350,000 m2
4 Batu andesit honed 60x60 cm 350,000 m2
5 Batu paras putih motif grid 300,000 m2
6 Dinding keramik ex Roman 20x20 cm 65,000 dus
7 Dinding homogenous tile ex Valentino gress uk. 30x60 275,000 m2
8 Dinding marmer Import 1,400,000 m2
9 Dinding marmer Traventine ( cream ) 1,120,000 m2

IV PEKERJAAN INSTALASI LISTRIK


Instalasi Penangkal Petir / titik
1 kawat BC 50 mm2 30,000 m'
2 Klem penyangga plat besi galvanis ( jarak @ 35 cm ) 5,000 bh
3 Air terminal tembaga 1" / splitzer conventional 350,000 unit
4 Tes klem box PVC 20x20 cm 250,000 unit
5 Pipa besi galvanis medium 1" ( kebutuhan 2 btg ) 250,000 btg
6 Bor pentanahan 12 m 75,000 m'
7 klem bak kontrol 150,000 unit
DAFTAR HARGA SATUAN UPAH

No. Uraian Sat


(

I PEKERJAAN PERSIAPAN
1 Pembersihan Lapangan 3,500 m2
2 Pembuatan pagar seng sementara proyek finish cat tinggi 180 cm 25,000 m'
+ Pondasi
3 Pasang Bouwplank 5,000 m'
4 Pembuatan kantor pelaksana & direksi ( sederhana ) 50,000 m2

II PEKERJAAN STRUKTUR
A PEKERJAAN PONDASI
1 Galian tanah biasa 45,000 m3
2 Pemadatan tanah dasar (dengan stemper) 4,500 m2
3 Urugan pasir dengan pasir urug padat tebal 10 cm 15,000 m3
4 Lt. Kerja / Rabat Beton ad. 1 : 3 : 5, tebal 5 cm, tanpa tulangan 7,500 m2
5 Pasangan batu kali campuran 1:5 50,000 m3
6 Urugan tanah kembali tanah bekas galian 15,000 m3
7 Pasangan Rollag 1:5 15,000 m'

B PEKERJAAN STRUKTUR BETON


1 Upah pembuatan Beton Site Mix 75,000 m3
2 Upah pengecoran Beton Readymix 75,000 m3
3 Upah pembesian 1,500 kg
4 Upah pasang wiremesh 15,000 m2
5 Upah bekisting pondasi plat setempat 75,000 m2
6 Upah bekisting sloof 15/20 55,000 m2
7 Upah bekisting kolom praktis 13/13 55,000 m2
8 Upah bekisting kolom struktur 15/20 75,000 m2
9 Upah bekisting balok struktur 15/30 75,000 m2
10 Upah bekisting plat beton t.12 mm 75,000 m2
11 Upah bekisting tangga 100,000 m2
12 Sewa Alat :
sewa stemper 200,000 hari
concrete pump 2,500,000 hari
operator concrete pump 350,000 hari
Sewa vibrator 350,000 hari
operator vibrator 75,000 hari
sewa scafolding 50,000 m2

C PASANGAN BATU BATA


1 Upah pasang batu bata 1/2 bata biasa campuran 1:5 20,000 m2
2 Upah Pasang batu bata 1/2 bata trasraam campuran 1:3 20,000 m2
3 Upah Pasang batu celcon 15,000 m2

D PLESTERAN & ACIAN


1 Upah Plesteran 15,000 m2
2 Upah Acian 15,000 m2
3 Upah Plesteran dak beton expose tebal 20 mm campuran 1:3 15,000 m2
No. Uraian Sat
(

E PEKERJAAN ATAP
1 Upah pasang genteng 30,000 m2
2 Upah pasang genteng Nok + Karpusan 45,000 m'
3 Upah pemasangan Lisplank 45,000 m'

III PEKERJAAN ARSITEKTUR


A PEKERJAAN FINISHING LANTAI
1 Upah pasang Lantai Homogenous tile 60x60 50,000 m2
2 Upah pasang Lantai Keramik 40x40 cm 50,000 m2
3 Upah pasang Plint Homogenous tile uk. 10x60 cm 15,000 m'
4 Upah pasang Plint Keramik 10x30 cm 15,000 m'
5 Upah pasang Lantai Keramik 20x20 cm 45,000 m2
6 Upah pasang Lantai Keramik 33,3x33,3 cm 35,000 m2
7 Upah pasang Lantai marmer 500,000 m2
8 Upah pasang plint granit 50,000 m'

B PEKERJAAN FINISHING DINDING


1 Upah pasang dinding batu alam 150,000 m2
2 Upah pasang Dinding Keramik 20x25 cm 45,000 m2

IV PEKERJAAN INSTALASI LISTRIK


1 Instalasi Penangkal Petir / titik 200,000 titik
CALCULATION SHEET

No. URAIAN PEKERJAAN


RUMUS

Pekerjaan Persiapan
Pekerjaan Pagar sementara
Pekerjaan Bowplank

PEKERJAAN STRUKTUR
PEKERJAAN STRUKTUR LT. DASAR
1 PONDASI BATU KALI
- Pagar

a
1
/2 h x ( a + b ) x L
- Dinding
h

Jumlah
b

1 Pondasi Plat Lajur


Beton ( a*b*0,2+ c*d*h) x Jml titik
- PJ1

h
Jumlah
20 cm
a Bekisting (2*(a+b)*0,2+2*( c+d)*h) x Jml titik
- PJ1

d b Jumlah
c Tulangan

- PJ1
dia. 19 tulangan balok membujur

dia. 16 tulangan balok membujur

dia. 10 tulangan balok membujur


dia. 10-100/200 tulangan sengkang balok
dia. 10-150 tulangan sengkang plat

dia. 8 Tulangan plat membujur

Total

- PJ1

Halaman : 59/238
No. URAIAN PEKERJAAN
RUMUS
Tulangan Plat atas dia. 13
dia. 13
Tulangan Plat bawah dia. 13
dia. 13
Tulangan utama Kolom dia. 13
Tulangan sengkang Kolom dia. 8
Jumlah

SLOOF
Beton S1
Bekisting S1
Tulangan S1
Tulangan utama dia.16

Tulangan tengah dia.10


Tulangan sengkang dia.10
Jumlah

1 GALIAN PONDASI
Galian Pondasi Batu Kali
a' = b + 20 cm
1
/2 x h' x ( a' + b' ) x L
- Dinding

h
Jumlah

b' = b + 10 cm

Galian Pondasi Plat lajur


a'

a x b x h x Jumlah
h = kedalaman - PJ1

Jumlah

b' = panjang

Pile Cap
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

Halaman : 60/238
No. URAIAN PEKERJAAN
RUMUS
Tie Beam TB1
TB2

Pit Lift

2 PASIR URUG
Pasir Urug di bawah batu kali - Dinding

Pasir Urug di bawah pondasi plat lajur - PJ1

Pasir Urug di bawah Pit Lift

Pasir Urug di bawah Tie Beam


#REF!
#REF!

Pasir Urug di bawah beton lantai dasar Luas lantai dasar x tebal

3 LANTAI KERJA, t. 5 cm
Lantai kerja di bawah Pondasi batu kali = 0,5 x Vol. Pasir Urug
Lantai kerja di bawah Pondasi plat setempat = 0,5 x Vol. Pasir Urug
Lantai kerja di bawah Pile Cap = 0,5 x Vol. Pasir Urug
Lantai kerja di bawah Tie Beam = 0,5 x Vol. Pasir Urug
Lantai kerja di bawah rabat beton lt. Dasar = 0,5 x Vol. Pasir Urug

1 Pondasi Bored pile


Pre-boring, dia. 300 mm, kedalaman 15m

Pile Cap PC1


Beton PC1

Bekisting PC1

Tulangan PC1
tulangan atas dia.13
dia.13

Halaman : 61/238
No. URAIAN PEKERJAAN
RUMUS
tulangan tengah dia.10

tulangan bawah dia.16


dia.16

2 Pile Cap PC2


Beton PC2

Bekisting PC2

Tulangan PC2
tulangan atas dia.13
dia.13

tulangan tengah dia.10

tulangan bawah dia.16


dia.16

1 Pile Cap PC3


Beton PC3

Bekisting PC3

Tulangan PC3
tulangan atas dia.13
dia.13

tulangan tengah dia.10

tulangan bawah dia.16


dia.16

Pile Cap PC4


Beton PC4

Bekisting PC4

Tulangan PC4
tulangan atas dia.13
dia.13

tulangan tengah dia.10

tulangan bawah dia.16

Halaman : 62/238
No. URAIAN PEKERJAAN
RUMUS
dia.16

1 Pile Cap PC5


Beton PC5

Bekisting PC5

Tulangan PC5
tulangan atas dia.16
dia.13

tulangan tengah dia.10

tulangan bawah dia.19


dia.16

1 Pile Cap PC6


Beton PC6

Bekisting PC6

Tulangan PC6
tulangan atas dia.16
dia.13

tulangan tengah dia.10

tulangan bawah dia.19


dia.16

3 Tie Beam

Beton TB1

Bekisting TB1

Tulangan
TB1
Tulangan utama dia.19

Tulangan tengah dia.10


Tulangan sengkang dia.10

Halaman : 63/238
No. URAIAN PEKERJAAN
RUMUS
Jumlah

PEKERJAAN STRUKTUR LT. 1

1 SLOOF PAGAR axbxL


- Beton -

Jumlah
- Bekisting 2xbxL
-
-
Jumlah

- Tulangan -
Tulangan utama dia. 13
Tulangan sengkang dia. 8
Jumlah
+ Waste 10%

1 KOLOM PAGAR
a x b x h x byk klm
- Beton -

Jumlah

- Bekisting 2 (a+b) x h x byk klm


-

Jumlah
- Tulangan
-
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

1 RING BALK PAGAR axbxL


- Beton -

Jumlah
- Bekisting 2xbxL
-
-
Jumlah

- Tulangan -
Tulangan utama dia. 13
Tulangan sengkang dia. 8
Jumlah
+ Waste 10%
GALIAN

Halaman : 64/238
No. URAIAN PEKERJAAN
RUMUS

Pile Cap
Pile cap 1
Pile cap 2
Pile cap 3
Pile cap 4
Pile cap 5
Pile cap 6
Jumlah

Tie Beam

2 PASIR URUG

Pasir Urug di bawah Pile Cap


Pile cap 1
Pile cap 2
Pile cap 3
Pile cap 4
Pile cap 5
Pile cap 6
Jumlah

Pasir Urug di bawah Tie Beam


TB1

Pasir Urug di bawah beton lantai dasar Luas lantai dasar x tebal

3 LANTAI KERJA, t. 5 cm
Lantai kerja di bawah Pile Cap = 0,5 x Vol. Pasir Urug
Lantai kerja di bawah Tie Beam = 0,5 x Vol. Pasir Urug
Lantai kerja di bawah rabat beton lt. Dasar = 0,5 x Vol. Pasir Urug

4 PLASTIK BAWAH LT. DASAR

5 URUGAN TANAH KEMBALI BEKAS GALIAN


Pondasi batu kali = Vol. Galian - ( Vol. Pondasi + Psr. Urug + Lt. Kerja )
Pile Cap = Vol. Galian - ( Vol. Pondasi + Psr. Urug + Lt. Kerja )
Tie Beam = Vol. Galian - ( Vol. Pondasi + Psr. Urug + Lt. Kerja )
Pondasi Plat Lajur = Vol. Galian - ( Vol. Pondasi + Psr. Urug + Lt. Kerja )
Jumlah

6 BUANG TANAH BEKAS GALIAN = Vol. Galian - Vol. Urugan


Pondasi batu kali
Pile Cap
Tie Beam
Basement

Halaman : 65/238
No. URAIAN PEKERJAAN
RUMUS
Pondasi Plat Setempat
Jumlah

7 SLOOF axbxL
- Beton - Dinding

Jumlah
- Bekisting 2xbxL
- Dinding
-
Jumlah

- Tulangan - Dinding
Tulangan utama dia. 13
Tulangan sengkang dia. 8
Jumlah
+ Waste 10%

7 PENINGGIAN TANAH SESUAI PEIL RENCANA


- Carport
- Bangunan utama

Jumlah

8 PEMADATAN LANTAI DASAR Seluruh ruang dalam lt. Dasar


Jumlah

9 RABAT BETON TANPA TULANGAN, t. 7 cm Luas lantai dasar x tebal

Jumlah

9 PLAT BETON LT. 1 Luas lantai dasar x tebal


Beton

SG2 - Plat beton tebal 15 mm Carport

Jumlah

Bekisting

SG2 - Plat beton tebal 15 mm Carport

Jumlah

Tulangan
SG2 - Plat beton tebal 15 mm SG2
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

Halaman : 66/238
No. URAIAN PEKERJAAN
RUMUS

10 KOLOM LT. 1
a x b x h x byk klm
- Beton - Type K1 35x35(12D16)

- Type K2 35x40(12D16)

- Type KP
Jumlah

- Bekisting 2 (a+b) x h x byk klm


- Type K1 35x35(12D16)

- Type K2 35x40(12D16)

- Type KP
Jumlah
- Tulangan
- Type K1 35x35(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

- Tulangan
- Type K2 35x40(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

- Type KP
Tulangan utama dia. 10
Tulangan sengkang dia. 8
Jumlah

11 BETON TANGGA
Tangga Utama Dari Lt. 1 Ke Lt. 2
- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

Beton Tangga Samping Lantai 1 - 2


- Beton Plat tangga + bordes
Trap tangga
Jumlah

Halaman : 67/238
No. URAIAN PEKERJAAN
RUMUS
- Bekisting Penutup plat bawah
Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah
- Tulangan Plat tangga

Beton Tangga Darurat Lantai 1-2


- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

- Tulangan Plat tangga

Tangga Putar Service baja area Service Lt. Semi basement Ke Lt. 1
Tiang : Besi Hbeam
Trap tangga : Plat bordes + rangka besi siku
Railing + pipa besi
Finishing : Zinckhromat + cat besi

#REF! STUKTUR LIFT LT. 1


- Beton
Dinding Beton

- Bekisting Total Luas + pjg kelilingxtinggi


Dinding Beton

- Tulangan
berat jenis tul x jml lapisan
jarak tul x tebal plat

Canopy
dia. 0.395 kg/m Tulangan atas dia. 10
dia. 0.617 kg/m Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3
#REF! BETON MEJA DAPUR, t. 10 cm
- Beton Plat

Halaman : 68/238
No. URAIAN PEKERJAAN
RUMUS

balok praktis
Jumlah

- Bekisting Plat = 2(a+b) x 0,1 + ab


Balok praktis=2bxL
Jumlah

- Tulangan
Tulangan atas plat, dia. 8
Tulangan bawah plat, dia. 8
Tulangan sengkang balok, dia.8

Tulangan utama balok, dia. 10


Jumlah

2 BETON MEJA WASTAFEL, t. 10 cm


- Beton Plat

balok praktis
Jumlah

- Bekisting Plat = 2(a+b) x 0,1 + ab


Balok praktis=2bxL
Jumlah

- Tulangan
Tulangan atas plat, dia. 8
Tulangan bawah plat, dia. 8
Tulangan sengkang balok, dia.8

Tulangan utama balok, dia. 10


Jumlah

13 Balok Opening Kusen LT. dasar axbxL


-Beton B1 (4D10)
- Bekisting 2xbxL
B1 (4D10)

B1 (4D10)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

PEKERJAAN STRUKTUR BETON LANTAI 2


1 BALOK BETON LT. 2 axbxL
B1 35x70(12D19)
B2 30x60(10D19)
B3 25x50(8D19)
B4 25x40(6D16)
B5 20x40(4D16)

Halaman : 69/238
No. URAIAN PEKERJAAN
RUMUS
B6 20x35(4D16)
B7 20x30(4D16)
Jumlah
- Bekisting 2xbxL
B1 35x70(12D19)
B2 30x60(10D19)
B3 25x50(8D19)
B4 25x40(6D16)
B5 20x40(4D16)
B6 20x35(4D16)
B7 20x30(4D16)
Jumlah

B1 35x70(12D19)
Tulangan utama dia.19
Tulangan sengkang dia.10
Jumlah

B2 30x60(10D19)
Tulangan utama dia.19
Tulangan sengkang dia.10
Jumlah

B3 25x50(8D19)
Tulangan utama dia.19
Tulangan sengkang dia.10

Jumlah

B4 25x40(6D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B5 20x40(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B6 20x35(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B7 20x30(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah
1 KOLOM LT. 2
a x b x h x byk klm
- Beton - Type K1 35x35(12D16)
- Type K2 35x40(12D16)
- Type KP
Jumlah

- Bekisting 2 (a+b) x h x byk klm


- Type K1 35x35(12D16)
- Type K2 35x40(12D16)

Halaman : 70/238
No. URAIAN PEKERJAAN
RUMUS
- Type KP
Jumlah
- Tulangan
- Type K1 35x35(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

- Type K2 35x40(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

- Type KP
Tulangan utama dia. 10
Tulangan sengkang dia. 8
Jumlah

PLAT BETON LT. 2


- Beton
S1 - plat lantai

- Bekisting Total Luas + pjg kelilingxtinggi


S1 - plat lantai

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

S1 - plat lantai
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

Tangga Dari Lt. 2 Ke Lt. 3


- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

Tanga Darurat

Halaman : 71/238
No. URAIAN PEKERJAAN
RUMUS
- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah
- Tulangan Plat tangga

#REF! STUKTUR LIFT LT. 1


- Beton
Dinding Beton

- Bekisting Total Luas + pjg kelilingxtinggi


Dinding Beton

- Tulangan
berat jenis tul x jml lapisan
jarak tul x tebal plat

Canopy
dia. 0.395 kg/m Tulangan atas dia. 13
dia. 0.617 kg/m Tulangan bawah dia. 13
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3
13 Balok Opening Kusen LT. 2 axbxL
-Beton B1 (4D10)
- Bekisting 2xbxL
B1 (4D10)

B1 (4D10)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

PEKERJAAN STRUKTUR BETON LANTAI 3


1 BALOK BETON LT. 3 axbxL
B1 35x70(10D19)
B2 30x60(8D19)
B3 25x50(6D16)
B4 25x40(6D16)
B5 20x40(4D16)
B6 20x35(4D16)
B7 20x30(4D16)

Halaman : 72/238
No. URAIAN PEKERJAAN
RUMUS
Jumlah
- Bekisting 2xbxL
B1 35x70(10D19)
B2 30x60(8D19)
B3 25x50(6D16)
B4 25x40(6D16)
B5 20x40(4D16)
B6 20x35(4D16)
B7 20x30(4D16)
Jumlah

B1 35x70(10D19)
Tulangan utama dia.19
Tulangan sengkang dia.10
Jumlah

B2 30x60(8D19)
Tulangan utama dia.19
Tulangan sengkang dia.10
Jumlah

B3 25x50(6D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah
B4 25x40(6D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah
B5 20x40(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah
B6 20x35(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah
B7 20x30(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

1 KOLOM LT. 3
a x b x h x byk klm
- Beton - Type K1 35x35(12D16)
- Type K2 35x40(12D16)
- Type KP
Jumlah

- Bekisting 2 (a+b) x h x byk klm


- Type K1 35x35(12D16)
- Type K2 35x40(12D16)
- Type KP
Jumlah
- Tulangan
- Type K1 35x35(12D16)

Halaman : 73/238
No. URAIAN PEKERJAAN
RUMUS
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

- Type K2 35x40(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

- Type KP
Tulangan utama dia. 10
Tulangan sengkang dia. 8
Jumlah

PLAT BETON LT. 3


- Beton
S1 - plat lantai

- Bekisting Total Luas + pjg kelilingxtinggi


S1 - plat lantai

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

S1 - plat lantai
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

Tangga Utama Dari Lt. 3 Ke Lt. 4


- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

Tangga Darurat Dari Lt.3 Ke Lt.4


-
- Beton Plat tangga + bordes
Trap tangga

Halaman : 74/238
No. URAIAN PEKERJAAN
RUMUS
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah
- Tulangan Plat tangga

2 BETON MEJA WASTAFEL, t. 10 cm


- Beton Plat

balok praktis
Jumlah

- Bekisting Plat = 2(a+b) x 0,1 + ab


Balok praktis=2bxL
Jumlah

- Tulangan
Tulangan atas plat, dia. 8
Tulangan bawah plat, dia. 8
Tulangan sengkang balok, dia.8

Tulangan utama balok, dia. 10


Jumlah

#REF! STUKTUR LIFT LT. 2


- Beton
Dinding Beton

- Bekisting Total Luas + pjg kelilingxtinggi


Dinding Beton

- Tulangan
berat jenis tul x jml lapisan
jarak tul x tebal plat

Canopy
dia. 0.395 kg/m Tulangan atas dia. 13
dia. 0.617 kg/m Tulangan bawah dia. 13
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3
13 Balok Opening Kusen LT. dasar axbxL
-Beton B1 (4D10)
- Bekisting 2xbxL
B1 (4D10)

Halaman : 75/238
No. URAIAN PEKERJAAN
RUMUS

B1 (4D10)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

PEKERJAAN STRUKTUR BETON LANTAI 4


1 BALOK BETON LT. 4 axbxL
B1 35x70(10D19)
B2 30x60(8D19)
B3 25x50(6D16)
B4 25x40(4D16)
B5 20x40(4D16)
B6 20x35(4D16)
B7 20x30(4D13)
Jumlah
- Bekisting 2xbxL
B1 35x70(10D19)
B2 30x60(8D19)
B3 25x50(6D16)
B4 25x40(4D16)
B5 20x40(4D16)
B6 20x35(4D16)
B7 20x30(4D13)
Jumlah

B1 35x70(10D19)
Tulangan utama dia.19
Tulangan sengkang dia.10
Jumlah

B2 30x60(8D19)
Tulangan utama dia.19
Tulangan sengkang dia.10
Jumlah

B3 25x50(6D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B4 25x40(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B5 20x40(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B6 20x35(4D16)

Halaman : 76/238
No. URAIAN PEKERJAAN
RUMUS
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B7 20x30(4D13)
Tulangan utama dia.13
Tulangan sengkang dia.10
Jumlah

2 KOLOM LT. 4
a x b x h x byk klm
- Beton - Type K1 35x35(12D16)
- Type K2 35x40(12D16)
- Type KP
Jumlah

- Bekisting 2 (a+b) x h x byk klm


- Type K1 35x35(12D16)
- Type K2 35x40(12D16)
- Type KP
Jumlah

- Tulangan
- Type K1 35x35(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

- Type K2 35x40(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 10
Jumlah

- Type KP
Tulangan utama dia. 10
Tulangan sengkang dia. 8
Jumlah

3 PLAT BETON LT. 4


- Beton
S1 - plat lantai

- Bekisting Total Luas + pjg kelilingxtinggi


S1 - plat lantai

Halaman : 77/238
No. URAIAN PEKERJAAN
RUMUS
- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

S1 - plat lantai
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3
Tangga Utama Dari Lt. 4 Ke Lt. 5
- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

Tangga Utama Dari Lt. 4 Ke Lt. 5


- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

2 BETON MEJA WASTAFEL, t. 10 cm


- Beton Plat

balok praktis
Jumlah

- Bekisting Plat = 2(a+b) x 0,1 + ab


Balok praktis=2bxL
Jumlah

- Tulangan
Tulangan atas plat, dia. 8
Tulangan bawah plat, dia. 8
Tulangan sengkang balok, dia.8

Halaman : 78/238
No. URAIAN PEKERJAAN
RUMUS

Tulangan utama balok, dia. 10


Jumlah

#REF! STUKTUR LIFT LT. 3


- Beton
Dinding Beton

- Bekisting Total Luas + pjg kelilingxtinggi


Dinding Beton

- Tulangan
berat jenis tul x jml lapisan
jarak tul x tebal plat

Canopy
dia. 0.395 kg/m Tulangan atas dia. 13
dia. 0.617 kg/m Tulangan bawah dia. 13
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3
13 Balok Opening Kusen LT. 4 axbxL
-Beton B1 (4D10)
- Bekisting 2xbxL
B1 (4D10)

B1 (4D10)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

PEKERJAAN STRUKTUR BETON LANTAI 5 DAN DAK ATAP


1 BALOK BETON LT. 5 axbxL
B2 30x60(8D19)
B3 25x50(6D16)
B4 25x40(4D16)
B5 20x40(4D16)
B6 20x35(4D16)
Jumlah
- Bekisting 2xbxL
B2 30x60(8D19)
B3 25x50(6D16)
B4 25x40(4D16)
B5 20x40(4D16)
B6 20x35(4D16)
Jumlah

B2 30x60(8D19)
Tulangan utama dia.19

Halaman : 79/238
No. URAIAN PEKERJAAN
RUMUS
Tulangan sengkang dia.10
Jumlah

B3 25x50(6D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B4 25x40(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B5 20x40(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B6 20x35(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

#REF! PLAT BETON LANTAI 5


- Beton
S1 - plat lantai

- Bekisting Total Luas + pjg kelilingxtinggi


S1 - plat lantai

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

S1 - plat lantai
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3
B1
B2
Jumlah
- Bekisting 2xbxL
B1
B2
Jumlah

Halaman : 80/238
No. URAIAN PEKERJAAN
RUMUS

B1
Tulangan utama dia.13
Tulangan sengkang dia.10
Jumlah

B2
Tulangan utama dia.13
Tulangan sengkang dia.10
Jumlah

2 KOLOM LANTAI 5
a x b x h x byk klm
- Beton - Type K1 35x35(12D16)
- Type K2 35x40(12D16)
- Type KP
Jumlah

- Bekisting 2 (a+b) x h x byk klm


- Type K1 35x35(12D16)
- Type K2 35x40(12D16)
- Type KP
Jumlah
- Tulangan
- Type K1 35x35(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 8
Jumlah

- Type K2 35x40(12D16)
Tulangan utama dia. 16
Tulangan sengkang dia. 8
Jumlah

- Type KP
Tulangan utama dia. 10
Tulangan sengkang dia. 8
Jumlah

#REF! STUKTUR LIFT LT. 3


- Beton
Dinding Beton

- Bekisting Total Luas + pjg kelilingxtinggi


Dinding Beton

- Tulangan
berat jenis tul x jml lapisan
jarak tul x tebal plat

Halaman : 81/238
No. URAIAN PEKERJAAN
RUMUS

Canopy
dia. 0.395 kg/m Tulangan atas dia. 13
dia. 0.617 kg/m Tulangan bawah dia. 13
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3
13 Balok Opening Kusen LT. dasar axbxL
-Beton B1 (4D10)
- Bekisting 2xbxL
B1 (4D10)

B1 (4D10)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah
3 PLAT BETON DAK
- Beton
S1 - plat lantai
S2 - plat dak belakang

- Bekisting Total Luas + pjg kelilingxtinggi


S1 - plat lantai
S2 - plat dak belakang

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

S1 - plat lantai
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

S2 - plat dak belakang


Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3
1 BALOK BETON DAK axbxL
B2 30x60(8D19)
B3 25x50(6D16)
B4 25x40(4D16)
B6 20x35(4D16)
Jumlah
- Bekisting 2xbxL
B2 30x60(8D19)
B3 25x50(6D16)
B4 25x40(4D16)

Halaman : 82/238
No. URAIAN PEKERJAAN
RUMUS
B6 20x35(4D16)
Jumlah

B2 30x60(8D19)
Tulangan utama dia.19
Tulangan sengkang dia.10
Jumlah

B3 25x50(6D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B4 25x40(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B6 20x35(4D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

4 BETON TANGGA
Tangga Dari Lt. 3 Ke Lt. Dak atap
- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

4 TANGGA BAJA LT. 3 KE LT. Atap


panjang
lebar
jml trap

- Balok tangga UNP 200x80x7,5


- Rangka trap, Siku L50.50.5
- Plat sambung T=10 mm
- Dynabolt M16 mm
- Baut HTB M10 mm
- Cat Zinchromat
- Cat Minyak

PEKERJAAN STRUKTUR BETON PENUTUP TANGGA DAN LIFT


1 BALOK BETON axbxL
B2 30x60(8D19)

Halaman : 83/238
No. URAIAN PEKERJAAN
RUMUS

Jumlah
- Bekisting 2xbxL
B2 30x60(8D19)

Jumlah

B1
Tulangan utama dia.19
Tulangan sengkang dia.10
Jumlah

2 KOLOM LT. M
a x b x h x byk klm
- Beton - Type K1
- Type KP
Jumlah

- Bekisting 2 (a+b) x h x byk klm


- Type K1
- Type KP
Jumlah
- Tulangan
- Type K1
Tulangan utama dia. 13
Tulangan sengkang dia. 8
Jumlah

- Type KP
Tulangan utama dia. 10
Tulangan sengkang dia. 8
Jumlah

3 PLAT BETON
- Beton
S1

- Bekisting Total Luas + pjg kelilingxtinggi


S1

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

S1
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%

Halaman : 84/238
No. URAIAN PEKERJAAN
RUMUS
Total berat = total volume beton x berat tulangan/m3

4 CANOPY BETON
- Beton
Canopy

- Bekisting Total Luas + pjg kelilingxtinggi


Canopy

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

Canopy
dia. 0.395 kg/m Tulangan atas dia. 10
dia. 0.617 kg/m Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

PEKERJAAN STRUKTUR DAK ATAP BETON


1 BALOK LT. DAK ATAP axbxL
B1 (12D16)
B2 (6D13)
B3 (4D13)
Jumlah
- Bekisting 2xbxL
B1 (12D16)
B2 (6D13)
B3 (4D13)
Jumlah

B1 (12D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B2 (6D13)
Tulangan utama dia.13
Tulangan sengkang dia.10
Jumlah

B3 (4D13)
Tulangan utama dia.13
Tulangan sengkang dia.10

Halaman : 85/238
No. URAIAN PEKERJAAN
RUMUS
Jumlah
#REF! DAK ATAP BETON
- Beton
Dak atap bangunan

- Bekisting Total Luas + pjg kelilingxtinggi


Dak atap bangunan

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

dia. 0.395 kg/m Tulangan atas dia. 10


dia. 0.617 kg/m Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

#REF! CANOPY BETON DAK ATAP


- Beton
Canopy

- Bekisting Total Luas + pjg kelilingxtinggi


Canopy

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

Canopy
dia. 0.395 kg/m Tulangan atas dia. 10
dia. 0.617 kg/m Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

PEKERJAAN WATERPROOFING
Luas = pjg x lebar+2*0,2*(pjg+lbr)
1 Waterproofing toilet Lantai 1
- Kamar mandi + Wc

Lantai 2
- Kamar Mandi

Lantai 3
- Kamar Mandi

Halaman : 86/238
No. URAIAN PEKERJAAN
RUMUS

Lantai 4
- Kamar Mandi
Lantai 5
- Toilet
Pit Lift
- Pit Lift

Dak beton talang


- Dak beton talang

Jumlah

Screed pelindung waterproofing dak beton tebal 3 cm

Waterproofing dinding luar

- Lantai 1, keliling bangunan

PEKERJAAN ATAP
Luas atap datar ( m2 )
1 Rangka atap Cosinus sudut atap ( Cos a )
2 Roof mesh + Alumunium voil
3 Penutup atap genteng
4 Nok genteng
5 Flashing pertemuan genteng dan dinding bata
6 Lisplank
7 Atap kaca tempered 10mm
- Tangga Utama

Jumlah

PEKERJAAN ARSITEKTUR
PEKERJAAN DINDING
1 Pasangan cellcon 7,5cm tinggi x pjg - Vol. pintu & jendela
Lantai 1
- Dinding bangunan

Lantai 2
- Dinding bangunan

Lantai atap
- Dinding parapet

Jumlah

1 Partisi gypsum 2 muka tinggi x pjg - Vol. pintu & jendela


Lantai 1
- Dinding partisi gypsum

Lantai 2
- Dinding partisi gypsum

Halaman : 87/238
No. URAIAN PEKERJAAN
RUMUS
Jumlah

2 Plesteran + skimcoat Luas bata biasa x 2

PEKERJAAN PLAFOND
Luas = pjg x lebar
1 Plafond expose Lantai 1

Jumlah

2 Plafond gypsum Lantai 1


- Kamar timur, koridor, fungsi penunjang

Lantai 2
- Kamar tidur, Kamar mandi, dan koridor, dll

Jumlah

Plafond Lambrisering Lantai 2


- Canopy pintu utama

Lantai 3
- Teras KT. Utama

Jumlah

#REF! List plafond Pjg Keliling = 2x( pjg + lebar )


Lantai 1
- Carport & Garasi
- Koridor service
- Area service
- KM. Service
- KT. Pembantu
- Gudang

Lantai 2
- Teras depan
- R. Keluarga
- R. Makan
- Dapur bersih
- Koridor
- KT. Tamu
- KM.Tamu

Lantai 3
- Foyer
- KT. Anak
- KM. Anak
- KT. Utama
- Walk in closet
- KM. Utama
- Teras KT. Utama

Jumlah
#REF! Cat Plafond
- Plafond Expose

Halaman : 88/238
No. URAIAN PEKERJAAN
RUMUS
- Plafond gypsum
- Plafond GRC
Jumlah

PEKERJAAN FINISHING LANTAI


Luas = pjg x lebar
1 Dinding keramik 20x20 cm Lantai 1
(Dapur) - Dapur kotor

Jumlah

2 Lantai keramik 40x40 cm ( area Service ) Lantai 1


ex. Asia Tile keramik atau setara - Gudang + Dapur kotor

Jumlah

#REF! Homogenous tile 60x60 cm Lantai 1


ex. Indogress atau setara - Koridor, Area Makan, R. Manajemen, R. Linen

Lantai 2
- Koridor dll

Jumlah

#REF! Paving Block Lantai 1


- Carport
Jumlah

#REF! Vinyl Lantai 1


ex. Korea standar - Kamar tidur

Lantai 2
- Kamar tidur

Jumlah

#REF! Karpet tile Lantai 1


ex. Korea standar - R. Meeting 1 dan 2

Jumlah

#REF! Step nosing Homogenous tile tangga service

PEKERJAAN TANGGA & RAILING


1 Railing Tangga & void tangga utama
- Tangga Lt. 1 ke Lt. 2
- Tangga Lt. 2 ke Lt. 3
Jumlah

Halaman : 89/238
No. URAIAN PEKERJAAN
RUMUS

2 Railing Tangga Carport


- Tangga Lt. carport ke Lt. 2
Jumlah
2 Railing balkon
Lantai 3
- Teras KT. Utama

Jumlah

2 Railing Balkon Lantai 2


- Dining room Balcony

Lantai 3
- Balkon depan
- Balkon belakang
Jumlah
3 Finishing Tangga Baja
- Trap kayu ulin
- Railing besi hollow

PEKERJAAN FINISHING DINDING


Lantai 3
1 Keramik 40x40 R. Tidur 5
R. Tidur 6
R. Tidur 7
R. Tidur 8
Jumlah

2 Keramik 20x20 (Toilet)


Jumlah

3 Plint keramik 10x40 cm


R. Tidur 5
R. Tidur 6
R. Tidur 7
R. Tidur 8
Jumlah

1 Cat Dinding luar


- Keliling bangunan Lantai 1
- Keliling bangunan Lantai 2
- Keliling bangunan Lantai 3
- Keliling bangunan Lantai dak atap
- Void belakang

2 Cat Dinding dalam


- Lantai 1
- Lantai 2
- Lantai Dak atap
Jumlah

3 Dinding Marmer Traventine

Halaman : 90/238
No. URAIAN PEKERJAAN
RUMUS

Jumlah

4 Dinding Batu Andesit 20x40 cm


- Fasade Lt. 1
Jumlah

3 Jaluzi kayu (Secondary skin)


Lantai 2
- KM. Utama

Jumlah
4 Dinding Marmer 60x60 cm Lantai 1

Jumlah

5
Batu andesit susun sirih Lantai 2
- Dinding depan R. Makan

Lantai 3
- Dinding depan teras KT. Utama
Jumlah

PEKERJAAN PAGAR
1 Pagar depan
(Asumsi tinggi pagar = 3.5 m) - Kolom struktur 15/25
- Balok Struktur 15/20
- Kolom praktis 15/15
- Dinding Bata
- Plester aci
- Fin. Granit tile motif kayu
- Ranga besi pagar depan
- Motif lambrisering kayu ex. Bengkirai fin. Melamik
- Cat Dinding
Jumlah
2 Pagar besi hollow
- Pagar depan
Jumlah

1 Bak tanaman depan rumah


- Dinding Bata
- Plester aci
- Fin. Cat dinding weathershield
- Pipa pembuangan air
Jumlah
2 Pagar besi hollow
- Pagar depan
Jumlah

PEKERJAAN ORNAMEN FAÇADE


1 Railing tiang profil - Teras depan Lt. GF
- Balkon Lt. 1
- Balkon Lt. 2
Jumlah

Halaman : 91/238
No. URAIAN PEKERJAAN
RUMUS

2 Ornamen dinding profil canopy beton - Lt. GF


- Balkon Lt. 1
- Balkon Lt. 2
Jumlah

3 Ornamen dinding profil canopy beton dak atap


4 Ornamen dinding profil bawah atap

5 Ornamen dinding profil jendela - Lt. GF


- Lt. 1
- Lt. 2
Jumlah

6 Tiang profil - Lt. GF

PEKERJAAN MEKANIKAL dan ELEKTRIKAL


PENGHITUNGAN KAPASITAS AC ( pk )

= Panjang x lebar Ruang x 500


9000

= Luas Ruang x 0.056

Lantai 1
- R. Keluarga & R. Tamu
- Pantry & R. Makan
- R. Direktur
- R. Staff
- Kamar tamu
- Kamar A
- Kamar B
- Kamar C
- Kamar D

Lantai 2
- Gallery
- R. Ganti
- Kamar anak 1
- Kamar anak 2
- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar Master
- Ruang bersama
- Kamar anak 3
- Kamar anak 4

Lantai 3

Halaman : 92/238
No. URAIAN PEKERJAAN
RUMUS
- Musholla
- Ruang senam & Gym
- Cinema
- Ruang Band
- Recording

Halaman : 93/238
Form No. 002/QS

Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg lbr
43.00 19.00 124.00 m'
42.00 19.00 122.00 m'

jml ttk kedlman jml per titik total pjg

a b h
0.30 0.60 0.80 110.45 39.76 m3

39.76 m3

Tot. Pjg lbr tebal Vol

0.00 0.80 0.20 0.00 m3

0.00 m3

0.00 m2

0.00 m2

pjg tul jarak tul byk tul BJ(kg/m)

0.00 7.50 2.23 0.00 kg


+ Waste 10% 0.00 kg

0.00 1.00 1.58 0.00 kg


+ Waste 10% 0.00 kg

0.00 2.00 0.62 0.00 kg


0.00 0.15 1.00 0.62 0.00 kg
0.00 0.15 1.00 0.62 0.00 kg
0.00 kg
+ Waste 10% 0.00 kg

0.00 10.00 0.40 0.00 kg


+ Waste 10% 0.00 kg

0.00 kg

pjg tul jarak tul byk tul berat/kg Jml titik

Halaman : 94/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
0.50 0.15 6.33 #REF! 0.00 #REF! kg
1.30 0.15 1.00 #REF! 0.00 #REF! kg
0.10 0.15 6.33 #REF! 0.00 #REF! kg
0.90 0.15 1.00 #REF! 0.00 #REF! kg
0.30 0.15 8.00 #REF! 0.00 0.00 #REF! kg
0.45 0.15 1.00 #REF! 0.00 0.00 #REF! kg
#REF! kg
+ Waste 10% #REF! kg

lbr tgg pjg


0.20 0.40 0.00 0.00 m3
0.00 m2
pjg/ring jarak tul byk tul berat/kg pjg total Berat Berat +Waste10%
4.00 1.58 0.00 0.00 0.00 kg

0.00 0.62 0.00 0.00 0.00 kg


1.20 0.15 1.00 0.00 0.00 0.00 kg
0.00 kg
Total 0.00 kg

lbr atas lbr bawah tinggi Tot. pjg


a' b'
0.80 0.70 0.90 110.45 74.55 m3

74.55 m3

Tot. Pjg lbr tinggi

0.00 m3

0.00 m3

jml ttk pjg lbr luas tinggi volume


#REF! 1.55 1.30 2.02 1.10 #REF! m3
#REF! 1.30 1.30 1.69 0.90 #REF! m3
#REF! 1.55 1.55 2.40 1.10 #REF! m3
#REF! 2.80 1.30 3.64 1.10 #REF! m3
#REF! 2.80 2.60 7.28 1.10 #REF! m3
#REF! 3.60 1.30 4.68 1.10 #REF! m3
Jumlah #REF! m3

Tot. Pjg lbr tinggi

Halaman : 95/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
75.50 0.40 0.80 24.16 m3
233.84 0.35 0.75 61.38 m3
85.54 m3
2.80 2.80 4.00 31.36 m3

0.80 110.45 0.10 8.84 m3


8.84 m3

lbr pjg tebal volume


0.00 0.00 0.10 0.00 m3
0.00 m3
pjg lbr luas tebal volume
2.85 2.85 8.12 0.10 6.60 m3

lbr tebal jml pjg volume


0.40 0.10 75.50 3.02 m3
#REF! 0.10 233.84 #REF! m3
#REF!

687.67 0.10 68.77 m3

4.42 m3
0.00 m3
0.00 m3
#REF! m3
#REF! m3

100.00 15.00 1.00 1,500.00 m'


300.00 m'

3.00 0.60 0.60 0.50 0.70 0.76 m3

5.04 m2

pjg tul jarak tul byk tul berat/kg Jml titik Berat Berat +Waste10%
0.70 0.15 5.00 1.04 3.00 10.92 12.01 kg
0.70 0.15 5.00 1.04 3.00 10.92 12.01 kg
24.02 kg

Halaman : 96/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
2.00 1.00 0.62 3.00 3.70 4.07 kg

1.90 0.15 5.00 1.04 3.00 29.64 32.60 kg


1.90 0.15 5.00 1.04 3.00 29.64 32.60 kg
59.28 kg
Total 87.37 kg

7.00 1.50 0.60 1.50 0.80 5.04 m3

23.52 m2

pjg tul jarak tul byk tul berat/kg Jml titik Berat Berat +Waste10%
1.60 0.15 5.00 1.04 7.00 58.24 64.06 kg
0.70 0.15 11.00 1.04 7.00 56.06 61.66 kg
125.73 kg

3.00 1.00 0.62 7.00 12.95 14.25 kg

3.00 0.15 5.00 1.58 7.00 166.25 182.88 kg


2.10 0.15 11.00 1.58 7.00 256.03 281.63 kg
422.28 kg
Total 562.25 kg

6.00 1.50 1.10 0.80 7.92 m3

24.96 m2

pjg tul jarak tul byk tul berat/kg Jml titik Berat Berat +Waste10%
1.60 0.15 8.33 1.04 6.00 83.20 91.52 kg
1.20 0.15 11.00 1.04 6.00 82.37 90.60 kg
182.12 kg

4.00 1.00 0.62 6.00 14.80 16.28 kg

2.60 0.10 12.00 1.58 6.00 296.40 326.04 kg


2.80 0.10 16.00 1.58 6.00 425.60 468.16 kg
722.00 kg
Total 920.40 kg

1.00 1.50 1.50 0.50 0.80 1.80 m3

4.80 m2

pjg tul jarak tul byk tul berat/kg Jml titik Berat Berat +Waste10%
1.60 0.15 11.00 1.04 1.00 18.30 20.13 kg
1.60 0.15 11.00 1.04 1.00 18.30 20.13 kg
40.27 kg

4.00 1.00 0.62 1.00 2.47 2.71 kg

3.00 0.15 11.00 1.58 1.00 52.25 57.48 kg

Halaman : 97/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
3.00 0.15 11.00 1.58 1.00 52.25 57.48 kg
104.50 kg
Total 147.48 kg

5.00 2.75 1.50 1.50 0.80 16.50 m3

34.00 m2

pjg tul jarak tul byk tul berat/kg Jml titik Berat Berat +Waste10%
2.85 0.13 13.00 1.58 5.00 293.31 322.64 kg
1.60 0.13 23.00 1.04 5.00 191.36 210.50 kg
533.14 kg

4.00 1.00 0.62 5.00 12.33 13.57 kg

4.35 0.10 16.00 2.23 5.00 777.20 854.92 kg


3.05 0.10 28.50 1.58 5.00 688.16 756.97 kg
1,465.36 kg
Total 2,012.06 kg

6.00 2.75 1.50 0.80 19.80 m3

40.80 m2

pjg tul jarak tul byk tul berat/kg Jml titik Berat Berat +Waste10%
2.85 0.13 13.00 1.58 6.00 351.98 387.17 kg
1.60 0.13 23.00 1.04 6.00 229.63 252.60 kg
639.77 kg

4.00 1.00 0.62 6.00 14.80 16.28 kg

4.35 0.10 16.00 2.23 6.00 932.64 1025.90 kg


3.05 0.10 28.50 1.58 6.00 825.79 908.37 kg
1,758.43 kg
Total 2,414.48 kg

lbr tgg pjg

0.25 0.50 245.50 23.32 m3

245.50 m2

pjg/ring jarak tul byk tul berat/kg pjg total total berat + Waste 10%
18.00 2.23 245.50 9,869.10 10,856.01 kg

2.00 0.62 245.50 302.783333 333.06 kg


1.50 0.15 1,637.67 0.62 1,514.84 1,666.33 kg

Halaman : 98/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
12,855.40 kg

0.20 0.30 110.45 6.63 m3


m3
110.45 6.63 m3

66.27 m2
0.00 m2
66.27 m2

pjg/ring jarak tul byk tul berat/kg pjg total


6.00 1.04 110.45 689.21 kg
1.00 0.20 552.25 0.62 340.55 kg
1,029.76 kg
1,132.74 kg

pjg lebar Luas tinggi byk klm


0.15 0.25 0.04 7.00 54.00 14.18 m3

14.18 m3

302.40 m2

302.40 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
6.00 1.04 7.00 54.00 2,358.72 kg
0.90 0.15 46.67 0.40 895.86 kg
3,254.58 kg
+ Waste 10% 3,580.04 kg

0.20 0.30 110.45 6.63 m3


m3
110.45 6.63 m3

66.27 m2
0.00 m2
66.27 m2

pjg/ring jarak tul byk tul berat/kg pjg total


6.00 1.04 110.45 689.21 kg
1.00 0.20 552.25 0.40 218.14 kg
907.35 kg
998.08 kg

Halaman : 99/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

jml ttk pjg lbr luas tinggi volume


3.00 0.80 0.80 0.64 1.10 2.11 m3
7.00 1.70 0.80 1.36 1.10 10.47
6.00 1.70 1.30 2.21 1.70 22.54
1.00 1.70 1.70 2.89 1.70 4.91
5.00 2.95 1.70 5.02 1.20 30.09
6.00 2.95 1.70 5.02 1.20 36.11
70.13

Tot. Pjg lbr tinggi


245.50 0.45 0.85 93.90 m3

TOTAL GALIAN 238.59

jml ttk pjg lbr luas tebal volume


3.00 0.80 0.80 0.64 0.10 0.19 m3
7.00 1.70 0.80 1.36 0.10 0.95 m3
6.00 1.70 1.30 2.21 0.10 1.33 m3
3.00 1.70 1.70 2.89 0.10 0.87 m3
5.00 2.95 1.70 5.02 0.10 2.51 m3
6.00 2.95 1.70 5.02 0.10 3.01 m3
30.00 8.85 m3

lbr tebal jml pjg volume


245.50 0.25 0.10 245.50 6.14 m3

555.00 0.10 55.50 m3

4.43 m3
3.07 m3
27.75 m3

171.10 m2

erja ) 0.00 m3
erja ) 37.05 m3
erja ) 61.38 m3
erja ) #REF! m3
#REF! m3

0.00 m3
(34.94) m3
93.90 m3
0.00 m3

Halaman : 100/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
#REF! m3
#REF! m3

0.15 0.30 0.00 0.00 m3


m3
0.00 0.00 m3

0.00 m2
0.00 m2
0.00 m2

pjg/ring jarak tul byk tul berat/kg pjg total


6.00 1.04 0.00 0.00 kg
0.90 0.20 0.00 0.40 0.00 kg
0.00 kg
0.00 kg

pjg lebar luas tinggi Volume

0.00 0.65 0.00 m3


0.00 1.30 0.00 m3

0.00 m2 0.00 m3

pjg lebar luas


0.00 m2
0.00 m2

luas tebal
0.00 0.07 0.00 m3
0.00 0.00 m3

luas tebal

460.00 0.15 69.00 m3

460.00 69.00 m3

460.00 0.19 86.25 m2

86.25 m2

berat/kg jml lapis jarak tul tebal plat Berat waste10% Berat +Waste10%

0.62 2.00 0.15 0.15 54.81 5.48 60.30 kg


0.62 2.00 0.15 0.15 54.81 5.48 60.30 kg
120.59 kg
n/m3 8,320.89 kg

Halaman : 101/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg lebar Luas tinggi byk klm


0.35 0.35 0.12 3.00 11.00 4.04 m3

0.35 0.40 0.14 3.00 17.00 7.14

0.13 0.13 0.02 3.00 32.00 1.62 m3


12.80 m3

46.20 m2

76.50

49.92 m2
172.62 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
12.00 1.58 3.00 11.00 627.00 kg
1.30 0.15 20.00 0.62 176.37 kg
803.37 kg
+ Waste 10% 883.70 kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
12.00 1.58 3.00 17.00 969.00 kg
1.40 0.15 20.00 0.62 293.53 kg
1,262.53 kg
+ Waste 10% 1,388.79 kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
4.00 0.62 3.00 32.00 236.80 kg
0.52 0.15 20.00 0.40 131.46 kg
368.26 kg
+ Waste 10% 405.08 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
12.50 0.94 0.15 1.76 m3
0.15 0.94 19.00 1.26 m3
3.02 m3

11.75 m2
3.75 m2
5.36 m2
20.86 m2

220.31 kg
157.39 kg
377.70 kg
468.75 kg
+ Waste 10% 515.63 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
10.30 1.50 0.15 2.32 m3
0.18 1.50 20.00 4.05 m3
6.37 m3

Halaman : 102/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
15.45 m2
3.09 m2
9.00 m2
27.54 m2

289.69 kg
506.25 kg
795.94 kg
386.25 kg
+ Waste 10% 849.75 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
10.30 1.50 0.15 2.32 m3
0.18 1.50 20.00 4.05 m3
6.37 m3

15.45 m2
3.09 m2
9.00 m2
27.54 m2

289.69 kg
506.25 kg
795.94 kg

386.25 kg
+ Waste 10% 849.75 kg

1.00 unit

pjg tinggi luas tebal

8.00 6.00 48.00 0.15 7.20 m3

7.20 m3

pjg kellg
48.00 28.00 0.15 52.20 m2

52.20 m2

berat/kg jml lapis jarak tul tebal plat

1.04 2.00 0.20 0.15 69.33 kg


1.04 2.00 0.20 0.15 69.33 kg
138.67 kg
13.87 kg
152.53 kg
n/m3 1,098.24 kg
pjg lebar tebal
16.72 0.60 0.10 1.00 m3

Halaman : 103/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

0.13 0.25 34.64 1.13 m3


2.13 m3

13.50 m2
17.32 m2
30.82 m2

pjg/ring jarak tul byk tul berat/kg


17.02 0.10 6.00 0.40 40.34 kg
0.90 0.10 167.20 0.40 59.44 kg
0.61 0.20 83.60 0.40 20.14 kg
119.92 kg

16.72 4.00 0.62 41.24 kg


161.16 kg
+ Waste 10% 177.28 kg

pjg lebar tebal


2.00 0.60 0.10 0.12 m3

0.13 0.25 5.20 0.17 m3


0.29 m3

1.72 m2
2.60 m2
4.32 m2

pjg/ring jarak tul byk tul berat/kg


2.30 0.10 6.00 0.40 5.45 kg
0.90 0.10 20.00 0.40 7.11 kg
0.61 0.20 10.00 0.40 2.41 kg
14.97 kg

2.00 4.00 0.62 4.93 kg


19.90 kg
+ Waste 10% 21.89 kg

pjg tinggi tot pjg Vol


0.15 0.20 6.00 0.07 m3

0.15 0.28 2 6.00 4.20 m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 0.62 6.00 14.80 16.28 kg
0.50 0.15 40.00 0.40 20.00 7.90 8.69 kg
24.97 kg

pjg tinggi tot pjg Vol


0.35 0.70 60.00 12.18 m3
0.30 0.60 77.10 11.10 m4
0.25 0.50 63.60 6.04 m5
0.25 0.40 191.00 13.37 m6
0.20 0.40 30.00 1.68 m7

Halaman : 104/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
0.20 0.35 12.00 0.55 m8
0.20 0.30 21.00 0.76 m9
45.68 m3

0.35 0.70 60.00 105.00 m2


0.30 0.60 77.10 115.65 m2
0.25 0.50 63.60 79.50 m2
0.25 0.40 191.00 200.55 m3
0.20 0.40 30.00 30.00 m4
0.20 0.35 12.00 10.80 m5
0.20 0.30 21.00 16.80 m6
558.30 m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
12.00 2.23 60.00 1,608.00 1,768.80 kg
2.00 0.15 400.00 0.62 493.33 542.67 kg
2,311.47 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
10.00 2.23 77.10 1,721.90 1,894.09 kg
1.70 0.15 514.00 0.62 538.84 592.73 kg
2,486.82 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
8.00 2.23 63.60 1,136.32 1,249.95 kg
1.40 0.15 424.00 0.62 366.05 402.66 kg

1,652.61 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
6.00 1.58 191.00 1,814.50 1,995.95 kg
1.20 0.20 955.00 0.62 706.70 777.37 kg
2,773.32 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 1.58 30.00 190.00 209.00 kg
1.10 0.20 150.00 0.62 101.75 111.93 kg
320.93 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 1.58 12.00 76.00 83.60 kg
1.00 0.20 60.00 0.62 37.00 40.70 kg
124.30 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 1.58 21.00 133.00 146.30 kg
0.90 0.20 105.00 0.62 58.28 64.10 kg
210.40 kg

pjg lebar Luas tinggi byk klm


0.35 0.35 0.12 4.00 11.00 5.39 m3
0.35 0.40 0.14 4.00 18.00 10.08 m3
0.13 0.13 0.02 4.00 77.00 5.21 m3
20.68 m3

61.60 m2
108.00 m2

Halaman : 105/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
160.16 m2
329.76 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
12.00 1.58 4.00 11.00 836.00 kg
1.30 0.15 26.67 0.62 235.16 kg
1,071.16 kg
+ Waste 10% 1,178.27 kg
pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
12.00 1.58 4.00 17.00 1,292.00 kg
1.40 0.15 26.67 0.62 391.38 kg
1,683.38 kg
+ Waste 10% 1,851.72 kg
pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
4.00 0.62 3.80 77.00 721.75 kg
0.52 0.15 25.33 0.40 400.67 kg
1,122.41 kg
+ Waste 10% 1,234.65 kg

pjg lebar luas void tebal

540.00 0.00 0.12 64.80 m3


64.80 m3

pjg kellg
540.00 121.00 0.12 554.52 m2
554.52 m2

berat/kg jml lapis jarak tul tebal plat

0.62 2.00 0.20 0.12 51.39 kg


0.62 2.00 0.20 0.12 51.39 kg
102.78 kg
10.28 kg
113.06 kg
n/m3 7,326.00 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
10.30 1.50 0.15 2.32 m3
0.18 1.50 22.00 4.46 m3
6.77 m3

15.45 m2
3.09 m2
9.90 m2
28.44 m2

289.69 kg
556.88 kg
846.56 kg
386.25 kg
+ Waste 10% 424.88 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat

Halaman : 106/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
10.30 1.50 0.15 2.32 m3
0.18 0.15 22.00 0.45 m3
2.76 m3

15.45 m2
3.09 m2
9.90 m2
28.44 m2

289.69 kg
55.69 kg
345.38 kg
386.25 kg
+ Waste 10% 424.88 kg

pjg tinggi luas tebal

8.00 4.00 32.00 0.15 4.80 m3

4.80 m3

pjg kellg
32.00 24.00 0.15 35.60 m2

35.60 m2

berat/kg jml lapis jarak tul tebal plat

1.04 2.00 0.20 0.15 69.33 kg


1.04 2.00 0.20 0.15 69.33 kg
138.67 kg
13.87 kg
152.53 kg
n/m3 732.16 kg
pjg tinggi tot pjg Vol
0.15 0.20 45.00 0.54 m3

0.15 0.28 2 45.00 31.50 m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 0.62 45.00 111.00 122.10 kg
0.50 0.15 300.00 0.40 150.00 59.25 65.18 kg
187.28 kg

pjg tinggi tot pjg Vol


0.35 0.70 60.00 12.18 m3
0.30 0.60 83.10 11.97 m3
0.25 0.50 65.40 6.21 m3
0.25 0.40 241.00 16.87 m3
0.20 0.40 39.00 2.18 m3
0.20 0.35 12.00 0.55 m3
0.20 0.30 39.00 1.40 m3

Halaman : 107/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
51.37 m3

0.35 0.70 60.00 105.00 m2


0.30 0.60 83.10 124.65 m2
0.25 0.50 65.40 81.75 m2
0.25 0.40 241.00 253.05
0.20 0.40 39.00 39.00
0.20 0.35 12.00 10.80
0.20 0.30 39.00 31.20 m2
645.45 m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
10.00 2.23 60.00 1,340.00 1,474.00 kg
2.00 0.15 400.00 0.62 493.33 542.67 kg
2,016.67 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
8.00 2.23 83.10 1,484.72 1,633.19 kg
1.70 0.15 554.00 0.62 580.78 638.85 kg
2,272.05 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
6.00 1.58 65.40 621.30 683.43 kg
1.40 0.15 436.00 0.62 376.41 414.05 kg
1,097.48 kg
pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
6.00 1.58 241.00 2,289.50 2,518.45 kg
1.20 0.20 1,205.00 0.62 891.70 980.87 kg
3,499.32 kg
pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 1.58 39.00 247.00 271.70 kg
1.10 0.20 195.00 0.62 132.28 145.50 kg
417.20 kg
pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 1.58 12.00 76.00 83.60 kg
1.00 0.20 60.00 0.62 37.00 40.70 kg
124.30 kg
pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 1.58 39.00 247.00 271.70 kg
0.90 0.20 195.00 0.62 108.23 119.05 kg
390.75 kg

pjg lebar Luas tinggi byk klm


0.35 0.35 0.12 4.00 11.00 5.39 m3
0.35 0.40 0.14 4.00 17.00 9.52
0.13 0.13 0.02 4.00 164.00 11.09 m3
26.00 m3

61.60 m2
102.00 m2
341.12 m2
504.72 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat

Halaman : 108/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
12.00 1.58 4.00 11.00 836.00 kg
1.30 0.15 26.67 0.62 235.16 kg
1,071.16 kg
+ Waste 10% 1,178.27 kg
pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
12.00 1.58 4.00 17.00 1,292.00 kg
1.40 0.15 26.67 0.62 391.38 kg
1,683.38 kg
+ Waste 10% 1,851.72 kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
4.00 0.62 3.80 164.00 1,537.23 kg
0.52 0.15 25.33 0.40 853.37 kg
2,390.60 kg
+ Waste 10% 2,629.65 kg

pjg lebar luas void tebal

540.00 0.00 0.12 64.80 m3


64.80 m3

pjg kellg
540.00 121.00 0.12 554.52 m2
554.52 m2

berat/kg jml lapis jarak tul tebal plat

0.62 2.00 0.20 0.12 51.39 kg


0.62 2.00 0.20 0.12 51.39 kg
102.78 kg
10.28 kg
113.06 kg
n/m3 7,326.00 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
10.30 1.50 0.15 2.32 m3
0.18 1.50 22.00 4.46 m3
6.77 m3

15.45 m2
3.09 m2
9.90 m2
28.44 m2

289.69 kg
556.88 kg
846.56 kg
386.25 kg
+ Waste 10% 424.88 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
10.30 1.50 0.15 2.32 m3
0.18 1.50 22.00 4.46 m3

Halaman : 109/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
6.77 m3

15.45 m2
3.09 m2
9.90 m2
28.44 m2

289.69 kg
556.88 kg
846.56 kg
386.25 kg
+ Waste 10% 424.88 kg
pjg lebar tebal
12.00 0.60 0.10 0.72 m3

0.13 0.25 25.20 0.82 m3


1.54 m3

9.72 m2
12.60 m2
22.32 m2

pjg/ring jarak tul byk tul berat/kg


12.30 0.10 6.00 0.40 29.15 kg
0.90 0.10 120.00 0.40 42.66 kg
0.61 0.20 60.00 0.40 14.46 kg
86.27 kg

12.00 4.00 0.62 29.60 kg


115.87 kg
+ Waste 10% 127.45 kg
pjg tinggi luas tebal

8.00 4.00 32.00 0.15 4.80 m3

4.80 m3

pjg kellg
32.00 24.00 0.15 35.60 m2

35.60 m2

berat/kg jml lapis jarak tul tebal plat

1.04 2.00 0.20 0.15 69.33 kg


1.04 2.00 0.20 0.15 69.33 kg
138.67 kg
13.87 kg
152.53 kg
n/m3 732.16 kg
pjg tinggi tot pjg Vol
0.15 0.20 62.00 0.74 m3

0.15 0.28 2 62.00 43.40 m2

Halaman : 110/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 0.62 62.00 152.93 168.23 kg
0.50 0.15 413.33 0.40 206.67 81.63 89.80 kg
258.02 kg

pjg tinggi tot pjg Vol


0.35 0.70 60.00 12.18 m3
0.30 0.60 78.90 11.36 m3
0.25 0.50 65.40 6.21
0.25 0.40 172.50 12.08
0.20 0.40 3.00 0.17
0.20 0.35 12.00 0.55
0.20 0.30 51.00 1.84 m3
44.39 m3

0.35 0.70 60.00 105.00 m2


0.30 0.60 78.90 118.35 m2
0.25 0.50 65.40 81.75 m2
0.25 0.40 172.50 181.13 m2
0.20 0.40 3.00 3.00 m2
0.20 0.35 12.00 10.80 m2
0.20 0.30 51.00 40.80 m2
540.83 m2

pjg/ring jarak tul byk tul berat/kg pjg total


10.00 2.23 60.00 1,340.00 kg
2.00 0.15 400.00 0.62 493.33 kg
1,833.33 kg
+ Waste 10% 2,016.67 kg
pjg/ring jarak tul byk tul berat/kg pjg total
8.00 2.23 78.90 1,409.68 kg
1.70 0.15 526.00 0.62 551.42 kg
1,961.10 kg
+ Waste 10% 2,157.21 kg

pjg/ring jarak tul byk tul berat/kg pjg total


6.00 1.58 65.40 621.30 kg
1.40 0.15 436.00 0.62 376.41 kg
997.71 kg
+ Waste 10% 1,097.48 kg
pjg/ring jarak tul byk tul berat/kg pjg total
4.00 1.58 172.50 1,092.50 kg
1.20 0.20 862.50 0.62 638.25 kg
1,730.75 kg
+ Waste 10% 1,903.83 kg
pjg/ring jarak tul byk tul berat/kg pjg total
4.00 1.58 3.00 19.00 kg
1.10 0.20 15.00 0.62 10.18 kg
29.18 kg
+ Waste 10% 32.09 kg
pjg/ring jarak tul byk tul berat/kg pjg total

Halaman : 111/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
4.00 1.58 12.00 76.00 kg
1.00 0.20 60.00 0.62 37.00 kg
113.00 kg
+ Waste 10% 124.30 kg
pjg/ring jarak tul byk tul berat/kg pjg total
4.00 1.04 51.00 212.16 kg
0.80 0.20 255.00 0.62 125.80 kg
337.96 kg
+ Waste 10% 371.76 kg

pjg lebar Luas tinggi byk klm


0.35 0.35 0.12 4.00 11.00 5.39 m3
0.35 0.40 0.14 4.00 17.00 9.52 m3
0.13 0.13 0.02 4.00 164.00 11.09 m3
26.00 m3

61.60 m2
102.00 m2
341.12 m2
504.72 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm


12.00 1.58 4.00 11.00 836.00 kg
1.30 0.15 26.67 0.62 235.16 kg
1,071.16 kg
+ Waste 10% 1,178.27 kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm


12.00 1.58 4.00 17.00 1,292.00 kg
1.40 0.15 26.67 0.62 391.38 kg
1,683.38 kg
+ Waste 10% 1,851.72 kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm


4.00 0.62 4.00 164.00 1,618.13 kg
0.33 0.15 26.67 0.40 570.06 kg
2,188.20 kg
+ Waste 10% 2,407.02 kg

pjg lebar luas void tebal

540.00 0.12 64.80 m3

64.80 m3

pjg kellg
480.00 121.00 0.12 494.52 m2

494.52 m2

Halaman : 112/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
berat/kg jml lapis jarak tul tebal plat

0.62 2.00 0.20 0.12 51.39 kg


0.62 2.00 0.20 0.12 51.39 kg
102.78 kg
10.28 kg
113.06 kg
n/m3 7,326.00 kg
pjg lbr tinggi trap lbr trap tebal jml trap total berat
10.30 1.50 0.15 2.32 m3
0.18 1.50 22.00 4.46 m3
6.77 m3

15.45 m2
3.09 m2
9.90 m2
28.44 m2

289.69 kg
556.88 kg
846.56 kg
386.25 kg
+ Waste 10% 424.88 kg
pjg lbr tinggi trap lbr trap tebal jml trap total berat
10.30 1.50 0.15 2.32 m3
0.18 1.50 22.00 4.46 m3
6.77 m3

15.45 m2
3.09 m2
9.90 m2
28.44 m2

289.69 kg
556.88 kg
846.56 kg

386.25 kg
+ Waste 10% 424.88 kg

pjg lebar tebal


12.00 0.60 0.10 0.72 m3

0.13 0.25 25.20 0.82 m3


1.54 m3

9.72 m2
12.60 m2
22.32 m2

pjg/ring jarak tul byk tul berat/kg


12.30 0.10 6.00 0.40 29.15 kg
0.90 0.10 120.00 0.40 42.66 kg
0.61 0.20 60.00 0.40 14.46 kg

Halaman : 113/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
86.27 kg

12.00 4.00 0.62 29.60 kg


115.87 kg
+ Waste 10% 127.45 kg
pjg tinggi luas tebal

8.00 3.80 30.40 0.15 4.56 m3

4.56 m3

pjg kellg
30.40 23.60 0.15 33.94 m2

33.94 m2

berat/kg jml lapis jarak tul tebal plat

1.04 2.00 0.20 0.15 69.33 kg


1.04 2.00 0.20 0.15 69.33 kg
138.67 kg
13.87 kg
152.53 kg
n/m3 695.55 kg
pjg tinggi tot pjg Vol
0.15 0.20 62.00 0.74 m3

0.15 0.28 2 62.00 43.40 m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 0.62 62.00 152.93 168.23 kg
0.50 0.15 413.33 0.40 206.67 81.63 89.80 kg
258.02 kg

pjg tinggi tot pjg Vol


0.30 0.60 138.90 20.00 m3
0.25 0.50 42.00 3.99 m3
0.25 0.40 165.40 11.58 m3
0.20 0.40 3.00 0.17 m3
0.20 0.35 9.00 0.41 m3
36.15 m3

0.30 0.60 138.90 208.35 m2


0.25 0.50 42.00 52.50 m2
0.25 0.40 165.40 173.67 m2
0.20 0.40 3.00 3.00 m2
0.20 0.35 9.00 8.10 m2
445.62 m2

pjg/ring jarak tul byk tul berat/kg pjg total


8.00 2.23 138.90 2,481.68 kg

Halaman : 114/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.70 0.15 926.00 0.62 970.76 kg
3,452.44 kg
+ Waste 10% 3,797.68 kg
pjg/ring jarak tul byk tul berat/kg pjg total
6.00 1.58 42.00 399.00 kg
1.40 0.15 280.00 0.62 241.73 kg
640.73 kg
+ Waste 10% 704.81 kg

pjg/ring jarak tul byk tul berat/kg pjg total


4.00 1.58 165.40 1,047.53 kg
1.20 0.15 1,102.67 0.62 815.97 kg
1,863.51 kg
+ Waste 10% 2,049.86 kg
pjg/ring jarak tul byk tul berat/kg pjg total
4.00 1.58 3.00 19.00 kg
1.10 0.15 20.00 0.62 13.57 kg
32.57 kg
+ Waste 10% 35.82 kg
pjg/ring jarak tul byk tul berat/kg pjg total
4.00 1.58 9.00 57.00 kg
1.00 0.15 60.00 0.62 37.00 kg
94.00 kg
+ Waste 10% 103.40 kg

pjg lebar luas void tebal

480.00 0.12 57.60 m3

57.60 m3

pjg kellg
480.00 9.45 0.12 481.13 m2

481.13 m2

berat/kg jml lapis jarak tul tebal plat

0.62 2.00 0.20 0.12 51.39 kg


0.62 2.00 0.20 0.12 51.39 kg
102.78 kg
10.28 kg
113.06 kg
n/m3 6,512.00 kg
0.20 0.40 0.00 m3
0.15 0.30 0.00 m3
0.00 m3

0.20 0.40 0.00 0.00 m2


0.15 0.30 0.00 0.00 m2
0.00 m2

Halaman : 115/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg/ring jarak tul byk tul berat/kg pjg total


6.00 1.04 0.00 0.00 kg
1.20 0.20 0.00 0.62 0.00 kg
0.00 kg
+ Waste 10% 0.00 kg
pjg/ring jarak tul byk tul berat/kg pjg total
5.00 1.04 0.00 0.00 kg
0.90 0.20 0.00 0.62 0.00 kg
0.00 kg
+ Waste 10% 0.00 kg

pjg lebar Luas tinggi byk klm


0.35 0.35 0.12 4.00 11.00 5.39 m3
0.35 0.40 0.14 4.00 12.00 6.72 m3
0.13 0.13 0.02 4.00 36.00 2.43 m3
14.54 m3

61.60 m2
72.00 m2
74.88 m2
208.48 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm


12.00 1.58 4.00 11.00 836.00 kg
1.30 0.15 26.67 0.62 235.16 kg
1,071.16 kg
+ Waste 10% 1,178.27 kg
pjg/ring jarak tul byk tul berat/kg tinggi byk klm
12.00 1.58 4.00 12.00 912.00 kg
1.40 0.15 26.67 0.62 276.27 kg
1,188.27 kg
+ Waste 10% 1,307.09 kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm


4.00 0.62 4.00 36.00 355.20 kg
0.52 0.15 26.67 0.40 197.18 kg
552.38 kg
+ Waste 10% 607.62 kg
.2+
pjg tinggi luas tebal

8.00 3.80 30.40 0.15 4.56 m3

4.56 m3

pjg kellg
30.40 23.60 0.15 33.94 m2

33.94 m2

berat/kg jml lapis jarak tul tebal plat

Halaman : 116/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

1.04 2.00 0.20 0.15 69.33 kg


1.04 2.00 0.20 0.15 69.33 kg
138.67 kg
13.87 kg
152.53 kg
n/m3 695.55 kg
pjg tinggi tot pjg Vol
0.15 0.20 26.30 0.32 m3

0.15 0.28 2 26.30 18.41 m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 1.58 26.30 166.57 183.22 kg
0.50 0.15 175.33 0.62 87.67 54.06 59.47 kg
242.69 kg
pjg lebar luas void tebal

465.00 0.12 55.80 m3


0.00 0.10 0.00 m3
55.80 m3

pjg kellg
465.00 0.12 465.00 m2
0.00 0.00 0.10 0.00 m2
465.00 m2

berat/kg jml lapis jarak tul tebal plat

0.62 2.00 0.20 0.12 51.39 kg


0.62 2.00 0.20 0.12 51.39 kg
102.78 kg
10.28 kg
113.06 kg
n/m3 6,308.50 kg

0.62 2.00 0.20 0.10 61.67 kg


0.62 2.00 0.20 0.10 61.67 kg
123.33 kg
12.33 kg
135.67 kg
n/m3 0.00 kg
pjg tinggi tot pjg Vol
0.30 0.60 111.00 15.98 m3
0.25 0.50 42.00 3.99 m3
0.25 0.40 50.00 3.50 m3
0.20 0.35 9.00 0.41 m3
23.89 m3

0.30 0.60 111.00 166.50 m2


0.25 0.50 42.00 52.50 m2
0.25 0.40 50.00 52.50 m2

Halaman : 117/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
0.20 0.35 9.00 8.10 m2
279.60 m2

pjg/ring jarak tul byk tul berat/kg pjg total


8.00 2.23 111.00 1,983.20 kg
1.70 0.15 740.00 0.62 775.77 kg
2,758.97 kg
+ Waste 10% 3,034.86 kg
pjg/ring jarak tul byk tul berat/kg pjg total
6.00 1.58 42.00 399.00 kg
1.40 0.15 280.00 0.62 241.73 kg
640.73 kg
+ Waste 10% 704.81 kg

pjg/ring jarak tul byk tul berat/kg pjg total


4.00 1.58 50.00 316.67 kg
1.20 0.15 333.33 0.62 246.67 kg
563.33 kg
+ Waste 10% 619.67 kg
pjg/ring jarak tul byk tul berat/kg pjg total
4.00 1.58 9.00 57.00 kg
1.10 0.15 60.00 0.62 40.70 kg
97.70 kg
+ Waste 10% 107.47 kg

pjg lbr tinggi trap lbr trap tebal jml trap


0.00 0.00 0.15 0.00 m3
0.25 0.30 21.00 0.00 m3
0.00 m3

0.00 m2
0.00 m2
0.00 m2
0.00 m2

0.00 kg
0.00 kg
0.00 kg
+ Waste 10% 0.00 kg

8.00
1.30
21.00

panjang jml Berat Jenis Waste 10%


8.00 2.00 24.67 1.10 434.13 kg
0.90 21.00 3.78 1.10 78.59 kg
51.27 kg
16.00 bh
16.00 bh
563.99 kg
563.99 kg

pjg tinggi tot pjg Vol


0.35 0.35 0.00 0.00 m3

Halaman : 118/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

0.00 m3

0.35 0.35 0.00 0.00 m2

0.00 m2

pjg/ring jarak tul byk tul berat/kg pjg total


6.00 1.04 0.00 0.00 kg
1.40 0.20 0.00 0.62 0.00 kg
0.00 kg
+ Waste 10% 0.00 kg

pjg lebar Luas tinggi byk klm


0.13 0.20 0.03 3.50 0.00 0.00 m3
0.13 0.13 0.02 3.50 0.00 0.00 m3
0.00 m3

0.00 m2
0.00 m2
0.00 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm


8.00 1.04 3.50 0.00 0.00 kg
0.99 0.15 23.33 0.40 0.00 kg
0.00 kg
+ Waste 10% 0.00 kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm


4.00 0.62 3.50 0.00 0.00 kg
0.52 0.15 23.33 0.40 0.00 kg
0.00 kg
+ Waste 10% 0.00 kg

pjg lebar luas tebal

0.00 0.12 0.00 m3

0.00 m3

pjg kellg
0.00 0.00 0.12 0.00 m2

0.00 m2

berat/kg jml lapis jarak tul tebal plat

0.00 2.00 0.20 0.12 0.00 kg


0.00 2.00 0.20 0.12 0.00 kg
0.00 kg
0.00 kg

Halaman : 119/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
n/m3 0.00 kg

pjg lebar luas tebal

0.00 0.00 0.00 0.10 0.00 m3


0.00 0.10 0.00 m3
0.00 m3

pjg kellg
0.00 0.00 0.10 0.00 m2
0.10 0.00 m2
0.00 m2

berat/kg jml lapis jarak tul tebal plat

0.62 2.00 0.20 0.10 61.67 kg


0.62 2.00 0.20 0.10 61.67 kg
123.33 kg
12.33 kg
135.67 kg
n/m3 0.00 kg

pjg tinggi tot pjg Vol


0.20 0.40 265.00 14.84 m3
0.20 0.40 104.40 5.85 m3
0.15 0.35 32.00 1.10 m3
21.79 m3

0.20 0.40 265.00 265.00 m2


0.20 0.40 104.40 104.40 m2
0.15 0.35 32.00 27.20 m2
396.60 m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
12.00 0.00 265.00 0.00 0.00 kg
1.20 0.15 1,766.67 0.62 1,307.33 1,438.07 kg
1,438.07 kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
6.00 #REF! 265.00 #REF! #REF! kg
1.20 0.15 1,766.67 0.62 1,307.33 1,438.07 kg
#REF! kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 #REF! 32.00 #REF! #REF! kg
1.00 0.15 213.33 0.62 131.56 144.71 kg

Halaman : 120/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
#REF! kg
pjg lebar luas void tebal

366.85 0.00 0.12 44.02 m3


44.02 m3

pjg kellg
366.85 93.20 0.12 378.03 m2
378.03 m2

berat/kg jml lapis jarak tul tebal plat

0.62 2.00 0.20 0.12 51.39 kg


0.62 2.00 0.20 0.12 51.39 kg
102.78 kg
10.28 kg
113.06 kg
n/m3 4,976.93 kg

pjg lebar luas tebal

0.00 0.00 0.00 0.10 0.00 m3


0.00 0.10 0.00 m3
0.00 m3

pjg kellg
0.00 0.00 0.10 0.00 m2
0.10 0.00 m2
0.00 m2

berat/kg jml lapis jarak tul tebal plat

0.62 2.00 0.20 0.10 61.67 kg


0.62 2.00 0.20 0.10 61.67 kg
123.33 kg
12.33 kg
135.67 kg
n/m3 0.00 kg

pjg lbr luas keliling overlaping ddg

3.84 m2

32.40 m2

74.50 m2

Halaman : 121/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

74.50 m2

24.00 m2

20.90 m2

448.50 m2

678.64 m2

678.64 m2

36.00 7.00 252.00 m2


252.00 m2

pjg datar lbr Luas sudut


0.00 0.00 0.00 15.00 0.00 m2
0.00 m2
0.00 m2
0.00 m'
0.00 m'
0.00 m'

0.00 0.00 0.00 0.00 m2

0.00 m2

pjg tinggi pnt & jendela

194.26 3.20 0.00 621.63 m2

214.08 3.20 0.00 685.06 m2

55.68 1.00 55.68 m2

1,362.37 m2

pjg tinggi pnt & jendela

38.39 3.20 0.00 122.85 m2

101.83 3.20 0.00 325.85 m2

Halaman : 122/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
448.69 m2

2,724.74 m2

pjg lbr Void Luas

0.00 m2
0.00 m2

346.86 m2

346.86 m2

693.72 m2

0.00 m2

0.00 m2

0.00 m2

pjg lbr keliling + an

0.00 0.00 0.00 0.00 0.00 m'


0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'

0.00 0.00 0.00 0.00 m'


0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'

0.00 0.00 0.00 0.00 m'


0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'
0.00 0.00 0.00 0.00 m'

0.00 m'

0.00 m2

Halaman : 123/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
693.72 m2
#REF! m2
693.72 m2

pjg lbr Kell Tinggi

23.20 2.00 46.40 m2

46.40 m2
+waste 51.04 m2

26.70 m2

26.70 m2
+waste 29.37 m2

100.46 m2

269.50 m2

369.96 m2
+waste 406.96 m2

0.00 m2
0.00 m2

51.04 m2

158.86 m2

209.90 m2
+waste 230.89 m2

171.94 m2

171.94 m2
+waste 189.13 m2

0.00 m'
0.00 m'
0.00 m'
0.00 m'

0.00 m'
0.00 m'
0.00 m'

Halaman : 124/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

0.00 m'
0.00 m'

0.00 m'

0.00 m'

m'

m'
m'
0.00 m'

21.00 trap
12.00 m'

0.00 m2
0.00 m2
0.00 m2
0.00 m2
0.00 m2

0.00 m2
0.00 m2

0.00 0.00 0.00 m'


0.00 0.00 0.00 m'
0.00 0.00 0.00 m'
0.00 0.00 0.00 m'
0.00 m'

pjg tinggi ddg smpg Luas

6.00 4.00 41.80 65.80 m2


6.00 4.00 41.80 65.80 m2
6.00 4.00 26.60 50.60 m2
6.00 1.00 6.00 m2
6.00 12.00 72.00 m2
260.20 m2

pjg tinggi luas opening


1,243.26 1,243.26 m2
1,370.11 1,370.11 m2
111.36 111.36 m2
2,724.74 m2

pjg tinggi opening


0.00 m2

Halaman : 125/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
0.00 m2
0.00 m2

0.00 m2
0.00 m2

pjg tinggi opening

3.00 4.20 0.00 12.60 m2

12.60 m2

0.00 m2

1.20 3.50 0.00 4.20 m2

1.20 3.50 0.00 4.20 m2


8.40 m2

pjg lebar tinggi Jumlah


0.15 0.25 3.50 2.00 0.26 m3
0.15 0.20 2.70 0.08 m3
0.15 0.15 3.50 1.00 0.08 m3
0.00 2.70 3.50 2.00 18.90 m2
37.80 m2
2.00 0.50 1.00 m2
3.15 2.50 7.88 m2
mik 6.50 1.80 7.88 m2
36.80 m2
7.88 m2
pjg tinggi
0.00 m2
0.00 m2

pjg lebar tinggi Jumlah


0.00 6.60 0.50 1.00 3.30 m2
6.60 m2
2.00 0.50 6.60 m2
1.00 Ls
16.50 m2
pjg tinggi
0.00 m2
0.00 m2

m'
m'
m'
0.00 m'

Halaman : 126/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

m'
m'
m'
0.00 m'

m'
m'

0.00 m'
0.00 m'
0.00 m'
0.00 m'

10.00 bh

jika ruang terkena langsung sinar matahari, koef = 800

Ukuran Ruang
pjg lebar Luas Koef PK Rounded

82.00 0.06 4.56 2x2.0 PK


Err:509 Err:509 Err:509 0.06 Err:509 2x2.0 PK
4.00 5.50 22.00 0.06 1.22 1.0 PK
Err:509 Err:509 Err:509 0.06 Err:509 1.0 PK
Err:509 4.00 Err:509 0.06 Err:509 1.0 PK
3.75 3.00 11.25 0.06 0.63 0.5 PK
3.75 3.00 11.25 0.06 0.63 0.5 PK
3.50 3.00 10.50 0.06 0.58 0.5 PK
3.50 3.00 10.50 0.06 0.58 0.5 PK

4.00 3.15 12.60 0.06 0.70 2.0 PK


18.00 0.06 1.00 1.0 PK
3.75 5.50 20.63 0.06 1.15 1.0 PK
3.75 5.50 20.63 0.06 1.15 1.0 PK
3.50 3.00 10.50 0.06 0.58 0.5 PK
3.50 3.00 10.50 0.06 0.58 0.5 PK
3.50 3.00 10.50 0.06 0.58 0.5 PK
3.50 3.00 10.50 0.06 0.58 0.5 PK
3.50 3.00 10.50 0.06 0.58 0.5 PK
3.50 3.00 10.50 0.06 0.58 0.5 PK
3.75 3.00 11.25 0.06 0.63 0.5 PK
3.75 3.00 11.25 0.06 0.63 0.5 PK
5.50 5.00 27.50 0.06 1.53 1.5 PK
Err:509 0.06 Err:509 2x1.5 PK
4.00 4.50 18.00 0.06 1.00 1.0 PK
4.00 4.50 18.00 0.06 1.00 1.0 PK

Halaman : 127/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
2.25 2.70 6.08 0.06 0.34 2.0 PK
3.10 3.78 11.70 0.06 0.65 2.0 PK
1.00 3.15 3.15 0.06 0.18 2.0 PK
Err:509 Err:509 Err:509 0.06 Err:509 1.0 PK
Err:509 Err:509 Err:509 0.06 Err:509 0.5 PK

Halaman : 128/238
RENCANA ANGGARAN BIAYA Koefisien Mark Up Volume
PEKERJAAN STRUKTUR Koefisien Mark Up Harga sat
FrontOne Inn Central One Cengkareng - Bp. Jaya <------------- kolom ini dihidden dulu, jika akan di print --------------------------->
RAP / MODAL
HARGA SAT JML HARGA TOTAL GRAND TOTAL HARGA SAT JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT QTY
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
I PEKERJAAN PERSIAPAN 1.00
1,11.02 186,235,000 186,235,000 231,594,900 231,594,900
1 Air kerja (selama proyek berjalan) PAM 8.00 bln 8.00 650,000 5,200,000 663,000 5,304,000
1 Bedeng kerja 1.00 ls 1.00 7,500,000 7,500,000 9,375,000 9,375,000
2 Air kerja (selama proyek berjalan) PAM 18.00 bln 18.00 600,000 10,800,000 750,000 13,500,000
3 Listrik kerja daya 2200 W PLN Tarif multiguna 18.00 bln 18.00 500,000 9,000,000 625,000 11,250,000
4 Pagar proyek sementara seng gelombang + rangka kaso 140.00 m' 140.00 137,000 19,180,000 171,250 23,975,000
5 Keamanan lingkungan proyek lingkungan setempat + koordinasi aparat s 1.00 ls 1.00 5,000,000 5,000,000 6,250,000 6,250,000
6 Pembersihan lapangan manual 570.00 m2 570.00 3,500 1,995,000 4,370 2,490,900
7 Transportasi & Mobilisasi 1.00 ls 1.00 25,000,000 25,000,000 31,250,000 31,250,000
8 Material & alat bantu kerja scafolding, gerobak, trolly, dll 1.00 ls 1.00 25,000,000 25,000,000 31,250,000 31,250,000
9 Pengukuran + Pas. Bouwplank papan 2/20 + kaso 5/7 borneo 128.00 m' 128.00 20,000 2,560,000 25,000 3,200,000
10 Akomodasi supervisor 1.00 Ls 1.00 75,000,000 75,000,000 93,750,000 93,750,000

III PEKERJAAN STRUKTUR 4,310,675,484 ###


A Pekerjaan Strukur Lift Supplied by Owner - 0
1 Kolom WF-200 - kg - 23,000 - 23,460 0
2 Balok Lantai WF-200 - kg - 23,000 - 23,460 0
3 Dudukan mesin WF-150 - kg - 23,000 - 23,460 0
4 Balok Anak UNP 100 - kg - 17,600 - 17,950 0
5 Jamb Pintu UNP 80 - kg - 17,600 - 17,950 0
6 Cover hoistway grc fin cat - m2 - 350,000 - 357,000 0
7 Pengecoran pit stop kedalaman 80 cm - Ls - 20,000,000 - 20,400,000 0
8 Rumah lift Batu bata fin. Plester + aci - m2 - 213,000 - 217,260 0
9 Plate sepatu kolom - set - 750,000 - 765,000 0
10 Ancore D16 x 20 - set - 350,000 - 357,000 0
11 Zincromate - kg - 75,000 - 76,500 0
12 Kawat Las - kg - 45,000 - 45,900 0

B Pekerjaan Galian & Urugan (Pit stop) Supplied by Owner - -


1 Lantai kerja tebal 5 cm adukan 1 : 3 : 5
- Pit stop - m2 - 145,000 - 147,900 -

2 Galian tanah Galian manual


- Pit stop - m3 - 51,800 - 52,800 -

3 Urugan tanah kembali bekas galian Urugan manual


- Pit stop - m3 - 51,800 - 52,800 -

C Pekerjaan Area pit stop + Rumah mesin Supplied by Owner - 0


1 Dinding bata - m2 - 134,500 - 137,190 0
2 Kolom praktis - bh - 1,450,000 - 1,479,000 0
3 Sloof beton praktis - m' - 1,750,000 - 1,785,000 0
4 Plester+ Aci dinding - m2 - 107,500 - 109,650 0
5 Pintu akses rumah mesin ex. Pintu alumunium - unit - 2,750,000 - 2,805,000 0
6 Cor dak atap rumah mesin - m2 - 3,467,000 - 3,536,340 0
7 Waterproofing dak atap rumah mesin ex. Brashbond flexi - m2 - 65,000 - 66,300 0

D Pekerjaan Kereta Lift dan Mesin lift by Owner - - -


1 Electric Passenger Lift type QS 450kg 4/4/4 ex. CREMONA
stainless steel auto door 1.00 unit 1.00 0 - - -
incld. ARD (Automatic Rescue Device)

2 Biaya pemasangan dan instalasi 1.00 ls 1.00 0 - - -

E Pekerjaan Struktur Eksisting 3,925,612,286 4,151,376,940

A Soil test 4,500,000 5,625,000

1 Boring, coring sd 30m', test laboratorium & report 3 titik 1.00 ls 1.00 4,500,000 4,500,000 5,625,000 5,625,000

B Pekerjaan Pondasi Bored pile 633,750,000 792,187,500

1 Mobilisasi & demobilisasi alat bored pile 1.00 ls 1.00 4,500,000 4,500,000 5,625,000 5,625,000
2 Bored pile mesin Dia. 30cm ; Asumsi kedalam 15 m 1,755.00 m' 1,755.00 350,000 614,250,000 437,500 767,812,500
3 Jasa pembuangan lumpur 1.00 Ls 1.00 15,000,000 15,000,000 18,750,000 18,750,000

C Pekerjaan Galian & Urugan 115,424,240 117,727,759

1 Galian tanah pondasi


- Galian pondasi Pile Cap galian manual 48.48 m3 48.48 200,000 9,696,000 204,000 9,889,920
- Galian pondasi Tie Beam galian manual 111.50 m3 111.50 200,000 22,300,000 204,000 22,746,000
- Galian pondasi Batu Kali untuk pagar 52.31 m3 52.31 200,000 10,462,000 204,000 10,671,240
- Galian pondasi Pit Lift 25.09 m3 25.09 200,000 5,018,000 204,000 5,118,360

2 Pasir urug pasir urug darat tebal 10 cm - 0 0 0


- di bawah Pile Cap 9.08 m3 9.08 375,000 3,405,000 382,500 3,473,100
- di bawah Tie Beam 7.29 m3 7.29 375,000 2,733,750 382,500 2,788,425
- di bawah beton Lantai dasar 57.60 m3 57.60 375,000 21,600,000 382,500 22,032,000
- di bawah pondasi Batu Kali untuk pagar 6.20 m3 6.20 375,000 2,325,000 382,500 2,371,500
- di bawah pondasi Pit Lift 6.60 m3 6.60 375,000 2,475,000 382,500 2,524,500

3 Lantai kerja tebal 5 cm adukan 1 : 3 : 5 - 0 0 0


- di bawah Pile Cap 4.54 m3 4.54 680,000 3,087,200 693,600 3,148,944
- di bawah Tie Beam 3.64 m3 3.64 680,000 2,475,200 693,600 2,524,704
- di bawah rabat beton Lantai dasar 28.80 m3 28.80 680,000 19,584,000 693,600 19,975,680

4 Urugan tanah kembali bekas galian padat dengan stamper - 0 0 0


- Pile Cap 21.66 m3 21.66 15,000 324,900 15,300 331,398
- Tie Beam 80.16 m3 80.16 15,000 1,202,400 15,300 1,226,448
- Tie Beam 80.16 m3 80.16 15,000 1,202,400 15,300 1,226,448
- Pondasi Batu Kali 52.31 m3 52.31 15,000 784,650 15,300 800,343

5 Buang tanah bekas galian - 0 0 0


- Pile Cap 26.83 m3 26.83 25,000 670,750 25,500 684,165
- Tie Beam 31.34 m3 31.34 25,000 783,500 25,500 799,170
- Pondasi Batu Kali (16.73) m3 (16.73) 15,000 (250,950) 15,300 (255,969)
- pondasi Pit Lift 25.09 m3 25.09 15,000 376,350 15,300 383,877

6 Anti Rayap - 0 0 0
- Anti rayap galian Poer dan Tie Beam Soil Treatment Premise 200 SL 212.29 m' 212.29 21,000 4,458,090 21,400 4,543,006
- Anti rayap Lantai Soil Treatment Premise 200 SL 45.00 m2 45.00 15,800 711,000 16,100 724,500
- 0 0 0

D Pekerjaan Struktur Beton Lantai Dasar 542,807,700 553,737,247

1 Pondasi Batu Kali - 0 0 0


- Pasangan Pondasi Batu Kali adukan 1 : 3 : 5 27.90 m3 27.90 964,000 26,895,600 983,300 27,434,070

2 Sloof Pagar - 0 0 0
- Beton beton readymix K225 4.65 m3 4.65 964,000 4,482,600 983,300 4,572,345
- Bekisting multipleks 9 mm + kaso meranti 46.50 m2 46.50 177,000 8,230,500 180,500 8,393,250
- Tulangan ex CKS / SJ 794.81 kg 794.81 9,800 7,789,138 10,000 7,948,100

3 Kolom Pagar - 0 0 0
- Beton beton readymix K225 2.59 m3 2.59 964,000 2,496,760 983,300 2,546,747
- Bekisting multipleks 9 mm + kaso meranti 55.20 m2 55.20 177,000 9,770,400 180,500 9,963,600
- Tulangan ex CKS / SJ 653.50 kg 653.50 9,800 6,404,300 10,000 6,535,000

4 Ring Balk Pagar - 0 0 0


- Beton beton readymix K225 4.65 m3 4.65 964,000 4,482,600 983,300 4,572,345
- Bekisting multipleks 9 mm + kaso meranti 46.50 m2 46.50 177,000 8,230,500 180,500 8,393,250
- Tulangan ex CKS / SJ 700.33 kg 700.33 9,800 6,863,234 10,000 7,003,300

5 Pile Cap PC1 - 0 0 0


- Beton beton readymix K225 1.76 m3 1.76 964,000 1,696,640 983,300 1,730,608
- Bekisting multipleks 9 mm + kaso meranti 11.76 m2 11.76 177,000 2,081,520 180,500 2,122,680
- Tulangan ex CKS / SJ 203.87 kg 203.87 9,800 1,997,926 10,000 2,038,700

6 Pile Cap PC2 - 0 0 0


- Beton beton readymix K225 5.76 m3 5.76 964,000 5,552,640 983,300 5,663,808
- Bekisting multipleks 9 mm + kaso meranti 26.88 m2 26.88 177,000 4,757,760 180,500 4,851,840
- Tulangan ex CKS / SJ 642.57 kg 642.57 9,800 6,297,186 10,000 6,425,700

Pekerjaan Struktur Halaman : 129/238


RENCANA ANGGARAN BIAYA Koefisien Mark Up Volume
PEKERJAAN STRUKTUR Koefisien Mark Up Harga sat
FrontOne Inn Central One Cengkareng - Bp. Jaya <------------- kolom ini dihidden dulu, jika akan di print --------------------------->
RAP / MODAL
HARGA SAT JML HARGA TOTAL GRAND TOTAL HARGA SAT JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT QTY
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)

1,1
7 Pile Cap PC3 - 0 0 0
- Beton beton readymix K225 13.20 m3 13.20 964,000 12,724,800 983,300 12,979,560
- Bekisting multipleks 9 mm + kaso meranti 41.60 m2 41.60 177,000 7,363,200 180,500 7,508,800
- Tulangan ex CKS / SJ 1,534.01 kg 1,534.01 9,800 15,033,298 10,000 15,340,100

8 Pile Cap PC4 - 0 0 0


- Beton beton readymix K225 5.40 m3 5.40 964,000 5,205,600 983,300 5,309,820
- Bekisting multipleks 9 mm + kaso meranti 14.40 m2 14.40 177,000 2,548,800 180,500 2,599,200
- Tulangan ex CKS / SJ 442.45 kg 442.45 9,800 4,336,010 10,000 4,424,500

9 Pile Cap PC5 - 0 0 0


- Beton beton readymix K225 13.20 m3 13.20 964,000 12,724,800 983,300 12,979,560
- Bekisting multipleks 9 mm + kaso meranti 27.20 m2 27.20 177,000 4,814,400 180,500 4,909,600
- Tulangan ex CKS / SJ 2,414.48 kg 2,414.48 9,800 23,661,904 10,000 24,144,800

10 Pile Cap PC6 - 0 0 0


- Beton beton readymix K225 13.20 m3 13.20 964,000 12,724,800 983,300 12,979,560
- Bekisting multipleks 9 mm + kaso meranti 27.20 m2 27.20 177,000 4,814,400 180,500 4,909,600
- Tulangan ex CKS / SJ 1,609.65 kg 1,609.65 9,800 15,774,570 10,000 16,096,500

11 Tie Beam TB1 25X40-6D19 - 0 0 0


- Beton beton readymix K225 20.41 m3 20.41 964,000 19,675,240 983,300 20,069,153
- Bekisting multipleks 9 mm + kaso meranti 233.20 m2 233.20 161,000 37,545,200 164,200 38,291,440
- Tulangan ex CKS / SJ 6,406.76 kg 6,406.76 9,800 62,786,248 10,000 64,067,600

12 Plat beton lantai tebal 12 cm ( area dalam ) - 0 0 0


- Beton beton readymix K225 6.75 m3 6.75 964,000 6,507,000 983,300 6,637,275
- Bekisting multipleks 9 mm + kaso meranti 22.31 m2 22.31 170,000 3,792,700 173,400 3,868,554
- Tulangan ex CKS / SJ 814.00 kg 814.00 9,800 7,977,200 10,000 8,140,000

13 Kolom struktur K1 - 0 0 0
- Beton beton readymix K225 15.83 m3 15.83 964,000 15,260,120 983,300 15,565,639
- Bekisting multipleks 9 mm + kaso meranti 180.88 m2 180.88 157,000 28,398,160 160,100 28,958,888
- Tulangan ex CKS / SJ 2,454.80 kg 2,454.80 9,800 24,057,040 10,000 24,548,000

14 Kolom praktis 13x13 - 0 0 0


- Beton beton sitemix 1 : 3 : 5 3.15 m3 3.15 861,000 2,712,150 878,200 2,766,330
- Bekisting papan + kaso meranti 48.41 m2 48.41 84,000 4,066,440 85,700 4,148,737
- Tulangan ex CKS / SJ 785.69 kg 785.69 9,800 7,699,762 10,000 7,856,900

15 Beton Tangga Utama dari Lt. Dasar ke lantai 1 - 0 0 0


- Beton beton readymix K225 3.08 m3 3.08 964,000 2,969,120 983,300 3,028,564
- Bekisting multipleks 9 mm + kaso meranti 28.33 m2 28.33 170,000 4,816,100 173,400 4,912,422
- Tulangan ex CKS / SJ 499.13 kg 499.13 9,800 4,891,474 10,000 4,991,300

16 Beton Tangga Samping dari Lt. Dasar ke lantai 1 - 0 0 0


- Beton beton readymix K225 2.26 m3 2.26 964,000 2,178,640 983,300 2,222,258
- Bekisting multipleks 9 mm + kaso meranti 20.03 m2 20.03 170,000 3,405,100 173,400 3,473,202
- Tulangan ex CKS / SJ 424.88 kg 424.88 9,800 4,163,824 10,000 4,248,800

17 Beton Struktur Lift - 0 0 0


- Beton beton sitemix 1 : 2 : 3 18.60 m3 18.60 959,000 17,837,400 978,200 18,194,520
- Bekisting multipleks 9 mm + kaso meranti 131.05 m2 131.05 170,000 22,278,500 173,400 22,724,070
- Tulangan ex CKS / SJ 2,837.12 kg 2,837.12 9,800 27,803,776 10,000 28,371,200

18 Beton Opening Kusen - 0 0 0


- Beton beton sitemix 1 : 2 : 3 0.16 m3 0.16 959,000 153,440 978,200 156,512
- Bekisting multipleks 9 mm + kaso meranti 9.10 m2 9.10 170,000 1,547,000 173,400 1,577,940
- Tulangan ex CKS / SJ 54.10 kg 54.10 9,800 530,180 10,000 541,000

E Pekerjaan Struktur Beton Lantai 1 748,745,902 763,818,733

1 Balok B1 25x50 - 0 0 0
- Beton beton readymix K225 144.20 m3 144.20 964,000 139,008,800 983,300 141,791,860
- Bekisting multipleks 9 mm + kaso meranti 216.30 m2 216.30 125,000 27,037,500 127,500 27,578,250
- Tulangan ex CKS / SJ 3,812.17 kg 3,812.17 9,800 37,359,266 10,000 38,121,700

2 Balok B2 20x45 - 0 0 0
- Beton beton readymix K225 10.16 m3 10.16 964,000 9,794,240 983,300 9,990,328
- Bekisting multipleks 9 mm + kaso meranti 192.50 m2 192.50 125,000 24,062,500 127,500 24,543,750
- Tulangan ex CKS / SJ 3,051.08 kg 3,051.08 9,800 29,900,584 10,000 30,510,800

3 Balok B3 20x40 - 0 0 0
- Beton beton readymix K225 5.33 m3 5.33 964,000 5,138,120 983,300 5,240,989
- Bekisting multipleks 9 mm + kaso meranti 95.10 m2 95.10 125,000 11,887,500 127,500 12,125,250
- Tulangan ex CKS / SJ 1,466.86 kg 1,466.86 9,800 14,375,228 10,000 14,668,600

4 Kolom struktur K1 35/35-12D16 - 0 0 0


- Beton beton readymix K225 15.83 m3 15.83 964,000 15,260,120 983,300 15,565,639
- Bekisting multipleks 9 mm + kaso meranti 180.88 m2 180.88 157,000 28,398,160 160,100 28,958,888
- Tulangan ex CKS / SJ 3,459.83 kg 3,459.83 9,800 33,906,334 10,000 34,598,300

5 Kolom praktis 13x13 - 0 0 0


- Beton beton sitemix 1 : 3 : 5 5.72 m3 5.72 861,000 4,924,920 878,200 5,023,304
- Bekisting papan + kaso meranti 87.93 m2 87.93 84,000 7,386,120 85,700 7,535,601
- Tulangan ex CKS / SJ 1,427.07 kg 1,427.07 9,800 13,985,286 10,000 14,270,700

6 Plat beton lantai tebal 12 cm - 0 0 0


- Beton beton readymix K225 83.66 m3 83.66 964,000 80,648,240 983,300 82,262,878
- Bekisting multipleks 9 mm + kaso meranti 714.48 m2 714.48 170,000 121,461,600 173,400 123,890,832
- Tulangan ex CKS / SJ 9,458.68 kg 9,458.68 9,800 92,695,064 10,000 94,586,800

7 Beton Tangga Utama dari Lt. 1 ke lantai 2 - 0 0 0


- Beton beton readymix K225 3.08 m3 3.08 964,000 2,969,120 983,300 3,028,564
- Bekisting multipleks 9 mm + kaso meranti 28.33 m2 28.33 170,000 4,816,100 173,400 4,912,422
- Tulangan ex CKS / SJ 499.13 kg 499.13 9,800 4,891,474 10,000 4,991,300

8 Beton Tangga Samping dari Lt. 1 ke lantai 2 - 0 0 0


- Beton beton readymix K225 2.26 m3 2.26 964,000 2,178,640 983,300 2,222,258
- Bekisting multipleks 9 mm + kaso meranti 20.03 m2 20.03 170,000 3,405,100 173,400 3,473,202
- Tulangan ex CKS / SJ 424.88 kg 424.88 9,800 4,163,824 10,000 4,248,800

10 Beton meja wastafel - 0 0 0


- Beton beton sitemix 1 : 2 : 3 1.54 m3 1.54 959,000 1,476,860 978,200 1,506,428
- Bekisting multipleks 9 mm + kaso meranti 22.32 m2 22.32 170,000 3,794,400 173,400 3,870,288
- Tulangan ex CKS / SJ 127.45 kg 127.45 9,800 1,249,010 10,000 1,274,500

11 Beton Struktur Lift - 0 0 0


- Beton beton sitemix 1 : 2 : 3 3.99 m3 3.99 959,000 3,826,410 978,200 3,903,018
- Bekisting multipleks 9 mm + kaso meranti 29.84 m2 29.84 170,000 5,072,800 173,400 5,174,256
- Tulangan ex CKS / SJ 608.61 kg 608.61 9,800 5,964,378 10,000 6,086,100

11 Beton Opening Kusen - 0 0 0


- Beton beton sitemix 1 : 2 : 3 0.54 m3 0.54 959,000 517,860 978,200 528,228
- Bekisting multipleks 9 mm + kaso meranti 31.50 m2 31.50 170,000 5,355,000 173,400 5,462,100
- Tulangan ex CKS / SJ 187.28 kg 187.28 9,800 1,835,344 10,000 1,872,800

F Pekerjaan Struktur Beton Lantai 2 375,583,632 383,164,592

1 Balok B1 25x50 - 0 0 0
- Beton beton readymix K225 16.74 m3 16.74 964,000 16,137,360 983,300 16,460,442
- Bekisting multipleks 9 mm + kaso meranti 220.25 m2 220.25 125,000 27,531,250 127,500 28,081,875
- Tulangan ex CKS / SJ 4,658.14 kg 4,658.14 9,800 45,649,772 10,000 46,581,400

2 Balok B2 20x45 - 0 0 0
- Beton beton readymix K225 5.20 m3 5.20 964,000 5,012,800 983,300 5,113,160
- Bekisting multipleks 9 mm + kaso meranti 86.68 m2 86.68 125,000 10,835,000 127,500 11,051,700
- Tulangan ex CKS / SJ 1,561.20 kg 1,561.20 9,800 15,299,760 10,000 15,612,000

3 Balok B3 20x40 - 0 0 0
- Beton beton readymix K225 12.43 m3 12.43 964,000 11,982,520 983,300 12,222,419

Pekerjaan Struktur Halaman : 130/238


RENCANA ANGGARAN BIAYA Koefisien Mark Up Volume
PEKERJAAN STRUKTUR Koefisien Mark Up Harga sat
FrontOne Inn Central One Cengkareng - Bp. Jaya <------------- kolom ini dihidden dulu, jika akan di print --------------------------->
RAP / MODAL
HARGA SAT JML HARGA TOTAL GRAND TOTAL HARGA SAT JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT QTY
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
- Bekisting multipleks 9 mm + kaso meranti 222.00 m2 222.00 125,000 27,750,000 127,500 28,305,000
1,1
- Tulangan ex CKS / SJ 3,424.23 kg 3,424.23 9,800 33,557,454 10,000 34,242,300

4 Balok B4 20x40 - 0 0 0
- Beton beton readymix K225 0.59 m3 0.59 964,000 568,760 983,300 580,147
- Bekisting multipleks 9 mm + kaso meranti 11.52 m2 11.52 125,000 1,440,000 127,500 1,468,800
- Tulangan ex CKS / SJ 3,424.23 kg 3,424.23 9,800 33,557,454 10,000 34,242,300

5 Kolom struktur K1 35/35-12D16 - 0 0 0


- Beton beton readymix K225 13.50 m3 13.50 964,000 13,014,000 983,300 13,274,550
- Bekisting multipleks 9 mm + kaso meranti 154.28 m2 154.28 157,000 24,221,960 160,100 24,700,228
- Tulangan ex CKS / SJ 2,183.31 kg 2,183.31 9,800 21,396,438 10,000 21,833,100

6 Kolom praktis 13x13 - 0 0 0


- Beton beton sitemix 1 : 3 : 5 3.08 m3 3.08 861,000 2,651,880 878,200 2,704,856
- Bekisting papan + kaso meranti 28.33 m2 28.33 84,000 2,379,720 85,700 2,427,881
- Tulangan ex CKS / SJ 499.13 kg 499.13 9,800 4,891,474 10,000 4,991,300

7 Plat beton lantai tebal 12 cm - 0 0 0


- Beton beton readymix K225 2.26 m3 2.26 964,000 2,178,640 983,300 2,222,258
- Bekisting multipleks 9 mm + kaso meranti 20.03 m2 20.03 170,000 3,405,100 173,400 3,473,202
- Tulangan ex CKS / SJ 424.88 kg 424.88 9,800 4,163,824 10,000 4,248,800

8 Beton Tangga Utama dari Lt. 2 ke lantai 3 - 0 0 0


- Beton beton readymix K225 3.08 m3 3.08 964,000 2,969,120 983,300 3,028,564
- Bekisting multipleks 9 mm + kaso meranti 28.33 m2 28.33 170,000 4,816,100 173,400 4,912,422
- Tulangan ex CKS / SJ 499.13 kg 499.13 9,800 4,891,474 10,000 4,991,300

9 Beton Tangga Samping dari Lt. 2 ke lantai 3 - 0 0 0


- Beton beton readymix K225 2.26 m3 2.26 964,000 2,178,640 983,300 2,222,258
- Bekisting multipleks 9 mm + kaso meranti 20.03 m2 20.03 170,000 3,405,100 173,400 3,473,202
- Tulangan ex CKS / SJ 424.88 kg 424.88 9,800 4,163,824 10,000 4,248,800

10 Beton meja wastafel - 0 0 0


- Beton beton sitemix 1 : 2 : 3 1.54 m3 1.54 959,000 1,476,860 978,200 1,506,428
- Bekisting multipleks 9 mm + kaso meranti 22.32 m2 22.32 170,000 3,794,400 173,400 3,870,288
- Tulangan ex CKS / SJ 127.45 kg 127.45 9,800 1,249,010 10,000 1,274,500

11 Beton Struktur Lift - 0 0 0


- Beton beton sitemix 1 : 2 : 3 3.99 m3 3.99 959,000 3,826,410 978,200 3,903,018
- Bekisting multipleks 9 mm + kaso meranti 29.84 m2 29.84 170,000 5,072,800 173,400 5,174,256
- Tulangan ex CKS / SJ 608.61 kg 608.61 9,800 5,964,378 10,000 6,086,100

12 Beton Opening Kusen - 0 0 0


- Beton beton sitemix 1 : 2 : 3 1.69 m3 1.69 959,000 1,620,710 978,200 1,653,158
- Bekisting multipleks 9 mm + kaso meranti 98.70 m2 98.70 170,000 16,779,000 173,400 17,114,580
- Tulangan ex CKS / SJ 586.80 kg 586.80 9,800 5,750,640 10,000 5,868,000

G Pekerjaan Struktur Beton Lantai 3 564,334,914 575,723,481

1 Balok B1 25x50 - 0 0 0
- Beton beton readymix K225 16.76 m3 16.76 964,000 16,156,640 983,300 16,480,108
- Bekisting multipleks 9 mm + kaso meranti 176.40 m2 176.40 125,000 22,050,000 127,500 22,491,000
- Tulangan ex CKS / SJ 4,663.43 kg 4,663.43 9,800 45,701,614 10,000 46,634,300

2 Balok B2 20x45 - 0 0 0
- Beton beton readymix K225 2.97 m3 2.97 964,000 2,863,080 983,300 2,920,401
- Bekisting multipleks 9 mm + kaso meranti 49.50 m2 49.50 125,000 6,187,500 127,500 6,311,250
- Tulangan ex CKS / SJ 3,654.42 kg 3,654.42 9,800 35,813,316 10,000 36,544,200

3 Balok B3 20x40 - 0 0 0
- Beton beton readymix K225 12.26 m3 12.26 964,000 11,818,640 983,300 12,055,258
- Bekisting multipleks 9 mm + kaso meranti 219.00 m2 219.00 125,000 27,375,000 127,500 27,922,500
- Tulangan ex CKS / SJ 3,476.99 kg 3,476.99 9,800 34,074,502 10,000 34,769,900

4 Kolom struktur K1 35/35-12D16 - 0 0 0


- Beton beton readymix K225 12.10 m3 12.10 964,000 11,664,400 983,300 11,897,930
- Bekisting multipleks 9 mm + kaso meranti 138.32 m2 138.32 157,000 21,716,240 160,100 22,145,032
- Tulangan ex CKS / SJ 1,957.45 kg 1,957.45 9,800 19,183,010 10,000 19,574,500

5 Kolom praktis 13x13 - 0 0 0


- Beton beton sitemix 1 : 3 : 5 15.61 m3 15.61 861,000 13,440,210 878,200 13,708,702
- Bekisting papan + kaso meranti 240.08 m2 240.08 84,000 20,166,720 85,700 20,574,856
- Tulangan ex CKS / SJ 3,896.38 kg 3,896.38 9,800 38,184,524 10,000 38,963,800

6 Plat beton lantai tebal 12 cm - 0 0 0


- Beton beton readymix K225 50.70 m3 50.70 964,000 48,874,800 983,300 49,853,310
- Bekisting multipleks 9 mm + kaso meranti 439.30 m2 439.30 170,000 74,681,000 173,400 76,174,620
- Tulangan ex CKS / SJ 5,731.92 kg 5,731.92 9,800 56,172,816 10,000 57,319,200

7 Beton Tangga Utama dari Lt. 3 ke lantai 4 - 0 0 0


- Beton beton readymix K225 3.08 m3 3.08 964,000 2,969,120 983,300 3,028,564
- Bekisting multipleks 9 mm + kaso meranti 28.33 m2 28.33 170,000 4,816,100 173,400 4,912,422
- Tulangan ex CKS / SJ 499.13 kg 499.13 9,800 4,891,474 10,000 4,991,300

8 Beton meja wastafel - 0 0 0


- Beton beton sitemix 1 : 2 : 3 1.54 m3 1.54 959,000 1,476,860 978,200 1,506,428
- Bekisting multipleks 9 mm + kaso meranti 22.32 m2 22.32 170,000 3,794,400 173,400 3,870,288
- Tulangan ex CKS / SJ 127.45 kg 127.45 9,800 1,249,010 10,000 1,274,500

9 Beton Struktur Lift - 0 0 0


- Beton beton sitemix 1 : 2 : 3 3.99 m3 3.99 959,000 3,826,410 978,200 3,903,018
- Bekisting multipleks 9 mm + kaso meranti 29.84 m2 29.84 170,000 5,072,800 173,400 5,174,256
- Tulangan ex CKS / SJ 608.61 kg 608.61 9,800 5,964,378 10,000 6,086,100

10 Beton Opening Kusen - 0 0 0


- Beton beton sitemix 1 : 2 : 3 1.69 m3 1.69 959,000 1,620,710 978,200 1,653,158
- Bekisting multipleks 9 mm + kaso meranti 98.70 m2 98.70 170,000 16,779,000 173,400 17,114,580
- Tulangan ex CKS / SJ 586.80 kg 586.80 9,800 5,750,640 10,000 5,868,000

H Pekerjaan Struktur Beton Lantai 4 469,002,568 478,456,348

1 Balok B1 25x50 - 0 0 0
- Beton beton readymix K225 15.41 m3 15.41 964,000 14,855,240 983,300 15,152,653
- Bekisting multipleks 9 mm + kaso meranti 202.75 m2 202.75 125,000 25,343,750 127,500 25,850,625
- Tulangan ex CKS / SJ - kg 9,800 0 10,000 0

2 Balok B2 20x45 - 0 0 0
- Beton beton readymix K225 3.34 m3 3.34 964,000 3,219,760 983,300 3,284,222
- Bekisting multipleks 9 mm + kaso meranti 55.66 m2 55.66 125,000 6,957,500 127,500 7,096,650
- Tulangan ex CKS / SJ - kg 9,800 0 10,000 0

3 Balok B3 20x40 - 0 0 0
- Beton beton readymix K225 5.98 m3 5.98 964,000 5,764,720 983,300 5,880,134
- Bekisting multipleks 9 mm + kaso meranti 106.80 m2 106.80 125,000 13,350,000 127,500 13,617,000
- Tulangan ex CKS / SJ - kg 9,800 0 10,000 0

4 Kolom struktur K1 - 0 0 0
- Beton beton readymix K225 7.45 m3 7.45 964,000 7,181,800 983,300 7,325,585
- Bekisting multipleks 9 mm + kaso meranti 85.12 m2 85.12 157,000 13,363,840 160,100 13,627,712
- Tulangan ex CKS / SJ 1,155.20 kg 1,155.20 9,800 11,320,960 10,000 11,552,000

5 Kolom praktis 13x13 - 0 0 0


- Beton beton sitemix 1 : 3 : 5 3.85 m3 3.85 861,000 3,314,850 878,200 3,381,070
- Bekisting papan + kaso meranti 59.28 m2 59.28 84,000 4,979,520 85,700 5,080,296
- Tulangan ex CKS / SJ 962.07 kg 962.07 9,800 9,428,286 10,000 9,620,700

6 Plat beton lantai tebal 12 cm - 0 0 0


- Beton beton readymix K225 66.72 m3 66.72 964,000 64,318,080 983,300 65,605,776
- Bekisting multipleks 9 mm + kaso meranti 568.96 m2 568.96 170,000 96,723,200 173,400 98,657,664
- Tulangan ex CKS / SJ 7,543.07 kg 7,543.07 9,800 73,922,086 10,000 75,430,700

7 Beton Tangga Utama dari Lt. 3 ke lantai 4 - 0 0 0

Pekerjaan Struktur Halaman : 131/238


RENCANA ANGGARAN BIAYA Koefisien Mark Up Volume
PEKERJAAN STRUKTUR Koefisien Mark Up Harga sat
FrontOne Inn Central One Cengkareng - Bp. Jaya <------------- kolom ini dihidden dulu, jika akan di print --------------------------->
RAP / MODAL
HARGA SAT JML HARGA TOTAL GRAND TOTAL HARGA SAT JML HARGA TOTAL GRAND TOTAL
No URAIAN PEKERJAAN SPESIFIKASI QTY SAT QTY
(Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp) (Rp)
- Beton beton readymix K225 3.08 m3 3.08 964,000 2,969,120 983,300 3,028,564
1,1
- Bekisting multipleks 9 mm + kaso meranti 28.33 m2 28.33 170,000 4,816,100 173,400 4,912,422
- Tulangan ex CKS / SJ 7,543.07 kg 7,543.07 9,800 73,922,086 10,000 75,430,700

8 Beton meja dapur - 0 0 0


- Beton beton sitemix 1 : 2 : 3 1.04 m3 1.04 959,000 997,360 978,200 1,017,328
- Bekisting multipleks 9 mm + kaso meranti 15.12 m2 15.12 170,000 2,570,400 173,400 2,621,808
- Tulangan ex CKS / SJ 85.23 kg 85.23 9,800 835,254 10,000 852,300

9 Beton meja wastafel - 0 0 0


- Beton beton sitemix 1 : 2 : 3 0.54 m3 0.54 959,000 517,860 978,200 528,228
- Bekisting multipleks 9 mm + kaso meranti 7.92 m2 7.92 170,000 1,346,400 173,400 1,373,328
- Tulangan ex CKS / SJ 43.01 kg 43.01 9,800 421,498 10,000 430,100

10 Beton Struktur Lift - 0 0 0


- Beton beton sitemix 1 : 2 : 3 3.99 m3 3.99 959,000 3,826,410 978,200 3,903,018
- Bekisting multipleks 9 mm + kaso meranti 29.84 m2 29.84 170,000 5,072,800 173,400 5,174,256
- Tulangan ex CKS / SJ 608.61 kg 608.61 9,800 5,964,378 10,000 6,086,100

11 Beton Opening Kusen - 0 0 0


- Beton beton sitemix 1 : 2 : 3 0.44 m3 0.44 959,000 421,960 978,200 430,408
- Bekisting multipleks 9 mm + kaso meranti 25.90 m2 25.90 170,000 4,403,000 173,400 4,491,060
- Tulangan ex CKS / SJ 153.98 kg 153.98 9,800 1,509,004 10,000 1,539,800

12 Kolom praktis 13x13 Dinding Parapet - 0 0 0


- Beton beton sitemix 1 : 3 : 5 0.27 m3 0.27 861,000 232,470 878,200 237,114
- Bekisting papan + kaso meranti 4.16 m2 4.16 84,000 349,440 85,700 356,512
- Tulangan ex CKS / SJ 67.51 kg 67.51 9,800 661,598 10,000 675,100

13 Ring Balk Dinding Parapet - 0 0 0


- Beton beton sitemix 1 : 3 : 5 0.45 m3 0.45 861,000 387,450 878,200 395,190
- Bekisting papan + kaso meranti 26.25 m2 26.25 84,000 2,205,000 85,700 2,249,625
- Tulangan ex CKS / SJ 156.06 kg 156.06 9,800 1,529,388 10,000 1,560,600

I Pekerjaan Struktur Beton Dak Atap 342,638,862 349,543,491


1 Balok B1 25x50 - 0 0 0
- Beton beton readymix K225 17.69 m3 17.69 964,000 17,053,160 983,300 17,394,577
- Bekisting multipleks 9 mm + kaso meranti 232.75 m2 232.75 125,000 29,093,750 127,500 29,675,625
- Tulangan ex CKS / SJ 1,264.44 kg 1,264.44 9,800 12,391,512 10,000 12,644,400

2 Balok B2 20x45 - 0 0 0
- Beton beton readymix K225 3.34 m3 3.34 964,000 3,219,760 983,300 3,284,222
- Bekisting multipleks 9 mm + kaso meranti 50.60 m2 50.60 125,000 6,325,000 127,500 6,451,500
- Tulangan ex CKS / SJ 3,208.85 kg 3,208.85 9,800 31,446,730 10,000 32,088,500

3 Balok B3 20x40 - 0 0 0
- Beton beton readymix K225 5.98 m3 5.98 964,000 5,764,720 983,300 5,880,134
- Bekisting multipleks 9 mm + kaso meranti 106.80 m2 106.80 125,000 13,350,000 127,500 13,617,000
- Tulangan ex CKS / SJ 1,312.64 kg 1,312.64 9,800 12,863,872 10,000 13,126,400

4 Plat beton lantai tebal 12 cm - 0 0 0


- Beton beton readymix K225 48.60 m3 48.60 964,000 46,850,400 983,300 47,788,380
- Bekisting multipleks 9 mm + kaso meranti 416.52 m2 416.52 170,000 70,808,400 173,400 72,224,568
- Tulangan ex CKS / SJ 5,494.50 kg 5,494.50 9,800 53,846,100 10,000 54,945,000

5 Kolom struktur K1 - 0 0 0
- Beton beton readymix K225 3.43 m3 3.43 964,000 3,306,520 983,300 3,372,719
- Bekisting multipleks 9 mm + kaso meranti 39.20 m2 39.20 157,000 6,154,400 160,100 6,275,920
- Tulangan ex CKS / SJ 851.11 kg 851.11 9,800 8,340,878 10,000 8,511,100

6 Kolom praktis 13x13 - 0 0 0


- Beton beton sitemix 1 : 3 : 5 0.14 m3 0.14 861,000 120,540 878,200 122,948
- Bekisting papan + kaso meranti 2.08 m2 2.08 84,000 174,720 85,700 178,256
- Tulangan ex CKS / SJ 33.76 kg 33.76 9,800 330,848 10,000 337,600

7 Dinding Beton Struktur Lift - 0 0 0


- Beton beton sitemix 1 : 2 : 3 3.99 m3 3.99 959,000 3,826,410 978,200 3,903,018
- Bekisting multipleks 9 mm + kaso meranti 29.84 m2 29.84 170,000 5,072,800 173,400 5,174,256
- Tulangan ex CKS / SJ 608.61 kg 608.61 9,800 5,964,378 10,000 6,086,100

8 Beton Opening Kusen - 0 0 0


- Beton beton sitemix 1 : 2 : 3 0.44 m3 0.44 959,000 421,960 978,200 430,408
- Bekisting multipleks 9 mm + kaso meranti 25.90 m2 25.90 170,000 4,403,000 173,400 4,491,060
- Tulangan ex CKS / SJ 153.98 kg 153.98 9,800 1,509,004 10,000 1,539,800

J Pekerjaan Struktur Beton Penutup Tangga dan Lift 15,241,768 15,548,269

1 Balok B1 25x50 - 0 0 0
- Beton beton readymix K225 1.93 m3 1.93 964,000 1,860,520 983,300 1,897,769
- Bekisting multipleks 9 mm + kaso meranti 25.20 m2 25.20 125,000 3,150,000 127,500 3,213,000
- Tulangan ex CKS / SJ 278.70 kg 278.70 9,800 2,731,260 10,000 2,787,000

2 Plat Beton tebal 12cm - 0 0 0


- Beton beton readymix K225 3.00 m3 3.00 964,000 2,892,000 983,300 2,949,900
- Bekisting multipleks 9 mm + kaso meranti 28.00 m2 28.00 125,000 3,500,000 127,500 3,570,000
- Tulangan ex CKS / SJ 113.06 kg 113.06 9,800 1,107,988 10,000 1,130,600

K Pekerjaan Waterproofing 113,582,700 115,844,520

1 Kamar Mandi dan Toilet - 0 0 0


- Kamar Mandi Lantai 1 Coating brasburnd ex.Fosrox 52.00 m2 52.00 70,900 3,686,800 72,300 3,759,600
- Kamar Mandi Lantai 2 Coating brasburnd ex.Fosrox 210.00 m2 210.00 70,900 14,889,000 72,300 15,183,000
- Kamar Mandi Lantai 3 Coating brasburnd ex.Fosrox 210.00 m2 210.00 70,900 14,889,000 72,300 15,183,000
- Kamar Mandi Lantai 4 Coating brasburnd ex.Fosrox 42.00 m2 42.00 70,900 2,977,800 72,300 3,036,600

2 Dak Atap - 0 0 0
- Dak talang Coating brasburnd ex.Fosrox 448.50 m2 448.50 70,900 31,798,650 72,300 32,426,550

3 Pit Lift - 0 0 0
- Pit Lift Coating brasburnd ex.Fosrox 20.90 m2 20.90 70,900 1,481,810 72,300 1,511,070

4 Screeding Waterprofing - 0 0 0
- Screeding Waterproofing Dak talang Coating brasburnd ex.Fosrox 983.40 m2 983.40 44,600 43,859,640 45,500 44,744,700
- Screeding Waterproofing Dak talang Coating brasburnd ex.Fosrox - m2 - 44,600 0 45,500 0

F Pekerjaan Conblok Eksisting 385,063,198 385,063,198 392,898,950

1 Pek. perapihan lahan 624.84 m2 624.84 19,500 12,184,380 19,900 12,434,316


2 Pek. pemadatan tanah 624.84 m2 624.84 32,500 20,307,300 33,200 20,744,688
3 Pek. Ledgestone 20 cm 624.84 m2 624.84 156,000 97,475,040 159,100 99,412,044
4 Pek. Makadam base coast 10 cm 624.84 m2 624.84 97,500 60,921,900 99,500 62,171,580
5 Pek. Pasir abu batu 4 cm 624.84 m2 624.84 32,500 20,307,300 33,200 20,744,688
6 Upah tenaga gelar batu 624.84 m2 624.84 32,500 20,307,300 33,200 20,744,688
7 Upah lead stun 624.84 m2 624.84 18,200 11,372,088 18,600 11,622,024
8 Con block 8cm 624.84 m2 624.84 156,000 97,475,040 159,100 99,412,044
9 Upah pasang conblock 624.84 m2 624.84 32,500 20,307,300 33,200 20,744,688
10 Pek. Kansteen 132.34 m1 132.34 104,000 13,763,360 106,100 14,041,274
11 Stamper 624.84 m2 624.84 9,750 6,092,190 9,900 6,185,916
12 Mob & Demob 1.00 ls 1.00 4,550,000 4,550,000 4,641,000 4,641,000

Pekerjaan Struktur Halaman : 132/238


CALCULATION SHEET

No. URAIAN PEKERJAAN


RUMUS

Pekerjaan Persiapan
Pekerjaan Pagar sementara
Pekerjaan Bowplank

PEKERJAAN BONGKARAN BONGK

1 Lantai 1
2 Lantai 1
3 Lantai 1
4 Lantai 1
5 Lantai 1
6 Lantai 1
7 Lantai 1
8 Lantai 1
9 Lantai 1
10 Lantai 1
11 Lantai 1

1 Lantai 2
2 Lantai 2
3 Lantai 2
4 Lantai 2
5 Lantai 2
6 Lantai 2
7 Lantai 2
8 Lantai 2
9 Lantai 2
10 Lantai 2

1 Lantai 3
2 Lantai 3
3 Lantai 3
4 Lantai 3
5 Lantai 3

1 Lantai 4
2 Lantai 5
3 Lantai 6
4 Lantai 7
5 Lantai 8

Jumlah

PEKERJAAN BONGKARAN
Luas = pjg x lebar+2*0,2*(pjg+lbr)

Bongkaran tangga utama Lantai dasar

Bongkaran railing door Lantai dasar

Halaman : 133/238
No. URAIAN PEKERJAAN
RUMUS

Jumlah

Bongkaran plat lantai untuk tangga Tangga


Tangga
Tangga
Lift
Void

Jumlah

Bongkaran plat lantai untuk tangga Tangga


Tangga
Tangga
Lift
Void

Jumlah

Bongkaran atap Atap

Jumlah

Bongkaran plat atap ruko depan Atap

Jumlah

Bongkaran KM eksisting - Lantai 1


- Lantai 2
- Lantai 3
- Lantai 4

Jumlah

Bongkaran instalasi listrik

Bongkaran pintu dan jendela - Lantai 1

Halaman : 134/238
No. URAIAN PEKERJAAN
RUMUS
- Lantai 2
- Lantai 3
- Lantai 4

Jumlah

Bongkaran keramik eksisting


Pembersihan puing
Plat yg dibongkar

Jumlah

Lantai 1

Area Umum
PEKERJAAN STRUKTUR - Teras
PEKERJAAN STRUKTUR LT. BASEMENT
1 Pondasi Bored pile
Pre-boring, dia. 400 mm, kedalaman 8 m

2 Pile Cap
Beton P2B

Bekisting P2B

Tulangan P2B
tulangan atas dia.16
dia.16

tulangan tengah dia.10

tulangan bawah dia.19


dia.19

3 Tie Beam

Jumlah

TB1

TB1

Tulangan
TB1
Tulangan utama dia.13

Halaman : 135/238
No. URAIAN PEKERJAAN
RUMUS
Tulangan tengah dia.10
Tulangan sengkang dia.10
Jumlah

PEKERJAAN STRUKTUR LT. DASAR


1 GALIAN PONDASI
Pile Cap
Pile cap

Tie Beam

2 PASIR URUG
Pasir Urug di bawah Pile Cap
Pile cap

Pasir Urug di bawah Tie Beam


TB1

Pasir Urug di bawah beton lantai dasar Luas lantai dasar x tebal

3 LANTAI KERJA, t. 5 cm
Lantai kerja di bawah Pile Cap = 0,5 x Vol. Pasir Urug
Lantai kerja di bawah Tie Beam = 0,5 x Vol. Pasir Urug
Lantai kerja di bawah rabat beton lt. Dasar = 0,5 x Vol. Pasir Urug

4 PLASTIK BAWAH LT. 1

5 URUGAN TANAH KEMBALI BEKAS GALIAN


Pile Cap = Vol. Galian - ( Vol. Pondasi + Psr. Urug + Lt. Kerja )
Tie Beam = Vol. Galian - ( Vol. Pondasi + Psr. Urug + Lt. Kerja )
Jumlah

6 BUANG TANAH BEKAS GALIAN = Vol. Galian - Vol. Urugan


Pile Cap
Tie Beam
Basement
Jumlah

7 PENINGGIAN TANAH SESUAI PEIL RENCANA


- Carport
- Bangunan utama

Jumlah

8 PEMADATAN LANTAI DASAR Seluruh ruang dalam lt. Dasar


Jumlah

Halaman : 136/238
No. URAIAN PEKERJAAN
RUMUS
PLAT BETON LT. 1 Luas lantai dasar x tebal
Beton
SG1 - Plat beton tebal 12 mm Dak Atap

SG1 - Plat beton tebal 12 mm Lantai 3


SG2 - Plat beton tebal 15 mm Carport
SG3 - Plat beton tebal 25 mm Kolam
Jumlah

9 PLAT BETON LT. 1 Luas lantai dasar x tebal


Beton
SG1 - Plat beton tebal 12 mm Lantai 2
Lantai 3
SG1 - Plat beton tebal 12 mm

SG2 - Plat beton tebal 15 mm Carport


Jumlah

Bekisting
SG1 - Plat beton tebal 12 mm Lantai 2
SG2 - Plat beton tebal 15 mm Carport
Jumlah

Tulangan
SG1 - Plat beton tebal 12 mm SG1
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

SG2 - Plat beton tebal 15 mm SG2


Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

10 KOLOM LT. 1
a x b x h x byk klm
- Beton - Type K1 ( Lt 1 dan Lt 4 )
- Type K2
- Type KP ( Lt 1 - Lt 4 )
Jumlah

- Bekisting 2 (a+b) x h x byk klm


- Type K1
- Type K2
- Type KP
Jumlah
- Tulangan
- Type K1 ( Lt 1 dan Lt 4 )
Tulangan utama dia. 13
Tulangan sengkang dia. 10

Halaman : 137/238
No. URAIAN PEKERJAAN
RUMUS
Jumlah

- Type K2
Tulangan utama dia. 13
Tulangan sengkang dia. 8
Jumlah

- Type KP
Tulangan utama dia. 10
Tulangan sengkang dia. 8
Jumlah

11 BETON TANGGA
Tangga Utama Dari Lt. 1 Ke Lt. 2
- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

Tangga Depan Dari Taman Ke Lt. 2


- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah
- Tulangan Plat tangga

12 BETON MEJA DAPUR, t. 10 cm


- Beton Plat

balok praktis
Jumlah

- Bekisting Plat = 2(a+b) x 0,1 + ab


Balok praktis=2bxL
Jumlah
- Tulangan

Halaman : 138/238
No. URAIAN PEKERJAAN
RUMUS
Tulangan atas plat, dia. 8
Tulangan bawah plat, dia. 8
Tulangan sengkang balok, dia.8

Tulangan utama balok, dia. 10


Jumlah

PEKERJAAN STRUKTUR BETON LANTAI 2


1 BALOK BETON LT. 2 axbxL

B1 (12D16) Lantai 1
B3 (4D13) Lantai 2
B3 (4D13) Dak Atap
B3 (4D13) Dak Atap

Jumlah
- Bekisting 2xbxL
B3 (4D13) Dak Atap
#REF!
-
Jumlah

B3 (4D13) Dak Atap


Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

#REF!
Tulangan utama dia.13
Tulangan sengkang dia.10
Jumlah

-
Tulangan utama dia.13
Tulangan sengkang dia.10
Jumlah
1 KOLOM LT. 2
a x b x h x byk klm
- Beton - Type K1
- Type K2
- Type KP
Jumlah

- Bekisting 2 (a+b) x h x byk klm


- Type K1
- Type K2
- Type KP
Jumlah
- Tulangan
- Type K1
Tulangan utama dia. 13
Tulangan sengkang dia. 10
Jumlah

Halaman : 139/238
No. URAIAN PEKERJAAN
RUMUS

- Type K2
Tulangan utama dia. 13
Tulangan sengkang dia. 8
Jumlah

- Type KP
Tulangan utama dia. 10
Tulangan sengkang dia. 8
Jumlah

#REF! PLAT BETON LT. 2


- Beton
S1 - plat lantai

- Bekisting Total Luas + pjg kelilingxtinggi


S1 - plat lantai

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

S1 - plat lantai
Tulangan atas dia. 10
Tulangan bawah dia. 10
berat tulangan/m3
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

#REF! BETON TANGGA


Tangga Utama Dari Lt. 2 Ke Lt. 3
- Beton Plat tangga + bordes
Trap tangga
Jumlah

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

- Tulangan Plat tangga

Tangga R. Tamu - R. Makan


- Beton Plat tangga + bordes
Trap tangga
Jumlah

Halaman : 140/238
No. URAIAN PEKERJAAN
RUMUS

- Bekisting Penutup plat bawah


Penutup plat samping
Penutup trap tangga
Jumlah

- Tulangan Plat tangga


trap tangga
Jumlah

- Tulangan Plat tangga

PEKERJAAN STRUKTUR DAK ATAP BETON


1 BALOK LT. DAK ATAP axbxL
B1 (12D16)
B2 (6D13)
B3 (4D13)
Jumlah
- Bekisting 2xbxL
B1 (12D16)
B2 (6D13)
B3 (4D13)
Jumlah

B1 (12D16)
Tulangan utama dia.16
Tulangan sengkang dia.10
Jumlah

B2 (6D13)
Tulangan utama dia.13
Tulangan sengkang dia.10
Jumlah

B3 (4D13)
Tulangan utama dia.13
Tulangan sengkang dia.10
Jumlah
#REF! DAK ATAP BETON
- Beton
Dak atap bangunan

- Bekisting Total Luas + pjg kelilingxtinggi


Dak atap bangunan

- Tulangan

berat jenis tul x jml lapisan


jarak tul x tebal plat

dia. 0.395 kg/m Tulangan atas dia. 10


dia. 0.617 kg/m Tulangan bawah dia. 10
berat tulangan/m3

Halaman : 141/238
No. URAIAN PEKERJAAN
RUMUS
Waste 10%
jumlah berat tulangan/m3
Total berat = total volume beton x berat tulangan/m3

PEKERJAAN WATERPROOFING
Luas = pjg x lebar+2*0,2*(pjg+lbr)
Waterproofing toilet Lantai 1
- Kamar mandi + Wc
- Dapur

Lantai 2
- Kamar Mandi

Dak beton talang


- Dak beton talang

Jumlah

PEKERJAAN WATERPROOFING
Luas = pjg x lebar+2*0,2*(pjg+lbr)
1 Waterproofing toilet Lantai 1
- Kamar mandi + Wc
- Dapur

Lantai 2
- Kamar Mandi

Dak beton talang


- Dak beton talang

Jumlah

#REF! Screed pelindung waterproofing dak beton tebal 3 cm

#REF! Waterproofing dinding luar

- Lantai 1, keliling bangunan

PEKERJAAN ATAP
Luas atap datar ( m2 )
1 Rangka atap Cosinus sudut atap ( Cos a )
2 Roof mesh + Alumunium voil
3 Penutup atap genteng
4 Nok genteng
5 Flashing pertemuan genteng dan dinding bata
6 Lisplank
7 Atap kaca tempered 10mm
- Tangga Utama

Jumlah

Halaman : 142/238
No. URAIAN PEKERJAAN
RUMUS
PEKERJAAN ARSITEKTUR
PEKERJAAN DINDING

tinggi x pjg - Vol. pintu & jendela

PASANGAN DINDING BATA Lantai 1


1 - Receptionist
2 - Server
3 - Server
4 - BOF
5 - BOF
6 - BOF
7 - Toilet
8 - Toilet
9 - Service
10 - Service
11 - Service
12 - Service
13 - Service
14 - Gudang
15 - Pantry
16 - Pantry
17 - Mushola
18 - Gudang
19 - Pantry
20 - Pantry
21 - Mushola
22 - Gudang
23 - Pantry
24 - Pantry
25 - Mushola
26 - Gudang
27 - Pantry
28 - Pantry

Jumlah

PASANGAN DINDING BATA Lantai 2

Kamar 1
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 2
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 3
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 4
- Dinding bangunan Kamar

Halaman : 143/238
No. URAIAN PEKERJAAN
RUMUS
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 5
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 6
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 7
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 8
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 9
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 10
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 11
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Kamar 12
- Dinding bangunan Kamar
- Dinding bangunan Kamar
- Dinding bangunan Kamar mandi
- Dinding bangunan Kamar mandi
Tangga
- Dinding bangunan
- Dinding bangunan
Service
- Dinding bangunan
- Dinding bangunan
- Dinding bangunan
- Dinding bangunan
Panel + Lift
- Dinding bangunan
- Dinding bangunan

Halaman : 144/238
No. URAIAN PEKERJAAN
RUMUS

Jumlah

1 tinggi x pjg - Vol. pintu & jendela

PARTISI PHENOLIC Lantai 1


- Toilet

Jumlah

Halaman : 145/238
No. URAIAN PEKERJAAN
RUMUS
PARTISI GYPSUM 2 MUKA Lantai 2

Kamar 1
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 2
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 3
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 4
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 5
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 6
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 7
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 8
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 9
- Dinding partisi gypsum
- Dinding partisi gypsum
Kamar 10
- Dinding partisi gypsum
- Dinding partisi gypsum

- Service & Linen


- Smoking Room

Jumlah

Plesteran + skimcoat Luas bata biasa x 2


1
PEKERJAAN PLAFOND

Luas = pjg x lebar

PLAFOND GYPSUM Lantai 1


gypsumboard 9 mm ex Jayaboard
Area Umum
- Teras

Jumlah

PLAFOND GYPSUM Lantai 1


gypsumboard 9 mm ex Jayaboard
- Kamar Tidur 1
- Kamar Tidur 2

Halaman : 146/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar Tidur 3
- Kamar Tidur 4
- Kamar Tidur 5
- Kamar Tidur 6
- Kamar Tidur 7
- Kamar Tidur 8

Jumlah

PLAFOND GYPSUM
gypsumboard 9 mm ex Jayaboard Lantai 1

- Seluruh ruangan
- Lift
- Void
- Tangga

Jumlah

LIST PLAFOND GYPSUM Lantai 1

Area Umum
- Teras

Jumlah

Halaman : 147/238
No. URAIAN PEKERJAAN
RUMUS

LIST PLAFOND GYPSUM Lantai 1

- Kamar Mandi 1

- Kamar Mandi 2

Jumlah

- Lobby + Receptionist ( 1 )
- Lobby + Receptionist ( 2 )
- Lobby + Receptionist ( 3 )
- Lobby + Receptionist ( 4 )
- Lobby + Receptionist ( 5 )
- Koridor ( 1 )
- Koridor ( 2 )
- Koridor ( 3 )
- Koridor ( 4 )
- Koridor ( 5 )
- Storage + Gas
- Storage + Gas
- Pantry
- Pantry
- Panel
- Panel
- Powder Room
- Powder Room
- Tangga
- Tangga
- Tangga
- Service
- Service
- Musholah
- Musholah
- Musholah
- House Keeping
- House Keeping
- Front Office
- Front Office

DROP CEILING Lantai 1, lantai 2, lantai 3

Lt 2
- Kamar Tidur 8
- Kamar Tidur 9
- Kamar Tidur 10
- Kamar Tidur 11
- Kamar Tidur 12

Lt 3

Halaman : 148/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar Tidur 8
- Kamar Tidur 9
- Kamar Tidur 10
- Kamar Tidur 11
- Kamar Tidur 12

Lt 4
- Kamar Tidur 8
- Kamar Tidur 9
- Kamar Tidur 10
- Kamar Tidur 11
- Kamar Tidur 12

Jumlah

PLAFOND GYPSUM - Kamar Tidur 1


gypsumboard 9 mm ex Jayaboard - Kamar Mandi 1
- Kamar Tidur 2
- Kamar Mandi 2
- Kamar Tidur 3
- Kamar Mandi 3
- Kamar Tidur 4
- Kamar Mandi 4
- Kamar Tidur 5
- Kamar Mandi 5
- Kamar Tidur 6
- Kamar Mandi 6
- Kamar Tidur 7
- Kamar Mandi 7
- Kamar Tidur 8
- Kamar Mandi 8
- Kamar Tidur 9
- Kamar Mandi 9
- Kamar Tidur 10
- Kamar Mandi 10
- Kamar Tidur 11
- Kamar Mandi 11
- Kamar Tidur 12
- Kamar Mandi 12

Jumlah

PLAFOND GYPSUM Lantai 2 / Lantai 3


gypsumboard 9 mm ex Jayaboard
- Koridor (1)
- Koridor (2)
- Panel
- Service

Jumlah

PLAFOND GYPSUM Lantai 4


gypsumboard 9 mm ex Jayaboard

Halaman : 149/238
No. URAIAN PEKERJAAN
RUMUS
- R. General Manager
- R. Finance
- Meeting Room
- Gudang + House Keeping
- R. Server + Security
- Depan Lift
- Area Tangga
- R. Enggineering
- R. Loker
- Janitor + Area Toilet
- Koridor

Jumlah

LIST PLAFOND GYPSUM Lantai 2 / Lantai 3

- Kamar Tidur 1

- Kamar Mandi 1

- Kamar Tidur 2

- Kamar Mandi 2

- Kamar Tidur 3

- Kamar Mandi 3

- Kamar Tidur 4

- Kamar Mandi 4

- Kamar Tidur 5

- Kamar Mandi 5

- Kamar Tidur 6

- Kamar Mandi 6

- Kamar Tidur 7

- Kamar Mandi 7

- Kamar Tidur 8

- Kamar Mandi 8

- Kamar Tidur 9

- Kamar Mandi 9

- Kamar Tidur 10

- Kamar Mandi 10

Halaman : 150/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar Tidur 11

- Kamar Mandi 11

- Kamar Tidur 12

- Kamar Mandi 12

Jumlah

LIST PLAFOND GYPSUM Lantai 2 / Lantai 3

- Koridor
- Koridor
- Koridor
- Panel
- Panel
- Service
- Service

Jumlah

LIST PLAFOND GYPSUM Lantai 4

- R. General Manager

- R. Finance

- Meeting Room

- Gudang + House Keeping

- R. Server + Security

- Area Tangga

- R. Enggineering

- R. Loker

- Janitor

- Toilet

- Depan Toilet

- Koridor

Jumlah

PEKERJAAN FINISHING LANTAI 1

Halaman : 151/238
No. URAIAN PEKERJAAN
RUMUS
Luas = pjg x lebar

Lantai Granit 60 x 60 Lantai 1

Area Umum
- Teras

Jumlah

Lantai Granit 60 x 60 Lantai 1

- Seluruh Ruangan
- Toilet
- Lift
- Void
- Musholah

Jumlah

Lantai Granit 60 x 60 Lantai 1

- Kamar Tidur

Jumlah

Lantai Granit 60 x 60 Lantai 1

- Area Tangga

Lantai Granit 60 x 60 Lantai 2

- Area Tangga

Plin Lantai Keramik Granit 10 x 60 Lantai 1

- Lobby + Receptionist ( 1 )
- Lobby + Receptionist ( 2 )
- Lobby + Receptionist ( 3 )
- Lobby + Receptionist ( 4 )
- Lobby + Receptionist ( 5 )
- Koridor ( 1 )
- Koridor ( 2 )
- Koridor ( 3 )
- Koridor ( 4 )
- Koridor ( 5 )
- Storage + Gas

Halaman : 152/238
No. URAIAN PEKERJAAN
RUMUS
- Storage + Gas
- Pantry
- Pantry
- Panel
- Panel
- Powder Room
- Powder Room
- Service
- Service
- Musholah
- Musholah
- Musholah
- House Keeping
- House Keeping
- Front Office
- Front Office

Halaman : 153/238
No. URAIAN PEKERJAAN
RUMUS

Jumlah

- Plin Lantai Keramik 40 x 10

- Service

Jumlah

- Toilet - Lantai Keramik 30 x 30


- Toilet - Lantai Keramik 30 x 30

Jumlah

- Toilet - Dinding Keramik 30 x 30

- Toilet - Dinding Keramik 30 x 30

Jumlah
Lantai Granit 60 x 60 Lantai 1

- Service

Jumlah

LANTAI Lantai 1
- Kamar Tidur 1
- Kamar Mandi 1
- Kamar Tidur 2
- Kamar Mandi 2
- Kamar Tidur 3
- Kamar Mandi 3
- Kamar Tidur 4
- Kamar Mandi 4
- Kamar Tidur 5
- Kamar Mandi 5
- Kamar Tidur 6
- Kamar Mandi 6
- Kamar Tidur 7
- Kamar Mandi 7
- Kamar Tidur 8
- Kamar Mandi 8

Jumlah

LANTAI KERAMIK 30 x 30 Lantai 1

Halaman : 154/238
No. URAIAN PEKERJAAN
RUMUS

- Kamar Mandi 1

- Kamar Mandi 2

Jumlah

LANTAI KERAMIK 30 x 30 Lantai 1


- Musholah

Jumlah

DINDING KERAMIK 30 x 30 Lantai 1

- Kamar Mandi 1

- Kamar Mandi 2

Jumlah

DINDING KERAMIK 30 x 30 Lantai 1

- Wudhu

Jumlah

Lantai 1
- Wudhu

Jumlah

PLIN KERAMIK 30 x 30 Lantai 1


- Wudhu

- Wudhu

Jumlah

PEKERJAAN FINISHING LANTAI 2

Halaman : 155/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar Tidur 1 - Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 2 - Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 3 - Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 4 - Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 5 - Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 6 - Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 7 - Vinyl ex. Gamachi atau setara 3mm
- Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 8 - Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 9 - Vinyl ex. Gamachi atau setara 3mm
- Kamar Tidur 10 - Vinyl ex. Gamachi atau setara 3mm

Jumlah

Halaman : 156/238
No. URAIAN PEKERJAAN
RUMUS
LANTAI KERAMIK 30 x 30 Lantai 2

- Kamar Mandi 1
- Kamar Mandi 2
- Kamar Mandi 3
- Kamar Mandi 4
- Kamar Mandi 5
- Kamar Mandi 6
- Kamar Mandi 7
- Kamar Mandi 8
- Kamar Mandi 9
- Kamar Mandi 10
- Kamar Mandi 11
- Kamar Mandi 12

Lantai Granit 60 x 60 Lantai 2 / Lantai 3

- Koridor (1)
- Koridor (2)
- Panel
- Service

Jumlah

Plin Lantai Granit 60 x 10 Lantai 2 / Lantai 3 / Lantai 4

- Koridor
- Koridor
- Koridor
- Koridor
- Koridor
- Panel
- Panel
- Service
- Service

Jumlah

KERAMIK DINDING 40 x 40 EX. MILAN SETA Kamar Mandi 1


- Dinding kamar mandi
- Dinding kamar mandi

Jumlah

LANTAI KERAMIK 30 x 30 Lantai 4

- Kamar mandi ( Kamar Tidur 1 )

Jumlah

Halaman : 157/238
No. URAIAN PEKERJAAN
RUMUS

PEKERJAAN FINISHING DINDING LANTAI 1


Luas = pjg x lebar

Plin Lantai Keramik Granit 10 x 60

Lantai 1

Area Umum
- Teras Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10

Jumlah

- Alfa Express Plin Lantai Granit 60 x 10


Plin Lantai Granit 60 x 10
- Receptionist Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
- Back Office Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
- R. Server Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10
- Loker Plin Lantai Granit 60 x 10
Plin Lantai Granit 60 x 10

Jumlah

- Area Tangga Plin Lantai Granit 60 x 10


Plin Lantai Granit 60 x 10

Jumlah

- Pantry - Plin Lantai Keramik 40 x 10


- Plin Lantai Keramik 40 x 10
- Service & Gudang - Plin Lantai Keramik 40 x 10
- Plin Lantai Keramik 40 x 10

Halaman : 158/238
No. URAIAN PEKERJAAN
RUMUS
Jumlah

1 Keramik 30x30 ex. Platinum atau setara Lantai 1


- Dinding kamar mandi
- Dinding kamar mandi

2 Keramik 30x30 ex. Platinum atau setara Lantai 1


- Dinding kamar mandi
- Dinding kamar mandi

Jumlah

PEKERJAAN FINISHING LANTAI & DINDING LANTAI 2

- Kamar Tidur 1
- Kamar Mandi 1
- Kamar Tidur 2
- Kamar Mandi 2
- Kamar Tidur 3
- Kamar Mandi 3
- Kamar Tidur 4
- Kamar Mandi 4
- Kamar Tidur 5
- Kamar Mandi 5
- Kamar Tidur 6
- Kamar Mandi 6
- Kamar Tidur 7
- Kamar Mandi 7
- Kamar Tidur 8
- Kamar Mandi 8
- Kamar Tidur 9
- Kamar Mandi 9
- Kamar Tidur 10
- Kamar Mandi 10
- Kamar Tidur 11
- Kamar Mandi 11
- Kamar Tidur 12
- Kamar Mandi 12

Jumlah

KERAMIK 40 x 40 EX. MILAN SETARA


Kamar Mandi 1
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 2
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 3
- Dinding kamar mandi

Halaman : 159/238
No. URAIAN PEKERJAAN
RUMUS
- Dinding kamar mandi

Kamar Mandi 4
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 5
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 6
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 7
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 8
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 9
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 10
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 11
- Dinding kamar mandi
- Dinding kamar mandi

Kamar Mandi 12
- Dinding kamar mandi
- Dinding kamar mandi

Jumlah

PEKERJAAN FINISHING DINDING LANTAI 4

KERAMIK 40 x 40 EX. MILAN SETARA Kamar Mandi 1


- Dinding kamar mandi
- Dinding kamar mandi

Jumlah

PEKERJAAN TANGGA & RAILING


1 Railing Tangga & void tangga utama
- Tangga Lt. 1 ke Lt. 2
- Tangga Lt. 2 ke Lt. 3
Jumlah

Halaman : 160/238
No. URAIAN PEKERJAAN
RUMUS
2 Railing Tangga Carport
- Tangga Lt. carport ke Lt. 2
Jumlah
2 Railing balkon
Lantai 3
- Teras KT. Utama

Jumlah

PEKERJAAN FINISHING DINDING LANTAI 1

CAT DINDING LUAR Lantai 1

Area Umum
- Lt 1, Lt 2 dan Lt 3 Depan

Jumlah

Secondary skin tampak depan Lantai 1

Area Umum
- Lt 1
- Lt 1
- Lt 1
- Lt 1
- Lt 2 dan Lt 3
- Lt 3
- Lt 3
- Lt 3
- Lt 2
- Lt 2
- Lt 1

Jumlah

CAT DINDING DALAM Lantai 1

- Lobby + Receptionist ( 1 )
- Lobby + Receptionist ( 2 )
- Lobby + Receptionist ( 3 )
- Lobby + Receptionist ( 4 )
- Lobby + Receptionist ( 5 )
- Koridor ( 1 )
- Koridor ( 2 )
- Koridor ( 3 )
- Koridor ( 4 )
- Koridor ( 5 )
- Storage + Gas
- Storage + Gas
- Pantry

Halaman : 161/238
No. URAIAN PEKERJAAN
RUMUS
- Pantry
- Panel
- Panel
- Powder Room
- Powder Room
- Tangga
- Tangga
- Tangga
- Service
- Service
- Musholah
- Musholah
- Musholah
- House Keeping
- House Keeping
- Front Office
- Front Office

Halaman : 162/238
No. URAIAN PEKERJAAN
RUMUS
CAT DINDING DALAM Lantai 2 / Lantai 3

- Kamar Tidur 1

- Kamar Tidur 2

- Kamar Tidur 3

- Kamar Tidur 4

- Kamar Tidur 5

- Kamar Tidur 6

- Kamar Tidur 7

- Kamar Tidur 8

- Kamar Tidur 9

- Kamar Tidur 10

- Kamar Tidur 11

- Kamar Tidur 12

- Koridor
- Koridor
- Koridor
- Koridor
- Panel
- Panel
- Service
- Service
- Tangga
- Tangga

Halaman : 163/238
No. URAIAN PEKERJAAN
RUMUS
PEKERJAAN PAGAR
1 Pagar depan
(Asumsi tinggi pagar = 3.5 m) - Kolom struktur 15/25
- Balok Struktur 15/20
- Kolom praktis 15/15
- Dinding Bata
- Plester aci
- Fin. Granit tile motif kayu
- Ranga besi pagar depan
- Motif lambrisering kayu ex. Bengkirai fin. Melamik
- Cat Dinding
Jumlah

1 Bak tanaman depan rumah


- Dinding Bata
- Plester aci
- Fin. Cat dinding weathershield
- Pipa pembuangan air
Jumlah

PEKERJAAN PINTU
1 PK : Pintu kaca, swing 2 daun uk. 80x220x2
Lokasi : Lobby
Lantai 1
- Lobby + Mini Market

Lokasi : Mini Market


Lantai 1
- Lobby + Mini Market

PEKERJAAN PINTU
2 P1 : Pintu kamar, swing 1 daun uk. 90x220 cm
Lokasi : Kamar tidur

Lantai 2
- Kamar

Lantai 3
- Kamar

Lantai 4
- Kamar

Jumlah

PEKERJAAN PINTU

3 P2 : Pintu kamar, swing 1 daun uk. 80x220 cm


Lokasi : Kamar mandi

Lantai 1

- Kamar Mandi 1
- Kamar Mandi 2

Halaman : 164/238
No. URAIAN PEKERJAAN
RUMUS

Lantai 2

- Kamar Mandi 1
- Kamar Mandi 2
- Kamar Mandi 3
- Kamar Mandi 4
- Kamar Mandi 5
- Kamar Mandi 8
- Kamar Mandi 9
- Kamar Mandi 10
- Kamar Mandi 11
- Kamar Mandi 12

Lantai 3

- Kamar Mandi 1
- Kamar Mandi 2
- Kamar Mandi 3
- Kamar Mandi 4
- Kamar Mandi 5
- Kamar Mandi 8
- Kamar Mandi 9
- Kamar Mandi 10
- Kamar Mandi 11
- Kamar Mandi 12

Lantai 4

- Kamar Mandi 1
- Kamar Mandi 2
- Kamar Mandi 3
- Kamar Mandi 4
- Kamar Mandi 5
- Kamar Mandi 8
- Kamar Mandi 9
- Kamar Mandi 10
- Kamar Mandi 11
- Kamar Mandi 12

Jumlah

PEKERJAAN PINTU

P3 : Pintu kamar mandi, sliding 1 daun uk. 80x220 cm


Lokasi : Kamar mandi

Lantai 1

- Kamar Mandi 6
- Kamar Mandi 7

Lantai 2

- Kamar Mandi 6
- Kamar Mandi 7

Halaman : 165/238
No. URAIAN PEKERJAAN
RUMUS
Lantai 3

- Kamar Mandi 6
- Kamar Mandi 7

Jumlah

4 PEKERJAAN PINTU
P4 : Pintu swing 1 daun uk. 90x220 cm
Lokasi : BOF, R. Server, Gudang, Connecting doo Lantai 1

- Storage
- Gas
- Powder Room
- Servis
- House Keeping
- Front Office

Lantai 2
- Service

Lantai 3
- Service

Lantai 4
- Service

Jumlah

PEKERJAAN PINTU
5 P5 : Pintu swing 2 daun uk. 80x220 cm
Lokasi : R. Meeting
Lantai 1
- R. Meeting

PEKERJAAN PINTU
6 J1 : Jendela Jungkit
Lokasi : Lantai 2

Lantai 2
- Depan Kamar

Lantai 3
- Depan Kamar

Lantai 4
- Depan Kamar

PEKERJAAN JENDELA

7 J2 : Jendela Kaca mati


Lokasi : Lobby Lantai 1

- Lobby

Halaman : 166/238
No. URAIAN PEKERJAAN
RUMUS

PEKERJAAN PINTU

8 PL : Pintu lipat
Lokasi : R. Meeting
Lantai 1
- Depan Back Office

PEKERJAAN INSTALASI LISTRIK

1 Titik Lampu Lantai 1

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Lobby
- Receptionist
- R. Server
- BOF
- Tangga
- Toilet
- Servis
- Gudang
- Pantry
- Musholah
- Koridor

2 Exhaust fan Lantai 1

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Toilet Luar
- Mushola

2 Saklar Seri Lantai 1

- Kamar 1
- Kamar 2

Halaman : 167/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Receptionist
- Tangga
- Mushola

Saklar Tunggal Lantai 1

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Receptionist
- Server
- BOF
- Tangga
- Servis
- Gudang
- Pantry

Stop Kontak Lantai 1

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Receptionist
- R. Server
- BOF
- Servis
- Gudang
- Pantry
- Mushola

Telepon Lantai 1

- Kamar 1
- Kamar 2
- Kamar 3

Halaman : 168/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Receptionist
- BOF

Outlet Data Lantai 1

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Receptionist
- BOF

PEKERJAAN INSTALASI LISTRIK LANTAI 2

2 Saklar Seri Lantai 2

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16
- Koridor

3 Saklar Tunggal Lantai 2

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6

Halaman : 169/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16
- Service

2 Stop Kontak Lantai 2

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16
- Koridor
- Service

2 Intalasi TV Lantai 2

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16

Halaman : 170/238
No. URAIAN PEKERJAAN
RUMUS

15 Titik Lampu Lantai 2

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16
- Tangga
- Service
- Koridor

16 Titik Lampu Indirect Light Lantai 2

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15

PEKERJAAN PENGHAWAAN

1 Kamar Mandi 1 ( Lt dasar )


2 Kamar Mandi 2 ( Lt dasar )
3 Kamar Mandi 3 ( Lt dasar )

Halaman : 171/238
No. URAIAN PEKERJAAN
RUMUS
4 Kamar Mandi 4 ( Lt dasar )
5 Kamar Mandi 5 ( Lt dasar )
6 Kamar Mandi 6 ( Lt dasar )
7 Kamar Mandi 7 ( Lt dasar )
8 Kamar Mandi 8 ( Lt dasar )
9 Toilet ( Lt dasar )
10 Dapur ( Lt dasar )
11 Memanjang
12 Kamar Mandi 1 ( Lt 2 )
13 Kamar Mandi 2 ( Lt 2 )
14 Kamar Mandi 3 ( Lt 2 )
15 Kamar Mandi 4 ( Lt 2 )
16 Kamar Mandi 5 ( Lt 2 )
17 Kamar Mandi 6 ( Lt 2 )
18 Kamar Mandi 7 ( Lt 2 )
19 Kamar Mandi 8 ( Lt 2 )
20 Kamar Mandi 9 ( Lt 2 )
21 Kamar Mandi 10 ( Lt 2 )
22 Kamar Mandi 11 ( Lt 2 )
23 Kamar Mandi 12 ( Lt 2 )
24 Kamar Mandi 13 ( Lt 2 )
25 Kamar Mandi 14 ( Lt 2 )
26 Kamar Mandi 15 ( Lt 2 )
27 Kamar Mandi 16 ( Lt 2 )
32 Memanjang
33 Kamar Mandi 1 ( Lt 3 )
34 Kamar Mandi 2 ( Lt 3 )
35 Kamar Mandi 3 ( Lt 3 )
36 Kamar Mandi 4 ( Lt 3 )
37 Kamar Mandi 5 ( Lt 3 )
38 Kamar Mandi 6 ( Lt 3 )
39 Kamar Mandi 7 ( Lt 3 )
40 Kamar Mandi 8 ( Lt 3 )
41 Kamar Mandi 9 ( Lt 3)
42 Kamar Mandi 10 ( Lt 3 )
43 Kamar Mandi 11 ( Lt 3 )
44 Kamar Mandi 12 ( Lt 3 )
45 Kamar Mandi 13 ( Lt 3 )
46 Kamar Mandi 14 ( Lt 3 )
47 Kamar Mandi 15 ( Lt 3 )
48 Kamar Mandi 16 ( Lt 3 )
53 Memanjang

PEKERJAAN MEKANIKAL dan ELEKTRIKAL


PENGHITUNGAN KAPASITAS AC ( pk )

= Panjang x lebar Ruang x 500


9000

= Luas Ruang x 0.056

Lantai 1
- Lobby
- Back Office

Halaman : 172/238
No. URAIAN PEKERJAAN
RUMUS
- R. Server
- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8

Lantai 2
- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16

Lantai 3
- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16

PEKERJAAN INSTALASI AC

Pipa Refrigrant isolasi Thermaflex Lantai 1

Halaman : 173/238
No. URAIAN PEKERJAAN
RUMUS
- Lobby
- Lobby
- R. Server
- BOF
- Kamar Tidur 1
- Kamar Tidur 2
- Kamar Tidur 3
- Kamar Tidur 4
- Kamar Tidur 5
- Kamar Tidur 6
- Kamar Tidur 7
- Kamar Tidur 8

Pipa Refrigrant isolasi Thermaflex Lantai 2

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16

Pipa Refrigrant isolasi Thermaflex Lantai 3

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15

Halaman : 174/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar 16

Halaman : 175/238
No. URAIAN PEKERJAAN
RUMUS
Pipa Drain Lantai 1

- Lobby
- Lobby
- R. Server
- BOF
- Kamar Tidur 1
- Kamar Tidur 2
- Kamar Tidur 3
- Kamar Tidur 4
- Kamar Tidur 5
- Kamar Tidur 6
- Kamar Tidur 7
- Kamar Tidur 8
- Pipa memanjang

Pipa Drain Lantai 2

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16
- Pipa memanjang

Pipa Drain Lantai 3

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13

Halaman : 176/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar 14
- Kamar 15
- Kamar 16
- Pipa memanjang

Gantungan Pipa Lantai


- Lantai 1
- Lantai 2
- Lantai 3
- Lantai 4

PEKERJAAN AIR KOTOR

Pipa air kotor ( toilet ) Lantai 1

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar mandi luar
- Memanjang

Pipa air kotor ( toilet ) Lantai 2

Halaman : 177/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16
- Memanjang

Pipa air kotor ( toilet ) Lantai 3

- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15
- Kamar 16
- Memanjang

PEKERJAAN AIR BEKAS

Pipa air bekas Lantai 1

- Kamar 1 ( floor drain )


- Kamar 1 ( wastafel )
- Kamar 2 ( floor drain )
- Kamar 2 ( wastafel )
- Kamar 3 ( floor drain )
- Kamar 3 ( wastafel )
- Kamar 4 ( floor drain )
- Kamar 4 ( wastafel )
- Kamar 5 ( floor drain )

Halaman : 178/238
No. URAIAN PEKERJAAN
RUMUS
- Kamar 5 ( wastafel )
- Kamar 6 ( floor drain )
- Kamar 6 ( wastafel )
- Kamar 7 ( floor drain )
- Kamar 7 ( wastafel )
- Kamar 8 ( floor drain )
- Kamar 8 ( wastafel )
- Toilet Umum ( floor drain )
- Toilet Umum ( wastafel )
- Pantry ( wastafel )
- Mushola ( wastafel )
- Memanjang

Pipa air bekas Lantai 2

- Kamar 1 ( floor drain )


- Kamar 1 ( wastafel )
- Kamar 2 ( floor drain )
- Kamar 2 ( wastafel )
- Kamar 3 ( floor drain )
- Kamar 3 ( wastafel )
- Kamar 4 ( floor drain )
- Kamar 4 ( wastafel )
- Kamar 5 ( floor drain )
- Kamar 5 ( wastafel )
- Kamar 6 ( floor drain )
- Kamar 6 ( wastafel )
- Kamar 7 ( floor drain )
- Kamar 7 ( wastafel )
- Kamar 8 ( floor drain )
- Kamar 8 ( wastafel )
- Kamar 9 ( floor drain )
- Kamar 9 ( wastafel )
- Kamar 10 ( floor drain )
- Kamar 10 ( wastafel )
- Kamar 11 ( floor drain )
- Kamar 11 ( wastafel )
- Kamar 12 ( floor drain )
- Kamar 12 ( wastafel )
- Kamar 13 ( floor drain )
- Kamar 13 ( wastafel )
- Kamar 14 ( floor drain )
- Kamar 14 ( wastafel )
- Kamar 15 ( floor drain )
- Kamar 15 ( wastafel )
- Kamar 16 ( floor drain )
- Kamar 16 ( wastafel )
- Memanjang

Halaman : 179/238
No. URAIAN PEKERJAAN
RUMUS
Pipa air bekas Lantai 3

- Kamar 1 ( floor drain )


- Kamar 1 ( wastafel )
- Kamar 2 ( floor drain )
- Kamar 2 ( wastafel )
- Kamar 3 ( floor drain )
- Kamar 3 ( wastafel )
- Kamar 4 ( floor drain )
- Kamar 4 ( wastafel )
- Kamar 5 ( floor drain )
- Kamar 5 ( wastafel )
- Kamar 6 ( floor drain )
- Kamar 6 ( wastafel )
- Kamar 7 ( floor drain )
- Kamar 7 ( wastafel )
- Kamar 8 ( floor drain )
- Kamar 8 ( wastafel )
- Kamar 9 ( floor drain )
- Kamar 9 ( wastafel )
- Kamar 10 ( floor drain )
- Kamar 10 ( wastafel )
- Kamar 11 ( floor drain )
- Kamar 11 ( wastafel )
- Kamar 12 ( floor drain )
- Kamar 12 ( wastafel )
- Kamar 13 ( floor drain )
- Kamar 13 ( wastafel )
- Kamar 14 ( floor drain )
- Kamar 14 ( wastafel )
- Kamar 15 ( floor drain )
- Kamar 15 ( wastafel )
- Kamar 16 ( floor drain )
- Kamar 16 ( wastafel )
- Memanjang

PEKERJAAN AIR BERSIH

Pipa air bersih Lantai 1

1 1/2" - Looping

1 1/2" - Kamar Tidur 1


1"
1/2"
1 1/2" - Kamar Tidur 2

Halaman : 180/238
No. URAIAN PEKERJAAN
RUMUS
1"
1/2"
1 1/2" - Kamar Tidur 3
1"
1/2"
1 1/2" - Kamar Tidur 4
1"
1/2"
1 1/2" - Kamar Tidur 5
1"
1/2"
1 1/2" - Kamar Tidur 6
1"
1/2"
1 1/2" - Kamar Tidur 7
1"
1/2"
1 1/2" - Kamar Tidur 8
1"
1/2"
1 1/2" - Mushola
1"
1/2"
1 1/2" - Toilet
1"
1/2"
1 1/2" - Pantry
1"
1/2"
1¼" - Vertikal

Pipa air bersih Lantai 2

1 1/2" - Looping
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"

1 1/2" - Kamar Tidur 1


1"
1/2"

Halaman : 181/238
No. URAIAN PEKERJAAN
RUMUS
1 1/2" - Kamar Tidur 2
1"
1/2"
1 1/2" - Kamar Tidur 3
1"
1/2"
1 1/2" - Kamar Tidur 4
1"
1/2"
1 1/2" - Kamar Tidur 5
1"
1/2"
1 1/2" - Kamar Tidur 6
1"
1/2"
1 1/2" - Kamar Tidur 7
1"
1/2"
1 1/2" - Kamar Tidur 8
1"
1/2"
1 1/2" - Kamar Tidur 9
1"
1/2"
1 1/2" - Kamar Tidur 10
1"
1/2"
1 1/2" - Kamar Tidur 11
1"
1/2"
1 1/2" - Kamar Tidur 12
1"
1/2"
1 1/2" - Kamar Tidur 13
1"
1/2"
1 1/2" - Kamar Tidur 14
1"
1/2"
1 1/2" - Kamar Tidur 15
1"
1/2"
1 1/2" - Kamar Tidur 16
1"
1/2"
1¼" - Vertikal

Halaman : 182/238
No. URAIAN PEKERJAAN
RUMUS

Pipa air bersih Lantai 3

1 1/2" - Looping
1 1/2"
1 1/2"
1 1/2"
1 1/2"
1 1/2"

1 1/2" - Kamar Tidur 1


1"
1/2"
1 1/2" - Kamar Tidur 2
1"
1/2"
1 1/2" - Kamar Tidur 3
1"
1/2"
1 1/2" - Kamar Tidur 4
1"
1/2"
1 1/2" - Kamar Tidur 5
1"
1/2"
1 1/2" - Kamar Tidur 6
1"
1/2"
1 1/2" - Kamar Tidur 7
1"
1/2"
1 1/2" - Kamar Tidur 8
1"
1/2"
1 1/2" - Kamar Tidur 9
1"
1/2"
1 1/2" - Kamar Tidur 10
1"
1/2"
1 1/2" - Kamar Tidur 11
1"
1/2"
1 1/2" - Kamar Tidur 12
1"
1/2"
1 1/2" - Kamar Tidur 13
1"
1/2"
1 1/2" - Kamar Tidur 14
1"
1/2"
1 1/2" - Kamar Tidur 15

Halaman : 183/238
No. URAIAN PEKERJAAN
RUMUS
1"
1/2"
1 1/2" - Kamar Tidur 16
1"
1/2"
1¼" - Vertikal

PEKERJAAN INTERIOR

Lantai 1

Kamar Single
- Kamar 6
- Kamar 7
- Kamar 8

Kamar Double
- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 5

Halaman : 184/238
No. URAIAN PEKERJAAN
RUMUS
Lantai 2 / Lantai 3

Kamar Single
- Kamar 1
- Kamar 2
- Kamar 3
- Kamar 4
- Kamar 6
- Kamar 7
- Kamar 8
- Kamar 9
- Kamar 10
- Kamar 11
- Kamar 12
- Kamar 13
- Kamar 14
- Kamar 15

Kamar Double
- Kamar 5
- Kamar 16

- Kamar Single
- Kamar Double

Halaman : 185/238
Form No. 002/QS

Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg lbr
26.50 m'
77.27 m'

pjg lbr tinggi keliling overlaping ddg

3.14 3.40 10.68 m2


2.20 3.40 7.48 m2
2.20 3.40 7.48 m2
2.14 3.40 7.28 m2
14.50 3.40 49.30 m2
11.90 3.40 40.46 m2
18.00 3.40 61.20 m2
13.20 3.40 44.88 m2
8.00 3.40 27.20 m2
6.60 3.40 22.44 m2
3.13 3.40 10.64 m2

0.00 3.40 0.00 m2


0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2

0.00 3.40 0.00 m2


0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2

0.00 3.40 0.00 m2


0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2
0.00 3.40 0.00 m2

289.03 m2
+waste 317.94 m2

pjg lbr luas keliling overlaping ddg

0.00 m2

Halaman : 186/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
4.50 3.40 15.30 m2

15.30 m2
+waste 16.83 m2

3.20 1.92 6.14 m2


3.20 1.92 6.14 m2
3.20 1.92 6.14 m2
2.46 2.30 3.00 16.95 m2
1.20 0.78 3.00 2.82 m2

38.20 m2
+waste 42.02 m2

3.20 1.92 6.14 m2


3.20 1.92 6.14 m2
3.20 1.92 6.14 m2
2.46 2.30 3.00 16.95 m2
1.20 0.78 3.00 2.82 m2

38.20 m2
+waste 42.02 m2

13.50 16.12 217.62 m2

217.62 m2
+waste 239.38 m2

13.50 1.00 13.50 m2


1.00 1.00 3.00 3.00 m2
13.50 1.00 1.00 13.50 m2
1.50 1.00 3.00 4.50 m2

34.50 m2
+waste 37.95 m2

1.00 5.00 5.00 bh


1.00 5.00 5.00 bh
1.00 6.00 6.00 bh
1.00 12.00 12.00 bh

28.00 m2

ruko
unit
9.00 9.00 bh

Halaman : 187/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
48.00 48.00 bh
17.00 17.00 bh
16.00 16.00 bh

90.00 bh

16.12 13.50 4.00 870.48 m2


(1.13) 3.00 (6.00) 20.34 m2

890.82 m2

pjg lbr Kell Tinggi Qty

13.50 5.20 70.20 m2


jml ttk kedlman jml per titik total pjg
32.00 8.00 2.00 512.00 m'
256.00 m'

32.00 0.60 1.50 1.50 0.60 17.28 m3

80.64 m2

pjg tul jarak tul byk tul berat/kg Jml titik Berat Berat +Waste10%
2.00 0.15 11.00 0.00 32.00 0.00 0.00 kg
2.00 0.15 5.00 0.00 32.00 0.00 0.00 kg
0.00 kg

4.00 1.00 0.00 32.00 0.00 0.00 kg

2.70 0.10 16.00 0.00 32.00 0.00 0.00 kg


2.70 0.10 7.00 0.00 32.00 0.00 0.00 kg
0.00 kg
Total 0.00 kg

TB1
227.00
227.00 - - - - -

lbr tgg pjg

0.25 0.50 227.00 21.57 m3


21.57 m3

172.52 m2
172.52 m2

pjg/ring jarak tul byk tul berat/kg pjg total total berat + Waste 10%
6.00 1.04 227.00 1,416.48 1,558.13 kg
0.00

Halaman : 188/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
2.00 0.00 227.00 0 0.00 kg
1.50 0.15 1,514.33 0.00 0.00 0.00 kg
1,558.13 kg

jml ttk pjg lbr luas tinggi volume


32.00 0.70 1.60 1.12 0.75 26.88 m3

Tot. Pjg lbr tinggi


227.00 0.25 0.65 36.89 m3

jml ttk pjg lbr luas tebal volume


32.00 0.60 1.50 0.90 0.10 2.88 m3

lbr tebal jml pjg volume


0.25 0.10 227.00 5.68 m3

10.00 6.00 0.10 6.00 m3

1.44 m3
2.84 m3
3.00 m3

152.73 m2

erja ) 5.28 m3
erja ) 0.00 m3
5.28 m3

21.60 m3
36.89 m3
0.00 m3
58.49 m3

pjg lebar luas tinggi Volume

0.00 0.65 0.00 m3


0.00 1.30 0.00 m3

0.00 m2 0.00 m3

pjg lebar luas


0.00 m2
0.00 m2

Halaman : 189/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
luas tebal

13.50 15.80 213.30 0.12 25.60 m3


0.00 0.12 0.00 m3
0.00 0.15 0.00 m3
0.00 0.25 0.00 m3
25.60 m3
4.60 3.00 2.10 3.22
1.50 1.50 2.30

2.30

luas tebal

3.22 2.30 3.00 7.41 0.12 2.67 m3


3.22 2.30 3.00 7.41 0.12 2.67 m3

0.00 0.15 0.00 m3


5.33 m3

7.41 0.15 1.11 m2


0.00 0.19 0.00 m2
1.11 m2

berat/kg jml lapis jarak tul tebal plat Berat waste10% Berat +Waste10%

0.00 2.00 0.15 0.12 0.00 0.00 0.00 kg


0.00 2.00 0.15 0.12 0.00 0.00 0.00 kg
0.00 kg
n/m3 0.00 kg

0.00 2.00 0.15 0.15 0.00 0.00 0.00 kg


0.00 2.00 0.15 0.15 0.00 0.00 0.00 kg
0.00 kg
n/m3 0.00 kg

pjg lebar Luas tinggi byk klm


0.15 0.40 0.06 3.78 15.00 3.40 m3
0.18 0.35 0.06 3.50 0.00 0.00 m3
0.13 0.13 0.02 3.78 171.00 10.92 m3
14.33 m3

62.37 m2
0.00 m2
168.06 m2
230.43 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
10.00 #REF! 3.78 15.00 #REF! kg
1.65 0.15 25.20 #REF! #REF! kg

Halaman : 190/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
#REF! kg
+ Waste 10% #REF! kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
4.00 #REF! 3.78 0.00 #REF! kg
1.06 0.15 25.20 #REF! #REF! kg
#REF! kg
+ Waste 10% #REF! kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
4.00 #REF! 3.78 56.00 #REF! kg
0.52 0.15 25.20 #REF! #REF! kg
#REF! kg
+ Waste 10% #REF! kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
3.75 2.30 0.15 1.29 m3
0.20 0.30 22.00 1.52 m3
2.81 m3

8.63 m2
1.13 m2
15.18 m2
24.93 m2

161.72 kg
189.75 kg
351.47 kg
140.63 kg
+ Waste 10% 154.69 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
8.50 1.20 0.15 1.53 m3
0.20 0.30 26.00 0.94 m3
2.47 m3

10.20 m2
2.55 m2
9.36 m2
22.11 m2

191.25 kg
117.00 kg
308.25 kg
318.75 kg
+ Waste 10% 350.63 kg

pjg lebar tebal


3.60 0.60 0.10 0.22 m3

0.13 0.25 8.40 0.27 m3


0.49 m3

3.00 m2
4.20 m2
7.20 m2
pjg/ring jarak tul byk tul berat/kg

Halaman : 191/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
3.90 0.10 6.00 #REF! #REF! kg
0.90 0.10 36.00 #REF! #REF! kg
0.61 0.20 18.00 #REF! #REF! kg
#REF! kg

3.60 4.00 #REF! #REF! kg


#REF! kg
+ Waste 10% #REF! kg

pjg tinggi tot pjg Vol

0.20 0.40 13.50 0.76 m3


0.15 0.35 13.50 0.47 m3
0.15 0.35 54.00 1.86 m3
0.15 0.35 47.40 1.64 m3

4.72 m3

0.15 0.35 54.00 45.90 m2


#REF! #REF! #REF! #REF! m2
0.00 0.00 0.00 0.00 m2
#REF! m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
12.00 #REF! 54.00 #REF! #REF! kg
1.00 0.15 360.00 #REF! #REF! #REF! kg
#REF! kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
6.00 #REF! 54.00 #REF! #REF! kg
#REF! 0.15 360.00 #REF! #REF! #REF! kg
#REF! kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 #REF! 0.00 #REF! #REF! kg
0.00 0.15 0.00 #REF! #REF! #REF! kg
#REF! kg

pjg lebar Luas tinggi byk klm


0.15 0.40 0.06 3.50 19.00 3.99 m3
0.18 0.35 0.06 3.50 11.00 2.43 m3
0.13 0.13 0.02 3.50 30.00 1.77 m3
8.19 m3

73.15 m2
40.81 m2
27.30 m2
141.26 m2

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
10.00 0.62 3.50 19.00 412.30 kg
1.65 0.15 23.33 #REF! #REF! kg
#REF! kg
+ Waste 10% #REF! kg

Halaman : 192/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
4.00 #REF! 3.50 11.00 #REF! kg
1.06 0.15 23.33 #REF! #REF! kg
#REF! kg
+ Waste 10% #REF! kg

pjg/ring jarak tul byk tul berat/kg tinggi byk klm total berat
4.00 #REF! 3.50 56.00 #REF! kg
0.52 0.15 23.33 #REF! #REF! kg
#REF! kg
+ Waste 10% #REF! kg

pjg lebar luas void tebal

346.85 0.00 0.12 41.62 m3


41.62 m3

pjg kellg
346.85 145.00 0.12 364.25 m2
368.15 m2

berat/kg jml lapis jarak tul tebal plat

#REF! 2.00 0.20 0.12 #REF! kg


#REF! 2.00 0.20 0.12 #REF! kg
#REF! kg
#REF! kg
#REF! kg
n/m3 #REF! kg

pjg lbr tinggi trap lbr trap tebal jml trap


12.54 1.80 0.15 3.39 m3
0.18 0.30 21.00 1.02 m3
4.41 m3

22.58 m2
3.76 m2
11.34 m2
37.68 m2

423.36 kg
127.58 kg
550.94 m2

470.40 kg
+ Waste 10% 517.44 kg

pjg lbr tinggi trap lbr trap tebal jml trap total berat
0.00 0.00 0.15 0.00 m3
0.18 0.30 16.00 0.00 m3
0.00 m3

Halaman : 193/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

0.00 m2
0.00 m2
0.00 m2
0.00 m2

0.00 kg
0.00 kg
0.00 kg

0.00 kg
+ Waste 10% 0.00 kg

pjg tinggi tot pjg Vol


0.20 0.40 265.00 14.84 m3
0.20 0.40 104.40 5.85 m3
0.15 0.35 32.00 1.10 m3
21.79 m3

0.20 0.40 265.00 265.00 m2


0.20 0.40 104.40 104.40 m2
0.15 0.35 32.00 27.20 m2
396.60 m2

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
12.00 #REF! 265.00 #REF! #REF! kg
1.20 0.15 1,766.67 #REF! #REF! #REF! kg
#REF! kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
6.00 #REF! 265.00 #REF! #REF! kg
1.20 0.15 1,766.67 #REF! #REF! #REF! kg
#REF! kg

pjg/ring jarak tul byk tul berat/kg pjg total berat berat + waste10%
4.00 #REF! 32.00 #REF! #REF! kg
1.00 0.15 213.33 #REF! #REF! #REF! kg
#REF! kg
pjg lebar luas void tebal

366.85 0.00 0.12 44.02 m3


44.02 m3

pjg kellg
366.85 93.20 0.12 378.03 m2
378.03 m2

berat/kg jml lapis jarak tul tebal plat

#REF! 2.00 0.20 0.12 #REF! kg


#REF! 2.00 0.20 0.12 #REF! kg
#REF! kg

Halaman : 194/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
#REF! kg
#REF! kg
n/m3 #REF! kg

pjg lbr luas keliling overlaping ddg

38.71 m2
26.70 m2

70.20 m2

0.00 m2

135.61 m2

pjg lbr luas keliling overlaping ddg

38.71 m2
26.70 m2

70.20 m2

440.22 m2

575.83 m2

575.83 m2

36.00 7.00 252.00 m2


252.00 m2

pjg datar lbr Luas sudut


0.00 0.00 0.00 15.00 0.00 m2
0.00 m2
0.00 m2
0.00 m'
0.00 m'
0.00 m'

0.00 0.00 0.00 0.00 m2

0.00 m2

Halaman : 195/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg tinggi Qty

3.50 3.40 1.00 11.90 m2


1.08 3.40 1.00 3.66 m2
2.49 3.40 1.00 8.46 m2
1.08 3.40 1.00 3.66 m2
3.50 3.40 1.00 11.90 m2
0.00 3.40 1.00 0.00 m2
3.50 3.40 1.00 11.90 m2
0.00 3.40 1.00 0.00 m2
1.50 3.40 1.00 5.10 m2
1.50 3.40 1.00 5.10 m2
3.20 3.40 1.00 10.88 m2
2.30 3.40 1.00 7.82 m2
2.30 3.40 1.00 7.82 m2
2.30 3.40 1.00 7.82 m2
3.20 3.40 1.00 10.88 m2
2.00 3.40 1.00 6.80 m2
2.00 3.40 1.00 6.80 m2
0.87 3.40 1.00 2.96 m2
3.20 3.40 1.00 10.88 m2
1.12 3.40 1.00 3.81 m2
2.24 3.40 1.00 7.62 m2
0.96 3.40 1.00 3.25 m2
0.96 3.40 1.00 3.25 m2
4.50 3.40 1.00 15.30 m2
4.20 3.40 1.00 14.28 m2
4.50 3.40 1.00 15.30 m2
3.07 3.40 1.00 10.44 m2
4.50 3.40 1.00 15.30 m2
0.00 m2
222.88 m'
+waste 245.17 m'

3.20 3.40 1.00 10.88 m2


1.92 3.40 1.00 6.53 m2
3.20 3.40 1.00 10.88 m2
1.20 3.40 1.00 4.08 m2

3.20 3.40 1.00 10.88 m2


1.92 3.40 1.00 6.53 m2
3.20 3.40 1.00 10.88 m2
1.20 3.40 1.00 4.08 m2

3.20 3.40 1.00 10.88 m2


1.92 3.40 1.00 6.53 m2
3.20 3.40 1.00 10.88 m2
1.20 3.40 1.00 4.08 m2

3.20 3.40 1.00 10.88 m2

Halaman : 196/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.92 3.40 1.00 6.53 m2
3.20 3.40 1.00 10.88 m2
1.20 3.40 1.00 4.08 m2

2.44 3.40 1.00 8.30 m2


3.20 3.40 1.00 10.88 m2
1.20 3.40 1.00 4.08 m2

0.00 3.40 1.00 0.00 m2


3.20 3.40 1.00 10.88 m2
3.14 3.40 2.00 21.35 m2
3.20 3.40 1.00 10.88 m2
1.20 3.40 2.00 8.16 m2

0.00 3.40 1.00 0.00 m2


3.20 3.40 1.00 10.88 m2
3.14 3.40 2.00 21.35 m2
3.20 3.40 1.00 10.88 m2
1.20 3.40 2.00 8.16 m2

0.00 3.40 1.00 0.00 m2


4.50 3.40 1.00 15.30 m2
1.17 3.40 1.00 3.98 m2
1.50 3.40 1.00 5.10 m2
1.95 3.40 2.00 13.26 m2

4.50 3.40 1.00 15.30 m2


1.17 3.40 1.00 3.98 m2
1.50 3.40 1.00 5.10 m2
1.95 3.40 2.00 13.26 m2

4.50 3.40 1.00 15.30 m2


1.05 3.40 1.00 3.57 m2
1.50 3.40 1.00 5.10 m2
2.07 3.40 2.00 14.08 m2

4.50 3.40 1.00 15.30 m2


1.05 3.40 1.00 3.57 m2
1.50 3.40 1.00 5.10 m2
2.07 3.40 2.00 14.08 m2

0.00 3.40 1.00 0.00 m2


1.20 3.40 1.00 4.08 m2
1.50 3.40 1.00 5.10 m2
2.44 3.40 2.00 16.59 m2

3.20 3.40 2.00 21.76 m2


1.92 3.40 1.00 6.53 m2

3.20 3.40 1.00 10.88 m2


1.20 3.40 2.00 8.16 m2
0.00 3.40 1.00 0.00 m2
0.00 3.40 1.00 0.00 m2

3.20 3.40 1.00 10.88 m2


2.30 3.40 3.00 23.46 m2

Halaman : 197/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

514.08 m'
+waste 1,696.46 m'

1.00 1.07
pjg tinggi pnt & jendela

1.44 2.00 0.00 2.87 m2


1.44 2.00 0.00 2.87 m2
1.44 2.00 0.00 2.87 m2
1.44 2.00 0.00 2.87 m2
1.44 2.00 0.00 2.87 m2

14.37 m'
+waste 15.81 m'

Halaman : 198/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

2.70 4.30 0.00 11.61 m2


1.30 4.30 1.00 6.59 m2

2.70 4.30 0.00 11.61 m2


1.30 4.30 1.00 6.59 m2

4.70 4.30 0.00 20.21 m2


1.30 4.30 1.00 6.59 m2

2.70 4.30 0.00 11.61 m2


1.30 4.30 1.00 6.59 m2

1.30 4.30 1.00 6.59 m2


4.70 4.30 0.00 20.21 m2

1.58 4.30 1.00 7.79 m2


2.68 4.30 0.00 11.52 m2

4.45 4.30 0.00 19.14 m2


1.85 4.30 1.00 8.96 m2

4.48 4.30 0.00 19.24 m2


1.20 4.30 1.00 6.16 m2

3.16 4.30 0.00 13.57 m2


1.31 4.30 1.00 6.61 m2

1.31 4.30 1.00 6.61 m2


1.31 4.30 1.00 6.61 m2

1.31 4.30 1.00 6.61 m2


1.31 4.30 1.00 6.61 m2

227.63 m'
+waste 500.80 m'

2.00 m2

pjg lbr Kell Tinggi

13.50 1.62 21.87 m2

21.87 m2
+waste 24.06 m2

3.30 2.86 9.44 9.44 m2


3.30 2.86 9.44 9.44 m2

Halaman : 199/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
3.30 2.86 9.44 9.44 m2
3.30 2.86 9.44 9.44 m2
3.30 2.86 9.44 9.44 m2
3.00 2.75 8.25 8.25 m2
3.00 2.75 8.25 8.25 m2
3.00 2.75 8.25 8.25 m2

71.94 m2
+waste 79.13 m2

14.50 13.50 195.75 m2


(2.30) 2.46 (5.65) m2
(1.12) 0.78 (0.88) m2
(1.82) 1.04 (1.90) m2

187.32 m2
+waste 206.05 m2

1.62 2.00 3.24 m'


13.50 2.00 27.00 m'

30.24 m'
+waste 33.26 m'

Halaman : 200/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

2.49 2.00 4.98 m'


1.08 2.00 2.15 m'
2.49 2.00 4.98 m'
1.08 2.00 2.15 m'

14.26 m'
+waste 15.68 m'

3.50 1.00 3.50 m'


7.08 1.00 7.08 m'
13.50 1.00 13.50 m'
5.23 1.00 5.23 m'
4.50 1.00 4.50 m'
9.27 1.00 9.27 m'
5.42 1.00 5.42 m'
5.42 1.00 5.42 m'
3.65 1.00 3.65 m'
3.20 1.00 3.20 m'
1.50 4.00 6.00 m'
3.50 2.00 7.00 m'
3.77 1.00 3.77 m'
4.50 1.00 4.50 m'
2.30 2.00 4.60 m'
0.74 2.00 1.49 m'
2.00 2.00 4.00 m'
2.15 2.00 4.30 m'
1.04 1.00 1.04 m'
1.82 1.00 1.82 m'
0.87 1.00 0.87 m'
2.42 2.00 4.84 m'
1.20 2.00 2.40 m'
4.50 2.00 9.00 m'
2.00 1.00 2.00 m'
0.96 3.00 2.87 m'
4.50 2.00 9.00 m'
4.20 2.00 8.40 m'
4.50 2.00 9.00 m'
3.07 2.00 6.14 m'

153.82 m'
169.20 m'

1.17 1.00 1.17 m'


1.17 1.00 1.17 m'
1.05 1.00 1.05 m'
1.05 1.00 1.05 m'
1.20 1.00 1.20 m'

Halaman : 201/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.17 1.00 1.17 m'
1.17 1.00 1.17 m'
1.05 1.00 1.05 m'
1.05 1.00 1.05 m'
1.20 1.00 1.20 m'

1.17 1.00 1.17 m'


1.17 1.00 1.17 m'
1.05 1.00 1.05 m'
1.05 1.00 1.05 m'
1.20 1.00 1.20 m'

16.92 m'
+waste 18.61 m'

3.20 3.12

3.20 3.12

3.20 3.12

3.20 3.12 9.98 m2


- m2
3.20 3.64 11.65 m2
- m2
3.20 4.34 13.89 m2
- m2
3.20 4.34 13.89 m2
- m2
4.50 3.12 14.04 m2
- m2
4.50 3.12 14.04 m2
- m2
4.50 3.12 14.04 m2
- m2
4.50 3.12 14.04 m2
- m2
4.50 3.64

105.57 m2
+waste 116.12 m2

16.12 2.60 41.91 m2


3.20 2.02 6.46 m2
2.30 0.74 1.71 m2
2.42 1.20 2.90 m2

52.99 m2
+waste 58.29 m2

Halaman : 202/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
7.00 3.00 21.00 m2
7.00 3.00 21.00 m2
7.00 3.00 21.00 m2
7.00 3.00 21.00 m2
7.00 3.00 21.00 m2
3.00 2.26 6.78 m2
4.50 3.00 13.50 m2
4.50 3.40 15.30 m2
4.50 2.60 11.70 m2
4.50 3.00 13.50 m2
15.00 2.00 30.00 m2

195.78 m2
+waste 215.36 m2

3.20 2.00 6.40 m'


1.92 2.00 3.84 m'
3.20 2.00 6.40 m'
1.20 2.00 2.40 m'
3.20 2.00 6.40 m'
1.92 2.00 3.84 m'
3.20 2.00 6.40 m'
1.20 2.00 2.40 m'
3.20 2.00 6.40 m'
1.92 2.00 3.84 m'
3.20 2.00 6.40 m'
1.20 2.00 2.40 m'
3.20 2.00 6.40 m'
1.92 2.00 3.84 m'
3.20 2.00 6.40 m'
1.20 2.00 2.40 m'
3.20 2.00 6.40 m'
2.44 2.00 4.88 m'
3.20 2.00 6.40 m'
1.20 2.00 2.40 m'
3.20 2.00 6.40 m'
3.14 2.00 6.28 m'
3.20 2.00 6.40 m'
1.20 2.00 2.40 m'
3.20 2.00 6.40 m'
3.14 2.00 6.28 m'
3.20 2.00 6.40 m'
1.20 2.00 2.40 m'
4.50 2.00 9.00 m'
3.12 2.00 6.24 m'
1.95 2.00 3.90 m'
1.50 2.00 3.00 m'
4.50 2.00 9.00 m'
3.12 2.00 6.24 m'
1.95 2.00 3.90 m'
1.50 2.00 3.00 m'
4.50 2.00 9.00 m'
3.12 2.00 6.24 m'
1.95 2.00 3.90 m'
1.50 2.00 3.00 m'

Halaman : 203/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
4.50 2.00 9.00 m'
3.12 2.00 6.24 m'
1.95 2.00 3.90 m'
1.50 2.00 3.00 m'
4.50 2.00 9.00 m'
3.64 2.00 7.28 m'
2.44 2.00 4.88 m'
1.50 2.00 3.00 m'

251.92 m'
+waste 277.11 m'

16.12 2.00 32.24 m'


14.10 2.00 28.20 m'
5.80 2.00 11.60 m'
2.30 2.00 4.60 m'
0.74 2.00 1.49
2.42 2.00 4.84 m'
1.20 2.00 2.40 m'

85.36 m'
371.01 +waste 93.90 m'

7.00 2.00 14.00 m'


3.00 2.00 6.00 m'
7.00 2.00 14.00 m'
3.00 2.00 6.00 m'
7.00 2.00 14.00 m'
3.00 2.00 6.00 m'
7.00 2.00 14.00 m'
3.00 2.00 6.00 m'
7.00 2.00 14.00 m'
3.00 2.00 6.00 m'
4.50 2.00 9.00 m'
3.00 1.00 3.00 m'
4.50 2.00 9.00 m'
3.40 2.00 6.80 m'
4.50 2.00 9.00 m'
2.60 2.00 5.20 m'
4.50 2.00 9.00 m'
1.00 2.00 2.00 m'
1.50 4.00 6.00 m'
2.00 2.00 4.00 m'
3.00 2.00 6.00 m'
2.01 1.00 2.01 m'
1.16 1.00 1.16 m'
15.00 2.00 30.00 m'
2.00 2.00 4.00 m'
2.18 2.00 4.36 m'

210.53 m'
+waste 231.58 m'

Halaman : 204/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
pjg lbr Kell Tinggi

13.50 1.62 21.87 m2

21.87 m2
+waste 24.06 m2

14.50 13.50 195.75 m2


(2.50) 2.15 (5.38) m2
(2.46) 2.30 (5.65) m2
(1.12) 0.78 (0.88) m2
(1.65) 0.62 (1.03) m2

182.82 m2
+waste 201.10 m2

0.29 1.87 0.54 m2

0.54 m2
+waste 0.60 m2
1,822.00

1.82 0.90 1.63 m2


0.28 0.90 6.00 1.50 m2

3.13 m2
+waste 3.45 m2

3.20 1.92 6.14 m2


0.90 0.19 18.00 2.98 m2

9.12 m2
+waste 10.04 m2

3.50 0.10 1.00 0.35 m'


7.08 0.10 1.00 0.71 m'
13.50 0.10 1.00 1.35 m'
5.23 0.10 1.00 0.52 m'
4.50 0.10 1.00 0.45 m'
9.27 0.10 1.00 0.93 m'
5.42 0.10 1.00 0.54 m'
5.42 0.10 1.00 0.54 m'
3.65 0.10 1.00 0.37 m'
3.20 0.10 1.00 0.32 m'
1.50 0.10 4.00 0.60 m'

Halaman : 205/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
3.50 0.10 2.00 0.70 m'
3.77 0.10 1.00 0.38 m'
4.50 0.10 1.00 0.45 m'
2.30 0.10 2.00 0.46 m'
0.74 0.10 2.00 0.15 m'
2.00 0.10 2.00 0.40 m'
2.15 0.10 2.00 0.43 m'
2.42 0.10 2.00 0.48 m'
1.20 0.10 2.00 0.24 m'
4.50 0.10 2.00 0.90 m'
2.00 0.10 1.00 0.20 m'
0.96 0.10 3.00 0.29 m'
4.50 0.10 2.00 0.90 m'
4.20 0.10 2.00 0.84 m'
4.50 0.10 2.00 0.90 m'
3.07 0.10 2.00 0.61 m'

Halaman : 206/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

15.01 m'
+waste 16.51 m'

1.20 0.10 2.00 0.24 m'


2.42 0.10 2.00 0.48 m'

0.72 m'
0.80 m'

1.90 1.09 2.07 m2


1.68 1.09 1.82 m2

3.89 m2
+waste 4.28 m2
pjg lbr Kell Tinggi

1.90 4.30 2.00 16.34 m2


1.09 4.30 2.00 9.35 m2
1.68 4.30 2.00 14.43 m2
1.09 4.30 2.00 9.35 m2

49.47 m2
+waste 54.41 m2

2.42 1.20 2.90 m2

2.90 m2
+waste 3.19 m2

3.30 2.86 9.44 m2


(1.86) 1.30 (2.42) m2
3.30 2.86 9.44 m2
(1.86) 1.30 (2.42) m2
3.30 2.86 9.44 m2
(1.86) 1.30 (2.42) m2
3.30 2.86 9.44 m2
(1.86) 1.30 (2.42) m2
3.30 2.86 9.44 m2
(1.86) 1.30 (2.42) m2
3.00 2.75 8.25 m2
(1.75) 1.25 (2.19) m2
3.00 2.75 8.25 m2
(1.75) 1.25 (2.19) m2
3.00 2.75 8.25 m2
(1.75) 1.25 (2.19) m2
- m2

53.29 m2
+waste 58.62 m2

Halaman : 207/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

2.49 1.08 2.68 m2

2.49 1.08 2.68 m2

5.35 m2
+waste 5.89 m2

4.50 1.10 4.95 m2

4.95 m2
+waste 5.45 m2

pjg lbr Kell Tinggi

2.49 3.23 2.00 16.08 m2


1.08 3.23 2.00 6.94 m2
2.49 3.23 2.00 16.08 m2
1.08 3.23 2.00 6.94 m2

46.05 m2
+waste 50.65 m2

1.65 2.00 1.00 3.30 m2


0.96 2.00 2.00 3.83 m2

7.13 m2
+waste 7.84 m2

1.65 0.62 1.00 1.03 m2

1.03 m2
+waste 1.13 m2

4.50 0.10 2.00 0.90 m2


1.10 0.10 2.00 0.22 m2
(3.42) 0.10 1.00 (0.34) m2
(0.53) 0.10 1.00 (0.05) m2

0.73 m2
+waste 0.80 m2

Halaman : 208/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
4.70 2.37 11.14 m2
4.70 2.37 11.14 m2
4.70 2.37 11.14 m2
4.70 2.37 11.14 m2
4.70 2.37 11.14 m2
4.70 2.65 12.46 m2
4.48 3.63 16.24 m2
(0.85) 3.63 (3.09) m2
4.48 3.17 14.19 m2
4.48 3.17 14.16 m2
4.48 3.17 14.16 m2

123.82 m2
+waste 136.20 m2

Halaman : 209/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

3.20 1.20 3.84 m2


3.20 1.20 3.84 m2
3.20 1.20 3.84 m2
3.20 1.20 3.84 m2
3.20 1.20 3.84 m2
3.20 1.20 3.84 m2
3.20 1.20 3.84 m2
1.95 1.50 2.93 m2
1.95 1.50 2.93 m2
2.07 1.50 3.11 m2
2.07 1.50 3.11 m2
2.44 1.50 3.66 m2

42.60 m2
+waste 46.86 m2

2.60 16.12 41.91 m2


2.02 3.20 6.46 m2
2.30 0.74 1.71 m2
2.42 1.20 2.90 m2

52.99 m2
+waste 58.29 m2

16.12 0.10 2.00 3.22 m'


14.10 0.10 1.00 1.41 m'
12.18 0.10 1.00 1.22
5.80 0.10 1.00 0.58 m'
4.60 0.10 1.00 0.46 m'
2.30 0.10 1.00 0.23 m'
0.74 0.10 1.00 0.07 m'
2.42 0.10 1.00 0.24 m'
1.20 0.10 1.00 0.12 m'

7.56 m2
+waste 8.31 m2

1.50 3.00 4.00 18.00 m'


2.00 3.00 2.00 12.00 m'

30.00 m2
+waste 33.00 m2

2.01 1.50 3.02 m2

3.02 m2
+waste 3.32 m2

Halaman : 210/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg lbr Kell Tinggi

4.68 0.10 0.47 m'


9.10 0.10 0.91 m'
8.09 0.10 0.81 m'

2.19 m'
+waste 2.41 m'

4.49 0.10 2.00 0.90 m'


4.68 0.10 2.00 0.94 m'
9.10 0.10 0.91 m'
8.09 0.10 0.81 m'
4.08 0.10 0.41 m'
2.66 0.10 0.27 m'
1.08 0.10 0.11 m'
4.49 0.10 0.45 m'
3.52 0.10 0.35 m'
2.67 0.10 0.27 m'
1.73 0.10 2.00 0.35 m'
4.54 0.10 2.00 0.91 m'
2.98 0.10 2.00 0.60 m'
2.67 0.10 2.00 0.53 m'
1.73 0.10 2.00 0.35 m'
3.03 0.10 2.00 0.61 m'
1.65 0.10 2.00 0.33 m'

9.07 m'
+waste 9.97 m'

2.77 0.10 0.28 m'


4.70 0.10 2.00 0.94 m'

1.22 m'
+waste 1.34 m'

2.88 2.00 2.88 m'


2.66 2.00 2.66 m'
1.80 2.00 1.80 m'
2.66 2.00 2.66 m'

Halaman : 211/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
41.86 m'

pjg lbr Kell Tinggi Qty

1.80 4.30 2.00 15.48 m2


1.09 4.30 2.00 9.35 m2

1.68 4.30 2.00 14.43 m2


1.09 4.30 2.00 9.35 m2

9.35 m2
+waste 10.28 m2

pjg lbr Kell Tinggi Qty

3.20 1.92 6.14 m2


- m2
3.20 1.92 6.14 m2
- m2
3.20 1.92 6.14 m2
- m2
3.20 1.92 6.14 m2
- m2
3.20 2.44 7.81 m2
- m2
3.20 3.14 10.05 m2
- m2
3.20 3.14 10.05 m2
- m2
4.50 3.12 14.04 m2
(1.95) 1.50 (2.93) m2
4.50 3.12 14.04 m2
(1.95) 1.50 (2.93) m2
4.50 3.12 14.04 m2
(2.07) 1.50 (3.11) m2
4.50 3.12 14.04 m2
(2.07) 1.50 (3.11) m2
4.50 3.64 16.38 m2
(2.44) 1.50 (3.66) m2

109.30 m2
+waste 120.23 m2

3.20 3.23 2.00 20.67 m2


1.20 3.23 2.00 7.75 m2

3.20 3.23 2.00 20.67 m2


1.20 3.23 2.00 7.75 m2

3.20 3.23 2.00 20.67 m2

Halaman : 212/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.20 3.23 2.00 7.75 m2

3.20 3.23 2.00 20.67 m2


1.20 3.23 2.00 7.75 m2

3.20 3.23 2.00 20.67 m2


1.20 3.23 2.00 7.75 m2

3.20 3.23 2.00 20.67 m2


1.20 3.23 2.00 7.75 m2

3.20 3.23 2.00 20.67 m2


1.20 3.23 2.00 7.75 m2

1.95 3.23 2.00 12.60 m2


1.50 3.23 2.00 9.69 m2

1.95 3.23 2.00 12.60 m2


1.50 3.23 2.00 9.69 m2

2.07 3.23 2.00 13.37 m2


1.50 3.23 2.00 9.69 m2

2.07 3.23 2.00 13.37 m2


1.50 3.23 2.00 9.69 m2

2.44 3.23 2.00 15.76 m2


1.50 3.23 2.00 9.69 m2

315.12 m2
+waste 346.63 m2

1.50 3.00 4.00 18.00 m'


2.00 3.00 2.00 12.00 m'

30.00 m2
+waste 33.00 m2

0.00 m'
0.00 m'
0.00 m'

Halaman : 213/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

0.00 m'
0.00 m'

0.00 m'

0.00 m'

pjg lbr Kell Tinggi Qty

13.50 10.20 137.70 m2

137.70 m'
+waste 151.47 m'

6.80 0.42 2.00 m2


1.20 0.42 2.00 m2
6.13 0.42 3.00 m2
0.90 0.42 2.00 m2

6.30 4.02 m2
0.50 4.02 m2
13.50 1.00 m2
1.63 0.40 m2
9.12 0.40 m2
2.03 0.40 m2
5.80 0.40 m2
4.62 0.40 m2
6.69 0.40 m2
2.43 0.40 m2
2.53 0.40 m2
4.59 1.00
1.97 1.00

0.00 m'
+waste 0.00 m'

3.50 3.23 1.00 11.31 m2


7.08 3.23 1.00 22.87 m2
13.50 3.23 1.00 43.61 m2
5.23 3.23 1.00 16.89 m2
4.50 3.23 1.00 14.54 m2
9.27 3.23 1.00 29.94 m2
5.42 3.23 1.00 17.52 m2
5.42 3.23 1.00 17.51 m2
3.65 3.23 1.00 11.79 m2
3.20 3.23 1.00 10.34 m2
1.50 3.23 4.00 19.38 m2
3.50 3.23 2.00 22.61 m2
3.77 3.23 1.00 12.18 m2

Halaman : 214/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
4.50 3.23 1.00 14.54 m2
2.30 3.23 2.00 14.86 m2
0.74 3.23 2.00 4.80 m2
2.00 3.23 2.00 12.92 m2
2.15 3.23 2.00 13.90 m2
1.04 3.23 1.00 3.37 m2
1.82 3.23 1.00 5.89 m2
0.87 3.23 1.00 2.81 m2
2.42 3.23 2.00 15.62 m2
1.20 3.23 2.00 7.75 m2
4.50 3.23 2.00 29.07 m2
2.00 3.23 1.00 6.46 m2
0.96 3.23 3.00 9.27 m2
4.50 3.23 2.00 29.07 m2
4.20 3.23 2.00 27.13 m2
4.50 3.23 2.00 29.07 m2
3.07 3.23 2.00 19.83 m2

496.83 m2
+waste 546.51 m2

Halaman : 215/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

3.20 3.23 2.00 20.67 m2


1.92 3.23 2.00 12.40 m2
3.20 3.23 2.00 20.67 m2
1.92 3.23 2.00 12.40 m2
3.20 3.23 2.00 20.67 m2
1.92 3.23 2.00 12.40 m2
3.20 3.23 2.00 20.67 m2
1.92 3.23 2.00 12.40 m2
3.20 3.23 2.00 20.67 m2
2.44 3.23 2.00 15.76 m2
3.20 3.23 2.00 20.67 m2
3.14 3.23 2.00 20.28 m2
3.20 3.23 2.00 20.67 m2
3.14 3.23 2.00 20.28 m2
4.50 3.23 2.00 29.07 m2
3.12 3.23 2.00 20.16 m2
4.50 3.23 2.00 29.07 m2
3.12 3.23 2.00 20.16 m2
4.50 3.23 2.00 29.07 m2
3.12 3.23 2.00 20.16 m2
4.50 3.23 2.00 29.07 m2
3.12 3.23 2.00 20.16 m2
4.50 3.23 2.00 29.07 m2
3.64 3.23 2.00 23.51 m2
16.12 3.23 2.00 104.14 m2
14.10 3.23 1.00 45.54 m2
12.18 3.23 1.00 39.34 m2
5.80 3.23 2.00 37.47 m2
0.74 3.23 2.00 4.80 m2
2.30 3.23 2.00 14.86
2.42 3.23 2.00 15.62 m2
1.20 3.23 2.00 7.75 m2
3.20 3.23 2.00 20.67 m2
1.92 3.23 1.00 6.20 m2

796.52 m2
227.58 +waste 2,628.53 m2

Halaman : 216/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

pjg lebar tinggi Jumlah


0.15 0.25 3.50 2.00 0.26 m3
0.15 0.20 2.70 0.08 m3
0.15 0.15 3.50 1.00 0.08 m3
0.00 2.70 3.50 2.00 18.90 m2
37.80 m2
2.00 0.50 1.00 m2
3.15 2.50 7.88 m2
mik 6.50 1.80 7.88 m2
36.80 m2
7.88 m2

pjg lebar tinggi Jumlah


0.00 6.60 0.50 1.00 3.30 m2
6.60 m2
2.00 0.50 6.60 m2
1.00 Ls
16.50 m2

1.0 BH

2.0 BH

12.0 BH

12.0 BH

12.0 BH

36.00 BH

1.0 BH
1.0 BH

Halaman : 217/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH

1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH

1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH

32.00 BH

1.0 BH
1.0 BH

1.0 BH
1.0 BH

Halaman : 218/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

1.0 BH
1.0 BH

6.00 BH

1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH
1.0 BH

1.0 BH

1.0 BH

1.0 BH

9.00 BH

2.0 BH
2.0 BH

2.0 BH

2.0 BH

2.0 BH

6.0 BH

pjg lebar tinggi Jumlah

12.43 3.40 42.3 m2

Halaman : 219/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

42.3 m2

pjg lebar tinggi Jumlah

26.00 4.80 124.8 m2

124.80 m2
+waste 137.28 m2

bh

3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
8.00 8.0 bh
1.00 1.0 bh
1.00 1.0 bh
2.00 2.0 bh
4.00 4.0 bh
1.00 1.0 bh
1.00 1.0 bh
2.00 2.0 bh
1.00 1.0 bh
3.00 3.0 bh
7.00 7.0 bh

55.00 bh
bh

1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

10.00 bh

bh

2.00 2.0 bh
2.00 2.0 bh

Halaman : 220/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

19.00 bh

bh

1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

15.00 bh

bh

4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

42.00 bh

bh

1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

Halaman : 221/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

10.00 bh

bh

1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

10.00 bh

bh

2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
2.00 2.0 bh
1.00 1.0 bh

33.00 bh

bh

1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

Halaman : 222/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

17.00 bh

bh

4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
4.00 4.0 bh
1.00 1.0 bh
1.00 1.0 bh

66.00 bh

bh

1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

16.00 bh

Halaman : 223/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

bh

3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
3.00 3.0 bh
4.00 4.0 bh
1.00 1.0 bh
8.00 8.0 bh

61.00 bh

bh

1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh
1.00 1.0 bh

14.00 bh

pjg pjg pjg pjg tinggi

1.00 1.0 m'


1.00 1.0 m'
1.00 1.0 m'

Halaman : 224/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.00 1.0 m'
1.00 1.0 m'
0.50 0.5 m'
0.50 0.5 m'
0.50 0.5 m'
1.00 1.0 m'
0.50 0.5 m'
13.30 13.30 26.6 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
13.20 13.20 14.80 14.80 56.0 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.70 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
0.65 0.7 m'
13.20 13.20 14.80 14.80 56.0 m'

109.60 m2
+waste 120.56 m2

jika ruang terkena langsung sinar matahari, koef = 800

Ukuran Ruang
pjg lebar Luas Koef PK Rounded

8.90 4.08 36.27 0.06 2.01 2x1.0 PK


3.52 1.75 6.16 0.06 0.34 1.0 PK

Halaman : 225/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
4.54 2.93 13.28 0.06 0.74 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.65 12.46 0.06 0.69 1.0 PK
4.48 2.94 13.16 0.06 0.73 1.0 PK
4.48 3.17 14.19 0.06 0.79 1.0 PK

4.70 2.37 11.14 0.06 0.62 1.0 PK


4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.65 12.46 0.06 0.69 1.0 PK
4.48 2.94 13.16 0.06 0.73 1.0 PK
4.48 3.17 14.19 0.06 0.79 1.0 PK
4.48 3.17 14.16 0.06 0.79 1.0 PK
4.48 3.17 14.16 0.06 0.79 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.65 12.46 0.06 0.69 1.0 PK

4.70 2.37 11.14 0.06 0.62 1.0 PK


4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.65 12.46 0.06 0.69 1.0 PK
4.48 2.94 13.16 0.06 0.73 1.0 PK
4.48 3.17 14.19 0.06 0.79 1.0 PK
4.48 3.17 14.16 0.06 0.79 1.0 PK
4.48 3.17 14.16 0.06 0.79 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.37 11.14 0.06 0.62 1.0 PK
4.70 2.65 12.46 0.06 0.69 1.0 PK

13.25

pjg pjg pjg pjg tinggi

Halaman : 226/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.00 2.13 14.30 9.60 27.0 m'
0.50 2.13 14.30 9.60 26.5 m'
0.50 2.25 8.58 1.45 9.60 22.4 m'
1.00 8.58 9.60 19.2 m'
1.00 14.30 9.60 24.9 m'
1.00 9.58 9.60 20.2 m'
1.00 8.58 9.60 19.2 m'
1.00 3.86 9.60 14.5 m'
1.00 2.86 9.60 13.5 m'
0.50 8.58 9.60 18.7 m'
0.50 9.58 9.60 19.7 m'
0.50 14.30 9.60 24.4 m'

250.05 m'
+waste 275.06 m'

pjg pjg pjg pjg tinggi

0.70 3.00 5.10 8.8 m'


0.70 4.00 5.10 9.8 m'
0.70 9.00 5.10 14.8 m'
0.70 10.00 5.10 15.8 m'
0.70 14.15 5.10 20.0 m'
0.70 7.01 5.10 12.8 m'
0.70 12.00 5.10 17.8 m'
0.70 15.80 5.10 21.6 m'
0.70 7.01 5.10 12.8 m'
0.70 12.00 5.10 17.8 m'
0.70 15.80 5.10 21.6 m'
0.70 3.00 5.10 8.8 m'
0.70 4.00 5.10 9.8 m'
0.70 9.00 5.10 14.8 m'
0.70 10.00 5.10 15.8 m'
0.70 14.15 5.10 20.0 m'

242.72 m'
+waste 266.99 m'

pjg pjg pjg pjg tinggi

0.70 3.00 0.60 4.3 m'


0.70 4.00 0.60 5.3 m'
0.70 9.00 0.60 10.3 m'
0.70 10.00 0.60 11.3 m'
0.70 14.15 0.60 15.5 m'
0.70 7.01 0.60 8.3 m'
0.70 12.00 0.60 13.3 m'
0.70 15.80 0.60 17.1 m'
0.70 7.01 0.60 8.3 m'
0.70 12.00 0.60 13.3 m'
0.70 15.80 0.60 17.1 m'
0.70 3.00 0.60 4.3 m'
0.70 4.00 0.60 5.3 m'
0.70 9.00 0.60 10.3 m'
0.70 10.00 0.60 11.3 m'

Halaman : 227/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
0.70 14.15 0.60 15.5 m'

170.72 m'
31.50 +waste 187.79 m'

Halaman : 228/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
pjg pjg pjg pjg tinggi

2.75 2.8 m'


2.75 2.8 m'
0.50 2.25 2.8 m'
1.00 1.0 m'
1.00 1.0 m'
1.00 1.0 m'
1.00 1.0 m'
1.00 1.0 m'
1.00 1.0 m'
0.95 1.0 m'
0.95 1.0 m'
0.95 1.0 m'
11.44 5.25 5.92 4.25 26.9 m'

43.96 m'
+waste 48.35 m'

pjg pjg pjg pjg tinggi

3.00 1.00 9.00 13.0 m'


3.00 3.54 1.00 9.00 16.5 m'
3.00 9.00 12.0 m'
3.00 9.00 12.0 m'
3.80 2.49 1.00 9.00 16.3 m'
3.00 9.00 12.0 m'
3.00 9.00 12.0 m'
3.80 9.00 12.8 m'
3.00 9.00 12.0 m'
3.00 9.00 12.0 m'
3.80 9.00 12.8 m'
3.00 4.32 9.00 16.3 m'
3.00 9.00 12.0 m'
3.00 9.00 12.0 m'
3.00 1.25 9.00 13.3 m'
3.80 9.00 12.8 m'
11.44 6.20 4.25 5.89 27.8 m'

237.57 m'
+waste 261.33 m'

pjg pjg pjg pjg tinggi

3.00 1.00 13.50 17.5 m'


3.00 3.54 1.00 13.50 21.0 m'
3.00 13.50 16.5 m'
3.00 13.50 16.5 m'
3.80 2.49 1.00 13.50 20.8 m'
3.00 13.50 16.5 m'
3.00 13.50 16.5 m'
3.80 13.50 17.3 m'
3.00 13.50 16.5 m'
3.00 13.50 16.5 m'
3.80 13.50 17.3 m'
3.00 4.32 13.50 20.8 m'
3.00 13.50 16.5 m'

Halaman : 229/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
3.00 13.50 16.5 m'
3.00 1.25 13.50 17.8 m'
3.80 13.50 17.3 m'
11.44 6.20 4.25 5.89 27.8 m'

309.57 m'
+waste 340.53 m'

120.00 120.0 bh
139.00 139.0 bh
139.00 139.0 bh
139.00 139.0 bh

537.00 bh
+waste 537.00 bh

pjg pjg pjg pjg pjg tinggi

0.72 1.30 1.95 4.0 m'


0.72 1.28 1.95 4.0 m'
0.72 1.28 2.0 m'
0.72 1.28 2.0 m'
0.72 1.28 1.95 4.0 m'
1.09 0.95 2.0 m'
1.09 0.95 2.0 m'
1.09 1.1 m'
1.09 1.1 m'
25.20 25.2 m'

94.67 m'
+waste 104.14 m'

pjg pjg pjg pjg pjg tinggi

Halaman : 230/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
0.72 1.39 4.50 6.6 m'
0.72 1.39 3.54 1.95 4.50 12.1 m'
0.72 1.39 4.50 6.6 m'
0.72 1.39 4.50 6.6 m'
1.32 1.40 1.95 4.50 9.2 m'
0.72 1.37 4.50 6.6 m'
0.72 1.37 4.50 6.6 m'
0.72 1.37 4.50 6.6 m'
0.72 1.37 4.50 6.6 m'
0.72 1.37 4.50 6.6 m'
0.72 1.37 4.50 6.6 m'
0.72 0.54 5.95 1.95 4.50 13.7 m'
0.72 2.00 4.50 7.2 m'
0.72 1.37 0.95 4.50 7.5 m'
0.72 1.37 4.50 6.6 m'
0.72 1.14 1.40 0.95 4.50 8.7 m'
25.20 25.2 m'

149.53 m'
+waste 164.48 m'

pjg pjg pjg pjg pjg tinggi

0.72 1.39 9.00 11.1 m'


0.72 1.39 3.54 1.95 9.00 16.6 m'
0.72 1.39 9.00 11.1 m'
0.72 1.39 9.00 11.1 m'
1.32 1.40 1.95 9.00 13.7 m'
0.72 1.37 9.00 11.1 m'
0.72 1.37 9.00 11.1 m'
0.72 1.37 9.00 11.1 m'
0.72 1.37 9.00 11.1 m'
0.72 1.37 9.00 11.1 m'
0.72 1.37 9.00 11.1 m'
0.72 0.54 5.95 1.95 9.00 18.2 m'
0.72 2.00 9.00 11.7 m'
0.72 1.37 0.95 9.00 12.0 m'
0.72 1.37 9.00 11.1 m'
0.72 1.14 1.40 0.95 9.00 13.2 m'
25.20 25.2 m'

221.53 m'
+waste 243.68 m'

pjg pjg pjg pjg pjg tinggi

0.41 0.79 0.98 2.2 m'


1.20 1.79 3.0 m'
0.41 0.79 1.2 m'
1.20 1.79 3.0 m'
0.41 0.79 0.98 2.2 m'
1.20 1.79 3.0 m'
0.41 0.79 1.2 m'
1.20 1.79 3.0 m'
0.41 0.79 0.98 2.2 m'

Halaman : 231/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.20 1.79 3.0 m'
0.41 0.79 1.2 m'
1.20 1.79 0.48 3.5 m'
0.41 0.79 1.2 m'
1.20 1.79 3.0 m'
0.41 0.79 0.48 1.7 m'
1.20 1.79 3.0 m'
1.63 2.54 4.2 m'
2.97 0.00 3.0 m'
2.45 0.75 3.2 m'
0.75 1.45 2.2 m'
15.12 14.95 30.1 m'

159.98 m'
+waste 175.97 m'

pjg pjg pjg pjg pjg tinggi

0.41 0.43 0.98 9.00 10.8 m'


0.33 1.60 9.00 10.9 m'
0.41 0.43 3.54 0.98 9.00 14.3 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
2.01 0.50 1.78 0.98 9.00 14.3 m'
0.88 0.50 9.00 10.4 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 4.94 2.58 9.00 17.4 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 0.48 9.00 10.3 m'
0.33 1.60 9.00 10.9 m'
0.41 0.43 9.00 9.8 m'
0.33 1.60 9.00 10.9 m'
2.01 0.50 1.25 0.48 9.00 13.2 m'
0.88 0.50 9.00 10.4 m'
3.00 14.30 12.00 29.3 m'

381.72 m'
+waste 419.89 m'

Halaman : 232/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
pjg pjg pjg pjg pjg tinggi

0.41 0.43 0.98 13.50 15.3 m'


0.33 1.60 13.50 15.4 m'
0.41 0.43 3.54 0.98 13.50 18.8 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
2.01 0.50 1.78 0.98 13.50 18.8 m'
0.88 0.50 13.50 14.9 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 4.94 2.58 13.50 21.9 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 0.48 13.50 14.8 m'
0.33 1.60 13.50 15.4 m'
0.41 0.43 13.50 14.3 m'
0.33 1.60 13.50 15.4 m'
2.01 0.50 1.25 0.48 13.50 17.7 m'
0.88 0.50 13.50 14.9 m'
3.00 14.30 12.00 6.00 35.3 m'

531.72 m'
+waste 584.89 m'

pjg pjg pjg pjg pjg tinggi

11.44 11.44 1.95 1.95 26.8 m'


6.65 6.65 0.95 0.95 15.2 m'
7.66 3.31 11.0 m'
2.35 3.65 6.0 m'

0.00 0.00 0.00 0.0 m'


1.86 1.00 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.00 0.0 m'

Halaman : 233/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
1.86 1.00 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.00 0.0 m'
1.86 1.00 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.00 0.0 m'
1.86 1.00 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.00 0.0 m'
1.86 1.00 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.00 0.0 m'
1.86 1.00 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.00 0.0 m'
1.86 1.00 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.00 0.0 m'
1.86 1.00 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.00 0.0 m'
2.30 0.35 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.00 0.0 m'
1.66 1.00 2.7 m'
3.50 3.50 7.0 m'
0.00 0.0 m'
2.70 0.75 3.5 m'
3.50 3.50 7.0 m'
10.50 6.00 16.5 m'

1¼" 16.50 m'


+waste 18.15 m'

1 1/2" 58.95 m'


+waste 64.84 m'

1" 31.64 m'


+waste 34.81 m'

1/2" 108.50 m'


+waste 119.35 m'

pjg pjg pjg pjg pjg tinggi

13.30 13.30 13.30 13.30 53.2 m'


1.40 1.40 1.25 1.25 5.3 m'
4.57 4.6 m'
2.65 2.7 m'
2.60 2.6 m'
0.96 1.0 m'

0.00 0.00 0.00 0.0 m'


2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'

Halaman : 234/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.21 0.70 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.21 0.70 2.9 m'
3.50 3.50 3.50 10.5 m'
7.00 6.00 13.0 m'

1¼" 13.00 m'


+waste 14.30 m'

1 1/2" 69.28 m'


+waste 76.20 m'

1" 43.62 m'


+waste 47.98 m'

1/2" 168.00 m'

Halaman : 235/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
+waste 184.80 m'

pjg pjg pjg pjg pjg tinggi

13.30 13.30 13.30 13.30 53.2 m'


1.40 1.40 1.25 1.25 5.3 m'
4.57 4.6 m'
2.65 2.7 m'
2.60 2.6 m'
0.96 1.0 m'

0.00 0.00 0.00 0.0 m'


2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.21 0.70 2.9 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'

Halaman : 236/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL
2.00 0.70 2.7 m'
3.50 3.50 3.50 10.5 m'
0.00 0.0 m'
2.21 0.70 2.9 m'
3.50 3.50 3.50 10.5 m'
3.50 6.00 9.5 m'

1¼" 9.50 m'


+waste 10.45 m'

1 1/2" 69.28 m'


+waste 76.20 m'

1" 43.62 m'


+waste 47.98 m'

1/2" 168.00 m'


+waste 184.80 m'

1¼" 39.00 m'


+waste 42.90 m'

1 1/2" 197.50 m'


+waste 217.25 m'

1" 118.88 m'


+waste 130.77 m'

1/2" 444.50 m'


+waste 488.95 m'

1.00 bh
1.00 bh
1.00 bh

3.00 bh

1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh

5.00 bh

Halaman : 237/238
Ukuran
Sat
a b c d h L ( Pjg ) HASIL

1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh
1.00 bh

14.00 bh
+ Untuk 2 Lt 28.00 bh

1.00 bh
1.00 bh

2.00 bh
+ Untuk 2 Lt 4.00 bh

31.00 bh
9.00 bh

40.00 bh

Halaman : 238/238