Beruflich Dokumente
Kultur Dokumente
REVISION
FACILITY REQUIREMENT & EVALUATION SHEET
Sawano Andi K Edu A Andy MD Harijawan W Zainal A
For new product STANDARD AND RULES Drawings of related products REQUIRED DIMENSIONS OF EQUIPMENT NO DETAILED SPECIFICATION CHECK
EQUIPMENT NAME CO2 WELDING
For production increase Water Pollution Control Law Process FMEA sheet Robot Spesification
REFERENCE
Increase of efficiency Air Pollution Prevention Act Process plan sheet 1 Robot welding use OTC Daihen Almega AX-V6 (standart type)
INSTALLATION PLACE Line Under Bracket Complete 2 Robot repeatability ± 0.2 mm
Panel Side door
PURPOSE INSTALLATION
ENVIRONMENT
Quality improvement Noise Control Law Experienced fault table Operatio 3 Robot must have a safety fence device
n
Labor shortage Vibration Registration Law Standard work combination sheet 4 Robot must be able to display the position coordinates (for setting and correction)
MANUFACTURE QTY 1 MACHINE
In-house manufacture Fire Protection Law Layout drawing 5 Simple teaching for difficult movement (Using wire type pendant conection for program teaching)
BUDGET Thousand-yen Environmental improvement High-pressure regulation Machining condition table 6 Ambient temperature 30~40ºC
RESULT (As specified in completion report) Thousand-yen Safety measures Equipment accuracy table
DOCUMENT
INSTALLATION DATE Date: September 1, 2019 Process way change Operation Manual of Parameter Front Welding Cabin
door
MANUFACTURE NO. Date: Update Operation Manual of Machine 1 Robot covered welding cabin
MACHINE NO. Used outside company Industrial Safety and Health Law Dayli Check Sheet Welding Welding 2 Automatic front door with pneumatic system for loading & unloading (use steel plate)
SAFETY
Jig Robot
INVESTMENT NO. Space saving Robot Safety Standard Process Facility Requirement 3 Side sliding door for robot maintenance process
Description of system 4 Attached stairs and upper fence
5 Equipped with welding jig
REQUIRED VALUE <<Evaluation>> Checked by: Check date: /
Abnormal Pressure Control Sec Sec 1 Abnormal Welding Current & Voltage Welding Controll, Alarm Start after reduce setting condition Machine stop,Alarm Tower ligth
60
Change Jig Sec Sec 2 Abnormal CO2 gas Pressure Pressure switch Alarm Start after reduce CO2 Pressure Machine stop,Alarm Tower ligth
SETUP
Length (setting position change model) 60 Sec Sec Machine stop, Alarm red Tower ligth, buzer
3 Protection for operator Area sensor Something part in area proces
Sec Sec & information no alarm