Sie sind auf Seite 1von 1

Beaconhouse AC installation project 2019

JOB COMPLETION CARD


School branch name & Code:

Caretaker/ Incharge Name:

Job completion date:

Detail Quantity
Installation
Un installation
AC Kit (Cooper pipe/wire/Insulation)
(AC kit Buy back)
Outdoor bracket
Drain pipe ( white color)
Drain pipe (pprc)
Main Wire 2 Core (Additional)
Main Wire 3 Core (Additional)
Main Wire 4 Core (Additional)
Reducer small
Reducer Large
Lacker
Duct 16*25
Duct 33*33
Duct 60*60
Others

Supervisor : Verified by:

Reliant Solutions Bursar/Incharge

Sig. & Stamp Sig. & Stamp

Das könnte Ihnen auch gefallen