Sie sind auf Seite 1von 10

HYDROLOGICAL ANALYSIS FOR MINOR BRIDGE AT CHAINAGE 171+275

PEAK DISCHARGE COMPUTATION BY DIFFERENT METHODS

Discharge (Cumecs)
Design
Existing C.A. Design By Area
Sr.No Bridge Name By Dicken By Rational Discharge
Chainage Chainage chainage Velocity
method Method (Cumecs)
Method
1 Minor Bridge - - 171+275 65.570 32.411 260.40 98.355

ABSTRACT OF HYDROLOGICAL AND HYDRAULIC CALCULATIONS

Latitude (N) 27.302315°


Coordinate
Longitude (E) 77.786153°

Proposed chainage 171+275

Proposed Span 2 x 25

Design discharge(cumecs) 98.355

Design HFL (m) 163.353

Velocity (m/s) 1.94

Average depth of water (m) 5.421

LBL (m) 157.932

Min. Proposed FRL 167.000 OK

Calculated FRL 166.528

Vertical clearance required (m) 0.9

Hydraulic Adequacy Adequate

Proposed waterway (m) 46

Proposed Min. Soffit Level 164.353

Silt Factor 0.5

Maximum Scour Level of Abutment (m) 159.114

Maximum Scour Level of Pier (m) 156.678


DICKEN METHOD

Name of bridge/stream : Minor Bridge


Existing Chainage (km) -
C.A. Chainage (km) -
Design Chainage (Km) 171+275

Catchment Area, A 8.65 Sq.Km


Normal Annual Rainfall 82.6 cm (as per CGWB, Mathura)
C 13 (As per Clause 4.2, IRC SP:13-2004)
Q CxA0.75
Q 65.57 Cumecs
Existing Chainage - -
C.A. Chainage - -
Proposed Chainage - 171+275

FLOOD ESTIMATION

By Rational Method :

Area of catchment, A = 8.650 km2 = 865 Hectares


Length of longest stream, L = 9.150 km
The fall in level between source and site, H = 10.0 m
Co-efficient of Runoff, P = 0.50 Sandy Silty Soil, lightly covered
Point Rainfall Intensity (100year - 24hr) = 24 cm Plate 10, CWC Report Upper Indo-Ganga Plains subzone 1(e)
Conversion factor (100year - 1hr) = 0.340 Fig. 10, CWC Report Upper Indo-Ganga Plains subzone 1(e)
100 years, 1 hour Rainfall, Io = 8.16 cm / hr
f - curve = 0.99

Concentration time, tc

tc = ( 0.87 X L3 / H )0.385
= 5.0368 hours

Critical Intensity of Rainfall, Ic

Ic = Io (2 / tc+1)
= 2.70 cm / hr

Runoff, Qd

Qd = 0.028 x P x f x A x Ic
= 32.411 m3 / sec
HYDRAULIC DESIGN REPORT FOR MINOR BRIDGE AT PROPOSED DESIGN CH: 171+275
Details of the bridge:
General details:
Span arrangements = 2 x 25 mxm
Clear Opening per span = 23 m
No of span = 2 nos.
Wearing coat = 65 mm
LHS Carriageway width = 13 m
LHS Overall width = 16 m
Drainage spout = As per Specifcations
Levels
HFL = 163.353
Min. Proposed FRL = 167.000 m
Average depth of water = 5.42 m
Lowest Bed Level = 157.932 m
Structural Details
Type of deck arrangement PSC Girder+ RCC Slab
No. of Intermediate walls = 1 nos.
Depth of Girder+Slab = 1.810 m
Cross slope = 2.5%
Design discharge:
a By area velocity method based on Manning's Formula
Calculation of longitudinal slope
Longitudinal slope has been calculated by fitting an equation to the longitudinal section of river bed to find bed slope by using
Microsoft Excel program.

x y
0 159.265
20 159.309
40 159.327
60 159.263
80 159.227
100 159.331
120 159.255
140 159.175
160 158.811
180 159.002
200 158.855
220 158.796
240 158.667
260 158.258
280 158.244
300 158.195
380 158.184
400 158.082 1.18 0.002957

Longitudinal Section of River


159.6
159.4
Series1
159.2
159
Linear (Series1)
158.8
158.6
158.4
158.2
158
157.8 y = -0.0037x + 159.5
0 50 100 150 200 250 300 350 400 450

Hence, Longitudinal slope (s) = 0.002957


The longitudinal bed slope is 1 in 338.12
Calculation of flood discharge at different cross sections
Flood discharge Q = A*V
where, A is area of cross section in sq m
V is the velocity of water in m/sec considered uniform throughout cross section
V= (1/n)*(S)1/2*(R)2/3
where, R is the hydraulic mean depth = A/P
S is the energy slope which may be taken as bed slope measured reasonably long stretch
n is co-efficient of roughness
P is wetted perimeter in m
i) Calculation of flood discharge through cross section at U/s stream of river
HFL = 163.353 m
Mean
Mean bed Depth of depth of Wetted
Distance Difference in level
Distance Bed level level b/w water water b/w Section at area "X 2 2
Perimeter
"X" in X*Z b/w adjacent point X Y
(m) (m) adjacent from HFL adjacent D". in Sqm = SQRT
meter "Y" (in m)
pt. Z (m) to LBL pt. "D" in (X2+Y2)
meter
163.353 0 164.945
163.353 3.256 164.227 164.586 0.000 0.000 3.256 0.000 535.892 0.000 10.60154 0.000 0.000
163.353 5.983 164.054 164.141 0.000 0.000 2.727 0.000 447.611 0.000 7.436529 0.000 0.000
163.353 7.162 163.967 164.011 0.000 0.000 1.179 0.000 193.368 0.733 1.390041 0.537 0.000
163.353 15.851 161.274 162.621 0.733 0.366 8.689 3.182 1413.010 1.467 75.49872 2.154 8.812
163.353 20.055 161.032 161.153 2.200 1.466 4.204 6.164 677.487 0.916 17.67362 0.839 4.303
163.353 26.257 159.442 160.237 3.116 2.658 6.202 16.485 993.790 0.834 38.4648 0.695 6.258
163.353 29.584 159.365 159.404 3.950 3.533 3.327 11.753 530.335 0.157 11.06893 0.025 3.331
163.353 32.346 159.127 159.246 4.107 4.028 2.762 11.126 439.837 -0.197 7.628644 0.039 2.769
163.353 40.677 159.759 159.443 3.910 4.009 8.331 33.395 1328.320 -0.632 69.40556 0.399 8.355
163.353 48.501 160.391 160.075 3.278 3.594 7.824 28.119 1252.427 -0.834 61.21498 0.695 7.868
163.353 51.592 161.426 160.909 2.445 2.861 3.091 8.844 497.368 -1.687 9.554281 2.844 3.521
163.353 60.724 163.764 162.595 0.758 1.601 9.132 14.623 1484.818 -0.758 83.39342 0.575 9.163
163.353 64.665 164.74 164.252 0.000 0.379 3.941 1.494 647.317 0.000 15.53148 0.000 3.941
163.353 68.868 164.836 164.788 0.000 0.000 4.203 0.000 692.604 0.000 17.66521 0.000 0.000

Total Area 135.186 Total Perimeter 58.321


 X*Z 4261.1581

Cross Section of Stream at U/S of Bridge Location


166

165

164

163

162

161

160

159

158
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75

Discharge, Q = A*V Cumecs


where A = Area m2
V = Velocity m/sec
From Manning's formula we have V = (1/n) x S^(1/2) x R^(2/3)
where n = Rugosity coefficient
R = Hydraulic mean radius
S = Longitudinal Slope
Referring SP 13. Table 5.1 for section with winding, some pools and shoals, clean
n = 0.05
Hydraulic Mean Radius, R = Wetted Area/Wetted Perimeter
R = A/P
R = 2.318 m
Longitudinal Slope, S = 0.0029575
Velocity, V=(1/n)*(S)1/2*(R)2/3 = 1.91 m/sec
Discharge, Q= A*V = 257.53 Cumecs
ii) Calculation of flood discharge through cross section at bridge location
HFL = 163.353 m
Mean
Mean bed Depth of depth of Wetted
Distance Difference in level
Distance Bed level level b/w water water b/w Section at area "X Perimeter
"X" in X*Z b/w adjacent point X2 Y2 = SQRT
(m) (m) adjacent from HFL adjacent D". in Sqm
meter "Y" (in m)
pt. Z (m) to LBL pt. "D" in (X2+Y2)
meter
163.353 0 165.426
163.353 4.818 164.301 164.864 0.000 0.000 4.818 0.000 794.312 0.000 23.21312 0.000 0.000
163.353 7.125 163.141 163.721 0.000 0.000 2.307 0.000 377.704 0.317 5.322249 0.100 0.000
163.353 11.033 162.932 163.037 0.317 0.158 3.908 0.618 637.147 0.658 15.27246 0.433 3.963
163.353 16.648 161.825 162.379 0.975 0.646 5.615 3.624 911.755 1.158 31.52823 1.341 5.733
163.353 22.496 160.616 161.221 2.133 1.554 5.848 9.085 942.817 0.707 34.1991 0.501 5.891
163.353 24.175 160.41 160.513 2.840 2.486 1.679 4.174 269.501 0.596 2.819041 0.356 1.782
163.353 28.445 159.423 159.917 3.437 3.138 4.27 13.400 682.843 1.026 18.2329 1.053 4.392
163.353 30.951 158.358 158.891 4.463 3.950 2.506 9.897 398.180 0.657 6.280036 0.432 2.591
163.353 34.226 158.108 158.233 5.120 4.791 3.275 15.691 518.213 -0.087 10.72563 0.007 3.276
163.353 38.582 158.531 158.320 5.034 5.077 4.356 22.114 689.640 -0.419 18.97474 0.176 4.376
163.353 40.655 158.946 158.739 4.615 4.824 2.073 10.000 329.065 -1.346 4.297329 1.810 2.471
163.353 46.069 161.222 160.084 3.269 3.942 5.414 21.341 866.695 -1.810 29.3114 3.278 5.709
163.353 52.375 162.567 161.895 1.459 2.364 6.306 14.906 1020.907 -1.282 39.76564 1.642 6.435
163.353 58.366 163.785 163.176 0.177 0.818 5.991 4.899 977.587 -0.177 35.89208 0.031 5.994
163.353 60.49 164.861 164.323 0.000 0.088 2.124 0.188 349.022 0.000 4.511376 0.000 2.124
163.353 65.563 165.411 165.136 0.000 0.000 5.073 0.000 837.735 0.000 25.73533 0.000 0.000

Total Area 129.939 Total Perimeter 54.736


 X*Z 5014.260

Cross Section of Stream at Bridge Location

166
165
164
163
162
161
160
159
158
157
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70

Discharge, Q = A*V Cumecs


where A = Area m2
V = Velocity m/sec
From Manning's formula we have V = (1/n) x S^(1/2) x R^(2/3)
where n = Rugosity coefficient
R = Hydraulic mean radius
S = Longitudinal Slope
Referring SP 13. Table 5.1 for section with winding, some pools and shoals, clean
n = 0.05
Hydraulic Mean Radius, R = Wetted Area/Wetted Perimeter
R = A/P
R = 2.373936502 m
Longitudinal Slope, S = 0.0029575
Velocity, V=(1/n)*(S)1/2*(R)2/3 = 1.94 m/sec
Discharge, Q= A*V = 251.50 Cumecs
Average depth of water in cross section at bridge location = m which is added to the weighted
average bed level at the upstream and downstream cross section to get the HFL at those sections
iii) Calculation of flood discharge through cross section at D/s of bridge location
HFL = 163.353 m
Mean
Mean bed Depth of depth of Wetted
Distance Difference in level
Distance Bed level level b/w water water b/w Section at area "X Perimeter
"X" in X*Z b/w adjacent point X2 Y2 = SQRT
(m) (m) adjacent from HFL adjacent D". in Sqm
meter "Y" (in m)
pt. Z (m) to LBL pt. "D" in (X2+Y2)
meter
163.353 0 163.952
163.353 3.125 163.879 163.916 0.000 0.000 3.125 0.000 512.236 0.000 9.765625 0.000 0.000
163.353 6.214 163.648 163.764 0.000 0.000 3.089 0.000 505.865 0.193 9.541921 0.037 0.000
163.353 10.258 162.672 163.160 0.193 0.097 4.044 0.390 659.819 0.990 16.35394 0.980 4.163
163.353 17.646 161.668 162.170 1.183 0.688 7.388 5.083 1198.112 0.606 54.58254 0.367 7.413
163.353 22.486 161.461 161.565 1.789 1.486 4.84 7.191 781.972 0.996 23.4256 0.993 4.942
163.353 26.023 159.675 160.568 2.785 2.287 3.537 8.088 567.929 1.492 12.51037 2.225 3.839
163.353 28.733 158.478 159.077 4.277 3.531 2.71 9.568 431.097 0.866 7.3441 0.750 2.845
163.353 31.933 157.943 158.211 5.142 4.709 3.2 15.070 506.274 0.279 10.24 0.078 3.212
163.353 33.675 157.921 157.932 5.421 5.282 1.742 9.201 275.118 -0.505 3.034564 0.256 1.814
163.353 39.16 158.954 158.438 4.916 5.168 5.485 28.348 869.030 -0.727 30.08523 0.529 5.533
163.353 40.661 159.375 159.165 4.189 4.552 1.501 6.833 238.906 -1.160 2.253001 1.344 1.897
163.353 48.476 161.273 160.324 3.029 3.609 7.815 28.202 1252.932 -1.430 61.07423 2.045 7.945
163.353 53.971 162.235 161.754 1.599 2.314 5.495 12.715 888.838 -0.702 30.19503 0.493 5.540
163.353 56.92 162.677 162.456 0.897 1.248 2.949 3.680 479.083 -0.678 8.696601 0.460 3.026
163.353 60.319 163.592 163.135 0.219 0.558 3.399 1.896 554.494 -0.219 11.5532 0.048 3.406
163.353 63.65 163.802 163.697 0.000 0.109 3.331 0.364 545.275 0.000 11.09556 0.000 3.331
163.353 65.031 163.975 163.889 0.000 0.000 1.381 0.000 226.330 0.000 1.907161 0.000 0.000
163.353 71.046 163.965 163.970 0.000 0.000 6.015 0.000 986.280 0.000 36.18022 0.000 0.000

Total Area 136.630 Total Perimeter 58.904


 X*Z 10967.35

Cross Section of Stream at D/s side of Bridge Location

165

164

163

162

161

160

159

158

157
0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75

Discharge, Q = A*V Cumecs


where A = Area m2
V = Velocity m/sec
From Manning's formula we have V = (1/n) x S^(1/2) x R^(2/3)
where n = Rugosity coefficient
R = Hydraulic mean radius
S = Longitudinal Slope
Referring SP 13. Table 5.1 for section with winding, some pools and shoals, clean
n = 0.05
Hydraulic Mean Radius, R = Wetted Area/Wetted Perimeter
R = A/P
R = 2.320 m
Longitudinal Slope, S = 0.0029575
Velocity, V=(1/n)*(S)1/2*(R)2/3 = 1.91 m/sec
Discharge, Q= A*V = 260.40 Cumecs
Average depth of water in cross section at bridge location = m which is added to the weighted
average bed level at the upstream and downstream cross section to get the HFL at those sections
Discharge from Area velocity is taken as highest of all three discharges
Discharge, Q = 260.40 Cumecs
CALCULATION OF SCOUR DEPTH FOR ABUTMENT

Existing Chainage (km) -


C.A. Chainage (km) -
P&P Chainage (Km) 171+275
Name of stream/Bridge -
HFL (m) 163.353
Q (cumecs) 98.36
Silt Factor (Ksf or f) 0.50 (From Geotech report)
Qd=1.3xQ (As per IRC: 78-2014) 127.86
Effective Linear Waterway ( L e ) (m) 46.000
Regime Width, W' = 4.8 x (Q d^ 0.5) (m) 47.604

By IRC - 5
Db = Qd / MIN(W',Le) (cumecs/m) 2.780
2
Mean Depth of Scour (m) , Dsm = 1.34 x [(Db /Ksf)^(1/3)] 3.338

RECOMMENDATIONS
Final Recommended mean scour depth, d sm = 3.338 m

Without Floor Protection Work


For Abutments
Maximum Scour Depth Below HFL, d sma = 1.27 * dsm = 4.239 m
HFL - dsma = 159.114 m
Maximum Scour Level = 159.114

A-1
CALCULATION OF SCOUR DEPTH FOR PIER

Existing Chainage (km) -


C.A. Chainage (km) -
P&P Chainage (Km) 171+275
Name of stream/Bridge -
HFL (m) 163.353
Q (cumecs) 98.355
Silt Factor (Ksf or f) 0.500 (From Geotech report)
Qd=1.3xQ (As per IRC: 78-2014) 127.862
Effective Linear Waterway ( L e ) (m) 46.000
Regime Width, W' = 4.8 x (Q d^ 0.5) (m) 47.604

By IRC - 5
Db = Qd / MIN(W',Le) (cumecs/m) 2.780
Mean Depth of Scour (m) , Dsm = 1.34 x [(Db2/Ksf)^(1/3)] 3.338

RECOMMENDATIONS
Final Recommended mean scour depth, d sm = 3.338 m

Without Floor Protection Work


For Piers
Maximum Scour Depth Below HFL, d sma = 2 * dsm = 6.675 m
HFL - dsma = 156.678
Maximum Scour Level = 156.678 m

A-1
Catchment Area Calculations

Catchment Area

Length of longest stream, L

Fall in level between source and site, H