17.

Analysis of Rates
17.1 General
Rates for various item of works of the project have been derived from the “Schedule of Rates
2014 for Road works (Post GST 2017 Basic Rates), Culvert works & Carriage etc. RRDA
ORISSA and “Addendum & Corrigendum to Schedule of Rates” effective from 12.06.2014.
However in general the basic rates of material have been taken from Orissa state schedule rate
2014 are taken. The rates of different items have been worked out inclusive of all labour
charges, hire charges of Tools & Plants, Machineries and all other cost estimates for the item of
work, overhead and contractor’s profit @ 20% on these.

17.2 Basic Rate of Material


The basic rates for stone materials & river bed materials have been taken from Orissa State
schedule of rate 2014.

Basic rate for bituminous materials, like VG-30 Viscocity grade bitumen and emulsion has been
considered at Vizag.

Basic rate of other materials like coarse & fine sand, Stone products are as per the latest from
Orissa State schedule of rate 2014. However the cost of cement is taken as average price of 3
brands approved by Govt. of Orissa which are available in the local market.

Basic rate of steel materials has been taken as per the rate of Orissa state Industrial corporation
Vizag after adding cost of carriage, loading & unloading.

17.3 Lead for Materials


For stone aggregates and sand, lead from source to work site is calculated from the district map
and block map of core network and finalized the same in discussion with PIU. The supply of
different materials to worksite is by road. Lead for bituminous & steel materials are similarly
obtained using SOR.
FORMAT-II

ANKADELI DOWN COB To ANKADELI TOP


Pakage No: OR19RCPL-16
Cost in Lakhs / Length in

Revised Provision for which cost is


Sl Earlier Provision Submitted
Items of Works Revised
No.
Physical ( length / No) Cost Physical ( length / No) Cost
CC Road 0.2 8.38 0.06 2.91
Conventional With 1.230 km to 1.370 km, 3.850km 1.230 km to 1.370 km,
Chainage to 4.000 km 3.850km to 4.000 km
1
Type of New
Technology with
Chainage
BT Road 1.6 50.87 2.165 207.05
Conventional With 0.00km to 1.230 km,1.370 km to 0.00km to 1.230 km,1.370 km
Chainage 3.850km, to 3.850km,
2
Type of New
Technology with
Chainage
Drain 2.891
Length 0.39 #REF! 0.12
3
1.230 km to 1.370 km, 3.850km 1.230 km to 1.370 km,
Chainage
to 4.000 km 3.850km to 4.000 km
HPC - 0.165km, 0.420km, HPC - 0.165km, 0.420km,
1.930km,3.100km,3.360km, 1.930km,3.100km,3.360km,
CD With Chainage
RCC - 1.110km, RCC -
4 2.410km 1.110km, 2.410km
HPC #REF! #REF! 5 Err:509
RCC Slab 2 (1x2x2) #REF! 0.000
Box Cell 2(1x2x2) 0.000
Protection Wall 0.17 #REF! 0.1 2.494
0.310km-0.410km, 0.310km-0.410km,
Chainage
5 1.890km-1.925km 1.890km-1.925km
Retaining Wall
( Chainage)
6 Road Furniture 0.00 3.722
Others incluidng
7 0.00 0.530
DPR
Shifting of Public
8
Utility
( Like Electicpole /
Telephone Pole)
Total: #REF! Err:509

Total Cost of Project of Road proper Considering 15% OHC Err:509


Total Cost of Project of Road Considering 12.5% OHC Err:509
Difference Err:509

Executive Engineer
R.&B. Division , Koraput
Cost in Lakhs / Length in Km

Remarks

lakhs

lakhs
lakhs

Engineer
on , Koraput
GOVERNMENT OF ODISHA

WORKS DEPARTMENT

R.&B. Division , Koraput

DETAILED PROJECT REPORT

FOR 2019 -2020


ESTIMATED COST IN INR 320.03 LAKHS

GENERAL INFORMATION

1 Name of PIU: Executive Engineer, R & B Division, KORAPUT

2 District :KORAPUT

3 Block :LAMTAPUT

4 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

5 Pakage No: OR19RCPL-16

6 Code No. :L-82

7 Length of Road :2.225 Km

8 Cost of Road (Construction Cost):235.24 Lakhs

9 Maintenance Cost :84.78 Lakhs

10 Construction Cost pre km :105.73 Lakhs


A

RT

LAKHS

KORAPUT

WN COB To ANKADELI TOP


A. Chapters
1 Introduction
2 Planning and Basic Design Consideration
3 Topographic Survey.
4 Soil and Materials Survey
5 Traffic Survey
6 Hydrological Survey

7 Geometric Design Standards

8 Alignment Design
9 Pavement Design
10 Design of Cross Drainage
11 Protective Works & Drainage
12 Land Acquisition
13 Utility shifting/relocation
14 Road Safety and Traffic Management
15 Specification
16 Environmental Issues
17 Analysis of Rates
18 Cost Estimate
19 Construction Program
B Proforma
1 Proforma B Package Summary
2 Proforma C Check List for PIU & STA
3 Format F1 Package-wise Summary Sheet
4 Format F6 Cost estimate for Road Construction Works – Pavement Works
5 Format F7 Cost estimate for Cross Drainage Works – Slab Culvert
6 Format F8 Rate of Materials supplied at site – Rate Analysis
Format F9A Certificate of Ground Verification from Executive Engineer / Head of PIU
7
8 Environmental Checklist
Checklist for community consultation on engineering
9
C. List of figures
Figure-1 Road Map of India and state
Figure-2 District Map
Figure-3 Block Maps showing all existing connectivity like District/block HQ, new
townships, National and State highway network, mandis, hospitals, colleges,
schools etc.

Figure-4 Strip plan showing land and alignment details


Figure -5 Quarry Map
D. Annexure
Annexure-1 Details of soil tests (Section 4.2)
Detailed hydraulic calculation of all replaced and proposed new culverts
Annexure-2 (Section 6.7)

Annexure-3 Chainages-wise Cut/fill volume


Annexure-4 Transect walk report
Page Nos.
0.5775
8.655

1 Design of Road :-
CBR 7.00
Chainage 0
CBR 5
Chainage 10500
Avarage CBR 5.2523809524
Car, Jeep, Van Auto Rickshaw

TRAFFIC
15 .05.2019 55 17

16 .05.2019 70 19

17 .05.2019 85 16

Current 72
Check the CVPD 1
GSB + SANDThickness in Design
1 Earth Work Calculation :-
Quantity

Check the E/w lead

2 Name of the Road :


Name of the Section :-
Name of the Sub-Division :-
Name of the Division :-
3 Road Details :-
EX BT Length of B.T 2165
EX CC Length of C.C New 0
EARTHEExisting C.C Road 60
Scarify BPavment Design SLNo
0 New BT EARTHE New BT 1
0 1000mm ф HPC S/R EARTHE CC M-30 2
0 1000mm ф HPC S/R NEW CC 3
0 1000mm ф HPC S/R EARTHE Scarify BT 4
0 1000mm ф HPC S/R New BT 5
0 1X2x2M Slab CC M-30 6
0 1X2x2M Slab NEW CC 7
0 1000mm ф HPC D/R 8
0 1000mm ф HPC S/R
0 1000mm ф HPC S/R
0 1000mm ф HPC D/R
0 1000mm ф HPC S/R
0 1000mm ф HPC S/R

0 1000mm ф HPC S/R CD WORK


0 1000mm ф HPC S/R 1200mm S/R ф HPC 1
0 1000mm ф HPC S/R 1200mm D/R ф HPC 2
3
0 1000mm ф HPC S/R 600mm ф HPC S/R 4
0 1000mm ф HPC S/R 600mm ф HPC D/R 5
0 1000mm ф HPC S/R 600mm ф HPC S/R 6
0 1000mm ф HPC S/R 1200mm ф HPC F/R 7
0 1000mm ф HPC S/R 1000mm ф HPC S/R 8
0 (2X5X5) BOXCELL 1000mm ф HPC D/R 9
0 600mm ф HPC S/R (1X3X3) RCC SLAB 10
0 600mm ф HPC S/R (1X4X2) RCC SLAB 11
(1X6X4) RCC SLAB 12
0 (1X3X3) RCC SLAB (1X6X4) RCC SLAB 13
0 1000mm ф HPC S/R (1X6X4) BOXCELL 14
0 (1X3X3) RCC SLAB (2X6X2) BOXCELL 15
0 1000mm ф HPC S/R (2X6X4) BOXCELL 16
0 (3X6X4) BOXCELL 1X2x2M Slab 17
0 1000mm ф HPC S/R 1X3x2M Slab 18
1X4x3M Slab 19
To Chainage 6 x 2 2Span RCC BOXCELL
6 x 3 1Span RCC BOXCELL Total
6x 5 Protection Wall SLNo
1
2
3

SLNo
1
2
3

Total
No.of C.D. 600 Single
1.5 X1 X 1span
2 X 1.5 X 1span
2X 1.5 X 2span
Check for lead of E/W

Drainage Layer Thickness


GSBThickness
Check of thickness of Sub-base in Qnty. Estimate
Logo in Nos 2
200mtr stone 9

5 Drain -CC 1 A
From Chainage
To Chainage

At the Side LHS


Length 120
Sand Filling Width
Foundation Base Width
Detais of SideWall Top Width
Clear Distance Betn Wall In Bottom
Clear Distance Betn Wall In Top

5 Laterite Drain - 1 A
From Chainage 0
To Chainage 0
0
Length 0
Sand Filling Width
Foundation Base Width
Detais of SideWall Top Width
Clear Distance Betn Wall In Bottom
Clear Distance Betn Wall In Top

200
510

1690
700
0.4275 0.855
7.80
CONTROL UNIT

5.80 6.20 5.90 6.10 6.00


500 1000 1500 2000 2500
5.9 6.2 6 5.7 6
11000 11500 12000 12500 13000

Scooters/Motorbikes Bus / Minibus (Loaded) Trucks (Loaded) Trucks Tractors with


(UnLoaded) trailer
(Loaded)

80 0 6 5 12
55 0 6 4 8

85 0 7 6 7

CVPD Cumulative ESAL Applications F 137 CVPD (Not to be entered)


36 173196 1

225 5 (Make the figure rounded to neare


1081.6067839196
Cutting 12985.574 Cum Filling 21523.975
3579.892
1000 Mtrs PER/KM BT ROAD CC ROAD BERM

3579.8921348315 1608.940 5.5 5.5 1.125


From ANKADELI DOWN COB TO ANKADELI TOP
ANKADELI DOWN COB To ANKADELI TOP
R&B. Section, Nandapur Block:- LAMTAPUT
R.&B . Sub-Division, pottangi Dist:- KORAPUT
R.&B. Division , Koraput State:- Odisha

Width 5.5 No.of. Electric Pole:-


Width Total Length 2225
0 5.5 0
Existing Pavment CondiProposed Pavment From Chainage To Chainage Length
EX BT Scarify BT 0 100 100
EX CC CC M-30 100 160 60
EX BT Scarify BT 160 1250 1090
EARTHEN New BT 1250 2225 975
EARTHEN New BT 0 0 0
EARTHEN NEW CC 0 0 0
EARTHEN New BT 0 0 0
EARTHEN NEW CC 0 0 0
EARTHEN New BT 0 0 0
EARTHEN NEW CC 0 0 0
EARTHEN NEW CC 0 0 0

1200mm S/R
ф HPC 600SR HPC
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1X2x2M Slab 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1X2x2M Slab 0
1X2x2M Slab 0
1000mm ф HPC D/R 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1000mm ф HPC D/R 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
1000mm ф HPC S/R 0
0 0 0

Left From Chainage To Chainage Length REMARKS


1168 1268 100 BILA
0 0 0 BILA
0 0 0
100
Right From Chainage To Chainage Length REMARKS
0 0 0 BILA
0 0 0 BILA
0 0 0
0
100
0 900 Single 0 1000 MM S/R 0
0 3 X 2 X 1span 0 6 X 2 X 1span 0
0 3 X 2 X 2span 0 6 X 2 X 2span 0
0 3 X 3 X 1span 0 6 X 3 X 1span 0
Verify the Cost Estimate in details

mm (Please check)
mm
se in Qnty. Estimate 0 mm 1
Furniture 4 5Kmstone 0 K.m Stone
Add for Citizen Information Board

B C D E
1000 1048 48 0
0 0
48 0 0
LHS RHS RHS LHS
E/w in Excavation Width 1.25 Depth
1.25 Depth 0.1
1.25 Depth 0.1
0.20 Bottom 0.3 Height 0.45
0.50 Pitching width 0.00
0.50

B C D E
0 0 0 0
0 0 0 0
0 0 0 0
E/w in Excavation Width 1.25 Depth
1.25 Depth 0.1
1.25 Depth 0.1
0.30 Bottom 0.3 Height 0.60
0.50 Pitching width 0.00
0.50

DRAIN

5/000 TO 5/150, 5/120 TO 5/200,3/500TO 3/650 ,3/450 TO 3/640km

200-

320
610

1730
850 (0/200-0/320),(0/510-0/610),(0/700-0/850),(1/690-1/730)
6.20 6 5 5.8 5
3500 4000 4500 5000 5500
5.8 5 5 5 5 5
13500 14000 14500 15000 15500 16000
(b) Average rain fall 1412
Tractors Tractor
with trailer without
(UnLoaded) trailer Cycles
Cycle Rickshaw Horse cart /
/ Hand Cart Bullock Cart Pedestrian
8 9 120 0 0 350
8 9 85 0 0 200

9 10 100 0 0 294

ot to be entered) HARD SOIL


5194.2296

ake the figure rounded to nearest 0 / 5) Site Clearance 3.8


10860
Cum Turfing 0.000 Sqm Not O.K
Benificiary Habitations
Road Code Link Name Code Populations
L-82 Ankadeli 200
300
Pakage No: OR19RCPL-16 120
620

2225

Scarifying existing bituminous length 0 Not O.K

Total Road Length 2225


Total BT SCARIFY B 1190 NEW BT 975 975
Total CC M-30 OVER60 NEW CC 0

CC ROAD 0/0 TO 0/300km,5/000 to 5/200 k

BT ROAD 0/300 to 5/000km


2225
600DR 1200mm 1200mm ф (1X6X4) RCC
HPC D/R ф HPC HPC F/R SLAB 1000SR HPC 1000DR HPC 1X2x2M Slab
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0 0
0
0 0 0 0 5 0 0

HT 300 5000
600 3800
1000 3980

Err:509 1x2x2 3250


HT 1x3x3 2460
1x4x4
1x5x5
1x2x6
2x6x6

900 Four 0 600 Double 0


1000 four 0 Causeway 0
8 X 3 X 3span 0 Cut off 0
2 X 1.5 X 1span 0 6X3X 4span 0
Total no of CD 0
O.K
3 Not O.K
Add for laying foundation stone etc. 0

CD/MB Span/diaType 1
1 6X3X 4span RCC BOXCELL
2 8 X 3 X 3span RCC BOXCELL
0 3 6 X 2 X 2span RCC BOXCELL
4 6 X 3 X 1span RCC BOXCELL
0.45 5 6 X 2 X 1span RCC BOXCELL
6 3 X 2 X 2span RCC BOXCELL
7 3 X 3 X 1span RCC SLAB
8 3 X 2 X 1span RCC BOXCELL
9 6X4X2 span RCC BOXCELL
10 2X1.5X1 span RCC SLAB
11 1000 four HPC
12 1000 MM S/R HPC 1090
13 900 Single HPC
14 600 Single HPC
15 600 Double HPC
0.45 16 900 Single HPC
17 900 Double HPC
18 600 Double HPC
19
19
20

3/650 ,3/450 TO 3/640km

/850),(1/690-1/730)
375 NA NA
5 5 5 5 5 5 5 5
6000 6500 7000 7500 8000 8500 9000 9500
5 5 5 5 5 5 5 5
16500 17000 17500 18000 18500 19000 19500 20000
: 1561 mm/Annum

STONEY BLASTING
3895.6722 3895.6722

Idirect Chainage Latitude Longitidue


0 Start 18° 31' 31.20" 82° 34' 33.95" E
End 18° 31' 23.90" 82°35' 4.18" E

SCARIFY BT
GSB
WBMGr-II
WBM Gr-III

TO 0/300km,5/000 to 5/200 km

00 to 5/000km
(1X6X4) (1X6X4) (2X6X2) (2X6X4)
(1X3X3) RCC (1X4X2) RCC RCC SLAB BOXCELL BOXCELL BOXCELL
3x2RCC 3x3RCC SLAB SLAB

0 0 0 0 0 0 0 0

5000

3980

3250
2460

6x3x4 0
8x3x3 0
6x2.5x2 0
2x1.5x1 0
2x1.5x2 0
Deduction for Box 0
CHAINAGE in Mtr
2 3 4 5 6 7 8 9
5
10000
5
20500
1X4x3M Slab

2X6X6RCC CUL(PARA) ( 1X 3X 3 ) RCC SLAB 12.5


CUL(PARA)-1 ( 1X 4X 2 ) RCC SLAB 12.5
CUL(PARA)-2 ( 1X 6X 4 ) RCC SLAB 12.5
CUL(PARA)-3 ( 1X 4X 2 ) RCC SLAB 12.5
BOXCELL(PARA) ( 1X 6X 4 ) BOXCELL 12.5
BOXCELL(PARA)-1 ( 2X 6X 2 ) BOXCELL 12.5
BOXCELL(PARA)-2 ( 2X 6 X 4.0 ) BOXCELL 12.5

0 0
Total
10 11
0
0
0
0
0
0
0
0
0
0
0
1
0
0
0
0
0

1
ADB Assisted RCPLWE Road tailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

CHAPTER 2
2 Planning and Basic Design Consideration
2.1 Key maps
RCPLWEA Road Detailed Proj
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKA

1 Introduction
1.1 RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)
Rural Road connectivity is a key component of rural development by promoting access to economic and s
services and thereby generating increased agricultural incomes and productive employment opportunitie
also a key ingredient in ensuring poverty reduction.
It was against this background of poor connectivity that the Prime Minister announced in 2000, a massive
roads program. The Prime Minister’s Rural Road Program (RCPLWE) set a target of :-

(i)   Achieving all-weather road access to every village/habitation with a population greater than 1000 by

(ii)   Providing all-weather road access to all villages/habitations of population greater than 500 people [2
case of hill States (North-Eastern states, Sikkim, Himachal Pradesh, Jammu & Kashmir and Uttaranchal), t
desert areas and tribal areas] by the end of the Tenth Five Year Plan, i.e., 2007

1.2 All Weather Road


The Project road is a link road with code L-82.This road starts from ANKADELI DOWN COB an
terminates at village ANKADELI TOP, the target Habitation.
The existing track of the road is narrow and existing surface condition of the road is earthen. During rain
the earthen portion creates severe problem in movement of vehicular traffic .There is no other existing roa
which can connect the target Habitation village DORAPUT

1.3 Core Network


The rural road network required for providing the ‘basic access’ to all villages/ habitations is termed as th
Network. Basic access is defined as one all-weather road access from each village/ habitation to the nearb
Centre or Rural Business Hub (RBH) and essential social and economic services.
A Core Network comprises of Through Routes and Link Routes. Through routes are the ones which collec
from several link roads or a long chain of habitations and lead it to a market centre or a higher category ro
the District Roads or the State or National Highways. Link Routes are the roads connecting a single habita
group of habitations to Through Roads or District Roads leading to Market Centres. Link Routes generally
dead ends terminating on habitations, while Through Routes arise from the confluence of two or more Lin
Routes and emerge on to a major road or to a Market Centre.

The Core Network may not represent the most convenient or economic route for all purposes. However, s
studies show 85-90% of rural trips are to market centres, the Core Network is likely to be a cost-effective
conceptual frame work for investment and management purposes, particularly in the context of scarce res

1.4 Geography
This district of Odisha,KORAPUT District is located at between 19-1712'N to 83.4163'E to 860-25'E & have
sq km of area. The population is 823,000 as per 2001 sensess with population density of 116/Sq.Km. The e
topography of the district lie in the flood plains are the major Rivers flowing on the district. Nearly 80% R
people of the total population are depending on the agriculture.
This link is connecting to ANKADELI TOP village with ANKADELI DOWN COB . After transfering
all-weather road in future the road will provide access to the people from existing habitations having
than five hundred population and will lead it to the market centre and will connect to PWD Road.
1.5 Climatic Condition
Avarage annual rain fall is near about 1500mm to 1650mm, humidity is fair near about 75% to 100% and m
temprature is 42 degree celcius and min temparature is around 14 degree celcius.

1.6 The Sub-Project Road


The Sub-project road ANKADELI DOWN COB to ANKADELI TOP is a link road with Code L-82 in LAM
block of KORAPUT District. This road directly connects the habitations of villages Ankadeli with populat
200 , 300 ,120 total 620 respectively. Thus this link road serves the total population of 651 Nos.The road is
from T- intersection from PWD Road , The road passes through plain terrain.

District: KORAPUT
Block: LAMTAPUT
ANKADELI DOWN COB To ANKADELI TOP
Road Name:
Road Code: L-82
Package No: OR19RCPL-16
Road Length: 2225 m
Detailed Project Report

DOWN COB To ANKADELI TOP

CPLWE)
cess to economic and social
ployment opportunities. It is

ced in 2000, a massive rural


:-

n greater than 1000 by 2003

ter than 500 people [250 in


mir and Uttaranchal), the

ELI DOWN COB and

s earthen. During rainy season


s no other existing road nearby

itations is termed as the Core


habitation to the nearby Market

e the ones which collect traffic


or a higher category road, i.e.
necting a single habitation or a
Link Routes generally have
nce of two or more Link

purposes. However, since


to be a cost-effective
he context of scarce resources.

3'E to 860-25'E & have 7584.7


y of 116/Sq.Km. The entar
district. Nearly 80% Rural
OB . After transfering into an
g habitations having more
ect to PWD Road.
out 75% to 100% and max

ith Code L-82 in LAMTAPUT


Ankadeli with populations of
f 651 Nos.The road is start
The detail description of design issues and solution in finalising the drawing,
provision of road .

Table 2.1 Road Design Brief


Sl. Location Issue
1 CH: 0Km. This road start with T- intersection
from RD Road . At the beginning of
the road is wide and open to construct
road.

3 CH: 0/00 to 0/100 To develop the road for allweather


Km. road.

CH :0/100KM Habitation area, it is necessary to


0/160KM develop the road for allweather road.

CH :0/160KM To develop the road for allweather


-2/225 KM road.

20 CH: 2.225Km. Here the Village Ankadeli is


terminating.
gn issues and solution in finalising the drawing,

Design Solutions
The proposed road ANKADELI DOWN
COB To ANKADELI TOP starting portion
is a belmouth, So it is designed as T-
junction and has recomended to construct as
per design .
It proposed for Flexible pavement

Habitation area, it is proposed for rigid


pavment .

It proposed for Flexible pavement

So the sub project Road here terminates.


2.5 Transect Walk Summary

Existing Additional
Type of Loss
Chainage Land Land Required Village Remarks/ Suggestion
Width
LHS RHS LHS RHS
0/00 7.30 1.10 2.20 Agricultural Agricultural
Land Land
0 7.00 1.15 1.35 Agricultural Agricultural 1000mm ф HPC S/R
Land Land

0 7.40 1.65 1.59 Agricultural Agricultural 1000mm ф HPC S/R


Land Land
0 7.80 1.20 1.45 Barren Land Barren Land 1000mm ф HPC S/R

0 6.98 2.19 2.32 Agricultural Agricultural 1000mm ф HPC S/R


Land Land
0 6.50 2.80 1.85 Barren Land Barren Land 1X2x2M Slab
Ankadeli
0 7.00 2.00 2.20 Barren Land Barren Land 1X2x2M Slab

0 6.90 1.95 1.85 Agricultural Agricultural 1000mm ф HPC D/R


Land Land
3500-3680 7.20 0.00 0.00 House House C.C road is proposed

Err:509 7.60 2.85 1.86 Agricultural Agricultural Err:509


Land Land

5000-5200 6.90 0.00 0.00 House House C.C road is proposed

2.6 Checklist
Transect walk done Yes
ü No
Transect walk summary table included Yes
ü No
Photographs taken Yes
ü No
Major changes in alignment perceived Yes
No ü
Design brief provided Yes
ü No
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 me of the Road : ANKADELI DOWN COB To ANKADELI TOP

3 Topographic Survey
3.1 General

Topographic survey to the ground realties have been done using Total Station
instruments, the collection of raw data from instrument is given below with the
following features of item 3.2 and 3.3 and TBM points, Cross-section Details &
Dataprocessing are done by our in house software.

The in-house standards, work procedures and quality plan prepared with reference to
IRC: SP 19-2001, IRC: SP 20, IRC: SP 13 (in respect of surveys for rivers/streams) and
current international practices have been followed during the above survey.

3.2 Traversing
Traverse has been done by total station having angular measurement accuracy of ± 1
sec.
Please see the brief methodology of traverse survey which is attached
3.3 Leveling
For accurace we are followed traverse close at each 250m distance and also save back
side reading in the Total station instrument.

3.4 Section &


Cross sections Detailing
were taken at 30 m interval and at closer interval in curved portion of
the existing road. All physical features of the road were recorded.

{Generally,
All cross
data from section will
topographic be taken
survey at every
recorded 30m interval.
by total In case
station were of any major
downloaded and variat
final
alignment, plan, profile were prepared and presented in AutoCAD Format.

3.6 Data from TS in (stn,X,Y,Z,Code) format given below.

TBM with northing-easting are given

Sl. No.Stn Northing Easting ElevationCode


1 {Tick
1 the relevant box} 30239.61 19363.36 310 TBM

TBM with northing-easting given Yes ü No


Traverse survey carried out Yes No ü
Cross section and detailing carried out Yes ü No
ANKADELI DOWN COB To ANKADELI TOP

QUARRY CHART *(NOT TO SCALE)

Name of the Works:-


ANKADELI DOWN COB To ANKADELI TOP
LENGTH OF ROAD:- 2225.0 KM.

GRANITE PRODUCT RANDOM RUBBLE H.G STONE


BEHERAGUDA CRUSHER :- 93 KM BEHERAGUDA CRUSHER
:- 93 KM

MORRUM SAND FOR MORTAR & FILLING


LOCAL :- 10 KM PADUA = 25 KM

CEMENT STEEL
JYPORE :- 86 KM VIZAG :- 242 Km

BITUMEN HUME PIPE


VIZAG :- 242 KM JEYPORE :-86 KM

EMULSION
VIZAG :- 242 KM

Junior Engineer Asst. Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
5.0 Traffic Survey
5.1 General
In the present scenario of new connectivity road, 3 day, 24 hr traffic volume count has been
conducted at chainage 0/000 Km on the existing "Gompakonda-Bhejangiwada-Orkel" road, 38.7
Km. The Classified Volume Count survey has been carried out in accordance with the
requirements of the TOR and relevant codes (IRC: SP: 19-2001, IRC: SP: 20, IRC: SP: 72-2015,IRC:
37-2012). The surveys have been carried out by trained enumerators manually under the
monitoring of Engineering Supervisor. Further additional traffic survey was done at the junction
of the Project road & N.H-326 at chainage 138/000 Km (On N.H 326). It is expected that about 30-
40 percent of the traffic load [Those road users whose destination is Balimela/near by towns to
Balimela] from the NH is expected to be diverted to our project road in future considering the
fact that the Project Road will reduce the journey distance by approx. 13 Km for the road users
who are travelling to Balimela. An additional traffic survey was carried out on a parallel road i.e
"Malkangiri-Balimela" Road [M.D.R] whose traffic pattern is expected to be reflected on our
project road.

5.1 (a) Design traffic justification/calculation summary for the Project Road

●Cumulative Design ESAL for the Project road i.e "Gompakonda-Bhejangiwadaa-Orkel" Road
based on the 3 days traffic count done at chainage 0/000 km on 4/08/2017, 5/08/2017 &
6/08/2017 = 1472984

●Cumulative Design ESAL for the N.H-326 at section 138/000 Km, based on the 3 days traffic
count done 1/08/2017, 2/08/2017 & 3/08/2017 = 1998345

●It is assumed that 40% of the ESAL of theN.H-326 will ply on the Project road at the design
period, once the road is completed. This assumption is based on the facts discussed above in
point 5.1.
● So, the design ESAL for the Project road based on all the above points =
(1472984+0.40*1998345)=2272322
● This traffic is almost same & comparable as that of the "Existing parallel Road i.e
Malkangiri-Balimela Road [M.D.R]" whose Design ESAL is 2343438
5.2 Traffic Data and Analysis for the Project Road i.e "Gompakonda-Bhejangiwada-Orkel"
The traffic count done was classified into different vehicle category as given below:

• Motorized vehicle comprising of light commercial vehicle, medium commercial vehicle, heavy

commercial vehicle, trucks, buses, agricultural tractors with trailers, car, jeep, two wheelers etc.

• Non- motorized vehicles comprising of cycle, rickshaw, cycle van, animal drawn vehicle etc.
The number of laden and un-laden commercial vehicles was recorded during the traffic counts.
Traffic volume count for this project road was done during peak season.

Average of 3 day traffic data is presented in Table 5.1


Table 5.1 Average Daily Traffic at junction of 0/000 Km of the Gompakonda-Bhejangiwada-
Orkel Road
Sl. Day-1 Day-2 Day-3
Type of Vehicle Average
No. 04.08.2017 05.08.207 06.08.2017
1. Car, Jeep, Van 222 231 236 230
2. Auto Rickshaw 0 0 0 0
3. Scooters/Motorbikes 497 683 467 549
4. Bus / Minibus 62 77 65 68
5. Trucks 116 130 118 121
6. Tractors 150 161 117 143
7. Cycles 96 90 84 90
8. Cycle Rickshaw / Hand Cart 2 6 4 4
9. Horse cart / Bullock Cart 0 0 0 0
10. Pedestrian 0 0 0 0
Total commercial vehicle per day (CPVD) 328 368 300 332
Total motorised vehicle per day 1111
Total non-motorised vehicle per day 94

a. Traffic volume and mix do not vary along the Road Yes No
b. Traffic volume and mix vary along the Road Yes No
c. Traffic volume and mix will vary along the road in the Future Yes No
d. There is a potential for through traffic using the Road Yes No
e. Percentage of loaded Vehicle. Yes 30% No
5.2 (a) Traffic Growth Rate and forecast
An average annual growth rate of 6% over the design life has been adopted.
Table 5.2 Average Annual Daily Traffic at M.V-62 Junction at Chainage 0/000 Km of Project
Road
Sl.
Type of Vehicle ADT AADT Growth Rate
No.
1. Car, Jeep, Van 230 6%
2. Auto Rickshaw 0
3. Scooters/Motorbikes 549 6%
4. Bus / Minibus 68
5. Trucks 121 6%
6. Tractors 143 6%
7. Cycles 90 1360 6%
8. Cycle Rickshaw / Hand Cart 4
9. Horse cart / Bullock Cart 0 6%
10. Pedestrian 0
Total commercial vehicle per day (cvpd)= 332 6%
Total motorised vehicle per day= 1111 6%
Total non-motorised vehicle per day= 94 6%
ESAL= 1472984

5.3 Traffic Data and Analysis for the Road i.e "N.H-326" at chainage 138/000 Km
The traffic count done was classified into different vehicle category as given below:

• Motorized vehicle comprising of light commercial vehicle, medium commercial vehicle, heavy

commercial vehicle, trucks, buses, agricultural tractors with trailers, car, jeep, two wheelers etc.

• Non- motorized vehicles comprising of cycle, rickshaw, cycle van, animal drawn vehicle etc.
The number of laden and un-laden commercial vehicles was recorded during the traffic counts.
Traffic volume count for this project road was done during peak season.
Average of 3 day traffic data is presented in Table 5.3
Table 5.3 Average Daily Traffic at junction of 138/000 Km of the N.H-326
Sl. Day-1 Day-2 Day-3
Type of Vehicle Average
No. 01.08.2017 02.08.2017 03.08.2017
1. Car, Jeep, Van 222 231 236 230
2. Auto Rickshaw 0 0 0 0
3. Scooters/Motorbikes 497 683 467 549
4. Bus / Minibus 62 77 65 68
5. Trucks 143 155 145 148
6. Tractors 182 183 148 171
7. Cycles 96 90 84 90
8. Cycle Rickshaw / Hand Cart 2 6 4 4
9. Horse cart / Bullock Cart 0 0 0 0
10. Pedestrian 0 0 0 0
Total commercial vehicle per day (CPVD) 387 415 358 387
Total motorised vehicle per day 1166
Total non-motorised vehicle per day 94

a. Traffic volume and mix do not vary along the Road


Yes No
b. Traffic volume and mix vary along the Road Yes No
c. Traffic volume and mix will vary along the road in the Future
Yes No
d. There is a potential for through traffic using the Road Yes No
e. Percentage of loaded Vehicle. Yes 30% No
5.3 (a) Traffic Growth Rate and forecast
An average annual growth rate of 6% over the design life has been adopted.
Table 5.4 Average Annual Daily Traffic at 138/000 Km on N.H-326
Sl.
Type of Vehicle ADT AADT Growth Rate
No.

1. Car, Jeep, Van 230 5%


2. Auto Rickshaw 0 5%
3. Scooters/Motorbikes 549 5%
4. Bus / Minibus 68 5%
5. Trucks 148 5%
6. Tractors 171 5%
7. Cycles 90 1421 5%
8. Cycle Rickshaw / Hand Cart 4 5%
9. Horse cart / Bullock Cart 0 5%
10. Pedestrian 0 5%
Total commercial vehicle per day (cvpd)= 387 5%
Total motorised vehicle per day= 1166 5%
Total non-motorised vehicle per day= 94 5%
ESAL= 3773315
N.H-326 at Section 138/000 KM
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : N.H-326 at Section 138/000 KM Annexure 5.3(a)

Location of Road :138/000 Km Date:- 01.08.2017 9See Para 5.6)

District : Malkangiri
State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Hour Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded

From 5.00Hrs.
To 9.00 Hrs. 100 117 15 23 12 0 21 15 1 100 0 0 25 1 0 0

From 9.00 Hrs.


To 13.00Hrs. 200 135 17 27 12 3 26 25 2 0 0 0 24 0 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 58 133 16 29 12 2 25 21 3 0 0 0 32 1 0 0

From 17.00Hrs.
To 21.00 Hrs. 67 112 14 25 11 3 26 23 0 0 0 0 15 0 0 0

Total for day 425 497 62 104 47 8 98 84 6 100 0 0 96 2 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
N.H-326 at Section 138/000 KM
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : N.H-326 at Section 138/000 KM Annexure 5.3(a)

Location of Road :138/000 Km Date:-02.08.2017 9See Para 5.6)

District : Malkangiri

State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Hour Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded
From 5.00Hrs.
To 9.00 Hrs. 42 139 19 27 12 1 19 18 2 0 0 0 24 1 0 0

From 9.00 Hrs.


To 13.00Hrs. 70 173 21 24 18 4 28 25 2 0 0 0 22 1 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 46 175 17 21 15 6 22 24 1 0 0 0 21 2 0 0

From 17.00Hrs.
To 21.00 Hrs. 67 196 20 29 14 2 21 26 1 0 0 0 23 2 0 0

Total for day 225 683 77 101 59 13 90 93 6 0 0 0 90 6 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
N.H-326 at Section 138/000 KM
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : N.H-326 at Section 138/000 KM Annexure 5.3(a)

Location of Road :138/000 Km Date:-03.08.2017 9See Para 5.6)

District : Malkangiri

State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
Hour wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded

From 5.00Hrs.
To 9.00 Hrs. 59 115 17 24 11 2 25 21 2 0 0 0 27 1 0 0
From 9.00 Hrs.
To 13.00Hrs. 57 105 16 23 15 1 25 11 3 0 0 0 26 2 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 55 116 14 24 10 2 26 9 1 0 0 0 18 0 0 0
From 17.00Hrs.
To 21.00 Hrs. 57 131 18 25 12 0 23 8 0 0 0 0 13 1 0 0

Total for day 228 467 65 96 48 5 99 49 6 0 0 0 84 4 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
N.H-326 at Section 138/000 KM
SUMMARY OF 3 DAY COUNTS
Name of Road : N.H-326 at Section 138/000 KM
Location of Road: 138/000 Km
District : Malkangiri
State : Odisha
Vehicle Class
Car, Jeeps, Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Vehicles Total
Day Three- two- Pick up / Rickshaw (SWC)
Wheelers wheelers Vans
Laden Unladen O-loaded Laden Unladen O-loaded Laden Unladen O-loaded SWC Num.Tyred
Day 1 226 497 62 225 47 8 98 84 500 0 0 0 96 2 0 0 1845
Day 2 225 683 77 325 59 13 90 93 600 0 0 0 90 6 0 0 2261
Day 3 228 467 65 96 48 5 99 49 345 0 0 0 84 4 0 0 1490
Total: 679 1647 204 646 154 26 287 226 1445 0 0 0 270 12 0 0 5596
Average Daily
226 549 68 215 51 9 96 75 482 0 0 0 90 4 0 0 1865
Traffic
PCU Factor 1.0 0.5 1.0 3.0 3.0 3.0 4.5 4.5 4.5 3.0 3.0 3.0 0.5 2.0 6.0 6.0
Average Daily
226 275 68 645 153 27 432 338 2169 0 0 0 45 8 0 0 4386
Traffic PCUs

Total Motorized
PCU/Day PCU/Day

ADT Total (T)= 1865 PCU per day 4386 4333


No of harvesting season (a ) = 1 PCU/day Before opening of road (after 2 day)
4928 4869
No of times traffic in peak period than in lean period n1 1 n2 0 @6% growth rate =
Value of t (assumed in days) = t1 70 t2 0 Design service volume in PCU/day (after 10
year) @ 6% growth rate = 8825 8720
Design Traffic AADT =T+(0.6 n a T t )/365 = 2080
Corrected AADT for Solid Wheeled Cart = 2080 1.00 2080
Before opening of road to traffic AADT i.e. after 1 year
(2nd year) @6% growth rate = 2337

Accordingly Laden Heavy Commercial Vehicles = 269 Laden Medium Commercial Vehicles = 120
Unladen Heavy Commercial Vehicles = 64 Unladen Medium Commercial Vehicles = 94
Overloaded Heavy Commercial Vehicles = 11 Overloaded Medium Commercial Vehicles = 604
CVPD for Design ( taking the traffic at the time of opening) = 1162
Cumulative ESAL applications per day as per V.D.F. values in para 3.4.4 of SP-72-2007 Values of V.D.F.
Laden HCV = 694.02 Vehicle Laden Unladen O-Loaded
Unladen HCV = 19.84 HCV 2.58 0.31 2.86
Overloaded HCV = 31.46 MCV 0.31 0.019 0.344
Laden MCV = 37.20
Unladen MCV = 1.79
Overloaded MCV = 207.78
Total (T0) = 784.31
Cumulative ESAL applications over 10 year @6% growth rate = T0 x 4811 X L (ESAL)= 3773315
So at the end of the design period it is expected that, 40% of this design traffic is likely to be diverted to our project road I.e "Gompakonda-Bhejangiwada-Orkel" Road.

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
Gompakonda-Bhejangiwada-orkel Road
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : Gompakonda-Bhejangiwada-orkel Road Annexure 5.3(a)

Location of Road :0.000 Km Date:- 04.08.2017 9See Para 5.6)

District : Malkangiri
State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Hour Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded

From 5.00Hrs.
To 9.00 Hrs. 53 117 15 18 14 0 17 15 1 0 0 0 25 1 0 0

From 9.00 Hrs.


To 13.00Hrs. 44 135 17 15 10 3 14 25 2 0 0 0 24 0 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 61 133 16 17 13 2 19 21 3 0 0 0 32 1 0 0

From 17.00Hrs.
To 21.00 Hrs. 64 112 14 19 10 3 16 23 0 0 0 0 15 0 0 0

Total for day 222 497 62 69 47 8 66 84 6 0 0 0 96 2 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
Gompakonda-Bhejangiwada-orkel Road
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : Gompakonda-Bhejangiwada-orkel Road Annexure 5.3(a)

Location of Road :0.000 Km Date:-05.08.207 9See Para 5.6)

District : Malkangiri

State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Hour Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded
From 5.00Hrs.
To 9.00 Hrs. 42 139 19 19 12 1 16 18 2 0 0 0 24 1 0 0

From 9.00 Hrs.


To 13.00Hrs. 71 173 21 16 18 4 19 25 2 0 0 0 22 1 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 52 175 17 14 15 6 20 24 1 0 0 0 21 2 0 0

From 17.00Hrs.
To 21.00 Hrs. 66 196 20 22 14 2 13 26 1 0 0 0 23 2 0 0

Total for day 231 683 77 71 59 13 68 93 6 0 0 0 90 6 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
Gompakonda-Bhejangiwada-orkel Road
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : Gompakonda-Bhejangiwada-orkel Road Annexure 5.3(a)

Location of Road :0.000 Km Date:-06.08.2017 9See Para 5.6)

District : Malkangiri

State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
Hour wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded

From 5.00Hrs.
To 9.00 Hrs. 46 115 17 16 11 2 21 21 2 0 0 0 27 1 0 0
From 9.00 Hrs.
To 13.00Hrs. 66 105 16 12 15 1 18 11 3 0 0 0 26 2 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 68 116 14 18 10 2 15 9 1 0 0 0 18 0 0 0
From 17.00Hrs.
To 21.00 Hrs. 56 131 18 24 12 0 14 8 0 0 0 0 13 1 0 0

Total for day 236 467 65 70 48 5 68 49 6 0 0 0 84 4 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
Gompakonda-Bhejangiwada-orkel Road
SUMMARY OF 3 DAY COUNTS
Name of Road : Gompakonda-Bhejangiwada-orkel Road
Location of Road: 0.000 Km
District : Malkangiri
State : Odisha
Vehicle Class
Car, Jeeps, Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Vehicles Total
Day Three- two- Pick up / Rickshaw (SWC)
Wheelers wheelers Vans
Laden Unladen O-loaded Laden Unladen O-loaded Laden Unladen O-loaded SWC Num.Tyred
Day 1 222 497 62 69 47 8 66 84 6 0 0 0 96 2 0 0 1159
Day 2 231 683 77 71 59 13 68 93 6 0 0 0 90 6 0 0 1397
Day 3 236 467 65 70 48 5 68 49 6 0 0 0 84 4 0 0 1102
Total: 689 1647 204 210 154 26 202 226 18 0 0 0 270 12 0 0 3658
Average Daily
230 549 68 70 51 9 67 75 6 0 0 0 90 4 0 0 1219
Traffic
PCU Factor 1.0 0.5 1.0 3.0 3.0 3.0 4.5 4.5 4.5 3.0 3.0 3.0 0.5 2.0 6.0 6.0
Average Daily
230 275 68 210 153 27 302 338 27 0 0 0 45 8 0 0 1683
Traffic PCUs

Total Motorized
PCU/Day PCU/Day

ADT Total (T)= 1219 PCU per day 1683 1630


No of harvesting season (a ) = 1 PCU/day Before opening of road (after 2 day)
1891 1831
No of times traffic in peak period than in lean period n1 1 n2 0 @6% growth rate =
Value of t (assumed in days) = t1 70 t2 0 Design service volume in PCU/day (after 10
year) @ 6% growth rate = 3386 3279
Design Traffic AADT =T+(0.6 n a T t )/365 = 1359
Corrected AADT for Solid Wheeled Cart = 1359 1.00 1359
Before opening of road to traffic AADT i.e. after 1 year
(2nd year) @6% growth rate = 1527

Accordingly Laden Heavy Commercial Vehicles = 88 Laden Medium Commercial Vehicles = 84


Unladen Heavy Commercial Vehicles = 64 Unladen Medium Commercial Vehicles = 94
Overloaded Heavy Commercial Vehicles = 11 Overloaded Medium Commercial Vehicles = 8
CVPD for Design ( taking the traffic at the time of opening) = 349
Cumulative ESAL applications per day as per V.D.F. values in para 3.4.4 of SP-72-2007 Values of V.D.F.
Laden HCV = 227.04 Vehicle Laden Unladen O-Loaded
Unladen HCV = 19.84 HCV 2.58 0.31 2.86
Overloaded HCV = 31.46 MCV 0.31 0.019 0.344
Laden MCV = 26.04
Unladen MCV = 1.79
Overloaded MCV = 2.75
Total (T0) = 306.17
Cumulative ESAL applications over 10 year @6% growth rate = T0 x 4811 X L (ESAL)= 1472984

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
Malkangiri Balimela Road at Chainage 7/000 Km
SUMMARY OF 3 DAY COUNTS
Name of Road : Malkangiri Balimela Road at Chainage 7/000 Km
Location of Road: 7/000 Km
District : Malkangiri
State : Odisha
Vehicle Class
Car, Jeeps, Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Vehicles Total
Day Three- two- Pick up / Rickshaw (SWC)
Wheelers wheelers Vans
Laden Unladen O-loaded Laden Unladen O-loaded Laden Unladen O-loaded SWC Num.Tyred
Day 1 261 526 81 112 54 9 110 92 9 14 0 0 96 2 0 0 1366
Day 2 239 623 76 110 59 13 102 65 6 10 0 0 93 9 0 0 1405
Day 3 263 472 78 107 48 5 104 68 7 10 0 0 84 8 0 0 1254
Total: 763 1621 235 329 161 27 316 225 22 34 0 0 273 19 0 0 4025
Average Daily
254 540 78 110 54 9 105 75 7 11 0 0 91 6 0 0 1340
Traffic
PCU Factor 1.0 0.5 1.0 3.0 3.0 3.0 4.5 4.5 4.5 3.0 3.0 3.0 0.5 2.0 6.0 6.0
Average Daily
254 270 78 330 162 27 473 338 32 33 0 0 46 12 0 0 2055
Traffic PCUs

Total Motorized
PCU/Day PCU/Day

ADT Total (T)= 1340 PCU per day 2055 1997


No of harvesting season (a ) = 1 PCU/day Before opening of road (after 2 day)
2309 2244
No of times traffic in peak period than in lean period n1 1 n2 0 @6% growth rate =
Value of t (assumed in days) = t1 70 t2 0 Design service volume in PCU/day (after 10
year) @ 6% growth rate = 4135 4019
Design Traffic AADT =T+(0.6 n a T t )/365 = 1494
Corrected AADT for Solid Wheeled Cart = 1494 1.00 1494
Before opening of road to traffic AADT i.e. after 1 year
(2nd year) @6% growth rate = 1679

Accordingly Laden Heavy Commercial Vehicles = 152 Laden Medium Commercial Vehicles = 132
Unladen Heavy Commercial Vehicles = 68 Unladen Medium Commercial Vehicles = 94
Overloaded Heavy Commercial Vehicles = 11 Overloaded Medium Commercial Vehicles = 9
CVPD for Design ( taking the traffic at the time of opening) = 466
Cumulative ESAL applications per day as per V.D.F. values in para 3.4.4 of SP-72-2007 Values of V.D.F.
Laden HCV = 392.16 Vehicle Laden Unladen O-Loaded
Unladen HCV = 21.08 HCV 2.58 0.31 2.86
Overloaded HCV = 31.46 MCV 0.31 0.019 0.344
Laden MCV = 40.92
Unladen MCV = 1.79
Overloaded MCV = 3.10
Total (T0) = 487.41
2344930
Cumulative ESAL applications over 10 year @6% growth rate = T0 x 4811 X L (ESAL)=
So at the end of the design period it is expected that THE SIMILAR TRAFFIC will be plying on our Project Road which i.e "Gompakonda-Bhejangiwada-Orkel" Road.

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
Malkangiri Balimela Road at Chainage 7/000 Km
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : Malkangiri Balimela Road at Chainage 7/000 Km Annexure 5.3(a)

Location of Road :7/000 Km Date:- 29.08.2017 9See Para 5.6)

District : Malkangiri
State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Hour Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded

From 5.00Hrs.
To 9.00 Hrs. 60 120 20 28 14 0 26 20 2 4 0 0 25 1 0 0

From 9.00 Hrs.


To 13.00Hrs. 61 141 21 26 12 2 29 21 2 3 0 0 24 0 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 68 143 22 30 13 4 30 25 1 5 0 0 32 1 0 0

From 17.00Hrs.
To 21.00 Hrs. 72 122 18 28 15 3 25 26 4 2 0 0 15 0 0 0

Total for day 261 526 81 112 54 9 110 92 9 14 0 0 96 2 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
Malkangiri Balimela Road at Chainage 7/000 Km
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : Malkangiri Balimela Road at Chainage 7/000 Km Annexure 5.3(a)

Location of Road :7/000 Km Date:-30.08.2017 9See Para 5.6)

District : Malkangiri

State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Hour Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded
From 5.00Hrs.
To 9.00 Hrs. 52 140 20 27 12 1 22 15 2 2 0 0 32 2 0 0

From 9.00 Hrs.


To 13.00Hrs. 68 150 19 26 18 4 26 20 2 4 0 0 12 3 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 50 165 18 28 15 6 27 14 1 3 0 0 20 4 0 0

From 17.00Hrs.
To 21.00 Hrs. 69 168 19 29 14 2 27 16 1 1 0 0 29 0 0 0

Total for day 239 623 76 110 59 13 102 65 6 10 0 0 93 9 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
Malkangiri Balimela Road at Chainage 7/000 Km
FIELD DATA SHEET FOR TRAFFIC CENSUS
Name of Road : Malkangiri Balimela Road at Chainage 7/000 Km Annexure 5.3(a)

Location of Road :7/000 Km Date:-31.08.2017 9See Para 5.6)

District : Malkangiri

State : Odisha
Vehicle Class
Cars,Jeeps Motorised Mini bus / Trucks Agricultural Tractors- Trailers Buses Cycles Cycle Animal Drawn Remarks Season:Post Harvest /
Three two- Pick up / Rickshaw Vehicle Monsoon Weather:
Hour wheelers wheelers Vans
Laden Unladen Over Laden Unladen Over Laden Unladen Over SWC Num.Tyred
Loaded Loaded Loaded

From 5.00Hrs.
To 9.00 Hrs. 69 120 20 26 11 2 24 22 1 5 0 0 27 0 0 0
From 9.00 Hrs.
To 13.00Hrs. 67 115 21 27 15 1 25 19 4 2 0 0 26 5 0 0
Post Harvest
From 13.00 Hrs.
To 17.00Hrs. 65 116 18 29 10 2 26 12 2 1 0 0 18 1 0 0
From 17.00Hrs.
To 21.00 Hrs. 62 121 19 25 12 0 29 15 0 2 0 0 13 2 0 0

Total for day 263 472 78 107 48 5 104 68 7 10 0 0 84 8 0 0

Assistant Engineer Assistant Exe. Engineer Executive Enginer


Malkangiri (R&B) Section-IV Malkangiri (R&B) Sub-division-II Malkanagiri (R&B) Division
RCPLWE Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TO

5. Traffic Survey
5.1 General
At chainage 0.0Km traffic survey has taken , Here there is more vehciles than other chainages,
as it is not very good at the end of the road. This will be new road.
5.2 Traffic Data and Analysis

The traffic count done was classified into different vehicle category as given below:

•        Motorized vehicle comprising of light commercial vehicle, medium commercial vehicle,
heavy commercial vehicle, trucks, buses, agricultural tractors with trailers, car, jeep, two
wheelers etc.

•        Non- motorized vehicles comprising of cycle, rickshaw, cycle van, animal drawn vehicle
etc.

The number of laden and un-laden commercial vehicles was recorded during the traffic counts.
Traffic volume count for this project road was done during {Summer (Lean) season}. The
seasonal variation {Winter & Spring Season as Peak Season} is based on local enquiry.

Average of 3 day traffic data is presented in Table 5.1.


Table 5.1 Average Daily Traffic at 0:0Km (both ways)
Sl. Type of Vehicle Day-1 Day-2 Day-3
No. 15.05.2019 16.05.2019 17.05.2019
1 Car, Jeep, Van 125 70 85
2 Auto Rickshaw 152 19 16
3 Scooters/Motorbikes 80 55 85
4 Bus / Minibus (Loaded) 5 6 7
Trucks (Loaded) 3 2 3
5
Trucks (UnLoaded) 2 3 2
Tractors with trailer (Loaded) 8 8 7
6
Tractors with trailer (UnLoaded) 8 8 9
7 Tractor without trailer 9 9 10
8 Cycles 120 85 100
9 Cycle Rickshaw / Hand Cart 4 3 2
10 Horse cart / Bullock Cart 0 0 0
11 Pedestrian 350 200 294
Total commercial vehicle per day (cvpd)
Total motorised vehicle per day
Total non-motorised vehicle per day
Total ESAL
{Tick the relevant box}
a) Traffic volume and mix do not vary along the road
b) Traffic volume and mix vary along the road
c) Traffic volume and mix will vary along the road in the future
d) There is a potential for through traffic using the road
e) % of loaded vehicles

5.3 Traffic Growth Rate and forecast

There are no specific generators of traffic growth, so we may adopt an average annual
growth rate of 5% over the design life as set out in IRC: 37,2012.}

Table 5.2 Average Annual Daily Traffic at ANKADELI DOWN COB To ANKADELI TOP(
Sl. Type of Vehicle ADT AADT Growth
No. Rate
1 Car, Jeep, Van 93 130 5%
2 Auto Rickshaw 62 87 5%
3 Scooters/Motorbikes 73 102 5%
4 Bus / Minibus 6 8 5%
Trucks ( Laden) 3 4 5%
5
Trucks ( Un-Laden) 2 3 5%
Tractors with trailers (Laden) 8 11 5%
6
Tractors with trailers (Un-Laden) 8 11 5%
7 Tractors without trailers 9 13 5%
8 Cycles 102 143 5%
9 Cycle Rickshaw / Hand Cart 3 4 5%
10 Horse cart / Bullock Cart 0 0 5%
11 Pedestrian 281 394 5%
Total commercial vehicle per day (cvpd) 36 50 5%
Total motorised vehicle per day 264 369 5%
Total non-motorised vehicle per day 105 147 5%
ESAL 29 36 5%

Cumulative ESAL Applications For Single Lane


(N)= 4811 x 36 = 173196
Detailed Project Report

LI DOWN COB To ANKADELI TOP

han other chainages,

ven below:

commercial vehicle,
s, car, jeep, two

animal drawn vehicle

ring the traffic counts.


an) season}. The
ocal enquiry.

Average VDF

93
62
73
6 2.86
3 2.86
2 0.31
8 0.34
8 0.02
9 0.02
102
3
0
281
36
264
105
29
an average annual

B To ANKADELI TOP(
VDF

2.56
2.56
0.31
0.31
0.019
0.019
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Road : ANKADELI DOWN COB To ANKADELI TOP

4. Soil and Materials Survey


4.1 General
The soil and material investigations were done following the guidelines of IRC: SP: 20-2002
and IRC: SP: 72-2007 and other relevant IS codes. The potential sources of borrow areas for
soil and quarry sites are identified.

4.2 Soil sample collection and Testing


•        Grain size analysis as per IS : 272 (Part 4) – 1985
•        Atterberg’s limit as per IS : 2720 (Part 5) – 1985
•        Standard Proctor density test as per IS : 2720 (Part 7) – 1980
•        4 day soaked CBR test as per IS : 2720 (Part 16) – 1985

{The IRC Rural Roads Manual SP: 20 contain instructions on Soil Survey and materials for the
road projects. Supplementary guidance on these subjects is given in Annexure 5.1.The
identification of the soil type in the field and the quick determination of its properties,
including CBR are the basic requirement for an economical pavement design. The grain-size
(wet sieve) analysis leading to the soil classification is a simple test and must be carried out to
have an idea of the CBR value with a reasonable level of accuracy; the nomograph given in
Annexure 5.2 can be used. This would minimise the need for CBR determination in lab. The
determination of CBR by a rigorous CBR apparatus on a large number of samples may not be
possible unless properly planned, and hence the nomograph given in Annexure 5.2 may be
used.}

Attached details of soil tests in Annexure-1


4.3 Analysis of Test Results
The laboratory soaked CBR value ranges from 7% to 7.2 %. The soil laboratory test results will
be summarized in Table 4.1
Table 4.1 CBR values for different stretches
Sl.No Section CBR
1. Sample is collected from existing Road's wheel track at CH: = 0m
(%)
7

2 Sample is collected from existing Road's wheel track at CH: = 1000m 7.2

3 Sample is collected from existing Road's wheel track at CH: = 2000m 7.1

4.4 Coarse and Fine Aggregates


The source of aggregate and sand is gathered. The stone aggregates shall be procured
fromBeheraguda,Local and Beheraguda only.

4.5 Sub-soil investigation for bridges N.A


4.6 Checklist
Borrow pit suitable Yes ü No
SSI for existing ground Yes ü No
Investigation for coarse/fine aggregate Yes ü No
Quarry map Yes ü No
SUMMARY OF 3- DAY COUNT ON A SIMILAR NEAR BY ROAD
PERIOD OF DATA = LEAN PERIOD
Name of the Road: ANKADELI DOWN COB To ANKADELI TOP NO OF HARVESTING SEASON a = 2 Nos.
Pakage No: OR19RCPL-16 DURATION OF PEAK PERIOD t = 75 days
Location on Road : 0/500 NO OF TIMES OF TRAFFIC(n) IN PEAK
District : KORAPUT PERIOD THAN LEAN PERIOD(T) n = 1 Nos.
State : ODISHA TRAFFIC IN LEAN PERIOD PER DAY(ADT) T = 1208 Nos.

Vehicle Class
(Medium-Heavy (Heavy
(Medium-Heavy (Heavy Commercial
Commercial Commercial
Commercial Vehicle) Vehicle)
Vehicle) Vehicle)
Day
Pick-up Vans , Medium Agricultural Tractors/
Cars, Jeeps, Trucks Full size Buses
Motorised two- sized trucks, Mini -Bus Trailers
Vans, Three- Cycles
wheelers
wheelers
L U.L L U.L L U.L L U.L
Day-1 15.05.2019 277 100 50 50 165 165 270 270 2 2 120
Day-2 16.05.2019 89 65 70 70 90 90 250 250 2 2 85
Day-3 17.05.2019 101 85 75 75 70 70 200 200 7 7 100
Total 467 250 195 195 325 325 720 720 11 11 305
Average Daily Traffic 156 83 65 65 108 108 240 270 4 4 102
PCU Faactor 1 0.5 1.0 3.00 3.00 3.00 4.50 4.50 4.50 3.00 0.50
Average Daily PCU 157 84 66 68 111 111 245 275 9 7 103
DESIGN:
Average Daily Traffic ADT = 1208 Nos

Avarage annual daily trafic i.e AADT = T + (2x0.5xn x T x t) AADT = 1506 Nos
365
Let us assuming an intial traffic growth @ 5% per annum.
Before opening the road to traffic (For 1years) the AADT = 1596
From the given traffic count data, AADTs of commercial vehicles are as follows: (VDF = Vehicle Damage Factor)
Laden Medium Commercial Vehicle(LMCV) in above AADT = 403 Nos 0.31
Un Laden Medium Commercial Vehicle(UMCV) in above AADT = 443 Nos 0.019
Laden Heavy Commercial Vehicle(LHCV) in above AADT = 148 Nos 2.58
Un Laden Heavy Commercial Vehicle(UHCV) in above AADT = 148 Nos 0.31
Cumulative ESAL applications for 10year with uniform growth rate @ 5%
Equivalent Standard Axle Load, To = ESAL = MCV x VDF + HCV x VDF
ESAL = (403 x 0.31) + (148 x 2.58) + (443 x 0.019) + (148x 0.31)
ESAL = 561 Nos/day
Cumulative ESAL N= 2,024,228 ( N = ESAL x 4811 x L)
Solid
Wheel
cart
Total
Cycle Animal
Rickshaw Drawn
s Vehicles

4 0 1475
3 0 1066
2 0 992
9 0 3533
3 0 1208
2.00 6.00
5 6 1247
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

6 Hydrological Survey
6.1 General

Hydrological survey is necessary for design of adequate and safe Cross Drainage
Structures so that the rain water can pass as per natural slope. Hydrological survey
of the proposed road is based on the following observations:

•        Rainfall Data


•        Catchments Area
•        Time of Concentration
•        Existing Cross Drainage Structures
6.2 Rainfall Data
Rainfall Data as applicable for the project road were collected with maximum
rainfall occurring in the months of June & July.
Avarage Rain fall in mm/annum : mm/Annum
6.4 Time of Concentration
Time of concentration (tc) in hours is calculated from the formula of (0.87 x
L3/H)0.385, where L is distance from the critical point to the structure site in km
and H is the difference in elevation between the critical point and the structure site
in meters.
N COB To ANKADELI TOP
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

6 Hydrological Survey
6.1 General

Hydrological survey is necessary for design of adequate and safe Cross Drainage
Structures so that the rain water can pass as per natural slope. Hydrological survey
of the proposed road is based on the following observations:

•        Rainfall Data


•        Catchments Area
•        Time of Concentration
•        Existing Cross Drainage Structures
6.2 Rainfall Data
Rainfall Data as applicable for the project road were collected with maximum
rainfall occurring in the months of June & July.
Avarage Rain fall in mm/annum : mm/Annum
6.4 Time of Concentration
Time of concentration (tc) in hours is calculated from the formula of (0.87 x
L3/H)0.385, where L is distance from the critical point to the structure site in km
and H is the difference in elevation between the critical point and the structure site
in meters.
N COB To ANKADELI TOP
RCPLWEA Road
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKA

7 Adopted Geometric Design Standards


7.1 General
The geometric design standards for this project conform to RCPLWE guidelines and the guidelines as sta
IRC-SP 20:2002. Recommended design standards vis-à-vis the standards followed for this road are descri
below.
7.2 Terrain
The classification of terrain was plain
Terrain Cross slope of the country
classification
Plain & Rolling 0-10%

7.3 Design Speed


The proposed design speed along this project road is given , please refere from the following table

Road Plain terrain


classification Ruling Min.
Rural Roads 50 40
(VR)
7.4 Right of Way (ROW)
7.4 The requirement of ROW for this road is as follows (as specified in IRC-SP 20:2002):

Plain and Rolling Terrain (ROW in m)


Open Area Built-up Area
Road classification Normal Range Normal Range

15
Rural roads (VR) 15 15-25 15-20

7.5 Roadway Width


Roadway width adapted for this road is given below

Terrain
Classification
Plain and Roadway Width (m)
Rolling 9.0

7.6 Carriageway Width


The width of carriageway for this project road is 5.5 m. Carriageway width
7.7 Shoulders
It is proposed to have {1.75 m} wide shoulder.

7.8 Roadway width at cross-drainage structures


The roadway width at culvert locations for this road is 10 m.
7.9 Sight Distance
The safe stopping sight distance is applicable in the geometric design. The sight distance values for this ro
per IRC recommendations are presented below:
Design Speed Safe Stopping Sight
(km/hr) Distance (m)
40 30
7.1 Radius of Horizontal Curve
According to IRC recommendations/standards, the minimum radius of horizontal curve for this project r
given below:

Radius of Horizontal Curve (m)


Absolute
Terrain Category Ruling Minimum Minimum
Plain 90 60

To minimize extra land arrangement, minimum radius used is 20 m and design speed in these curves are
restricted to 20 km/hr.

7.11 Camber & Super elevation


A camber adopted on this road section is given below. The maximum super elevation is 7 % for this proje

Camber (%)
Low rainfall (Annual High rainfall (Annual
Surface type rainfall <1000mm rainfall >1000mm)
Thin bituminous 3.0
Road
Rigid Pavement 2.5

7.12 Vertical Alignment


The present road is in plain terrain and vertical alignment has been designed well within ruling gradient.
Generally, minimum gradient of 0.3% for drainage purpose is considered for designing the vertical alignm
this road. Vertical curves are not required when grade change is less than 1%, however a minimum vertic
curve is provided to avoid vertical kink.

7.13 Vertical Curves


For satisfactory appearance, the minimum length of vertical curve for different design speed is given in IR
20:2002. Vertical curves will be designed to provide the visibility at least corresponding to the safe stoppi
distance. Valley curves will be designed for headlight sight distance.
7.14 Side slope
Due to Constraint of Land H::V Slope = 1.5 : 1
7.15 Extra Widening of Pavement
The Extra Widening of Pavement at Curve as per IRC guideline is given
below:
Extra Widening
for 5.5 m wide
0.9 0.6 Nil
intermidiae lane
carriageway, (m)
Detailed Project Report

ad : ANKADELI DOWN COB To ANKADELI TOP

ines and the guidelines as stated in


owed for this road are described

om the following table


ight distance values for this road as
izontal curve for this project road is

ign speed in these curves are also

elevation is 7 % for this project road.

d well within ruling gradient.


r designing the vertical alignment of
%, however a minimum vertical

ent design speed is given in IRC-SP


responding to the safe stopping sight
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

8 The
Alignment
basic aim Design
of highway design is to identify
8.1 technically
General sound, environment-friendly and
economically feasible highway alignment.
The ensuing sections deals with obligatory
points, which control highway alignment,
design of cross-section, highway geometRY
The main components included in the highway
Ø            Cross-sectional elements
Ø            Embankment
Ø            Horizontal alignment
Ø            Vertical profile
Ø            Junctions and/or Interchanges
Ø            Road furniture
Ø            Miscellaneous items
8.2 Horizontal alignment
{Insert a table (example given below) on the physical features of the existing alignment and
possible geometric improvement required}
Table 8.1 – Features of Horizontal Alignment (Example
Chainage Length Descrip Reason for deviation from existing alignment,
tion if necessary
From To (km) (km)
(km)
0 2.225 2.225 Retaine
d
existing
centre
Checklist line
{Tick the relevant box}
a) Centre line of the existing and proposed horizontal alignment coincide
b) Centre line of the existing and proposed horizontal alignment deviate at certain sections

Chaina LHS Existing RHS Chain Approx


ge alignment age land
shift require
d (m)
0
2.225

Figure 8.1Schematic diagram showing location and offsets from existing alignment
Various horizontal geometric improvement carri
Table 8.2 – Horizontal Curve details
Cur CurveIP Chainage Radius Ls Speed Extra S.E Def Angle Lc Ltotal Hand
ve Type Widen of
No. needed Curve
(m) (m) (Kmph) in (m) D M S (m) (m) L/R
1 Transition2230.079 55 60 35 0.6 0.07 41 7 14 39.36 159.357 Right
2 Transition2468.166 40 61 30 0.6 0.07 49 5 22 34.21 156.208 Right
3 Transition7051.802 40 61 30 0.6 0.07 56 8 7 39.1 161.095 Right

3 Total (L) 113

8.3 Vertical alignmen Total Curve Area in BT Road 0.020


Total Curve Area in CC Road 2%
As the vertical gradient of the road alignment is less than 1%, Vertical curves are not proposed in this
Development of Junctions
No Chaina Junction Area of Description
of ge (M) Type Junction
jun
ctio
ns
1 0T 68.4 At the beginning of subproject road

68.4
0
Curve Area
BT/CC

BT 59.614
BT 57.125
BT 60.057
176.796

osed in this estimate.


RCPLWEA Road
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN C

9.0 Pavment Design

Name of the roANKADELI DOWN COB To ANKADELI TOP


District : KORAPUTBlock : LAMTAPUT Pakage No: OR19RCPL-16
9.1 General
The Road design has been carried out considering the sub-grade strength projected traffic & the
the guidelines of IRC SP-72- 2015 & IRC SP-62 2004. In built of area CC pavement are provided w
for hygienic & sefety reasons.
9.2 Pavement Design approch
9.2.1 Design life
The Road design life of 10 years is considered for the purpose of pavement design of flexible pa
9.2.2 Design traffic
The average annual daily traffic(AADT)for the opening year as well as as the total commercial v
(CVPD) is presented in table.

9.2.3 Determination of ESAL Appliications


DESIGN DATA :
(a) Cumulative ESAL Applications over 10years 2,024,228 Nos/day
(b) Average rain fall 1412 : mm/Annum
(c) Design C.B.R. of the sub-grade (Hard soil) :5%
HCV 2.86 0.31
MCV 0.34 0.02

9.3 Design Alternatives

Chainage Design alternatives considered


Pavement Shoulder
Ear
the Hard Morrum Soil stabilization
From To n Full shoulder and use of locally
Flexible Rigid
full widt 1.75 m available marginal
wi h each side materials.
dth
0 100 √
100 160 √
160 1250 √
1250 2225 √
9.4 Pavement composition
Flexible Pavement
The Flexible pavement is designed As per SP - 72 2015

SEAL COAT SEALING COAT


OGPC OPEN GRADED PREIX CARPET
BM LAYER BITUMINOUS MACADAM

BASE LAYER WET MIX MACADAM


SUB BASE
LAYER GRANULAR SUB BASE GR-IV

`
The Concrete pavement is designed as per IRC:SP-62
For Existing CC Portion

TOP LAYER Pavement Quality Concrete (PQC)

BASE LAYER PCC M-10

Junior Engineer Assistant Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi
Detailed Project Report

NKADELI DOWN COB To ANKADELI TOP

ected traffic & the design life as per


ent are provided with hard shoulder

sign of flexible pavement.

otal commercial vehicle per day

Specify
design
Justificati
alternati
on
ve
selected

20 MM THICK
50 MM THICK

225 MM THICK

150 MM THICK

100 mm THICK

100 mm THICK

Executive Engineer
R.&B. Division , Koraput
RCPLWEA Road

DPR Preparation, Works Department

Govt. of Odisha.

Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To AN

10. Design of Cross Drainage Works


10.1 General
On the basis of hydrological survey, 5 new cross drainage structures are recommended for the project road
below.

10.2 Hydrological Design


The existing structures in poor condition that are proposed for replacement as listed below. Agricultural co
which basically act as balancers, have also been provided as listed below in Table 10.2.

10.3 Design Feature


Design Standards for culverts has been prepared based on standard codes and guidelines of IRC: SP: 20: 20
similar type of ongoing projects. General features of the designed cross drainage structures are given below
For hume pipe culvert & slab, boxcell minimum road width has been
taken as 10 m,
10.4 Justification for retaining/widening and replacement of culverts
Design considerations developed after the transect walk is below formula

10.5 Hydraulic calculation for Culvert


The design discharge was calculated by the rational method considering peak runoff from catchment using
formula, Discharge by Dicken's Formula
Q =CM 2/3
Q=peak runoff in cum/sec , M= Catchment Area in sqkm , C = Annual Rainfall

Discharge calculation of new culverts

Table 10.2 Proposed Culverts


Sl. No. Chainage in (M) Type of Culvert Span/dia CONDITION

1 0/200 BRIDGE 10 M GOOD

2 0/800
HPC
600MM SINGLE ROW DAMAGE
3 1/375
HPC
1000MM SINGLE ROW --------------------
4 1/555
HPC
1000MM SINGLE ROW --------------------
5 1/600
HPC
1000MM SINGLE ROW --------------------
6 1/975
HPC
1000MM SINGLE ROW --------------------
Detailed Project Report

KADELI DOWN COB To ANKADELI TOP

ended for the project road as listed

ted below. Agricultural conduits,


e 10.2.

uidelines of IRC: SP: 20: 2002 and


structures are given below:

noff from catchment using the

PROVISION MADE

RETAIN

REPALCE WITH 1000 MM SR

NEW PROPOSE

NEW PROPOSE

NEW PROPOSE

NEW PROPOSE
RCPLWEA Road
DPR Preparation, Works Department
Govt. of Odisha. Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
Pakage No: OR19RCPL-16

11 Protection Works & Drainage


Necessary protection wall have been proposed near pond and water bodies Road falling & Hilly Area & Agricul
Land within the proposed alignment.

Sl. No. Toe wall


Chainage Chainage
1 1550-1650 LHS

100
Total 100 m
Proposed new Saucer drain on both side of the road on account of the built up area [Ballel To
Doraput Built-up Area] on BOTH side.

Sl. No. DRAIN


Chainage Chainage Chainage Chainage
1 100-160 BOTH
Total 120 m
Detailed Project Report

ANKADELI DOWN COB To ANKADELI TOP

water bodies Road falling & Hilly Area & Agricultural

Remark

FOREST AREA
,AGRICULTURAL LAND

ccount of the built up area [Ballel To

Remark

Bulitup area
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.me of the Road : ANKADELI DOWN COB To ANKADELI TOP
Pakage No: OR19RCPL-16

12 Land Requirement
12.1 General

The existing road is generally an earthen track with some stretches of earthen
(description of the road surface). Thus the project road is a new connectivity
road. The existing Right of Way (ROW) is varying from9.0 m to 15 m.
12.2 Proposed ROW

The width of carriageway has been considered as 5.5 in accordance with the
IRC-SP 20: 2002. The total roadway width is limited to 9.0 m with m earthen
shoulder on either side of carriage way. The proposed ROW generally varies
from 9 m – 15m depending upon the embankment height and the proposed
ROW is even less than 10 m in some stretches of habitation area and in areas
having tree plantation.
12.3 Additional Land
Width of Land Required in m
Sl. No. Chainage (m) LHS RHS Comments
1 0/00 TO 2/225 N/A
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

13 Utility shifting/relocation
Width of Land Required in m
Sl. No. Chainage (m) LHS RHS
1 0/00 TO 2/225
Detailed Project Report

KADELI DOWN COB To ANKADELI TOP

Comments
N/A
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16
the Road : ANKADELI DOWN COB To ANKADELI TOP

13 Utility shifting/relocation

Sl. No. Utility Type Qty Estimated Rate


1 Electric poles 0 Rs. 15,000.00
Etc.
Estimated Total Cost in RS.
Detailed Project Report

WN COB To ANKADELI TOP

Estimated Cost
Rs. 0.00

Rs. 0.00
RCPLWEA Road Detailed Project Report
DPR Preparation,Works Department
Govt. of Odisha.
Pakage No: Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

14 Traffic Management and Road Safety Measures


14.1 Road Furniture

Road Furniture details include:


Ø      Cautionary, mandatory and information signs
Ø      KM stones and 200m stones
Ø      Guard posts, crash barriers and speed breakers
Ø      Boundry Pillars
14.1.1 Road Markings

Road markings perform the important function of guiding and controlling traffic on a highway. The
markings serve as psychological barriers and signify the delineation of traffic paths and their lateral
clearance from traffic hazards for safe movement of traffic. Road markings are therefore essential to
ensure smooth and orderly flow of traffic and to promote road safety. The Code of Practice for Road
Markings, IRC: 35-1997 has been used in the study as the design basis. Schedules of Road Markings are
included in contract drawings.

14.1.2 Cautionary, Mandatory and Informatory Signs

Cautionary, mandatory and informatory signs are provided depending on the situation and function
they perform in accordance with the IRC: 67-2001 guidelines for Road Signs.
Overhead signs are proposed in accordance with IRC: 67-2001.
14.1.3 Kilometer Stone

The details of kilometre stones are in accordance with IRC: 8-1980 guidelines. Both ordinary and fifth
kilometre stones are provided as per the schedule. Kilometre stones are located on both the side of the
road.

The details of 200m stones conform to IRC: 26-1967. 200m stones are located on the same side of the
road as the kilometre stones. The inscription on the stones shall be the numerals 2,4,6 and 8 marked in
an ascending order in the direction of increasing kilometerage away from the starting station. Table
14.1 gives the details of Km. stone.5th km. stone and boundary pillars provided. figures in the table
below and this is shown in the drawings also.

Table 14.1
Details of Km. stone.5th km. stone and boundary pillars

Sl. Name of Road Chainage (km) 5th. Km. Km. stone 200m
stone (nos.) (nos.) stone
(nos.)
1 Name of the Road : 0.00km to 5.087Km 1 5 22
PMGSY ROAD To
BHATABARI
14.1.4 Delineators and Object Markers

Roadway delineators are intended to mark the edges of the roadway to guide drivers on the alignment
ahead. Object markers are used to indicate hazards and obstructions within the vehicle flow path, for
example, channelising islands close to the intersections.

Delineators and object markers are provided in accordance with the provisions of IRC: 79-1981. They
are driving aids and should not be regarded as substitutes for warning signs, road markings or
barriers.
14.1.5 Guard Posts, Crash Barriers and Speed Breakers

Guard posts are proposed on embankments of height more than 1.5m and bridge approaches. The
spacing of guard post shall be 10.0 m c/c in these areas. Typical Guard post consists of pre-cast (M20)
CC post of size 200 mm x 200 mm and a height of 600 mm above ground level. They are encased in
M15 cement concrete to a depth of 450 mm below ground level. Guard posts are painted with alternate
black and white reflective paint of 150 mm wide bands. Table 14.2 gives the details of guard posts,
crash barrier and speed breakers. A layout of a typical speed breaker is given below. {Insert figures in
the table below and this should be shown in the drawings also}
Table 14.2

14.3 Checklist for Road Safety Measures

Sl Road Safety Checklist


a A minimum 150 mm thickness of pavement GSB layer constructed to the full
roadway width
b The upper layer of all shoulders of sub‐base quality compacted to a minimum
thickness if 75 mm.
c Shoulder side slopes are not be steeper than 2H:1V unless stone pitching of the
slope is provided.
d Within densely populated habitations, a cement concrete (CC) pavement or V-
shaped side drain is constructed to the full width of the available roadway.
e Within habitations, wherever deep side drains are constructed either within or
adjacent to the roadway, is covered by slabs laid level with the adjacent
pavement and capable of being manually removed.
f In habitations where child playing areas border the road, a low profile wall,
raised kerb or similar form of boundary marking (depending on the site
conditions), is constructed to create a physical boundary and act as a deterrent
to the random movement of a child onto the road.

g On roads where, because of the lack of dry land in the general area, the shoulder
will be continually occupied and only intermittently available for traffic, speed
breakers are installed at regular intervals, not more than 300 m apart, for the
entire length of the road.
h The drawings show all obstructions in the proposed road shoulder with a note
that the obstruction is to be removed.
Detailed Project Report

N COB To ANKADELI TOP

ffic on a highway. The


paths and their lateral
e therefore essential to
de of Practice for Road
les of Road Markings are

situation and function

Both ordinary and fifth


d on both the side of the

on the same side of the


als 2,4,6 and 8 marked in
starting station. Table
d. figures in the table

Guard post
225
drivers on the alignment
he vehicle flow path, for

s of IRC: 79-1981. They


road markings or

dge approaches. The


onsists of pre-cast (M20)
. They are encased in
re painted with alternate
etails of guard posts,
below. {Insert figures in

Remarks
Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes
RCPLWEA Road Detailed Project Report
DPR Preparation,Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

14 Traffic Management and Road Safety Measures

{This DPR may be subjected to a road safety audit by an independent third party. The
recommendations of the road safety audit as approved by PIU shall be incorporated in the final DPR.}
14.1 Road Furniture

Road Furniture details include:


Ø      Cautionary, mandatory and information signs
Ø      KM stones and 200m stones
Ø      Guard posts, crash barriers and speed breakers
Ø      Boundry Pillars
14.1.1 Road Markings

Road markings perform the important function of guiding and controlling traffic on a highway. The
markings serve as psychological barriers and signify the delineation of traffic paths and their lateral
clearance from traffic hazards for safe movement of traffic. Road markings are therefore essential to
ensure smooth and orderly flow of traffic and to promote road safety. The Code of Practice for Road
Markings, IRC: 35-1997 has been used in the study as the design basis. Schedules of Road Markings are
included in contract drawings.
14.1.2 Cautionary, Mandatory and Informatory Signs

Cautionary, mandatory and informatory signs are provided depending on the situation and function
they perform in accordance with the IRC: 67-2001 guidelines for Road Signs.
Overhead signs are proposed in accordance with IRC: 67-2001.
14.1.3 Kilometer Stone

The details of kilometre stones are in accordance with IRC: 8-1980 guidelines. Both ordinary and fifth
kilometre stones are provided as per the schedule. Kilometre stones are located on both the side of the
road.

The details of 200m stones conform to IRC: 26-1967. 200m stones are located on the same side of the
road as the kilometre stones. The inscription on the stones shall be the numerals 2,4,6 and 8 marked in
an ascending order in the direction of increasing kilometerage away from the starting station. Table
14.1 gives the details of Km. stone.5th km. stone and boundary pillars provided. figures in the table
below and this is shown in the drawings also.

Table 14.1
Details of Km. stone.5th km. stone and boundary pillars

Sl. Name of Road Chainage (km) 5th. Km. Km. stone 200m
stone (nos.) (nos.) stone
(nos.)
1 Name of the Road : 0.00km to 2.225Km 0 2 10
ANKADELI DOWN
COB To
ANKADELI TOP
14.1.4 Delineators and Object Markers

Roadway delineators are intended to mark the edges of the roadway to guide drivers on the alignment
ahead. Object markers are used to indicate hazards and obstructions within the vehicle flow path, for
example, channelising islands close to the intersections.

Delineators and object markers are provided in accordance with the provisions of IRC: 79-1981. They
are driving aids and should not be regarded as substitutes for warning signs, road markings or
barriers.
14.1.5 Guard Posts, Crash Barriers and Speed Breakers

Guard posts are proposed on embankments of height more than 1.5m and bridge approaches. The
spacing of guard post shall be 10.0 m c/c in these areas. Typical Guard post consists of pre-cast (M20)
CC post of size 200 mm x 200 mm and a height of 600 mm above ground level. They are encased in
M15 cement concrete to a depth of 450 mm below ground level. Guard posts are painted with alternate
black and white reflective paint of 150 mm wide bands. Table 14.2 gives the details of guard posts,
crash barrier and speed breakers. A layout of a typical speed breaker is given below. {Insert figures in
the table below and this should be shown in the drawings also}

14.3 Checklist for Road Safety Measures

Sl Road Safety Checklist


a A minimum 150 mm thickness of pavement GSB layer constructed to the full
roadway width
b The upper layer of all shoulders of sub‐base quality compacted to a minimum
thickness if 75 mm.

c Shoulder side slopes are not be steeper than 2H:1V unless stone pitching of the
slope is provided.

d Within densely populated habitations, a cement concrete (CC) pavement or V-


shaped side drain is constructed to the full width of the available roadway.
e Within habitations, wherever deep side drains are constructed either within or
adjacent to the roadway, is covered by slabs laid level with the adjacent
pavement and capable of being manually removed.
f In habitations where child playing areas border the road, a low profile wall,
raised kerb or similar form of boundary marking (depending on the site
conditions), is constructed to create a physical boundary and act as a deterrent
to the random movement of a child onto the road.

g On roads where, because of the lack of dry land in the general area, the shoulder
will be continually occupied and only intermittently available for traffic, speed
breakers are installed at regular intervals, not more than 300 m apart, for the
entire length of the road.
h The drawings show all obstructions in the proposed road shoulder with a note
that the obstruction is to be removed.
i If a shoulder obstruction cannot be removed, hazard markers are installed to
mark the Obstruction,
j Hazard markers are installed at all pipe culvert headwalls.
k Hazard markers are installed at each end of all box culverts, river crossing
Detailed Project Report

N COB To ANKADELI TOP

rty. The
orated in the final DPR.}

ffic on a highway. The


paths and their lateral
e therefore essential to
de of Practice for Road
les of Road Markings are

situation and function

Both ordinary and fifth


d on both the side of the

on the same side of the


als 2,4,6 and 8 marked in
starting station. Table
d. figures in the table

Boundary
stone (nos.)
196
drivers on the alignment
he vehicle flow path, for

s of IRC: 79-1981. They


road markings or

dge approaches. The


onsists of pre-cast (M20)
. They are encased in
re painted with alternate
etails of guard posts,
below. {Insert figures in

Remarks
Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes

Yes
Yes
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

15 Specification
15.1 General
The “Specification for Rural Roads” published by IRC on behalf of the Min

15.2 Construction Equipment

Construction by manual means and simple tools has been considered for
the project as per the guideline of NRRDA. For handling of bulk
materials like spreading of aggregates in sub-base & base courses by mix-
in-place method, use of motor grader & tractor-towed rotavator has been
allowed in line with the schedule of rate for RCPLWE work. Compaction
of all items shall be done by ordinary smooth wheeled roller if the
thickness of the compacted layer does not exceed 100 mm. It is also
considered that, hot mix plant of medium type & capacity with separate
dryer arrangement for aggregate shall be used for bituminous surfacing
work that can be easily shifted. A self-propelled or towed bitumen
pressure sprayer shall be used for spraying the materials in narrow strips
with a pressure hand sprayer.

Now the vibratory rollers are also being used for rapid progress.
For structural works, concrete shall be mixed in a mechanical mixer fitted

The excavation shall be done manually or mechanically using suitable


medium size excavators.

15.3 Construction Methods


15.3.1 Preparation for Earthwork
After setting out existing ground shall be scarified to a minimum depth
of 150 mm and leveled manually and compacted with ordinary roller to
receive the first layer of earthwork. In filling area, existing embankment
will be generally widened on both sides as per the alignment plan.
Continuous horizontal bench, each at least 300 mm wide, shall be cut on
the existing slopes for bonding with the fresh embankment/ subgrade
material as per Cl 301.7.

15.3.2 Embankment work


Material from borrow pits will be used for embankment construction as
well as the approved material deposited at site from roadway cutting and
excavation of drain & foundation may be used. Layer of the earth shall be
laid in not more than 25 cm (loose) thick layers & compacted each layer
of the soil up to 30 cm below the subgrade level at OMC to meet 97% of
Standard Proctor Density.

Material for embankment and sub-grade shall satisfy the requirements of


Table 300-1 and 300-2 as per the Specification for Rural Roads.
15.3.3 Sub-grade
Material from borrow pits will be used for construction of top 30 cm as
sub-grade. Soil in these sections is quite good for road construction. Top
30 cm upto the subgrade level and shoulder at OMC to meet 100 % of
Standard Proctor Density by proper control of moisture and by required
compaction with a smooth wheeled roller.
15.3.4 Sub-base
Sub base material in the form of stone aggregates and sand as available in
the area to be used in GSB Grade IV layer.
15.3.5 Base
Stone aggregates will be used in base course. 63 mm to 45 mm size
(Grading 2) aggregate has been proposed for the bottom layer and 53 mm
to 22.4 mm (Grading 3) size has been proposed for the top layer.
15.3.6 Shoulder
Earthen shoulder shall be constructed in layers and compacted to 100% of
Proctor’s Density. First layer of shoulder shall be laid after the sub–base
layer is laid. Thereafter earth layer shall be laid with base layer of
pavement and compacted.

15.3.7 Surfacing
Slow setting bitumen emulsion will be applied as primer on Wet Mix
Macadam (WMM) layer. Emulsion shall be sprayed on surface with
pressure distributor. Rapid setting bituminous emulsion shall be used for
Tack coat.

Bituminous Macadam and OGPC equivalent viscosity grade bitumen


shall be laid as surfacing course. 50 mm thick BM & 20 MM Thick OGPC
is considered for seal COAT of the carpet.

15.3.8 Structural Works


Following grades of concrete are proposed for Structural works and
comply with MORD and IRC specifications:

•         Concrete in superstructure of slab culvert – M25 (RCC )


•         Concrete in abutment cap, dirt wall of slab culverts – M25- (RCC)
•         Brickwork in abutment, return wall, headwall – M15 (PCC)
•         Concrete below abutment, return wall, headwall – M10 (PCC)
•         Concrete in Rigid Pavement- PCC & PQC
•         EARTHEN shoulder
RCPLWEA Road Detailed Project Report

DPR Preparation, Works Department

Govt. of Odisha.

Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

16. Environmental Issues

16.1 Alignment

The alignment is adopted as per design

16.2
Environmental Sensitive Area (National Park, Wild Life Sanctuary, Protected
/Reserve Forest, Wet land etc.)

NA

16.3 Construction Camp


Construction camps will be established away from forest area/water body. The
minimum facilities such as water supply, sanitation, storm water drainage, solid
waste management and first aid box will be provided during the construction period
of the project. Necessary provision for rehabilitation or restoration after the
completion of construction phase will be done.

16.4 Permit / Clearance required prior to commending of civil work

·         No objection Certificate- This will be taken by PIU from SPCB (State Pollution
Control Board).
·         Forest Department- If the project road passing thorough forest land and
acquisition of the same is involved and it will be taken by PIU from Forest
Department

·         Consent to establish (CFE) and Consent to Operate (CFO) - This is required for
Plant Hot Mix Plant, WMM Plant, Batching Plant required for the project and the
same will be taken by the Contractor from SPCB.
·         Lease from Mines & Geology- This will be taken by the Contractor for new
Stone Quarry required for the project.
16.5            Borrow area

The filling soil will have to be procured from borrow pit. Borrow area will be so
excavated that the lands can reused as agricultural field. The depth of borrow pit
shall not exceed 450 mm (150 mm top soil included). The top soil shall be stripped
and stacked and shall be spread back on the land. As far as possible the borrow pits
shall not be dug close to the road embankment. The Redevelopment of borrow area
will be done before closure of the same and it will be as per agreement between
landowner and the Contractor.

16.7            Drainage

Suitable cross drainage structures have been provided on the basis of hydrological
survey of the area. So, there will be no obstruction to the natural drainage of the area.
Road side drainage is also duly considered in a manner so that surface water is led to
the low points and is drained through the CD structures.
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

17 Analysis of Rates
17.1 General
Rates for various item of works of the project have been derived from the "Schedule of
Rates(2014)(Volume-I) for Road works, Culvert works & carriage etc.

17.2 Basic Rate of Material

For Stone materials & river bed materials the basic rate in the Addendum & Corrigendum
to SOR(June 2014) have been considered.
Basic rate of other materials like coarse & fine sand, cement , steel are as per the latest
Schedule of Rates (Odisha)

17.3 Lead for Materials

Minmum Lead Is provided in this Estimate .


RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16
Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

17 Analysis of Rates
17.1 General
Rates for various item of works of the project have been derived from the "Schedule of
Rates(2014)(Volume-I) for Road works, Culvert works & carriage etc.

17.2 Basic Rate of Material

For Stone materials & river bed materials the basic rate in the Addendum & Corrigendum
to SOR(June 2014) have been considered.

For bituminous materils, basic rate at Haladia refinery for S-65 grade and for emulsion
the basic rate of Ulberia has been considered as suggested in latest Addendum &
Corrigendum to SOR.
Basic rate of other materials like coarse & fine sand, cement are as per the latest Schedule
of Rates (Odisha)
Basic rate of steel materials at Sub-Divisional Head Quarter has been considered in
analysis after adding cost of carriage, loading & unloading.
17.3 Lead for Materials

For stone aggregates and sand, lead from source to work site is calculated from the
district map and block level map of core network and finalizing the same in discussion
with PIU. The supply of different materials to work site is by road. Lead for bituminous &
steel materials are similarly obtained using SOR(Odisha). The details of rate analysis are
presented in Format F8
RCPLWEA Road Detailed Project Report
DPR Preparation, Works Department
Govt. of Odisha.
Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

18 Cost Estimates
18.1 General
Cost Estimate of project has been arrived on the following basis.
Selection of Items of work.
Estimation of item wise quantities.
Analysis of Rates
18.2 Estmation of Quantities.
All the relevant road structure work items has been identified as per survey,
design and drawings.
Following major item of works considered are given below:
Site clearance, dismantling and earthwork.
Pavement works(GSB,WMM,Bituminous layers)
Cross drainage structure works.
Drainage and protective works.
Road safety and furniture
Utility relocation
Maintenance works.
Quantity of earthwork is derived from the proposed cross section drawings.
Volume of cut and fill is obtained diferctly using the design package
software.Quantity derived from software has also been manually verified. There
are same stretches of the road in cut section. The details are provided chainage
wise in Annexure 3.The soil obtained from roadway excavation shall be used for
construction embankment and shall be paid as per item no-4. All other quantites
have been computed from the drawing of finished road, miscellaneous drawings
& drawings of CD structure.

18.3 Abstract of Cost


Quantities of all items have been estimated. Unit rates have been derived by using
the "Schedule of Rates for Road Works, Culvert works and Carriage et. Odisha.The
abstract of Cost estimate is given in the below. The details of cost are presented in
18.4 Format6 & Format7.
Maintenance
Cost of Annual Maintenance for five years after completion of project has been
estimated as per the RCPLWE Guidelines. Different activities of ordinary repairs
are
Thedone as 5and
Costof when.
year Routine Maintenance Works is presented in Format F6
19. Construction Program
19.1 General
The Construction of the road is assumed to start from the month of Novmber . This is a high
rainfall area and rainy season extends from June to October . However, the construction
program is based for a total working period of 12 months, considering the program set out by
MoRD. Generally, dry working season of about 8 months are required for construction of
roads. However, works will be affected for the monsoon during the month June to
September.

It is anticipated that some activity like collection of materials, CD works, Guard walls &
Concrete road etc. will continue in monsoon period also.

19.2 Realistic duration


Probably 12 Calender Months from November' . to next October'. is required to complete the
road including rainy season. Detail work programme can be finalised as per the
commencement month of the work.

Junior. Engineer Assistant Executive Engineer, Executive Engineer,


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
19. Construction Program
19.1 General
The Construction of the road is assumed to start from the month of September. This is a high
rainfall area and rainy season extends from April to September. However, the construction
program is based for a total working period of 12 months, considering the program set out by
MoRD. Generally, dry working season of about 8 months are required for construction of
roads. However, works will be affected for the monsoon during the month June to
September.

It is anticipated that some activity like collection of materials, CD works, Guard walls &
Concrete road etc. will continue in monsoon period also.

19.2 Realistic duration


Probably 12 Calender Months from Sept' . to next August'. is required to complete the road
including rainy season. Detail work programme can be finalised as per the commencement
month of the work.

Junior. Engineer Assistant Executive Engineer, Executive Engineer,


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
TRANSECT WALK REPORT
NAME OF ROAD:- ANKADELI DOWN COB To ANKADELI TOP

2225.00 km
DIST:- KORAPUT
BLOCK:-

REPORT

During conducting survey on the road to find out / select the suitable alignment for
construction of road, we interacted with some villagers/ land owners/public representatives of
village ANKADELI TOP COB TO ANKADEL DOWN , ". Discussion was made with them &
they have agreed for construction of the road on the exsting alignment. Required land width is
available, how ever if required the villagers/land owners have agreed to extend their co-
operation to provide the required land.No forest land/deforestation is required for construction
of the road,since entire length of the road is passing through revenue land.

Junior Engineer, Assistant Exe. Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi

Executive Engineer
R.&B. Division , Koraput
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLW

Instructions and Notes


1. Complete the road details in the title block and the reviewer details in the Reviewed By block.

2. Review DPR Report chapter by chapter. Rank each as not included (0), poor standard (1), fair standard
standard (3) in the ranking cell.

3. Review Drawings section by section. Rank each as not included (0), poor standard (1), fair standard
standard (3) in the ranking cell.

4. DPR Report chapters and Drawing sections are critical categories and have higher weighting.

5. If mandatory information is not included (Report Chapters 2 & 5 and Drawing Section 4), score is ze
will not be approved.

6. Ranking less than (1), or less than (2) for critical categories, means the chapter/drawing cannot be revie
DPR will not be approved.

7. The outcome for each chapter and section will be automatically displayed. If it is CHECKED (cell highl
the review continues.

8. All report chapters and drawing sections must achieve CHECKED status to proceed to check the overal

9. If any report chapter or drawing section does not achieve CHECKED status, the DPR will not be appro
overall score will not be checked.

12. Only when all review cells give result of CHECKED and APPROVED (all review cells highlighted gr
DPR be approved for issue.

To be assessed by PIU and score indicated

Also to be assessed by STA and score indicated

Also to be assessed by NRRDA and score indicated


M AREA (RCPLWEA)

ed By block.

dard (1), fair standard (2) or good

ard (1), fair standard (2) or good

r weighting.

Section 4), score is zero and DPR

wing cannot be reviewed and the

CHECKED (cell highlights green),

ed to check the overall score.

DPR will not be approved and the

w cells highlighted green) will the


19 Construction Program
19.1 General
Assuming that the Construction of theRCPLWEA -XIII2013-14 roads will start from OCT-2018 This is a high rainfall area and rainy season extend
to September. However, the construction program is based for a total working period of 12 months, considering the program set out by MoRD. G
working season of about 8 months are required for construction of Rcplwe roads. However, works will be affected for the monsoon during the m
September.
It is anticipated that some activity like collection of materials, CD works etc. will continue in monsoon period also.
19.2 Realistic duration
The reasonable duration of the construction period is 12 months.
Time Schedule
For construction of the work ANKADELI DOWN COB To ANKADELI TOP
Year 2019 2020
Item
SL No Month Oct Nov Dec Jan Feb March March May Jun July
Description
Week 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39
Construction Program For Flexible Pavment
1 Site Clearance
2 Earth Work
Base/ Sub - Base
3 Drainage Layer
4 GSB
7 Earthen Shoulder
Bituminous Layers
8 Prime Coat
9 Tack Coat
10 OGPC
11 Seal Coat
Construction Program For Rigid Pavment
12 Earth Work Excavation
13 GSB
14 WBM - II
15 Pavement Quality Concrete (M30 )
16 Moorum Shoulder
Cross Drainage Work
17 Pipe Culvert
18 RCC Culvert
Protection Work
19 Retaining Wall
20 Side Drain
Road Seafty Mesures & Road Furnitures
21 Guard Post
22 Bumps
23 Signboards
y season extends from April
ut by MoRD. Generally, dry
on during the month June to

Aug Sep - OCT


40 41 42 43 44 46 48 50
BILL OF QUANTITY
Package No :- OR-27-338 Name of Work -: Bijapur to Madhukupuda
Bid Identification No. PMGSY On-line

Excess ( + ) 0.0

SCHEDULE OF WORKS
Sl. Description of work No.or Unit Estimated Rate
No. Qty. Figure Words
1.00 Clearing grass and removal of rubbish on
both side of the road to facilitate widening of
berms ,disposal of the stuff including all
labour, T&P articles required for the work etc.
complete as per cluse 201 of MORD by 19395.00 Sqm 5.12 #NAME?
manual means etc. complete as per direction
of the Engineer-in-charge

2.00 Construction of embankment with approved


material obtained from borrow pits
transporting to site by manual means with
initial leads & lifts, spreading, grading to 7965.26 Cum 154.97 #NAME?
required slope and compacting to meet
requirement of Tables 300.1 and 300.2 as per
Technical Specification

Excavation for roadway in hard rock (blasting


prohibited) with rock breakers including
breaking rock, loading in tippers and disposal
with a lift upto 1.5 m and lead upto 1000
3.00 metres, trimming bottom and side slopes in 1298.557 Cum 233.14 #NAME?
accordance with requirements of lines, grades
and cross- sections as per Technical
Specification Clause 302.3.5 and as per the
direction of the Engineer-in-charge

Excavation in Hilly Area in Ordinary Rock not


requiring Blastig by Mechanical Means
including Cutting and Trimming of side slopes
4.00 2597.115 411.99 #NAME?
and disposing of excavated Earth with a lift
upto 1.5m and a lead upto 20m as per
Techical Specification Clause 1603.2.

Excavation in Soil in Hilly Area by Mechanical


Means including Cutting and Trimming of side
5.00 slopes and disposing of excavated Earth with 9089.902 48.56 #NAME?
a lift upto 1.5m and a lead upto 20m as per
Techical Specification Clause 1603.1.

Construction of embankment with approved


materials deposited at site from road way
cutting and excavation from drain &
foundation of other strutures graded &
6.00 8674.61 Cum 28.44 #NAME?
compacted to meet the requirement of Tables
300.1 & 300.2 as per clause no.301of MORD
specification for Rural roads and as per
direction of Engineer-In-Charge.

Signature of Tenderer with seal


Construction of Moorum sub-base (Grading-
III) by providing ,Moorum & Sand admixture
spreading in uniform layers with Tractor
grader on prepared surface, mixing by mix in
place method at OMC and compacting with
7.00 2720.15 Cum Err:509 #NAME?
smooth wheel roller to achive the desired
density complete as per Technical
Specification clause 401.as per the directions
of the Engineer incharge of the work .

Providing, laying, spreading and compacting


stone aggregates of specific sizes to Water
Bound Macadam specification including
spreading in uniform thickness hand packing,
rolling with three wheel 80-100 KN static roller
in stages to proper grade & camber, applying
& brooming, crushable screening / stone
8.00
screening to fill up the interstices of coarse
aggregate, watering & compacting to the
required density as per Clause 405 of MORD
Specification for Rural roads including
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per
direction of Engineer in Charge.

8.01 W.B.M G-II 0.00 Cum 2219.43 #NAME?


8.02 W.B.M G-III 0.00 Cum 4000.34 #NAME?

Providing and applying primer coat with


bitumen Emulsion [SS-1] on prepared surface
of Granular base including cleaning of road
surface & spraying primer @ 0.70kg/ 1.0
9.00 kg/sqm using mechanical means as per 12089.55 Sqm 33.52 #NAME?
clause 502 of MORD Specification for Rural
roads including cost,conveyance,royalty,
taxes, labour and T&P required for the work
and as per direction of Engineer-in charge.

Providing and applying tack coat with bitumen


Emulsion [RS-1] using emulsion distributor @
0.25 to 0.30 kg /sqm on the prepared granular
surface treated with primer & cleaned with
10.00 hydraulic broom as per clause 503 of MORD 12089.55 Sqm 9.62 #NAME?
Specification for Rural roads including
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per direction
of Engineer-in charge.

Signature of Tenderer with seal


Providing, laying and rolling of open graded
premix carpet of 20mm thickness composed
of 13.2mm - 5.6mm aggregate using VG-30
penetration grade bitumen to required line,
grade and level to serve as wearing course on
a previously prepared base, including mixing
in a suitable plant, laying and rolling with a
11.00 three wheel 80-100KN static roller capacity, 604.48 Sqm 6025.47 #NAME?
finished to required level and grades to be
followed by seal coat of type-C as per clause
508 of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
labour and T&P required for the work by
manual means and as per direction of
Engineer-in charge.

Providing and laying seal coat sealing the


voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type-C as per clause 510 of MORD
12.00 Specification for Rural roads including 0.00 Sqm 7078.59 #NAME?
cost,conveyance,royalty, taxes, labour and
T&P required for the work with VG-30
grade bitumen laid by manual means and as
per direction of Engineer in charge.

Fine dressing and turfing including


transportation by mechanical means with all
leads and lifts and placing of turfs in position
13.00 and ramming with thapies including watering 0.00 Sqm 17.82 #NAME?
and cost of labour and all materials etc.
complete as per the direction of the Engineer-
in-Charge.

Earth work in excavation for foundtion of


structures upto 3 m depth as per drawing
and technical specification Clause 305.1
including setting out, construction of shoring
14.00 and bracing, removal of stumps and other 0.00 Cum 194.02 #NAME?
deleterious material dressing of sides and
bottom and backfilling in trenches excavated
suitable material.as per direction of the
Engineer-in-Charge

Filling in foundation trenches with approved


quality of sand as per clause 1108, 305.3.9
& 1200 of MORD Specification for Rural
15.00 0.00 Cum 812.36 #NAME?
roads including cost,conveyance,royalty,
taxes, labour and T&P required for the work
and as per direction of Engineer in charge.

Providing concrete for plain concrete of M-15


in open foundations/Sub
Structure/Superstructure complete as per
drawings and technical specification clause
16.00 802,803,1202,1203 of MORD Specification for
Rural roads including
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per the
direction of the Engineer-in-Charge.
16.01 (A) PCC Grade M 15 For foundation 0.00 Cum 5063.87 #NAME?
16.02 (B) PCC M 15 For substructure 0.00 Cum 5348.50 #NAME?

Signature of Tenderer with seal


Providing concrete for plain concrete 0f M-20
in open foundation complete as per drawings
17.00 0.00 5815.39 #NAME?
and technical specifications clause
802,803,1202
Providing reinforced cement concrete of M-
20 complete as per drawings and technical
18.00 specification Clauses 802, 804, 805, 806,
807, 1202 and 1204 of MoRD as per direction
of the Engineer-in-Charge.

18.01 Substructure 0.00 Cum 6142.63 #NAME?

Construction of Unreinforced cement


concrete pavement, thickness as per design,
over a prepared sub base, with 43 grade
cement or any other type as per Clause
1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS:383, maximum
size of coarse aggregate not exceeding 25
mm & using Plasticizer as approved, mixed in
a concrete mixer of not less than 0.2 cum
capacity and appropriate weigh batcher using
approved mix design, laid in approved fixed
side formwork, laying and fixing of 125 micron
thick polythene film, wedges including
19.00 levelling the formwork as per drawing, 33.66 Cum 6047.92 #NAME?
spreading the concrete with shovels, rakes,
compacted using needle, screed and plate
vibrators and finished in continuous operation
including provision of contraction and
expansion, construction joints, primer, sealant
on the joint as approved, curing of concrete
slabs for 14-days with curing compound and
water, finishing to lines and grade as per
Clause 1501 of MORD Specification for Rural
roads including
cost,conveyance,royalty,taxes, labour and
T&P required for the work and as per direction
of Engineer-in charge.

Providing and laying reinforced cement


concrete pipe (NP3) for culverts including
fixing collar with cement mortar 1:2 but
excluding excavation,protection
works,backfilling, concrete and masonry work
20.00 in head wall and parapets as per Clause
1106 of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
labour and T&P required for the worketc
complete and as per direction of Engineer-in-
Charge

20.01 1000 mm dia S/R HPC 0.00 MTR 6479.71 #NAME?


20.02 1000 mm dia D/R HPC 0.00 MTR 11278.75 #NAME?
Providing and laying boulder appron for bed
protection with stone boulders of minimum
size and weight as per table 1300.1,no
21.00 0.00 cum 1439.63 #NAME?
fragment weighing not less than 25kg laid dry
complete as per drawing and Technical
Specification clause1301.

Signature of Tenderer with seal


Providing concrete M-25 for plain/reinforced
concrete in open foundation/Sub structure/
superstructure complete as per drawings and
technical specification clause
22.00 800,1205.4,1205.5 of MORD Specification for
Rural roads including
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per the
direction of the Engineer-in-Charge.
22.01 Foundations 0.00 Cum 6598.01 #NAME?
22.02 Substructure 0.00 Cum 6986.86 #NAME?
23.03 Superstructure 0.00 Cum 7571.82 #NAME?
Providing and laying reinforced cement
concrete of M-30 grade in superstructure as
per drawing and technical specifications
24.00 Clauses 800, 1205.4 and 1205.5 of MoRD as 0.00 Cum 7850.68 #NAME?
per direction of the Engineer-in-Charge.

Supplying, fitting and placing HYSD bar for


Sub structure reinforcement complete as per
drawings and technical specifications Clause
100 and 1202 of MORD Specification for
25.00
Rural roads including
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per the
direction of the Engineer-in-Charge..
25.01 Foundations 0.00 t 48374.32 #NAME?
25.02 Substructure 0.00 t 48475.14 #NAME?
25.03 Superstructure 0.00 t 49311.12 #NAME?

Providing Weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment,
wing wall, return wall etc.all complete as per
26.00 0.00 No 171.41 #NAME?
Clauses 614, 709, 1204.3.7 of MORD
specification for Rural roads and as per
direction of Engineer-in- charge.

Providing & laying cement concrete wearing


course M 30 grade including reinforcement
etc. complete as per drawing & MORD
27.00 0.00 Cum 6794.68 #NAME?
Technical Specification clause 800, 1000 &
1200 and as per direction of the Engineer-in-
Charge .(Rate to be quoted inclusive of steel)

Gravel backing below approns & rivetment of


MORD specification for Rural road
work.including
28.00
cost,conveyance,royalty,taxes,labour,T&Pcom
0 Cum 666.48 #NAME?
plete for the work and as per direction of
Engineer-in- charge.

Painting two coats including primer coat after


filling the surface with synthetic enamel paint
29.00 in all shades on new plastered / concrete 0.00 Sqm 82.59 #NAME?
surface as per drawing and technical
specification and as per direction of EIC.

Signature of Tenderer with seal


Providing and laying filter media with granular
crushed aggregates as per specification to a
thickness of not less than 600 mm with
smaller size towards the soil and bigger size
towards the wall and providing over the entire
30.00 surface behind abutment, wing wall, return 0.00 Cum 2853.32 #NAME?
wall to the full height, compacted to firm
condition complete as per drawing and
technical specification as per Clause
1200,1204.3.8 of MoRD and as per direction
of the Engineer-in-Charge.

Providing and fixing of typical PMGSY


informatory sign board with Logo as per
MORD specifications and drawing. Three MS
Plates of 1.6 mm thick, top and middle plate
duly welded with MS flat iron 25mm x 5m size
on back on edges. The lower plate will be
welded with MS angle iron frame of 25mm x
25mm x 5mm. The angle iron frame of the
lower most plate and flat iron frame of middle
plate will be welded to 2 nos. 75mm x 75 mm
of 12 SWG sheet tubes posts duly embedded
in cement concrete M-15 grade blocks of
450mm x 450mm x 600mm, 600mm below
31.00 2.00 no 9382.78 #NAME?
ground level. The top most diamond plate will
be welded to middle plate by 47mm x 47mm
of 12 SWG steel plate tube. All M.S. will be
stove enameled on both sides. Lettering and
printing arrows, border etc. will be painted
with ready mixed synthetic enamel paint of
superior quality in required shade and colour.
All sections of framed posts and steel tube will
be painted with primer and two coats of epoxy
paint as per drawing and MORD specification
Clause 300,800 & 1700 and Annexure 1700.1
of MORD and as per direction of the
Engineer-in-charge.

Reinforced cement concrete M15 grade


Kilometre stone / local stone of standard
design as per IRC:8 fixing in position including
32.00
painting and printing, etc as per drawing and
Technical Specification Clause 1703 of MORD
as per direction of Engineer-in-charge.

32.01 5km stone 0 no 2772.04 #NAME?


32.02 1 km stone 2.00 no 1701.56 #NAME?
32.03 200 mtr stone 10.00 no 447.77 #NAME?

Signature of Tenderer with seal


Construction fo RCC guard posts of 200 mm
dia M15 grade cast-in-situ with 20 mm
nominal size aggregate, true to line and
33.00 grade, tolerance of vertical RCC posts not to 196.00 no 272.19 #NAME?
exceed 1 in 500 as per drawing and Technical
Specification Clause.and as per the direction
of the Engineer-in-charge

Providing and fixing of typical PMGSY Citizen


Information board as per MORD specification
and drawing. Three MS plates of 50 x 5 mm.
thick, back plate duty welded with 75 mm dia
steel tubes back on edges as per drawings.
The upper and lowe plate will be welded with
MS flat iron frame of 50mm x 5 mm. The steel
tubes dully embeded in cement concrete M-
15 grade blocksw of 600mm x 600 mm x 750
34.00 mm below ground level. All MS will be stove 2.00 nos 26893.46 #NAME?
enameled on both sides. Lettering and
printing arrows, border etc. will be painted
with redimixed synthetic enamel paint of
superor quality in required shade and colour.
All selection of framed posts and steel tubes
will be painted with primer and two coats of
epoxupaint as per drawing Clause 1701 and
Annexure - 1700.1. and as per the direction of
the Engineer-in-charge

35.00 Providing and fixing of semi reflective


cautionary, mandatory and informatory sign
board as per IRC:67 made of 1.5 mm thick
MS Sheet duly stove white colour in front and
gray colour on back with red reflective border
of 65 mm width and required letters and
figures with reflective tape engineering grade
as per Clause 1700 of MORD for Rural Roads
of required shade and colour supported and
welded on 47mm x 47 mm x 12 SWG sheet
tube firmly fixed to the ground by mean of
properly designed foundations with M-15
grade cement concrete 450x450x600 mm,
600 mm below ground level as per approved
drawing Clause 1700,300 & 800 of MORD
etc. complete as per direction of the Engineer-
in-Charge

35.01 i) 900mm equilateral triangle ( turn & reduced


carriage way ) 25.00 nos 2073.16 #NAME?

35.02 ii) 600mm equilateral triangle ( turn &


reduced carriage way ) 0.00 nos 1511.44 #NAME?

Signature of Tenderer with seal


35.03 600 mm x 450 mm rectangular

35.00 nos 1504.18 #NAME?

Total

Signature of Tenderer with seal


PART-II (MAINTANCE)

1.00 Routine Maintenance after completion of


22.00 km 50623.79 #NAME?
construction works for 1 st year
2.00 Routine Maintenance after completion of
22.00 km 72531.70 #NAME?
construction works for 2 nd year
3.00 Routine Maintenance after completion of
22.00 km 86074.02 #NAME?
construction works for 3 rd year
Routine Maintenance after completion of
4.00 22.00 km 107813.29 #NAME?
construction works for 4 th year
Routine Maintenance after completion of
5.00 22.00 km 140223.94 #NAME?
construction works for 5 th year
Total
Total estimated cost in Figures

#NAME?

Total no. of items Approved:- 35

Signature of Tenderer with seal


L OF QUANTITY
Work -: Bijapur to Madhukupuda

HEDULE OF WORKS
AMOUNT
Rs. P

99302.40

1234376.34

302745.58

1069985.41

441405.64

246705.91

Signature of Tenderer with seal


Err:509

0.00
0.00

405241.72

116301.47

Signature of Tenderer with seal


3642276.11

0.00

0.00

0.00

0.00

0.00
0.00

Signature of Tenderer with seal


0.00

0.00

203572.99

0.00
0.00

0.00

Signature of Tenderer with seal


0.00
0.00
0.00

0.00

0.00
0.00
0.00

0.00

0.00

0.00

0.00

Signature of Tenderer with seal


0.00

18765.56

0.00
3403.12
4477.70

Signature of Tenderer with seal


53349.24

53786.92

###

51829.00

0.00

Signature of Tenderer with seal


52646.30

Err:509

Signature of Tenderer with seal


###

1113723.38

1595697.40

1893628.44

2371892.38

3084926.68

10059868.28
Err:509
Err:509

#NAME?

Total no. of items Approved:- 35

Signature of Tenderer with seal


PROFORM
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)
PACKAGE SUMMARY

Package Number : Pakage No: OR19RCPL-16


District: KORAPUT

State: Odisha
Sl.No Name of Block Name of the road Type of Proposed Cost of No. of CD works Cost of CD Total Estimated Cost
Proposal length Pavement Works

From To N/U Km Rs. (in Lakhs) Nos. Rs. (in Lakhs) Rs. (in Lakhs)

ANKADELI DOWN
1 LAMTAPUT ANKADELI TOP N 2.225 224.029 5 11.210 235.239 84.780
COB

WORK PROPERMAINTENANCE

Total Estimated cost of the Package: Rs.320.02 Lakhs


Total Estmated Cost as per 15% O.H.C 320.019 Lakhs
Total Estmated Cost as per 12.5% O.H.C 317.547 Lakhs
Difference 2.472 Lakhs

*N-New Connectivity U-Up gradation Technical scrutiny STA:- Signature


done by; Name
Designation
Prepared by: Signature:
Name:
Designation:
Checked by: Signature:
Name: Co-ordinator STA:- Signature
done by; Name
Scrutinised by:- Designation
Signature:
Name:
PROFORMA-B

Average Cost per


Km

Rs. (in Lakhs)

105.725 38.103

ANCE
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA
CHECK LIST FOR P.I.U. & S.T.A.
( For Indvidual Road Works )
To be filled by PIU.

1. Location : State: Odisha District : KORAPUT

2. Package No: OR19RCPL-16

3. Name of the Road: ANKADELI DOWN COB

4. Total Length (Km) - 2.225 In Open Area - 2.165 Km

5. Estimated Cost Rs : 235.24 Lakhs Average Cost : 105.725


Item

Flexible Pavem
Rigid Pavem
Protection Work & Dr
CD wo
DPR, Road Furnitures & Misc
Sifiting of Public Utilites
DPR
To
6. Type of proposal:- New connectivity / Up gradation
-If the proposed road is a New connectivity
- Is the road a part of core network
If Yes Through Route/ Link Route No. T-
- Name of the unconnected Target Habitation (s) (to be crosschecked with CN-6)

- Population sub served by the proposed road.


- Does the Proposed Road lead up to the Habitation for which it is supposed to (A)
provide connectivity (In other words are you sure that the road is not being made
partially?)
- Does the proposed Road connect the unconnected Habitation to (B)
-a) Another habitation having All- weather road.
-b) Directly to an All weather road.
If ( b) indicate the nature of road to which the proposed road leads.

RR

- If the proposal is for up gradation


- is the road a part of the core network
- is it associated Through Route or Not
- PCI value
- Age of the road
- Is it certified that there are no other unconnected Eligible Habitations in
the district.
- Is it certified that there are no other unconnected Eligible Habitations in
the district.

7. a) Whether the Proposed Road has the desired


carriage way width,Roadway width and Road Land
Width (RLW )

b) Indicates the actual widths of the following for the In the Built Up Area (m)
proposed road
a) Carriageway 5.500
b) Roadway 9.000
c) Road Land Width 9.000
8. Base year traffic volume
Month & Year of Traffic Volume Count = 15.05.2019
Motorised Traffic
Days Cars,Jeep, Motorised two Light Trucks Buses
Vans,Thr Wheelers Commercial
ee Vehicle
Wheelers

Agricultural Tractors Trallers


L U OL L U OL L
Day 1 277 100 50 50 165 165 270 270 2 2
Day 2 89 65 70 70 90 90 250 250 2 2
Day 3 101 85 75 75 70 70 200 200 7 7
Average 208 111 87 87 144 144 320 320 5 5
ADT in the year of Traffic Count = 1566 Nos
Growth rate adopted (%) = 5% Base Year Traffic AADT (T) =
Design Life = 10 Years Completion period AADT =
Number of Harvesting Seasons = 2 ESAL =
No. of Days in Each Harvesting Season (t) = 75 days Cumulative ESAL For Single Lane 481
Value of (n) assumed = 1
Traffic Category =
9 Subgrade CBR ( for Different Sections ) =
Chainage 0 1000 2000 0 0
CBR % 7 7.2 7.1 0 0

10. Cost Details

A. General Costs
Cost of Preparation of DPR
B. Pavement Components
Description of layer Thickness in mm

Site Clearance
Clearing and Grubbing
Earthwork and Erosion Control
Earth Work - in Excavation/ Cutting
Earthwork- in Filling (Embankment)
Subgrade (if provided seperately)

Scarifying & Reworking


Granular Sub base
GSB 150

WMM- 225

C.Bituminous Layers

Prime Coat

Tack Coat

Bituminous Macadam 50.00

OGPC 20.00
SEAL COAT
Total Cost Of (Flexiable Pavment)
D. Cement Concrete Road

Earth work in excavation

PCC M-10 100

Pavement Quality Concrete (M30 ) 100

Total Cost Of (Rigid Pavment)


E: C D Works
Location - Chainage ( Similar Type of CD's may be grouped Type of CD & their Nos
together)

0/800 , 1/375 , 1/555, 1/600,1/975 1000mm ф HPC S/R 5


5
Total Cost of Proposed CD works

F. Protection works
Length 0.100 km
COVER e Drains (if Provided)
Length 0.120 km
H. Road Logo, other Road Furniture

I. Any other Provisions (Please Specify)

Total Cost of the Project (R


Name of the road

J. Five Year Routine Maintenance


Year Cost in lakhs
I 1.46
II 2.28
III 2.85
IV 3.87
V 4.76
VI 69.56
Total Maintenance Cost Rs. 84.78
11. Whether the road has Geometrics as per Rural Roads Mannual R.R.M / Latest Circulars of NRRDA.

12.Whether C.D.works / Protection works are provided as per R.R.M / Latest Circulars of NRRDA / Respective Codes.

13. Whether the Cost etimates are as per standerd data analysis and S.S.R.

14. Sources and the Lead distances of Materials are as under


Material Source Lead Distance Material Source
(Km)
Earth local 10 Cement jypore
Moroom (Subgrade) local 10 Emulsion vizag
Aggregate Beheraguda 93 Bitumen vizag
Sand Padua 25 Steel vizag
Total Estmated Cost as per 15% O.H.C = 320.019 Lakhs
Total Estmated Cost as per 12.5% O.H.C = 317.547 Lakhs
Difference = 2.472 Lakhs
Certified that information provided is true

Prepared By Checked By
Asst. Executive Engineer Executive Engineer
R.&B . Sub-Division, pottangi R.&B. Division , Koraput
Signatures of Technical
scrutiny at STA.

\
To be filled by State Technical Agency
Name of the STA: IIT BBSR

Name of Road : ANKADELI DOWN COB To ANKADELI TOP

15 Is the Proposed Road entered on the OMMS :


(Data entries to be verified by STA before Clicking the Propopsal)
16 If the Proposal is for new connectivity
Have you satisfied yourself that the proposed road is a part of Core Network
Is the unconnected habitation (s) part of list of unconnected Habitations as per CN-6

Does the Proposal ensure full connectivity to Target Habitation


a) If No, the name of Unconected Habitation up to which it is connected
b) If such Unconnected Habitation eligble Under RCPLWE
17 Are you satisfied with the following
Engineering Surveys (L section,Crossection must be verified)
Soil/ Material Investigation ( CBR, Density, LL, PI, Gradation to be verified)
Traffic Surveys / Estimation
Hydraulic Studies.
( Catchment for structures with more than 2 Vents to be verified from topo sheet. Location and requirement o
all CD structures to be verified from L section )
18 In case , Traffic is projected beyond T 4 Category are you satisfied with the reason given by PIU

19 In case, sub grade CBR is less than 3; has Soil Stabilisation etc. been proposed

( If not , specific Reasons given by PIU)

20 Is the design of the following elements as per Rural Roads Manul / Circulars of NRRDA:

Alignment & Geometrics


Location and type of CD works and
Side drains
Integration for Cross and longitudinal Drainage
Protection Works
21 Is the design of flexible Pavement as per IRC SP: 37- 2015 and design of Rigid Pavement as per IRC SP:62- 201

22 Does the Estimation Conform to Standard Rate Analysis and SSR generated for the current Phase

23 Does the proposal have provisions for


PMGSY Logo Sign Boards and Information Board
Km/Hm Stones
Guard Stones (where necessary )
Traffic Sign Boards (as necessary)

24 Secific Remarks, if any, by STA


( Specific remarks of STA about the overall project are necessary on each DPR)
Certified that the Design and Estimation for the Proposed Road work are based on the data and SSR provided by PIU Engin
entered on the OMMS.The Propasal may be considered for clearance.

Technical Scrutiny at STA done by:


Signature Co-ordinator STA:
Name Signature
Date Name
Date
Proforma C
EMISIM AREA (RCPLWE)
T.A.

Block: LAMTAPUT

DOWN COB To ANKADELI TOP

In Builtup Area - 0.060 Km

105.725 Lakhs
Total Cost in lakhs Cost per Km.
Rs. Lakhs

Flexible Pavement 207.046 95.633


Rigid Pavement 2.911 1.308
ction Work & Drain 6.030 2.710
CD works 12.553 5.642
urnitures & Misc etc. 4.169 1.874
ublic Utilites 2.000 0.899
PR 0.530 0.238
Total 235.239 105.725
New connectivity

YES
or L- L-82
Ankadeli

620

YES

A B

MDR SH NH

No
YES
YES

YES
YES

YES

t Up Area (m) In the Open Area (m)

5.500 5.500
9.000 9.000
9.000 15.50
Non Motorised Traffic
Cycles Cycle Animal ADT
Rickshawa Drawn
Vechicle

U OL SWC Num.
Tyred
2 4 120 120 0 0 1432
2 3 85 85 0 0 1063
7 2 100 100 0 0 1029
5 4 136 136 0 0 1566

DT (T) = 1952 Nos


ADT = 2193 Nos
36
r Single Lane 4811 x 36 = 2,024,228

ffic Category = T9

0 0 0 0 0 0
0 0 0 0 0 0

Cost in lakhs Rs. Cost /km (Rs)

0.530 0.2382022472

Quantity unit Cost in lakhs Cost/km in


lakhs

19395.000 Sqm 0.993 0.45

22017.184 cum 20.733 9.32


7965.260 cum 12.344 5.55
2909.250 0.606 0.27

8330.000 Sqm 0.741 0.33

1229.360 cum 26.481 0.11

2720.150 cum 60.372 27.13

12089.55 sqm 4.052 1.82

12089.55 sqm 1.163 0.52

604.48 cum 36.423 16.37

241.79 Cum 15.428 6.93


12089.55 Sqm 5.526
Rs. 184.862 Lakhs

12.00 0.004

12.00 cum 0.559 9.32

33.66 cum 2.036 33.93

Rs. 2.599 Lakhs


Total widh of Bridge/ Cost in lakhs Rs.
Culvert

10.00 11.21

Rs. 11.210 Rs. 5.038

Cost in Rs (in lakhs) Cost /Km (Rs)

2.494 1.121

2.891 1.299

3.722 1.673
0

he Project (Rs) 208.310 Lakhs

t in lakhs % Cost Cost /km


1.46 0.621 0.66
2.28 0.969 1.02
2.85 1.212 1.28
3.87 1.645 1.74
4.76 2.023 2.14
69.56 29.570 31.26
Rs. 84.78 36.040 38.10
YES
ive Codes.
YES

YES

Source Lead Distance

re 86
g 242
g 242
g 242

Scrutinized By
Superintending Engineer
R&B. Circle, jypore
Counter Signatures of
Co-ordinator STA :
ADELI TOP

Yes/ No

Yes / No

Yes / No

Yes / No

Yes/ No

Yes / No
Yes / No
Yes / No
Yes / No
and requirement of

IU
Yes / No

Yes / No

Yes / No
Yes / No
Yes / No
Yes / No
Yes / No
er IRC SP:62- 2014 .
Yes / No
nt Phase Yes / No

Yes / No
Yes / No
Yes / No
ed by PIU Engineers . The Proposal after final Correction is
DET

Name of the Division:- R.&B. Division , Koraput

Road proper work


Protection & Drain
Pavement CC Road No
Name of Package Road Name of U/ of Cost of
Sl No
the Block No Code the Road N CD
Length Cost Length Cost Length Cost CD No

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15(a)
ANKADE
Pakage
LI DOWN
LAMTAP No:
1 L-82 COB To N 2.17 207.046 0.06 2.911 0.100 6.03 5 12.553
UT OR19RCP
ANKADE
L-16
LI TOP

ANKADE
Pakage
LI DOWN
LAMTAP No:
1 L-82 COB To N 2.17 206.195 0.06 2.9 0.1 5.928 5 12.435
UT OR19RC
ANKADE
PL-16
LI TOP

2.23
DETAILS OF ROAD FOR RCPLWE (2018-2019)

Rs.in lakhs
CD Span > 15 m Others Habitation Cost of Maintenance
like cost Total
Total Cost
DPR Length
Span (8+10+12+ Populati
MORD State Furniture, (7+9+14 Name 1st 2nd 3rd 4th
length in Total 15+16) on
share share shifting )
m etc
15(b) 15© 15(d) 15(e) 16 17 18 Avg 19 20 21 22 23 24

6.699 2.23 235.239 105.49 Ankadeli 620 1.46 2.28 2.85 3.87

6.639 2.23 234.097 104.98 Ankadeli 620 1.44 2.25 2.83 3.83
Trafic Data
Total No of No of Whether
cost of Non- Motorise Carriage recomm
CBR Value Remarks
5th mainten Motori d ADT width ended
ance sed Vehicle by MP
(21+22+ Vehicl
25 23+24+2
26 e 27 28 29 30 31 32 33

4.76 15.22 102 264 366 5.5 7% No 15% OHC

4.72 15.07 102 264 366 5.5 7% No 12.5% OHC

3
RCPLWE item wise statement

Existing surface Propose length IN


Sl Traffic Carriage
District Block Name of the work
No. Category Way Width
TOTAL
Earthen Gravel BT CC BT CC

1 2 3 4 5 6 7 8 9 10 11 12 13

ANKADELI
1 KORAPUT LAMTAPUT DOWN COB To T9 5.5 0.975 0.06 1.035 0.975 0.060
ANKADELI TOP
FORMAT-1

opose length IN KM Earth Work Base course


Tack Premix
prime coat BM SDBC
coat carpet
WBM GR WBM
Carraige way Embakment subgrade shoulders GSB WMM
II GR III
14 15 16 17 18 19 20 21 22 23 24 25 26

5.50 35.42 26.481 60.372 4.05 1.163015 36.423 15.428


FORMAT-I

CCpavment
seal coat
cost

27 28

5.526 2.599
FORMAT-I

Utility
shifiting
platentions
price
CDS Drain Toe Wall/Guard wall Protection Work escalaratio
DPR Road
Others GST n turfing
preparation Furnitures
etc(to burn
Length in Length Height Length Height by state
No Cost cost Cost Cost
m in M in m in M in m govt
29 30 31 32 33 34 35 36 37 38 39 40 41 42 43
including
its GST

5 11.208 120.000 2.891 100 0.700 2.494 0.530 3.722 24.93 2.000
R
e
m
Total Cost
Total a
Per Km
rA
k
s
s
44 45 ###
p
e
r

O
.
235.24 105.73 H
.
C

1
5
.
0
0
%
FORMAT-1
Component wise cost of Roads Proposed

Stage I / Length in Km Cost of Pavement( Rs in Lakhs)


L Route / Carriage
Sl Stage II / Name of the
District Block Package No. T Route Way N/U
No. Complet Road
No Width
e Earth
CC BT Total Sub Base Base Surfacing
Work

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16

ANKADELI
DOWN COB
KORAP LAMTA Pakage No:
1 L-82 5.5 N Stage I To 0.060 2.165 2.23 39.67 29.659 67.616 70.103
UT PUT OR19RCPL-16
ANKADELI
TOP

12.23
FORMAT-I
Component wise cost of Roads Proposed

ent( Rs in Lakhs) cover Drain CD Works Minor Bidge Protection Work


Road Total
Traffic
Furnitur Others Total Cost
Category
CC Lengt Nos of es Per Km
Cost Per Nos of Span Length
Paveme Total h in Cost Cost Slab/ Box Cost Cost Cost
Km HPC in mtr in M
nt cost M cvt
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34

2.91 209.958 94.15 120 3.238 5 12.553 0 0.000 100 2.793 4.169 2.530 235.24 105.49 T9
CBR Remarks

35 36

7.00% As per O.H.C 15.00%


PRADHAN MANTRI GRAM SADAK YOJANA
ABSTRACT

Pakage No: OR19RCPL-16


Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
A PART-I (Road Proper)
1 Road Length 2.225 K.m. Rs
2 CD Works 5 Nos Rs
3 Protection Work 0.100 K.m. Rs
4 Drain 0.120 K.m. Rs
5 Maintenance Cost Rs
6 Add for Sign Board, Logo & other Road Furnitures. Rs
7 Add for D.P.R Rs
8 Contigency
9 Gst 12%
Total Rs
Rs

B) PART-II(BRIDGE)
1 BRIDGE Cost
2 Contigency Rs
3 Gst 12% Rs
Total Rs
Rs

Grand Total Rs
Rs

Junior Engineer cement Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
Superintending Engineer
R&B. Circle, jypore
AK YOJANA

18746142.00
1120795.00
249368.00
289064.97
254810.00
372213.00
0.00
0.00
2523887.16
23556280.13
235.56 Lakhs

94161792.42
111700.00
11312819.04
105586311.46
1055.86 Lakhs

129142591.59
1291.43 Lakhs

Executive Engineer
R.&B. Division , Koraput
PRADHAN MANTRI GRAM SADAK YOJANA

GENERAL ABSTRACT

Pakage No: OR19RCPL-16


PART - I (ROAD)

1. ANKADELI DOWN COB To ANKADELI TOP Rs. Err:509


2. Long Span Bridge Rs. 942.73

Total cost of Part - I = Rs. Err:509

PART - II (MAINTENANCE)

1. ANKADELI DOWN COB To ANKADELI TOP Rs. 425281.00

Total cost of PartRs.


- II = 425281.00

Total cost of Estimate(Part-I+Part- II) Rs. Err:509

Junior Engineer Asst. Exe. Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi

Executive Engineer Superintending Engineer


R.&B. Division , Koraput R.W.Circle Sunabeda

BOQ Items
1) Road & CD Cost of Rs 14475527.04
2) LSB Cost of Rs 94161792.42
3) Maintenance Cost of Rs 254810.00
Sub Total Rs 108892129.46

Non BOQ Items


1) Cost of DPR Rs 0.00
2)Contingency on road Proper Rs 0.00
3) Contingency on LSB Rs 111700.00
Sub Total Rs 111700.00
Total Rs 109003829.46
GST 12% 13080459.54
122084289.00
Or Say 1942.28lakhs

Rural Works,PMGSY, Odisha


Bhubaneswar
Tender Inviting Autority: Chief Engineer,Rural Works,PMGSY,Bhubaneswar.
Package No :- OR-19-528 Name of Work = Chipakur Road to amaljodi including LSB
Bid Identification No. PMGSY On-line-CC
Bidder
Name: Excess ( + ) 0.0

SCHEDULE OF WORKS
Sl. Description of work No.or Unit Estimated Rate
No. Qty. Figure Words
1.00 Clearing grass and removal of rubbish on
both side of the road to facilitate widening of
berms ,disposal of the stuff including all
labour, T&P articles required for the work etc. 19395.00 Sqm 5.12 #NAME?
complete as per cluse 201 of MORD by
manual means etc. complete as per direction
of the Engineer-in-charge

3.00 Construction of embankment with approved


materials deposited at site from road way
cutting and excavation from drain &
foundation of other strutures graded &
compacted to meet the requirement of Tables
8674.61 Cum 28.44 #NAME?
300.1 & 300.2 as per clause no.301of MORD
specification for Rural roads and as per
direction of Engineer-In-Charge.

1.05 Excavation of roadway in ordinary rock


with hydraulic excavator including cutting
and loading in tippers, transporting to
embankment site with all leads and lifts,
trimming bottom and side slopes in
accordance with requirements of lines,
grades and cross-sections as per 9089.90 Cum 48.56
Technical Specification Clause 302.of
MORD and as per direction of the
Engineer-in-charge.

1.06 Cutting in disintegrated rock(D.I) not


requiring blasting to be removed by pick
axes and crow bars and depositing
materials within 50m initial lead and
1.50m initial lift including rough dressing
as per direction and specification of the 2597.11 Cum 411.99
department including stacking the useful
materials separately as ordered.

1.08 Excavation of roadway in hard rock


(blasting prohibited) by drilling, blasting
and breaking loading and disposal of cut
rocks with all leads and lifts trimming
bottom and side slopes in accordance
with requirements of lines, grades and 1298.56 Cum 233.14
cross-sections as per Technical
Specification Clause 302 of MORD and
as per direction of the Engineer-in-charge.

Signature of Tenderer with seal


4.00 Earth work in excavation for foundtion of
structures upto 3 m depth as per drawing
and technical specification Clause 305.1
including setting out, construction of shoring
and bracing, removal of stumps and other 91.60 Cum 323.08 #NAME?
deleterious material dressing of sides and
bottom and backfilling in trenches excavated
suitable material.

5.00 Construction of embankment with approved


material obtained from borrow pit with lift
up to 1.5 m transporting to sites, spreading,
grading to required slope and compacting to
meet requirement of Tables 300.1 and 300.2
7965.26 Cum 154.97 #NAME?
as per Clause 301.5 of MoRD specification
for rural roads & as per direction of the
Engineer-in-Charge.

6.00 Fine dressing and turfing including


transportation by mechanical means with all
leads and lifts and placing of turfs in position
and ramming with thapies including watering Sqm 16.17 #NAME?
and cost of labour and all materials etc.
complete as per the direction of the Engineer-
in-Charge.

Providing and laying of Type-B(first class)


bedding for laying of Hume Pipe on well
compacted moorum or approved granular
material as per MORD Technical Specification Cum 431.30 #NAME?
clause 1105(ii) and as per direction of the
engineer-in-charge.

Providing,laying and Spreading soil on a


prepared sub-grade,pulverising,adding the
designed quantity of cement to the spread
soil,mixing in place with rotavator,grading
with the motor grader and compacting with
2720.15 Cum 2219.43 #NAME?
the road roller at OMC to achieve the desired
unconfined compressive strength and to form
a layer of sub-base as per Technical
Specification clause 404.

Providing,laying and Spreading soil on a


prepared sub-grade,pulverising,adding the
designed quantity of cement to the spread
soil,mixing in place with rotavator,grading
with the motor grader and compacting with
0.00 Cum 2219.43 #NAME?
the road roller at OMC to achieve the desired
unconfined compressive strength and to form
a layer of base as per Technical Specification
clause 404.

Waterproofing on top of the sub Grade soil


base with Nano technology based Organo
silane & acrylic co-polymer with water (1000
ppm TDS) in the ratio of 1:1:200 @ 2ltrs/sqm Sqm 13.64 #NAME?
as per direction of the Engineer-in-charge.

Signature of Tenderer with seal


Stabilized Sub base / Base: Providing, laying,
Spreading and compacting borrow area Soil
of CBR 5-8%; Cement @ 3%.Mixing 0.6kg
/cum each of Nanotechnology based Organo
silane & Acrylic Co-Polymer, spreading in
uniform layers with mortor grader on a
prepared base including watering and Cum 1242.38 #NAME?
compacting with 8 to 10 tonne vibratory power
roller to achieve the desired density inclduing
all materials, labour, HOM of machery etc.
complete as per specifications.

Providing , Laying, Spreading of Grit of size


13.2mm down, machine cut aggregate on the
Stabilized soil surface to achieve 20mm
compacted thickness; by spreading in uniform
layers with mortor grader on a prepared base
including watering and compacting with 8 to
10 tonne vibratory power roller to achieve the
desired density inclduing all materials, labour,
HOM of machery etc. complete as per Cum 3123.85 #NAME?
specifications. Treating the surface with Nano
Technology Acrylic Co- Polymer mixed with
water @1:300 @5ltrs/sqm & compacting with
one pass of roller to achieve desired density.

Construction of 1st layer of Bio enzyme based


soil stablised layer to a required thickness as
per manufacturer design with a exisiting soil ,
by ripping open the existing road formation
and treating it with TerraZyme in the ratio 1L
for 14.0 cum soil, spreading in uniform layer
with motor grader on prepared surface. mixing
by mix in place method with rotavator at
OMC and compacting with smooth wheel Cum 893.79 #NAME?
roller to achieve the desired density
complete as per technical specification incl all
labour, equipments etc., complete. as per the
directions of the Engineer incharge of the
work . except materials like soil and metal.

Construction of 2nd layer Bio enzyme based


soil stablised layer to a required thickness as
per manufacturer design with local soil
material/gravel/murram, having CBR greater
than 5% and treating it with TerraZyme in the
ratio 1L for 15.0 cum soil with 25% 40mm
crusher broken metal in desing mix, spreading
in uniform layer with tractor grader on
prepared surface. mixing by mix in place
method with rotavator at OMC and Cum 1333.48 #NAME?
compacting with smooth wheel roller to
achieve the desired density complete as per
technical specification incl all labour,
materials, like soil and metal, equipments etc.,
complete. as per the directions of the
Engineer incharge of the work

Signature of Tenderer with seal


7.00 Construction of Moorum sub-base by
providing ,Moorum & Sand admixture
spreading in uniform layers with Tractor
grader on prepared surface, mixing by mix in
place method at OMC and compacting with 0.00 Cum 2154.08 #NAME?
smooth wheel roller to achive the desired
density complete as per Technical
Specification clause 401.

8.00 Providing, laying, spreading and compacting


stone aggregates of specific sizes to Water
Bound Macadam specification including
spreading in uniform thickness hand packing,
rolling with three wheel 80-100 KN static roller
in stages to proper grade & camber, applying
& brooming, crushable screening to fill up the
interstices of coarse aggregate, watering &
compacting to the required density as per
Clause 405 of MORD Specification for Rural
roads including cost,conveyance,royalty,
taxes, labour and T&P required for the work
and as per direction of Engineer in Charge.

8.10 i) Grading -II (With Moorum sand Admixture) Cum 1182.06 #NAME?

8.20 ii) Grading -III (With Moorum sand Admixture) 0.00 Cum 4000.34 #NAME?
9.00 Providing and applying primer coat with
bitumen Emulsion [SS-1] on prepared surface
of Granular base including cleaning of road
surface & spraying primer @ 0.70kg/ 1.0
kg/sqm using mechanical means as per
clause 502 of MORD Specification for Rural 12089.55 Sqm 33.52 #NAME?
roads including cost,conveyance,royalty,
taxes, labour and T&P required for the work
and as per direction of Engineer-in charge.

Prime Coat : Preparing and applying of


water soluble silane nanotechnology (for
bitumen emulsion application, IRC approved)
with cationic bitumen emulsion CSS1 and
water (<1000 ppm TDS) in the ratio of 1 kg
silane : 100 kg cationic bitumen emulsion :
200 liter water . Take 1 kg of silane
nanotechnology and add in 200 liter water
while filling water in tanker/drum and then add Sqm 16.04 #NAME?
100 kg cationic bitumen emulsion under
circulation. Mix the solution completely. Spray
the solution at the rate of 1 liter per sqm on
compacted stone base. Check quality of
bitumen emulsion before bulk use.

10.00 Providing and applying tack coat with bitumen


Emulsion [RS-1] using emulsion distributor @
0.25 to 0.30 kg /sqm on the prepared granular
surface treated with primer & cleaned with
hydraulic broom as per clause 503 of MORD
Specification for Rural roads including Sqm 11.30 #NAME?
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per direction
of Engineer-in charge.

Signature of Tenderer with seal


Providing and laying surface dressing as
wearing course consisting of a layer of
Bituminous binder laid on the prepared
surface, followed by a cover of crushed stone
aggregates of specified size and rolling with
Sqm 84.72 #NAME?
three wheel 80-100 KN Static roller including
cleaning the road surface as per Technical
Specification clause 506.(First Coat Surface
Dressing)

Providing and laying surface dressing as


wearing course consisting of a layer of
Bituminous binder laid on the prepared
surface, followed by a cover of crushed stone
aggregates of specified size and rolling with
Sqm 74.53 #NAME?
three wheel 80-100 KN Static roller including
cleaning the road surface as per Technical
Specification clause 506.(Second Coat
Surface Dressing)

Providing and laying surface dressing as


wearing course consisting of a layer of
Bituminous emulsion laid on the prepared
surface,followed by a cover of crushed stone
chipping of specified size and rolling with 80-
12089.55 Sqm 9.62 #NAME?
100 KN roller including cleaning the road
surface as per Technical Specification Clause
507.
(First Coat Surface Dressing)

Providing and laying surface dressing as


wearing course consisting of a layer of
Bituminous emulsion laid on the prepared
surface,followed by a cover of crushed stone
chipping of specified size and rolling with 80-
604.48 Sqm 6025.47 #NAME?
100 KN roller including cleaning the road
surface as per Technical Specification Clause
507.
(Second Coat Surface Dressing)

11.00 Providing, laying and rolling of open graded


premix carpet of 20mm thickness composed
of 13.2mm-5.6mm aggregate using S-65
penetration grade bitumen to required line,
grade and level to serve as wearing course on
a previously prepared base, including mixing
in a suitable plant, laying and rolling with a
three wheel 80-100KN static roller capacity,
finished to required level and grades to be
Cum 152.43 #NAME?
followed by seal coat of type-C as per clause
508 of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
labour and T&P required for the work by
manual means and as per direction of
Engineer-in charge.

12.00 Providing and laying seal coat sealing the


voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type-C as per clause 510 of MORD
Specification for Rural roads including
Sqm 51.71 #NAME?
cost,conveyance,royalty, taxes, labour and
T&P required for the work with S-65 grade
bitumen laid by manual means and as per
direction of Engineer in charge.

Signature of Tenderer with seal


1.00 Providing, laying and rolling of open-graded
premix carpet of 20 mm thickness compacted
of 13.2 mm to 5.6 mm aggregates using
Bitumen Emulsion(Cold Mix) @ 21.5 kg/10
sqm to required line, grade and level to serve
as wearing course on a previously prepared
base, including mixing in a suitable hot mix
plant, laying and rolling with a three wheel 80-
100 kN static roller capacity, finished to Sqm 161.23 #NAME?
required level and grades to be followed by
seal coat of Type C as per Technical
Specification Clause 508.2 of MoRD and as
per direction of Engineer-in-Charge(Cold Mix
Bitumen)

2.00 Providing and laying seal coat sealing the


voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type C as per Technical Specification Clause
510 of MORD with bitumen Emulsion SS-1 Sqm 61.77 #NAME?
laid by manual means and as per direction of
Engineer-in-Charge. (COLD MIX).

13.00 Providing, laying and rolling of open-graded


premix carpet of 20 mm thickness composed
of 13.2 mm to 5.6 mm aggregates using S-65
penetration grade bitumen @ 14.6 kg/10 sqm
to required line,mixed with nano technology
silane @ 0.1% by weight of bitumen grade
and level to serve as wearing course on a
previously prepared base, including mixing in
a suitable hot mix plant, laying and rolling with Cum 159.98 #NAME?
a three wheel 80-100 kN static roller capacity,
finished to required level and grades to be
followed by seal coat of Type C as per
Technical Specification Clause 508 of MoRD
and as per direction of Engineer-in-Charge.

14.00 Providing and laying seal coat sealing the


voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type C as per Technical Specification Clause
510 of MORD with S-65 grade bitumen mixed
with nano technology silane @ 0.1% by 0.00 54.53 #NAME?
weight of bitumen laid by manual means and
as per direction of Engineer-in-Charge.

Signature of Tenderer with seal


3.00 Providing, laying and rolling of open-graded
premix carpet of 20 mm thickness compacted
of 13.2 mm to 5.6 mm aggregates using
Bitumen Emulsion(Cold Mix) @ 21.5 kg/10
sqm to required line mixed with nano
technology silane @ 0.5% by weight of
bitumen emulsion, grade and level to serve as
wearing course on a previously prepared
base, including mixing in a suitable hot mix
plant, laying and rolling with a three wheel 80- 0.00 182.25 #NAME?
100 kN static roller capacity, finished to
required level and grades to be followed by
seal coat of Type C as per Technical
Specification Clause 508.2 of MoRD and as
per direction of Engineer-in-Charge(Cold Mix
Bitumen)

4.00 Providing and laying seal coat sealing the


voids in a bituminous surface laid to the
specified levels, grade and cross fall using
Type C as per Technical Specification Clause
510 of MORD with bitumen Emulsion SS-1
laid by manual means and as per direction of Cum 71.09 #NAME?
Engineer-in-Charge. (COLD MIX).

12.00 Construction of Cell filled cement concrete


pavement, thickness as per design, over a
prepared sub-base, with 43 grade cement or
any other type as per Clause 1501.2.2, M30
(grade) coarse and fine aggregates
conforming to IS:383, maximum size of
coarse aggregate not exceeding 25mm mixed
in a concrete mixer of not less than 0.2 cum
capacity and appropriate weigh batcher using
approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing
of 125 micron thick polythene film, wedges,
steel plates including levelling the form work
as per drawing), spreading the concrete with
shovels, rakes, compacted using needle,
screed and plate vibrators and finished in 33.66 Cum 6047.92 #NAME?
continuous operation including provision of
contraction and expansion, construction
joints, applying debonding strips, primer,
sealant, dowel bars near approaches to
bridges and culverts (expansion joints),
admixtures as approved, curing of concrete
slabs for 14 days, curing compound and water
finishing to lines and grade as per drawing
and Technical Specification Clause 1501.

Signature of Tenderer with seal


13.00 Construction of Roller Compacted Concrete
Pavement(RCCP) with coarse and fine
aggregates conforming to IS:383,the size of
coarse aggregate not exeeding 25mm with
minimum aggregate cement ratio of 5:1 mm
and with minimum cement content of 310kg
per cum,aggregate gradation to be as per
Table 602.2 after blending, mixing in concrete
mixture at optimum moisture content
,transporting to site, laying with wheel barrows Cum 5887.81 #NAME?
or steel pans or with mechanical
paver,compacting with 80-100 KN smooth
wheel,tandem vibratory roller,to achieve,the
designed flexural strength,finishing and curing
as per drawings and Technical Specification
clause 1502.

2.00 Construction of Panelled cement concrete


pavement, thickness as per design, over a
prepared sub-base, with 43 grade cement or
any other type as per Clause 1501.2.2, M30
(grade) coarse and fine aggregates
conforming to IS:383, maximum size of
coarse aggregate not exceeding 25mm mixed
in a concrete mixer of not less than 0.2 cum
capacity and appropriate weigh batcher using
approved mix design, laid in approved fixed
side formwork (steel channel, laying and fixing
of 125 micron thick polythene film, wedges,
steel plates including levelling the form work
as per drawing), spreading the concrete with
shovels, rakes, compacted using needle,
screed and plate vibrators and finished in Cum 5866.48 #NAME?
continuous operation including provision of
contraction and expansion, construction
joints, applying debonding strips, primer,
sealant, dowel bars near approaches to
bridges and culverts (expansion joints),
admixtures as approved, curing of concrete
slabs for 14 days, curing compound and water
finishing to lines and grade as per drawing
and Technical Specification Clause 1501.

Signature of Tenderer with seal


13.00 Construction of Unreinforced cement
concrete pavement, thickness as per design,
over a prepared sub base, with 43 grade
cement or any other type as per Clause
1501.2.2 M30 (Grade), coarse and fine
aggregates conforming to IS:383, maximum
size of coarse aggregate not exceeding 25
mm & using Plasticizer as approved, mixed in
a concrete mixer of not less than 0.2 cum
capacity and appropriate weigh batcher using
approved mix design, laid in approved fixed
side formwork, laying and fixing of 125 micron
thick polythene film, wedges including
levelling the formwork as per drawing,
spreading the concrete with shovels, rakes,
compacted using needle, screed and plate Cum 6022.30 #NAME?
vibrators and finished in continuous operation
including provision of contraction and
expansion, construction joints, primer, sealant
on the joint as approved, curing of concrete
slabs for 14-days with curing compound and
water, finishing to lines and grade as per
Clause 1501 of MORD Specification for Rural
roads including
cost,conveyance,royalty,taxes, labour and
T&P required for the work and as per direction
of Engineer-in charge.

14.00 Filling in foundation trenches with approved


quality of sand as per clause 1108, 305.3.9
& 1200 of MORD Specification for Rural
roads including cost,conveyance,royalty, 29.40 Cum 671.95 #NAME?
taxes, labour and T&P required for the work
and as per direction of Engineer in charge.

15.00 Providing and laying reinforced cement


concrete pipe (NP3) for culverts including
fixing collar with cement mortar 1:2 but
excluding excavation,protection
works,backfilling, concrete and masonry work
in head wall and parapets as per Clause
1106 of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
labour and T&P required for the worketc
complete and as per direction of Engineer-in-
Charge.

13.10 600mm Dia. Single Row H.P. Culvert 0.00 Rmt 8235.60 #NAME?
2.10 600mm Dia. Double Row H.P. Culvert 0.00 5091.67 #NAME?
13.10 900mm Dia. Single Row H.P. Culvert Rmt 5598.57 #NAME?
14.10 900mm Dia. Double Row H.P. Culvert Rmt 9547.04 #NAME?
15.10 1000mm Dia. Single Row H.P. Culvert 0.00 Rmt 6031.16 #NAME?
13.20 1000mm Dia. Double Row H.P. Culvert Rmt 11229.27 #NAME?
2.20 1200mm Dia. Single Row H.P. Culvert Rmt 7091.75 #NAME?
13.20 1200mm Dia. Double Row H.P. Culvert Rmt 14233.96 #NAME?

Signature of Tenderer with seal


16.00 Providing concrete for plain concrete of M-15
in open foundations complete as per drawings
and technical specification clause
802,803,1202,1203 of MORD Specification for
Rural roads including 69.40 Cum 4261.76 #NAME?
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per the
direction of the Engineer-in-Charge.

17.00 Plain cement concrete (nominal mix 1:2.5:5)


M-15 in Sub structure complete as per
Clauses 802, 804, 805, 806, 807, 1202 and
1204 of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes, 36.00 Cum 4489.61 #NAME?
labour and T&P required for the work and as
per the direction of the Engineer-in-Charge.

18.00 Providing and laying reinforced cement


concrete of M-25 grade in foundation
complete as per drawings and technical
specifications Clause 800 & 1200 of MoRD Cum 6239.47 #NAME?
and as per the direction of the Engineer-in-
charge

19.00 Providing and laying reinforced cement


concrete of M-25 grade in Sub-structure
complete as per drawings and technical
specifications Clause 800 & 1200 of MoRD Cum 6607.26
and as per the direction of the Engineer-in-
charge

20.00 Providing and laying reinforced cement


concrete of M-25 grade in Super structure
complete as per drawings and technical
specifications Clause 800 & 1200 of MoRD 0.00 Cum 6762.60
and as per the direction of the Engineer-in-
charge

21.00 Supplying, fitting and placing HYSD bar


reinforcement in foundation complete as
per drawings and technical specifications qnl 5821.86 #NAME?
Clauses 1000 and 1200 of MoRD and as per
direction of the Engineer-in-Charge.
22.00 Supplying, fitting and placing HYSD bar
reinforcement in substructrue complete as
per drawings and technical specification qnl 5832.63
Clauses 1000 and 1200 of MoRD and as per
direction of the Engineer-in-Charge.
23.00 Supplying, fitting and placing HYSD bar
reinforcement in superstructure complete
as per drawings and technical specification
Clauses 1000 and 1200 of MoRD and as per 0.00 qnl 5559.43
direction of the Engineer-in-Charge.

24.00 Providing & laying cement concrete wearing


course M 30 grade including reinforcement
etc. complete as per drawing & MORD
Technical Specification clause 800, 1000 & 0.00 Cum 6041.08
1206 and as per direction of the Engineer-in-
Charge .

Signature of Tenderer with seal


25.00 Construction of R.C.C railling of M 25 grade in
cast-in-situ with 20 mm nominal size
aggreagate, true to line and grade, tolerance
of vertical ralling post not to exceed 1 in 500,
centre to - centre spacing between vertical
posts not to exceed 2000 mm as per drawing Rm 2548.45
and technical specifications Clauses 800, 900
and 1208.3 and as per the direction of the
Engineer-in-charge

26.00 Providing Weepholes in brick masonry/stone


masonry, plain/reinforced concrete abutment,
wing wall, return wall etc.all complete as per
Clauses 614, 709, 1204.3.7 of MORD 100.00 Nos. 219.98 #NAME?
specification for Rural roads and as per
direction of Engineer-in- charge.

Providing and laying pitching with stone


boulders on slopes laid over prepared filter
media as per drawing and MORD technical Cum 2130.42 #NAME?
specifications Clause 1300 and as per
direction of the Engineer in charge
27.00 Providing and laying boulder appron for bed
protection with stone boulders of minimum
size and weight as per table 1300.1,no
fragment weighing not less than 25kg laid dry 0.00 Cum 2032.89 #NAME?
complete as per drawing and Technical
Specification clause1301.

28.00 Providing and laying filter material


underneath pitching in slopes complete as
per drawing and technical specifications Cum #NAME?
Clause 1302 and as per the direction of the
Engineer-in-charge.
29.00 Providing and laying filter media with
granular crushed aggregates as per
specification to a thickness of not less than
600 mm with smaller size towards the soil
and bigger size towards the wall and
providing over the entire surface behind
abutment, wing wall, return wall to the full 0.00 Cum 2445.86 #NAME?
height, compacted to firm condition complete
as per drawing and MORD technical
specification Clause 1204.3.8 and as per
direction of the Engineer in charge

30.00 Providing and fixing 20mm thick compressible


fiber board in expansion joint complete as per
drawing and technical specifications including
cost convyance taxes of all materials, cost of
all labours, T & P required for the work Rm 252.96
etc.complete and as per direction of the
Engineer -in- charge.

Signature of Tenderer with seal


31.00 Providing and fixing of typical PMGSY
informatory sign board with Logo as per
MORD specifications and drawing. Three MS
Plates of 1.6 mm thick, top and middle plate
duly welded with MS flat iron 25mm x 5m size
on back on edges. The lower plate will be
welded with MS angle iron frame of 25mm x
25mm x 5mm. The angle iron frame of the
lower most plate and flat iron frame of middle
plate will be welded to 2 nos. 75mm x 75 mm
of 12 SWG sheet tubes posts duly embedded
in cement concrete M-15 grade blocks of
450mm x 450mm x 600mm, 600mm below
ground level. The top most diamond plate will
be welded to middle plate by 47mm x 47mm
of 12 SWG steel plate tube. All M.S. will be
stove enameled on both sides. Lettering and 2.00 No 9382.78 #NAME?
printing arrows, border etc. will be painted
with ready mixed synthetic enamel paint of
superior quality in required shade and colour.
All sections of framed posts and steel tube will
be painted with primer and two coats of epoxy
paint as per Clause 1701 and Annexure
1700.1 of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
labour and T&P required for the work and
as per direction of Engineer-in-charge.
Providing and fixing of typical
PMGSY logos made of 1.6mm thick
MS sheet duly stove enameled on both
side with lettering and printing
29. arrows, border etc.will be painted
with ready mixed synthetic enamel
paint of superior quality in required
shade & colour fixed & supported on
No 10000.000
75mmx75mmx6mmM.S.angle
3500mm long firmly fixed to the
ground by means of properly
foundation with M15 grade c.c.
32.00 Providing and fixing of ,600mmbelow
450x450x600mm semi reflective
cautionary, mandatory and informatory sign
ground
board as level as permade
per IRC:67 drawings
of 1.5 mm& tech.
thick
specification
MS clause
Sheet duly stove 1701
white and
colour as per
in front and
direction
gray colourof
onthe
backEngineer -in- charge.
with red reflective border
of 65 mm width and required letters and
figures with reflective tape engineering grade
as per Clause 1701.3.9 of MORD for Rural
Roads of required shade and colour
supported and welded on 47mm x 47 mm x
12 SWG sheet tube firmly fixed to the ground
by mean of properly designed foundations
with M-15 grade cement concrete
450x450x600 mm, 600 mm below ground
level as per approved drawing Clause
1701.2.2 of MORD Specification for Rural
roads including cost,conveyance,royalty,
taxes, labour and T&P required for the work
as per direction of the Engineer-in-Charge.

32.10 600 mm Equilateral Triangle No 1484.38 #NAME?

Signature of Tenderer with seal


33.00 Supplying and installing of reinforced cement
concrete M 15 grade Kilometer stone/ local
stone of standard design as per IRC : 8
fixing in position including painting, and
printing etc. as per clause 1703 of MORD
specification for Rural roads and as per
direction of Engineer-in-charge.

33.10 5th Kilometer stone (Precast) 0 No 2772.04 #NAME?


33.20 Ordinary kilometer stone(Precast) 2.00 No 1701.56 #NAME?
33.30 200 mm Stone(Precast) 10.00 No 447.77 #NAME?
34.00 Reinforced cement concrete M-15 grade
Guard stone / local stone of standard design
as per IRC-25 fixed position including 196.00 No 272.19 #NAME?
finishing as per clause 1704 of MORD.

35.00 Providing and erecting direction and place


identification of semi reflective sign boards
as per IRC-67 made of 2 mm thick M.S.
Sheet duly stove enameled paint white colour
in front and grey colour on back with reflective
border of 70 mm width and required message,
letters, figures with reflective tape of
engineering grade as per MORD
specifications of required shade and colour.
Supported and welded on two nos. 47 mm x
47 mm of 12 SWG square tube of 3050 mm
height duly strengthened by 25 mm x 5 mm 8.00 No 1738.79
MS flat iron on edges on back firmly fixed to
the ground by means of properly designed
foundations with M-15 grade cement concrete
450 mm x 450 mm x 600 mm, 600 mm below
ground level as per approved drawing and
Technical Specification Clause 1701 (upto
0.90 square meter size)

36.00 Providing and fixing of typical PMGSY


Citizens information board as per MORD
specifications and drawing. Three MS Plates
of 50 X 5 cm thick, back plate duly welded
with 75mm dia steel tubes back on edges as
per drawings. The lower & upper plate will be
welded with MS flat iron frame of 50mm x
5mm. The steel tubes duly embeded in
cement concrete M-15 grade blocks of
600mm x 600mm x 750mm below ground
level. All M.S. will be stove enameled on both
sides. Lettering and printing arrows, border
etc. will be painted with ready mixed synthetic
2.00 No 26893.46 #NAME?
enamel paint of superior quality in required
shade and colour. All sections of framed posts
and steel tube will be painted with primer and
two coats of epoxy paint as per Clause 1701
and Annexure 1700.1 of MORD Specification
for Rural roads including
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per direction
of Engineer-in-charge.

Total road propoer:


MAINTENANCE

Signature of Tenderer with seal


37.00 Routine Maintenance after completion of
2.23 km 292.74 #NAME?
construction works for 1 st year
38.00 Routine Maintenance after completion of
2.23 km 292.74 #NAME?
construction works for 2 nd year
39.00 Routine Maintenance after completion of
2.23 km 0.00 #NAME?
construction works for 3 rd year
40.00 Routine Maintenance after completion of
2.23 km 292.74 #NAME?
construction works for 4 th year
41.00 Routine Maintenance after completion of
2.23 km 292.74 #NAME?
construction works for 5 th year
Total maintenance
35 Earth work in excavation of in all kinds
of soil with initial lead and lift including
dressing the sides & leveling the bed of
the foundation to the required width &
required depth including dewatering if
necessary and stacking the excavated 2173.190 Cum 207.06 #NAME?
materials away from working area
etc.complete and as per specification and
direction of Engineer -in –charge.

36
Providing & constructing temporary island
16 mtr Diametre for construction of well
foundation for 8.0mtr Dia well including all
#NAME?
cost, carriage etc complete as per
specification & Direction of Engineer-in
charge

36.1 Abutment wells Nos 31,505.99 #NAME?


36.2 Pier wells Nos 27,571.84 #NAME?
37.20 Construction of embankment with approved
material obtained from borrow pit with lift
up to 1.5 m transporting to sites, spreading,
grading to required slope and compacting to
meet requirement of Tables 300.1 and 300.2
450.00 Cum 154.17 #NAME?
as per Clause 301.5 of MoRD specification
for rural roads & as per direction of the
Engineer-in-Charge.

37
Providing & constructing one span service
road to reach island location from one pier
location to another pier location including Rmt 1,753.93 #NAME?
all labours , materials & T&P etc complete
as per direction of Engineer- in –charge

Signature of Tenderer with seal


38 Labour of sinking single circular well
caission/ cribwell of specified external
diameter in all kinds of soil to lines levels
& plumb by scooping out from inside the
well & below the steining including cost of
dredging & plants ,supply & work of
pumps, dredgers & compressors, derrick,
winches, cranes etc. balling out of water &
dredging, removing all materials &
obstacles from inside the wells inclusive
of hire & running charges of all such
machinery including materials & labour
charges for providing kentledge loading if
necessary & sinking to the required depth
by loading with proper designed &
preapproved weight & taking precautions
adequately against tilting & shifting &
dispiosal of the dredged materials away
from the wells as per the direction of
Engineer-in charge with all leads & lifts in
all repects including all incidental charges
like temporary sand filling, top pluging of
well etc. for safety of the structure during
execution as directed by the Enginer-in
charge. (Payment will only be made for
sinking of the well & other items required
for the well sinking operation is only
incidental & no payment will be made for
such items)

38.1 A) In all kinds of Soil(upto 10m depth)

38.2 i) For 7.5m dia abutment wells 40.160 Rmt 21,263.41 #NAME?
38.3 ii) For 6.5m dia. pier wells 95.280 Rmt 17,274.40 #NAME?
38.4 B) In Soft Rock #NAME?
38.5 i) For 7.5m dia abutment wells 5.000 Rmt 154,596.80 #NAME?
38.6 ii) For 6.5m dia. pier wells 15.000 Rmt 116,119.38 #NAME?
38.7 C) In Hard Rock
38.8 i) For 7.5m dia abutment wells 1.200 Rmt 313,975.78 #NAME?
38.9 ii) For 6.5m dia. pier wells 3.600 Rmt 235,830.70 #NAME?

Signature of Tenderer with seal


39 Supplying & fitting fixing in position steel
cutting edge as per approved design &
drawing weighing not less than 80kg. per
meter including steel cladding using
M.S.Angles/ rods, plates bolts & nuts,
rivets complete wherever necessary
including bending to size & shape drilling
holes riveting welding bolting etc.
complete in all respects confirming to
relevant IRC codes & ISI specification
including cost conveyance & all taxes of
all materials, labour & T&P & all 67.280 MT 71,490.90 #NAME?
machineries etc. required for the work
with all leads & lifts complete in position in
all respects (cutting edge to be placed at
the level of the bottom of well cap
indicated in Drg. or 150 mm. above L.W.L.
as specified in the Drg. or as per written
order of the Engineer-in-Charge.

40 Cement concrete with M-15+10% extra


cement on nominal mix to be used for
bottom plugging having maximum
compressive strength of 150 kg./cm2 with
minimum quantity of cement as specified
in IRC code in work tests on 150 mm.
cubes at 28 days curing using cement as
per CL 710-7 of IRC-78/1983 after mixing
& tests conduct in accordance with IS 456
& IS-516 with crusher broken hard granite
coarse aggregate of 40 mm. size down
graded in conformity with clause-302.6.2
of IRC-21/1987 of approved quality (test
in laboratory) from approved quarry &
concrete laid in continuous operation
using tremie pipes or skip boxes upto
required depth including lowering, #NAME?
hoisting & laying in layers of 150 mm.
thick with cost, conveyance royalty &
other taxes of all materials, labour hire
charges of all T&P & machineries
required for the work complete in all
respect. (in case of grouted concrete the
grout mix shall not be leaner than 1:2)
(Recuperation test may have to be done
if directed by Engineer-in-Charge).

40.1 (i) Bottom plugging 426.970 Cum 6,853.08 #NAME?

Signature of Tenderer with seal


41 Cement concrete of M-150 having
maximum compressive strength of 150
kg./cm2 ( test to be conducted) on 150
mm. cubes tested at 28 days including
curing (tests conducted in accordance
with IS-456 & IS-516) & conforming to
clause-302 of IRC 21/1987 using clean
crusher broken hard granite coarse
aggregate of 40 mm. size down grade of
approved quality to be protested in the
laboratory) obtained from approved
quarry the proportion mix, grading
conforming to relevant ISI/IRC codes pre-
approved including arranging of
reinforcement as per approved drawing
including hoisting, lowering concrete in
layers not exceeding 150 mm. thick each
compacting with vibrator watering &
curing for 28 days centering shuttering &
finishing the exposed surface smooth
providing grooves & beads where
necessary including cost, conveyance
royality & taxes of all labour machineries
etc. required for the work complete in all
respects including dismantling the
centering & shuttering as per specification
& direction of Engineer-in-Charge.

41.1 (i) Top plugging 69.80 4,588.36 #NAME?


42.10 Providing and laying reinforced cement
concrete of M-25 grade in foundation
complete as per drawings and technical
specifications Clause 800 & 1200 of MoRD 50.16 Cum 6239.47 #NAME?
and as per the direction of the Engineer-in-
charge

43.10 Providing and laying reinforced cement


concrete of M-25 grade in Sub-structure
complete as per drawings and technical
specifications Clause 800 & 1200 of MoRD 78.00 Cum 6607.26 #NAME?
and as per the direction of the Engineer-in-
charge

44.10 Providing and laying reinforced cement


concrete of M-25 grade in Super structure
complete as per drawings and technical
specifications Clause 800 & 1200 of MoRD 50.16 Cum 7161.77 #NAME?
and as per the direction of the Engineer-in-
charge

Signature of Tenderer with seal


42 RCC of design mix of M-25grade having
specified characteristics compressive
strength/ target mean strength of
250kg./cm2 in design mix with minimum
quantity of cement as specified in IRC
Code of 150 mm. cubes at 28 days curing
after mixing & tests conducted in
accordance with relevant clauses of IS
456/IS 516/IRC 216/1987/IRC-78/1983
using crusher broken hard granite course
aggregate of 20mm. down graded.sizes &
proportion as specified in clause-302.6.2
of IRC 21/1987 & IS-10262 & subject to
mix design in conformity with the grading
& proportion of different materials for
concrete as specified in the relevant
codes of approved quality, obtained from
approved quarry & using minimum
quantity of cement confirming to codal
provision including hoisting, lowering &
laying concrete in layers not exceeding
15cm thick compacting with vibrators
watering & curing for 28 days including
water tight steel centering , shuttering &
form works finishing the exposed surface
smooth providing beads & grooves
wherever necessary including cost,
conveyance royalties and all other taxes
of all materials with all leads & lifts, cost of
all labour T&P & machineries etc. required
for the work including dewatering if
necessary, complete in all respects as per
direction of the Engineer-in-Charge but
42.1 excluding
Well Curb cost, conveyance of tor steel & 631.320 Cum 8,384.44 #NAME?
42.2 Well Steining 1639.180 Cum 7,617.15 #NAME?
42.3 Well Cap 436.650 Cum 7,617.15 #NAME?
42.4 Abutment & Pier shaft 570.970 Cum 6,817.88 #NAME?
42.5 Wing wall, Tie beam & column 23.440 Cum 10,814.20 #NAME?
42.6 RCC railing 474.000 Rmt 2,548.45 #NAME?
42.7 Approach Slab 16.200 Cum 7,161.77 #NAME?

Signature of Tenderer with seal


43 RCC of design mix of M-20grade having
specified characteristics compressive
strength/ target mean strength of
200kg./cm2 in design mix with minimum
quantity of cement as specified in IRC
Code of 150 mm. cubes at 28 days curing
after mixing & tests conducted in
accordance with relevant clauses of IS
456/IS 516/IRC 216/1987/IRC-78/1983
using crusher broken hard granite course
aggregate of 20mm. graded sizes &
proportion as specified in clause-302.6.2
of IRC 21/1987 & IS-10262 & subject to
mix design in conformity with the grading
& proportion of different materials for
concrete as specified in the relevant
codes of approved quality, obtained from
approved quarry & using minimum
quantity of cement confirming to codal
provision including hoisting, lowering &
laying concrete in layers not exceeding
15cm thick compacting with vibrators
watering & curing for 28 days including
water tight steel centering ,shuttering &
form works finishing the exposed surface
smooth providing beads & grooves
wherever necessary including cost,
conveyance royalties and all other taxes
of all materials with all leads & lifts, cost of
all labour T&P & machineries etc. required
for the work including dewatering if
necessary, complete in all respects as per
direction of the Engineer-in-Charge but
43.1 excluding cost, conveyance of tor steel &
Approach Slab Cum 5,973.99 #NAME?
43.2 Well Steining Cum 7,255.99 #NAME?
43.3 RCC railing Rmt 1,905.50 #NAME?

Signature of Tenderer with seal


44 RCC of design mix of M-30grade having
specified characteristics compressive
strength/ target mean strength of
300kg./cm2 in design mix with minimum
quantity of cement as specified in IRC
Code of 150 mm. cubes at 28 days curing
after mixing & tests conducted in
accordance with relevant clauses of IS
456/IS 516/IRC 216/1987/IRC-78/1983
using crusher broken hard granite course
aggregate of 20mm. down graded sizes
& proportion as specified in clause-
302.6.2 of IRC 21/1987 & IS-10262 &
subject to mix design in conformity with
the grading & proportion of different
materials for concrete as specified in the
relevant codes of approved quality,
obtained from approved quarry & using
minimum quantity of cement confirming to
codal provision including hoisting,
lowering & laying concrete in layers not
exceeding 15cm thick compacting with
vibrators watering & curing for 28 days
including water tight steel centering ,
shuttering & form works finishing the
exposed surface smooth providing beads
& grooves wherever necessary including
cost, conveyance royalties and all other
taxes of all materials with all leads & lifts,
cost of all labour T&P & machineries etc.
required for the work including dewatering
if necessary, complete in all respects as
per direction of the Engineer-in-Charge
44.1 but excluding
Abutment & piercost,
cap conveyance of tor 25.400 Cum 7,640.16 #NAME?
44.2 Dirt wall Cum 8,407.40 #NAME?
44.3 Superstructure 912.590 Cum 18,678.72 #NAME?
Kerb 31.250 Cum 8,918.95 #NAME?
44.4 Wearing Coat 129.890 Cum 6,239.95 #NAME?
Supplying, fitting and placing HYSD bar
reinforcement in Foundation complete as
per drawings and technical specification 5.016 MT 58,218.60 #NAME?
Clauses 1000 and 1200 of MoRD and as per
45.40 direction
Supplying,of the Engineer-in-Charge.
fitting and placing HYSD bar
reinforcement in substructrue complete as
per drawings and technical specification 259.28 MT 58326.29 #NAME?
Clauses 1000 and 1200 of MoRD and as per
direction of the Engineer-in-Charge.
46.40 Supplying, fitting and placing HYSD bar
reinforcement in superstructure complete
as per drawings and technical specification
Clauses 1000 and 1200 of MoRD and as per 219.99 Mt 59176.00 #NAME?
direction of the Engineer-in-Charge.

Signature of Tenderer with seal


46 Providing and laying filter media with
granular crushed aggregates as per
specification to a thickness of not less
than 600 mm with smaller size towards
the soil and bigger size towards the wall
and providing over the entire surface
behind abutment, wing wall, return wall to 149.150 Cum 2,657.20 #NAME?
the full height, compacted to firm
condition complete as per drawing and
MORD technical specification Clause
1204.3.8 and as per direction of the
Engineer in charge

47 Providing weep hole in plan / Reinforced


concrete abutment, wing wall / retaining
wall with 100mm dia A.C. Pipe, extending
through the full width of the structure with
slope of 1V : 20 H towards drawing face
complete as per drawing and technical 228.000 Rmt 169.41 #NAME?
specification and direction of Engineer in
charge.

48 Providing Rough stone dry packing /


pitching in slope, protection walls,
approns and revetments to designed
thickness using hard granite stones of
required size of approved quality from
approved quarry including quarrying
supplying conveying and cost conveyance
taxes royalty of all materials including
T&P complete including filling the Cum 2,130.42 #NAME?
interstices with small stones by wedging
and hammering finished to proper slope
and level as per direction of the Engineer
– in – charge including dewatering if
required.

49 Back filling behind abutment, wing wall &


return wall with granular material including
all cost, carriage, royality & labour as per Cum 503.79 #NAME?
specification & direction of the Engineer-
in-Charge.

50 Supplying & filling good clean river sand


inside the well/approach road including
watering to complete saturation &
ramming complete with all leads & lifts
including cost. Conveyance royality &
taxes of all materials & cost of all labour &
T&P required for the work complete Cum 463.79 #NAME?
( measurement will be taken for
compacted section as per direction of
Engineer-in-Charge.)

Signature of Tenderer with seal


51
Supplying and fixing of RCC Guard post
of 150 mm dia and IM long in RCC (1:2:4)
using 20mm down graded size h.g chips Nos 823.94 #NAME?
including all labours, materials ,carriage
,royality & taxes of etc. complete.

52 Providing fitting & fixing expansion joints


with M.S. Angles 75mm. X 75 mm. X 6
mm. at the edges of the slab with suitable
anchoring arrangements by 12mm. M.S.
Bars as per MOST design & drawing
including fitting, fixing & welding with 6
mm. plates & filling joints of wearing coat
with bitumen joint filler 12 mm. thick &
joint sealing compound at top including
painting of exposed surface of M.S. 16.030 Rmt 2,091.98 #NAME?
covered plates with anticorrosive
bitumanstic paint etc. with cost,
conveyance taxes of all materials labour
& T&P etc. complete in all respects as per
specification & direction of the Engineer-
in-Charge.

53 Cement concrete (1:3:6) in foundation &


plinth with 4cm. crusher broken granite
metal of approved quality from approved
quarry including hoisting lowering & laying
in layers not exceeding 150mm. thick with
proper packing & ramming each layer of
concrete by means of vibrator ,providing
groove & beads where necessary
including curing, dewatering, shoring,
shuttering if necessary at the time of
laying concrete with cost, conveyance
royality & taxes of all material required for
the work including supplying & working
pumps, T&P articles finishing the exposed
surface smooth as per specific ation &
direction of the Engineer-in Charge

53.1 In Foundation Cum 4,609.70 #NAME?


53.2 above bed level Cum 4,263.70 #NAME?
53.3 upto bed level Cum 4,321.88 #NAME?

Signature of Tenderer with seal


54 Supplying, fitting, fixing in position
Neoprene bearing of approved design &
specification at the designed level
including fixing with resin of required
grade & strength/ holding down bolts of
standard specification including cost
conveyance taxes of all materials with
cost of all labour T&P & other machineries
required for the work complete in respects 595200.000 ccm 1.01 #NAME?
as per direction of the Engineer-in-
Charge. The bearing should confirm to
the latest MOST specification & IRC
codes & should be tested before use( test
certificate to be furnished)

55 Providing C.I. grating to holes in deck


slabs size upto 15 cm dia for drainage of
water including cost of materials & T&P Nos 45.65 #NAME?
required for the work as directed by the
Engineer-in-Charge.

56 Fixing anchor bars upto 28mm. dia to the


founding level at rock strata as per
approved design including cost,
conveyance & all taxes of all materials
and T&P required for the work but
excluding cost of TS rod & labour charges 825.000 Nos 96.46 #NAME?
for bending, binding, tying the grills &
placing in position as per specification &
direction of Engineer-in-Charge.

57 Levelling the D.I/Soft/Hard rock including


hard granite surface under wells for piers
& abutments under water including
chiseling the rock surface by engaging
divers & provision of key trenches &
provision of drilling, providing anchor rods
as per specification, grouting etc. if
required as directed by the Engineer-in-
Charge & all other arrangements to work
inside water including cost of lifting & 274.980 sqm 164.13 #NAME?
stacking the excavated materials away
from the working area as directed by
Engineer-in-Charge including cost & hire
charges of all labour, T&P & other
machineries required for the work
complete in all respect.

Cement washing two coats with all labour,


materials etc complete
508.200 sqm 18.65 #NAME?

Signature of Tenderer with seal


58 Providing and applying two coats of water
based cement paint to unplastered
concrete surface after cleaning the
surface of dirt, dust, oil, grease,
efflorescense and applying paint @ 1 litre 1384.180 sqm 28.28 #NAME?
per 02 Sqm as per drawing and technical
specification under section 1700 of
MORD.

59 Earth work in excavation of in hard or


gravelly soil with initial lead and lift
including dressing the sides & leveling the
bed of the foundation to the required
width & required depth including
dewatering if necessary and stacking the Cum 178.05 #NAME?
excavated materials away from working
area etc.complete and as per
specification and direction of Engineer -in
–charge.

60 Earth work in all kinds of soil from


approved borrow areas including all leads
& lifts & carriage with manual means on
properly prepared & scientifically
approved surface including spreading
leveling earth in 22.50 cm. layers to make cum 179.19 #NAME?
ready for compaction with PRR to bring it
upto OMC condition as per specification &
direction of Engineer-in-Charge.

61 Construction of embankment with


approved material obtained from borrow
pits with all lifts and leads, transporting to
site by mechanical means within a lead of
5kms, spreading, grading to required
slope and compacting to meet
requirement of table 300-2 & clause 305 cum 136.96 #NAME?
of MoSRT&H Specifications for Road &
Bridge works (4th Revision)and as per the
direction of engineer in charge.

62 Loosening of the ground upto a level of


500 mm below the sub grade level,
watered, graded and compacted in layers
to meet requirements of table 300 - 2 for
sub grade construction & clause 305 of cum 33.93 #NAME?
MoSRT&H specifications for road &
bridge works(4th revision).

Signature of Tenderer with seal


63 Supplying & filling good clean river
sand of approved quality including
watering to complete saturation &
ramming complete with all leads & lifts
including cost. , conveyance, royalty &
taxes of all materials & cost of all labour & 2456.770 Cum 463.80 #NAME?
T&P required for the work with cess etc
complete as per specification & direction
of Engineer-in Charge.

64.00 Providing and laying reinforced cement


concrete pipe (NP3) for culverts including
fixing collar with cement mortar 1:2 but
excluding excavation,protection
works,backfilling, concrete and masonry work
in head wall and parapets as per Clause
1106 of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
labour and T&P required for the worketc
complete and as per direction of Engineer-in-
Charge.

60.10 600mm Dia. Single Row H.P. Culvert 0.00 0.00 28.28 #NAME?
61.10 600mm Dia. Double Row H.P. Culvert 0.00 0.00 #NAME?
62.10 900mm Dia. Single Row H.P. Culvert 0.00 0.00 #NAME?
63.10 900mm Dia. Double Row H.P. Culvert 0.00 0.00 #NAME?
64.10 1000mm Dia. Single Row H.P. Culvert 15.00 0.00 5598.59 #NAME?
60.20 1000mm Dia. Double Row H.P. Culvert 0.00 0.00 #NAME?
61.20 1200mm Dia. Single Row H.P. Culvert 0.00 0.00 #NAME?
62.20 1200mm Dia. Double Row H.P. Culvert 0.00 0.00 #NAME?
64 Construction of Moorum sub-base by
providing ,Moorum & Sand admixture
spreading in uniform layers with Tractor
grader on prepared surface, mixing by mix in
place method at OMC and compacting with 40.360 Cum 438.37 #NAME?
smooth wheel roller to achive the desired
density complete as per Technical
Specification clause 401.

Signature of Tenderer with seal


65

Providing, laying, spreading and


compacting stone aggregates of following
size Water Bound Macadam specification
(75mm compacted thick) including
spreading in uniform thickness, hand
packing, rolling with 3 wheeled steel roller
8-10 tonnes in stages to proper grade and
camber, applying and brooming requisite #NAME?
type of screened dust as binding
materials to fill up the interstices of coarse
aggregate, watering and compacting to
the required density as per Clause 404 of
MoSRT&H Specifications for Road &
Bridge works (4th Revision) including hire
and running charges of PRR and all other
machinaries including all labour, T&P and
cost, conveyance royalty & taxes of all
materials required for the work complete
in all respect as per direction of the
Engineer-in-Charge.
65.1 WBM Grade - II Cum 2,066.49 #NAME?
65.2 WBM Grade - III 34.000 Cum 2,320.10 #NAME?
66
Construction of Sub grade and earthen
shoulders with approved material
obtained from borrow pits with all lifts and
Cum 169.16 #NAME?
leads, transporting to site, spreading ,
grading to required slope and compacted
to meet requirements of table No 300 - 2.

67
Providing and applying primer coat with
bitumen emulsion (SS) on prepared
surface of granular base including
cleaning of road surface and spraying
primer at the rate of 0.60 kg/sqm using
mechanical means as per Technical 225.000 Sqm 32.31 #NAME?
Specification Clause 502 of MOSRT&H
including cost, conveyance, royalty, taxes
of chips and bitumen & other required
materials etc. complete and as per
direction of Engineer-In-Charge.

Providing and laying surface dressing as


wearing course consisting of a layer of
Bituminous emulsion laid on the prepared
surface,followed by a cover of crushed stone
chipping of specified size and rolling with 80-
225.00 sqm 84.72 #NAME?
100 KN roller including cleaning the road
surface as per Technical Specification Clause
507.
(First Coat Surface Dressing)

Signature of Tenderer with seal


Providing and laying surface dressing as
wearing course consisting of a layer of
Bituminous emulsion laid on the prepared
surface,followed by a cover of crushed stone
chipping of specified size and rolling with 80-
225.00 sqm 74.55 #NAME?
100 KN roller including cleaning the road
surface as per Technical Specification Clause
507.
(Second Coat Surface Dressing)

1.00 Providing and laying boulder appron for bed


protection with stone boulders of minimum
size and weight as per table 1300.1,no
fragment weighing not less than 25kg laid dry 200.40 Cum 2130.43 #NAME?
complete as per drawing and Technical
Specification clause1301.

68
Providing and laying tack coat with
penetration grade of bitumen emulsion
(RS) of 0.20 Kg per Sqm after scraping
cleaning the road surface including cost,
conveyance royalty of all materials, T&P Sqm 26.51 #NAME?
labour, hire charges of machinaries etc.
complete as per Technical Specification
Clause 503 of MOSRT&H and as per
direction of the Engineer in charge.

69
Providing, laying and rolling open graded
premix carpet of 20mm thick using 0.27
cum composed of 13.2 mm to 5.6 mm
size crusher stone chips using pentration
grade of bitumen of grade VG-30 (60/70)
of 14.60 kg per 10 sqm including hand
packing to proper camber and
consolidation with 80-100 KN roller Sqm 144.86 #NAME?
inclusive of hire and running charges of
PRR, bitumen mixtures, tar boilers and all
other T&P articles including cost,
conveyance, royalty, taxes of chips and
bitumen & other required materials etc.
complete as per specification and
direction of the Engineer in charge.

70
Providing and laying 6mm thick precoated
Seal Coat Type B using 0.06 cum of 6.70
mm size chips as per sieve analysis for
sealing the voids in the bituminous
surface laid to the specified levels, grade
and cross fall using penetration grade of
bitumen of 6.80 kg per 10 sqm and
Sqm 71.55 #NAME?
rolled with smooth wheeled power
roller, bitumen mixure, tar boiler and all
other T&P articles including cost,
conveyance, royalty, taxes of chips and
bitumen & other required materials etc
complete and as per the direction of
engineer in charge.

Signature of Tenderer with seal


71
Blinding Road surface with 6 mm thick
Sand including all labour cost, Carriage
Sqm 2.33 #NAME?
and royalty etc. complete as per direction
of the Engineer in Charge.

72
Furnishing and laying of live sods of
perennial turf forming Grass on
embankment slope, verges or other
locations shown on the drawing including
ransportation of turfs by mechanical
Sqm 17.86 #NAME?
means with all leads & lifts and placing of
turfs in position and ramming with thapies
including watering and cost of labour & all
materials etc. complete as per direction of
Engineer - in - charge.

73 Providing Plain Cement Concrete M15


grade using 40mm size and down graded
crusher broken hard granite stone
aggregate of approved quality from
approved quarry including hoisting,
lowering and laying in position in layers
with proper packing and ramming by
means of vibtator to proper slope and
level incuding watering and curing with
cost conveyance, royalty and taxes of all
materials required for the work including
hire and running charges of machineries
required for the work including all labour ,
T&P for the work ect. complete in all
respect as per the specification and
direction of the Engineer – in – charge.

73.1 In Foundation 245.740 Cum 4,790.29 #NAME?


73.2 In Substructure 120.630 Cum 5,059.62 #NAME?

Signature of Tenderer with seal


74 Providing RCC work of M-25 grade of
controlled quality having cube strength of
250kg./cm2 mix with minimum quantity of
cement as specified in IRC Code of 150
mm. cubes at 28 days curing after mixing
& tests conducted in accordance with
relevant clauses of IS 456/IS 516/IRC
16/1987/IRC-78/1983 using crusher
broken hard granite coarse aggregate of
10 mm. to 20mm. sizes obtained from
approved quary & proportion as specified
in clause-302.6.2 of IRC 21/1987, IS-
10262 & including hoisting, lowering &
laying concrete in layers compacting with
vibrators watering & curing for 28 days
including water tight steel centering &
shuttering & form works finishing the
exposed surface smooth providing beads
& grooves wherever necessary including
cost, conveyance royalties, Cess and all
other taxes of all materials with all leads &
lifts, cost of all labour T&P & machineries
etc. required for the work including
dewatering if necessary, complete in all
respects as per direction of the Engineer-
in-Charge but excluding cost, conveyance
of tor steel & binding wire & labour
charges for straightening, cutting,
bending, binding welding & tying the grills
lapping spacing etc. where ever
necessary & hoisting & placing in position
( to be paid separately as required for
RCC works)
74.1 In Foundation Cum 5,537.09 #NAME?
74.2 In Superstructure Cum 7,203.65 #NAME?
Total road propoer:
Total estimated cost in Figures
Quoted Amount 108639945.98
Quoted rate in Words
#NAME?

Signature of Tenderer with seal


SY,Bhubaneswar.
to amaljodi including LSB

EDULE OF WORKS
AMOUNT
Rs. P

99302.40

246705.91

441405.54

1069983.35

302746.28

Signature of Tenderer with seal


29594.13

1234376.34

0.00

0.00

6037182.51

0.00

0.00

Signature of Tenderer with seal


0.00

0.00

0.00

0.00

Signature of Tenderer with seal


0.00

0.00

0.00

0.00

405241.72

0.00

0.00

Signature of Tenderer with seal


0.00

0.00

116301.47

3642276.11

0.00

0.00

Signature of Tenderer with seal


0.00

0.00

0.00

0.00

Signature of Tenderer with seal


0.00

0.00

203572.99

Signature of Tenderer with seal


0.00

0.00

Signature of Tenderer with seal


0.00

19755.33

0.00

0.00
0.00
0.00
0.00
0.00
0.00
0.00
0.00

Signature of Tenderer with seal


295766.14

161625.96

0.00

0.00

0.00

0.00

0.00

0.00

0.00

Signature of Tenderer with seal


0.00

21998.00

0.00

0.00

###

0.00

0.00

Signature of Tenderer with seal


18765.56

0.00

###

0.00

Signature of Tenderer with seal


###

0.00
3403.12
4477.70

53349.24

13910.32

53786.92

14475527.04
###

Signature of Tenderer with seal


652.80

652.80

0.00

652.80

652.80
2611.20

449980.72

0.00
0.00

69376.50

0.00

Signature of Tenderer with seal


853938.55
1645904.83

772984.00
1741790.70

376770.94
848990.52

Signature of Tenderer with seal


4809907.75

2926059.57

Signature of Tenderer with seal


320267.53

312971.82

515366.28

359234.38

Signature of Tenderer with seal


5293264.66
12485879.94
3326028.55
3892804.94
253484.85
1207965.30
116020.67

Signature of Tenderer with seal


0.00
0.00
0.00

Signature of Tenderer with seal


194060.06
0.00
17046013.08
278717.19
810507.11

292024.50

15122840.47

13018128.24

Signature of Tenderer with seal


396321.38

38625.48

0.00

0.00

0.00

Signature of Tenderer with seal


0.00

33534.44

0.00
0.00
0.00

Signature of Tenderer with seal


601152.00

0.00

79579.50

45132.47

9477.93

Signature of Tenderer with seal


39144.61

0.00

0.00

0.00

0.00

Signature of Tenderer with seal


1139449.93

0.00

0.00
0.00
0.00
0.00
83978.85
0.00
0.00
0.00

17692.61

Signature of Tenderer with seal


0.00

0.00
78883.40

0.00

7269.75

19062.00

Signature of Tenderer with seal


16773.75

426938.17

0.00

0.00

0.00

Signature of Tenderer with seal


0.00

0.00

1177165.86
610341.96

Signature of Tenderer with seal


0.00
0.00
94161807.74
108639945.98
108639946.00

#NAME?

Signature of Tenderer with seal


Tender Inviting Autority: Superintending Engineer,Rural Works Circle,Sunabed

Pakage No: OR19RCPL-16 Name of the Road : ANKADELI DOWN COB T

Bidder
Excess ( + )
Name:
SCHEDULE OF WORKS
Sl. No.or Estimated Rate
Description of work Unit
No. Qty. Figure

Clearing and grubbing road land including


uprooting wild vegetation, grass, bushes,
shrubs, saplings and trees of girth upto
300 mm, removal of stumps of such trees
cut earlier and disposal of unserviceable
materials and stacking of serviceable
1.00 19,395.00 Sqm 5.12
material to be used or auctioned, upto a
lead of 1000 m including removal and
disposal of top organic soil not exceeding
150 mm in thickness as per Technical
Specification Clause 201 of MoRD by
manual means.

Construction of embankment with


approved materials deposited at site from
road way cutting and excavation from
drain & foundation of other strutures
2.00 graded & compacted to meet the 8,674.61 Cum 28.44
requirement of Tables 300.1 & 300.2 as per
clause no.301of MORD specification for
Rural roads and as per direction of
Engineer-In-Charge.

Earth work in excavation for foundation of


structures upto 3 m depth as per drawing
and technical specification Clause 1104
including setting out, construction of
3.00 shoring and bracing, removal of stumps
91.60 323.08
and other deleterious matter, dressing of
sides, bottom and backfilling with
approved materials.

Excavation of roadway in hard rock


(blasting prohibited) by drilling,
blasting and breaking loading and
disposal of cut rocks with all leads and
lifts trimming bottom and side slopes
4.00 1,298.56 Cum 233.14
in accordance with requirements of
lines, grades and cross-sections as
per Technical Specification Clause 302
of MORD and as per direction of the
Engineer-in-charge.

Signature of Tenderer with seal


Construction of embankment with
approved material obtained from borrow
pit with lift up to 1.5 m transporting to
sites, spreading, grading to required slope
5.00 and compacting to meet requirement of 7,965.26 Cum 154.97
Tables 300.1 and 300.2 as per Clause
301.5 of MoRD specification for rural roads
& as per direction of the Engineer-in-
Charge.

Excavation in Hard Rock (blasting


6.00 prohibited by mechanical means) as 2,597.11 CUM 411.99
per technical specificaation clause 302

Excavation in Hilly Area in Ordinary


Rock not requiring Blastig by
Mechanical Means including Cutting
7.00 and Trimming of side slopes and 9,089.90 CUM 48.56
disposing of excavated Earth with a lift
upto 1.5m and a lead upto 20m as per
Techical Specification Clause 1603.2.

Fine dressing and turfing including


transportation by mechanical means with
all leads and lifts and placing of turfs in
8.00 position and ramming with thapies 0.00 Sqm 17.82
including watering and cost of labour and
all materials etc. complete as per the
direction of the Engineer-in-Charge.

Signature of Tenderer with seal


9.00 Cement Treated Soil Sub-Base

Providing, laying and spreading soil on a


prepared sub-grade, pulverising, adding
the designed quantity of cement to the
spread soil, mixing in place with rotavator,
grading with the motor grader and
9.10 compacting with the road roller at OMC to
2,720.15 CUM 2219.43
achieve the desired unconfined
compressive strength and to form a layer
of sub base/base as per Technical
Specification clause 404

10.00 WMM - SECONED LAYER

Providing, laying and spreading soil on a


prepared sub-grade, pulverising, adding
the designed quantity of cement to the
spread soil, mixing in place with rotavator,
grading with the motor grader and
10.10
compacting with the road roller at OMC to
0.00 Cum 2219.43
achieve the desired unconfined
compressive strength and to form a layer
of sub base/base as per Technical
Specification clause 404

11.00 Bituminous work 12,089.55 Sqm 33.52

12.00 0 12,089.55 Sqm 9.62

13.00 PMC & SC COLD MIX 604.48 Sqm 6025.47

Signature of Tenderer with seal


14.00 Existing CC widening 33.66 Cum 6047.92

Providing and laying reinforced cement


concrete pipe (NP3) for culverts including
fixing collar with cement mortar 1:2 but
excluding excavation,protection
works,backfilling, concrete and masonry
15.00 work in head wall and parapets as per
Clause 1106 of MORD Specification for
Rural roads including
cost,conveyance,royalty, taxes, labour and
T&P required for the worketc complete and
as per direction of Engineer-in-Charge.

15.10 600mm Dia. Single Row H.P. Culvert 0.00 Rmt 8235.60

15.20 1000mm Dia. Single Row H.P. Culvert 0.00 Rmt 6031.16

Providing concrete for plain concrete of M-15


in open foundations complete as per drawings
and technical specification clause
802,803,1202,1203 of MORD Specification for
16.00 Rural roads including 69.40 Cum 4261.76
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per the
direction of the Engineer-in-Charge.

Signature of Tenderer with seal


Plain cement concrete (nominal mix 1:2.5:5)
M-15 in Sub structure complete as per
Clauses 802, 804, 805, 806, 807, 1202 and
1204 of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
17.00 36.00 Cum 4489.61
labour and T&P required for the work and as
per the direction of the Engineer-in-Charge.

Providing and laying reinforced cement


concrete of M-25 grade in Supper
18.00 Structure complete as per drawings and 0.00 Cum 6762.60
technical specifications Clause 800 & 1200
of MoRD and as per the direction of the
Engineer-in-charge

19.00 0 0.00 Cum 2154.08

Providing, laying, spreading and


compacting stone aggregates of specific
sizes to Water Bound Macadam
specification including spreading in
uniform thickness hand packing, rolling
with three wheel 80-100 KN static roller in
stages to proper grade & camber, applying
20.00 & brooming, crushable screening/Stone
Screening to fill up the interstices of
coarse aggregate, watering & compacting
to the required density as per Clause 405
of MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
labour and T&P required for the work and
as per direction of Engineer in Charge.

20.10 i) Grading -III 0.00 Cum 4000.34

Filling in foundation trenches with


approved quality of sand as per clause
1108, 305.3.9 & 1200 of MORD
21.00 Specification for Rural roads including 29.40 Cum 671.95
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per
direction of Engineer in charge.

Supplying, fitting and placing HYSD bar


reinforcement in supper structrue
complete as per drawings and technical
22.00 specification Clauses 1000 and 1200 of
0.00 Qtl 5559.43
MoRD and as per direction of the
Engineer-in-Charge.

Signature of Tenderer with seal


Providing and laying cement concrete
wearing course M30 grade without
23.00 reinforcement complete as per drawing 0.00 Cum 6041.08
and technical specifications Clause 800
and 1206.3

Providing Weepholes in brick


masonry/stone masonry, plain/reinforced
concrete abutment, wing wall, return wall
24.00 etc.all complete as per Clauses 614, 709, 100.00 Nos. 219.98
1204.3.7 of MORD specification for Rural
roads and as per direction of Engineer-in-
charge.

Providing and laying filter media with


granular crushed aggregates as per
specification to a thickness of not less
than 600 mm with smaller size towards
the soil and bigger size towards the wall
and providing over the entire surface
25.00 0.00 Cum 2445.86
behind abutment, wing wall, return wall to
the full height, compacted to firm
condition complete as per drawing and
MORD technical specification Clause
1204.3.8 and as per direction of the
Engineer in charge

Providing and laying pitching on slopes


laid over prepared filter media as per
26.00 drawing and Technical Specification
0.00 cum 2032.89
clause 1302.

Signature of Tenderer with seal


Providing and fixing of typical PMGSY
informatory sign board with Logo as per
MORD specifications and drawing. Three
MS Plates of 1.6 mm thick, top and middle
plate duly welded with MS flat iron 25mm x
5m size on back on edges. The lower plate
will be welded with MS angle iron frame of
25mm x 25mm x 5mm. The angle iron
frame of the lower most plate and flat iron
frame of middle plate will be welded to 2
nos. 75mm x 75 mm of 12 SWG sheet
tubes posts duly embedded in cement
concrete M-15 grade blocks of 450mm x
450mm x 600mm, 600mm below ground
27.00 level. The top most diamond plate will be 2.00 No 9382.78
welded to middle plate by 47mm x 47mm
of 12 SWG steel plate tube. All M.S. will be
stove enameled on both sides. Lettering
and printing arrows, border etc. will be
painted with ready mixed synthetic enamel
paint of superior quality in required shade
and colour. All sections of framed posts
and steel tube will be painted with primer
and two coats of epoxy paint as per
Clause 1701 and Annexure 1700.1 of
MORD Specification for Rural roads
including cost,conveyance,royalty, taxes,
labour and T&P required for the work and
as per direction of Engineer-in-charge.

Signature of Tenderer with seal


cautionary, mandatory and informatory
sign board as per IRC:67 made of 1.5 mm
thick MS Sheet duly stove white colour in
front and gray colour on back with red
reflective border of 65 mm width and
required letters and figures with reflective
tape engineering grade as per Clause
1701.3.9 of MORD for Rural Roads of
required shade and colour supported and
28.00 welded on 47mm x 47 mm x 12 SWG sheet
8.00 1738.79
tube firmly fixed to the ground by mean of
properly designed foundations with M-15
grade cement concrete 450x450x600 mm,
600 mm below ground level as per
approved drawing Clause 1701.2.2 of
MORD Specification for Rural roads
Supplying and installing of reinforced
including cost,conveyance,royalty, taxes,
cement concrete M 15 grade Kilometer
labour and T&P required for the work as
stone/ local stone of standard design as
per direction of the Engineer-in-Charge.
per IRC : 8 fixing in position including
29.00
painting, and printing etc. as per clause
1703 of MORD specification for Rural
roads and as per direction of Engineer-in-
charge.

29.10 5th Kilometer stone (Precast) 0 No 2772.04

29.20 Ordinary kilometer stone(Precast) 2.00 No 1701.56

29.30 200 mm Stone(Precast) 10.00 No 447.77

Reinforced cement concrete M-15 grade


Guard stone / local stone of standard
30.00 design as per IRC-25 fixed position 196.00 No 272.19
including finishing as per clause 1704 of
Providing and fixing
MORD.of typical PMGSY
Citizens information board as per MORD
specifications and drawing. Three MS
Plates of 50 X 5 cm thick, back plate duly
welded with 75mm dia steel tubes back on
edges as per drawings. The lower & upper
plate will be welded with MS flat iron frame
of 50mm x 5mm. The steel tubes duly
embeded in cement concrete M-15 grade
blocks of 600mm x 600mm x 750mm below
ground level. All M.S. will be stove
31.00 enameled on both sides. Lettering and 2.00 No 26893.46
printing arrows, border etc. will be painted
with ready mixed synthetic enamel paint of
superior quality in required shade and
colour. All sections of framed posts and
steel tube will be painted with primer and
two coats of epoxy paint as per Clause
1701 and Annexure 1700.1 of MORD
Specification for Rural roads including
cost,conveyance,royalty, taxes, labour and
T&P required for the work and as per
direction of Engineer-in-charge.

Signature of Tenderer with seal


MAINTENANCE

Routine Maintenance after completion of


32.00 2.23 KM 292.74
construction works for 1 st year

Routine Maintenance after completion of


33.00 2.23 KM 292.74
construction works for 2 nd year

Routine Maintenance after completion of


34.00 construction works for 3 rd year
2.23 KM 0.00

Routine Maintenance after completion of


35.00 2.23 KM 292.74
construction works for 4 th year

Routine Maintenance after completion of


36.00 2.23 KM 292.74
construction works for 5 th year

Signature of Tenderer with seal


SB OR-27-
Description of work

Earth work in excavation for foundation of


structures upto 3 m depth as per drawing
and technical specification Clause 1104
including setting out, construction of
37.00
shoring and bracing, removal of stumps
and other deleterious matter, dressing of
sides, bottom and backfilling with
approved materials.

2,173.19 Cum 207.06

Construction of embankment with


approved material obtained from borrow
pit with lift up to 1.5 m transporting to
sites, spreading, grading to required slope
38.00 and compacting to meet requirement of
Tables 300.1 and 300.2 as per Clause
301.5 of MoRD specification for rural roads
& as per direction of the Engineer-in-
Charge.

450.00 Cum 154.17

Supplying & fitting fixing in position steel


cutting edge as per approved design &
drawing weighing not less than 80kg. per
meter including steel cladding using
39.00 M.S.Angles/ rods, plates bolts & nuts, 67.28 MT 71490.9
rivets complete wherever necessary
including bending to size & shape drilling
holes riveting welding bolting etc.
complete in all respects confirming to
relevant IRC codes & ISI specification
including cost conveyance & all taxes of
all materials, labour & T&P & all
machineries etc. required for the work
with all leads & lifts complete in position in
all respects (cutting edge to be placed at
the level of the bottom of well cap
indicated in Drg. or 150 mm. above L.W.L.
as specified in the Drg. or as per written
order of the Engineer-in-Charge.

Signature of Tenderer with seal


Labour of sinking single circular well
caission/ cribwell of specified external
diameter in all kinds of soil to lines levels
& plumb by scooping out from inside the
well & below the steining including cost of
dredging & plants ,supply & work of
pumps, dredgers & compressors, derrick,
winches, cranes etc. balling out of water &
dredging, removing all materials &
obstacles from inside the wells inclusive
of hire & running charges of all such
machinery including materials & labour
charges for providing kentledge loading if
necessary & sinking to the required depth
40.00 by loading with proper designed &
preapproved weight & taking precautions
adequately against tilting & shifting &
dispiosal of the dredged materials away
from the wells as per the direction of
Engineer-in charge with all leads & lifts in
all repects including all incidental charges
like temporary sand filling, top pluging of
well etc. for safety of the structure during
execution as directed by the Enginer-in
charge. (Payment will only be made for
sinking of the well & other items required
for the well sinking operation is only
incidental & no payment will be made for
such items)
a) In all kinds of Soil upto 10mtr depth

40.10 i) For 7.5m dia abutment wells 40.16 RM 21263.41

40.20 ii) For 6.5m dia. pier wells 95.28 RM 17274.4

b) In Soft rock

40.30 i) For 7.5m dia abutment wells 5.00 RM 154596.8

40.40 ii) For 6.5m dia. pier wells 15.00 RM 116119.38

c) In Hard rock

40.50 i) For 7.5m dia abutment wells 1.20 RM 313975.78

Signature of Tenderer with seal


40.60 ii) For 6.5m dia. pier wells 3.60 RM 235830.7

Levelling the hard rock surface for


abutment and pier wells as per approved
Drawing & Technical Specifications and as
41.00 per Section 1200 of MoSRT&H
Specifications for Road & Bridge works
(Latest Revision).

274.98 Sqm 164.13

Fixing of anchoring bars 25mm dia on


foundation of piers and abutments
after drilling holes grouting with
cement or cement mortar excluding
42.00 cost of steel as per approved Drawing
& Technical Specifications and as per
Section 1200 &1600 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

825.00 mtr 96.46

Sand filling in Road work & foundation


of structure as per approved Drawing
& Technical Specifications and as per
43.00
Section - 2100 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

2,456.77 Cum 463.80

44.00 0

Signature of Tenderer with seal


40.36 Cum 438.37

P.C.C. M-15 grade + 10% extra cement


for Bottom Plugging of abutment and
pier wells as per approved Drawing &
45.00 Technical Specifications and as per
Section 1200 & 1700 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

426.97 cum 6853.08

P.C.C. M-15 grade for top Plugging of


abutment and pier wells as per
approved Drawing & Technical
46.00 Specifications and as per Section 1200
& 1700 of MoSRT&H Specifications for
Road & Bridge works (Latest
Revision).

69.80 cum 4588.36

P.C.C.M15 nominal mix in foundation


of C.D. works as per approved Drawing
& Technical Specifications and as per
47.00
Section 1700 & 2100 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

245.74 Cum 4790.29

Providing concreteM15 for


plain/reinforced concrete in
substructure upto 5m height complete
48.00
as per drawings and technical
specification clause
802,804,805,806,807,1202,1204

Signature of Tenderer with seal


120.63 Cum 5,059.62

R.C.C. M-25 grade in Well Curb for


abutment and pier wells as per approved
Drawing & Technical Specifications and as
49.00 per Section 1200 & 1700 of MoSRT&H
631.32 CUM 8384.44
Specifications for Road & Bridge works
(Latest Revision).

R.C.C. M-25 grade in Well Staining for


abutment and pier wells as per approved
Drawing & Technical Specifications and as
50.00 per Section 1200 & 1700 of MoSRT&H
1,639.18 cum 7617.15
Specifications for Road & Bridge works
(Latest Revision).

R.C.C. M-25 grade in Approach slab


including reinforcementas per
approved Drawing & Technical
51.00 Specifications and as per Section
1500,1700 & 2700 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

16.20 Cum 7161.77

R.C.C. M-25 grade for Dirt wall, Wing


wall & Tie beam as per approved
Drawing & Technical Specifications
52.00
and as per Section 1500,1700 & 2200 of
MoSRT&H Specifications for Road &
Bridge works (Latest Revision).

23.44 Cum 10814.2

R.C.C. M-25 grade in Well Cap for


abutment and pier as per approved
Drawing & Technical Specifications
53.00
and as per Section 1200, 1500 & 1700
of MoSRT&H Specifications for Road &
Bridge works (Latest Revision).

Signature of Tenderer with seal


436.65 Cum 7617.15

R.C.C. M-25 grade for abutment and


pier shaft as per approved Drawing &
Technical Specifications and as per
54.00
Section 1500,1700 & 2200 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

570.97 Cum 6817.88

R.C.C. M-25 grade in Railing of


Culvert / Bridge for rails panel in 2 ties
as per approved Drawing & Technical
55.00 Specifications and as per Section
-2700 of MoRT&H Specifications for
Road & Bridge works (Latest
Revision).

474.00 Mtr 2548.45

RCC of design mix of M-25grade having


specified characteristics compressive
strength/ target mean strength of
250kg./cm2 in design mix with minimum
quantity of cement as specified in IRC
Code of 150 mm. cubes at 28 days curing
after mixing & tests conducted in
accordance with relevant clauses of IS
456/IS 516/IRC 216/1987/IRC-78/1983
using crusher broken hard granite course
aggregate of 20mm. down graded.sizes &
56.00 proportion as specified in clause-302.6.2
of IRC 21/1987 & IS-10262 & subject to
mix design in conformity with the grading
& proportion of different materials for
concrete as specified in the relevant
codes of approved quality, obtained from
approved quarry & using minimum
quantity of cement confirming to codal
provision including hoisting, lowering &
laying concrete in layers not exceeding
15cm thick compacting with vibrators
watering & curing for 28 days including
water tight steel centering , shuttering &
56.10 form works finishing the exposed surface
foundation 50.16 6,239.47
smooth providing beads & grooves
wherever necessary including cost,
conveyance royalties and all other taxes
of all materials with all leads & lifts, cost of
all labour T&P & machineries etc. required
Signature of Tenderer
forwith
theseal
work including dewatering if
56.20 Sub structure 78.00 6,607.26

56.30 Supper Structure 50.16 7,161.77

R.C.C. M-30 grade for abutment and


pier cap as per approved Drawing &
Technical Specifications and as per
57.00
Section 1500,1700 & 2200 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

25.40 Cum 7640.16

R.C.C. M-30 grade in Kerb concreting


as per approved Drawing & Technical
Specifications and as per Section
58.00
1500,1700 & 2300 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

31.25 Cum 8918.95

R.C.C. M-30 grade for superstructure


of Bridge in Soffit slab, Girder, Beam &
Deck slab as per approved Drawing &
59.00 Technical Specifications and as per
Section 1500,1700 & 2300 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

912.59 Cum 18678.72

Providing and laying cement concrete


wearing course M 30 grade Without
60.00 reinforcement complete as per drawing
and technical specifications Clauses
800 and 1206.3

Signature of Tenderer with seal


129.89 Cum 6,239.95

Steel reinforcement works using HYSD


as per approved Drawing & Technical
Specifications and as per Section
61.00
-1600 of MoSRT&H Specifications for
Road & Bridge works (Latest
Revision).

61.10 foundation 5.016 Mt 58,218.60

61.20 Sub structure 259.28 Mt 58326.29

61.30 Supper Structure 219.99 Mt 59176.00

Supplying, Fitting, Fixing and Placing


in position of Neoprene Bearing
including cost of bearing as per
62.00 approved Drawing & Technical
Specifications and as per Section 2000
of MoSRT&H Specifications for Road &
Bridge works (Latest Revision).

595,200.00 Cum 1.01

Supplying, Fitting, Fixing and Placing


in position Steel Plate Sliding
Expansion Joints as per approved
63.00 Drawing & Technical Specifications
and as per Section 2600 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

16.03 Cum 2091.98

Signature of Tenderer with seal


Providing Weep Holes as per approved
Drawing & Technical Specifications
64.00 and as per Section 2700 of MoRT&H
Specifications for Road & Bridge
works (Latest Revision).

228.00 Nos. 169.41

Providing and laying Filter Media with


stone aggregates of 45mm size HB
Stone satisfying requirements laid
down in as per approved Drawing &
65.00
Technical Specifications and Clause
2504.2.2 of MoSRT&H Specifications
for Road & Bridge works (Latest
Revision).

149.15 Cum 2657.2

Cement washing two coats with all


66.00
labour, materials etc complete

508.20 Sqm 18.65

Painting two coats with approved


67.00 paints including all labour, materials
etc complete

1,384.18 Sqm 28.28

Providing W.B.M. base course using


IRC WBM Gr.-III crushed stone & stone
screened dust as per approved
68.00 Drawing & Technical Specifications
and as per Clause - 404 of MoSRT&H
Specifications for Road & Bridge
works (Latest Revision).

34.00 Cum 2320.1

Signature of Tenderer with seal


Providing and applying Prime coat
with bitumen emulsion (SS-1) on
prepared surface of granular base
69.00 including cleaning of road surface and
sparying primer at the rate of 0.7-1.0
kg/sqm as per Technical Specification
Clause 502.

225.00 Sqm 32.31

Providing and laying surface dressing


as wearing course in single coat using
crushed stone aggregates of specified
size on a layer of bitumeous binder of
60/70 penetration gradeof bitumen laid
70.00
on prepared surface and rolling with
three wheel 80-10kN static Roller
capacity as per Technical Specification
Clause 510 of MoSRT&H Specification
for road and bridge

225.00 Sqm 84.72

Providing and laying surface dressing


as wearing course in single coat using
crushed stone aggregates of specified
size on a layer of bitumeous binder of
60/70 penetration gradeof bitumen laid
71.00
on prepared surface and rolling with
three wheel 80-10kN static Roller
capacity as per Technical Specification
Clause 510 of MoSRT&H Specification
for road and bridge

225.00 Sqm 74.55

Providing and laying reinforced


cement concrete pipe NP3 of 1000mm
dia. for culverts on first class bedding
72.00 of granular material in single row
including fixing collar with cement
mortar 1:2 but excluding excavation,
protection works, backfilling, concrete.

15.00 RM 5,598.59

Signature of Tenderer with seal


Providing and laying pitching on
slopes laid over prepared filter media
73.00
as per drawing and Technical
Specification clause 1302.

200.40 Cum 2,130.43

Total estimated cost in Figures


Quoted Amount

Quoted rate in Words #NAME?

Approved items no 73

Signature of Tenderer with seal


uperintending Engineer,Rural Works Circle,Sunabeda

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

0.0 %

SCHEDULE OF WORKS
Estimated Rate AMOUNT
Words Rs. P

#NAME? 99302.40

#NAME? 246705.91

#NAME? 29594.13

#NAME? 302746.28

Signature of Tenderer with seal


#NAME? 1234376.34

#NAME? 1069983.35

#NAME? 441405.54

#NAME? 0.00

Signature of Tenderer with seal


#NAME? 6037182.51

#NAME? 0.00

#NAME? 405241.72

#NAME? 116301.47

#NAME? 3642276.11

Signature of Tenderer with seal


#NAME? 203572.99

###

#NAME? 0.00

#NAME? 0.00

#NAME? 295766.14

Signature of Tenderer with seal


#NAME? 161625.96

#NAME? 0.00

#NAME? 0.00

###

#NAME? 0.00

#NAME? 19755.33

#NAME? 0.00

Signature of Tenderer with seal


#NAME? 0.00

#NAME? 21998.00

#NAME? 0.00

#NAME? 0.00

Signature of Tenderer with seal


#NAME? 18765.56

Signature of Tenderer with seal


#NAME? 13910.32

###

#NAME? 0.00

#NAME? 3403.12

#NAME? 4477.70

#NAME? 53349.24

#NAME? 53786.92

ROAD PROPER 14475527.04

Signature of Tenderer with seal


###

#NAME? 652.80

#NAME? 652.80

#NAME? 0.00

#NAME? 652.80

#NAME? 652.80

TOTAL
2611.20
MAINTANANCE

Signature of Tenderer with seal


#NAME? 449980.72

#NAME? 69376.50

#NAME? 4809907.75

Signature of Tenderer with seal


#NAME? 853938.55

#NAME? 1645904.83

#NAME? 772984.00

#NAME? 1741790.70

#NAME? 376770.94

Signature of Tenderer with seal


#NAME? 848990.52

#NAME? 45132.47

#NAME? 79579.50

#NAME? 1139449.93

Signature of Tenderer with seal


#NAME? 17692.61

#NAME? 2926059.57

#NAME? 320267.53

#NAME? 1177165.86

Signature of Tenderer with seal


#NAME? 610341.96

#NAME? 5293264.66

#NAME? 12485879.94

#NAME? 116020.67

#NAME? 253484.85

Signature of Tenderer with seal


#NAME? 3326028.55

#NAME? 3892804.94

#NAME? 1207965.30

#NAME? 312971.82

Signature of Tenderer with seal


#NAME? 515366.28

#NAME? 359234.38

#NAME? 194060.06

#NAME? 278717.19

#NAME? 17046013.08

Signature of Tenderer with seal


#NAME? 810507.11

#NAME? 292024.50

#NAME? 15122840.47

#NAME? 13018128.24

#NAME? 601152.00

#NAME? 33534.44

Signature of Tenderer with seal


#NAME? 38625.48

#NAME? 396321.38

#NAME? 9477.93

#NAME? 39144.61

#NAME? 78883.40

Signature of Tenderer with seal


#NAME? 7269.75

#NAME? 19062.00

#NAME? 16773.75

#NAME? 83978.85

Signature of Tenderer with seal


#NAME? 426938.17

Total Bridge cost 94161807.74

###

108639945.98
SAY @ 108639946.00

#NAME?

Signature of Tenderer with seal


RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)
QUANTITY ESTIMATE FOR NEW CONSTRUCTION
Pakage No:

Name of the Road : BALEL To DORAPUT

Total length of road 1048 M


Length of Flexible pavement (New) 1000 M
less CD length -2
total flexible pavment 998
Length of Rigid Pavement( Strengthen) 48 M
idth of Carrige way of Flexible Pavement 5.50 M
Width of Carrige way of Rigid Pavement 5.50 M
Sl Description of Item Unit Nos. Length Breadth Height in mtr. Qnty.
No in mtr. in mtr.

1 2 3 4 5 6 7 8
Site Clearance
1 Clearing and grubbing road land
including uprooting wild vegetation,
grass, bushes, shrubs, saplings and trees
of girth upto 300 mm, removal of stumps
of such trees cut earlier and disposal of
unserviceable materials and stacking of
serviceable material to be used or
auctioned, upto a lead of 1000 m including
removal and disposal of top organic soil
not exceeding 150 mm in thickness as per
Technical Specification Clause 201 of
MoRD by manual means.
Sqm 2 998.00 4.00 7984

Earthwork and Erosion Control


2.1 Excavation in Hard Rock (blasting
prohibited by mechanical means) as per
technical specificaation clause 302
Cum 10% 1245.000 124.5
2.2 Cutting in disintegrated rock not
requiring blasting to be removed by pick
axes and crow bars and depositing
materials within 50m initial lead and 1.5m
initial lift including rough dressing as per
direction and specification of the
department including stacking the useful
materials separately as ordered.

Cum 20% 1245.000 249


2.3 Excavation in Soil in Hilly Area by
Mechanical Means including Cutting and
Trimming of side slopes and disposing of
excavated Earth with a lift upto 1.5m and
a lead upto 20m as per Techical
Specification Clause 1603.1.
Cum 70% 1245.000 871.5
3 Construction of embankment with
approaved materials deposited at site
from roadway cutting and excavation
from drain and foundation of other
structure graded and compacted to meet
requirement of Table 300.1 and 300.2 as
per Technical Specification clause 301.5(As
per calculation sheet enclosed)

Cum 699.30
4 Construction of embankment with
approaved materials obtained from
borrow pits with a lift upto 1.5m
transporting to site, spreading, grading to
required slope and compacting to meet
requirement of tables 300.1 and 300.2 as
per Technical Specification clause 301.5(As
per calculation sheet enclosed)

With a lead By Mechanical means Cum 3248.16


10 Loosening, Levelling and compacting
original ground supporting embankment
to facilitate placement of first layer of
embankment ,scarified to a depth of
150mm, mixed with water at OMC and
then compacted by rolling so as to achieve
minimum dry density as given in tables
300.1 and 300.2 for embanckment
counstruction as per technical
Specification Clause 301.4.1

Cum 2 998.00 1 0.150 149.7


Base and Sub-base
7 Construction of Granular Sub-base by
providing close graded Grading-Iv
materials as per clause 401 , spreading in
uniform layers with motor grader on
prepared surface , mixing by mix in place
method with rotavator at OMC, and
compacting with vibratory roller to
achieve desired destiny complete as per
clause 401 eof MORT&H Specifications for
Road & Bridge works ( Latest Revision ).

new BT cum 1 998.00 5.800 0.175 1012.97


Add extra for widening portion at curves and
junctions as per design Sqm 2% 20.26
cum Total 1033.23
Providing compacted granular materials
in shoulder by using moorum having
required P.I. value with sand admixture if
required as per approved Drawing &
Technical Specifications and as per Clause
- 407 of MoSRT&H Specifications for Road
& Bridge works (Latest Revision). cum 2 998.00 1.125 0.075 168.41
WMM
6 Providing, laying, spreading and
compacting graded stone aggregates to
wet mix macadam specification including
premixing the material with water at
OMC in mechanical mix plant, carriag of
mixed material by Tiper to site, laying in
uniform layers with paver in sub
base/base course on wel prepared surface
and compacting with vibratory roller to
achieve the desired density as per Clause
406 of MoSRT&H specification for Road
and Bridge works (4th Revision)

cum 1 998.00 5.500 0.225 1235.03


Add extra for widening portion at curves and 2% 24.70
junctions as per design
Total 1259.73
Bituminous work
8 Providing and applying Prime coat with
bitumen emulsion (SS-1) on prepared
surface of granular base including
cleaning of road surface and sparying
primer at the rate of 0.7-1.0 kg/sqm as
per Technical Specification Clause 502.
Sqm 1 998.00 5.50 5489.00
Add extra for widening portion at curves and ju 2% 109.78
Sqm Total 5598.78
9 Providing and applying Tack coat with
bitumen (RS-1) using emulsion
distrubutor at the rate of 0.2 - 0.25 kg/sqm
on prepared bituminous surface properly
cleaned with hydraulic broom as per
Technical Specification Clause 503.

Sqm 1 998.00 5.50 5489.00


Add extra for widening portion at curves and ju 2% 109.78
Total 5598.78
10 Providing and laying Bituminous
Macadam with Hot Mix Plant using
crushed aggregates of specified grading,
premixed with bituminous binder of
60/70 grade of Bitumen, transported to
site, laid over a previously prepared
surface with a hydroustatic paver finisher
with sensor control to the required grade,
level and alignment and rolling with
smooth wheeled, vibratory and tandem
rollers to achieve the desired compaction
as per clause 504 of MoSRT&H
Specifications for Road and Bridge work

Sqm 1 998.00 5.50 0.05 274.45

Add extra for widening portion at curves and ju 2% 5.49


Total 279.94
11 Providing and laying semi dense
bituminous concrete with hot mix plant
using crushed aggregates of specified
grading, premixed with bituminous
binder of 60/70 penetration grade of
bitumen, transporting the hot mix to work
site, laying with a hydrostatic paver
finisher with sensor control to the
required grade, level and alignment,
rolling with smooth wheelede, vibratory
and tandem rollers to achieve the desired
compaction as per Clause 508 of
MoSRT&H Specifications for Road &
Bridge works (4th Revision) AR-175/47

Sqm 1 998.00 5.50 0.025 137.23


Add extra for widening portion at curves and ju 2% 2.74
sqm Total 139.97

Total Cost (Flexible Pavment)


RIGID PAVEMENT
12 Earth work in excavation for foundation
of structures upto 3 m depth as per
drawing and technical specification
Clause 1104 including setting out,
construction of shoring and bracing,
removal of stumps and other deleterious
matter, dressing of sides, bottom and
backfilling with approved materials.
Existing CC widening Cum 2 48.000 1.000 0.250 24.00
. 24.00

16 Construction 0f sub base by providing


sand spearding in uniform layers with
tractor grader on prepared surface

Existing CC widening Cum 2 48.00 1.000 0.100 9.60


Add extra for widening portion at curve sqm 2% 0.19
9.79

18 Providing PCC DLC for plain/reinforced


concrete in open foundations complete as
per drawings and technical specification
clause 802,803,1202,1203

Existing CC widening Cum 2 48 1.00 0.150 14.40


14.40
14 Construction of Cell filled cement
concrete pavement, thickness as per
design, over a prepared sub base, with 43
grade cement or any other type concrete
strength M30 (Grade), coarse and fine
aggregates conforming to IS:383 with
minimum cement content of 350kg per
cum, maximum size of coarse aggregate
not exceeding 20 mm, mixed in a concrete
mixer of not less than 0.2 cum capacity
and appropriate weigh batcher using
approved mix design, laid in approved
fixed side formwork spreading the
concrete with shovels, rakes, compacted
using needle, screed and plate vibrators
and finished in continuous operation
including provision of admixtures as
approved, curing of concrete slabs for 14-
days, and as per direction of Engineer-in-
charge.

cum
Over Existing C.C Road cum 1 48.00 5.50 0.150 39.60
Add extra for widening portion at curves 2% 0.79
and junctions as per design Total 40.39
Total (Rigid Pavement)
ROAD APPURTENANCES
Road marking with Hot applied
thermoplastic compound with
Reflectorising Glass beads on bituminous
surface by providing and laying of hot
applied thermoplastic compound 2.5mm
thick including Reflectorising glass beads
@ 250gms per sqm area thickness of
2.5mm.is exclusive of surface applied
glass beads The finished surface to be
level uniform and free from streaks and
holes as per IRC: 35

sqm 1 950.00 33% 0.10 31.35


sqm 2 950.00 100% 0.15 285
extra curve ,etc 30% 94.905
411.255

15 Providing and fixing typical RCPLWE


informatory sign board with Logo as per
MORD specification and drawing.Three
MS Plates of 1.6mm thick, top and middle
plate duly welded with MS flat iron 25mm
x 5mm size on back edges. The lower
plate will be welded with MS angle iron
frame of 25mm x 25mm x 5mm . The
angle iron frame of lower most plate and
flat iron frame of middle of middle plate
will be welded to 2 Nos. 75mm x 75mm x
of 12 SWG sheet tubes posts duly
embeded in cement concrete M--15 grade
blocks of 450mm x 450mm x 600mm ,
600mm below ground level. The top most
diamond plate will be welded to middle
plate by 47mm x 47mm of 12 SWG steel
plate tube. All M.S will be stove
enamelled on both sides.Lettering and
printing arrows, boarder etc. will be
painted with ready mixed synthetic
enamel paint of superior quality in
required shade and colour.All sections of
framed posts and steel tube will be
painted with primer and two coats of
epoxy paint as per drawing Clause 1701
Nos 2 2
and Annexure 1700.1
16 Providing and erecting direction and
place identification of semi-reflective sign
boards as per IRC:67 made of 2mm thick
M.S.sheet duly stove enamelled paint in
white colour in front and grey colour on
back with red reflective boarder of 70 mm
width and required message,
letters,figures with reflective engineering
grade tape as per MORD specification of
required shade and colour. Supported and
welded on 47mm x 47mm of 12 SWG
Square tube of 3050mm height duly 8 8
strengthened by 25mm x 5 mm M/s flats
iron on edges on back firmly fixed to the
ground by means of properly designed
foundations with M-15 grade cement
concrete 450mm X 450mm x
600mm,600mm below ground level as per
approved drawing and technical
specification clause 1701.

For 600 mm Equolateral Triangle


Nos 3 3
For 900 mm Equolateral Triangle
Nos 5 5
For 600 mm x 450 mm Rectangular 7 7
Nos
17 Reinforced Cement Concrete M15 grade
kilometer stone / local stone of standard
design as per IRC:8 fixing in position
including painting and printing etc. as per
drawing and Technical specification
Clause 1703

(b) Ordinary Kilometer stone (Precast) 1 1


Nos
(c) 200m stone (Precast) Nos 5 5
18 Reinforced cement concrete M15 grade
Guard stone/local stone of standard
design as per IRC:25 fixed position
including finishing and lettering but
excluding painting as per drawing and Nos 197 197
Technical specification Clause 1704 of
MORD.
19 Providing and fixing of typical RCPLWE
Citizen informatory sign board as per
MORD specifications and drawing. All
M.S. will be stove enameled on both sides.
Lettering and printing arrows, border etc.
will be painted with ready mixed
synthetic enamel paint of superior quality
in required shade and colour. All sections Nos 3 3
of framed posts and steel tube will be
painted with primer and two coats of
epoxy paint as per drawing and as per
direction of Engineer-in charge

TOTAL ROAD APPURTENANCES


GRAND TOTAL (FLEXIBLE+ RIGID
PAVEMENT + ROAD APPURTENCES)

Junior Engineer Assistant Exe. Engineer Executive Eng


R&B. Section, Koraput R.&B . Sub-Division,koraput R.&B. Division
Block:- 0

Dist:- KORAPUT

Rate in Rs Amount in Rs

9 10

5.12 40878.08

233.14 29025.93

411.99 102585.51
48.56 42320.04

28.44 19888.09

154.97 503367.36

20.83 3118.25
2616.94 2703900.92
701.34 118112.67

2807.72 3536969.12

29.30 164044.25

6.99 39135.47
6370.69 1783410.96

7463.30 1044638.10

10131394.75
323.08 7753.92

1013.27 9919.91

4765.89 68628.82

6596.73 266441.92
344990.65
494.99 203567.11

9582.36 19164.72
1838.58 14708.64

2184.04 6552.12

2184.04 10920.20
1603.98 11227.86

1896.35 1896.35
476.69 2383.45

278.82 54927.54
27435.23 82305.69

407653.68

Rs 10884039.00

Executive Engineer
R.&B. Division ,koraput
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)

FUND SHARING
Central govt & state govt share (60% - 40%)
Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
0

PART - I (Central govt)


1 B.T. Road
2 Concrete Road
3 (CD WORKS)
A 1000mm ф HPC S/R
B 1X2x2M RCC Slab (up to 8.4 m)
C

4 Protection work(WALL & DRAIN)

5 Others ( road furniture &DPR)

PART - II (State govt)


1 Differntial cost (15%-12.5%)

0 (Above 8.4 m)

1X2x2M RCC Slab (Above 8.4 m)

3 Utility shifitung and tree cutting

TOTAL( I+II)

PART - III (Maintenance )


For the 1st year 1.4628
For the 2nd year 2.28

For the 3rd year 2.85


For the 4th year 3.87
For the 5th year 4.76
For the 6th year (Renewal) 69.56
84.78

Grand total (Part -I + Part - II + Part - III) 323.8000

Chief Engineer
DPI & ROADS Odisha
Bhubaneswar
Pakage No: OR19RCPL-16
vt & state govt share (60% - 40%)

COST FOR
12.5% COST FOR 15%
206.8116
2.9003

16.1689
0.0000
0.0000

5.9279

4.6430
236.45
1.19283

-0.6185

2
2.57

239.020

`
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM
ABSTRACT
Pakage No: OR19RCPL-16

Name of the Road : ANKADELI DOWN COB To ANKADELI

A PART-I (Road Proper)

1 B.T. Road 2.165 K.m. Rs


2 Concrete Road 0.060 K.m. Rs
Total 2.225 K.m. Rs
3 C.D.Works.
7 1000mm ф HPC S/R 5 Nos. Rs
Total Cost of CD Rs 5 Rs

4 Protection Work 0.100 K.m. Rs

5 Drain 0.120 K.m. Rs

6 Add for Sign Board, Logo & other Road Furnitures. Rs

Sifiting of Public Utilites Rs


Rs
Total Rs
To
B PART-II (Road Maintenance )
i) 1st year Rs
ii) 2nd year Rs
iii) 3rd year Rs
iv) 4th year Rs
v) 5th year Rs
vi) 6th year (Renewal) Rs
Total Rs
Tota

C Add for D.P.R(GST 18% & CESS 1%) Rs 20,000 /K.m


(GST 18% & CESS 1%)

Total Cost for Estimate Rs


Say
Junior Engineer Asst. Executive Engineer Executive Engineer
R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput

Superintending Engineer Chief Engineer


R&B. Circle, jypore DPI &Roads ,Odisha
WING EXTREMISIM AREA (RCPLWE)
T

N COB To ANKADELI TOP

d Proper)
Add GST @ 12% Total
18486207.00 2218344.84 20704551.84
259935.00 31192.20 291127.20
18746142.00 20995679.04

1120795.00 134495.40 1255290.40


1120795.00 1255290.40

249368.00 29924.16 279292.16

289064.97 34687.80 323752.77

372213.00 44665.56 416878.56

200000.00 200000.00

1110645.97 1219923.49
Total Cost for part-I 23470892.93
Maintenance )
130605.00 15672.60 146277.60
203240.00 24388.80 227628.80
254810.00 30577.20 285387.20
345670.00 41480.40 387150.40
425281.00 51033.72 476314.72
6210643.64 745277.24 6955920.88
7570249.64 8478679.60
Total Cost for part-II 8478679.60

3800.00 52955.00
(GST 18% & CESS 1%)

32002527.53
320.03 Lakhs
Executive Engineer
R.&B. Division , Koraput

Chief Engineer
DPI &Roads ,Odisha
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)
QUANTITY ESTIMATE FOR NEW CONSTRUCTION
Pakage No: OR19RCPL-16

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

Total length of road 2225 M


Length of Flexible pavement (New)
Length of Flexible pavement (New) 975 M
Flexible pavement ( Widen & Strengthen) 1190 M
Length of Rigid Pavement (New) 0 M
less bridge length -10
total flexible pavment 2155
of Rigid Pavement(widen & Strengthen) 60 M
idth of Carrige way of Flexible Pavement 5.50 M
Width of Carrige way of Rigid Pavement 5.50 M

chainage (BT) 0/00 TO 0/100 , 0/160 TO 2/225

chainage (CC) 0/100 TO 0/160


Sl Description of Item Unit Nos. Length Breadth Height in mtr. Qnty.
No in mtr. in mtr.

1 2 3 4 5 6 7 8
Site Clearance
1 Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth
upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of
serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil no
exceeding 150 mm in thickness as per Technical Specification Clause 201 of MoRD by manual means.

Sqm 2 2155.00 4.50 19395

Earthwork and Erosion Control


3 Scarifying existing bituminous road surface to a depth of 150mm and disposal of scarified material with a lift of 3m and
lead upto 1000m as per Technical Specification clause 301.4 of MORD

Sqm 1 1190 3.50 4165


2 Re-working of scarified bituminous surface suitably after supplementing base materials with sand and compacting
finished surface as per Technical Specifications and as per Clause - 501.8.3.2 of MoSRT&H Specifications for Road &
Bridge works (Latest Revision).
3.0
Sqm 1 1190 3.500 4165
3.1 Excavation in Hard Rock (blasting prohibited by mechanical means) as per technical specificaation clause 302
Cum 10% 12985.574 1298.5574
3.2 Cutting in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing materials
within 50m initial lead and 1.5m initial lift including rough dressing as per direction and specification of the department
including stacking the useful materials separately as ordered.

Cum 20% 12985.574 2597.1148


3.3 Excavation in Soil in Hilly Area by Mechanical Means including Cutting and Trimming of side slopes and disposing of
excavated Earth with a lift upto 1.5m and a lead upto 20m as per Techical Specification Clause 1603.1.

Cum 70% 12985.574 9089.9018


4.0 Construction of embankment with approaved materials deposited at site from roadway cutting and excavation from
drain and foundation of other structure graded and compacted to meet requirement of Table 300.1 and 300.2 as per
Technical Specification clause 301.5(As per calculation sheet enclosed)
Cum 8674.61
5 Construction of embankment with approaved materials obtained from borrow pits with a lift upto 1.5m transporting to
site, spreading, grading to required slope and compacting to meet requirement of tables 300.1 and 300.2 as per Technica
Specification clause 301.5(As per calculation sheet enclosed)

With a lead By Mechanical means Cum 7965.26


6 Loosening, Levelling and compacting original ground supporting embankment to facilitate placement of first layer of
embankment ,scarified to a depth of 150mm, mixed with water at OMC and then compacted by rolling so as to achieve
minimum dry density as given in tables 300.1 and 300.2 for embanckment counstruction as per technical Specification
Clause 301.4.1

Cum 1 2155.00 9 0.150 2909.25


7 Base and Sub-base
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in
tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and
transporting to the embankment location within all lifts and lead upto 1000m as per Data Book Cl.302. 3.5 (iii) Unit-1
cum Data for 360cum

cum 2 1190 1.00 0.150 357


8 Granural Sub Base (GSB)
Construction of granular sub-baseIV by providing coarse graded material, spreading in uniform layers with motor grader on
prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the
desired density, complete as per clause 401.

new BT cum 1 975.00 5.800 0.150 848.25


For Ex BT cum 2 1190.00 1.000 0.150357.00
Add extra for widening portion at curves and
junctions as per design cum 2% 24.11
cum Total 1229.36
10 Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including
premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, layin
in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory rolle
to achieve the desired density.

cum 1 2155.00 5.500 0.225 2666.81


Add extra for widening portion at curves and 2% 53.34
junctions as per design Total 2720.15
Bituminous work
11 Prime Coat
Providing and applying Primer coat with bitumen emulsion ( SS-1) on prepared surface of granular sub-base
including cleaning of road surface and spraying primer at the rate of 1.05kg/sqm using mechanical means As per Da
Book 502 (5.1) Data for 1750sqm Unit-sqm

Sqm 1 2155.00 5.50 11852.50


Add extra for widening portion at curves and ju 2% 237.05
Sqm Total 12089.55
Providing and applying Tack coat with bitumen (RS-1) using emulsion distrubutor at the rate of 0.2 - 0.25 kg/sqm on
prepared bituminous surface properly cleaned with hydraulic broom as per Technical Specification Clause 503.

12
Sqm 1 2155.00 5.50 11852.50
cum
Add extra for widening portion at curves and ju 2% 237.05
Total 12089.55

13 Providing and laying bituminous macadam with 60-90 TPH hot mix plant producing an average output of 75 tonnes
per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid
over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per
clauses 501.6 and 501.7 to achieve the desired compaction

cum 1 2155.00 5.50 0.05 592.63

Add extra for widening portion at curves and ju 2% 11.85


Total 604.48
14 Providing ,laying and rolling of Open Graded Pre-Mix Carpet of 20mm thickness composed of 13.2mm to 5.6mm
aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing
coarse on a previously prepared base, including mixing in a suitable plant, laying and rolling with three wheel 80-
10kN static Roller capacity, finished to required level and grades to be as per Technical Specification Clause 508.

Add extra for widening portion at curves and cum 1 2155.00 5.50 0.02 237.05
junctions as per design 4.74
241.79
15 Providing and laying Seal Coat and sealing the voids in a bituminous surface laid to specified levels,grade and cross fall using
Type C as per Technical Specification Clause 510.

sqm 1 2155.00 5.50 11852.50

Add extra for approach connect(total length) 2% 237.05


12089.55
Total Cost (Flexible Pavment)
RIGID PAVEMENT
16 Earth work in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause
1104 including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressin
of sides, bottom and backfilling with approved materials.

Existing CC widening Cum 2 60.000 1.000 0.100 12.00


. 12.00

17 Providing PCC M10 for plain/reinforced concrete in open foundations complete as per drawings and technical
specification clause 802,803,1202,1203

Existing CC widening Cum 2 60 1.00 0.100 12.00


12.00
18 Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub-base, with
43 grade cement or any other type as per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383,
maximum size of coarse aggregate not exceeding 25mm mixed in a concrete mixer of not less than 0.2 cum capacity and
appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and
fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing),
spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuo
operation including provision of contraction and expansion, construction joints, applying debonding strips, primer,
sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of
concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical
Specification Clause 1501.
Over Existing C.C Road cum 1 60.00 5.50 0.100 33.00
Add extra for widening portion at curves 2% 0.66
and junctions as per design Total 33.66

Total (Rigid Pavement)


ROAD APPURTENANCES
19 Road marking with Hot applied thermoplastic compound with Reflectorising Glass beads on bituminous surface by
providing and laying of hot applied thermoplastic compound 2.5mm thick including Reflectorising glass beads @ 250gm
per sqm area thickness of 2.5mm.is exclusive of surface applied glass beads The finished surface to be level uniform and
free from streaks and holes as per IRC: 35

sqm 2 862.00 100% 0.10 172.4


172.4
20 Providing and fixing typical RCPLWE informatory sign board with Logo as per MORD specification and drawing.Thre
MS Plates of 1.6mm thick, top and middle plate duly welded with MS flat iron 25mm x 5mm size on back edges. The
lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm . The angle iron frame of lower most plate
and flat iron frame of middle of middle plate will be welded to 2 Nos. 75mm x 75mm x of 12 SWG sheet tubes posts duly
embeded in cement concrete M--15 grade blocks of 450mm x 450mm x 600mm ,600mm below ground level. The top mos
diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S will be stove
enamelled on both sides.Lettering and printing arrows, boarder etc. will be painted with ready mixed synthetic enamel
paint of superior quality in required shade and colour.All sections of framed posts and steel tube will be painted with
primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

Nos 2 2
21 Providing and erecting direction and place identification of semi-reflective sign boards as per IRC:67 made of 2mm thick
M.S.sheet duly stove enamelled paint in white colour in front and grey colour on back with red reflective boarder of 70
mm width and required message, letters,figures with reflective engineering grade tape as per MORD specification of
required shade and colour. Supported and welded on 47mm x 47mm of 12 SWG Square tube of 3050mm height duly
strengthened by 25mm x 5 mm M/s flats iron on edges on back firmly fixed to the ground by means of properly design
foundations with M-15 grade cement concrete 450mm X 450mm x 600mm,600mm below ground level as per approved
drawing and technical specification clause 1701.

1 8 8
For 600 mm Equolateral Triangle
Nos 10 10
For 900 mm Equolateral Triangle
Nos 25 25
For 600 mm x 450 mm Rectangular 35 35
Nos
22 Reinforced Cement Concrete M15 grade kilometer stone / local stone of standard design as per IRC:8 fixing in position
including painting and printing etc. as per drawing and Technical specification Clause 1703

(b) Ordinary Kilometer stone (Precast)


2 2
Nos
(c) 200m stone (Precast) Nos 10 10
Providing and fixing of typical PMGSY logo asper mord specification and drawing . Three Ms plateof 1.6 mm thick top
and middle plate duty welded with ms angle iron frame of the lawer most plate duly welded to 2 nos . 75 mm x75mm of
12 SWGtubes posts duly embedded in cement concrete m-15 grade blocks of 450mmx450mm x600mm ,600mm beloe
ground level. the topmost diamond plate wiil be welded the middle plate by enameled on both sides Lettering and
printing arrows, boarder etc

Nos 1 1
23 Reinforced cement concrete M15 grade Guard stone/local stone of standard design as per IRC:25 fixed position includin
finishing and lettering but excluding painting as per drawing and Technical specification Clause 1704 of MORD.

Nos 196 196


24
Providing and fixing of typical PMGSY Maintenance information board as per MORD specifications and drawing. Three
MS Plates of 50x5mm mm thick, back plate duly welded with 75mm dia steel tubes back on edges as per drawings. The
upper & lower plate will be welded with MS flat iron frame of 50mmx5mm. The steel tubes duly embedded in cement
concrete M-15 grade blocks of 600mm x 600mm x 750mm below ground level.All M.S. will be stove enameled on both
sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior
quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two
coats of epoxy paint as per drawing Clause 1701 and Annexture 1700.1.

Nos 1 1
25 Providing and fixing of typical RCPLWE Citizen informatory sign board as per MORD specifications and drawing. All
M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed
synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will
be painted with primer and two coats of epoxy paint as per drawing and as per direction of Engineer-in charge

26
Nos 2 2

TOTAL ROAD APPURTENANCES


GRAND TOTAL (FLEXIBLE+ RIGID
PAVEMENT + ROAD APPURTENCES)

Junior Engineer Assistant Exe. Engineer Executive Eng


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division ,
Block:- LAMTAPUT

Dist:- KORAPUT

mtr

Rate in Rs Amount in Rs

9 10

gs and trees of girth


d stacking of
of top organic soil not
.

5.12 99302.40

with a lift of 3m and

7.15 29779.75
nd compacting
ons for Road &

10.64 44315.60
lause 302
233.14 302745.67
epositing materials
n of the department

411.99 1069985.33
s and disposing of
1.

48.56 441405.63
excavation from
nd 300.2 as per

28.44 246705.91
.5m transporting to
00.2 as per Technical

154.97 1234376.34
nt of first layer of
ng so as to achieve
nical Specification

20.83 60599.68
ting and loading in
oss sections, and
l.302. 3.5 (iii) Unit-1

34.85 12441.45

motor grader on
ler to achieve the

2154.08 2648139.79
cation including
y tipper to site, laying
with vibratory roller

2219.43 6037182.51

ar sub-base
l means As per Data

33.52 405241.72
0.2 - 0.25 kg/sqm on
on Clause 503.

9.62 116301.47

utput of 75 tonnes
orted to site, laid
and rolled as per
6025.47 3642276.11
.2mm to 5.6mm
o serve as wearing
h three wheel 80-
tion Clause 508.

6380.72 1542794.29
and cross fall using

45.71 552613.33
18486206.98
pecification Clause
ious matter, dressing

34.85 418.20

d technical

4661.99 55943.88
ared sub-base, with
nforming to IS:383,
2 cum capacity and
channel, laying and
per drawing),
finished in continuous
g strips, primer,
ved, curing of
and Technical

6047.92 203572.99

259935.07
nous surface by
glass beads @ 250gms
be level uniform and

494.99 85336.28
n and drawing.Three
back edges. The
e of lower most plate
heet tubes posts duly
d level. The top most
will be stove
d synthetic enamel
ll be painted with

9382.78 18765.56
7 made of 2mm thick
ctive boarder of 70
D specification of
mm height duly
s of properly designed
el as per approved

1738.79 13910.32

2073.16 20731.60

2073.16 51829.00
1504.18 52646.30
8 fixing in position

1701.56 3403.12
447.77 4477.70
of 1.6 mm thick top
s . 75 mm x75mm of
m ,600mm beloe
s Lettering and

2981.85 2981.85
ed position including
4 of MORD.

272.19 53349.24
and drawing. Three
per drawings. The
bedded in cement
enameled on both
paint of superior
h primer and two

10994.84 10994.84
ns and drawing. All
d with ready mixed
s and steel tube will
r-in charge

26893.46 53786.92

372212.73

Rs 19118355.00

Executive Engineer
R.&B. Division , Koraput
Type of C.D.Works :- 300mm Dia. Conduit.
Pakage No: OR19RCPL-16 Block:- LAMTAPUT Dist:-
Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
At Chainages (M): Road Corssing in builtup area

Sl Description of Item Unit No. Length Width Depth Quantity


No in Mtrs in in Mtrs
1 2 3 4 5 Mtrs
6 7 8
1 Earth work in excavation for foundation of structures upto 3 m depth as per drawing and
technical specification Clause 1104 including setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing of sides, bottom and backfilling with
approved materials.
Head wall Cum 2 2.00 0.60 0.50 1.20
Pipe Portion Cum 1 6.80 0.50 0.45 1.53
Cum Total 2.73
2 Filling in foundation with sand trenches as per drawing and technical specification clause
3005.3.9
Below Head Wall Cum 2 2.00 0.60 0.10 0.24
Below Pipe Bed Cum 1 6.80 0.50 0.10 0.34
Head wall (Inner Side) Cum 2 2.00 0.15 0.50 0.30
Total 0.88
3 Providing concrete for plain concrete of M-15 in open foundations complete as per drawings
and technical specification clause 802,803,1202,1203
Head wall Bed Cum 2 2.00 0.60 0.10 0.24
Below Pipe Cum 1 6.800 0.50 0.10 0.34
Net Qnty 0.58
4
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class bedding
of granular material in single row including fixing colar with cement mortar 1:2 but excluding
excavation,protection works,backfilling, concrete and masonary work
R.M 1 7.5 7.5

5 Providing concrete for plain concrete of M-15 in open foundations complete as per drawings
and technical specification clause 802,803,1202,1203
Head wall - Cum 2 2.00 0.375 1.10 1.65
Pipe joint - Cum 2 0.65 0.200 0.20 0.05
Cum Total 1.70

Deduct for pipe 2x π/4 (0.36)2 0.814 cum -0.17


Total -0.17
Net Qnty 1.53
Total for one Culvert
For 0 Nos

Junior Engineer Assistant Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
onduit.
KORAPUT

area

Rate in Amount in
Rs Rs
9 10

323.08 882.01

671.95 591.32

4261.76 2471.82

661.45 4960.875

4261.76 6520.49
Rs 15426.52
Rs 0.00

Executive Engineer
R.&B. Division , Koraput
Type of C.D.Works :- 600mm Dia. Single Row H.P. Culvert
Pakage No: OR19RCPL-16 Block:- LAMTAPUT Dist:- KORAPUT

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP


At Chainages (M): 600 mm dia

Sl Description of Item Unit No. Length Width Depth Quantity Rate in Rs


No in Mtrs in Mtrs in Mtrs
1 2 3 4 5 6 7 8 9
1 Earth work in excavation for foundation of structures upto 3 m depth as per
drawing and technical specification Clause 1104 including setting out, construction
of shoring and bracing, removal of stumps and other deleterious matter, dressing of
sides, bottom and backfilling with approved materials.
Head wall Cum 2 3.48 1.40 1.00 9.74
Pipe Portion Cum 1 4.85 1.36 1.8 11.87
Pipe joint Cum 2 1.36 0.20 0.50 0.27
Cum Total 21.88 323.08
2 Providing concrete for plain concrete of M-15 in open foundations complete as per
drawings and technical specification clause 802,803,1202,1203
Head wall Bed Cum 2 3.48 1.40 0.15 1.46
Total 1.46
Deduct for collar joint Cum 2 1.36 0.2 0.15 0.08
Net Qnty 1.38 4261.76
3 Construction of Gravel/Soil aggregates Base/Surface by providing well graded
material of nominal maximum size grading 5mm as per Table 2.3 of IRC SP 77-
2008,spreading in uniform layers with tractor mount appropriate grading
arrangements on prepared surface,mixing by mix in place method at OMC with
tractor mount appropriate rotavator attachment and compaction with three wheel
80-100 KN static Roller capacity to achieve the desired density complete as per
specifications contained in Para 2.2,3.6 and 3.7 of IRC SP 77-2008

Below Pipe Cum 1 5.486 1.36 0.15 1.12 812.75


4
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class
bedding of granular material in single row including fixing colar with cement
mortar 1:2 but excluding excavation,protection works,backfilling, concrete and
masonary work
R.M 1 7.5 7.5 8235.60

5 Providing concrete for plain concrete of M-15 in open foundations complete as per
drawings and technical specification clause 802,803,1202,1203
Head wall - Cum 2 3.33 0.83 2.01 11.11
Parapet - Cum 2 3.33 0.40 0.40 1.07
Pipe joint - Cum 2 1.36 1.31 0.20 0.71
Cum Total 12.89

Deduct for collar joint 2x π/4 (0.76)2 0.20 cum -0.18


Deduct for pipe 2x π/4 (0.76)2 0.814 cum -0.74
Total -0.92
Net Qnty 11.97 4261.76
Total for one Culvert Rs
For 0 Nos Rs

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
vert
KORAPUT

ADELI TOP

Amount in Rs

10

7068.99

5881.23

910.00

61767

51013.27
126640.49
0.00

Executive Engineer
R.&B. Division , Koraput
Type of C.D.Works :- 1000mm Dia. Single Row H.P. Culvert

Pakage No: OR19RCPL- Block:-LAMTAPUT Dist:-

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

At Chainages (M):
Sl. Description of item Nos Length Width Ht./ Th, Unit Quantity Total
No. in M. in M. in M Quantity
1 2 3 4 5 6 7 8

1 Earthwork in excavation for foundation of structures upto 3 m depth as per


drawing and technical specification Clause 1104 includding setting out,
construction of shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides and b

Head wall 2x 5.80 x 1.5 x 1.00Cum = 17.40


Pipe portion
1x 4.65 x 2.23 x 0.35Cum = 3.63
appron U/s 0x 6.20 x 1.50 x 0.30Cum = 0.00
appron D/s 0 x 6.20 x 2.00 x 0.30Cum = 0.00
Toe wall 0 x 6.20 x 0.6 x 0.30Cum = 0.00
Total 21.03 21.03
2 Backfilling in Foundation Trenches as per drawing and technical specification
Clause 1108 and 305.3.9 of MoRD
Sand filling Head wall 2x 5.8 x 1.5 x 0.20Cum = 3.48
Below pipe 1 x 5.23 x 2.23 x 0.2Cum = 2.33
Filling gaps 1 x (6.7+5.35x 2.23 x 1.53Cum = 20.55
Deduct for pipe 1 x (6.7+5.35x p / 4 x 1.23 2Cum = 7.16 ( - )
Cum = 33.52 33.52
2 Construction of Gravel/Soil aggregates Base/Surface by providing well graded
material of nominal maximum size grading 5mm as per Table 2.3 of IRC SP 77-
2008,spreading in uniform layers with tractor mount appropriate grading
arrangements on prepared surface,mixing by mix in place method at OMC with
tractor mount appropriate rotavator attachment and compaction with three wheel
80-100 KN static Roller capacity to achieve the desired density complete as per
specifications contained in Para 2.2,3.6 and 3.7 of IRC SP 77-2008
Below pipe
1x 5.35 x 2.23 x 0.15Cum = 1.79
Total Cum = 1.79 1.79
3 Providing M-15 Grade concrete for plain concrete in open foundations complete as
per drawings and technical specification clause 802,803,1202,1203
Head wall bed 2x 5.80 x 1.50 x 0.15Cum = 2.61 2.61
4 Providing and laying reinforced cement concrete pipe NP3 of 1000mm dia. for
culverts on first class bedding of granular material in single row including fixing
collar with cement mortar 1:2 but excluding excavation, protection works,
backfilling, concrete 3x 2.5 RM = 7.5 7.50
5 Plain cement concrete in sub structure, Nominal mix (1:2.5:5) complete as per
drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204

Head wall 2x 5.65 x 0.875 x 2.45Cum = 24.22


Parapet 2x 5.65 x 0.4 x 0.4Cum = 1.81
pipe joint 2x 2.23 x 1.53 x 0.2Cum = 1.36
Deduct for pipe at joint 2x 0.2 x p/4 x 1.23 2Cum = 0.48 ( - )
Deduct for pipe 2x 0.875 x p/4 x 1.23 2Cum = 2.08 (-)
Total Cum = 24.83 24.83

Cost of each culvert,(1x1000 dia.) in Rs. 198,607.00


So Cost for 0 Nos in Rs. 0.00

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
KORAPUT

ADELI TOP

Rate Amount
Rs. Rs
9 10

323.08 6,794.37

671.95 22,523.76

812.75 1,454.82

4,261.76 11,123.19

6,031.16 45,233.70
4,489.61 111,477.02
Total cost Rs. 198,606.86

198,607.00
0.00

cutive Engineer
Division , Koraput
Type of C.D.Works :- 1000mm Dia. Double Row H.P. Culvert

Pakage No: OR19RCPL-16 Block:- LAMTAPUT Dist:-


Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
At Chainages (M):
Sl. Description of item Nos Length Width Ht./ Th, Unit Quantity Total
No. in M. in M. in M Quantity
1 2 3 4 5 6 7 8

1
Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104
setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides a and b

Head wall 2x 8.03 x 1.5 x 1.20 Cum = 28.91


Pipe portion 1x 4.65 x 3.96 x 0.75 Cum = 13.81
appron U/s 1x 7.88 x 1.50 x 0.30 Cum = 3.55
appron D/s 1x 7.88 x 2.00 x 0.30 Cum = 4.73
Toe wall 4x 4.00 x 0.6 x 0.30 Cum = 2.88
Total 53.88
53.88
2 Backfilling in Foundation Trenches as per drawing and technical specification Clause 1108 and 305.3.9 of MoRD

Sand filling Head wall 2x 8.03 x 1.5 x 0.20 4.82


Cum =
Below pipe 1x 5.23 x 3.96 x 0.2 4.14
Cum =
Filling gaps 1x (6.7+5.35)/2x 3.96 x 1.53
Cum = 36.50
Deduct for pipe 2x (6.7+5.35)/2x p / 4 x 1.23 2
Cum = 14.32 ( - )
Cum = 31.14 31.14
3 Construction of Gravel/Soil aggregates Base/Surface by providing well graded material of nominal maximum size grading 5
Table 2.3 of IRC SP 77-2008,spreading in uniform layers with tractor mount appropriate grading arrangements on prepared
surface,mixing by mix in place method at OMC with tractor mount appropriate rotavator attachment and compaction with thr
80-100 KN static Roller capacity to achieve the desired density complete as per specifications contained in Para 2.2,3.6 and
SP 77-2008

Below pipe 1x 5.35 x 3.96 x


0.15 Cum = 3.18
Total Cum = 3.18 3.18
4 Plain Cement Concrete (1:2.5:5 nominal mix) in levelling course below open foundation of Head walls as per drawings & Te
Specification Clause 802,803,1109,1202,1203 of MoRD

Head wall bed 2x 8.03 x 1.50 x 0.15 Cum = 3.61 3.61


5 Providing and laying reinforced cement concrete pipe NP3 of 1000mm dia. for culverts on first class bedding of granular ma
single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete.

3x 2.5 RM = 7.5 7.50


6 Plain cement concrete in sub structure, Nominal mix (1:2.5:5) complete as per drawings and technical specification Clauses
805, 806, 807, 1202 and 1204
Head wall 2x 7.88 x 0.875 x 2.68 Cum = 36.96
Parapet 2x 7.88 x 0.4 x 0.4 Cum = 2.52
pipe joint 2x 3.96 x 1.53 x 0.2 Cum = 2.42
Deduct for pipe at joint 4x 0.2 x p / 4 x 1.23 2 Cum = 0.95 ( - )
Deduct for pipe 4x 0.875 x p / 4 x 1.23 2 Cum = 4.16 (-)
Toe wall 4x 4.00 x 0.6 x 0.1 Cum = 0.24
Toe wall 4x 4.00 (0.5+0.4)/2 1.30 Cum = 2.34
Total Cum = 39.37 39.37
Total cost Rs.

Cost of each culvert,(2x1000 dia.) in Rs. 340,165.00


So cost for 0 Nos in Rs. = 0.00
Junior Engineer Assistant Exe. Engineer Executive Engin
R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Ko
KORAPUT

Rate Amount
Rs. Rs
9 10

ication Clause 1104 includding


ng of sides a and b

323.08 17,407.55
of MoRD

671.95 20,924.52
mum size grading 5mm as per
ements on prepared
compaction with three wheel
d in Para 2.2,3.6 and 3.7 of IRC

812.75 2,584.55
as per drawings & Technical

4,489.61 16,207.49
dding of granular material in
ckfilling, concrete.

14,170.03 106,275.23
pecification Clauses 802, 804,

4,489.61 176,755.95
Total cost Rs. 340,165.29

340,165.00
0.00
Executive Engineer
R.&B. Division , Koraput
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY) Format-F-7

COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS.

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

Type of cross Drainage Work: Hume Pipe Culvert (1200mm dia Double row)
Total Nos. of Culvert : 0 Nos. District : Koraput
Type of soil : All kinds of soil Block : Pottangi
Sl. Ht / Th Amount in
Description of item Nos. Length Width in M Unit Quantity Rate in Rs.
No Rs.
1 2 3 4 5 6 7 8 9 10
1 Earthwork in excavation for foundation of
structures upto 3 m depth as per drawing and
technical specification Clause 1104 includding
setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter,
dressing of sides and b
Head wall 2 × 8.00 × 1.80 × 1.20 Cum 34.56
Pipe portion 1 × 4.05 × 3.90 × 0.900 Cum 14.22
Total 48.78
For 0 no culverts 48.78 x 0 Cum 0 @ 323.08 0.00
2 P.C.C(1:3:6) using 40mm size H.G.metal well

rammed with cost, Conveyance , royality,taxes

of all material and labour,T & P etc.Complete.


Head Wall 2 × 8.00 × 1.800 × 0.150 Cum 4.32
Pipe Bed 1 × 5.00 × 3.900 × 0.150 Cum 2.93
Total 7.25
For 0 no culverts 7.25 x 0 Cum 0.00 @ 4261.76 0.00
3 Providing laying R.C.C. Hume pipe NP3 class
for culverts including fixing collar with cement
mortar 1:2 but excluding excavation, protection
work, backfilling,concrete and masonry work in
head walls and parapets clause 1106 of MORD
specification for Rural roads and as per irection
of Engineer-in charge.
1200 mm dia Double row 0 × 7.50 RM 0.00 @ 6031.16 0.00
4 Plain cement concrete M-15 grade in
Foundation complete as per drawing and
technical specification.
Head Wall up to Bed Level 2 × 5.65 x (1.65+1.2)/2 × 0.65 Cum 10.47
For 0 no culverts 10.47 x 0 Cum 0 @ 4261.76 0.00

2
Sl. Ht / Th Amount in
Description of item Nos. Length Width in M Unit Quantity Rate in Rs.
No Rs.
1 2 3 4 5 6 7 8 9 10
5 Plain cement concrete M-15 grade in Sub-
Structure complete as per drawing and technical
specification.
Head Wall 2 × 8.00 × (1.2+0.4)/2 × 2.45 Cum 31.36
Pipe Joint 2 × 3.90 × 0.200 × 1.40 Cum 2.18
Total 33.54
Deduction in Pipe joint 4 × 0.200 × 0.785 × (1.40)2 Cum (-) 1.23
Deduct for Pipe 4 × 0.875 × 0.785 × (1.40)2 Cum (-) 5.39
Total 26.92
For 0 no culverts 26.92 x 0 Cum 0 @ 4489.61 0.00

0 Nos. of Hume Pipe Culverts Total Cost Rs. 0.00

Junior. Engineer Asst. Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput

2
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS.

Name of the road: ANKADELI DOWN COB To ANKADELI TOP


Type of cross Drainage Work: Hume Pipe Culvert (1200mm dia Single row)
Total Nos. of Culvert : 0 Nos. District :
Type of soil : All kinds of soil Block :
Sl. Ht / Th
No
Description of item Nos. Length Width in M Unit Quantity Rate in Rs.

1 2 3 4 5 6 7 8 9
1. Earth work in excavation of fondation in hard soil

within the initial lead & lift including dressing &

levelling the bed & depositiong the excavated earth

away from the site etc. all complete as per the

direction of Engineer in Charge.


Head wall 2 × 6.15 × 1.50 × 1.20 Cum 22.14
Pipe portion 1 × 4.650 × 2.10 × 0.900 Cum 8.79
Total 30.93
For 0 no culverts 30.93 x 0 Cum 0.00 @ 323.08
2 P.C.C(1:3:6) using 40mm size H.G.metal well
rammed with cost, Conveyance , royality,taxes of all
material and labour,T & P etc.Complete.
Head wall 2 × 6.15 × 1.500 × 0.150 Cum 2.77
Pipe Bed 1 × 5.30 × 2.100 × 0.150 Cum 1.67
Total Cum 4.44
For 0 no culverts 4.44 x 0 Cum 0 @ 4261.76

3 Providing laying R.C.C. Hume pipe NP3 class for


culverts including fixing collar with cement mortar
1:2 but excluding excavation, protection work,
backfilling,concrete and masonry work in head walls
and parapets clause 1106 of MORD specification for
Rural roads and as per irection of Engineer-in
charge.
1200 mm dia Single row 0 × 7.50 RM 0.00 @ 6031.16
4 Plain cement concrete M-15 grade in Foundation

complete as per drawing and technical specification.


Head Wall Up to Bed Level 2 × 4.85 x (1.35+1.1)/2 × 0.65 Cum 7.72
For 0 × 7.72 Cum 0.00 @ 4261.76

1
Sl. Ht / Th
No
Description of item Nos. Length Width in M Unit Quantity Rate in Rs.

1 2 3 4 5 6 7 8 9
5 Plain cement concrete M-15 grade in Sub-Structure

complete as per drawing and technical specification.


Head Wall 2 × 6.15 × (1.1+0.4)/2 × 2.45 Cum 22.60
Pipe Joint 2 × 2.10 × 0.200 × 1.40 Cum 1.18
Total 23.78
Deduction in Pipe joint 2 × 0.20 × 0.785 × (1.40)2 Cum (-) 0.62
Deduct for Pipe in Wall 2 × 0.875 × 0.785 × (1.40)2 Cum (-) 2.69
Total 20.47
For 0 no culverts 20.47 x 0 Cum 0 @ 4489.61

0 Nos. of Hume Pipe Culverts Total Cost Rs.

Junior. Engineer Asst. Exe. Engineer Executive Engineer


Rural Works Section,Pottangi. Rural Works Sub Division,Pottangi. Rural Works Division, Sunabed

1
Format-F-7

NKADELI DOWN COB To ANKADELI TOP

Koraput
Pottangi
Amount in
Rs.
10

0.00

0.00

0.00

0.00

1
Amount in
Rs.
10

0.00

0.00

Executive Engineer
Rural Works Division, Sunabeda.

1
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS.

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

Type of cross Drainage Work: Hume Pipe Culvert (1200mm dia Four Row)
Total Nos. of Culvert : 0 Nos. District :

Type of soil : All kinds of soil Block :

1) Earth work in excavation of fondation in hard soil within the initial lead &
lift including dressing & levelling the bed & depositiong the excavated
earth away from the site etc. all complete as per the direction of
Engineer in Charge.

Upstream Cut-off wall.


1x 8.70 = 8.70
2x 13.90 = 27.80
Total = 36.50 x 1.00 x 2.00 = 73.00 cum.
D/S cut-off wall
1x 8.70 = 8.70
Total = 8.70 x 1.00 x 2.50 = 21.75 cum.
Appron U/S 1x 7.10 x 2.20 x 0.80 = 12.50 cum.
Appron D/S 1x 7.10 x 4.20 x 0.80 = 23.86 cum.
U/S & D/S Stone packing 2x 8.30 x 5.00 x 0.90 = 74.70 cum.
Wing-Wall portion 4x 5.00 x 1.70 x 1.10 = 37.40 cum.
Bed 1x 7.10 x 7.50 x 0.80 = 42.60 cum.
Total = 285.81 cum.
Or say = 286.00 cum.
@Rs. 323.08 / Cum. ……. …. ……….……….

2) Plain cement concrete M-15 grade in


Foundation complete as per drawing and
technical specification.

U/S cut-off wall 1x 36.50 x 1.00 x 0.50 = 18.25 cum.


1x 36.50 x 0.60 x 1.50 = 32.85 cum.
D/S cut-off wall 1x 8.70 x 1.00 x 0.50 = 4.35 cum.
1x 8.70 x 0.60 x 2.00 = 10.44 cum.
Appron U/S 1x 7.10 x 2.40 x 0.50 = 8.52 cum.
Appron D/S 1x 7.10 x 4.40 x 0.50 = 15.62 cum.
Bed 1x 7.10 x 7.50 x 0.50 = 26.63 cum.
Total = 116.66 cum.

@Rs. 4261.76 /Cum. ……. …. ……….……….

3) Plain cement concrete M-15 grade in Sub-


Structure complete as per drawing and technical
specification.
V.C. Proper above G.L. 1x 8.30 x 7.50 x 1.90 = 118.28 cum.
Wing Wall 4x 5.00 x 1.70 x 0.50 = 17.00 cum.
4x 5.00 x 0.90 x 2.475 = 44.55 cum.
Total = 179.83 cum.
Deduct H.P. portion 4 x 7.50 x 22/7 x 0.25 x (1.40)2 (-) = 46.16 cum.
Net = 133.67 cum.

P.C.C work of M-20 grade with 20mm and down grade


@Rs. black hard
4489.61 /Cum. ……. …. ……….……….
4) granite (crusherbroken) stone chips including hoisting and laying

Wearing coat 1x 8.30 x 7.50 x 0.075 = 4.67 cum.


Appron U/S 1x 8.30 x 3.00 x 0.100 = 2.49 cum.
Appron D/S 1x 8.30 x 5.00 x 0.100 = 4.15 cum.
Guard posts 2x 20x 0.5 x( 0.0625 + 0.0225 )x 0.60 = 1.02 cum.
Net = 12.33 cum.

@Rs. 6762.60 /Cum. ……. …. ……….……….


5)

Supplying, fitting, and placing HYSD bar reinforcement in


superstructure complete as per drawing and technical specifications
Steel 12.33 cum. @ 0.50 Qntl./cum. = 6.17 Qntl.
Total = 6.17 Qntl.
@Rs. 5559.43 /Qntl ……. …. ……….……….

6)
Providing Weep Holes is Brick Masonry/Paln/Rainforced concrete
abutment, wing wall / return wall with 100mm dia AC pipe, extending
through the full width of the structure wirh slope of IV:2Htowards
drawing force etc, complete.

Wing wall 2 x 2 x 5 = 20 Nos.

@Rs. 0.00 /Each ……. …. ……….……….

7)
Providing laying R.C.C. Hume pipe NP3 class for culverts including
fixing collar with cement mortar 1:2 but excluding excavation, protection
work, backfilling,concrete and masonry work in head walls and
parapets clause 1106 of MORD specification for Rural roads and as per
irection of Engineer-in charge.
1200m. Dia NP3
Qnty. 0x 7.50 = 0.00 mtr

@Rs. 6031.16 /mtr ……. …. ……….……….

Total =

For 0 No. of Culverts= Rs. 1,307,388.51 x 0

Junior. Engineer Asst. Exe. Engineer Executive Engineer


Rural Works Section,Pottangi. Rural Works Sub Division,Pottangi. Rural Works Division, Sunabeda.
NAGE WORKS.

LI TOP

Koraput

Pottangi

Rs. 92,400.88

Rs. 497,176.92

Rs. 600,126.17

Rs. 83,382.86
Rs. 34,301.68

Rs. -

Rs. -

Rs. 1,307,388.51

Rs. -

Executive Engineer
Rural Works Division, Sunabeda.
Type of C.D.Works :- 900mm Dia. Single Row H.P. Culvert
Pakage No: OR19RCPL-16 Block:- LAMTAPUT Dist:- KORAPUT
Name of the Road : ANKADELI DOWN COB To ANKA138 0 0 0

Sl Description of Item Unit No Lengt Width Depth Quantit Rate in


No . h in in in y Rs
Mtrs Mtrs Mtrs
1 2 3 4 5 6 7 8 9
1 Earth work in excavation for foundation of structures upto 3 m depth as per drawing
and technical specification Clause 1104 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious matter, dressing of sides and
bottom and backfilling with approved materials.
Head wall - Cum 2 5.15 1.50 1.10 17.00
Pipe portion - Cum 1 4.85 2.00 1.00 9.70
Pipe joint Cum 2 2.00 0.20 0.50 0.40
U/S appron Cum 1 3.00 1.50 0.30 1.35
D/S appron Cum 1 3.00 1.50 0.30 1.35
Down stream Toe wall Cum 1 3.00 0.30 0.60 0.54
Cum Total 30.34 323.08
2 Filling in foundation trenches as per drawing and technical specification clause
3005.3.9
Below Head Wall Cum 2 5.15 1.50 0.20 3.09
Below Pipe Bed Cum 1 5.125 2.00 0.20 2.05
Head wall (Inner Side) Cum 2 5.00 0.14 0.30 0.42
For pipe covering Cum 1 5.89 2.00 1.40 16.49
22.05
Deduction for pipe portion (-) Cum 1 22/28 (1.1)2 5.89 -5.60
Total 16.45 671.95
3
Providing concrete for plain concrete of M-10 in open foundations complete as per
drawings and technical specification clause 802,803,1202,1203
Head wall Bed Cum 2 5.00 1.50 0.15 2.25
Cum Total 2.25
Deduction for pipe joint (-) Cum 2 0.20 2.00 0.15 0.12
Net Qnty 2.13 4661.99
4 Construction of Gravel/Soil aggregates Base/Surface by providing well graded
material of nominal maximum size grading 5mm as per Table 2.3 of IRC SP 77-
2008,spreading in uniform layers with tractor mount appropriate grading
arrangements on prepared surface,mixing by mix in place method at OMC with tractor
mount appropriate rotavator attachment and compaction with three wheel 80-100 KN
static Roller capacity to achieve the desired density complete as per specifications
contained in Para 2.2,3.6 and 3.7 of IRC SP 77-2008

Below Pipe Cum 1 5.27 2.00 0.15 1.58 812.75


5
Providing and laying reinforced cement concrete pipe NP3 for culverts on first class
bedding of granular material in single row including fixing colar with cement mortar 1:2
but excluding excavation,protection works,backfilling, concrete and masonary work in
head wall and parapet Clause 1106
R.M 1 7.5 7.5 697.04
6
Providing concrete for plain concrete of M-15 in open foundations complete as per
drawings and technical specification clause 802,803,1202,1203
Head wall - Cum 2 5.00 0.875 2.35 20.56
Parapet - Cum 2 5.00 0.40 0.40 1.60
Pipe joint - Cum 2 2.00 1.650 0.20 1.32
Total 23.48
Deduct for Collar joint 2
π/4 0.20 (1.1)2 -0.38
Deduct for pipe
2 π/4 0.865 (1.1)2 -1.64
Total -2.02
Net Qnty 21.46 4261.76
7 Providing and laying boulder appron for bed protection with stone boulders of
minimum size and weight as per table 1300.1,no fragment weighing not less than
25kg laid dry complete as per drawing and Technical Specification clause1301.

U/S appron Cum 1 3.00 1.50 0.30 1.35


D/S appron Cum 1 3.00 1.50 0.30 1.35
D/S Toe Wall Cum 1 3.00 0.60 0.40 0.72
3.42 2032.89
Total for one Culvert Rs
For 0 Nos Rs

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
KORAPUT

Amount
in Rs

10

9802.25

11053.58

9930.04

1284.00
5227.80
91457.37

6952.48
135707.52
0.00

ecutive Engineer
Division , Koraput
Type of C.D.Works :- 900mm Double Dia. Row H.P. Culvert
Pakage No: OR19RCPL-16 Block:- LAMTAPUT Dist:- KORAPUT
Name of the Road : ANKADELI DOWN COB T 415 1810

Sl Description of Item Unit No. Length Width Depth Quantity Rate in Amount in
No in Mtrs in Mtrs in Rs Rs
1 2 3 4 5 6 Mtrs
7 8 9 10
1 Earth work in excavation for foundation of structures upto 3 m depth as per
drawing and technical specification Clause 1104 including setting out, construction
of shoring and bracing, removal of stumps and other deleterious matter, dressing
of sides and bottom and backfilling with approved materials.
Head wall - Cum 2 5.80 1.50 1.10 19.14
Pipe portion - Cum 1 4.85 3.55 1.00 17.22
Pipe joint Cum 2 3.55 0.20 0.50 0.71
U/S appron Cum 1 5.00 1.20 0.30 1.80
D/S appron Cum 1 5.00 1.30 0.30 1.95
Down stream Toe wall Cum 1 5.00 0.30 0.60 0.90
Cum Total 41.72 323.08 13478.90
2 Filling in foundation trenches as per drawing and technical specification clause
3005.3.9
Below Head Wall Cum 2 5.80 1.50 0.20 3.48
Below Pipe Bed Cum 1 4.85 3.55 0.20 3.44
Head wall (Inner Side) Cum 2 5.80 0.14 0.30 0.49
For pipe covering Cum 1 5.89 3.55 1.40 29.27
Deduct for pipe Cum 2 π/4 (1.1)2 5.89 -11.19
Total 25.49 671.95 17128.01
3 Providing concrete for plain concrete of M-10 in open foundations complete as per
drawings and technical specification clause 802,803,1202,1203
Head wall Bed Cum 2 5.80 1.50 0.15 2.61
Below Pipe Cum 1 5.27 3.55 0.15 2.81
Cum Total 5.42
Deduction for pipe joint (-) Cum 2 0.20 3.55 0.15 0.21
Net Qnty 5.21 4299.72 22401.54
4 Providing and laying reinforced cement concrete pipe NP3 for culverts on first
class bedding of PCC M-10 in single row including fixing colar with cement mortar
1:2 but excluding excavation,protection works,backfilling, concrete and masonary
work in head wall and parapet Clause 1106
R.M 2 7.5 15 697.04 10455.60

5 Providing concrete for plain concrete of M-15 in open foundations complete as per
drawings and technical specification clause 802,803,1202,1203
Head wall - Cum 2 5.65 0.875 2.35 23.24
Parapet - Cum 2 5.65 0.40 0.40 1.81
Pipe joint - Cum 2 3.55 1.650 0.20 2.34
Cum Total 27.39

Deduct for pipe joint Cum 4 π/4 0.20 (1.1)2 -0.76


Deduct for pipe Cum 4 π/4 0.865 (1.1)2 -3.29
Total -4.05
Net Qnty 23.34 4261.76 99469.48
6 Providing and laying boulder appron for bed protection with stone boulders of
minimum size and weight as per table 1300.1,no fragment weighing not less than
25kg laid dry complete as per drawing and Technical Specification clause1301.

U/S appron Cum 1 5.00 1.20 0.30 1.80


D/S appron Cum 1 5.00 1.30 0.30 1.95
Down stream Toe wall Cum 1 5.00 0.30 0.60 0.90
Revetment Cum 4 0.785 1.50 0.30 1.41
6.06 2032.89 12319.31

Total for one Culvert Rs 175252.84


For 0 Nos Rs 0.00

Junior Engineer Assistant Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
PRADHAN MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Type of Cross Drainage Work: Boxcell 1Span 3 M X 2 M Height.
Name of the Road : ANKADELI DOWN COB To ANKADELI TOP Pakage No: OR19RCPL-16
Chainage Block
Sl Description of Item Nos Length in Width in Mtr Depth Unit
No. Mtr in Mtr

1 2 3 4 5 6 7
1 Earth work in excavation for foundation of structures upto 3 m depth as per drawing
and technical specification Clause 1104 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious matter, dressing of sides and b

Abutment 2 6.20 1.67 1.15 Cum


Wing wall 4 2.50 2.36 1.15 Cum
Cut off U/S & D/S 2 4.40 1.00 1.10 Cum
Bed 1 6.00 2.00 0.35 Cum
Fexiable App. U/S 1 5.00 2.00 1.00 Cum
D/S 1 5.00 3.00 1.00 Cum
Toe wall 4 15.00 0.60 0.75 Cum

2 Filling in foundation trenches with Sand as per drawing and technical specification
clause 3005.3.9
Abutment 2 6.20 1.67 1.15 Cum
Wing wall 4 2.50 2.36 1.15 Cum
Bed 1 6.00 2.00 0.15 Cum
Toe wall 4 15.00 0.60 0.15 Cum
Back filling abutment &
wing wall 2 6.9+3.7 3.0+2.5 3.27 Cum

2 2
3 Providing M-10 Grade concrete for plain concrete in open foundations complete as
per drawings and technical specification clause 802,803,1202,1203

Abutment 2 6.20 1.67 0.20 Cum


Wing wall 4 2.50 2.36 0.20 Cum
Bed 1 6.00 3.00 0.20 Cum
Cut off Foundation 2 4.40 1.00 0.15 Cum
Wall 2 4.40 0.60 0.50 Cum

4 Providing M-15 Grade concrete for plain concrete in open foundations complete as
per drawings and technical specification clause 802,803,1202,1203

Abutment 2 6.20 (1.267+1.467) 0.75 Cum


2
2 6.20 (0.6+1.267) 1.47 Cum
2
Wing wall 4 2.5+2.5+3 0.3+2.156 3.265 Cum
3.00 2
Toe wall 4 15.00 0.60 0.10 Cum
4 15.00 (0.6+0.4)/2 0.60 Cum
5 Providing concrete M-25 for plain/reinforced concrete in open
superstructure complete as per drawings and technical specification
clause 800,1205.4,1205.5
Abutment Cap 2 6.00 0.675 0.20 Cum
Dirt Wall 2 6.00 0.3 0.315 Cum

Deck Slab 1 3.60 6 0.30 Cum


Wearing Coat 1 3.60 6 0.075 Cum

Kerb 2 4.20 0.25 0.25 Cum


Framed Rail Post 8 0.15 0.15 0.90 Cum
Railing 16 0.87 0.1 0.15 Cum
Guard post in wing wall
Cum
4 4.00 (0.1x0.1)+(0.15x0.15) 0.90
2
6 Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and technical
specifications Clause 100 and 1202

Abutment Cap 1.62 @ Qtl/Cum 1.00 Qtl


Dirt Wall 1.13 @ Qtl/Cum 1.00 Qtl
Deck Slab 6.48 @ Qtl/Cum 1.00 Qtl
Wearing Coat 1.62 @ Qtl/Cum 0.5 Qtl
Kerb 0.53 @ Qtl/Cum 1.00 Qtl
Framed Rail Post 0.16 @ Qtl/Cum 0.75 Qtl
Railing 0.21 @ Qtl/Cum 0.75 Qtl
Surface Reinforcement
for Abutment & wing
wall 94.10 @ Qtl/Cum 0.1 Qtl
Total Qtl
Say Mt
R.S Dry Packing in app. &
7 rivetment U/S 1 5.00 2 1 Cum
D/S 1 5.00 3 1 Cum
Toe wall 4 10.00 1.00 0.30 Cum

8 Providing weepholes in brick masonary / stone masonary/plain/ reinforced concrete abutment,


wingwall , return wall with 100mm dia. AC pipeextending through the full width of the structure
with slope of 1(V):20(H) towards drawing face complete as per drawi

Abutment 2 12 No
Wing wall 2 5 No
Toe wall 4 7.5 No
Total
9 Reinforced cement concrete M15 grade Guard stone/local stone of standard design as per
IRC:25 fixed position including finishing and lettering but excluding painting as per drawing and
Technical specification Clause 1704 of MORD.

4 10 No
Total

Total
For 0 Nos

Junior Engineer Assistant Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
FORMAT-6
YOJANA
S DRAINAGE WORKS
M X 2 M Height.
Pakage No: OR19RCPL-16
LAMTAPUT Dist:- Rayagada
Qnty. Rate Amount
in Rs in Rs

8 9 10

23.81
27.14
9.68
4.20
10.00
15.00
27.00
116.83 323.08 37,745.44

23.81
27.14
1.80
5.40

95.32

153.47 671.95 103,124.17

4.14
4.72
3.60
1.32
2.64
16.42 4261.76 69,978.10

12.71

17.02

42.77

3.60
18.00
94.10 4261.76 401,031.62
1.62
1.13
2.75
6.48
1.62

0.53
0.16
0.21

0.23

14.73 6762.60 99,613.10


1.62
1.13
6.48
0.81
0.53
0.12
0.16

9.41

20.26
2.03 5559.43 11,285.64
10.00
15.00
12.00
37.00 2032.89 75,216.93

24
10
30
64 219.98 14,078.72

40
40 272.19 10,887.60

Rs 822,961.32
Rs -
Say Rs -

Executive Engineer
R.&B. Division , Koraput
PRADHAN MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Type of Cross Drainage Work: Boxcell 1Span 3 M X 3 M Height.
Name of the Road : ANKADELI DOWN COB To ANKADELI TOP Pakage No: OR19RCPL-16
Chainage Block
Sl Description of Item Nos Length in Width in Mtr Depth Unit
No Mtr in Mtr
1. 2 3 4 5 6 7
1 Earth work in excavation for foundation of structures upto 3 m depth as per drawing
and technical specification Clause 1104 including setting out, construction of shoring
and bracing, removal of stumps and other deleterious matter, dressing of sides and b

Abutment 2 6.20 2.00 1.15 Cum


Wing wall 4 2.50 2.87 1.15 Cum
Cut off U/S & D/S 2 4.40 1.00 1.10 Cum
Bed 1 6.00 2.00 0.35 Cum
Fexiable App. U/S 1 5.00 2.00 1.00 Cum
D/S 1 5.00 3.00 1.00 Cum
Toe wall 4 5.00 0.60 0.75 Cum

2 Filling in foundation trenches with Sand as per drawing and technical specification
clause 3005.3.9
Abutment 2 6.20 2.00 1.15 Cum
Wing wall 4 2.50 2.87 1.15 Cum
Bed 1 6.00 2.00 0.15 Cum
Toe wall 4 5.00 0.60 0.15 Cum
Back filling abutment & wing
2 6.9+3.7 3.0+2.5 4.27 Cum

2 2
3 Providing concrete for plain concrete of 1:2:4 in open foundations complete as per
drawings and technical specification clause 802,803,1202,1203
Abutment 2 6.20 2.00 0.20 Cum
Wing wall 4 2.50 2.87 0.20 Cum
Bed 1 6.00 3.00 0.20 Cum
Cut off Foundation 2 4.40 1.00 0.15 Cum
Wall 2 4.40 0.60 0.60 Cum

Abutment 2 6.20 (1.6+1.8) 0.75 Cum


2
2 6.20 (0.6+1.6) 1.80 Cum
2
Wing wall 4 2.5+2.5+3 0.3+2.667 4.265 Cum
3.00 2
Toe wall 4 5.00 0.60 0.10 Cum
4 5.00 (0.6+0.4)/2 0.50 Cum

5 Providing concrete M-25 for plain/reinforced concrete in superstructure


complete as per drawings and technical specification clause
800,1205.4,1205.5
Abutment Cap 2 6.00 0.675 0.20 Cum
Dirt Wall 2 6.00 0.3 0.315 Cum
Deck Slab 1 3.60 6 0.30 Cum
Wearing Coat 1 3.60 6 0.075 Cum

Kerb 2 4.20 0.25 0.25 Cum


Framed Rail Post 8 0.15 0.15 0.90 Cum
Railing 16 0.87 0.1 0.15 Cum
Guard post in wing wall
Cum
4 4.00 (0.1x0.1)+(0.15x0.15) 0.90
2
6 Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and technical
specifications Clause 100 and 1202

Abutment Cap 1.62 @ Qtl/Cum 1.30 Qtl


Dirt Wall 1.13 @ Qtl/Cum 1.30 Qtl
Deck Slab 6.48 @ Qtl/Cum 1.30 Qtl
Wearing Coat 1.62 @ Qtl/Cum 0.5 Qtl
Kerb 0.53 @ Qtl/Cum 1.00 Qtl
Framed Rail Post 0.16 @ Qtl/Cum 0.75 Qtl
Railing 0.21 @ Qtl/Cum 0.75 Qtl
Surface Reinforcement
for Abutment & wing
wall 114.05 @ Qtl/Cum 0.1 Qtl
Total Qtl
Say Mt

8 Providing weepholes in brick masonary / stone masonary/plain/ reinforced concrete abutment,


wingwall , return wall with 100mm dia. AC pipeextending through the full width of the structure
with slope of 1(V):20(H) towards drawing face complete as per drawing.

Abutment 2 12 No
Wing wall 2 5 No
Toe wall 4 2.5 No
Total
9 Reinforced cement concrete M15 grade Guard stone/local stone of standard design as per
IRC:25 fixed position including finishing and lettering but excluding painting as per drawing and
Technical specification Clause 1704 of MORD.

4 5.00 No
Total
Total
For 0 Nos

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
FORMAT-6
YOJANA
S DRAINAGE WORKS
3 M X 3 M Height.
Pakage No: OR19RCPL-16
LAMTAPUT Dist:- Rayagada
Qnty. Rate Amount
in Rs in Rs
8 9 10

28.52
33.01
9.68
4.20
10.00
15.00
9.00
109.41 323.08 35,348.18

28.52
33.01
1.80
1.80

124.47

189.60 671.95 127,401.72

4.96
5.74
3.60
1.32
3.17
18.79 4261.76 80,078.47
15.81

24.55

67.49

1.20
5.00
114.05 4261.76 486,053.73

1.62
1.13
2.75
6.48
1.62

0.53
0.16
0.21

0.23

14.73 6762.60 99,613.10


2.11
1.47
8.42
0.81
0.53
0.12
0.16

11.41

25.03
2.50 5559.43 13,898.58

24
10
10
44 219.98 9,679.12

20
20 272.19 5,443.80
Rs 857,516.70
Rs -
Say Rs -

Executive Engineer
R.&B. Division , Koraput
PRADHAN MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Type of Cross Drainage Work: Boxcell 1Span 2 M X 2 M Height.
Name of the Road : ANKADELI DOWN COB To ANKADELI TOP Pakage No: OR19RCPL-16
Chainage Block LAMTAPUT Dist:-
Sl Description of Item Nos Length in Width in Mtr Depth Unit Qnty. Rate
No Mtr in Mtr in Rs
1. 2 3 4 5 6 7 8 9
1 Earth work in excavation for foundation of structures upto 3 m depth as per
drawing and technical specification Clause 1104 including setting out,
construction of shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides and b

Abutment 2 6.20 1.50 0.95 Cum 17.67


Wing wall 4 2.50 2.10 0.95 Cum 19.95
Cut off U/S & D/S 2 4.40 1.00 1.10 Cum 9.68
Bed 1 6.00 2.00 0.35 Cum 4.20
Fexiable App. U/S 1 5.00 2.00 1.00 Cum 10.00
D/S 1 5.00 3.00 1.00 Cum 15.00
Toe wall 4 5.00 0.60 0.75 Cum 9.00
85.50 323.08
2 Filling in foundation trenches with Sand as per drawing and technical
specification clause 3005.3.9
Abutment 2 6.20 1.50 0.95 Cum 17.67
Wing wall 4 2.50 2.10 0.95 Cum 19.95
Bed 1 6.00 2.00 0.15 Cum 1.80
Toe wall 4 5.00 0.60 0.15 Cum 1.80
Back filling abutment &
2 2.88 Cum 83.95
wing wall 6.9+3.7 3.0+2.5
2 2 125.17 671.95
3 Providing M-15 Grade concrete for plain concrete in open foundations
complete as per drawings and technical specification clause
802,803,1202,1203
Abutment 2 6.20 1.50 0.20 Cum 3.72
Wing wall 4 2.50 2.10 0.20 Cum 4.20
Bed 1 6.00 2.00 0.20 Cum 2.40
Cut off Foundation 2 4.40 1.00 0.15 Cum 1.32
Wall 2 4.40 0.60 0.60 Cum 3.17
14.81 4261.76
4 Providing M-15 Grade concrete for plain concrete in open foundations
complete as per drawings and technical specification clause
802,803,1202,1203
Abutment 2 6.20 (1.1+1.3) 0.75 Cum 11.16
2
2 6.20 (0.6+1.1) 1.30 Cum 13.70
2
Wing wall 4 2.5+2.5+3 0.3+1.9 2.565 Cum 30.10
3.00 2
Toe wall 4 5.00 0.60 0.10 Cum 1.20
4 5.00 (0.6+0.4)/2 0.50 Cum 5
61.16 4261.76
5 Providing concrete M-25 for plain/reinforced concrete in open
superstructure complete as per drawings and technical
specification clause 800,1205.4,1205.5
Abutment Cap 2 6.00 0.675 0.20 Cum 1.62
Dirt Wall 2 6.00 0.3 0.315 Cum 1.13
2.75
Deck Slab 1 2.60 6 0.24 Cum 3.74
Wearing Coat 1 2.60 6 0.075 Cum 1.17

Kerb 2 3.20 0.25 0.25 Cum 0.40


Framed Rail Post 8 0.15 0.15 0.90 Cum 0.16
Railing 12 0.87 0.1 0.15 Cum 0.16
Guard post in wing wall
Cum 0.23
4 4.00 (0.1x0.1)+(0.15x0.15) 0.90
2 11.36 6762.60
6 Supplying, fitting and placing HYSD bar reinforcement complete as per drawings and
technical specifications Clause 100 and 1202

Abutment Cap 1.62 @ Qtl/Cum 1.30 Qtl 2.11


Dirt Wall 1.13 @ Qtl/Cum 1.30 Qtl 1.47
Deck Slab 3.74 @ Qtl/Cum 1.30 Qtl 4.86
Wearing Coat 1.17 @ Qtl/Cum 0.5 Qtl 0.59
Kerb 0.40 @ Qtl/Cum 1.00 Qtl 0.40
Framed Rail Post 0.16 @ Qtl/Cum 0.75 Qtl 0.12
Railing 0.16 @ Qtl/Cum 0.75 Qtl 0.12
Surface Reinforcement
for Abutment & wing wall 6.12
61.16 @ Qtl/Cum 0.1 Qtl
Total Qtl 15.79
Say Mt 1.58 5559.43
8 Providing weepholes in brick masonary / stone masonary/plain/ reinforced concrete
abutment, wingwall , return wall with 100mm dia. AC pipeextending through the full
width of the structure with slope of 1(V):20(H) towards drawing face complete as per
drawi

Abutment 2 4 No 8
Wing wall 2 3 No 6
Toe wall 4 2.5 No 10
At 2.0 Mtr interval Total 24 219.98
9 Reinforced cement concrete M15 grade Guard stone/local stone of standard design as
per IRC:25 fixed position including finishing and lettering but excluding painting as per
drawing and Technical specification Clause 1704 of MORD.

4 5.00 No 20
Total 20 272.19

Total Rs
For 0 Nos Rs
Say Rs

Junior Engineer Assistant Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
FORMAT-6

Rayagada
Amount
in Rs
10

27,623.34

84,107.98

63,116.67

260,649.24
76,823.14

8,783.90

5,279.52

5,443.80

531,827.59
-
-
PRADHAN MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR CONSTRUCTION OF PROTECTION WORKS

Pakage No: OR19RCPL-16 Block:- LAMTAPUT


Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
Sl. Description of item Nos. Length Width Ht./ Th. Unit Quantity
No. in M. in M. in M.
1 2 3 4 5 6 7 8
At Chainage: (M)
From 0 0 0 0
To 0 0 0 0
At Road Side LHS RHS RHS LHS RHS 0.00

Average width of
Top and bottom of
Wall Top= 0.30 Mtrs,Bottom= 0.54 Mtrs Average
1 Earth work in excavation for foundation of structures upto 3 m depth as per
drawing and technical specification Clause 1104 including setting out,
construction of shoring and bracing, removal of stumps and other deleterious
matter, dressing of sides, bott

1 0.00 0.7 0.90 Cum 0.00

2 Filling in foundation with sand trenches as per drawing and technical


specification clause 3005.3.9
1 0.00 0.7 0.100 Cum 0.00
3
Providing concrete for plain concrete of M-10 in open foundations complete
as per drawings and technical specification clause 802,803,1202,1203
Footing Base 1 0.00 0.70 0.15 Cum 0.00
Taking Avg. Width of
wall 1 0.00 0.42 0.90 Cum 0.00
Cum 0.00
4 Back filling behind abutment, wing wall and returnwall complete as per
drawing
One third&oftechnical specification Clause 1204.3.8
Excavation Qt (1/3)x 0.00 Cum 0
0.00
5 Providing weepholes in brick masonary / stone masonary/plain/ reinforced
concrete abutment, wingwall , return wall with 100mm dia. AC pipeextending
through the full width of the structure with slope of 1(V):20(H) towards
drawing face complete as per drawi

At 2.0 Mtr interval 1 0.00 Nos 0


Total

Junior Engineer Assistant Engineer Executive E


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division
K YOJANA
ION WORKS

Dist:- KORAPUT

Rate Amount
in Rs. in Rs.
9 10

0.00 0.00

0.42 Mtrs.

323.08 0.00

671.95 0.00

4261.76 0.00

968.41 0.00

219.98 0.00
Rs 0.00

Executive Engineer
R.&B. Division , Koraput
Type of C.D.Works :- 6x6 2Span RCC Culvert
Pakage No: OR19RCPL-16 Block:- LAMTAPUT Dist:- KORAPUT
Name of the Road:ANKADELI DOWN COB To ANKADELI TOP
At Chainage in (M):
Sl No Description of Item No. Length Width in Depth Unit
in Mtrs Mtrs in Mtrs
1 2 3 4 5 6 7
1 Earthwork in excavation for foundation
structures upto 3m depth as per drawing and
technical specification clauses 1104 including
setting out construction of shoring and bracing
and dewatering as directed by the site
Engineer.
Raft and appron : 1 21.43 12.50 1.00 Cum
Cut off U/S : 1 21.43 1.00 0.70 Cum
Cut off D/S : 1 21.43 1.00 1.20 Cum
Cross Cut off : 2 10.50 1.00 0.70 Cum
Wing wall : 4 4.40 4.79 2.20 Cum
Flexible appron
U/S : 1 21.43 3.00 1.00 Cum
D/S : 1 21.43 5.00 1.00 Cum
Revetment : 4 8.25 0.60 0.40 Cum
Cum
2 Providing and filling manually with sand .
Bed with Rigid appron 1 21.43 10.90 0.20 Cum
Wing wall 4 4.60 4.79 0.20 Cum
Between Wing wall 2 5.00 5.70 0.30 Cum
Cum
3 Foundation concrete (1:3:6) of abutments/ piers
or bedding for pipe/box culverts.
Raft and appron 1 21.43 10.90 0.15 Cum
Wing wall 4 4.60 4.79 0.15 Cum
Revetment 4 8.25 0.60 1.00 Cum
Cum
4 PCC M-15 grade (1:2.5:5) in foundation using
12mm to 20mm size chips etc
Cut off U/S : 1 21.43 1.00 0.5 Cum
1 21.03 0.60 0.55 Cum
Cut off D/S : 1 21.43 1.00 0.5 Cum
1 21.03 0.60 1.05 Cum
Cross Cut off : 2 10.50 1.00 0.5 Cum
2 10.90 0.60 1 Cum
Rigid appron
U/S : 1 21.43 1.60 0.45 Cum
D/S : 1 21.43 3.00 0.45 Cum

Cum
5 RCC M-20 in substructure using 12mm size
chips including centering, shuttering, cost,
conveyance royalty of all materials complete.

Wing wall 4 4.40 3.34 0.45 Cum


4 5.00 0.90 5.8 Cum
Cum
6 RCC M-25 concrete in open foundation
complete as per drawing and technical
specification clauses 802,803,1202,1203.

RCC M-25 Raft 1 21.43 5.50 0.45 Cum

7 RCC M-25 in substructure using 12mm size


chips including centering, shuttering, cost,
conveyance royalty of all materials complete.

Piers 1 5.50 0.80 5.280 Cum


Abutment 2 5.50 0.550 6.000 Cum
Hunch 1/2*8 5.50 0.150 0.150 Cum

8 RCC M-25 in superstructure using 12mm size


chips including centering, shuttering, cost,
conveyance royalty of all materials complete.

Deck Slab 1 21.43 5.500 0.520 Cum

RCC Railing 2 21.43 0.20 0.15 Cum


RCC Post 1*26 0.20 0.20 0.75 Cum

9 Providing and laying cement concrete wearing


course M-30 Grade excluding reinforcement etc.
complte as per drawing and technical
specification clauses 800,1200 as per directed
by the site Engineer.

Wearing Coat 1 21.43 5.500 0.075 Cum

10 Cutting, bending, binding and tying the grills and

A Raft 53.04 @ 1 Qtl/Cum Qtl

Abut ment 68.06 @ 1 Qtl/Cum Qtl


B Wing wall 130.85 @ 0.05 Qtl/sqm Qtl
Hand rail post 1.95 @ 0.8 Qtl/Cum Qtl

C Deck slab of box 61.29 @ 1 Qtl/Cum Qtl


Approach Slab 23.23 @ 0.8 Qtl/Cum Qtl
Wearing coat 8.84 @ 0.05 Qtl/sqm Qtl
T Qtl
11 Providing weepholes in RCC abutment wing
wall, return wall with 100mm dia AC pipe
extending through the full width of structures
with slope of 1(V):20(H) towards drawing face
complete as per drawing and technical
specification clauses 614, 709, 1204.3.7

Nos
12 Providing and laying filter media with granular
crushed aggregates as per specification to a
thickness of not less than 600 mm with smaller
size towards the soil and bigger size towards the
wall and providing over the entire surface behind
abutment, wing

Behind Wing wall sides 4 5.00 6.00 0.60 Cum


Abutment sides 2 5.70 6.00 0.60 Cum

13 Providing and laying boulder appron for bed


protection with stone boulders of minimum size
and weight as per Table 1300.1 no fragment
weight less than 25 kg laid dry completed as
per drawing and Technical specification clause
1301

U/S appron 1 21.43 5.00 1.00 Cum


D/S appron 1 21.43 3.00 1.00 Cum

14 Providing and laying pitching on slopes laid over


prepared filter media completed as per drawing
and Technical specification clause 1302

Revetment 4 8.25 5.00 0.30 Cum


15 Gravel Backing to Revetments/ underneath
pitching in slope completed as per drawing and
Revetment 4 8.25 5.00 0.15 Cum
16 Technical specification
Providing clause
supplying fitting 1302
fixing of salitex Board
on the expansion joints for the bridge works
complete for finished item of work as per clause
2600 of MOST (4th Revision)/ IRC sp- 20 - 2002
and direction of the EIC.

4 3.98 1.20 Sqm


17 Painting two coats including primer coat after
filling the surface with synthetic enamel paint in
all shades on new plastered / concrete surface
as per drawing and technical specification and
as per direction of EIC.

Post 2x11 0.80 0.80 Sqm


Post top 2x11 0.20 0.20 Sqm
Railing 2x16.75 0.15 0.20 Sqm
T Sqm
For 1 nos RCC culvert : 1

So Cost for : Nos in Rs. 0

Junior Engineer Asst Engineer Executive Engine


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Ko
KORAPUT State: Odisha

Quanti Rate in Amount in


ty Rs Rs
8 9 10

267.88
15.00
25.72
14.70
185.47

64.29
107.15
7.92
688.13 323.08 222321.04

46.72
17.63
17.10
81.45 671.95 54730.33

35.04
13.22
19.80
68.06 4661.99 317295.04

10.72
6.94
10.72
13.25
10.50
13.08

15.43
28.93
109.57 4261.76 466961.04

26.45
104.40
130.85 5520.96 722417.62
53.04 6031.16 319892.73

23.23
36.30
0.68

60.21 5891.38 354719.99

61.29

1.29
0.66
1.95
63.24 6762.60 427666.82

8.84 10821.08 95658.35

53.04 545.72 28944.99

68.06
6.54
1.56
76.16 0.00 0.00
61.29
18.58
0.44
80.31 555.94 44647.54

48 219.98 10559.04
72.00
41.04
113.04 1309.51 148027.01

107.15
64.29
171.44 748.60 128339.98

49.50 748.60 37055.70

24.75 748.60 18527.85

19.10 130.00 2483.00

14.08
0.88
1.005
15.97 57.59 919.71
= 3401167.78
Say 3401168.00
0

Executive Engineer
R.&B. Division , Koraput
6X2 Boxcell

PRADHAN MANTRI GRAM SADAK YOJANA


COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Boxcell (6 mtr. X 2 mtr.) Single Span
Name of the Road : ANKADELI DOWN CO Pakage No: OR19RCPL-16
At Chainage:
S NO Description of Nos Length (m) Breadth (m) Height/ Depth Unit
1 2 3 5 6 7 8
1 Earthwork in excavation for foundation of structures upto 3m depth as per drawing and technical specification c
a) Abutment 2 7.6 1.65 1.15 Cum
b) Bed 1 7.6 1.9 0.725 Cum
c) Wing Wall 4 5.3 2.45 1.15 Cum
d) Cut off wall 1 7.6 0.8 1.7 Cum
2 1.5 0.8 1.7 Cum
e) Cut off wall 1 7.6 0.8 1.2 Cum
f) Appron D/S 1 6 1.5 0.5 Cum
Toe wall 4 10 0.6 0.75 Cum
Total earth work excavation Cum
2 Back filling in foundation trenches (sand)
a)Abutment 2 7.6 1.65 0.2 Cum
b)Wing wall 4 5.3 2.45 0.2 Cum
c)Cutoff wall D 1 7.6 0.8 0.2 Cum
2 1.5 0.8 0.2 Cum
d) Cutoff wall 1 7.6 0.8 0.2 Cum
e) Inner side 2 9.1 0.35 1 Cum
f) Outer side 2 9.1 0.1 1.4 Cum
g)Wing wall si 4 5.3 0.1 2.5 Cum
2 7.6 0.1 2.5 Cum
4 4.15 0.445 2.16 Cum
2 7.5 0.4 2 Cum
h) Inside of Re 2 6 6.6 0.2 Cum
Toe wall 4 10 0.6 0.15 Cum
Total Back filling in foundation trenches (sand) Cum
3 Cement concrete (1:3:6) with 4 cm size hard granite metal including cost, conveyance, royality, taxes watering a
a) Abutment 2 7.6 1.65 0.2 Cum
b)Bed 1 7.6 4 0.15 Cum
c) Return walls 4 5.3 2.45 0.2 Cum
d)Cut off wall 1 7.6 0.8 0.2 Cum
2 1.5 0.8 0.2 Cum
e)Cut off wall 1 5.6 0.8 0.2 Cum
g)Appron D/S 1 6.2 2.4 0.15 Cum
h)Appron U/S 1 6.2 0.9 0.15 Cum
Inside of Retur 2 6 6.6 0.15 Cum
Total Cement Concrete Cum

4 Cement concrete (1:2.5:5) with 12mm size hard granite chips including cost, conveyance, royality, taxes wateri
A)Below G.L. with centering ,shuttering & dewatering
Cut off wall
D/S side 1 7.4 0.6 1.3 Cum
2 2.4 0.6 1.3 Cum

Page 384
6X2 Boxcell

U/S side 1 7.4 0.6 0.8 Cum


2 0.9 0.6 0.8 Cum
Abutment 2 7.4 1.7 0.4 Cum
2 6.7 1.65 1 Cum
Wing wall 4 5.3 1.587 0.4 Cum
4 5.05 1.387 1 Cum
Toe wall 4 10 0.6 0.1 Cum
4 10 (0.6+0.4)/2 0.6 Cum
Cum
(B)Above G.L. with centring, shuttering
Abutment 2 6 1 1.8 Cum
Return wall 4 5.7 0.745 2 Cum
Wing wall TOP 4 6 0.4 0.15 Cum
Cum
5 Providing & laying RCC Grade M30 in Supertructure as per drawing & technical specification.
Slab 1 6 5.5 0.48 Cum
Wearing coat 1 6 5.5 0.075 Cum
End pillar 4 0.4 0.4 0.6 Cum
Abutment Cap 2 6 0.7 0.2 Cum
Dirt Wall 2 6 0.3 0.48 Cum
Guard Posts 26 0.2 0.2 0.45 Cum
Cum
6 Providing concrete for plain / reinforced concrete in open foundation complete as per drawings and technical sp
PCC M-20 Nominal Mix (1:2:4)
Bed 1 6 6 0.15 cum
1 6 3 0.15 cum
1 6 1.5 0.15 cum
Total
7 Providing and laying rough stone dry packing in approns and revetments with hard granite stone 30 cm & Abov
Bed 1 6 6 0.3 cum
Appron 1 6.2 2.4 0.3 cum
Appron 1 6.2 0.9 0.3 cum
Toe wall 4 10 1 0.3 Cum
Total
8 Providing & cutting bending, binding M.s. Rod for RCC work including placing in position and cost of M.S. Road
Abutment skin 21.6 0.5 qntl
Guard post @0 0.468 0.6 qntl

Deck slab @ 1 15.84 1 qntl


Abutment Cap 3.408 1 qntl
Wearing coat @ 2.475 0.5 qntl
Total
9 Providing weepholes in abutment, wing wall, return wall etc.
Abutment 2 15 nos
Wing wall 4 10 nos
Toe wall 4 5 No

10 Providing and laying cement concrete wearing course M30 grade including reinforcement complete as per draw
Wearing coat @ 2.475 5.792 0.075 qntl

Page 385
6X2 Boxcell

11 Reinforced cement concrete M15 grade Guard stone/local stone of standard design as per IRC:25 fixed positio
4 10 No

For

Junior Engineer Assistant Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi

Page 386
6X2 Boxcell

Quantity Rate Amount


9 10 11
drawing and technical specification clause 300 & 1104.
28.842
10.469
59.731
10.336
4.08
7.296
4.5
18
143.25 323.08 46281.21

5.016
10.388
1.216
0.48
1.216
6.37
2.548
5.3
3.8
15.95592
12
15.84
3.6
83.73 671.95 56262.37
conveyance, royality, taxes watering and curing etc.complete.
5.016
4.56
10.388
1.216
0.48
0.896
2.232
0.837
11.88
37.51 4261.76 159858.62

ost, conveyance, royality, taxes watering and curing etc.complete.

5.772
3.744

Page 387
6X2 Boxcell

3.552
0.864
10.064
22.11
13.45776
28.0174
2.4
12
87.58 4261.76 373244.94

21.6
33.972
1.44
57.01 4489.61 255952.67
hnical specification.
15.84
2.475
0.384
1.68
1.728
0.468
22.58 6041.08 136407.59
plete as per drawings and technical specifications clause 802,803,1202

5.4
2.7
1.35
9.45 4639.31 43841.48
with hard granite stone 30 cm & Above sizes
10.8
4.464
1.674
12
28.94 2445.86 70783.19
cing in position and cost of M.S. Road & binding wire etc. complete.
10.8
0.281
11.081 0 0
15.84
3.408
1.238
20.49 555.94 11391.21

30
40
20
90 219.98 19798.2
g reinforcement complete as per drawing and technical specifications Clause 800 and 1206.3
1.075 6602.72 7097.92

Page 388
6X2 Boxcell

ard design as per IRC:25 fixed position including finishing and lettering but excluding painting as per drawing and Technical specification C
40 272.19 10887.6

Total for 1 culv 1191807

Culverts 0

Executive Engineer
R.&B. Division , Koraput

Page 389
Type of C.D.Works :- 6.0x3.0 2Span RCC Culvert
Pakage No: OR19RCPL-1 Block:LAMTAPUT Dist:- KORAPUT State:
Name of the Road:ANKADELI DOWN COB To ANKADELI TOP
At Chainage in (M):
Sl No Description of Item No. Length Width Depth Unit Quanti Rate in
in Mtrs in Mtrs in Mtrs ty Rs
1 2 3 4 5 6 7 8 9
1
Earthwork in excavation for foundation
structures upto 3m depth as per drawing
and technical specification clauses 1104
including setting out construction of shoring
and bracing and dewatering as directed
by the site Engineer.

Raft and appron : 1 16.75 12.50 1.00 Cum 209.38


Cut off U/S : 1 16.75 1.00 0.70 Cum 11.73
Cut off D/S : 1 16.75 1.00 1.20 Cum 20.10
Cross Cut off : 2 10.50 1.00 0.70 Cum 14.70
Wing wall : 4 4.40 3.05 0.80 Cum 42.94
Flexible appron
U/S : 1 16.75 3.00 1.00 Cum 50.25
D/S : 1 16.75 5.00 1.00 Cum 83.75
Toe wall 4 10.00 0.600 0.750 Cum 18.000
Revetment : 4 8.25 0.60 0.40 Cum 7.92
Cum 458.77 323.08
2
Providing and filling manually with sand .
Bed with Rigid appron 1 16.75 10.90 0.20 Cum 36.52
Wing wall 4 4.60 3.05 0.20 Cum 11.22
Between Wing wall 2 5.00 5.70 3.00 Cum 171.00
Toe wall 4 5.00 0.600 0.150 Cum 1.800
Cum 220.54 671.95
3 PCC M-15 grade (1:2.5:5) in foundation
using 12mm to 20mm size chips etc
Raft and appron 1 16.75 10.90 0.15 Cum 27.39
Wing wall 4 4.60 2.25 0.15 Cum 6.21
Revetment 4 8.25 0.60 1.00 Cum 19.80
Cum 53.40 4261.76
Cut off U/S : 1 16.75 1.00 0.5 Cum 8.38
1 16.35 0.60 0.55 Cum 5.40
Cut off D/S : 1 16.75 1.00 0.5 Cum 8.38
1 16.35 0.60 1.05 Cum 10.30
Cross Cut off : 2 10.50 1.00 0.5 Cum 10.50
2 10.90 0.60 1 Cum 13.08
Rigid appron
U/S : 1 16.75 1.60 0.45 Cum 12.06
D/S : 1 16.75 3.00 0.45 Cum 22.61
Toe wall 4 5.00 0.60 0.1 Cum 1.20
4 5.00 (0.6+0.4)/2 0.6 Cum 6.00

Cum 97.91 4261.76


5 RCC M-20 in substructure using 12mm size
chips including centering, shuttering, cost,
conveyance royalty of all materials
complete.

Wing wall 4 4.40 2.00 0.45 Cum 15.84


4 5.00 0.90 2.8 Cum 50.40
Cum 66.24 5520.96
6 RCC M-25 concrete in open foundation
complete as per drawing and technical
specification clauses 802,803,1202,1203.

RCC M-25 Raft 1 16.75 5.50 0.45 Cum 41.46 6031.16

7 RCC M-25 in substructure using 12mm size


chips including centering, shuttering, cost,
conveyance royalty of all materials
complete.

Piers 1 5.50 0.45 3.000 Cum 7.43


Abutment 2 5.50 0.550 3.000 Cum 18.15
Hunch 1/2*8 5.50 0.150 0.150 Cum 0.68

26.26 5891.38

8 RCC M-25 in superstructure using 12mm


size chips including centering, shuttering,
cost, conveyance royalty of all materials
complete.

Deck Slab 1 16.75 5.500 0.480 Cum 44.22

RCC Railing 2 16.75 0.20 0.15 Cum 1.01


RCC Post 1*22 0.20 0.20 0.75 Cum 0.66
1.67
45.89 6762.60

9 Providing and laying cement concrete


wearing course M-30 Grade excluding
reinforcement etc. complte as per drawing
and technical specification clauses
800,1200 as per directed by the site
Engineer.
Wearing Coat 1 16.75 5.500 0.075 Cum 6.91 6602.72

10 Cutting, bending, binding and tying the grills


and placing in position including cost of
bindingwires and HYSD reinforcing bars .

A Raft 41.46 @ 1.3 Qtl/Cum Qtl 53.90 545.72

Abut ment 53.40 @ 1.3 Qtl/Cum Qtl 69.42


B Wing wall 66.24 @ 0.05 Qtl/sqm Qtl 3.31
Hand rail post 1.67 @ 0.8 Qtl/Cum Qtl 1.34
74.07 0.00
C Deck slab of box 44.22 @ 1.3 Qtl/Cum Qtl 57.49
Approach Slab 7.43 @ 1.0 Qtl/Cum Qtl 7.43
Wearing coat 6.91 @ 0.05 Qtl/sqm Qtl 0.35
T Qtl 65.27 555.94
11 Providing weepholes in RCC abutment wing
wall, return wall with 100mm dia AC pipe
extending through the full width of structures
with slope of 1(V):20(H) towards drawing
face complete as per drawing and technical
specification clauses 614, 709, 1204.3.7

Nos 24 219.98
12 Providing and laying filter media with
granular crushed aggregates as per
specification to a thickness of not less than
600 mm with smaller size towards the soil
and bigger size towards the wall and
providing over the entire surface behind
abutment, wing

Behind Wing wall sides 4 5.00 3.00 0.60 Cum 36.00


Abutment sides 2 5.70 3.00 0.60 Cum 20.52
56.52 2445.86
13 Painting two coats including primer coat
after filling the surface with synthetic enamel
paint in all shades on new plastered /
concrete surface as per drawing and
technical specification and as per direction
of EIC.
Post 2x11 0.80 0.80 Sqm 14.08
Post top 2x11 0.20 0.20 Sqm 0.88
Railing 2x16.7 0.15 0.20 Sqm 1.005
T Sqm 15.97 57.59
For 1 nos RCC culvert : 1 =
Say
So Cost for : Nos in Rs. 0

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
Odisha

Amount
in Rs
10

148219.41

148191.85

227577.98

417268.92
365708.39

250051.89

154707.64

310335.71

45624.80

29414.31
0.00

36286.20

5279.52

138240.01

919.71
2277826.34
2277826.00
PRADHAN MANTRI GRAM SADAK YOJANA
COST ESTIMATE FOR CONSTRUCTION OF CROSS DRAINAGE WORKS
Slab Culvert (6 mtr. X 3 mtr.) Single Span
Name of the Road : ANKADELI DOWN COB To ANKADELI TO Pakage No: OR19RCPL-16
At Chainage:
S NO Description of the Item Nos Length Breadt Height/ Unit Quantity Rate
(m) h (m) Depth
1 2 3 4 5 (m)
6 7 8 9
1 Earthwork in excavation for foundation of structures
upto 3m depth as per drawing and technical
specification clause 300 & 1104.
a) Abutment 2 7.600 2.450 2.100 Cum 78.204
b) Bed 1 7.600 1.900 0.725 Cum 10.469
c) Wing Wall 4 5.300 2.100 2.100 Cum 93.492
d) Cut off wall D/s 1 7.600 0.800 1.700 Cum 10.336
2 1.500 0.800 1.700 Cum 4.080
e) Cut off wall U/s 1 7.600 0.800 1.200 Cum 7.296
f) Appron D/S 1 6.000 1.500 0.500 Cum 4.500
Toe wall 4 5.00 0.600 0.750 Cum 9.000
Total earth work excavation Cum 217.380 323.08
2 Back filling in foundation trenches (sand)
a)Abutment 2 7.600 2.450 0.200 Cum 7.448
b)Wing wall 4 5.300 2.100 0.200 Cum 8.904
c)Cutoff wall D/S 1 7.600 0.800 0.200 Cum 1.216
2 1.500 0.800 0.200 Cum 0.480
d) Cutoff wall U/S 1 7.600 0.800 0.200 Cum 1.216
e) Inner side 2 9.100 0.350 1.000 Cum 6.370
f) Outer side 2 9.100 0.100 1.400 Cum 2.548
g)Wing wall side 4 5.300 0.100 2.500 Cum 5.300
2 7.600 0.100 2.500 Cum 3.800
4 4.150 0.445 2.160 Cum 15.956
2 7.500 0.400 2.000 Cum 12.000
Toe wall 4 5.00 0.600 0.150 Cum 1.800
h) Inside of Return wall 2 6.000 6.600 0.200 Cum 15.840
Total Back filling in foundation trenches (sand) Cum 82.880 671.95
3 Cement concrete (1:2.5:5) with 12mm size hard
granite chips including cost, conveyance, royality,
taxes watering and curing etc.complete.
a) Abutment 2 7.600 2.450 0.200 Cum 7.448
b)Bed 1 7.600 4.000 0.150 Cum 4.560
c) Return walls 4 5.300 2.100 0.200 Cum 8.904
d)Cut off wall D/S 1 7.600 0.800 0.200 Cum 1.216
2 1.500 0.800 0.200 Cum 0.480
e)Cut off wall D/S 1 5.600 0.800 0.200 Cum 0.896
g)Appron D/S 1 6.200 2.400 0.150 Cum 2.232
h)Appron U/S 1 6.200 0.900 0.150 Cum 0.837
Inside of Return wall 2 6.000 6.600 0.150 Cum 11.880
Total Cement Concrete Cum 38.450 4,261.76

4 Cement concrete (1:2.5:5) with 12mm size hard


granite chips including cost, conveyance, royality,
taxes watering and curing etc.complete.
A)Below G.L. with centering ,shuttering & dewatering
Cut off wall
D/S side 1 7.400 0.600 1.300 Cum 5.772
2 2.400 0.600 1.300 Cum 3.744
U/S side 1 7.400 0.600 0.800 Cum 3.552
2 0.900 0.600 0.800 Cum 0.864
Abutment 2 7.400 1.700 0.400 Cum 10.064
2 6.700 1.650 1.000 Cum 22.110
Wing wall 4 5.300 1.587 0.400 Cum 13.458
4 5.050 1.387 1.000 Cum 28.017
Toe wall 4 5.000 0.600 0.100 Cum 1.200
4 5.0006+0.4)/2 0.600 Cum 6.000
Cum 94.780 4,261.76
(B)Above G.L. with centring, shuttering
Abutment 2 6.000 1.000 2.800 Cum 33.600
Return wall 4 5.700 0.745 3.160 Cum 53.676
Wing wall TOP 4 6.000 0.400 0.150 Cum 1.440
Cum 88.720 4,489.61
5 Providing & laying RCC Grade M30 in Supertructure
as per drawing & technical specification.
Slab 1 6.000 5.500 0.480 Cum 15.840
Wearing coat 1 6.000 5.500 0.075 Cum 2.475
End pillar 4 0.400 0.400 0.600 Cum 0.384
Abutment Cap 2 6.000 0.700 0.200 Cum 1.680
Dirt Wall 2 6.000 0.300 0.480 Cum 1.728
Guard Posts 26 0.200 0.200 0.450 Cum 0.468
Cum 22.580 6,041.08
6 Providing concrete for plain / reinforced concrete in
open foundation complete as per drawings and
technical specifications clause 802,803,1202
PCC M-20 Nominal Mix (1:2:4)
Bed 1 6.000 6.000 0.150 cum 5.400
1 6.000 3.000 0.150 cum 2.700
1 6.000 1.500 0.150 cum 1.350
Total 9.450 4,639.31
7 Providing and laying rough stone dry packing in
approns and revetments with hard granite stone 30
cm & Above sizes
Bed 1 6.000 6.000 0.300 cum 10.800
Appron 1 6.200 2.400 0.300 cum 4.464
Appron 1 6.200 0.900 0.300 cum 1.674
Toe wall 4 5.00 1.00 0.30 Cum 6.00
Total 22.940 2,032.89
8 Providing & cutting bending, binding M.s. Rod for
RCC work including placing in position and cost of
M.S. Road & binding wire etc. complete.
Abutment skin reinforcement @ 0.5 qtl./cum 33.600 0.500 qntl 16.800
Guard post @0.6 qtl./cum 0.468 0.600 qntl 0.281
17.081 0
Deck slab @ 1 qtl /cum 15.840 1.000 qntl 15.840
Abutment Cap @ 1 qtl./cum 3.408 1.000 qntl 3.408
Wearing coat @ 0.50 qtl/ cum 2.475 0.500 qntl 1.238
Total 20.490 555.94
9 Providing weepholes in abutment, wing wall, return
wall etc.
Abutment 2 15.000 nos 30
Wing wall 4 10.000 nos 40
Toe wall 4 2.50 No 10
80 219.98
10 Providing and laying cement concrete wearing
course M30 grade including reinforcement complete
as per drawing and technical specifications Clause
800 and 1206.3
Wearing coat @ 0.50 qtl/ cum 2.475 5.792 0.075 qntl 1.075 6,602.72
Total for 1 culvert
For Culverts

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
E WORKS

Amount

10

70231.13

55691.22

163864.67
403929.61

398318.20

136407.59

43841.48

46634.50

0.00

11391.21

17598.40
7097.92
1355006.00
0.00
Type of C.D.Works :- 6.0x2.0 2Span RCC Culvert
Pakage No: OR19RCPL- Block:- LAMTAPUT Dist:- KORAPUT
Name of the Road:ANKADELI DOWN COB To ANKADELI TOP
At Chainage in (M):
Sl Description of Item No. Length Width in Depth Unit Quanti
No in Mtrs Mtrs in Mtrs ty
1 2 3 4 5 6 7 8
1
Earthwork in excavation for foundation
structures upto 3m depth as per drawing
and technical specification clauses 1104
including setting out construction of shoring
and bracing and dewatering as directed by
the site Engineer.

Raft and appron : 1 16.75 12.50 1.00 Cum 209.38


Cut off U/S : 1 16.75 1.00 0.70 Cum 11.73
Cut off D/S : 1 16.75 1.00 1.20 Cum 20.10
Cross Cut off : 2 10.50 1.00 0.70 Cum 14.70
Wing wall : 4 4.40 1.65 0.80 Cum 23.23
Flexible appron
U/S : 1 16.75 3.00 1.00 Cum 50.25
D/S : 1 16.75 5.00 1.00 Cum 83.75
Revetment : 4 8.25 0.60 0.40 Cum 7.92
Cum 421.06
2 Providing and filling manually with sand .
Bed with Rigid appron 1 16.75 10.90 0.20 Cum 36.52
Wing wall 4 4.60 1.65 0.20 Cum 6.07
Between Wing wall 2 5.00 5.70 2.00 Cum 114.00
Cum 156.59
3 PCC M-15 grade (1:2.5:5) in foundation
using 12mm to 20mm size chips etc
Raft and appron 1 16.75 10.90 0.15 Cum 27.39
Wing wall 4 4.60 1.65 0.15 Cum 4.55
Revetment 4 8.25 0.60 1.00 Cum 19.80
Cum 51.74
4 PCC M-15 grade (1:2.5:5) in foundation
using 12mm to 20mm size chips etc
Cut off U/S : 1 16.75 1.00 0.5 Cum 8.38
1 16.35 0.60 0.55 Cum 5.40
Cut off D/S : 1 16.75 1.00 0.5 Cum 8.38
1 16.35 0.60 1.05 Cum 10.30
Cross Cut off : 2 10.50 1.00 0.5 Cum 10.50
2 10.90 0.60 1 Cum 13.08
Rigid appron
U/S : 1 16.75 1.60 0.45 Cum 12.06
D/S : 1 16.75 3.00 0.45 Cum 22.61
Cum 90.71
5 RCC M-20 in substructure using 12mm size
chips including centering, shuttering, cost,
conveyance royalty of all materials complete.

Wing wall 4 4.40 1.65 0.45 Cum 13.07


4 5.00 0.90 1.8 Cum 32.40
Cum 45.47

6 RCC M-25 concrete in open foundation


complete as per drawing and technical
specification clauses 802,803,1202,1203.

RCC M-25 Raft 1 16.75 5.50 0.45 Cum 41.46

7 RCC M-25 in substructure using 12mm size


chips including centering, shuttering, cost,
conveyance royalty of all materials complete.

Piers 1 5.50 0.45 2.000 Cum 4.95


Abutment 2 5.50 0.550 2.450 Cum 14.82
Hunch 1/2*8 5.50 0.150 0.150 Cum 0.68

20.45
8 RCC M-25 in superstructure using 12mm
size chips including centering, shuttering,
cost, conveyance royalty of all materials
complete.

Deck Slab 1 16.75 5.500 0.480 Cum 44.22

RCC Railing 2 16.75 0.20 0.15 Cum 1.01


RCC Post 1*22 0.20 0.20 0.75 Cum 0.66
1.67
45.89

9 Providing and laying cement concrete


wearing course M-30 Grade excluding
reinforcement etc. complte as per drawing
and technical specification clauses 800,1200
as per directed by the site Engineer.

Wearing Coat 1 16.75 5.500 0.075 Cum 6.91

10 Cutting, bending, binding and tying the grills

A Raft 41.46 @ 1.3 Qtl/Cum Qtl 53.90

Abut ment 51.74 @ 1.3 Qtl/Cum Qtl 67.26


B Wing wall 45.47 @ 0.05 Qtl/sqm Qtl 2.27
Hand rail post 1.67 @ 0.8 Qtl/Cum Qtl 1.34
70.87
C Deck slab of box 44.22 @ 1.3 Qtl/Cum Qtl 57.49
Approach Slab 4.95 @ 1.0 Qtl/Cum Qtl 4.95
Wearing coat 6.91 @ 0.05 Qtl/sqm Qtl 0.35
T Qtl 62.79
11 Providing weepholes in RCC abutment wing
wall, return wall with 100mm dia AC pipe
extending through the full width of structures
with slope of 1(V):20(H) towards drawing
face complete as per drawing and technical
specification clauses 614, 709, 1204.3.7

Nos 16
12 Providing and laying filter media with
granular crushed aggregates as per
specification to a thickness of not less than
600 mm with smaller size towards the soil
and bigger size towards the wall and
providing over the entire surface behind
abutment, wing

Behind Wing wall sides 4 5.00 2.00 0.60 Cum 24.00


Abutment sides 2 5.70 2.00 0.60 Cum 13.68
37.68
13 Providing and laying boulder appron for bed
protection with stone boulders of minimum
size and weight as per Table 1300.1 no
fragment weight less than 25 kg laid dry
completed as per drawing and Technical
specification clause 1301

U/S appron 1 16.75 5.00 1.00 Cum 83.75


D/S appron 1 16.75 3.00 1.00 Cum 50.25
134.00
Revetment 4 8.25 5.00 0.30 Cum 49.50
183.50
14 Painting two coats including primer coat after
filling the surface with synthetic enamel paint
in all shades on new plastered / concrete
surface as per drawing and technical
specification and as per direction of EIC.

Post 2x11 0.80 0.80 Sqm 14.08


Post top 2x11 0.20 0.20 Sqm 0.88
Railing 2x16.75 0.15 0.20 Sqm 1.005
T Sqm 15.97
For 1 nos RCC culvert : 1

So Cost for : Nos in Rs. 0


Junior Engineer Assistant Exe. Engineer Executive Engineer
R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
State: Odisha

Rate in Amount in
Rs Rs
9 10

323.08 136036.06

671.95 105220.65

4261.76 220503.46

4261.76 386584.25
5520.96 251038.05

6031.16 250051.89

5891.38 120478.72

6762.60 310335.71

6602.72 45624.80

545.72 29414.31

0.00 0.00

555.94 34907.47
219.98 3519.68

2445.86 92160.00

2032.89 373035.32

80.14 1279.84
= 2360190.21
Say 2360190.00
utive Engineer
ivision , Koraput
rural connectivity project for left wing (RCPLWE)
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. SLAB CULVERT

Name of
the road:-
ANKADELI DOWN COB To ANKADELI TOP Pakage No: OR19RCPL-

Type of cross Drainage Work:- 1 Span R.C.C. Slab Culvert of


( 2.000 x 2.000 m)
Nos. of Culvert :- 0 Nos Chainage
Sl. No Description of item Ht / Th
Nos. Length Width Unit Quantity
in M
1 2 3 4 5 6 7 8
1 Dismantling of existing structures like culverts, bridges, retaining walls and other
sturcture comprising of masonry, cement concrete wood work, steel work,
including T&P and scaffolding wherever necessary, sorting the dismantled
material, disposal of unserviceable materials and stacking the serviceable materials
with all lifts and lead of 1000m as per Technical Specification Clause 202

wingwall, RR Stone massonary 4 x 3.50 x 1.24 x 3.40 Cum 59.02


Parapet 2 x 5.50 x 0.95 x 0.95 Cum 9.93
Cum 68.95
NO of Slab 0 0.00 @

2 Earthwork in excavation for foundation of structures in all types of soil as per


drawing and technical specification Clause 305 and 1104 of MoRD includding
setting out, construction of shoring and bracing, removal of stumps and other
deleterious material and disposal upto all lead & lift, dressing of sides and
bottom and back filling with excavated suitable material upto 3mt. as per
direction of Engineer-in-Charge.

Foundation
Abutments 2 × 9.60 × 2.10 × 1.00 Cum 40.32
Cut off U/S 1 × 5.00 × 0.50 × 0.70 Cum 1.75
Cut off D/S 1 × 6.00 × 0.50 × 1.00 Cum 3.00
D/S Bed 1 × 2.00 × 1.50 × 0.40 Cum 1.20
U/S Bed 1 × 2.00 × 1.00 × 0.60 Cum 1.20
CD Bed 1 × 10.00 × 2.40 × 0.60 Cum 14.40
Wing walls 4 × 2.50 × 2.52 × 1.50 Cum 37.80
Total Cum 99.67 @
3 Providing and constructing well compacted drainage layer above the subgrade
of roadwork with approved quality of dust free washed coarse to medium sand
as per Clauses 5.8 and 6.6 of SP:20-2002.

Foundation
Abutments 2 × 11.20 × 2.10 × 0.20 Cum 9.41
Piers 0 × 11.33 × 1.95 × 0.20 Cum 0.00
Cut off U/S 1 × 5.00 × 0.50 × 0.20 Cum 0.50
Cut off D/S 1 × 6.00 × 0.50 × 0.20 Cum 0.60
Wing walls 4 × 2.50 × 2.52 × 0.20 Cum 5.04
D/S Bed 1 × 2.00 × 1.50 × 0.20 Cum 0.60
U/S Bed 1 × 2.00 × 1.00 × 0.20 Cum 0.40
CD Bed 1 × 10.00 × 1.60 × 0.20 Cum 3.20
Total Cum 19.75 @
4 Providing CC 1:3:6 for plain/reinforced concrete in open foundations complete
as per drawings and technical specification clause 802,803,1202,1203

With Dewatering in Foundation


Abutments 1st Step 2 × 11.20 × 2.10 × 0.20 Cum 9.41
Cut off D/S 1st step 1 × 6.00 × 0.50 × 0.30 Cum 0.9
Sl. No Description of item Ht / Th
Nos. Length Width Unit Quantity
in M
1 2 3 4 5 6 7 8
Cut off D/S 2nd step 1 × 6.00 × 0.50 × 0.50 Cum 1.50
Cut off U/S 1st step 1 × 5.00 × 0.50 × 0.30 Cum 0.75
Cut off U/S 2nd step 1 × 5.00 × 0.50 × 0.20 Cum 0.50
Wing 1st Step 4 × 2.50 × 2.52 × 0.40 Cum 10.08
CD Bed 1 × 10.00 × 1.60 × 0.15 Cum 2.4
U/S Bed 1 × 2.00 × 1.00 × 0.15 Cum 0.3
D/S Bed 1 × 2.00 × 1.50 × 0.15 Cum 0.45
Total Cum 26.29 @
Sl. No Description of item Ht / Th
Nos. Length Width Unit Quantity
in M
1 2 3 4 5 6 7 8
5 Plain cement concrete 1:2:4 nominal mix in foundation with crushed stone
aggregates to 40mm nominal size mechanically mixed placed in foundation and
compacted by vibration including curing for 14 daysas per specifcation and
direction of the Engineer-in-charge

Abutments 2nd Step 2 × 11.20 × 1.70 × 0.20 Cum 7.62


Cum 7.62
Abutments 3rd step 2 × 10.80 × 1.70 × 0.40 Cum 14.69
4th Step 2 x 9.2+8.4 x 1.7+1.30 x 0.40 Cum 12.48
2 2
Above G.L. 2 × 8+8.4 × 1.6+0.7 × 1.60 Cum 25.09
2 2
2
Wing 4 × 2.70 × 2.12 × 0.40 Cum 9.16
4 × 2.90 × 1.92 × 0.40 Cum 8.91
4 × 3.5+2.90 × 1.72+.4 × 2.29 Cum 31.07
2 2
Total Cum 109.02 @
6 Reinforcement cement concrete M-25 nominal mix in Superstructure with
crushed stone aggregates to 40mm nominal size mechanically mixed placed in
foundation and compacted by vibration including curing for 14 days as per
section specifcation and direction of the Engineer-in-charge

(a) Deck Slab 1 × 2.80 × 10.00 × 0.215 Cum 6.02

(b) Abutment Cap 2 × 10.00 × 0.45 × 0.150 Cum 1.35


Parapet 2 × 2.80 × 0.40 × 0.400 Cum 0.90
Dirt wall 2 × 10.00 × 0.30 × 0.440 Cum 2.64
Cum 10.91 @
7 RCC Grade M-30 in wearing coat including dewatering farm work and mixing
CM with concrete Mixer and complete as per Data book Sr. 13.2 492 Sr.14.4
(Ref.to Book P.477 Sr. 14.1 (C) Clause 1500, 1600 & 1700 Unit= 1 cum

Wearing Coat 2 × 2.80 × 10.00 × 0.075 Cum 0.00 @


8 Supplying, fitting and placing HYSD bar reinforcement (Fe 415) complete as per
drawings and MORD technical specification Clauses 1000,1200 as per direction
of the Engineer in charge

a - Deck Slab - R.C.C 6.02 Cum @ 1.00 Qntl. 6.020


b- Cap & Dirt wall 10.91 Cum @ 1.00 Qntl. 10.910
c.- Abutments Piers 31.07 Cum @ 0.08 Qntl. 2.486
Total Qntl. 19.416 @
9 Providing weepholes in brick masonry/stone masonry, plain/reinforced
concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending
through the full width of the structures with slope of 1(V):20(H) towards
drawing face complete as per drawing and MORD technical specification
Clauses 614, 709, 1204 and as per direction of the Engineer in charge

Abutment 2 × 11 Nos. Nos. 22.00


Wing wall 4 × 8 Nos. Nos. 32.00
Nos. 54.00 @
10 Providing and laying filter media with granular crushed aggregates as per
specification to a thickness of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height, compacted to firm
condition complete as per drawing and MORD technical specification Clause
1204.3.8 and as per direction of the Engineer in charge

In between Wing wall and Abutment


Sl. No Description of item Ht / Th
Nos. Length Width Unit Quantity
in M
1 2 3 4 5 6 7 8
Behind Abutments 2 × 10.00 × 2.00 × 0.60 Cum 24.00
Behind Wing wall 4 × 3.20 × 2.29 × 0.60 Cum 17.59
Cum 41.59 @

For
0 Nos. of slab culvert

Junior Engineer Assistant Exe. Engineer Executi


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Div
ivity project for left wing (RCPLWE)
CONSTRUCTION OF R.C.C. SLAB CULVERT

Pakage No: OR19RCPL-16

1/168
Amount in
Rate in Rs.
Rs.
9 10

254.44 0.00

34.85 3473.50

0.00 0.00
Amount in
Rate in Rs.
Rs.
9 10

4,261.76 112041.67
Amount in
Rate in Rs.
Rs.
9 10

4,489.61 489457.28

6762.60 73779.97

6,041.08 0.00

5,559.43 107941.89

219.98 11878.92
Amount in
Rate in Rs.
Rs.
9 10

2445.86 101723.32

Total 900296.55

Rs. 0.00

Executive Engineer
R.&B. Division , Koraput
PART-A
Replacement of 1.5 x 1.5 RCC slab culvert with 2.00 x 2.00 span RCC slab culvert

Number o
1 Dismantling of existing structures like culverts, bridges, retaining
walls and other structures, comprising of masonry, cement
concrete, wood work, steel work including T&P and scaffolding
wherever necessary sorting the dismantling materials disposal of
unserviceable materials and stacking the serviceable materials
with all leads and lifts of 1000m

a PCC Parapet
2 x 2.00 x 0.40 x 0.400 M 0.64 cum
Quantity for 0 Nos = 0.00 cum @R. 390.47
Wing wall
1.76 + 0.50 27.120 cum
4 x 4.00 x x 1.50
2 1.13
48.17 cum
Quantity for 0 Nos = 0.00 cum @R. 254.44
2 Earth work in excavation of foundation of structures as per drawing
and technical specification, including setting out construction of
shoring and bracing removal of stumps and other deleterious
materials, dressing of sides and bottoms backfilling the excavation
earth to the extent required and utilising the remaining earth locally
for road work as per MORD specification

a Abutment 1 x 5.60 x 10.50 x 1.80 105.840 cum


b Wingwall 4 x (4.10 -0.400) x 2.58 x 1.35 51.550 cum
Less concrete ### x -48.170 cum
Qnty for 1no 109.22 cum
Quantity for 0 nos 0.00 cum
@R. 34.85 /cum

3 Filling foundation and plinth trenches with sand as per drawing and
technical specification ofas per MORD specification

A Below PCC
a Abutment 1 x 1 x 5.60 x 10.50 x 0.15 8.820 cum
b Wing wall 4 x (4.10 -0.400) x 2.58 x 0.15 5.730 cum
14.55 cum
Qnty for 1no 14.55 cum
Quantity for 0 nos 0.00 cum @R. 430.64 /cum
3 Plain cement concrete 1:3:6 Nominal mix in foundation with crushed
stone aggregates 40mm nominal size mechanically mixed placed in
foundation and compacted by vibration including curring for 14
days

Below PCC
i Abutment 1 x 1 x 5.60 x 10.50 x 0.15 8.820 cum
CD Bed 1 x 1 x 2.75 x 1.60 x 0.15 = 0.660 cum
9.48 cum
Qnty for 1no 9.48 cum
Quantity for 0 nos 0.00 cum @R. 4261.76 /cum
4 Plain/ Reinforced cement concrete M-15 nominal mix with
crushed stone aggregates to 40mm nominal size mechanically mixed
placed in foundation and compacted by vibration including curing
for 14 days
½
A Below Bed level (Upto GL)
i Abutment
1st.Footing 1 x 1 x 10.10 x 2.60 x 0.20 = 5.252 cum
2nd.Footing 1 x 2 x 10.10 x 2.20 x 0.20 = 8.888 cum
3rd footing 1 x 2 x 10.10 x 1.80 x 0.40 = 14.544 cum
4th footing 1 x 2 x 10.10 x 1.80 x 0.30 = 10.908 cum

ii Wing wall
1st.footing 4 x (4.00 -0.200) x 2.38 x 0.40 15.990 cum
2nd footing 4 x (4.00 -0.400) x 1.98 x 0.40 13.940 cum
3rd footing 4 x (4.00 -0.400) x 0.40 x 0.40 2.820 cum
72.342 cum
Qnty for 1no 72.34 cum
Quantity for 0 nos 0.00 cum
@R. 4489.61 /cum
5 Plain cement concrete M-20 nominal mix with crushed stone
aggregates to 40mm nominal size mechanically mixed placed in
substructure and compacted by vibration including curing for 14
days

A Above GL
i Abutment 1 x 2 x 10.10 ½(1.50+ 0.77) x 1.19 2.700 cum
Wing Wall 4 x ½(3.60+ 4.00) x ½(1.58+ 0.50) x 2.290 36.200 cum
38.900 cum
Qnty for 1no 38.90 cum
Quantity for 0 nos 0.00 cum
@R. 5577.21 /cum
6 Reinforced cement concrete M-25 nominal mix in Super-structure
with crushed stone aggregates to 40mm nominal size mechanically
mixed placed in foundation and compacted by vibration including
curing as per MORD specification

Dirt Wall 1 x 2 x 10.10 ½(0.47+ 0.30) x 0.515 0.400 cum


Bed Block 1 x 2 x 10.10 x 0.375 x 0.300 = 2.273 cum
Deck slab 1 x 1 x 10.10 x 2.75 x 0.215 = 5.972 cum
Kerbs 1 x 2 x 3.35 x 0.150 x 0.150 = 0.151 cum
Parapets 1 x 2 x 3.35 x 0.400 x 0.600 = 1.608 cum
10.404 cum
Qnty for 1no 10.40 cum
Quantity for 0 nos 0.00 cum
@R. 6762.60 /cum
7 Reinforced cement concrete M-30 wearing coat and compacted by
vibration including curing foras per MORD specification

Over deck 1 x 2.75 x 9.00 x 0.075 = 1.86 cum


Qnty for 1no 1.86 cum
Quantity for 0 nos 0.00 cum @R. 6041.08

8 Supplying fitting and fixing HYSD bars reinforcement in foundation,


substructure and superstructures as per drawing and technical
specifications as per MORD specification

A Skin reinforcement
Abt Outer 1 x 2 x 10.10 x 0.400 = 8.08 sqm
2 x 10.10 x 0.400 = 8.08 sqm
2 x 10.10 x 0.400 = 8.08 sqm
2 x 10.10 x 0.300 = 6.06 sqm
2 x 10.10 x 1.185 = 23.94 sqm
Abt Inner 1 x 2 x 10.10 x 2.535 = 51.21 sqm

Abt Face 2 x 2.60 x 0.20 = 1.04 sqm


2 x 2.20 x 0.20 = 0.88 sqm
2 x 1.80 x 0.40 = 1.44 sqm
2 x 1.80 x 0.30 = 1.08 sqm
4 x ½(1.50+ 0.77) x 1.185 5.38 sqm
Wing Wall Upto Hauch
b Wing wall 4 x (4.00 -0.200) x 0.40 x 2Side 13.44 sqm
4 x (4.00 -0.400) x 0.40 x 2Side 14.08 sqm
4 x (4.00 -0.600) x 0.40 x 2Side 14.72 sqm
Above Hunch
Wing Out/ Inn 4 x ½(4.00+ 3.60) x 2.290 = 34.81 sqm
Wing Face 4 x 2.38 x 0.40 = 3.81 sqm
4 x 1.98 x 0.40 = 3.17 sqm
4 x ½(1.98+ 1.58) x 0.40 = 2.85 sqm
4 x ½(1.58+ 0.50) x 2.290 = 9.53 sqm
211.68 sqm
211.68 sqm @ 5.00 Kg/sqm 1058.40 Kg

B Dirt wall, RCC slab, Kerb & Parapet


Vide item- 6 10.404 cum @ 120 Kg/cum 1248.48 Kg
C Wearing coat
Vide item- 7 1.860 cum @ 75 Kg/cum 139.50 Kg
2446.38 kg
2.45 MT
Qnty for 1no 2.45 MT
Quantity for 0 nos 0.00 MT @R. 5559.43 /MT

9 Providing weep holes in masonry/ Plain reinforced cement concrete


abutment, wing wall/ return wall with 100mm dia AC pipe

a Abutment 1 x 2 x 20.0 40.00 nos


b Wing wall 1 x 4 x 6.00 24.00 nos
64.00 nos
Qnty for 1no 64.00 nos
Quantity for 0 nos 0.00 nos @R. 219.98 /Ech

10 Providing laying of filter media with granular materials/ stone


crushed aggregates satisfying the requirements laid down in MORD
specification to a thickness not less than 600mm with small size
towards the soil and bigger towards the wall and provided over the
entire surface behind abutment wing walls return walls to the full
height compacted to a firm condition complete as per drawing and
technical specification

Abt 1 x 2 x ½(7.80+ 6.80) x 1.190 = 17.37 sqm


Wing 1 x 4 x ½(3.40+ 3.40) x 1.990 = 27.06 sqm
wall 44.430 sqm
Volume 44.430 x 0.60 26.660 cum
Qnty for 1no 26.66 cum
Quantity for 0 nos 0.00 cum
@R. 2445.86 /cum
11 Providing and fixing in position of 20mm thick Salitex board in
expansion joint for fixed ends of simply supported spans not
exceeding 10m to cater for a horizontal movement upto 20mm
covered with sealant complete as per drawing and technical
specification

W.Wall 4 x 2.290 = 9.16


Below deck slab 2 x 10.10 = 20.20
Dirt wall side 2 x 10.10 = 20.20
### x 49.56 mtr
Qnty for 1no 49.56 mtr
Quantity for 0 nos 0.00 mtr @R. 437.11 /mtr

Junior Engineer Assistant Executive Engineer Executive En


Malakanagiri R&B Sec-I Malakanagiri R&B Sub-Divn-II Malakanagiri R
t

Number of CD 0Nos

/cum R 0.00

/cum R 0.00

R 0.00

R 0.00
R 0.00

R 0.00
R 0.00

R 0.00

/cum R 0.00
R 0.00

R 0.00

R 0.00
R 0.00
0.00

xecutive Engineer
akanagiri R&B Divn
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTERMISIM AREA (RCPLWE
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. SLAB CULVERT

Name of
the road:-
ANKADELI DOWN COB To ANKADELI TOP Pakage No: OR19RCPL-1

Type of cross Drainage Work:- 1 Span R.C.C. Slab Culvert of


( 2.000 x 2.000 m)
Nos. of Culvert :- 1 No
Sl. No Description of item
Ht / Th
Nos. Length Width Unit Quantity
in M

1 2 3 4 5 6 7 8
1 Dismantling of existing structures like
culverts, bridges, retaining walls and
other sturcture comprising of masonry,
cement concrete wood work, steel work,
including T&P and scaffolding wherever
necessary, sorting the dismantled
material, disposal of unserviceable
materials and stacking the serviceable
materials with all lifts and lead of 1000m
as per Technical Specification Clause 202
A Head wall 2 x 5.00 x 1.00 x 1.00 Cum 10.00
Quantity of Nos 1 10.00
RCC M 20 side of Deck slab & Dirt wall

Deck slab 1 x 2.35 x 5 x 0.215 m 2.53 cum


Bed block 2 x 5.0 x 0.50 x 0.300 m 1.50 cum
Dirtwall 2 x 5.0 x 0.465 x 0.400 m 1.86 cum
5.89 cum
Quantity of Nos = 1 5.89 cum
B RR Stone Masonry
Abutment
1.45 + 1.39
2 x 5.00 x x 0.60 8.52
2.00 1.42
1.39 + 0.97
2 x 5.00 x x 0.90 10.62
2.00 1.18

C WING WALL

1.76 + 0.50
4 x 4.00 x x 1.50 27.12
2.00 1.13
Quantity of Nos = 1 46.26

1 Earthwork in excavation for foundation of structures in all types of


soil as per drawing and technical specification Clause 305 and 1104 of
MoRD includding setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and disposal upto
all lead & lift, dressing of sides and bottom and back filling with
excavated suitable material upto 3mt. as per direction of Engineer-in-
Charge.

Abutments 2 × 8.10 × 10.50 × 1.80 Cum 306.18


Wing walls 4 × 5.60 × 2.52 × 1.50 Cum 84.67
Total Cum 390.85
Sl. No Description of item
Ht / Th
Nos. Length Width Unit Quantity
in M

1 2 3 4 5 6 7 8
2 Providing and constructing well compacted drainage layer above the
subgrade of roadwork with approved quality of dust free washed coarse
to medium sand as per Clauses 5.8 and 6.6 of SP:20-2002.

Foundation
Abutments 2 × 8.10 × 10.50 × 0.20 Cum 34.02
Cut off U/S 1 × 5.00 × 0.50 × 0.20 Cum 0.50
Cut off D/S 1 × 6.00 × 0.50 × 0.20 Cum 0.60
Wing walls 4 × 5.60 × 2.52 × 0.20 Cum 11.29
D/S Bed 1 × 2.00 × 1.50 × 0.20 Cum 0.60
U/S Bed 1 × 2.00 × 1.00 × 0.20 Cum 0.40
CD Bed 0 × 7.50 × 1.50 × 0.20 Cum 0.00
Total Cum 0.00
2 Providing concrete for plain / reinforced concrete in open foundation
complete as per drawing and MORD technical specification Clause
800,1100,1200 and as per direction of Engineer-in-Charge.

With Dewatering in Foundation


Abutments 1st Step 2 × 8.10 × 10.50 × 0.20 Cum 34.02
Cut off D/S 1st step 1 × 6.00 × 0.50 × 0.30 Cum 0.9
Cut off D/S 2nd step 1 × 6.00 × 0.50 × 1.30 Cum 3.90
Cut off U/S 1st step 1 × 5.00 × 0.50 × 0.30 Cum 0.75
Cut off U/S 2nd step 1 × 5.00 × 0.50 × 1.00 Cum 2.50
Wing 1st Step 4 × 5.60 × 2.52 × 0.40 Cum 22.58
CD Bed 0 × 7.50 × 1.50 × 0.15 Cum 0
U/S Bed 1 × 2.00 × 1.00 × 0.15 Cum 0.3
D/S Bed 1 × 2.00 × 1.50 × 0.15 Cum 0.45
Total Cum 65.40
Sl. No Description of item
Ht / Th
Nos. Length Width Unit Quantity
in M

1 2 3 4 5 6 7 8
3 Plain/reinforced cement concrete in sub-structure complete as per
drawings and MORD technical specification Clauses 800,1200 and as
per direction of the Engineer in charge

Abutments 2nd Step 2 × 7.70 × 10.10 × 0.20 Cum 31.11


Pier 2nd Step 0 × 8.43 × 1.58 × 0.40 Cum 0.00
Cum 31.11
Abutments 3rd step 2 × 7.30 × 9.70 × 0.40 Cum 56.65
4th Step 2 x 6.6+5.6 x 2.4+2.0 x 0.40 Cum 52.44
2 2
Above G.L. 2 × 5.4+6.0 × 1.6+0.7 × 2.40 Cum 156.67
2 2
2
Wing 4 × 5.80 × 2.12 × 0.40 Cum 19.67
4 × 6.00 × 1.92 × 0.40 Cum 18.43
4 × 3.0+2.05 × 1.72+.4 × 2.29 Cum 46.12
2 2
Total Cum 381.09
4 Providing and laying reinforced cement concrete in superstructure as
per drawing and technical specifications Clauses 800, 1205.4 and 1205.5

(a) Deck Slab 1 × 2.80 × 7.50 × 0.215 Cum 4.52

(b) Abutment Cap 2 × 7.50 × 0.45 × 0.150 Cum 1.01


Parapet 2 × 2.80 × 0.40 × 0.400 Cum 0.90
Dirt wall 2 × 7.50 × 0.30 × 0.440 Cum 1.98
Cum 8.41
5 Providing and laying cement concrete wearing course M30 grade
without reinforcement complete as per drawing and technical
specifications Clause 800 and 1206.3

Wearing Coat 2 × 2.80 × 7.50 × 0.075 Cum 3.15

6 Supplying, fitting and placing HYSD bar reinforcement (Fe 415)


complete as per drawings and MORD technical specification Clauses
1000,1200 as per direction of the Engineer in charge

a - Deck Slab - R.C.C 4.52 Cum @ 1.00 Qntl. 4.520


b- Cap & Dirt wall 8.41 Cum @ 1.00 Qntl. 8.410
c.- Abutments Piers 46.12 Cum @ 0.08 Qntl. 3.690
Total Qntl. 16.620
7 Providing weepholes in brick masonry/stone masonry, plain/reinforced
concrete abutment, wing wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures with slope of
1(V):20(H) towards drawing face complete as per drawing and MORD
technical specification Clauses 614, 709, 1204 and as per direction of the
Engineer in charge
Abutment 2 × 11 Nos. Nos. 22.00
Wing wall 4 × 8 Nos. Nos. 32.00
Nos. 54.00
8 Providing and laying filter media with granular crushed aggregates as
per specification to a thickness of not less than 600 mm with smaller size
towards the soil and bigger size towards the wall and providing over the
entire surface behind abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per drawing and MORD
technical specification Clause 1204.3.8 and as per direction of the
Engineer in charge

In between Wing wall and Abutment


Behind Abutments 2 × 7.50 × 2.00 × 0.60 Cum 18.00
Sl. No Description of item
Ht / Th
Nos. Length Width Unit Quantity
in M

1 2 3 4 5 6 7 8
Behind Wing wall 4 × 4.75 × 2.29 × 0.60 Cum 26.11
Cum 44.11

For
0 Nos. of slab culvert

Junior Engineer Assistant Exe. Engineer E


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&
CT FOR LEFT WING EXTERMISIM AREA (RCPLWE)
ONSTRUCTION OF R.C.C. SLAB CULVERT

Pakage No: OR19RCPL-16

Rate in Amount in
Rs. Rs.

9 10

@ 390.47 3904.70

@ 1105.50 6511.40

cum

cum

cum
cum @ 254.44 11770.39

@ 323.08 126275.82
Rate in Amount in
Rs. Rs.

9 10

@ 671.95 0.00

@ 4,261.76 278719.10
Rate in Amount in
Rs. Rs.

9 10

@ 4,489.61 1710945.47

@ 6762.60 56873.47

@ 6,041.08 19029.40

@ 555.94 9239.72

@ 219.98 11878.92
Rate in Amount in
Rs. Rs.

9 10

@ 2445.86 107886.88

Total 2343035.27

Rs. 0.00

Executive Engineer
R.&B. Division , Koraput
rural connectivity project for left wing (RCPLWE)
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. SLAB CULVERT

Name of
ANKADELI DOWN COB To ANKADELI TOP Pakage No: OR19RCPL-16
the road:-

Type of cross Drainage Work:- Span R.C.C.


1 Slab Culvert of
( 4.000 x 2.000 m)
Nos. of Culvert :- 0 Nos
Sl. No Description of item Ht / Th Amount in
Nos. Length Width Unit Quantity Rate in Rs.
in M Rs.
1 2 3 4 5 6 7 8 9 10
1 Earthwork in excavation for foundation of structures in all
types of soil as per drawing and technical specification Clause
305 and 1104 of MoRD includding setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto all lead & lift, dressing of sides and
bottom and back filling with excavated suitable material upto
3mt. as per direction of Engineer-in-Charge.

Foundation
Abutments 2 × 13.90 × 3.20 × 1.50 Cum 133.44
Piers 0 × 13.83 × 1.97 × 1.50 Cum 0.00
Cut off U/S 1 × 8.00 × 1.00 × 1.20 Cum 9.60
Cut off D/S 1 × 9.00 × 1.00 × 1.50 Cum 13.50
D/S Bed 1 × 3.00 × 2.20 × 0.60 Cum 3.96
U/S Bed 1 × 3.00 × 1.70 × 0.60 Cum 3.06
CD Bed 1 × 12.50 × 4.40 × 0.60 Cum 33.00
Wing walls 4 × 2.15 × 2.52 × 1.50 Cum 32.51
Total Cum 229.07 @ 323.08 74007.94
2 Providing concrete for plain / reinforced concrete in open
foundation complete as per drawing and MORD technical
specification Clause 800,1100,1200 and as per direction of
Engineer-in-Charge.

With Dewatering in Foundation


Abutments 1st Step 2 × 13.90 × 3.20 × 0.20 Cum 17.79
Pier 1st Step 0 × 13.83 × 1.97 × 0.40 Cum 0.00
Cut off D/S 1st step 1 × 9.00 × 1.00 × 0.30 Cum 2.7
Cut off D/S 2nd step 1 × 9.00 × 0.60 × 1.00 Cum 5.40
Cut off U/S 1st step 1 × 8.00 × 1.00 × 0.30 Cum 2.4
Cut off U/S 2nd step 1 × 8.00 × 0.60 × 0.70 Cum 3.36
Wing 1st Step 4 × 2.15 × 2.52 × 0.40 Cum 8.67
CD Bed 1 × 12.50 × 3.50 × 0.15 Cum 6.56
U/S Bed 1 × 3.00 × 1.90 × 0.15 Cum 0.86
D/S Bed 1 × 3.00 × 2.40 × 0.15 Cum 1.08
Toe wall 0 × 5.00 × 0.60 × 0.45 Cum 0.00
Total Cum 48.82 @ 4,261.76 208059.12
3 Plain/reinforced cement concrete in sub-structure complete as
per drawings and MORD technical specification Clauses
800,1200 and as per direction of the Engineer in charge

Abutments 2nd Step 2 × 13.50 × 2.80 × 0.20 Cum 15.12


Pier 2nd Step 0 × 13.43 × 1.57 × 0.40 Cum 0.00
Cum 15.12
Abutments 3rd step 2 × 13.10 × 2.40 × 0.40 Cum 25.15
4th Step 2 x 6.6+5.6 x 2.4+2.0 x 0.40 Cum 22.35
2 2
Above G.L. 2 × 5.4+6.0 × 1.6+0.7 × 2.10 Cum 58.93
2 2
Pier 3rd Step 0 × 13.03 × 1.17 × 0.40 Cum 0.00
Above G.L. 0 × 12.63 × .77+0.7 × 2.10 Cum 0.00
2
Wing 4 × 2.35 × 2.12 × 0.40 Cum 7.97
4 × 2.55 × 1.92 × 0.40 Cum 7.83
Sl. No Description of item Ht / Th Amount in
Nos. Length Width Unit Quantity Rate in Rs.
in M Rs.
1 2 3 4 5 6 7 8 9 10
4
× 3.0+2.05 × 1.72+.4 × 2.42 Cum 31.04
2 2
Total Cum 168.39 @ 4,489.61 756005.43
4 Providing and laying reinforced cement concrete in
superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5

(a) Deck Slab 1 × 4.80 × 12.50 × 0.345 Cum 20.7

(b) Abutment Cap 2 × 12.50 × 0.45 × 0.150 Cum 1.69


Pier Cap 0 × 12.63 × 0.80 × 0.150 Cum 0.00
Parapet 2 × 4.80 × 0.40 × 0.400 Cum 1.54
Dirt wall 2 × 12.50 × 0.30 × 0.570 Cum 4.28
Cum 28.21 @ 6762.60 190772.95
5 Providing and laying cement concrete wearing course M30
grade without reinforcement complete as per drawing and
technical specifications Clause 800 and 1206.3

Wearing Coat 2 × 4.80 × 12.50 × 0.075 Cum 9.00 @ 6,041.08 54369.72

6 Supplying, fitting and placing HYSD bar reinforcement (Fe


415) complete as per drawings and MORD technical
specification Clauses 1000,1200 as per direction of the
Engineer in charge
a - Deck Slab - R.C.C 20.70 Cum @ 1.00 Qntl. 20.700
b- Cap & Dirt wall 28.21 Cum @ 1.00 Qntl. 28.210
c.- Abutments Piers 31.04 Cum @ 0.08 Qntl. 2.483
Total Qntl. 51.393 @ 5,559.43 285715.79
7 Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall
with 100 mm dia AC pipe extending through the full width of
the structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and MORD technical specification
Clauses 614, 709, 1204 and as per direction of the Engineer in
charge
Abutment 2 × 11 Nos. Nos. 22.00
Wing wall 4 × 8 Nos. Nos. 32.00
Nos. 54.00 @ 219.98 11878.92
8 Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less than
600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted
to firm condition complete as per drawing and MORD
technical specification Clause 1204.3.8 and as per direction of
the EngineerWing
In between in charge
wall and Abutment
Behind Abutments 2 × 12.50 × 2.00 × 0.60 Cum 30.00
Behind Wing wall 4 × 3.03 × 2.42 × 0.60 Cum 17.60
Cum 47.60 @ 2445.86 116422.94
Total 1697232.81
For
0 Nos. of slab culvert Rs. 0.00

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
rural connectivity project for left wing (RCPLWE)
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. SLAB CULVERT

Name of
ANKADELI DOWN COB To ANKADELI TOP Pakage No: OR19RCPL-16
the road:-

Type of cross Drainage Work:- Span R.C.C.


1 Slab Culvert of
( 6.000 x 4.000 m)
Nos. of Culvert :- 0 Nos
Sl. No Description of item Ht / Th Amount in
Nos. Length Width Unit Quantity Rate in Rs.
in M Rs.
1 2 3 4 5 6 7 8 9 10
1 Earthwork in excavation for foundation of structures in all
types of soil as per drawing and technical specification Clause
305 and 1104 of MoRD includding setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto all lead & lift, dressing of sides and
bottom and back filling with excavated suitable material upto
3mt. as per direction of Engineer-in-Charge.

Foundation
Abutments 2 × 13.90 × 3.20 × 1.50 Cum 133.44
Piers 0 × 13.97 × 2.04 × 1.50 Cum 0.00
Cut off U/S 1 × 11.00 × 1.00 × 1.20 Cum 13.20
Cut off D/S 1 × 13.00 × 1.00 × 1.50 Cum 19.50
D/S Bed 1 × 5.00 × 3.20 × 0.60 Cum 9.60
U/S Bed 1 × 5.00 × 2.20 × 0.60 Cum 6.60
CD Bed 1 × 12.50 × 6.40 × 0.60 Cum 48.00
Wing walls 4 × 1.65 × 2.52 × 1.50 Cum 24.95
Total Cum 255.29 @ 323.08 82479.09
2 Providing and constructing well compacted drainage layer
above the subgrade of roadwork with approved quality of
dust free washed coarse to medium sand as per Clauses 5.8
and 6.6 of SP:20-2002.

Foundation
Abutments 2 × 13.90 × 3.20 × 0.20 Cum 17.79
Piers 0 × 13.97 × 2.04 × 0.20 Cum 0.00
Cut off U/S 1 × 11.00 × 1.00 × 0.20 Cum 2.20
Cut off D/S 1 × 13.00 × 1.00 × 0.20 Cum 2.60
Wing walls 4 × 1.65 × 2.52 × 0.20 Cum 3.33
D/S Bed 1 × 5.00 × 3.40 × 0.20 Cum 3.40
U/S Bed 1 × 5.00 × 2.40 × 0.20 Cum 2.40
CD Bed 1 × 12.50 × 5.50 × 0.20 Cum 13.75
Total Cum 45.47 @ 671.95 30553.57
2 Providing concrete for plain / reinforced concrete in open
foundation complete as per drawing and MORD technical
specification Clause 800,1100,1200 and as per direction of
Engineer-in-Charge.

With Dewatering in Foundation


Abutments 1st Step 2 × 13.90 × 3.20 × 0.20 Cum 17.79
Pier 1st Step 0 × 13.97 × 2.04 × 0.40 Cum 0.00
Cut off D/S 1st step 1 × 13.00 × 1.00 × 0.30 Cum 3.9
Cut off D/S 2nd step 1 × 13.00 × 0.60 × 1.00 Cum 7.80
Cut off U/S 1st step 1 × 11.00 × 1.00 × 0.30 Cum 3.3
Cut off U/S 2nd step 1 × 11.00 × 0.60 × 0.70 Cum 4.62
Wing 1st Step 4 × 1.65 × 2.52 × 0.40 Cum 6.65
CD Bed 1 × 12.50 × 5.50 × 0.15 Cum 10.31
U/S Bed 1 × 5.00 × 2.40 × 0.15 Cum 1.8
D/S Bed 1 × 5.00 × 3.40 × 0.15 Cum 2.55
Toe wall 4 × 5.00 × 0.60 × 0.45 Cum 5.40
Total Cum 64.12 @ 4,261.76 273264.05
Sl. No Description of item Ht / Th Amount in
Nos. Length Width Unit Quantity Rate in Rs.
in M Rs.
1 2 3 4 5 6 7 8 9 10
3 Plain cement concrete 1:2:4 nominal mix in foundation with
crushed stone aggregates to 40mm nominal size mechanically
mixed placed in foundation and compacted by vibration
including curing for 14 daysas per specifcation and direction
of the Engineer-in-charge
Abutments 2nd Step 2 × 13.50 × 2.80 × 0.20 Cum 15.12
Pier 2nd Step 0 × 13.57 × 1.64 × 0.40 Cum 0.00
Cum 15.12 @ 4,489.61 67882.90
Abutments 3rd step 2 × 13.10
× 2.40 × 0.40 Cum 25.15
4th Step 2 x 6.6+5.6
x 2.4+2.0 x 0.40 Cum 22.35
2 2
Above G.L. 2 × 5.4+6.0
× 1.6+0.7 × 4.10 Cum 115.05
2 2
Pier 3rd Step 0 × 13.17
× 1.24 × 0.40 Cum 0.00
Above G.L. 0 × 12.77
× .77+0.7 × 4.10 Cum 0.00
2
Wing 4 × 1.85 × 2.12 × 0.40 Cum 6.28
4 × 2.05 × 1.92 × 0.40 Cum 6.3
4 × 3.0+2.05 × 1.72+.4 × 4.52 Cum 48.39
2 2
Total Cum 223.52 @ 4,489.61 1003517.63
4 Providing and laying reinforced cement concrete in
superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5

(a) Deck Slab 1 × 6.80 × 12.50 × 0.445 Cum 37.83 @ 6762.60 255829.16

(b) Abutment Cap 2 × 12.50 × 0.45 × 0.150 Cum 1.69


Pier Cap 0 × 12.77 × 0.80 × 0.150 Cum 0.00
Parapet 2 × 6.80 × 0.40 × 0.400 Cum 2.18
Dirt wall 2 × 12.50 × 0.30 × 0.670 Cum 5.03
Cum 8.90 @ 6762.60 60187.14
5 Providing and laying cement concrete wearing course M30
grade without reinforcement complete as per drawing and
technical specifications Clause 800 and 1206.3

Wearing Coat 2 × 6.80 × 12.50 × 0.075 Cum 12.75 @ 6,041.08 77023.77

6 Supplying, fitting and placing HYSD bar reinforcement (Fe


415) complete as per drawings and MORD technical
specification Clauses 1000,1200 as per direction of the
Engineer in charge
a - Deck Slab - R.C.C 37.83 Cum @ 1.00 Qntl. 37.830
b- Cap & Dirt wall 8.90 Cum @ 1.00 Qntl. 8.900
c.- Abutments Piers 48.39 Cum @ 0.08 Qntl. 3.871
Total Qntl. 50.601 @ 5,559.43 281312.72
7 Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall
with 100 mm dia AC pipe extending through the full width of
the structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and MORD technical specification
Clauses 614, 709, 1204 and as per direction of the Engineer in
charge
Abutment 2 × 11 Nos. Nos. 22.00
Wing wall 4 × 8 Nos. Nos. 32.00
Nos. 54.00 @ 219.98 11878.92
8 Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less than
600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted
to firm condition complete as per drawing and MORD
technical specification Clause 1204.3.8 and as per direction of
the EngineerWing
In between in charge
wall and Abutment
Behind Abutments 2 × 12.50 × 4.00 × 0.60 Cum 60.00
Sl. No Description of item Ht / Th Amount in
Nos. Length Width Unit Quantity Rate in Rs.
in M Rs.
1 2 3 4 5 6 7 8 9 10
Behind Wing wall 4 × 2.53 × 4.52 × 0.60 Cum 27.45
Cum 87.45 @ 2445.86 213890.46
9 Providing and fixing 20 mm thick compressible fibre board in
expansion joint complete as per drawing and technical
specifications

In between dirt wall and slab 2 × 12.50 RM 25.00


RM 25.00 @ 266.39 6659.75

Total 2364479.16
For
0 Nos. of slab culvert Rs. 0.00

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
rural connectivity project for left wing (RCPLWE)
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. BOX-CELL CULVERT

Name of the road: ANKADELI DOWN COB To Pakage No: OR19RCPL-16


Type of cross Drainage Work: 2 Span Box-cell Culvert ( 6.00 m x 4.00 m) size
Total Nos. of Culvert : 0 Nos At RD-0,0,0,0
Type of soil : All kinds of soil
Sl. Ht / Th
Description of item Nos Length Width in M Unit Quantity Rate in Rs.
No
1 2 3 4 5 6 7 8 9
1 Earthwork in excavation for foundation of structures in all
types of soil as per drawing and technical specification
Clause 305 and 1104 of MoRD includding setting out,
construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto all lead &
lift, dressing of sides and bottom and back filling with
excavated suitable material upto 3mt. as per direction of
Engineer-in-Charge.

Cut off U/S(with side cut off) 1 × 28.90 × 1.00 × 1.50 Cum 43.35
Cut off D/S 1 × 30.90 × 1.00 × 2.00 Cum 61.80
Bridge proper and appron 1 × 18.00 × 13.40 × 0.80 Cum 192.96
Flexible appron U/S 1 × 14.40 × 3.00 × 1.00 Cum 43.20
Flexible appron D/S 1 × 14.40 × 4.00 × 1.00 Cum 57.60
Wing walls 4 × 2.20 × 2.52 × 1.50 Cum 33.26
Total Cum 432.17 @ 34.85
2 Providing and constructing well compacted drainage layer
above the subgrade of roadwork with approved quality of
dust free washed coarse to medium sand as per Clauses 5.8
and 6.6 of SP:20-2002.

Below raft 1 × 18.50 × 13.90 × 0.20 Cum 51.43


Cut off wall U/S 1 × 28.90 × 1.00 × 0.15 Cum 4.34
Cut off wall D/S 1 × 30.90 × 1.00 × 0.15 Cum 4.64
Wing walls 4 × 2.20 × 2.52 × 0.20 Cum 4.44
Total Cum 64.85 @ 0.00
3 Providing concrete for plain / reinforced concrete in open
foundation complete as per drawing and MORD technical
specification Clause 800,1100,1200 and as per direction of
Engineer-in-Charge.

Below bed level


Below raft 1 × 18.50 × 13.90 × 0.15 Cum 38.57
Wing walls 4 × 2.20 × 2.52 × 0.40 Cum 8.87
Cut off D/S 1st step 1 × 28.90 × 1.00 × 0.50 Cum 14.45
Cut off U/S 1st step 1 × 30.90 × 1.00 × 0.50 Cum 15.45
Toe wall 0 × 3.00 × 0.60 × 0.45 Cum 0.00
Cut off D/S 2nd step 1 × 28.90 × 0.60 × 0.55 Cum 9.54
Cut off U/S 2nd step 1 × 30.90 × 0.60 × 1.05 Cum 19.47
DEWATERING ( Below bed)
Rigid Appron U/S 1 × 14.80 × 3.00 × 0.30 Cum 13.32
D/S 1 × 14.80 × 4.00 × 0.30 Cum 17.76
Wing 4 × 2.20 × 2.12 × 0.40 Cum 7.46
144.89 @ 4,261.76
4 Plain/reinforced cement concrete in sub-structure
complete as per drawings and MORD technical
specification Clauses 800,1200 and as per direction of the
Engineer in charge

SHUTTERING(above bed)
Wing walls 4 × 2.20 × 1.92 × 0.40 Cum 6.76
4 × 3.00 × 1.06 × 3.10 Cum 39.43
Sl. Ht / Th
Description of item Nos Length Width in M Unit Quantity Rate in Rs.
No
1 2 3 4 5 6 7 8 9
Total Cum 46.19 @ 4,489.61
5 Providing and laying reinforced cement concrete in
superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5

(a) Raft 1 × 12.50 × 13.40 × 0.40 Cum 67.00 @ 6031.16


(b) Deck Slab 1 × 12.50 × 13.40 × 0.40 Cum 67.00 @ 6762.60
(c) Rib 2 x 12.50 × 0.50 × 4.00 Cum 50.00
(d) Pier Rib 1 x 12.50 × 0.40 × 4.00 Cum 20.00
Sl. Ht / Th
Description of item Nos Length Width in M Unit Quantity Rate in Rs.
No
1 2 3 4 5 6 7 8 9
(e) Hunch 8 x 12.50 × 0.15/2 × 0.15 Cum 1.13
Cum 71.13 @ 5,891.38
d) Construction of R.C.C. railing of M 25 grade in cast-in-situ
with 20 mm nominal size aggregate, true to line and grade,
tolerance of vertical railing post not to exceed 1 in 500,
centre-to-centre spacing between vertical posts not to
exceed 2000 mm as per drawing and technical
specifications Clauses 800, 900 and 1208.3

2 × 13.40 Rm 26.80 @ 2,342.52


6 Providing and laying cement concrete wearing course M 30
grade including reinforcement complete as per drawing
and technical specifications Clauses 800 and 1206.3

1 × 12.50 × 13.40 × 0.075 Cum 12.56 @ 6,041.08


7 Supplying, fitting and placing HYSD bar reinforcement (Fe
415) complete as per drawings and MORD technical
specification Clauses 1000,1200 as per direction of the
Engineer in charge

a - Deck Slab 67.00 Cum @ 1.00 Qntl. 67 @ 555.94


c.- Raft 67.00 Cum @ 1.00 Qntl. 67 @ 545.72
d-Rib & Hunch 71.13 Cum @ 0.80 Qntl. 56.904
e-Wing wall 39.43 Cum @ 0.075 Qntl. 2.957
Total Qntl. 59.861 @ 5,559.43
8 Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall
with 100 mm dia AC pipe extending through the full width
of the structures with slope of 1(V):20(H) towards drawing
face complete as per drawing and MORD technical
specification Clauses 614, 709, 1204 and as per direction of
the Engineer in charge

Abutment 2 × 10 Nos. Nos. 20.00


Wing wall 4 × 8 Nos. Nos. 32.00
Nos. 52.00 @ 219.98
10 Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less
than 600 mm with smaller size towards the soil and bigger
size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per drawing and
MORD technical specification Clause 1204.3.8 and as per
direction of the Engineer in charge

In between Wing wall and Abutment


Behind Abutment Ribs 2 × 10.38 × 3.70 × 0.60 Cum 46.09
Behind Wing wall 4 × 3.00 × 3.70 × 0.60 Cum 26.64
Cum 72.73 @ 2,445.86
Total

0 Nos. of culvert 0 x 2850744.52 Rs.


Sl. Ht / Th
Description of item Nos Length Width in M Unit Quantity Rate in Rs.
No
1 2 3 4 5 6 7 8 9

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Korap
RT

Amount in Rs.

10

15061.12

617486.41
Amount in Rs.

10
207375.09

404087.72
453094.2
Amount in Rs.

10

419053.86

62779.54

75875.96

37247.98
36563.24

332793.04

11438.96

177887.4
2850744.52

0.00
Amount in Rs.

10

Executive Engineer
&B. Division , Koraput
PRADHANMANTRI GRAM SADAK YOJANA (PMGSY)
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. SLAB CULVERT

Name of
ANKADELI DOWN COB To ANKADELI TOP Pakage No: OR19RCPL-16
the road:-

Type of cross Drainage Work:- Span R.C.C.


1 Slab Culvert of
( 2.000 x 2.000 m)
Nos. of Culvert :- 0 Nos
Sl. No Description of item Ht / Th Amount in
Nos. Length Width Unit Quantity Rate in Rs.
in M Rs.
1 2 3 4 5 6 7 8 9 10
1 Earthwork in excavation for foundation of structures in all
types of soil as per drawing and technical specification Clause
305 and 1104 of MoRD includding setting out, construction of
shoring and bracing, removal of stumps and other deleterious
material and disposal upto all lead & lift, dressing of sides and
bottom and back filling with excavated suitable material upto
3mt. as per direction of Engineer-in-Charge.

Foundation
Abutments 2 × 13.90 × 3.20 × 1.50 Cum 133.44
Piers 0 × 13.83 × 1.97 × 1.50 Cum 0.00
Cut off U/S 1 × 4.00 × 1.00 × 1.20 Cum 4.80
Cut off D/S 1 × 5.00 × 1.00 × 1.50 Cum 7.50
D/S Bed 1 × 1.00 × 1.20 × 0.60 Cum 0.72
U/S Bed 1 × 1.00 × 0.70 × 0.60 Cum 0.42
CD Bed 1 × 12.50 × 2.40 × 0.60 Cum 18.00
Wing walls 4 × 1.65 × 2.52 × 1.50 Cum 24.95
Total Cum 189.83 @ 323.08 61330.28
2 Providing concrete for plain / reinforced concrete in open
foundation complete as per drawing and MORD technical
specification Clause 800,1100,1200 and as per direction of
Engineer-in-Charge.

With Dewatering in Foundation


Abutments 1st Step 2 × 13.90 × 3.20 × 0.20 Cum 17.79
Pier 1st Step 0 × 13.83 × 1.97 × 0.40 Cum 0.00
Cut off D/S 1st step 1 × 5.00 × 1.00 × 0.30 Cum 1.5
Cut off D/S 2nd step 1 × 5.00 × 0.60 × 1.00 Cum 3.00
Cut off U/S 1st step 1 × 4.00 × 1.00 × 0.30 Cum 1.2
Cut off U/S 2nd step 1 × 4.00 × 0.60 × 0.70 Cum 1.68
Wing 1st Step 4 × 1.65 × 2.52 × 0.40 Cum 6.65
CD Bed 1 × 12.50 × 1.50 × 0.15 Cum 2.81
U/S Bed 1 × 1.00 × 0.90 × 0.15 Cum 0.14
D/S Bed 1 × 1.00 × 1.40 × 0.15 Cum 0.21
Toe wall 4 × 5.00 × 0.60 × 0.45 Cum 5.40
Total Cum 40.38 @ 4,261.76 172089.87
3 Plain/reinforced cement concrete in sub-structure complete as
per drawings and MORD technical specification Clauses
800,1200 and as per direction of the Engineer in charge

Abutments 2nd Step 2 × 13.50 × 2.80 × 0.20 Cum 15.12


Pier 2nd Step 0 × 13.43 × 1.57 × 0.40 Cum 0.00
Cum 15.12 @ 4,489.61 67882.90
Abutments 3rd step 2 × 13.10 × 2.40 × 0.40 Cum 25.15
4th Step 2 x 6.6+5.6 x 2.4+2.0 x 0.40 Cum 22.35
2 2
Above G.L. 2 × 5.4+6.0 × 1.6+0.7 × 2.10 Cum 58.93
2 2
Pier 3rd Step 0 × 13.03 × 1.17 × 0.40 Cum 0.00
Above G.L. 0 × 12.63 × .77+0.7 × 2.10 Cum 0.00
2
Wing 4 × 1.85 × 2.12 × 0.40 Cum 6.28
Sl. No Description of item Ht / Th Amount in
Nos. Length Width Unit Quantity Rate in Rs.
in M Rs.
1 2 3 4 5 6 7 8 9 10
4
× 2.05 × 1.92 × 0.40 Cum 6.3
4
× 3.0+2.05 × 1.72+.4 × 2.29 Cum 24.52
2 2
Total Cum 143.53 @ 4,489.61 644393.72
4 Providing and laying reinforced cement concrete in
superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5

(a) Deck Slab 1 × 2.80 × 12.50 × 0.215 Cum 7.53 @ 6762.60 50922.38

(b) Abutment Cap 2 × 12.50 × 0.45 × 0.150 Cum 1.69


Pier Cap 0 × 12.63 × 0.80 × 0.150 Cum 0.00
Parapet 2 × 2.80 × 0.40 × 0.400 Cum 0.90
Dirt wall 2 × 12.50 × 0.30 × 0.440 Cum 3.30
Cum 5.89 @ 6762.60 39831.71
5 Providing and laying cement concrete wearing course M30
grade without reinforcement complete as per drawing and
technical specifications Clause 800 and 1206.3

Wearing Coat 2 × 2.80 × 12.50 × 0.075 Cum 5.25 @ 6,041.08 31715.67

6 Supplying, fitting and placing HYSD bar reinforcement (Fe


415) complete as per drawings and MORD technical
specification Clauses 1000,1200 as per direction of the
Engineer in charge
a - Deck Slab - R.C.C 7.53 Cum @ 1.00 Qntl. 7.530
b- Cap & Dirt wall 5.89 Cum @ 1.00 Qntl. 5.890
c.- Abutments Piers 24.52 Cum @ 0.08 Qntl. 1.962
Total Qntl. 15.382 @ 555.94 8551.47
7 Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall
with 100 mm dia AC pipe extending through the full width of
the structures with slope of 1(V):20(H) towards drawing face
complete as per drawing and MORD technical specification
Clauses 614, 709, 1204 and as per direction of the Engineer in
charge
Abutment 2 × 11 Nos. Nos. 22.00
Wing wall 4 × 8 Nos. Nos. 32.00
Nos. 54.00 @ 219.98 11878.92
8 Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less than
600 mm with smaller size towards the soil and bigger size
towards the wall and providing over the entire surface behind
abutment, wing wall, return wall to the full height, compacted
to firm condition complete as per drawing and MORD
technical specification Clause 1204.3.8 and as per direction of
the EngineerWing
In between in charge
wall and Abutment
Behind Abutments 2 × 12.50 × 2.00 × 0.60 Cum 30.00
Behind Wing wall 4 × 2.53 × 2.29 × 0.60 Cum 13.90
Cum 43.90 @ 2445.86 107373.25
9 Providing and fixing 20 mm thick compressible fibre board in
expansion joint complete as per drawing and technical
specifications

In between dirt wall and slab 2 × 12.50 RM 25.00


RM 25.00 @ 266.39 6659.75

Total 1202629.92
For
0 Nos. of slab culvert Rs. 0.00
Sl. No Description of item Ht / Th Amount in
Nos. Length Width Unit Quantity Rate in Rs.
in M Rs.
1 2 3 4 5 6 7 8 9 10

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. BOX-CELL CULVERT

Pakage No: OR19RCPL-


Name of the road: 16
ANKADELI DOWN COB To ANKADELI TOP
Type of cross Drainage Work: 2 Span Box-cell Culvert ( 6.00 m x 2.00 m) size
Total Nos. of Culvert : 0 Nos
Type of soil : All kinds of soil
Sl. Ht / Th
Description of item Nos Length Width in M Unit Quantity Rate in Rs.
No
1 2 3 4 5 6 7 8 9
1 Earthwork in excavation for foundation of structures in all
types of soil as per drawing and technical specification
Clause 305 and 1104 of MoRD includding setting out,
construction of shoring and bracing, removal of stumps
and other deleterious material and disposal upto all lead &
lift, dressing of sides and bottom and back filling with
excavated suitable material upto 3mt. as per direction of
Engineer-in-Charge.

Cut off U/S(with side cut off) 1 × 31.90 × 1.00 × 2.00 Cum 63.80
Cut off D/S 1 × 32.90 × 1.00 × 2.50 Cum 82.25
Bridge proper and appron 1 × 15.40 × 13.40 × 0.80 Cum 165.09
Flexible appron U/S 1 × 14.60 × 2.00 × 1.00 Cum 29.20
Flexible appron D/S 1 × 14.60 × 2.50 × 1.00 Cum 36.50
Wing walls 4 × 2.20 × 2.52 × 2.00 Cum 44.35
Total Cum 421.19 @ 34.85
2 Providing and constructing well compacted drainage layer
above the subgrade of roadwork with approved quality of
dust free washed coarse to medium sand as per Clauses 5.8
and 6.6 of SP:20-2002.

Below raft 1 × 15.80 × 13.80 × 0.20 Cum 43.61


Cut off wall U/S 1 × 31.90 × 1.00 × 0.20 Cum 6.38
Cut off wall D/S 1 × 32.90 × 1.00 × 0.20 Cum 6.58
Wing walls 4 × 2.20 × 2.52 × 0.20 Cum 4.44
Total Cum 61.01 @ 0.00
2 Providing concrete for plain / reinforced concrete in open
foundation complete as per drawing and MORD technical
specification Clause 800,1100,1200 and as per direction of
Engineer-in-Charge.

Below bed level


Below raft 1 × 15.80 × 13.80 × 0.15 Cum 32.71
Wing walls 4 × 2.20 × 2.52 × 0.40 Cum 8.87
Cut off D/S 1st step 1 × 31.90 × 1.00 × 0.50 Cum 15.95
Cut off U/S 1st step 1 × 32.90 × 1.00 × 0.50 Cum 16.45
Toe wall 0 × 15.00 × 0.60 × 1.20 Cum 0.00
Cut off D/S 2nd step 1 × 31.90 × 0.60 × 1.00 Cum 19.14
Cut off U/S 2nd step 1 × 32.90 × 0.60 × 1.50 Cum 29.61
DEWATERING ( Below bed)
Rigid Appron U/S 1 × 15.00 × 2.00 × 0.30 Cum 9.00
D/S 1 × 15.00 × 2.50 × 0.30 Cum 11.25
Wing 4 × 2.20 × 2.12 × 0.40 Cum 7.46
150.44 @ 4,261.76
3 Plain/reinforced cement concrete in sub-structure
complete as per drawings and MORD technical
specification Clauses 800,1200 and as per direction of the
Engineer in charge
Sl. Ht / Th
Description of item Nos Length Width in M Unit Quantity Rate in Rs.
No
1 2 3 4 5 6 7 8 9
SHUTTERING(above bed)
Wing walls 4 × 2.20 × 1.92 × 0.40 Cum 6.76
4 × 3.00 × 1.06 × 3.60 Cum 45.79
Total Cum 52.55 @ 4,489.61
Sl. Ht / Th
Description of item Nos Length Width in M Unit Quantity Rate in Rs.
No
1 2 3 4 5 6 7 8 9
4 Providing and laying reinforced cement concrete in
superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5

(a) Raft 1 × 12.50 × 13.40 × 0.40 Cum 67.00 @ 0.00


(b) Deck Slab 1 × 12.50 × 13.40 × 0.40 Cum 67.00 @ 0.00
(c) Rib 2 x 12.50 × 0.50 × 2.00 Cum 25.00
(d) Pier Rib 1 x 12.50 × 0.40 × 2.00 Cum 10.00
(e) Hunch 8 x 12.50 × 0.15/2 × 0.15 Cum 1.13
Cum 170.13 @ 5,891.38
5 Construction of RCC railing of M-25 grade in cast-in-situ
with 20mm nominal size aggregate,true to line and
grade,tolerance of vertical railing post not to exceed 1 in
500 center to center spacing between vertical posts not to
exceeding 2000mm as per drawing and Technical
Specifications clauses 800,900 and 1208.3.

2 × 13.40 Rm 26.80 @ 2,342.52


6 0
Providing and laying cement concrete wearing course M 30
grade including reinforcement complete as per drawing
and technical specifications Clauses 800 and 1206.3 @

1 12.50 × 13.40 × 0.075 Cum 12.56 6,041.08


7 Supplying, fitting and placing HYSD bar reinforcement (Fe
415) complete as per drawings and MORD technical
specification Clauses 1000,1200 as per direction of the
Engineer in charge

a - Deck Slab 67.00 Cum @ 1.00 Qntl. 67 @ 555.94


c.- Raft 67.00 Cum @ 1.00 Qntl. 67 @ 545.72
d-Rib & Hunch 170.13 Cum @ 0.80 Qntl. 136.104
e-Wing wall 45.79 Cum @ 0.075 Qntl. 3.434
Total Qntl. 139.538 @ 0.00
8 Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall
with 100 mm dia AC pipe extending through the full width
of the structures with slope of 1(V):20(H) towards drawing
face complete as per drawing and MORD technical
specification Clauses 614, 709, 1204 and as per direction of
the Engineer in charge

Abutment 2 × 9 Nos. Nos. 18.00


Wing wall 4 × 6 Nos. Nos. 24.00
Nos. 42.00 @ 219.98
9 Providing and laying boulder appron for bed protection &
pitching on slopes with stone boulders of minimum size
and weight as per Table 1300.1, no fragment weighing less
than 25 kg laid dry complete as per drawing and technical
specifications Clause 1301 & 1302

U/S Appron 1 × 15.00 × 2.00 × 0.6 Cum 18.00


D/S Appron 2 × 15.00 × 2.50 × 0.6 Cum 45.00
Revertment 4 × 3.00 × 4.00 × 0.3 Cum 14.40
Cum 0.00 @ 2032.89
Sl. Ht / Th
Description of item Nos Length Width in M Unit Quantity Rate in Rs.
No
1 2 3 4 5 6 7 8 9
10 Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less
than 600 mm with smaller size towards the soil and bigger
size towards the wall and providing over the entire surface
behind abutment, wing wall, return wall to the full height,
compacted to firm condition complete as per drawing and
MORD technical specification Clause 1204.3.8 and as per
direction of the Engineer in charge

In between Wing wall and Abutment


Behind Abutment Ribs 2 × 10.38 × 1.70 × 0.60 Cum 21.18
Behind Wing wall 4 × 3.00 × 1.70 × 0.60 Cum 12.24
Cum 33.42 @ 2,445.86
Total

0 Nos. of slab culvert 0 x 4185703.62 Rs.

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
ge No: OR19RCPL-
16

Amount in Rs.

10

14678.47

641139.17
Amount in Rs.

10

235929.01
Amount in Rs.

10

0
0

1002300.48

62779.54

75875.96

37247.98
36563.24

9239.16

0
Amount in Rs.

10

2069950.61
4185703.62

0.00

ngineer
n , Koraput
rural connectivity project for left wing (RCPLWE)
COST ESTIMATE FOR CONSTRUCTION OF R.C.C. BOX-CELL CULVERT

Name of the road: ANKADELI DOWN COB ToPakage No: OR19RCPL-16


Type of cross Drainage Work: 2 Span Box-cell Culvert ( 6.00 m x 4.00 m) size
Total Nos. of Culvert : 0 Nos At RD-0,0,0,0
Type of soil : All kinds of soil
Sl. Ht /
Quantit Rate in
N Description of item Nos Length Width Th Unit
y Rs.
o in M
1 2 3 4 5 6 7 8 9
1 Earthwork in excavation for foundation of structures
in all types of soil as per drawing and technical
specification Clause 305 and 1104 of MoRD
includding setting out, construction of shoring and
bracing, removal of stumps and other deleterious
material and disposal upto all lead & lift, dressing of
sides and bottom and back filling with excavated
suitable material upto 3mt. as per direction of
Engineer-in-Charge.

Cut off U/S(with side cut off) 1 × 33.90 × 1.00 × 2.00 Cum 67.80
Cut off D/S 1 × 35.90 × 1.00 × 2.50 Cum 89.75
Bridge proper and appron 1 × 17.90 × 13.40 × 0.80 Cum 191.89
Flexible appron U/S 1 × 14.60 × 3.00 × 1.00 Cum 43.80
Flexible appron D/S 1 × 14.60 × 4.00 × 1.00 Cum 58.40
Wing walls 4 × 2.20 × 2.52 × 2.00 Cum 44.35
Total Cum 495.99 @ 34.85
2 Providing and constructing well compacted
drainage layer above the subgrade of roadwork with
approved quality of dust free washed coarse to
medium sand as per Clauses 5.8 and 6.6 of SP:20-
2002.

Below raft 1 × 18.30 × 13.80 × 0.20 Cum 50.51


Cut off wall U/S 1 × 33.90 × 1.00 × 0.20 Cum 6.78
Cut off wall D/S 1 × 35.90 × 1.00 × 0.20 Cum 7.18
Wing walls 4 × 2.20 × 2.52 × 0.20 Cum 4.44
Total Cum 68.91 @ 0.00
3 Providing concrete for plain / reinforced concrete in
open foundation complete as per drawing and
MORD technical specification Clause 800,1100,1200
and as per direction of Engineer-in-Charge.

Below bed level


Below raft 1 × 18.30 × 13.80 × 0.15 Cum 37.88
Wing walls 4 × 2.20 × 2.52 × 0.40 Cum 8.87
Cut off D/S 1st step 1 × 33.90 × 1.00 × 0.50 Cum 16.95
Cut off U/S 1st step 1 × 35.90 × 1.00 × 0.50 Cum 17.95
Toe wall 4 × 5.00 × 0.60 × 0.54 Cum 6.48
Cut off D/S 2nd step 1 × 33.90 × 0.60 × 1.00 Cum 20.34
Cut off U/S 2nd step 1 × 35.90 × 0.60 × 1.50 Cum 32.31
DEWATERING ( Below bed)
Rigid Appron U/S 1 × 15.00 × 3.00 × 0.30 Cum 13.50
D/S 1 × 15.00 × 4.00 × 0.30 Cum 18.00
Wing 4 × 2.20 × 2.12 × 0.40 Cum 7.46
179.74 @ 4,261.76
4 Plain/reinforced cement concrete in sub-structure
complete as per drawings and MORD technical
specification Clauses 800,1200 and as per direction
of the Engineer in charge
SHUTTERING(above bed)
Sl. Ht /
Quantit Rate in
N Description of item Nos Length Width Th Unit
y Rs.
o in M
1 2 3 4 5 6 7 8 9
Wing walls 4 × 2.20 × 1.92 × 0.40 Cum 6.76
4 × 3.00 × 1.06 × 3.60 Cum 45.79
Total Cum 52.55 @ 4,489.61
5 Providing and laying reinforced cement concrete in
superstructure as per drawing and technical
specifications Clauses 800, 1205.4 and 1205.5
(a) Raft 1 × 12.50 × 13.40 × 0.40 Cum 67.00 @ 6031.16
(b) Deck Slab 1 × 12.50 × 13.40 × 0.40 Cum 67.00 @ 6762.60
(c) Rib 2 x 12.50 × 0.50 × 4.00 Cum 50.00
(d) Pier Rib 1 x 12.50 × 0.40 × 4.00 Cum 20.00
(e) Hunch 8 x 12.50 × 0.15/2 × 0.15 Cum 1.13
Cum 71.13 @ 5,891.38
d) 0
2 × 13.40 Rm 26.80 @ 2,342.52
6 0
1 × 12.50 × 13.40 × 0.075 Cum 12.56 @ 6,041.08
7 Supplying, fitting and placing HYSD bar
reinforcement (Fe 415) complete as per drawings and
MORD technical specification Clauses 1000,1200 as
per direction of the Engineer in charge

a - Deck Slab 67.00 Cum @ 1.00 Qntl. 67 @ 5,244.20


c.- Raft 67.00 Cum @ 1.00 Qntl. 67 @ 545.72
d-Rib & Hunch 71.13 Cum @ 0.80 Qntl. 56.904
e-Wing wall 45.79 Cum @ 0.075 Qntl. 3.434
Total Qntl. 60.338 @ 5,559.43
8 Providing weepholes in brick masonry/stone
masonry, plain/reinforced concrete abutment, wing
wall, return wall with 100 mm dia AC pipe
extending through the full width of the structures
with slope of 1(V):20(H) towards drawing face
complete as per drawing and MORD technical
specification Clauses 614, 709, 1204 and as per
direction of the Engineer in charge

Abutment 2 × 10 Nos. Nos. 20.00


Wing wall 4 × 8 Nos. Nos. 32.00
Nos. 52.00 @ 219.98
9 Providing and laying filter media with granular
crushed aggregates as per specification to a thickness
of not less than 600 mm with smaller size towards
the soil and bigger size towards the wall and
providing over the entire surface behind abutment,
wing wall, return wall to the full height, compacted
to firm condition complete as per drawing and
MORD technical specification Clause 1204.3.8 and as
per direction of the Engineer in charge

In between Wing wall and Abutment


Behind Abutment Ribs 2 × 10.38 × 3.70 × 0.60 Cum 46.09
Behind Wing wall 4 × 3.00 × 3.70 × 0.60 Cum 26.64
Cum 72.73 @ 2,445.86
Total

0 Nos. of slab culvert 0 x 3346810.17 Rs.


Sl. Ht /
Quantit Rate in
N Description of item Nos Length Width Th Unit
y Rs.
o in M
1 2 3 4 5 6 7 8 9

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
Amount in
Rs.
10

17285.25

766008.74
Amount in
Rs.
10

235929.01

404087.72
453094.2

419053.86

62779.54

75875.96

351361.4
36563.24

335444.89

11438.96

177887.4
3346810.17

0.00
Amount in
Rs.
10

Engineer
on , Koraput
TYPICAL CROSS SECTION OF ( FLEXIBLE PAVEMENT) FROM 0/

3.875
2.750 2.750 1.125
1.000 1.750

Earthain Road
1.463

1.20 av
1.613
2.900

4.550 4.550 1.460

EXISTING PROPOSED
EXISTING PROPOSED

Junior Engineer, Asst Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi
TYPICAL CROSS SECTION OF ( RIGID PAVEMENT) FROM 1/000

PQC

2.750
2.750 2.750
1.000 1.750

BUILT-UP AREA 0.100M PQC BUILT-UP AREA

0.150M DLC
1.00 av

4.250 4.250

EXISTING PROPOSED
EXISTING PROPOSED

NEW CONSTRUCTION

Junior Engineer, Asst Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi
400
1000MM SINGLE ROW
M-15
500

M-15
500
275
125 750
125

1625
1000
M-15
1800 1000
300
125 1050
150 1:3:6
150 SAND 750
M-15 1350 125

275
6250
150
SAND 150
SECTION 1250 PLAN

Junior Engineer, Asst.Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi
TYPE-I

NT) FROM 0/00 to 1/000 (BALLEL TO DORAPUT)

NOT TO SCALE
MSA - 2.00

M THICK SDBC WITH USING CRRI BITCHEM BINDER CBR- 5%


0.025 TAILOR
M
0.075 M THICK WMM LAYER
M THICK NANO-TECHNOLOGY STABILIZED
0.125 T
LAYER
H
M THICK NANO-TECHNOLOGY STABILIZED
0.100 I
LAYER
0.075 M THICK MOORUM ON SHOULDER C
K

G
S
B
###
G
R
A
D
1.425 I
N
G
-
I
V
Executive Engineer
R.&B. Division , Koraput
TYPE-II

FROM 1/000 TO 1/048 (BALLEL TO DORAPUT)

0.150 M THICK PQC


M
0.150 M THICK DLC
0.100 M THICK SAND LAYER T
H
I
C
K

G
S
B
###
G
R
A
1.400
D
I
N
G
-
I
V
Executive Engineer
R.&B. Division , Koraput
850
400

###
275

###

###
275

LAN
###

Executive Engineer
R.&B. Division , Koraput
ZYDEX INDUSTRIES
RATE ANALYSIS FOR RURAL ROADS
Sl. No. SDB Sl. MORD
DESCRIPTION Dosage with Unit Unit Quantity Basic Rates Amount in Rs
No. Ref No.
WATERPROOFING WITH NANOTECHNOLOGY
Waterproofing on top of the prepared sub Grade with Nano technology based "Terrasil" Organo silane nanotechnology & "Zycobond" nano
acrylic co-polymer with water (<1000 ppm TDS) in the ratio of 1:1:200 @ 3 ltrs/sqm as per direction of the Engineer-in-charge. (IRC
accreditation of Terrasil is : IRC-24(7)/2017 (ACC-224) and Zycobond is : IRC-24(7)/2017 (ACC-225))

Unit = Sqm 7000


Talking output = 7000 Sqm
a) Labour
Mazdoor (Skilled) day 2.00 320.00 640.00
mazdoor(Unskilled) day 3.00 280.00 840.00
b) Machinery
Three wheel 80-100 kN vibratory roller @ 60 cum per hour hr 1.00 864.35 864.35

Water tanker 6 kl capacity 24 kl*trip/day hr 7.000 506.09 3,542.63

c) Material
Organo silane Nanotechnology (Terrasil) Kg 105.00 550.00 57,750.00
Nano Acrylic Co-polymer (Zycobond) Kg 105.00 180.00 18,900.00
Water kl 21.000 10.00 210.00
Total 82,746.98
d) Overhead Charges and contactor profit @ 15% 15.00% 12,412.05
Rate Cost for 7000 Sqm = a+b+c 95,159.03
Rate per sqm = (a+b+c+d)/7000 13.59
Labour welfare Cess 1% 1% 0.14
Total Cost per Sqm including labour Cess = Sqm 13.73
Total Cost Per Sqm 13.73

Page 25 of 641
ZYDEX INDUSTRIES
RATE ANALYSIS FOR RURAL ROADS
Sl. No. SDB Sl. MORD
DESCRIPTION Dosage with Unit Unit Quantity Basic Rates Amount in Rs
No. Ref No.
5.2 503 Prime Coat (Low Porosity) with Nanotechnology
Prime Coat : Preparing and applying of water soluble Terraprime organo silane nanotechnology (for bitumen emulsion application, IRC
approved) with cationic bitumen emulsion CSS1 and water (<1000 ppm TDS) in the ratio of 1 kg silane : 100 kg cationic bitumen emulsion :
200 liter water . Take 1 kg of silane nanotechnology and add in 200 liter water while filling water in tanker/drum and then add 100 kg
cationic bitumen emulsion under circulation. Mix the solution completely. Spray the solution at the rate of 1 liter per sqm on compacted
stone base. Check quality of bitumen emulsion before bulk use.
Terraprime IRC accreditation : IRC-24(7)/2017 (ACC-234)

Unit = sqm
Taking output = 1750 sqm
a)  Labour
Mate day 0.04 320.00 12.80
Mazdoor (Unskilled) day 1.00 280.00 280.00
b) Machinery
Hydraulic broom @ 1250 sqm per hour 1250 sqm/hr hour 1.40 200.00 280.00
Air compressor 210 cfm hour 1.40 179.13 250.78
Bitumen emulsion pressure distributor @ 1750 sqm per hour 1750 sqm/hr hour 1.00 448.70 448.70
Water tanker 6 kl capacity 1 trip per hour 6 kl hour 0.19 506.09 96.16
c) Material
Bitumen emulsion (SS-1) (Solution Sray @1 kg per sqm ) 1 kg/sqm t 0.58 26578.20 15415.36
Organosilane nanotechnology (Terraprime) Kg 5.80 1016.95 5898.31
Water KL 1.17 10.00 11.70
d) Overhead Charges and contactor profit @ 15% 15.00% 3404.07
e) Royality of Material
Total 26097.88
Cost per Sqm (a+b+c+d+e)/1750 14.91
labour Cess 1% 1% 0.15
Total Cost per Sqm including labour Cess 15.06
Total Cost per sqm 15.06

Page 26 of 641
RATE ANALYSIS FOR RURAL ROADS
Sl. No. SDB Sl. MORD
DESCRIPTION Dosage with Unit Unit Quantity Basic Rates Amount in Rs
No. Ref No.
508 Semi Dense Bituminous Concrete with Zydex Nano-Technology
SDBC with Nanotechnology
Providing and laying semi dense bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with
bituminous binder of 60/70 penetration grade of bitumen and mixed with Nano Technology Based Organo Silane Compound @ 0.1% by the
weight of bitumen for enhansed performance and durability , transporting the hot mix to work site, laying with a hydrostatic paver finisher
with sensor control to the required grade, level and alignment, rolling with smooth wheelede, vibratory and tandem rollers to achieve the
desired compaction as per Clause 508 of MoSRT&H Specifications for Road & Bridge works (4th Revision) AR-175/47
ZycoTherm
IRC accreditation : IRC-24(7) / 2017 (ACC-248)

By Mechanical Means
Bitumen (S-65)
Unit = sqm
Taking output = 195 cum (450 tonnes)
a) Labour
Mate day 0.76 320.0 243.20
day 14.00

Mulia unskilled working with HMP,mechanical broom, paver, 3,920.00


roller, asphalt cutter and assistance for setting out lines, levels
and layout 280.0
Mulia Skilled for checking line & levels day 5.00 370.0 1,850.00
b) Machinery
Batch mix HMP 100-120 THP @ 75 t per hour actual output hour 6.00
58,262.58
9710.43
Paver finisher hydrostatic with sensor control @ 75 cum per hour hour 6.00 1500.00 9,000.00
Generator 250 KVA hour 6.00 978.26 5,869.56
Front end loader 1 cum bucket hour 6.00 452.17 2,713.02
Tipper 10 tonne capacity tonne.km 2250 2.17 4,882.50
Add 10 per cent of cost of carriage to cover cost of loading and unloading 90.00
Smooth wheeled roller 8-10 tonnes for initial break down rolling hour 3.90
1,149.64
(6.00 X 0.65* = 3.90) 294.78
Vibratory roller 8 tonnes for intermediate rolling (6.00 x 0.65* = hour 3.90
3.90) 864.35
Finish rolling with 6-8 tonnes smooth wheeled tandem roller. hour 3.90
Page 27 of 641 2,502.79
(6.00 x 0.65* = 3.90) 641.74
c) Material
ZYDEX INDUSTRIES
RATE ANALYSIS FOR RURAL ROADS
Nano-Technology Stabilized Sub-Base
SDB Sl. MORD Rate
No. Ref No. Amount in
Description Dosage with unit Unit Quantity without
Rs
Taxes
2 Stabilized Sub base with Nano-technology
Stabilized Sub- Base: Providing, Laying, Spreading and Compacting 70% borrow area moorum/ granular soil of CBR >5%
mixed with 30% GSB Grade-II as per mix design.
Application: To be done in two seperate layers of 125 mm each with the mentioned appplication procedure
(1) Rip and loosen soil with excavator / tractor operated ripper and scarify with tractor operated rotavator to achieve
desired thickness. Mix aggregates as per mix design with rotavator.
(2) Spread percentage of Cement as per mix design by weight of soil aggregate mix and mix with tractor operated rotavator.
(3) Prepare and apply 1.0 kg /cum organosilane Nanotechnology and 1.0 kg/cum acrylic copolymer mixed in OMC water
(<1000 ppm TDS) on loose mix . Scarify the treated mix with rotavator.
(4).Compact the stabilized soil-aggregate-cement base with 8 to 10 tonne vibratory roller to achieve stone embedded layer
with the desired density and thickness.
Rates include all material, labour, hire charges of machinery etc. as per State SOR
IRC accreditation of Terrasil is : IRC-24(7)/2017 (ACC-224) and Zycobond is : IRC-24(7)/2017 (ACC-225)

Unit = cum
Width m 5.8
Taking output = 300 cum cum 300
a) Labour
Mate day 0.48 320.00 153.60
Mazdoor (Skilled) day 2 370.00 740.00
Mazdoor (Unskilled) day 14.65 280.00 4102.00
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/hr hour 3 730.43 2191.29
Tipper 5.5 cum with 10t capacity (4 trips per hou 5.5 cum hour 13.64 506.09 6903.07
Dozer for spreading @ 200 cum per hour 200 cum/hr hour 1.50 1592.17 2388.26
Motor grader 110 HP @ 50 cum per hour 50 cum/hr hour 4 1343.48 5373.92
Three wheel 80-100 kN vibratory roller @ 100
hour 3 864.35 2593.05
cum per hour 100 cum/hr
Water tanker 6 kl capacity truck mounted 6 Kl/hr hour 10.76 506.09 5445.53
Tractor with ripper @ 60 cum per hour 60 cum/hr hour 5 216.52 1082.60
Tractor with Rotavater @ 25 cum per hour 25 cum/hr hour 12 411.31 4935.72
c) Material
Cement (At Site) 3% T 18.45 6044.03 111512.35
Organo silane nanotechnology (Terrasil) 1 kg/cum Kg 300.00 550.00 165000.00
Nano Acrylic Co-polymer (Zycobond) 1 kg/cum Kg 300.00 180.00 54000.00
Moorum @ 70% cum 252.00 241.29 60805.08
GSB material Grade2 / Crushed Aggregate @
cum 108.00
30%
26.5 mm to 9.5 mm @ 35 per cent cum 37.80 1770.75 66934.35
9.5 mm to 2.36 mm @ 25 per cent cum 27.00 1765.04 47656.08
2.36 mm below @ 40 per cent cum 43.20 909.32 39282.62
Water 10.5 % kl 64.58 10.00 645.80
Total Cost 581745.32
Overhead Charges & Contractors Profit@15%
87261.80
d) on a+b+c+d
e) Royality of Material
Moorum @ 70% cum 252.00 35.00 8820.00
GSB material Grade2 / Crushed Aggregate @ 30% cum 108.00 130.00 14040.00

Cost for 300 cum = a+b+c+d 691867.12


Cost per cum 2306.22
Add Labour Cess@ 1% 23.06
TOTAL COST PER CUM including Labour Cess 2329.28
Total Cost per cum 2329.28
ZYDEX INDUSTRIES
RATE ANALYSIS FOR RURAL ROADS
Nano-Technology Stabilized Base
SDB Sl. MORD Rate
No. Ref No. Amount in
Description Dosage with unit Unit Quantity without
Rs
Taxes
2 Stabilized Base: WITH NANOTECHNOLOGY
Stabilized Base: Providing, Laying, Spreading and Compacting 70% borrow area moorum/ granular soil of CBR
>5% mixed with 30% GSB Grade-II as per mix design.
Application: To be done in Single layers of 85 mm with the mentioned appplication procedure
(1) Rip and loosen soil with excavator / tractor operated ripper and scarify with tractor operated rotavator to
achieve desired thickness. Mix aggregates as per mix design with rotavator.
(2) Spread percentage of Cement as per mix design by weight of soil aggregate mix and mix with tractor operated
rotavator.
(3) Prepare and apply 1.0 kg /cum organosilane Nanotechnology and 1.0 kg/cum acrylic copolymer mixed in
OMC water (<1000 ppm TDS) on loose mix . Scarify the treated mix with rotavator.
(4).Compact the stabilized soil-aggregate-cement base with 8 to 10 tonne vibratory roller to achieve stone
embedded layer with the desired density and thickness.
Waterproof the top of the compacted stabilized base (2nd layer only) with organosilane & nano acrylic Polymer in
the ratio of 1 kg organosilane :1 kg nano acrylic Co-Polymer : 200 liter water (<1000 ppm TDS) @ 3ltrs/sqm in two
spray applications (1.5 ltrs. + 1.5 ltrs.).
Rates include all material, labour, hire charges of machinery etc. as per State SOR.
IRC accreditation of Terrasil is : IRC-24(7)/2017 (ACC-224) and Zycobond is : IRC-24(7)/2017 (ACC-225)

Unit = cum
Width m 5.5
Taking output = 300 cum cum 300
a) Labour
Mate day 0.48 320.00 153.60
Mazdoor (Skilled) day 2 370.00 740.00
Mazdoor (Unskilled) day 14.65 280.00 4102.00
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @ 100 cum/hr hour 3 730.43 2191.29
Tipper 5.5 cum with 10t capacity (4 trips per hou 5.5 cum hour 13.64 506.09 6903.07
Dozer for spreading @ 200 cum per hour 200 cum/hr hour 1.50 1592.17 2388.26
Motor grader 110 HP @ 50 cum per hour 50 cum/hr hour 4 1343.48 5373.92
Three wheel 80-100 kN vibratory roller @ 100
hour 3 864.35 2593.05
cum per hour 100 cum/hr
Water tanker 6 kl capacity truck mounted 6 Kl/hr hour 10.94 506.09 5536.62
Tractor with ripper @ 60 cum per hour 60 cum/hr hour 5 216.52 1082.60
Tractor with Rotavater @ 25 cum per hour 25 cum/hr hour 12 411.31 4935.72
c) Material
Cement (At Site) 4% T 24.6 6044.03 148683.14
Organo silane nanotechnology (Terrasil) 1 kg/cum Kg 305.29 550.00 167909.50
Nano Acrylic Co-polymer (Zycobond) 1 kg/cum Kg 305.29 180.00 54952.20
Moorum @ 70% cum 252.00 241.29 60805.08
GSB material Grade2 / Crushed Aggregate @
cum 108.00
30%
26.5 mm to 9.5 mm @ 35 per cent cum 37.80 1770.75 66934.35
9.5 mm to 2.36 mm @ 25 per cent cum 27.00 1765.04 47656.08
2.36 mm below @ 40 per cent cum 43.20 909.32 39282.62
Water 10.5 % kl 65.63 10.00 656.30
Total Cost 622879.40
Overhead Charges & Contractors Profit@15%
93431.91
d) on a+b+c+d
e) Royality of Material
Moorum @ 70% cum 252.00 35.00 8820.00
GSB material Grade2 / Crushed Aggregate @ 30% cum 108.00 130.00 14040.00

Cost for 300 cum = a+b+c+d 739171.31


Cost per cum 2463.90
Add Labour Cess@ 1% 24.64
TOTAL COST PER CUM including Labour Cess 2488.54
Total Cost per cum 2488.54
EXTENSION RCC slab culvert ( 2.0 x 2.0) at Km 0/322

1 Dismantling of existing structures like No of CD 1 nos


culverts,bridges,retaining walls and other
structure comprising of masonry,cement
concrete,wood work,steel work,including T&P and
scaffolding wherever necessary,sorting the
dismantled material,disposal of unserviceable
material and stacking theunserviceable material
with all lifts and lead of 1000m as per Technical
specification clause202.1

Wing wall CC M15 & M-20)


4 x 5.00 x 1.24 x 3.40 84.32 cum
2 x 4.00 x 0.40 x 0.40 Parapet 1.28 cum
85.60 cum
Quantity for 1 nos 85.60 cum @R. 390.47 /cum R 33424.23
2 Excavation for roadwork in soil with hydraulic excavator
of 0.9 cum bucket capacity including cutting and loading
in tippers, trimming bottom and side slopes, in
accordance with requirements of lines, grades and cross
sections, and transporting to the embankment location
within all lifts and lead upto 1000m as per Data Book
Cl.302. 3.5 (iii) Unit-1 cum Data for 360cum

a Abutment 4 x 2.25 x 3.00 x 1.80 48.600 cum


b Wingwall 4 x (3.50 -0.400) x 2.28 x 1.35 38.170 cum
c Cutoff wall DS 1 x 3.00 x 1.50 x 2.80 12.600 cum
d Cutoff wall US 1 x 3.00 x 1.50 x 2.30 10.350 cum
e DS floor 1 x 4.80 x 2.40 x 0.45 5.180 cum
f US floor 1 x 4.80 x 2.10 x 0.45 4.540 cum
Total 119.44 cum
Quantity for 1 nos 119.44 cum @R. 34.85 /cum R 4162.48
3 Filling in foundation trenches as per drawing and
technical specification clause 305.3.9

A Below PCC
i Abutment 1 x 4 x 2.25 x 3.00 x 0.15 4.050 cum
ii Wing wall 4 x (3.50 -0.400) x 2.28 x 0.15 4.240 cum
8.29 cum
Quantity for 1 nos 8.29 cum @R. 0.00 /cum R 0.00
4 Providing CC 1:3:6 for plain/reinforced concrete in open
foundations complete as per drawings and technical
specification clause 802,803,1202,1203

a Below PCC
i Abutment 1 x 4 x 2.25 x 3.00 x 0.15 4.050 cum
ii Inner floor 2 x 2.25 x 2.30 x 0.15 1.550 cum
iii DS floor 1 x 4.80 x 2.40 x 0.15 1.730 cum
US floor 1 x 4.80 x 2.10 x 0.15 1.510 cum
Total 8.84 cum
Quantity for 1 nos 8.84 cum @R. 4261.76 /cum R 37673.96
5 Plain cement concrete 1:2:4 nominal mix in foundation
with crushed stone aggregates to 40mm nominal size
mechanically mixed placed in foundation and compacted
by vibration including curing for 14 daysas per
specifcation and direction of the Engineer-in-charge

A Below Bed level (Upto GL)


i Abutment
1st.Footing 1 x 4 x 2.25 x 2.80 x 0.20 = 5.040 cum
2nd.Footing 1 x 4 x 2.25 x 2.40 x 0.20 = 4.320 cum
3rd footing 1 x 4 x 2.25 x 2.00 x 0.40 = 7.200 cum
4th footing 1 x 4 x 2.25 x 1.60 x 0.40 = 5.760 cum

iii Wing wall


1st.footing 4 x (3.50 -0.200) x 2.48 x 0.15 5.510 cum
2nd footing 4 x (3.50 -0.400) x 1.88 x 0.40 11.730 cum
3rd footing 4 x (3.50 -0.400) x 0.40 x 0.40 2.500 cum
iv Cutoff wall DS
1st.Footing 0 x 1 x 3.00 x 1.50 x 0.80 = 3.600 cum
2nd footing 0 x 1 x 3.00 x 0.45 x 0.75 = 1.010 cum
3rd Footing 0 x 1 x 3.00 x 0.20 x 0.45 = 0.270 cum
v Cutoff wall US
1st.Footing ### x 1 x 3.00 x 1.50 x 0.80 = 3.600 cum
2nd footing ### x 1 x 3.00 x 0.45 x 0.75 = 1.010 cum
3rd footing 0 x 1 x 3.00 x 0.20 x 0.45 = 0.270 cum
51.820 cum
Quantity for 1 nos 51.82 cum @R. 4639.31 /cum R 240409.04
6 Providing concrete 1:2:4 in open superstructure complete
as per drawings and technical specification clause
800,1205.4,1205.5

A Above GL
i Abutment 1.60 + 0.765 14.870 cum
1 x 4 x 2.25 x 1.400
2 1.18
Wing Wall 3.50 + 2.60 1.48 + 0.50 27.660 cum
4 x x x 2.290
2 3.05 2 0.99
42.530 cum
Quantity for 1 nos 42.53 cum @R. 4919.58 /cum R 209229.74
7 Reinforcement cement concrete M-25 nominal mix in
Superstructure with crushed stone aggregates to 40mm
nominal size mechanically mixed placed in foundation
and compacted by vibration including curing for 14 days
as per section specifcation and direction of the Engineer-
in-charge

Dirt Wall 0.465 + 0.30 2.210 cum


1 x 4 x 2.25 x 0.645
2 0.38
Bed Block 1 x 4 x 2.25 x 0.375 x 0.300 = 1.010 cum
Deck slab 1 x 2 x 2.25 x 10.80 x 0.215 = 10.450 cum
Kerbs 1 x 2 x 3.00 x 0.150 x 0.150 = 0.140 cum
Parapets 1 x 2 x 3.00 x 0.400 x 0.600 = 1.440 cum
15.250 cum
Quantity for 1 nos 15.25 cum @R. 6762.60 /cum R 103129.65
8 RCC Grade M-30 in wearing coat including dewatering
farm work and mixing CM with concrete Mixer and
complete as per Data book Sr. 13.2 492 Sr.14.4 (Ref.to
complete as per Data book Sr. 13.2 492 Sr.14.4 (Ref.to
Book P.477 Sr. 14.1 (C) Clause 1500, 1600 & 1700 Unit= 1
cum
Over deck 1 x 10.80 x 7.20 x 0.075 = 5.83 cum
Quantity for 1 nos 5.83 cum @R. 6041.08 /cum R 35219.50
9 Supplying, fitting and placing HYSD bar reinforcement in
superstructure complete as per drawings and technical
specifications Clause 1002,1010,1202.

A Skin reinforcement
Abt Outer 1 x 4 x 2.25 x 2.000 = 18.00 sqm
4 x 2.25 x 1.400 = 12.60 sqm
Abt Inner 1 x 4 x 2.25 x 3.150 = 28.35 sqm

Abt Face 4 x 2.80 x 1.10 = 12.32 sqm


4 x1.60 + 0.765 x 3.150 = 14.87 sqm
2 1.18
Wing Wall Upto Hauch
b Wing wall 4 x (3.50 -0.200) x 0.15 x 2Side 4.44 sqm
4 x (3.50 -0.400) x 0.40 x 2Side 12.48 sqm
4 x (3.50 -0.600) x 0.40 x 2Side 13.12 sqm
Above Hunch
Wing Out/ Inn 4 x (3.50 + 3.100 x 2.290 = 30.23 sqm
2 3.3
Wing Face 4 x 2.28 x 0.15 = 1.37 sqm
4 x 1.88 x 0.40 = 3.01 sqm
4 x 1.88 + 1.48 x 0.40 = 2.69 sqm
2 1.68
4 x 1.48 + 0.50 x 2.290 = 9.07 sqm
2 0.99
162.55 sqm
162.55 sqm @ 5.00 Kg/sqm 812.75 Kg
B Dirt wall, RCC slab, Kerb & Parapet
Vide item- 6 15.250 cum @ 100 Kg/cum 1525.00 Kg
C Wearing coat
Vide item- 7 5.830 cum @ 65 Kg/cum 378.95 Kg
2716.70 kg
27.17 Qntl
Quantity for 1 nos 27.17 Qnt @R. 5559.43 /Qnt R 151049.71
10 Providing weepholes in brick masonary / stone
masonary/plain/ reinforced concrete abutment, wingwall
, return wall with 100mm dia. AC pipeextending through
the full width of the structure with slope of 1(V):20(H)
towards drawing face complete as per drawing and
technical specification Clause 614,709,1204.3.7

a Abutment 1 x 4 x 3.0 12.00 nos


b Wing wall 1 x 4 x 2.00 8.00 nos
20.00 nos
Quantity for 1 nos 20.00 nos @R. 219.98 /Ech R 4399.60
0.00
R

Junior Engineer, Assistant Executive Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
33424.23

4162.48

0.00
37673.96
240409.04

209229.74

103129.65
35219.50
151049.71

4399.60
0.00

neer
oraput
Type of C.D.Works :- 1000mm Dia. Single Row H.P. Culvert

Pakage No: OR19RCPL- Block:- LAMTAPUT Dist:-

ANKADELI DOWN COB To ANKADELI TOP

At Chainages (M): 0/800 , 1/375, 1/555, 1/600, 1/975


Sl. Description of item Nos Length Width Ht./ Th, Unit Quantity
No. in M. in M. in M Quantity
1 2 3 4 5 6 7

1 Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and
technical specification Clause 1104 includding setting out, construction of shoring and bracing,
removal of stumps and other deleterious matter, dressing of sides and b

Head wall 2x 6.85 x 1.25 x 1.10Cum = 18.84


bed
2x 7.2 x 2.25 x 0.50Cum = 16.20
appron U/s 0x 6.20 x 1.50 x 0.30Cum = 0.00
appron D/s 0x 6.20 x 2.00 x 0.30Cum = 0.00
Toe wall 0x 6.20 x 0.6 x 0.30Cum = 0.00
Total 35.04
3 Providing 1:3:6 Grade concrete for plain concrete in open foundations complete as per
drawings and technical specification clause 802,803,1202,1203

Head wall
2x 6.85 x 1.25 x 0.15Cum = 2.57
Bed for HP
2x 7.20 x 2.25 x 0.15Cum = 4.86
7.43
4 Providing and laying reinforced cement concrete pipe NP4 of 1000mm dia. for culverts on first
class bedding of granular material in single row including fixing collar with cement mortar 1:2
but excluding excavation, protection works, backfilling, concrete

4x 2.5 RM = 10
5 Plain cement concrete in sub structure, Nominal mix (1:2:4) complete as per drawings and
technical specification Clauses 802, 804, 805, 806, 807, 1202 and 1204

Head wall 2x 6.85 x 0.825 x 2.05Cum = 23.17


Parapet
2x 6.85 x 0.4 x 0.5Cum = 2.74
pipe joint
2x 2.23 x 1.53 x 0.2Cum = 1.36
Deduct for pipe at joint
2x 0.2 x p/4 x 1.23 2Cum = 0.48
Deduct for pipe
2x 0.875 x p/4 x 1.23 2Cum = 2.08
Total Cum = 24.71
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork
and Dismantling of Masonry Works as per Technical Specification Clause 202 of MoRD
excluding cost of excavation of earth,dismantling of stone masonry in headwall & protective
work
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork
and Dismantling of Masonry Works as per Technical Specification Clause 202 of MoRD
excluding cost of excavation of earth,dismantling of stone masonry in headwall & protective
work

600 mm dia 1 x 2 x 2.5 5.00

Cost of each culvert,(1x1000 dia.) in Rs.


So Cost for 5 Nos in Rs.

Junior Engineer Assistant Exe. Engineer Executive Engin


R&B. Section, Nandapur R.&B
R.&B
. Sub-Div
. Sub-Division,koraput R.&B. Division ,ko
KORAPUT

TOP

Total Rate Amount


Quantity Rs. Rs
8 9 10

35.04 34.85 1,221.14

7.43 4,261.76 31,664.88

10.00 7,575.27 75,752.70

(-)

(-)
24.71 4,639.31 114,637.35
5.00 176.55 882.75

Total cost Rs. 224,158.82

224,159.00
1,120,795.00

Executive Engineer
R.&B. Division ,koraput
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCP
COST ESTIMATE FOR CONSTRUCTION OF PROTECTION WORKS

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP


total 100 mtr
1 Earth work in excavation for foundation of structures upto 3 m depth as per
drawing and technical specification Clause 1104 including setting out,
construction of shoring and bracing, removal of stumps and other
deleterious matter, dressing of sides, bottom

1 100.00 1.00 0.700 Cum 70.00

2
Providing concrete for plain concrete of 1:2:4 in open foundations complete as
per drawings and technical specification clause 802,803,1202,1203
Footing Base 1 100.00 1.00 0.15 Cum 15.00
wall
1 100.00 (0.5+0.3)/2 1.00 Cum 40.00

Cum 55.00

Total

Junior Engineer Assistant Exe. Engineer Executive Eng


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , K
IM AREA (RCPLWE)
N WORKS

34.85 2439.50

4489.61 246928.55

Rs 249368.00

Executive Engineer
R.&B. Division , Koraput
Page 21

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

120.00 mtr
Total 120.00 Mtr
1 Earthwork in excavation for foundation of structures in all
types of soil as per drawing and technical specification
Clause 305 and 1104 of MoRD includding setting out,
construction of shoring and bracing, removal of stumps and
other deleterious material and disposal upto all lead & lift,
dressing of sides and bottom and back filling with excavated
suitable material upto 3mt. as per direction of Engineer-in-
Charge.

1 x 120.0 x 0.85 x 0.80 = 81.60 cum


81.60 cum @R 34.85 /cum R 2,843.76
3 Plain cement concrete 1:3:6 Nominal mix in foundation
with crushed stone aggregates 40mm nominal size
mechanically mixed placed in foundation and compacted by
vibration including curring for 14 days

1 x 120.0 x 0.85 x 0.10 = 10.20 cum


10.20 cum @R 4261.76 /cum R 43,469.95
4 Plain cement concrete 1:2:4 nominal mix in foundation
with crushed stone aggregates to 40mm nominal size
mechanically mixed placed in foundation and compacted by
vibration including curing for 14 daysas per specifcation
and direction of the Engineer-in-charge

I Bed concrete
1 x 120.0 x 0.85 x 0.15 = 15.30 cum

II Side wall
2 x 120.0 x 0.15 x 0.45 = 16.20 cum

III Cover slab


1 x 48.0 x 0.75 x 0.100 40% 1.44 cum
32.94 cum @R 4489.61 /cum R 147,887.75
Page 22

5 Supplying, fitting and placing HYSD bar reinforcement (Fe


415) complete as per drawings and MORD technical
specification Clauses 1000,1200 as per direction of the
Engineer in charge

F&W 0.00 cum @ 0.40/Qntl/cum 0.000 qnt


Slab 32.94 cum @ 0.50/Qntl/cum 16.470 qnt
16.470 qnt
or Say 16.47 Qntl @R 5559.43 /Qntl R 91,563.81

6 Providing weep holes in brick masonry / plain or RCC


abutment, wing wall and return wall with 100mm dia AC
pipe extending through the full width of structure with slope
of 1V : 20H towards draining face complete as per drawing
and technical specification

2 x 50.0 x 0.15 = 15.00 mtr


15.00 mtr @R 219.98 /mtr R 3,299.70
R 289,064.97

0.15 0.45 0.15 M-20 COVER SLAB

0.45
0.45 0.80

1:2:4 0.15
0.05

100 MM 1:3:6 0.10

0.85

TYPICAL CROSS SECTION OF CRONCRETE DRAIN


Page 23

2,843.76

43,469.95

147,887.75
Page 24

91,563.81

3,299.70
289,064.97
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE
COST ESTIMATE FOR SAUCER DRAIN WORK

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP


Pakage No: OR19RCPL-16 chainage (m)
DISTRICT :- KORAPUT 1000-1048 both side 48
BLOCK :- LAMTAPUT

SL. Description of item Nos. Length Width Thick Unit Quantity


NO (in Mtr.) (in ness
Total Length of Drain= 120 Mtr Mtr.) (in
Mtr.)
Earthwork in excavation for structures as per drawing and
technical specifications Clause 305.1 including setting out,
construction of shoring and bracing, removal of stumps M-10
1 and other deleterious material and disposal upto a lead of
50 m, dressing of side

1 120.00 1.200 0.150 Cum 21.60

2 Providing 1:3:6 concrete for plain/reinforced concrete in


open foundations complete as per drawings and technical
specification clause 802,803,1202,1203
Bottom Base 1 120.00 1.200 0.100 Cum 14.40
Plain cement concrete 1:2:4 nominal mix with crushed
stone aggregates to 40mm nominal size mechanically
3 mixed placed in substructure and compacted by vibration
including curing for 14 days

1 120.00 1.20 0.250 Cum 36.00


Less Semi circular portion PI x (a x b)
Drain 1 120.00 3.14 0.053 ½ Cum -9.99
. 26.01
O O O
S S S
T T T

Junior Engineer Assistant Exe. Engineer Executiv


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Divis
(RCPLWE)

Rate Amount
(in (in Rs.)
Rs.)

34.85 752.76

4261.76 61369.34

4489.61 116774.7561

Total :- 0.00

Executive Engineer
R.&B. Division , Koraput
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLW
QUANTITY EARTH WORK CALCULATION
Pakage No: OR19RCPL-16 Block:- LAMTAPUT

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

Total length of road 2.225 M


Length of Flexible pavement 2.165 M
Length of Rigid pavement 0.06 M
A From Software
Gross Quantity of earth work :-
Crust Fill at cutting :-
Gross Area of Turfing :-
Deductions :-
A Quantity of Sub-base for B.T.Road :-
B Quantity of WmM for B.T.Road :-
C Quantity B.T. :-
C Quantity C.C. :-
H Qty. vide excavation of E.W from 1000mm Dia Single Row 35.04

K Qty. vide excavation of E.W from RCC/BOX Culvert 0.000

L Qty. vide excavation of E.W from Drain 81.60

M Qty. vide excavation of E.W from Protection Wall 70.00


N Qty. vide excavation of E.W from C.C.Road 4177.000
Total Deductions :-

Net Quantity of Earth Work :-

With a lead upto 1000 m

Junior Engineer Assistant Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi
EMISIM AREA (RCPLWE)
ATION
Dist:- KORAPUT

o ANKADELI TOP

21523.975 Cum
12985.574 Cum
0.000 Sqm

1229.360 Cum

2720.150 Cum

888.938 Cum

45.660 Cum

17.520 Cum

0.000 Cum

40.800 Cum

35.000 Cum
2088.500 Cum
13558.715 Cum

7965.260 Cum

7965.260 Cum

Executive Engineer
R.&B. Division , Koraput
ANALYSIS OF RATES KORAPUT
Pakage No: OR19RCPL-16 LAMTAPUT
Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
Sl. Refere Description Unit Rate (Rs.)
No nce to
MORD
Specifi
cation
1 (i) Loading of Earth, Sand, Moorum, Manure, Flyash Manual Means including a le Rs.
(ii) Unloading of Earth, Sand, Moorum, Manure, Flyash Manual Means including a Rs.
2 Clearing and grubbing road land
a. Clearing and grubbing road land including uprooting w Rs.
b. In area of thorny jungle Rs.
c Clearing grass and removal of rubbish up to a distance of 30 m outside the
periphery of the area as per Technical Specification Clause 201. Rs.

Removal of telephone / electric poles with wires including excavation and


dismentalling of foundation conrete and lines under the supervision of concerned
3 department,disposal with all lifts and upto a lead of 1000m and stacking the Rs.
serviceable and unserviceable material separately as per Technical Specification
Clause 202.3

4 a Excavation for roadway in soil using manual means for carrying of cut earth to emb Rs.
b. Excavation in Soil in Hilly Area by Mechanical Means including Cutting and Trimming Rs.
c Excavation in Hard Rock (blasting prohibited by mechanical means) as per technical Rs.
d Construction of embankment with approved materials deposited at site from roadway Rs.

e Excavation in Hilly Area in Ordinary Rock not requiring Blastig by Mechanical Mea Rs.
f Earthwork in excavation for structures as per drawing and technical specifications C
Rs.

5 a Construction of embankment with approaved materials obtained from borrow pits with
Rs.

b Construction of embankment with approaved materials deposited at site from roadw


Rs.

c Construction of Shoulder with approaved materials like Moorum obtained from locality
Rs.

Construction of gravel/soil aggregate sub-base / base by providing well graded ma


6 Rs.
7 a WBM Grading 2 ,Providing, laying, spreading and compacting stone aggregate of spec Rs.
b WBM Grading 3 ,Providing, laying, spreading and compacting stone aggregate of spec Rs.
8 a (ii)Low Porosity ,Providing and applying Primer coat with bitumen emulsion (SS-1) o Rs.
b Providing and applying Tack coat with bitumen (RS-1) using emulsion distrubutor at
Rs.
c Providing ,laying and rolling of Open Graded Pre-Mix Carpet of 20mm thickness compo
Rs.

d Providing and laying Seal Coat and sealing the voids in a bituminous surface laid to Rs.
9 Construction of un-reinforced, dowel jointed at expansion and construction joint o Rs.
10 Fine dressing and turfing including transportation by mechanical means with all leads Rs.
11 Earth work in excavation for structures upto 3 m depth as per drawing and technica Rs.
12 Filling in foundation trenches as per drawing and technical specification clause 305
Rs.

13 Providing PCC M-10 concrete for plain/reinforced concrete in open foundations com
Rs.
II P.C.C. Grade M 15 Rs.
(i) Nominal Mix 1:2.5:5 Rs.
III P.C.C. Grade M 20 Rs.
IV R.C.C. Grade M 20 Rs.
V R.C.C. Grade M 25 Rs.
14 Supplying, fitting and placing HYSD bar reinforcement in foundation complete Rs.
15 1100 Providing and laying reinforced cement concrete pipe NP3 for culverts on first
class bedding of granular material in single row including fixing colar with cement Rs.
mortar 1:2 but excluding excavation,protection works,backfilling, concrete and
masonarya) work
1000 mm dia.
in head wall and parapet Clause 1106 Rs.
b) 600 mm dia. Rs.
LOGO ,SIGN BOARD KM. STONE & 200 M STONE
Providing and fixing typical PMGSY informatory sign board with Logo as per MORD Rs.
16
Painting two coats including primer coat after filling the surface with synthetic en
Rs.
17
Printing New letters and figures of any shade with synthetic enamel paint black o
Rs.
19
Printing New letters and figures of any shade with synthetic enamel paint black o
Rs.
20

21 Kilometer stone
Reinforced Cement Concrete M15 grade kilometer stone / local stone of standard desi
i) 5th Kilometer stone (Precast) Rs.
ii) Ordinary Kilometer stone (Precast) Rs.
iii) 200m stone (Precast) Rs.
22 Boundary Pillar Rs.
Reinforced cement concrete M15 grade Guard stone/local stone of standard
design as per IRC:25 fixed position including finishing and lettering but excluding
painting as per drawing and Technical specification Clause 1704 of MORD. Rs.

Providing and erecting direction and place identification of semi-reflective sign


boards as per IRC:67 made of 2mm thick M.S.sheet duly stove enamelled paint in
white colour in front and grey colour on back with red reflective boarder of 70 mm
width and required message, letters,figures with reflective engineering grade tape
as per MORD specification of required shade and colour. Supported and welded
Rs.
on 47mm x 47mm of 12 SWG Square tube of 3050mm height duly strengthened
by 25mm x 5 mm M/s flats iron on edges on back firmly fixed to the ground by
means of properly designed foundations with M-15 grade cement concrete 450mm
X 450mm x 600mm,600mm below ground level as per approved drawing and
technical specification clause 1701.
23
24 B Traffic Sign Rs.
Providing and fixing of semi-reflective cautionary,mandatiry and informatory
sign boards as per IRC:67 made of 1.5mm thick M.S.sheet duly stove in
white colour in front and grey colour on back with red reflective boarder of 65
mm width and required message, letters,figures with reflective engineering
grade tape as per Clause 1701.3.9 MORD for rural roads of required shade
and colour. Supported and welded on 47mm x 47mm of 12 SWG Square Rs.
tube firmly fixed to the ground by means of properly designed foundations
with M-15 grade cement concrete 450mm X 450mm x 600mm,600mm below
ground level as per approved drawing and technical specification clause
1701.2.2

For 900 mm Equolateral Triangle) Rs.


For 600 mm Circular Rs.
For 600mmx450mm Rs.

EXTRA ITEM FOR BRIDGE AND FOR SUB STRUCTURE (Height upto 5 mtrs for all items)

25
Providing concrete for plain/reinforced concrete in open substructure comple
I P.C.C. Grade M 10 Rs.
26 I Providing concreteM15 for plain/reinforced concrete in substructure upto 5m Rs.
(i) Nominal Mix 1:2.5:5 Rs.
II Providing concreteM20 for plain/reinforced concrete in substructure upto 5m
Rs.
(ii) Nominal Mix 1:2:4 Rs.
(iii) Providing concreteM20 for reinforced concrete in substructure upto 5m heigh Rs.

(iv) Providing concrete M25 for reinforced concrete in substructure upto 5m heig Rs.

27 Supplying, fitting and placing HYSD bar reinforcement(Fe415) in sub-structu Rs.

Providing weepholes in brick masonary / stone masonary/plain/ reinforced conc


28 Rs.
(II)
Sub-analysis Rs.
Cement mortar (1:3) (1 cement , 3 sand) Rs.
1200 Back filling behind abutment, wing wall and return
29 Rs.
1200 Providing and laying filtermedia with granular crushed aggregates as per speci
30 Rs.

EXTRA ITEM FOR BRIDGE AND FOR ANY SUPER STRUCTURE (Height more 5 mtrs for all
items)
800 Providing concrete for plain/reinforced concrete in open superstructure
31 complete as per drawings and technical specification clause
800,1205.4,1205.5
i R.C.C. Grade M 20 (Nominal Mix) Rs.
ii R.C.C. Grade M 25 Rs.
32 1000 Supplying, fitting and placing HYSD bar Rs.
reinforcement in superstructure
iii R.C.C. Grade M 30 complete as per Rs.
1300 Providing and laying boulder appron for bed protection with stone boulders of mini
33 Rs.

1300 Providing and laying pitching on slopes laid over prepared filter media as per draw
34 Rs.
As per Providing Grouting apprones and Revetment 23 cm deep with cement concrete 1:3
35 A/R Rs.
Page
a. M-10 grade of Concrete
40 Sl
36 No. 12 I P.C.C. Grade M 10 Rs.
Laying Cement concrete pipe NP3(burried conduits) on first class bedding of g
37 Rs.
Providing and laying cement concrete wearing course M-30 grade including reinfor
38 Rs.
Construction of RCC railing of M-25 grade in cast-in-situ with 20mm nominal s
39 Rs.
40 White washing of parapet walls of CD work and tree truncks Rs.
White washing two coats on parapet walls and tree trunks including preparation of s Rs.
2.5 C.M artifical stone flooring with cement concrete(1:2:4)including punning usi
41 Rs.

Providing and laying filter material underneath pitching in slopes complete a


42 Rs.
Providing (Aggregate plug) using HG Metal ( Gr - III ) on sides of drainage layer
43 Rs.

Loosening, Levelling and compacting original ground supporting embankment to faci


44 Rs.

Providing and fixing 20 mm thick compressible fibre board in expansion joint comple
45 Rs.
46 Lateraite stone masonary in cement mortor(1:6) including cost conveyance royalitie Rs.
47 20 mm thick cement plaster (1:6) for stonework including cost conveyance royalities Rs.

Wet Mix Macadam Sub-base/Base


Providing, laying, spreading and compacting graded stone aggregates to wet mix mac
48 Gravel Backing to Revetments/ underneath pitching in slopes complete as per drawi
Rs.
49 Providing supplying fitting fixing of salitex Board on the expansion joints for the b
Rs.
Junior Engineer Assistant Exe. Engineer Executive Engineer
R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
Amount (Rs.)

33.66
21.24

5.12
6.85

1.36

147.70

127.53
80.96
225.86

28.44

137.70

34.85

154.97

28.44

1695.19

812.75
3664.64
4000.34
33.52

9.62

6380.72

41.74
3700.53
17.82
323.08

671.95

4661.99
4261.76
4261.76
4639.31
5656.60
6031.16
5457.15

7575.27
8235.60
9382.78

149.83

0.88

0.53

2772.04
1701.56
447.77

622.63

1865.84

1738.79

2073.16
1511.44
1504.18

tems)

5012.36

4489.61

5520.96
5465.73

5891.38

0.00

219.98

3770.81
968.41

2445.86

5577.21
6762.60
5559.43
6602.72

2032.89

2346.66

208.63

4150.18
661.45

10502.89

2342.52

14.38

309.96

1,365.31

2029.67

20.83

266.39
5311.47
159.34

660.34

Err:509
ecutive Engineer
. Division , Koraput
Pakage No: OR19RCPL-16
Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
Sl. Description of work No. or Unit
No. Qty.

1.00 Clearing grass and removal of rubbish up to a distance of


30 m outside the periphery of the area as per Technical
Specification Clause 201 of MoRD by Manual means & as per 19395.00 Sqm
direction of the Engineer-in-Charge.

3.00
Construction of embankment with approved materials
deposited at site from roadway cutting / excavation of
foundation and Soil all lead & lift by mechanical means
graded and compacted to meet requirement of Tables 300.1
8674.61 Cum
and 300.2 as per Technical Specification Clause 301.5 &
MORD clause 301.5 as directed by Engineer in charge.

4.00 Construction of embankment with approved material obtained


from borrow pits and transporting to site with all lifts &
leads, spreading, grading to required slope and compacting to
meet requirement of Tables 300.1 and 300.2 as per Technical
Specification Clause 301.5 of MoRD & as per direction of the
Engineer-in-Charge.
4.01
With a lead By Mechanical means 7965.26 Cum
4.00 Fine dressing and turfing including transportation of turfs by
mechanical means with all leads and lifts and placing of turfs
in position and ramming with thapies including watering and
cost of labour and all materials etc. complete as per the 42135.94 Sqm
direction of the Engineer-in-Charge.

7.00 Providing and constructing well compacted drainage layer


above the subgrade of road work with approved quality of dust
free washed coarse to medium sand as per item 5.8 of SP-20
and technical specification and as per direction of the Cum
Engineer-in-Charge.

5.00 Earthwork in excavation for structures upto 3 m depth as


per drawing and technical specification Clause 305.1(11.1)
includding setting out, construction of shoring and bracing,
removal of stumps and other deleterious material and disposal
upto a lead of 50m, dressing of sides and bottom and
backfilling with approved material and as per direction of the
Engineer-in-Charge.

5.01 Ordinary Soil 1025.31 Cum


5.02 Ordinary rock (Not requiring blasting) 2597.11 Cum
5.03 Ordinary soil, Hard Soil 1298.56 Cum
5.04 Hilly Area 9089.90 Cum
7.00 Providing and laying filter media with granular crushed
aggregates as per specification to a thickness of not less than
600 mm with smaller size towards the soil and bigger size 94.20 Cum
towards the wall and providing over the entire surface behind
abutment, wing

Signature of Tenderer with seal


Sl. Description of work No. or Unit
No. Qty.

8.00 Construction of Granular Sub-base by providing well graded


granite material, spreading in uniform layers with tractor
mounted grader on prepared surface, mixing by mix in place
method with tractor mounted rotavator at OMC, and 0.00 Cum
compacting with smooth wheel roller to achieve the desired
density as per technical specification clause 401 of IRC SP-20
and as per direction of the Engineer-in-Charge.

9.00 Providing, laying, spreading and compacting stone aggregates


of specific sizes to water bound macadam specification
including spreading in uniform thickness, hand packing, rolling
with smooth wheel roller 80-100 kN in stages to proper grade
and camber, applying and brooming, stone screening/
Crushable screening to fill-up the interstices of coarse
aggregate, watering and compacting to the required density
as per Technical Specification Clause 405 of MoRD by
mechanical means and as per direction of the Engineer-in-
Charge.

Signature of Tenderer with seal


Sl. Description of work No. or Unit
No. Qty.

9.01 i) Grading No.-2 with Crushable screening


0.00 Cum
14.02 i) Grading No.-2 with Stone screening
Cum
9.02 ii) Grading No.-3 with Crushable screening 0.00 Cum
14.04 ii) Grading No.-3 with Stone screening
Cum
10.00 Painting two coats including primer coat after filling the
surface with synthetic enamel paint in all shades on new
plastered / concrete surface as per drawing and technical 31.94 Sqm
specification and as per direction of EIC.

11.00 Providing and applying primer coat with bitumen emulsion on


prepared surface of granular base including cleaning of road
surface and spraying primer at the rate of 0.70-1.0 kg/sqm
using mechanical means as per Technical Specification Clause 12089.55 Sqm
502 of MoRD and as per direction of the Engineer-in-Charge.

12.00 Providing and applying tack coat with Bitumen emulsion


using emulsion distributor at the rate of 0.20 to 0.25 kg per
sqm on the prepared bituminous primed surfaces cleaned with 12089.55 Sqm
Hydraulic broom as per Technical Specification Clause 503 of
MoRD & as per direction of the Engineer-in-Charge.
13.00 Providing, laying and rolling of open-graded premix carpet of
20 mm thickness composed of 13.2 mm to 5.6 mm aggregates
using VG-30 grade bitumen to required line, grade and level
to serve as wearing course on a previously prepared base,
including mixing in a suitable plant, laying and rolling with a
three wheel 80-100 kN static roller capacity, finished to 604.48 Sqm
required level and grades to be followed by seal coat of Type
C as per Technical Specification Clause 508 of MoRD & as
per direction of the Engineer-in-Charge.

14.00 Providing and laying seal coat sealing the voids in a


bituminous surface laid to the specified levels, grade and cross
fall using Type C as per Technical Specification Clause 510 of 0.00 Sqm
MORD with VG-30 grade bitumen & as per direction of the
Engineer-in-Charge.

Signature of Tenderer with seal


Sl. Description of work No. or Unit
No. Qty.

15.00 Construction of un-reinforced, plain cement concrete


pavement, thickness as per design, over a prepared sub base,
with 43 grade cement or any other type as per Clause
1501.2.2 M30 (Grade), coarse and fine aggregates
conforming to IS:383, maximum size of coarse aggregate not
exceeding 25 mm, mixed in a concrete mixer of not less than
0.2 cum capacity using approved mix design, laid in approved
fixed side formwork (steel channel, laying and fixing of 125
micron thick polythene film, wedges, steel plates including
levelling the formwork as per drawing), spreading the concrete
with shovels, rakes, compacted using needle, screed and plate
vibrators and finished in continuous operation including 33.66 Cum
provision of contraction and expansion, construction joints,
applying debonding strips, primer, sealant, dowel bars, near
approaches to bridge/culvert and construction joints,
admixtures as approved, curing of concrete slabs for 14-days,
curing compound (where specified) and water finishing to lines
and grade as per drawing and technical specification as per
clause 1501and direction of Engineer in Charge.

16.00 Providing and laying reinforced cement concrete pipe NP3 on


first class bedding (Type-B) of granular material in single row
including fixing collar with cement mortar 1:2 but excluding
excavation, protection works, backfilling, concrete and
masonry works in head walls and parapets Clause 1106 of
MoRD & as per direction of the Engineer-in-Charge.

16.01 1000 mm dia HPC S/R 0.00 Rmt


16.02 1000 mm dia HPC D/R 7.50 Rmt
17.00 Providing and laying boulder apron for bed protection with
stone boulders of minimum size and weight as per Table
1300.1, no fragment weighing less than 25 kg laid dry 0.00 Cum
complete as per drawing and technical specifications Clause
1301
18.00 Providing and laying boulder apron for bed protection with
stone boulders of minimum size and weight as per Table
1300.1, no fragment weighing less than 25 kg laid dry
complete as per drawing and technical specifications Clause Cum
1301 of MoRD and as per direction of the Engineer-in-Charge.

Gravel Backing to Revetments/ underneath pitching in slope


completed as per drawing and Technical specification clause
1302 0.00 Cum

Signature of Tenderer with seal


Sl. Description of work No. or Unit
No. Qty.

20.00 Providing concrete for plain/reinforced concrete in open


foundations complete as per drawings and technical
specifications Clause 802, 803, 1202 & 1203 and as per
direction of the Engineer-in-Charge.
20.01 P.C.C grade M 10,Nominal mix 1:3:6
105.14 Cum
20.02 P.C.C grade M 15,Nominal mix 1:2.5:5
247.23 Cum
20.03 P.C.C grade M 15,Nominal mix 1:2.5:6 drain
14.40 Cum
20.04 P.C.C. grade M 20 ,Nominal mix (1:2:4)
0.00 Cum
29.04 R.C.C. grade M 20

20.05 P.C.C. grade M 20, drain


36.00 Cum
20.06 R.C.C. grade M 25
82.92 Cum
21.00 Providing Plain/reinforced cement concrete in sub structure
complete as per drawings and technical specification Clauses
802, 804, 805, 806, 807, 1202 and 1204 of MoRD as per
direction of the Engineer-in-Charge.
21.01 P.C.C grade M 15,Nominal mix 1:2.5:5 1x6x3 0.00 Cum
21.02 P.C.C grade M 15,Nominal mix 1:2.5:5 39.37 Cum
30.02 P.C.C. grade M 20 ,Nominal mix (1:2:4) Cum
21.03 R.C.C. grade M 20 111.71 Cum
21.04 R.C.C. grade M 25 46.71 Cum
22.00 Providing and laying reinforced cement concrete in
superstructure as per drawing and technical specifications
Clauses 800, 1205.4 and 1205.5 of MoRD as per direction of
the Engineer-in-Charge.
31.01 R.C.C. grade M 20 Cum
22.01 R.C.C. grade M 25 91.78 Cum
22.02 R.C.C. grade M 30 0.00 Cum
32.00 Providing and laying cement concrete wearing course M30
grade including reinforcement complete as per drawing and
technical specifications clauses 800 and 1206.3 of MoRD as Cum
per direction of the Engineer-in-Charge
23.00 Providing and laying cement concrete wearing course M-30
Grade excluding reinforcement etc. complte as per drawing
and technical specification clauses 800,1200 as per directed 13.82 Cum
by the site Engineer.

24.00 Cutting, bending, binding and tying the grills and placing in
position including cost of bindingwires and HYSD reinforcing
bars .
24.01 Raft 107.80 qtl
24.02 Abut ment 144.94 qtl
24.03 Deck slab @ 1 qtl /cum 128.06 qtl

Signature of Tenderer with seal


Sl. Description of work No. or Unit
No. Qty.

25.00 Supplying, fitting and placing HYSD / TMT reinforcement in


foundation complete as per drawings and technical
specifications Clauses 1000 and 1202 of MoRD as per 0.00 MT
direction of the Engineer-in-Charge.
26.00 Providing weepholes in brick masonry/stone masonry,
plain/reinforced concrete abutment, wing wall, return wall with
100 mm dia AC pipe extending through the full width of the
structures with slope of 1(V):20(H) towards drawing face 140.00 Rmt
complete as per drawing and technical specification Clause
614,709 &1204.3.7 of MoRD and as per direction of the
Engineer-in-Charge.
27.00 Back filling in foundation and trenches as per drawing and
technical specification as per clause 1108 of MoRD as per 437.67 Cum
direction of the Engineer-in-Charge.
28.00 Providing and laying pitching on slopes/ appron,
revetments with minimum size of 30 cm H.G. boulder laid
over prepared filter media as per drawing and technical
specification clause 1302 including cost of all materials 183.50 Cum
,labour,T&P required for the work etc.complete as per direction
of the Engineer-in -Charge.

29.00 Gravel backing to revetment and slope and below underneath


pitching using good quality of moorum/ gravel to required
thickness including cost, conveyance, royalty and all other
taxes of materials, labour charges, T&P etc. required for the 0.00 Cum
work complete as per specification and direction of Engineer-in
-Charge.

30.01 i) 5 kilometer stone(Precast)


0 Nos
30.02 ii) Ordinary kilometer stone(Precast)
2.00 Nos
30.03 iii) 200 mm Stone(Precast)
10.00 Nos

Signature of Tenderer with seal


Sl. Description of work No. or Unit
No. Qty.

30.04 iv) Boundary stone / Guard stone


196.00 Nos
31.00 Providing supplying fitting fixing of salitex Board on the
expansion joints for the bridge works complete for finished
item of work as per clause 2600 of MOST (4th Revision)/ IRC 0.00 Sqm
sp- 20 - 2002 and direction of the EIC.

32.00 Providing and fixing of typical PMGSY informatory sign board


with Logo as per MORD specifications and drawing. Three MS
Plates of 1.6 mm thick, top and middle plate duly welded with
MS flat iron 25mm x 5m size on back on edges. The lower
plate will be welded with MS angle iron frame of 25mm x
25mm x 5mm. The angle iron frame of the lower most plate
and flat iron frame of middle plate will be welded to 2 nos.
75mm x 75 mm of 12 SWG sheet tubes posts duly embedded
in cement concrete M-15 grade blocks of 450mm x 450mm x
600mm, 600mm below ground level. The top most diamond
plate will be welded to middle plate by 47mm x 47mm of 12
SWG steel plate tube. All M.S. will be stove enameled on both
2.00 Nos
sides. Lettering and printing arrows, border etc. will be painted
with ready mixed synthetic enamel paint of superior quality in
required shade and colour. All sections of framed posts and
steel tube will be painted with primer and two coats of epoxy
paint as per drawing Clause 1701 and Annexure 1700 of
MoRD as per direction of the Engineer-in-Charge.

33.00 Providing and fixing of typical PMGSY Citizens information


board as per MORD specifications and drawing. Three MS
Plates of 50 X 5 mm thick, back plate duly welded with 75mm
dia steel tubes back on edges as per drawings. The lower &
upper plate will be welded with MS flat iron frame of 50mm x
5mm. The steel tubes duly embeded in cement concrete M-15
grade blocks of 600mm x 600mm x 750mm below ground
level. All M.S. will be stove enameled on both sides. Lettering 2.00 Nos
and printing arrows, border etc. will be painted with ready
mixed synthetic enamel paint of superior quality in required
shade and colour. All sections of framed posts and steel tube
will be painted with primer and two coats of epoxy paint as per
drawing Clause 1701 and Annexure 1700.1

34.01 i) 900mm equilateral triangle ( turn & reduced carriage way )


25.00 Nos
34.02 ii) 600mm equilateral triangle ( turn & reduced carriage way )
0.00 Nos
34.03 600 mm x 450 mm rectangular
35.00 Nos

Total Estimated Cost in Figures Err:509

difference

50.00 Routine Maintenance

Signature of Tenderer with seal


Sl. Description of work No. or Unit
No. Qty.

48.00 Routine Maintenance after completion of construction


22.00 Km
works for 1 st year
48.01 Routine Maintenance after completion of construction
22.00 Km
works for 2 nd year
Routine Maintenance after completion of construction
22.00 Km
works for 3 rd year
Routine Maintenance after completion of construction
22.00 Km
works for 4 th year
Routine Maintenance after completion of construction
22.00 Km
works for 5 th year

Total Maintainance Cost


Add for D.P.R(GST 18% & CESS 1%)

Grand Total
Quoted Rate in Words

Signature of Tenderer with seal


Estimated Rate AMOUNT
PRINT
HELPRs. P

Figure Words

5.12 99302.40

28.44 246705.91

1234376.34
154.97

17.82 750862.45

0.00

323.08 331257.15
411.99 1069983.35
233.14 302746.28
48.56 441405.54

2,445.86 230400.01

Signature of Tenderer with seal


Estimated Rate AMOUNT
PRINT
HELPRs. P

Figure Words

2,154.08 0.00

Signature of Tenderer with seal


Estimated Rate AMOUNT
PRINT
HELPRs. P

Figure Words

2,219.43 0.00

0.00

4,000.34 0.00

0.00

80.14 2559.67

33.52 405241.72

9.62 116301.47

6,025.47 3642276.11

7,078.59 0.00

Signature of Tenderer with seal


Estimated Rate AMOUNT
PRINT
HELPRs. P

Figure Words

6,047.92 203572.99

6,031.16 0.00
14,170.03 106275.23
0.00
2,032.89

2,445.86 0.00

748.60 0.00

Signature of Tenderer with seal


Estimated Rate AMOUNT
PRINT
HELPRs. P

Figure Words

448081.45
4,261.76

1053634.92
4,261.76

61369.34
4,261.76

0.00
4,639.31

0.00
0.00

500103.79
6,031.16

0.00

4,489.61 0.00
4,489.61 176755.95
0.00
5,520.96 616746.44
5,891.38 275186.36

0.00
6,762.60 620671.43
6,041.08 0.00
0.00

91249.59

6,602.72

545.72 58828.62

0.00 0.00

555.94 71193.68

Signature of Tenderer with seal


Estimated Rate AMOUNT
PRINT
HELPRs. P

Figure Words

5,559.43 0.00

0.00 0.00

671.95 294092.36

2,032.89 373035.32

1,365.31 0.00

0.00
2,772.04

1,701.56 3403.12

4477.70
447.77

Signature of Tenderer with seal


Estimated Rate AMOUNT
PRINT
HELPRs. P

Figure Words
53349.24
272.19

0.00
130.00

9,382.78 18765.56

26,893.46 53786.92

51829.00
2,073.16

0.00
1,511.44

52646.30
1,504.18

Err:509 10313061.44

#REF! Err:509

Signature of Tenderer with seal


Estimated Rate AMOUNT
PRINT
HELPRs. P

Figure Words

29.67 652.80

29.67 652.80

0.00 0.00

29.67 652.80

29.67 652.80

2611.20

0.00

10315672.64

Signature of Tenderer with seal


RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)
COST OF MATERIALS AT SITE
Pakage No: OR19RCPL-16 Block:- LAMTAPUT

Name of the Road : ANKADELI DOWN COB To ANKADELI TOP


Sl. Name of the Materials Name Lead Lead Total Cost
Of the Quarry in Km Cost in Basic Cost
Rs

1 45mm size H.G.Metal (C.B) Beheraguda 93 813.13 563.81


2 40mm size H.G.Metal (C.B) Beheraguda 93 813.13 767.62
3 26.5mm size C.B.chips Beheraguda 93 813.13 815.24
4 25mm sizeC.B.Chips Beheraguda 93 813.13 836.19
4 22.4mm sizeC.B.Chips Beheraguda 93 813.13 872.38
5 20mm sizeC.B.Chips Beheraguda 93 813.13 1092.38
6 13.2 mm size C.BChips Beheraguda 93 813.13 1100.00
7 12mm size C.B Beheraguda 93 813.13 1128.57
8 11.2mm size C.BChips Beheraguda 93 813.13 1186.67
9 10mm size C.B.Chips Beheraguda 93 813.13 1194.29

10 6.7mm size C.B. Chips Beheraguda 93 813.13 775.24


11 4.7mm size C.B. Chips Beheraguda 93 813.13 709.52
12 2.36mm below(DUST) Beheraguda 93 813.13 96.19
13 H.G.Stone Boulder for Pitching Beheraguda 93 813.13 221.26
14 LooseStone for Masonary Beheraguda 93 813.13 611.43

15 Moorum Local 10 193.67 47.62


16 Sand (filling) Padua 25 325.67 53.33
17 Sand (Mortar) Padua 25 325.67 56.19
18 Cement jypore 86 783.71 5260.32
19 Bitumen (vg-30) vizag 242 1874.15 31842.08
20 Bitumen Emulsion ( SS-1) vizag 242 1874.15 24704.05

21 vizag 242 1874.15 25664.05


Bitumen Emulsion ( RS-1)
22 Bitumen Emulsion ( MS-1) vizag 242 1874.15 25864.05
23 Steel vizag 242 1874.15 39947.03
24 Hume Pipe 1200mm(NP4) joypore 86 573.09 7882.00
25 Hume Pipe 1000mm(NP4) joypore 86 573.09 5954.00
26 Hume Pipe 900 mm(NP4) joypore 86 343.85 4695.00
27 Epoxy Paint 2633.90
28 Red oxide primer 101.57
29 Binding wire 67.23
30 Paint (Synthetic Enamel) 151.97
OF RATE:- LABOUR COMPONENT
SL PARTICULARS WAGES SL. No. WAGES
1 M./W. Mulia 280.00 7 280.00
2 Higly Skilled Mason 430.00 8 370.00
3 Mason 2nd.class/ SkilledLabour
370.00
(Skilled)/Black smith 2nd class 9 430.00
4 Semiskilled Mazdoor 320.00 10 320.00
5 Mate 320.00 11 280.00
6 Black -Smith 430.00 370.00
Blaster
Royality
Sand, Mourroum 35.00
Aggregate 130.00
Dust 35.00
Laterite Stone 137.20

Certified that the Lead provided in this Estimate is Correct


and Minimum to the best of my Knowledge and belief.

Junior Engineer Assistant Exe. Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
REMISIM AREA (RCPLWE)

KORAPUT

B To ANKADELI TOP
Total Cost Total Cost Unit
Lead+ Basic carraige Per
Cost &Royalit
y

1376.94 943.13 Cum


1580.75 943.13 Cum
1628.37 943.13 Cum
1649.32 943.13 Cum
1685.51 943.13 Cum
1905.51 943.13 Cum
1913.13 943.13 Cum
1941.70 943.13 Cum
1999.80 943.13 Cum
2007.42 943.13 Cum

1588.37 943.13
Cum

1522.65 839.52 Cum


909.32 848.13 Cum
1034.39 943.13 Cum
1424.56 943.13 Cum

241.29 228.67
Cum

379.00 360.67 Cum


381.86 0.00 t
6044.03 1874.15 t
33716.23 0.00 t
26578.20 0.00 t
27538.20
t
27738.20 0.00 t
41821.18 0.00 mt
8455.09 0.00 R.M
6527.09 0.00 R.M
4695.00 0.00 R.M
2633.90 R.M
101.57 litre
67.23 Kg
151.97 litre
PARTICULARS
Bhisti
Surveyor

Painter 1st Class


Bitumen Sprayer
Electrician
White Washer

Executive Engineer
R.&B. Division , Koraput
RATE OF CEMENT, STEEL,BITUMEN & OTHER MATERIAL AND LABOUR.
Rate of Cement (At koraput)
Sl Manufacture Name Unit Ref (Date) Grade Rate (Rs) Lead(km) Cost(Rs) E. bag(Rs) Total Cost(Rs)
1 Konark Cement Ltd Mt 16.09.2019 P.S.C. 5312.50 86.00 62.60 5249.90
2 A.C.C. Ltd Mt 16.09.2019 P.S.C. 5421.88 86.00 62.60 5359.28
3 Ultratech cement Ltd Mt 16.09.2019 P.P.C. 5234.38 86.00 62.60 5171.78
Rate per one Mt. Avg. Min. 15780.96 ./3 . = Rs 5260.32
Rate of Tor steel
Ref Dia. Rate (Rs) VAT Entry Tax @ 2% (Rs)
Sl Manufacture Name Unit Total Cost
(Rs)
1 Mt 8 mm 49000.00 49000.00
Mt 10 mm 47500.00 47500.00
Mt 12 mm 47000.00 47000.00
S.A.I.L. TMT - Mt 16 mm 47800.00
MONTH OF 47800.00
EQR 500 / IS Mt SEP-2019 20 mm 46600.00 46600.00
1786 Fe 500D Mt 25 mm 46400.00 46400.00
28 mm 46400.00 46400.00
Mt 32 mm 46400.00 46400.00
Average Rate per one Mt. Rs. 377100.00 ./ 8 = Rs 39947.03
Rate of Bitumen
Rate (Rs) VAT Entry Tax @ 2% (Rs)
Sl Grade of Bitumen Unit Ref (Date) Quarry Total Cost(Rs)
(Rs)
1 Bitumen (VG-30)Bulk. Mt 16.08.2019 vizag 32530.00 Drum(6.41 xRs.107.32) 31842.08
2 Emulsion Bulk (R.S) Mt 16.08.2019 vizag 26660.00 995.95 25664.05
3 Emulsion Bulk (S.S) Mt 16.08.2019 vizag 25700.00 995.95 24704.05
4 Emulsion Bulk (M.S) Mt 16.08.2019 vizag 26860.00 995.95 25864.05
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. (Rs.) (Rs.)
Spe.

36 Earthwork in stoney earth not requiring Blasting


a. Excavation in ordinary rock using Hydraulic Excavator of 0.9 cum bucket capacity including cutting and loading
in tippers,transporting to embankment site with a lift upto 1000m,trimming bottom and side slopes in accordance
with requirements of lines,grades and cross-section as per Techinal Specification clause 302.3.5.

Unit = Cum
Talking output = 240 Cum
a) Labour
Mate day 0.08 370.00 29.60
Mazdoor (Unskilled) day 2.00 280.00 560.00
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @60 cum per hour Hour 6.00 730.43 4,382.58
Tipper 6.05 cum with 10t capacity Hour 10.000 506.09 5,060.90
Total 10,033.08
c) Overhead charges @ 15% on (a+b+c) 15.0% 1,504.96
Cost for 240 cum = a+b+c+d 11,538.04
Rate per Cum 48.08
Labour welfare Cess 1% 0.48
GST 12% 0.00

48.56
37 a. Excavation in Hard Rock (blasting prohibited by mechanical means) as per technical specificaation
clause 302 (B) PAGE NO/3-8

Unit = Cum
Talking output = 36 Cum
a) Labour
Mate day 0.40 370.00 148.00
Mazdoor (Unskilled) day 10.00 280.00 2,800.00
b) Machinery
Hydraulic excavator 0.9 cum bucket capacity @60 cum per hour Hour 6.00 730.43 4,382.58
Tipper 6.05 cum with 10t capacity Hour 6.500 506.09 3,289.59
Credit for excavated rock found suitable for use @ 50% of excavated Cum 18.000 188.57 3,394.26
quantity Total 7,225.91
c) Overhead charges @ 15% on (a+b) 15.0% 1,083.89
Rate Cost for 100 sqm = a+b+c+d 8,309.80
Rate per sqm = (a+b+c+d)/360 230.83
Labour welfare Cess 1% 2.31
233.14

38 Cutting D.I.Rock
a. Cutting in disintegrated rock not requiring blasting to be removed by pick axes and crow bars and depositing
materials within 50m initial lead and 1.5m initial lift including rough dressing as per direction and specification of
the department including stacking the useful materials separately as ordered.

Unit = Cum
Talking output = 100 Cum
a) Labour
Mate day 55.00 370.00 20,350.00
Mazdoor (Unskilled) day 54.00 280.00 15,120.00
Total 35,470.00
c) Overhead charges @ 15% on (a+b+c) 15.0% 5,320.50
Rate Cost for 100 sqm = a+b+c+d 40,790.50
Rate per sqm = (a+b+c+d)/360 407.91
Ref. to
Sr. Rate Amount
MORD Description Unit Quantity
No. (Rs.) (Rs.)
Spe.

Labour welfare Cess 1% 4.08


411.99
BASES AND SURFACE COURSES (BITUMINOUS)
Name of the Road Format - 8
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.

34 507 Surface Dressing using Bituminous(Penetrations grade/modified bitumen) Binder.


Providing and laying surface dressing as wearing course consisting of a layer of Bituminous binder laid on the
prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100
KN Static roller including cleaning the road surface as per Technical Specification clause 506.(First Coat Surface
Dressing)
Case - I By Manual Means
Nominal Chipping 13.2mm size
(II) Bitumen(S-65)
Unit = sqm
Taking output = 900 sqm
a) Labour
Mate day 2.60 370.00 962.00
Bitumen Sprayer day 1.00 370.00 370.00
Mazdoor (Unskilled) day 58.00 280.00 16,240.00
Mazdoor (Semi-Skilled) day 6.00 370.00 2,220.00
b)  Machinery
Bitumen boiler oil fired1000 litre capacity fitted with spray set hour 2.25 111.30 250.43
Three wheel 80-100 kN static roller hour 2.25 294.78 663.26
Add 0.50% of (a) labour for sundries 98.96
c) Material
Bitumen(S-65) @ 1.0kg per Sqm t 0.90 6,044.03 5,439.63
Crushed stone Chipping, 13.2 mm nominal size @ 0.01 cum per cum 9.00 1,913.13 17,218.17
Sqm
e) Overheads @ 15% 15.0% 6,519.37
f) Carriage and Royalty t 0.90 0.00 0.00
Crushed stone chipping, 13.2 mm cum 9.00 130.00 1,170.00
Cost of 900 sqm = a+b+c+d+e+f 51,151.82
Rate per sqm = (a+b+c+d+e+f)/900 56.84
Labour welfare Cess 1% 0.57
GST 12% 0.00
57.41
35 507 Providing and laying surface dressing as wearing course consisting of a layer of Bituminous binder laid on the
prepared surface, followed by a cover of crushed stone aggregates of specified size and rolling with three wheel 80-100
KN Static roller including cleaning the road surface as per Technical Specification clause 506.(Second Coat Surface
Dressing)
Case - II By Manual Means
Nominal Chipping 9.5mm size
(II) Bitumen(S-65)
Unit = sqm
Taking output = 1000 sqm
a) Labour
Mate day 2.60 370.00 962.00
Bitumen Sprayer day 1.00 370.00 370.00
Mazdoor (Unskilled) day 58.00 280.00 16,240.00
Mazdoor (Semi-Skilled) day 6.00 370.00 2,220.00
b)  Machinery
Bitumen boiler oil fired1000 litre capacity fitted with spray set hour 2.00 111.30 222.60
Three wheel 80-100 kN static roller hour 2.00 294.78 589.56
c) Material
Bitumen(S-65) @ 0.7kg per Sqm t 0.70 6,044.03 4,230.82
Crushed stone Chipping, 9.5 mm nominal size @ 0.008 cum per cum 8.00 2,214.40 17,715.20
Sqm
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.

e) Overheads @ 15% 15.0% 6,382.53


f) Carriage and Royalty 0.00 0.00
Crushed stone chipping, 9.5 mm cum 8.00 130.00 1,040.00
Cost of 1000 sqm = a+b+c+d+e+f 49,972.71
Rate per sqm = (a+b+c+d+e+f)/1000 49.97
Labour welfare Cess 1% 0.50
GST 12% 0.00
50.47
Add for Precoating of Chips with 1% of Bitumen by weight of cum 0.008 501.42 4.01
Chips Crushed stone Chipping,9.5mm Size
Total 54.48
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. (Rs.)
Spe.
ANALYSIS OF RATES Dist:- KORAPUT

Pakage No: OR19RCPL-16 Block:- LAMTAPUT


Name of the Road : ANKADELI DOWN COB To ANKADELI TOP

2 201.1 a. Clearing and grubbing road land


Clearing and grubbing road land including uprooting wild vegetation, grass,
bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such
trees cut earlier and disposal of unserviceable materials and stacking of serviceable
material to be used or auctioned, upto a lead of 1000 m including removal and
disposal of top organic soil not exceeding 150 mm in thickness as per Technical
Specification Clause 201 of MoRD by manual means.

By Manual Means Page-2-2

A. In area of light jungle


Unit = Hectare Taking Out Put = 1
hectare
a) Labour

Mate day
6.00 320.000
Mazdoor(Unskilled) day
150.00 280.000
b) Machinery

Tractor with trolley hour 1.00 200.870

c) Overheads @ Rs. 15% on (a )

Cost for 1 hectare = (a+b+c)

Add Cess@1%

Rate Per Sqm = (a+b+c)/10000 Re.


43 301.4 Re-working of scarified bituminous

Re-working of scarified bituminous surface suitably after supplementing base materials with
sand and compacting finished surface as per Technical Specifications and as per Clause -
501.8.3.2 of MoSRT&H Specifications for Road & Bridge works (Latest Revision).

Unit=Sqm

Taking output=100 sqm

(a) Labour

Man mulia for (15mm thick @ 0.30nos per day 0.81 320.000
93sqm of 6mm thick)
(b) Machinery

Smoth Wheeled Roller 8-10ton capacity hour 0.05 641.740

Water tanker 6 KL capacity hour 0.02 506.090

(c) Material

Sand cum 1.5 379.000

Water kl 0.09 10.000

(d) overhead charges@15% on(a+b+c)

(e)
Lead and Royality of Materials.
cum 1.5 35.000

Cost for 100sqm=(a+b+c+d+e)

Machinery

Add Cess@1%

Rate per one sqm(a+b+c+d)/100


11.1 300 Excavation for Structures

Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity
including cutting and loading in tippers, trimming bottom and side slopes, in
accordance with requirements of lines, grades and cross sections, and transporting
to the embankment location within all lifts and lead upto 1000m as per Data Book
Cl.302. 3.5 (iii) Unit-1 cum Data for 360cum

I. Ordinary soil

(i) Upto 3 m depth

Unit = cum

Taking output = 10 cum

a) Labour

Mate day 0.06 320.00

Mazdoor (Unskilled) day 2.00 280.00

b Machinary

Hydraulic excavator 0.9cum hour 3.60 730.43

Tipper 5.5cum capacity hour 15.00 506.09

c)Overheads @ 15% on (a+b)

Rate per cum = (a+b+c)/360

add cess @1%

Total
2 301.5
Construction of Embankment with Material
obtained from borrow pit
Construction of embankment with approaved materials obtained from borrow pits
with a lift upto 1.5m transporting to site, spreading, grading to required slope and
compacting to meet requirement of tables 300.1 and 300.2 with a lead upto 1000 m as
per Technical Specification clause 301.5

Unit = Cum Taking Out Put = 100


Cum
a) Labour

Mate day 0.04 320.000

Mazdoor(Unskilled) day 1.00 280.000

b) Machinery

Hydraulic excavator 0.9 cum bucket hour 1.00 730.430


capacity @ 60cum per hour
Tipper 6.05 Cum hour 4.091 506.090

loading of earth as per item 1.1(ii) Cum 100.00 30.15

unloading of earth as per item 1.1(iv) Cum 100.00 18.35

Dozer D-50 for spreading @ 200 Cum hour 0.50 1592.170


per hour
Tractor Grader for grading @ 200 Cum hour 0.50 251.300
per Hour
Water Tanker 6kl capacity hour 2.00 506.090

Three wheel 80-100kN Static Roller @ hour 1.43 294.780


80 Cum
c) Water kl 0.00 0.000

d) Overheads @ Rs. 15% on (a+b+c)

Cost for 100 cum = (a+b+c+d+e)

Rate per Cum = (a+b+c+d)/100

Royality Cum 1.00 35.000

Rate per Cum Rs.

Add Cess@1%

GST 12%
3 301.5
Construction of Embankment with Material obtained from roadway cutting
Construction of embankment with approaved materials deposited at site from
roadway cutting and excavation from drain and foundation of other structure
graded and compacted to meet requirement of Table 300.1 and 300.2 as per
Technical Specification clause 301.5

Unit = Cum Taking Out Put = 100


Cum
a) Labour

Mate day 0.02 320.000

Mazdoor(Unskilled) day 0.50 280.000

b) Machinery

Dozer D-50 for spreading @ 200 Cum hour 0.50 1592.170


per hour
Motor Grader for grading @ 200 Cum hour 0.50 251.300
per Hour
Water Tanker 6kl capacity hour 2.00 506.090

Three wheel 80-100kN Static Roller @ hour 1.25 294.780


80 Cum
c) Water kl 18.00 10.000

d) Overheads @ Rs. 15% on (a+b+c)

Cost for 100 cum = (a+b+c+d)

Rate per Cum = (a+b+c+d)/100

Add Cess@1%

GST 12%

Rate per Cum Rs.


4 401 (iii) Granural Sub-base
Providing compacted granular materials in shoulder by using moorum having
required P.I. value with sand admixture if required as per approved Drawing &
Technical Specifications and as per Clause - 407 of MoSRT&H Specifications
for Road & Bridge works (Latest Revision).

Unit = Cum Taking Out Put = 2.83 Cum


AR-2006, PAGE-142/8
a) Labour

Mulia day 2.50 280.000

b) Material

Moorum Cum 2.83 241.290

c) Machinery

Smoth Wheeled Roller 8-10ton capacity hour 0.00 294.780

Tipper 6.05 Cum hour 0.00 0.000

loading of earth as per item 1.1(ii) Cum 0.00 0.000

unloading of earth as per item Cum 0.00 0.000


1.1(iv)
Dozer D-50 for spreading @ 200 hour 0.00 0.000
Cum per hour
Tractor Grader for grading @ 200 hour 0.00 0.000
Cum per Hour
Water Tanker 6kl capacity hour 0.00 320.000

Smoth Wheeled Roller 8-10ton capacity hour 0.05327 294.780

d) Water kl 0.00 1592.170

d) Overheads @ Rs. 15% on (a+b+c)

Royality Cum 2.83 35.000

Cost for 2.83 cum = (a+b+c+d)

loading of earth as per item 1.1(ii)

Add cess @1%

Rate per Cum = (a+b+c+d+e)/2.83

Rate per Cum Rs.


5 Construction of granular sub-baseIV by providing coarse graded material,
spreading in uniform layers with motor grader on prepared surface, mixing by
mix in place method with rotavator at OMC, and compacting with vibratory
roller to achieve the desired density, complete as per clause 401.

Unit = Cum Taking Out Put = 300


Cum

a) Labour

Mate day 0.40 320.000

Mazdoor(Skilled) day 2.00 370.000

Mazdoor(Unskilled) day 8.00 280.000

b) Machinery

Motor grader grader 110 HP @ 50 hour 6.00 1343.480


Cum per hour

Vibratory wheel 80-100kN Static hour 6.00 864.350


Roller @ 10 cum per hour
Tractor with Rotavator 25 Cum Per hour 12.00 210.440
hour
Water Tanker 6kl capacity hour 3.00 506.090

c) Materials

cum 288.00 762.380


26.5mm to 4.75mm 75%
96.00 96.190
2.36mm below @ 25percent (dust)
18.00 10.000
Cost of Water

d) Overheads @ Rs. 15% on (a+b+c)

e) Lead and Royality of Material

26.5mm to 4.75mm 75% cum 288.00 943.130

4.75mm to 2.36mm @ 12.5 percent cum 0.00 0.000

2.36mm below @ 25percent (dust) cum 96.00 848.130

Cost for 300 cum = (a+b+c+d)

Add Cess@1%

Rate per Cum = (a+b+c+d)/300 Rs.


59 406 Wet Mix Macadam Sub-base/Base
Providing, laying, spreading and compacting graded stone aggregate to wet mix
macadam specification including premixing the Material with water at OMC in
mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform
layers with paver in sub- base / base course on well prepared surface and
compacting with vibratory roller to achieve the desired density.

Unit = cum
Taking output = 225cum (495t)
a) Labour
Mate Nos 0.48 320.00

Mulia (skilled) Nos 2.00 370.00

Mulia (unskilled) Nos 10.00 280.00

b) Machinery

Wet mix plant of 75t capacity per hour Hour 6.60 900.87

Electric generating set 125KVA Hour 6.00 786.96

Front end loader 1 cum capacity Hour 6.00 452.17

Paver finisher mechanical 100TPH Hour 6.00 642.61

Vibratory roller 8-10tonne capacity Hour 3.90 864.35

Water tanker 6kl capacity Hour 3.00 506.09

Tipper ton.km 2475.00 2.17

Add 10% of cost of carriage to cover cost of loading and unloading

c) Material (Refer Tables 400-11)

Aggregate

45mm to 22.4mm @ 30% cum 89.10 718.10

22.4mm to 2.36mm @ 40% cum 118.80 720.95

2.36mm to 75micron @ 30% cum 89.10 96.19

Cost of water cum 18.00 10.00

d) Overheads @ 15% on (a+b+c)

e) Royality and lead


45mm to 22.4mm @ 30% cum 89.10 943.13
22.4mm to 2.36mm @ 40% cum 118.80 978.13
2.36mm to 75micron @ 30% cum 89.10 848.13

Cost for 225 cum = (a+b+c+d+e)


Add Cess@1%
Cost for 225 cum = (a+b+c+d+e)/225
9 502
Prime Coat

(ii) medium Porosity


Providing and applying Primer coat with bitumen emulsion ( SS-1) on prepared
surface of granular sub-base including cleaning of road surface and spraying primer
at the rate of 1.05kg/sqm using mechanical means As per Data Book 502 (5.1) Data
for 1750sqm Unit-sqm

Unit = Sqm Taking Out Put = 1750 Sqm


a) Labour

Mate day 0.10 320.000

Mazdoor(Unskilled) day 2.00 280.000

b) Machinery

Hydraulic broom @ 1250 sqm per hour hour 1.40 200.000

Air compressor 210 cfm hour 1.40 179.130

Bitumen emulsion pressure hour 1.00 448.700


distrubutor @ 1750 sqm per hour
Water tanker 6 kl capacity 1 trip per hour 0.50 506.090
hour
c) Materials

Bitumen emulsion (SS-1) @ 1.05 Kg t 1.83 26578.200


per Sqm

Water kl 3.00 15.6

d) Overheads @ Rs. 15% on (a+b+c)

Cost for 1750 Sqm = (a+b+c+d+e)

Add Cess@1%

Rate per Sqm = (a+b+c+d+e)/1750 Rs.


13 503
Tack Coat
(i) Providing and applying Tack coat with bitumen (RS-1) using emulsion distrubutor
at the rate of 0.2 - 0.25 kg/sqm on prepared bituminous surface properly cleaned
with hydraulic broom as per Technical Specification Clause 503.

Unit = Sqm Taking Out Put = 1750 Sqm


a) Labour

Mate day 0.04 320.000

Mazdoor(Unskilled) day 1.00 280.000

b) Machinery

Hydraulic broom @ 1250 sqm per hour hour 1.40 200.000

Air compressor 210 cfm hour 1.40 179.130

Bitumen emulsion pressure hour 1.00 448.700


distrubutor @ 1750 sqm per hour

c) Materials

Bitumen emulsion (RS-1) @ 0.275 Kg t 0.48 27538.200


per Sqm

d) Overheads @ Rs. 15% on (a+b+c)

e) Royality of Material

Bitumen emulsion (RS-1) @ 0.275 Kg t 0.48 0.000


per Sqm

Cost for 1750 Sqm = (a+b+c+d+e)

Add Cess@1%

Rate per Sqm = (a+b+c+d+e)/1750 Rs.


14 508 20mm thick Open-Graded Premix Carpet using Bituminous (penetration grade
/Modified Bitumen) Binder

Providing ,laying and rolling of Open Graded Pre-Mix Carpet of 20mm thickness
composed of 13.2mm to 5.6mm aggregates either using penetration grade bitumen
or emulsion to required line, grade and level to serve as wearing coarse on a
previously prepared base, including mixing in a suitable plant, laying and rolling
with three wheel 80-10kN static Roller capacity, finished to required level and
grades to be as per Technical Specification Clause 508.

Case -II By Mechanical Means

(i) Bitumen (S-65)

Unit = Sqm
Taking Out Put=4000 Sqm (80Cum)
a) Labour

Mate day 0.52 320.000

Mazdoor(Unskilled) day 10.00 280.000

Mazdoor(Semi-skilled) day 3.00 370.000

b) Machinery

Mini Hot mix plant 6-8 TPH hour 6.00 891.300

Electric generator set, 125 KVA hour 6.00 786.960

Three wheel 80-100kN Static Roller hour 16.00 294.780

Front end loader 1 cum bucket hour 6.00 452.170


capacity
Tipper 5.5 cum/10 t hour 3.64 506.090

Paver Finisher Mechanical100 TPH hour 6.00 642.610

c) Materials

Bitumen(S-65) @ 14.60 Kg per 10 Sqm t 5.84 31842.080

Crushed stone Chipping,13.2mm to Cum 108.00 1186.670


5.6 mm @ 0.27 cum per 10 sqm
d) Overheads @ Rs. 15% on (a+b+c)

e) Royality of Material
Bitumen(S-65) @ 14.60 Kg per 10 Sqm t 5.84 1874.150

Crushed stone Chipping,13.2mm Cum 108.00 943.130


Cost for 80 cum = (a+b+c+d+e)
Add Cess@1%
Rate per Sqm = (a+b+c+d+e)/80 Rs.
Providing and laying Seal Coat and sealing the voids in a bituminous surface laid to
specified levels,grade and cross fall using Type C as per Technical Specification
Clause 510.

(i) Bitumen (S-65)

Unit = Sqm Taking Out Put=7500


Sqm (67.5Cum)
a. Mate day 0.20 320.00

Mazdoor(Unskilled) day 5.00 280.00

b. Machinery

Hydrulic self paropelled chips hour 6.00 1,478.26


spreader
Tipper 5.5 cum/10 t hour 6.00 506.09

Front end-loader 1 cum bucket 6.00 452.17


capacity @ 45 cum/hour

bitumen pressure distibuter 6.00 601.74

Three wheel 80-100kN Static Roller 15.00 294.78

c. Materials

Bitumen emulsion (seal coat type) @ t 4.88 31,842.08


10 Kg per 10 Sqm

Crushed stone Chipping,6.7mm size cum 67.50 775.24


defined as 100% passing 9.5 mm sieve
and retained on 2.36mm sieve @ 0.09
cum.

d. Overheads @ Rs. 15% on (a+b+c)

e. Lead & Royalty of Material

granite product cum 67.50 943.13

Bitumen emulsion (seal coat type) @ 4.88 1,874.15


10 Kg per 10 Sqm
Cost for 7500 Sqm = (a+b+c+d+e)

Rate per Sqm = (a+b+c+d+e)/7500

Add Cess@1%

Total

CEMENT CONCRETE PAVEMENT


1920.00

42000.00

200.87

6618.13

50739.00

507.39

5.12
259.20

32.09

10.12

568.50

0.90

130.62

52.50

1053.93

10.54

1064.47

10.64
19.20

560.00

2,629.55

7,591.35

10,800.10

1,620.02

34.50

0.35

34.85
12.80

280.00

730.43

2070.41

3015.00

1835.00

796.09

125.65

1012.18

421.54

0.00

1544.87

11843.97

118.44

35.00

153.44

1.53

0.00

154.97
6.40

140.00

796.09

125.65

1012.18

368.48

0.00

367.32

2816.12

28.16

0.28

0.00

28.44
AR-2006, PAGE-142/8

700.00

682.85

0.00

0.00

0.00

0.00

0.00

0.00

0.00

15.70

0.00

209.78

99.05

1707.38

17.07

609.35

609.35
128.00

740.00

2240.00

8060.88

5186.10

2525.28

1518.27

219565.44

9234.24

180.00

37406.73

271621.44

0.00

81420.48

639826.86

6398.27

2154.08
153.60

740.00

2,800.00

5,945.74

4,721.76

2,713.02

3,855.66

3,370.97

1,518.27

5,370.75

537.08

63,982.71

85,648.86

8,570.53

180.00

28,516.34

84,032.88
116,201.84
75,568.38

494,428.39
4944.28
2,219.43
32.00

560.00

280.00

250.78

448.70

253.05

48638.11

46.80

7576.42

58085.86

580.86

33.52
12.80

280.00

280.00

250.78

448.70

13218.34

2173.59

0.00

16664.21

166.64

9.62
166.40

2800.00

1110.00

5347.80

4721.76

4716.48

2713.02

1842.17

3855.66

185957.75

128160.36

51208.71

10945.04

101858.04
505403.19
5054.03
6380.72

64.00

1,400.00

8,869.56

3,036.54

2,713.02

3,610.44

4,421.70

155,389.35

52,328.70

231,833.31

34,775.00

63,661.28

9,145.85

339,415.44

45.26

0.45

45.71
61 504 Bituminous Macadam
Providing and laying bituminous macadam with 60-90 TPH hot mix plant producing an average
using crushed aggregates of specified grading premixed with bituminous binder, transported to
prepared surface with paver finisher to the required grade, level and alignment and rolled as per
the desired compaction

Unit = cum

Taking output = 205 cum(450 tonnes)

a) Labour

Mate

Mulia (Skilled)

Mulia (Unskilled)

b)  Machinery

HMP 60 - 90 TPH @ 75 tonne per hour

Paver finisher Hydrostatic @ 75 cum per hour

Generator 250 KVA

Front end loader 1 cum capacity

Tipper 10 tonne capacity

Add 10% of cost of carriage to cover cost of loading and unloading

Smooth whelled Roller 8 - 10 tonne for initial break down rol

Vibratory Roller 8 tonne for intermediate rolling

Finishing rolling with 6-8 tonne smooth wheeled tandem roll

Grading - II (19mm nominal size)

c) Material
i Bitumen (vg-30) @ 3.3% of weight of mix

ii Crushed stone chipping, 25 mm to 10mm @ 40%

iii Crushed stone chipping, 10 mm to 5mm @ 40%

iv Crushed stone chipping, 5 mm & below @ 20%

d) Overheads @ 15% on (a+b+c)

e) Lead and Royality

Crushed stone chipping, 25 mm to 10mm @ 40%

Crushed stone chipping, 10 mm to 5mm @ 40%

Crushed stone chipping, 5 mm & below @ 20%

Cost of 205 cum = a+b+c+d+e

Add Cess@1%

Rate per cum = (a+b+c+d+e)/205


62 508 Semi Dense Bituminous Concrete
Providing and laying semi dense bituminous concrete with 60-90 TPH HMP producing an avera
using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per c
the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the requi
rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as
No. 508 complete in all respects

Unit = cum

Taking output = 195 cum (450 tonnes)

a) Labour

Mate

Mulia unskilled working with HMP,mechanical broom, paver, rol

Mulia Skilled for checking line & levels

b) Machinery

HMP 60-90TPH

@ 75 tonne per hour

Paver finisher hydrostatic

control @ 75 cum per hour

Generator 250 KVA

Front end loader 1 cum bucket

Tipper 10 tonne capacity

Add 10 per cent of cost of carriage to cover cost of loading and unloading

Smooth wheeled roller 8-10 tonnes for initial break down rolli
Vibratory roller 8 tonnes for intermediate rolling (6.00 x 0.65*

Finish rolling with 6-8 tonnes smooth wheeled tandem roller.(6


c) Material

(A) Grading II (10 mm Nominal Size)

i) 60/70 penetration grade of Bitumen @ 4.5 per cent of mix

ii) 9.5mm - 4.75mm @ 57% (10mm+4.75mm)/2

(iii) 4.75mm below @ 41 % (4.75mm+Dust)/2

Filter media @ 2% weight of aggregate

Total

d) Overhead charges @ 15% on (a+b+c)

e)Lead and Royalty

ii) 9.5mm - 4.75mm @ 57% (10mm+4.75mm)/2

(iii) 4.75mm below @ 41 % (4.75mm+Dust)/2

Filter media @ 2% weight of aggregate

Rate per cum = (a+b+c+d+e)/195

Add Cess@1%

Rate per cum =


lant producing an average output of 75 tonnes per hour
ous binder, transported to site, laid over a previously
lignment and rolled as per clauses 501.6 and 501.7 to achieve

day 0.84 320.00 268.8

day 5 370.00 1850

day 16 280.00 4480

hour 6 7765.22 46591.32

hour 6 642.61 3855.66

hour 6 978.26 5869.56

hour 6 452.17 2713.02

ton.Km 2250 2.17 4882.5

g and unloading 488.25

hour 3.9 294.78 1149.642

hour 3.9 864.35 3370.965

hour 3.9 641.74 2502.786


t 14.85 33716.23 500686.0155

cum 116.04 1015.24 117808.4496

cum 116.04 951.905 110459.0562

cum 58.02 402.855 23373.6471

124552.45071

cum 116.04 943.13 109440.8052

cum 116.04 943.13 109440.8052

cum 58.02 848.13 49208.5026

1222992.24

12229.92

6025.47
HMP producing an average output of 75 tonnes per hour
nous binder @ 4.5 to 5 per cent of mix and filler, transporting
sensor control to the required grade, level and alignment,
the desired compaction as per MoRTH specification clause

each 0.84 320.00 268.8

each 5 370.00 1850

each 16 280.00 4480

6598.8

hour 6 7765.22 46591.32

hour 6 642.61 3855.66

hour 6 978.26 5869.56

hour 6 452.17 2713.02

tonne.km 2250 2.17 4882.5

oading and unloading 90

hour 3.9 294.78 1149.642


hour 3.9 864.35 3370.965

hour 3.9 641.74 2502.786

71025.453

71025.453
0

M.tonne 20.25 33716.23 682753.6575

cum 162.45 951.905 154636.96725

cum 116.85 402.855 47073.60675

cum 5.7 96.19 548.283

885012.5145

962636.7675

144395.515125

cum 162.45 943.13 153211.4685

cum 116.85 848.13 99103.9905

cum 8.62 848.13 7310.8806

259626.3396

7008.505755

70.08505755

7078.59
Ref. to
Sr. Rate Amount
MOR Description Unit Quantity
No. (Rs.) (Rs.)
D Spe.

1. Excavation in Hard Rock


a. Excavation in Hard Rock (blasting prohibited by mechanical means) as per technical specificaation clause 302

Unit = Cum
Talking output = 36 Cum
a) Labour
Mate day 0.40 320.00 128.00
Mazdoor (Unskilled) day 10.00 280.00 2,800.00
b) Machinery

Hydraulic excavator 0.9 cum bucket capacity @60 cum per hour Hour 6.00 730.43 4,382.58
Tipper 6.05 cum with 10t capacity Hour 6.500 506.09 3,289.59
Credit for excavated rock found suitable for use @ 50% of excavated quantity
Cum 18.000 230.00 4,140.00

c) Over head charge @ 15% on (a+b) 6,460.17


Rate Cost for 100 sqm = a+b+c 1,590.03
8,050.20
Rate per sqm = (a+b+c)/360 223.62
Labour welfare Cess 1% 2.24
GST 12% 0.00
225.86
2.0 301.5 Construction of Embankment with Material Obtained from Roadway Cutting
Construction of embankment with approved materials deposited at site from
roadway cutting and excavation from drain and foundation of other structures
graded and compacted to meet requirement as per MORD technical Specification
Clause 301 and direction of the Engineer in Charge (excluding cost of excavation
and transportation to site).

Unit = Cum
Talking output = 100 Cum
a) Labour
Mate day 0.02 320.00 6.40
Mazdoor (Unskilled) day 0.50 280.00 140.00
b) Machinery
Dozer D-50 for spreading @ 200 cum per hour Hour 0.50 1,592.17 796.09
Motor grader for grading @ 200 cum per hour Hour 0.50 251.30 125.65
Water tanker 6 kl capacity Hour 2.00 506.09 1,012.18
Three wheel 80-100 kN Static Roller Hour 1.25 294.78 368.48
c) Over head charge @ 15% on (a+b) 367.32
Rate Cost for 100 sqm = a+b+c 2,816.12
Rate per sqm = (a+b+c)/100 28.16
Labour welfare Cess 1% 0.28
GST 12% 0.00
28.44

8.3 1600 & Earth work in HILL ROAD


300 Excavation in HILL AREAS in Soil By Mechanical Means
(ii). Excavation in Soil in Hilly Area by Mechanical Means including Cutting and
Trimming
Unit = Cumof side slopes and disposing of excavated Earth with a lift upto 1.5m and a
Talking output = 260 Cum
a) Labour
Mate day 0.80 320.00 256.00
Mazdoor (Unskilled) day 20.00 280.00 5,600.00
b) Machinery
Dozer D-50 @ 28.32 cum Per Hour Hour 6.00 1,592.17 9,553.02
Front end Loader Hour 6.00 452.17 2,713.02
c) Over head charge @ 15% on (a+b) 2,718.31
Rate Cost for 100 sqm = a+b+c 20,840.35
Rate per sqm = (a+b+c)/260 80.16
Labour welfare Cess 1% 0.80
GST 12% 0.00
80.96
8.3 1600 & Excavation in HILL AREAS in Ordinary Roack By Mechanical Means not requring
300 Blasting.

(iv). Excavation in Hilly Area in Ordinary Rock not requiring Blastig by Mechanical
Means including Cutting and Trimming of side slopes and disposing of excavated
Earth with a lift upto 1.5m and a lead upto 20m as per Techical Specification Clause
1603.2.
Unit = Cum
Talking output = 170 Cum
a) Labour
Mate day 0.68 320.00 217.60
Mazdoor (Unskilled) day 17.00 280.00 4,760.00
Mazdoor For Disposing of Earth upto 20m day 9.00 280.00 2,520.00
b) Machinery
Dozer D-50 @ 28.32 cum Per Hour Hour 6.00 1,592.17 9,553.02
Hydraulic excavator 0.9 cum bucket capacity @40 cum per hour Hour 4.25 730.43 3,104.33
c) Over head charge @ 15% on (a+b) 3,023.24
Rate Cost for 100 sqm = a+b+c 23,178.19
Rate per sqm = (a+b+c)/170 136.34
Labour welfare Cess 1% 1.36
GST 12% 0.00
137.70
CEMENT CONCRETE PAVEMENT
Ref. to
Sr. Rate
MORD Description Unit Quantity Amount (Rs.)
No. Spe. (Rs.)
6.1 400 Granual Sub-base
Rate as per item No.4.1 of Chapter 4
6.3 1500 & Water Bound Macadam (WBM) - Sub-base
400 (A) By Manual Means
As per item No.4.7 of Chapter 4
6.4 1500 Cement Concrete Pavement
Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub-base, with 43 grade cement or any other type as
per Clause 1501.2.2, M30 (grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm mixed in a concrete
mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying
and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the form work as per drawing), spreading the concrete with shovels,
rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction
joints, applying debonding strips, primer, sealant, dowel bars near approaches to bridges and culverts (expansion joints), admixtures as approved, curing of
concrete slabs for 14 days, curing compound and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
Unit = cum
Taking output = 75 cum (172.50 t)
a) Labour
Mate day 7.00 320.00 2,240.00
Mason (1st class) day 5.00 430.00 2,150.00
Mason (2nd class) day 5.00 370.00 1,850.00
Mazdoor (Unskilled) day 129.00 280.00 36,120.00
Mazdoor (Skilled) day 6.00 370.00 2,220.00
Surveyor day 2.00 370.00 740.00
Mazdoor (Semi-Skilled) day 6.00 320.00 1,920.00
Bhisti day 14.00 280.00 3,920.00
b) Machinery
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh batcher and suitable hour 36.00 153.91 5,540.76
capacity calibrated water tank

Screed Vibrator hour 9.00 92.17 829.53


Needle vibrator hour 9.00 92.17 829.53
Plate vibrator hour 9.00 92.17 829.53
Concrete joint cutting machine for initial & final cuts hour 4.00 260.87 1,043.48
Water tanker 6 kl capacity hour 5.00 506.09 2,530.45
Air Compressor (1 hour initial + 1 hour final) hour 2.00 179.13 358.26
c) Material
(i) Crushed stone coarse aggregates, grading will be as per Clause 1501.2.4.1 (Table 1500.1) of cum 67.50 1,833.77 123,779.48
specifications @ 0.90 cum/ cum of concrete (Rate=(20mm+10mm+6.7mm)/3)

(ii) Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of concrete cum 33.75 379.00 12,791.25
(iii) Cement @ 350 kg/cum of concrete t 26.25 6,044.03 158,655.79
(iv) Polythene sheet 125 micron sqm 412.50 3.00 1,237.50
(vi) Bitumen primer @ 200 ml per joint for 23 joints t 0.005 33,716.23 168.58
Bituminous sealant 800 ml per joint for 23 joints litre 19.00 50.00 950.00
Jute rope 12 mm dia including 5 per cent wastage m 0.00 12.00 0.00
Debonding strips 3.75 m (length) x 10 mm (width) x 5 mm (thick) cut-out of rubber filler board m 60.00 0.00
or similar material including 5 per cent wastage
Plasticizer 0.5 per cent by weight of cement litre 122.00 40.00 4,880.00
Curing compound litre 131.25 20.00 2,625.00
Joint filler board 20 mm thick as per IS:1838 (4 x 3.75 x 0.200 = 3 sqm) sqm 3.00 845.00 2,535.00
d) Formwork @ 3% of (a+b+c) 11,122.32
e) Overhead charges @ 15% on (a+b+c+d) 15.0% 57,279.97
f) Royalty
(i) Cement t 26.25 0.00 0.00
(ii) Bitumen Primer t 0.005 0.00 0.00
(iii) Crushed stone coarse aggregates ,grading will be as per Clause 1501.2.4.1 (Table cum 67.50 130.00 8,775.00
1500.1) of specifications @ 0.90 cum/cum of concrete
(iv) Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of cum 33.75 35.00 1,181.25
concrete
Cost for 75 cum = a+b+c+d+e+f 449,102.68
Rate per cum = (a+b+c+d+e+f)/75 5,988.04
Labour welfare Cess 1% 59.88
6,047.92
6.5 1500 Roller Compacted Concrete Pavement
Construction of Roller Compacted Concrete Pavement(RCCP) with coarse and fine aggregates conforming to
IS:383,the size of coarse aggregate not exeeding 25mm with minimum aggregate cement ratio of 5:1 mm and
with minimum cement content of 310kg per cum,aggregate gradation to be as per Table 602.2 after blending,
mixing in concrete mixture at optimum moisture content ,transporting to site, laying with wheel barrows or
steel pans or with mechanical paver,compacting with 80-100 KN smooth wheel,tandem vibratory roller,to
achieve,the designed flexural strength,finishing and curing as per drawings and Technical Specification clause
Unit
1502.= cum
Taking output = 75 cum
a) Labour
i) Mate day 6.00 320.00 1,920.00
ii) Mazdoor (Unskilled) day 132.00 280.00 36,960.00
iii) Mason (1st class) day 4.00 430.00 1,720.00
iv) Mason (2nd class) day 4.00 370.00 1,480.00
v) Surveyor day 2.00 370.00 740.00
vi) Bhisti day 14.00 280.00 3,920.00
b) Machinery
i) Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh batcher and suitable capacity hour 36.00 153.91 5,540.76
calibrated water tank
ii) Vibratory/80-100kn Static Roller hour 6.00 864.35 5,186.10
iii) Concrete joint cutting machine for days end work and regular joint cutting hour 6.00 260.87 1,565.22
iv) Water tanker 6 kl capacity hour 6.00 506.09 3,036.54
v) Air Compressor (1 hour initial + 1 hour final) hour 2.00 179.13 358.26
c) Material
(i) Crushed stone coarse aggregates, grading will be as per Clause 1501.2.4.1 (Table 1500.1) of cum 67.50 1,833.77 123,779.48
specifications @ 0.90 cum/ cum of concrete (Rate=(20mm+10mm+6.7mm)/3)

(ii) Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of concrete cum 33.75 379.00 12,791.25
(iii) Cement @ 350 kg/cum of concrete t 26.25 6,044.03 158,655.79
iv) Bituminous Primer @ 200ml per joint for 21 joints t 0.004 33,716.23 134.86
v) Jute rope 10 mm dia including 5 per cent wastage m 90.00 12.00 1,080.00
vi) Bituminous sealant @ 800 ml per joint for 21 joints kg 16.80 50.00 840.00
vii) Curing compound @ 0.33 litre per Sqm ltr 131.25 20.00 2,625.00
Vii) Water for Mixing and curing for 14-days day 18.00 0.00 0.00
d) Formwork @ 2% of (a+b+c) 7,246.67
e) Overhead charges @ 15% on (a+b+c+d) 15.0% 55,436.99
f) Royalty
(i) Crushed stone coarse aggregates ,grading will be as per Clause 1501.2.4.1 (Table cum 67.50 130.00 8,775.00
1500.1) of specifications @ 0.90 cum/cum of concrete
(ii) Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of cum 33.75 35.00 1,181.25
concrete
Cost for 75 cum = a+b+c+d+e+f 434,973.17
Rate per cum = (a+b+c+d+e+f)/75 5,799.64
Labour welfare Cess 1% 58.00
5,857.64
33 1500 Cement Concrete Pavement(Cell Filled Concrete)
Construction of Cell filled cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade
cement or any other type concrete strength M30 (Grade), coarse and fine aggregates conforming to IS:383 with minimum
cement content of 350kg per cum, maximum size of coarse aggregate not exceeding 20 mm, mixed in a concrete mixer of not
less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side
formwork spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in
continuous operation including provision of admixtures as approved, curing of concrete slabs for 14-days, and as per
direction of Engineer-in-charge.
Unit = cum
Taking output = 75 cum (172.50 t)
a) Labour
Mate day 7.00 320.00 2,240.00
Mason (1st class) day 5.00 430.00 2,150.00
Mason (2nd class) day 5.00 370.00 1,850.00
Mazdoor (Unskilled) day 129.00 280.00 36,120.00
Mazdoor (Skilled) day 6.00 370.00 2,220.00
Surveyor day 2.00 370.00 740.00
Mazdoor (Semi-Skilled) day 6.00 320.00 1,920.00
Bhisti day 14.00 280.00 3,920.00
b) Machinery 0.00
Concrete mixer 0.28 / 0.4 cum capacity (6 mixers) with weigh batcher and suitable hour 36.00 153.91 5,540.76
capacity calibrated water tank

Screed Vibrator hour 9.00 95.00 855.00


Needle vibrator hour 9.00 106.00 954.00
Plate vibrator hour 9.00 95.00 855.00
Concrete joint cutting machine for initial & final cuts hour 0.00 300.00 0.00
Water tanker 6 kl capacity hour 5.00 506.09 2,530.45
Air Compressor (1 hour initial + 1 hour final) hour 2.00 179.13 358.26
c) Material 0.00
(i) Crushed stone coarse aggregates, grading will be as per Clause 1501.2.4.1 (Table 1500.1) of cum 67.50 1,833.77 123,779.48
specifications @ 0.90 cum/ cum of concrete (Rate=(20mm+10mm+6.7mm)/3)

(ii) Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of concrete cum 33.75 379.00 12,791.25

(iii) Cement @350 kg/cum of concrete t 26.25 6,044.03 158,655.79


(iv) Polythene sheet 125 micron sqm 412.50 30.00 12,375.00
(v) High Quality Plastic Cell sqm 375.00 55.00 20,625.00
(vi) Edge Stone(450mmx350mmx100mm) No =100/0.45=222.22 say 223, for t 446.00 50.00 22,300.00
both sides=446
Rod 6mm dia for corner of cell to retain the shape.length=300mm, No of kg 4,400.09 45.56 6,682.27
Cells=16667, Assuming the rod can be used 30 times
Plasticizer 0.5 per cent by weight of cement m 122.00 40.00 4,880.00
Water for Curing m 18.00 10.00 180.00

d) Formwork @ 3% of (a+b+c) 0.00


e) Overhead charges @ 15% on (a+b+c+d) 15.0% 63,678.34
f) Royalty
(i) Crushed stone coarse aggregates ,grading will be as per Clause 1501.2.4.1 (Table cum 67.50 130.00 8,775.00
1500.1) of specifications @ 0.90 cum/cum of concrete
(ii) Sand as per IS:383 and conforming to Clause 1500.2.4.2 @ 0.45 cum/cum of cum 33.75 35.00 1,181.25
concrete
Cost for 75 cum = a+b+c+d+e+f 498,156.85
Rate per cum = (a+b+c+d+e+f)/75 6,642.09
Labour welfare Cess 1%
66.42
6,708.51
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)

ANALYSIS OF RATES FOR MAINTANCE OF THE ROAD

Name of the Road :ANKADELI DOWN COB To ANKADELI TOP


Block:- LAMTAPUT
Sl. Reference Description Unit Quan
No to MORD tity
Specificati
1 1900
on
Maintence of bituminous surface Road
(i) Repair to potholes by removal of loosed materials, trimming the sides cleaning of
surface providing tack coat 20mm thick premix carpet and sealcoat type C as per
drawing and Technical specifications Clausees 1904.2, 503 and 508.1

Unit = Sqm Taking Out Put=200 Sqm


a) Labour

Mate day 0.64

Mazdoor(Unskilled) day 16.00

b) Machinery

Air compressor 210 cfm with tractor hour 2.50

Bitumen pressure distributor hour 0.06

Mini Hot mix plant 6/10 t capacity hour 2.00

Three wheeled 80-100kN Static Roller hour 4.00

c) Materials

Bitumen for tack coat @ 3 Kg/ per 10 Sqm 200 x t 0.064


3 / 10 = 60 Kg
Bitumen for Pre mix carpet @ 14.6 Kg/ per 10 t 0.43
Sqm 200 x 14.6 / 10 = 292 Kg
Bitumen for seal coat @ 6.8 Kg/ per 10 Sqm 200 t 0.20
x 6.8 / 10 = 136 Kg
Crushed stone aggregate @ 0.27 Cum, per 10 Cum 5.40
Sqm Rs.(1057+817)/2
Crushed sand passing 2.36 mm sieve and Cum 1.20
retained on 180 micron sieve @ 0.06 per 10 Sqm

d) Overheads @ Rs. 15% on (a+b+c)

e) Royalty of gr.product
(200*0.27)/100 Crushed stone aggregate @ 0.27 Cum, per 10 Cum 5.40
Sqm Rs.(1057+817)/2
Crushed sand passing 2.36 mm sieve and Cum 1.80
retained on 180 micron sieve @ 0.06 per 10 Sqm
Cost for 200 Sqm = (a+b+c+d+e)

Add Cess@1%

Rate per Sqm = (a+b+c+d+e)/200


2 1900 Maintenance of Earthen shoulder (filling with
fresh selected soil)
Making up loss of material/irregularities on shoulders to the design level by
adding fresh approved selected soil and compacting it with appropriate
equipment at OMC upto a lead of 1000 m as per technical specification Clause
1903

Unit = sqm

Taking output = 100 sqm

Assuming average thickness of filling to be 150 mm

Quality of fresh material = 15 cum

a. Labour

Mate day 0.20

Mazdoor (Unskilled) day 5.00

b. Machinery

Hydraulic Excavator 0.9 hour 0.25


cum bucket capacity @
60 cum 5.5
Tipper percum
hour hour 0.68

Add 10% cost of


transportation to cover
cost
Plateofcompactor
loading and
@ 25 sqm hour 4.00
unloading
c. Overheads Charges @ 15% on (a+b)

Royality of earth cum 15.00

Cost for 100 sqm = a+b+c

Add Cess@1%

Rate per sqm = (a+b+c)/100

3 1903 Stripping of excess soil from shoulder surface to achive the approaved level and
comacting with plate compactor at OMC as per drawing and Technical
specifications Clausees 1903.

Unit = Sqm Taking Out Put=100 Sqm


a) Labour

Mate day 0.10

Mazdoor(Unskilled) day 2.50

b) Machinery

Plate Compactor hour


4.00
c) Overheads @ Rs. 15% on (a+b)

Cost for 100 Sqm = (a+b+c+d)

Add Cess@1%

GST 12%

Rate per Sqm = (a+b+c+d)/100


4 1900
Restoration of Rain Cuts
Restoration of Rain Cuts with soil, moorum gravel or a mixture of these, clearing
the loose soil, benching for 300mm width laying fresh material in layers not
exceeding 250 mm and compaction with plate compactor or power rammer to
restore the original allignment, level and slopes as per drawings and Technical
specification clause 1902

Unit = Cum Taking Out Put=10 Cum


a) Labour

Mate day 0.24

Mazdoor(Unskilled) day 6.00

b) Machinery

Plate Compactor hour 3.00

c) Overheads @ Rs. 15% on (a+b)

d) Royality of earth cum 7.50

Cost for 10 Cum = (a+b+c+d)

Add Cess@1%

Rate per Cum = (a+b+c+d)/10

5 1900

White washing of Parapet walls of CD Work


and Tree Trunks
White washing two coats on parapet walls and tree trunks including preparation
of surface by cleaning scraping etc. as per technical specification clause 1915

Unit = Sqm Taking Out Put= 9 Sqm


a) Labour

Mate day 0.01

Mazdoor(Unskilled) day 0.143

White washer day 0.143


b) Materials

Lime Qntl 0.045

Fevical Adhesive (Local Market Rate) kg 0.10

Indiglo ( Local Market Rate) kg 0.013

c) Overheads @ Rs. 15% on (a+b)

Cost for 9 Cum = (a+b+c+d)

Add Cess@1%

Rate per Cum = (a+b+c+d)/9


6 1900
Maintenance of Road signs
Maintenance of Road signs by way of cleaning /regulatory / cautionary /
informatory and place identification sign board as per drawings and Technical
Specification Clause 1910

Unit = 1.0 km Taking Out Put= one km.


a) Labour

Mate day 0.09

Mazdoor(Unskilled) day 2.00

Painter day 0.125

b) Materials

Synthetic Enamel Paint, Engineering Grade LS


tape, welding machine etc. (Rs.300)

c) Overheads @ Rs. 15% on (a+b)

Rate for one k.m = (a+b+c+d)

Add Cess@1%

Rate for 1 k.m


7 1900
Cutting of Branches of Trees shrubs and
Trimming of Grass and Weeds
(i) Cutting of branches of trees shrubs from the roadway or within R.O.W. including
disposal of wood and leaves to suitable location as per Technical Specification
Clause 1914

Unit = one tree Taking Out Put= 10


trees of 900mm average girth

a) Labour

Mate day 0.12

Mazdoor(Skilled) day 1.00

Mazdoor(Unskilled) day 2.00

b) Overheads @ Rs. 15% on (a)

Rate for 10 tree = (a+b)

Add Cess@1%

Rate for one tree = (a+b+c)/10

8 1900
Maintenance of WBM Road
Maintenance of WmM road including filling potholes,ruts and rectifying
corrugated surface,damagaed edges and ravelling as per technical specification
Clause 1906

OutPut - taking affected area @ 5 % in 1 k.m= 1000 x 3.75


x 0.05 = 187.5 Sqm

Qnty 187.5 x 0.075 =14.06 Cum

a) Rate a s per item No. 4.7 of chapter 4 of data book 14.06


b) Add 50 % f for extra effort involvec on maintenance to be
done in small reaches

Cost of 187.5 sqm = a+b


Add Cess@1%

Cost per Sqm ST

9.A 1900
Maintenance of Culverts
Maintenance of Hume pipe culverts by way of clearing,cleaning,erosion repairs to
cracks,parapet walls and protection work as per drawing and Technical
Specification clause 1908 of MORD.

OutPut -one HP culvert


a) Labour

Mate day 0.10

Mason(second class) day 1.40

Mazdoor(Unskilled) day 1.00

b) Materials

Cement,sand,brick,boulder etc. LS

b) Overheads @ Rs. 15% on (a)

Rate for one HPC = (a+b+c)

Add Cess@1%
B 1900 Maintenance of Slab type culverts by way of clearing,cleaning,erosion repairs to
cracks,parapet walls and protection work as per drawing and Technical
Specification clause 1908 of MORD.

OutPut -one Salb culvert


a) Labour

Mate day 0.20

Mason(second class) day 1.00

Mazdoor(Unskilled) day 4.00

b) Materials

Cement,sand,brick,boulder etc. LS

b) Overheads @ Rs. 15% on (a)

Rate for one HPC = (a+b+c)

Add Cess@1%

10 1900
Maintenance of RCC railing
Repair of RCC railing to bring it to the original shape,cleaning and repainting as
per drawings and Technical Specification clause 1911.

OutPut -one metre ,Unit-RM

It is assumed that damaged is to the extent of 10%


a) Labour

Mate day 0.012

Mason(First class) day 0.10

Mazdoor(Unskilled) day 0.20

b) Materials

M-30 grade cement concrete cum 0.10


Steel reinforcement HYSD bars t 0.013

c) Overheads @ Rs. 15% on (a)

Rate for one metre = (a+b+c)

Add Cess@1%

11 1900

Cutting of shrubs from the roadway or within R.O.W and disposal of shrubs to
suitable location as per technical specification clause 1914.

Unit-Each,Taking output-100 shrubs


a) Labour

Mate day 0.08

Mazdoor(Unskilled) day 2.00

b) Overheads @ Rs. 15% on (a)

Rate for hundred shrub = (a+b+c)

Add Cess@1%

Rate for one shrub = (a+b+c)/100


12 1900 Trimming of grass and weeds from the shoulders/berms and disposing of the
same to suitable locations as per technical specification clause 1914

Unit-Sqm,Taking output-1500 Sqm


a) Labour

Mate day 0.40

Mazdoor(Unskilled) day 10.00

b) Overheads @ Rs. 15% on (a)

Rate for 1500sqm = (a+b+c)

Add Cess@1%

GST 12%

Rate for one sqm = (a+b+c)/1500


13 1900 Maintenance of 200 m stone/km stone by way of refixing of tilted stones repairing
with cement mortar,cleaning ,repairing and lettering on 200m/km stone and 5th
km stone as per drawing and technical specification clause 1912.

Assuming 1 km stone,4 200m stone and 1/5th 5th km stone


i) ,Unit-one km

Painting 2 coats with synthetic enamel paint

200 m stone 4Nos=0.76 sqm


One km stone=0.815sqm

5th km stone1x1/5=0.32 sqm

Total=1.895 sqm
sqm 1.895
Printing letters and figures of any shade with synthetic enamel paint of any
approved colour to give an even

ii)
200 m stone 4Nos=40percm
height per letter
One km stone=120percm height per letter

5th km stone1x1/5=60cmp/h
per cm
height per
Total=220 per cm height per letter
letter 220
a) Labour

Mate day 0.024

Mason(First class) day 0.10

Mazdoor(Unskilled) day 0.50

b) Materials

cement,sand,aggts. etc LS

c) Overheads @ Rs. 15% on (a+b)

Rate for one km = (I+ii+a+b+c+d)

Add Cess@1%

GST 12%
1900 (I) Maintenance of Drains
14
Maintenance of drains include erosion, repair, clearing, cleaning ,
regrading , deepening of side drains as well as catch water drains as
per drawing and technical specification Clause 1907

Unit = Running meter

Taking output one km= 1000m

a) Labour

Mate day 0.32

Mazdoor (Unskilled) day 8.00

b) Overhead charges @ 15% on a+b

Cost for 1000 meter = a+b

Add Cess@1%

GST 0.12

Rate per meter = (a+b)/1000

Junior Engineer Assistant Engineer Executive Engineer


R&B. Section, Nandapur R.&B . Sub-Division, pottangi R.&B. Division , Koraput
EMISIM AREA (RCPLWE)

THE ROAD

Dist:- KORAPUT
Rate (Rs.) Amount (Rs.)

ng the sides cleaning of


d sealcoat type C as per
3 and 508.1

320.00 204.80

280.00 4480.00

179.13 447.83

448.70 26.92

891.30 1782.60

294.78 1179.12

26578.20 1701.00

6044.03 2598.93

6044.03 1208.81

1186.67 6408.02

1588.37 1906.04

3291.61
130.00 702.00

130.00 234.00

26171.68

261.72

Rs. 132.17
the design level by
th appropriate
l specification Clause

320.00 64.00

280.00 1,400.00

730.43 182.61

506.09 344.14

34.41

100.00 400.00

363.77

35.00 525.00

3,313.93

33.14

33.47

e approaved level and


and Technical
320.00 32.00

280.00 700.00

100.00 400.00

169.80

1301.80

13.02

0.00

13.15
ixture of these, clearing
terial in layers not
or power rammer to
awings and Technical

320.00 76.80

280.00 1680.00

100.00 300.00

308.52

35.00 262.50

2627.82

26.28

265.41

s including preparation
ication clause 1915

320.00 3.20

280.00 40.04

370.00 52.91
151.97 6.84

67.23 6.72

129.00 1.68

16.71

128.10

1.28

14.38
y / cautionary /
awings and Technical

320.00 28.80

280.00 560.00

430.00 53.75

300.00

141.38

1083.93

10.84

1094.77
within R.O.W. including
chnical Specification

320.00 38.40

370.00 370.00

280.00 560.00

145.26

1113.66

11.14

112.48

s and rectifying
technical specification

4000.34 56244.78
28122.39

84367.17

843.67

454.46
eaning,erosion repairs to
and Technical

320.00 32.00

370.00 518.00

280.00 280.00

200.00

154.50

1184.50

11.85

1196.35
ning,erosion repairs to
and Technical

320.00 64.00

370.00 370.00

280.00 1120.00

350.00

285.60

2189.60

21.90

2211.50

ning and repainting as

320.00 3.84

430.00 43.00

280.00 56.00

5981.27 598.13
39947.03 519.31

15.43

1235.71

12.36

1248.07

nd disposal of shrubs to
14.

320.00 25.60

280.00 560.00

87.84

673.44

6.73

6.80
and disposing of the
ause 1914

320.00 128.00

280.00 2800.00

439.20

3367.20

33.67

0.00

2.27
of tilted stones repairing
00m/km stone and 5th
e 1912.

150.37
79.35
enamel paint of any

0.39 85.80

320.00 7.68

430.00 43.00

280.00 140.00

100.00

43.60

570.45

5.70

0.00

576.15
r, clearing, cleaning ,
s catch water drains as
se 1907

320.00 102.40

280.00 2,240.00

351.36

2,693.76

26.94

0.00

2.72

Executive Engineer
R.&B. Division , Koraput
RURAL CONNECTIVITY PROJECT FOR LEFT WING EXTREMISIM AREA (RCPLWE)

Pakage No: OR19RCPL-16 Block:- LAMTAPUT Dist:- KORAPUT


Name of the Road : ANKADELI DOWN COB To ANKADELI TOP
Usage Rates of Plant and Machinery
Sr. Description of Machine Output of Usage Rates in Govt. of Orissa Accepted Rate by
No Machine Rupees Rate GOO
Machine Activity Unit Output Unit
cum/ho Rates Unit Rates Unit Rates
1 Dozer D-50- Spreading ur
cum/ho 200 per 1831 1592.17
A 15 Cutting ur
cum/ho 100 hour 1831 1592.17
Cleaning ur
cum/ho 150
2 Dozer D-80- Spreading ur
cum/ho 300 per 2519 2190.43
A 12 Cutting ur
cum/ho 150 hour 2519 2190.43
Cleaning ur
cum/ho 250 2519 2190.43
3 Tractor Cleaning ur
cum/ho 200 per 242 251.30
with Spreading ur
cum/ho 200 hour 242
ordinary GSB ur
cum/ho 50 242
Grader 3.35 WMM ur 50 242
4 meter blade
Hydraulic cum/ho per 840 730.43
Excavater of Soil Ordinarry cum/ho
ur 60 hour
1 cum Soil
Soil Marshy ur
cum/ho 60
bucket Unsuitable ur
cum/ho 60
5 Front end Soil Loading ur 60 per 520 452.17
loader 1 Aggregate cum/ho hour
cum bucket loading ur 45
6 capacity
Tipper-5 Transportatio Capacity 5.5 Per km 24.00 0 20.87
cum n of soil, GSB, in cum Per
WMM, tonne.k
Hotmix etc. m 2.50 2.17
Per
Cum/ho hour 582 506.09
7 Vibratory Earth/Soil ur
Cum/ho 100 Per 994 864.35
Roller 8 GSB ur
Cum/ho 60 Hour
tonne WMM ur 60
8 Smooth Soil cum/ho per 339.00 per
Wheeled Compaction ur 70 hour hour 294.78
Roller 8
tonne
BM cum/ho
Compaction ur 25
9 Truck
mounted
Water Water Capacity Per
Tanker Transport in KL 6 Hour 582 506.09
10 Tractor Puling Capacity per
in H.P. 50 hour 234 200.87
11 Rotavator
cum/ho per
Scarifying ur 25 hour 11 210.44
12 Riper cum/ho per
Scarifying ur 60 hour 18 15.65
13 Air
Compressor General capacity 170/ per
Purpose in cfm 250 hour 206 179.13
14 Wetmix
Plant 60 cum/ho per
TPH Wet Mix ur 25 hour 777 675.65
Sr. Description of Machine Output of Usage Rates in Govt. of Orissa Accepted Rate by
No Machine Rupees Rate GOO
Machine Activity Unit Output Unit Rates Unit Rates Unit Rates
15 Mechanical
broom Surface sqm./ho per
Hydraulic Dressing ur 1250 hour 234 200.00
16 Bitumen Applying
Pressure bitumen tack sqm/ho per
Distributer coat ur 1750 hour 692 601.74
17 Emulsion applying
Pressure emulsion tack sqm/ho per
Distributer coat ur 1750 hour 516 448.70
18 Hotmix
Plant- 120
TPH DBM/BM/SD cum/ho per
capacity C/ Premix ur 40 hour 15100 13130.43
19 Hotmix
Plant- 100
TPH DBM/BM/SD cum/ho per
capacity C/ Premix ur 30 hour 11167 9710.43
20 Hotmix
Plant-60 to
90TPH DBM/BM/SD cum/ho per
capacity C/ Premix ur 25 hour 8930 7765.22
21 Hotmix
Plant-40 to
60 TPH DBM/BM/SD cum/ho per
capacity C/ Premix ur 17 hour 7150 6217.39
22 Paver
Finisher
Hydrostatic
with sensor Paving of
controll 100 DBM/BM/ cum/ho per
TPH SDC/ Premix ur 40 hour 1725 1500.00
23 Paver Paving of cum/ho per
Finisher WMM ur 40 hour 739 642.61
Mechanical1 cum/ho per
00 TPH Paving of DLC ur 30 hour 739 642.61
24 Hydraulic
Chip Surface sqm/ho per
Spreader Dressing ur 1500 hour 1700 1478.26
25 Tandem Rolling of
road Roller Asphalt cum/ho per
Surface ur 30 hour 738 641.74
26 Pneumatic Rolling of
Road Roller Asphalt cum/ho per
Surface ur 25 hour 802 697.39
27 Pot-hole
Repair Repair of pot- cum/ho per
Machine holes ur 4 hour 585 508.70
28 Bitumen
Boiler Oil Bitumen capacity per
Fired Spraying in litre 1500 hour 128 111.30
29 GSB Plant Producing cum/ho per
GSB ur 40 hour 670 582.61
Sr. Description of Machine Output of Usage Rates in Govt. of Orissa Accepted Rate by
No Machine Rupees Rate GOO
Machine Activity Unit Output Unit Rates Unit Rates Unit Rates
30 Mastic Mastic capacity per
Cooker Wearing Coat in tonne 1 hour 1586 1379.13
31(a) Concrete Concrete cum/ho per
Mixture Mixing ur 7.5 hour 177 153.91
31 (b) Batching
and Mixing
Plant 15-20
Cum Concrete cum/ho per
capacity Mixing ur
cum/ho 13 hour
per 1200 1043.48
32 Transit Transportatio ur 4.5 hour 600 521.74
Mixer n of Concrete cum/ho per
Mix to Site ur 3 hour 550 478.26
33(a) Concrete
Pump of 45
cum Pumping of cum/ho per
capacity Concrete ur 33 hour 165 143.48
33(b) Concrete
Pump of 30
cum Pumping of cum/ho per
capacity Concrete ur 22 hour 165 143.48
34(a) Cranes 80 Lifting per
tonnes purpose hour 825 717.39
34(b) Cranes 35 Lifting per
tonnes purpose hour 550 478.26
34© Cranes 3 Lifting per
tonnes purpose hour 230 200.00
35 Cocrete For Pouring capacity per
Bucket Cocrete in cum 1 hour 10 8.70
36 Kerb
Casting Rm/hou per
Machine Kerb Making r 80 hour 200 173.91
37(a) Concrete
Mixing . Concrete cum/ho per
4/0.28 cum Mixing ur 2.5 hour 177 153.91
37(b) Concrete
Mixing 01 Concrete cum/ho per
cum Mixing ur 7.5 hour 161 153.91
38 Piling Rig 0.75m dia to
with 1.2met. Dia
Bantonite Boring per
Pump attachment rm/hour 2.5 hour 3525 3065.22
39 Concrete
Paver
Finisher Paving of
with 40 HP Concrete cum/ho per
Motor Surface ur 20 hour 1850 1608.70
40 Integrated per
Stone Crushing of TPH 100 hour
per 5590 4860.87
Crusher Spalls TPH 200 hour 11760 10226.09
Sr. Description of Machine Output of Usage Rates in Govt. of Orissa Accepted Rate by
No Machine Rupees Rate GOO
Machine Activity Unit Output Unit Rates Unit Rates Unit Rates
41 Prestressng
Jack with Stressing of
Pump & Steel per
access wire/stands hour 83 72.17
42(a) Generater Generation of per
100kva Electricity KVA 100 hour 450 391.30
42(b) Generater Generation of per
33kva Electricity KVA 50 hour 240 208.70
43 Pneumatic Pneumatic
Sinking Sinking of cum/ho per
Plant Wells ur 1.75 hour 2690 2339.13
44(a) Truck 5.5
cum per 10 Material Capacity
tonnes Transport / cum 4.5 per km 20 17.39
44(b) Truck 5.5
cum per 10 Material Capacity Per
tonnes Transport / cum hour 557 484.35
45 Road
Making sqm/ho per
Machine Road Making ur 100 hour 60 52.17
46 Mobile Mixing and
Slurry Seal laying slurry sqm/ho per
equipment seal ur 2700 hour 650 565.22
47 Concrete
joint cutting
machine for
initial and per
final cut hour hour 200 260.87
48 Mixal 6-10T For admixing
Capacity bitumen & per
chips hour hour 1024.9 891.30
49 Road
Making per
Machine Road Making hour hour 100.00 52.17
50 Cost of
water
kl 15.60
51 Needle/ For Concrete
Screed/ compaction
Plate per
Vibrator hour hour 106.00 92.17
MOTOR GRADER per hour 1,343.48
Generator 250kva 978.26

Junior Engineer Assistant Engineer Executive Engineer


62 MORD spe
&
IRC,SP:100- (A) 25mm thick SDBC using CRRI-BitChem Tailor made Cold mix® binder
2014

Providing and laying CRRI-BitChem Cold Mix® semi dense bituminous concrete (C
producing an average output of 75tonnes per hour using crushed aggregates of speci
BitChem tailor made cold mix® binder @ 7% of mix as per IRC :SP:100-2014 to requir
wearing course on a previously prepared base, including mixing in a suitable plant,
with mechanical control to the required grade, level and alignment, rolling with smo
to achieve the desired compaction as per Technical Specification of MORD & IRC:SP

The above bituminous mix should SATISFY the testing be as per IS :14982 2
m thick SDBC using CRRI-BitChem Tailor made Cold mix® binder

g and laying CRRI-BitChem Cold Mix® semi dense bituminous concrete (CMSDBC) with 60-90 batch type HMP
ng an average output of 75tonnes per hour using crushed aggregates of specified grading premixed with CRRI
tailor made cold mix® binder @ 7% of mix as per IRC :SP:100-2014 to required line, grade and level to serve as
course on a previously prepared base, including mixing in a suitable plant, Laying with a hydrostatic paver finish
chanical control to the required grade, level and alignment, rolling with smooth wheeled ,vibratory and tandem r
e the desired compaction as per Technical Specification of MORD & IRC:SP:100-2014

The above bituminous mix should SATISFY the testing be as per IS :14982 2017

Unit = cum

Taking output = 195 cum (450 tonnes)

a) Labour

Mate each 0.35

Mulia (Skilled) each 1

Mulia (Unskilled) each 8

b) Machinery

DRUM mix plant 60-90TPH hour 6

@ 75 tonne per hour

Paver finisher hydrostatic with sensor hour 6

Generator 250 KVA hour 6

Front end loader 1 cum bucket hour 5

Tipper 10 tonne capacity tonne.km 33300


Add 10 per cent of cost of carriage to cover cost of loading and unloading

Smooth wheeled roller 8-10 tonnes for initial break down rollihour 3.9

Vibratory roller 8 tonnes for intermediate rolling (6.00 x 0.65*hour 3.9

Finish rolling with 6-8 tonnes smooth wheeled tandem roller.(6


hour 3.9
c) Material

CRRI-BITHC CHEM tailor made cold mix binder cold MT 31 .05

Bitumen content 65% of mix of grade VG 30 M.tonne 20.5

Nano tac @ 0.3% by weight of bitumen kg 61.5


Chemicals, Emulsifiers, Water, Solvents, HDPE Drums,
Overhead Charges, Operating Margin & Etc M.tonne 11

Grading II (10 mm Nominal Size)

ii) 9.5mm - 4.75mm @ 57% (10mm+4.75mm)/2 cum 167.4

(iii) 4.75mm below @ 41 % (4.75mm+quarry rubbie)/2 cum 111.6


Total

d) Overhead charges @ 15% on (a+b+c)

e)Lead and Royalty

ii) 9.5mm - 4.75mm @ 57% (10mm+4.75mm)/2 cum 167.4

(iii) 4.75mm below @ 41 % (4.75mm+quarry rubbie)/2 cum 111.6

Rate per cum = (a+b+c+d+e)/205

Add Cess@1%

Rate per cum =


SDBC) with 60-90 batch type HMP
ed grading premixed with CRRI
d line, grade and level to serve as
ying with a hydrostatic paver finisher
th wheeled ,vibratory and tandem rollers
100-2014

320.00 112

370.00 370

280.00 2240

2722

7765.22 46591.32

1500.00 9000

978.26 5869.56

452.17 2260.85

2.17 72261
90

294.78 1149.642

864.35 3370.965

641.74 2502.786

143096.123

143096.123
32530.00 666865

1200 73800

77550 853050

1765.035 295466.859

766.325 85521.87
1974703.729

2120521.852

318078.2778

130.00 21762

130.00 14508

36270

12072.53721854

120.7253721854

12193.26259072
ROAD WAY
WITH
SL NO CHAINAGE TYPE
CULVERT
LOCATION

1 0/322 SLAB 7.5


NO OF
DIA/SIZE CONDITION provision made
SPAN

BOTH SIDE
1 SPAN 1x2x2 GOOD WIDENING
DETAILED ESTIMATE FOR MAINTENANCE OF ROAD
PART-H

Name of the Road :- ANKADELI DOWN COB To ANKADELI TOP


Factors considered :-
1). Average annual rainfall-1893.54 mm 2). Traffic intensity- sp 72
Length of road in K.M.:
Sl.
Items of works Quantity Unit Rate
No.
1 2 3 4 5
1. Restoration of rain cuts with soil, clearing the loose soil, benching for
300mm width laying fresh material in layers not exceeding 250 mm and
compaction with plate compactor or power rammer to restore the original
alignment, level and slopes as per drawings and MORD technical
specifications Clause 1902 by manual means as per direction of the
Engineer in charge
Quantity /Km 2x1000x1.75x0.30=1050.00Cum
1st year Take 10% of the area 222.50 Cum 265.41
2nd year 20% excess over 1st year 267.00 Cum 265.41
3rd year 25% excess over 1st year 333.75 Cum 265.41
4th year 30% excess over 1st year 433.88 Cum 265.41

5th year 35% excess over 1st year 585.74 Cum 265.41

2. Making up loss of material/irregularities on shoulders to the design


level by adding fresh approved selected soil and compacting it with
appropriate equipment at OMC upto a lead of 1000 m as per MORD
technical specification Clause 1903 as per direction of the Engineer in
charge.

1st year Take 10% of the area 222.50 Sqm 33.47


2nd year 20% excess over 1st year 267.00 Sqm 33.47
3rd year 30% excess over 1st year 347.10 Sqm 33.47
4th year 40% excess over 1st year 485.94 Sqm 33.47
5th year 50% excess over 1st year 728.91 Sqm 33.47

3. Stripping excess soil from the shoulder surface to achieve the approved
level and compacting with plate compactor at OMC as per drawings and
Technical Specification Clause 1903.

1st year Take 10% of the area 222.50 Sqm 13.15


2nd year 20% excess over 1st year 267.00 Sqm 13.15
3rd year 40% excess over 1st year 311.50 Sqm 13.15
4th year 60% excess over 1st year 356.00 Sqm 13.15
5th year 80% excess over 1st year 400.50 Sqm 13.15

4. Repair to pot holes and removal of loose material, trimming of sides,


cleaning of surface by providing tack coat, 20 mm thick pre-mix carpet
and seal coat type C as per MORD technical specification Clause
503,508,510,1904 as per direction of the Engineer in charge.

1st year 2% 6.12 CUM 7078.59


2nd year 2 times that of 1st year 12.24 CUM 7078.59
3rd year 3 times that of 1st year 18.36 CUM 7078.59
4th year 4 times that of 1st year 24.48 CUM 7078.59
5th year 5 times of 1st year 30.60 CUM 7078.59
5. Maintenance of Hume pipe Culvert by way of Clearing, Cleaning, Erosion
repair, repairs to cracks, parapet wall and protection work as per drawing
and technical specification Clause 1908 of MORD and as per direction of
the Engineer in charge.
1st year Take10% of the culverts 1.00 Nos. 1196.35
2nd year 20% excess over 1st year 2.00 Nos. 1196.35
3rd year 40% excess over 1st year 3.00 Nos. 1196.35
4th year 60% excess over 1st year 4.00 Nos. 1196.35
5th year 80% excess over 1st year 5.00 Nos. 1196.35

6. Maintenance of road signs by way of cleaning and repainting of


mandatory / requlatory / cautionary / informatory and place
identifications sign board as perdrawings and technical specification
Clause 1910 of MORD as per direction of the Engineer in charge.
1st year No maintainance 0.00 Km 0.00
2nd year 100% maintainance 13.000 Km 1094.77
3rd year No maintainance 0.00 Km 0.00
4th year Same as 2nd year 13.000 Km 1094.77
5th year No maintainance 0.00 Km 0.00

7. Maintenance of 200 metre, km stones & 5th Km stones by way of refiting


of tilted stones repairing with cement mortar, cleaning, repairing and
lettering on 200 metre km stone and 5th km stone as per drawing and
technical specification Clause 1912 of MORD as per direction of the
Engineer in charge.
1st year Take100% for maintainance 10.000 Km 576.15
2nd year Same as 1st year 10.000 Km 576.15
3rd year Same as 1st year 10.000 Km 576.15
4th year Same as 1st year 10.000 Km 576.15
5th year Same as 1st year 10.000 Km 576.15

8. Cutting of branches of trees from the road way or with in R.O.W


including disposal of wood and leaves to suitable location as per technical
specification Clause 1914 of MORD as per direction of the Engineer in
charge.
1st year 10 Nos per Km 0.00 Nos. 112.48
2nd year Same as 1st year 0.00 Nos. 112.48
3rd year Same as 1st year 0.00 Nos. 112.48
4th year Same as 1st year 0.00 Nos. 112.48
5th year Same as 1st year 0.00 Nos. 112.48

9. Cutting of shurb from the road way or with in R.O.W including disposal
of wood and leaves to suitable location as per technical specification
Clause 1914 of MORD as per direction of the Engineer in charge.
1st year 1000.00 Nos. 6.80
2nd year Same as 1st year 1000.00 Nos. 6.80
3rd year Same as 1st year 1000.00 Nos. 6.80
4th year Same as 1st year 1000.00 Nos. 6.80
5th year Same as 1st year 1000.00 Nos. 6.80

10 Triming of grass and weeds from the shoulder/berms and disposal the
same to suitable location as per technical specification Clause 1914 of
MORD as per direction of the Engineer in charge
1st year Take 5% of the area 133.50 Sqm 2.27
2nd year 10% excess over 1st year 133.50 Sqm 2.27
3rd year 20% excess over 1st year 267.00 Sqm 2.27
4th year 30% excess over 1st year 400.50 Sqm 2.27
5th year 40% excess over 1st year 534.00 Sqm 2.27
11 White washing two coats on parapet walls and tree trunks including
preparation of surface by cleaning scraping etc. as per MORD technical
specifications Clause 1915 as per direction of the Engineer in charge.
1st year Take 20 Sqm / Km 264.00 Sqm 14.38
2nd year Same as 1st year 264.00 Sqm 14.38
3rd year Same as 1st year 264.00 Sqm 14.38
4th year Same as 1st year 264.00 Sqm 14.38
5th year Same as 1st year 264.00 Sqm 14.38

13 6th year Tack coat for renewal as per MoRD Guideline


Considering 35% of the Total Area 867.75
6th year For Renewal Tack Coat 0.00 Sqm 9.62

14 6th year Renewal OGPCcoat of 20 mm as per the MoRTH 5th Revision


guideline
Considering 35% of the Total Area
6th year For Renewal OGPC 867.75 Cum. 6380.72

Total

Cost of
YEAR Maintain- Total
ance

For the 1st year 130605.00 130605.00


For the 2nd year 203240.00 203240.00
For the 3rd year 254810.00 254810.00
For the 4th year 345670.00 345670.00
For the 5th year 425281.00 425281
For the 6th year (Renewal) 6210643.64 6210643.64
7570249.64 7570249.64

, Junior Engineer , , Assistant Executive Engineer , Executive Engineer


Kalimela R&B Section Malkangiri R&B Sub-Divn Malkangiri R&B Division
PART-H

To ANKADELI TOP

2225.000
Amount

59053.73
70864.47
88580.59
115156.09

155461.25

7447.08
8936.49
11617.44
16264.41
24396.62

2925.88
3511.05
4096.23
4681.40
5266.58

43320.97
86641.94
129962.91
173283.88
216604.85
1196.35
2392.70
3589.05
4785.40
5981.75

0.00
14232.01
0.00
14232.01
0.00

5761.50
5761.50
5761.50
5761.50
5761.50

0.00
0.00
0.00
0.00
0.00

6800.00
6800.00
6800.00
6800.00
6800.00

303.05
303.05
606.09
909.14
1212.18
3796.32
3796.32
3796.32
3796.32
3796.32

8347.76

5536869.78

6904823.28

% of Costn.
Cost

0.12
0.17
0.21
0.28
0.35
0.00
1.13

neer
ivision
BASIC RATES
(B) USAGE RATES OF PLANT & MACHINERY
Description of Output of Machine
Sr. No.
Machine Activity Unit Output
Supplying
PM-001 Air Compressor 210 cfm cfm 210.00
compressed air
BM, DBM, SDBC,
PM-002 Batch mix HMP 100 TPH t/h 50.00
PM
Applying bitumen
PM-003 Bitumen emulsion pressure distributor sqm/h 1750.00
tack coat
Electricity
PM-004 Electric generator set, 125 KVA KVA 125.00
generation
Loading
PM-005 Front end-loader 1 cum bucket capacity @ 45 cum/h 25.00
Aggregates
cum/hour
Loading Soil cum/h 60.00
PM-006 Hydraulic broom with tractor Surface cleaning sqm/h 1250.00
PM-007 Tractor Grader
Paver finisher Hydrostatic with sensor control
PM-008 Laying/spreading t/h 75.00
100TPH

Compaction of Sub-
PM-009 Smooth wheeled 80-100 kN tandem roller cum/h 30.00
base/ Asphalt

Compaction/
PM-010 Three wheel 80-100 kN Static Roller
Rolling
Earth:-
Embankment or
sub-grade cum/h 80/70

Sub-base G-I cum/h 10.00


Sub-base G-II/G-III cum/h 8.00
WMM cum/h 16.00
BUSG cum/h 10.00
BM 50/75 mm cum/h 12.00
Premix 20 mm sqm/h 250.00
Seal Coat sqm/h 500.00
cum/tri
PM-011 Tipper 5.5 cum/10 t Carriage 5.50
p
PM-012 Tractor with Ripper Scarifier cum/h 25.00
Compaction of soil
PM-013 cum/h 100.00
WMM
Vibratory roller 80-100 kN
Compaction of BM cum/h 60.00
PM-014 Water tanker 6 kl capacity (Truck Mounted) Carriage of water litre / h 6000.00
PM-015 Tractor with Trolley pulling 3 to 5
PM-016 Hydraulic excavator 1 cum bucket capacity soil cum / h 60.00
PM-017 Dozer D-50- A 15 spreading cum / h 200.00
PM-018 Motor Grader spreading cum / h 200.00
Usage Rates in Rs.

Unit Rate

per hour 179.13

per hour 6,217.39

per hour 448.70

per hour 786.96

452.17
per hour
452.17
per hour 200.00
per hour 251.30

per hour 1,500.00

per hour 641.74

294.78

294.78

294.78
per hour
294.78
294.78
294.78
294.78
294.78
294.78
per hour 506.09
per hour 215.44
864.35
per hour
864.35
per hour 506.09
per hour 200.87
per hour 730.43
per hour 1,592.17
per hour 1,343.48

Das könnte Ihnen auch gefallen