OPERATION

MANAGEMENT
ASSIGNMENT

SEPTEMBER 24, 2018

SECOND WANCI
 Product Description

Xxxxxx(isi setelah tau gambaran produk)xxxxxxxxxxxxxxxxxxxx

 SUPPLY CHAIN DESIGN


Watch Store

Movement Supplier
(Miyota 2035)

Stoked and checked by


Bamboo watch & Packaging our companies(Wanci) Shipment
Manufacturing ( Vendor )

Rp. 250.000 -
Rp. 300.000
Supplier kaca jam Customer
 VENDOR SELECTION ANALYSIS

We assessed the capability of our vendor by determining 6 factors that is critical for us on
choosing the vendor. Those are the vendor location, prici.ng, quality of product, commitment
& fast response servicing, work duration and track record. Bellow attached the result of the
assessment from our vendor:

No Factor (Criteria) Importance Provider


weight Ina Bamboo Kenzie FSRD’s
Craftsman
1. Location 0.2 3 3 5
2. Pricing 0.2 2 4 4
3. Quality Product 0.2 4 2 4
4. Commitment & Fast Response Servicing 0.2 2 3 3
5. Work Duration (Quantity Product) 0.1 4 3 3
6. Track Record 0.1 2 2 4
Total 2.8 2.9 3.9

 Strategies for Competitive Advantage


1. Differentiation ; Elevate Indonesian Culture and originality
Second Wanci as a company offer a product that will elevate Indonesian culture. Our
product are watches made of bamboo taken from local craftsman not machine and
then combined with the straps from Indonesian fabric culture.
2. Cost Leadership ; Cheaper than other
We as a new brand that appears on the market able to offer a much cheaper price start
from Rp.550.000 compare to other bamboo watches product who mostly have the price
start from Rp.650.000. This is because we use services from craftsman and for the raw
material itself such as machines and glass we get from the other vendors separately to
get a much cheaper price and can suppress our COGS. Then we bring it to Craftsman
to be processed into bamboo watches.
3. Responses : Fast Response
We as a member of Second Wanci will provide our best service to customer with fast
response to facilitate customer in obtaining information of our products through several
media such as Instagram, Whatsapp, and Line@.
 Mapping Activity by Second Wanci
 Flow Charts:

Finished product
in Workshop

Bamboo Gombong Materials


From Garut Waiting to be
processed

Craftmans in
Workshop Second Wanci
Watch Machine supplier from FSRD Company
ABC Street Bandung

Examine material
for Quality and Move materials by
Crystal Watch supplier from
Quantity Operation staff using
ABC Street Bandung
Motorcycle

Indonesian fabric culture


supplier from Pasar Baru
 Time-Function Mapping: Base Line
Customer Order Product Received
Product
Production
Control Wait
Workshop In Making
Warehouse Wait
Transport Move
1 Days 1 Days 7 Days 1Days 1Days
11 Days

 Value Streaming Mapping:

Monthly Forecast Monthly Forecast = 40

Manufacturing
Supplier Customer
Management

Monthly Orders 40 Daily Orders 2

Monthly
Monthly Daily

Production
Supervisor
Ship 1

Daily Communication

Machine Component Assemble


Test Package
Mounting
1 Operator 2 Operators
1 Operator 1 Operator
1 Operator
 Process Chart

 Service Blue Printing

 RAB

- Masal ;

1. Bamboo ; Bambu Tali dan Gombong 15 rb dan 20 rb harga pas. Sama harga
kirim jadi 20 dan 25. 20-30 buah dan 20-40 buah. Sekitar 5 meter dua
duanya. Tali lebih tipis seratnya juga lebih kecil, Gombong lebih tebel
seratnya juga. Garut no 1 dan subang.
2. Mesin ; 25rb
3. Kaca ; 25rb
4. Strap ; Kain cari harga.
5. Ongkos kerja pengrajin bamboo ; 100 rb
6. Biaya pengrajin kain ; 20 rb / strap
7. Treatment ; Rendem pake boraks. Hargaa boraks 1 kg 70 trs bisa dipake
untuk 10 bambu.
8. Finishing Glossy ; Spray using cat dasar and tinner. Pengencer cet 300rb +
Tinner 40rb. 380 rb for 30 produk. 15 rb an dah
9. Packaging + Finishing lucu ; 70 rb
10. Grafier : Untuk nama brand 20 rb.

Hitungan kasarnya untuk cogs / produk


1. Bambu : 25 rb ; 30 = 833.33 -) rp. 1000
2. Mesin ; 25 rb
3. Kaca : 25 rb
4. Strap : 30 rb ( Include bahan 10 rb + pengrajin 20 rb)
5. Ongkos kerja : 100 rb
6. Treatmen : 70,000 : (10 x 30) jd 300 perak -) 1000 dibulatkan
7. Finishing : 15 rb
8. Packaing : 70 rb
9. Grafier : 20 rb
Total = yang bold jumlahkan 1000 + 25.000 + 25.000 + 30.000 + 100.000 + 1000 + 15.000
+ 70.000 + 20.000 = 287.000