Sie sind auf Seite 1von 1

A B C

10000
1700 4150
3625 525 5850
2875 1275 1325 2825

A B C
100mm THK. CONCRETE SLAB
WF-1 10000

WF-1
WF-1
SPACING
4150 5850
1125

1125
@ 600mm BOTHWAYS ELEV. 550 mm
NAT. GRD.LN.
3550 600 1700 1225 2927
F1C1 WF-1 F1C1 WF-1
1 1 2000 2150
WF-1 SC F1C1
LABOR ROOM/
4325

BIRTHING RECOVERY
ROOM ROOM
RB-1 RB-1 RB-1

WF-1
WF-2
WF-1
3200

3200
WF-2
SLAB ON FILL
SLAB ON FILL
SLAB ON FILL 1

1575
ELEV. 600 mm ELEV. 600 mm
ELEV. 600 mm NAT. GRD.LN. NAT. GRD.LN.

CAPPING ON TOP
NAT. GRD.LN.

RB-1
SC

RB-1
WF-2 F1C1 WF-1 F1C1 BIRTHING

3200
RB-1
W-2

CONCRETE
ROOM LABOR ROOM
2 1

OF CHB
SLAB ON FILL
F1C1 STERILIZATION
ELEV. 600 mm TOILET &
HALLWAY

1625
ROOM NAT. GRD.LN. BATH
1800
0 1800

2000
WF-1
SLAB ON FILL SLAB ON FILL SLAB ON FILL

WF-1
C1 RB-1 SC RB-1 C1

SLAB ON FILL
ELEV. 600 mm ELEV. 550 mm
SCRUP-UP
NAT. GRD.LN. NAT. GRD.LN.
2

CONCRETE CAPPING
ROOM

WF-2
WF-1
3750

3750

CONCRETE CAPPING
WF-1 RB-1
WF-2 STERILIZATION C1

ON TOP OF CHB
WF-2 MIDWIFE

ON TOP OF CHB
ROOM

W-2

WF-2

1800
TOILET &

2000
STATION SUPPLY RECORD'S

WF-1
BATH
1950

SLAB ON FILL STO. STO.

1750

CONCRETE CAPPING
2550

ELEV. 600 mm

0
NAT. GRD.LN. ELEV. 600 mm ELEV. 600 mm
F1C1 ELEV. 600 mm

3750

3750
RB-1

RB-1
NAT. GRD.LN. NAT. GRD.LN. CONCRETE CAPPING

ON TOP OF CHB
NAT. GRD.LN.

13700
WF-2 WF-2 WF-2 WF-2

RB-1
7500

CONCRETE CAPPING
3 2 ON TOP THE CHB
600

SC

1950
WF-2

1750
CONCRETE
MIDWIFE SUPPLY RECORD'S
F1C1 F1C1

CAPPING
STATION STO. STO.
TREATMENT &

13700

13700
CONSULTATION
10500

RB-1

7500
RM. C1
3 C1
WF-1

WF-2

WF-1
3750

3750

600
C1 RB-1 SC RB-1

CAPPING
CONCRETE
SLAB ON FILL SLAB ON FILL

CONCRETE
LOBBY CAPPING ON TOP
THE CHB
ELEV. 600 mm ELEV. 600 mm

3750

3750
RB-1

RB-1

RB-1
NAT. GRD.LN. NAT. GRD.LN.
WF-1 WF-1
4 3 TREATMENT &
CONSULTATION
LOBBY

SC
1275

ROOM
F1C1 F1C1 PORCH F1C1
WF-1
RB-1 C1
WF-1

WF-1

WAITING
3000

3000
SLAB ON FILL AREA
4 CONCRETE LEDGE 02
C1 RB-1 SC RB-1 C1
1650

WF-1

SLAB ON FILL PORCH

RB-1
ELEV. 600 mm
NAT. GRD.LN.
WF-1 WF-1 WAITING

3000

3000
RB-1
5 4 AREA
775

WF-1
F1C1 F1C1
100mm THK. CONCRETE SLAB
LEGEND: SPACING @ 250 BOTHWAYS
150mm THK. CHB EXTERIOR
ELEV. 0.00mm
NAT. GRD.LN. 5
WALLS RB-2
100mm THK. CHB INTERIOR 1975 2175 2000 2150
WALLS
6150 2925 2925
4150
5850
10000

A B C

FOUNDATION PLAN ROOF BEAM LAYOUT


SCALE 1: 100 MTRS SCALE 1: 100 MTRS

CONTRACTOR: RA 9266 SECTION 33 PROJECT TITLE: SHEET CONTENT: CHECKED BY: APPROVED BY: SHEET NO.

Drawings and specifications and other contract


documents duly signed, stamped or sealed, as CONSTRUCTION OF BARANGAY
instruments of service, are the intellectual
property and documents of the architect, whether
the object for which they are made is executed or
not. It shall be unlawful for any person to
HEALTH STATION W/ SAFE S-1
duplicate or make copies of said documents for
use in the repetition of and for other projects or
BIRTHING FACILITY AS-BUILT PLAN

PROJECT ENGINEER
buildings, whether executed partly or in whole,
without the written consent of the architect or
author of said documents.
LOCATION:

BRGY. NANGAN, GOVERNOR GENEROSO,


DIVINA B.SONIDO,CE,MBA
ENGINEER III, DOH REGION Xl
ABDULLAH B.DUMAMA Jr.,MD,MPA,CESO III
ASSISTANT SECRETARY OF HEALTH - VISAYAS & MINDANAO - FIELD IMPLEMENTATION
3
DAVAO ORIENTAL AND MANAGEMENT CLUSTER AND REGIONAL DIRECTOR

Das könnte Ihnen auch gefallen